11 103RD GENERAL ASSEMBLY State of Illinois 2023 and 2024 SB1789 Introduced 2/9/2023, by Sen. David Koehler SYNOPSIS AS INTRODUCED: 20 ILCS 3855/1-75 Amends the Illinois Power Agency Act. Provides that renewable energy credits procured from new utility-scale wind projects, new utility-scale solar projects, and new brownfield solar projects pursuant to Agency procurement events must be from facilities built by general contractors that must enter into a project labor agreement with 2 or more labor organizations. LRB103 26314 AMQ 52675 b A BILL FOR 103RD GENERAL ASSEMBLY State of Illinois 2023 and 2024 SB1789 Introduced 2/9/2023, by Sen. David Koehler SYNOPSIS AS INTRODUCED: 20 ILCS 3855/1-75 20 ILCS 3855/1-75 Amends the Illinois Power Agency Act. Provides that renewable energy credits procured from new utility-scale wind projects, new utility-scale solar projects, and new brownfield solar projects pursuant to Agency procurement events must be from facilities built by general contractors that must enter into a project labor agreement with 2 or more labor organizations. LRB103 26314 AMQ 52675 b LRB103 26314 AMQ 52675 b A BILL FOR
22 103RD GENERAL ASSEMBLY State of Illinois 2023 and 2024 SB1789 Introduced 2/9/2023, by Sen. David Koehler SYNOPSIS AS INTRODUCED:
33 20 ILCS 3855/1-75 20 ILCS 3855/1-75
44 20 ILCS 3855/1-75
55 Amends the Illinois Power Agency Act. Provides that renewable energy credits procured from new utility-scale wind projects, new utility-scale solar projects, and new brownfield solar projects pursuant to Agency procurement events must be from facilities built by general contractors that must enter into a project labor agreement with 2 or more labor organizations.
66 LRB103 26314 AMQ 52675 b LRB103 26314 AMQ 52675 b
77 LRB103 26314 AMQ 52675 b
88 A BILL FOR
99 SB1789LRB103 26314 AMQ 52675 b SB1789 LRB103 26314 AMQ 52675 b
1010 SB1789 LRB103 26314 AMQ 52675 b
1111 1 AN ACT concerning State government.
1212 2 Be it enacted by the People of the State of Illinois,
1313 3 represented in the General Assembly:
1414 4 Section 5. The Illinois Power Agency Act is amended by
1515 5 changing Section 1-75 as follows:
1616 6 (20 ILCS 3855/1-75)
1717 7 Sec. 1-75. Planning and Procurement Bureau. The Planning
1818 8 and Procurement Bureau has the following duties and
1919 9 responsibilities:
2020 10 (a) The Planning and Procurement Bureau shall each year,
2121 11 beginning in 2008, develop procurement plans and conduct
2222 12 competitive procurement processes in accordance with the
2323 13 requirements of Section 16-111.5 of the Public Utilities Act
2424 14 for the eligible retail customers of electric utilities that
2525 15 on December 31, 2005 provided electric service to at least
2626 16 100,000 customers in Illinois. Beginning with the delivery
2727 17 year commencing on June 1, 2017, the Planning and Procurement
2828 18 Bureau shall develop plans and processes for the procurement
2929 19 of zero emission credits from zero emission facilities in
3030 20 accordance with the requirements of subsection (d-5) of this
3131 21 Section. Beginning on the effective date of this amendatory
3232 22 Act of the 102nd General Assembly, the Planning and
3333 23 Procurement Bureau shall develop plans and processes for the
3434
3535
3636
3737 103RD GENERAL ASSEMBLY State of Illinois 2023 and 2024 SB1789 Introduced 2/9/2023, by Sen. David Koehler SYNOPSIS AS INTRODUCED:
3838 20 ILCS 3855/1-75 20 ILCS 3855/1-75
3939 20 ILCS 3855/1-75
4040 Amends the Illinois Power Agency Act. Provides that renewable energy credits procured from new utility-scale wind projects, new utility-scale solar projects, and new brownfield solar projects pursuant to Agency procurement events must be from facilities built by general contractors that must enter into a project labor agreement with 2 or more labor organizations.
