California 2025-2026 Regular Session

California Assembly Bill AB941 Compare Versions

Only one version of the bill is available at this time.
OldNewDifferences
11 CALIFORNIA LEGISLATURE 20252026 REGULAR SESSION Assembly Bill No. 941Introduced by Assembly Member ZburFebruary 19, 2025An act to add Chapter 8.5 (commencing with Section 2845) to Part 2 of Division 1 of the Public Utilities Code, relating to energy.LEGISLATIVE COUNSEL'S DIGESTAB 941, as introduced, Zbur. California Environmental Quality Act: electrical infrastructure projects.The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. CEQA exempts certain projects from its requirements, including actions necessary to prevent or mitigate an emergency.Existing law prohibits an electrical corporation from beginning the construction of a line, plant, or system, or extensions of those facilities without first obtaining from the Public Utilities Commission a certificate that the present or future convenience and necessity require or will require the construction. Existing law specifies that the certificate is not required for the extension, expansion, upgrade, or other modification of existing electrical transmission facilities.This bill would require the commission to determine whether to certify the environmental impact report for an electrical infrastructure project that is a priority project, as defined, no later than 270 days after the commission determines that an application for an electrical infrastructure project is complete, except as specified. The bill would require a project applicant to identify an electrical infrastructure project that is a priority project and the basis for the designation in the application to the commission. The bill would require commission staff to review an application for a priority project no later than 30 days after it is filed and notify the applicant in writing of any deficiencies in the information and data submitted in the application. The bill would require the applicant to correct any deficiencies or notify the commission in writing why it is unable to, as specified, within 60 days of that notification. The bill would require the commission to deem an application for a priority project complete with a preliminary ruling setting the scope and schedule, as provided.Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: YES Bill TextThe people of the State of California do enact as follows:SECTION 1. Chapter 8.5 (commencing with Section 2845) is added to Part 2 of Division 1 of the Public Utilities Code, to read: CHAPTER 8.5. Electrical Infrastructure Projects Article 1. Definitions2845. For purposes of this chapter, the following definitions apply:(a) Applicant means the entity proposing an electrical infrastructure project.(b) California Environmental Quality Act or CEQA means Division 13 (commencing with Section 21000) of the Public Resources Code and guidelines adopted pursuant to that division.(c) Electrical infrastructure project or project means a project for the construction and operation of an electrical transmission line or power line, as defined by the commissions General Order 131-E, and associated infrastructure, including substations and ancillary facilities, that requires discretionary approval by the commission pursuant to Section 1001 or the commissions General Order 131-E or its successor.(d) Priority project means any electrical infrastructure project that is one or more of the following:(1) Approved by the Independent System Operator in a transmission plan.(2) For the purpose of interconnection of renewable generation resources to the electrical grid.(3) A system upgrade project included in a Independent System Operator cluster study.(4) Substation projects identified as necessary to support anticipated load growth as a result of the electrification of the states energy supply. Article 2. General Provisions2845.10. (a) For a priority project, no later than 270 days after the commission determines in a preliminary ruling setting the scope and schedule that an application for an electrical infrastructure project is complete, the commission shall determine whether to certify the environmental impact report, adopt a negative declaration, mitigated negative declaration, or an addendum, or determine that the project is exempt from CEQA, and make a final determination regarding the project.(b) The time period specified in subdivision (a) may be extended if any of the following occurs:(1) The commission is required to recirculate the environmental impact report pursuant to Section 15088.5 of Title 14 of the California Code of Regulations.(2) Substantial changes are proposed in the project that may involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects.(3) Substantial changes occur with respect to the circumstances under which the project is undertaken that may involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects.(4) New information of substantial importance, that was not known and could not have been known with the exercise of reasonable diligence before the commission publishes the notice of availability, is submitted that may require additional analysis and consideration.(c) An applicant shall identify an electrical infrastructure project that is a priority project and the basis for the designation in the application to the commission.2845.11. For a priority project, all of the following shall apply:(a) No later than 30 days after the filing of an application, the commission staff shall review it and notify the applicant in writing of any deficiencies in the information and data submitted in the application.