Colorado 2022 Regular Session

Colorado House Bill HB1184 Compare Versions

OldNewDifferences
1+Second Regular Session
2+Seventy-third General Assembly
3+STATE OF COLORADO
4+REREVISED
5+This Version Includes All Amendments
6+Adopted in the Second House
7+LLS NO. 22-0477.01 Carolyn Kampman x4959
18 HOUSE BILL 22-1184
2-BY REPRESENTATIVE(S) McCluskie, Herod, Ransom, Bird, Cutter,
3-Duran, Esgar, Gray, Hooton, Jodeh, Kipp, McLachlan, Mullica, Ricks,
4-Valdez D.;
5-also SENATOR(S) Moreno, Hansen, Rankin.
9+House Committees Senate Committees
10+Appropriations Appropriations
11+A BILL FOR AN ACT
612 C
7-ONCERNING FUNDING FOR CAPITAL CONSTRUCTION , AND MAKING
8-SUPPLEMENTAL APPROPRIATIONS IN CONNECTION THEREWITH
9-.
10-
11-Be it enacted by the General Assembly of the State of Colorado:
12-SECTION 1. Capital construction appropriations for the fiscal
13-year beginning July 1, 2021. In Session Laws of Colorado 2021, amend
14-section 3 of chapter 504, (SB 21-205), as follows:
15-Section 3. Capital Construction Appropriation.
16-NOTE: This bill has been prepared for the signatures of the appropriate legislative
17-officers and the Governor. To determine whether the Governor has signed the bill
18-or taken other action on it, please consult the legislative status sheet, the legislative
19-history, or the Session Laws.
20-________
21-Capital letters or bold & italic numbers indicate new material added to existing law; dashes
22-through words or numbers indicate deletions from existing law and such material is not part of
23-the act. APPROPRIATION FROM
13+ONCERNING FUNDING FOR CAPITAL CONSTRUCTION , AND MAKING101
14+SUPPLEMENTAL APPROPRIATIONS IN CONNECTION THEREWITH .102
15+Bill Summary
16+(Note: This summary applies to this bill as introduced and does
17+not reflect any amendments that may be subsequently adopted. If this bill
18+passes third reading in the house of introduction, a bill summary that
19+applies to the reengrossed version of this bill will be available at
20+http://leg.colorado.gov
21+.)
22+Supplemental appropriations are made for capital construction
23+projects.
24+Be it enacted by the General Assembly of the State of Colorado:1
25+SENATE
26+3rd Reading Unamended
27+February 17, 2022
28+SENATE
29+2nd Reading Unamended
30+February 16, 2022
31+HOUSE
32+3rd Reading Unamended
33+February 10, 2022
34+HOUSE
35+2nd Reading Unamended
36+February 9, 2022
37+HOUSE SPONSORSHIP
38+McCluskie, Herod, Ransom, Bird, Cutter, Duran, Esgar, Gray, Hooton, Jodeh, Kipp,
39+McLachlan, Mullica, Ricks, Valdez D.
40+SENATE SPONSORSHIP
41+Moreno, Hansen, Rankin
42+Shading denotes HOUSE amendment. Double underlining denotes SENATE amendment.
43+Capital letters or bold & italic numbers indicate new material to be added to existing law.
44+Dashes through the words or numbers indicate deletions from existing law. SECTION 1. Capital construction appropriations for the fiscal1
45+year beginning July 1, 2021. In Session Laws of Colorado 2021, amend2
46+section 3 of chapter 504, (SB 21-205), as follows:3
47+Section 3. Capital Construction Appropriation.4
48+1184
49+-2- APPROPRIATION FROM
2450 ITEM &
2551 SUBTOTAL
2652 TOTAL CAPITAL
2753 CONSTRUCTION
2854 FUND
2955 CASH
3056 FUNDS
3157 REAPPROPRIATED
3258 FUNDS
3359 FEDERAL
3460 FUNDS
3561 $$ $ $ $ $
36-PART I
37-CONTROLLED MAINTENANCE
38-(1) STATE AGENCIES
39-(A) Department of Agriculture
40-Code and Safety Updates, Events
41-Center, Colorado State Fair 1,153,056 1,153,056
42-(B) Department of Corrections
43-Improve Accessibility, Fremont
44-Correctional Facility 1,891,058
45-Improve Door Security, Cellhouse
46-3, Colorado Territorial Correctional
47-Facility 1,645,295
48-Improve Door Security, Lower
49-North, Buena Vista Correctional
50-Facility 1,615,288
51-Replace Roof, Administration
52-Building, Colorado Territorial
53-Correctional Facility 1,058,021
54-6,209,662 6,209,662
55-(C) Department of Education
56-Install Fire Sprinklers and Update
57-HVAC and ADA, Hubert Work
58-Gymnasium, Colorado School for
59-the Deaf and the Blind 1,559,927
60-Roof Replacements, West and
61-Argo Halls, Colorado School for
62-the Deaf and the Blind 1,443,067
63-PAGE 2-HOUSE BILL 22-1184 APPROPRIATION FROM
62+PART I 1
63+CONTROLLED MAINTENANCE 2
64+3
65+(1) STATE AGENCIES 4
66+(A) Department of Agriculture 5
67+Code and Safety Updates, Events 6
68+Center, Colorado State Fair 7 1,153,056 1,153,056
69+8
70+(B) Department of Corrections 9
71+Improve Accessibility, Fremont 10
72+Correctional Facility 11 1,891,058
73+Improve Door Security, Cellhouse 12
74+3, Colorado Territorial Correctional 13
75+Facility 14 1,645,295 1184
76+-3- APPROPRIATION FROM
6477 ITEM &
6578 SUBTOTAL
6679 TOTAL CAPITAL
6780 CONSTRUCTION
6881 FUND
6982 CASH
7083 FUNDS
7184 REAPPROPRIATED
7285 FUNDS
7386 FEDERAL
7487 FUNDS
7588 $$ $ $ $ $
76-Improve Site Drainage and Safety,
77-Talking Book Library 529,744
78-3,532,738 3,532,738
79-(D) Office of the Governor - Office of Information Technology
80-Replace Microwave Towers, Group
81-F 1,315,802 1,315,802
82-(E) Department of Higher Education - History Colorado
83-Replace Roofs, Santa Fe Trail
84-Museum and Baca House 223,919 223,919
85-(F) Department of Human Services
86-Refurbish Ash Conveyor System,
87-Heat Plant, Colorado Mental
88-Health Institute at Pueblo 1,860,384
89-Replace Roofs, Five Buildings,
90-Colorado Mental Health Institute at
91-Fort Logan 1,812,524
92-Repair/Replace Sewer and Steam
93-Producers, Colorado Mental Health
94-Institute at Fort Logan 1,794,921
95-Refurbish Secondary and
96-Emergency Electrical Systems, Tier
97-1, Colorado Mental Health Institute
98-at Pueblo 1,791,932
99-Refurbish HVAC and Mechanical
100-Equipment, Zebulon Pike, Pueblo,
101-and Spring Creek Youth Services
102-Centers 1,575,149
103-Upgrade Interiors Group Home 1,035,555
104-PAGE 3-HOUSE BILL 22-1184 APPROPRIATION FROM
89+Improve Door Security, Lower 1
90+North, Buena Vista Correctional 2
91+Facility 3 1,615,288
92+Replace Roof, Administration 4
93+Building, Colorado Territorial 5
94+Correctional Facility 6 1,058,021
95+7 6,209,662 6,209,662
96+8
97+(C) Department of Education 9
98+Install Fire Sprinklers and Update 10
99+HVAC and ADA, Hubert Work 11
100+Gymnasium, Colorado School for 12
101+the Deaf and the Blind 13 1,559,927
102+Roof Replacements, West and 14
103+Argo Halls, Colorado School for 15
104+the Deaf and the Blind 16 1,443,067
105+1184
106+-4- APPROPRIATION FROM
105107 ITEM &
106108 SUBTOTAL
107109 TOTAL CAPITAL
108110 CONSTRUCTION
109111 FUND
110112 CASH
111113 FUNDS
112114 REAPPROPRIATED
113115 FUNDS
114116 FEDERAL
115117 FUNDS
116118 $$ $ $ $ $
117-Refurbish HVAC Systems, B
118-Building, Colorado Mental Health
119-Institute at Fort Logan 986,078
120-Replace Hydronic Valves,
121-Southern District 930,303
122-Replace HVAC Systems, Platte
123-Valley and Marvin Foote Youth
124-Services Centers 685,036
125-Improve ADA Accessibility 188,278
126-12,660,160 12,660,160
127-(G) Department of Local Affairs
128-Replace Chiller, Building 5, Fort
129-Lyon 227,300 227,300
130-(H) Department of Military and Veterans Affairs
131-Site Security Lighting Upgrade,
132-Montrose and Chestnut Readiness
133-Centers 648,160
134-Mitigate Site Flooding Risk and
