1-Assembly Bill No. 427 CHAPTER 163 An act to amend Sections 31462 and 31468 of the Streets and Highways Code, relating to transportation, and declaring the urgency thereof, to take effect immediately. [ Approved by Governor September 08, 2023. Filed with Secretary of State September 08, 2023. ] LEGISLATIVE COUNSEL'S DIGESTAB 427, Alvarez. Otay Mesa East Toll Facility Act: alternative project delivery method.The Otay Mesa East Toll Facility Act authorizes the San Diego Association of Governments (SANDAG) to carry out a construction project for the State Highway Route 11 corridor, including, among other things, highway improvements and international border crossing facilities, to be operated as a toll facility. Existing law authorizes the use of alternative bidding and building procedures for a project or components of a project after SANDAG commences a comparison of the traditional design-bid-build process of construction with the proposed alternative project delivery method in a public meeting and if the governing board of SANDAG makes written findings that use of an alternative project delivery method on the specific project or project component under consideration will accomplish at least one of 3 specified objectives. Existing law requires the design-bid-build method of project construction for the project or project components if these conditions are not met. This bill would provide that SANDAG is no longer required to use the design-bid-build delivery method for construction of a project if specified conditions for utilizing an alternative delivery method are not met. This bill would authorize SANDAG to use the Construction Manager/General Contractor method (CMGC), as defined, as an additional alternative project delivery method. The bill would impose specified requirements on SANDAG and a construction manager, as defined, if they enter into a CMGC contract for alternative project delivery.This bill would declare that it is to take effect immediately as an urgency statute.Digest Key Vote: 2/3 Appropriation: NO Fiscal Committee: NO Local Program: NO Bill TextThe people of the State of California do enact as follows:SECTION 1. Section 31462 of the Streets and Highways Code is amended to read:31462. For purposes of this chapter, the following definitions shall apply:(a) Best value means a value determined by evaluation of objective criteria that relate to price, features, functions, life-cycle costs, experience, and past performance. A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and meeting the objectives of the project, selection of the best proposal for a stipulated sum established by the procuring agency, or a tradeoff between price and other specified factors.(b) Board means the board of directors of SANDAG.(c) Bonds means any bonds, notes, variable rate and variable maturity securities, and any other evidence of indebtedness issued pursuant to this chapter.(d) Construction Manager/General Contractor method or CMGC means a project delivery method using a best value procurement process in which a construction manager is procured to provide preconstruction services during the design phase of the project and construction services during the construction phase of the project. The execution of the design and the construction of the project may be in sequential phases or concurrent phases.(e) Construction manager means a partnership, corporation, or other legal entity that is able to provide appropriately licensed contracting and engineering services as needed pursuant to a CMGC contract.(f) Corridor means State Route 11 in the County of San Diego, as defined in Section 311.(g) Costs includes the cost of construction or acquisition; the cost of the acquisition of all land, rights-of-way, property, rights, easements, and interests acquired by SANDAG for the construction; the cost of demolishing or removing any buildings or structures on land acquired, including the cost of acquiring any lands to which buildings or structures may be moved; the cost of all machinery and equipment, financing charges, interest before and during construction and, if considered advisable by SANDAG, costs of accounting, consulting, printing, advertising, and travel, cost of traffic estimates and of engineering and legal services, plans, specifications, surveys, estimates of cost and of revenues, and other expenses necessary or incident to determining the feasibility or practicability of constructing, repairing, or improving a project; administrative expenses; and such other expenses as may be necessary or incident to the construction, repair, or improvement of a project, the financing of the project, the placing and maintaining of a project in operation, and any payments to an entity to cover all or a portion of the costs described in this chapter. Any money paid or advanced to SANDAG with its approval for traffic surveys, borings, preparation of plans and specifications, and other engineering services in connection with the construction, repair, or improvement of a project shall be regarded as a part of the cost of a project and may be reimbursed out of the proceeds of the revenue bonds issued for a project as authorized in this chapter. Cost includes the cost to operate, maintain, repair, or improve a project.(h) Department means the Department of Transportation.(i) Design-build means a procurement process in which both the design and construction of a project are procured in a single phase.(j) Design sequencing means a procurement process that enables the sequencing of design activities to permit each construction phase to commence when design for that phase is complete, instead of requiring the design for the entire project to be completed before commencing construction.(k) Entity means the United States or any agency or department of the United States, any State of California agency, department or political subdivision of the state, or any public or private corporation, company, partnership, joint venture, foundation, trust, estate, individual, or other legal business organization.(l) Federal agency means any agency or department of the United States.(m) Project or projects means any property and related facilities, whether or not now in existence, acquired or constructed to facilitate the movement of goods and people along the corridor or at the Otay Mesa East Port of Entry, including property suitable for any of the following purposes:(1) International ports of entry.(2) International border crossing facilities.(3) Transportation facilities, including highway and roadway, public transit, and nonmotorized facilities, and other projects supporting any transportation facility.(4) A bridge or tunnel, overpasses, underpasses, entrance plazas, toll houses, administration, storage and other buildings and facilities, and all equipment therefor, and may include terminal facilities, customs and immigration facilities, and such approaches and approach highways as may be determined by SANDAG to be necessary to facilitate the flow of traffic or to connect a project with the existing highway systems, together with all property, rights, easements, and interests acquired by SANDAG for the construction or operation of a project, including, but not limited to, energy and communication lines.(n) Property means land, improvements to land, buildings, improvements to buildings, machinery and equipment of any kind, operating capital, and any other real or personal property necessary for a project.(o) SANDAG means the San Diego Association of Governments, as referenced in the San Diego Regional Transportation Consolidation Act, Chapter 3 (commencing with Section 132350) of Division 12.7 of the Public Utilities Code.(p) Toll means a toll, fee, or other charge for entrance to or use of the corridor and such toll, fee, or other charge as may be governed by an agreement under Section 31483.(q) Trustee means any financial institution or trust company actually doing business in this state.SEC. 2. Section 31468 of the Streets and Highways Code is amended to read:31468. (a) The Legislature has recognized the merits of alternative project delivery methods in the past by authorizing their use for projects undertaken by school districts, the University of California, specified local government projects, state office buildings, and public transit projects.(b) It is the intent of the Legislature to provide optional, alternative procedures for delivering the project and its components pursuant to this act. SANDAG may enter into an alternative project delivery method contract authorized in this section on a project or any project component, after comparison of the traditional design, bid, and build process of construction with the proposed alternative project delivery method in a public meeting, if the governing board makes written findings that use of an alternative project delivery method on the specific project or project component under consideration will accomplish at least one of the following objectives: reduce comparable project costs, expedite a projects completion, or provide features not achievable through the traditional design-bid-build method.(c) SANDAG may utilize the following alternative project delivery methods if the conditions in this section are met:(1) Design-build.(2) Design sequencing.(3) Construction Manager/General Contractor (CMGC).(d) (1) If a contract for CMGC services is entered into pursuant to this chapter and includes preconstruction services by the construction manager, SANDAG shall enter into a written contract with the construction manager for the preconstruction services, under which SANDAG shall pay the construction manager a fee for preconstruction services in an amount agreed upon by SANDAG and the construction manager. The preconstruction services contract may include fees for services to be performed during the contract period, provided that SANDAG shall not request or obtain a fixed price or a guaranteed maximum price for the construction contract from the construction manager or enter into a construction contract with the construction manager until after SANDAG has entered into a services contract. A preconstruction services contract shall provide for the subsequent negotiation for construction of all or any discrete phase or phases of the project and shall provide for SANDAG to own the design plans and other preconstruction services work products.(2) A contract for construction services may be awarded after the plans have been sufficiently developed and either a fixed price or a guaranteed maximum price has been successfully negotiated. In the event that a fixed price or a guaranteed maximum price is not successfully negotiated, SANDAG may award the contract for construction services utilizing any other procurement method authorized by law.(3) The construction manager shall perform not less than 30 percent of the work covered by the fixed price or guaranteed maximum price agreement reached. Work that is not performed directly by the construction manager shall be bid to subcontractors pursuant to Section 6955 of the Public Contract Code.(e) It is the intent of the Legislature that alternative project delivery methods as authorized in this section shall not be construed to extend, limit, or change in any manner the legal responsibility of public agencies and contractors to comply with existing laws.SEC. 3. This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:In order for state and local governments to meet critical deadlines and stakeholder agreements on a project of regional, statewide, and national significance in partnership with the federal government, while protecting worker and public safety, it is necessary that this act take effect immediately.