(b) The applicant shall, within 60 days of notification pursuant to subdivision (a), correct any deficiencies or explain in writing to the commission staff why it is unable to do so and include an estimate of when it will be able to correct the deficiencies.(c) As required by Section 65943 of the Government Code, the commission shall deem the application complete with a preliminary ruling setting the scope and schedule as follows:(1) No later than 30 days after submission of the application, except when the applicant is notified of deficiencies pursuant to subdivision (a).(2) If the applicant is notified of deficiencies pursuant to subdivision (a), no later than 30 days after the applicant submits information in response to the notification, except when the applicant is notified during those 30 days that previously identified deficiencies remain.(3) Immediately upon the commissions determination that all additional information requested by the commission staff has been provided.SEC. 2. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
22
33 CALIFORNIA LEGISLATURE 20252026 REGULAR SESSION Assembly Bill No. 941Introduced by Assembly Member ZburFebruary 19, 2025An act to add Chapter 8.5 (commencing with Section 2845) to Part 2 of Division 1 of the Public Utilities Code, relating to energy.LEGISLATIVE COUNSEL'S DIGESTAB 941, as introduced, Zbur. California Environmental Quality Act: electrical infrastructure projects.The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. CEQA exempts certain projects from its requirements, including actions necessary to prevent or mitigate an emergency.Existing law prohibits an electrical corporation from beginning the construction of a line, plant, or system, or extensions of those facilities without first obtaining from the Public Utilities Commission a certificate that the present or future convenience and necessity require or will require the construction. Existing law specifies that the certificate is not required for the extension, expansion, upgrade, or other modification of existing electrical transmission facilities.This bill would require the commission to determine whether to certify the environmental impact report for an electrical infrastructure project that is a priority project, as defined, no later than 270 days after the commission determines that an application for an electrical infrastructure project is complete, except as specified. The bill would require a project applicant to identify an electrical infrastructure project that is a priority project and the basis for the designation in the application to the commission. The bill would require commission staff to review an application for a priority project no later than 30 days after it is filed and notify the applicant in writing of any deficiencies in the information and data submitted in the application. The bill would require the applicant to correct any deficiencies or notify the commission in writing why it is unable to, as specified, within 60 days of that notification. The bill would require the commission to deem an application for a priority project complete with a preliminary ruling setting the scope and schedule, as provided.Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: YES
44
55
66
77
88
99 CALIFORNIA LEGISLATURE 20252026 REGULAR SESSION
1010
1111 Assembly Bill
1212
1313 No. 941
1414
1515 Introduced by Assembly Member ZburFebruary 19, 2025
1616
1717 Introduced by Assembly Member Zbur
1818 February 19, 2025
1919
2020 An act to add Chapter 8.5 (commencing with Section 2845) to Part 2 of Division 1 of the Public Utilities Code, relating to energy.
2121
2222 LEGISLATIVE COUNSEL'S DIGEST
2323
2424 ## LEGISLATIVE COUNSEL'S DIGEST
2525
2626 AB 941, as introduced, Zbur. California Environmental Quality Act: electrical infrastructure projects.
2727
2828 The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. CEQA exempts certain projects from its requirements, including actions necessary to prevent or mitigate an emergency.Existing law prohibits an electrical corporation from beginning the construction of a line, plant, or system, or extensions of those facilities without first obtaining from the Public Utilities Commission a certificate that the present or future convenience and necessity require or will require the construction. Existing law specifies that the certificate is not required for the extension, expansion, upgrade, or other modification of existing electrical transmission facilities.This bill would require the commission to determine whether to certify the environmental impact report for an electrical infrastructure project that is a priority project, as defined, no later than 270 days after the commission determines that an application for an electrical infrastructure project is complete, except as specified. The bill would require a project applicant to identify an electrical infrastructure project that is a priority project and the basis for the designation in the application to the commission. The bill would require commission staff to review an application for a priority project no later than 30 days after it is filed and notify the applicant in writing of any deficiencies in the information and data submitted in the application. The bill would require the applicant to correct any deficiencies or notify the commission in writing why it is unable to, as specified, within 60 days of that notification. The bill would require the commission to deem an application for a priority project complete with a preliminary ruling setting the scope and schedule, as provided.Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.
