1 | 1 | | HOUSE OF REPRESENTATIVES H.B. NO. 363 THIRTY-SECOND LEGISLATURE, 2023 STATE OF HAWAII A BILL FOR AN ACT relating to capital improvement projects for the benefit of THE Thirty-first REPRESENTATIVE DISTRICT. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII: |
---|
2 | 2 | | |
---|
3 | 3 | | HOUSE OF REPRESENTATIVES H.B. NO. 363 |
---|
4 | 4 | | THIRTY-SECOND LEGISLATURE, 2023 |
---|
5 | 5 | | STATE OF HAWAII |
---|
6 | 6 | | |
---|
7 | 7 | | HOUSE OF REPRESENTATIVES |
---|
8 | 8 | | |
---|
9 | 9 | | H.B. NO. |
---|
10 | 10 | | |
---|
11 | 11 | | 363 |
---|
12 | 12 | | |
---|
13 | 13 | | THIRTY-SECOND LEGISLATURE, 2023 |
---|
14 | 14 | | |
---|
15 | 15 | | |
---|
16 | 16 | | |
---|
17 | 17 | | STATE OF HAWAII |
---|
18 | 18 | | |
---|
19 | 19 | | |
---|
20 | 20 | | |
---|
21 | 21 | | |
---|
22 | 22 | | |
---|
23 | 23 | | |
---|
24 | 24 | | |
---|
25 | 25 | | |
---|
26 | 26 | | |
---|
27 | 27 | | |
---|
28 | 28 | | |
---|
29 | 29 | | |
---|
30 | 30 | | |
---|
31 | 31 | | A BILL FOR AN ACT |
---|
32 | 32 | | |
---|
33 | 33 | | |
---|
34 | 34 | | |
---|
35 | 35 | | |
---|
36 | 36 | | |
---|
37 | 37 | | relating to capital improvement projects for the benefit of THE Thirty-first REPRESENTATIVE DISTRICT. |
---|
38 | 38 | | |
---|
39 | 39 | | |
---|
40 | 40 | | |
---|
41 | 41 | | |
---|
42 | 42 | | |
---|
43 | 43 | | BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII: |
---|
44 | 44 | | |
---|
45 | 45 | | |
---|
46 | 46 | | |
---|
47 | 47 | | SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $35,982,000 or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2023-2024 for the purpose of capital improvement projects for the thirty-first representative district, as follows: 1. Aliamanu elementary school Plans, land, design, construction, and equipment and appurtenances for the redesign and expansion of the common area, offices, and conference room and additional storage. Plans $49,000 Land $1,000 Design $600,000 Construction $10,000,000 Equipment $1,000,000 Total funding $11,650,000 The sum appropriated for this capital improvement project shall be expended by the department of education. 2. Aliamanu middle school Plans, land, design, construction, and equipment and appurtenances for building a 21st century maker space room. Plans $30,000 Land $1,000 Design $60,000 Construction $400,000 Equipment $710,000 Total funding $1,201,000 The sum appropriated for this capital improvement project shall be expended by the department of education. 3. Aliamanu middle school Plans, land, design, construction, and equipment and appurtenances for covering E Quad. Plans $30,000 Land $1,000 Design $60,000 Construction $4,300,000 Equipment $110,000 Total funding $4,501,000 The sum appropriated for this capital improvement project shall be expended by the department of education. 4. Aliamanu middle school Plans, land, design, construction, and equipment and appurtenances for phone/intercom upgrades for safety and security. Plans $25,000 Land $1,000 Design $50,000 Construction $300,000 Equipment $400,000 Total funding $776,000 The sum appropriated for this capital improvement project shall be expended by the department of education. 5. Aliamanu middle school Plans, land, design, construction, and equipment and appurtenances for resurfacing the basketball and volleyball courts. Plans $40,000 Land $1,000 Design $60,000 Construction $1,000,000 Equipment $200,000 Total funding $1,301,000 The sum appropriated for this capital improvement project shall be expended by the department of education. 