11 THE SENATE S.B. NO. 1181 THIRTY-SECOND LEGISLATURE, 2023 STATE OF HAWAII A BILL FOR AN ACT relating to ENERGY. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
22
33 THE SENATE S.B. NO. 1181
44 THIRTY-SECOND LEGISLATURE, 2023
55 STATE OF HAWAII
66
77 THE SENATE
88
99 S.B. NO.
1010
1111 1181
1212
1313 THIRTY-SECOND LEGISLATURE, 2023
1414
1515
1616
1717 STATE OF HAWAII
1818
1919
2020
2121
2222
2323
2424
2525
2626
2727
2828
2929
3030
3131 A BILL FOR AN ACT
3232
3333
3434
3535
3636
3737 relating to ENERGY.
3838
3939
4040
4141
4242
4343 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
4444
4545
4646
4747 SECTION 1. The legislature finds that meeting the State's goal of transitioning completely to renewable energy for electricity and transportation is most cost-efficient when certain measures are taken during the construction of new homes rather than as retrofits after construction has already been completed. The legislature further finds that when undertaken during home construction, preparation for the future installation of infrastructure for photovoltaic systems and electric vehicles can leverage existing work activities with a minimum of additional time and effort. In contrast, retrofitting a completed home to install photovoltaic infrastructure may require breaking and repairing walls, installing longer conduits, and performing expensive upgrades of already-installed electric service panels. Meanwhile, retrofitting a finished home to install electric vehicle infrastructure may require trenching, demolition, and re-paving. Furthermore, the costs for permitting, inspection, and project management are lower for new construction than for existing structures. On February 18, 2020, the office of climate change, sustainability and resiliency of the city and county of Honolulu provided cost estimates for certain measures passed by the Honolulu city council in order to make new homes "photovoltaic and electric vehicle ready". The cost estimate for solar conduit and electric panel readiness ranges from $100 to $300, and the cost estimate for electric vehicle readiness also falls within the same range. The city and county of Honolulu enacted a measure to require solar conduit and electrical panel readiness for new construction and a measure to require electric vehicle readiness when an electrical panel and parking area are installed. The legislature finds that these important actions should be adopted on a statewide basis. Therefore, the purpose of this Act is to require, beginning on January 1, 2024: (1) Solar conduit and electrical panel readiness for new residential construction; and (2) Electric vehicle readiness when an electrical panel and parking area are installed. SECTION 2. Chapter 196, Hawaii Revised Statutes, is amended by adding two new sections to be appropriately designated and to read as follows: "§196- Photovoltaic infrastructure; new residential construction. (a) With respect to the construction of new residences, construction plans shall indicate: (1) A location for inverters, metering equipment, battery equipment, energy storage equipment, and other equipment to interconnect a residence with on-site solar energy generation facilities with the electrical grid in compliance with all applicable laws and utility tariffs; and (2) A pathway for the routing of conduits from the solar panel location to the point of interconnection with electrical service. (b) An electrical panel with the capacity to accommodate not less than a five-kilowatt alternating current photovoltaic system shall be installed for each newly constructed single-family residence or each residential unit within a two-family detached residence or duplex. (c) An electrical panel that includes reserved space to accommodate a photovoltaic system shall be installed for each newly constructed multi-family residence. The electrical panel shall be sized: (1) To serve common-area electrical loads; or (2) To the amount of available space on the roof of the multi-family residence. The reserved space shall be clearly labeled "solar photovoltaic ready". (d) All feeders and electrical distribution equipment, including switchgear, switchboards, and panelboards, that will be fed simultaneously by the electrical grid and other power sources shall be sized to support the installation of future solar energy generation systems in accordance with the interconnection requirements of the applicable electrical code. (e) Conduits of not less than one and one-half inches that provide a pathway from the electrical panel to the inverter location and from the inverter location to the underside of the roof sufficient to allow future installation of solar equipment shall be installed for all newly constructed residences. (f) If conduits are to be installed between buildings or other structures, the construction plans shall provide sufficient details to demonstrate that compliance with the applicable electrical code's restrictions on the number of power supplies to each building or other structure has been examined. (g) As used in this section: "Residential unit" means each individual dwelling in a two-family detached residence or duplex. A "residential unit" shall be designed or used exclusively for residential occupancy and have all necessary facilities for permanent residency, such as