1 | 1 | | THE SENATE S.B. NO. 2689 THIRTY-FIRST LEGISLATURE, 2022 STATE OF HAWAII A BILL FOR AN ACT relating to capital improvement projects for the benefit of THE sixteenth SENATORIAL DISTRICT. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII: |
---|
2 | 2 | | |
---|
3 | 3 | | THE SENATE S.B. NO. 2689 |
---|
4 | 4 | | THIRTY-FIRST LEGISLATURE, 2022 |
---|
5 | 5 | | STATE OF HAWAII |
---|
6 | 6 | | |
---|
7 | 7 | | THE SENATE |
---|
8 | 8 | | |
---|
9 | 9 | | S.B. NO. |
---|
10 | 10 | | |
---|
11 | 11 | | 2689 |
---|
12 | 12 | | |
---|
13 | 13 | | THIRTY-FIRST LEGISLATURE, 2022 |
---|
14 | 14 | | |
---|
15 | 15 | | |
---|
16 | 16 | | |
---|
17 | 17 | | STATE OF HAWAII |
---|
18 | 18 | | |
---|
19 | 19 | | |
---|
20 | 20 | | |
---|
21 | 21 | | |
---|
22 | 22 | | |
---|
23 | 23 | | |
---|
24 | 24 | | |
---|
25 | 25 | | |
---|
26 | 26 | | |
---|
27 | 27 | | |
---|
28 | 28 | | |
---|
29 | 29 | | |
---|
30 | 30 | | |
---|
31 | 31 | | A BILL FOR AN ACT |
---|
32 | 32 | | |
---|
33 | 33 | | |
---|
34 | 34 | | |
---|
35 | 35 | | |
---|
36 | 36 | | |
---|
37 | 37 | | relating to capital improvement projects for the benefit of THE sixteenth SENATORIAL DISTRICT. |
---|
38 | 38 | | |
---|
39 | 39 | | |
---|
40 | 40 | | |
---|
41 | 41 | | |
---|
42 | 42 | | |
---|
43 | 43 | | BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII: |
---|
44 | 44 | | |
---|
45 | 45 | | |
---|
46 | 46 | | |
---|
47 | 47 | | SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $63,080,000 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2022-2023 for the purpose of capital improvement projects for the sixteenth senatorial district, as follows: 1. Aiea Elementary School A. Campus-wide covered walkways, parking lot solar canopy, and ground and site improvements. Design $40,000 Construction $1,570,00 Equipment $300,000 Total funding $1,910,000 2. Aiea High School A. New culinary facility. Design $250,000 Construction $3,150,000 Equipment $600,000 Total funding $5,000,000 B. ADA compliance upgrades for parking lot near flagpole. Plans $50,000 Design $50,000 Construction $900,000 Equipment $50,000 Total funding $1,050,000 3. Alvah Scott Elementary School A. New computer lab. Design $50,000 Construction $200,000 Equipment $150,000 Total funding $400,000 B. New kindergarten playground. Equipment $250,000 Total funding $250,000 C. Cafeteria kitchen upgrades. Equipment $500,000 Total funding $500,000 4. Highlands Intermediate School A. New water bottle refill stations. Construction $50,000 Equipment $10,000 Total funding $60,000 B. Slope stabilization project, including retaining walls, terrace, backfill and concrete. Plans $100,000 Design $100,000 Construction $2,000,000 Equipment $100,000 Total funding $2,300,000 5. Lehua Elementary School A. Construction of new administration building and library. Construction $8,000,000 Equipment $800,000 Total funding $8,800,000 B. New covered playcourt. Plans $50,000 Construction $5,000,000 Equipment $250,000 Total funding $5,300,000 6. Momilani Elementary School A. Design and conception of expansion of administration building. Plans $250,000 Design $250,000 Total funding $500,000 B. Slope stabilization and covered playcourt. Plans $350,000 Design $350,000 Construction $7,000,000 Equipment $250,000 Total funding $7,950,000 7. Pearl City High School A. Replacement of auditorium dimmer system. Plans $250,000 Design $250,000 Construction $1,000,000 Equipment $4,000,000 Total funding $5,500,000 B. Refinish audience floors in auditorium. Plans $50,000 Design $50,000 Construction $100,000 Total funding $200,000 C. Resurface tennis courts and replace appurtenances. Plans $25,000 Design $25,000 Construction $500,000 Total funding $550,000 D. F-Building renovation for two classrooms, multipurpose room, and courtyard. Plans $250,000 Design $250,000 Construction $5,000,000 Equipment $100,000 Total funding $5,600,000 E. Electrical upgrades to install split system air-conditioning at Pearl City Cultural Center. Plans $25,000 Design $25,000 Construction $500,000 Construction $100,000 Total funding $650,000 8. Pearl City Highlands Elementary School A. Construction and replacement of administration building and library. Plans $25,000 Design $25,000 Construction $7,000,000 Equipment $250,000 Total funding $7,300,000 9. Pearl Ridge Elementary School A. New playground area. Design $30,000 Construction $50,000 Equipment $100,000 Total funding $180,000 B. New eight-classroom building, ground and site improvements, and appurtenances. Design $325,000 Construction $2,155,00 Total funding $2,480,000 10. Waiau Elementary School A. Covered walkways from portables to cafeteria. Plans $50,000 Design $50,000 Construction $1,000,000 Total funding $1,100,000 11. Waimalu Elementary School A. Drainage improvements and flooring for building f and library. Design $400,000 Construction $1,600,00 Total funding $2,000,000 B. Covered playcourt. Design $500,000 Construction $3,000,000 Total funding $3,500,000 SECTION 2. The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriations are made; provided that all moneys from the appropriations that are unencumbered as of June 30, 2024, shall lapse as of that date. SECTION 3. The sums appropriated for the respective capital improvement projects set forth in section 1 shall be expended by the department of education for the purposes of this Act. SECTION 4. This Act shall take effect on July 1, 2022. INTRODUCED BY: _____________________________ |
---|
48 | 48 | | |
---|
49 | 49 | | SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $63,080,000 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2022-2023 for the purpose of capital improvement projects for the sixteenth senatorial district, as follows: |
---|
50 | 50 | | |
---|
51 | 51 | | 1. Aiea Elementary School |
---|
52 | 52 | | |
---|
53 | 53 | | A. Campus-wide covered walkways, parking lot solar canopy, and ground and site improvements. |
---|
54 | 54 | | |
---|
55 | 55 | | Design $40,000 |
---|
56 | 56 | | |
---|
57 | 57 | | Construction $1,570,00 |
---|
58 | 58 | | |
---|
59 | 59 | | Equipment $300,000 |
---|
60 | 60 | | |
---|
61 | 61 | | Total funding $1,910,000 |
---|
62 | 62 | | |
---|
63 | 63 | | 2. Aiea High School |
---|
64 | 64 | | |
---|
65 | 65 | | A. New culinary facility. |
---|
66 | 66 | | |
---|
67 | 67 | | Design $250,000 |
---|
68 | 68 | | |
---|
69 | 69 | | Construction $3,150,000 |