1+Enrolled August 25, 2023 Passed IN Senate July 06, 2023 Passed IN Assembly August 24, 2023 Amended IN Senate June 08, 2023 CALIFORNIA LEGISLATURE 20232024 REGULAR SESSION Assembly Bill No. 427Introduced by Assembly Member AlvarezFebruary 06, 2023 An act to amend Sections 31462 and 31468 of the Streets and Highways Code, relating to transportation, and declaring the urgency thereof, to take effect immediately.LEGISLATIVE COUNSEL'S DIGESTAB 427, Alvarez. Otay Mesa East Toll Facility Act: alternative project delivery method.The Otay Mesa East Toll Facility Act authorizes the San Diego Association of Governments (SANDAG) to carry out a construction project for the State Highway Route 11 corridor, including, among other things, highway improvements and international border crossing facilities, to be operated as a toll facility. Existing law authorizes the use of alternative bidding and building procedures for a project or components of a project after SANDAG commences a comparison of the traditional design-bid-build process of construction with the proposed alternative project delivery method in a public meeting and if the governing board of SANDAG makes written findings that use of an alternative project delivery method on the specific project or project component under consideration will accomplish at least one of 3 specified objectives. Existing law requires the design-bid-build method of project construction for the project or project components if these conditions are not met. This bill would provide that SANDAG is no longer required to use the design-bid-build delivery method for construction of a project if specified conditions for utilizing an alternative delivery method are not met. This bill would authorize SANDAG to use the Construction Manager/General Contractor method (CMGC), as defined, as an additional alternative project delivery method. The bill would impose specified requirements on SANDAG and a construction manager, as defined, if they enter into a CMGC contract for alternative project delivery.This bill would declare that it is to take effect immediately as an urgency statute.Digest Key Vote: 2/3 Appropriation: NO Fiscal Committee: NO Local Program: NO Bill TextThe people of the State of California do enact as follows:SECTION 1. Section 31462 of the Streets and Highways Code is amended to read:31462. For purposes of this chapter, the following definitions shall apply:(a) Best value means a value determined by evaluation of objective criteria that relate to price, features, functions, life-cycle costs, experience, and past performance. A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and meeting the objectives of the project, selection of the best proposal for a stipulated sum established by the procuring agency, or a tradeoff between price and other specified factors.(b) Board means the board of directors of SANDAG.(c) Bonds means any bonds, notes, variable rate and variable maturity securities, and any other evidence of indebtedness issued pursuant to this chapter.(d) Construction Manager/General Contractor method or CMGC means a project delivery method using a best value procurement process in which a construction manager is procured to provide preconstruction services during the design phase of the project and construction services during the construction phase of the project. The execution of the design and the construction of the project may be in sequential phases or concurrent phases.(e) Construction manager means a partnership, corporation, or other legal entity that is able to provide appropriately licensed contracting and engineering services as needed pursuant to a CMGC contract.(f) Corridor means State Route 11 in the County of San Diego, as defined in Section 311.(g) Costs includes the cost of construction or acquisition; the cost of the acquisition of all land, rights-of-way, property, rights, easements, and interests acquired by SANDAG for the construction; the cost of demolishing or removing any buildings or structures on land acquired, including the cost of acquiring any lands to which buildings or structures may be moved; the cost of all machinery and equipment, financing charges, interest before and during construction and, if considered advisable by SANDAG, costs of accounting, consulting, printing, advertising, and travel, cost of traffic estimates and of engineering and legal services, plans, specifications, surveys, estimates of cost and of revenues, and other expenses necessary or incident to determining the feasibility or practicability of constructing, repairing, or improving a project; administrative expenses; and such other expenses as may be necessary or incident to the construction, repair, or improvement of a project, the financing of the project, the placing and maintaining of a project in operation, and any payments to an entity to cover all or a portion of the costs described in this chapter. Any money paid or advanced to SANDAG with its approval for traffic surveys, borings, preparation of plans and specifications, and other engineering services in connection with the construction, repair, or improvement of a project shall be regarded as a part of the cost of a project and may be reimbursed out of the proceeds of the revenue bonds issued for a project as authorized in this chapter. Cost includes the cost to operate, maintain, repair, or improve a project.(h) Department means the Department of Transportation.(i) Design-build means a procurement process in which both the design and construction of a project are procured in a single phase.(j) Design sequencing means a procurement process that enables the sequencing of design activities to permit each construction phase to commence when design for that phase is complete, instead of requiring the design for the entire project to be completed before commencing construction.(k) Entity means the United States or any agency or department of the United States, any State of California agency, department or political subdivision of the state, or any public or private corporation, company, partnership, joint venture, foundation, trust, estate, individual, or other legal business organization.(l) Federal agency means any agency or department of the United States.(m) Project or projects means any property and related facilities, whether or not now in existence, acquired or constructed to facilitate the movement of goods and people along the corridor or at the Otay Mesa East Port of Entry, including property suitable for any of the following purposes:(1) International ports of entry.(2) International border crossing facilities.(3) Transportation facilities, including highway and roadway, public transit, and nonmotorized facilities, and other projects supporting any transportation facility.(4) A bridge or tunnel, overpasses, underpasses, entrance plazas, toll houses, administration, storage and other buildings and facilities, and all equipment therefor, and may include terminal facilities, customs and immigration facilities, and such approaches and approach highways as may be determined by SANDAG to be necessary to facilitate the flow of traffic or to connect a project with the existing highway systems, together with all property, rights, easements, and interests acquired by SANDAG for the construction or operation of a project, including, but not limited to, energy and communication lines.(n) Property means land, improvements to land, buildings, improvements to buildings, machinery and equipment of any kind, operating capital, and any other real or personal property necessary for a project.(o) SANDAG means the San Diego Association of Governments, as referenced in the San Diego Regional Transportation Consolidation Act, Chapter 3 (commencing with Section 132350) of Division 12.7 of the Public Utilities Code.(p) Toll means a toll, fee, or other charge for entrance to or use of the corridor and such toll, fee, or other charge as may be governed by an agreement under Section 31483.(q) Trustee means any financial institution or trust company actually doing business in this state.SEC. 2. Section 31468 of the Streets and Highways Code is amended to read:31468. (a) The Legislature has recognized the merits of alternative project delivery methods in the past by authorizing their use for projects undertaken by school districts, the University of California, specified local government projects, state office buildings, and public transit projects.(b) It is the intent of the Legislature to provide optional, alternative procedures for delivering the project and its components pursuant to this act. SANDAG may enter into an alternative project delivery method contract authorized in this section on a project or any project component, after comparison of the traditional design, bid, and build process of construction with the proposed alternative project delivery method in a public meeting, if the governing board makes written findings that use of an alternative project delivery method on the specific project or project component under consideration will accomplish at least one of the following objectives: reduce comparable project costs, expedite a projects completion, or provide features not achievable through the traditional design-bid-build method.(c) SANDAG may utilize the following alternative project delivery methods if the conditions in this section are met:(1) Design-build.(2) Design sequencing.(3) Construction Manager/General Contractor (CMGC).(d) (1) If a contract for CMGC services is entered into pursuant to this chapter and includes preconstruction services by the construction manager, SANDAG shall enter into a written contract with the construction manager for the preconstruction services, under which SANDAG shall pay the construction manager a fee for preconstruction services in an amount agreed upon by SANDAG and the construction manager. The preconstruction services contract may include fees for services to be performed during the contract period, provided that SANDAG shall not request or obtain a fixed price or a guaranteed maximum price for the construction contract from the construction manager or enter into a construction contract with the construction manager until after SANDAG has entered into a services contract. A preconstruction services contract shall provide for the subsequent negotiation for construction of all or any discrete phase or phases of the project and shall provide for SANDAG to own the design plans and other preconstruction services work products.(2) A contract for construction services may be awarded after the plans have been sufficiently developed and either a fixed price or a guaranteed maximum price has been successfully negotiated. In the event that a fixed price or a guaranteed maximum price is not successfully negotiated, SANDAG may award the contract for construction services utilizing any other procurement method authorized by law.(3) The construction manager shall perform not less than 30 percent of the work covered by the fixed price or guaranteed maximum price agreement reached. Work that is not performed directly by the construction manager shall be bid to subcontractors pursuant to Section 6955 of the Public Contract Code.(e) It is the intent of the Legislature that alternative project delivery methods as authorized in this section shall not be construed to extend, limit, or change in any manner the legal responsibility of public agencies and contractors to comply with existing laws.SEC. 3. This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:In order for state and local governments to meet critical deadlines and stakeholder agreements on a project of regional, statewide, and national significance in partnership with the federal government, while protecting worker and public safety, it is necessary that this act take effect immediately.