6. Makalapa elementary school Plans, land, design, construction, and equipment and appurtenances for a school-wide electrical upgrade to provide appropriate technological classroom advancements and a comfortable learning environment by employing the use of air conditioning. Plans $1,000 Land $1,000 Design $337,000 Construction $1,500,000 Equipment $1,000 Total funding $1,840,000 The sum appropriated for this capital improvement project shall be expended by the department of education. 7. Makalapa elementary school Plans, land, design, construction, and equipment and appurtenances for installing covered walkways and awnings. Plans $1,000 Land $1,000 Design $25,000 Construction $125,000 Equipment $1,000 Total funding $153,000 The sum appropriated for this capital improvement project shall be expended by the department of education. 8. Moanalua high school Plans, land, design, construction, and equipment and appurtenances for synthetic turf field and track improvements. Plans $1,000 Land $1,000 Design $600,000 Construction $5,100,000 Equipment $100,000 Total funding $5,802,000 The sum appropriated for this capital improvement project shall be expended by the department of education. 9. Moanalua middle school Plans, land, design, construction, and equipment and appurtenances for the completion of the outdoor covered playcourt. Plans $1,000 Land $1,000 Design $1,000 Construction $2,000,000 Equipment $2,000,000 Total funding $4,003,000 The sum appropriated for this capital improvement project shall be expended by the department of education. 10. Pearl Harbor elementary school Plans, land, design, construction, and equipment and appurtenances for expanding the library and computer lab. Plans $1,000 Land $1,000 Design $400,000 Construction $1,100,000 Equipment $1,000 Total funding $1,503,000 The sum appropriated for this capital improvement project shall be expended by the department of education. 11. Radford high school Plans, land, design, construction, and equipment and appurtenances for the installation of gym fans. Plans $100,000 Land $1,000 Design $100,000 Construction $1,000,000 Equipment $800,000 Total funding $2,001,000 The sum appropriated for this capital improvement project shall be expended by the department of education. 12. Salt Lake elementary school Plans, land, design, construction, and equipment and appurtenances for the installation of synthetic turf on the school playground. Plans $50,000 Land $1,000 Design $200,000 Construction $500,000 Equipment $500,000 Total funding $1,251,000 The sum appropriated for this capital improvement project shall be expended by the department of education. SECTION 2. The appropriation made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriation is made; provided that all moneys from the appropriation unencumbered as of June 30, 2026, shall lapse as of that date. SECTION 3. This Act shall take effect on July 1, 2023. INTRODUCED BY: _____________________________ |
---|
48 | 48 | | |
---|
49 | 49 | | SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $35,982,000 or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2023-2024 for the purpose of capital improvement projects for the thirty-first representative district, as follows: |
---|
50 | 50 | | |
---|
51 | 51 | | 1. Aliamanu elementary school |
---|
52 | 52 | | |
---|
