Connecticut 2017 Regular Session

Connecticut House Bill HB07065 Compare Versions

OldNewDifferences
11 General Assembly Raised Bill No. 7065
22 January Session, 2017 LCO No. 3960
3- *_____HB07065ENV___031317____*
3+ *03960_______ENV*
44 Referred to Committee on ENVIRONMENT
55 Introduced by:
66 (ENV)
77
88 General Assembly
99
1010 Raised Bill No. 7065
1111
1212 January Session, 2017
1313
1414 LCO No. 3960
1515
16-*_____HB07065ENV___031317____*
16+*03960_______ENV*
1717
1818 Referred to Committee on ENVIRONMENT
1919
2020 Introduced by:
2121
2222 (ENV)
2323
2424 AN ACT AUTHORIZING THE PERMITTING OF WASTE CONVERSION FACILITIES.
2525
2626 Be it enacted by the Senate and House of Representatives in General Assembly convened:
2727
2828 Section 1. Section 22a-207 of the general statutes is repealed and the following is substituted in lieu thereof (Effective October 1, 2017):
2929
3030 For the purposes of this chapter and chapter 103b:
3131
3232 (1) "Commissioner" means the Commissioner of Energy and Environmental Protection or his authorized agent;
3333
3434 (2) "Department" means the Department of Energy and Environmental Protection;
3535
3636 (3) "Solid waste" means unwanted or discarded solid, liquid, semisolid or contained gaseous material, including, but not limited to, demolition debris, material burned or otherwise processed at a resources recovery facility or incinerator, material processed at a recycling facility and sludges or other residue from a water pollution abatement facility, water supply treatment plant or air pollution control facility;
3737
3838 (4) "Solid waste facility" means any solid waste disposal area, volume reduction plant, transfer station, wood-burning facility or biomedical waste treatment facility;
3939
4040 (5) "Volume reduction plant" means any location or structure, whether located on land or water, where more than two thousand pounds per hour of solid waste generated elsewhere may be reduced in volume, including but not limited to, resources recovery facilities, waste conversion facilities and other incinerators, recycling facilities, pulverizers, compactors, shredders, balers and composting facilities;
4141
4242 (6) "Solid waste disposal area" means any location, including a landfill or other land disposal site, used for the disposal of more than ten cubic yards of solid waste. For purposes of this subdivision, "disposal" means the placement of material at a location with the intent to leave it at such location indefinitely, or to fail to remove material from a location within forty-five days, but does not mean the placement of material required to be recycled under section 22a-241b in a location on the premises of a recycling facility, provided such facility is in compliance with all requirements of state or federal law and any permits required thereunder;
4343
4444 (7) "Recycling" means the processing of solid waste to reclaim material therefrom;
4545
4646 (8) "Recycling facility" or "recycling center" means land and appurtenances thereon and structures where recycling is conducted, including but not limited to, an intermediate processing center as defined in section 22a-260;
4747
4848 (9) "Resources recovery facility" means a facility [utilizing processes to reclaim energy from municipal solid waste] that combusts municipal solid waste to generate electricity;
4949
5050 (10) "Waste conversion facility" means a facility that uses thermal, chemical or biological processes to convert solid waste, including, but not limited to, municipal solid waste, into electricity, fuel, gas, chemical or other products and that is not a facility that combusts mixed municipal solid waste to generate electricity;
5151
5252 [(10)] (11) "Transfer station" means any location or structure, whether located on land or water, where more than ten cubic yards of solid waste, generated elsewhere, may be stored for transfer or transferred from transportation units and placed in other transportation units for movement to another location, whether or not such waste is stored at the location prior to transfer;
5353
5454 [(11)] (12) "Municipality" means any town, city or borough within the state;
5555
5656 [(12)] (13) "Municipal authority" means the local governing body having legal jurisdiction over solid waste management within its corporate limits which shall be, in the case of any municipality which adopts a charter provision or ordinance pursuant to section 7-273aa, the municipal resource recovery authority;
5757
5858 [(13)] (14) "Regional authority" means the administrative body delegated the responsibility of solid waste management for two or more municipalities which have joined together by creating a district or signing an interlocal agreement or signing a mutual contract for a definitive period of time;
5959
6060 [(14)] (15) "Region" means two or more municipalities which have joined together by creating a district or signing an interlocal agreement or signing a mutual contract for a definite period of time concerning solid waste management within such municipalities;
6161