22
3- Assembly Bill No. 427 CHAPTER 163 An act to amend Sections 31462 and 31468 of the Streets and Highways Code, relating to transportation, and declaring the urgency thereof, to take effect immediately. [ Approved by Governor September 08, 2023. Filed with Secretary of State September 08, 2023. ] LEGISLATIVE COUNSEL'S DIGESTAB 427, Alvarez. Otay Mesa East Toll Facility Act: alternative project delivery method.The Otay Mesa East Toll Facility Act authorizes the San Diego Association of Governments (SANDAG) to carry out a construction project for the State Highway Route 11 corridor, including, among other things, highway improvements and international border crossing facilities, to be operated as a toll facility. Existing law authorizes the use of alternative bidding and building procedures for a project or components of a project after SANDAG commences a comparison of the traditional design-bid-build process of construction with the proposed alternative project delivery method in a public meeting and if the governing board of SANDAG makes written findings that use of an alternative project delivery method on the specific project or project component under consideration will accomplish at least one of 3 specified objectives. Existing law requires the design-bid-build method of project construction for the project or project components if these conditions are not met. This bill would provide that SANDAG is no longer required to use the design-bid-build delivery method for construction of a project if specified conditions for utilizing an alternative delivery method are not met. This bill would authorize SANDAG to use the Construction Manager/General Contractor method (CMGC), as defined, as an additional alternative project delivery method. The bill would impose specified requirements on SANDAG and a construction manager, as defined, if they enter into a CMGC contract for alternative project delivery.This bill would declare that it is to take effect immediately as an urgency statute.Digest Key Vote: 2/3 Appropriation: NO Fiscal Committee: NO Local Program: NO
3+ Enrolled August 25, 2023 Passed IN Senate July 06, 2023 Passed IN Assembly August 24, 2023 Amended IN Senate June 08, 2023 CALIFORNIA LEGISLATURE 20232024 REGULAR SESSION Assembly Bill No. 427Introduced by Assembly Member AlvarezFebruary 06, 2023 An act to amend Sections 31462 and 31468 of the Streets and Highways Code, relating to transportation, and declaring the urgency thereof, to take effect immediately.LEGISLATIVE COUNSEL'S DIGESTAB 427, Alvarez. Otay Mesa East Toll Facility Act: alternative project delivery method.The Otay Mesa East Toll Facility Act authorizes the San Diego Association of Governments (SANDAG) to carry out a construction project for the State Highway Route 11 corridor, including, among other things, highway improvements and international border crossing facilities, to be operated as a toll facility. Existing law authorizes the use of alternative bidding and building procedures for a project or components of a project after SANDAG commences a comparison of the traditional design-bid-build process of construction with the proposed alternative project delivery method in a public meeting and if the governing board of SANDAG makes written findings that use of an alternative project delivery method on the specific project or project component under consideration will accomplish at least one of 3 specified objectives. Existing law requires the design-bid-build method of project construction for the project or project components if these conditions are not met. This bill would provide that SANDAG is no longer required to use the design-bid-build delivery method for construction of a project if specified conditions for utilizing an alternative delivery method are not met. This bill would authorize SANDAG to use the Construction Manager/General Contractor method (CMGC), as defined, as an additional alternative project delivery method. The bill would impose specified requirements on SANDAG and a construction manager, as defined, if they enter into a CMGC contract for alternative project delivery.This bill would declare that it is to take effect immediately as an urgency statute.Digest Key Vote: 2/3 Appropriation: NO Fiscal Committee: NO Local Program: NO
44
5- Assembly Bill No. 427 CHAPTER 163
5+ Enrolled August 25, 2023 Passed IN Senate July 06, 2023 Passed IN Assembly August 24, 2023 Amended IN Senate June 08, 2023
66
7- Assembly Bill No. 427
7+Enrolled August 25, 2023
8+Passed IN Senate July 06, 2023
9+Passed IN Assembly August 24, 2023
10+Amended IN Senate June 08, 2023
811
9- CHAPTER 163
12+ CALIFORNIA LEGISLATURE 20232024 REGULAR SESSION
13+
14+ Assembly Bill
15+
16+No. 427
17+
18+Introduced by Assembly Member AlvarezFebruary 06, 2023
19+
20+Introduced by Assembly Member Alvarez
21+February 06, 2023
1022
1123 An act to amend Sections 31462 and 31468 of the Streets and Highways Code, relating to transportation, and declaring the urgency thereof, to take effect immediately.
12-
13- [ Approved by Governor September 08, 2023. Filed with Secretary of State September 08, 2023. ]
1424
1525 LEGISLATIVE COUNSEL'S DIGEST
1626
1727 ## LEGISLATIVE COUNSEL'S DIGEST
1828
1929 AB 427, Alvarez. Otay Mesa East Toll Facility Act: alternative project delivery method.
2030
2131 The Otay Mesa East Toll Facility Act authorizes the San Diego Association of Governments (SANDAG) to carry out a construction project for the State Highway Route 11 corridor, including, among other things, highway improvements and international border crossing facilities, to be operated as a toll facility. Existing law authorizes the use of alternative bidding and building procedures for a project or components of a project after SANDAG commences a comparison of the traditional design-bid-build process of construction with the proposed alternative project delivery method in a public meeting and if the governing board of SANDAG makes written findings that use of an alternative project delivery method on the specific project or project component under consideration will accomplish at least one of 3 specified objectives. Existing law requires the design-bid-build method of project construction for the project or project components if these conditions are not met. This bill would provide that SANDAG is no longer required to use the design-bid-build delivery method for construction of a project if specified conditions for utilizing an alternative delivery method are not met. This bill would authorize SANDAG to use the Construction Manager/General Contractor method (CMGC), as defined, as an additional alternative project delivery method. The bill would impose specified requirements on SANDAG and a construction manager, as defined, if they enter into a CMGC contract for alternative project delivery.This bill would declare that it is to take effect immediately as an urgency statute.
2232
2333 The Otay Mesa East Toll Facility Act authorizes the San Diego Association of Governments (SANDAG) to carry out a construction project for the State Highway Route 11 corridor, including, among other things, highway improvements and international border crossing facilities, to be operated as a toll facility. Existing law authorizes the use of alternative bidding and building procedures for a project or components of a project after SANDAG commences a comparison of the traditional design-bid-build process of construction with the proposed alternative project delivery method in a public meeting and if the governing board of SANDAG makes written findings that use of an alternative project delivery method on the specific project or project component under consideration will accomplish at least one of 3 specified objectives. Existing law requires the design-bid-build method of project construction for the project or project components if these conditions are not met.
2434
2535 This bill would provide that SANDAG is no longer required to use the design-bid-build delivery method for construction of a project if specified conditions for utilizing an alternative delivery method are not met. This bill would authorize SANDAG to use the Construction Manager/General Contractor method (CMGC), as defined, as an additional alternative project delivery method. The bill would impose specified requirements on SANDAG and a construction manager, as defined, if they enter into a CMGC contract for alternative project delivery.
