California 2023-2024 Regular Session

California Assembly Bill AB463 Compare Versions

Only one version of the bill is available at this time.
OldNewDifferences
11 CALIFORNIA LEGISLATURE 20232024 REGULAR SESSION Assembly Bill No. 463Introduced by Assembly Member HartFebruary 06, 2023 An act to amend Sections 2772 and 8386 of the Public Utilities Code, relating to electricity. LEGISLATIVE COUNSEL'S DIGESTAB 463, as introduced, Hart. Electricity: prioritization of service: public transit vehicles.Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law requires the commission to establish priorities among the types or categories of customers of every electrical corporation and every gas corporation, and among the uses of electricity or gas by those customers, to determine which of those customers and uses provide the most important public benefits and serve the greatest public need, and to categorize all other customers and uses in order of descending priority based on these standards. Existing law requires the commission, in establishing those priorities, to consider, among other things, the economic, social, and other effects of a temporary discontinuance in electrical or gas service to certain customers or for certain uses, as specified. If an electrical or gas corporation experiences a shortage of capacity or capability and is unable to meet all demands by its customers, existing law requires the commission to order that service be temporarily reduced by an amount that reflects the established priorities for the duration of the shortage.This bill would require the commission, in establishing those priorities, to also consider the economic, social equity, and mobility impacts of a temporary discontinuance in electrical service to the customers that rely on electrical service to operate public transit vehicles.Existing law requires each electrical corporation to annually prepare and submit a wildfire mitigation plan to the Wildfire Safety Division for review and approval. The California Energy Infrastructure Safety Act establishes the Office of Energy Infrastructure Safety within the Natural Resources Agency, and provides that, on and after July 1, 2021, the Office of Energy Infrastructure Safety is the successor to, and is vested with, all of the duties, powers, and responsibilities of the Wildfire Safety Division of the commission. Existing law requires that each wildfire mitigation plan include, among other things, the electrical corporations protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, including related to mitigating those public safety impacts on critical first responders, health and communication infrastructure, and customers who receive medical baseline allowances.This bill would require that those protocols also include protocols related to mitigating those public safety impacts on public transit vehicle charging infrastructure.Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.Because the violation of a commission action implementing some of this bills requirements would be a crime, the bill would impose a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: YES Bill TextThe people of the State of California do enact as follows:SECTION 1. Section 2772 of the Public Utilities Code is amended to read:2772. In establishing the priorities pursuant to Section 2771, the commission shall include, but not be limited to, a consideration of all the following:(a) A determination of the customers and uses of electricity and gas, in descending order of priority, that provide the most important public benefits and serve the greatest public need.(b) A determination of the customers and uses of electricity and gas that are not included under subdivision (a).(c) A determination of the economic, social, and other effects of a temporary discontinuance in electrical or gas service to the customers or for the uses determined in accordance with subdivision (a) or (b).(d) A determination of the economic, social equity, and mobility impacts of a temporary discontinuance in electrical service to the customers that rely on electrical service to operate public transit vehicles.(d)(e) A determination of the potential effect of extreme temperatures on the health and safety of residential customers. In making this determination, the commission shall do all of the following:(1) Consult with appropriate medical experts and review appropriate literature and research.(2) Consider whether providing priority to customers experiencing extreme temperatures would result in increased outage frequency and duration for remaining customers and its effect on the health and safety of those remaining customers.(3) To the extent the commission determines it is in the public interest to provide priority to customers that experience extreme temperatures, it shall provide that priority only when temperatures are extreme.(4) Consider whether alternative measures are appropriate, including, but not limited to, reducing the duration of the outage or imposing the outage earlier or later in the day.(e)(f) A determination of unacceptable jeopardy or imminent danger to public health and safety that creates substantial likelihood of severe health risk requiring medical attention.(f)(g) Any curtailment or allocation rules, orders, or regulations issued by any agency of the federal government.(g)The commission shall also consider the(h) The effect of providing a high priority to some customers on those customers who do not receive a high priority.SEC. 2. Section 8386 of the Public Utilities Code is amended to read:8386. (a) Each electrical corporation shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment.(b) Each electrical corporation shall annually prepare and submit a wildfire mitigation plan to the Wildfire Safety Division office for review and approval. In calendar year 2020, and thereafter, the plan shall cover at least a three-year period. The division office shall establish a schedule for the submission of subsequent comprehensive wildfire mitigation plans, which may allow for the staggering of compliance periods for each electrical corporation. In its discretion, the division office may allow the annual submissions to be updates to the last approved comprehensive wildfire mitigation plan; provided, that each electrical corporation shall submit a comprehensive wildfire mitigation plan at least once every three years.(c) The wildfire mitigation plan shall include all of the following:(1) An accounting of the responsibilities of persons responsible for executing the plan.(2) The objectives of the plan.(3) A description of the preventive strategies and programs to be adopted by the electrical corporation to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of dynamic climate change risks.(4) A description of the metrics the electrical corporation plans to use to evaluate the plans performance and the assumptions that underlie the use of those metrics.(5) A discussion of how the application of previously identified metrics to previous plan performances has informed the plan.(6) A description of the electrical corporations protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety. As part of these protocols, each electrical corporation shall include protocols related to mitigating the public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system that consider the impacts on all of the following:(A) Critical first responders.(B) Health and communication Health, communication, and public transit vehicle charging infrastructure.(C) Customers who receive medical baseline allowances pursuant to subdivision (c) of Section 739. The electrical corporation may deploy backup electrical resources or provide financial assistance for backup electrical resources to a customer receiving a medical baseline allowance for a customer who meets all of the following requirements:(i) The customer relies on life-support equipment that operates on electricity to sustain life.(ii) The customer demonstrates financial need, including through enrollment in the California Alternate Rates for Energy program continued pursuant to Section 739.1.(iii) The customer is not eligible for backup electrical resources provided through medical services, medical insurance, or community resources.(D) Subparagraph (C) shall not be construed as preventing does not prevent an electrical corporation from deploying backup electrical resources or providing financial assistance for backup electrical resources under any other authority.(7) A description of the electrical corporations appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, including procedures for those customers receiving medical baseline allowances as described in paragraph (6). The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event. The procedures shall comply with any orders of the commission regarding notifications of deenergization events.(8) Identification of circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits, including, but not limited to, the estimated annual decline in circuit deenergization and deenergization impact on customers, and replacing, hardening, or undergrounding any portion of the circuit or of upstream transmission or distribution lines.(9) Plans for vegetation management.(10) Plans for inspections of the electrical corporations electrical infrastructure.(11) A description of the electrical corporations protocols for the deenergization of the electrical corporations transmission infrastructure, for instances when the deenergization may impact customers who, or entities that, are dependent upon the infrastructure. The protocols shall comply with any order of the commission regarding deenergization events.(12) A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the electrical corporations service territory, including all relevant wildfire risk and risk mitigation information that is part of the commissions Safety Model Assessment Proceeding (A.15-05-002, et al.) and the Risk Assessment Mitigation Phase filings. The list shall include, but not be limited to, both of the following:(A) Risks and risk drivers associated with design, construction, operations, and maintenance of the electrical corporations equipment and facilities.(B) Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the electrical corporations service territory.(13) A description of how the plan accounts for the wildfire risk identified in the electrical corporations Risk Assessment Mitigation Phase filing.(14) A description of the actions the electrical corporation will take to ensure its system will achieve the highest level of safety, reliability, and resiliency, and to ensure that its system is prepared for a major event, including hardening and modernizing its infrastructure with improved engineering, system design, standards, equipment, and facilities, such as undergrounding, insulating of distribution wires, and replacing poles.(15) A description of where and how the electrical corporation considered undergrounding electrical distribution lines within those areas of its service territory identified to have the highest wildfire risk in a commission fire threat map.