135-Repair Building Envelope, Watkins
136-Armory 385,080
137-Replace Fire Alarm and Upgrade
138-for Code and Security, Buckley Air
139-Force Base Building 1500 339,546
140-1,372,786 524,353 848,433(I)
141-(I) Department of Personnel
142-Controlled Maintenance
143-Emergency Account 3,000,000
144-Water and Fire Line Replacement,
145-Camp George West 1,799,255
146-PAGE 4-HOUSE BILL 22-1184 APPROPRIATION FROM
119+Improve Site Drainage and Safety, 1
120+Talking Book Library 2 529,744
121+3 3,532,738 3,532,738
122+4
123+(D) Office of the Governor - Office of Information Technology 5
124+Replace Microwave Towers, Group 6
125+F 7 1,315,802 1,315,802
126+8
127+(E) Department of Higher Education - History Colorado 9
128+Replace Roofs, Santa Fe Trail 10
129+Museum and Baca House 11 223,919 223,919
130+12
131+(F) Department of Human Services 13
132+Refurbish Ash Conveyor System, 14
133+Heat Plant, Colorado Mental 15
134+Health Institute at Pueblo 16 1,860,384
135+1184
136+-5- APPROPRIATION FROM
147137 ITEM &
148138 SUBTOTAL
149139 TOTAL CAPITAL
150140 CONSTRUCTION
151141 FUND
152142 CASH
153143 FUNDS
154144 REAPPROPRIATED
155145 FUNDS
156146 FEDERAL
157147 FUNDS
158148 $$ $ $ $ $
159-Upgrade/Replace HVAC Systems,
160-690 and 700 Kipling 1,503,051
161-Replace Plumbing and Abate
162-Asbestos, Centennial Building 1,440,849
163-Restroom Modernization, 1881
164-Pierce Street 1,182,928
165-Replace Freight Elevator, State
166-Capitol Building 584,212
167-9,510,295 9,510,295
168-(J) Department of Public Health and Environment
169-Replace Emergency Generator,
170-Argo Water Treatment Facility 321,974 321,974
171-36,527,692
172-(2) INSTITUTIONS OF HIGHER EDUCATION
173-(A) Adams State University
174-Repair Electrical Distribution,
175-Campus 1,635,526
176-Upgrade Campus Security and
177-Safety 1,294,152
178-2,929,678 2,929,678
179-(B) Arapahoe Community College
180-Replace HVAC Primary
181-Equipment, Main Building 1,912,304 1,912,304
182-(C) Auraria Higher Education Center
183-Replace Main Electrical
184-Switchgear, Campus 1,263,359
185-PAGE 5-HOUSE BILL 22-1184 APPROPRIATION FROM
149+Replace Roofs, Five Buildings, 1
150+Colorado Mental Health Institute at 2
151+Fort Logan 3 1,812,524
152+Repair/Replace Sewer and Steam 4
153+Producers, Colorado Mental Health 5
154+Institute at Fort Logan 6 1,794,921
155+Refurbish Secondary and 7
156+Emergency Electrical Systems, Tier 8
157+1, Colorado Mental Health Institute 9
158+at Pueblo 10 1,791,932
159+Refurbish HVAC and Mechanical 11
160+Equipment, Zebulon Pike, Pueblo, 12
161+and Spring Creek Youth Services 13
162+Centers 14 1,575,149
163+Upgrade Interiors Group Home 15 1,035,555 1184
164+-6- APPROPRIATION FROM
186165 ITEM &
187166 SUBTOTAL
188167 TOTAL CAPITAL
189168 CONSTRUCTION
190169 FUND
191170 CASH
192171 FUNDS
193172 REAPPROPRIATED
194173 FUNDS
195174 FEDERAL
196175 FUNDS
197176 $$ $ $ $ $
198-Provide ADA Walkways, Curtis
199-and Champa Streets and Classroom
200-Courtyard 1,117,216
201-Replace Fire Sprinkler System,
202-North Classroom Building 1,074,241
203-Replace Transformers at North
204-Chiller and PE Events Center 253,880
205-3,708,696 3,708,696
206-(D) Community College of Aurora
207-Roof Replacement, Administration
208-Building 572,934 572,934
209-(E) Colorado Community College System at Lowry
210-Upgrade HVAC System, Building
211-905 1,994,717
212-Upgrade HVAC, Building 859 1,191,876
213-Install New Boilers, Chiller, AHUs
214-and Upgrade the Controls, Building
215-999 1,093,378
216-4,279,971 4,279,971
217-(F) Colorado Mesa University
218-Upgrade HVAC and Control
219-Systems, Lowell Heiny Hall 1,142,932
220-Upgrade HVAC, BAS, and
221-Security Systems, Wubben and
222-Health Science 182,435
223-Replace Boiler, Maverick Center 121,275
224-1,446,642 1,446,642
225-PAGE 6-HOUSE BILL 22-1184 APPROPRIATION FROM
177+Refurbish HVAC Systems, B 1
178+Building, Colorado Mental Health 2
179+Institute at Fort Logan 3 986,078
180+Replace Hydronic Valves, 4
181+Southern District 5 930,303
182+Replace HVAC Systems, Platte 6
183+Valley and Marvin Foote Youth 7
184+Services Centers 8 685,036
185+Improve ADA Accessibility 9 188,278
186+10 12,660,160 12,660,160
187+11
188+(G) Department of Local Affairs 12
189+Replace Chiller, Building 5, Fort 13
190+Lyon 14 227,300 227,300
191+15
192+16
193+1184
194+-7- APPROPRIATION FROM
226195 ITEM &
227196 SUBTOTAL
228197 TOTAL CAPITAL
229198 CONSTRUCTION
230199 FUND
231200 CASH
232201 FUNDS
233202 REAPPROPRIATED
234203 FUNDS
235204 FEDERAL
236205 FUNDS
237206 $$ $ $ $ $
238-(G) Colorado Northwestern Community College
239-Replace Roof, Windows, Blakeslee
240-and Allesbrooke Buildings,
241-Rangely Campus 717,475
242-Upgrade and Repair Campus
243-Access Control and Camera
244-System, Rangely Campus 511,148
245-1,228,623 1,228,623
246-(H) Colorado School of Mines
247-Install Emergency Responder
248-Radio Amplification 619,985
249-Replacement of Hazardous
250-Laboratory Exhaust Fans 496,873
251-Repair Elevators, Five Buildings 434,833
252-1,551,691 1,551,691
253-(I) Colorado State University
254-Refurbish Water Wells, Pumps,
255-Ditches, ARDEC 1,090,497
256-Replace Roof, Engineering
257-Building, B Wing 538,891
258-Repair C Basin Sanitary Sewer
259-Outfall 517,012
260-Separate Domestic and Industrial
261-Plumbing Systems, Plant Sciences
262-Building 514,553
263-Replacement Domestic Water Line,
264-East Drive 504,134
265-Replace Roof, Centennial Hall 484,382
266-Improve ADA Accessibility 377,862
267-PAGE 7-HOUSE BILL 22-1184 APPROPRIATION FROM
207+(H) Department of Military and Veterans Affairs 1
208+Site Security Lighting Upgrade, 2
209+Montrose and Chestnut Readiness 3
210+Centers 4 648,160
211+Mitigate Site Flooding Risk and 5
212+Repair Building Envelope, Watkins 6
213+Armory 7 385,080
214+Replace Fire Alarm and Upgrade 8
215+for Code and Security, Buckley Air 9
216+Force Base Building 1500 10 339,546
217+11 1,372,786 524,353 848,433(I)
218+12
219+(I) Department of Personnel 13
220+Controlled Maintenance 14
221+Emergency Account 15 3,000,000
222+1184
223+-8- APPROPRIATION FROM
268224 ITEM &
269225 SUBTOTAL
270226 TOTAL CAPITAL
271227 CONSTRUCTION
272228 FUND
273229 CASH
274230 FUNDS
275231 REAPPROPRIATED
276232 FUNDS
277233 FEDERAL
278234 FUNDS
279235 $$ $ $ $ $
280-Install Fire Sprinkler, Danforth
281-Chapel 124,194
282-4,151,525 4,151,525
283-(J) Colorado State University - Pueblo
284-Replace/Upgrade Building Fire
285-Alarm Equipment, Campuswide 1,193,814
286-Replace Campus Water Lines 924,495
287-Refurbish Elevators, Upgrade ADA
288-Compliance, Four Building 890,193
289-3,008,502 3,008,502
290-(K) Fort Lewis College
291-Replace Fire Alarm Equipment,
292-Multiple Buildings 1,477,247 1,477,247
293-(L) Front Range Community College
294-Repair/Upgrade VAV Boxes and
295-Controls, College Hill Library 2,176,349 1,305,809 870,540
296-a
297-Replace RTUs, College Hill
298-Library, Westminster Campus 1,994,354 1,196,612 797,742
299-a
300-Replace HVAC System and
301-Controls, Challenger Point,
302-Larimer Campus 1,164,328 1,164,328
303-Replace Harmony Library Roof,
304-Larimer Campus 482,662 482,662
305-5,817,693 a
306- These amounts shall be from a forty percent match from the City of Westminster.
