| 17 | + | John A. Wilson Building |
---|
| 18 | + | 1350 Pennsylvania Avenue, NW, Suite 504 |
---|
| 19 | + | Washington, DC 20004 |
---|
| 20 | + | |
---|
| 21 | + | Dear Chairman Mendelson: |
---|
| 22 | + | |
---|
| 23 | + | Enclosed for consideration and enactment by the Council of the District of Columbia is an |
---|
| 24 | + | emergency bill, the “Modification Nos. 7, 9, and 13 to Contract No. CW108950 with Stormwater |
---|
| 25 | + | Maintenance, LLC Approval and Payment Authorization Emergency Act of 2025,” and the |
---|
| 26 | + | accompanying emergency declaration resolution. |
---|
| 27 | + | |
---|
| 28 | + | The legislation will approve Modification Nos. 7, 9, and 13 to Contract No. CW108950 with |
---|
| 29 | + | Stormwater Maintenance, LLC, for routine restorative and reconstructive maintenance on just over |
---|
| 30 | + | 3,000 District-owned and installed green stormwater infrastructure assets, to fully exercise option |
---|
| 31 | + | year one of the contract. In addition, the legislation will approve payment for the goods and |
---|
| 32 | + | services received and to be received under the modifications. |
---|
| 33 | + | |
---|
| 34 | + | My administration is available to discuss any questions you may have regarding the proposed |
---|
| 35 | + | contract modifications. In order to facilitate a response to any questions you may have, please have |
---|
| 36 | + | your staff contact Marc Scott, Chief Operating Officer, Office of Contracting and Procurement, at |
---|
| 37 | + | (202) 724-8759. |
---|
| 38 | + | |
---|
| 39 | + | I urge the Council to take prompt and favorable action on the enclosed legislation. |
---|
| 40 | + | |
---|
| 41 | + | Sincerely, |
---|
| 42 | + | |
---|
| 43 | + | |
---|
| 44 | + | |
---|
| 45 | + | Muriel Bowser 1 |
---|
| 46 | + | 2 |
---|
| 47 | + | 3 |
---|
| 48 | + | 4 |
---|
| 49 | + | 5 |
---|
| 50 | + | 6 |
---|
| 51 | + | 7 |
---|
| 52 | + | 8 |
---|
| 53 | + | 9 |
---|
| 54 | + | 10 |
---|
| 55 | + | 11 |
---|
| 56 | + | 12 |
---|
| 57 | + | 13 |
---|
| 58 | + | 14 |
---|
| 59 | + | 15 |
---|
| 60 | + | 16 |
---|
| 61 | + | 17 |
---|
| 62 | + | 18 |
---|
| 63 | + | 19 |
---|
| 64 | + | 20 |
---|
| 65 | + | 21 |
---|
| 66 | + | 22 |
---|
| 67 | + | 23 |
---|
| 68 | + | 24 |
---|
| 69 | + | 25 |
---|
| 70 | + | 26 |
---|
| 71 | + | 27 |
---|
| 72 | + | 28 |
---|
| 73 | + | 29 |
---|
| 74 | + | 30 |
---|
| 75 | + | 31 |
---|
| 76 | + | 32 |
---|
| 77 | + | 33 |
---|
| 78 | + | ~ |
---|
| 79 | + | at the request of the Mayor |
---|
| 80 | + | A BILL |
---|
| 81 | + | IN THE COUNCIL |
---|
| 82 | + | OF THE DISTRICT OF COLUMBIA |
---|
| 83 | + | To approve, on |
---|
| 84 | + | an emergency basis, Modification Nos. 7, 9, and 13 to Contract No. CW108950 |
---|
| 85 | + | with Stormwater Maintenance, LLC, and to authorize payment for the goods and services |
---|
| 86 | + | received and to be received under the modifications. |
---|
| 87 | + | BE IT ENACTED BY THE COUNCIL |
---|
| 88 | + | OF THE DISTRICT OF COLUMBIA, That this |
---|
| 89 | + | act may be cited |
---|
| 90 | + | as the "Modification Nos. 7, 9, and 13 to Contract No. CW108950 with |
---|
| 91 | + | Stormwater Maintenance, LLC Approval and Payment Authorization Emergency Act |
---|
| 92 | + | of 2025". |
---|
| 93 | + | Sec. 2. Pursuant to section |
---|
| 94 | + | 451 of the District of Columbia Home Rule Act, approved |
---|
| 95 | + | December 24, 1973 (87 Stat. 803; D.C. Official |
---|
| 96 | + | Code§ 1-204.51), and notwithstanding the |
---|
| 97 | + | requirements |
---|
| 98 | + | of section 202 of the Procurement Practices Reform Act of 2010, effective April 8, |
---|
| 99 | + | 2011 (D.C. Law 18-371; D.C. Official Code§ 2-352.02), the Council approves Modification |
---|
| 100 | + | Nos. 7, |
---|
| 101 | + | 9, and 13 to Contract No. CW108950 with Stormwater Maintenance, LLC, and |
---|
| 102 | + | authorizes payment |
---|
| 103 | + | in the not-to-exceed amount of $6,429,579.11 for the goods and services |
---|
| 104 | + | received and |
---|
| 105 | + | to be received under the modifications. |
---|
| 106 | + | Sec. 3. Fiscal impact statement. |
---|
| 107 | + | The Council adopts the fiscal impact statement provided by the Chief Fi9ancial Officer |
---|
| 108 | + | as |
---|
| 109 | + | the fiscal impact statement required by section 4a of the General Legislative Procedures Act of |
---|
| 110 | + | 1975, approved October 16, 2006 (120 Stat. 2038; D.C. Official Code§ 1-301.47a). 2 |
---|
| 111 | + | Sec. 4. Effective date. 34 |
---|
| 112 | + | This act shall take effect following approval by the Mayor (or in the event of veto by the 35 |
---|
| 113 | + | Mayor, action by the Council to override the veto), and shall remain in effect for no longer than 36 |
---|
| 114 | + | 90 days, as provided for emergency acts of the Council of the District of Columbia in section 37 |
---|
| 115 | + | 412(a) of the District of Columbia Home Rule Act, approved December 24, 1973 (87 Stat. 788; 38 |
---|
| 116 | + | D.C. Official Code § 1- 204.12(a)). 39 1 |
---|
| 117 | + | |
---|
| 118 | + | GOVERNMENT OF THE DISTRICT OF COLUMBIA |
---|
| 119 | + | Office of Contracting and Procurement |
---|
| 120 | + | |
---|
| 121 | + | |
---|
| 122 | + | |
---|
| 123 | + | |
---|
| 124 | + | Pursuant to section 202(c-1) of the Procurement Practices Reform Act of 2010, as amended, D.C. |
---|
| 125 | + | Official Code § 2-352.02(c-1), the following contract summary is provided : |
---|
| 126 | + | |
---|
| 127 | + | COUNCIL CONTRACT SUMMARY |
---|
| 128 | + | (Tipping) |
---|
| 129 | + | |
---|
| 130 | + | |
---|
| 131 | + | |
---|
| 132 | + | (A) Contract Number: CW108950 |
---|
| 133 | + | |
---|
| 134 | + | Proposed Contractor: |
---|
| 135 | + | Stormwater Maintenance, LLC |
---|
| 136 | + | |
---|
| 137 | + | Proposed Contractor’s Principals: Jennifer Rauhofer, PE |
