Hawaii 2023 Regular Session

Hawaii House Bill HB1247 Compare Versions

Only one version of the bill is available at this time.
OldNewDifferences
11 HOUSE OF REPRESENTATIVES H.B. NO. 1247 THIRTY-SECOND LEGISLATURE, 2023 STATE OF HAWAII A BILL FOR AN ACT relating to Development projects. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
22
33 HOUSE OF REPRESENTATIVES H.B. NO. 1247
44 THIRTY-SECOND LEGISLATURE, 2023
55 STATE OF HAWAII
66
77 HOUSE OF REPRESENTATIVES
88
99 H.B. NO.
1010
1111 1247
1212
1313 THIRTY-SECOND LEGISLATURE, 2023
1414
1515
1616
1717 STATE OF HAWAII
1818
1919
2020
2121
2222
2323
2424
2525
2626
2727
2828
2929
3030
3131 A BILL FOR AN ACT
3232
3333
3434
3535
3636
3737 relating to Development projects.
3838
3939
4040
4141
4242
4343 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
4444
4545
4646
4747 SECTION 1. The legislature finds that Hawaii is facing a housing crisis. Residents of all income levels are increasingly unable to buy homes due to a lack of adequate supply, which also contributes to elevated housing prices. The solution to a housing shortage is to build more housing generally, but current environmental review laws make it inordinately burdensome to obtain approvals for new development. The legislature further finds that projects across the State have been stifled by an expansive interpretation of the Hawaii Environmental Policy Act (HEPA). In 2019, the environmental advisory council amended the implementing rules of HEPA under section 11-200.1, Hawaii Administrative Rules, to address, among other things, the problem of project segmentation, where a developer divides up a project incrementally in order to avoid having to prepare an environmental review. Under the 2019 rule, projects built solely to serve another project (e.g., drainage infrastructure needed for a residential project) or a project that will clearly be developed in multiple phases (e.g., a multi-stage highway or housing project) must be analyzed in a single environmental review as part of a "program." Thus, while this rule was intended to ensure that the impact of broad proposals or planning-level decisions are fully and properly evaluated, courts have interpreted the provision overbroadly and required developers to include, within their own environmental review, other tangential projects that developers have limited information on or no control over, projects that are speculative and not reasonably foreseeable, past actions for which HEPA's statute of limitations period has run, legislative actions, and other zoning or land use classifications that would not otherwise be statutorily triggered under HEPA. This trend will increasingly jeopardize the construction of new housing throughout the State. Amendments to HEPA are necessary to address ambiguities in the law, provide greater certainty for developers, and accelerate the delivery and supply of housing. Accordingly, the purpose of this Act is to: (1) Exempt affordable housing and certain qualifying housing development projects from HEPA; (2) Establish a definition of "program" and "project" to preempt the existing definitions under section 11-200.1-2, Hawaii Administrative Rules, and narrow the existing interpretation that requires analysis of tangentially related projects; (3) Amends the applicability and requirements section of HEPA to clarify when multiple actions must be considered in the same environmental review document for the purposes of project segmentation; (4) Require that project opponents exhaust their administrative remedies as a prerequisite to litigation for environmental assessments and environmental impact statements; and (5) Retroactively apply the new amendments under this Act to projects that received approval for their environmental assessment or environmental impact statement on or after August 9, 2019. SECTION 2. Chapter 343, Hawaii Revised Statutes, is amended by adding a new section to be appropriately designated and to read as follows: "§343- Housing development projects consistent with environmental policies or long-term environmental goals established by law; exemption. (a) New construction housing development projects shall be exempt from the requirements of this chapter if: (1) The use of state or county lands or funds or the project's location within the Waikiki area of Oahu pursuant to section 343-5, is the sole statutory trigger for compliance with this chapter; (2) The project is consistent with the existing county general plan or development plan classification that allows housing; (3) The project is consistent with the existing zoning code; and (4) The project does not require a variance for shoreline setbacks or siting in an environmentally sensitive area, including but not limited to a flood plain, tsunami zone, sea level rise exposure area, beach, erosion-prone area, geologically hazardous land, estuary, fresh water, or coastal waters. (b) For the purposes of this section, "housing development project" means a use consisting of: (1) Residential units only; or (2) Mixed-use developments consisting of residential and nonresidential uses with at least two-thirds of the square footage designated for residential use." SECTION 3. Section 343-2, Hawaii Revised Statutes, is amended by adding two new definitions to be appropriately inserted and to read as follows: ""Program" means a series of one or more projects to be carried out concurrently or in phases within a general timeline, that may include multiple sites or geographic areas, and is undertaken for the same shared goal or purpose. Projects proposing similar uses do not create a presumption of having the same shared goal or purpose where the projects can be independently implemented and one project is not a critical functioning element of the other projects. A program may include: (1) A number of separate projects in a given geographic area which, if considered singly, may have minor impacts, but if considered together, may have significant impacts; (2) Separate projects