53 | 53 | | Plans, land, design, construction, and equipment and appurtenances for the redesign and expansion of the common area, offices, and conference room and additional storage. |
---|
54 | 54 | | |
---|
55 | 55 | | Plans $49,000 |
---|
56 | 56 | | |
---|
57 | 57 | | Land $1,000 |
---|
58 | 58 | | |
---|
59 | 59 | | Design $600,000 |
---|
60 | 60 | | |
---|
61 | 61 | | Construction $10,000,000 |
---|
62 | 62 | | |
---|
63 | 63 | | Equipment $1,000,000 |
---|
64 | 64 | | |
---|
65 | 65 | | Total funding $11,650,000 |
---|
66 | 66 | | |
---|
67 | 67 | | The sum appropriated for this capital improvement project shall be expended by the department of education. |
---|
68 | 68 | | |
---|
69 | 69 | | 2. Aliamanu middle school |
---|
70 | 70 | | |
---|
71 | 71 | | Plans, land, design, construction, and equipment and appurtenances for building a 21st century maker space room. |
---|
72 | 72 | | |
---|
73 | 73 | | Plans $30,000 |
---|
74 | 74 | | |
---|
75 | 75 | | Land $1,000 |
---|
76 | 76 | | |
---|
77 | 77 | | Design $60,000 |
---|
78 | 78 | | |
---|
79 | 79 | | Construction $400,000 |
---|
80 | 80 | | |
---|
81 | 81 | | Equipment $710,000 |
---|
82 | 82 | | |
---|
83 | 83 | | Total funding $1,201,000 |
---|
84 | 84 | | |
---|
85 | 85 | | The sum appropriated for this capital improvement project shall be expended by the department of education. |
---|
86 | 86 | | |
---|
87 | 87 | | 3. Aliamanu middle school |
---|
88 | 88 | | |
---|
89 | 89 | | Plans, land, design, construction, and equipment and appurtenances for covering E Quad. |
---|
90 | 90 | | |
---|
91 | 91 | | Plans $30,000 |
---|
92 | 92 | | |
---|
93 | 93 | | Land $1,000 |
---|
94 | 94 | | |
---|
95 | 95 | | Design $60,000 |
---|
96 | 96 | | |
---|
97 | 97 | | Construction $4,300,000 |
---|
98 | 98 | | |
---|
99 | 99 | | Equipment $110,000 |
---|
100 | 100 | | |
---|
101 | 101 | | Total funding $4,501,000 |
---|
102 | 102 | | |
---|
103 | 103 | | The sum appropriated for this capital improvement project shall be expended by the department of education. |
---|
104 | 104 | | |
---|
105 | 105 | | 4. Aliamanu middle school |
---|
106 | 106 | | |
---|
107 | 107 | | Plans, land, design, construction, and equipment and appurtenances for phone/intercom upgrades for safety and security. |
---|
108 | 108 | | |
---|
109 | 109 | | Plans $25,000 |
---|
110 | 110 | | |
---|
111 | 111 | | Land $1,000 |
---|
112 | 112 | | |
---|
113 | 113 | | Design $50,000 |
---|
114 | 114 | | |
---|
115 | 115 | | Construction $300,000 |
---|
116 | 116 | | |
---|
117 | 117 | | Equipment $400,000 |
---|
118 | 118 | | |
---|
119 | 119 | | Total funding $776,000 |
---|
120 | 120 | | |
---|
121 | 121 | | The sum appropriated for this capital improvement project shall be expended by the department of education. |
---|
122 | 122 | | |
---|
123 | 123 | | 5. Aliamanu middle school |
---|
124 | 124 | | |
---|
125 | 125 | | Plans, land, design, construction, and equipment and appurtenances for resurfacing the basketball and volleyball courts. |
---|
126 | 126 | | |
---|
127 | 127 | | Plans $40,000 |
---|
128 | 128 | | |
---|
129 | 129 | | Land $1,000 |
---|
130 | 130 | | |
---|
131 | 131 | | Design $60,000 |
---|
132 | 132 | | |
---|
133 | 133 | | Construction $1,000,000 |
---|
134 | 134 | | |
---|
135 | 135 | | Equipment $200,000 |
---|
136 | 136 | | |
---|
137 | 137 | | Total funding $1,301,000 |
---|
138 | 138 | | |
---|
139 | 139 | | The sum appropriated for this capital improvement project shall be expended by the department of education. |
---|
140 | 140 | | |
---|