4141 LRB103 26314 AMQ 52675 b LRB103 26314 AMQ 52675 b
4242 LRB103 26314 AMQ 52675 b
4343 A BILL FOR
4444
4545
4646
4747
4848
4949 20 ILCS 3855/1-75
5050
5151
5252
5353 LRB103 26314 AMQ 52675 b
5454
5555
5656
5757
5858
5959
6060
6161
6262
6363 SB1789 LRB103 26314 AMQ 52675 b
6464
6565
6666 SB1789- 2 -LRB103 26314 AMQ 52675 b SB1789 - 2 - LRB103 26314 AMQ 52675 b
6767 SB1789 - 2 - LRB103 26314 AMQ 52675 b
6868 1 procurement of carbon mitigation credits from carbon-free
6969 2 energy resources in accordance with the requirements of
7070 3 subsection (d-10) of this Section. The Planning and
7171 4 Procurement Bureau shall also develop procurement plans and
7272 5 conduct competitive procurement processes in accordance with
7373 6 the requirements of Section 16-111.5 of the Public Utilities
7474 7 Act for the eligible retail customers of small
7575 8 multi-jurisdictional electric utilities that (i) on December
7676 9 31, 2005 served less than 100,000 customers in Illinois and
7777 10 (ii) request a procurement plan for their Illinois
7878 11 jurisdictional load. This Section shall not apply to a small
7979 12 multi-jurisdictional utility until such time as a small
8080 13 multi-jurisdictional utility requests the Agency to prepare a
8181 14 procurement plan for their Illinois jurisdictional load. For
8282 15 the purposes of this Section, the term "eligible retail
8383 16 customers" has the same definition as found in Section
8484 17 16-111.5(a) of the Public Utilities Act.
8585 18 Beginning with the plan or plans to be implemented in the
8686 19 2017 delivery year, the Agency shall no longer include the
8787 20 procurement of renewable energy resources in the annual
8888 21 procurement plans required by this subsection (a), except as
8989 22 provided in subsection (q) of Section 16-111.5 of the Public
9090 23 Utilities Act, and shall instead develop a long-term renewable
9191 24 resources procurement plan in accordance with subsection (c)
9292 25 of this Section and Section 16-111.5 of the Public Utilities
9393 26 Act.
9494
9595
9696
9797
9898
9999 SB1789 - 2 - LRB103 26314 AMQ 52675 b
100100
101101
102102 SB1789- 3 -LRB103 26314 AMQ 52675 b SB1789 - 3 - LRB103 26314 AMQ 52675 b
103103 SB1789 - 3 - LRB103 26314 AMQ 52675 b
104104 1 In accordance with subsection (c-5) of this Section, the
105105 2 Planning and Procurement Bureau shall oversee the procurement
106106 3 by electric utilities that served more than 300,000 retail
107107 4 customers in this State as of January 1, 2019 of renewable
108108 5 energy credits from new utility-scale solar projects to be
109109 6 installed, along with energy storage facilities, at or
110110 7 adjacent to the sites of electric generating facilities that,
111111 8 as of January 1, 2016, burned coal as their primary fuel
112112 9 source.
113113 10 (1) The Agency shall each year, beginning in 2008, as
114114 11 needed, issue a request for qualifications for experts or
115115 12 expert consulting firms to develop the procurement plans
116116 13 in accordance with Section 16-111.5 of the Public
117117 14 Utilities Act. In order to qualify an expert or expert
118118 15 consulting firm must have:
119119 16 (A) direct previous experience assembling
120120 17 large-scale power supply plans or portfolios for
121121 18 end-use customers;
122122 19 (B) an advanced degree in economics, mathematics,
123123 20 engineering, risk management, or a related area of
124124 21 study;
125125 22 (C) 10 years of experience in the electricity
126126 23 sector, including managing supply risk;
127127 24 (D) expertise in wholesale electricity market
128128 25 rules, including those established by the Federal
129129 26 Energy Regulatory Commission and regional transmission
130130
131131
132132
133133
134134
135135 SB1789 - 3 - LRB103 26314 AMQ 52675 b
136136
137137
138138 SB1789- 4 -LRB103 26314 AMQ 52675 b SB1789 - 4 - LRB103 26314 AMQ 52675 b
139139 SB1789 - 4 - LRB103 26314 AMQ 52675 b
140140 1 organizations;
141141 2 (E) expertise in credit protocols and familiarity
142142 3 with contract protocols;
143143 4 (F) adequate resources to perform and fulfill the
144144 5 required functions and responsibilities; and
145145 6 (G) the absence of a conflict of interest and
146146 7 inappropriate bias for or against potential bidders or
147147 8 the affected electric utilities.