having generic or common impacts; (3) The implementation of multiple projects over a long timeframe by the same person or persons acting in concert; or (4) The implementation of a single project over a large geographic area. Common use, development, or funding of shared infrastructure does not create a presumption of a program. Shared responsibility among one or more projects for compliance with conditions of regulatory approval imposed by the State or a local agency does not create a presumption of a program. "Project" means a discrete, planned undertaking that is site and time specific, has a specific goal or purpose, and has potential impact to the environment." SECTION 4. Section 343-5, Hawaii Revised Statutes, is amended to read as follows: "§343-5 Applicability and requirements. (a) Except as otherwise provided, an environmental assessment shall be required for actions that: (1) Propose the use of state or county lands or the use of state or county funds, other than funds to be used for feasibility or planning studies for possible future programs or projects that the agency has not approved, adopted, or funded, or funds to be used for the acquisition of unimproved real property; provided that the agency shall consider environmental factors and available alternatives in its feasibility or planning studies; provided further that an environmental assessment for proposed uses under section 205-2(d)(11) or 205-4.5(a)(13) shall only be required pursuant to section 205-5(b); (2) Propose any use within any land classified as a conservation district by the state land use commission under chapter 205; (3) Propose any use within a shoreline area as defined in section 205A-41; (4) Propose any use within any historic site as designated in the National Register or Hawaii Register, as provided for in the Historic Preservation Act of 1966, Public Law 89-665, or chapter 6E; (5) Propose any use within the Waikiki area of Oahu, the boundaries of which are delineated in the land use ordinance as amended, establishing the "Waikiki Special District"; (6) Propose any amendments to existing county general plans where the amendment would result in designations other than agriculture, conservation, or preservation, except actions proposing any new county general plan or amendments to any existing county general plan initiated by a county; (7) Propose any reclassification of any land classified as a conservation district by the state land use commission under chapter 205; (8) Propose the construction of new or the expansion or modification of existing helicopter facilities within the State, that by way of their activities, may affect: (A) Any land classified as a conservation district by the state land use commission under chapter 205; (B) A shoreline area as defined in section 205A-41; or (C) Any historic site as designated in the National Register or Hawaii Register, as provided for in the Historic Preservation Act of 1966, Public Law 89-665, or chapter 6E; or until the statewide historic places inventory is completed, any historic site that is found by a field reconnaissance of the area affected by the helicopter facility and is under consideration for placement on the National Register or the Hawaii Register of Historic Places; and (9) Propose any: (A) Wastewater treatment unit, except an individual wastewater system or a wastewater treatment unit serving fewer than fifty single-family dwellings or the equivalent; (B) Waste-to-energy facility; (C) Landfill; (D) Oil refinery; or (E) Power-generating facility. (b) Whenever an agency proposes an action in subsection (a), other than feasibility or planning studies for possible future programs or projects that the agency has not approved, adopted, or funded, or other than the use of state or county funds for the acquisition of unimproved real property that is not a specific type of action declared exempt under section 343-6, the agency shall prepare an environmental assessment for the action at the earliest practicable time to determine whether an environmental impact statement shall be required; provided that if the agency determines, through its judgment and experience, that an environmental impact statement is likely to be required, the agency may choose not to prepare an environmental assessment and instead shall prepare an environmental impact statement that begins with the preparation of an environmental impact statement preparation notice as provided by rules. (c) For environmental assessments for which a finding of no significant impact is anticipated: (1) A draft environmental assessment shall be made available for public review and comment for a period of thirty days; (2) The office shall inform the public of the availability of the draft environmental assessment for public review and comment pursuant to section 343-3; (3) The agency shall respond in writing to comments received during the review and prepare a final environmental assessment to determine whether an environmental impact statement shall be required; (4) A statement shall be required if the agency finds that the proposed action may have a significant effect on the environment; and (5) The agency shall file notice of the determination with the office. When a conflict of interest may exist because the proposing agency and the agency making the determination are the same, the office may review the agency's determination, consult the agency, and advise the agency of potential conflicts, to comply with this section. The office shall publish the final determination for the public's information pursuant to section 343-3. The draft and final statements, if required, shall be prepared by the agency and submitted to the office. The draft statement shall be made available for public review and comment through the office for a period of forty-five days. The office shall inform the public of the availability of the draft statement for public review and comment pursuant to section 343-3. The agency shall respond in