living, sleeping, cooking, eating, and sanitation. "Single-family residence" means an individual, freestanding, unattached dwelling unit, typically built on a lot larger than the structure itself, resulting in an area surrounding the dwelling. "Two-family detached residence" means a freestanding, unattached dwelling unit that is intended or designed to be occupied by only two families in the following manner: (1) The individual residential units are constructed side by side and joined by a common wall; or (2) One residential unit is located on the first floor and the other residential unit is located on the second floor. §196- Electric vehicle readiness. (a) In addition to the requirements of the applicable electrical code, if an application for a building permit involves the installation of an electrical panel and parking area for: (1) A multi-family residence of three or fewer stories; or (2) A single-family residence, two-family detached residence, or duplex, a dedicated receptacle for an electric vehicle shall be provided with a minimum alternating current level 2. (b) As used in this section: "Residential unit" means each individual dwelling in a two-family detached residence or duplex. A "residential unit" shall be designed or used exclusively for residential occupancy and have all necessary facilities for permanent residency, such as living, sleeping, cooking, eating, and sanitation. "Single-family residence" means an individual, freestanding, unattached dwelling unit, typically built on a lot larger than the structure itself, resulting in an area surrounding the dwelling. "Two-family detached residence" means a freestanding, unattached dwelling unit that is intended or designed to be occupied by only two families in the following manner: (1) The individual residential units are constructed side by side and joined by a common wall; or (2) One residential unit is located on the first floor and the other residential unit is located on the second floor." SECTION 3. New statutory material is underscored. SECTION 4. This Act shall take effect on January 1, 2024. INTRODUCED BY: _____________________________
4848
4949 SECTION 1. The legislature finds that meeting the State's goal of transitioning completely to renewable energy for electricity and transportation is most cost-efficient when certain measures are taken during the construction of new homes rather than as retrofits after construction has already been completed.
5050
5151 The legislature further finds that when undertaken during home construction, preparation for the future installation of infrastructure for photovoltaic systems and electric vehicles can leverage existing work activities with a minimum of additional time and effort. In contrast, retrofitting a completed home to install photovoltaic infrastructure may require breaking and repairing walls, installing longer conduits, and performing expensive upgrades of already-installed electric service panels. Meanwhile, retrofitting a finished home to install electric vehicle infrastructure may require trenching, demolition, and re-paving. Furthermore, the costs for permitting, inspection, and project management are lower for new construction than for existing structures.
5252
5353 On February 18, 2020, the office of climate change, sustainability and resiliency of the city and county of Honolulu provided cost estimates for certain measures passed by the Honolulu city council in order to make new homes "photovoltaic and electric vehicle ready". The cost estimate for solar conduit and electric panel readiness ranges from $100 to $300, and the cost estimate for electric vehicle readiness also falls within the same range.
5454
5555 The city and county of Honolulu enacted a measure to require solar conduit and electrical panel readiness for new construction and a measure to require electric vehicle readiness when an electrical panel and parking area are installed.
5656
5757 The legislature finds that these important actions should be adopted on a statewide basis. Therefore, the purpose of this Act is to require, beginning on January 1, 2024:
5858
5959 (1) Solar conduit and electrical panel readiness for new residential construction; and
6060
6161 (2) Electric vehicle readiness when an electrical panel and parking area are installed.
6262
6363 SECTION 2. Chapter 196, Hawaii Revised Statutes, is amended by adding two new sections to be appropriately designated and to read as follows:
6464
6565 "§196- Photovoltaic infrastructure; new residential construction. (a) With respect to the construction of new residences, construction plans shall indicate:
6666
6767 (1) A location for inverters, metering equipment, battery equipment, energy storage equipment, and other equipment to interconnect a residence with on-site solar energy generation facilities with the electrical grid in compliance with all applicable laws and utility tariffs; and
6868
6969 (2) A pathway for the routing of conduits from the solar panel location to the point of interconnection with electrical service.
7070
7171 (b) An electrical panel with the capacity to accommodate not less than a five-kilowatt alternating current photovoltaic system shall be installed for each newly constructed single-family residence or each residential unit within a two-family detached residence or duplex.