(16) A showing that the electrical corporation has an adequately sized and trained workforce to promptly restore service after a major event, taking into account employees of other utilities pursuant to mutual aid agreements and employees of entities that have entered into contracts with the electrical corporation.(17) Identification of any geographic area in the electrical corporations service territory that is a higher wildfire threat than is currently identified in a commission fire threat map, and where the commission should consider expanding the high fire threat district based on new information or changes in the environment.(18) A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk that is consistent with the methodology used by other electrical corporations unless the commission determines otherwise.(19) A description of how the plan is consistent with the electrical corporations disaster and emergency preparedness plan prepared pursuant to Section 768.6, including both of the following:(A) Plans to prepare for, and to restore service after, a wildfire, including workforce mobilization and prepositioning equipment and employees.(B) Plans for community outreach and public awareness before, during, and after a wildfire, including language notification in English, Spanish, and the top three primary languages used in the state other than English or Spanish, as determined by the commission based on the United States Census data.(20) A statement of how the electrical corporation will restore service after a wildfire.(21) Protocols for compliance with requirements adopted by the commission regarding activities to support customers during and after a wildfire, outage reporting, support for low-income customers, billing adjustments, deposit waivers, extended payment plans, suspension of disconnection and nonpayment fees, repair processing and timing, access to electrical corporation representatives, and emergency communications.(22) A description of the processes and procedures the electrical corporation will use to do all of the following:(A) Monitor and audit the implementation of the plan.(B) Identify any deficiencies in the plan or the plans implementation and correct those deficiencies.(C) Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, carried out under the plan and other applicable statutes and commission rules.(23) Any other information that the Wildfire Safety Division office may require.(d) The Wildfire Safety Division office shall post all wildfire mitigation plans and annual updates on the commissions internet website before July 1, 2021, and on the offices its internet website beginning July 1, 2021, for no less than two months before the divisions or offices decision regarding approval of the plan. The division or office shall accept comments on each plan from the public, other local and state agencies, and interested parties, and verify that the plan complies with all applicable rules, regulations, and standards, as appropriate.SEC. 3. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
22
33 CALIFORNIA LEGISLATURE 20232024 REGULAR SESSION Assembly Bill No. 463Introduced by Assembly Member HartFebruary 06, 2023 An act to amend Sections 2772 and 8386 of the Public Utilities Code, relating to electricity. LEGISLATIVE COUNSEL'S DIGESTAB 463, as introduced, Hart. Electricity: prioritization of service: public transit vehicles.Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law requires the commission to establish priorities among the types or categories of customers of every electrical corporation and every gas corporation, and among the uses of electricity or gas by those customers, to determine which of those customers and uses provide the most important public benefits and serve the greatest public need, and to categorize all other customers and uses in order of descending priority based on these standards. Existing law requires the commission, in establishing those priorities, to consider, among other things, the economic, social, and other effects of a temporary discontinuance in electrical or gas service to certain customers or for certain uses, as specified. If an electrical or gas corporation experiences a shortage of capacity or capability and is unable to meet all demands by its customers, existing law requires the commission to order that service be temporarily reduced by an amount that reflects the established priorities for the duration of the shortage.This bill would require the commission, in establishing those priorities, to also consider the economic, social equity, and mobility impacts of a temporary discontinuance in electrical service to the customers that rely on electrical service to operate public transit vehicles.Existing law requires each electrical corporation to annually prepare and submit a wildfire mitigation plan to the Wildfire Safety Division for review and approval. The California Energy Infrastructure Safety Act establishes the Office of Energy Infrastructure Safety within the Natural Resources Agency, and provides that, on and after July 1, 2021, the Office of Energy Infrastructure Safety is the successor to, and is vested with, all of the duties, powers, and responsibilities of the Wildfire Safety Division of the commission. Existing law requires that each wildfire mitigation plan include, among other things, the electrical corporations protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, including related to mitigating those public safety impacts on critical first responders, health and communication infrastructure, and customers who receive medical baseline allowances.This bill would require that those protocols also include protocols related to mitigating those public safety impacts on public transit vehicle charging infrastructure.Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.Because the violation of a commission action implementing some of this bills requirements would be a crime, the bill would impose a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: YES
44
55
66
77
88
99 CALIFORNIA LEGISLATURE 20232024 REGULAR SESSION
1010
1111 Assembly Bill
1212
1313 No. 463
1414
1515 Introduced by Assembly Member HartFebruary 06, 2023
1616
1717 Introduced by Assembly Member Hart
1818 February 06, 2023
1919
2020 An act to amend Sections 2772 and 8386 of the Public Utilities Code, relating to electricity.
2121
2222 LEGISLATIVE COUNSEL'S DIGEST
2323
2424 ## LEGISLATIVE COUNSEL'S DIGEST
2525
2626 AB 463, as introduced, Hart. Electricity: prioritization of service: public transit vehicles.
2727
2828 Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law requires the commission to establish priorities among the types or categories of customers of every electrical corporation and every gas corporation, and among the uses of electricity or gas by those customers, to determine which of those customers and uses provide the most important public benefits and serve the greatest public need, and to categorize all other customers and uses in order of descending priority based on these standards. Existing law requires the commission, in establishing those priorities, to consider, among other things, the economic, social, and other effects of a temporary discontinuance in electrical or gas service to certain customers or for certain uses, as specified. If an electrical or gas corporation experiences a shortage of capacity or capability and is unable to meet all demands by its customers, existing law requires the commission to order that service be temporarily reduced by an amount that reflects the established priorities for the duration of the shortage.This bill would require the commission, in establishing those priorities, to also consider the economic, social equity, and mobility impacts of a temporary discontinuance in electrical service to the customers that rely on electrical service to operate public transit vehicles.Existing law requires each electrical corporation to annually prepare and submit a wildfire mitigation plan to the Wildfire Safety Division for review and approval. The California Energy Infrastructure Safety Act establishes the Office of Energy Infrastructure Safety within the Natural Resources Agency, and provides that, on and after July 1, 2021, the Office of Energy Infrastructure Safety is the successor to, and is vested with, all of the duties, powers, and responsibilities of the Wildfire Safety Division of the commission. Existing law requires that each wildfire mitigation plan include, among other things, the electrical corporations protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, including related to mitigating those public safety impacts on critical first responders, health and communication infrastructure, and customers who receive medical baseline allowances.This bill would require that those protocols also include protocols related to mitigating those public safety impacts on public transit vehicle charging infrastructure.Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.Because the violation of a commission action implementing some of this bills requirements would be a crime, the bill would impose a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.
2929
3030 Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law requires the commission to establish priorities among the types or categories of customers of every electrical corporation and every gas corporation, and among the uses of electricity or gas by those customers, to determine which of those customers and uses provide the most important public benefits and serve the greatest public need, and to categorize all other customers and uses in order of descending priority based on these standards. Existing law requires the commission, in establishing those priorities, to consider, among other things, the economic, social, and other effects of a temporary discontinuance in electrical or gas service to certain customers or for certain uses, as specified. If an electrical or gas corporation experiences a shortage of capacity or capability and is unable to meet all demands by its customers, existing law requires the commission to order that service be temporarily reduced by an amount that reflects the established priorities for the duration of the shortage.
3131
3232 This bill would require the commission, in establishing those priorities, to also consider the economic, social equity, and mobility impacts of a temporary discontinuance in electrical service to the customers that rely on electrical service to operate public transit vehicles.
3333
3434 Existing law requires each electrical corporation to annually prepare and submit a wildfire mitigation plan to the Wildfire Safety Division for review and approval. The California Energy Infrastructure Safety Act establishes the Office of Energy Infrastructure Safety within the Natural Resources Agency, and provides that, on and after July 1, 2021, the Office of Energy Infrastructure Safety is the successor to, and is vested with, all of the duties, powers, and responsibilities of the Wildfire Safety Division of the commission. Existing law requires that each wildfire mitigation plan include, among other things, the electrical corporations protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, including related to mitigating those public safety impacts on critical first responders, health and communication infrastructure, and customers who receive medical baseline allowances.
