District Of Columbia 2023 2023-2024 Regular Session

District Of Columbia Council Bill PR25-0539 Introduced / Bill

Filed 11/30/2023

                    1 
 
 
_______________________________ 
Councilmember Janeese Lewis George 
 
 
 
 
 
A PROPOSED RESOLUTION 1 
 2 
____________ 3 
 4 
IN THE COUNCIL OF THE DISTRICT OF COLUMBIA 5 
 6 
_______________ 7 
 8 
To declare the existence of an emergency with respect to the need to reduce the building 9 
restriction line along the southern side of Fern Street NW, on lots 847, 973, 1016 to 1033, 10 
and 1062 to 1072 in Square 2950 from 15 feet to 9.5 feet.  11 
RESOLVED, BY THE COUNCIL OF THE DISTRICT OF COLUMBIA, That this 12 
resolution may be cited as the “Adjustment of Building Restriction Line in Square 2950 along 13 
the southern side of Fern Street NW, S.R. 23-06301 Emergency Declaration Resolution of 14 
2023”. 15 
Sec. 2. (a) The redevelopment of the former Walter Reed Army Medical Center campus, 16 
the Parks at Walter Reed, includes the development of 141 townhomes and stacked townhome 17 
flats fronting on the south side of Fern Street NW on Parcels A-G of the Master Plan called 18 
Veranda at the Parks. 19 
(b) The Project has been fully designed and infrastructure serving the townhomes has 20 
been installed in reliance with the understanding that there is no Building Restriction Line along 21 
the south side of Fern Street. 22  2 
 
(c) There is no BRL shown in the District’s survey database on SurDocs and there is no 23 
shown in the ALTA survey prepared for the District in December 2014. The homes, as currently 24 
designed, extend five feet beyond the BRL in question and feature porches which extend an 25 
additional five feet beyond the BRL in question and feature porches which extend an additional 26 
five feet six inches. They cannot be constructed as designed and approved by HPRB and ANC 27 
4A without removal or the reduction of the BRL to 9.5’.  28 
(d) The Project design received unanimous approval from the Historic Preservation 29 
Review Board on February 24, 2022 after a months-long community engagement process that 30 
resulted in revisions to the plans prior to approval.  The front yards and front porches along Fern 31 
Street were key design elements including a few follow up revisions that were addressed in the 32 
March 2022 HPRB resubmission package. 33 
(e) Phase I of the land development, which accounts for 38% of all units, has been 34 
completed by the Master Developer on the basis of plans there were permitted and approved by 35 
the Department of Buildings, Department of Energy and Environment, DC Water, Pepco, and 36 
Washington Gas. The site has been graded and new facilities have been installed over the past 37 
year at a substantial investment. 38 
(f) In parallel to the land development work being completed by Master Developer, Toll 39 
Brothers, has advanced its design documents. It submitted its permit set for “Building 12” and 40 
“Building 13” to DOB, which make up two of six impacted buildings along Fern Street NW. 41 
Upon permit approval, Toll Brothers plans to commence construction this year. 42 
(g) Toll Brothers, with its civil engineer, applied for a District Department of 43 
Transportation construction permit for stairs and leadwalks in Public Space along Fern Street 44 
NW. Chris Shaheen with the Office of Planning issued the following comment: 45  3 
 
Office of the Surveyor records show there is a 15' building restriction line on Fern 46 
Street that is not indicated on site plans submitted with this application. Revise 47 
plans and application to include the building restriction line and include all work 48 
in this area as part of the public space permit OR provide documentation showing 49 
that the building restriction line has been removed. 50 
 51 
Chris Shaheen directed Toll Brothers and the civil engineer to a survey from 1972 52 
indicating a 15’ BRL on the south side of Fern Street NW between Georgia Avenue NW and 53 
Alaska Avenue NW. 54 
(h) The Master Developer consulted with the Office of the Surveyor as to whether there 55 
was a Building Restriction Line given the ALTA survey and SURDocs maps upon which they 56 
relied did not show it.The Surveyor indicated that, in his opinion, when the District created a 57 
new parcel to convey the Walter Reed campus from the US Army to the District, the BRL was 58 
likely eliminated consistent with several other BRLs nearby. However, the documents pursuant 59 
to the parcel creation were not specific as to the elimination of the BRL. As a result, the surveyor 60 
advised that the BRL would need to be removed or reduced by the District for the project to 61 
move forward as approved. 62 
(i) Toll Brothers’ townhomes are designed such that the face of the house is ten feet back 63 
from the property line, meaning 5 feet of the townhomes are within the BRL.  64 
As indicated previously, the BRL did not show up in the ALTA survey that AMT 65 
prepared for the District in December 2014. Additionally, when searched on SurDocs, no such 66 
BRL is shown on the south side of Fern Street NW. 67 
(j) There are no public utilities within the fifteen foot BRL, which is also within the 68 
fenceline of the former Army Medical Center campus that would be impacted by removal and 69 
and no public purpose served by retention of the BRL. 70  4 
 
(k) TPWR Developer and Toll Brothers are seeking the removal of a fifteen foot Building 71 
Restriction Line on the south side of Fern Street NW between Alaska Avenue NW and George 72 
Avenue NW and establishment of a 9.5 foot BRL so that the only projection are on the stairs and 73 
porch. 74 
 Both parties have invested years of effort and significant expense to advance the land 75 
development and design of the Project. TPWR Developer and Toll Brothers deployed this capital 76 
based on assumed credible surveys. The Project will deliver much-needed family sized homes 77 
with 3+ bedrooms, including 12 affordable. As mentioned above, the Project went thru an HPRB 78 
approval process as well as a community design review process gaining support from ANC 4A, 79 
whose constituents’ homes, including our former ANC 4A Commissioner, face the Project on 80 
Fern Street. The Master Developer will have to repeat these protracted processes with an 81 
uncertain outcome in the event that the BRL is not adjusted and the Project has to be redesigned 82 
to accommodate the BRL.  83 
(l) In conclusion, the Project is meritorious in providing new housing and affordable 84 
housing, the Master Developer relied in good faith on the ALTA survey and SurDocs which did 85 
not show the BRL and no public interest is served with the retention of the BRL. 86 
Sec. 3. The Council of the District of Columbia determines that the circumstances 87 
enumerated in section 2 constitute emergency circumstances making it necessary that the 88 
Adjustment of Building Restriction Line in Square 2950 along the southern side of Fern Street 89 
NW, S.R. 23-06301 be adopted after a single reading. 90 
Sec. 4. This resolution shall take effect immediately. 91