1-Assembly Bill No. 1649 CHAPTER 281An act to amend Sections 20142 and 20395 of the Public Contracts Code, relating to public contracts. [ Approved by Governor September 30, 2023. Filed with Secretary of State September 30, 2023. ] LEGISLATIVE COUNSEL'S DIGESTAB 1649, Kalra. Local Agency Public Construction Act: change orders: County of Santa Clara.Existing law, the Local Agency Public Construction Act, regulates contracting by local agencies, including counties and special districts. The act includes specific provisions for contracting by counties and contracting for county highways. Those provisions include change order authorization for construction contracts, as prescribed, and impose specified caps on the extra cost of any change order, varying with the value of the original contract. The act prohibits a change or alteration cost from exceeding $210,000.The act, until January 1, 2027, authorizes the County of Los Angeles to be subject to a change order cap of $400,000 for construction contracts whose original cost exceeds $25,000,000 and of $750,000 for those contracts whose original cost exceeds $50,000,000, both of which are adjusted annually to reflect the percentage change in the California Consumer Price Index. The act provides a similar authorization for the County of Los Angeles with regard to county highways. The act requires the County of Los Angeles to modify no more than 7 contracts pursuant to these provisions and requires the County of Los Angeles to provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026. This bill would authorize the County of Santa Clara to be subject to a change order of $400,000 for contracts whose original cost exceeds $25,000,000 and of $750,000 for contracts whose original cost exceeds $50,000,000, adjusted annually to reflect the percentage change in the California Consumer Price Index. These change order caps would apply to construction contracting by the county and contracting for county highways. The bill would require the County of Santa Clara to modify no more than 7 contracts pursuant to these provisions and would require the County of Santa Clara provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.This bill would make legislative findings and declarations as to the necessity of a special statute for the County of Santa Clara.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: NO Local Program: NO Bill TextThe people of the State of California do enact as follows:SECTION 1. Section 20142 of the Public Contract Code, as amended by Section 1 of Chapter 95 of the Statutes of 2021, is amended to read:20142. (a) The board of supervisors may, by ordinance, resolution, or board order, authorize the county engineer, or other county officer, to order changes or additions in the work being performed under construction contracts. When so authorized, any change or addition in the work shall be ordered in writing by the county engineer, or other designated officer, and the extra cost to the county for any change or addition to the work so ordered shall not exceed five thousand dollars ($5,000) when the total amount of the original contract does not exceed fifty thousand dollars ($50,000), nor 10 percent of the amount of any original contract that exceeds fifty thousand dollars ($50,000), but does not exceed two hundred fifty thousand dollars ($250,000).(b) For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (c) and (d), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).(c) The County of Los Angeles may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (b) of Section 20395, subdivision (e) of Section 20405, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(d) The County of Santa Clara may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision and subdivision (c) of Section 20395 exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Santa Clara shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(e) This section shall remain in effect only until January 1, 2027, and as of that date is repealed.SEC. 2. Section 20395 of the Public Contract Code, as amended by Section 3 of Chapter 95 of the Statutes of 2021, is amended to read:20395. (a) In any county that has appointed a road commissioner pursuant to Section 2006 of the Streets and Highways Code, or in any county that has abolished the office of road commissioner and complied with Section 2006.1 of the Streets and Highways Code, the board of supervisors may authorize the road commissioner, or a registered civil engineer under the direction of the county director of transportation, to have any work upon county highways done under their supervision and direction. The work may be done in any of the following ways:(1) By letting a contract covering both work and material. In that event, the contract shall be let to the lowest responsible bidder as provided in this article.(2) By purchasing the material and letting a contract for the performance of the work. In that event, the material shall be bought at the lowest possible cost and the contract let to the lowest responsible bidder as provided in this article.(3) By purchasing the material and having the work done by day labor, in which case advertising for bids is not required.(4) (A) By authorizing the county road commissioner or a registered civil engineer under the direction of the county director of transportation to execute changes or additions to the work for any contract pursuant to this section in an amount not to exceed five thousand dollars ($5,000) for contracts of fifty thousand dollars ($50,000) or less, or 10 percent for contracts over fifty thousand dollars ($50,000) but not to exceed two hundred fifty thousand dollars ($250,000). In no event shall any change or addition to the work exceed a net total addition of twenty-five thousand dollars ($25,000).(B) For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (b) and (c), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).(b) The County of Los Angeles may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (c) of Section 20142, subdivision (e) of Section 20405, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(c) The County of Santa Clara may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision and subdivision (d) of Section 20142 exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Santa Clara shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(d) By purchasing the material and letting a contract for the work or by letting a contract covering both work and material without advertising for bids when the estimated cost of emergency work necessitated by the imminence or occurrence of a landslide, flood, storm damage, or other emergency exceeds twenty-five thousand dollars ($25,000) and the public interest and necessity demand immediate action to safeguard life, health, or property.(e) This section shall remain in effect only until January 1, 2027, and as of that date is repealed.SEC. 3. The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique need for flexibility given the contract costs of public contracts within the County of Santa Clara.