3535
3636 This bill would require that those protocols also include protocols related to mitigating those public safety impacts on public transit vehicle charging infrastructure.
3737
3838 Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
3939
4040 Because the violation of a commission action implementing some of this bills requirements would be a crime, the bill would impose a state-mandated local program.
4141
4242 The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
4343
4444 This bill would provide that no reimbursement is required by this act for a specified reason.
4545
4646 ## Digest Key
4747
4848 ## Bill Text
4949
5050 The people of the State of California do enact as follows:SECTION 1. Section 2772 of the Public Utilities Code is amended to read:2772. In establishing the priorities pursuant to Section 2771, the commission shall include, but not be limited to, a consideration of all the following:(a) A determination of the customers and uses of electricity and gas, in descending order of priority, that provide the most important public benefits and serve the greatest public need.(b) A determination of the customers and uses of electricity and gas that are not included under subdivision (a).(c) A determination of the economic, social, and other effects of a temporary discontinuance in electrical or gas service to the customers or for the uses determined in accordance with subdivision (a) or (b).(d) A determination of the economic, social equity, and mobility impacts of a temporary discontinuance in electrical service to the customers that rely on electrical service to operate public transit vehicles.(d)(e) A determination of the potential effect of extreme temperatures on the health and safety of residential customers. In making this determination, the commission shall do all of the following:(1) Consult with appropriate medical experts and review appropriate literature and research.(2) Consider whether providing priority to customers experiencing extreme temperatures would result in increased outage frequency and duration for remaining customers and its effect on the health and safety of those remaining customers.(3) To the extent the commission determines it is in the public interest to provide priority to customers that experience extreme temperatures, it shall provide that priority only when temperatures are extreme.(4) Consider whether alternative measures are appropriate, including, but not limited to, reducing the duration of the outage or imposing the outage earlier or later in the day.(e)(f) A determination of unacceptable jeopardy or imminent danger to public health and safety that creates substantial likelihood of severe health risk requiring medical attention.(f)(g) Any curtailment or allocation rules, orders, or regulations issued by any agency of the federal government.(g)The commission shall also consider the(h) The effect of providing a high priority to some customers on those customers who do not receive a high priority.SEC. 2. Section 8386 of the Public Utilities Code is amended to read:8386. (a) Each electrical corporation shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment.(b) Each electrical corporation shall annually prepare and submit a wildfire mitigation plan to the Wildfire Safety Division office for review and approval. In calendar year 2020, and thereafter, the plan shall cover at least a three-year period. The division office shall establish a schedule for the submission of subsequent comprehensive wildfire mitigation plans, which may allow for the staggering of compliance periods for each electrical corporation. In its discretion, the division office may allow the annual submissions to be updates to the last approved comprehensive wildfire mitigation plan; provided, that each electrical corporation shall submit a comprehensive wildfire mitigation plan at least once every three years.(c) The wildfire mitigation plan shall include all of the following:(1) An accounting of the responsibilities of persons responsible for executing the plan.(2) The objectives of the plan.(3) A description of the preventive strategies and programs to be adopted by the electrical corporation to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of dynamic climate change risks.(4) A description of the metrics the electrical corporation plans to use to evaluate the plans performance and the assumptions that underlie the use of those metrics.(5) A discussion of how the application of previously identified metrics to previous plan performances has informed the plan.(6) A description of the electrical corporations protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety. As part of these protocols, each electrical corporation shall include protocols related to mitigating the public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system that consider the impacts on all of the following:(A) Critical first responders.(B) Health and communication Health, communication, and public transit vehicle charging infrastructure.(C) Customers who receive medical baseline allowances pursuant to subdivision (c) of Section 739. The electrical corporation may deploy backup electrical resources or provide financial assistance for backup electrical resources to a customer receiving a medical baseline allowance for a customer who meets all of the following requirements:(i) The customer relies on life-support equipment that operates on electricity to sustain life.(ii) The customer demonstrates financial need, including through enrollment in the California Alternate Rates for Energy program continued pursuant to Section 739.1.(iii) The customer is not eligible for backup electrical resources provided through medical services, medical insurance, or community resources.(D) Subparagraph (C) shall not be construed as preventing does not prevent an electrical corporation from deploying backup electrical resources or providing financial assistance for backup electrical resources under any other authority.(7) A description of the electrical corporations appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, including procedures for those customers receiving medical baseline allowances as described in paragraph (6). The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event. The procedures shall comply with any orders of the commission regarding notifications of deenergization events.(8) Identification of circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits, including, but not limited to, the estimated annual decline in circuit deenergization and deenergization impact on customers, and replacing, hardening, or undergrounding any portion of the circuit or of upstream transmission or distribution lines.(9) Plans for vegetation management.(10) Plans for inspections of the electrical corporations electrical infrastructure.(11) A description of the electrical corporations protocols for the deenergization of the electrical corporations transmission infrastructure, for instances when the deenergization may impact customers who, or entities that, are dependent upon the infrastructure. The protocols shall comply with any order of the commission regarding deenergization events.(12) A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the electrical corporations service territory, including all relevant wildfire risk and risk mitigation information that is part of the commissions Safety Model Assessment Proceeding (A.15-05-002, et al.) and the Risk Assessment Mitigation Phase filings. The list shall include, but not be limited to, both of the following:(A) Risks and risk drivers associated with design, construction, operations, and maintenance of the electrical corporations equipment and facilities.(B) Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the electrical corporations service territory.(13) A description of how the plan accounts for the wildfire risk identified in the electrical corporations Risk Assessment Mitigation Phase filing.(14) A description of the actions the electrical corporation will take to ensure its system will achieve the highest level of safety, reliability, and resiliency, and to ensure that its system is prepared for a major event, including hardening and modernizing its infrastructure with improved engineering, system design, standards, equipment, and facilities, such as undergrounding, insulating of distribution wires, and replacing poles.(15) A description of where and how the electrical corporation considered undergrounding electrical distribution lines within those areas of its service territory identified to have the highest wildfire risk in a commission fire threat map.(16) A showing that the electrical corporation has an adequately sized and trained workforce to promptly restore service after a major event, taking into account employees of other utilities pursuant to mutual aid agreements and employees of entities that have entered into contracts with the electrical corporation.(17) Identification of any geographic area in the electrical corporations service territory that is a higher wildfire threat than is currently identified in a commission fire threat map, and where the commission should consider expanding the high fire threat district based on new information or changes in the environment.(18) A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk that is consistent with the methodology used by other electrical corporations unless the commission determines otherwise.(19) A description of how the plan is consistent with the electrical corporations disaster and emergency preparedness plan prepared pursuant to Section 768.6, including both of the following:(A) Plans to prepare for, and to restore service after, a wildfire, including workforce mobilization and prepositioning equipment and employees.(B) Plans for community outreach and public awareness before, during, and after a wildfire, including language notification in English, Spanish, and the top three primary languages used in the state other than English or Spanish, as determined by the commission based on the United States Census data.(20) A statement of how the electrical corporation will restore service after a wildfire.(21) Protocols for compliance with requirements adopted by the commission regarding activities to support customers during and after a wildfire, outage reporting, support for low-income customers, billing adjustments, deposit waivers, extended payment plans, suspension of disconnection and nonpayment fees, repair processing and timing, access to electrical corporation representatives, and emergency communications.(22) A description of the processes and procedures the electrical corporation will use to do all of the following:(A) Monitor and audit the implementation of the plan.(B) Identify any deficiencies in the plan or the plans implementation and correct those deficiencies.(C) Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, carried out under the plan and other applicable statutes and commission rules.(23) Any other information that the Wildfire Safety Division office may require.(d) The Wildfire Safety Division office shall post all wildfire mitigation plans and annual updates on the commissions internet website before July 1, 2021, and on the offices its internet website beginning July 1, 2021, for no less than two months before the divisions or offices decision regarding approval of the plan. The division or office shall accept comments on each plan from the public, other local and state agencies, and interested parties, and verify that the plan complies with all applicable rules, regulations, and standards, as appropriate.SEC. 3. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
5151
5252 The people of the State of California do enact as follows:
5353
5454 ## The people of the State of California do enact as follows:
5555
5656 SECTION 1. Section 2772 of the Public Utilities Code is amended to read:2772. In establishing the priorities pursuant to Section 2771, the commission shall include, but not be limited to, a consideration of all the following:(a) A determination of the customers and uses of electricity and gas, in descending order of priority, that provide the most important public benefits and serve the greatest public need.(b) A determination of the customers and uses of electricity and gas that are not included under subdivision (a).(c) A determination of the economic, social, and other effects of a temporary discontinuance in electrical or gas service to the customers or for the uses determined in accordance with subdivision (a) or (b).(d) A determination of the economic, social equity, and mobility impacts of a temporary discontinuance in electrical service to the customers that rely on electrical service to operate public transit vehicles.(d)(e) A determination of the potential effect of extreme temperatures on the health and safety of residential customers. In making this determination, the commission shall do all of the following:(1) Consult with appropriate medical experts and review appropriate literature and research.(2) Consider whether providing priority to customers experiencing extreme temperatures would result in increased outage frequency and duration for remaining customers and its effect on the health and safety of those remaining customers.(3) To the extent the commission determines it is in the public interest to provide priority to customers that experience extreme temperatures, it shall provide that priority only when temperatures are extreme.(4) Consider whether alternative measures are appropriate, including, but not limited to, reducing the duration of the outage or imposing the outage earlier or later in the day.(e)(f) A determination of unacceptable jeopardy or imminent danger to public health and safety that creates substantial likelihood of severe health risk requiring medical attention.(f)(g) Any curtailment or allocation rules, orders, or regulations issued by any agency of the federal government.(g)The commission shall also consider the(h) The effect of providing a high priority to some customers on those customers who do not receive a high priority.