---|
| 138 | + | President |
---|
| 139 | + | |
---|
| 140 | + | |
---|
| 141 | + | Contract Amount: Not-to-Exceed $6,429,579.11 |
---|
| 142 | + | |
---|
| 143 | + | Unit and Method of Compensation: Fixed Price |
---|
| 144 | + | |
---|
| 145 | + | Term of Contract: August 14, 2024, through August 13, 2025 |
---|
| 146 | + | |
---|
| 147 | + | Type of Contract: Indefinite Delivery/Indefinite Quantity (IDIQ) |
---|
| 148 | + | |
---|
| 149 | + | Source Selection Method: Cooperative Agreement |
---|
| 150 | + | |
---|
| 151 | + | (B) For a contract containing option periods, the contract amount for the base period and for each |
---|
| 152 | + | option period. If the contract amount for one or more of the option periods differs from the |
---|
| 153 | + | amount for the base period, provide an explanation of the reason for the difference: |
---|
| 154 | + | |
---|
| 155 | + | Base Period Amount: Not-to-Exceed $6,412,783.57 |
---|
| 156 | + | Council Approval: CA25-0683 |
---|
| 157 | + | |
---|
| 158 | + | Option Period 1 Amount: Not-to-Exceed $6,429,579.11 |
---|
| 159 | + | Explanation of difference from base period (if applicable): |
---|
| 160 | + | Increase in prices for option year of underlying agreement. |
---|
| 161 | + | |
---|
| 162 | + | 2 |
---|
| 163 | + | |
---|
| 164 | + | (C) The goods or services to be provided, the methods of delivering goods or services, and any |
---|
| 165 | + | significant program changes reflected in the proposed contract: |
---|
| 166 | + | |
---|
| 167 | + | The Office of Contracting and Procurement, on behalf of the Department of Energy and Environment |
---|
| 168 | + | (DOEE) awarded Stormwater Maintenance, LLC, Contract No. CW108950 to perform assessments, |
---|
| 169 | + | routine restorative and reconstructive maintenance on just over 3,000 District- owned and installed |
---|
| 170 | + | Green Stormwater Infrastructure (GSI) assets to keep them in good working order per the 2020 |
---|
| 171 | + | Stormwater Management Guidebook. The contractor provides maintenance reports including detailed |
---|
| 172 | + | information for tracking, invoicing and reporting to the Self-Inspection Self-Reporting (SISR). |
---|
| 173 | + | Reports will list activities performed, hours of staff time billed, and quantity of materials used during |
---|
| 174 | + | the maintenance of the GSI. |
---|
| 175 | + | |
---|
| 176 | + | (D) The selection process, including the number of offerors, the evaluation criteria, and the |
---|
| 177 | + | evaluation results, including price, technical or quality, and past performance components: |
---|
| 178 | + | |
---|
| 179 | + | The agency’s requirements were procured utilizing the cooperative agreement procurement method. |
---|
| 180 | + | The cooperative agreement is with Howard County, Maryland; Contract Number 4400003902; |
---|
| 181 | + | awarded August 25, 2019; and has one option period remaining ending August 24, 2025. |
---|
| 182 | + | |
---|
| 183 | + | (E) A description of any bid protest related to the award of the contract, including whether the |
---|
| 184 | + | protest was resolved through litigation, withdrawal of the protest by the protestor, or voluntary |
---|
| 185 | + | corrective action by the District. I nclude the identity of the protestor, the grounds alleged in |
---|
| 186 | + | the protest, and any deficiencies identified by the District as a result of the protest: |
---|
| 187 | + | |
---|
| 188 | + | There was no protest. |
---|
| 189 | + | |
---|
| 190 | + | (F) A description of any other contracts the proposed contractor is currently seeking or holds |
---|
| 191 | + | with the District: |
---|
| 192 | + | |
---|
| 193 | + | Stormwater Maintenance, LLC, has a contract with the Government of the District of Columbia on |
---|
| 194 | + | behalf of DOEE, CW108394, FY23 Hickey Run |
---|
| 195 | + | best management practice (BMP”) for maintenance |
---|
| 196 | + | for Stormwater best management practice in northeast Washington. |
---|
| 197 | + | |
---|
| 198 | + | (G) The background and qualifications of the proposed contractor, including its organization , |
---|
| 199 | + | financial stability, personnel, and performance on past or current government or private sector |
---|
| 200 | + | contracts with requirements similar to those of the proposed contrac t: |
---|
| 201 | + | |
---|
| 202 | + | With over twenty- two years of experience and a diverse team of experts, Stormwater Maintenance, |
---|
| 203 | + | LLC, is an Industry Leader providing stormwater infrastructure services including Construction, |
---|
| 204 | + | Engineering, Maintaining Streams, Pond and BMP Maintenance, Inspections, Surveying and |
---|
| 205 | + | Underground Maintenance. Stormwater Maintenance, LLC, is also a Women Owned Business |
---|
| 206 | + | Enterprise (DBE/WBE) in numerous municipalities. |
---|
| 207 | + | |
---|
| 208 | + | Stormwater Maintenance, LLC, has an a verage rating score of 4.25 out of 8 within the District’s |
---|
| 209 | + | Contractor Performance Evaluation System (CPES) submitted by previous and current District |
---|
| 210 | + | Contract Administrators. For the Base Year of current contract CW108950, the Contractor 3 |
---|
| 211 | + | |
---|
| 212 | + | Administrator rated a score of 3.7 out of 5, confirming the contractor’s ability to successfully meet |
---|
| 213 | + | the agency’s requirements. |
---|
| 214 | + | |
---|
| 215 | + | (H) The period of performance associated with the proposed change, including date as of which the |
---|
| 216 | + | proposed change is to be made effective: |
---|
| 217 | + | |
---|
| 218 | + | August 14, 2024, through August 13, 2025 |
---|
| 219 | + | |
---|
| 220 | + | (I) The value of any work or services performed pursuant to a proposed change for which the |
---|
