Hawaii 2023 Regular Session

Hawaii Senate Bill SB851 Compare Versions

Only one version of the bill is available at this time.
OldNewDifferences
11 THE SENATE S.B. NO. 851 THIRTY-SECOND LEGISLATURE, 2023 STATE OF HAWAII A BILL FOR AN ACT relating to capital improvement projects for the benefit of the sixteenth senatorial district. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
22
33 THE SENATE S.B. NO. 851
44 THIRTY-SECOND LEGISLATURE, 2023
55 STATE OF HAWAII
66
77 THE SENATE
88
99 S.B. NO.
1010
1111 851
1212
1313 THIRTY-SECOND LEGISLATURE, 2023
1414
1515
1616
1717 STATE OF HAWAII
1818
1919
2020
2121
2222
2323
2424
2525
2626
2727
2828
2929
3030
3131 A BILL FOR AN ACT
3232
3333
3434
3535
3636
3737 relating to capital improvement projects for the benefit of the sixteenth senatorial district.
3838
3939
4040
4141
4242
4343 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
4444
4545
4646
4747 SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $80,500,000 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2023-2024 for the purpose of capital improvement projects for the sixteenth senatorial district, as follows: 1. Aiea High School. A. Design and construction to replace cafeteria dining room windows and improvements for cooling or heat abatement measures; ground and site improvements; and equipment and appurtenances. Total funding $500,000 B. Design and construction for a new state of the art culinary program, new multipurpose room, and renovation of building C to convert culinary rooms to classrooms; ground and site improvements; and equipment and appurtenances. Total funding $12,000,000 C. Design and construction of a football field. Total funding $10,000,000 2. Aiea Elementary School. A. Installation of an elevator and construction of second floor connecting walkways for buildings A, B, and C. Design $800,000 Construction $4,000,000 Equipment $200,000 Total funding $5,000,000 B. Design, construction, and equipment for a new covered playground and a large assembly area. Design $550,000 Construction $3,500,000 Equipment $250,000 Total funding $4,300,000 3. Aiea Intermediate School. A. Design and construction for outdoor gathering area, including a stage and seating and infrastructure; ground and site improvements; and equipment and appurtenances. Total funding $3,000,000 4. Alvah Scott Elementary School. A. Design and construction for a new office area to include a health room. Plans $100,000 Design $100,000 Construction $1,500,000 Equipment $500,000 Total funding $2,200,000 5. Palisades Elementary School. A. Design and construction for a new outdoor covered playground. Design $1,077,000 Construction $4,423,000 Total funding $5,500,000 6. Pearl Ridge Elementary School. A. Design and construction for improvements to school buildings and facilities; ground and site improvements; equipment and appurtenances. Total funding $1,000,000 7. Pearl City Elementary School. A. Resurfacing of driveway. Plans $100,000 Design $100,000 Construction $2,000,000 Total funding $2,200,000 B. Slope stabilization. Plans $250,000 Design $250,000 Construction $5,000,000 Total funding $5,500,000 C. Replacement of water supply lines. Plans $250,000 Design $250,000 Construction $5,000,000 Total funding $5,500,000 D. Replacement of playground equipment. Plans $100,000 Design $100,000 Construction $2,000,000 Total funding $2,200,000 8. Pearl City High School. A. Resurfacing tennis courts. Design $50,000 Construction $600,000 Total funding $650,000 B. Retrofitting and renovation of A/B and C/D and KLM elevators. Plans $50,000 Design $200,000 Construction $1,000,000 Equipment $100,000 Total funding $1,350,000 C. Installation of dimmer system and lighting replacement in the Michael D. Nakasone Auditorium. Plans $250,000 Design $250,000 Construction $3,000,000 Equipment $500,000 Total funding $4,000,000 9. Waiau Elementary School. A. Covered walkways from portables to cafeteria. Plans $50,000 Design $50,000 Construction $1,000,000 Total funding $1,100,000 10. Waimalu Elementary School. A. Drainage for building F and library. Design $400,000 Construction $1,600,000 Total funding $2,000,000 B. Covered playground. Design $500,000 Construction $3,000,000 Total funding $3,500,000 11. Webling Elementary School. A. Design and construction for the expansion of the administration and library buildings and covered walkways to classroom buildings; ground and site improvements; equipment and appurtenances. Total funding $7,000,000 B. Construction of a dedicated custodian room and work area. Total funding $1,000,000 C. Resurfacing and line painting of basketball court; replacement of basketball rims. Total funding $1,000,000 SECTION 2. The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriations are made; provided that all moneys from the appropriations that are unencumbered as of June 30, 2026, shall lapse as of that date. SECTION 3. The sums appropriated for the respective capital improvement projects set forth in section 1 shall be expended for the purposes of this Act by the department of education. SECTION 4. This Act shall take effect on July 1, 2023. INTRODUCED BY: _____________________________
4848
4949 SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $80,500,000 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2023-2024 for the purpose of capital improvement projects for the sixteenth senatorial district, as follows:
5050
5151 1. Aiea High School.
5252
5353 A. Design and construction to replace cafeteria dining room windows and improvements for cooling or heat abatement measures; ground and site improvements; and equipment and appurtenances.
5454
5555 Total funding $500,000
5656
5757 B. Design and construction for a new state of the art culinary program, new multipurpose room, and renovation of building C to convert culinary rooms to classrooms; ground and site improvements; and equipment and appurtenances.
5858
5959 Total funding $12,000,000
6060
6161 C. Design and construction of a football field.
6262
6363 Total funding $10,000,000
6464
6565 2. Aiea Elementary School.