2636
2737 This bill would declare that it is to take effect immediately as an urgency statute.
2838
2939 ## Digest Key
3040
3141 ## Bill Text
3242
3343 The people of the State of California do enact as follows:SECTION 1. Section 31462 of the Streets and Highways Code is amended to read:31462. For purposes of this chapter, the following definitions shall apply:(a) Best value means a value determined by evaluation of objective criteria that relate to price, features, functions, life-cycle costs, experience, and past performance. A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and meeting the objectives of the project, selection of the best proposal for a stipulated sum established by the procuring agency, or a tradeoff between price and other specified factors.(b) Board means the board of directors of SANDAG.(c) Bonds means any bonds, notes, variable rate and variable maturity securities, and any other evidence of indebtedness issued pursuant to this chapter.(d) Construction Manager/General Contractor method or CMGC means a project delivery method using a best value procurement process in which a construction manager is procured to provide preconstruction services during the design phase of the project and construction services during the construction phase of the project. The execution of the design and the construction of the project may be in sequential phases or concurrent phases.(e) Construction manager means a partnership, corporation, or other legal entity that is able to provide appropriately licensed contracting and engineering services as needed pursuant to a CMGC contract.(f) Corridor means State Route 11 in the County of San Diego, as defined in Section 311.(g) Costs includes the cost of construction or acquisition; the cost of the acquisition of all land, rights-of-way, property, rights, easements, and interests acquired by SANDAG for the construction; the cost of demolishing or removing any buildings or structures on land acquired, including the cost of acquiring any lands to which buildings or structures may be moved; the cost of all machinery and equipment, financing charges, interest before and during construction and, if considered advisable by SANDAG, costs of accounting, consulting, printing, advertising, and travel, cost of traffic estimates and of engineering and legal services, plans, specifications, surveys, estimates of cost and of revenues, and other expenses necessary or incident to determining the feasibility or practicability of constructing, repairing, or improving a project; administrative expenses; and such other expenses as may be necessary or incident to the construction, repair, or improvement of a project, the financing of the project, the placing and maintaining of a project in operation, and any payments to an entity to cover all or a portion of the costs described in this chapter. Any money paid or advanced to SANDAG with its approval for traffic surveys, borings, preparation of plans and specifications, and other engineering services in connection with the construction, repair, or improvement of a project shall be regarded as a part of the cost of a project and may be reimbursed out of the proceeds of the revenue bonds issued for a project as authorized in this chapter. Cost includes the cost to operate, maintain, repair, or improve a project.(h) Department means the Department of Transportation.(i) Design-build means a procurement process in which both the design and construction of a project are procured in a single phase.(j) Design sequencing means a procurement process that enables the sequencing of design activities to permit each construction phase to commence when design for that phase is complete, instead of requiring the design for the entire project to be completed before commencing construction.(k) Entity means the United States or any agency or department of the United States, any State of California agency, department or political subdivision of the state, or any public or private corporation, company, partnership, joint venture, foundation, trust, estate, individual, or other legal business organization.(l) Federal agency means any agency or department of the United States.(m) Project or projects means any property and related facilities, whether or not now in existence, acquired or constructed to facilitate the movement of goods and people along the corridor or at the Otay Mesa East Port of Entry, including property suitable for any of the following purposes:(1) International ports of entry.(2) International border crossing facilities.(3) Transportation facilities, including highway and roadway, public transit, and nonmotorized facilities, and other projects supporting any transportation facility.(4) A bridge or tunnel, overpasses, underpasses, entrance plazas, toll houses, administration, storage and other buildings and facilities, and all equipment therefor, and may include terminal facilities, customs and immigration facilities, and such approaches and approach highways as may be determined by SANDAG to be necessary to facilitate the flow of traffic or to connect a project with the existing highway systems, together with all property, rights, easements, and interests acquired by SANDAG for the construction or operation of a project, including, but not limited to, energy and communication lines.(n) Property means land, improvements to land, buildings, improvements to buildings, machinery and equipment of any kind, operating capital, and any other real or personal property necessary for a project.(o) SANDAG means the San Diego Association of Governments, as referenced in the San Diego Regional Transportation Consolidation Act, Chapter 3 (commencing with Section 132350) of Division 12.7 of the Public Utilities Code.(p) Toll means a toll, fee, or other charge for entrance to or use of the corridor and such toll, fee, or other charge as may be governed by an agreement under Section 31483.(q) Trustee means any financial institution or trust company actually doing business in this state.SEC. 2. Section 31468 of the Streets and Highways Code is amended to read:31468. (a) The Legislature has recognized the merits of alternative project delivery methods in the past by authorizing their use for projects undertaken by school districts, the University of California, specified local government projects, state office buildings, and public transit projects.(b) It is the intent of the Legislature to provide optional, alternative procedures for delivering the project and its components pursuant to this act. SANDAG may enter into an alternative project delivery method contract authorized in this section on a project or any project component, after comparison of the traditional design, bid, and build process of construction with the proposed alternative project delivery method in a public meeting, if the governing board makes written findings that use of an alternative project delivery method on the specific project or project component under consideration will accomplish at least one of the following objectives: reduce comparable project costs, expedite a projects completion, or provide features not achievable through the traditional design-bid-build method.(c) SANDAG may utilize the following alternative project delivery methods if the conditions in this section are met:(1) Design-build.(2) Design sequencing.(3) Construction Manager/General Contractor (CMGC).(d) (1) If a contract for CMGC services is entered into pursuant to this chapter and includes preconstruction services by the construction manager, SANDAG shall enter into a written contract with the construction manager for the preconstruction services, under which SANDAG shall pay the construction manager a fee for preconstruction services in an amount agreed upon by SANDAG and the construction manager. The preconstruction services contract may include fees for services to be performed during the contract period, provided that SANDAG shall not request or obtain a fixed price or a guaranteed maximum price for the construction contract from the construction manager or enter into a construction contract with the construction manager until after SANDAG has entered into a services contract. A preconstruction services contract shall provide for the subsequent negotiation for construction of all or any discrete phase or phases of the project and shall provide for SANDAG to own the design plans and other preconstruction services work products.(2) A contract for construction services may be awarded after the plans have been sufficiently developed and either a fixed price or a guaranteed maximum price has been successfully negotiated. In the event that a fixed price or a guaranteed maximum price is not successfully negotiated, SANDAG may award the contract for construction services utilizing any other procurement method authorized by law.(3) The construction manager shall perform not less than 30 percent of the work covered by the fixed price or guaranteed maximum price agreement reached. Work that is not performed directly by the construction manager shall be bid to subcontractors pursuant to Section 6955 of the Public Contract Code.(e) It is the intent of the Legislature that alternative project delivery methods as authorized in this section shall not be construed to extend, limit, or change in any manner the legal responsibility of public agencies and contractors to comply with existing laws.SEC. 3. This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:In order for state and local governments to meet critical deadlines and stakeholder agreements on a project of regional, statewide, and national significance in partnership with the federal government, while protecting worker and public safety, it is necessary that this act take effect immediately.