| 221 | + | Council has not provided approval, disaggregated by each proposed change if more than one |
---|
| 222 | + | proposed change has been aggregated for Council review: |
---|
| 223 | + | |
---|
| 224 | + | $989,994.76. |
---|
| 225 | + | |
---|
| 226 | + | (J) The aggregate dollar value of the proposed changes as compared with the amount of the |
---|
| 227 | + | contract as awarded: |
---|
| 228 | + | |
---|
| 229 | + | Total ceiling amount for Option Period One is Not -to-Exceed $6,429,579.11. |
---|
| 230 | + | |
---|
| 231 | + | (K) The date on which the contracting officer was notified of the proposed change: |
---|
| 232 | + | |
---|
| 233 | + | August 12, 2024 |
---|
| 234 | + | |
---|
| 235 | + | (L) The reason why the proposed change was sent to Council for approval after it is intended to |
---|
| 236 | + | take effect: |
---|
| 237 | + | |
---|
| 238 | + | The option year for the requirements contract was exercised in order to issue a task order for the |
---|
| 239 | + | purpose of continuing assessments, routine, restorative, and reconstructive maintenance on |
---|
| 240 | + | approximately 3,000 Green Stormwater Infrastructure (GSI) assets that are owned and installed by |
---|
| 241 | + | the District. This is necessary to ensure that GSI is in good working order in accordance with the |
---|
| 242 | + | 2020 Stormwater Management Guidebook. The option's transmittal was delayed prior to submission |
---|
| 243 | + | due to the completion of fundin g and compliances. |
---|
| 244 | + | |
---|
| 245 | + | (M) The reason for the proposed change: |
---|
| 246 | + | |
---|
| 247 | + | The Department of Energy and Environment has a critical need to continue the required services to |
---|
| 248 | + | maintain compliance with the 2020 Stormwater Management Guidebook. |
---|
| 249 | + | |
---|
| 250 | + | (N) The legal, regulatory, or contractual authority for the proposed change: |
---|
| 251 | + | |
---|
| 252 | + | 27 DCMR § 3601.2 |
---|
| 253 | + | |
---|
| 254 | + | |
---|
| 255 | + | |
---|
| 256 | + | 4 |
---|
| 257 | + | |
---|
| 258 | + | (O) A certification that the proposed contractor has been determined not to violate section 334a of |
---|
| 259 | + | the Board of Ethics and Government Accountability Establishment and Comprehensive Ethics |
---|
| 260 | + | Reform Amendment Act of 2011, D.C. Official Code § 1- 1163.34a; and (2) A certification from |
---|
| 261 | + | the proposed contractor that it currently is not and will not be in violation of section 334a of |
---|
| 262 | + | the Board of Ethics and Government Accountability Establishment and Comprehensive Ethics |
---|
| 263 | + | Reform Amendment Act of 2011, D.C. Official Code § 1- 1163.34a: |
---|
| 264 | + | |
---|
| 265 | + | Stormwater Maintenance, LLC, has certified in its B idder/Offeror certification dated June 25, 2024, |
---|
| 266 | + | that it currently is not in violat ion and will not be in violation of section 334a of the Board of Ethics |
---|
| 267 | + | and Government Accountability Establishment and Comprehensive Ethics Reform Amendment Act |
---|
| 268 | + | of 2011, D.C. Official Code § 1- 1163.34a. |
---|
| 269 | + | |
---|
| 270 | + | (P) A summary of the subcontracting plan required under section 2346 of the Small, Local, and |
---|
| 271 | + | Disadvantaged Business Enterprise Development and Assistance Act of 2005, as amended , D.C. |
---|
| 272 | + | Official Code § 2-218.01 et seq. (“Act”), including a certification that the subcontracting plan |
---|
| 273 | + | meets the minimum requirements of the Act and the dollar volume of the portion of the contract |
---|
| 274 | + | to be subcontracted, expressed both in total dollars and as a percentage of the total contract |
---|
| 275 | + | amount: |
---|
| 276 | + | |
---|
| 277 | + | A subcontracting plan is not required. |
---|
| 278 | + | |
---|
| 279 | + | (Q) Performance standards and the expected outcome of the proposed contract: |
---|
| 280 | + | |
---|
| 281 | + | The expected outcome of the proposed contract are assessments, routine restorative and |
---|
| 282 | + | reconstructive maintenance on just over 3,000 District-owned and installed Green Stormwater |
---|
| 283 | + | Infrastructure (GSI) assets; and maintenance reports including detailed information for tracking, |
---|
| 284 | + | invoicing and reporting to the Self-Inspection Self-Reporting (SISR). |
---|
| 285 | + | |
---|
| 286 | + | (R) The amount and date of any expenditure of funds by the District pursuant to the contract prior |
---|
| 287 | + | to its submission to the Council for approval: |
---|
| 288 | + | |
---|
| 289 | + | August 09, 2024 - $574,819.00 (Task Order #2) |
---|
| 290 | + | October 04, 2024 - $415,175.76 (Task Order #3) |
---|
| 291 | + | |
---|
| 292 | + | (S) A certification that the proposed contract is within the appropriated budget authority for the |
---|
| 293 | + | agency for the fiscal year and is consistent with the financial plan and budget adopted in |
---|
| 294 | + | accordance with D.C. Official Code §§ 47- 392.01 and 47- 392.02: |
---|
| 295 | + | |
---|
| 296 | + | The Agency Fiscal Officer on January 8, 2025, confirmed funding in the amount of $2,755,000 i s |
---|
| 297 | + | currently available for the procurement of Green Stormwater Infrastructure Maintenance for Contract |
---|
| 298 | + | No. CW108950. The ceiling amount for Option Period One contract requirements is not to exceed |
---|
| 299 | + | $6,429,579.11. |
---|
| 300 | + | |
---|
| 301 | + | (T) A certification that the contract is legally sufficient, including whether the proposed contractor |
---|
| 302 | + | has any pending legal claims against the District: 5 |
---|
| 303 | + | |
---|
| 304 | + | The Office of the Attorney General has reviewed and approved the proposed contract for legal |
---|
| 305 | + | sufficiency. The proposed contractor has no pending legal claims against the District. |
