Colorado 2023 Regular Session

Colorado Senate Bill SB292 Compare Versions

OldNewDifferences
1+First Regular Session
2+Seventy-fourth General Assembly
3+STATE OF COLORADO
4+REREVISED
5+This Version Includes All Amendments
6+Adopted in the Second House
7+LLS NO. 23-0302.01 Nicole Myers x4326
18 SENATE BILL 23-292
2-BY SENATOR(S) Hansen and Fenberg, Coleman, Danielson, Exum,
3-Hinrichsen, Marchman, Mullica, Roberts, Rodriguez, Bridges, Buckner,
4-Cutter, Fields, Gonzales, Jaquez Lewis, Kolker, Priola, Sullivan, Winter F.;
5-also REPRESENTATIVE(S) Duran and Bird, Amabile, Bacon, Brown,
6-deGruy Kennedy, Dickson, Epps, Froelich, Garcia, Gonzales-Gutierrez,
7-Hamrick, Herod, Jodeh, Joseph, Lieder, Lindsay, Martinez, McCormick,
8-McLachlan, Michaelson Jenet, Ricks, Sharbini, Sirota, Snyder, Titone,
9-Vigil, Weissman, Woodrow, McCluskie.
9+Senate Committees House Committees
10+Business, Labor, & Technology State, Civic, Military, & Veterans Affairs
11+Appropriations Appropriations
12+A BILL FOR AN ACT
1013 C
11-ONCERNING LABOR REQUIREMENTS FOR ENERGY SECTOR CONSTRUCTION ,
12-AND, IN CONNECTION THEREWITH, MAKING AN APPROPRIATION.
13-Be it enacted by the General Assembly of the State of Colorado:
14-SECTION 1. In Colorado Revised Statutes, add part 3 to article 92
15-of title 24 as follows:
16-PART 3
17-ENERGY SECTOR PUBLIC WORKS PROJECTS
18-CRAFT LABOR REQUIREMENTS
14+ONCERNING LABOR REQUIREMENTS FOR ENERGY SECTOR101
15+CONSTRUCTION, AND, IN CONNECTION THEREWITH , MAKING AN
16+102
17+APPROPRIATION.103
18+Bill Summary
19+(Note: This summary applies to this bill as introduced and does
20+not reflect any amendments that may be subsequently adopted. If this bill
21+passes third reading in the house of introduction, a bill summary that
22+applies to the reengrossed version of this bill will be available at
23+http://leg.colorado.gov
24+.)
25+Current labor requirements for public projects. In 2019, the
26+general assembly adopted an apprenticeship utilization law
27+(apprenticeship utilization law) that requires the general contractor for a
28+public project that does not receive federal money, and that is in the
29+amount of one million dollars or more, to submit, at the time a
30+HOUSE
31+3rd Reading Unamended
32+May 6, 2023
33+HOUSE
34+2nd Reading Unamended
35+May 4, 2023
36+SENATE
37+3rd Reading Unamended
38+May 1, 2023
39+SENATE
40+Amended 2nd Reading
41+April 28, 2023
42+SENATE SPONSORSHIP
43+Hansen and Fenberg, Coleman, Danielson, Exum, Hinrichsen, Marchman, Mullica,
44+Roberts, Rodriguez, Bridges, Buckner, Cutter, Fields, Gonzales, Jaquez Lewis, Kolker, Priola,
45+Sullivan, Winter F.
46+HOUSE SPONSORSHIP
47+Duran and Bird, Amabile, Bacon, Brown, deGruy Kennedy, Dickson, Epps, Froelich,
48+Garcia, Gonzales-Gutierrez, Hamrick, Herod, Jodeh, Joseph, Lieder, Lindsay, Martinez,
49+McCluskie, McCormick, McLachlan, Michaelson Jenet, Ricks, Sharbini, Sirota, Snyder,
50+Titone, Vigil, Weissman, Woodrow
51+Shading denotes HOUSE amendment. Double underlining denotes SENATE amendment.
52+Capital letters or bold & italic numbers indicate new material to be added to existing law.
53+Dashes through the words or numbers indicate deletions from existing law. mechanical, electrical, or plumbing subcontractor is put under contract,
54+documentation to the contracting agency that identifies the contractors or
55+subcontractors that will be used for specified aspects of the public project
56+and certifies that all firms identified participate in specified
57+apprenticeship programs.
58+At the same time, the general assembly also adopted a prevailing
59+wage law (prevailing wage law) that requires any contractor who is
60+awarded a contract for a public project by an agency of government for
61+$500,000 or more and that does not include federal money, and any
62+subcontractors working on the public project, to pay their employees a
63+prevailing wage at weekly intervals. The contractors and subcontractors
64+are required to comply with prevailing wage enforcement provisions and
65+requirements.
66+Energy sector public works projects. The bill creates a new
67+category of public works projects defined as "energy sector public works
68+projects", and requires these projects to comply with the requirements of
69+the apprenticeship utilization law and the prevailing wage law for energy
70+sector public works projects. An "energy sector public works project" is
71+any project that:
72+! Has the purpose of generating, transmitting, or distributing
73+electricity or natural gas for the purpose of providing
74+energy to Colorado individual consumers and businesses;
75+or
76+! Has the purpose of generating or distributing electricity or
77+natural gas for the purpose of providing energy to Colorado
78+individual consumers and businesses from utility customer
79+funding as approved by a cooperative electric association.
80+With certain exceptions, the bill requires that a contract for an
81+energy sector public works project include provisions that expressly
82+require that all work performed under the contract comply with the state
83+mechanical, electrical, and plumbing apprenticeship utilization law and
84+the state prevailing wage law if the project is an electric power generation
85+project with a nameplate generation capacity of one megawatt or higher
86+or if the project is a project other than an electric power generation
87+project with a total cost of one million dollars or more. All contracts with
88+subcontractors on the project are also required to include such provisions.
89+If the contract for an energy sector public works project does not include
90+such provisions, the project will not be eligible to receive state funding
91+or to receive required authorizations or approvals from the public utilities
92+commission (PUC).
93+The lead contractor for an energy sector public works project is
94+required to:
95+! Prepare certified payroll records for workers directly
96+employed by the contractor and any subcontractors on the
97+project and submit the records to the public utility or other
98+292
99+-2- owner of the energy sector public works project weekly;
100+and
101+! Prepare a quarterly craft labor certification that attests that
102+the lead contractor and all subcontractors are compliant
103+with the apprenticeship utilization law and the prevailing
104+wage law.
105+The public utility, cooperative electric association, independent
106+power producer, or other owner of an energy sector public works project
107+is required to maintain the records for all craft labor certifications and is
108+required to either provide copies quarterly to the department of labor and
109+employment or require the lead contractor to provide such copies.
110+The state auditor's office, in conjunction with the PUC and the
111+department of labor and employment, is required to conduct periodic
112+random audits of the labor certifications for energy sector public works
113+projects.
114+Violations of the requirements for energy sector public works
115+project contracts are subject to the penalties described in the
116+apprenticeship utilization law and the prevailing wage law.
117+For projects funded in whole or in part by the state, the
118+requirements to comply with the apprenticeship utilization law and the
119+prevailing wage law apply only when the total project cost is one million
120+dollars or more and the aggregated public assistance from the state is
121+$500,000 or more or when the project is a power generation project with
122+a nameplate generation capacity of one megawatt or higher, and the
123+aggregated public assistance from the state is $500,000 or more.
124+The requirements to comply with the apprenticeship utilization law
125+and the prevailing wage law do not apply to a project that is covered by
126+a project labor agreement, work on an energy sector public works project
127+performed by employees of a utility company, a utility-incentivized
128+demand-side management or electrification program, a utility or
129+state-funded building efficiency program, service agreements that were
130+entered into on or before a certain date, projects that involve an electric
131+distribution line with a specified capacity, work on an energy sector
132+public works project put out to bid on or after January 1, 2024, that is
133+qualified for and claims the increased federal production tax credit or
134+investment tax credit amount, excluding any domestic content, energy
135+community, or low-income community bonus credit, and projects that
136+involve pipelines with a specified minimum yield strength.
137+Project labor agreements. In lieu of compliance with the
138+apprenticeship utilization law and the prevailing wage law, a public
139+utility, cooperative electric association, or independent power producer
140+may incorporate a project labor agreement requirement for an energy
141+sector public works project. A project labor agreement is a prehire
142+collective bargaining agreement that establishes the terms and conditions
143+of employment of the construction workforce on an energy sector public
144+292
145+-3- works project. A project labor agreement is required to:
146+! Include provisions for resolving labor disputes and
147+grievances;
148+! Guarantee against strikes and lockouts;
149+! Ensure a reliable source of trained and skilled labor;
150+! Further public policy objectives regarding improved
151+employment opportunities for minorities, women, and other
152+economically disadvantaged populations in the construction
153+industry;
154+! Permit the selection of the lowest qualified responsible
155+bidder or lowest qualified responsible offeror without
156+regard to union or non-union status at other construction
157+sites; and
158+! Bind all contractors and subcontractors on the energy
159+sector public works project to the project labor agreement
160+through the inclusion of appropriate bid specifications in
161+all relevant bid documents.
162+The PUC is prohibited from denying approval of an energy sector
163+public works project solely because it uses a project labor agreement.
164+The bill specifies which provisions of the apprenticeship
165+utilization law for public projects apply to energy sector public works
166+projects.
167+Regarding "best value" employment metrics that the PUC is
168+required to consider when it evaluates electric resource acquisitions and
169+requests for certificates of public convenience and necessity for
170+construction or expansion of generating facilities, the bill:
171+! Requires the PUC to promulgate rules requiring utilities,
172+when submitting annual progress reports for an electric
173+resource acquisition, to collect and provide to the PUC
174+information concerning the implementation of "best value"
175+employment metrics;
176+! Requires the PUC to report annually to committees of
177+reference of the general assembly concerning the
178+information that is reported; and
179+! Repeals obsolete language requiring the state auditor to
180+conduct a performance audit.
181+The bill adds enforcement mechanisms for the existing
182+mechanical, electrical, and plumbing apprenticeship utilization
183+requirements for gas demand-side management projects and beneficial
184+electrification projects.
185+In addition, the bill requires that projects undertaken pursuant to
186+specified existing state laws comply with the state mechanical, electrical,
187+and plumbing apprenticeship utilization law and the state prevailing wage
188+law.
189+292
190+-4- Be it enacted by the General Assembly of the State of Colorado:1
191+SECTION 1. In Colorado Revised Statutes, add part 3 to article2
192+92 of title 24 as follows:3
193+PART 34
194+ENERGY SECTOR PUBLIC WORKS PROJECTS5
195+CRAFT LABOR REQUIREMENTS6
19196 24-92-301. Short title. T
20-HE SHORT TITLE OF THIS PART 3 IS THE
21-"COLORADO ENERGY SECTOR PUBLIC WORKS PROJECT CRAFT LABOR
22-________
23-Capital letters or bold & italic numbers indicate new material added to existing law; dashes
24-through words or numbers indicate deletions from existing law and such material is not part of
25-the act. REQUIREMENTS ACT".
197+HE SHORT TITLE OF THIS PART 3 IS THE7
198+"C
199+OLORADO ENERGY SECTOR PUBLIC WORKS PROJECT CRAFT LABOR8
200+R
201+EQUIREMENTS ACT".9
26202 24-92-302. Legislative declaration. (1) T
27-HE GENERAL ASSEMBLY
28-HEREBY FINDS AND DECLARES THAT
29-:
203+HE GENERAL ASSEMBLY10
204+HEREBY FINDS AND DECLARES THAT :11
30205 (a) T
31-HE ENERGY INDUSTRY IN COLORADO IS UNDERGOING A HISTORIC
32-TRANSFORMATION TO ADDRESS THREATS POSED BY CLIMATE CHANGE
33-,
34-WHICH INCLUDES EFFORTS TO DIVERSIFY CAPACITY , PROMOTE THE
35-DEVELOPMENT OF RENEWABLE AND OTHER CLEAN
36-, NON-CARBON
37-GENERATION SOURCES
38-, AND ELECTRIFY MAJOR SEGMENTS OF THE STATE 'S
39-ECONOMY
40-;
206+HE ENERGY INDUSTRY IN COLORADO IS UNDERGOING A12
207+HISTORIC TRANSFORMATION TO ADDRESS THREATS POSED BY CLIMATE13
208+CHANGE, WHICH INCLUDES EFFORTS TO DIVERSIFY CAPACITY , PROMOTE14
209+THE DEVELOPMENT OF RENEWABLE AND OTHER CLEAN , NON-CARBON15
210+GENERATION SOURCES, AND ELECTRIFY MAJOR SEGMENTS OF THE STATE 'S16
211+ECONOMY;17
41212 (b) T
42-HESE DEVELOPMENTS WILL REQUIRE MASSIVE INVESTMENTS OF
43-RESOURCES FROM THE STATE AND PUBLIC UTILITY COMPANIES
44-, WHICH WILL
45-ULTIMATELY BE PAID BY RESIDENTS THROUGH FUTURE TAXES AND UTILITY
46-BILLS
47-;
213+HESE DEVELOPMENTS WILL REQUIRE MASSIVE INVESTMENTS18
214+OF RESOURCES FROM THE STATE AND PUBLIC UTILITY COMPANIES , WHICH19
215+WILL ULTIMATELY BE PAID BY RESIDENTS THROUGH FUTURE TAXES AND20
216+UTILITY BILLS;21
48217 (c) T
49-HE SAFE AND COST-EFFECTIVE DELIVERY OF THESE PROJECTS IS
50-VITAL TO THE PUBLIC HEALTH AND WELFARE OF RESIDENTS AND THE
51-ECONOMIC SECURITY OF THE STATE
52-, AND CRITICAL TO ENSURE THAT
53-ADEQUATE POWER IS PROVIDED TO
54-COLORADO HOMES AND BUSINESSES ;
218+HE SAFE AND COST-EFFECTIVE DELIVERY OF THESE PROJECTS22
219+IS VITAL TO THE PUBLIC HEALTH AND WELFARE OF RESIDENTS AND THE23
220+ECONOMIC SECURITY OF THE STATE , AND CRITICAL TO ENSURE THAT24
221+ADEQUATE POWER IS PROVIDED TO COLORADO HOMES AND BUSINESSES ;25
55222 (d) D
56-EFICIENT PLANNING OF THESE RESOURCES CAN RESULT IN
57-ESCALATING UTILITY BILLS AND DANGEROUS POWER OUTAGES IF POWER
58-SUPPLY IS NOT MAINTAINED IN SUFFICIENT CAPACITY TO MEET FUTURE
59-,
60-GROWING DEMAND. FOR THESE REASONS, APPROPRIATE MEASURES MUST BE
61-TAKEN TO PROTECT FUTURE ENERGY INVESTMENTS
62-, PROMOTE SUCCESSFUL
63-CONSTRUCTION DELIVERY
64-, AND PREVENT ERRORS IN THE PLANNING AND
65-DELIVERY OF NEW FACILITIES
66-.
223+EFICIENT PLANNING OF THESE RESOURCES CAN RESULT IN26
224+292-5- ESCALATING UTILITY BILLS AND DANGEROUS POWER OUTAGES IF POWER1
225+SUPPLY IS NOT MAINTAINED IN SUFFICIENT CAPACITY TO MEET FUTURE ,2
226+GROWING DEMAND. FOR THESE REASONS, APPROPRIATE MEASURES MUST3
227+BE TAKEN TO PROTECT FUTURE ENERGY INVESTMENTS , PROMOTE4
228+SUCCESSFUL CONSTRUCTION DELIVERY , AND PREVENT ERRORS IN THE5
229+PLANNING AND DELIVERY OF NEW FACILITIES .6
67230 (e) O
68-NE OF THE MOST CHALLENGING ASPECTS OF ENERGY FACILITY
69-CONSTRUCTION IS ENSURING THAT PROJECTS ARE SUPPORTED BY CAPABLE
70-CRAFT LABOR RESOURCES
71-. IT IS ESSENTIAL FOR THESE PROJECTS TO BE
72-STAFFED BY A RELIABLE AND ADEQUATE SUPPLY OF PROPERLY TRAINED
73-WORKERS IN ALL APPLICABLE TRADES AND CRAFTS REQUIRED FOR THESE
74-FACILITIES
75-.
231+NE OF THE MOST CHALLENGING ASPECTS OF ENERGY FACILITY7
232+CONSTRUCTION IS ENSURING THAT PROJECTS ARE SUPPORTED BY CAPABLE8
233+CRAFT LABOR RESOURCES . IT IS ESSENTIAL FOR THESE PROJECTS TO BE9
234+STAFFED BY A RELIABLE AND ADEQUATE SUPPLY OF PROPERLY TRAINED10
235+WORKERS IN ALL APPLICABLE TRADES AND CRAFTS REQUIRED FOR THESE11
236+FACILITIES.12
76237 (f) E
77-NERGY SECTOR PUBLIC WORKS PROJECTS BUILT BY OR FOR THE
78-USE OF REGULATED UTILITIES
79-, LIKE TRADITIONAL PUBLIC PROJECTS, ARE
80-OFTEN BUILT FOR THE COLLECTIVE BENEFIT OF ALL CITIZENS AND RESIDENTS
81-PAGE 2-SENATE BILL 23-292 OF COLORADO. THESE PROJECTS ARE OFTEN FUNDED THROUGH PUBLIC TAX
82-DOLLARS OR THROUGH THE COLLECTIVE RESOURCES ACQUIRED THROUGH
83-COLORADO UTILITIES BILLING CUSTOMERS . LIKE TAX DOLLARS, THESE
84-RESOURCES ACQUIRED THROUGH UTILITY RATES SHOULD DEMAND A HIGHER
85-STANDARD OF PUBLIC BENEFIT BACK TO THE CONSUMERS AND COMMUNITIES
86-FROM WHICH THE RESOURCES WERE COLLECTED
87-.
238+NERGY SECTOR PUBLIC WORKS PROJECTS BUILT BY OR FOR THE13
239+USE OF REGULATED UTILITIES, LIKE TRADITIONAL PUBLIC PROJECTS, ARE14
240+OFTEN BUILT FOR THE COLLECTIVE BENEFIT OF ALL CITIZENS AND15
241+RESIDENTS OF COLORADO. THESE PROJECTS ARE OFTEN FUNDED THROUGH16
242+PUBLIC TAX DOLLARS OR THROUGH THE COLLECTIVE RESOURCES17
243+ACQUIRED THROUGH COLORADO UTILITIES BILLING CUSTOMERS. LIKE TAX18
244+DOLLARS, THESE RESOURCES ACQUIRED THROUGH UTILITY RATES S HOULD19
245+DEMAND A HIGHER ST ANDARD OF PUBLIC BENEFIT BACK TO THE20
246+CONSUMERS AND COMMUNITIES FROM WHICH THE RESOURCES WERE21
247+COLLECTED.22
88248 (g) E
89-XTENSIVE RESEARCH SHOWS THAT PREVAILING WAGE LAWS ARE
90-EFFECTIVE IN ATTRACTING BETTER QUALIFIED WORKERS TO PROJECTS AND
91-PROMOTING CRITICALLY NEEDED INVESTMENTS IN APPRENTICESHIP TRAINING
92-REQUIRED TO ENSURE ADEQUATE CRAFT LABOR SKILL LEVELS AND
93-PRODUCTIVITY
94-. LIKEWISE, THE USE OF REGISTERED APPRENTICESHIP
95-TRAINING PROGRAMS AND PROJECT LABO R AGREEMENTS HAS BEEN PROVEN
96-TO BE THE MOST EFFECTIVE STRATEGY FOR PROVIDING HIGH
97--LEVEL SKILLS
98-TRAINING AND ENSURING NEEDED QUALIFICATION CREDENTIALING FOR
99-WORKERS IN THE CONSTRUCTION INDUSTRY
100-.