writing to comments received during the review and prepare a final statement. The office, when requested by the agency, may make a recommendation as to the acceptability of the final statement. (d) The final authority to accept a final statement shall rest with: (1) The governor, or the governor's authorized representative, whenever an action proposes the use of state lands or the use of state funds, or whenever a state agency proposes an action within the categories in subsection (a); or (2) The mayor, or the mayor's authorized representative, of the respective county whenever an action proposes only the use of county lands or county funds. Acceptance of a required final statement shall be a condition precedent to implementation of the proposed action. Upon acceptance or nonacceptance of the final statement, the governor or mayor, or the governor's or mayor's authorized representative, shall file notice of such determination with the office. The office, in turn, shall publish the determination of acceptance or nonacceptance pursuant to section 343-3. (e) Whenever an applicant proposes an action specified by subsection (a) that requires approval of an agency and that is not a specific type of action declared exempt under section 343-6, the agency initially receiving and agreeing to process the request for approval shall require the applicant to prepare an environmental assessment of the proposed action at the earliest practicable time to determine whether an environmental impact statement shall be required; provided that if the agency determines, through its judgment and experience, that an environmental impact statement is likely to be required, the agency may authorize the applicant to choose not to prepare an environmental assessment and instead prepare an environmental impact statement that begins with the preparation of an environmental impact statement preparation notice as provided by rules. The final approving agency for the request for approval is not required to be the accepting authority. For environmental assessments for which a finding of no significant impact is anticipated: (1) A draft environmental assessment shall be made available for public review and comment for a period of thirty days; (2) The office shall inform the public of the availability of the draft environmental assessment for public review and comment pursuant to section 343-3; and (3) The applicant shall respond in writing to comments received during the review and the applicant shall prepare a final environmental assessment to determine whether an environmental impact statement shall be required. A statement shall be required if the agency finds that the proposed action may have a significant effect on the environment. The agency shall file notice of the agency's determination with the office, which, in turn, shall publish the agency's determination for the public's information pursuant to section 343-3. The draft and final statements, if required, shall be prepared by the applicant, who shall file these statements with the office. The draft statement shall be made available for public review and comment through the office for a period of forty-five days. The office shall inform the public of the availability of the draft statement for public review and comment pursuant to section 343-3. The applicant shall respond in writing to comments received during the review and prepare a final statement. The office, when requested by the applicant or agency, may make a recommendation as to the acceptability of the final statement. The authority to accept a final statement shall rest with the agency initially receiving and agreeing to process the request for approval. The final decision-making body or approving agency for the request for approval is not required to be the accepting authority. The planning department for the county in which the proposed action will occur shall be a permissible accepting authority for the final statement. Acceptance of a required final statement shall be a condition precedent to approval of the request and commencement of the proposed action. Upon acceptance or nonacceptance of the final statement, the agency shall file notice of the determination with the office. The office, in turn, shall publish the determination of acceptance or nonacceptance of the final statement pursuant to section 343-3. The agency receiving the request, within thirty days of receipt of the final statement, shall notify the applicant and the office of the acceptance or nonacceptance of the final statement. The final statement shall be deemed to be accepted if the agency fails to accept or not accept the final statement within thirty days after receipt of the final statement; provided that the thirty-day period may be extended at the request of the applicant for a period not to exceed fifteen days. In any acceptance or nonacceptance, the agency shall provide the applicant with the specific findings and reasons for its determination. (f) Whenever an applicant requests approval for a proposed action and there is a question as to which of two or more state or county agencies with jurisdiction has the responsibility of determining whether an environmental assessment is required, the office, after consultation with and assistance from the affected state or county agencies, shall determine which agency has the responsibility for determining whether an environmental assessment by the applicant is required, except in situations involving secondary actions under section 343-5.5; provided that in no case shall the office be considered the approving agency. (g) In preparing an environmental assessment, an agency may consider and, where applicable and appropriate, incorporate by reference, in whole or in part, previous determinations of whether a statement is required and previously accepted statements. The council, by rule, shall establish criteria and procedures for the use of previous determinations and statements. (h) Whenever an action is