---|
| 306 | + | |
---|
| 307 | + | (U) A certification that the Citywide Clean Hands database indicates that the proposed contractor |
---|
| 308 | + | is current with its District taxes. If the Citywide Clean Hands Database indicates that the |
---|
| 309 | + | proposed contractor is not current with its District taxes, either: (1) a certification that the |
---|
| 310 | + | contractor has worked out and is current with a payment schedule approved by the District; or |
---|
| 311 | + | (2) a certification that the contractor will be current with its District taxes after the District |
---|
| 312 | + | recovers any outstanding debt as provided under D.C. Official Code § 2 -353.01(b): |
---|
| 313 | + | |
---|
| 314 | + | DC Clean Hands certification verification issued by the Office of the Chief Financial Officer, Office |
---|
| 315 | + | of Tax and Revenue was made on January 10, 2025, confirming Stormwater Maintenance , LLC, has |
---|
| 316 | + | no outstanding debt with the District. |
---|
| 317 | + | |
---|
| 318 | + | (V) A certification from the proposed contractor that it is current with its federal taxes, or has |
---|
| 319 | + | worked out and is current with a payment schedule approved by the federal government: |
---|
| 320 | + | |
---|
| 321 | + | Stormwater Maintenance, LLC, has provided DC Clean Hand and Bidder Offeror certificate |
---|
| 322 | + | confirming clearance with current federal taxes. |
---|
| 323 | + | |
---|
| 324 | + | (W) The status of the proposed contractor as a certified local, small, or disadvantaged business |
---|
| 325 | + | enterprise as defined in the Small, Local, and Disadvantaged Business Enterprise Development |
---|
| 326 | + | and Assistance Act of 2005, as amended, D.C. Official Code § 2- 218.01 et seq .: |
---|
| 327 | + | |
---|
| 328 | + | Stormwater Maintenance, LLC, is not certified as a CBE with the Department of Small and Local |
---|
| 329 | + | Business Development (DSLBD). |
---|
| 330 | + | |
---|
| 331 | + | (X) Other aspects of the proposed contract that the Chief Procurement Officer considers |
---|
| 332 | + | significant: |
---|
| 333 | + | |
---|
| 334 | + | None |
---|
| 335 | + | |
---|
| 336 | + | (Y) A statement indicating whether the proposed contractor is currently debarred from providing |
---|
| 337 | + | services or goods to the District or federal government, the dates of the debarment, and the |
---|
| 338 | + | reasons for debarment: |
---|
| 339 | + | |
---|
| 340 | + | Based upon the DC Clean Hands and SAMs report dated January 10, 2025, Stormwater Maintenance, |
---|
| 341 | + | LLC, is not debarred from providing goods or services to the District or Federal government. |
---|
| 342 | + | |
---|
| 343 | + | (Z) Any determination and findings issues relating to the contract’s formation, including any |
---|
| 344 | + | determination and findings made under D.C. Official Code § 2-352.05 (privatization contracts): |
---|
| 345 | + | |
---|
| 346 | + | CW108950 – OP1 Determination and Findings for Responsibility |
---|
| 347 | + | CW108950 – OP1 Determination and Findings for Price Reasonableness |
---|
| 348 | + | CW108950 – OP1 Determination and Findings for Use of Cooperative Agreement with Howard |
---|
| 349 | + | County, Maryland 6 |
---|
| 350 | + | |
---|
| 351 | + | |
---|
| 352 | + | (AA) Was the contract, and any amendments or modifications, if executed, will be made available |
---|
| 353 | + | online: |
---|
| 354 | + | |
---|
| 355 | + | The executed contract and all modifications were made available online at Contracts and Procurement |
---|
| 356 | + | Transparency Portal (dc.gov). |
---|
| 357 | + | (BB) Was the original solicitation, and any amendments or modifications, made available online: The original solicitation, and all amendments, was not made available online because it is a Cooperative Agreement with Howard County, Maryland. 1101 4 |
---|
| 358 | + | th |
---|
| 359 | + | Street, SW |
---|
| 360 | + | Washington, DC 20024 |
---|
| 361 | + | Date of Notice:January 10, 2025 L0013120332Notice Number: |
---|
| 362 | + | FEIN: **-***3017 |
---|
| 363 | + | Case ID: 18435638 |
---|
| 364 | + | |
---|
| 365 | + | Government of the District of Columbia |
---|
| 366 | + | Office of the Chief Financial Officer |
---|
| 367 | + | Office of Tax and Revenue |
---|
| 368 | + | STORMWATER MAINTENANCE, LLC |
---|
| 369 | + | 913 RIDGEBROOK RD STE 302 |
---|
| 370 | + | SPARKS MD 21152-9457 |
---|
| 371 | + | |
---|
| 372 | + | Branch Chief, Collection and Enforcement Administration |
---|
| 373 | + | Authorized By Melinda Jenkins |
---|
| 374 | + | To validate this certificate, please visit MyTax.DC.gov. On the MyTax DC homepage, click the |
---|
| 375 | + | “Validate a Certificate of Clean Hands” hyperlink under the Clean Hands section. |
---|
| 376 | + | CERTIFICATE OF CLEAN HANDS |
---|
| 377 | + | As reported in the Clean Hands system, the above referenced individual/entity has no outstanding |
---|
| 378 | + | liability with the District of Columbia Office of Tax and Revenue or the Department of Employment |
---|
| 379 | + | Services. As of the date above, the individual/entity has complied with DC Code § 47-2862, therefore |
---|
| 380 | + | this Certificate of Clean Hands is issued. |
---|
| 381 | + | TITLE 47. TAXATION, LICENSING, PERMITS, ASSESSMENTS, AND FEES |
---|
| 382 | + | CHAPTER 28 GENERAL LICENSE |
---|
| 383 | + | SUBCHAPTER II. CLEAN HANDS BEFORE RECEIVING A LICENSE OR PERMIT |
---|
| 384 | + | D.C. CODE § 47-2862 (2006) |
---|
| 385 | + | § 47-2862 PROHIBITION AGAINST ISSUANCE OF LICENSE OR PERMIT |
---|
| 386 | + | 1101 4th Street SW, Suite W270, Washington, DC 20024/Phone: (202) 724-5045/MyTax.DC.gov |
---|
| 387 | + | |
---|
| 388 | + | |
---|
| 389 | + | COPY GOVERNMENT OF THE DISTRICT OF COLUMBIA |