---|
70 | 70 | | |
---|
71 | 71 | | Equipment $600,000 |
---|
72 | 72 | | |
---|
73 | 73 | | Total funding $5,000,000 |
---|
74 | 74 | | |
---|
75 | 75 | | B. ADA compliance upgrades for parking lot near flagpole. |
---|
76 | 76 | | |
---|
77 | 77 | | Plans $50,000 |
---|
78 | 78 | | |
---|
79 | 79 | | Design $50,000 |
---|
80 | 80 | | |
---|
81 | 81 | | Construction $900,000 |
---|
82 | 82 | | |
---|
83 | 83 | | Equipment $50,000 |
---|
84 | 84 | | |
---|
85 | 85 | | Total funding $1,050,000 |
---|
86 | 86 | | |
---|
87 | 87 | | 3. Alvah Scott Elementary School |
---|
88 | 88 | | |
---|
89 | 89 | | A. New computer lab. |
---|
90 | 90 | | |
---|
91 | 91 | | Design $50,000 |
---|
92 | 92 | | |
---|
93 | 93 | | Construction $200,000 |
---|
94 | 94 | | |
---|
95 | 95 | | Equipment $150,000 |
---|
96 | 96 | | |
---|
97 | 97 | | Total funding $400,000 |
---|
98 | 98 | | |
---|
99 | 99 | | B. New kindergarten playground. |
---|
100 | 100 | | |
---|
101 | 101 | | Equipment $250,000 |
---|
102 | 102 | | |
---|
103 | 103 | | Total funding $250,000 |
---|
104 | 104 | | |
---|
105 | 105 | | C. Cafeteria kitchen upgrades. |
---|
106 | 106 | | |
---|
107 | 107 | | Equipment $500,000 |
---|
108 | 108 | | |
---|
109 | 109 | | Total funding $500,000 |
---|
110 | 110 | | |
---|
111 | 111 | | 4. Highlands Intermediate School |
---|
112 | 112 | | |
---|
113 | 113 | | A. New water bottle refill stations. |
---|
114 | 114 | | |
---|
115 | 115 | | Construction $50,000 |
---|
116 | 116 | | |
---|
117 | 117 | | Equipment $10,000 |
---|
118 | 118 | | |
---|
119 | 119 | | Total funding $60,000 |
---|
120 | 120 | | |
---|
121 | 121 | | B. Slope stabilization project, including retaining walls, terrace, backfill and concrete. |
---|
122 | 122 | | |
---|
123 | 123 | | Plans $100,000 |
---|
124 | 124 | | |
---|
125 | 125 | | Design $100,000 |
---|
126 | 126 | | |
---|
127 | 127 | | Construction $2,000,000 |
---|
128 | 128 | | |
---|
129 | 129 | | Equipment $100,000 |
---|
130 | 130 | | |
---|
131 | 131 | | Total funding $2,300,000 |
---|
132 | 132 | | |
---|
133 | 133 | | 5. Lehua Elementary School |
---|
134 | 134 | | |
---|
135 | 135 | | A. Construction of new administration building and library. |
---|
136 | 136 | | |
---|
137 | 137 | | Construction $8,000,000 |
---|
138 | 138 | | |
---|
139 | 139 | | Equipment $800,000 |
---|
140 | 140 | | |
---|
141 | 141 | | Total funding $8,800,000 |
---|
142 | 142 | | |
---|
143 | 143 | | B. New covered playcourt. |
---|
144 | 144 | | |
---|
145 | 145 | | Plans $50,000 |
---|
146 | 146 | | |
---|
147 | 147 | | Construction $5,000,000 |
---|
148 | 148 | | |
---|
149 | 149 | | Equipment $250,000 |
---|
150 | 150 | | |
---|
151 | 151 | | Total funding $5,300,000 |
---|
152 | 152 | | |
---|
153 | 153 | | 6. Momilani Elementary School |
---|
154 | 154 | | |
---|
155 | 155 | | A. Design and conception of expansion of administration building. |
---|
156 | 156 | | |
---|
157 | 157 | | Plans $250,000 |
---|
158 | 158 | | |
---|
159 | 159 | | Design $250,000 |
---|
160 | 160 | | |
---|
161 | 161 | | Total funding $500,000 |
---|
162 | 162 | | |
---|
163 | 163 | | B. Slope stabilization and covered playcourt. |
---|
164 | 164 | | |