5757
5858 SECTION 1. Section 2772 of the Public Utilities Code is amended to read:
5959
6060 ### SECTION 1.
6161
6262 2772. In establishing the priorities pursuant to Section 2771, the commission shall include, but not be limited to, a consideration of all the following:(a) A determination of the customers and uses of electricity and gas, in descending order of priority, that provide the most important public benefits and serve the greatest public need.(b) A determination of the customers and uses of electricity and gas that are not included under subdivision (a).(c) A determination of the economic, social, and other effects of a temporary discontinuance in electrical or gas service to the customers or for the uses determined in accordance with subdivision (a) or (b).(d) A determination of the economic, social equity, and mobility impacts of a temporary discontinuance in electrical service to the customers that rely on electrical service to operate public transit vehicles.(d)(e) A determination of the potential effect of extreme temperatures on the health and safety of residential customers. In making this determination, the commission shall do all of the following:(1) Consult with appropriate medical experts and review appropriate literature and research.(2) Consider whether providing priority to customers experiencing extreme temperatures would result in increased outage frequency and duration for remaining customers and its effect on the health and safety of those remaining customers.(3) To the extent the commission determines it is in the public interest to provide priority to customers that experience extreme temperatures, it shall provide that priority only when temperatures are extreme.(4) Consider whether alternative measures are appropriate, including, but not limited to, reducing the duration of the outage or imposing the outage earlier or later in the day.(e)(f) A determination of unacceptable jeopardy or imminent danger to public health and safety that creates substantial likelihood of severe health risk requiring medical attention.(f)(g) Any curtailment or allocation rules, orders, or regulations issued by any agency of the federal government.(g)The commission shall also consider the(h) The effect of providing a high priority to some customers on those customers who do not receive a high priority.
6363
6464 2772. In establishing the priorities pursuant to Section 2771, the commission shall include, but not be limited to, a consideration of all the following:(a) A determination of the customers and uses of electricity and gas, in descending order of priority, that provide the most important public benefits and serve the greatest public need.(b) A determination of the customers and uses of electricity and gas that are not included under subdivision (a).(c) A determination of the economic, social, and other effects of a temporary discontinuance in electrical or gas service to the customers or for the uses determined in accordance with subdivision (a) or (b).(d) A determination of the economic, social equity, and mobility impacts of a temporary discontinuance in electrical service to the customers that rely on electrical service to operate public transit vehicles.(d)(e) A determination of the potential effect of extreme temperatures on the health and safety of residential customers. In making this determination, the commission shall do all of the following:(1) Consult with appropriate medical experts and review appropriate literature and research.(2) Consider whether providing priority to customers experiencing extreme temperatures would result in increased outage frequency and duration for remaining customers and its effect on the health and safety of those remaining customers.(3) To the extent the commission determines it is in the public interest to provide priority to customers that experience extreme temperatures, it shall provide that priority only when temperatures are extreme.(4) Consider whether alternative measures are appropriate, including, but not limited to, reducing the duration of the outage or imposing the outage earlier or later in the day.(e)(f) A determination of unacceptable jeopardy or imminent danger to public health and safety that creates substantial likelihood of severe health risk requiring medical attention.(f)(g) Any curtailment or allocation rules, orders, or regulations issued by any agency of the federal government.(g)The commission shall also consider the(h) The effect of providing a high priority to some customers on those customers who do not receive a high priority.
6565
6666 2772. In establishing the priorities pursuant to Section 2771, the commission shall include, but not be limited to, a consideration of all the following:(a) A determination of the customers and uses of electricity and gas, in descending order of priority, that provide the most important public benefits and serve the greatest public need.(b) A determination of the customers and uses of electricity and gas that are not included under subdivision (a).(c) A determination of the economic, social, and other effects of a temporary discontinuance in electrical or gas service to the customers or for the uses determined in accordance with subdivision (a) or (b).(d) A determination of the economic, social equity, and mobility impacts of a temporary discontinuance in electrical service to the customers that rely on electrical service to operate public transit vehicles.(d)(e) A determination of the potential effect of extreme temperatures on the health and safety of residential customers. In making this determination, the commission shall do all of the following:(1) Consult with appropriate medical experts and review appropriate literature and research.(2) Consider whether providing priority to customers experiencing extreme temperatures would result in increased outage frequency and duration for remaining customers and its effect on the health and safety of those remaining customers.(3) To the extent the commission determines it is in the public interest to provide priority to customers that experience extreme temperatures, it shall provide that priority only when temperatures are extreme.(4) Consider whether alternative measures are appropriate, including, but not limited to, reducing the duration of the outage or imposing the outage earlier or later in the day.(e)(f) A determination of unacceptable jeopardy or imminent danger to public health and safety that creates substantial likelihood of severe health risk requiring medical attention.(f)(g) Any curtailment or allocation rules, orders, or regulations issued by any agency of the federal government.(g)The commission shall also consider the(h) The effect of providing a high priority to some customers on those customers who do not receive a high priority.
6767
6868
6969
7070 2772. In establishing the priorities pursuant to Section 2771, the commission shall include, but not be limited to, a consideration of all the following:
7171
7272 (a) A determination of the customers and uses of electricity and gas, in descending order of priority, that provide the most important public benefits and serve the greatest public need.
7373
7474 (b) A determination of the customers and uses of electricity and gas that are not included under subdivision (a).
7575
7676 (c) A determination of the economic, social, and other effects of a temporary discontinuance in electrical or gas service to the customers or for the uses determined in accordance with subdivision (a) or (b).
7777
7878 (d) A determination of the economic, social equity, and mobility impacts of a temporary discontinuance in electrical service to the customers that rely on electrical service to operate public transit vehicles.