---|
| 390 | + | Department of Energy and Environment |
---|
| 391 | + | 1200 First Street NE, 5th Floor, Washington, DC 20002 | (202) 535- |
---|
| 392 | + | 2600 | doee.dc.gov |
---|
| 393 | + | MEMORANDUM |
---|
| 394 | + | TO: Nancy Hapeman, Chief Procurement Officer |
---|
| 395 | + | O |
---|
| 396 | + | ffice of Contracting and Procurement |
---|
| 397 | + | FROM: Lazaro Dela Cruz, Agency Fiscal Officer |
---|
| 398 | + | Department of Energy and Environment |
---|
| 399 | + | DATE: January 8, 2025 |
---|
| 400 | + | SUBJECT: Certification of Funding for the Maintenance of Green Stormwater Infrastructure |
---|
| 401 | + | This memorandum certifies that the Department of Energy and Environment has sufficient |
---|
| 402 | + | funding in Fiscal Year 2025 (FY25) for the procurement of Green Stormwater |
---|
| 403 | + | Infrastructure |
---|
| 404 | + | Maintenance via Contract # CW108950 in the amount of $2,755,000. Funding for option year |
---|
| 405 | + | one will be $3,744,994.76 (FY24 ARPA funds $415,175.76 and FY24 stormwater funds $574,819.00). The requirements contract's ceiling for option year one is not to exceed |
---|
| 406 | + | $6,429,579.11. |
---|
| 407 | + | Budget authority has been established and the funds are immediately available from the funding |
---|
| 408 | + | source below: |
---|
| 409 | + | If you have any questions, please contact me at (202) 535-2512 or Lazaro.delacruz@dc.gov. |
---|
| 410 | + | Agen |
---|
| 411 | + | cy |
---|
| 412 | + | Amount Fund ProgramCost |
---|
| 413 | + | Center |
---|
| 414 | + | Account Project Task & |
---|
| 415 | + | Sub Task |
---|
| 416 | + | Award Inter |
---|
| 417 | + | Fund |
---|
| 418 | + | KG0 $2,755,000.00 1010001 600078 60078 7132001 0 0 0 0000000 |
---|
| 419 | + | Total $2,755,000 |
---|
| 420 | + | *Note: the total amount of $2,755,000 has |
---|
| 421 | + | been |
---|
| 422 | + | encumbered on RK292803. |
---|
| 423 | + | Jessica Howard for Lazaro dela Cruz Jessica Howard 1/9/2025 1350 Pennsylvania Avenue, N.W., Suite 409, Washington, D.C. 20004 Phone (202) 7 35-7589 Email: |
---|
| 424 | + | benjamin.moskowitz1@dc.gov |
---|
| 425 | + | GOVERNMENT OF THE DISTRICT OF COLUMBIA |
---|
| 426 | + | OFFICE OF THE ATTORNEY GENERAL |
---|
| 427 | + | Legal Counsel Division |
---|
| 428 | + | MEMORANDUM |
---|
| 429 | + | TO: |
---|
| 430 | + | FROM: |
---|
| 431 | + | DATE: |
---|
| 432 | + | RE: |
---|
| 433 | + | Tomás Talamante |
---|
| 434 | + | Director |
---|
| 435 | + | Office of Policy and Legislative Affairs |
---|
| 436 | + | B |
---|
| 437 | + | en Moskowitz |
---|
| 438 | + | Acting Deputy Attorney General |
---|
| 439 | + | Legal Counsel Division |
---|
| 440 | + | January 24, 2025 |
---|
| 441 | + | Legal |
---|
| 442 | + | Sufficiency R eview of the “Modifications to Contract No. CW108950 with |
---|
| 443 | + | Stormwater Maintenance, LLC Approval and Payment Authorization Emergency |
---|
| 444 | + | Act of 2025” and Accompanying Declaration Resolution |
---|
| 445 | + | ( |
---|
| 446 | + | AE-25-001 B) |
---|
| 447 | + | _____________________________________________________________________________________ |
---|
| 448 | + | This is to Certify that the Office of the Attorney General has reviewed the |
---|
| 449 | + | above-referenced legislation and determined that it is legally sufficient. If you have any questions, |
---|
| 450 | + | please do not hesitate to call me at (202) 735-7589. |
---|
| 451 | + | |
---|
| 452 | + | _________________________________ |
---|
| 453 | + | B |
---|
| 454 | + | en Moskowitz MODIFICATION OF CONTRACT |
---|
| 455 | + | 1. Contract Number |
---|
| 456 | + | CW108950 |
---|
| 457 | + | Page of Pages |
---|
| 458 | + | 1 2 |
---|
| 459 | + | 2. Amendment/Modification Number |
---|
| 460 | + | M0007 |
---|
| 461 | + | 3. Effective Date |
---|
| 462 | + | August 14, 2024 |
---|
| 463 | + | 4. Requisition/Purchase Request No. 5. Solicitation Caption |
---|
| 464 | + | FY23 Green Stormwater |
---|
| 465 | + | Infrastructure Maintenance |
---|
| 466 | + | 6. Issued by: Code |
---|
| 467 | + | Office of Contracting and Procurement |
---|
| 468 | + | Information Technology Group |
---|
| 469 | + | 441 4 |
---|
| 470 | + | th |
---|
| 471 | + | Street, Suite 330S NW |
---|
| 472 | + | Washington, DC 20001 |
---|
| 473 | + | 7. Administered by (If other than line 6) |
---|
| 474 | + | Office of Contracting and Procurement |
---|
| 475 | + | Department of Energy and Environment |
---|
| 476 | + | 1200 First Street, 5 |
---|
| 477 | + | th |
---|
| 478 | + | Floor, NE |
---|
| 479 | + | Washington, DC 20002 |
---|
| 480 | + | 8. Name and Address of Contractor (No. street, city, county, state and zip code) |
---|
| 481 | + | Stormwater Maintenance LLC 9123 Ridgebrook Rd, Suite 302 |
---|
| 482 | + | Sparks, MD 21152 |
---|
| 483 | + | 9A. Amendment of Solicitation No. |
---|
| 484 | + | 9B. Dated (See Item 11) |
---|
| 485 | + | X |
---|
| 486 | + | 10A. Modification of Contractor/Order No. |
---|
| 487 | + | CW108950/M0007 |
---|
| 488 | + | 10B. Dated (See Item 13) |
---|
| 489 | + | 08/14/2023 |
---|
| 490 | + | 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS |
---|
| 491 | + | The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended. is not extended. |
---|
| 492 | + | Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: |
---|
| 493 | + | (a) By completing Items 8 and 15 and returning copies of the amendment: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) |
---|
| 494 | + | BY separate letter or fax which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED |
---|
| 495 | + | AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR |
---|
| 496 | + | OFFER. If by virtue of this amendment you desire to change an offer already submitted, such may be made by letter or fax, provided each letter or telegram makes |
---|