249+XTENSIVE RESEARCH SHOWS THAT PREVAILING WAGE LAWS23
250+ARE EFFECTIVE IN ATTRACTING BETTER QUALIFIED WORKERS TO PROJECTS24
251+AND PROMOTING CRITICALLY NEEDED INVESTMENTS IN APPRENTICESHIP25
252+TRAINING REQUIRED TO ENSURE ADEQUATE CRAFT LABOR SKILL LEVELS26
253+AND PRODUCTIVITY. LIKEWISE, THE USE OF REGISTERED APPRENTICESHIP27
254+292
255+-6- TRAINING PROGRAMS AND PROJECT LABOR AGREEMENTS HAS BEEN1
256+PROVEN TO BE THE MOST EFFECTIVE STRATEGY FOR PROVIDING2
257+HIGH-LEVEL SKILLS TRAINING AND ENSURING NEEDED QUALIFICATION3
258+CREDENTIALING FOR WORKERS IN THE CONSTRUCTION INDUSTRY .4
101259 (h) B
102-Y PROVIDING PROJECT OWNERS , DEVELOPERS, AND
103-CONTRACTORS UNIQUE AND UNPARALLELED ACCESS TO AN ADEQUATE
104-SUPPLY OF WELL
105--TRAINED, HIGHLY SKILLED CRAFT LABOR IN AFFECTED
106-PROJECT AREAS
107-, CRAFT LABOR STANDARDS PROMOTE SUCCESSFUL PROJECT
108-DELIVERY GOALS
109-, INCLUDING QUALITY , SAFETY, TIMELINESS, AND
110-COST
111--EFFICIENCY, BY PROVIDING EFFECTIVE QUALITY CONTROL OVER CRAFT
112-LABOR SUPPLY CAPABILITIES
113-, AS WELL AS RISK AVOIDANCE TO PREVENT
114-DISRUPTIONS AND OTHER LABOR PERFORMANCE PROBLEMS CAUSED BY
115-INADEQUATE CRAFT LABOR CAPABILITIES
116-;
260+Y PROVIDING PROJECT OWNERS , DEVELOPERS, AND5
261+CONTRACTORS UNIQUE AND UNPARALLELED ACCESS TO AN ADEQUATE6
262+SUPPLY OF WELL-TRAINED, HIGHLY SKILLED CRAFT LABOR IN AFFECTED7
263+PROJECT AREAS, CRAFT LABOR STANDARDS PROMOTE SUCCESSFUL8
264+PROJECT DELIVERY GOALS, INCLUDING QUALITY, SAFETY, TIMELINESS, AND9
265+COST-EFFICIENCY, BY PROVIDING EFFECTIVE QUALITY CONTROL OVER10
266+CRAFT LABOR SUPPLY CAPABILITIES , AS WELL AS RISK AVOIDANCE TO11
267+PREVENT DISRUPTIONS AND OTHER LABOR PERFORMANCE PROBLEMS12
268+CAUSED BY INADEQUATE CRAFT LABOR CAPABILITIES ;13
117269 (i) F
118-OR THESE REASONS, INCORPORATING PREVAILING WAGE
119-STANDARDS AND APPRENTICESHIP REQUIREMENTS AND ENCOURAGING
120-PROJECT LABOR AGREEMENTS FOR PUBLIC UTILITIES AND OTHER ENERGY
121-FACILITY PLANNING AND CONSTRUCTION IS NECESSARY TO PROTECT AND
122-PROMOTE THE PUBLIC
123-'S INTEREST IN THESE PROJECTS;
270+OR THESE REASONS, INCORPORATING PREVAILING WAGE14
271+STANDARDS AND APPRENTICESHIP REQUIREMENTS AND ENCOURAGING15
272+PROJECT LABOR AGREEMENTS FOR PUBLIC UTILITIES AND OTHER ENERGY16
273+FACILITY PLANNING AND CONSTRUCTION IS NECESSARY TO PROTECT AND17
274+PROMOTE THE PUBLIC'S INTEREST IN THESE PROJECTS;18
124275 (j) B
125-Y INCORPORATING WELL ESTABLISHED QUALITY CONTRACTING
126-PROCUREMENT TOOLS
127-, SUCH AS PREVAILING WAGES , APPRENTICESHIP
128-UTILIZATION REQUIREMENTS
129-, AND PROJECT LABOR AGREEMENTS INTO OUR
130-ENERGY RESOURCE PLANNING
131-, THE STATE OF COLORADO WILL HAVE THE
132-CAPABILITIES TO BETTER PROTECT ITS ENERGY INVESTMENTS
133-, IMPROVE
134-CONSTRUCTION PROJECT DELIVERY IN THE ENERGY SECTOR
135-, FULLY
136-DOCUMENT AND EVALUATE THE DIRECTIVES SET FORTH IN SECTION
137-PAGE 3-SENATE BILL 23-292 40-2-129, AND CREATE A CLEAR SET OF STANDARDS FOR ENFORCEMENT TO
138-ACHIEVE THE LAW
139-'S INTENT FOR THE BENEFIT OF COLORADO WORKERS AND
140-THE COMMUNITIES WHERE THEY LIVE
141-;
276+Y INCORPORATING WELL ESTABLISHED QUALITY CONTRACTING19
277+PROCUREMENT TOOLS , SUCH AS PREVAILING WAGES , APPRENTICESHIP20
278+UTILIZATION REQUIREMENTS, AND PROJECT LABOR AGREEMENTS INTO OUR21
279+ENERGY RESOURCE PLANNING , THE STATE OF COLORADO WILL HAVE THE22
280+CAPABILITIES TO BETTER PROTECT ITS ENERGY INVESTMENTS , IMPROVE23
281+CONSTRUCTION PROJECT DELIVERY IN THE ENERGY SECTOR , FULLY24
282+DOCUMENT AND EVALUATE THE DIRECTIVES SET FORTH IN SECTION25
283+40-2-129,
284+ AND CREATE A CLEAR SET OF STANDARDS FOR ENFORCEMENT TO26
285+ACHIEVE THE LAW'S INTENT FOR THE BENEFIT OF COLORADO WORKERS27
286+292
287+-7- AND THE COMMUNITIES WHERE THEY LIVE ;1
142288 (k) U
143-SE OF THESE QUALITY CONTRACTING TOOLS IS ALREADY
144-INCORPORATED INTO
145-COLORADO'S TRADITIONAL PUBLIC PROCUREMENT LAW
146-AS PREVAILING WAGE AND APPRENTICESHIP POLICIES ADOPTED IN SECTIONS
147-24-92-115 (7) AND PART 2 OF THIS ARTICLE 92. IN ADDITION, PROJECT LABOR
148-AGREEMENTS HAVE BEEN SUCCESSFULLY USED IN
149-COLORADO IN THE PAST
150-FOR PROJECTS IN THE ENERGY SECTOR AND THE BROADER PRIVATE SECTOR
151-CONSTRUCTION INDUSTRY
152-. THESE AGREEMENTS HAVE ALSO BEEN UPHELD
153-BY THE COURTS
154-, FOR EXAMPLE, IN BLDG. & CONSTR. TRADES COUNCIL V.
155-A
156-SSOCIATED BUILDERS & CONTRACTORS OF MASS./R.I., INC., 507 U.S. 230,
157-231
158- (1993), DUE TO THEIR ABILITY TO HELP SECURE RELIABLE CRAFT LABOR
159-STAFFING AND PROMOTE TIMELY PROJECT DELIVERY
160-.
289+SE OF THESE QUALITY CONTRACTING TOOLS IS ALREADY2
290+INCORPORATED INTO COLORADO'S TRADITIONAL PUBLIC PROCUREMENT3
291+LAW AS PREVAILING WAGE AND APPRENTICESHIP POLICIES ADOPTED IN4
292+SECTIONS 24-92-115 (7) AND PART 2 OF THIS ARTICLE 92. IN ADDITION,5
293+PROJECT LABOR AGREEMENTS HAVE BEEN SUCCESSFULLY USED IN6
294+C
295+OLORADO IN THE PAST FOR PROJECTS IN THE ENERGY SECTOR AND THE7
296+BROADER PRIVATE SECTOR CONSTRUCTION INDUSTRY . THESE8
297+AGREEMENTS HAVE ALSO BEEN UPHELD BY THE COURTS , FOR EXAMPLE, IN9
298+B
299+LDG. & CONSTR. TRADES COUNCIL V. ASSOCIATED BUILDERS &10
300+C
301+ONTRACTORS OF MASS./R.I., INC., 507 U.S. 230, 231 (1993), DUE TO THEIR11
302+ABILITY TO HELP SECURE RELIABLE CRAFT LABOR STAFFING AND PROMOTE12
303+TIMELY PROJECT DELIVERY.13
161304 (l) D
162-UE TO THEIR BENEFITS IN PROMOTING SUCCESSFUL PROJECT
163-DELIVERY IN PROJECTS ASSISTED BY FEDERAL GRANTS AND TAX CREDITS
164-,
165-THE FEDERAL GOVERNMENT IS STRONGLY ENCOURAGING THE USE OF THESE
166-QUALITY CONTRACTING TOOLS GENERALLY
167-, AND ESPECIALLY IN THE ENERGY
168-SECTOR
169-, WHERE MAJOR FEDERAL ASSISTANCE PROGRAMS UNDER THE
170-RECENT FEDERAL
171-"INFLATION REDUCTION ACT OF 2022", PUB. L. 117-169,
172-ARE PROVIDING APPROXIMATELY THREE HUNDRED SEVENTY BILLION
173-DOLLARS IN FUNDING TO PROMOTE CLEAN ENERGY SOURCES ACROSS THE
174-COUNTRY
175-.
305+UE TO THEIR BENEFITS IN PROMOTING SUCCESSFUL PROJECT14
306+DELIVERY IN PROJECTS ASSISTED BY FEDERAL GRANTS AND TAX CREDITS ,15
307+THE FEDERAL GOVERNMENT IS STRONGLY ENCOURAGING THE USE OF16
308+THESE QUALITY CONTRACTING TOOLS GENERALLY , AND ESPECIALLY IN17
309+THE ENERGY SECTOR, WHERE MAJOR FEDERAL ASSISTANCE PROGRAMS18
310+UNDER THE RECENT FEDERAL "INFLATION REDUCTION ACT OF 2022", PUB.19
311+L.
312+ 117-169, ARE PROVIDING APPROXIMATELY THREE HUNDRED SEVENTY20
313+BILLION DOLLARS IN FUNDING TO PROMOTE CLEAN ENERGY SOURCES21
314+ACROSS THE COUNTRY.22
176315 (2) T
177-HE GENERAL ASSEMBLY FURTHER FINDS AND DECLARES THAT
178-BECAUSE COST
179--EFFECTIVE, SAFE, AND EFFICIENT GENERATION ,
180-TRANSMISSION, AND DISTRIBUTION SYSTEMS IN THE ENERGY SECTOR ARE
181-VITAL TO THE STATE
182-'S ECONOMY AND THE PUBLIC WELFARE AND SAFETY ,
183-QUALITY CONTROL AND RISK AVOIDANCE MEASURES ARE NECESSARY TO
184-ENSURE THAT THE CONSTRUCTION OF PROJECTS NECESSARY FOR THESE
185-SYSTEMS ARE ADEQUATELY STAFFED BY PROPERLY TRAINED AND QUALIFIED
186-CRAFT LABOR PERSONNEL
187-.
316+HE GENERAL ASSEMBLY FURTHER FINDS AND DECLARES THAT23
317+BECAUSE COST-EFFECTIVE, SAFE, AND EFFICIENT GENERATION ,24
318+TRANSMISSION, AND DISTRIBUTION SYSTEMS IN THE ENERGY SECTOR ARE25
319+VITAL TO THE STATE'S ECONOMY AND THE PUBLIC WELFARE AND SAFETY ,26
320+QUALITY CONTROL AND RISK AVOIDANCE MEASURES ARE NECESSARY TO27
321+292
322+-8- ENSURE THAT THE CONSTRUCTION OF PROJECTS NECESSARY FOR THESE1
323+SYSTEMS ARE ADEQUATELY STAFFED BY PROPERLY TRAINED AND2
324+QUALIFIED CRAFT LABOR PERSONNEL .3
188325 24-92-303. Definitions. A
189-S USED IN THIS PART 3, UNLESS THE
190-CONTEXT OTHERWISE REQUIRES
191-:
326+S USED IN THIS PART 3, UNLESS THE4
327+CONTEXT OTHERWISE REQUIRES :5
192328 (1) "C
193-ONSTRUCTION" MEANS THE CONSTRUCTION, ALTERATION, OR
194-REPAIR OF AN ENERGY SECTOR PUBLIC WORKS PROJECT
195-, CONSISTENT WITH
196-PAGE 4-SENATE BILL 23-292 AND INCLUDING THE SAME LIMITATIONS AS THE DEFINITION OF
197-CONSTRUCTION AS ESTABLISHED IN SECTION
198-45(b)(7)(a) OF THE FEDERAL
199-"INTERNAL REVENUE CODE OF 1986", AS AMENDED, AND AS DESCRIBED IN
200-ALL RELATED OFFICIAL GUIDANCE FROM THE FEDERAL INTERNAL REVENUE
201-SERVICE AND THE
202-UNITED STATES DEPARTMENT OF LABOR IMPLEMENTING
203-THE APPLICABLE SECTIONS OF THE FEDERAL
204-"INFLATION REDUCTION ACT".
329+ONSTRUCTION" MEANS THE CONSTRUCTION, ALTERATION, OR6
330+REPAIR OF AN ENERGY SECTOR PUBLIC WORKS PROJECT , CONSISTENT WITH7
331+AND INCLUDING THE SAME LIMITATIONS AS THE DEFINITION OF8
332+CONSTRUCTION AS ESTABLISHED IN SECTION 45(b)(7)(a) OF THE FEDERAL9
333+"I
334+NTERNAL REVENUE CODE OF 1986", AS AMENDED, AND AS DESCRIBED10
335+IN ALL RELATED OFFICIAL GUIDANCE FROM THE FEDERAL INTERNAL11
336+REVENUE SERVICE AND THE UNITED STATES DEPARTMENT OF LABOR12
337+IMPLEMENTING THE APPLICABLE SECTIONS OF THE FEDERAL "INFLATION13
338+R
339+EDUCTION ACT".14
205340 (2) "C
206-OOPERATIVE ELECTRIC ASSOCIATION" HAS THE SAME MEANING
207-AS SET FORTH IN SECTION
208-40-9.5-102 (1).
341+OOPERATIVE ELECTRIC ASSOCIATION " HAS THE SAME15
342+MEANING AS SET FORTH IN SECTION 40-9.5-102 (1).16
209343 (3) "C
210-RAFT LABOR" MEANS EMPLOYEES WHO ARE ENGAGED IN THE
211-CONSTRUCTION OF AN ENERGY SECTOR PUBLIC WORKS PROJECT
212-, INCLUDING
213-ALL TRADES
214-, CRAFTS, AND OCCUPATIONS, AND WHO ARE PAID HOURLY.
344+RAFT LABOR" MEANS EMPLOYEES WHO ARE ENGAGED IN THE17
345+CONSTRUCTION OF AN ENERGY SECTOR PUBLIC WORKS PROJECT ,18
346+INCLUDING ALL TRADES, CRAFTS, AND OCCUPATIONS, AND WHO ARE PAID19
347+HOURLY.20
215348 (4) "C
216-RAFT LABOR CERTIFICATION" MEANS ALL DOCUMENTATION
217-AND CERTIFICATION OF PAYROLL REQUIRED FOR AN ENERGY SECTOR PUBLIC
218-WORKS PROJECT IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION
219-24-92-115 (7) AND PART 2 OF THIS ARTICLE 92.
349+RAFT LABOR CERTIFICATION" MEANS ALL DOCUMENTATION21
350+AND CERTIFICATION OF PAYROLL REQUIRED FOR AN ENERGY SECTOR22
351+PUBLIC WORKS PROJECT IN ACCORDANCE WITH THE REQUIREMENTS OF23
352+SECTION 24-92-115 (7) AND PART 2 OF THIS ARTICLE 92.24
220353 (5) (a) "E
221-NERGY SECTOR PUBLIC WORKS PROJECT " MEANS ANY
222-PROJECT IN THE STATE THAT
223-:
354+NERGY SECTOR PUBLIC WORKS PROJECT " MEANS ANY25
355+PROJECT IN THE STATE THAT:26
224356 (I) H
225-AS THE PURPOSE OF GENERATING , TRANSMITTING, OR
226-DISTRIBUTING ELECTRICITY OR NATURAL GAS TO PROVIDE ENERGY TO
227-COLORADO INDIVIDUAL CONSUMERS AND BUSINESSES , IS BUILT BY OR FOR
228-A PUBLIC UTILITY
229-, INCLUDING ANY PROJECT FOR WHICH ENERGY IS
230-PURCHASED THROUGH A POWER PURCHASER OR SIMILAR AGREEMENT
231-, AND
232-IS FUNDED IN WHOLE OR IN PART BY
233-:
357+AS THE PURPOSE OF GENERATING , TRANSMITTING, OR27
358+292
359+-9- DISTRIBUTING ELECTRICITY OR NATURAL GAS TO PROVIDE ENERGY TO1
360+C
361+OLORADO INDIVIDUAL CONSUMERS AND BUSINESSES , IS BUILT BY OR FOR2
362+A PUBLIC UTILITY, INCLUDING ANY PROJECT FOR WHICH ENERGY IS3
363+PURCHASED THROUGH A POWER PURCHASER OR SIMILAR AGREEMENT , AND4
364+IS FUNDED IN WHOLE OR IN PART BY:5
234365 (A) T
235-HE STATE, THROUGH DIRECT FUNDING , LOANS, LOAN
236-GUARANTEES
237-, LAND TRANSFERS, TAX ASSISTANCE, INCLUDING TAX CREDITS,
238-DEDUCTIONS, OR INCENTIVES, OR OTHER ASSISTANCE ALLOCATED OR
239-APPROPRIATED BY THE STATE
240-; OR
241-(B) UTILITY CUSTOMER FUNDING AS APPROVED IN ANY PROCEEDING
242-CONDUCTED BY THE PUBLIC UTILITIES COMMISSION AS PART OF AN ELECTRIC
243-RESOURCE ACQUISITION OR REQUESTS FOR CERTIFICATES OF CONVENIENCE
244-AND NECESSITY FOR CONSTRUCTION OR EXPANSION OF A PROJECT
245-,
246-INCLUDING BUT NOT LIMITED TO POLLUTION CONTROL OR FUEL CONVERSION
247-UPGRADES AND CONVERSION OF EXISTING COAL
248--FIRED PLANTS TO NATURAL
249-PAGE 5-SENATE BILL 23-292 GAS PLANTS; OR
250-(II) HAS THE PURPOSE OF GENERATING OR DISTRIBUTING
251-ELECTRICITY OR NATURAL GAS FOR THE PURPOSES OF PROVIDING ENERGY TO
252-COLORADO INDIVIDUAL CONSUMERS AND BUSINESSES FROM UTILITY
253-CUSTOMER FUNDING AS APPROVED BY A COOPERATIVE ELECTRIC
254-ASSOCIATION
255-.