subject to both the National Environmental Policy Act of 1969 (Public Law 91-190) and the requirements of this chapter, the office and agencies shall cooperate with federal agencies to the fullest extent possible to reduce duplication between federal and state requirements. Such cooperation, to the fullest extent possible, shall include joint environmental impact statements with concurrent public review and processing at both levels of government. Where federal law has environmental impact statement requirements in addition to but not in conflict with this chapter, the office and agencies shall cooperate in fulfilling these requirements so that one document shall comply with all applicable laws. (i) A statement that is accepted with respect to a particular action shall satisfy the requirements of this chapter, and no other statement for the proposed action shall be required. (j) A group of actions shall be treated as a single action when: (1) The component actions are phases or increments of a larger total program; provided that each component action depends on and cannot be implemented independent of the other phases or increments; (2) An individual action is a necessary precedent to a larger action; provided that the development or funding of shared infrastructure does not create a presumption that the actions should be treated as a single action; (3) An individual action represents a commitment to a larger action; or (4) The actions in question are essentially identical and a single environmental assessment or environmental impact statement will adequately address the impacts of each individual action and those of the group of actions as a whole." SECTION 5. Section 343-7, Hawaii Revised Statutes, is amended by amending subsection (b) to read as follows: "(b) Any judicial proceeding, the subject of which is the determination that a statement is required for a proposed action, shall be initiated within sixty days after the public has been informed of such determination pursuant to section 343-3. Any judicial proceeding, the subject of which is the determination that a statement is not required for a proposed action, shall be initiated within thirty days after the public has been informed of such determination pursuant to section 343-3. The applicant shall be adjudged an aggrieved party for the purposes of bringing judicial action under this subsection[. Others, by environmental court action, may be adjudged aggrieved.]; provided that the contestable issues shall be limited to those issues identified by the accepting authority as the basis for requiring a statement. Affected agencies and persons who provided written comments to an accepted statement during the designated review period shall be adjudged aggrieved parties for the purpose of bringing judicial action under this subsection; provided that for other aggrieved parties, the contestable issues shall be limited to issues identified and discussed in the written comments." SECTION 6. (a) The amendments to sections 343-2 and 343-5, Hawaii Revised Statutes, made by this Act shall in no way affect the validity of any environmental assessment or environmental impact statement approved on or after August 9, 2019. (b) Any previous regulations established by the environmental advisory council, to the extent inconsistent with these changes, shall be null and void. (c) The Hawaii Environmental Policy Act is a procedural and informational statute, and any effects of these provisions shall not be deemed to affect a substantial right of any person. SECTION 7. Statutory material to be repealed is bracketed and stricken. New statutory material is underscored. SECTION 8. This Act shall take effect upon its approval and shall apply retroactively to projects that received approval for their environmental assessment or environmental impact statement on or after August 9, 2019. INTRODUCED BY: _____________________________
4848
4949 SECTION 1. The legislature finds that Hawaii is facing a housing crisis. Residents of all income levels are increasingly unable to buy homes due to a lack of adequate supply, which also contributes to elevated housing prices. The solution to a housing shortage is to build more housing generally, but current environmental review laws make it inordinately burdensome to obtain approvals for new development.
5050
5151 The legislature further finds that projects across the State have been stifled by an expansive interpretation of the Hawaii Environmental Policy Act (HEPA). In 2019, the environmental advisory council amended the implementing rules of HEPA under section 11-200.1, Hawaii Administrative Rules, to address, among other things, the problem of project segmentation, where a developer divides up a project incrementally in order to avoid having to prepare an environmental review. Under the 2019 rule, projects built solely to serve another project (e.g., drainage infrastructure needed for a residential project) or a project that will clearly be developed in multiple phases (e.g., a multi-stage highway or housing project) must be analyzed in a single environmental review as part of a "program." Thus, while this rule was intended to ensure that the impact of broad proposals or planning-level decisions are fully and properly evaluated, courts have interpreted the provision overbroadly and required developers to include, within their own environmental review, other tangential projects that developers have limited information on or no control over, projects that are speculative and not reasonably foreseeable, past actions for which HEPA's statute of limitations period has run, legislative actions, and other zoning or land use classifications that would not otherwise be statutorily triggered under HEPA. This trend will increasingly jeopardize the construction of new housing throughout the State. Amendments to HEPA are necessary to address ambiguities in the law, provide greater certainty for developers, and accelerate the delivery and supply of housing.