| 497 | + | reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. |
---|
| 498 | + | 12. Accounting and Appropriation Data (If required): |
---|
| 499 | + | 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTORS/ORDERS, |
---|
| 500 | + | IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14 |
---|
| 501 | + | A. This change order is issued pursuant to (Specify Authority): The changes set forth in Item 14 are made in the contract/order no. in item 10A. |
---|
| 502 | + | B. The above numbered contract/order is modified to reflect the administrative changes (such as changes in paying office, appropriation data etc.) set forth in |
---|
| 503 | + | item 14, pursuant to the authority of 27 DCMR, Chapter 36, Section 3601.2. |
---|
| 504 | + | C. This supplemental agreement is entered into pursuant to authority of 27 DCMR, 3601.3 and mutual agreement of the parties |
---|
| 505 | + | X D. Other (Specify type of modification and authority) 27 DCMR, Chapter 20 Section 2008 Exercise of Options |
---|
| 506 | + | E.IMPORTANT: Contractor ☐ is not ☒ is required to sign this document and return 1 copy to the issuing office. |
---|
| 507 | + | 14.Description of Amendment/Modification (Organized by UCF Section headings, including solicitation/contract subject matter where feasible). |
---|
| 508 | + | The purpose of this modification is to: |
---|
| 509 | + | 1.End the base period on August 13, 2024. |
---|
| 510 | + | 2.Decrease Option Period One contract line item numbers (CLIN) 1001 through 1033; and 1037 through |
---|
| 511 | + | 1095 quantities to zero (0). (See Attachment A: Pricing Schedule); |
---|
| 512 | + | 3.As a result of these changes, Option Period One decreases by $2,482,964.57 from $6,412,783.57 to |
---|
| 513 | + | $3,929,819. |
---|
| 514 | + | 4.In accordance with Section F.2, Option to Extend the Term of the Contract, the Government of District of |
---|
| 515 | + | Columbia, Office of Contracting and Procurement, hereby PARTIALLY exercise Option Period One to |
---|
| 516 | + | extend the term of the contract for the period of August 14, 2024, through August 13, 2025, in the amount of $574,819.00. |
---|
| 517 | + | 5.The remaining amount $3,355,000 will be added to option year one once Council Approval is received. |
---|
| 518 | + | 15A. Name and Title of Signer (Type or print) 16A. Name of Contracting Officer |
---|
| 519 | + | Tracy Crump |
---|
| 520 | + | 15B. Name of Contractor |
---|
| 521 | + | (Signature of person authorized to sign) |
---|
| 522 | + | 15C. |
---|
| 523 | + | Date Signed |
---|
| 524 | + | 16B. |
---|
| 525 | + | (Signature o |
---|
| 526 | + | f Contracting Officer) |
---|
| 527 | + | 16C. |
---|
| 528 | + | Date Signed. |
---|
| 529 | + | 8/13/2024 CW108950/M0009: GSI Maintenance |
---|
| 530 | + | CONTRACT RECAP |
---|
| 531 | + | Base Year |
---|
| 532 | + | Letter Contract (08/14/2023) $ 900,000.00 |
---|
| 533 | + | M0001: Extend Letter Contract through 02/11/2024 $ 0.00 |
---|
| 534 | + | M0002: Add additional funding and extend Letter Contract through 02/29/2024 $ 99,000.00 |
---|
| 535 | + | M0003: Extend Letter Contract to 03/29/2024 $ 0.00 |
---|
| 536 | + | M0004: Extend Letter Contract to 04/29/2024 $ 0.00 |
---|
| 537 | + | Definitized the Contract (04/29/2024) $6,412,783.57 |
---|
| 538 | + | M0005: Definitize Contract effective 04/29/2024 and extend to 08/13/2024 $ 0.00 |
---|
| 539 | + | M0006: Extend Contract Base Year to 10/13/2024 $ 0.00 |
---|
| 540 | + | Section B.4.1 Base Year Contract Total $7,411,783.57 |
---|
| 541 | + | M0007: Option Year One –- Exercise Option (August 14, 2024, through $ 574,819.00 |
---|
| 542 | + | August 13, 2025) and add funds M0008: Administrative $ 0.00 |
---|
| 543 | + | M0009: Option Year One (Add Funds) $ 415,175.76 |
---|
| 544 | + | Section B.4.2 Option Year One Contract Total $ 989,994.76 MODIFICATION OF CONTRACT |
---|
| 545 | + | 1. Contract Number |
---|
| 546 | + | CW108950 |
---|
| 547 | + | Page of Pages |
---|
| 548 | + | 1 1 |
---|
| 549 | + | 2. Amendment/Modification Number |
---|
| 550 | + | M0009 |
---|
| 551 | + | 3. Effective Date |
---|
| 552 | + | See blk 16c |
---|
| 553 | + | 4. Requisition/Purchase Request No. |
---|
| 554 | + | RK283348-v2 |
---|
| 555 | + | 5. Solicitation Caption |
---|
| 556 | + | FY23 Green Stormwater |
---|
| 557 | + | Infrastructure (GSI) |
---|
| 558 | + | Maintenance |
---|
| 559 | + | 6. Issued by: Code |
---|
| 560 | + | Office of Contracting and Procurement |
---|
| 561 | + | Information Technology Group |
---|
| 562 | + | 441 4 |
---|
| 563 | + | th |
---|
| 564 | + | Street, Suite 330S NW Washington, |
---|
| 565 | + | DC 20001 |
---|
| 566 | + | 7. Administered by (If other than line 6) |
---|
| 567 | + | Office of Contracting and Procurement |
---|
| 568 | + | Department of Energy and Environment |
---|
| 569 | + | 1200 First Street, 5 |
---|
| 570 | + | th |
---|
| 571 | + | Floor, NE |
---|
| 572 | + | Washington, DC 20002 |
---|
| 573 | + | 8. Name and Address of Contractor (No. street, city, county, state and zip code) |
---|
| 574 | + | Stormwater Maintenance LLC 9123 Ridgebrook Rd, Suite 302 |
---|
| 575 | + | Sparks, MD 21152 |
---|
| 576 | + | 9A. Amendment of Solicitation No. |
---|
| 577 | + | 9B. Dated (See Item 11) |
---|
| 578 | + | X |
---|
| 579 | + | 10A. Modification of Contractor/Order No. |
---|
| 580 | + | CW108950/M0009 |
---|
| 581 | + | 10B. Dated (See Item 13) |
---|
| 582 | + | 08/14/2023 |
---|
| 583 | + | 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS |
---|
| 584 | + | The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended. is not extended. |
---|
| 585 | + | Offers must acknowledge receipt of thi |
---|
| 586 | + | s amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15 and returning copies of the amendment: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) |
---|