1+Enrolled September 07, 2023 Passed IN Senate September 05, 2023 Passed IN Assembly April 20, 2023 Amended IN Assembly March 09, 2023 CALIFORNIA LEGISLATURE 20232024 REGULAR SESSION Assembly Bill No. 1649Introduced by Assembly Member KalraFebruary 17, 2023An act to amend Sections 20142 and 20395 of the Public Contracts Code, relating to public contracts.LEGISLATIVE COUNSEL'S DIGESTAB 1649, Kalra. Local Agency Public Construction Act: change orders: County of Santa Clara.Existing law, the Local Agency Public Construction Act, regulates contracting by local agencies, including counties and special districts. The act includes specific provisions for contracting by counties and contracting for county highways. Those provisions include change order authorization for construction contracts, as prescribed, and impose specified caps on the extra cost of any change order, varying with the value of the original contract. The act prohibits a change or alteration cost from exceeding $210,000.The act, until January 1, 2027, authorizes the County of Los Angeles to be subject to a change order cap of $400,000 for construction contracts whose original cost exceeds $25,000,000 and of $750,000 for those contracts whose original cost exceeds $50,000,000, both of which are adjusted annually to reflect the percentage change in the California Consumer Price Index. The act provides a similar authorization for the County of Los Angeles with regard to county highways. The act requires the County of Los Angeles to modify no more than 7 contracts pursuant to these provisions and requires the County of Los Angeles to provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026. This bill would authorize the County of Santa Clara to be subject to a change order of $400,000 for contracts whose original cost exceeds $25,000,000 and of $750,000 for contracts whose original cost exceeds $50,000,000, adjusted annually to reflect the percentage change in the California Consumer Price Index. These change order caps would apply to construction contracting by the county and contracting for county highways. The bill would require the County of Santa Clara to modify no more than 7 contracts pursuant to these provisions and would require the County of Santa Clara provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.This bill would make legislative findings and declarations as to the necessity of a special statute for the County of Santa Clara.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: NO Local Program: NO Bill TextThe people of the State of California do enact as follows:SECTION 1. Section 20142 of the Public Contract Code, as amended by Section 1 of Chapter 95 of the Statutes of 2021, is amended to read:20142. (a) The board of supervisors may, by ordinance, resolution, or board order, authorize the county engineer, or other county officer, to order changes or additions in the work being performed under construction contracts. When so authorized, any change or addition in the work shall be ordered in writing by the county engineer, or other designated officer, and the extra cost to the county for any change or addition to the work so ordered shall not exceed five thousand dollars ($5,000) when the total amount of the original contract does not exceed fifty thousand dollars ($50,000), nor 10 percent of the amount of any original contract that exceeds fifty thousand dollars ($50,000), but does not exceed two hundred fifty thousand dollars ($250,000).(b) For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (c) and (d), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).(c) The County of Los Angeles may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (b) of Section 20395, subdivision (e) of Section 20405, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(d) The County of Santa Clara may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision and subdivision (c) of Section 20395 exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Santa Clara shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(e) This section shall remain in effect only until January 1, 2027, and as of that date is repealed.SEC. 2. Section 20395 of the Public Contract Code, as amended by Section 3 of Chapter 95 of the Statutes of 2021, is amended to read:20395. (a) In any county that has appointed a road commissioner pursuant to Section 2006 of the Streets and Highways Code, or in any county that has abolished the office of road commissioner and complied with Section 2006.1 of the Streets and Highways Code, the board of supervisors may authorize the road commissioner, or a registered civil engineer under the direction of the county director of transportation, to have any work upon county highways done under their supervision and direction. The work may be done in any of the following ways:(1) By letting a contract covering both work and material. In that event, the contract shall be let to the lowest responsible bidder as provided in this article.(2) By purchasing the material and letting a contract for the performance of the work. In that event, the material shall be bought at the lowest possible cost and the contract let to the lowest responsible bidder as provided in this article.(3) By purchasing the material and having the work done by day labor, in which case advertising for bids is not required.(4) (A) By authorizing the county road commissioner or a registered civil engineer under the direction of the county director of transportation to execute changes or additions to the work for any contract pursuant to this section in an amount not to exceed five thousand dollars ($5,000) for contracts of fifty thousand dollars ($50,000) or less, or 10 percent for contracts over fifty thousand dollars ($50,000) but not to exceed two hundred fifty thousand dollars ($250,000). In no event shall any change or addition to the work exceed a net total addition of twenty-five thousand dollars ($25,000).(B) For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (b) and (c), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).(b) The County of Los Angeles may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (c) of Section 20142, subdivision (e) of Section 20405, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(c) The County of Santa Clara may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision and subdivision (d) of Section 20142 exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Santa Clara shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(d) By purchasing the material and letting a contract for the work or by letting a contract covering both work and material without advertising for bids when the estimated cost of emergency work necessitated by the imminence or occurrence of a landslide, flood, storm damage, or other emergency exceeds twenty-five thousand dollars ($25,000) and the public interest and necessity demand immediate action to safeguard life, health, or property.(e) This section shall remain in effect only until January 1, 2027, and as of that date is repealed.SEC. 3. The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique need for flexibility given the contract costs of public contracts within the County of Santa Clara.