7272
7373 (c) An electrical panel that includes reserved space to accommodate a photovoltaic system shall be installed for each newly constructed multi-family residence. The electrical panel shall be sized:
7474
7575 (1) To serve common-area electrical loads; or
7676
7777 (2) To the amount of available space on the roof of the multi-family residence.
7878
7979 The reserved space shall be clearly labeled "solar photovoltaic ready".
8080
8181 (d) All feeders and electrical distribution equipment, including switchgear, switchboards, and panelboards, that will be fed simultaneously by the electrical grid and other power sources shall be sized to support the installation of future solar energy generation systems in accordance with the interconnection requirements of the applicable electrical code.
8282
8383 (e) Conduits of not less than one and one-half inches that provide a pathway from the electrical panel to the inverter location and from the inverter location to the underside of the roof sufficient to allow future installation of solar equipment shall be installed for all newly constructed residences.
8484
8585 (f) If conduits are to be installed between buildings or other structures, the construction plans shall provide sufficient details to demonstrate that compliance with the applicable electrical code's restrictions on the number of power supplies to each building or other structure has been examined.
8686
8787 (g) As used in this section:
8888
8989 "Residential unit" means each individual dwelling in a two-family detached residence or duplex. A "residential unit" shall be designed or used exclusively for residential occupancy and have all necessary facilities for permanent residency, such as living, sleeping, cooking, eating, and sanitation.
9090
9191 "Single-family residence" means an individual, freestanding, unattached dwelling unit, typically built on a lot larger than the structure itself, resulting in an area surrounding the dwelling.
9292
9393 "Two-family detached residence" means a freestanding, unattached dwelling unit that is intended or designed to be occupied by only two families in the following manner:
9494
9595 (1) The individual residential units are constructed side by side and joined by a common wall; or
9696
9797 (2) One residential unit is located on the first floor and the other residential unit is located on the second floor.
9898
9999 §196- Electric vehicle readiness. (a) In addition to the requirements of the applicable electrical code, if an application for a building permit involves the installation of an electrical panel and parking area for:
100100
101101 (1) A multi-family residence of three or fewer stories; or
102102
103103 (2) A single-family residence, two-family detached residence, or duplex,
104104
105105 a dedicated receptacle for an electric vehicle shall be provided with a minimum alternating current level 2.
106106
107107 (b) As used in this section:
108108
109109 "Residential unit" means each individual dwelling in a two-family detached residence or duplex. A "residential unit" shall be designed or used exclusively for residential occupancy and have all necessary facilities for permanent residency, such as living, sleeping, cooking, eating, and sanitation.
110110
111111 "Single-family residence" means an individual, freestanding, unattached dwelling unit, typically built on a lot larger than the structure itself, resulting in an area surrounding the dwelling.
112112
113113 "Two-family detached residence" means a freestanding, unattached dwelling unit that is intended or designed to be occupied by only two families in the following manner:
114114
115115 (1) The individual residential units are constructed side by side and joined by a common wall; or
116116
117117 (2) One residential unit is located on the first floor and the other residential unit is located on the second floor."
118118
119119 SECTION 3. New statutory material is underscored.
120120
121121 SECTION 4. This Act shall take effect on January 1, 2024.
122122
123123
124124
125125 INTRODUCED BY: _____________________________
126126
127127 INTRODUCED BY:
128128
129129 _____________________________
130130
131131
132132
133133
134134
135135 Report Title: Photovoltaic Systems and Electric Vehicles; Readiness; New Residential Construction Description: Requires solar conduit and electrical panel readiness for new residential construction and electric vehicle readiness when an electrical panel and parking area are installed. Effective 1/1/2024. The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.
136136
137137
138138
139139
140140
141141 Report Title:
142142
143143 Photovoltaic Systems and Electric Vehicles; Readiness; New Residential Construction
144144
145145
146146
147147 Description:
148148
149149 Requires solar conduit and electrical panel readiness for new residential construction and electric vehicle readiness when an electrical panel and parking area are installed. Effective 1/1/2024.
150150
151151
152152
153153
154154
155155
156156