2929
3030 The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. CEQA exempts certain projects from its requirements, including actions necessary to prevent or mitigate an emergency.
3131
3232 Existing law prohibits an electrical corporation from beginning the construction of a line, plant, or system, or extensions of those facilities without first obtaining from the Public Utilities Commission a certificate that the present or future convenience and necessity require or will require the construction. Existing law specifies that the certificate is not required for the extension, expansion, upgrade, or other modification of existing electrical transmission facilities.
3333
3434 This bill would require the commission to determine whether to certify the environmental impact report for an electrical infrastructure project that is a priority project, as defined, no later than 270 days after the commission determines that an application for an electrical infrastructure project is complete, except as specified. The bill would require a project applicant to identify an electrical infrastructure project that is a priority project and the basis for the designation in the application to the commission. The bill would require commission staff to review an application for a priority project no later than 30 days after it is filed and notify the applicant in writing of any deficiencies in the information and data submitted in the application. The bill would require the applicant to correct any deficiencies or notify the commission in writing why it is unable to, as specified, within 60 days of that notification. The bill would require the commission to deem an application for a priority project complete with a preliminary ruling setting the scope and schedule, as provided.
3535
3636 Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
3737
3838 Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
3939
4040 The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
4141
4242 This bill would provide that no reimbursement is required by this act for a specified reason.
4343
4444 ## Digest Key
4545
4646 ## Bill Text
4747
4848 The people of the State of California do enact as follows:SECTION 1. Chapter 8.5 (commencing with Section 2845) is added to Part 2 of Division 1 of the Public Utilities Code, to read: CHAPTER 8.5. Electrical Infrastructure Projects Article 1. Definitions2845. For purposes of this chapter, the following definitions apply:(a) Applicant means the entity proposing an electrical infrastructure project.(b) California Environmental Quality Act or CEQA means Division 13 (commencing with Section 21000) of the Public Resources Code and guidelines adopted pursuant to that division.(c) Electrical infrastructure project or project means a project for the construction and operation of an electrical transmission line or power line, as defined by the commissions General Order 131-E, and associated infrastructure, including substations and ancillary facilities, that requires discretionary approval by the commission pursuant to Section 1001 or the commissions General Order 131-E or its successor.(d) Priority project means any electrical infrastructure project that is one or more of the following:(1) Approved by the Independent System Operator in a transmission plan.(2) For the purpose of interconnection of renewable generation resources to the electrical grid.(3) A system upgrade project included in a Independent System Operator cluster study.(4) Substation projects identified as necessary to support anticipated load growth as a result of the electrification of the states energy supply. Article 2. General Provisions2845.10. (a) For a priority project, no later than 270 days after the commission determines in a preliminary ruling setting the scope and schedule that an application for an electrical infrastructure project is complete, the commission shall determine whether to certify the environmental impact report, adopt a negative declaration, mitigated negative declaration, or an addendum, or determine that the project is exempt from CEQA, and make a final determination regarding the project.(b) The time period specified in subdivision (a) may be extended if any of the following occurs:(1) The commission is required to recirculate the environmental impact report pursuant to Section 15088.5 of Title 14 of the California Code of Regulations.(2) Substantial changes are proposed in the project that may involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects.(3) Substantial changes occur with respect to the circumstances under which the project is undertaken that may involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects.(4) New information of substantial importance, that was not known and could not have been known with the exercise of reasonable diligence before the commission publishes the notice of availability, is submitted that may require additional analysis and consideration.(c) An applicant shall identify an electrical infrastructure project that is a priority project and the basis for the designation in the application to the commission.2845.11. For a priority project, all of the following shall apply:(a) No later than 30 days after the filing of an application, the commission staff shall review it and notify the applicant in writing of any deficiencies in the information and data submitted in the application.