7979
8080 (d)
8181
8282
8383
8484 (e) A determination of the potential effect of extreme temperatures on the health and safety of residential customers. In making this determination, the commission shall do all of the following:
8585
8686 (1) Consult with appropriate medical experts and review appropriate literature and research.
8787
8888 (2) Consider whether providing priority to customers experiencing extreme temperatures would result in increased outage frequency and duration for remaining customers and its effect on the health and safety of those remaining customers.
8989
9090 (3) To the extent the commission determines it is in the public interest to provide priority to customers that experience extreme temperatures, it shall provide that priority only when temperatures are extreme.
9191
9292 (4) Consider whether alternative measures are appropriate, including, but not limited to, reducing the duration of the outage or imposing the outage earlier or later in the day.
9393
9494 (e)
9595
9696
9797
9898 (f) A determination of unacceptable jeopardy or imminent danger to public health and safety that creates substantial likelihood of severe health risk requiring medical attention.
9999
100100 (f)
101101
102102
103103
104104 (g) Any curtailment or allocation rules, orders, or regulations issued by any agency of the federal government.
105105
106106 (g)The commission shall also consider the
107107
108108
109109
110110 (h) The effect of providing a high priority to some customers on those customers who do not receive a high priority.
111111
112112 SEC. 2. Section 8386 of the Public Utilities Code is amended to read:8386. (a) Each electrical corporation shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment.(b) Each electrical corporation shall annually prepare and submit a wildfire mitigation plan to the Wildfire Safety Division office for review and approval. In calendar year 2020, and thereafter, the plan shall cover at least a three-year period. The division office shall establish a schedule for the submission of subsequent comprehensive wildfire mitigation plans, which may allow for the staggering of compliance periods for each electrical corporation. In its discretion, the division office may allow the annual submissions to be updates to the last approved comprehensive wildfire mitigation plan; provided, that each electrical corporation shall submit a comprehensive wildfire mitigation plan at least once every three years.(c) The wildfire mitigation plan shall include all of the following:(1) An accounting of the responsibilities of persons responsible for executing the plan.(2) The objectives of the plan.(3) A description of the preventive strategies and programs to be adopted by the electrical corporation to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of dynamic climate change risks.(4) A description of the metrics the electrical corporation plans to use to evaluate the plans performance and the assumptions that underlie the use of those metrics.(5) A discussion of how the application of previously identified metrics to previous plan performances has informed the plan.(6) A description of the electrical corporations protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety. As part of these protocols, each electrical corporation shall include protocols related to mitigating the public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system that consider the impacts on all of the following:(A) Critical first responders.(B) Health and communication Health, communication, and public transit vehicle charging infrastructure.(C) Customers who receive medical baseline allowances pursuant to subdivision (c) of Section 739. The electrical corporation may deploy backup electrical resources or provide financial assistance for backup electrical resources to a customer receiving a medical baseline allowance for a customer who meets all of the following requirements:(i) The customer relies on life-support equipment that operates on electricity to sustain life.(ii) The customer demonstrates financial need, including through enrollment in the California Alternate Rates for Energy program continued pursuant to Section 739.1.(iii) The customer is not eligible for backup electrical resources provided through medical services, medical insurance, or community resources.(D) Subparagraph (C) shall not be construed as preventing does not prevent an electrical corporation from deploying backup electrical resources or providing financial assistance for backup electrical resources under any other authority.(7) A description of the electrical corporations appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, including procedures for those customers receiving medical baseline allowances as described in paragraph (6). The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event. The procedures shall comply with any orders of the commission regarding notifications of deenergization events.(8) Identification of circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits, including, but not limited to, the estimated annual decline in circuit deenergization and deenergization impact on customers, and replacing, hardening, or undergrounding any portion of the circuit or of upstream transmission or distribution lines.(9) Plans for vegetation management.(10) Plans for inspections of the electrical corporations electrical infrastructure.(11) A description of the electrical corporations protocols for the deenergization of the electrical corporations transmission infrastructure, for instances when the deenergization may impact customers who, or entities that, are dependent upon the infrastructure. The protocols shall comply with any order of the commission regarding deenergization events.(12) A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the electrical corporations service territory, including all relevant wildfire risk and risk mitigation information that is part of the commissions Safety Model Assessment Proceeding (A.15-05-002, et al.) and the Risk Assessment Mitigation Phase filings. The list shall include, but not be limited to, both of the following:(A) Risks and risk drivers associated with design, construction, operations, and maintenance of the electrical corporations equipment and facilities.(B) Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the electrical corporations service territory.(13) A description of how the plan accounts for the wildfire risk identified in the electrical corporations Risk Assessment Mitigation Phase filing.(14) A description of the actions the electrical corporation will take to ensure its system will achieve the highest level of safety, reliability, and resiliency, and to ensure that its system is prepared for a major event, including hardening and modernizing its infrastructure with improved engineering, system design, standards, equipment, and facilities, such as undergrounding, insulating of distribution wires, and replacing poles.(15) A description of where and how the electrical corporation considered undergrounding electrical distribution lines within those areas of its service territory identified to have the highest wildfire risk in a commission fire threat map.(16) A showing that the electrical corporation has an adequately sized and trained workforce to promptly restore service after a major event, taking into account employees of other utilities pursuant to mutual aid agreements and employees of entities that have entered into contracts with the electrical corporation.(17) Identification of any geographic area in the electrical corporations service territory that is a higher wildfire threat than is currently identified in a commission fire threat map, and where the commission should consider expanding the high fire threat district based on new information or changes in the environment.(18) A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk that is consistent with the methodology used by other electrical corporations unless the commission determines otherwise.(19) A description of how the plan is consistent with the electrical corporations disaster and emergency preparedness plan prepared pursuant to Section 768.6, including both of the following:(A) Plans to prepare for, and to restore service after, a wildfire, including workforce mobilization and prepositioning equipment and employees.(B) Plans for community outreach and public awareness before, during, and after a wildfire, including language notification in English, Spanish, and the top three primary languages used in the state other than English or Spanish, as determined by the commission based on the United States Census data.(20) A statement of how the electrical corporation will restore service after a wildfire.(21) Protocols for compliance with requirements adopted by the commission regarding activities to support customers during and after a wildfire, outage reporting, support for low-income customers, billing adjustments, deposit waivers, extended payment plans, suspension of disconnection and nonpayment fees, repair processing and timing, access to electrical corporation representatives, and emergency communications.(22) A description of the processes and procedures the electrical corporation will use to do all of the following:(A) Monitor and audit the implementation of the plan.(B) Identify any deficiencies in the plan or the plans implementation and correct those deficiencies.(C) Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, carried out under the plan and other applicable statutes and commission rules.(23) Any other information that the Wildfire Safety Division office may require.(d) The Wildfire Safety Division office shall post all wildfire mitigation plans and annual updates on the commissions internet website before July 1, 2021, and on the offices its internet website beginning July 1, 2021, for no less than two months before the divisions or offices decision regarding approval of the plan. The division or office shall accept comments on each plan from the public, other local and state agencies, and interested parties, and verify that the plan complies with all applicable rules, regulations, and standards, as appropriate.
113113
114114 SEC. 2. Section 8386 of the Public Utilities Code is amended to read:
115115
116116 ### SEC. 2.