6262 [(15)] (16) "Solid waste management plan" means an administrative and financial plan for an area which considers solid waste storage, collection, transportation, volume reduction, recycling, reclamation and disposal practices for a twenty-year period, or extensions thereof;
6363
6464 [(16)] (17) "Municipal collection" means solid waste collection from all residents thereof by a municipal authority;
6565
6666 [(17)] (18) "Contract collection" means collection by a private collector under a formal agreement with a municipal authority in which the rights and duties of the respective parties are set forth;
6767
6868 [(18)] (19) "Solid waste planning region" means those municipalities within the defined boundaries of regional councils of governments or as prescribed in the state solid waste management plan;
6969
7070 [(19)] (20) "Biomedical waste" means infectious waste, pathological waste and chemotherapy waste generated during the administration of medical care or the performance of medical research involving humans or animals and which, because of its quantity, character or composition, has been determined by the commissioner to require special handling but excluding any solid waste which has been classified by the department as a hazardous waste pursuant to section 22a-115 or is a radioactive material regulated pursuant to section 22a-148;
7171
7272 [(20)] (21) "Generator of biomedical waste" means any person who owns or operates a facility that produces biomedical waste in any quantity, including, but not limited to the following: General hospitals, skilled nursing facilities or convalescent hospitals, intermediate care facilities, chronic dialysis clinics, free clinics, health maintenance organizations, surgical clinics, acute psychiatric hospitals, laboratories, medical buildings, physicians' offices, veterinarians, dental offices and funeral homes. Where more than one generator is located in the same building, each individual business entity shall be considered a separate generator;
7373
7474 [(21)] (22) "Biomedical waste treatment facility" means a solid waste facility capable of storing, treating or disposing of any amount of biomedical waste, excluding any facility where the only biomedical waste treated, stored or disposed of is biomedical waste generated at the site and any licensed acute care facility or licensed regional household hazardous waste collection facility accepting untreated solid waste generated during the administration of medical care in a single or multiple family household by a resident of such household;
7575
7676 [(22)] (23) "Throughput" means the amount of municipal solid waste processed by a resources recovery facility determined by dividing the average annual tonnage of municipal solid waste by three hundred sixty-five days;
7777
7878 [(23)] (24) "Municipal solid waste" means solid waste from residential, commercial and industrial sources, excluding solid waste consisting of significant quantities of hazardous waste as defined in section 22a-115, land-clearing debris, demolition debris, biomedical waste, sewage sludge and scrap metal;
7979
8080 [(24)] (25) "Wood-burning facility" means a facility, as defined in section 16-50i, whose principal function is energy recovery from wood for commercial purposes. "Wood-burning facility" does not mean a biomass gasification plant that utilizes land clearing debris, tree stumps or other biomass that regenerates, or the use of which will not result in a depletion of, resources;
8181
8282 [(25)] (26) "Person" has the same meaning as in subsection (b) of section 22a-2;
8383
8484 [(26)] (27) "Closure plan" means a comprehensive written plan, including maps, prepared by a professional engineer licensed by the state that details the closure of a solid waste disposal area and that addresses final cover design, stormwater controls, landfill gas controls, water quality monitoring, leachate controls, postclosure maintenance and monitoring, financial assurance for closure and postclosure activities, postclosure use and any other information that the commissioner determines is necessary to protect human health and the environment from the effects of the solid waste disposal areas;
8585
8686 [(27)] (28) "Designated recyclable item" means an item designated for recycling by the Commissioner of Energy and Environmental Protection in regulations adopted pursuant to subsection (a) of section 22a-241b, or designated for recycling pursuant to section 22a-208v or 22a-256;
8787
8888 [(28)] (29) "Composting facility" means land, appurtenances, structures or equipment where organic materials originating from another process or location that have been separated at the point or source of generation from nonorganic material are recovered using a process of accelerated biological decomposition of organic material under controlled aerobic or anaerobic conditions;
8989
9090 [(29)] (30) "Source-separated organic material" means organic material, including, but not limited to, food scraps, food processing residue and soiled or unrecyclable paper that has been separated at the point or source of generation from nonorganic material.