5252
5353 Accordingly, the purpose of this Act is to:
5454
5555 (1) Exempt affordable housing and certain qualifying housing development projects from HEPA;
5656
5757 (2) Establish a definition of "program" and "project" to preempt the existing definitions under section 11-200.1-2, Hawaii Administrative Rules, and narrow the existing interpretation that requires analysis of tangentially related projects;
5858
5959 (3) Amends the applicability and requirements section of HEPA to clarify when multiple actions must be considered in the same environmental review document for the purposes of project segmentation;
6060
6161 (4) Require that project opponents exhaust their administrative remedies as a prerequisite to litigation for environmental assessments and environmental impact statements; and
6262
6363 (5) Retroactively apply the new amendments under this Act to projects that received approval for their environmental assessment or environmental impact statement on or after August 9, 2019.
6464
6565 SECTION 2. Chapter 343, Hawaii Revised Statutes, is amended by adding a new section to be appropriately designated and to read as follows:
6666
6767 "§343- Housing development projects consistent with environmental policies or long-term environmental goals established by law; exemption. (a) New construction housing development projects shall be exempt from the requirements of this chapter if:
6868
6969 (1) The use of state or county lands or funds or the project's location within the Waikiki area of Oahu pursuant to section 343-5, is the sole statutory trigger for compliance with this chapter;
7070
7171 (2) The project is consistent with the existing county general plan or development plan classification that allows housing;
7272
7373 (3) The project is consistent with the existing zoning code; and
7474
7575 (4) The project does not require a variance for shoreline setbacks or siting in an environmentally sensitive area, including but not limited to a flood plain, tsunami zone, sea level rise exposure area, beach, erosion-prone area, geologically hazardous land, estuary, fresh water, or coastal waters.
7676
7777 (b) For the purposes of this section, "housing development project" means a use consisting of:
7878
7979 (1) Residential units only; or
8080
8181 (2) Mixed-use developments consisting of residential and nonresidential uses with at least two-thirds of the square footage designated for residential use."
8282
8383 SECTION 3. Section 343-2, Hawaii Revised Statutes, is amended by adding two new definitions to be appropriately inserted and to read as follows:
8484
8585 ""Program" means a series of one or more projects to be carried out concurrently or in phases within a general timeline, that may include multiple sites or geographic areas, and is undertaken for the same shared goal or purpose. Projects proposing similar uses do not create a presumption of having the same shared goal or purpose where the projects can be independently implemented and one project is not a critical functioning element of the other projects. A program may include:
8686
8787 (1) A number of separate projects in a given geographic area which, if considered singly, may have minor impacts, but if considered together, may have significant impacts;
8888
8989 (2) Separate projects having generic or common impacts;
9090
9191 (3) The implementation of multiple projects over a long timeframe by the same person or persons acting in concert; or
9292
9393 (4) The implementation of a single project over a large geographic area.
9494
9595 Common use, development, or funding of shared infrastructure does not create a presumption of a program. Shared responsibility among one or more projects for compliance with conditions of regulatory approval imposed by the State or a local agency does not create a presumption of a program.
9696
9797 "Project" means a discrete, planned undertaking that is site and time specific, has a specific goal or purpose, and has potential impact to the environment."
