Hawaii 2024 Regular Session

Hawaii House Bill HB2169 Compare Versions

Only one version of the bill is available at this time.
OldNewDifferences
11 HOUSE OF REPRESENTATIVES H.B. NO. 2169 THIRTY-SECOND LEGISLATURE, 2024 STATE OF HAWAII A BILL FOR AN ACT RELATING TO HIGH-VOLTAGE ELECTRIC TRANSMISSION LINES. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
22
33 HOUSE OF REPRESENTATIVES H.B. NO. 2169
44 THIRTY-SECOND LEGISLATURE, 2024
55 STATE OF HAWAII
66
77 HOUSE OF REPRESENTATIVES
88
99 H.B. NO.
1010
1111 2169
1212
1313 THIRTY-SECOND LEGISLATURE, 2024
1414
1515
1616
1717 STATE OF HAWAII
1818
1919
2020
2121
2222
2323
2424
2525
2626
2727
2828
2929
3030
3131 A BILL FOR AN ACT
3232
3333
3434
3535
3636
3737 RELATING TO HIGH-VOLTAGE ELECTRIC TRANSMISSION LINES.
3838
3939
4040
4141
4242
4343 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
4444
4545
4646
4747 SECTION 1. Section 269-27.5, Hawaii Revised Statutes, is amended to read as follows: "[[]§269-27.5[]] Construction of overhead high-voltage electric transmission lines; hearing. Whenever a public utility [plans] seeks approval to place, construct, erect, or otherwise build a new 46 kilovolt or greater high-voltage electric transmission system above the surface of the ground through any residential area[,] pursuant to section 269-7.6, the public utilities commission shall conduct a public hearing prior to its issuance of approval thereof. Notice of the hearing shall be given in the manner provided in section 269-16 for notice of public hearings." SECTION 2. Section 269-27.6, Hawaii Revised Statutes, is amended to read as follows: "§269-27.6 Construction of overhead high-voltage electric transmission lines; [overhead or underground construction. (a)] prohibited. Notwithstanding any law to the contrary, [whenever a] no public utility [applies to the public utilities commission for approval to] shall place, construct, erect, or otherwise build a new 46 kilovolt or greater high-voltage electric transmission system[, either] above [or below] the surface of the ground[, the public utilities commission shall determine whether the electric transmission system shall be placed, constructed, erected, or built above or below the surface of the ground; provided that in its determination, the public utilities commission shall consider: (1) Whether a benefit exists that outweighs the costs of placing the electric transmission system underground; (2) Whether there is a governmental public policy requiring the electric transmission system to be placed, constructed, erected, or built underground, and the governmental agency establishing the policy commits funds for the additional costs of undergrounding; (3) Whether any governmental agency or other parties are willing to pay for the additional costs of undergrounding; (4) The recommendation of the division of consumer advocacy of the department of commerce and consumer affairs, which shall be based on an evaluation of the factors set forth under this subsection; and (5) Any other relevant factors. (b) In making the determination set forth in subsection (a), for new 138 kilovolt or greater high-voltage electric transmission systems, the public utilities commission shall evaluate and make specific findings on all of the following factors: (1) The amortized cost of construction over the respective usable life of an above-ground versus underground system; (2) The amortized cost of repair over the respective usable life of an above-ground versus underground system; (3) The risk of damage or destruction over the respective usable life of an above-ground versus an underground system; (4) The relative safety and liability risks of an above-ground versus underground system; (5) The electromagnetic field emission exposure from an above-ground versus underground system; (6) The proximity and visibility of an above-ground system to: (A) High density population areas; (B) Conservation and other valuable natural resource and public recreation areas; (C) Areas of special importance to the tourism industry; and (D) Other industries particularly dependent on Hawaii's natural beauty; (7) The length of the system; (8) The breadth and depth of public sentiment with respect to an above-ground versus underground system; and (9) Any other factors that the public utilities commission deems relevant. (c) A public utility making an application to the public utilities commission under this section shall clearly and fully state and support its evaluation of each factor set forth in subsection (b). (d) Notwithstanding the requirements under subsections (a) and (b), a public utility shall not be required to seek public utilities