307-PAGE 8-HOUSE BILL 22-1184 APPROPRIATION FROM
236+Water and Fire Line Replacement, 1
237+Camp George West 2 1,799,255
238+Upgrade/Replace HVAC Systems, 3
239+690 and 700 Kipling 4 1,503,051
240+Replace Plumbing and Abate 5
241+Asbestos, Centennial Building 6 1,440,849
242+Restroom Modernization, 1881 7
243+Pierce Street 8 1,182,928
244+Replace Freight Elevator, State 9
245+Capitol Building 10 584,212
246+11 9,510,295 9,510,295
247+12
248+(J) Department of Public Health and Environment 13
249+Replace Emergency Generator, 14
250+Argo Water Treatment Facility 15 321,974 321,974
251+16
252+1184
253+-9- APPROPRIATION FROM
308254 ITEM &
309255 SUBTOTAL
310256 TOTAL CAPITAL
311257 CONSTRUCTION
312258 FUND
313259 CASH
314260 FUNDS
315261 REAPPROPRIATED
316262 FUNDS
317263 FEDERAL
318264 FUNDS
319265 $$ $ $ $ $
320-(M) Lamar Community College
321-Replace Roofs, Bowman, Trustees,
322-and Wellness Center Buildings 759,440
323-Campus Accessibility Compliance 682,500
324-1,441,940 1,441,940
325-(N) Morgan Community College
326-Replace Campus Irrigation System 1,238,903 1,238,903
327-(O) Northeastern Junior College
328-Replace Roof and East Entrance
329-and Update Fire Alarm, Knowles
330-Hall 711,500 711,500
331-(P) Otero Junior College
332-Abate Asbestos, Safety Upgrade,
333-Humanities Center 1,400,000 1,400,000
334-(Q) Pikes Peak Community College
335-Improve Electrical Infrastructure
336-and Install Emergency Generator,
337-Downtown Studio Campus 1,326,331 1,326,331
338-(R) Pueblo Community College
339-Replace Roof System, Fremont
340-Campus 828,542 828,542
341-(S) Red Rocks Community College
342-Replace Coil and Supply Fan, West
343-End RTU, Main Building,
344-Lakewood Campus 844,310
345-PAGE 9-HOUSE BILL 22-1184 APPROPRIATION FROM
266+1 36,527,692
267+2
268+(2) INSTITUTIONS OF HIGHER EDUCATION 3
269+(A) Adams State University 4
270+Repair Electrical Distribution, 5
271+Campus 6 1,635,526
272+Upgrade Campus Security and 7
273+Safety 8 1,294,152
274+9 2,929,678 2,929,678
275+10
276+(B) Arapahoe Community College 11
277+Replace HVAC Primary 12
278+Equipment, Main Building 13 1,912,304 1,912,304
279+14
280+15
281+1184
282+-10- APPROPRIATION FROM
346283 ITEM &
347284 SUBTOTAL
348285 TOTAL CAPITAL
349286 CONSTRUCTION
350287 FUND
351288 CASH
352289 FUNDS
353290 REAPPROPRIATED
354291 FUNDS
355292 FEDERAL
356293 FUNDS
357294 $$ $ $ $ $
358-Refurbish West Wing Elevator,
359-Lakewood Campus 299,731
360-1,144,041 1,144,041
361-(T) Trinidad State Junior College
362-Replace Roof, Mullen Building 327,306 327,306
363-(U) University of Colorado at Boulder
364-Repair Exterior Structure, Macky
365-Auditoriun 1,086,807
366-Install Rooftop Fall Protection,
367-Muenzinger, Porter, and Imig
368-Buildings 1,032,016
369-Upgrade Elevators, Duane and
370-Ramaley Buildings 911,169
371-Replace Fire Alarm Control Panel,
372-EC Civil and Classroom Buildings 616,404
373-3,646,396 3,646,396
374-(V) University of Colorado at Colorado Springs
375-Replace VAV and Upgrade
376-Controls, Engineering Building 1,999,350
377-Replace AHU and Return Air
378-System, Columbine Hall 646,048
379-Modernize Elevators 288,225
380-2,933,623 2,933,623
381-(W) University of Colorado Denver
382-Upgrade Electrical Systems, CU
383-Denver Building 1,321,872
384-PAGE 10-HOUSE BILL 22-1184 APPROPRIATION FROM
295+(C) Auraria Higher Education Center 1
296+Replace Main Electrical 2
297+Switchgear, Campus 3 1,263,359
298+Provide ADA Walkways, Curtis 4
299+and Champa Streets and Classroom 5
300+Courtyard 6 1,117,216
301+Replace Fire Sprinkler System, 7
302+North Classroom Building 8 1,074,241
303+Replace Transformers at North 9
304+Chiller and PE Events Center 10 253,880
305+11 3,708,696 3,708,696
306+12
307+(D) Community College of Aurora 13
308+Roof Replacement, Administration 14
309+Building 15 572,934 572,934
310+16
311+1184
312+-11- APPROPRIATION FROM
385313 ITEM &
386314 SUBTOTAL
387315 TOTAL CAPITAL
388316 CONSTRUCTION
389317 FUND
390318 CASH
391319 FUNDS
392320 REAPPROPRIATED
393321 FUNDS
394322 FEDERAL
395323 FUNDS
396324 $$ $ $ $ $
397-Replace Chiller, Fitzsimons
398-Building 1,122,100
399-Improve Heating System, Building
400-500 821,737
401-3,265,709 3,265,709
402-(X) University of Northern Colorado
403-Replace Chiller, Michener 922,705
404-Replace Chiller, Candelaria Hall 902,545
405-1,825,250 1,825,250
406-(Y) Western Colorado University
407-Upgrade HVAC Systems,
408-Academic Buildings 884,785 884,785
409-53,059,832
410-TOTALS PART I
411-(CONTROLLED
412-MAINTENANCE)$89,587,524 $87,070,809 $1,668,282 $848,433
413-PAGE 11-HOUSE BILL 22-1184 APPROPRIATION FROM
325+1
326+(E) Colorado Community College System at Lowry 2
327+Upgrade HVAC System, Building 3
328+905 4 1,994,717
329+Upgrade HVAC, Building 859 5 1,191,876
330+Install New Boilers, Chiller, AHUs 6
331+and Upgrade the Controls, Building 7
332+999 8 1,093,378
333+9 4,279,971 4,279,971
334+10
335+(F) Colorado Mesa University 11
336+Upgrade HVAC and Control 12
337+Systems, Lowell Heiny Hall 13 1,142,932
338+Upgrade HVAC, BAS, and 14
339+Security Systems, Wubben and 15
340+Health Science 16 182,435
341+1184
342+-12- APPROPRIATION FROM
414343 ITEM &
415344 SUBTOTAL
416345 TOTAL CAPITAL
417346 CONSTRUCTION
418347 FUND
419348 CASH
420349 FUNDS
421350 REAPPROPRIATED
422351 FUNDS
423352 FEDERAL
424353 FUNDS
425354 $$ $ $ $ $
426-PART II
427-STATE AGENCIES
428-(1) CAPITAL RENEWAL AND RECAPITALIZATION
429-(A) Department of Agriculture
430-Repair/Replace Water, Sanitary,
431-and Stormwater Infrastructure,
432-Colorado State Fair (Capital
433-Renewal) 3,383,907 3,383,907
434-(B) Department of Corrections
435-Steam Condensate Line
436-Replacement, Sterling Correctional
437-Facility (Capital Renewal) 8,487,496 8,487,496
438-(C) Department of Higher Education
439-(1) History Colorado
440-Regional Museum Preservation
441-Projects 310,000
355+Replace Boiler, Maverick Center 1 121,275
356+2 1,446,642 1,446,642
357+3
358+(G) Colorado Northwestern Community College 4