3444
3545 The people of the State of California do enact as follows:
3646
3747 ## The people of the State of California do enact as follows:
3848
3949 SECTION 1. Section 31462 of the Streets and Highways Code is amended to read:31462. For purposes of this chapter, the following definitions shall apply:(a) Best value means a value determined by evaluation of objective criteria that relate to price, features, functions, life-cycle costs, experience, and past performance. A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and meeting the objectives of the project, selection of the best proposal for a stipulated sum established by the procuring agency, or a tradeoff between price and other specified factors.(b) Board means the board of directors of SANDAG.(c) Bonds means any bonds, notes, variable rate and variable maturity securities, and any other evidence of indebtedness issued pursuant to this chapter.(d) Construction Manager/General Contractor method or CMGC means a project delivery method using a best value procurement process in which a construction manager is procured to provide preconstruction services during the design phase of the project and construction services during the construction phase of the project. The execution of the design and the construction of the project may be in sequential phases or concurrent phases.(e) Construction manager means a partnership, corporation, or other legal entity that is able to provide appropriately licensed contracting and engineering services as needed pursuant to a CMGC contract.(f) Corridor means State Route 11 in the County of San Diego, as defined in Section 311.(g) Costs includes the cost of construction or acquisition; the cost of the acquisition of all land, rights-of-way, property, rights, easements, and interests acquired by SANDAG for the construction; the cost of demolishing or removing any buildings or structures on land acquired, including the cost of acquiring any lands to which buildings or structures may be moved; the cost of all machinery and equipment, financing charges, interest before and during construction and, if considered advisable by SANDAG, costs of accounting, consulting, printing, advertising, and travel, cost of traffic estimates and of engineering and legal services, plans, specifications, surveys, estimates of cost and of revenues, and other expenses necessary or incident to determining the feasibility or practicability of constructing, repairing, or improving a project; administrative expenses; and such other expenses as may be necessary or incident to the construction, repair, or improvement of a project, the financing of the project, the placing and maintaining of a project in operation, and any payments to an entity to cover all or a portion of the costs described in this chapter. Any money paid or advanced to SANDAG with its approval for traffic surveys, borings, preparation of plans and specifications, and other engineering services in connection with the construction, repair, or improvement of a project shall be regarded as a part of the cost of a project and may be reimbursed out of the proceeds of the revenue bonds issued for a project as authorized in this chapter. Cost includes the cost to operate, maintain, repair, or improve a project.(h) Department means the Department of Transportation.(i) Design-build means a procurement process in which both the design and construction of a project are procured in a single phase.(j) Design sequencing means a procurement process that enables the sequencing of design activities to permit each construction phase to commence when design for that phase is complete, instead of requiring the design for the entire project to be completed before commencing construction.(k) Entity means the United States or any agency or department of the United States, any State of California agency, department or political subdivision of the state, or any public or private corporation, company, partnership, joint venture, foundation, trust, estate, individual, or other legal business organization.(l) Federal agency means any agency or department of the United States.(m) Project or projects means any property and related facilities, whether or not now in existence, acquired or constructed to facilitate the movement of goods and people along the corridor or at the Otay Mesa East Port of Entry, including property suitable for any of the following purposes:(1) International ports of entry.(2) International border crossing facilities.(3) Transportation facilities, including highway and roadway, public transit, and nonmotorized facilities, and other projects supporting any transportation facility.(4) A bridge or tunnel, overpasses, underpasses, entrance plazas, toll houses, administration, storage and other buildings and facilities, and all equipment therefor, and may include terminal facilities, customs and immigration facilities, and such approaches and approach highways as may be determined by SANDAG to be necessary to facilitate the flow of traffic or to connect a project with the existing highway systems, together with all property, rights, easements, and interests acquired by SANDAG for the construction or operation of a project, including, but not limited to, energy and communication lines.(n) Property means land, improvements to land, buildings, improvements to buildings, machinery and equipment of any kind, operating capital, and any other real or personal property necessary for a project.(o) SANDAG means the San Diego Association of Governments, as referenced in the San Diego Regional Transportation Consolidation Act, Chapter 3 (commencing with Section 132350) of Division 12.7 of the Public Utilities Code.(p) Toll means a toll, fee, or other charge for entrance to or use of the corridor and such toll, fee, or other charge as may be governed by an agreement under Section 31483.(q) Trustee means any financial institution or trust company actually doing business in this state.
4050
4151 SECTION 1. Section 31462 of the Streets and Highways Code is amended to read:
4252
4353 ### SECTION 1.
4454
4555 31462. For purposes of this chapter, the following definitions shall apply:(a) Best value means a value determined by evaluation of objective criteria that relate to price, features, functions, life-cycle costs, experience, and past performance. A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and meeting the objectives of the project, selection of the best proposal for a stipulated sum established by the procuring agency, or a tradeoff between price and other specified factors.(b) Board means the board of directors of SANDAG.(c) Bonds means any bonds, notes, variable rate and variable maturity securities, and any other evidence of indebtedness issued pursuant to this chapter.(d) Construction Manager/General Contractor method or CMGC means a project delivery method using a best value procurement process in which a construction manager is procured to provide preconstruction services during the design phase of the project and construction services during the construction phase of the project. The execution of the design and the construction of the project may be in sequential phases or concurrent phases.(e) Construction manager means a partnership, corporation, or other legal entity that is able to provide appropriately licensed contracting and engineering services as needed pursuant to a CMGC contract.(f) Corridor means State Route 11 in the County of San Diego, as defined in Section 311.(g) Costs includes the cost of construction or acquisition; the cost of the acquisition of all land, rights-of-way, property, rights, easements, and interests acquired by SANDAG for the construction; the cost of demolishing or removing any buildings or structures on land acquired, including the cost of acquiring any lands to which buildings or structures may be moved; the cost of all machinery and equipment, financing charges, interest before and during construction and, if considered advisable by SANDAG, costs of accounting, consulting, printing, advertising, and travel, cost of traffic estimates and of engineering and legal services, plans, specifications, surveys, estimates of cost and of revenues, and other expenses necessary or incident to determining the feasibility or practicability of constructing, repairing, or improving a project; administrative expenses; and such other expenses as may be necessary or incident to the construction, repair, or improvement of a project, the financing of the project, the placing and maintaining of a project in operation, and any payments to an entity to cover all or a portion of the costs described in this chapter. Any money paid or advanced to SANDAG with its approval for traffic surveys, borings, preparation of plans and specifications, and other engineering services in connection with the construction, repair, or improvement of a project shall be regarded as a part of the cost of a project and may be reimbursed out of the proceeds of the revenue bonds issued for a project as authorized in this chapter. Cost includes the cost to operate, maintain, repair, or improve a project.(h) Department means the Department of Transportation.(i) Design-build means a procurement process in which both the design and construction of a project are procured in a single phase.(j) Design sequencing means a procurement process that enables the sequencing of design activities to permit each construction phase to commence when design for that phase is complete, instead of requiring the design for the entire project to be completed before commencing construction.(k) Entity means the United States or any agency or department of the United States, any State of California agency, department or political subdivision of the state, or any public or private corporation, company, partnership, joint venture, foundation, trust, estate, individual, or other legal business organization.(l) Federal agency means any agency or department of the United States.(m) Project or projects means any property and related facilities, whether or not now in existence, acquired or constructed to facilitate the movement of goods and people along the corridor or at the Otay Mesa East Port of Entry, including property suitable for any of the following purposes:(1) International ports of entry.(2) International border crossing facilities.(3) Transportation facilities, including highway and roadway, public transit, and nonmotorized facilities, and other projects supporting any transportation facility.(4) A bridge or tunnel, overpasses, underpasses, entrance plazas, toll houses, administration, storage and other buildings and facilities, and all equipment therefor, and may include terminal facilities, customs and immigration facilities, and such approaches and approach highways as may be determined by SANDAG to be necessary to facilitate the flow of traffic or to connect a project with the existing highway systems, together with all property, rights, easements, and interests acquired by SANDAG for the construction or operation of a project, including, but not limited to, energy and communication lines.(n) Property means land, improvements to land, buildings, improvements to buildings, machinery and equipment of any kind, operating capital, and any other real or personal property necessary for a project.(o) SANDAG means the San Diego Association of Governments, as referenced in the San Diego Regional Transportation Consolidation Act, Chapter 3 (commencing with Section 132350) of Division 12.7 of the Public Utilities Code.(p) Toll means a toll, fee, or other charge for entrance to or use of the corridor and such toll, fee, or other charge as may be governed by an agreement under Section 31483.(q) Trustee means any financial institution or trust company actually doing business in this state.