| 587 | + | BY separate letter or fax which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT |
---|
| 588 | + | THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR |
---|
| 589 | + | OFFER. If by virtue of this amendment you desire to change an offer already submitted, such may be made by letter or fax, provided each letter or telegram makes |
---|
| 590 | + | reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. |
---|
| 591 | + | 12. Accounting and Appropriation Data (If required): |
---|
| 592 | + | 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTORS/ORDERS, IT |
---|
| 593 | + | MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14 |
---|
| 594 | + | A.This change order is issued pursuant to (Specify Authority): The changes set forth in Item 14 are made in the contract/order no. in item 10A. |
---|
| 595 | + | B. The above numbered contract/order is modified to reflect the administrative changes (such as changes in paying office, appropriation data etc.) set forth in |
---|
| 596 | + | item 14, pursuant to the authority of 27 DCMR, Chapter 36, Section 3601.2. |
---|
| 597 | + | C. This supplemental agreement is entered into pursuant to authority of 27 DCMR, 3601.3 and mutual agreement of the parties |
---|
| 598 | + | X D. Other (Specify type of modification and authority) 27 DCMR, Chapter 20 Section 2008 Exercise of Options |
---|
| 599 | + | E.IMPORTANT: Contractor ☐ is not ☒ is required to sign this document and return 1 copy to the issuing office. |
---|
| 600 | + | 14.Description of Amendment/Modification (Organized by UCF Section headings, including solicitation/contract subject matter where feasible). |
---|
| 601 | + | The purpose of thi s modification is to: |
---|
| 602 | + | 1.Increase the Option Period One ceiling in Section B.4.2 Pricing Schedule by $16,795.54 from $6,413,783.57 to not |
---|
| 603 | + | exceed the value of $6,430,579.11 (See Attachment A) due to Howard County, the party in the |
---|
| 604 | + | District’s Cooperative Agreement, exercising an option for Contract Number: 4400003902 and escalating option |
---|
| 605 | + | year pricing (see Attachment B) |
---|
| 606 | + | 2.Add funds in the amount of $415,175.76 for Task Order #2. |
---|
| 607 | + | 3.Correct the Unit of Measure from “Lot” with “Lump Sum” in Section B.4.2 Option Year One, CLIN number 1034, |
---|
| 608 | + | 1035 and 1036, (See Attachment A: Pricing Schedule); |
---|
| 609 | + | 4.Correct M0007, Section 14, Item #4, from “PARTIALLY” executed to “FULLY” executed; |
---|
| 610 | + | 5.Correct M0007. Section 14 Item #3 by Deleting in its’ entirety “As a result of these changes, Option Period One |
---|
| 611 | + | decreases by $2,482,964.57 from $6,412,783.57 to $3,929,819.” |
---|
| 612 | + | 15A. Name and Title of Signer (Type or print) 16A. Name of Contracting Officer |
---|
| 613 | + | 15B. Name of Contractor |
---|
| 614 | + | (Signature of person authorized to sign) |
---|
| 615 | + | 15C. |
---|
| 616 | + | Date Signed |
---|
| 617 | + | 16B. |
---|
| 618 | + | (Signature of Contracting Officer) |
---|
| 619 | + | 16C. |
---|
| 620 | + | Date Signed. |
---|
| 621 | + | 10/09/2024 CW108950/M0009: GSI Maintenance |
---|
| 622 | + | CONTRACT RECAP |
---|
| 623 | + | Base Year |
---|
| 624 | + | Letter Contract (08/14/2023) $ 900,000.00 |
---|
| 625 | + | M0001: Extend Letter Contract through 02/11/2024 $ 0.00 |
---|
| 626 | + | M0002: Add additional funding and extend Letter Contract through 02/29/2024 $ 99,000.00 |
---|
| 627 | + | M0003: Extend Letter Contract to 03/29/2024 $ 0.00 |
---|
| 628 | + | M0004: Extend Letter Contract to 04/29/2024 $ 0.00 |
---|
| 629 | + | Definitized the Contract (04/29/2024) $6,412,783.57 |
---|
| 630 | + | M0005: Definitize Contract effective 04/29/2024 and extend to 08/13/2024 $ 0.00 |
---|
| 631 | + | M0006: Extend Contract Base Year to 10/13/2024 $ 0.00 |
---|
| 632 | + | Section B.4.1 Base Year Contract Total $7,411,783.57 |
---|
| 633 | + | M0007: Option Year One –- Exercise Option (August 14, 2024, through $ 574,819.00 |
---|
| 634 | + | August 13, 2025) and add funds M0008: Administrative $ 0.00 |
---|
| 635 | + | M0009: Option Year One (Add Funds) $ 415,175.76 |
---|
| 636 | + | Section B.4.2 Option Year One Contract Total $ 989,994.76 MODIFICATION OF CONTRACT |
---|
| 637 | + | 1. Contract Number |
---|
| 638 | + | C |
---|
| 639 | + | W108950 |
---|
| 640 | + | Page of Pages |
---|
| 641 | + | 1 |
---|
| 642 | + | |
---|
| 643 | + | 2 |
---|
| 644 | + | |
---|
| 645 | + | 2. Amendment/Modification Number |
---|
| 646 | + | M0013 |
---|
| 647 | + | |
---|
| 648 | + | 3. Effective Date |
---|
| 649 | + | See blk 16c |
---|
| 650 | + | 4. Requisition/Purchase Re |
---|
| 651 | + | quest No. |
---|
| 652 | + | 5. Solicitation Caption |
---|
| 653 | + | FY23 Green Stormwater |
---|
| 654 | + | |
---|
| 655 | + | I |
---|
| 656 | + | nfrastructure ( |
---|
| 657 | + | GSI) |
---|
| 658 | + | Maintenance |
---|
| 659 | + | 6. Issued by: Code |
---|
| 660 | + | Office of Contracting and Procurement |
---|
| 661 | + | Information Technology Group |
---|
| 662 | + | 441 4 |
---|
| 663 | + | th |
---|
| 664 | + | Street, Suite 330S NW |
---|
| 665 | + | Washington, DC 20001 |
---|
| 666 | + | 7. Administered by (If other than li |
---|
| 667 | + | 6) |
---|
| 668 | + | Office of Contracting and Procurement |
---|
| 669 | + | Department of Energy an |
---|
| 670 | + | Environment |
---|
| 671 | + | 1200 First Street, 5 |
---|
| 672 | + | th |
---|
| 673 | + | Floor, NE |
---|
| 674 | + | Washington, DC 20002 |
---|
| 675 | + | 8. Name and Address of Contractor (No. street, ci |
---|
| 676 | + | county, st and zip code) |
---|
| 677 | + | Stormwater Maintenance LLC |
---|
| 678 | + | 913 Ridgebrook Rd, Suite 302 |
---|
| 679 | + | Sparks, MD 21152 |
---|
| 680 | + | 9A. Amendment of Solicitation No |
---|