148148 9 (2) The Agency shall each year, as needed, issue a
149149 10 request for qualifications for a procurement administrator
150150 11 to conduct the competitive procurement processes in
151151 12 accordance with Section 16-111.5 of the Public Utilities
152152 13 Act. In order to qualify an expert or expert consulting
153153 14 firm must have:
154154 15 (A) direct previous experience administering a
155155 16 large-scale competitive procurement process;
156156 17 (B) an advanced degree in economics, mathematics,
157157 18 engineering, or a related area of study;
158158 19 (C) 10 years of experience in the electricity
159159 20 sector, including risk management experience;
160160 21 (D) expertise in wholesale electricity market
161161 22 rules, including those established by the Federal
162162 23 Energy Regulatory Commission and regional transmission
163163 24 organizations;
164164 25 (E) expertise in credit and contract protocols;
165165 26 (F) adequate resources to perform and fulfill the
166166
167167
168168
169169
170170
171171 SB1789 - 4 - LRB103 26314 AMQ 52675 b
172172
173173
174174 SB1789- 5 -LRB103 26314 AMQ 52675 b SB1789 - 5 - LRB103 26314 AMQ 52675 b
175175 SB1789 - 5 - LRB103 26314 AMQ 52675 b
176176 1 required functions and responsibilities; and
177177 2 (G) the absence of a conflict of interest and
178178 3 inappropriate bias for or against potential bidders or
179179 4 the affected electric utilities.
180180 5 (3) The Agency shall provide affected utilities and
181181 6 other interested parties with the lists of qualified
182182 7 experts or expert consulting firms identified through the
183183 8 request for qualifications processes that are under
184184 9 consideration to develop the procurement plans and to
185185 10 serve as the procurement administrator. The Agency shall
186186 11 also provide each qualified expert's or expert consulting
187187 12 firm's response to the request for qualifications. All
188188 13 information provided under this subparagraph shall also be
189189 14 provided to the Commission. The Agency may provide by rule
190190 15 for fees associated with supplying the information to
191191 16 utilities and other interested parties. These parties
192192 17 shall, within 5 business days, notify the Agency in
193193 18 writing if they object to any experts or expert consulting
194194 19 firms on the lists. Objections shall be based on:
195195 20 (A) failure to satisfy qualification criteria;
196196 21 (B) identification of a conflict of interest; or
197197 22 (C) evidence of inappropriate bias for or against
198198 23 potential bidders or the affected utilities.
199199 24 The Agency shall remove experts or expert consulting
200200 25 firms from the lists within 10 days if there is a
201201 26 reasonable basis for an objection and provide the updated
202202
203203
204204
205205
206206
207207 SB1789 - 5 - LRB103 26314 AMQ 52675 b
208208
209209
210210 SB1789- 6 -LRB103 26314 AMQ 52675 b SB1789 - 6 - LRB103 26314 AMQ 52675 b
211211 SB1789 - 6 - LRB103 26314 AMQ 52675 b
212212 1 lists to the affected utilities and other interested
213213 2 parties. If the Agency fails to remove an expert or expert
214214 3 consulting firm from a list, an objecting party may seek
215215 4 review by the Commission within 5 days thereafter by
216216 5 filing a petition, and the Commission shall render a
217217 6 ruling on the petition within 10 days. There is no right of
218218 7 appeal of the Commission's ruling.
219219 8 (4) The Agency shall issue requests for proposals to
220220 9 the qualified experts or expert consulting firms to
221221 10 develop a procurement plan for the affected utilities and
222222 11 to serve as procurement administrator.
223223 12 (5) The Agency shall select an expert or expert
224224 13 consulting firm to develop procurement plans based on the
225225 14 proposals submitted and shall award contracts of up to 5
226226 15 years to those selected.
227227 16 (6) The Agency shall select an expert or expert
228228 17 consulting firm, with approval of the Commission, to serve
229229 18 as procurement administrator based on the proposals
230230 19 submitted. If the Commission rejects, within 5 days, the
231231 20 Agency's selection, the Agency shall submit another
232232 21 recommendation within 3 days based on the proposals
233233 22 submitted. The Agency shall award a 5-year contract to the
234234 23 expert or expert consulting firm so selected with
235235 24 Commission approval.