22
3- Assembly Bill No. 1649 CHAPTER 281An act to amend Sections 20142 and 20395 of the Public Contracts Code, relating to public contracts. [ Approved by Governor September 30, 2023. Filed with Secretary of State September 30, 2023. ] LEGISLATIVE COUNSEL'S DIGESTAB 1649, Kalra. Local Agency Public Construction Act: change orders: County of Santa Clara.Existing law, the Local Agency Public Construction Act, regulates contracting by local agencies, including counties and special districts. The act includes specific provisions for contracting by counties and contracting for county highways. Those provisions include change order authorization for construction contracts, as prescribed, and impose specified caps on the extra cost of any change order, varying with the value of the original contract. The act prohibits a change or alteration cost from exceeding $210,000.The act, until January 1, 2027, authorizes the County of Los Angeles to be subject to a change order cap of $400,000 for construction contracts whose original cost exceeds $25,000,000 and of $750,000 for those contracts whose original cost exceeds $50,000,000, both of which are adjusted annually to reflect the percentage change in the California Consumer Price Index. The act provides a similar authorization for the County of Los Angeles with regard to county highways. The act requires the County of Los Angeles to modify no more than 7 contracts pursuant to these provisions and requires the County of Los Angeles to provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026. This bill would authorize the County of Santa Clara to be subject to a change order of $400,000 for contracts whose original cost exceeds $25,000,000 and of $750,000 for contracts whose original cost exceeds $50,000,000, adjusted annually to reflect the percentage change in the California Consumer Price Index. These change order caps would apply to construction contracting by the county and contracting for county highways. The bill would require the County of Santa Clara to modify no more than 7 contracts pursuant to these provisions and would require the County of Santa Clara provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.This bill would make legislative findings and declarations as to the necessity of a special statute for the County of Santa Clara.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: NO Local Program: NO
3+ Enrolled September 07, 2023 Passed IN Senate September 05, 2023 Passed IN Assembly April 20, 2023 Amended IN Assembly March 09, 2023 CALIFORNIA LEGISLATURE 20232024 REGULAR SESSION Assembly Bill No. 1649Introduced by Assembly Member KalraFebruary 17, 2023An act to amend Sections 20142 and 20395 of the Public Contracts Code, relating to public contracts.LEGISLATIVE COUNSEL'S DIGESTAB 1649, Kalra. Local Agency Public Construction Act: change orders: County of Santa Clara.Existing law, the Local Agency Public Construction Act, regulates contracting by local agencies, including counties and special districts. The act includes specific provisions for contracting by counties and contracting for county highways. Those provisions include change order authorization for construction contracts, as prescribed, and impose specified caps on the extra cost of any change order, varying with the value of the original contract. The act prohibits a change or alteration cost from exceeding $210,000.The act, until January 1, 2027, authorizes the County of Los Angeles to be subject to a change order cap of $400,000 for construction contracts whose original cost exceeds $25,000,000 and of $750,000 for those contracts whose original cost exceeds $50,000,000, both of which are adjusted annually to reflect the percentage change in the California Consumer Price Index. The act provides a similar authorization for the County of Los Angeles with regard to county highways. The act requires the County of Los Angeles to modify no more than 7 contracts pursuant to these provisions and requires the County of Los Angeles to provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026. This bill would authorize the County of Santa Clara to be subject to a change order of $400,000 for contracts whose original cost exceeds $25,000,000 and of $750,000 for contracts whose original cost exceeds $50,000,000, adjusted annually to reflect the percentage change in the California Consumer Price Index. These change order caps would apply to construction contracting by the county and contracting for county highways. The bill would require the County of Santa Clara to modify no more than 7 contracts pursuant to these provisions and would require the County of Santa Clara provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.This bill would make legislative findings and declarations as to the necessity of a special statute for the County of Santa Clara.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: NO Local Program: NO
44
5- Assembly Bill No. 1649 CHAPTER 281
5+ Enrolled September 07, 2023 Passed IN Senate September 05, 2023 Passed IN Assembly April 20, 2023 Amended IN Assembly March 09, 2023