(b) The applicant shall, within 60 days of notification pursuant to subdivision (a), correct any deficiencies or explain in writing to the commission staff why it is unable to do so and include an estimate of when it will be able to correct the deficiencies.(c) As required by Section 65943 of the Government Code, the commission shall deem the application complete with a preliminary ruling setting the scope and schedule as follows:(1) No later than 30 days after submission of the application, except when the applicant is notified of deficiencies pursuant to subdivision (a).(2) If the applicant is notified of deficiencies pursuant to subdivision (a), no later than 30 days after the applicant submits information in response to the notification, except when the applicant is notified during those 30 days that previously identified deficiencies remain.(3) Immediately upon the commissions determination that all additional information requested by the commission staff has been provided.SEC. 2. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
4949
5050 The people of the State of California do enact as follows:
5151
5252 ## The people of the State of California do enact as follows:
5353
5454 SECTION 1. Chapter 8.5 (commencing with Section 2845) is added to Part 2 of Division 1 of the Public Utilities Code, to read: CHAPTER 8.5. Electrical Infrastructure Projects Article 1. Definitions2845. For purposes of this chapter, the following definitions apply:(a) Applicant means the entity proposing an electrical infrastructure project.(b) California Environmental Quality Act or CEQA means Division 13 (commencing with Section 21000) of the Public Resources Code and guidelines adopted pursuant to that division.(c) Electrical infrastructure project or project means a project for the construction and operation of an electrical transmission line or power line, as defined by the commissions General Order 131-E, and associated infrastructure, including substations and ancillary facilities, that requires discretionary approval by the commission pursuant to Section 1001 or the commissions General Order 131-E or its successor.(d) Priority project means any electrical infrastructure project that is one or more of the following:(1) Approved by the Independent System Operator in a transmission plan.(2) For the purpose of interconnection of renewable generation resources to the electrical grid.(3) A system upgrade project included in a Independent System Operator cluster study.(4) Substation projects identified as necessary to support anticipated load growth as a result of the electrification of the states energy supply. Article 2. General Provisions2845.10. (a) For a priority project, no later than 270 days after the commission determines in a preliminary ruling setting the scope and schedule that an application for an electrical infrastructure project is complete, the commission shall determine whether to certify the environmental impact report, adopt a negative declaration, mitigated negative declaration, or an addendum, or determine that the project is exempt from CEQA, and make a final determination regarding the project.(b) The time period specified in subdivision (a) may be extended if any of the following occurs:(1) The commission is required to recirculate the environmental impact report pursuant to Section 15088.5 of Title 14 of the California Code of Regulations.(2) Substantial changes are proposed in the project that may involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects.(3) Substantial changes occur with respect to the circumstances under which the project is undertaken that may involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects.(4) New information of substantial importance, that was not known and could not have been known with the exercise of reasonable diligence before the commission publishes the notice of availability, is submitted that may require additional analysis and consideration.(c) An applicant shall identify an electrical infrastructure project that is a priority project and the basis for the designation in the application to the commission.2845.11. For a priority project, all of the following shall apply:(a) No later than 30 days after the filing of an application, the commission staff shall review it and notify the applicant in writing of any deficiencies in the information and data submitted in the application.(b) The applicant shall, within 60 days of notification pursuant to subdivision (a), correct any deficiencies or explain in writing to the commission staff why it is unable to do so and include an estimate of when it will be able to correct the deficiencies.(c) As required by Section 65943 of the Government Code, the commission shall deem the application complete with a preliminary ruling setting the scope and schedule as follows:(1) No later than 30 days after submission of the application, except when the applicant is notified of deficiencies pursuant to subdivision (a).(2) If the applicant is notified of deficiencies pursuant to subdivision (a), no later than 30 days after the applicant submits information in response to the notification, except when the applicant is notified during those 30 days that previously identified deficiencies remain.(3) Immediately upon the commissions determination that all additional information requested by the commission staff has been provided.