359+Replace Roof, Windows, Blakeslee 5
360+and Allesbrooke Buildings, 6
361+Rangely Campus 7 717,475
362+Upgrade and Repair Campus 8
363+Access Control and Camera 9
364+System, Rangely Campus 10 511,148
365+11 1,228,623 1,228,623
366+12
367+(H) Colorado School of Mines 13
368+Install Emergency Responder 14
369+Radio Amplification 15 619,985
370+1184
371+-13- APPROPRIATION FROM
372+ITEM &
373+SUBTOTAL
374+TOTAL CAPITAL
375+CONSTRUCTION
376+FUND
377+CASH
378+FUNDS
379+REAPPROPRIATED
380+FUNDS
381+FEDERAL
382+FUNDS
383+$$ $ $ $ $
384+Replacement of Hazardous 1
385+Laboratory Exhaust Fans 2 496,873
386+Repair Elevators, Five Buildings 3 434,833
387+4 1,551,691 1,551,691
388+5
389+(I) Colorado State University 6
390+Refurbish Water Wells, Pumps, 7
391+Ditches, ARDEC 8 1,090,497
392+Replace Roof, Engineering 9
393+Building, B Wing 10 538,891
394+Repair C Basin Sanitary Sewer 11
395+Outfall 12 517,012
396+Separate Domestic and Industrial 13
397+Plumbing Systems, Plant Sciences 14
398+Building 15 514,553
399+1184
400+-14- APPROPRIATION FROM
401+ITEM &
402+SUBTOTAL
403+TOTAL CAPITAL
404+CONSTRUCTION
405+FUND
406+CASH
407+FUNDS
408+REAPPROPRIATED
409+FUNDS
410+FEDERAL
411+FUNDS
412+$$ $ $ $ $
413+Replacement Domestic Water Line, 1
414+East Drive 2 504,134
415+Replace Roof, Centennial Hall 3 484,382
416+Improve ADA Accessibility 4 377,862
417+Install Fire Sprinkler, Danforth 5
418+Chapel 6 124,194
419+7 4,151,525 4,151,525
420+8
421+(J) Colorado State University - Pueblo 9
422+Replace/Upgrade Building Fire 10
423+Alarm Equipment, Campuswide 11 1,193,814
424+Replace Campus Water Lines 12 924,495
425+Refurbish Elevators, Upgrade ADA 13
426+Compliance, Four Building 14 890,193
427+15 3,008,502 3,008,502
428+1184
429+-15- APPROPRIATION FROM
430+ITEM &
431+SUBTOTAL
432+TOTAL CAPITAL
433+CONSTRUCTION
434+FUND
435+CASH
436+FUNDS
437+REAPPROPRIATED
438+FUNDS
439+FEDERAL
440+FUNDS
441+$$ $ $ $ $
442+1
443+(K) Fort Lewis College 2
444+Replace Fire Alarm Equipment, 3
445+Multiple Buildings 4 1,477,247 1,477,247
446+5
447+(L) Front Range Community College 6
448+Repair/Upgrade VAV Boxes and 7
449+Controls, College Hill Library 8 2,176,349 1,305,809 870,540
450+a
451+Replace RTUs, College Hill 9
452+Library, Westminster Campus 10 1,994,354 1,196,612 797,742
453+a
454+Replace HVAC System and 11
455+Controls, Challenger Point, 12
456+Larimer Campus 13 1,164,328 1,164,328
457+Replace Harmony Library Roof, 14
458+Larimer Campus 15 482,662 482,662
459+16 5,817,693
460+1184
461+-16- APPROPRIATION FROM
462+ITEM &
463+SUBTOTAL
464+TOTAL CAPITAL
465+CONSTRUCTION
466+FUND
467+CASH
468+FUNDS
469+REAPPROPRIATED
470+FUNDS
471+FEDERAL
472+FUNDS
473+$$ $ $ $ $
474+1
475+a
476+ These amounts shall be from a forty percent match from the City of Westminster. 2
477+3
478+(M) Lamar Community College 4
479+Replace Roofs, Bowman, Trustees, 5
480+and Wellness Center Buildings 6 759,440
481+Campus Accessibility Compliance 7 682,500
482+8 1,441,940 1,441,940
483+9
484+(N) Morgan Community College 10
485+Replace Campus Irrigation System 11 1,238,903 1,238,903
486+12
487+13
488+14
489+15
490+1184
491+-17- APPROPRIATION FROM
492+ITEM &
493+SUBTOTAL
494+TOTAL CAPITAL
495+CONSTRUCTION
496+FUND
497+CASH
498+FUNDS
499+REAPPROPRIATED
500+FUNDS
501+FEDERAL
502+FUNDS
503+$$ $ $ $ $
504+(O) Northeastern Junior College 1
505+Replace Roof and East Entrance 2
506+and Update Fire Alarm, Knowles 3
507+Hall 4 711,500 711,500
508+5
509+(P) Otero Junior College 6
510+Abate Asbestos, Safety Upgrade, 7
511+Humanities Center 8 1,400,000 1,400,000
512+9
513+(Q) Pikes Peak Community College 10
514+Improve Electrical Infrastructure 11
515+and Install Emergency Generator, 12
516+Downtown Studio Campus 13 1,326,331 1,326,331
517+14
518+15
519+16 1184
520+-18- APPROPRIATION FROM
521+ITEM &
522+SUBTOTAL
523+TOTAL CAPITAL
524+CONSTRUCTION
525+FUND
526+CASH
527+FUNDS
528+REAPPROPRIATED
529+FUNDS
530+FEDERAL
531+FUNDS
532+$$ $ $ $ $
533+(R) Pueblo Community College 1
534+Replace Roof System, Fremont 2
535+Campus 3 828,542 828,542
536+4
537+(S) Red Rocks Community College 5
538+Replace Coil and Supply Fan, West 6
539+End RTU, Main Building, 7
540+Lakewood Campus 8 844,310
541+Refurbish West Wing Elevator, 9
542+Lakewood Campus 10 299,731
543+11 1,144,041 1,144,041
544+12
545+(T) Trinidad State Junior College 13
546+Replace Roof, Mullen Building 14 327,306 327,306
547+15
548+1184
549+-19- APPROPRIATION FROM
550+ITEM &
551+SUBTOTAL
552+TOTAL CAPITAL
553+CONSTRUCTION
554+FUND
555+CASH
556+FUNDS
557+REAPPROPRIATED
558+FUNDS
559+FEDERAL
560+FUNDS
561+$$ $ $ $ $
562+(U) University of Colorado at Boulder 1
563+Repair Exterior Structure, Macky 2
564+Auditoriun 3 1,086,807
565+Install Rooftop Fall Protection, 4
566+Muenzinger, Porter, and Imig 5
567+Buildings 6 1,032,016
568+Upgrade Elevators, Duane and 7
569+Ramaley Buildings 8 911,169
570+Replace Fire Alarm Control Panel, 9
571+EC Civil and Classroom Buildings 10 616,404
572+11 3,646,396 3,646,396
573+12
574+(V) University of Colorado at Colorado Springs 13
575+Replace VAV and Upgrade 14
576+Controls, Engineering Building 15 1,999,350
577+1184
578+-20- APPROPRIATION FROM
579+ITEM &
580+SUBTOTAL
581+TOTAL CAPITAL
582+CONSTRUCTION
583+FUND
584+CASH
585+FUNDS
586+REAPPROPRIATED
587+FUNDS
588+FEDERAL
589+FUNDS
590+$$ $ $ $ $
591+Replace AHU and Return Air 1
592+System, Columbine Hall 2 646,048
593+Modernize Elevators 3 288,225
594+4 2,933,623 2,933,623
595+5
596+(W) University of Colorado Denver 6
597+Upgrade Electrical Systems, CU 7
598+Denver Building 8 1,321,872
599+Replace Chiller, Fitzsimons 9
600+Building 10 1,122,100
601+Improve Heating System, Building 11
602+500 12 821,737
603+13 3,265,709 3,265,709
604+14
605+15
606+1184
607+-21- APPROPRIATION FROM
608+ITEM &
609+SUBTOTAL
610+TOTAL CAPITAL
611+CONSTRUCTION
612+FUND
613+CASH
614+FUNDS
615+REAPPROPRIATED
616+FUNDS
617+FEDERAL
618+FUNDS
619+$$ $ $ $ $
620+(X) University of Northern Colorado 1