366+HE STATE, THROUGH DIRECT FUNDING , LOANS, LOAN6
367+GUARANTEES,
368+ LAND TRANSFERS, TAX ASSISTANCE, INCLUDING TAX7
369+CREDITS, DEDUCTIONS, OR INCENTIVES, OR OTHER ASSISTANCE ALLOCATED8
370+OR APPROPRIATED BY THE STATE; OR9
371+(B) U
372+TILITY CUSTOMER FUNDING AS APPROVED IN ANY10
373+PROCEEDING CONDUCTED BY THE PUBLIC UTILITIES COMMISSION AS PART11
374+OF AN ELECTRIC RESOURCE ACQUISITION OR REQUESTS FOR CERTIFICATES12
375+OF CONVENIENCE AND NECESSITY FOR CONSTRUCTION OR EXPANSION OF13
376+A PROJECT, INCLUDING BUT NOT LIMITED TO POLLUTION CONTROL OR FUEL14
377+CONVERSION UPGRADES AND CONVERSION OF EXISTING COAL -FIRED15
378+PLANTS TO NATURAL GAS PLANTS ; OR16
379+(II) H
380+AS THE PURPOSE OF GENERATING OR DISTRIBUTING17
381+ELECTRICITY OR NATURAL GAS FOR THE PURPOSES OF PROVIDING ENERGY18
382+TO COLORADO INDIVIDUAL CONSUMERS AND BUSINESSES FROM UTILITY19
383+CUSTOMER FUNDING AS APPROVED BY A COOPERATIVE ELECTRIC20
384+ASSOCIATION.21
256385 (b) "E
257386 NERGY SECTOR PUBLIC WORKS PROJECT " INCLUDES THE
258-FOLLOWING PROJECT TYPES
259-, SO LONG AS THEY SATISFY THE CRITERIA IN
260-SUBSECTION
261-(5)(a)(I) OR (5)(a)(II) OF THIS SECTION:
387+22
388+FOLLOWING PROJECT TYPES, SO LONG AS THEY SATISFY THE CRITERIA IN23
389+SUBSECTION (5)(a)(I) OR (5)(a)(II) OF THIS SECTION:24
262390 (I) P
263-OWER GENERATION WITH A NAMEPLATE GENERATION CAPACITY
264-OF ONE MEGAWATT OR HIGHER
265-, INCLUDING GENERATION SOURCED FROM
266-WIND
267-, SOLAR, GEOTHERMAL, HYDROGEN, NUCLEAR, OR BIOENERGY, OR ANY
268-PROJECT THAT GENERATES ELECTRICITY FROM THE COMBUSTION OF OIL
269-, GAS,
270-OR OTHER FOSSIL FUELS OR AN ENERGY STORAGE SYSTEM AS DEFINED BY
271-SECTION
272-40-2-202 WITH AN ENERGY RATING OF ONE MEGAWATT OF POWER
273-CAPACITY OR FOUR MEGAWATT HOURS OF USEABLE ENERGY CAPACITY OR
274-HIGHER
275-; AND
276-(II) OTHER PROJECTS WITH A TOTAL PROJECT COST OF ONE MILLION
277-DOLLARS OR MORE THAT INCLUDE
278-:
391+OWER GENERATION WITH A NAMEPLATE GENERATION25
392+CAPACITY OF ONE MEGAWATT OR HIGHER , INCLUDING GENERATION26
393+SOURCED FROM WIND, SOLAR, GEOTHERMAL, HYDROGEN, NUCLEAR, OR27
394+292
395+-10- BIOENERGY, OR ANY PROJECT THAT GENERATES ELECTRICITY FROM THE1
396+COMBUSTION OF OIL, GAS, OR OTHER FOSSIL FUELS OR AN ENERGY2
397+STORAGE SYSTEM AS DEFINED BY SECTION 40-2-202 WITH AN ENERGY3
398+RATING OF ONE MEGAWATT OF POWER CAPACITY OR FOUR MEGAWATT4
399+HOURS OF USEABLE ENERGY CAPACITY OR HIGHER ; AND5
400+(II) O
401+THER PROJECTS WITH A TOTAL PROJECT COST OF ONE MILLION6
402+DOLLARS OR MORE THAT INCLUDE :7
279403 (A) P
280-OLLUTION CONTROLS;
404+OLLUTION CONTROLS;8
281405 (B) U
282-TILITY GAS DISTRIBUTION;
406+TILITY GAS
407+ DISTRIBUTION;9
283408 (C) E
284-LECTRIC TRANSMISSION PROJECTS;
409+LECTRIC TRANSMISSION PROJECTS;10
285410 (D) G
286-EOTHERMAL SYSTEMS THAT ARE USED TO PROVIDE HEAT OR
287-HEATED WATER OR THAT OPERATE AS THERMAL SYSTEMS OR THERMAL
288-NETWORKS AS DEFINED IN LAW
289-;
411+EOTHERMAL SYSTEMS THAT ARE USED TO PROVIDE HEAT OR11
412+HEATED WATER OR THAT OPERATE AS THERMAL SYSTEMS OR THERMAL12
413+NETWORKS AS DEFINED IN LAW;13
290414 (E) E
291-LECTRIC VEHICLE CHARGING INFRASTRUCTURE INSTALLATIONS ;
415+LECTRIC VEHICLE CHARGING INFRASTRUCTURE
416+14
417+INSTALLATIONS;15
292418 (F) H
293-YDROGEN-RELATED INFRASTRUCTURE CONSTRUCTION
294-PROJECTS
295-;
419+YDROGEN-RELATED INFRASTRUCTURE CONSTRUCTION16
420+PROJECTS;17
296421 (G) A
297-NY PROJECT THAT TRANSPORTS OR STORES CARBON DIOXIDE
298-PAGE 6-SENATE BILL 23-292 CAPTURED FROM POWER GENERATION ; AND
299-(H) ANY OTHER CONSTRUCTION PROJECTS COVERED BY THIS PART 3.
422+NY PROJECT THAT TRANSPORTS OR STORES CARBON DIOXIDE18
423+CAPTURED FROM POWER GENERATION ; AND19
424+(H) A
425+NY OTHER CONSTRUCTION PROJECTS COVERED BY THIS PART20
426+3.21
300427 (6) "F
301-EDERAL PREVAILING WAGE AND APPRENTICESHIP
302-REQUIREMENTS
303-" MEANS THE REQUIREMENTS UNDER :
428+EDERAL PREVAILING WAGE AND APPRENTICESHIP22
429+REQUIREMENTS" MEANS THE REQUIREMENTS UNDER :23
304430 (a) S
305-ECTIONS 45(b)(7) AND (8) OF TITLE 26 OF THE UNITED STATES
306-CODE, WHETHER APPLICABLE DIRECTLY OR UNDER A PROVISION OF THE
307-FEDERAL
308-"INTERNAL REVENUE CODE OF 1986", AS AMENDED, THAT APPLIES
309-SUCH SECTIONS OF THE
310-UNITED STATES CODE; OR
311-(b) SECTIONS 48(a)(10) AND (11) OF TITLE 26 OF THE UNITED STATES
312-CODE, WHETHER APPLICABLE DIRECTLY OR UNDER A PROVISION OF THE
313-FEDERAL
314-"INTERNAL REVENUE CODE OF 1986", AS AMENDED THAT APPLIES
315-SUCH SECTIONS OF THE
316-UNITED STATES CODE.
431+ECTIONS 45(b)(7) AND (8) OF TITLE 26 OF THE UNITED STATES24
432+C
433+ODE, WHETHER APPLICABLE DIRECTLY OR UNDER A PROVISION OF THE25
434+FEDERAL "INTERNAL REVENUE CODE OF 1986", AS AMENDED, THAT26
435+APPLIES SUCH SECTIONS OF THE UNITED STATES CODE; OR27
436+292
437+-11- (b) SECTIONS 48(a)(10) AND (11) OF TITLE 26 OF THE UNITED1
438+S
439+TATES CODE, WHETHER APPLICABLE DIRECTLY OR UNDER A PROVISION2
440+OF THE FEDERAL "INTERNAL REVENUE CODE OF 1986", AS AMENDED THAT3
441+APPLIES SUCH SECTIONS OF THE UNITED STATES CODE.4
317442 (7) "F
318-EDERAL "INFLATION REDUCTION ACT"" MEANS THE FEDERAL
319-"INFLATION REDUCTION ACT OF 2022", UNITED STATES CODE, TITLE 26,
320-INCLUDING BUT NOT LIMITED TO SECTIONS 30C, 45, 45B, 45L, 45Q, 45U,
443+EDERAL "INFLATION REDUCTION ACT"" MEANS THE FEDERAL5
444+"I
445+NFLATION REDUCTION ACT OF 2022", UNITED STATES CODE, TITLE 26,6
446+INCLUDING BUT NOT LIMITED TO SECTIONS 30C, 45, 45B, 45L, 45Q, 45U,7
321447 45V,
322- 45X, 45Y, 45Z, 48, 48C, 48E, AND 179D, AND ASSOCIATED
323-IMPLEMENTING RULES AND GUIDANCE PROMULGATED BY THE
324-UNITED
325-STATES DEPARTMENT OF THE TREASURY AND THE UNITED STATES INTERNAL
326-REVENUE SERVICE
327-, AS THE STATUTE AND IMPLEMENTING RULES AND
328-GUIDANCE MAY BE AMENDED FROM TIME TO TIME
329-.
448+ 45X, 45Y, 45Z, 48, 48C, 48E, AND 179D, AND ASSOCIATED8
449+IMPLEMENTING RULES AND GUI DANCE PROMULGATED BY THE UNITED9
450+S
451+TATES DEPARTMENT OF THE TREASURY AND THE UNITED STATES10
452+INTERNAL REVENUE SERVICE, AS THE STATUTE AND IMPLEMENTING RULES11
453+AND GUIDANCE MAY BE AMENDED FROM TIME TO TIME .12
330454 (8) "L
331-EAD CONTRACTOR" MEANS A GENERAL CONTRACTOR ,
332-CONSTRUCTION MANAGER , DEVELOPER, DESIGN BUILDER, OR OTHER PARTY
333-THAT IS PRIMARILY RESPONSIBLE TO A PUBLIC UTILITY OR INDEPENDENT
334-POWER PRODUCER FOR PERFORMING CONSTRUCTION UNDER A CONTRACT FOR
335-AN ENERGY SECTOR PUBLIC WORKS PROJECT
336-.
455+EAD CONTRACTOR" MEANS A GENERAL CONTRACTOR ,13
456+CONSTRUCTION MANAGER , DEVELOPER, DESIGN BUILDER, OR OTHER PARTY14
457+THAT IS PRIMARILY RESPONSIBLE TO A PUBLIC UTILITY OR INDEPENDENT15
458+POWER PRODUCER FOR PERFORMING CONSTRUCTION UNDER A CONTRACT16
459+FOR AN ENERGY SECTOR PUBLIC WORKS PROJECT .17
337460 (9) "P
338-ROJECT LABOR AGREEMENT " MEANS A PREHIRE COLLECTIVE
339-BARGAINING AGREEMENT BETWEEN A LEAD CONTRACTOR AND
340-CONSTRUCTION LABOR ORGANIZATIONS
341-, INCLUDING BUT NOT LIMITED TO
342-THE
343-COLORADO BUILDING AND CONSTRUCTION TRADES COUNCIL AND ITS
344-AFFILIATES OR A GROUP OF LABOR UNIONS COVERING THE AFFECTED TRADES
345-NECESSARY TO PERFORM WORK ON A PROJECT
346-, THAT ESTABLISHES THE
347-TERMS AND CONDITIONS OF EMPLOYMENT OF THE CONSTRUCTION
348-WORKFORCE ON AN ENERGY SECTOR PUBLIC WORKS PROJECT
349-. A PROJECT
350-PAGE 7-SENATE BILL 23-292 LABOR AGREEMENT MUST INCLUDE PROVISIONS THAT :
461+ROJECT LABOR AGREEMENT " MEANS A PREHIRE COLLECTIVE18
462+BARGAINING AGREEMENT BETWEEN A LEAD CONTRACTOR AND19
463+CONSTRUCTION LABOR ORGANIZATIONS , INCLUDING BUT NOT LIMITED TO20
464+THE COLORADO BUILDING AND CONSTRUCTION TRADES COUNCIL AND ITS21
465+AFFILIATES OR A GROUP OF LABOR UNIONS COVERING THE AFFECTED22
466+TRADES NECESSARY TO PERFORM WORK ON A PROJECT , THAT ESTABLISHES23
467+THE TERMS AND CONDITIONS OF EMPLOYMENT OF THE CONSTRUCTION24
468+WORKFORCE ON AN ENERGY SECTOR PUBLIC WORKS PROJECT . A PROJECT25
469+LABOR AGREEMENT MUST INCLUDE PROVISIONS THAT :26
351470 (a) S
352-ET FORTH EFFECTIVE, IMMEDIATE, AND MUTUALLY BINDING
353-PROCEDURES FOR RESOLVING JURISDICTIONAL LABOR DISPUTES AND
354-GRIEVANCES ARISING BEFORE THE COMPLETION OF WORK
355-;
471+ET FORTH EFFECTIVE, IMMEDIATE, AND MUTUALLY BINDING27
472+292
473+-12- PROCEDURES FOR RESOLVING JURISDICTIONAL LABOR DISPUTES AND1
474+GRIEVANCES ARISING BEFORE THE COMPLETION OF WORK ;2
356475 (b) C
357-ONTAIN GUARANTEES AGAINST STRIKES , LOCKOUTS, OR SIMILAR
358-ACTIONS
359-;
476+ONTAIN GUARANTEES AGAINST STRIKES , LOCKOUTS, OR3
477+SIMILAR ACTIONS;4
360478 (c) E
361-NSURE A RELIABLE SOURCE OF TRAINED , SKILLED, AND
362-EXPERIENCED CONSTRUCTION CRAFT LABOR
363-;
479+NSURE A RELIABLE SOURCE OF TRAINED , SKILLED, AND5
480+EXPERIENCED CONSTRUCTION CRAFT LABOR ;6
364481 (d) F
365-URTHER PUBLIC POLICY OBJECTIVES REGARDING IMPROVED
366-EMPLOYMENT OPPORTUNITIES FOR MINORITIES
367-, WOMEN, OR OTHER
368-ECONOMICALLY DISADVANTAGED POPULATIONS IN THE CONSTRUCTION
369-INDUSTRY
370-, INCLUDING PERSONS FROM DISPROPORTIONATELY IMPACTED
371-COMMUNITIES
372-, TO THE EXTENT PERMITTED BY STATE AND FEDERAL LAW ;
482+URTHER PUBLIC POLICY OBJECTIVES REGARDING IMPROVED7
483+EMPLOYMENT OPPORTUNITIES FOR MINORITIES , WOMEN, OR OTHER8
484+ECONOMICALLY DISADVANTAGED POPULATIONS IN THE CONSTRUCTION9
485+INDUSTRY, INCLUDING PERSONS FROM DISPROPORTIONATELY IMPACTED10
486+COMMUNITIES, TO THE EXTENT PERMITTED BY STATE AND FEDERAL LAW ;11
373487 (e) P
374-ERMIT THE SELECTION OF THE LOWEST QUALIFIED RESPONSIBLE
375-BIDDER OR LOWEST QUALIFIED RESPONSIBLE OFFEROR WITHOUT REGARD TO
376-UNION OR NON
377--UNION STATUS AT OTHER CONSTRUCTION SITES ;
488+ERMIT THE SELECTION OF THE LOWEST QUALIFIED12
489+RESPONSIBLE BIDDER OR LOWEST QUALIFIED RESPONSIBLE OFFEROR13
490+WITHOUT REGARD TO UNION OR NON -UNION STATUS AT OTHER14
491+CONSTRUCTION SITES;15
378492 (f) B
379-IND ALL CONTRACTORS AND SUBCONTRACTORS ON THE ENERGY
380-SECTOR PUBLIC WORKS PROJECT TO THE PROJECT LABOR AGREEMENT
381-THROUGH THE INCLUSION OF APPROPRIATE BID SPECIFICATIONS IN ALL
382-RELEVANT CONTRACT DOCUMENTS
383-; AND
384-(g) INCLUDE OTHER TERMS AS THE PARTIES DEEM APPROPRIATE .
493+IND ALL CONTRACTORS AND SUBCONTRACTORS ON THE16
494+ENERGY SECTOR PUBLIC WORKS PROJECT TO THE PROJECT LABOR17
495+AGREEMENT THROUGH THE INCLUSION OF APPROPRIATE BID18
496+SPECIFICATIONS IN ALL RELEVANT CONTRACT DOCUMENTS ; AND19
497+(g) I
498+NCLUDE OTHER TERMS AS THE PARTIES DEEM APPROPRIATE .20
385499 (10) "P
386-UBLIC UTILITY" HAS THE SAME MEANING AS SET FORTH IN
387-SECTION
388-40-1-103.
389-24-92-304. Energy sector public works projects - craft labor
500+UBLIC UTILITY" HAS THE SAME MEANING AS SET FORTH IN21
501+SECTION 40-1-103.22
502+24-92-304. Energy sector public works projects - craft labor23
390503 employment - training - wage requirements. (1) (a) E
391-XCEPT AS
392-OTHERWISE PROVIDED IN SUBSECTIONS
393-(1)(b) AND (1)(c) OF THIS SECTION,
394-A CONTRACT BETWEEN PUBLIC UTILITIES , COOPERATIVE ELECTRIC
395-ASSOCIATIONS
396-, OR INDEPENDENT POWER PRODUCERS AND LEAD
397-CONTRACTORS FOR AN ENERGY SECTOR PUBLIC WORKS PROJECT MUST
398-INCLUDE PROVISIONS EXPRESSLY REQUIRING THAT ALL WORK PERFORMED
399-UNDER THE CONTRACT COMPLY WITH THE REQUIREMENTS OF SECTION
400-PAGE 8-SENATE BILL 23-292 24-92-115 (7) AND THE REQUIREMENTS OF PART 2 OF THIS ARTICLE 92 IF THE
401-PROJECT IS AN ELECTRIC POWER GENERATION PROJECT WITH A NAMEPLATE
402-GENERATION CAPACITY OF ONE MEGAWATT OR HIGHER OR IF THE PROJECT
403-IS A PROJECT SPECIFIED IN SUBSECTION
404-24-92-303 (5)(b)(II) WITH A TOTAL
405-PROJECT COST OF ONE MILLION DOLLARS OR MORE
406-. THESE REQUIREMENTS
407-CONSTITUTE MATERIAL TERMS OF SUCH CONTRACTS
408-.
504+XCEPT AS24
505+OTHERWISE PROVIDED IN SUBSECTIONS (1)(b) AND (1)(c) OF THIS SECTION,25
506+A CONTRACT BETWEEN PUBLIC UTILITIES , COOPERATIVE ELECTRIC26
507+ASSOCIATIONS, OR INDEPENDENT POWER PRODUCERS AND LEAD27
508+292
509+-13- CONTRACTORS FOR AN ENERGY SECTOR PUBLIC WORKS PROJECT MUST1
510+INCLUDE PROVISIONS EXPRESSLY REQUIRING THAT ALL WORK PERFORMED2
511+UNDER THE CONTRACT COMPLY WITH THE REQUIREMENTS OF SECTION3
512+24-92-115
513+ (7) AND THE REQUIREMENTS OF PART 2 OF THIS ARTICLE 92 IF4
514+THE PROJECT IS AN ELECTRIC POWER GENERATION PROJECT WITH A5
515+NAMEPLATE GENERATION CAPACITY OF ONE MEGAWATT OF HIGHER OR IF6
516+THE PROJECT IS A PROJECT SPECIFIED IN SUBSECTION 24-92-303 (5)(b)(II)7
517+WITH A TOTAL PROJECT COST OF ONE MILLION DOLLARS OR MORE . THESE8
518+REQUIREMENTS CONSTITUTE MATERIAL TERMS OF SUCH CONTRACTS .9
409519 (b) (I) F
410520 OR ENERGY SECTOR PUBLIC WORKS PROJECTS FUNDED
411-PURSUANT TO SECTION
412- 24-92-303 (5)(a)(I)(A), THE REQUIREMENTS OF THIS
413-PART
414-3 APPLY ONLY WHEN THE PROJECT IS A POWER GENERATION PROJECT
415-WITH A NAMEPLATE GENERATION CAPACITY OF ONE MEGAWATT OR HIGHER
416-OR AN ENERGY STORAGE SYSTEM AS DEFINED BY SECTION
417-40-2-202 WITH AN
418-ENERGY RATING OF ONE MEGAWATT OF POWER CAPACITY OR FOUR
419-MEGAWATT HOURS OF USEABLE ENERGY CAPACITY OR HIGHER AND THE
420-AGGREGATED PUBLIC ASSISTANCE FROM THE STATE IS FIVE HUNDRED
421-THOUSAND DOLLARS OR MORE
422-.
521+10
522+PURSUANT TO SECTION 24-92-303 (5)(a)(I)(A), THE REQUIREMENTS OF11
523+THIS PART 3 APPLY ONLY WHEN THE PROJECT IS A POWER GENERATION12
524+PROJECT WITH A NAMEPLATE GENERATION CAPACITY OF ONE MEGAWATT13
525+OR HIGHER OR AN ENERGY STORAGE SYSTEM AS DEFINED BY SECTION14
526+40-2-202
527+ WITH AN ENERGY RATING OF ONE MEGAWATT OF POWER
528+15
529+CAPACITY OR FOUR MEGAWATT HOURS OF USEABLE ENERGY CAPACITY OR16
530+HIGHER AND THE AGGREGATED PUBLIC ASSISTANCE FROM THE STATE IS17
531+FIVE HUNDRED THOUSAND DOLLARS OR MORE .18
423532 (II) F
424533 OR ENERGY SECTOR PUBLIC WORKS PROJECTS UNDER
425-24-92-303(5)(b)(II), THE REQUIREMENTS OF THIS PART 3 APPLY ONLY WHEN
426-THE TOTAL PROJECT COST IS ONE MILLION DOLLARS OR MORE
427-, AND THE
428-AGGREGATED PUBLIC ASSISTANCE FROM THE STATE
429-, FUNDING FROM A
430-PUBLIC UTILITY
431-, OR FUNDING FROM A COOPERATIVE ELECTRIC ASSOCIATION
432-IS FIVE HUNDRED THOUSAND DOLLARS OR MORE
433-.