4656
4757 31462. For purposes of this chapter, the following definitions shall apply:(a) Best value means a value determined by evaluation of objective criteria that relate to price, features, functions, life-cycle costs, experience, and past performance. A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and meeting the objectives of the project, selection of the best proposal for a stipulated sum established by the procuring agency, or a tradeoff between price and other specified factors.(b) Board means the board of directors of SANDAG.(c) Bonds means any bonds, notes, variable rate and variable maturity securities, and any other evidence of indebtedness issued pursuant to this chapter.(d) Construction Manager/General Contractor method or CMGC means a project delivery method using a best value procurement process in which a construction manager is procured to provide preconstruction services during the design phase of the project and construction services during the construction phase of the project. The execution of the design and the construction of the project may be in sequential phases or concurrent phases.(e) Construction manager means a partnership, corporation, or other legal entity that is able to provide appropriately licensed contracting and engineering services as needed pursuant to a CMGC contract.(f) Corridor means State Route 11 in the County of San Diego, as defined in Section 311.(g) Costs includes the cost of construction or acquisition; the cost of the acquisition of all land, rights-of-way, property, rights, easements, and interests acquired by SANDAG for the construction; the cost of demolishing or removing any buildings or structures on land acquired, including the cost of acquiring any lands to which buildings or structures may be moved; the cost of all machinery and equipment, financing charges, interest before and during construction and, if considered advisable by SANDAG, costs of accounting, consulting, printing, advertising, and travel, cost of traffic estimates and of engineering and legal services, plans, specifications, surveys, estimates of cost and of revenues, and other expenses necessary or incident to determining the feasibility or practicability of constructing, repairing, or improving a project; administrative expenses; and such other expenses as may be necessary or incident to the construction, repair, or improvement of a project, the financing of the project, the placing and maintaining of a project in operation, and any payments to an entity to cover all or a portion of the costs described in this chapter. Any money paid or advanced to SANDAG with its approval for traffic surveys, borings, preparation of plans and specifications, and other engineering services in connection with the construction, repair, or improvement of a project shall be regarded as a part of the cost of a project and may be reimbursed out of the proceeds of the revenue bonds issued for a project as authorized in this chapter. Cost includes the cost to operate, maintain, repair, or improve a project.(h) Department means the Department of Transportation.(i) Design-build means a procurement process in which both the design and construction of a project are procured in a single phase.(j) Design sequencing means a procurement process that enables the sequencing of design activities to permit each construction phase to commence when design for that phase is complete, instead of requiring the design for the entire project to be completed before commencing construction.(k) Entity means the United States or any agency or department of the United States, any State of California agency, department or political subdivision of the state, or any public or private corporation, company, partnership, joint venture, foundation, trust, estate, individual, or other legal business organization.(l) Federal agency means any agency or department of the United States.(m) Project or projects means any property and related facilities, whether or not now in existence, acquired or constructed to facilitate the movement of goods and people along the corridor or at the Otay Mesa East Port of Entry, including property suitable for any of the following purposes:(1) International ports of entry.(2) International border crossing facilities.(3) Transportation facilities, including highway and roadway, public transit, and nonmotorized facilities, and other projects supporting any transportation facility.(4) A bridge or tunnel, overpasses, underpasses, entrance plazas, toll houses, administration, storage and other buildings and facilities, and all equipment therefor, and may include terminal facilities, customs and immigration facilities, and such approaches and approach highways as may be determined by SANDAG to be necessary to facilitate the flow of traffic or to connect a project with the existing highway systems, together with all property, rights, easements, and interests acquired by SANDAG for the construction or operation of a project, including, but not limited to, energy and communication lines.(n) Property means land, improvements to land, buildings, improvements to buildings, machinery and equipment of any kind, operating capital, and any other real or personal property necessary for a project.(o) SANDAG means the San Diego Association of Governments, as referenced in the San Diego Regional Transportation Consolidation Act, Chapter 3 (commencing with Section 132350) of Division 12.7 of the Public Utilities Code.(p) Toll means a toll, fee, or other charge for entrance to or use of the corridor and such toll, fee, or other charge as may be governed by an agreement under Section 31483.(q) Trustee means any financial institution or trust company actually doing business in this state.
4858
4959 31462. For purposes of this chapter, the following definitions shall apply:(a) Best value means a value determined by evaluation of objective criteria that relate to price, features, functions, life-cycle costs, experience, and past performance. A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and meeting the objectives of the project, selection of the best proposal for a stipulated sum established by the procuring agency, or a tradeoff between price and other specified factors.(b) Board means the board of directors of SANDAG.(c) Bonds means any bonds, notes, variable rate and variable maturity securities, and any other evidence of indebtedness issued pursuant to this chapter.(d) Construction Manager/General Contractor method or CMGC means a project delivery method using a best value procurement process in which a construction manager is procured to provide preconstruction services during the design phase of the project and construction services during the construction phase of the project. The execution of the design and the construction of the project may be in sequential phases or concurrent phases.(e) Construction manager means a partnership, corporation, or other legal entity that is able to provide appropriately licensed contracting and engineering services as needed pursuant to a CMGC contract.(f) Corridor means State Route 11 in the County of San Diego, as defined in Section 311.(g) Costs includes the cost of construction or acquisition; the cost of the acquisition of all land, rights-of-way, property, rights, easements, and interests acquired by SANDAG for the construction; the cost of demolishing or removing any buildings or structures on land acquired, including the cost of acquiring any lands to which buildings or structures may be moved; the cost of all machinery and equipment, financing charges, interest before and during construction and, if considered advisable by SANDAG, costs of accounting, consulting, printing, advertising, and travel, cost of traffic estimates and of engineering and legal services, plans, specifications, surveys, estimates of cost and of revenues, and other expenses necessary or incident to determining the feasibility or practicability of constructing, repairing, or improving a project; administrative expenses; and such other expenses as may be necessary or incident to the construction, repair, or improvement of a project, the financing of the project, the placing and maintaining of a project in operation, and any payments to an entity to cover all or a portion of the costs described in this chapter. Any money paid or advanced to SANDAG with its approval for traffic surveys, borings, preparation of plans and specifications, and other engineering services in connection with the construction, repair, or improvement of a project shall be regarded as a part of the cost of a project and may be reimbursed out of the proceeds of the revenue bonds issued for a project as authorized in this chapter. Cost includes the cost to operate, maintain, repair, or improve a project.(h) Department means the Department of Transportation.(i) Design-build means a procurement process in which both the design and construction of a project are procured in a single phase.(j) Design sequencing means a procurement process that enables the sequencing of design activities to permit each construction phase to commence when design for that phase is complete, instead of requiring the design for the entire project to be completed before commencing construction.(k) Entity means the United States or any agency or department of the United States, any State of California agency, department or political subdivision of the state, or any public or private corporation, company, partnership, joint venture, foundation, trust, estate, individual, or other legal business organization.(l) Federal agency means any agency or department of the United States.(m) Project or projects means any property and related facilities, whether or not now in existence, acquired or constructed to facilitate the movement of goods and people along the corridor or at the Otay Mesa East Port of Entry, including property suitable for any of the following purposes:(1) International ports of entry.(2) International border crossing facilities.(3) Transportation facilities, including highway and roadway, public transit, and nonmotorized facilities, and other projects supporting any transportation facility.(4) A bridge or tunnel, overpasses, underpasses, entrance plazas, toll houses, administration, storage and other buildings and facilities, and all equipment therefor, and may include terminal facilities, customs and immigration facilities, and such approaches and approach highways as may be determined by SANDAG to be necessary to facilitate the flow of traffic or to connect a project with the existing highway systems, together with all property, rights, easements, and interests acquired by SANDAG for the construction or operation of a project, including, but not limited to, energy and communication lines.(n) Property means land, improvements to land, buildings, improvements to buildings, machinery and equipment of any kind, operating capital, and any other real or personal property necessary for a project.(o) SANDAG means the San Diego Association of Governments, as referenced in the San Diego Regional Transportation Consolidation Act, Chapter 3 (commencing with Section 132350) of Division 12.7 of the Public Utilities Code.(p) Toll means a toll, fee, or other charge for entrance to or use of the corridor and such toll, fee, or other charge as may be governed by an agreement under Section 31483.(q) Trustee means any financial institution or trust company actually doing business in this state.
5060
5161
5262
5363 31462. For purposes of this chapter, the following definitions shall apply:
5464
5565 (a) Best value means a value determined by evaluation of objective criteria that relate to price, features, functions, life-cycle costs, experience, and past performance. A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and meeting the objectives of the project, selection of the best proposal for a stipulated sum established by the procuring agency, or a tradeoff between price and other specified factors.
5666
5767 (b) Board means the board of directors of SANDAG.
5868
5969 (c) Bonds means any bonds, notes, variable rate and variable maturity securities, and any other evidence of indebtedness issued pursuant to this chapter.
6070
6171 (d) Construction Manager/General Contractor method or CMGC means a project delivery method using a best value procurement process in which a construction manager is procured to provide preconstruction services during the design phase of the project and construction services during the construction phase of the project. The execution of the design and the construction of the project may be in sequential phases or concurrent phases.
6272
6373 (e) Construction manager means a partnership, corporation, or other legal entity that is able to provide appropriately licensed contracting and engineering services as needed pursuant to a CMGC contract.