621+Replace Chiller, Michener 2 922,705
622+Replace Chiller, Candelaria Hall 3 902,545
623+4 1,825,250 1,825,250
624+5
625+(Y) Western Colorado University 6
626+Upgrade HVAC Systems, 7
627+Academic Buildings 8 884,785 884,785
628+9
629+10 53,059,832
630+11
631+12
632+TOTALS PART I 13
633+(CONTROLLED 14
634+MAINTENANCE) 15 $89,587,524 $87,070,809 $1,668,282 $848,433
635+1184
636+-22- APPROPRIATION FROM
637+ITEM &
638+SUBTOTAL
639+TOTAL CAPITAL
640+CONSTRUCTION
641+FUND
642+CASH
643+FUNDS
644+REAPPROPRIATED
645+FUNDS
646+FEDERAL
647+FUNDS
648+$$ $ $ $ $
649+1
650+PART II 2
651+STATE AGENCIES 3
652+4
653+(1) CAPITAL RENEWAL AND RECAPITALIZATION 5
654+(A) Department of Agriculture 6
655+Repair/Replace Water, Sanitary, 7
656+and Stormwater Infrastructure, 8
657+Colorado State Fair (Capital 9
658+Renewal) 10 3,383,907 3,383,907
659+11
660+(B) Department of Corrections 12
661+Steam Condensate Line 13
662+Replacement, Sterling Correctional 14
663+Facility (Capital Renewal) 15 8,487,496 8,487,496
664+16 1184
665+-23- APPROPRIATION FROM
666+ITEM &
667+SUBTOTAL
668+TOTAL CAPITAL
669+CONSTRUCTION
670+FUND
671+CASH
672+FUNDS
673+REAPPROPRIATED
674+FUNDS
675+FEDERAL
676+FUNDS
677+$$ $ $ $ $
678+(C) Department of Higher Education 1
679+(1) History Colorado 2
680+Regional Museum Preservation 3
681+Projects 4 310,000
442682 310,000
443683 a
444-960,000 960,000
684+5 960,000 960,000
445685 a
686+6
446687 a
447688 Of this amount, $210,000
448689 $860,000 shall be from limited gaming revenues deposited in
449690 the M
450691 USEUM AND
451692 P
452693 RESERVATION
453694 O
454695 PERATIONS
455696 A
456697 CCOUNT OF THE
457698 S
458699 TATE
459700 H
460701 ISTORICAL
461702 F
462703 UND
463-,
704+, 7
464705 CREATED IN
465706 S
466707 ECTION
467708 44-30-1201 (5)(c)(I)(B), C.R.S., Stat e Historical Fund created in Section 9 (5 )(b)(II) of Article XVIII of the State Constitut ion, to be used pursuant to Section
709+8
468710 44-30-1201, C.R.S.,
469711 and $100,000 shall be from revenue generated at community museums and historic sites. A
470712 MOUNTS IN THE
471713 M
472714 USEUM AND
473715 P
474716 RESERVATION
475717 O
476718 PERATIONS
477719 A
478720 CCOUNT
721+9
479722 ARE FROM LIMITED GAMING REVENUES DEPOSITED IN THE
480723 S
481724 TATE
482725 H
483726 ISTORICAL
484727 F
485728 UND PURSUANT TO
486729 S
487730 ECTION
488731 9 (5)(b)(II)
489732 OF
490733 A
491734 RTICLE
492735 XVIII
493736 OF THE
494737 S
495738 TATE
496739 C
497740 ONSTITUTION AND ALLOCATED
741+10
498742 PURSUANT TO
499743 S
500744 ECTION
501-44-30-1201 (5)(c), C.R.S.
502-PAGE 12-HOUSE BILL 22-1184 APPROPRIATION FROM
745+44-30-1201 (5)(c), C.R.S. 11
746+12
747+13
748+14
749+15
750+16
751+1184
752+-24- APPROPRIATION FROM
503753 ITEM &
504754 SUBTOTAL
505755 TOTAL CAPITAL
506756 CONSTRUCTION
507757 FUND
508758 CASH
509759 FUNDS
510760 REAPPROPRIATED
511761 FUNDS
512762 FEDERAL
513763 FUNDS
514764 $$ $ $ $ $
515-(D) Department of Human Services
516-HVAC Replacement in Four
517-Buildings, Colorado Mental Health
518-Institute at Pueblo (Capital
519-Renewal) 12,196,140 12,196,140
520-Department-wide Facility Master
521-Plan 1,758,841 1,758,841
765+(D) Department of Human Services 1
766+HVAC Replacement in Four 2
767+Buildings, Colorado Mental Health 3
768+Institute at Pueblo (Capital 4
769+Renewal) 5 12,196,140 12,196,140
770+Department-wide Facility Master 6
771+Plan 7 1,758,841 1,758,841
522772 a
523773 E
524774 MERGENCY SUICIDE MITIGATION
525-,
775+, 8
526776 C
527777 OLORADO
528778 M
529779 ENTAL
530780 H
531781 EALTH
782+9
532783 I
533784 NSTITUTE AT
534785 P
535786 UEBLO
536-4,113,216 4,113,216
537-13,954,981
538-18,068,197
787+10 4,113,216 4,113,216
788+11 13,954,981
789+12 18,068,197 13
539790 a
540- This amount shall be from the Fort Logan Land Sale Account within the Capital Construction Fund created in Section 24-75-302 ( 3.3), C.R.S.
541-(E) Department of Natural Resources
542-(1) Division of Parks and Wildlife
543-Infrastructure and Real Property
544-Maintenance 18,840,500 18,840,500
545-a
546-a
547- Of this amount, it is estimated that $18,540,500 shall be from the Wildlife Cash Fund created in Section 33-1-112 (1)(a), C.R. S., and $300,000 shall be from the Highway Users Tax
548-Fund created in Section 43-4-201 (1)(a), C.R.S., pursuant to Section 33-10-111 (4), C.R.S.
549-(F) Department of Transportation
550-Highway Construction Projects 500,000 500,000
551-45,476,884
552-50,240,100
553-PAGE 13-HOUSE BILL 22-1184 APPROPRIATION FROM
791+ This amount shall be from the Fort Logan Land Sale Account within the Capital Construction Fund created in Section 24-75-302 ( 3.3), C.R.S. 14
792+15
793+16
794+1184
795+-25- APPROPRIATION FROM
554796 ITEM &
555797 SUBTOTAL
556798 TOTAL CAPITAL
557799 CONSTRUCTION
558800 FUND
559801 CASH
560802 FUNDS
561803 REAPPROPRIATED
562804 FUNDS
563805 FEDERAL
564806 FUNDS
565807 $$ $ $ $ $
566-(2) CAPITAL EXPANSION
567-(A) Department of Military and Veterans Affairs
568-Field Artillery Readiness Center 2,459,000 614,750 1,844,250(I)
569-(B) Department of Natural Resources
570-(1) Division of Parks and Wildlife
571-Property Acquisition and
572-Improvements 11,000,000 11,000,000
808+(E) Department of Natural Resources 1
809+(1) Division of Parks and Wildlife 2
810+Infrastructure and Real Property 3
811+Maintenance 4 18,840,500 18,840,500
573812 a
813+5
574814 a
575- This amount shall be from the Wildlife Cash Fund created in Section 33-1-112 (1)(a), C.R.S.
576-(C) Department of Transportation
577-Weather Radar System in
578-Southwest Colorado 2,600,000 300,000 100,000
579-a
580-1,800,000
581-b
582-400,000(I)
583-a
584- This amount shall be from the State Highway Fund created in Section 43-1-219, C.R.S., from revenues credited pursuant to Secti on 43-4-205 (5)(a), C.R.S.
585-b
586- Of this amount, $1,700,000 shall be from funds received from th e Department of Local Affairs and $100,000 shall be from funds received from the Department of Natural Resources.