534+19
535+24-92-303(5)(b)(II),
536+THE REQUIREMENTS OF THIS PART 3 APPLY ONLY
537+20
538+WHEN THE TOTAL PROJECT COST IS ONE MILLION DOLLARS OR MORE , AND21
539+THE AGGREGATED PUBLIC ASSISTANCE FROM THE STATE , FUNDING FROM22
540+A PUBLIC UTILITY, OR FUNDING FROM A COOPERATIVE ELECTRIC23
541+ASSOCIATION IS FIVE HUNDRED THOUSAND DOLLARS OR MORE .24
434542 (c) T
435-HE REQUIREMENTS OF THIS PART 3 DO NOT APPLY TO:
543+HE REQUIREMENTS OF THIS PART 3 DO NOT APPLY TO:25
436544 (I) A
437- PROJECT THAT IS COVERED BY A PROJECT LABOR AGREEMENT ;
545+ PROJECT THAT IS COVERED BY A PROJECT LABOR AGREEMENT ;26
438546 (II) W
439-ORK ON AN ENERGY SECTOR PUBLIC WORKS PROJECT
440-PERFORMED BY THE EMPLOYEES OF A UTILITY COMPANY
441-;
547+ORK ON AN ENERGY SECTOR PUBLIC WORKS PROJECT27
548+292
549+-14- PERFORMED BY THE EMPLOYEES OF A UTILITY COMPANY ;1
442550 (III) S
443-O LONG AS COMPLIANCE WITH ANY APPLICABLE FEDERAL
444-"INFLATION REDUCTION ACT" QUALIFICATION REQUIREMENTS IS A
445-MATERIAL TERM OF THE AGREEMENT WITH A PUBLIC UTILITY
446-, COOPERATIVE
447-ELECTRIC ASSOCIATION
448-, INDEPENDENT POWER PRODUCER , OR THE STATE,
449-WORK ON AN ENERGY SECTOR PUBLIC WORKS PROJECT PUT OUT TO BID ON OR
450-AFTER
451-JANUARY 1, 2024, THAT IS QUALIFIED FOR AND CLAIMS THE
452-INCREASED FEDERAL PRODUCTION TAX CREDIT OR INVESTMENT TAX CREDIT
453-AMOUNT
454-, EXCLUDING ANY DOMESTIC CONTENT , ENERGY COMMUNITY, OR
455-LOW
456--INCOME COMMUNITY BONUS CREDIT , AS A RESULT OF:
457-PAGE 9-SENATE BILL 23-292 (A) SATISFYING THE PREVAILING WAGE AND APPRENTICESHIP
458-REQUIREMENTS UNDER THE PROVISIONS OF THE FEDERAL
459-"INFLATION
460-REDUCTION ACT"; OR
461-(B) ACHIEVING THE START OF CONSTRUCTION PRIOR TO JANUARY 29,
462-2023,
463- PURSUANT TO THE PRINCIPLES OUTLINED IN THE FEDERAL INTERNAL
464-REVENUE SERVICE GUIDANCE AND THE
465-UNITED STATES DEPARTMENT OF
466-LABOR GUIDANCE RELATED TO THE FEDERAL
467-"INFLATION REDUCTION ACT"
468-AS AMENDED OR SUPPLEMENTED FROM TIME TO TIME ;
551+O LONG AS COMPLIANCE WITH ANY APPLICABLE FEDERAL2
552+"I
553+NFLATION REDUCTION ACT" QUALIFICATION REQUIREMENTS IS A3
554+MATERIAL TERM OF THE AGREEMENT WITH A PUBLIC UTILITY ,4
555+COOPERATIVE ELECTRIC ASSOCIATION , INDEPENDENT POWER PRODUCER ,5
556+OR THE STATE, WORK ON AN ENERGY SECTOR PUBLIC WORKS PROJECT PUT6
557+OUT TO BID ON OR AFTER JANUARY 1, 2024, THAT IS QUALIFIED FOR AND7
558+CLAIMS THE INCREASED FEDERAL PRODUCTION TAX CREDIT OR8
559+INVESTMENT TAX CREDIT AMOUNT , EXCLUDING ANY DOMESTIC CONTENT ,9
560+ENERGY COMMUNITY , OR LOW-INCOME COMMUNITY BONUS CREDIT , AS A10
561+RESULT OF:11
562+(A)
563+ SATISFYING THE PREVAILING WAGE AND APPRENTICESHIP12
564+REQUIREMENTS UNDER THE PROVISIONS OF THE FEDERAL "INFLATION13
565+R
566+EDUCTION ACT"; OR14
567+(B) A
568+CHIEVING THE START OF CONSTRUCTION PRIOR TO JANUARY15
569+29,
570+ 2023, PURSUANT TO THE PRINCIPLES OUTLINED IN THE FEDERAL16
571+INTERNAL REVENUE SERVICE GUIDANCE AND THE UNITED STATES17
572+DEPARTMENT OF LABOR GUIDANCE RELATED TO THE FEDERAL "INFLATION18
573+R
574+EDUCTION ACT" AS AMENDED OR SUPPLEMENTED FROM TIME TO TIME ;19
469575 (IV) A
470- UTILITY-INCENTIVIZED DEMAND-SIDE MANAGEMENT OR
471-ELECTRIFICATION PROGRAM PURSUANT TO SECTION
472-40-3.2-105.5 OR
473-40-3.2-105.6;
576+ UTILITY-INCENTIVIZED DEMAND-SIDE MANAGEMENT OR20
577+ELECTRIFICATION PROGRAM PURSUANT TO SECTION 40-3.2-105.5 OR21
578+40-3.2-105.6;22
474579 (V) U
475-TILITY OR STATE-FUNDED BUILDING ENERGY EFFICIENCY
476-PROGRAMS
477-;
580+TILITY OR STATE-FUNDED BUILDING ENERGY
581+ EFFICIENCY23
582+PROGRAMS;24
478583 (VI) S
479-ERVICE AGREEMENTS THAT WERE ENTERED INTO BY A PUBLIC
480-UTILITY
481-, INDEPENDENT POWER PRODUCER , OR COOPERATIVE ELECTRIC
482-ASSOCIATION ON OR BEFORE
483-MARCH 1, 2023; EXCEPT THAT UPON RENEWAL
484-OR ISSUANCE OF A NEW REQUEST FOR PROPOSALS
485-, THE SERVICE AGREEMENT
486-MUST COME INTO COMPLIANCE WITH THE REQUIREMENTS OF THIS SECTION
487-;
584+ERVICE AGREEMENTS THAT WERE ENTERED INTO BY A25
585+PUBLIC UTILITY, INDEPENDENT POWER PRODUCER , OR COOPERATIVE26
586+ELECTRIC ASSOCIATION ON OR BEFORE MARCH 1, 2023; EXCEPT THAT27
587+292
588+-15- UPON RENEWAL OR ISSUANCE OF A NEW REQUEST FOR PROPOSALS , THE1
589+SERVICE AGREEMENT MUST COME INTO COMPLIANCE WITH THE2
590+REQUIREMENTS OF THIS SECTION;3
488591 (VII) P
489-ROJECTS THAT INVOLVE AN ELECTRIC DISTRIBUTION LINE
490-WITH A CAPACITY OF
491-69KV OR LESS; AND
492-(VIII) PROJECTS THAT INVOLVE PIPELINES WITH A SPECIFIED
493-MINIMUM YIELD STRENGTH LESS THAN THIRTY PERCENT
494-.
592+ROJECTS THAT INVOLVE AN ELECTRIC DISTRIBUTION LINE4
593+WITH A CAPACITY OF 69KV OR LESS; AND5
594+(VIII) P
595+ROJECTS THAT INVOLVE PIPELINES WITH A SPECIFIED6
596+MINIMUM YIELD STRENGTH LESS THAN THIRTY PERCENT .7
495597 (2) U
496-NLESS THE CONTRACTUAL REQUIREMENTS SPECIFIED IN
497-SUBSECTION
498-(1) OF THIS SECTION ARE IN PLACE, AN AFFECTED PROJECT
499-SHALL NOT BE ELIGIBLE TO
500-:
598+NLESS THE CONTRACTUAL REQUIREMENTS SPECIFIED IN8
599+SUBSECTION (1) OF THIS SECTION ARE IN PLACE, AN AFFECTED PROJECT9
600+SHALL NOT BE ELIGIBLE TO:10
501601 (a) R
502-ECEIVE FUNDING FROM THE STATE THROUGH GENERAL FUND
503-APPROPRIATIONS
504-, TAX CREDITS, TAX DEDUCTIONS, LAND TRANSFERS, OR
505-OTHER FUNDING OR ASSISTANCE PROVIDED BY THE GENERAL ASSEMBLY OR
506-A GOVERNMENT AGENCY
507-; OR
508-(b) RECEIVE ANY APPROVALS OR AUTHORIZATIONS FROM THE PUBLIC
509-UTILITIES COMMISSION
510-, INCLUDING APPROVALS FOR UTILITY FUNDING OR FOR
511-PAGE 10-SENATE BILL 23-292 COMMENCEMENT OF THE PROJECT , INCLUDING A CERTIFICATE OF PUBLIC
512-CONVENIENCE
513-.
602+ECEIVE FUNDING FROM THE STATE THROUGH GENERAL FUND11
603+APPROPRIATIONS, TAX CREDITS, TAX DEDUCTIONS, LAND TRANSFERS, OR12
604+OTHER FUNDING OR ASSISTANCE PROVIDED BY THE GENERAL ASSEMBLY OR13
605+A GOVERNMENT AGENCY ; OR14
606+(b) R
607+ECEIVE ANY APPROVALS OR AUTHORIZATIONS FROM THE15
608+PUBLIC UTILITIES COMMISSION, INCLUDING APPROVALS FOR UTILITY16
609+FUNDING OR FOR COMMENCEMENT OF THE PROJECT , INCLUDING A17
610+CERTIFICATE OF PUBLIC CONVENIENCE .18
514611 (3) T
515-HE LEAD CONTRACTOR ENGAGED TO PERFORM CONSTRUCTION
516-SERVICES FOR AN ENERGY SECTOR PUBLIC WORKS PROJECT MUST REQUIRE
517-ALL SUBCONTRACTORS USED ON THE PROJECT TO COMPLY WITH SECTION
518-24-92-115 (7) AND PART 2 OF THIS ARTICLE 92 BY ENSURING THAT SUCH
519-REQUIREMENTS ARE STIPULATED IN ALL SUBCONTRACTS
520-. LEAD
521-CONTRACTORS MUST TAKE ALL REASONABLY NECESSARY STEPS TO ENSURE
522-COMPLIANCE BY MONITORING SUBCONTRACTORS
523-.
612+HE LEAD CONTRACTOR ENGAGED TO PERFORM CONSTRUCTION19
613+SERVICES FOR AN ENERGY SECTOR PUBLIC WORKS PROJECT MUST REQUIRE20
614+ALL SUBCONTRACTORS USED ON THE PROJECT TO COMPLY WITH SECTION21
615+24-92-115
616+ (7) AND PART 2 OF THIS ARTICLE 92 BY ENSURING THAT SUCH22
617+REQUIREMENTS ARE STIPULATED IN ALL SUBCONTRACTS . LEAD23
618+CONTRACTORS MUST TAKE ALL REASONABLY NECESSARY STEPS TO24
619+ENSURE COMPLIANCE BY MONITORING SUBCONTRACTORS .25
524620 (4) T
525-HE PUBLIC UTILITIES COMMISSION SHALL NOT FIND AN ENERGY
526-SECTOR PUBLIC WORKS PROJECT TO BE IN COMPLIANCE WITH SECTION
527-40-2-129 UNLESS THE CONSTRUCTION CONTRACT FOR THE PROJECT
528-INCLUDES PROVISIONS EXPRESSLY REQUIRING THAT ALL WORK PERFORMED
529-UNDER THE CONTRACT COMPLY WITH THE REQUIREMENTS OF SECTION
530-24-92-115 (7) AND PART 2 OF THIS ARTICLE 92. COMPLIANCE WITH THIS
531-SUBSECTION
532-(4) DOES NOT PREVENT THE COMMISSION FROM CONSIDERING
533-ALL
534-"BEST VALUE" EMPLOYMENT METRICS AS DEFINED IN SECTION 40-2-129,
535-INCLUDING THOSE METRICS THAT ARE NOT DIRECTLY RELATED TO THE
536-PROCUREMENT OF CRAFT LABOR AND APPRENTICESHIP TRAINING ON AN
537-ENERGY SECTOR PUBLIC WORKS PROJECT
538-.
621+HE PUBLIC UTILITIES COMMISSION SHALL NOT FIND AN26
622+ENERGY SECTOR PUBLIC WORKS PROJECT TO BE IN COMPLIANCE WITH27
623+292
624+-16- SECTION 40-2-129 UNLESS THE CONSTRUCTION CONTRACT FOR THE1
625+PROJECT INCLUDES PROVISIONS EXPRESSLY REQUIRING THAT ALL WORK2
626+PERFORMED UNDER THE CONTRACT COMPLY WITH THE REQUIREMENTS OF3
627+SECTION 24-92-115 (7) AND PART 2 OF THIS ARTICLE 92. COMPLIANCE4
628+WITH THIS SUBSECTION (4) DOES NOT PREVENT THE COMMISSION FROM5
629+CONSIDERING ALL "BEST VALUE" EMPLOYMENT METRICS AS DEFINED IN6
630+SECTION 40-2-129, INCLUDING THOSE METRICS THAT ARE NOT DIRECTLY7
631+RELATED TO THE PROCUREMENT OF CRAFT LABOR AND APPRENTICESHIP8
632+TRAINING ON AN ENERGY SECTOR PUBLIC WORKS PROJECT .9
539633 (5) C
540-ONSISTENT WITH SECTION 24-92-203 (4), BIDDERS ON ENERGY
541-SECTOR PUBLIC WORKS PROJECTS SHALL NOT ARTIFICIALLY DIVIDE THE
542-OVERALL GENERATION CAPACITY OR OVERALL PROJECT COST OF AN ENERGY
543-SECTOR PUBLIC WORKS PROJECT TO DELIBERATELY AVOID THE
544-REQUIREMENTS TO COMPLY WITH SECTION
545-24-92-115 (7) AND PART 2 OF THIS
546-ARTICLE
547-92. THE PUBLIC UTILITIES COMMISSION, THE STATE, A PUBLIC
548-UTILITY
549-, OR A COOPERATIVE ELECTRIC ASSOCIATION MAY STILL REQUIRE
550-COMPLIANCE WITH PREVAILING WAGE AND APPRENTICESHIP UTILIZATION
551-REQUIREMENTS IF THEY DETERMINE THAT A BIDDER HAS ARTIFICIALLY
552-DIVIDED A PROJECT WITH THE INTENT OF AVOIDING THE REQUIREMENT TO
553-COMPLY WITH THOSE SECTIONS
554-.
555-24-92-305. Energy sector public works projects - record keeping
556-- reporting - craft labor certification - sanctions - compliance with best
557-value employment metrics. (1) T
558-HE LEAD CONTRACTOR FOR AN ENERGY
559-SECTOR PUBLIC WORKS PROJECT SHALL PREPARE CERTIFIED PAYROLL
560-RECORDS FOR CRAFT WORKERS DIRECTLY EMPLOYED BY THE CONTRACTOR
561-,
562-PAGE 11-SENATE BILL 23-292 OBTAIN CERTIFIED PAYROLL RECORDS FROM ALL CONTRACTORS AND
563-SUBCONTRACTORS ON THE PROJECTS
564-, AND SUBMIT THE RECORDS TO THE
565-PUBLIC UTILITY OR OTHER OWNER OF THE ENERGY SECTOR PUBLIC WORKS
566-PROJECT ON A WEEKLY BASIS
567-. EACH LEAD CONTRACTOR AND
568-SUBCONTRACTOR SHALL CERTIFY
569-, UNDER THE PENALTY OF PERJURY, THAT
570-THE RECORDS PROVIDE COMPLETE AND ACCURATE INFORMATION FOR ALL
571-CRAFT WORKERS EMPLOYED ON THE PROJECT
572-.
634+ONSISTENT WITH SECTION 24-92-203 (4), BIDDERS ON ENERGY10
635+SECTOR PUBLIC WORKS PROJECTS SHALL NOT ARTIFICIALLY DIVIDE THE11
636+OVERALL GENERATION CAPACITY OR OVERALL PROJECT COST OF AN12
637+ENERGY SECTOR PUBLIC WORKS PROJECT TO DELIBERATELY AVOID THE13
638+REQUIREMENTS TO COMPLY WITH SECTION 24-92-115 (7) AND PART 2 OF14
639+THIS ARTICLE 92. THE PUBLIC UTILITIES COMMISSION, THE STATE, A PUBLIC15
640+UTILITY, OR A COOPERATIVE ELECTRIC ASSOCIATION MAY STILL REQUIRE16
641+COMPLIANCE WITH PREVAILING WAGE AND APPRENTICESHIP UTILIZATION17
642+REQUIREMENTS IF THEY DETERMINE THAT A BIDDER HAS ARTIFICIALLY18
643+DIVIDED A PROJECT WITH THE INTENT OF AVOIDING THE REQUIREMENT TO19
644+COMPLY WITH THOSE SECTIONS.20
645+24-92-305. Energy sector public works projects - record21
646+keeping - reporting - craft labor certification - sanctions - compliance22
647+with best value employment metrics. (1) T
648+HE LEAD CONTRACTOR FOR23
649+AN ENERGY SECTOR PUBLIC WORKS PROJECT SHALL PREPARE CERTIFIED24
650+PAYROLL RECORDS FOR CRAFT WORKERS DIRECTLY EMPLOYED BY THE25
651+CONTRACTOR, OBTAIN CERTIFIED PAYROLL RECORDS FROM ALL26
652+CONTRACTORS AND SUBCONTRACTORS ON THE PROJECTS , AND SUBMIT THE27
653+292
654+-17- RECORDS TO THE PUBLIC UTILITY OR OTHER OWNER OF THE ENERGY1
655+SECTOR PUBLIC WORKS PROJECT ON A WEEKLY BASIS . EACH LEAD2
656+CONTRACTOR AND SUBCONTRACTOR SHALL CERTIFY , UNDER THE PENALTY3
657+OF PERJURY, THAT THE RECORDS PROVIDE COMPLETE AND ACCURATE4
658+INFORMATION FOR ALL CRAFT WORKERS EMPLOYED ON THE PROJECT .5
573659 (2) T
574-HE LEAD CONTRACTOR FOR AN ENERGY SECTOR PUBLIC WORKS
575-PROJECT SHALL PREPARE A CRAFT LABOR CERTIFICATION ON A QUARTERLY
576-BASIS FOR WORK THAT IS BEING PERFORMED UNDER AFFECTED PROJECTS
577-.
660+HE LEAD CONTRACTOR FOR AN ENERGY SECTOR PUBLIC6
661+WORKS PROJECT SHALL PREPARE A CRAFT LABOR CERTIFICATION ON A7
662+QUARTERLY BASIS FOR WORK THAT IS BEING PERFORMED UNDER AFFECTED8
663+PROJECTS.9
578664 (3) A
579- CRAFT LABOR CERTIFICATION MUST INCLUDE THE FOLLOWING :
665+ CRAFT LABOR CERTIFICATION MUST INCLUDE THE10
666+FOLLOWING:11
580667 (a) A
581- SWORN ATTESTATION, UNDER THE PENALTY OF PERJURY, THAT
582-THE LEAD CONTRACTOR IS FULLY COMPLIANT WITH ALL EMPLOYMENT
583-,
584-TRAINING, AND WAGE REQUIREMENTS OF SECTION 24-92-115 (7) AND PART
585-2 OF THIS ARTICLE 92; AND
586-(b) AN IDENTICAL, EQUIVALENT CRAFT LABOR CERTIFICATION
587-EXECUTED IN THE SAME MANNER BY ALL SUBCONTRACTORS PARTICIPATING
588-IN THE ENERGY SECTOR PUBLIC WORKS PROJECT
589-.
668+ SWORN ATTESTATION, UNDER THE PENALTY OF PERJURY ,12
669+THAT THE LEAD CONTRACTOR IS FULLY COMPLIANT WITH ALL13
670+EMPLOYMENT, TRAINING, AND WAGE REQUIREMENTS OF SECTION14
671+24-92-115
672+ (7) AND PART 2 OF THIS ARTICLE 92; AND15
673+(b) A
674+N IDENTICAL, EQUIVALENT CRAFT LABOR CERTIFICATION16
675+EXECUTED IN THE SAME MANNER BY ALL SUBCONTRACTORS17
676+PARTICIPATING IN THE ENERGY SECTOR PUBLIC WORKS PROJECT .18
590677 (4) T
591-HE PUBLIC UTILITY, COOPERATIVE ELECTRIC ASSOCIATION ,
592-INDEPENDENT POWER PRODUCER , OR OTHER OWNER OF AN ENERGY SECTOR
593-PUBLIC WORKS PROJECT IS RESPONSIBLE FOR MAINTENANCE OF RECORDS FOR
594-ALL CRAFT LABOR CERTIFICATIONS
595-. THE PUBLIC UTILITY, COOPERATIVE
596-ELECTRIC ASSOCIATION
597-, INDEPENDENT POWER PRODUCER , OR OTHER OWNER
598-OF AN ENERGY SECTOR PUBLIC WORKS PROJECT SHALL EITHER PROVIDE
599-COPIES QUARTERLY OR REQUIRE BY CONTRACT THAT THE LEAD CONTRACTOR
600-PROVIDE COPIES QUARTERLY
601-, TO THE DEPARTMENT OF LABOR AND
602-EMPLOYMENT FOR REVIEW AND OVERSIGHT PURPOSES
603-.