6474
6575 (f) Corridor means State Route 11 in the County of San Diego, as defined in Section 311.
6676
6777 (g) Costs includes the cost of construction or acquisition; the cost of the acquisition of all land, rights-of-way, property, rights, easements, and interests acquired by SANDAG for the construction; the cost of demolishing or removing any buildings or structures on land acquired, including the cost of acquiring any lands to which buildings or structures may be moved; the cost of all machinery and equipment, financing charges, interest before and during construction and, if considered advisable by SANDAG, costs of accounting, consulting, printing, advertising, and travel, cost of traffic estimates and of engineering and legal services, plans, specifications, surveys, estimates of cost and of revenues, and other expenses necessary or incident to determining the feasibility or practicability of constructing, repairing, or improving a project; administrative expenses; and such other expenses as may be necessary or incident to the construction, repair, or improvement of a project, the financing of the project, the placing and maintaining of a project in operation, and any payments to an entity to cover all or a portion of the costs described in this chapter. Any money paid or advanced to SANDAG with its approval for traffic surveys, borings, preparation of plans and specifications, and other engineering services in connection with the construction, repair, or improvement of a project shall be regarded as a part of the cost of a project and may be reimbursed out of the proceeds of the revenue bonds issued for a project as authorized in this chapter. Cost includes the cost to operate, maintain, repair, or improve a project.
6878
6979 (h) Department means the Department of Transportation.
7080
7181 (i) Design-build means a procurement process in which both the design and construction of a project are procured in a single phase.
7282
7383 (j) Design sequencing means a procurement process that enables the sequencing of design activities to permit each construction phase to commence when design for that phase is complete, instead of requiring the design for the entire project to be completed before commencing construction.
7484
7585 (k) Entity means the United States or any agency or department of the United States, any State of California agency, department or political subdivision of the state, or any public or private corporation, company, partnership, joint venture, foundation, trust, estate, individual, or other legal business organization.
7686
7787 (l) Federal agency means any agency or department of the United States.
7888
7989 (m) Project or projects means any property and related facilities, whether or not now in existence, acquired or constructed to facilitate the movement of goods and people along the corridor or at the Otay Mesa East Port of Entry, including property suitable for any of the following purposes:
8090
8191 (1) International ports of entry.
8292
8393 (2) International border crossing facilities.
8494
8595 (3) Transportation facilities, including highway and roadway, public transit, and nonmotorized facilities, and other projects supporting any transportation facility.
8696
8797 (4) A bridge or tunnel, overpasses, underpasses, entrance plazas, toll houses, administration, storage and other buildings and facilities, and all equipment therefor, and may include terminal facilities, customs and immigration facilities, and such approaches and approach highways as may be determined by SANDAG to be necessary to facilitate the flow of traffic or to connect a project with the existing highway systems, together with all property, rights, easements, and interests acquired by SANDAG for the construction or operation of a project, including, but not limited to, energy and communication lines.
8898
8999 (n) Property means land, improvements to land, buildings, improvements to buildings, machinery and equipment of any kind, operating capital, and any other real or personal property necessary for a project.
90100
91101 (o) SANDAG means the San Diego Association of Governments, as referenced in the San Diego Regional Transportation Consolidation Act, Chapter 3 (commencing with Section 132350) of Division 12.7 of the Public Utilities Code.
92102
93103 (p) Toll means a toll, fee, or other charge for entrance to or use of the corridor and such toll, fee, or other charge as may be governed by an agreement under Section 31483.
94104
95105 (q) Trustee means any financial institution or trust company actually doing business in this state.
96106
97107 SEC. 2. Section 31468 of the Streets and Highways Code is amended to read:31468. (a) The Legislature has recognized the merits of alternative project delivery methods in the past by authorizing their use for projects undertaken by school districts, the University of California, specified local government projects, state office buildings, and public transit projects.(b) It is the intent of the Legislature to provide optional, alternative procedures for delivering the project and its components pursuant to this act. SANDAG may enter into an alternative project delivery method contract authorized in this section on a project or any project component, after comparison of the traditional design, bid, and build process of construction with the proposed alternative project delivery method in a public meeting, if the governing board makes written findings that use of an alternative project delivery method on the specific project or project component under consideration will accomplish at least one of the following objectives: reduce comparable project costs, expedite a projects completion, or provide features not achievable through the traditional design-bid-build method.(c) SANDAG may utilize the following alternative project delivery methods if the conditions in this section are met:(1) Design-build.(2) Design sequencing.(3) Construction Manager/General Contractor (CMGC).(d) (1) If a contract for CMGC services is entered into pursuant to this chapter and includes preconstruction services by the construction manager, SANDAG shall enter into a written contract with the construction manager for the preconstruction services, under which SANDAG shall pay the construction manager a fee for preconstruction services in an amount agreed upon by SANDAG and the construction manager. The preconstruction services contract may include fees for services to be performed during the contract period, provided that SANDAG shall not request or obtain a fixed price or a guaranteed maximum price for the construction contract from the construction manager or enter into a construction contract with the construction manager until after SANDAG has entered into a services contract. A preconstruction services contract shall provide for the subsequent negotiation for construction of all or any discrete phase or phases of the project and shall provide for SANDAG to own the design plans and other preconstruction services work products.(2) A contract for construction services may be awarded after the plans have been sufficiently developed and either a fixed price or a guaranteed maximum price has been successfully negotiated. In the event that a fixed price or a guaranteed maximum price is not successfully negotiated, SANDAG may award the contract for construction services utilizing any other procurement method authorized by law.(3) The construction manager shall perform not less than 30 percent of the work covered by the fixed price or guaranteed maximum price agreement reached. Work that is not performed directly by the construction manager shall be bid to subcontractors pursuant to Section 6955 of the Public Contract Code.(e) It is the intent of the Legislature that alternative project delivery methods as authorized in this section shall not be construed to extend, limit, or change in any manner the legal responsibility of public agencies and contractors to comply with existing laws.
98108
99109 SEC. 2. Section 31468 of the Streets and Highways Code is amended to read:
100110
101111 ### SEC. 2.
102112
103113 31468. (a) The Legislature has recognized the merits of alternative project delivery methods in the past by authorizing their use for projects undertaken by school districts, the University of California, specified local government projects, state office buildings, and public transit projects.(b) It is the intent of the Legislature to provide optional, alternative procedures for delivering the project and its components pursuant to this act. SANDAG may enter into an alternative project delivery method contract authorized in this section on a project or any project component, after comparison of the traditional design, bid, and build process of construction with the proposed alternative project delivery method in a public meeting, if the governing board makes written findings that use of an alternative project delivery method on the specific project or project component under consideration will accomplish at least one of the following objectives: reduce comparable project costs, expedite a projects completion, or provide features not achievable through the traditional design-bid-build method.(c) SANDAG may utilize the following alternative project delivery methods if the conditions in this section are met:(1) Design-build.(2) Design sequencing.(3) Construction Manager/General Contractor (CMGC).(d) (1) If a contract for CMGC services is entered into pursuant to this chapter and includes preconstruction services by the construction manager, SANDAG shall enter into a written contract with the construction manager for the preconstruction services, under which SANDAG shall pay the construction manager a fee for preconstruction services in an amount agreed upon by SANDAG and the construction manager. The preconstruction services contract may include fees for services to be performed during the contract period, provided that SANDAG shall not request or obtain a fixed price or a guaranteed maximum price for the construction contract from the construction manager or enter into a construction contract with the construction manager until after SANDAG has entered into a services contract. A preconstruction services contract shall provide for the subsequent negotiation for construction of all or any discrete phase or phases of the project and shall provide for SANDAG to own the design plans and other preconstruction services work products.(2) A contract for construction services may be awarded after the plans have been sufficiently developed and either a fixed price or a guaranteed maximum price has been successfully negotiated. In the event that a fixed price or a guaranteed maximum price is not successfully negotiated, SANDAG may award the contract for construction services utilizing any other procurement method authorized by law.(3) The construction manager shall perform not less than 30 percent of the work covered by the fixed price or guaranteed maximum price agreement reached. Work that is not performed directly by the construction manager shall be bid to subcontractors pursuant to Section 6955 of the Public Contract Code.(e) It is the intent of the Legislature that alternative project delivery methods as authorized in this section shall not be construed to extend, limit, or change in any manner the legal responsibility of public agencies and contractors to comply with existing laws.