5555
5656 SECTION 1. Chapter 8.5 (commencing with Section 2845) is added to Part 2 of Division 1 of the Public Utilities Code, to read:
5757
5858 ### SECTION 1.
5959
6060 CHAPTER 8.5. Electrical Infrastructure Projects Article 1. Definitions2845. For purposes of this chapter, the following definitions apply:(a) Applicant means the entity proposing an electrical infrastructure project.(b) California Environmental Quality Act or CEQA means Division 13 (commencing with Section 21000) of the Public Resources Code and guidelines adopted pursuant to that division.(c) Electrical infrastructure project or project means a project for the construction and operation of an electrical transmission line or power line, as defined by the commissions General Order 131-E, and associated infrastructure, including substations and ancillary facilities, that requires discretionary approval by the commission pursuant to Section 1001 or the commissions General Order 131-E or its successor.(d) Priority project means any electrical infrastructure project that is one or more of the following:(1) Approved by the Independent System Operator in a transmission plan.(2) For the purpose of interconnection of renewable generation resources to the electrical grid.(3) A system upgrade project included in a Independent System Operator cluster study.(4) Substation projects identified as necessary to support anticipated load growth as a result of the electrification of the states energy supply. Article 2. General Provisions2845.10. (a) For a priority project, no later than 270 days after the commission determines in a preliminary ruling setting the scope and schedule that an application for an electrical infrastructure project is complete, the commission shall determine whether to certify the environmental impact report, adopt a negative declaration, mitigated negative declaration, or an addendum, or determine that the project is exempt from CEQA, and make a final determination regarding the project.(b) The time period specified in subdivision (a) may be extended if any of the following occurs:(1) The commission is required to recirculate the environmental impact report pursuant to Section 15088.5 of Title 14 of the California Code of Regulations.(2) Substantial changes are proposed in the project that may involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects.(3) Substantial changes occur with respect to the circumstances under which the project is undertaken that may involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects.(4) New information of substantial importance, that was not known and could not have been known with the exercise of reasonable diligence before the commission publishes the notice of availability, is submitted that may require additional analysis and consideration.(c) An applicant shall identify an electrical infrastructure project that is a priority project and the basis for the designation in the application to the commission.2845.11. For a priority project, all of the following shall apply:(a) No later than 30 days after the filing of an application, the commission staff shall review it and notify the applicant in writing of any deficiencies in the information and data submitted in the application.(b) The applicant shall, within 60 days of notification pursuant to subdivision (a), correct any deficiencies or explain in writing to the commission staff why it is unable to do so and include an estimate of when it will be able to correct the deficiencies.(c) As required by Section 65943 of the Government Code, the commission shall deem the application complete with a preliminary ruling setting the scope and schedule as follows:(1) No later than 30 days after submission of the application, except when the applicant is notified of deficiencies pursuant to subdivision (a).(2) If the applicant is notified of deficiencies pursuant to subdivision (a), no later than 30 days after the applicant submits information in response to the notification, except when the applicant is notified during those 30 days that previously identified deficiencies remain.(3) Immediately upon the commissions determination that all additional information requested by the commission staff has been provided.