604-(5) N
605-O LATER THAN JANUARY 1, 2029, AND AT LEAST FIVE YEARS
606-THEREAFTER
607-, THE STATE AUDITOR'S OFFICE SHALL CONDUCT AN AUDIT OF
608-THE COMMISSION
609-'S APPROVAL OF ENERGY SECTOR PUBLIC WORKS PROJECTS .
610-T
611-HE PURPOSE OF THE AUDIT IS TO ESTABLISH OVERSIGHT AND
612-ACCOUNTABILITY FOR COMPLIANCE WITH SECTION
613-40-2-129, AND TO
614-DETERMINE WHETHER A SAMPLE OF PROJECTS THAT HAVE BEEN APPROVED
615-BY THE COMMISSION ARE FULLY COMPLIANT WITH ALL EMPLOYMENT
616-,
617-PAGE 12-SENATE BILL 23-292 TRAINING, WAGE, AND APPRENTICESHIP REQUIREMENTS OF SECTION
618-24-92-115 (7) AND PART 2 OF THIS ARTICLE 92. THE AUDIT MUST CONSIDER
619-INFORMATION AND RECORDS RELATED TO THE CRAFT LABOR CERTIFICATIONS
620-THAT ARE COLLECTED AND MAINTAINED BY THE DEPARTMENT OF LABOR
621-AND EMPLOYMENT
622-. THE DEPARTMENT OF LABOR AND EMPLOYMENT SHALL
623-PROVIDE ANY INFORMATION NEEDED TO PERFORM THE AUDIT AS REQUESTED
624-BY THE STATE AUDITOR
625-'S OFFICE.
678+HE PUBLIC UTILITY, COOPERATIVE ELECTRIC ASSOCIATION ,19
679+INDEPENDENT POWER PRODUCER , OR OTHER OWNER OF AN ENERGY20
680+SECTOR PUBLIC WORKS PROJECT IS RESPONSIBLE FOR MAINTENANCE OF21
681+RECORDS FOR ALL CRAFT LABOR CERTIFICATIONS . THE PUBLIC UTILITY,
682+22
683+COOPERATIVE ELECTRIC ASSOCIATION , INDEPENDENT POWER PRODUCER ,23
684+OR OTHER OWNER OF AN ENERGY SECTOR PUBLIC WORKS PROJECT SHALL24
685+EITHER PROVIDE COPIES QUARTERLY OR REQUIRE BY CONTRACT THAT THE25
686+LEAD CONTRACTOR PROVIDE COPIES QUARTERLY , TO THE DEPARTMENT OF26
687+LABOR AND EMPLOYMENT FOR REVIEW AND OVERSIGHT PURPOSES .27
688+292
689+-18- (5) NO LATER THAN JANUARY 1, 2029, AND AT LEAST FIVE YEARS1
690+THEREAFTER, THE STATE AUDITOR'S OFFICE SHALL CONDUCT AN AUDIT OF2
691+THE COMMISSION'S APPROVAL OF ENERGY SECTOR PUBLIC WORKS3
692+PROJECTS. THE PURPOSE OF THE AUDIT IS TO ESTABLISH OVERSIGHT AND4
693+ACCOUNTABILITY FOR COMPLIANCE WITH SECTION 40-2-129, AND TO5
694+DETERMINE WHETHER A SAMPLE OF PROJECTS THAT HAVE BEEN APPROVED6
695+BY THE COMMISSION ARE FULLY COMPLIANT WITH ALL EMPLOYMENT ,7
696+TRAINING, WAGE, AND APPRENTICESHIP REQUIREMENTS OF SECTION8
697+24-92-115
698+ (7) AND PART 2 OF THIS ARTICLE 92. THE AUDIT MUST
699+9
700+CONSIDER INFORMATION AND RECORDS RELATED TO THE CRAFT LABOR10
701+CERTIFICATIONS THAT ARE COLLECTED AND MAINTAINED BY THE11
702+DEPARTMENT OF LABOR AND EMPLOYMENT . THE DEPARTMENT OF LABOR12
703+AND EMPLOYMENT SHALL PROVIDE ANY INFORMATION NEEDED TO13
704+PERFORM THE AUDIT AS REQUESTED BY THE STATE AUDITOR 'S OFFICE.14
626705 (a) T
627706 HE AUDIT PROCESS MUST SELECT A SAMPLE OF PROJECTS FOR
628-REVIEW AND ENSURE THAT THE SCOPE OF THE AUDIT ENCOMPASSES THE
629-BROAD TYPES OF ENERGY SECTOR PUBLIC WORKS PROJECTS
630-.
707+15
708+REVIEW AND ENSURE THAT THE SCOPE OF THE AUDIT ENCOMPASSES THE16
709+BROAD TYPES OF ENERGY SECTOR PUBLIC WORKS PROJECTS .17
631710 (b) U
632-PON RELEASE OF THE AUDIT REPORT BY THE LEGISLATIVE AUDIT
633-COMMITTEE
634-, THE STATE AUDITOR MUST MAKE THE RESULTS OF THE AUDIT
635-AVAILABLE TO THE PUBLIC
636-.
711+PON RELEASE OF THE AUDIT REPORT BY THE LEGISLATIVE
712+18
713+AUDIT COMMITTEE, THE STATE AUDITOR MUST MAKE THE RESULTS OF THE19
714+AUDIT AVAILABLE TO THE PUBLIC.20
637715 (c) A
638716 FTER CONDUCTING TWO AUDITS UNDER THIS SUBSECTION (5),
639-THE STATE AUDITOR MAY CONDUCT ADDITIONAL AUDITS IN THE STATE
640-AUDITOR
641-'S DISCRETION.
717+21
718+THE STATE AUDITOR MAY CONDUCT ADDITIONAL AUDITS IN THE STATE22
719+AUDITOR'S DISCRETION.23
642720 (6) V
643-IOLATIONS OF THE REQUIREMENTS SPECIFIED IN THIS SECTION ,
644-INCLUDING WAGE AND HOUR VIOLATIONS , VIOLATIONS OF APPRENTICESHIP
645-REQUIREMENTS
646-, FALSIFICATION OF RECORDS, OR WILLFUL NON-COMPLIANCE,
647-ARE SUBJECT TO THE PENALTIES AND ENFORCEMENT RIGHTS AND REMEDIES
648-DESCRIBED IN SECTIONS
649-24-92-115 (3), 24-92-209, 24-92-210, AND
650-24-109-105.
721+IOLATIONS OF THE REQUIREMENTS SPECIFIED IN THIS SECTION,24
722+INCLUDING WAGE AND HOUR VIOLATIONS , VIOLATIONS OF APPRENTICESHIP25
723+REQUIREMENTS , FALSIFICATION OF RECORDS , OR WILLFUL26
724+NON-COMPLIANCE, ARE SUBJECT TO THE PENALTIES AND ENFORCEMENT27
725+292
726+-19- RIGHTS AND REMEDIES DESCRIBED IN SECTIONS 24-92-115 (3), 24-92-209,1
727+24-92-210,
728+ AND 24-109-105.2
651729 (7) I
652-F AN ENERGY SECTOR PUBLIC WORKS PROJECT USES FEDERAL
653-FUNDING THAT REQUIRES COMPLIANCE WITH THE FEDERAL
654-"DAVIS-BACON
655-ACT", 40 U.S.C. SEC. 3141 ET SEQ., OR RELATED STATUTES, THE OWNER OF
656-THE ENERGY SECTOR PUBLIC WORKS PROJECT SHALL
657-:
730+F AN ENERGY SECTOR PUBLIC WORKS PROJECT USES FEDERAL3
731+FUNDING THAT REQUIRES COMPLIANCE WITH THE FEDERAL "DAVIS-BACON4
732+A
733+CT", 40 U.S.C. SEC. 3141 ET SEQ., OR RELATED STATUTES, THE OWNER5
734+OF THE ENERGY SECTOR PUBLIC WORKS PROJECT SHALL :6
658735 (a) N
659-OTIFY THE PUBLIC UTILITIES COMMISSION OF THEIR INTENT TO
660-USE FEDERAL FUNDING TO FUND
661-, IN WHOLE OR IN PART, THE ENERGY SECTOR
662-PUBLIC WORKS PROJECT
663-; AND
664-(b) REQUIRE THE LEAD CONTRACTORS AND ALL OTHER
665-CONTRACTORS AND SUBCONTRACTORS WORKING ON THE ENERGY SECTOR
666-PUBLIC WORKS PROJECT TO PAY APPLICABLE FEDERALLY STIPULATED WAGE
667-AND BENEFIT RATES AND PROVIDE CERTIFIED PAYROLL REPORTS TO THE
668-PAGE 13-SENATE BILL 23-292 PUBLIC UTILITIES COMMISSION IN THE SAME MANNER REQUIRED BY
669-SUBSECTION
670-(1) OF THIS SECTION.
671-24-92-306. Energy sector public works projects - use of project
736+OTIFY THE PUBLIC UTILITIES COMMISSION OF THEIR INTENT TO7
737+USE FEDERAL FUNDING TO FUND , IN WHOLE OR IN PART, THE ENERGY8
738+SECTOR PUBLIC WORKS PROJECT; AND9
739+(b) R
740+EQUIRE THE LEAD CONTRACTORS AND ALL OTHER10
741+CONTRACTORS AND SUBCONTRACTORS WORKING ON THE ENERGY SECTOR11
742+PUBLIC WORKS PROJECT TO PAY APPLICABLE FEDERALLY STIPULATED12
743+WAGE AND BENEFIT RATES AND PROVIDE CERTIFIED PAYROLL REPORTS TO13
744+THE PUBLIC UTILITIES COMMISSION IN THE SAME MANNER REQUIRED BY14
745+SUBSECTION (1) OF THIS SECTION.15
746+24-92-306. Energy sector public works projects - use of project16
672747 labor agreements. (1) A
673- PUBLIC UTILITY, COOPERATIVE ELECTRIC
674-ASSOCIATION
675-, OR INDEPENDENT POWER PRODUCER IS AUTHORIZED TO
676-INCORPORATE A PROJECT LABOR AGREEMENT REQUIREMENT FOR AN ENERGY
677-SECTOR PUBLIC WORKS PROJECT IF THE PROJECT LABOR AGREEMENT WILL
678-PROMOTE SUCCESSFUL PROJECT DELIVERY BY SECURING A SKILLED LABOR
679-FORCE FOR THE PROJECT AND IF IT WILL PROMOTE COST
680--EFFICIENCY, SAFETY,
681-QUALITY, AND TIMELY COMPLETION OF THE PROJECT .
748+ PUBLIC UTILITY, COOPERATIVE ELECTRIC17
749+ASSOCIATION, OR INDEPENDENT POWER PRODUCER IS AUTHORIZED TO18
750+INCORPORATE A PROJECT LABOR AGREEMENT REQUIREMENT FOR AN19
751+ENERGY SECTOR PUBLIC WORKS PROJECT IF THE PROJECT LABOR20
752+AGREEMENT WILL PROMOTE SUCCESSFUL PROJECT DELIVERY BY SECURING21
753+A SKILLED LABOR FORCE FOR THE PROJECT AND IF IT WILL PROMOTE22
754+COST-EFFICIENCY, SAFETY, QUALITY, AND TIMELY COMPLETION OF THE23
755+PROJECT.24
682756 (2) I
683-F ALL CONSTRUCTION WORK ON AN ENERGY SECTOR PUBLIC
684-WORKS PROJECT IS COVERED BY A PROJECT LABOR AGREEMENT
685-, THE
686-REQUIREMENTS OF SECTIONS
687-24-92-304 AND 24-92-305 DO NOT APPLY TO
688-THE PROJECT
689-.
757+F ALL CONSTRUCTION WORK ON AN ENERGY SECTOR PUBLIC25
758+WORKS PROJECT IS COVERED BY A PROJECT LABOR AGREEMENT , THE26
759+REQUIREMENTS OF SECTIONS 24-92-304 AND 24-92-305 DO NOT APPLY TO27
760+292
761+-20- THE PROJECT.1
690762 (3) T
691-HE PUBLIC UTILITIES COMMISSION SHALL NOT DENY APPROVAL
692-OF AN ENERGY SECTOR PUBLIC WORKS PROJECT SOLELY BECAUSE THE
693-PROJECT OWNER VOLUNTARILY ELECTS TO USE A PROJECT LABOR
694-AGREEMENT FOR THE PROJECT
695-. THE PUBLIC UTILITIES COMMISSION MUST
696-STATE ITS REASONS FOR DENIAL IN WRITING WHEN IT ISSUES THE DECISION
697-.
698-24-92-307. Energy sector public works projects - existing
763+HE PUBLIC UTILITIES COMMISSION SHALL NOT DENY2
764+APPROVAL OF AN ENERGY SECTOR PUBLIC WORKS PROJECT SOLELY3
765+BECAUSE THE PROJECT OWNER VOLUNTARILY ELECTS TO USE A PROJECT4
766+LABOR AGREEMENT FOR THE PROJECT . THE PUBLIC UTILITIES COMMISSION5
767+MUST STATE ITS REASONS FOR DENIAL
768+ IN WRITING WHEN IT ISSUES6
769+THE DECISION.7
770+24-92-307. Energy sector public works projects - existing8
699771 authority of the public utilities commission. N
700-OTHING IN THIS SECTION
701-CONTRAVENES THE STATUTORY AUTHORITY OF THE PUBLIC UTILITIES
702-COMMISSION TO CONSIDER OVERALL PROJECT COSTS
703-, THE IMPACT OF A
704-PROJECT ON UTILITY CUSTOMERS
705-, OR THE IMPACT OF PROJECT COST ON
706-UTILITY RATES
707-.
708-SECTION 2. In Colorado Revised Statutes, 24-38.5-118, add (11)
709-as follows:
710-24-38.5-118. Geothermal energy grant program - creation -
711-procedures - fund - report - definitions - repeal. (11) Grants awarded
772+OTHING IN THIS SECTION9
773+CONTRAVENES THE STATUTORY AUTHORITY OF THE PUBLIC UTILITIES10
774+COMMISSION TO CONSIDER OVERALL PROJECT COSTS , THE IMPACT OF A11
775+PROJECT ON UTILITY CUSTOMERS , OR THE IMPACT OF PROJECT COST ON12
776+UTILITY RATES.13
777+SECTION 2. In Colorado Revised Statutes, 24-38.5-118, add14
778+(11) as follows:15
779+24-38.5-118. Geothermal energy grant program - creation -16
780+procedures - fund - report - definitions - repeal. (11) Grants awarded17
712781 to energy sector public works projects - requirements. A
713-NY PROJECT
714-THAT IS FUNDED IN WHOLE OR IN PART BY A GRANT AWARDED PURSUANT TO
715-THIS SECTION AND THAT IS AN ENERGY SECTOR PUBLIC WORKS PROJECT
716-, AS
717-DEFINED IN SECTION
718-24-92-303 (5), MUST COMPLY WITH THE APPLICABLE
719-REQUIREMENTS OF THE
720-"COLORADO ENERGY SECTOR PUBLIC WORKS
721-PAGE 14-SENATE BILL 23-292 PROJECT CRAFT LABOR REQUIREMENTS ACT", PART 3 OF ARTICLE 92 OF THIS
722-TITLE
723-24.
724-SECTION 3. In Colorado Revised Statutes, 24-92-115, add (7) as
725-follows:
726-24-92-115. Apprenticeship utilization requirements -
727-mechanical, electrical, and plumbing contracts - public projects -
782+NY PROJECT18
783+THAT IS FUNDED IN WHOLE OR IN PART BY A GRANT AWARDED PURSUANT19
784+TO THIS SECTION AND THAT IS AN ENERGY SECTOR PUBLIC WORKS PROJECT ,20
785+AS DEFINED IN SECTION 24-92-303 (5), MUST COMPLY WITH THE21
786+APPLICABLE REQUIREMENTS OF THE "COLORADO ENERGY SECTOR PUBLIC22
787+W
788+ORKS PROJECT CRAFT LABOR REQUIREMENTS ACT", PART 3 OF ARTICLE23
789+92
790+ OF THIS TITLE 24.24
791+SECTION 3. In Colorado Revised Statutes, 24-92-115, add (7)25
792+as follows:26
793+24-92-115. Apprenticeship utilization requirements -27
794+292
795+-21- mechanical, electrical, and plumbing contracts - public projects -1
728796 definition. (7) (a) F
729-OR AN ENERGY SECTOR PUBLIC WORKS PROJECT , AS
730-DEFINED IN SECTION
731-24-92-303 (5), THE GENERAL CONTRACTOR OR OTHER
732-FIRM TO WHICH THE CONTRACT IS AWARDED SHALL
733-:
797+OR AN ENERGY SECTOR PUBLIC WORKS PROJECT , AS2
798+DEFINED IN SECTION 24-92-303 (5),
799+ THE GENERAL CONTRACTOR OR3
800+OTHER FIRM TO WHICH THE CONTRACT IS AWARDED SHALL :4
734801 (I) I
735-DENTIFY, AT THE TIME THEY ARE PUT UNDER CONTRACT , ALL
736-CONTRACTORS OR SUBCONTRACTORS REQUIRED FOR THE PROJECT
737-, OTHER
738-THAN THOSE USED FOR ALL MECHANICAL
739-, SHEET METAL, FIRE SUPPRESSION,
740-SPRINKLER FITTING, ELECTRICAL, PLUMBING WORK, AND CONSTRUCTION
741-CRAFT LABOR
742-; AND
743-(II) CERTIFY THAT ALL CONTRACTORS OR SUBCONTRACTORS
744-IDENTIFIED PARTICIPATE IN APPRENTICESHIP TRAINING PROGRAMS
745-REGISTERED WITH THE
746-UNITED STATES DEPARTMENT OF LABOR 'S
747-EMPLOYMENT AND TRAINING ADMINISTRATION OR STATE APPRENTICESHIP
748-AGENCIES RECOGNIZED BY THE
749-UNITED STATES DEPARTMENT OF LABOR 'S
750-EMPLOYMENT AND TRAINING ADMINISTRATION AND HAVE A PROVEN RECORD
751-OF GRADUATING APPRENTICES FOR AT LEAST THREE OF THE PAST FIVE
752-YEARS
753-.
802+DENTIFY, AT THE TIME THEY ARE PUT UNDER CONTRACT , ALL5
803+CONTRACTORS OR SUBCONTRACTORS REQUIRED FOR THE PROJECT , OTHER6
804+THAN THOSE USED FOR ALL MECHANICAL , SHEET METAL, FIRE7
805+SUPPRESSION, SPRINKLER FITTING, ELECTRICAL, PLUMBING WORK, AND8
806+CONSTRUCTION CRAFT LABOR ; AND9
807+(II) C
808+ERTIFY THAT ALL CONTRACTORS OR SUBCONTRACTORS10
809+IDENTIFIED PARTICIPATE IN APPRENTICESHIP TRAINING PROGRAMS11
810+REGISTERED WITH THE UNITED STATES DEPARTMENT OF LABOR 'S12
811+EMPLOYMENT AND TRAINING ADMINISTRATION OR STATE APPRENTICESHIP13
812+AGENCIES
813+ RECOGNIZED BY THE UNITED STATES DEPARTMENT OF LABOR'S14
814+EMPLOYMENT AND TRAINING ADMINISTRATION AND HAVE A PROVEN15
815+RECORD OF GRADUATING APPRENTICES FOR AT LEAST THREE OF THE PAST16
816+FIVE YEARS.17
754817 (b) S
755-UBSECTIONS (1)(a) TO (1)(c) OF THIS SECTION APPLY TO
756-MECHANICAL
757-, ELECTRICAL, AND PLUMBING CONTRACTORS AND
758-SUBCONTRACTORS SUBJECT TO THIS SUBSECTION
759-(7).
818+UBSECTIONS (1)(a) TO (1)(c) OF THIS SECTION APPLY TO18
819+MECHANICAL, ELECTRICAL, AND PLUMBING CONTRACTORS AND19
820+SUBCONTRACTORS SUBJECT TO THIS SUBSECTION (7).20
760821 (c) C
761-ONTRACTORS AND SUBCONTRACTORS THAT ARE SUBJECT TO
762-THE REQUIREMENTS OF THIS SUBSECTION
763-(7) AND THAT PROVIDE
764-CONSTRUCTION CRAFT LABOR MUST CERTIFY THAT ALL FIRMS IDENTIFIED
765-PARTICIPATE IN APPRENTICESHIP TRAINING PROGRAMS THAT ARE
766-REGISTERED WITH THE
767-UNITED STATES DEPARTMENT OF LABOR 'S
768-EMPLOYMENT AND TRAINING ADMINISTRATION OR A STATE APPRENTICESHIP
769-AGENCY RECOGNIZED BY THE
770-UNITED STATES DEPARTMENT OF LABOR 'S
771-EMPLOYMENT AND TRAINING ADMINISTRATION AND THAT
772-:
773-PAGE 15-SENATE BILL 23-292 (I) SATISFY TO THE GRADUATION REQUIREMENTS OF SUBSECTIONS
774-(1)(a)(II)(A) TO (1)(a)(II)(C) OF THIS SECTION AT THE TIME THE CONTRACT
775-OR SUBCONTRACT WAS EXECUTED
776-; AND
777-(II) PROVIDE DOCUMENTATION REQUIRED IN SUBSECTION (1)(a)(III)
778-OF THIS SECTION.