---|
165 | 165 | | Plans $350,000 |
---|
166 | 166 | | |
---|
167 | 167 | | Design $350,000 |
---|
168 | 168 | | |
---|
169 | 169 | | Construction $7,000,000 |
---|
170 | 170 | | |
---|
171 | 171 | | Equipment $250,000 |
---|
172 | 172 | | |
---|
173 | 173 | | Total funding $7,950,000 |
---|
174 | 174 | | |
---|
175 | 175 | | 7. Pearl City High School |
---|
176 | 176 | | |
---|
177 | 177 | | A. Replacement of auditorium dimmer system. |
---|
178 | 178 | | |
---|
179 | 179 | | Plans $250,000 |
---|
180 | 180 | | |
---|
181 | 181 | | Design $250,000 |
---|
182 | 182 | | |
---|
183 | 183 | | Construction $1,000,000 |
---|
184 | 184 | | |
---|
185 | 185 | | Equipment $4,000,000 |
---|
186 | 186 | | |
---|
187 | 187 | | Total funding $5,500,000 |
---|
188 | 188 | | |
---|
189 | 189 | | B. Refinish audience floors in auditorium. |
---|
190 | 190 | | |
---|
191 | 191 | | Plans $50,000 |
---|
192 | 192 | | |
---|
193 | 193 | | Design $50,000 |
---|
194 | 194 | | |
---|
195 | 195 | | Construction $100,000 |
---|
196 | 196 | | |
---|
197 | 197 | | Total funding $200,000 |
---|
198 | 198 | | |
---|
199 | 199 | | C. Resurface tennis courts and replace appurtenances. |
---|
200 | 200 | | |
---|
201 | 201 | | Plans $25,000 |
---|
202 | 202 | | |
---|
203 | 203 | | Design $25,000 |
---|
204 | 204 | | |
---|
205 | 205 | | Construction $500,000 |
---|
206 | 206 | | |
---|
207 | 207 | | Total funding $550,000 |
---|
208 | 208 | | |
---|
209 | 209 | | D. F-Building renovation for two classrooms, multipurpose room, and courtyard. |
---|
210 | 210 | | |
---|
211 | 211 | | Plans $250,000 |
---|
212 | 212 | | |
---|
213 | 213 | | Design $250,000 |
---|
214 | 214 | | |
---|
215 | 215 | | Construction $5,000,000 |
---|
216 | 216 | | |
---|
217 | 217 | | Equipment $100,000 |
---|
218 | 218 | | |
---|
219 | 219 | | Total funding $5,600,000 |
---|
220 | 220 | | |
---|
221 | 221 | | E. Electrical upgrades to install split system air-conditioning at Pearl City Cultural Center. |
---|
222 | 222 | | |
---|
223 | 223 | | Plans $25,000 |
---|
224 | 224 | | |
---|
225 | 225 | | Design $25,000 |
---|
226 | 226 | | |
---|
227 | 227 | | Construction $500,000 |
---|
228 | 228 | | |
---|
229 | 229 | | Construction $100,000 |
---|
230 | 230 | | |
---|
231 | 231 | | Total funding $650,000 |
---|
232 | 232 | | |
---|
233 | 233 | | 8. Pearl City Highlands Elementary School |
---|
234 | 234 | | |
---|
235 | 235 | | A. Construction and replacement of administration building and library. |
---|
236 | 236 | | |
---|
237 | 237 | | Plans $25,000 |
---|
238 | 238 | | |
---|
239 | 239 | | Design $25,000 |
---|
240 | 240 | | |
---|
241 | 241 | | Construction $7,000,000 |
---|
242 | 242 | | |
---|
243 | 243 | | Equipment $250,000 |
---|
244 | 244 | | |
---|
245 | 245 | | Total funding $7,300,000 |
---|
246 | 246 | | |
---|
247 | 247 | | 9. Pearl Ridge Elementary School |
---|
248 | 248 | | |
---|
249 | 249 | | A. New playground area. |
---|
250 | 250 | | |
---|
251 | 251 | | Design $30,000 |
---|
252 | 252 | | |
---|
253 | 253 | | Construction $50,000 |
---|
254 | 254 | | |
---|
255 | 255 | | Equipment $100,000 |
---|
256 | 256 | | |
---|
257 | 257 | | Total funding $180,000 |
---|