6161
6262 CHAPTER 8.5. Electrical Infrastructure Projects Article 1. Definitions2845. For purposes of this chapter, the following definitions apply:(a) Applicant means the entity proposing an electrical infrastructure project.(b) California Environmental Quality Act or CEQA means Division 13 (commencing with Section 21000) of the Public Resources Code and guidelines adopted pursuant to that division.(c) Electrical infrastructure project or project means a project for the construction and operation of an electrical transmission line or power line, as defined by the commissions General Order 131-E, and associated infrastructure, including substations and ancillary facilities, that requires discretionary approval by the commission pursuant to Section 1001 or the commissions General Order 131-E or its successor.(d) Priority project means any electrical infrastructure project that is one or more of the following:(1) Approved by the Independent System Operator in a transmission plan.(2) For the purpose of interconnection of renewable generation resources to the electrical grid.(3) A system upgrade project included in a Independent System Operator cluster study.(4) Substation projects identified as necessary to support anticipated load growth as a result of the electrification of the states energy supply. Article 2. General Provisions2845.10. (a) For a priority project, no later than 270 days after the commission determines in a preliminary ruling setting the scope and schedule that an application for an electrical infrastructure project is complete, the commission shall determine whether to certify the environmental impact report, adopt a negative declaration, mitigated negative declaration, or an addendum, or determine that the project is exempt from CEQA, and make a final determination regarding the project.(b) The time period specified in subdivision (a) may be extended if any of the following occurs:(1) The commission is required to recirculate the environmental impact report pursuant to Section 15088.5 of Title 14 of the California Code of Regulations.(2) Substantial changes are proposed in the project that may involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects.(3) Substantial changes occur with respect to the circumstances under which the project is undertaken that may involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects.(4) New information of substantial importance, that was not known and could not have been known with the exercise of reasonable diligence before the commission publishes the notice of availability, is submitted that may require additional analysis and consideration.(c) An applicant shall identify an electrical infrastructure project that is a priority project and the basis for the designation in the application to the commission.2845.11. For a priority project, all of the following shall apply:(a) No later than 30 days after the filing of an application, the commission staff shall review it and notify the applicant in writing of any deficiencies in the information and data submitted in the application.(b) The applicant shall, within 60 days of notification pursuant to subdivision (a), correct any deficiencies or explain in writing to the commission staff why it is unable to do so and include an estimate of when it will be able to correct the deficiencies.(c) As required by Section 65943 of the Government Code, the commission shall deem the application complete with a preliminary ruling setting the scope and schedule as follows:(1) No later than 30 days after submission of the application, except when the applicant is notified of deficiencies pursuant to subdivision (a).(2) If the applicant is notified of deficiencies pursuant to subdivision (a), no later than 30 days after the applicant submits information in response to the notification, except when the applicant is notified during those 30 days that previously identified deficiencies remain.(3) Immediately upon the commissions determination that all additional information requested by the commission staff has been provided.
6363
6464 CHAPTER 8.5. Electrical Infrastructure Projects
6565
6666 CHAPTER 8.5. Electrical Infrastructure Projects
6767
6868 Article 1. Definitions2845. For purposes of this chapter, the following definitions apply:(a) Applicant means the entity proposing an electrical infrastructure project.(b) California Environmental Quality Act or CEQA means Division 13 (commencing with Section 21000) of the Public Resources Code and guidelines adopted pursuant to that division.(c) Electrical infrastructure project or project means a project for the construction and operation of an electrical transmission line or power line, as defined by the commissions General Order 131-E, and associated infrastructure, including substations and ancillary facilities, that requires discretionary approval by the commission pursuant to Section 1001 or the commissions General Order 131-E or its successor.(d) Priority project means any electrical infrastructure project that is one or more of the following:(1) Approved by the Independent System Operator in a transmission plan.(2) For the purpose of interconnection of renewable generation resources to the electrical grid.(3) A system upgrade project included in a Independent System Operator cluster study.(4) Substation projects identified as necessary to support anticipated load growth as a result of the electrification of the states energy supply.