66
7- Assembly Bill No. 1649
7+Enrolled September 07, 2023
8+Passed IN Senate September 05, 2023
9+Passed IN Assembly April 20, 2023
10+Amended IN Assembly March 09, 2023
811
9- CHAPTER 281
12+ CALIFORNIA LEGISLATURE 20232024 REGULAR SESSION
13+
14+ Assembly Bill
15+
16+No. 1649
17+
18+Introduced by Assembly Member KalraFebruary 17, 2023
19+
20+Introduced by Assembly Member Kalra
21+February 17, 2023
1022
1123 An act to amend Sections 20142 and 20395 of the Public Contracts Code, relating to public contracts.
12-
13- [ Approved by Governor September 30, 2023. Filed with Secretary of State September 30, 2023. ]
1424
1525 LEGISLATIVE COUNSEL'S DIGEST
1626
1727 ## LEGISLATIVE COUNSEL'S DIGEST
1828
1929 AB 1649, Kalra. Local Agency Public Construction Act: change orders: County of Santa Clara.
2030
2131 Existing law, the Local Agency Public Construction Act, regulates contracting by local agencies, including counties and special districts. The act includes specific provisions for contracting by counties and contracting for county highways. Those provisions include change order authorization for construction contracts, as prescribed, and impose specified caps on the extra cost of any change order, varying with the value of the original contract. The act prohibits a change or alteration cost from exceeding $210,000.The act, until January 1, 2027, authorizes the County of Los Angeles to be subject to a change order cap of $400,000 for construction contracts whose original cost exceeds $25,000,000 and of $750,000 for those contracts whose original cost exceeds $50,000,000, both of which are adjusted annually to reflect the percentage change in the California Consumer Price Index. The act provides a similar authorization for the County of Los Angeles with regard to county highways. The act requires the County of Los Angeles to modify no more than 7 contracts pursuant to these provisions and requires the County of Los Angeles to provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026. This bill would authorize the County of Santa Clara to be subject to a change order of $400,000 for contracts whose original cost exceeds $25,000,000 and of $750,000 for contracts whose original cost exceeds $50,000,000, adjusted annually to reflect the percentage change in the California Consumer Price Index. These change order caps would apply to construction contracting by the county and contracting for county highways. The bill would require the County of Santa Clara to modify no more than 7 contracts pursuant to these provisions and would require the County of Santa Clara provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.This bill would make legislative findings and declarations as to the necessity of a special statute for the County of Santa Clara.
2232
2333 Existing law, the Local Agency Public Construction Act, regulates contracting by local agencies, including counties and special districts. The act includes specific provisions for contracting by counties and contracting for county highways. Those provisions include change order authorization for construction contracts, as prescribed, and impose specified caps on the extra cost of any change order, varying with the value of the original contract. The act prohibits a change or alteration cost from exceeding $210,000.
2434
2535 The act, until January 1, 2027, authorizes the County of Los Angeles to be subject to a change order cap of $400,000 for construction contracts whose original cost exceeds $25,000,000 and of $750,000 for those contracts whose original cost exceeds $50,000,000, both of which are adjusted annually to reflect the percentage change in the California Consumer Price Index. The act provides a similar authorization for the County of Los Angeles with regard to county highways. The act requires the County of Los Angeles to modify no more than 7 contracts pursuant to these provisions and requires the County of Los Angeles to provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.
2636
2737 This bill would authorize the County of Santa Clara to be subject to a change order of $400,000 for contracts whose original cost exceeds $25,000,000 and of $750,000 for contracts whose original cost exceeds $50,000,000, adjusted annually to reflect the percentage change in the California Consumer Price Index. These change order caps would apply to construction contracting by the county and contracting for county highways. The bill would require the County of Santa Clara to modify no more than 7 contracts pursuant to these provisions and would require the County of Santa Clara provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.
2838
2939 This bill would make legislative findings and declarations as to the necessity of a special statute for the County of Santa Clara.