822+ONTRACTORS AND SUBCONTRACTORS THAT ARE SUBJECT TO21
823+THE REQUIREMENTS OF THIS SUBSECTION (7) AND THAT PROVIDE22
824+CONSTRUCTION CRAFT LABOR MUST CERTIFY THAT ALL FIRMS IDENTIFIED23
825+PARTICIPATE IN APPRENTICESHIP TRAINING PROGRAMS THAT ARE24
826+REGISTERED WITH THE UNITED STATES DEPARTMENT OF LABOR 'S25
827+EMPLOYMENT AND TRAINING ADMINISTRATION OR A STATE26
828+APPRENTICESHIP AGENCY
829+ RECOGNIZED BY THE UNITED STATES27
830+292
831+-22- DEPARTMENT OF LABOR'S EMPLOYMENT AND TRAINING ADMINISTRATION1
832+AND THAT:2
833+(I) S
834+ATISFY
835+ TO THE GRADUATION REQUIREMENTS OF SUBSECTIONS3
836+(1)(a)(II)(A)
837+TO(1)(a)(II)(C) OF THIS SECTION AT THE TIME THE CONTRACT
838+4
839+OR SUBCONTRACT WAS EXECUTED ; AND5
840+(II) P
841+ROVIDE DOCUMENTATION REQUIRED IN SUBSECTION6
842+(1)(a)(III)
843+OF THIS SECTION.7
779844 (d) U
780-PON EVALUATION OF THE SUBMITTED BIDS , A PUBLIC UTILITY,
781-INDEPENDENT POWER PRODUCER , OR COOPERATIVE ELECTRIC ASSOCIATION
782-MAY WAIVE THE REQUIREMENTS OF THIS SECTION IF IT DETERMINES THAT
783-THERE IS SUBSTANTIAL EVIDENCE THAT THERE ARE NO RESPONSIVE ELIGIBLE
784-CONTRACTORS OR SUBCONTRACTORS FOR ANY TRADES AVAILABLE TO
785-FULFILL THE APPRENTICESHIP REQUIREMENTS FOR ONE OR MORE OF THE
786-TRADES SUBJECT TO THIS SECTION
787-. ANY PARTY EXERCISING A WAIVER
788-PURSUANT TO THIS SUBSECTION
789- (7)(d) SHALL DISCLOSE THE WAIVER ON A
790-PUBLICLY ACCESSIBLE WEBSITE
791-, INCLUDING THE CONTRACTOR OR
792-SUBCONTRACTOR TO WHICH THE WAIVER APPLIES AND THE SPECIFIC
793-RATIONALE FOR THE WAIVER
794-.
845+PON EVALUATION OF THE SUBMITTED BIDS, A PUBLIC UTILITY,8
846+INDEPENDENT POWER PRODUCER , OR COOPERATIVE ELECTRIC9
847+ASSOCIATION MAY WAIVE THE REQUIREMENTS OF THIS SECTION IF IT10
848+DETERMINES THAT THERE IS SUBSTANTIAL EVIDENCE THAT THERE ARE NO11
849+RESPONSIVE ELIGIBLE CONTRACTORS OR SUBCONTRACTORS FOR ANY12
850+TRADES AVAILABLE TO FULFILL THE APPRENTICESHIP REQUIREMENTS FOR13
851+ONE OR MORE OF THE TRADES SUBJECT TO THIS SECTION . ANY PARTY14
852+EXERCISING A WAIVER PURSUANT TO THIS SUBSECTION (7)(d) SHALL15
853+DISCLOSE THE WAIVER ON A PUBLICLY ACCESSIBLE WEBSITE , INCLUDING16
854+THE CONTRACTOR OR SUBCONTRACTOR TO WHICH THE WAIVER APPLIES17
855+AND THE SPECIFIC RATIONALE FOR THE WAIVER .18
795856 (e) I
796-N THE EVENT OF AN EXTREME WEATHER EVENT , A WILDFIRE, OR
797-AN EMERGENCY DECLARED BY THE STATE OF
798-COLORADO OR THE FEDERAL
799-GOVERNMENT
800-, A PUBLIC UTILITY OR COOPERATIVE ELECTRIC ASSOCIATION
801-MAY WAIVE THE REQUIREMENTS OF THIS SUBSECTION
802-(7) WHEN PERFORMING
803-REPAIR WORK TO RESTORE ELECTRIC SERVICE TO CUSTOMERS OR
804-ASSOCIATION MEMBERS WHEN IT CAN REASONABLY DEMONSTRATE THAT
805-:
857+N THE EVENT OF AN EXTREME WEATHER EVENT , A WILDFIRE,19
858+OR AN EMERGENCY DECLARED BY THE STATE OF COLORADO OR THE20
859+FEDERAL GOVERNMENT , A PUBLIC UTILITY OR COOPERATIVE ELECTRIC21
860+ASSOCIATION MAY WAIVE THE REQUIREMENTS OF THIS SUBSECTION (7)22
861+WHEN PERFORMING REPAIR WORK TO RESTORE ELECTRIC SERVICE TO23
862+CUSTOMERS OR ASSOCIATION MEMBERS WHEN IT CAN REASONABLY24
863+DEMONSTRATE THAT:25
806864 (I) T
807-HE CAPACITY NEEDED TO RESTORE POWER EXCEEDS THE PUBLIC
808-UTILITY
809-'S OR COOPERATIVE ELECTRIC ASSOCIATION 'S AVAILABLE CAPACITY
810-FOR EMERGENCY REPAIRS THROUGH ITS EMPLOYEES
811-, STANDBY CONTRACTOR
812-CAPACITY
813-, OR APPLICABLE MUTUAL AID AGREEMENTS ; AND
814-(II) A GOOD FAITH EFFORT TO IDENTIFY CONTRACTORS AND
815-SUBCONTRACTORS THAT CAN COMPLY WITH THIS SUBSECTION
816-(7) WAS MADE
817-AND NO ELIGIBLE CONTRACTORS OR SUBCONTRACTORS WERE AVAILABLE
818-FOR THE TIME FRAME FOR WHICH THE EMERGENCY CAPACITY WAS NEEDED
819-.
820-SECTION 4. In Colorado Revised Statutes, 40-2-123, add (5) as
821-follows:
822-40-2-123. Energy technologies - consideration by commission -
823-PAGE 16-SENATE BILL 23-292 incentives - demonstration projects - definitions - repeal. (5) A NY
824-PROJECT APPROVED PURSUANT TO THIS SECTION THAT IS AN ENERGY SECTOR
825-PUBLIC WORKS PROJECT
826-, AS DEFINED IN SECTION 24-92-303 (5), MUST
827-COMPLY WITH THE APPLICABLE REQUIREMENTS OF THE
828-"COLORADO ENERGY
829-SECTOR PUBLIC WORKS PROJECT CRAFT LABOR REQUIREMENTS ACT", PART
830-3 OF ARTICLE 92 OF TITLE 24.
831-SECTION 5. In Colorado Revised Statutes, 40-2-127, add (3.7) as
832-follows:
833-40-2-127. Community energy funds - community solar gardens
834-- definitions - rules - legislative declaration - repeal. (3.7) Energy sector
835-public works projects. I
836-F THE DEVELOPMENT OF A COMMUNITY SOLAR
837-GARDEN IS AN ENERGY SECTOR PUBLIC WORKS PROJECT
838-, AS DEFINED IN
839-SECTION
840-24-92-303 (5), THEN THE PROJECT MUST COMPLY WITH THE
841-APPLICABLE REQUIREMENTS OF THE
842-"COLORADO ENERGY SECTOR PUBLIC
843-WORKS PROJECT CRAFT LABOR REQUIREMENTS ACT", PART 3 OF ARTICLE
844-92 OF TITLE 24.
845-SECTION 6. In Colorado Revised Statutes, 40-2-129, amend
846-(1)(a); repeal (4); and add (5) and (6) as follows:
847-40-2-129. New resource acquisitions - factors in determination
848-- local employment - "best value" employment metrics - performance
849-audit. (1) (a) (I) When evaluating electric resource acquisitions and
850-requests for a certificate of convenience and necessity for construction or
851-expansion of generating facilities, including but not limited to pollution
852-control or fuel conversion upgrades and conversion of existing coal-fired
853-plants to natural gas plants, the commission shall consider, in all decisions
854-involved in electric resource acquisition processes, best value regarding
855-employment of Colorado labor, as defined in section 8-17-101 (2)(a), and
856-positive impacts on the long-term economic viability of Colorado
857-communities. To this end, the commission shall require utilities to obtain
858-and provide to the commission the following information regarding "best
859-value" employment metrics:
860-(A) The availability of training programs, including training through
861-apprenticeship programs registered with the United States department of
862-labor's office of apprenticeship or by state apprenticeship councils
863-AGENCIES recognized by that office FOR ALL APPRENTICEABLE TRADES
864-PAGE 17-SENATE BILL 23-292 REQUIRED TO EFFECTIVELY DELIVER THE PROJECT TO COMPLETION ;
865-(B) Employment of Colorado labor as compared to importation of
866-out-of-state workers;
865+HE CAPACITY NEEDED TO RESTORE POWER EXCEEDS THE26
866+PUBLIC UTILITY'S OR COOPERATIVE ELECTRIC ASSOCIATION 'S AVAILABLE27
867+292
868+-23- CAPACITY FOR EMERGENCY REPAIRS THROUGH ITS EMPLOYEES , STANDBY1
869+CONTRACTOR CAPACITY, OR APPLICABLE MUTUAL AID AGREEMENTS ; AND 2
870+(II) A
871+ GOOD FAITH EFFORT TO IDENTIFY CONTRACTORS AND3
872+SUBCONTRACTORS THAT CAN COMPLY WITH THIS SUBSECTION (7) WAS4
873+MADE AND NO ELIGIBLE CONTRACTORS OR SUBCONTRACTORS WERE5
874+AVAILABLE FOR THE TIME FRAME FOR WHICH THE EMERGENCY CAPACITY6
875+WAS NEEDED.7
876+SECTION 4. In Colorado Revised Statutes, 40-2-123, add (5) as8
877+follows:9
878+40-2-123. Energy technologies - consideration by commission10
879+- incentives - demonstration projects - definitions - repeal. (5) A
880+NY11
881+PROJECT APPROVED PURSUANT TO THIS SECTION THAT IS AN ENERGY12
882+SECTOR PUBLIC WORKS PROJECT , AS DEFINED IN SECTION 24-92-303 (5),13
883+MUST COMPLY WITH THE APPLICABLE REQUIREMENTS OF THE "COLORADO14
884+E
885+NERGY SECTOR PUBLIC WORKS PROJECT CRAFT LABOR REQUIREMENTS15
886+A
887+CT", PART 3 OF ARTICLE 92 OF TITLE 24.16
888+SECTION 5. In Colorado Revised Statutes, 40-2-127, add (3.7)17
889+as follows:18
890+40-2-127. Community energy funds - community solar19
891+gardens - definitions - rules - legislative declaration - repeal.20
892+(3.7) Energy sector public works projects. I
893+F THE DEVELOPMENT OF A21
894+COMMUNITY SOLAR GARDEN IS AN ENERGY SECTOR PUBLIC WORKS22
895+PROJECT, AS DEFINED IN SECTION 24-92-303 (5), THEN THE PROJECT MUST23
896+COMPLY WITH THE APPLICABLE REQUIREMENTS OF THE "COLORADO24
897+E
898+NERGY SECTOR PUBLIC WORKS PROJECT CRAFT LABOR REQUIREMENTS25
899+A
900+CT", PART 3 OF ARTICLE 92 OF TITLE 24.26
901+SECTION 6. In Colorado Revised Statutes, 40-2-129, amend27
902+292
903+-24- (1)(a); repeal (4); and add (5) and (6) as follows:1
904+40-2-129. New resource acquisitions - factors in determination2
905+- local employment - "best value" employment metrics - performance3
906+audit. (1) (a) (I) When evaluating electric resource acquisitions and4
907+requests for a certificate of convenience and necessity for construction or5
908+expansion of generating facilities, including but not limited to pollution6
909+control or fuel conversion upgrades and conversion of existing coal-fired7
910+plants to natural gas plants, the commission shall consider, in all8
911+decisions involved in electric resource acquisition processes, best value9
912+regarding employment of Colorado labor, as defined in section 8-17-10110
913+(2)(a), and positive impacts on the long-term economic viability of11
914+Colorado communities. To this end, the commission shall require utilities12
915+to obtain and provide to the commission the following information13
916+regarding "best value" employment metrics:14
917+(A) The availability of training programs, including training15
918+through apprenticeship programs registered with the United States16
919+department of labor's office of apprenticeship or by state apprenticeship17
920+councils AGENCIES recognized by that office FOR ALL APPRENTICEABLE18
921+TRADES REQUIRED TO EFFECTIVELY DELIVER THE PROJECT TO19
922+COMPLETION;20
923+(B) Employment of Colorado labor as compared to importation of21
924+out-of-state workers;22
867925 (C) T
868-HE ABILITY OF THE PROJECT TO EMPLOY WORKERS FROM
869-TRADITIONALLY UNDERSERVED COMMUNITIES OR DISPROPORTIONATELY
870-IMPACTED COMMUNITIES AS DEFINED IN SECTION
871-24-4-109 (2)(b)(II);
926+HE ABILITY OF THE PROJECT TO EMPLOY WORKERS FROM23
927+TRADITIONALLY UNDERSERVED COMMUNITIES OR DISPROPORTIONATELY24
928+IMPACTED COMMUNITIES AS DEFINED IN SECTION 24-4-109 (2)(b)(II);25
872929 (D) H
873-OW THE PROJECT SUPPORTS DOMESTIC MANUFACTURING
874-THROUGH THE UTILIZATION OF
875-COLORADO AND DOMESTICALLY PRODUCED
876-MATERIALS
877-, INCLUDING CONSIDERATION OF THE POTENTIAL FOR
878-DOMESTICALLY MANUFACTURED MATERIALS BEING UNAVAILABLE IN THE
879-MARKETPLACE
880-;
881-(E) Long-term career opportunities; and
882-(F) Industry-standard wages, health care, and pension benefits.
883-(II) When a utility proposes to construct new facilities of its own,
884-the utility shall supply similar information to the commission.
885-(4) (a) The state auditor shall conduct or cause to be conducted aperformance audit of the commission's implementation of the "best value"
886-employment metrics requirements of this section, including review of:
887-(I) The projects subject to subsection (1)(a) of this section that have
888-been approved in the previous ten years;
889-(II) Whether the work done used contractors that met the criteria
890-specified in this section;
891-(III) Any shortfalls in enforcement capacity or implementation by
892-the commission;
893-(IV) Current enforcement procedures for investor-owned utilities,
894-independent power producers, and wholesale generation and transmission
895-electric cooperatives; and
896-(V) Whether and how delayed rule-making proceedings have
897-PAGE 18-SENATE BILL 23-292 prevented the "best value" employment metrics requirements of this section
898-from being implemented.
899-(b) The governor's office, the commission, and commission staff
900-shall cooperate with stakeholders and the state auditor in conducting the
901-audit and making recommendations for reforms of, or potential alternatives
902-to, the implementation and enforcement of "best value" employment
903-metrics.
904-(c) Upon completion of a performance audit, the state auditor shall
905-submit a written report to the legislative audit committee, together with any
906-findings and recommendations.
907-(5) THE COMMISSION SHALL PROMULGATE RULES REQUIRING
908-UTILITIES
909-, WHEN SUBMITTING ANNUAL PROGRESS REPORTS FOR AN ELECTRIC
910-RESOURCE ACQUISITION
911-, TO COLLECT AND PROVIDE TO THE COMMISSION
912-INFORMATION CONCERNING THE IMPLEMENTATION OF
913-"BEST VALUE"
914-EMPLOYMENT METRICS , AS DESCRIBED IN SUBSECTION (1)(a) OF THIS
915-SECTION
916-, WHICH METRICS WERE APPROVED BY THE COMMISSION DURING THE
917-ACQUISITION PLANNING PROCESS AND WHICH ACQUISITIONS ARE UNDER
918-CONSTRUCTION BY EITHER THE UTILITY OR BY OTHERS
919-.
930+OW THE PROJECT SUPPORTS DOMESTIC MANUFACTURING26
931+THROUGH THE UTILIZATION OF COLORADO AND DOMESTICALLY PRODUCED27
932+292
933+-25- MATERIALS, INCLUDING CONSIDERATION OF THE POTENTIAL FOR1
934+DOMESTICALLY MANUFACTURED MATERIALS BEING UNAVAILABLE IN THE2
935+MARKETPLACE;3
936+(E) Long-term career opportunities; and4
937+(F) Industry-standard wages, health care, and pension benefits.5
938+(II) When a utility proposes to construct new facilities of its own,6
939+the utility shall supply similar information to the commission.7
940+(4) (a) The state auditor shall conduct or cause to be conducted a8
941+performance audit of the commission's implementation of the "best value"9
942+employment metrics requirements of this section, including review of:10
943+(I) The projects subject to subsection (1)(a) of this section that11
944+have been approved in the previous ten years;12
945+(II) Whether the work done used contractors that met the criteria13
946+specified in this section;14
947+(III) Any shortfalls in enforcement capacity or implementation by15
948+the commission;16
949+(IV) Current enforcement procedures for investor-owned utilities,17
950+independent power producers, and wholesale generation and transmission18
951+electric cooperatives; and19
952+(V) Whether and how delayed rule-making proceedings have20
953+prevented the "best value" employment metrics requirements of this21
954+section from being implemented.22
955+(b) The governor's office, the commission, and commission staff23
956+shall cooperate with stakeholders and the state auditor in conducting the24
957+audit and making recommendations for reforms of, or potential25
958+alternatives to, the implementation and enforcement of "best value"26
959+employment metrics.27
960+292
961+-26- (c) Upon completion of a performance audit, the state auditor shall1
962+submit a written report to the legislative audit committee, together with2
963+any findings and recommendations.3
964+(5) T
965+HE COMMISSION SHALL PROMULGATE RULES REQUIRING4
966+UTILITIES, WHEN SUBMITTING ANNUAL PROGRESS REPORTS FOR AN5
967+ELECTRIC RESOURCE ACQUISITION , TO COLLECT AND PROVIDE TO THE6
968+COMMISSION INFORMATION CONCERNING THE IMPLEMENTATION OF "BEST7
969+VALUE" EMPLOYMENT METRICS, AS DESCRIBED IN SUBSECTION (1)(a) OF8
970+THIS SECTION, WHICH METRICS WERE APPROVED BY THE COMMISSION9
971+DURING THE ACQUISITION PLANNING PROCESS AND WHICH ACQUISITIONS10
972+ARE UNDER CONSTRUCTION BY EITHER THE UTILITY OR BY OTHERS .11
920973 (6) (a) O
921-N OR BEFORE DECEMBER 31, 2024, AND ON OR BEFORE
922-DECEMBER 31 OF EACH YEAR THEREAFTER, THE COMMISSION SHALL SUBMIT
923-A REPORT TO THE ENERGY AND ENVIRONMENT COMMITTEE OF THE HOUSE OF
924-REPRESENTATIVES AND THE TRANSPORTATION AND ENERGY COMMITTEE OF
925-THE SENATE
926-, OR ANY SUCCESSOR COMMITTEES . THE REPORT MUST
927-SUMMARIZE THE INFORMATION CONCERNING
928-"BEST VALUE" EMPLOYMENT
929-METRICS THAT IS REPORTED TO THE COMMISSION BY UTILITIES PURSUANT TO
930-SUBSECTIONS
931- (1)(a) AND (5) OF THIS SECTION AND INDICATE THE MANNER
932-IN WHICH THE COMMISSION CONSIDERED THE INFORMATION
933-.