6969
7070 Article 1. Definitions
7171
7272 Article 1. Definitions
7373
7474 2845. For purposes of this chapter, the following definitions apply:(a) Applicant means the entity proposing an electrical infrastructure project.(b) California Environmental Quality Act or CEQA means Division 13 (commencing with Section 21000) of the Public Resources Code and guidelines adopted pursuant to that division.(c) Electrical infrastructure project or project means a project for the construction and operation of an electrical transmission line or power line, as defined by the commissions General Order 131-E, and associated infrastructure, including substations and ancillary facilities, that requires discretionary approval by the commission pursuant to Section 1001 or the commissions General Order 131-E or its successor.(d) Priority project means any electrical infrastructure project that is one or more of the following:(1) Approved by the Independent System Operator in a transmission plan.(2) For the purpose of interconnection of renewable generation resources to the electrical grid.(3) A system upgrade project included in a Independent System Operator cluster study.(4) Substation projects identified as necessary to support anticipated load growth as a result of the electrification of the states energy supply.
7575
7676
7777
7878 2845. For purposes of this chapter, the following definitions apply:
7979
8080 (a) Applicant means the entity proposing an electrical infrastructure project.
8181
8282 (b) California Environmental Quality Act or CEQA means Division 13 (commencing with Section 21000) of the Public Resources Code and guidelines adopted pursuant to that division.
8383
8484 (c) Electrical infrastructure project or project means a project for the construction and operation of an electrical transmission line or power line, as defined by the commissions General Order 131-E, and associated infrastructure, including substations and ancillary facilities, that requires discretionary approval by the commission pursuant to Section 1001 or the commissions General Order 131-E or its successor.
8585
8686 (d) Priority project means any electrical infrastructure project that is one or more of the following:
8787
8888 (1) Approved by the Independent System Operator in a transmission plan.
8989
9090 (2) For the purpose of interconnection of renewable generation resources to the electrical grid.
9191
9292 (3) A system upgrade project included in a Independent System Operator cluster study.
9393
9494 (4) Substation projects identified as necessary to support anticipated load growth as a result of the electrification of the states energy supply.
9595
9696 Article 2. General Provisions2845.10. (a) For a priority project, no later than 270 days after the commission determines in a preliminary ruling setting the scope and schedule that an application for an electrical infrastructure project is complete, the commission shall determine whether to certify the environmental impact report, adopt a negative declaration, mitigated negative declaration, or an addendum, or determine that the project is exempt from CEQA, and make a final determination regarding the project.(b) The time period specified in subdivision (a) may be extended if any of the following occurs:(1) The commission is required to recirculate the environmental impact report pursuant to Section 15088.5 of Title 14 of the California Code of Regulations.(2) Substantial changes are proposed in the project that may involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects.(3) Substantial changes occur with respect to the circumstances under which the project is undertaken that may involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects.(4) New information of substantial importance, that was not known and could not have been known with the exercise of reasonable diligence before the commission publishes the notice of availability, is submitted that may require additional analysis and consideration.(c) An applicant shall identify an electrical infrastructure project that is a priority project and the basis for the designation in the application to the commission.2845.11. For a priority project, all of the following shall apply:(a) No later than 30 days after the filing of an application, the commission staff shall review it and notify the applicant in writing of any deficiencies in the information and data submitted in the application.(b) The applicant shall, within 60 days of notification pursuant to subdivision (a), correct any deficiencies or explain in writing to the commission staff why it is unable to do so and include an estimate of when it will be able to correct the deficiencies.(c) As required by Section 65943 of the Government Code, the commission shall deem the application complete with a preliminary ruling setting the scope and schedule as follows:(1) No later than 30 days after submission of the application, except when the applicant is notified of deficiencies pursuant to subdivision (a).(2) If the applicant is notified of deficiencies pursuant to subdivision (a), no later than 30 days after the applicant submits information in response to the notification, except when the applicant is notified during those 30 days that previously identified deficiencies remain.(3) Immediately upon the commissions determination that all additional information requested by the commission staff has been provided.