3040
3141 ## Digest Key
3242
3343 ## Bill Text
3444
3545 The people of the State of California do enact as follows:SECTION 1. Section 20142 of the Public Contract Code, as amended by Section 1 of Chapter 95 of the Statutes of 2021, is amended to read:20142. (a) The board of supervisors may, by ordinance, resolution, or board order, authorize the county engineer, or other county officer, to order changes or additions in the work being performed under construction contracts. When so authorized, any change or addition in the work shall be ordered in writing by the county engineer, or other designated officer, and the extra cost to the county for any change or addition to the work so ordered shall not exceed five thousand dollars ($5,000) when the total amount of the original contract does not exceed fifty thousand dollars ($50,000), nor 10 percent of the amount of any original contract that exceeds fifty thousand dollars ($50,000), but does not exceed two hundred fifty thousand dollars ($250,000).(b) For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (c) and (d), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).(c) The County of Los Angeles may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (b) of Section 20395, subdivision (e) of Section 20405, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(d) The County of Santa Clara may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision and subdivision (c) of Section 20395 exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Santa Clara shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(e) This section shall remain in effect only until January 1, 2027, and as of that date is repealed.SEC. 2. Section 20395 of the Public Contract Code, as amended by Section 3 of Chapter 95 of the Statutes of 2021, is amended to read:20395. (a) In any county that has appointed a road commissioner pursuant to Section 2006 of the Streets and Highways Code, or in any county that has abolished the office of road commissioner and complied with Section 2006.1 of the Streets and Highways Code, the board of supervisors may authorize the road commissioner, or a registered civil engineer under the direction of the county director of transportation, to have any work upon county highways done under their supervision and direction. The work may be done in any of the following ways:(1) By letting a contract covering both work and material. In that event, the contract shall be let to the lowest responsible bidder as provided in this article.(2) By purchasing the material and letting a contract for the performance of the work. In that event, the material shall be bought at the lowest possible cost and the contract let to the lowest responsible bidder as provided in this article.(3) By purchasing the material and having the work done by day labor, in which case advertising for bids is not required.(4) (A) By authorizing the county road commissioner or a registered civil engineer under the direction of the county director of transportation to execute changes or additions to the work for any contract pursuant to this section in an amount not to exceed five thousand dollars ($5,000) for contracts of fifty thousand dollars ($50,000) or less, or 10 percent for contracts over fifty thousand dollars ($50,000) but not to exceed two hundred fifty thousand dollars ($250,000). In no event shall any change or addition to the work exceed a net total addition of twenty-five thousand dollars ($25,000).(B) For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (b) and (c), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).(b) The County of Los Angeles may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (c) of Section 20142, subdivision (e) of Section 20405, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(c) The County of Santa Clara may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision and subdivision (d) of Section 20142 exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Santa Clara shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(d) By purchasing the material and letting a contract for the work or by letting a contract covering both work and material without advertising for bids when the estimated cost of emergency work necessitated by the imminence or occurrence of a landslide, flood, storm damage, or other emergency exceeds twenty-five thousand dollars ($25,000) and the public interest and necessity demand immediate action to safeguard life, health, or property.(e) This section shall remain in effect only until January 1, 2027, and as of that date is repealed.SEC. 3. The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique need for flexibility given the contract costs of public contracts within the County of Santa Clara.
3646
3747 The people of the State of California do enact as follows:
3848
3949 ## The people of the State of California do enact as follows:
4050
4151 SECTION 1. Section 20142 of the Public Contract Code, as amended by Section 1 of Chapter 95 of the Statutes of 2021, is amended to read:20142. (a) The board of supervisors may, by ordinance, resolution, or board order, authorize the county engineer, or other county officer, to order changes or additions in the work being performed under construction contracts. When so authorized, any change or addition in the work shall be ordered in writing by the county engineer, or other designated officer, and the extra cost to the county for any change or addition to the work so ordered shall not exceed five thousand dollars ($5,000) when the total amount of the original contract does not exceed fifty thousand dollars ($50,000), nor 10 percent of the amount of any original contract that exceeds fifty thousand dollars ($50,000), but does not exceed two hundred fifty thousand dollars ($250,000).(b) For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (c) and (d), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).(c) The County of Los Angeles may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (b) of Section 20395, subdivision (e) of Section 20405, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(d) The County of Santa Clara may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision and subdivision (c) of Section 20395 exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Santa Clara shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(e) This section shall remain in effect only until January 1, 2027, and as of that date is repealed.
4252
4353 SECTION 1. Section 20142 of the Public Contract Code, as amended by Section 1 of Chapter 95 of the Statutes of 2021, is amended to read:
4454
4555 ### SECTION 1.
4656
4757 20142. (a) The board of supervisors may, by ordinance, resolution, or board order, authorize the county engineer, or other county officer, to order changes or additions in the work being performed under construction contracts. When so authorized, any change or addition in the work shall be ordered in writing by the county engineer, or other designated officer, and the extra cost to the county for any change or addition to the work so ordered shall not exceed five thousand dollars ($5,000) when the total amount of the original contract does not exceed fifty thousand dollars ($50,000), nor 10 percent of the amount of any original contract that exceeds fifty thousand dollars ($50,000), but does not exceed two hundred fifty thousand dollars ($250,000).(b) For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (c) and (d), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).(c) The County of Los Angeles may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (b) of Section 20395, subdivision (e) of Section 20405, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(d) The County of Santa Clara may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision and subdivision (c) of Section 20395 exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Santa Clara shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(e) This section shall remain in effect only until January 1, 2027, and as of that date is repealed.