| 681 | + | . |
---|
| 682 | + | 9B. Dated (See Item 11) |
---|
| 683 | + | X |
---|
| 684 | + | 10A. Modification of Contractor/Order No. |
---|
| 685 | + | C |
---|
| 686 | + | W108950/M0008 |
---|
| 687 | + | 10B. Dated (See Item 13) |
---|
| 688 | + | 0 |
---|
| 689 | + | 8/14/2023 |
---|
| 690 | + | 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS |
---|
| 691 | + | The above numbered solicitation is amended a s set forth in item 14. The hour and date specified for receipt of Offers is extended. is not extended. |
---|
| 692 | + | Offers must acknowledge receipt of this amendment p rior to the hour and date specified in the solicitation or as amended, by one of |
---|
| 693 | + | the following methods: |
---|
| 694 | + | (a) By completing Items 8 an d 15 |
---|
| 695 | + | and returning c opies of the amendment: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) |
---|
| 696 | + | BY separate letter or fax which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED |
---|
| 697 | + | AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR |
---|
| 698 | + | OFFER. If by virtue of th |
---|
| 699 | + | amendment you desire to change an offer already submitted, such may be made by letter or fax, provided each le tter or telegram makes |
---|
| 700 | + | reference to the s |
---|
| 701 | + | and this amendment, and is received prior to the opening hour and date specified. |
---|
| 702 | + | 12. Accounting and Appropriation Data (If required): |
---|
| 703 | + | 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTORS/ORDERS, |
---|
| 704 | + | IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14 |
---|
| 705 | + | A. This change ord |
---|
| 706 | + | er is issued pursuant to (Specify Authority): The changes set forth in Item 14 are made in the contract/order no. in item 10A. |
---|
| 707 | + | X |
---|
| 708 | + | B.The above numbered contract/order is modified to reflect the administrative changes (such as changes in paying office, appropriation data etc.) set forth in |
---|
| 709 | + | item 14, pursuant to the authority o |
---|
| 710 | + | f 27 DCMR, C hapter 36, Section 3 601. 2. |
---|
| 711 | + | C. This supplemental agreement is entered into pursuant t o authority of |
---|
| 712 | + | 27 DCMR, 3601.3 and mutual agreement of the parties |
---|
| 713 | + | D. Other (Specify type of modification and authority) 27 DCMR, Chapter 20 |
---|
| 714 | + | Section 2 008 Exercise of Options |
---|
| 715 | + | E.IMPORTANT: Contractor ☐ is not ☒ is required to sign th |
---|
| 716 | + | document and return |
---|
| 717 | + | 1 copy to the issuing office. |
---|
| 718 | + | 14. Description of Amendment/Modification (O |
---|
| 719 | + | rganized by UCF Se headings, including solicitation/contract subject matter where feasible). |
---|
| 720 | + | The purpose of this modification is to: |
---|
| 721 | + | 1.Rescind modification 0006, 0007, 0008, 0009, 0011 and 0012 and replace with modification 0013 |
---|
| 722 | + | 2.Withdraw unexecuted modification 0010 |
---|
| 723 | + | 3.Increase option Period One pricing by $16,795.54 from 6,412,783.57 to $6,429,579.11 due to Howard |
---|
| 724 | + | County, the party in the District’s Cooperative Agreement, exercising an option for Contract Number: |
---|
| 725 | + | 4400003902 and escalating option year (see attachment A). |
---|
| 726 | + | 4.Fully exercise option period one, period of performance August 14, 2024, through August 13, 2025, for |
---|
| 727 | + | the full NTE amount of $6,429,579.11. |
---|
| 728 | + | 5.Verify that the contractor’s address of record is 913 Ridgebrook Rd, Suite 30 |
---|
| 729 | + | 2 Sparks, MD 2 1152 |
---|
| 730 | + | 15A. Name and Title of Signer (Type or print) 16A. Name of Contracting Officer |
---|
| 731 | + | Tracy Crump |
---|
| 732 | + | 15B. Name of Contractor |
---|
| 733 | + | (Signature of person authorized to sign) |
---|
| 734 | + | 15C. |
---|
| 735 | + | Date Signed |
---|
| 736 | + | 16B. |
---|
| 737 | + | (Signature of Contracting Officer) |
---|
| 738 | + | 16C. |
---|
| 739 | + | Date Signed. CONTRACT RECAP |
---|
| 740 | + | $ 900,000.00 |
---|
| 741 | + | $ 0.00 |
---|
| 742 | + | $ 99,000.00 |
---|
| 743 | + | $ 0.00 |
---|
| 744 | + | $ 0.00 |
---|
| 745 | + | $6,412,783.57 |
---|
| 746 | + | $ 0.00 |
---|
| 747 | + | $3,894,435.32 |
---|
| 748 | + | Base Year |
---|
| 749 | + | Letter Contract (08/14/2023) |
---|
| 750 | + | M0001: Extend Letter Contract through 02/11/2024 |
---|
| 751 | + | M0002: Add additional funding and extend Letter Contract through 02/29/2024 |
---|
| 752 | + | M0003: Extend Letter Contract to 03/29/2024 |
---|
| 753 | + | M0004: Extend L etter Contract to 04/29/2024 |
---|
| 754 | + | Definitized the Contract (04/29/2024) |
---|
| 755 | + | M0005: |
---|
| 756 | + | Definitize Contract effective 04/29/2024 and extend to 08/13/2024 |
---|
| 757 | + | Task Order T001 : Executed 05/06/2024 |
---|
| 758 | + | M0006: RESCIND |
---|
| 759 | + | $ 0.00 |
---|
| 760 | + | Section B.4.1 Base Year Cumulative Contract Total $4,690,328.84 |
---|
| 761 | + | Not-to-Exceed $6,412,783.57 |
---|
| 762 | + | Option Yer One – Period of Performance August 14, 2024, through August 13, 2025 |
---|
| 763 | + | M0007: RESCIND |
---|
| 764 | + | M0008: RESCIND |
---|
| 765 | + | M0009: RESCIND |
---|
| 766 | + | M0010: RESCIND |
---|
| 767 | + | M0011: RESCIND |
---|
| 768 | + | M0012: RESCIND |
---|
| 769 | + | M0013: Administrative NTE |
---|
| 770 | + | |
---|
| 771 | + | |
---|
| 772 | + | |
---|
| 773 | + | $6,429,579.11 |
---|
| 774 | + | Section B.4.2 Option Year One Contract Total |
---|
| 775 | + | Not-to |
---|
| 776 | + | -Exceed |
---|
| 777 | + | $3,744,994.76 |
---|
| 778 | + | |
---|
| 779 | + | $6,429,579.11 |
---|
| 780 | + | ATTACHMENTA:PricingSchedule |
---|
| 781 | + | BA2 OptionPeriodOne(August14,2024,throughAugust13,2025) |
---|