117117
118118 8386. (a) Each electrical corporation shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment.(b) Each electrical corporation shall annually prepare and submit a wildfire mitigation plan to the Wildfire Safety Division office for review and approval. In calendar year 2020, and thereafter, the plan shall cover at least a three-year period. The division office shall establish a schedule for the submission of subsequent comprehensive wildfire mitigation plans, which may allow for the staggering of compliance periods for each electrical corporation. In its discretion, the division office may allow the annual submissions to be updates to the last approved comprehensive wildfire mitigation plan; provided, that each electrical corporation shall submit a comprehensive wildfire mitigation plan at least once every three years.(c) The wildfire mitigation plan shall include all of the following:(1) An accounting of the responsibilities of persons responsible for executing the plan.(2) The objectives of the plan.(3) A description of the preventive strategies and programs to be adopted by the electrical corporation to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of dynamic climate change risks.(4) A description of the metrics the electrical corporation plans to use to evaluate the plans performance and the assumptions that underlie the use of those metrics.(5) A discussion of how the application of previously identified metrics to previous plan performances has informed the plan.(6) A description of the electrical corporations protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety. As part of these protocols, each electrical corporation shall include protocols related to mitigating the public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system that consider the impacts on all of the following:(A) Critical first responders.(B) Health and communication Health, communication, and public transit vehicle charging infrastructure.(C) Customers who receive medical baseline allowances pursuant to subdivision (c) of Section 739. The electrical corporation may deploy backup electrical resources or provide financial assistance for backup electrical resources to a customer receiving a medical baseline allowance for a customer who meets all of the following requirements:(i) The customer relies on life-support equipment that operates on electricity to sustain life.(ii) The customer demonstrates financial need, including through enrollment in the California Alternate Rates for Energy program continued pursuant to Section 739.1.(iii) The customer is not eligible for backup electrical resources provided through medical services, medical insurance, or community resources.(D) Subparagraph (C) shall not be construed as preventing does not prevent an electrical corporation from deploying backup electrical resources or providing financial assistance for backup electrical resources under any other authority.(7) A description of the electrical corporations appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, including procedures for those customers receiving medical baseline allowances as described in paragraph (6). The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event. The procedures shall comply with any orders of the commission regarding notifications of deenergization events.(8) Identification of circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits, including, but not limited to, the estimated annual decline in circuit deenergization and deenergization impact on customers, and replacing, hardening, or undergrounding any portion of the circuit or of upstream transmission or distribution lines.(9) Plans for vegetation management.(10) Plans for inspections of the electrical corporations electrical infrastructure.(11) A description of the electrical corporations protocols for the deenergization of the electrical corporations transmission infrastructure, for instances when the deenergization may impact customers who, or entities that, are dependent upon the infrastructure. The protocols shall comply with any order of the commission regarding deenergization events.(12) A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the electrical corporations service territory, including all relevant wildfire risk and risk mitigation information that is part of the commissions Safety Model Assessment Proceeding (A.15-05-002, et al.) and the Risk Assessment Mitigation Phase filings. The list shall include, but not be limited to, both of the following:(A) Risks and risk drivers associated with design, construction, operations, and maintenance of the electrical corporations equipment and facilities.(B) Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the electrical corporations service territory.(13) A description of how the plan accounts for the wildfire risk identified in the electrical corporations Risk Assessment Mitigation Phase filing.(14) A description of the actions the electrical corporation will take to ensure its system will achieve the highest level of safety, reliability, and resiliency, and to ensure that its system is prepared for a major event, including hardening and modernizing its infrastructure with improved engineering, system design, standards, equipment, and facilities, such as undergrounding, insulating of distribution wires, and replacing poles.(15) A description of where and how the electrical corporation considered undergrounding electrical distribution lines within those areas of its service territory identified to have the highest wildfire risk in a commission fire threat map.(16) A showing that the electrical corporation has an adequately sized and trained workforce to promptly restore service after a major event, taking into account employees of other utilities pursuant to mutual aid agreements and employees of entities that have entered into contracts with the electrical corporation.(17) Identification of any geographic area in the electrical corporations service territory that is a higher wildfire threat than is currently identified in a commission fire threat map, and where the commission should consider expanding the high fire threat district based on new information or changes in the environment.(18) A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk that is consistent with the methodology used by other electrical corporations unless the commission determines otherwise.(19) A description of how the plan is consistent with the electrical corporations disaster and emergency preparedness plan prepared pursuant to Section 768.6, including both of the following:(A) Plans to prepare for, and to restore service after, a wildfire, including workforce mobilization and prepositioning equipment and employees.(B) Plans for community outreach and public awareness before, during, and after a wildfire, including language notification in English, Spanish, and the top three primary languages used in the state other than English or Spanish, as determined by the commission based on the United States Census data.(20) A statement of how the electrical corporation will restore service after a wildfire.(21) Protocols for compliance with requirements adopted by the commission regarding activities to support customers during and after a wildfire, outage reporting, support for low-income customers, billing adjustments, deposit waivers, extended payment plans, suspension of disconnection and nonpayment fees, repair processing and timing, access to electrical corporation representatives, and emergency communications.(22) A description of the processes and procedures the electrical corporation will use to do all of the following:(A) Monitor and audit the implementation of the plan.(B) Identify any deficiencies in the plan or the plans implementation and correct those deficiencies.(C) Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, carried out under the plan and other applicable statutes and commission rules.(23) Any other information that the Wildfire Safety Division office may require.(d) The Wildfire Safety Division office shall post all wildfire mitigation plans and annual updates on the commissions internet website before July 1, 2021, and on the offices its internet website beginning July 1, 2021, for no less than two months before the divisions or offices decision regarding approval of the plan. The division or office shall accept comments on each plan from the public, other local and state agencies, and interested parties, and verify that the plan complies with all applicable rules, regulations, and standards, as appropriate.
119119
120120 8386. (a) Each electrical corporation shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment.(b) Each electrical corporation shall annually prepare and submit a wildfire mitigation plan to the Wildfire Safety Division office for review and approval. In calendar year 2020, and thereafter, the plan shall cover at least a three-year period. The division office shall establish a schedule for the submission of subsequent comprehensive wildfire mitigation plans, which may allow for the staggering of compliance periods for each electrical corporation. In its discretion, the division office may allow the annual submissions to be updates to the last approved comprehensive wildfire mitigation plan; provided, that each electrical corporation shall submit a comprehensive wildfire mitigation plan at least once every three years.(c) The wildfire mitigation plan shall include all of the following:(1) An accounting of the responsibilities of persons responsible for executing the plan.(2) The objectives of the plan.(3) A description of the preventive strategies and programs to be adopted by the electrical corporation to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of dynamic climate change risks.(4) A description of the metrics the electrical corporation plans to use to evaluate the plans performance and the assumptions that underlie the use of those metrics.(5) A discussion of how the application of previously identified metrics to previous plan performances has informed the plan.(6) A description of the electrical corporations protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety. As part of these protocols, each electrical corporation shall include protocols related to mitigating the public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system that consider the impacts on all of the following:(A) Critical first responders.(B) Health and communication Health, communication, and public transit vehicle charging infrastructure.(C) Customers who receive medical baseline allowances pursuant to subdivision (c) of Section 739. The electrical corporation may deploy backup electrical resources or provide financial assistance for backup electrical resources to a customer receiving a medical baseline allowance for a customer who meets all of the following requirements:(i) The customer relies on life-support equipment that operates on electricity to sustain life.(ii) The customer demonstrates financial need, including through enrollment in the California Alternate Rates for Energy program continued pursuant to Section 739.1.(iii) The customer is not eligible for backup electrical resources provided through medical services, medical insurance, or community resources.(D) Subparagraph (C) shall not be construed as preventing does not prevent an electrical corporation from deploying backup electrical resources or providing financial assistance for backup electrical resources under any other authority.(7) A description of the electrical corporations appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, including procedures for those customers receiving medical baseline allowances as described in paragraph (6). The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event. The procedures shall comply with any orders of the commission regarding notifications of deenergization events.(8) Identification of circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits, including, but not limited to, the estimated annual decline in circuit deenergization and deenergization impact on customers, and replacing, hardening, or undergrounding any portion of the circuit or of upstream transmission or distribution lines.(9) Plans for vegetation management.(10) Plans for inspections of the electrical corporations electrical infrastructure.(11) A description of the electrical corporations protocols for the deenergization of the electrical corporations transmission infrastructure, for instances when the deenergization may impact customers who, or entities that, are dependent upon the infrastructure. The protocols shall comply with any order of the commission regarding deenergization events.