9191
9292 Sec. 2. Section 22a-207a of the general statutes is repealed and the following is substituted in lieu thereof (Effective October 1, 2017):
9393
9494 (a) As used in [sections] section 22a-208d [, 22a-208q] and subsection (b) of section 22a-228: (1) "Composting" means a process of accelerated biological decomposition of organic material under controlled conditions; and (2) "mixed municipal solid waste" means municipal solid waste that consists of mixtures of solid wastes which have not been separated at the source of generation or processed into discrete, homogeneous waste streams such as glass, paper, plastic, aluminum or tire waste streams provided such wastes shall not include any material required to be recycled pursuant to section 22a-241b. [; and (3) "mixed municipal solid waste composting facility" means a volume reduction plant where mixed municipal solid waste is processed using composting technology.]
9595
9696 (b) As used in this chapter, "end user" means any person who uses a material for such material's original use or any manufacturer who uses a material as feedstock to make a marketable product.
9797
9898 Sec. 3. Section 22a-208d of the general statutes is repealed and the following is substituted in lieu thereof (Effective October 1, 2017):
9999
100100 (a) On and after July 1, 1989, the Commissioner of Energy and Environmental Protection shall not issue a permit under section 22a-208a to construct or expand a resources recovery facility [or a mixed municipal solid waste composting facility] where any mixed municipal solid waste will be processed or a disposal area for ash residue generated by resources recovery facilities or mixed municipal solid waste unless said commissioner makes a written determination that such facility or disposal area is necessary to meet the solid waste disposal needs of the state and will not result in substantial excess capacity of resources recovery facilities [,] or disposal areas. [or mixed municipal solid waste composting facilities.]
101101
102102 (b) The commissioner shall publish, at the expense of the applicant, notice of the preliminary determination of need for the proposed facility or disposal area in a newspaper having a substantial circulation in the area affected. Publication shall be within sixty days of determination by the commissioner that the application is complete. Any person may submit written comments on the preliminary determination of need in the same manner as provided by the commissioner for the submission of comments on the application. The commissioner shall not make a final determination of need for the facility or disposal area unless a permit is issued. A preliminary determination of need shall be void if a permit is not issued. As used in this section, "preliminary determination of need" means a statement by the commissioner of the need for a resources recovery facility [, a mixed municipal solid waste composting facility] or disposal area during the pendency of an application to construct such facility or area.
103103
104104 (c) (1) The applicant for a permit to construct or expand a resources recovery facility [or a mixed municipal solid waste composting facility] requiring a determination of need under subsection (a) of this section shall provide such information as the commissioner deems necessary, including but not limited to:
105105
106106 (A) The design capacity of the proposed facility;
107107
108108 (B) The planned operating rate and throughput for the facility;
109109
110110 (C) An explanation of any difference between the information provided under subparagraphs (A) and (B) of this subdivision;
111111
112112 (D) The estimated amount of the following: (i) The mixed municipal solid waste generated by and received from each municipality and other customers that will send waste to the facility, in tons per day evidenced by contracts or letters of intent, (ii) the mixed municipal solid waste to be recycled pursuant to regulations adopted by the commissioner under section 22a-241b, and (iii) change in the amount of mixed municipal solid waste generated because of population growth, waste generation, source reduction and industrial and commercial development over the design life of the facility. Information submitted under this subdivision shall include the methodology used to determine the estimates;
113113
114114 (E) A contingency plan for use of facility capacity if throughput declines or increases by at least ten per cent from the throughput estimated in the application;
115115
116116 (F) An analysis of reasonable levels of reserve capacity for seasonal peaks and unexpected facility outages;
117117
118118 (G) The capability of the applicant to complete the project;
119119
120120 (H) The technical feasibility of the proposed facility; and
121121
122122 (I) A demonstration that the throughput capacity of the proposed facility, when combined with the throughput capacity of all other resources recovery facilities with permits to construct under the provisions of section 22a-208a [,] and existing resources recovery facilities with construction permits to expand [and mixed municipal solid waste composting facilities,] shall not exceed the total throughput capacity of resources recovery facilities [and mixed municipal solid waste composting facilities] needed to process waste generated in the state as set forth in the solid waste management plan adopted pursuant to section 22a-228.