4858
4959 20142. (a) The board of supervisors may, by ordinance, resolution, or board order, authorize the county engineer, or other county officer, to order changes or additions in the work being performed under construction contracts. When so authorized, any change or addition in the work shall be ordered in writing by the county engineer, or other designated officer, and the extra cost to the county for any change or addition to the work so ordered shall not exceed five thousand dollars ($5,000) when the total amount of the original contract does not exceed fifty thousand dollars ($50,000), nor 10 percent of the amount of any original contract that exceeds fifty thousand dollars ($50,000), but does not exceed two hundred fifty thousand dollars ($250,000).(b) For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (c) and (d), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).(c) The County of Los Angeles may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (b) of Section 20395, subdivision (e) of Section 20405, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(d) The County of Santa Clara may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision and subdivision (c) of Section 20395 exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Santa Clara shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(e) This section shall remain in effect only until January 1, 2027, and as of that date is repealed.
5060
5161 20142. (a) The board of supervisors may, by ordinance, resolution, or board order, authorize the county engineer, or other county officer, to order changes or additions in the work being performed under construction contracts. When so authorized, any change or addition in the work shall be ordered in writing by the county engineer, or other designated officer, and the extra cost to the county for any change or addition to the work so ordered shall not exceed five thousand dollars ($5,000) when the total amount of the original contract does not exceed fifty thousand dollars ($50,000), nor 10 percent of the amount of any original contract that exceeds fifty thousand dollars ($50,000), but does not exceed two hundred fifty thousand dollars ($250,000).(b) For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (c) and (d), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).(c) The County of Los Angeles may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (b) of Section 20395, subdivision (e) of Section 20405, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(d) The County of Santa Clara may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision and subdivision (c) of Section 20395 exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Santa Clara shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(e) This section shall remain in effect only until January 1, 2027, and as of that date is repealed.
5262
5363
5464
5565 20142. (a) The board of supervisors may, by ordinance, resolution, or board order, authorize the county engineer, or other county officer, to order changes or additions in the work being performed under construction contracts. When so authorized, any change or addition in the work shall be ordered in writing by the county engineer, or other designated officer, and the extra cost to the county for any change or addition to the work so ordered shall not exceed five thousand dollars ($5,000) when the total amount of the original contract does not exceed fifty thousand dollars ($50,000), nor 10 percent of the amount of any original contract that exceeds fifty thousand dollars ($50,000), but does not exceed two hundred fifty thousand dollars ($250,000).
5666
5767 (b) For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (c) and (d), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).
5868
5969 (c) The County of Los Angeles may elect to be subject to all of the following provisions:
6070
6171 (1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
6272
6373 (2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
6474
6575 (3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.
6676
6777 (4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
6878
6979 (5) This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (b) of Section 20395, subdivision (e) of Section 20405, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.
7080
7181 (6) If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.
7282
7383 (d) The County of Santa Clara may elect to be subject to all of the following provisions:
7484
7585 (1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
7686
7787 (2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
7888
7989 (3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.
8090
8191 (4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
8292
8393 (5) This subdivision does not apply if the sum of the contracts modified under this subdivision and subdivision (c) of Section 20395 exceeds seven contracts.
8494
8595 (6) If a contract is modified under this subdivision, the County of Santa Clara shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.
8696
8797 (e) This section shall remain in effect only until January 1, 2027, and as of that date is repealed.
8898
8999 SEC. 2. Section 20395 of the Public Contract Code, as amended by Section 3 of Chapter 95 of the Statutes of 2021, is amended to read:20395. (a) In any county that has appointed a road commissioner pursuant to Section 2006 of the Streets and Highways Code, or in any county that has abolished the office of road commissioner and complied with Section 2006.1 of the Streets and Highways Code, the board of supervisors may authorize the road commissioner, or a registered civil engineer under the direction of the county director of transportation, to have any work upon county highways done under their supervision and direction. The work may be done in any of the following ways:(1) By letting a contract covering both work and material. In that event, the contract shall be let to the lowest responsible bidder as provided in this article.(2) By purchasing the material and letting a contract for the performance of the work. In that event, the material shall be bought at the lowest possible cost and the contract let to the lowest responsible bidder as provided in this article.(3) By purchasing the material and having the work done by day labor, in which case advertising for bids is not required.(4) (A) By authorizing the county road commissioner or a registered civil engineer under the direction of the county director of transportation to execute changes or additions to the work for any contract pursuant to this section in an amount not to exceed five thousand dollars ($5,000) for contracts of fifty thousand dollars ($50,000) or less, or 10 percent for contracts over fifty thousand dollars ($50,000) but not to exceed two hundred fifty thousand dollars ($250,000). In no event shall any change or addition to the work exceed a net total addition of twenty-five thousand dollars ($25,000).(B) For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (b) and (c), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).(b) The County of Los Angeles may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (c) of Section 20142, subdivision (e) of Section 20405, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(c) The County of Santa Clara may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision and subdivision (d) of Section 20142 exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Santa Clara shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(d) By purchasing the material and letting a contract for the work or by letting a contract covering both work and material without advertising for bids when the estimated cost of emergency work necessitated by the imminence or occurrence of a landslide, flood, storm damage, or other emergency exceeds twenty-five thousand dollars ($25,000) and the public interest and necessity demand immediate action to safeguard life, health, or property.(e) This section shall remain in effect only until January 1, 2027, and as of that date is repealed.