587-16,059,000
588-TOTALS PART II
589-(STATE AGENCIES)$61,535,884
590-$25,482,293
591-$32,009,341
592-$1,800,000 $2,244,250
593-$66,299,100 $29,595,509 $32,659,341
594-PAGE 14-HOUSE BILL 22-1184 APPROPRIATION FROM
815+ Of this amount, it is estimated that $18,540,500 shall be from the Wildlife Cash Fund created in Section 33-1-112 (1)(a), C.R. S., and $300,000 shall be from the Highway Users Tax 6
816+Fund created in Section 43-4-201 (1)(a), C.R.S., pursuant to Section 33-10-111 (4), C.R.S. 7
817+8
818+(F) Department of Transportation 9
819+Highway Construction Projects 10 500,000 500,000
820+11
821+12 45,476,884
822+13 50,240,100 14 15
823+1184
824+-26- APPROPRIATION FROM
595825 ITEM &
596826 SUBTOTAL
597827 TOTAL CAPITAL
598828 CONSTRUCTION
599829 FUND
600830 CASH
601831 FUNDS
602832 REAPPROPRIATED
603833 FUNDS
604834 FEDERAL
605835 FUNDS
606836 $$ $ $ $ $
607-PART III
608-INSTITUTIONS OF HIGHER EDUCATION
609-(1) CAPITAL RENEWAL AND RECAPITALIZATION
610-(A) Arapahoe Community College
611-Health Programs Integration and
612-Annex Building Renovation 11,152,093 8,364,000 2,788,093
837+(2) CAPITAL EXPANSION 1
838+(A) Department of Military and Veterans Affairs 2
839+Field Artillery Readiness Center 3 2,459,000 614,750 1,844,250(I)
840+4
841+(B) Department of Natural Resources 5
842+(1) Division of Parks and Wildlife 6
843+Property Acquisition and 7
844+Improvements 8 11,000,000 11,000,000
613845 a
846+9
614847 a
615- This amount shall be from unrestricted institutional reserves.
616-(B) Auraria Higher Education Center
617-AHEC Campus-wide HVAC
618-Infrastructure Replacement (Capital
619-Renewal) 20,563,100 20,353,100 210,000
848+ This amount shall be from the Wildlife Cash Fund created in Section 33-1-112 (1)(a), C.R.S. 10
849+11
850+(C) Department of Transportation 12
851+Weather Radar System in 13
852+Southwest Colorado 14 2,600,000 300,000 100,000
620853 a
621-a
622- This amount shall be from deferred maintenance funds received from each of the three institutions on the AHEC campus.
623-(C) Community College of Denver
624-Boulder Creek Health Science
625-Center Renovation 15,747,133 13,227,592 2,519,541
626-a
627-a
628- This amount shall be from unrestricted donations to th e project's Foundation and unrestricted institutional reserves.
629-(D) Colorado Mesa University
630-Kinesiology Renovation and
631-Expansion 23,289,512 17,467,133 5,822,379
632-a
633-a
634- This amount shall be from unrestricted institutional reserves.
635-PAGE 15-HOUSE BILL 22-1184 APPROPRIATION FROM
854+1,800,000
855+b
856+400,000(I)
857+15
858+1184
859+-27- APPROPRIATION FROM
636860 ITEM &
637861 SUBTOTAL
638862 TOTAL CAPITAL
639863 CONSTRUCTION
640864 FUND
641865 CASH
642866 FUNDS
643867 REAPPROPRIATED
644868 FUNDS
645869 FEDERAL
646870 FUNDS
647871 $$ $ $ $ $
648-(E) Colorado State University - Pueblo
649-Technology Building Renovation
650-and Addition 17,122,654 16,952,654 170,000
651872 a
652-a
653- This amount shall be from CSU-Pueblo institutional reserves.
654-(F) Lamar Community College
655-Bowman Library Renovation 1,979,866 1,929,866 50,000
656-a
657-a
658- This amount shall be from unrestricted institutional reserves.
659-(G) Trinidad State Junior College
660-Freudenthal Library Renovation 6,276,339 6,276,339
661-(H) University of Colorado at Boulder
662-Hellems Arts and Sciences
663-Building Renovation and Mary
664-Rippon Outdoor Theatre
665-Renovation 35,207,000 14,082,800 21,124,200
666-a
667-a
668- This amount shall be from campus cash funds, primarily derived from various uncommitted, unrestricted net assets for program i mprovements.
669-131,337,697
670-(2) CAPITAL EXPANSION
671-(A) Community College of Aurora
672-Diesel and Support Services
673-Building 9,395,879 6,188,439 3,207,440
674-a
675-a
676- This amount shall be from the Community College of Aurora Foundation and unrestricted institutional reserves.
677-PAGE 16-HOUSE BILL 22-1184 APPROPRIATION FROM
873+ This amount shall be from the State Highway Fund created in Section 43-1-219, C.R.S., from revenues credited pursuant to Secti on 43-4-205 (5)(a), C.R.S. 1
874+b
875+ Of this amount, $1,700,000 shall be from funds received from th e Department of Local Affairs and $100,000 shall be from funds received from the Department of Natural Resources. 2
876+3
877+4 16,059,000
878+5
879+6
880+TOTALS PART II 7
881+(STATE AGENCIES) 8 $61,535,884
882+$25,482,293
883+$32,009,341
884+$1,800,000 $2,244,250
885+9 $66,299,100 $29,595,509 $32,659,341
886+10
887+11
888+12
889+13
890+14
891+15
892+1184
893+-28- APPROPRIATION FROM
678894 ITEM &
679895 SUBTOTAL
680896 TOTAL CAPITAL
681897 CONSTRUCTION
682898 FUND
683899 CASH
684900 FUNDS
685901 REAPPROPRIATED
686902 FUNDS
687903 FEDERAL
688904 FUNDS
689905 $$ $ $ $ $
690-(B) Colorado State University
691-National Western Center Lease
692-Purchase Payments 9,860,000 9,860,000
906+PART III 1
907+INSTITUTIONS OF HIGHER EDUCATION 2
908+3
909+(1) CAPITAL RENEWAL AND RECAPITALIZATION 4
910+(A) Arapahoe Community College 5
911+Health Programs Integration and 6
912+Annex Building Renovation 7 11,152,093 8,364,000 2,788,093
693913 a
914+8
694915 a
695- This amount shall be from the National Western Center Trust Fund created in Section 23-31-902 (2), C.R.S.
696-19,255,879
697-TOTALS PART III
698-(INSTITUTIONS OF HIGHER
699-EDUCATION)$150,593,576 $104,841,923 $45,751,653
700-GRAND TOTALS
701-(CAPITAL CONSTRUCTION)$301,716,984
702-$217,395,025
703-$79,429,276
916+ This amount shall be from unrestricted institutional reserves. 9
917+10
918+(B) Auraria Higher Education Center 11
919+AHEC Campus-wide HVAC 12
920+Infrastructure Replacement (Capital 13
921+Renewal) 14 20,563,100 20,353,100 210,000
704922 a
705- $1,800,000 $3,092,683
706-b
707-
708-$306,480,200 $221,508,241 $80,079,276
709-a
710-a
711- Of this amount, $400,000 shall be from the Highway Users Tax Fund created in Section 43-4-201 (1)(a), C.R.S., and appropriated pursuant to Section 33-10-111 (4), C.R.S.
712-b
713- This amount contains an (I) notation.
714-PAGE 17-HOUSE BILL 22-1184 APPROPRIATION FROM
923+15
924+1184
925+-29- APPROPRIATION FROM
715926 ITEM &
716927 SUBTOTAL
717928 TOTAL CAPITAL
718929 CONSTRUCTION
719930 FUND
720931 CASH
721932 FUNDS
722933 REAPPROPRIATED
723934 FUNDS
724935 FEDERAL
725936 FUNDS
726937 $$ $ $ $ $
727-SECTION 2. Capital construction appropriations for the fiscal year beginning July 1, 2020. In Session Laws of Colorado 2020, section 3 of chapter 326, (HB 20-1360),
728-amend Part II (1)(A) and the affected totals, as the affected totals are amended by section 1 of chapter 503, (SB 21-052), and secti on 17 of chapter 504, (SB21-205), as follows:
729-Section 3. Capital Construction Appropriation.
730-PART II
731-CAPITAL RENEWAL AND RECAPITALIZATION
732-(1) DEPARTMENT OF HIGHER EDUCATION
733-(A) Colorado State University
734-Shepardson Building Renovation and Addition
735-3,100,000
736-3,100,00
737-0
738938 a
939+ This amount shall be from deferred maintenance funds received from each of the three institutions on the AHEC campus. 1
940+2
941+(C) Community College of Denver 3
942+Boulder Creek Health Science 4
943+Center Renovation 5 15,747,133 13,227,592 2,519,541
739944 a
740- This amount shall be from donations and institutional reserves.