123123
124124 (2) In making the determination required under this section, the commissioner shall consider the information submitted under subdivision (1) of this subsection, the current and anticipated availability of throughput capacity for mixed municipal solid waste at resources recovery facilities, [mixed municipal solid waste composting facilities,] land disposal areas, recycling facilities and other facilities that process or dispose of mixed municipal solid waste that have obtained all necessary permits to construct and any other information the commissioner deems pertinent and shall insure that no waste is accounted for more than once as a result of transfer from one vehicle or facility to another or for any other reason.
125125
126126 (d) (1) The applicant for a permit to construct a disposal area for ash residue generated by resources recovery facilities or mixed municipal solid wastes which requires a certificate of need under subsection (a) of this section shall submit such information as the commissioner deems necessary, including but not limited to, (A) the name of the resources recovery facilities or municipalities to be served by the disposal area; (B) the transportation system needed to serve the disposal area; (C) the available capacity of other disposal areas for ash residue or mixed municipal solid waste in the state that have obtained all necessary permits to construct; and (D) the design capacity of the disposal area.
127127
128128 (2) In making the determination required under this subsection, the commissioner shall consider the information submitted pursuant to subdivision (1) of this subsection and any other information the commissioner deems pertinent.
129129
130130 (e) The provisions of this section shall apply to any application for a permit under section 22a-208a for a resources recovery facility, for a disposal area for ash residue generated by resources recovery facilities, [for a mixed municipal solid waste composting facility] or for a disposal area for mixed municipal solid wastes which is pending on or submitted after July 1, 1989.
131131
132132 (f) This section shall not apply to an application for a permit or permit modifications of any resources recovery facility operating as of June 30, 1993, provided there is no expansion after that date of the facility's boilers or waste handling and processing equipment. Any such facility shall comply with all applicable environmental laws and regulations. Nothing in this subsection and no action taken by the commissioner pursuant hereto shall validate or invalidate any permit or determination of need issued or approved prior to June 30, 1993, for any resources recovery facility not operating as of that date, or otherwise affect any action of the commissioner, proceedings or judicial review relating thereto, pending on or commenced after that date.
133133
134134 Sec. 4. Section 22a-208q of the general statutes is repealed. (Effective October 1, 2017)
135135
136136
137137
138138
139139 This act shall take effect as follows and shall amend the following sections:
140140 Section 1 October 1, 2017 22a-207
141141 Sec. 2 October 1, 2017 22a-207a
142142 Sec. 3 October 1, 2017 22a-208d
143143 Sec. 4 October 1, 2017 Repealer section
144144
145145 This act shall take effect as follows and shall amend the following sections:
146146
147147 Section 1
148148
149149 October 1, 2017
150150
151151 22a-207
152152
153153 Sec. 2
154154
155155 October 1, 2017
156156
157157 22a-207a
158158
159159 Sec. 3
160160
161161 October 1, 2017
162162
163163 22a-208d
164164
165165 Sec. 4
166166
167167 October 1, 2017
168168
169169 Repealer section
170170
171+Statement of Purpose:
171172
173+To facilitate the permitting of waste conversion facilities.
172174
173-ENV Joint Favorable
174-
175-ENV
176-
177-Joint Favorable
175+[Proposed deletions are enclosed in brackets. Proposed additions are indicated by underline, except that when the entire text of a bill or resolution or a section of a bill or resolution is new, it is not underlined.]