9898
9999 SECTION 4. Section 343-5, Hawaii Revised Statutes, is amended to read as follows:
100100
101101 "§343-5 Applicability and requirements. (a) Except as otherwise provided, an environmental assessment shall be required for actions that:
102102
103103 (1) Propose the use of state or county lands or the use of state or county funds, other than funds to be used for feasibility or planning studies for possible future programs or projects that the agency has not approved, adopted, or funded, or funds to be used for the acquisition of unimproved real property; provided that the agency shall consider environmental factors and available alternatives in its feasibility or planning studies; provided further that an environmental assessment for proposed uses under section 205-2(d)(11) or 205-4.5(a)(13) shall only be required pursuant to section 205-5(b);
104104
105105 (2) Propose any use within any land classified as a conservation district by the state land use commission under chapter 205;
106106
107107 (3) Propose any use within a shoreline area as defined in section 205A-41;
108108
109109 (4) Propose any use within any historic site as designated in the National Register or Hawaii Register, as provided for in the Historic Preservation Act of 1966, Public Law 89-665, or chapter 6E;
110110
111111 (5) Propose any use within the Waikiki area of Oahu, the boundaries of which are delineated in the land use ordinance as amended, establishing the "Waikiki Special District";
112112
113113 (6) Propose any amendments to existing county general plans where the amendment would result in designations other than agriculture, conservation, or preservation, except actions proposing any new county general plan or amendments to any existing county general plan initiated by a county;
114114
115115 (7) Propose any reclassification of any land classified as a conservation district by the state land use commission under chapter 205;
116116
117117 (8) Propose the construction of new or the expansion or modification of existing helicopter facilities within the State, that by way of their activities, may affect:
118118
119119 (A) Any land classified as a conservation district by the state land use commission under chapter 205;
120120
121121 (B) A shoreline area as defined in section 205A-41; or
122122
123123 (C) Any historic site as designated in the National Register or Hawaii Register, as provided for in the Historic Preservation Act of 1966, Public Law 89-665, or chapter 6E; or until the statewide historic places inventory is completed, any historic site that is found by a field reconnaissance of the area affected by the helicopter facility and is under consideration for placement on the National Register or the Hawaii Register of Historic Places; and
124124
125125 (9) Propose any:
126126
127127 (A) Wastewater treatment unit, except an individual wastewater system or a wastewater treatment unit serving fewer than fifty single-family dwellings or the equivalent;
128128
129129 (B) Waste-to-energy facility;
130130
131131 (C) Landfill;
132132
133133 (D) Oil refinery; or
134134
135135 (E) Power-generating facility.
136136
137137 (b) Whenever an agency proposes an action in subsection (a), other than feasibility or planning studies for possible future programs or projects that the agency has not approved, adopted, or funded, or other than the use of state or county funds for the acquisition of unimproved real property that is not a specific type of action declared exempt under section 343-6, the agency shall prepare an environmental assessment for the action at the earliest practicable time to determine whether an environmental impact statement shall be required; provided that if the agency determines, through its judgment and experience, that an environmental impact statement is likely to be required, the agency may choose not to prepare an environmental assessment and instead shall prepare an environmental impact statement that begins with the preparation of an environmental impact statement preparation notice as provided by rules.
138138
139139 (c) For environmental assessments for which a finding of no significant impact is anticipated:
140140
141141 (1) A draft environmental assessment shall be made available for public review and comment for a period of thirty days;
142142
143143 (2) The office shall inform the public of the availability of the draft environmental assessment for public review and comment pursuant to section 343-3;
144144
145145 (3) The agency shall respond in writing to comments received during the review and prepare a final environmental assessment to determine whether an environmental impact statement shall be required;
146146
147147 (4) A statement shall be required if the agency finds that the proposed action may have a significant effect on the environment; and
148148
149149 (5) The agency shall file notice of the determination with the office. When a conflict of interest may exist because the proposing agency and the agency making the determination are the same, the office may review the agency's determination, consult the agency, and advise the agency of potential conflicts, to comply with this section. The office shall publish the final determination for the public's information pursuant to section 343-3.
150150
151151 The draft and final statements, if required, shall be prepared by the agency and submitted to the office. The draft statement shall be made available for public review and comment through the office for a period of forty-five days. The office shall inform the public of the availability of the draft statement for public review and comment pursuant to section 343-3. The agency shall respond in writing to comments received during the review and prepare a final statement.
152152
153153 The office, when requested by the agency, may make a recommendation as to the acceptability of the final statement.
154154
155155 (d) The final authority to accept a final statement shall rest with:
156156
157157 (1) The governor, or the governor's authorized representative, whenever an action proposes the use of state lands or the use of state funds, or whenever a state agency proposes an action within the categories in subsection (a); or
158158
159159 (2) The mayor, or the mayor's authorized representative, of the respective county whenever an action proposes only the use of county lands or county funds.