141 | 141 | | 6. Makalapa elementary school |
---|
142 | 142 | | |
---|
143 | 143 | | Plans, land, design, construction, and equipment and appurtenances for a school-wide electrical upgrade to provide appropriate technological classroom advancements and a comfortable learning environment by employing the use of air conditioning. |
---|
144 | 144 | | |
---|
145 | 145 | | Plans $1,000 |
---|
146 | 146 | | |
---|
147 | 147 | | Land $1,000 |
---|
148 | 148 | | |
---|
149 | 149 | | Design $337,000 |
---|
150 | 150 | | |
---|
151 | 151 | | Construction $1,500,000 |
---|
152 | 152 | | |
---|
153 | 153 | | Equipment $1,000 |
---|
154 | 154 | | |
---|
155 | 155 | | Total funding $1,840,000 |
---|
156 | 156 | | |
---|
157 | 157 | | The sum appropriated for this capital improvement project shall be expended by the department of education. |
---|
158 | 158 | | |
---|
159 | 159 | | 7. Makalapa elementary school |
---|
160 | 160 | | |
---|
161 | 161 | | Plans, land, design, construction, and equipment and appurtenances for installing covered walkways and awnings. |
---|
162 | 162 | | |
---|
163 | 163 | | Plans $1,000 |
---|
164 | 164 | | |
---|
165 | 165 | | Land $1,000 |
---|
166 | 166 | | |
---|
167 | 167 | | Design $25,000 |
---|
168 | 168 | | |
---|
169 | 169 | | Construction $125,000 |
---|
170 | 170 | | |
---|
171 | 171 | | Equipment $1,000 |
---|
172 | 172 | | |
---|
173 | 173 | | Total funding $153,000 |
---|
174 | 174 | | |
---|
175 | 175 | | The sum appropriated for this capital improvement project shall be expended by the department of education. |
---|
176 | 176 | | |
---|
177 | 177 | | 8. Moanalua high school |
---|
178 | 178 | | |
---|
179 | 179 | | Plans, land, design, construction, and equipment and appurtenances for synthetic turf field and track improvements. |
---|
180 | 180 | | |
---|
181 | 181 | | Plans $1,000 |
---|
182 | 182 | | |
---|
183 | 183 | | Land $1,000 |
---|
184 | 184 | | |
---|
185 | 185 | | Design $600,000 |
---|
186 | 186 | | |
---|
187 | 187 | | Construction $5,100,000 |
---|
188 | 188 | | |
---|
189 | 189 | | Equipment $100,000 |
---|
190 | 190 | | |
---|
191 | 191 | | Total funding $5,802,000 |
---|
192 | 192 | | |
---|
193 | 193 | | The sum appropriated for this capital improvement project shall be expended by the department of education. |
---|
194 | 194 | | |
---|
195 | 195 | | 9. Moanalua middle school |
---|
196 | 196 | | |
---|
197 | 197 | | Plans, land, design, construction, and equipment and appurtenances for the completion of the outdoor covered playcourt. |
---|
198 | 198 | | |
---|
199 | 199 | | Plans $1,000 |
---|
200 | 200 | | |
---|
201 | 201 | | Land $1,000 |
---|
202 | 202 | | |
---|
203 | 203 | | Design $1,000 |
---|
204 | 204 | | |
---|
205 | 205 | | Construction $2,000,000 |
---|
206 | 206 | | |
---|
207 | 207 | | Equipment $2,000,000 |
---|
208 | 208 | | |
---|
209 | 209 | | Total funding $4,003,000 |
---|
210 | 210 | | |
---|
211 | 211 | | The sum appropriated for this capital improvement project shall be expended by the department of education. |
---|
212 | 212 | | |
---|
213 | 213 | | 10. Pearl Harbor elementary school |
---|
214 | 214 | | |
---|
215 | 215 | | Plans, land, design, construction, and equipment and appurtenances for expanding the library and computer lab. |
---|
216 | 216 | | |
---|
217 | 217 | | Plans $1,000 |
---|
218 | 218 | | |
---|
219 | 219 | | Land $1,000 |
---|
220 | 220 | | |
---|
221 | 221 | | Design $400,000 |
---|
222 | 222 | | |
---|