90100
91101 SEC. 2. Section 20395 of the Public Contract Code, as amended by Section 3 of Chapter 95 of the Statutes of 2021, is amended to read:
92102
93103 ### SEC. 2.
94104
95105 20395. (a) In any county that has appointed a road commissioner pursuant to Section 2006 of the Streets and Highways Code, or in any county that has abolished the office of road commissioner and complied with Section 2006.1 of the Streets and Highways Code, the board of supervisors may authorize the road commissioner, or a registered civil engineer under the direction of the county director of transportation, to have any work upon county highways done under their supervision and direction. The work may be done in any of the following ways:(1) By letting a contract covering both work and material. In that event, the contract shall be let to the lowest responsible bidder as provided in this article.(2) By purchasing the material and letting a contract for the performance of the work. In that event, the material shall be bought at the lowest possible cost and the contract let to the lowest responsible bidder as provided in this article.(3) By purchasing the material and having the work done by day labor, in which case advertising for bids is not required.(4) (A) By authorizing the county road commissioner or a registered civil engineer under the direction of the county director of transportation to execute changes or additions to the work for any contract pursuant to this section in an amount not to exceed five thousand dollars ($5,000) for contracts of fifty thousand dollars ($50,000) or less, or 10 percent for contracts over fifty thousand dollars ($50,000) but not to exceed two hundred fifty thousand dollars ($250,000). In no event shall any change or addition to the work exceed a net total addition of twenty-five thousand dollars ($25,000).(B) For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (b) and (c), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).(b) The County of Los Angeles may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (c) of Section 20142, subdivision (e) of Section 20405, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(c) The County of Santa Clara may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision and subdivision (d) of Section 20142 exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Santa Clara shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(d) By purchasing the material and letting a contract for the work or by letting a contract covering both work and material without advertising for bids when the estimated cost of emergency work necessitated by the imminence or occurrence of a landslide, flood, storm damage, or other emergency exceeds twenty-five thousand dollars ($25,000) and the public interest and necessity demand immediate action to safeguard life, health, or property.(e) This section shall remain in effect only until January 1, 2027, and as of that date is repealed.
96106
97107 20395. (a) In any county that has appointed a road commissioner pursuant to Section 2006 of the Streets and Highways Code, or in any county that has abolished the office of road commissioner and complied with Section 2006.1 of the Streets and Highways Code, the board of supervisors may authorize the road commissioner, or a registered civil engineer under the direction of the county director of transportation, to have any work upon county highways done under their supervision and direction. The work may be done in any of the following ways:(1) By letting a contract covering both work and material. In that event, the contract shall be let to the lowest responsible bidder as provided in this article.(2) By purchasing the material and letting a contract for the performance of the work. In that event, the material shall be bought at the lowest possible cost and the contract let to the lowest responsible bidder as provided in this article.(3) By purchasing the material and having the work done by day labor, in which case advertising for bids is not required.(4) (A) By authorizing the county road commissioner or a registered civil engineer under the direction of the county director of transportation to execute changes or additions to the work for any contract pursuant to this section in an amount not to exceed five thousand dollars ($5,000) for contracts of fifty thousand dollars ($50,000) or less, or 10 percent for contracts over fifty thousand dollars ($50,000) but not to exceed two hundred fifty thousand dollars ($250,000). In no event shall any change or addition to the work exceed a net total addition of twenty-five thousand dollars ($25,000).(B) For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (b) and (c), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).(b) The County of Los Angeles may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (c) of Section 20142, subdivision (e) of Section 20405, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(c) The County of Santa Clara may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision and subdivision (d) of Section 20142 exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Santa Clara shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(d) By purchasing the material and letting a contract for the work or by letting a contract covering both work and material without advertising for bids when the estimated cost of emergency work necessitated by the imminence or occurrence of a landslide, flood, storm damage, or other emergency exceeds twenty-five thousand dollars ($25,000) and the public interest and necessity demand immediate action to safeguard life, health, or property.(e) This section shall remain in effect only until January 1, 2027, and as of that date is repealed.