160160
161161 Acceptance of a required final statement shall be a condition precedent to implementation of the proposed action. Upon acceptance or nonacceptance of the final statement, the governor or mayor, or the governor's or mayor's authorized representative, shall file notice of such determination with the office. The office, in turn, shall publish the determination of acceptance or nonacceptance pursuant to section 343-3.
162162
163163 (e) Whenever an applicant proposes an action specified by subsection (a) that requires approval of an agency and that is not a specific type of action declared exempt under section 343-6, the agency initially receiving and agreeing to process the request for approval shall require the applicant to prepare an environmental assessment of the proposed action at the earliest practicable time to determine whether an environmental impact statement shall be required; provided that if the agency determines, through its judgment and experience, that an environmental impact statement is likely to be required, the agency may authorize the applicant to choose not to prepare an environmental assessment and instead prepare an environmental impact statement that begins with the preparation of an environmental impact statement preparation notice as provided by rules. The final approving agency for the request for approval is not required to be the accepting authority.
164164
165165 For environmental assessments for which a finding of no significant impact is anticipated:
166166
167167 (1) A draft environmental assessment shall be made available for public review and comment for a period of thirty days;
168168
169169 (2) The office shall inform the public of the availability of the draft environmental assessment for public review and comment pursuant to section 343-3; and
170170
171171 (3) The applicant shall respond in writing to comments received during the review and the applicant shall prepare a final environmental assessment to determine whether an environmental impact statement shall be required. A statement shall be required if the agency finds that the proposed action may have a significant effect on the environment. The agency shall file notice of the agency's determination with the office, which, in turn, shall publish the agency's determination for the public's information pursuant to section 343-3.
172172
173173 The draft and final statements, if required, shall be prepared by the applicant, who shall file these statements with the office.
174174
175175 The draft statement shall be made available for public review and comment through the office for a period of forty-five days. The office shall inform the public of the availability of the draft statement for public review and comment pursuant to section 343-3.
176176
177177 The applicant shall respond in writing to comments received during the review and prepare a final statement. The office, when requested by the applicant or agency, may make a recommendation as to the acceptability of the final statement.
178178
179179 The authority to accept a final statement shall rest with the agency initially receiving and agreeing to process the request for approval. The final decision-making body or approving agency for the request for approval is not required to be the accepting authority. The planning department for the county in which the proposed action will occur shall be a permissible accepting authority for the final statement.
180180
181181 Acceptance of a required final statement shall be a condition precedent to approval of the request and commencement of the proposed action. Upon acceptance or nonacceptance of the final statement, the agency shall file notice of the determination with the office. The office, in turn, shall publish the determination of acceptance or nonacceptance of the final statement pursuant to section 343-3.
182182
183183 The agency receiving the request, within thirty days of receipt of the final statement, shall notify the applicant and the office of the acceptance or nonacceptance of the final statement. The final statement shall be deemed to be accepted if the agency fails to accept or not accept the final statement within thirty days after receipt of the final statement; provided that the thirty-day period may be extended at the request of the applicant for a period not to exceed fifteen days.
184184
185185 In any acceptance or nonacceptance, the agency shall provide the applicant with the specific findings and reasons for its determination.
186186
187187 (f) Whenever an applicant requests approval for a proposed action and there is a question as to which of two or more state or county agencies with jurisdiction has the responsibility of determining whether an environmental assessment is required, the office, after consultation with and assistance from the affected state or county agencies, shall determine which agency has the responsibility for determining whether an environmental assessment by the applicant is required, except in situations involving secondary actions under section 343-5.5; provided that in no case shall the office be considered the approving agency.
188188
189189 (g) In preparing an environmental assessment, an agency may consider and, where applicable and appropriate, incorporate by reference, in whole or in part, previous determinations of whether a statement is required and previously accepted statements. The council, by rule, shall establish criteria and procedures for the use of previous determinations and statements.
190190
191191 (h) Whenever an action is subject to both the National Environmental Policy Act of 1969 (Public Law 91-190) and the requirements of this chapter, the office and agencies shall cooperate with federal agencies to the fullest extent possible to reduce duplication between federal and state requirements. Such cooperation, to the fullest extent possible, shall include joint environmental impact statements with concurrent public review and processing at both levels of government. Where federal law has environmental impact statement requirements in addition to but not in conflict with this chapter, the office and agencies shall cooperate in fulfilling these requirements so that one document shall comply with all applicable laws.
192192
193193 (i) A statement that is accepted with respect to a particular action shall satisfy the requirements of this chapter, and no other statement for the proposed action shall be required.