258 | 258 | | |
---|
259 | 259 | | B. New eight-classroom building, ground and site improvements, and appurtenances. |
---|
260 | 260 | | |
---|
261 | 261 | | Design $325,000 |
---|
262 | 262 | | |
---|
263 | 263 | | Construction $2,155,00 |
---|
264 | 264 | | |
---|
265 | 265 | | Total funding $2,480,000 |
---|
266 | 266 | | |
---|
267 | 267 | | 10. Waiau Elementary School |
---|
268 | 268 | | |
---|
269 | 269 | | A. Covered walkways from portables to cafeteria. |
---|
270 | 270 | | |
---|
271 | 271 | | Plans $50,000 |
---|
272 | 272 | | |
---|
273 | 273 | | Design $50,000 |
---|
274 | 274 | | |
---|
275 | 275 | | Construction $1,000,000 |
---|
276 | 276 | | |
---|
277 | 277 | | Total funding $1,100,000 |
---|
278 | 278 | | |
---|
279 | 279 | | 11. Waimalu Elementary School |
---|
280 | 280 | | |
---|
281 | 281 | | A. Drainage improvements and flooring for building f and library. |
---|
282 | 282 | | |
---|
283 | 283 | | Design $400,000 |
---|
284 | 284 | | |
---|
285 | 285 | | Construction $1,600,00 |
---|
286 | 286 | | |
---|
287 | 287 | | Total funding $2,000,000 |
---|
288 | 288 | | |
---|
289 | 289 | | B. Covered playcourt. |
---|
290 | 290 | | |
---|
291 | 291 | | Design $500,000 |
---|
292 | 292 | | |
---|
293 | 293 | | Construction $3,000,000 |
---|
294 | 294 | | |
---|
295 | 295 | | Total funding $3,500,000 |
---|
296 | 296 | | |
---|
297 | 297 | | SECTION 2. The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriations are made; provided that all moneys from the appropriations that are unencumbered as of June 30, 2024, shall lapse as of that date. |
---|
298 | 298 | | |
---|
299 | 299 | | SECTION 3. The sums appropriated for the respective capital improvement projects set forth in section 1 shall be expended by the department of education for the purposes of this Act. |
---|
300 | 300 | | |
---|
301 | 301 | | SECTION 4. This Act shall take effect on July 1, 2022. |
---|
302 | 302 | | |
---|
303 | 303 | | |
---|
304 | 304 | | |
---|
305 | 305 | | INTRODUCED BY: _____________________________ |
---|
306 | 306 | | |
---|
307 | 307 | | INTRODUCED BY: |
---|
308 | 308 | | |
---|
309 | 309 | | _____________________________ |
---|
310 | 310 | | |
---|
311 | 311 | | |
---|
312 | 312 | | |
---|
313 | 313 | | |
---|
314 | 314 | | |
---|
315 | 315 | | Report Title: CIP; 16th Senatorial District; Appropriation Description: Appropriates funds for capital improvement projects in the 16th senatorial district. The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent. |
---|
316 | 316 | | |
---|
317 | 317 | | |
---|
318 | 318 | | |
---|
319 | 319 | | |
---|
320 | 320 | | |
---|
321 | 321 | | Report Title: |
---|
322 | 322 | | |
---|
323 | 323 | | CIP; 16th Senatorial District; Appropriation |
---|
324 | 324 | | |
---|
325 | 325 | | |
---|
326 | 326 | | |
---|
327 | 327 | | Description: |
---|
328 | 328 | | |
---|
329 | 329 | | Appropriates funds for capital improvement projects in the 16th senatorial district. |
---|
330 | 330 | | |
---|
331 | 331 | | |
---|
332 | 332 | | |
---|
333 | 333 | | |
---|
334 | 334 | | |
---|
335 | 335 | | |
---|
336 | 336 | | |
---|
337 | 337 | | The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent. |
---|