6666
6767 A. Installation of an elevator and construction of second floor connecting walkways for buildings A, B, and C.
6868
6969 Design $800,000
7070
7171 Construction $4,000,000
7272
7373 Equipment $200,000
7474
7575 Total funding $5,000,000
7676
7777 B. Design, construction, and equipment for a new covered playground and a large assembly area.
7878
7979 Design $550,000
8080
8181 Construction $3,500,000
8282
8383 Equipment $250,000
8484
8585 Total funding $4,300,000
8686
8787 3. Aiea Intermediate School.
8888
8989 A. Design and construction for outdoor gathering area, including a stage and seating and infrastructure; ground and site improvements; and equipment and appurtenances.
9090
9191 Total funding $3,000,000
9292
9393 4. Alvah Scott Elementary School.
9494
9595 A. Design and construction for a new office area to include a health room.
9696
9797 Plans $100,000
9898
9999 Design $100,000
100100
101101 Construction $1,500,000
102102
103103 Equipment $500,000
104104
105105 Total funding $2,200,000
106106
107107 5. Palisades Elementary School.
108108
109109 A. Design and construction for a new outdoor covered playground.
110110
111111 Design $1,077,000
112112
113113 Construction $4,423,000
114114
115115 Total funding $5,500,000
116116
117117 6. Pearl Ridge Elementary School.
118118
119119 A. Design and construction for improvements to school buildings and facilities; ground and site improvements; equipment and appurtenances.
120120
121121 Total funding $1,000,000
122122
123123 7. Pearl City Elementary School.
124124
125125 A. Resurfacing of driveway.
126126
127127 Plans $100,000
128128
129129 Design $100,000
130130
131131 Construction $2,000,000
132132
133133 Total funding $2,200,000
134134
135135 B. Slope stabilization.
136136
137137 Plans $250,000
138138
139139 Design $250,000
140140
141141 Construction $5,000,000
142142
143143 Total funding $5,500,000
144144
145145 C. Replacement of water supply lines.
146146
147147 Plans $250,000
148148
149149 Design $250,000
150150
151151 Construction $5,000,000
152152
153153 Total funding $5,500,000
154154
155155 D. Replacement of playground equipment.
156156
157157 Plans $100,000
158158
159159 Design $100,000
160160
161161 Construction $2,000,000
162162
163163 Total funding $2,200,000
164164
165165 8. Pearl City High School.
166166
167167 A. Resurfacing tennis courts.
168168
169169 Design $50,000
170170
171171 Construction $600,000
172172
173173 Total funding $650,000
174174
175175 B. Retrofitting and renovation of A/B and C/D and KLM elevators.
176176
177177 Plans $50,000
178178
179179 Design $200,000
180180
181181 Construction $1,000,000
182182
183183 Equipment $100,000
184184
185185 Total funding $1,350,000
186186
187187 C. Installation of dimmer system and lighting replacement in the Michael D. Nakasone Auditorium.
188188
189189 Plans $250,000
190190
191191 Design $250,000
192192
193193 Construction $3,000,000
194194
195195 Equipment $500,000
196196
197197 Total funding $4,000,000
198198
199199 9. Waiau Elementary School.
200200
201201 A. Covered walkways from portables to cafeteria.
202202
203203 Plans $50,000
204204
205205 Design $50,000
206206
207207 Construction $1,000,000
208208
209209 Total funding $1,100,000
210210
211211 10. Waimalu Elementary School.
212212
213213 A. Drainage for building F and library.
214214
215215 Design $400,000
216216
217217 Construction $1,600,000
218218
219219 Total funding $2,000,000
220220
221221 B. Covered playground.
222222
223223 Design $500,000
224224
225225 Construction $3,000,000
226226
227227 Total funding $3,500,000
228228
229229 11. Webling Elementary School.
230230
231231 A. Design and construction for the expansion of the administration and library buildings and covered walkways to classroom buildings; ground and site improvements; equipment and appurtenances.
232232
233233 Total funding $7,000,000
234234
235235 B. Construction of a dedicated custodian room and work area.
236236
237237 Total funding $1,000,000
238238
239239 C. Resurfacing and line painting of basketball court; replacement of basketball rims.
240240
241241 Total funding $1,000,000
242242
243243 SECTION 2. The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriations are made; provided that all moneys from the appropriations that are unencumbered as of June 30, 2026, shall lapse as of that date.
244244
245245 SECTION 3. The sums appropriated for the respective capital improvement projects set forth in section 1 shall be expended for the purposes of this Act by the department of education.
246246
247247 SECTION 4. This Act shall take effect on July 1, 2023.
248248
249249
250250
251251 INTRODUCED BY: _____________________________
252252
253253 INTRODUCED BY:
254254
255255 _____________________________
256256
257257
258258
259259
260260
261261
262262
263263
264264
265265
266266
267267
268268
269269
270270
271271
272272
273273
274274
275275
276276
277277
278278
279279
280280
281281
282282
283283
284284
285285
286286
287287
288288
289289 Report Title: CIP Sixteenth Senatorial District; Appropriations Description: Appropriates funds for capital improvement projects in the sixteenth senatorial district. The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.
290290
291291
292292
293293
294294
295295 Report Title:
296296
297297 CIP Sixteenth Senatorial District; Appropriations
298298
299299
300300
301301 Description:
302302
303303 Appropriates funds for capital improvement projects in the sixteenth senatorial district.
304304
305305
306306
307307
308308
309309
310310
311311 The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.