974+N OR BEFORE DECEMBER 31, 2024, AND ON OR BEFORE12
975+D
976+ECEMBER 31 OF EACH YEAR THEREAFTER , THE COMMISSION SHALL13
977+SUBMIT A REPORT TO THE ENERGY AND ENVIRONMENT COMMITTEE OF THE14
978+HOUSE OF REPRESENTATIVES AND THE TRANSPORTATION AND ENERGY15
979+COMMITTEE OF THE SENATE , OR ANY SUCCESSOR COMMITTEES . THE16
980+REPORT MUST SUMMARIZE THE INFORMATION CONCERNING "BEST VALUE"17
981+EMPLOYMENT METRICS THAT IS REPORTED TO THE COMMISSION BY18
982+UTILITIES PURSUANT TO SUBSECTIONS (1)(a) AND (5) OF THIS SECTION AND19
983+INDICATE THE MANNER IN WHICH THE COMMISSION CONSIDERED THE20
984+INFORMATION.21
934985 (b) N
935-OTWITHSTANDING THE LIMITATION DESCRIBED IN SECTION
936-24-1-136 (11)(a)(I), THE REPORTING REQUIREMENT DESCRIBED IN
937-SUBSECTION
938- (6)(a) OF THIS SECTION CONTINUES IN PERPETUITY.
939-SECTION 7. In Colorado Revised Statutes, 40-3.2-105.5, add (5),
940-(6), and (7) as follows:
941-40-3.2-105.5. Labor standards for gas DSM projects. (5) (a) F
942-OR
943-PAGE 19-SENATE BILL 23-292 A PLUMBING, MECHANICAL, OR ELECTRICAL PROJECT IN A NEW OR EXISTING
944-INDUSTRIAL
945-, COMMERCIAL, OR MULTIFAMILY RESIDENTIAL BUILDING THAT
946-CONTAINS TWENTY THOUSAND SQUARE FEET OR MORE OF CONDITIONED
947-FLOOR SPACE AND FOR WHICH A REBATE IS TO BE PROVIDED DIRECTLY TO
948-THE BUILDING OWNER AS PART OF A GAS
949-DSM PROGRAM, A UTILITY SHALL
950-NOT ISSUE ANY REBATES OR INCENTIVES UNLESS THE LEAD GENERAL
951-CONTRACTOR PERFORMING THE WORK FOR THE PROJECT SIGNS A NOTARIZED
952-AFFIDAVIT UNDER PENALTY OF PERJURY STATING THAT ALL OF THE
953-REQUIREMENTS OF THIS SECTION HAVE BEEN MET AND PROVIDES THE SIGNED
954-AFFIDAVIT TO THE SPONSORING UTILITY
955-. THE AFFIDAVIT MUST:
986+OTWITHSTANDING THE LIMITATION DESCRIBED IN SECTION22
987+24-1-136 (11)(a)(I),
988+THE REPORTING REQUIREMENT DESCRIBED IN23
989+SUBSECTION (6)(a) OF THIS SECTION CONTINUES IN PERPETUITY.24
990+SECTION 7. In Colorado Revised Statutes, 40-3.2-105.5, add25
991+(5), (6), and (7) as follows:26
992+40-3.2-105.5. Labor standards for gas DSM projects.27
993+292
994+-27- (5) (a) FOR A PLUMBING, MECHANICAL, OR ELECTRICAL PROJECT IN A NEW1
995+OR EXISTING INDUSTRIAL, COMMERCIAL, OR MULTIFAMILY RESIDENTIAL2
996+BUILDING THAT CONTAINS TWENTY THOUSAND SQUARE FEET OR MORE OF3
997+CONDITIONED FLOOR SPACE AND FOR WHICH A REBATE IS TO BE PROVIDED4
998+DIRECTLY TO THE BUILDING OWNER AS PART OF A GAS DSM PROGRAM, A5
999+UTILITY SHALL NOT ISSUE ANY REBATES OR INCENTIVES UNLESS THE LEAD6
1000+GENERAL CONTRACTOR PERFORMING THE WORK FOR THE PROJECT SIGNS7
1001+A NOTARIZED AFFIDAVIT UNDER PENALTY OF PERJURY STATING THAT ALL8
1002+OF THE REQUIREMENTS OF THIS SECTION HAVE BEEN MET AND PROVIDES9
1003+THE SIGNED AFFIDAVIT TO THE SPONSORING UTILITY . THE AFFIDAVIT10
1004+MUST:11
9561005 (I) I
957-DENTIFY THE CONTRACTORS OR SUBCONTRACTORS THAT WILL BE
958-USED FOR ALL MECHANICAL
959-, SHEET METAL, FIRE SUPPRESSION, SPRINKLER
960-FITTING
961-, ELECTRICAL, AND PLUMBING WORK, REQUIRED ON THE PROJECT;
1006+DENTIFY THE CONTRACTORS OR SUBCONTRACTORS THAT WILL12
1007+BE USED FOR ALL MECHANICAL , SHEET METAL, FIRE SUPPRESSION,13
1008+SPRINKLER FITTING, ELECTRICAL, AND PLUMBING WORK, REQUIRED ON THE14
1009+PROJECT;15
9621010 (II) C
963-ERTIFY THAT ALL FIRMS IDENTIFIED PARTICIPATE IN
964-APPRENTICESHIP PROGRAMS REGISTERED WITH THE
965-UNITED STATES
966-DEPARTMENT OF LABOR
967-'S EMPLOYMENT AND TRAINING ADMINISTRATION OR
968-STATE APPRENTICESHIP
969- AGENCIES RECOGNIZED BY THE UNITED STATES
970-DEPARTMENT OF LABOR AND HAVE A PROVEN RECORD OF GRADUATING
971-APPRENTICES AS FOLLOWS
972-:
1011+ERTIFY THAT ALL FIRMS IDENTIFIED PARTICIPATE IN16
1012+APPRENTICESHIP PROGRAMS REGISTERED WITH THE UNITED STATES17
1013+DEPARTMENT OF LABOR'S EMPLOYMENT AND TRAINING ADMINISTRATION18
1014+OR STATE APPRENTICESHIP AGENCIES
1015+ RECOGNIZED BY THE UNITED STATES19
1016+DEPARTMENT OF LABOR AND HAVE A PROVEN RECORD OF GRADUATING20
1017+APPRENTICES AS FOLLOWS:21
9731018 (A) B
974-EGINNING JULY 1, 2021, THROUGH JUNE 30, 2026, A MINIMUM
975-OF FIFTEEN PERCENT OF ITS APPRENTICES FOR AT LEAST THREE OF THE PAST
976-FIVE YEARS
977-;
1019+EGINNING JULY 1, 2021, THROUGH JUNE 30, 2026, A22
1020+MINIMUM OF FIFTEEN PERCENT OF ITS APPRENTICES FOR AT LEAST THREE23
1021+OF THE PAST FIVE YEARS;24
9781022 (B) B
979-EGINNING JULY 1, 2026, THROUGH JUNE 30, 2031, A MINIMUM
980-OF TWENTY PERCENT OF APPRENTICES FOR AT LEAST THREE OF THE PAST FIVE
981-YEARS
982-; AND
983-(C) BEGINNING JULY 1, 2031, AND EACH YEAR THEREAFTER , A
984-MINIMUM OF THIRTY PERCENT OF APPRENTICES FOR AT LEAST THREE OF THE
985-PAST FIVE YEARS
986-; AND
987-(III) SUPPLY SUPPORTING DOCUMENTATION FROM THE UNITED
988-STATES DEPARTMENT OF LABOR 'S OFFICE OF APPRENTICESHIP OR STATE
989-APPRENTICESHIP AGENCY VERIFYING THE INFORMATION PROVIDED IN THE
990-CERTIFICATION SPECIFIED IN SUBSECTION
991- (1)(a)(II) OF THIS SECTION.
1023+EGINNING JULY 1, 2026, THROUGH JUNE 30, 2031, A25
1024+MINIMUM OF TWENTY PERCENT OF APPRENTICES FOR AT LEAST THREE OF26
1025+THE PAST FIVE YEARS; AND27
1026+292
1027+-28- (C) BEGINNING JULY 1, 2031, AND EACH YEAR THEREAFTER , A1
1028+MINIMUM OF THIRTY PERCENT OF APPRENTICES FOR AT LEAST THREE OF2
1029+THE PAST FIVE YEARS; AND3
1030+(III) S
1031+UPPLY SUPPORTING DOCUMENTATION FROM THE UNITED4
1032+S
1033+TATES DEPARTMENT OF LABOR 'S OFFICE OF APPRENTICESHIP OR STATE5
1034+APPRENTICESHIP AGENCY VERIFYING THE INFORMATION PROVIDED IN THE6
1035+CERTIFICATION SPECIFIED IN SUBSECTION (1)(a)(II) OF THIS SECTION.7
9921036 (b) T
993-HE UTILITY MUST MAINTAIN A DATABASE OF THE INFORMATION
994-PAGE 20-SENATE BILL 23-292 CONTAINED IN THE AFFIDAVIT FOR EACH PROJECT AWARDED A REBATE OR
995-INCENTIVE
996-.
1037+HE UTILITY MUST MAINTAIN A DATABASE OF THE8
1038+INFORMATION CONTAINED IN THE AFFIDAVIT FOR EACH PROJECT AWARDED9
1039+A REBATE OR INCENTIVE.10
9971040 (c) T
998-HIS SUBSECTION (5) DOES NOT APPLY TO A GAS DSM PROGRAM
999-THAT IS LIMITED TO IN
1000--UNIT WORK IN A MULTIFAMILY BUILDING , AS
1001-UNDERTAKEN BY THE OWNER OR TE NANT OF THE MULTIFAMILY BUILDING OR
1002-UNIT
1003-.
1041+HIS SUBSECTION (5) DOES NOT APPLY TO A GAS DSM
1042+11
1043+PROGRAM THAT IS LIMITED TO IN-UNIT WORK IN A MULTIFAMILY BUILDING,12
1044+AS UNDERTAKEN BY THE OWNER OR TENANT OF THE MULTIFAMILY13
1045+BUILDING OR UNIT.14
10041046 (6) (a) T
1005-O ENSURE COMPLIANCE WITH THE REQUIREMENTS OF
1006-SUBSECTION
1007-(5) OF THIS SECTION, THE GENERAL CONTRACTOR OR OTHER
1008-FIRM TO WHICH THE CONTRACT IS AWARDED MUST AGREE TO PROVIDE
1009-ADDITIONAL DOCUMENTATION TO THE PARTICIPATING UTILITY OFFERING THE
1010-REBATE OR INCENTIVE REGARDING THE REQUIREMENTS FOR AFFECTED
1011-APPRENTICESHIP TRAINING PROGRAMS SPECIFIED IN SUBSECTION
1012- (5)(a) OF
1013-THIS SECTION
1014-.
1047+O ENSURE COMPLIANCE WITH THE REQUIREMENTS OF15
1048+SUBSECTION (5) OF THIS SECTION, THE GENERAL CONTRACTOR OR OTHER16
1049+FIRM TO WHICH THE CONTRACT IS AWARDED MUST AGREE TO PROVIDE17
1050+ADDITIONAL DOCUMENTATION TO THE PARTICIPATING UTILITY OFFERING18
1051+THE REBATE OR INCENTIVE REGARDING THE REQUIREMENTS FOR AFFECTED19
1052+APPRENTICESHIP TRAINING PROGRAMS SPECIFIED IN SUBSECTION (5)(a) OF20
1053+THIS SECTION.21
10151054 (b) I
1016-F THE UTILITY OFFERING THE REBATE OR INCENTIVE DETERMINES
1017-THAT A MECHANICAL
1018-, ELECTRICAL, OR PLUMBING SUBCONTRACTOR HAS
1019-WILLFULLY FALSIFIED DOCUMENTATION OR WILLFULLY MISREPRESENTED
1020-THEIR QUALIFICATIONS AS REQUIRED TO COMPLY WITH THIS SECTION IN THE
1021-CONTRACT
1022-, THE UTILITY SHALL DIRECT THE CONTRACTOR TO TERMINATE
1023-THE SUBCONTRACTOR CONTRACT IMMEDIATELY AND THE SUBCONTRACTOR
1024-SHALL IMMEDIATELY BE REMOVED FROM THE PUBLIC PROJECT
1025-. THE UTILITY
1026-MAY ALSO DEBAR THE OFFENDING SUBCONTRACTORS FOR FUTURE
1027-PARTICIPATION IN REBATES OR INCENTIVE PROGRAMS ESTABLISHED UNDER
1028-THIS SECTION
1029-.
1055+F THE UTILITY OFFERING THE REBATE OR INCENTIVE22
1056+DETERMINES THAT A MECHANICAL , ELECTRICAL, OR PLUMBING23
1057+SUBCONTRACTOR HAS WILLFULLY FALSIFIED DOCUMENTATION OR24
1058+WILLFULLY MISREPRESENTED THEIR QUALIFICATIONS AS REQUIRED TO25
1059+COMPLY WITH THIS SECTION IN THE CONTRACT, THE UTILITY SHALL DIRECT26
1060+THE CONTRACTOR TO TERMINATE THE SUBCONTRACTOR CONTRACT27
1061+292
1062+-29- IMMEDIATELY AND THE SUBCONTRACTOR SHALL IMMEDIATELY BE1
1063+REMOVED FROM THE PUBLIC PROJECT . THE UTILITY MAY ALSO DEBAR THE2
1064+OFFENDING SUBCONTRACTORS FOR FUTURE PARTICIPATION IN REBATES OR3
1065+INCENTIVE PROGRAMS ESTABLISHED UNDER THIS SECTION .4
10301066 (c) I
1031-F AFTER ISSUING A REBATE OR INCENTIVE PURSUANT TO THIS
1032-SECTION
1033-, A UTILITY DETERMINES THAT A CONTRACTOR OR SUBCONTRACTOR
1034-HAS WILLFULLY VIOLATED ANY REQUIREMENT OF THIS SECTION
1035-, THE UTILITY
1036-MAY DEMAND A FULL REFUND OF THE REBATE OR INCENTIVE WITH
1037-REASONABLE PENALTIES AND INTEREST AND MAY PURSUE ANY REMEDY
1038-PROVIDED BY LAW
1039-.
1067+F AFTER ISSUING A REBATE OR INCENTIVE PURSUANT TO THIS5
1068+SECTION, A UTILITY DETERMINES THAT A CONTRACTOR OR6
1069+SUBCONTRACTOR HAS WILLFULLY VIOLATED ANY REQUIREMENT OF THIS7
1070+SECTION, THE UTILITY MAY DEMAND A FULL REF UND OF THE REBATE OR8
1071+INCENTIVE WITH REASONABLE PENALTIES AND INTEREST AND MAY PURSUE9
1072+ANY REMEDY PROVIDED BY LAW .10
10401073 (d) A
1041- UTILITY MUST MAINTAIN A LIST OF CONTRACTORS AND
1042-SUBCONTRACTORS THAT HAVE WILLFULLY FALSIFIED DOCUMENTATION OR
1043-WILLFULLY MISREPRESENTED THEIR QUALIFICATIONS OR THAT ARE
1044-DEBARRED FROM RECEIVING FUTURE REBATES OR INCENTIVES AND MAKE
1045-THAT LIST AVAILABLE TO THEIR CUSTOMERS ON THEIR WEBSITE
1046-.
1047-PAGE 21-SENATE BILL 23-292 (7) (a) THE UTILITY THAT OFFERS THE REBATE OR INCENTIVE
1048-PURSUANT TO THIS SECTION MUST ESTABLISH PERIODIC AUDITS OF THE
1049-QUALIFYING REBATES THAT REPRESENT THE HIGHEST TWO PERCENT OF
1050-REBATES ISSUED BY DOLLAR AMOUNT AT LEAST EVERY THREE YEARS TO
1051-ENSURE THAT THE CONTRACTORS OR SUBCONTRACTORS MAINTAIN
1052-COMPLIANCE WITH THIS SECTION
1053-.
1074+ UTILITY MUST MAINTAIN A LIST OF CONTRACTORS AND11
1075+SUBCONTRACTORS THAT HAVE WILLFULLY FALSIFIED DOCUMENTATION OR12
1076+WILLFULLY MISREPRESENTED THEIR QUALIFICATIONS OR THAT ARE13
1077+DEBARRED FROM RECEIVING FUTURE REBATES OR INCENTIVES AND MAKE14
1078+THAT LIST AVAILABLE TO THEIR CUSTOMERS ON THEIR WEBSITE .15
1079+(7) (a) T
1080+HE UTILITY THAT OFFERS THE REBATE OR INCENTIVE
1081+16
1082+PURSUANT TO THIS SECTION MUST ESTABLISH PERIODIC AUDITS OF THE17
1083+QUALIFYING REBATES THAT REPRESENT THE HIGHEST TWO PERCENT OF18
1084+REBATES ISSUED BY DOLLAR AMOUNT AT LEAST EVERY THREE YEARS TO19
1085+ENSURE THAT THE CONTRACTORS OR SUBCONTRACTORS MAINTAIN20
1086+COMPLIANCE WITH THIS SECTION.21
10541087 (b) I
1055-F THE AUDIT DETERMINES THAT THERE WERE WILLFUL
1056-VIOLATIONS OF THIS SECTION
1057-, THE UTILITY MAY DEMAND A FULL REFUND OF
1058-THE REBATE OR INCENTIVE WITH REASONABLE PENALTIES AND INTEREST
1059-AND MAY PURSUE ANY REMEDY PROVIDED BY LAW
1060-.
1061-SECTION 8. In Colorado Revised Statutes, 40-3.2-105.6, add (5),
1062-(6), and (7) as follows:
1063-40-3.2-105.6. Labor standards for beneficial electrification
1088+F THE AUDIT DETERMINES THAT THERE WERE WILLFUL22
1089+VIOLATIONS OF THIS SECTION, THE UTILITY MAY DEMAND A FULL REFUND23
1090+OF THE REBATE OR INCENTIVE WITH REASONABLE PENALTIES AND24
1091+INTEREST AND MAY PURSUE ANY REMEDY PROVIDED BY LAW .25
1092+SECTION 8. In Colorado Revised Statutes, 40-3.2-105.6, add26
1093+(5), (6), and (7) as follows:27
1094+292
1095+-30- 40-3.2-105.6. Labor standards for beneficial electrification1
10641096 projects. (5) (a) F
1065-OR A BENEFICIAL ELECTRIFICATION PROJECT IN A NEW OR
1066-EXISTING INDUSTRIAL
1067-, COMMERCIAL, OR MULTIFAMILY RESIDENTIAL
1068-BUILDING THAT CONTAINS TWENTY THOUSAND SQUARE FEET OR MORE OF
1069-CONDITIONED FLOOR SPACE AND FOR WHICH A REBATE IS TO BE PROVIDED
1097+OR A BENEFICIAL ELECTRIFICATION PROJECT IN A NEW2
1098+OR EXISTING INDUSTRIAL, COMMERCIAL, OR MULTIFAMILY RESIDENTIAL3
1099+BUILDING THAT CONTAINS TWENTY THOUSAND SQUARE FEET OR MORE OF4
1100+CONDITIONED FLOOR SPACE AND FOR WHICH A REBATE IS TO BE PROVIDED5
10701101 DIRECTLY TO THE BUILDING OWNER AS PART OF THE BENEFICIAL
1071-ELECTRIFICATION PROGRAM
1072-, A UTILITY SHALL NOT ISSUE ANY REBATES OR
1073-INCENTIVES UNLESS THE LEAD GENERAL CONTRACTOR PERFORMING THE
1074-WORK FOR THE PROJECT SIGNS A NOTARIZED AFFIDAVIT UNDER PENALTY OF
1075-PERJURY STATING THAT ALL OF THE REQUIREMENTS OF THIS SECTION HAVE
1076-BEEN MET AND PROVIDES THE SIGNED AFFIDAVIT TO THE SPONSORING
1077-UTILITY
1078-. THE AFFIDAVIT MUST:
1102+6
1103+ELECTRIFICATION PROGRAM, A UTILITY SHALL NOT ISSUE ANY REBATES OR7
1104+INCENTIVES UNLESS THE LEAD GENERAL CONTRACTOR PERFORMING THE8
1105+WORK FOR THE PROJECT SIGNS A NOTARIZED AFFIDAVIT UNDER PENALTY9
1106+OF PERJURY STATING THAT ALL OF THE REQUIREMENTS OF THIS SECTION10
1107+HAVE BEEN MET AND PROVIDES THE SIGNED AFFIDAVIT TO THE11
1108+SPONSORING UTILITY. THE AFFIDAVIT MUST:12
10791109 (I) I
1080-DENTIFY THE CONTRACTORS OR SUBCONTRACTORS THAT WILL BE
1081-USED FOR ALL MECHANICAL
1082-, SHEET METAL, FIRE SUPPRESSION, SPRINKLER
1083-FITTING
1084-, ELECTRICAL, AND PLUMBING WORK REQUIRED ON THE PROJECT ;
1110+DENTIFY THE CONTRACTORS OR SUBCONTRACTORS THAT WILL13
1111+BE USED FOR ALL MECHANICAL , SHEET METAL, FIRE SUPPRESSION,14
1112+SPRINKLER FITTING, ELECTRICAL, AND PLUMBING WORK REQUIRED ON THE15
1113+PROJECT;16
10851114 (II) C
1086-ERTIFY THAT ALL FIRMS IDENTIFIED PARTICIPATE IN
1087-APPRENTICESHIP PROGRAMS REGISTERED WITH THE
1088-UNITED STATES
1089-DEPARTMENT OF LABOR
1090-'S EMPLOYMENT AND TRAINING ADMINISTRATION OR
1091-STATE APPRENTICESHIP AGENCIES RECOGNIZED BY THE
1092-UNITED STATES
1093-DEPARTMENT OF LABOR AND HAVE A PROVEN RECORD OF GRADUATING
1094-APPRENTICES AS FOLLOWS
1095-:
1115+ERTIFY THAT ALL FIRMS IDENTIFIED PARTICIPATE IN17
1116+APPRENTICESHIP PROGRAMS REGISTERED WITH THE UNITED STATES18
1117+DEPARTMENT OF LABOR'S EMPLOYMENT AND TRAINING ADMINISTRATION19
1118+OR STATE APPRENTICESHIP AGENCIES
1119+ RECOGNIZED BY THE UNITED STATES20
1120+DEPARTMENT OF LABOR AND HAVE A PROVEN RECORD OF GRADUATING21
1121+APPRENTICES AS FOLLOWS:22
10961122 (A) B
1097-EGINNING JULY 1, 2021, THROUGH JUNE 30, 2026, A MINIMUM
1098-PAGE 22-SENATE BILL 23-292 OF FIFTEEN PERCENT OF ITS APPRENTICES FOR AT LEAST THREE OF THE PAST
1099-FIVE YEARS
1100-;
1123+EGINNING JULY 1, 2021, THROUGH JUNE 30, 2026, A23
1124+MINIMUM OF FIFTEEN PERCENT OF ITS APPRENTICES FOR AT LEAST THREE24
1125+OF THE PAST FIVE YEARS;25
11011126 (B) B
1102-EGINNING JULY 1, 2026, THROUGH JUNE 30, 2031, A MINIMUM
1103-OF TWENTY PERCENT OF APPRENTICES FOR AT LEAST THREE OF THE PAST FIVE
1104-YEARS
1105-; AND
1106-(C) BEGINNING JULY 1, 2031, AND EACH YEAR THEREAFTER , A
1107-MINIMUM OF THIRTY PERCENT OF APPRENTICES FOR AT LEAST THREE OF THE
1108-PAST FIVE YEARS
1109-; AND
1110-(III) SUPPLY SUPPORTING DOCUMENTATION FROM THE UNITED
1111-STATES DEPARTMENT OF LABOR 'S OFFICE OF APPRENTICESHIP OR STATE
1112-APPRENTICESHIP AGENCY VERIFYING THE INFORMATION PROVIDED IN THE
1113-CERTIFICATION SPECIFIED IN SUBSECTION
1114- (1)(a)(II) OF THIS SECTION.