commission approval to place, construct, erect, or otherwise build a high-voltage electric transmission system if: (1) The electric transmission system is to be built underground; (2) The entire cost due to building underground, rather than above-ground, is paid by an entity other than the public utility as a contribution in aid of construction; and (3) Prior to commencing construction, the public utility provides a report to the public utilities commission, with a copy to the consumer advocate, describing in detail the electric transmission system and providing sufficient documentation that affirms that the additional costs of building the electric transmission system underground will be paid by an entity other than the public utility. (e) The public utilities commission shall have sixty days to take action on the report filed pursuant to subsection (d)(3), or it shall be assumed that the public utility may proceed with the project]." SECTION 3. (a) No later than , 2024, the office of planning and sustainable development shall submit to the public utilities commission a report identifying the areas of the State having the highest risk of wildfires. Upon receipt of the report, the public utilities commission shall require each public utility that owns an overhead high-voltage electric transmission line to underground each of the public utility's overhead high-voltage electric transmission lines; provided that any utility that owns multiple overhead high-voltage electric transmission lines shall prioritize the undergrounding of high‑voltage electric transmission lines in areas of the State having the highest risk of wildfires, as identified by the office of planning and sustainable development. (b) As used in this section: "Overhead high-voltage electric transmission line" means a high-voltage electric transmission line that was placed, constructed, erected, or otherwise built above the surface of the ground. "Underground" or "undergrounding" means the process of replacing an overhead high-voltage electric transmission line with a new high-voltage electric transmission line that is placed, constructed, erected, or otherwise built under the surface of the ground. SECTION 4. Statutory material to be repealed is bracketed and stricken. New statutory material is underscored. SECTION 5. This Act shall take effect upon its approval. INTRODUCED BY: _____________________________
4848
4949 SECTION 1. Section 269-27.5, Hawaii Revised Statutes, is amended to read as follows:
5050
5151 "[[]§269-27.5[]] Construction of overhead high-voltage electric transmission lines; hearing. Whenever a public utility [plans] seeks approval to place, construct, erect, or otherwise build a new 46 kilovolt or greater high-voltage electric transmission system above the surface of the ground through any residential area[,] pursuant to section 269-7.6, the public utilities commission shall conduct a public hearing prior to its issuance of approval thereof. Notice of the hearing shall be given in the manner provided in section 269-16 for notice of public hearings."
5252
5353 SECTION 2. Section 269-27.6, Hawaii Revised Statutes, is amended to read as follows:
5454
5555 "§269-27.6 Construction of overhead high-voltage electric transmission lines; [overhead or underground construction. (a)] prohibited. Notwithstanding any law to the contrary, [whenever a] no public utility [applies to the public utilities commission for approval to] shall place, construct, erect, or otherwise build a new 46 kilovolt or greater high-voltage electric transmission system[, either] above [or below] the surface of the ground[, the public utilities commission shall determine whether the electric transmission system shall be placed, constructed, erected, or built above or below the surface of the ground; provided that in its determination, the public utilities commission shall consider:
5656
5757 (1) Whether a benefit exists that outweighs the costs of placing the electric transmission system underground;
5858
5959 (2) Whether there is a governmental public policy requiring the electric transmission system to be placed, constructed, erected, or built underground, and the governmental agency establishing the policy commits funds for the additional costs of undergrounding;
6060
6161 (3) Whether any governmental agency or other parties are willing to pay for the additional costs of undergrounding;
6262
6363 (4) The recommendation of the division of consumer advocacy of the department of commerce and consumer affairs, which shall be based on an evaluation of the factors set forth under this subsection; and
6464
6565 (5) Any other relevant factors.