104114
105115 31468. (a) The Legislature has recognized the merits of alternative project delivery methods in the past by authorizing their use for projects undertaken by school districts, the University of California, specified local government projects, state office buildings, and public transit projects.(b) It is the intent of the Legislature to provide optional, alternative procedures for delivering the project and its components pursuant to this act. SANDAG may enter into an alternative project delivery method contract authorized in this section on a project or any project component, after comparison of the traditional design, bid, and build process of construction with the proposed alternative project delivery method in a public meeting, if the governing board makes written findings that use of an alternative project delivery method on the specific project or project component under consideration will accomplish at least one of the following objectives: reduce comparable project costs, expedite a projects completion, or provide features not achievable through the traditional design-bid-build method.(c) SANDAG may utilize the following alternative project delivery methods if the conditions in this section are met:(1) Design-build.(2) Design sequencing.(3) Construction Manager/General Contractor (CMGC).(d) (1) If a contract for CMGC services is entered into pursuant to this chapter and includes preconstruction services by the construction manager, SANDAG shall enter into a written contract with the construction manager for the preconstruction services, under which SANDAG shall pay the construction manager a fee for preconstruction services in an amount agreed upon by SANDAG and the construction manager. The preconstruction services contract may include fees for services to be performed during the contract period, provided that SANDAG shall not request or obtain a fixed price or a guaranteed maximum price for the construction contract from the construction manager or enter into a construction contract with the construction manager until after SANDAG has entered into a services contract. A preconstruction services contract shall provide for the subsequent negotiation for construction of all or any discrete phase or phases of the project and shall provide for SANDAG to own the design plans and other preconstruction services work products.(2) A contract for construction services may be awarded after the plans have been sufficiently developed and either a fixed price or a guaranteed maximum price has been successfully negotiated. In the event that a fixed price or a guaranteed maximum price is not successfully negotiated, SANDAG may award the contract for construction services utilizing any other procurement method authorized by law.(3) The construction manager shall perform not less than 30 percent of the work covered by the fixed price or guaranteed maximum price agreement reached. Work that is not performed directly by the construction manager shall be bid to subcontractors pursuant to Section 6955 of the Public Contract Code.(e) It is the intent of the Legislature that alternative project delivery methods as authorized in this section shall not be construed to extend, limit, or change in any manner the legal responsibility of public agencies and contractors to comply with existing laws.
106116
107117 31468. (a) The Legislature has recognized the merits of alternative project delivery methods in the past by authorizing their use for projects undertaken by school districts, the University of California, specified local government projects, state office buildings, and public transit projects.(b) It is the intent of the Legislature to provide optional, alternative procedures for delivering the project and its components pursuant to this act. SANDAG may enter into an alternative project delivery method contract authorized in this section on a project or any project component, after comparison of the traditional design, bid, and build process of construction with the proposed alternative project delivery method in a public meeting, if the governing board makes written findings that use of an alternative project delivery method on the specific project or project component under consideration will accomplish at least one of the following objectives: reduce comparable project costs, expedite a projects completion, or provide features not achievable through the traditional design-bid-build method.(c) SANDAG may utilize the following alternative project delivery methods if the conditions in this section are met:(1) Design-build.(2) Design sequencing.(3) Construction Manager/General Contractor (CMGC).(d) (1) If a contract for CMGC services is entered into pursuant to this chapter and includes preconstruction services by the construction manager, SANDAG shall enter into a written contract with the construction manager for the preconstruction services, under which SANDAG shall pay the construction manager a fee for preconstruction services in an amount agreed upon by SANDAG and the construction manager. The preconstruction services contract may include fees for services to be performed during the contract period, provided that SANDAG shall not request or obtain a fixed price or a guaranteed maximum price for the construction contract from the construction manager or enter into a construction contract with the construction manager until after SANDAG has entered into a services contract. A preconstruction services contract shall provide for the subsequent negotiation for construction of all or any discrete phase or phases of the project and shall provide for SANDAG to own the design plans and other preconstruction services work products.(2) A contract for construction services may be awarded after the plans have been sufficiently developed and either a fixed price or a guaranteed maximum price has been successfully negotiated. In the event that a fixed price or a guaranteed maximum price is not successfully negotiated, SANDAG may award the contract for construction services utilizing any other procurement method authorized by law.(3) The construction manager shall perform not less than 30 percent of the work covered by the fixed price or guaranteed maximum price agreement reached. Work that is not performed directly by the construction manager shall be bid to subcontractors pursuant to Section 6955 of the Public Contract Code.(e) It is the intent of the Legislature that alternative project delivery methods as authorized in this section shall not be construed to extend, limit, or change in any manner the legal responsibility of public agencies and contractors to comply with existing laws.
108118
109119
110120
111121 31468. (a) The Legislature has recognized the merits of alternative project delivery methods in the past by authorizing their use for projects undertaken by school districts, the University of California, specified local government projects, state office buildings, and public transit projects.
112122
113123 (b) It is the intent of the Legislature to provide optional, alternative procedures for delivering the project and its components pursuant to this act. SANDAG may enter into an alternative project delivery method contract authorized in this section on a project or any project component, after comparison of the traditional design, bid, and build process of construction with the proposed alternative project delivery method in a public meeting, if the governing board makes written findings that use of an alternative project delivery method on the specific project or project component under consideration will accomplish at least one of the following objectives: reduce comparable project costs, expedite a projects completion, or provide features not achievable through the traditional design-bid-build method.
114124
115125 (c) SANDAG may utilize the following alternative project delivery methods if the conditions in this section are met:
116126
117127 (1) Design-build.
118128
119129 (2) Design sequencing.
120130
121131 (3) Construction Manager/General Contractor (CMGC).
122132
123133 (d) (1) If a contract for CMGC services is entered into pursuant to this chapter and includes preconstruction services by the construction manager, SANDAG shall enter into a written contract with the construction manager for the preconstruction services, under which SANDAG shall pay the construction manager a fee for preconstruction services in an amount agreed upon by SANDAG and the construction manager. The preconstruction services contract may include fees for services to be performed during the contract period, provided that SANDAG shall not request or obtain a fixed price or a guaranteed maximum price for the construction contract from the construction manager or enter into a construction contract with the construction manager until after SANDAG has entered into a services contract. A preconstruction services contract shall provide for the subsequent negotiation for construction of all or any discrete phase or phases of the project and shall provide for SANDAG to own the design plans and other preconstruction services work products.
124134
125135 (2) A contract for construction services may be awarded after the plans have been sufficiently developed and either a fixed price or a guaranteed maximum price has been successfully negotiated. In the event that a fixed price or a guaranteed maximum price is not successfully negotiated, SANDAG may award the contract for construction services utilizing any other procurement method authorized by law.
126136
127137 (3) The construction manager shall perform not less than 30 percent of the work covered by the fixed price or guaranteed maximum price agreement reached. Work that is not performed directly by the construction manager shall be bid to subcontractors pursuant to Section 6955 of the Public Contract Code.
128138
129139 (e) It is the intent of the Legislature that alternative project delivery methods as authorized in this section shall not be construed to extend, limit, or change in any manner the legal responsibility of public agencies and contractors to comply with existing laws.
130140
131141 SEC. 3. This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:In order for state and local governments to meet critical deadlines and stakeholder agreements on a project of regional, statewide, and national significance in partnership with the federal government, while protecting worker and public safety, it is necessary that this act take effect immediately.
132142
133143 SEC. 3. This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:In order for state and local governments to meet critical deadlines and stakeholder agreements on a project of regional, statewide, and national significance in partnership with the federal government, while protecting worker and public safety, it is necessary that this act take effect immediately.
134144
135145 SEC. 3. This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
136146
137147 ### SEC. 3.
138148
139149 In order for state and local governments to meet critical deadlines and stakeholder agreements on a project of regional, statewide, and national significance in partnership with the federal government, while protecting worker and public safety, it is necessary that this act take effect immediately.