194194
195195 (j) A group of actions shall be treated as a single action when:
196196
197197 (1) The component actions are phases or increments of a larger total program; provided that each component action depends on and cannot be implemented independent of the other phases or increments;
198198
199199 (2) An individual action is a necessary precedent to a larger action; provided that the development or funding of shared infrastructure does not create a presumption that the actions should be treated as a single action;
200200
201201 (3) An individual action represents a commitment to a larger action; or
202202
203203 (4) The actions in question are essentially identical and a single environmental assessment or environmental impact statement will adequately address the impacts of each individual action and those of the group of actions as a whole."
204204
205205 SECTION 5. Section 343-7, Hawaii Revised Statutes, is amended by amending subsection (b) to read as follows:
206206
207207 "(b) Any judicial proceeding, the subject of which is the determination that a statement is required for a proposed action, shall be initiated within sixty days after the public has been informed of such determination pursuant to section 343-3. Any judicial proceeding, the subject of which is the determination that a statement is not required for a proposed action, shall be initiated within thirty days after the public has been informed of such determination pursuant to section 343-3. The applicant shall be adjudged an aggrieved party for the purposes of bringing judicial action under this subsection[. Others, by environmental court action, may be adjudged aggrieved.]; provided that the contestable issues shall be limited to those issues identified by the accepting authority as the basis for requiring a statement. Affected agencies and persons who provided written comments to an accepted statement during the designated review period shall be adjudged aggrieved parties for the purpose of bringing judicial action under this subsection; provided that for other aggrieved parties, the contestable issues shall be limited to issues identified and discussed in the written comments."
208208
209209 SECTION 6. (a) The amendments to sections 343-2 and 343-5, Hawaii Revised Statutes, made by this Act shall in no way affect the validity of any environmental assessment or environmental impact statement approved on or after August 9, 2019.
210210
211211 (b) Any previous regulations established by the environmental advisory council, to the extent inconsistent with these changes, shall be null and void.
212212
213213 (c) The Hawaii Environmental Policy Act is a procedural and informational statute, and any effects of these provisions shall not be deemed to affect a substantial right of any person.
214214
215215 SECTION 7. Statutory material to be repealed is bracketed and stricken. New statutory material is underscored.
216216
217217 SECTION 8. This Act shall take effect upon its approval and shall apply retroactively to projects that received approval for their environmental assessment or environmental impact statement on or after August 9, 2019.
218218
219219
220220
221221 INTRODUCED BY: _____________________________
222222
223223 INTRODUCED BY:
224224
225225 _____________________________
226226
227227
228228
229229
230230
231231 Report Title: Hawaii Environmental Policy Act; Environmental Impact Statements; Environmental Assessments; Affordable Housing; Project Segmentation Description: Exempts affordable housing and certain qualifying housing development projects from HEPA. Establishes a definition of "program" and "project" to preempt the existing definitions under section 11-200.1-2, Hawaii Administrative Rules, and narrow the existing interpretation that requires analysis of tangentially related projects. Amends the applicability and requirements section of HEPA to clarify when multiple actions must be considered in the same environmental review document for the purposes of project segmentation. Expands the requirement that project opponents must exhaust their administrative remedies as a prerequisite to litigation to apply to environmental assessments and environmental impact statements. Retroactively applies to projects that received approval for their environmental assessment or environmental impact statement on or after August 9, 2019. The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.
232232
233233
234234
235235
236236
237237 Report Title:
238238
239239 Hawaii Environmental Policy Act; Environmental Impact Statements; Environmental Assessments; Affordable Housing; Project Segmentation
240240
241241
242242
243243 Description:
244244
245245 Exempts affordable housing and certain qualifying housing development projects from HEPA. Establishes a definition of "program" and "project" to preempt the existing definitions under section 11-200.1-2, Hawaii Administrative Rules, and narrow the existing interpretation that requires analysis of tangentially related projects. Amends the applicability and requirements section of HEPA to clarify when multiple actions must be considered in the same environmental review document for the purposes of project segmentation. Expands the requirement that project opponents must exhaust their administrative remedies as a prerequisite to litigation to apply to environmental assessments and environmental impact statements. Retroactively applies to projects that received approval for their environmental assessment or environmental impact statement on or after August 9, 2019.
246246
247247
248248
249249