(12) A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the electrical corporations service territory, including all relevant wildfire risk and risk mitigation information that is part of the commissions Safety Model Assessment Proceeding (A.15-05-002, et al.) and the Risk Assessment Mitigation Phase filings. The list shall include, but not be limited to, both of the following:(A) Risks and risk drivers associated with design, construction, operations, and maintenance of the electrical corporations equipment and facilities.(B) Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the electrical corporations service territory.(13) A description of how the plan accounts for the wildfire risk identified in the electrical corporations Risk Assessment Mitigation Phase filing.(14) A description of the actions the electrical corporation will take to ensure its system will achieve the highest level of safety, reliability, and resiliency, and to ensure that its system is prepared for a major event, including hardening and modernizing its infrastructure with improved engineering, system design, standards, equipment, and facilities, such as undergrounding, insulating of distribution wires, and replacing poles.(15) A description of where and how the electrical corporation considered undergrounding electrical distribution lines within those areas of its service territory identified to have the highest wildfire risk in a commission fire threat map.(16) A showing that the electrical corporation has an adequately sized and trained workforce to promptly restore service after a major event, taking into account employees of other utilities pursuant to mutual aid agreements and employees of entities that have entered into contracts with the electrical corporation.(17) Identification of any geographic area in the electrical corporations service territory that is a higher wildfire threat than is currently identified in a commission fire threat map, and where the commission should consider expanding the high fire threat district based on new information or changes in the environment.(18) A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk that is consistent with the methodology used by other electrical corporations unless the commission determines otherwise.(19) A description of how the plan is consistent with the electrical corporations disaster and emergency preparedness plan prepared pursuant to Section 768.6, including both of the following:(A) Plans to prepare for, and to restore service after, a wildfire, including workforce mobilization and prepositioning equipment and employees.(B) Plans for community outreach and public awareness before, during, and after a wildfire, including language notification in English, Spanish, and the top three primary languages used in the state other than English or Spanish, as determined by the commission based on the United States Census data.(20) A statement of how the electrical corporation will restore service after a wildfire.(21) Protocols for compliance with requirements adopted by the commission regarding activities to support customers during and after a wildfire, outage reporting, support for low-income customers, billing adjustments, deposit waivers, extended payment plans, suspension of disconnection and nonpayment fees, repair processing and timing, access to electrical corporation representatives, and emergency communications.(22) A description of the processes and procedures the electrical corporation will use to do all of the following:(A) Monitor and audit the implementation of the plan.(B) Identify any deficiencies in the plan or the plans implementation and correct those deficiencies.(C) Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, carried out under the plan and other applicable statutes and commission rules.(23) Any other information that the Wildfire Safety Division office may require.(d) The Wildfire Safety Division office shall post all wildfire mitigation plans and annual updates on the commissions internet website before July 1, 2021, and on the offices its internet website beginning July 1, 2021, for no less than two months before the divisions or offices decision regarding approval of the plan. The division or office shall accept comments on each plan from the public, other local and state agencies, and interested parties, and verify that the plan complies with all applicable rules, regulations, and standards, as appropriate.
121121
122122 8386. (a) Each electrical corporation shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment.(b) Each electrical corporation shall annually prepare and submit a wildfire mitigation plan to the Wildfire Safety Division office for review and approval. In calendar year 2020, and thereafter, the plan shall cover at least a three-year period. The division office shall establish a schedule for the submission of subsequent comprehensive wildfire mitigation plans, which may allow for the staggering of compliance periods for each electrical corporation. In its discretion, the division office may allow the annual submissions to be updates to the last approved comprehensive wildfire mitigation plan; provided, that each electrical corporation shall submit a comprehensive wildfire mitigation plan at least once every three years.(c) The wildfire mitigation plan shall include all of the following:(1) An accounting of the responsibilities of persons responsible for executing the plan.(2) The objectives of the plan.(3) A description of the preventive strategies and programs to be adopted by the electrical corporation to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of dynamic climate change risks.(4) A description of the metrics the electrical corporation plans to use to evaluate the plans performance and the assumptions that underlie the use of those metrics.(5) A discussion of how the application of previously identified metrics to previous plan performances has informed the plan.(6) A description of the electrical corporations protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety. As part of these protocols, each electrical corporation shall include protocols related to mitigating the public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system that consider the impacts on all of the following:(A) Critical first responders.(B) Health and communication Health, communication, and public transit vehicle charging infrastructure.(C) Customers who receive medical baseline allowances pursuant to subdivision (c) of Section 739. The electrical corporation may deploy backup electrical resources or provide financial assistance for backup electrical resources to a customer receiving a medical baseline allowance for a customer who meets all of the following requirements:(i) The customer relies on life-support equipment that operates on electricity to sustain life.(ii) The customer demonstrates financial need, including through enrollment in the California Alternate Rates for Energy program continued pursuant to Section 739.1.(iii) The customer is not eligible for backup electrical resources provided through medical services, medical insurance, or community resources.(D) Subparagraph (C) shall not be construed as preventing does not prevent an electrical corporation from deploying backup electrical resources or providing financial assistance for backup electrical resources under any other authority.(7) A description of the electrical corporations appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, including procedures for those customers receiving medical baseline allowances as described in paragraph (6). The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event. The procedures shall comply with any orders of the commission regarding notifications of deenergization events.(8) Identification of circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits, including, but not limited to, the estimated annual decline in circuit deenergization and deenergization impact on customers, and replacing, hardening, or undergrounding any portion of the circuit or of upstream transmission or distribution lines.(9) Plans for vegetation management.(10) Plans for inspections of the electrical corporations electrical infrastructure.(11) A description of the electrical corporations protocols for the deenergization of the electrical corporations transmission infrastructure, for instances when the deenergization may impact customers who, or entities that, are dependent upon the infrastructure. The protocols shall comply with any order of the commission regarding deenergization events.(12) A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the electrical corporations service territory, including all relevant wildfire risk and risk mitigation information that is part of the commissions Safety Model Assessment Proceeding (A.15-05-002, et al.) and the Risk Assessment Mitigation Phase filings. The list shall include, but not be limited to, both of the following:(A) Risks and risk drivers associated with design, construction, operations, and maintenance of the electrical corporations equipment and facilities.(B) Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the electrical corporations service territory.(13) A description of how the plan accounts for the wildfire risk identified in the electrical corporations Risk Assessment Mitigation Phase filing.(14) A description of the actions the electrical corporation will take to ensure its system will achieve the highest level of safety, reliability, and resiliency, and to ensure that its system is prepared for a major event, including hardening and modernizing its infrastructure with improved engineering, system design, standards, equipment, and facilities, such as undergrounding, insulating of distribution wires, and replacing poles.(15) A description of where and how the electrical corporation considered undergrounding electrical distribution lines within those areas of its service territory identified to have the highest wildfire risk in a commission fire threat map.(16) A showing that the electrical corporation has an adequately sized and trained workforce to promptly restore service after a major event, taking into account employees of other utilities pursuant to mutual aid agreements and employees of entities that have entered into contracts with the electrical corporation.(17) Identification of any geographic area in the electrical corporations service territory that is a higher wildfire threat than is currently identified in a commission fire threat map, and where the commission should consider expanding the high fire threat district based on new information or changes in the environment.(18) A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk that is consistent with the methodology used by other electrical corporations unless the commission determines otherwise.(19) A description of how the plan is consistent with the electrical corporations disaster and emergency preparedness plan prepared pursuant to Section 768.6, including both of the following:(A) Plans to prepare for, and to restore service after, a wildfire, including workforce mobilization and prepositioning equipment and employees.(B) Plans for community outreach and public awareness before, during, and after a wildfire, including language notification in English, Spanish, and the top three primary languages used in the state other than English or Spanish, as determined by the commission based on the United States Census data.(20) A statement of how the electrical corporation will restore service after a wildfire.(21) Protocols for compliance with requirements adopted by the commission regarding activities to support customers during and after a wildfire, outage reporting, support for low-income customers, billing adjustments, deposit waivers, extended payment plans, suspension of disconnection and nonpayment fees, repair processing and timing, access to electrical corporation representatives, and emergency communications.(22) A description of the processes and procedures the electrical corporation will use to do all of the following:(A) Monitor and audit the implementation of the plan.(B) Identify any deficiencies in the plan or the plans implementation and correct those deficiencies.(C) Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, carried out under the plan and other applicable statutes and commission rules.(23) Any other information that the Wildfire Safety Division office may require.(d) The Wildfire Safety Division office shall post all wildfire mitigation plans and annual updates on the commissions internet website before July 1, 2021, and on the offices its internet website beginning July 1, 2021, for no less than two months before the divisions or offices decision regarding approval of the plan. The division or office shall accept comments on each plan from the public, other local and state agencies, and interested parties, and verify that the plan complies with all applicable rules, regulations, and standards, as appropriate.