223 | 223 | | Construction $1,100,000 |
---|
224 | 224 | | |
---|
225 | 225 | | Equipment $1,000 |
---|
226 | 226 | | |
---|
227 | 227 | | Total funding $1,503,000 |
---|
228 | 228 | | |
---|
229 | 229 | | The sum appropriated for this capital improvement project shall be expended by the department of education. |
---|
230 | 230 | | |
---|
231 | 231 | | 11. Radford high school |
---|
232 | 232 | | |
---|
233 | 233 | | Plans, land, design, construction, and equipment and appurtenances for the installation of gym fans. |
---|
234 | 234 | | |
---|
235 | 235 | | Plans $100,000 |
---|
236 | 236 | | |
---|
237 | 237 | | Land $1,000 |
---|
238 | 238 | | |
---|
239 | 239 | | Design $100,000 |
---|
240 | 240 | | |
---|
241 | 241 | | Construction $1,000,000 |
---|
242 | 242 | | |
---|
243 | 243 | | Equipment $800,000 |
---|
244 | 244 | | |
---|
245 | 245 | | Total funding $2,001,000 |
---|
246 | 246 | | |
---|
247 | 247 | | The sum appropriated for this capital improvement project shall be expended by the department of education. |
---|
248 | 248 | | |
---|
249 | 249 | | 12. Salt Lake elementary school |
---|
250 | 250 | | |
---|
251 | 251 | | Plans, land, design, construction, and equipment and appurtenances for the installation of synthetic turf on the school playground. |
---|
252 | 252 | | |
---|
253 | 253 | | Plans $50,000 |
---|
254 | 254 | | |
---|
255 | 255 | | Land $1,000 |
---|
256 | 256 | | |
---|
257 | 257 | | Design $200,000 |
---|
258 | 258 | | |
---|
259 | 259 | | Construction $500,000 |
---|
260 | 260 | | |
---|
261 | 261 | | Equipment $500,000 |
---|
262 | 262 | | |
---|
263 | 263 | | Total funding $1,251,000 |
---|
264 | 264 | | |
---|
265 | 265 | | The sum appropriated for this capital improvement project shall be expended by the department of education. |
---|
266 | 266 | | |
---|
267 | 267 | | SECTION 2. The appropriation made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriation is made; provided that all moneys from the appropriation unencumbered as of June 30, 2026, shall lapse as of that date. |
---|
268 | 268 | | |
---|
269 | 269 | | SECTION 3. This Act shall take effect on July 1, 2023. |
---|
270 | 270 | | |
---|
271 | 271 | | |
---|
272 | 272 | | |
---|
273 | 273 | | INTRODUCED BY: _____________________________ |
---|
274 | 274 | | |
---|
275 | 275 | | INTRODUCED BY: |
---|
276 | 276 | | |
---|
277 | 277 | | _____________________________ |
---|
278 | 278 | | |
---|
279 | 279 | | |
---|
280 | 280 | | |
---|
281 | 281 | | |
---|
282 | 282 | | |
---|
283 | 283 | | Report Title: CIP; Thirty-first Representative District; Appropriation Description: Appropriates funds for capital improvement projects in the thirty-first representative district. The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent. |
---|
284 | 284 | | |
---|
285 | 285 | | |
---|
286 | 286 | | |
---|
287 | 287 | | |
---|
288 | 288 | | |
---|
289 | 289 | | Report Title: |
---|
290 | 290 | | |
---|
291 | 291 | | CIP; Thirty-first Representative District; Appropriation |
---|
292 | 292 | | |
---|
293 | 293 | | |
---|
294 | 294 | | |
---|
295 | 295 | | Description: |
---|
296 | 296 | | |
---|
297 | 297 | | Appropriates funds for capital improvement projects in the thirty-first representative district. |
---|
298 | 298 | | |
---|
299 | 299 | | |
---|
300 | 300 | | |
---|
301 | 301 | | |
---|
302 | 302 | | |
---|
303 | 303 | | |
---|
304 | 304 | | |
---|
305 | 305 | | The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent. |
---|