741-TOTALS PART II
742-(CAPITAL RENEWAL AND
743-RECAPITALIZATION)$57,895,414
744-$500,000 $25,902,958
745-$31,492,456
746-$54,795,414 $22,802,598
747-GRAND TOTALS
748-(CAPITAL CONSTRUCTION)$114,061,860
749-$3,988,768 $74,575,636
945+6
750946 a
751-$35,497,456
752-b
753-$110,961,860 $71,475,636
947+ This amount shall be from unrestricted donations to th e project's Foundation and unrestricted institutional reserves. 7
948+8
949+(D) Colorado Mesa University 9
950+Kinesiology Renovation and 10
951+Expansion 11 23,289,512 17,467,133 5,822,379
754952 a
953+12
755954 a
756- Of this amount, $2,210,704 contains an (I) notation.
757-b
758- This amount contains an (I) notation.
759-PAGE 18-HOUSE BILL 22-1184 APPROPRIATION FROM
955+ This amount shall be from unrestricted institutional reserves. 13
956+14
957+15
958+1184
959+-30- APPROPRIATION FROM
760960 ITEM &
761961 SUBTOTAL
762962 TOTAL CAPITAL
763963 CONSTRUCTION
764964 FUND
765965 CASH
766966 FUNDS
767967 REAPPROPRIATED
768968 FUNDS
769969 FEDERAL
770970 FUNDS
771971 $$ $ $ $ $
772-SECTION 3. Capital construction appropriations for the fiscal year beginning July 1, 2019. In Session Laws of Colorado 2019, section 3 of chapter 454, (SB
773-19-207), amend Part III (1)(A) and the affected totals, as Part III (1)(A) and the affected totals are amended by section 1 of chapter 325 (H B 20-1259), Session Laws of Colorado
774-2020, as follows:
775-Section 3. Capital Construction Appropriation.
776-PART III
777-CAPITAL EXPANSION
778-(1) DEPARTMENT OF HIGHER EDUCATION
779-(A) Colorado School of Mines
780-Subsurface Frontiers Building
781-121,856,741
782-1,856,741
783-120,000,000
972+(E) Colorado State University - Pueblo 1
973+Technology Building Renovation 2
974+and Addition 3 17,122,654 16,952,654 170,000
784975 a
976+4
785977 a
786- This amount shall be from donations and bonds.
787-TOTALS PART III (CAPITAL EXPANSION)$196,303,138
788-$33,631,151
789-$162,671,987
790-$74,446,397 $31,774,410 $42,671,987
791-GRAND TOTALS
792-(CAPITAL CONSTRUCTION)$392,809,477
793-$185,066,899
794-$184,234,179
978+ This amount shall be from CSU-Pueblo institutional reserves. 5
979+6
980+(F) Lamar Community College 7
981+Bowman Library Renovation 8 1,979,866 1,929,866 50,000
795982 a
796-$8,911,836 $14,596,563
797-b
798-
799-$270,952,736 $183,210,158 $64,234,179
983+9
800984 a
801-a
802- Of this amount, $300,000 shall be from the Highway Users Tax Fund created in Section 43-4-201 (1)(a), C.R.S., and appropriated pursuant to Section 33-10-111 (4), C.R.S.
803-b
804- This amount contains an (I) notation.
805-PAGE 19-HOUSE BILL 22-1184 APPROPRIATION FROM
985+ This amount shall be from unrestricted institutional reserves. 10
986+11
987+(G) Trinidad State Junior College 12
988+Freudenthal Library Renovation 13 6,276,339 6,276,339
989+14
990+15
991+1184
992+-31- APPROPRIATION FROM
806993 ITEM &
807994 SUBTOTAL
808995 TOTAL CAPITAL
809996 CONSTRUCTION
810997 FUND
811998 CASH
812999 FUNDS
8131000 REAPPROPRIATED
8141001 FUNDS
8151002 FEDERAL
8161003 FUNDS
8171004 $$ $ $ $ $
818-SECTION 4. Capital construction appropriations for the fiscal year beginning July 1, 2018. In Session Laws of Colorado 2018, section 3 of chapter 424, (HB 18-1322),
819-add footnote 104a to Part IV (6), as the affected totals are amended by section 1 of chapter 453 (SB 19-127) and section 5 of chap ter 504 (SB21-205), as follows:
820-Section 3. Capital Construction Appropriation.
821-PART IV
822-INFORMATION TECHNOLOGY PROJECTS
823-(6) DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT
824-Electronic Birth Registration
1005+(H) University of Colorado at Boulder 1
1006+Hellems Arts and Sciences 2
1007+Building Renovation and Mary 3
1008+Rippon Outdoor Theatre 4
1009+Renovation 5 35,207,000 14,082,800 21,124,200
1010+a
1011+6
1012+a
1013+ This amount shall be from campus cash funds, primarily derived from various uncommitted, unrestricted net assets for program i mprovements. 7
1014+8
1015+9 131,337,697
1016+10
1017+(2) CAPITAL EXPANSION 11
1018+(A) Community College of Aurora 12
1019+Diesel and Support Services 13
1020+Building 14 9,395,879 6,188,439 3,207,440
1021+a
1022+15
1023+1184
1024+-32- APPROPRIATION FROM
1025+ITEM &
1026+SUBTOTAL
1027+TOTAL CAPITAL
1028+CONSTRUCTION
1029+FUND
1030+CASH
1031+FUNDS
1032+REAPPROPRIATED
1033+FUNDS
1034+FEDERAL
1035+FUNDS
1036+$$ $ $ $ $
1037+a
1038+ This amount shall be from the Community College of Aurora Foundation and unrestricted institutional reserves. 1
1039+2
1040+(B) Colorado State University 3
1041+National Western Center Lease 4
1042+Purchase Payments 5 9,860,000 9,860,000
1043+a
1044+6
1045+a
1046+ This amount shall be from the National Western Center Trust Fund created in Section 23-31-902 (2), C.R.S. 7
1047+8
1048+9 19,255,879
1049+10
1050+11
1051+TOTALS PART III 12
1052+(INSTITUTIONS OF HIGHER 13
1053+EDUCATION) 14 $150,593,576 $104,841,923 $45,751,653
1054+15
1055+1184
1056+-33- APPROPRIATION FROM
1057+ITEM &
1058+SUBTOTAL
1059+TOTAL CAPITAL
1060+CONSTRUCTION
1061+FUND
1062+CASH
1063+FUNDS
1064+REAPPROPRIATED
1065+FUNDS
1066+FEDERAL
1067+FUNDS
1068+$$ $ $ $ $
1069+1
1070+GRAND TOTALS 2
1071+(CAPITAL CONSTRUCTION) 3 $301,716,984
1072+$217,395,025
1073+$79,429,276
1074+a
1075+ $1,800,000 $3,092,683
1076+b
1077+
1078+4 $306,480,200 $221,508,241 $80,079,276
1079+a
1080+5
1081+a
1082+ Of this amount, $400,000 shall be from the Highway Users Tax Fund created in Section 43-4-201 (1)(a), C.R.S., and appropriated pursuant to Section 33-10-111 (4), C.R.S. 6
1083+b
1084+ This amount contains an (I) notation. 7
1085+8
1086+1184
1087+-34- APPROPRIATION FROM
1088+ITEM &
1089+SUBTOTAL
1090+TOTAL CAPITAL
1091+CONSTRUCTION
1092+FUND
1093+CASH
1094+FUNDS
1095+REAPPROPRIATED
1096+FUNDS
1097+FEDERAL
1098+FUNDS
1099+$$ $ $ $ $
1100+SECTION 2. Capital construction appropriations for the fiscal year beginning July 1, 2020. In Session Laws of Colorado 2020, section 3 of chapter 326, (HB 20-1360), 1
1101+amend Part II (1)(A) and the affected totals, as the affected totals are amended by section 1 of chapter 503, (SB 21-052), and secti on 17 of chapter 504, (SB21-205), as follows: 2
1102+Section 3. Capital Construction Appropriation. 3
1103+PART II 4
1104+CAPITAL RENEWAL AND RECAPITALIZATION 5
1105+6
1106+(1) DEPARTMENT OF HIGHER EDUCATION 7
1107+(A) Colorado State University
1108+8
1109+Shepardson Building Renovation
1110+9
1111+and Addition
1112+10 3,100,000
1113+3,100,00
1114+0
1115+a
1116+11
1117+a
1118+ This amount shall be from donations and institutional reserves.