123123
124124
125125
126126 8386. (a) Each electrical corporation shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment.
127127
128128 (b) Each electrical corporation shall annually prepare and submit a wildfire mitigation plan to the Wildfire Safety Division office for review and approval. In calendar year 2020, and thereafter, the plan shall cover at least a three-year period. The division office shall establish a schedule for the submission of subsequent comprehensive wildfire mitigation plans, which may allow for the staggering of compliance periods for each electrical corporation. In its discretion, the division office may allow the annual submissions to be updates to the last approved comprehensive wildfire mitigation plan; provided, that each electrical corporation shall submit a comprehensive wildfire mitigation plan at least once every three years.
129129
130130 (c) The wildfire mitigation plan shall include all of the following:
131131
132132 (1) An accounting of the responsibilities of persons responsible for executing the plan.
133133
134134 (2) The objectives of the plan.
135135
136136 (3) A description of the preventive strategies and programs to be adopted by the electrical corporation to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of dynamic climate change risks.
137137
138138 (4) A description of the metrics the electrical corporation plans to use to evaluate the plans performance and the assumptions that underlie the use of those metrics.
139139
140140 (5) A discussion of how the application of previously identified metrics to previous plan performances has informed the plan.
141141
142142 (6) A description of the electrical corporations protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety. As part of these protocols, each electrical corporation shall include protocols related to mitigating the public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system that consider the impacts on all of the following:
143143
144144 (A) Critical first responders.
145145
146146 (B) Health and communication Health, communication, and public transit vehicle charging infrastructure.
147147
148148 (C) Customers who receive medical baseline allowances pursuant to subdivision (c) of Section 739. The electrical corporation may deploy backup electrical resources or provide financial assistance for backup electrical resources to a customer receiving a medical baseline allowance for a customer who meets all of the following requirements:
149149
150150 (i) The customer relies on life-support equipment that operates on electricity to sustain life.
151151
152152 (ii) The customer demonstrates financial need, including through enrollment in the California Alternate Rates for Energy program continued pursuant to Section 739.1.
153153
154154 (iii) The customer is not eligible for backup electrical resources provided through medical services, medical insurance, or community resources.
155155
156156 (D) Subparagraph (C) shall not be construed as preventing does not prevent an electrical corporation from deploying backup electrical resources or providing financial assistance for backup electrical resources under any other authority.
157157
158158 (7) A description of the electrical corporations appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, including procedures for those customers receiving medical baseline allowances as described in paragraph (6). The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event. The procedures shall comply with any orders of the commission regarding notifications of deenergization events.
159159
160160 (8) Identification of circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits, including, but not limited to, the estimated annual decline in circuit deenergization and deenergization impact on customers, and replacing, hardening, or undergrounding any portion of the circuit or of upstream transmission or distribution lines.
161161
162162 (9) Plans for vegetation management.
163163
164164 (10) Plans for inspections of the electrical corporations electrical infrastructure.
165165
166166 (11) A description of the electrical corporations protocols for the deenergization of the electrical corporations transmission infrastructure, for instances when the deenergization may impact customers who, or entities that, are dependent upon the infrastructure. The protocols shall comply with any order of the commission regarding deenergization events.
167167
168168 (12) A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the electrical corporations service territory, including all relevant wildfire risk and risk mitigation information that is part of the commissions Safety Model Assessment Proceeding (A.15-05-002, et al.) and the Risk Assessment Mitigation Phase filings. The list shall include, but not be limited to, both of the following:
169169
170170 (A) Risks and risk drivers associated with design, construction, operations, and maintenance of the electrical corporations equipment and facilities.
171171
172172 (B) Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the electrical corporations service territory.
173173
174174 (13) A description of how the plan accounts for the wildfire risk identified in the electrical corporations Risk Assessment Mitigation Phase filing.
175175
176176 (14) A description of the actions the electrical corporation will take to ensure its system will achieve the highest level of safety, reliability, and resiliency, and to ensure that its system is prepared for a major event, including hardening and modernizing its infrastructure with improved engineering, system design, standards, equipment, and facilities, such as undergrounding, insulating of distribution wires, and replacing poles.
177177
178178 (15) A description of where and how the electrical corporation considered undergrounding electrical distribution lines within those areas of its service territory identified to have the highest wildfire risk in a commission fire threat map.
179179
180180 (16) A showing that the electrical corporation has an adequately sized and trained workforce to promptly restore service after a major event, taking into account employees of other utilities pursuant to mutual aid agreements and employees of entities that have entered into contracts with the electrical corporation.
181181
182182 (17) Identification of any geographic area in the electrical corporations service territory that is a higher wildfire threat than is currently identified in a commission fire threat map, and where the commission should consider expanding the high fire threat district based on new information or changes in the environment.
183183
184184 (18) A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk that is consistent with the methodology used by other electrical corporations unless the commission determines otherwise.
185185
186186 (19) A description of how the plan is consistent with the electrical corporations disaster and emergency preparedness plan prepared pursuant to Section 768.6, including both of the following:
187187
188188 (A) Plans to prepare for, and to restore service after, a wildfire, including workforce mobilization and prepositioning equipment and employees.
189189
190190 (B) Plans for community outreach and public awareness before, during, and after a wildfire, including language notification in English, Spanish, and the top three primary languages used in the state other than English or Spanish, as determined by the commission based on the United States Census data.
191191
192192 (20) A statement of how the electrical corporation will restore service after a wildfire.
193193
194194 (21) Protocols for compliance with requirements adopted by the commission regarding activities to support customers during and after a wildfire, outage reporting, support for low-income customers, billing adjustments, deposit waivers, extended payment plans, suspension of disconnection and nonpayment fees, repair processing and timing, access to electrical corporation representatives, and emergency communications.
195195
196196 (22) A description of the processes and procedures the electrical corporation will use to do all of the following:
197197
198198 (A) Monitor and audit the implementation of the plan.
199199
200200 (B) Identify any deficiencies in the plan or the plans implementation and correct those deficiencies.
201201
202202 (C) Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, carried out under the plan and other applicable statutes and commission rules.
203203
204204 (23) Any other information that the Wildfire Safety Division office may require.
205205
206206 (d) The Wildfire Safety Division office shall post all wildfire mitigation plans and annual updates on the commissions internet website before July 1, 2021, and on the offices its internet website beginning July 1, 2021, for no less than two months before the divisions or offices decision regarding approval of the plan. The division or office shall accept comments on each plan from the public, other local and state agencies, and interested parties, and verify that the plan complies with all applicable rules, regulations, and standards, as appropriate.
207207
208208 SEC. 3. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
209209
210210 SEC. 3. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
211211
212212 SEC. 3. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
213213
214214 ### SEC. 3.