6666
6767 (b) In making the determination set forth in subsection (a), for new 138 kilovolt or greater high-voltage electric transmission systems, the public utilities commission shall evaluate and make specific findings on all of the following factors:
6868
6969 (1) The amortized cost of construction over the respective usable life of an above-ground versus underground system;
7070
7171 (2) The amortized cost of repair over the respective usable life of an above-ground versus underground system;
7272
7373 (3) The risk of damage or destruction over the respective usable life of an above-ground versus an underground system;
7474
7575 (4) The relative safety and liability risks of an above-ground versus underground system;
7676
7777 (5) The electromagnetic field emission exposure from an above-ground versus underground system;
7878
7979 (6) The proximity and visibility of an above-ground system to:
8080
8181 (A) High density population areas;
8282
8383 (B) Conservation and other valuable natural resource and public recreation areas;
8484
8585 (C) Areas of special importance to the tourism industry; and
8686
8787 (D) Other industries particularly dependent on Hawaii's natural beauty;
8888
8989 (7) The length of the system;
9090
9191 (8) The breadth and depth of public sentiment with respect to an above-ground versus underground system; and
9292
9393 (9) Any other factors that the public utilities commission deems relevant.
9494
9595 (c) A public utility making an application to the public utilities commission under this section shall clearly and fully state and support its evaluation of each factor set forth in subsection (b).
9696
9797 (d) Notwithstanding the requirements under subsections (a) and (b), a public utility shall not be required to seek public utilities commission approval to place, construct, erect, or otherwise build a high-voltage electric transmission system if:
9898
9999 (1) The electric transmission system is to be built underground;
100100
101101 (2) The entire cost due to building underground, rather than above-ground, is paid by an entity other than the public utility as a contribution in aid of construction; and
102102
103103 (3) Prior to commencing construction, the public utility provides a report to the public utilities commission, with a copy to the consumer advocate, describing in detail the electric transmission system and providing sufficient documentation that affirms that the additional costs of building the electric transmission system underground will be paid by an entity other than the public utility.
104104
105105 (e) The public utilities commission shall have sixty days to take action on the report filed pursuant to subsection (d)(3), or it shall be assumed that the public utility may proceed with the project]."
106106
107107 SECTION 3. (a) No later than , 2024, the office of planning and sustainable development shall submit to the public utilities commission a report identifying the areas of the State having the highest risk of wildfires. Upon receipt of the report, the public utilities commission shall require each public utility that owns an overhead high-voltage electric transmission line to underground each of the public utility's overhead high-voltage electric transmission lines; provided that any utility that owns multiple overhead high-voltage electric transmission lines shall prioritize the undergrounding of high‑voltage electric transmission lines in areas of the State having the highest risk of wildfires, as identified by the office of planning and sustainable development.
108108
109109 (b) As used in this section:
110110
111111 "Overhead high-voltage electric transmission line" means a high-voltage electric transmission line that was placed, constructed, erected, or otherwise built above the surface of the ground.
112112
113113 "Underground" or "undergrounding" means the process of replacing an overhead high-voltage electric transmission line with a new high-voltage electric transmission line that is placed, constructed, erected, or otherwise built under the surface of the ground.
114114
115115 SECTION 4. Statutory material to be repealed is bracketed and stricken. New statutory material is underscored.
116116
117117 SECTION 5. This Act shall take effect upon its approval.
118118
119119
120120
121121 INTRODUCED BY: _____________________________
122122
123123 INTRODUCED BY:
124124
125125 _____________________________
126126
127127
128128
129129
130130
131131 Report Title: PUC; OPSD; Public Utilities; High-Voltage Electric Transmission Lines; Overhead Construction; Undergrounding Description: Prohibits the construction of overhead high-voltage electric transmission lines. Requires the Office of Planning and Sustainable Development to submit to the Public Utilities Commission a report identifying the areas of the State having the highest risk of wildfires. Requires the Public Utilities Commission to direct certain public utilities to underground all existing overhead high-voltage electric transmission lines. The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.
132132
133133
134134
135135
136136
137137
138138
139139 Report Title:
140140
141141 PUC; OPSD; Public Utilities; High-Voltage Electric Transmission Lines; Overhead Construction; Undergrounding
142142
143143
144144
145145 Description:
146146
147147 Prohibits the construction of overhead high-voltage electric transmission lines. Requires the Office of Planning and Sustainable Development to submit to the Public Utilities Commission a report identifying the areas of the State having the highest risk of wildfires. Requires the Public Utilities Commission to direct certain public utilities to underground all existing overhead high-voltage electric transmission lines.
148148
149149
150150
151151