98108
99109 20395. (a) In any county that has appointed a road commissioner pursuant to Section 2006 of the Streets and Highways Code, or in any county that has abolished the office of road commissioner and complied with Section 2006.1 of the Streets and Highways Code, the board of supervisors may authorize the road commissioner, or a registered civil engineer under the direction of the county director of transportation, to have any work upon county highways done under their supervision and direction. The work may be done in any of the following ways:(1) By letting a contract covering both work and material. In that event, the contract shall be let to the lowest responsible bidder as provided in this article.(2) By purchasing the material and letting a contract for the performance of the work. In that event, the material shall be bought at the lowest possible cost and the contract let to the lowest responsible bidder as provided in this article.(3) By purchasing the material and having the work done by day labor, in which case advertising for bids is not required.(4) (A) By authorizing the county road commissioner or a registered civil engineer under the direction of the county director of transportation to execute changes or additions to the work for any contract pursuant to this section in an amount not to exceed five thousand dollars ($5,000) for contracts of fifty thousand dollars ($50,000) or less, or 10 percent for contracts over fifty thousand dollars ($50,000) but not to exceed two hundred fifty thousand dollars ($250,000). In no event shall any change or addition to the work exceed a net total addition of twenty-five thousand dollars ($25,000).(B) For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (b) and (c), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).(b) The County of Los Angeles may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (c) of Section 20142, subdivision (e) of Section 20405, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(c) The County of Santa Clara may elect to be subject to all of the following provisions:(1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.(3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.(4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.(5) This subdivision does not apply if the sum of the contracts modified under this subdivision and subdivision (d) of Section 20142 exceeds seven contracts.(6) If a contract is modified under this subdivision, the County of Santa Clara shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(d) By purchasing the material and letting a contract for the work or by letting a contract covering both work and material without advertising for bids when the estimated cost of emergency work necessitated by the imminence or occurrence of a landslide, flood, storm damage, or other emergency exceeds twenty-five thousand dollars ($25,000) and the public interest and necessity demand immediate action to safeguard life, health, or property.(e) This section shall remain in effect only until January 1, 2027, and as of that date is repealed.
100110
101111
102112
103113 20395. (a) In any county that has appointed a road commissioner pursuant to Section 2006 of the Streets and Highways Code, or in any county that has abolished the office of road commissioner and complied with Section 2006.1 of the Streets and Highways Code, the board of supervisors may authorize the road commissioner, or a registered civil engineer under the direction of the county director of transportation, to have any work upon county highways done under their supervision and direction. The work may be done in any of the following ways:
104114
105115 (1) By letting a contract covering both work and material. In that event, the contract shall be let to the lowest responsible bidder as provided in this article.
106116
107117 (2) By purchasing the material and letting a contract for the performance of the work. In that event, the material shall be bought at the lowest possible cost and the contract let to the lowest responsible bidder as provided in this article.
108118
109119 (3) By purchasing the material and having the work done by day labor, in which case advertising for bids is not required.
110120
111121 (4) (A) By authorizing the county road commissioner or a registered civil engineer under the direction of the county director of transportation to execute changes or additions to the work for any contract pursuant to this section in an amount not to exceed five thousand dollars ($5,000) for contracts of fifty thousand dollars ($50,000) or less, or 10 percent for contracts over fifty thousand dollars ($50,000) but not to exceed two hundred fifty thousand dollars ($250,000). In no event shall any change or addition to the work exceed a net total addition of twenty-five thousand dollars ($25,000).
112122
113123 (B) For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (b) and (c), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).
114124
115125 (b) The County of Los Angeles may elect to be subject to all of the following provisions:
116126
117127 (1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
118128
119129 (2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
120130
121131 (3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.
122132
123133 (4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
124134
125135 (5) This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (c) of Section 20142, subdivision (e) of Section 20405, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.
126136
127137 (6) If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.
128138
129139 (c) The County of Santa Clara may elect to be subject to all of the following provisions:
130140
131141 (1) For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
132142
133143 (2) For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
134144
135145 (3) If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.
136146
137147 (4) At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
138148
139149 (5) This subdivision does not apply if the sum of the contracts modified under this subdivision and subdivision (d) of Section 20142 exceeds seven contracts.
140150
141151 (6) If a contract is modified under this subdivision, the County of Santa Clara shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.
142152
143153 (d) By purchasing the material and letting a contract for the work or by letting a contract covering both work and material without advertising for bids when the estimated cost of emergency work necessitated by the imminence or occurrence of a landslide, flood, storm damage, or other emergency exceeds twenty-five thousand dollars ($25,000) and the public interest and necessity demand immediate action to safeguard life, health, or property.
144154
145155 (e) This section shall remain in effect only until January 1, 2027, and as of that date is repealed.
146156
147157 SEC. 3. The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique need for flexibility given the contract costs of public contracts within the County of Santa Clara.
148158
149159 SEC. 3. The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique need for flexibility given the contract costs of public contracts within the County of Santa Clara.
150160
151161 SEC. 3. The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique need for flexibility given the contract costs of public contracts within the County of Santa Clara.
152162
153163 ### SEC. 3.