1119+12
1120+13
1121+14
1122+15
1123+1184
1124+-35- APPROPRIATION FROM
1125+ITEM &
1126+SUBTOTAL
1127+TOTAL CAPITAL
1128+CONSTRUCTION
1129+FUND
1130+CASH
1131+FUNDS
1132+REAPPROPRIATED
1133+FUNDS
1134+FEDERAL
1135+FUNDS
1136+$$ $ $ $ $
1137+TOTALS PART II 1
1138+(CAPITAL RENEWAL AND 2
1139+RECAPITALIZATION) 3 $57,895,414
1140+$500,000 $25,902,958
1141+$31,492,456
1142+4 $54,795,414 $22,802,598
1143+5
1144+6
1145+GRAND TOTALS 7
1146+(CAPITAL CONSTRUCTION) 8 $114,061,860
1147+$3,988,768 $74,575,636
1148+a
1149+$35,497,456
1150+b
1151+9 $110,961,860 $71,475,636
1152+a
1153+10
1154+a
1155+ Of this amount, $2,210,704 contains an (I) notation. 11
1156+b
1157+ This amount contains an (I) notation. 12
1158+13
1159+1184
1160+-36- APPROPRIATION FROM
1161+ITEM &
1162+SUBTOTAL
1163+TOTAL CAPITAL
1164+CONSTRUCTION
1165+FUND
1166+CASH
1167+FUNDS
1168+REAPPROPRIATED
1169+FUNDS
1170+FEDERAL
1171+FUNDS
1172+$$ $ $ $ $
1173+SECTION 3. Capital construction appropriations for the fiscal year beginning July 1, 2019. In Session Laws of Colorado 2019, section 3 of chapter 454, (SB 1
1174+19-207), amend Part III (1)(A) and the affected totals, as Part III (1)(A) and the affected totals are amended by section 1 of chapter 325 (H B 20-1259), Session Laws of Colorado 2
1175+2020, as follows: 3
1176+Section 3. Capital Construction Appropriation. 4
1177+PART III 5
1178+CAPITAL EXPANSION 6
1179+7
1180+(1) DEPARTMENT OF HIGHER EDUCATION 8
1181+(A) Colorado School of Mines
1182+9
1183+Subsurface Frontiers Building
1184+10 121,856,741
1185+1,856,741
1186+120,000,000
1187+a
1188+11
1189+a
1190+ This amount shall be from donations and bonds.
1191+12 13 14 15
1192+1184
1193+-37- APPROPRIATION FROM
1194+ITEM &
1195+SUBTOTAL
1196+TOTAL CAPITAL
1197+CONSTRUCTION
1198+FUND
1199+CASH
1200+FUNDS
1201+REAPPROPRIATED
1202+FUNDS
1203+FEDERAL
1204+FUNDS
1205+$$ $ $ $ $
1206+TOTALS PART III 1
1207+(CAPITAL EXPANSION) 2 $196,303,138
1208+$33,631,151
1209+$162,671,987
1210+3 $74,446,397 $31,774,410 $42,671,987
1211+4
1212+5
1213+GRAND TOTALS 6
1214+(CAPITAL CONSTRUCTION) 7 $392,809,477
1215+$185,066,899
1216+$184,234,179
1217+a
1218+$8,911,836 $14,596,563
1219+b
1220+
1221+8 $270,952,736 $183,210,158 $64,234,179
1222+a
1223+9
1224+a
1225+ Of this amount, $300,000 shall be from the Highway Users Tax Fund created in Section 43-4-201 (1)(a), C.R.S., and appropriated pursuant to Section 33-10-111 (4), C.R.S. 10
1226+b
1227+ This amount contains an (I) notation. 11
1228+12
1229+1184
1230+-38- APPROPRIATION FROM
1231+ITEM &
1232+SUBTOTAL
1233+TOTAL CAPITAL
1234+CONSTRUCTION
1235+FUND
1236+CASH
1237+FUNDS
1238+REAPPROPRIATED
1239+FUNDS
1240+FEDERAL
1241+FUNDS
1242+$$ $ $ $ $
1243+SECTION 4. Capital construction appropriations for the fiscal year beginning July 1, 2018. In Session Laws of Colorado 2018, section 3 of chapter 424, (HB 18-1322), 1
1244+add footnote 104a to Part IV (6), as the affected totals are amended by section 1 of chapter 453 (SB 19-127) and section 5 of chap ter 504 (SB21-205), as follows: 2
1245+Section 3. Capital Construction Appropriation. 3
1246+PART IV 4
1247+INFORMATION TECHNOLOGY PROJECTS 5
1248+6
1249+(6) DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT 7
1250+Electronic Birth Registration 8
8251251 System Replacement Project
1252+9
8261253 P
8271254 ROJECT
8281255 104a
829- 2,440,000 745,000 1,695,000
1256+ 10 2,440,000 745,000 1,695,000
8301257 a
1258+11
8311259 a
832- This amount shall be from the Vital Statistics Records Cash Fund created in Section 25-2-121 (2)(b)(I), C.R.S.
833-TOTALS PART IV
834-(INFORMATION
835-TECHNOLOGY PROJECTS)$49,272,912 $15,206,760 $10,518,326 $18,368,326 $5,179,500
836-GRAND TOTALS
837-(CAPITAL CONSTRUCTION)$375,093,669 $157,873,610 $193,297,233
1260+ This amount shall be from the Vital Statistics Records Cash Fund created in Section 25-2-121 (2)(b)(I), C.R.S. 12
1261+13
1262+TOTALS PART IV 14
1263+(INFORMATION 15
1264+TECHNOLOGY PROJECTS) 16 $49,272,912 $15,206,760 $10,518,326 $18,368,326 $5,179,500
1265+1184
1266+-39- APPROPRIATION FROM
1267+ITEM &
1268+SUBTOTAL
1269+TOTAL CAPITAL
1270+CONSTRUCTION
1271+FUND
1272+CASH
1273+FUNDS
1274+REAPPROPRIATED
1275+FUNDS
1276+FEDERAL
1277+FUNDS
1278+$$ $ $ $ $
1279+1
1280+2
1281+GRAND TOTALS 3
1282+(CAPITAL CONSTRUCTION) 4 $375,093,669 $157,873,610 $193,297,233
8381283 a
8391284 $18,743,326 $5,179,500
8401285 b
8411286
1287+5
8421288 a
843- Of this amount, $20,105,025 contains an (I) notation and $300,000 shall be from the Highway Users Tax Fund created in Section 43-4-201 (1)(a), C.R.S., and appropriated pursuant
844-to Section 33-10-111 (4), C.R.S.
1289+ Of this amount, $20,105,025 contains an (I) notation and $300,000 shall be from the Highway Users Tax Fund created in Section 43-4-201 (1)(a), C.R.S., and appropriated pursuant 6
1290+to Section 33-10-111 (4), C.R.S. 7
8451291 b
846- This amount contains an (I) notation.
847-FOOTNOTES -- The following statements are referenced to the numbered footnotes throughout section 3.
1292+ This amount contains an (I) notation. 8
1293+9
1294+FOOTNOTES -- The following statements are referenced to the numbered footnotes throughout section 3. 10
1295+11
8481296 104a
8491297 D
8501298 EPARTMENT OF
8511299 P
8521300 UBLIC
8531301 H
8541302 EALTH AND
8551303 E
8561304 NVIRONMENT
8571305 ,
8581306 E
8591307 LECTRONIC
8601308 B
8611309 IRTH
8621310 R
8631311 EGISTRATION
8641312 S
8651313 YSTEM
8661314 R
8671315 EPLACEMENT
8681316 P
8691317 ROJECT
8701318 --
8711319 T
8721320 HIS APPROPRIATION
1321+12
8731322 REMAINS AVAILABLE THROUGH
8741323 J
8751324 UNE
8761325 30,
877- 2023.
878-PAGE 20-HOUSE BILL 22-1184 SECTION 5. Safety clause. The general assembly hereby finds,
879-determines, and declares that this act is necessary for the immediate
880-preservation of the public peace, health, and safety.
881-____________________________ ____________________________
882-Alec Garnett Steve Fenberg
883-SPEAKER OF THE HOUSE PRESIDENT OF
884-OF REPRESENTATIVES THE SENATE
885-____________________________ ____________________________
886-Robin Jones Cindi L. Markwell
887-CHIEF CLERK OF THE HOUSE SECRETARY OF
888-OF REPRESENTATIVES THE SENATE
889- APPROVED________________________________________
890- (Date and Time)
891- _________________________________________
892- Jared S. Polis
893- GOVERNOR OF THE STATE OF COLORADO
894-PAGE 21-HOUSE BILL 22-1184
1326+ 2023. 13
1327+14
1328+15
1329+16
1330+1184
1331+-40- SECTION 5. Safety clause. The general assembly hereby finds,1
1332+determines, and declares that this act is necessary for the immediate2
1333+preservation of the public peace, health, and safety.3
1334+1184-41-