1127+EGINNING JULY 1, 2026, THROUGH JUNE 30, 2031, A26
1128+MINIMUM OF TWENTY PERCENT OF APPRENTICES FOR AT LEAST THREE OF27
1129+292
1130+-31- THE PAST FIVE YEARS; AND1
1131+(C) B
1132+EGINNING JULY 1, 2031, AND EACH YEAR THEREAFTER , A2
1133+MINIMUM OF THIRTY PERCENT OF APPRENTICES FOR AT LEAST THREE OF3
1134+THE PAST FIVE YEARS; AND4
1135+(III) S
1136+UPPLY SUPPORTING DOCUMENTATION FROM THE UNITED5
1137+S
1138+TATES DEPARTMENT OF LABOR 'S OFFICE OF APPRENTICESHIP OR STATE6
1139+APPRENTICESHIP AGENCY VERIFYING THE INFORMATION PROVIDED IN THE7
1140+CERTIFICATION SPECIFIED IN SUBSECTION (1)(a)(II) OF THIS SECTION.8
11151141 (b) T
1116-HE UTILITY MUST MAINTAIN A DATABASE OF THE INFORMATION
1117-CONTAINED IN THE AFFIDAVIT FOR EACH PROJECT AWARDED A REBATE OR
1118-INCENTIVE
1119-.
1142+HE UTILITY MUST MAINTAIN A DATABASE OF THE9
1143+INFORMATION CONTAINED IN THE AFFIDAVIT FOR EACH PROJECT AWARDED10
1144+A REBATE OR INCENTIVE.11
11201145 (c) T
11211146 HIS SUBSECTION (5) DOES NOT APPLY TO A BENEFICIAL
1122-ELECTRIFICATION PROJECT THAT IS LIMITED TO IN
1123--UNIT WORK IN A
1124-MULTIFAMILY BUILDING
1125-, AS UNDERTAKEN BY THE OWNER OR TENANT OF THE
1126-MULTIFAMILY BUILDING OR UNIT
1127-.
1147+12
1148+ELECTRIFICATION PROJECT THAT IS LIMITED TO IN -UNIT WORK IN A13
1149+MULTIFAMILY BUILDING, AS UNDERTAKEN BY THE OWNER OR TENANT OF14
1150+THE MULTIFAMILY BUILDING OR UNIT.15
11281151 (6) (a) T
1129-O ENSURE COMPLIANCE WITH THE REQUIREMENTS OF
1130-SUBSECTION
1131-(5) OF THIS SECTION, THE GENERAL CONTRACTOR OR OTHER
1132-FIRM TO WHICH THE CONTRACT IS AWARDED MUST AGREE TO PROVIDE
1133-ADDITIONAL DOCUMENTATION TO THE PARTICIPATING UTILITY OFFERING THE
1134-REBATE OR INCENTIVE REGARDING THE REQUIREMENTS FOR AFFECTED
1135-APPRENTICESHIP TRAINING PROGRAMS SPECIFIED IN SUBSECTION
1136-(5)(a) OF
1137-THIS SECTION
1138-.
1152+O ENSURE COMPLIANCE WITH THE REQUIREMENTS OF16
1153+SUBSECTION (5) OF THIS SECTION, THE GENERAL CONTRACTOR OR OTHER17
1154+FIRM TO WHICH THE CONTRACT IS AWARDED MUST AGREE TO PROVIDE18
1155+ADDITIONAL DOCUMENTATION TO THE PARTICIPATING UTILITY OFFERING19
1156+THE REBATE OR INCENTIVE REGARDING THE REQUIREMENTS FOR AFFECTED20
1157+APPRENTICESHIP TRAINING PROGRAMS SPECIFIED IN SUBSECTION (5)(a) OF21
1158+THIS SECTION.22
11391159 (b) I
1140-F THE UTILITY OFFERING THE REBATE OR INCENTIVE DETERMINES
1141-THAT A MECHANICAL
1142-, ELECTRICAL, OR PLUMBING SUBCONTRACTOR HAS
1143-WILLFULLY FALSIFIED DOCUMENTATION OR WILLFULLY MISREPRESENTED
1144-THEIR QUALIFICATIONS AS REQUIRED TO COMPLY WITH THIS SECTION IN THE
1145-CONTRACT
1146-, THE UTILITY SHALL DIRECT THE CONTRACTOR TO TERMINATE
1147-THE SUBCONTRACTOR CONTRACT IMMEDIATELY AND THE SUBCONTRACTOR
1148-MUST IMMEDIATELY BE REMOVED FROM THE PUBLIC PROJECT
1149-. THE UTILITY
1150-PAGE 23-SENATE BILL 23-292 MAY DEBAR THE OFFENDING SUBCONTRACTORS FOR FUTURE PARTICIPATION
1151-IN REBATE OR INCENTIVE PROGRAMS ESTABLISHED UNDER THIS SECTION
1152-.
1160+F THE UTILITY OFFERING THE REBATE OR INCENTIVE23
1161+DETERMINES THAT A MECHANICAL , ELECTRICAL, OR PLUMBING24
1162+SUBCONTRACTOR HAS WILLFULLY FALSIFIED DOCUMENTATION OR25
1163+WILLFULLY MISREPRESENTED THEIR QUALIFICATIONS AS REQUIRED TO26
1164+COMPLY WITH THIS SECTION IN THE CONTRACT, THE UTILITY SHALL DIRECT27
1165+292
1166+-32- THE CONTRACTOR TO TERMINATE THE SUBCONTRACTOR CONTRACT1
1167+IMMEDIATELY AND THE SUBCONTRACTOR MUST IMMEDIATELY BE2
1168+REMOVED FROM THE PUBLIC PROJECT . THE UTILITY MAY DEBAR THE3
1169+OFFENDING SUBCONTRACTORS FOR FUTURE PARTICIPATION IN REBATE OR4
1170+INCENTIVE PROGRAMS ESTABLISHED UNDER THIS SECTION .5
11531171 (c) I
1154-F AFTER ISSUING A REBATE OR INCENTIVE PURSUANT TO THIS
1155-SECTION
1156-, A UTILITY DETERMINES THAT A CONTRACTOR OR SUBCONTRACTOR
1157-HAS WILLFULLY VIOLATED ANY REQUIREMENT OF THIS SECTION
1158-, THE UTILITY
1159-MAY DEMAND A FULL REFUND OF THE REBATE OR INCENTIVE WITH
1160-REASONABLE PENALTIES AND INTEREST AND MAY PURSUE ANY REMEDY
1161-PROVIDED BY LAW
1162-.
1172+F AFTER ISSUING A REBATE OR INCENTIVE PURSUANT TO THIS6
1173+SECTION, A UTILITY DETERMINES THAT A CONTRACTOR OR7
1174+SUBCONTRACTOR HAS WILLFULLY VIOLATED ANY REQUIREMENT OF THIS8
1175+SECTION, THE UTILITY MAY DEMAND A FULL REF UND OF THE REBATE OR9
1176+INCENTIVE WITH REASONABLE PENALTIES AND INTEREST AND MAY PURSUE10
1177+ANY REMEDY PROVIDED BY LAW .11
11631178 (d) A
1164- UTILITY SHALL MAINTAIN A LIST OF CONTRACTORS AND
1165-SUBCONTRACTORS THAT HAVE WILLFULLY FALSIFIED DOCUMENTATION OR
1166-WILLFULLY MISREPRESENTED THEIR QUALIFICATIONS OR THAT ARE
1167-DEBARRED FROM RECEIVING FUTURE REBATES OR INCENTIVES AND MAKE
1168-THAT LIST AVAILABLE TO THEIR CUSTOMERS ON THEIR WEBSITE
1169-.
1179+ UTILITY SHALL MAINTAIN A LIST OF CONTRACTORS AND12
1180+SUBCONTRACTORS THAT HAVE WILLFULLY FALSIFIED DOCUMENTATION OR13
1181+WILLFULLY MISREPRESENTED THEIR QUALIFICATIONS OR THAT ARE14
1182+DEBARRED FROM RECEIVING FUTURE REBATES OR INCENTIVES AND MAKE15
1183+THAT LIST AVAILABLE TO THEIR CUSTOMERS ON THEIR WEBSITE .16
11701184 (7) (a) T
11711185 HE UTILITY THAT OFFERS THE REBATE OR INCENTIVE
1172-PURSUANT TO THIS SECTION MUST ESTABLISH PERIODIC AUDITS OF THE
1173-QUALIFYING REBATES THAT REPRESENT THE HIGHEST TWO PERCENT OF
1174-REBATES ISSUED BY DOLLAR AMOUNT AT LEAST EVERY THREE YEARS TO
1175-ENSURE THAT THE CONTRACTORS OR SUBCONTRACTORS MAINTAIN
1176-COMPLIANCE WITH THIS SECTION
1177-.
1186+17
1187+PURSUANT TO THIS SECTION MUST ESTABLISH PERIODIC AUDITS OF THE18
1188+QUALIFYING REBATES THAT REPRESENT THE HIGHEST TWO PERCENT OF19
1189+REBATES ISSUED BY DOLLAR AMOUNT AT LEAST EVERY THREE YEARS TO20
1190+ENSURE THAT THE CONTRACTORS OR SUBCONTRACTORS MAINTAIN21
1191+COMPLIANCE WITH THIS SECTION.22
11781192 (b) I
1179-F THE AUDIT DETERMINES THAT THERE WERE WILLFUL
1180-VIOLATIONS OF THIS SECTION
1181-, THE UTILITY MAY DEMAND A FULL REFUND OF
1182-THE REBATE OR INCENTIVE WITH REASONABLE PENALTIES AND INTEREST
1183-AND MAY PURSUE ANY REMEDY PROVIDED BY LAW
1184-.
1185-SECTION 9. In Colorado Revised Statutes, 40-3.2-108, add (8)(e)
1186-as follows:
1187-40-3.2-108. Clean heat targets - legislative declaration -
1188-definitions - plans - rules - reports. (8) Employment and utility
1193+F THE AUDIT DETERMINES THAT THERE WERE WILLFUL23
1194+VIOLATIONS OF THIS SECTION, THE UTILITY MAY DEMAND A FULL REFUND24
1195+OF THE REBATE OR INCENTIVE WITH REASONABLE PENALTIES AND25
1196+INTEREST AND MAY PURSUE ANY REMEDY PROVIDED BY LAW .26
1197+SECTION 9. In Colorado Revised Statutes, 40-3.2-108, add27
1198+292
1199+-33- (8)(e) as follows:1
1200+40-3.2-108. Clean heat targets - legislative declaration -2
1201+definitions - plans - rules - reports. (8) Employment and utility3
11891202 workforce. (e) I
1190-F A PROJECT IN CONNECTION WITH A CLEAN HEAT PLAN , IS
1191-AN ENERGY SECTOR PUBLIC WORKS PROJECT
1192-, AS DEFINED IN SECTION
1193-24-92-303 (5), THE PROJECT MUST COMPLY WITH THE APPLICABLE
1194-REQUIREMENTS OF THE
1195-"COLORADO ENERGY SECTOR PUBLIC WORKS
1196-PROJECT CRAFT LABOR REQUIREMENTS ACT", PART 3 OF ARTICLE 92 OF
1197-TITLE
1198-24.
1199-PAGE 24-SENATE BILL 23-292 SECTION 10. In Colorado Revised Statutes, 40-5-107, add (3)(c)
1200-as follows:
1201-40-5-107. Electric vehicle programs - definitions - repeal.
1203+F A PROJECT IN CONNECTION WITH A CLEAN HEAT PLAN ,4
1204+IS AN ENERGY SECTOR PUBLIC WORKS PROJECT , AS DEFINED IN SECTION5
1205+24-92-303
1206+ (5), THE PROJECT MUST COMPLY WITH THE APPLICABLE6
1207+REQUIREMENTS OF THE "COLORADO ENERGY SECTOR PUBLIC WORKS7
1208+P
1209+ROJECT CRAFT LABOR REQUIREMENTS ACT", PART 3 OF ARTICLE 92 OF8
1210+TITLE 24.9
1211+SECTION 10. In Colorado Revised Statutes, 40-5-107, add10
1212+(3)(c) as follows:11
1213+40-5-107. Electric vehicle programs - definitions - repeal.12
12021214 (3) (c) A
1203-N ELECTRIC VEHICLE INFRASTRUCTURE PROJECT THAT IS AN
1204-ENERGY SECTOR PUBLIC WORKS PROJECT
1205-, AS DEFINED IN SECTION 24-92-303
1206-(5),
1207- MUST COMPLY WITH THE APPLICABLE REQUIREMENTS OF THE
1208-"COLORADO ENERGY SECTOR PUBLIC WORKS PROJECT CRAFT LABOR
1209-REQUIREMENTS ACT", PART 3 OF ARTICLE 92 OF TITLE 24.
1210-SECTION 11. In Colorado Revised Statutes, 40-42-107, add (4) as
1211-follows:
1212-40-42-107. Labor standards - apprenticeship - supervision.
1215+N ELECTRIC VEHICLE INFRASTRUCTURE PROJECT THAT IS AN13
1216+ENERGY SECTOR PUBLIC WORKS PROJECT , AS DEFINED IN SECTION14
1217+24-92-303
1218+ (5), MUST COMPLY WITH THE APPLICABLE REQUIREMENTS OF15
1219+THE "COLORADO ENERGY SECTOR PUBLIC WORKS PROJECT CRAFT LABOR16
1220+R
1221+EQUIREMENTS ACT", PART 3 OF ARTICLE 92 OF TITLE 24.17
1222+SECTION 11. In Colorado Revised Statutes, 40-42-107, add (4)18
1223+as follows:19
1224+40-42-107. Labor standards - apprenticeship - supervision.20
12131225 (4) A
1214-NY PROJECT FOR THE CONSTRUCTION , EXPANSION, OR MAINTENANCE
1215-OF FACILITIES UNDERTAKEN IN
1216-COLORADO PURSUANT TO THIS ARTICLE 42
1217-THAT IS AN ENERGY SECTOR PUBLIC WORKS PROJECT , AS DEFINED IN SECTION
1218-24-92-303 (5), MUST COMPLY WITH THE APPLICABLE REQUIREMENTS OF THE
1219-"COLORADO ENERGY SECTOR PUBLIC WORKS PROJECT CRAFT LABOR
1220-REQUIREMENTS ACT", PART 3 OF ARTICLE 92 OF TITLE 24.
1221-SECTION 12. Appropriation. For the 2023-24 state fiscal year,
1222-$108,401 is appropriated to the department of labor and employment for use
1223-by the division of labor standards and statistics. This appropriation is from
1224-the general fund and is based on an assumption that the division will require
1225-an additional 1.0 FTE. To implement this act, the division may use this
1226-appropriation for program costs related to labor standards.
1227-SECTION 13. Act subject to petition - effective date -
1228-applicability. (1) This act takes effect January 1, 2024; except that, if a
1229-referendum petition is filed pursuant to section 1 (3) of article V of the state
1230-constitution against this act or an item, section, or part of this act within the
1231-ninety-day period after final adjournment of the general assembly, then the
1232-act, item, section, or part will not take effect unless approved by the people
1233-at the general election to be held in November 2024 and, in such case, will
1234-take effect on the date of the official declaration of the vote thereon by the
1235-governor.
1236-(2) This act only applies to any energy sector public works project
1237-PAGE 25-SENATE BILL 23-292 for which a public utility or cooperative electric association invitation for
1238-bids or proposals is issued on or after January 1, 2024.
1239-____________________________ ____________________________
1240-Steve Fenberg
1241-Julie McCluskie
1242-PRESIDENT OF SPEAKER OF THE HOUSE
1243-THE SENATE OF REPRESENTATIVES
1244-____________________________ ____________________________
1245-Cindi L. Markwell Robin Jones
1246-SECRETARY OF CHIEF CLERK OF THE HOUSE
1247-THE SENATE OF REPRESENTATIVES
1248- APPROVED________________________________________
1249- (Date and Time)
1250- _________________________________________
1251- Jared S. Polis
1252- GOVERNOR OF THE STATE OF COLORADO
1253-PAGE 26-SENATE BILL 23-292
1226+NY PROJECT FOR THE CONSTRUCTION, EXPANSION, OR MAINTENANCE21
1227+OF FACILITIES UNDERTAKEN IN COLORADO PURSUANT TO THIS ARTICLE 4222
1228+THAT IS AN ENERGY SECTOR PUBLIC WORKS PROJECT , AS DEFINED IN23
1229+SECTION 24-92-303 (5), MUST COMPLY WITH THE APPLICABLE24
1230+REQUIREMENTS OF THE "COLORADO ENERGY SECTOR PUBLIC WORKS25
1231+P
1232+ROJECT CRAFT LABOR REQUIREMENTS ACT", PART 3 OF ARTICLE 92 OF26
1233+TITLE 24.27
1234+292
1235+-34- SECTION 12. Appropriation. For the 2023-24 state fiscal year,1
1236+$108,401 is appropriated to the department of labor and employment for2
1237+use by the division of labor standards and statistics. This appropriation is3
1238+from the general fund and is based on an assumption that the division will4
1239+require an additional 1.0 FTE. To implement this act, the division may5
1240+use this appropriation for program costs related to labor standards.6
1241+SECTION 13. Act subject to petition - effective date -7
1242+applicability. (1) This act takes effect January 1, 2024; except that, if a8
1243+referendum petition is filed pursuant to section 1 (3) of article V of the9
1244+state constitution against this act or an item, section, or part of this act10
1245+within the ninety-day period after final adjournment of the general11
1246+assembly, then the act, item, section, or part will not take effect unless12
1247+approved by the people at the general election to be held in November13
1248+2024 and, in such case, will take effect on the date of the official14
1249+declaration of the vote thereon by the governor.15
1250+(2) This act only applies to any energy sector public works project16
1251+for which a public utility or cooperative electric association invitation for17
1252+bids or proposals is issued on or after January 1, 2024.18
1253+292