9797
9898 Article 2. General Provisions
9999
100100 Article 2. General Provisions
101101
102102 2845.10. (a) For a priority project, no later than 270 days after the commission determines in a preliminary ruling setting the scope and schedule that an application for an electrical infrastructure project is complete, the commission shall determine whether to certify the environmental impact report, adopt a negative declaration, mitigated negative declaration, or an addendum, or determine that the project is exempt from CEQA, and make a final determination regarding the project.(b) The time period specified in subdivision (a) may be extended if any of the following occurs:(1) The commission is required to recirculate the environmental impact report pursuant to Section 15088.5 of Title 14 of the California Code of Regulations.(2) Substantial changes are proposed in the project that may involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects.(3) Substantial changes occur with respect to the circumstances under which the project is undertaken that may involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects.(4) New information of substantial importance, that was not known and could not have been known with the exercise of reasonable diligence before the commission publishes the notice of availability, is submitted that may require additional analysis and consideration.(c) An applicant shall identify an electrical infrastructure project that is a priority project and the basis for the designation in the application to the commission.
103103
104104
105105
106106 2845.10. (a) For a priority project, no later than 270 days after the commission determines in a preliminary ruling setting the scope and schedule that an application for an electrical infrastructure project is complete, the commission shall determine whether to certify the environmental impact report, adopt a negative declaration, mitigated negative declaration, or an addendum, or determine that the project is exempt from CEQA, and make a final determination regarding the project.
107107
108108 (b) The time period specified in subdivision (a) may be extended if any of the following occurs:
109109
110110 (1) The commission is required to recirculate the environmental impact report pursuant to Section 15088.5 of Title 14 of the California Code of Regulations.
111111
112112 (2) Substantial changes are proposed in the project that may involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects.
113113
114114 (3) Substantial changes occur with respect to the circumstances under which the project is undertaken that may involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects.
115115
116116 (4) New information of substantial importance, that was not known and could not have been known with the exercise of reasonable diligence before the commission publishes the notice of availability, is submitted that may require additional analysis and consideration.
117117
118118 (c) An applicant shall identify an electrical infrastructure project that is a priority project and the basis for the designation in the application to the commission.
119119
120120 2845.11. For a priority project, all of the following shall apply:(a) No later than 30 days after the filing of an application, the commission staff shall review it and notify the applicant in writing of any deficiencies in the information and data submitted in the application.(b) The applicant shall, within 60 days of notification pursuant to subdivision (a), correct any deficiencies or explain in writing to the commission staff why it is unable to do so and include an estimate of when it will be able to correct the deficiencies.(c) As required by Section 65943 of the Government Code, the commission shall deem the application complete with a preliminary ruling setting the scope and schedule as follows:(1) No later than 30 days after submission of the application, except when the applicant is notified of deficiencies pursuant to subdivision (a).(2) If the applicant is notified of deficiencies pursuant to subdivision (a), no later than 30 days after the applicant submits information in response to the notification, except when the applicant is notified during those 30 days that previously identified deficiencies remain.(3) Immediately upon the commissions determination that all additional information requested by the commission staff has been provided.
121121
122122
123123
124124 2845.11. For a priority project, all of the following shall apply:
125125
126126 (a) No later than 30 days after the filing of an application, the commission staff shall review it and notify the applicant in writing of any deficiencies in the information and data submitted in the application.
127127
128128 (b) The applicant shall, within 60 days of notification pursuant to subdivision (a), correct any deficiencies or explain in writing to the commission staff why it is unable to do so and include an estimate of when it will be able to correct the deficiencies.
129129
130130 (c) As required by Section 65943 of the Government Code, the commission shall deem the application complete with a preliminary ruling setting the scope and schedule as follows:
131131
132132 (1) No later than 30 days after submission of the application, except when the applicant is notified of deficiencies pursuant to subdivision (a).
133133
134134 (2) If the applicant is notified of deficiencies pursuant to subdivision (a), no later than 30 days after the applicant submits information in response to the notification, except when the applicant is notified during those 30 days that previously identified deficiencies remain.
135135
136136 (3) Immediately upon the commissions determination that all additional information requested by the commission staff has been provided.
137137
138138 SEC. 2. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
139139
140140 SEC. 2. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
141141
142142 SEC. 2. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.