236236 25 (b) The experts or expert consulting firms retained by the
237237 26 Agency shall, as appropriate, prepare procurement plans, and
238238
239239
240240
241241
242242
243243 SB1789 - 6 - LRB103 26314 AMQ 52675 b
244244
245245
246246 SB1789- 7 -LRB103 26314 AMQ 52675 b SB1789 - 7 - LRB103 26314 AMQ 52675 b
247247 SB1789 - 7 - LRB103 26314 AMQ 52675 b
248248 1 conduct a competitive procurement process as prescribed in
249249 2 Section 16-111.5 of the Public Utilities Act, to ensure
250250 3 adequate, reliable, affordable, efficient, and environmentally
251251 4 sustainable electric service at the lowest total cost over
252252 5 time, taking into account any benefits of price stability, for
253253 6 eligible retail customers of electric utilities that on
254254 7 December 31, 2005 provided electric service to at least
255255 8 100,000 customers in the State of Illinois, and for eligible
256256 9 Illinois retail customers of small multi-jurisdictional
257257 10 electric utilities that (i) on December 31, 2005 served less
258258 11 than 100,000 customers in Illinois and (ii) request a
259259 12 procurement plan for their Illinois jurisdictional load.
260260 13 (c) Renewable portfolio standard.
261261 14 (1)(A) The Agency shall develop a long-term renewable
262262 15 resources procurement plan that shall include procurement
263263 16 programs and competitive procurement events necessary to
264264 17 meet the goals set forth in this subsection (c). The
265265 18 initial long-term renewable resources procurement plan
266266 19 shall be released for comment no later than 160 days after
267267 20 June 1, 2017 (the effective date of Public Act 99-906).
268268 21 The Agency shall review, and may revise on an expedited
269269 22 basis, the long-term renewable resources procurement plan
270270 23 at least every 2 years, which shall be conducted in
271271 24 conjunction with the procurement plan under Section
272272 25 16-111.5 of the Public Utilities Act to the extent
273273 26 practicable to minimize administrative expense. No later
274274
275275
276276
277277
278278
279279 SB1789 - 7 - LRB103 26314 AMQ 52675 b
280280
281281
282282 SB1789- 8 -LRB103 26314 AMQ 52675 b SB1789 - 8 - LRB103 26314 AMQ 52675 b
283283 SB1789 - 8 - LRB103 26314 AMQ 52675 b
284284 1 than 120 days after the effective date of this amendatory
285285 2 Act of the 102nd General Assembly, the Agency shall
286286 3 release for comment a revision to the long-term renewable
287287 4 resources procurement plan, updating elements of the most
288288 5 recently approved plan as needed to comply with this
289289 6 amendatory Act of the 102nd General Assembly, and any
290290 7 long-term renewable resources procurement plan update
291291 8 published by the Agency but not yet approved by the
292292 9 Illinois Commerce Commission shall be withdrawn. The
293293 10 long-term renewable resources procurement plans shall be
294294 11 subject to review and approval by the Commission under
295295 12 Section 16-111.5 of the Public Utilities Act.
296296 13 (B) Subject to subparagraph (F) of this paragraph (1),
297297 14 the long-term renewable resources procurement plan shall
298298 15 attempt to meet the goals for procurement of renewable
299299 16 energy credits at levels of at least the following overall
300300 17 percentages: 13% by the 2017 delivery year; increasing by
301301 18 at least 1.5% each delivery year thereafter to at least
302302 19 25% by the 2025 delivery year; increasing by at least 3%
303303 20 each delivery year thereafter to at least 40% by the 2030
304304 21 delivery year, and continuing at no less than 40% for each
305305 22 delivery year thereafter. The Agency shall attempt to
306306 23 procure 50% by delivery year 2040. The Agency shall
307307 24 determine the annual increase between delivery year 2030
308308 25 and delivery year 2040, if any, taking into account energy
309309 26 demand, other energy resources, and other public policy
310310
311311
312312
313313
314314
315315 SB1789 - 8 - LRB103 26314 AMQ 52675 b
316316
317317
318318 SB1789- 9 -LRB103 26314 AMQ 52675 b SB1789 - 9 - LRB103 26314 AMQ 52675 b
319319 SB1789 - 9 - LRB103 26314 AMQ 52675 b
320320 1 goals. In the event of a conflict between these goals and
321321 2 the new wind and new photovoltaic procurement requirements
322322 3 described in items (i) through (iii) of subparagraph (C)
323323 4 of this paragraph (1), the long-term plan shall prioritize
324324 5 compliance with the new wind and new photovoltaic
325325 6 procurement requirements described in items (i) through
326326 7 (iii) of subparagraph (C) of this paragraph (1) over the
327327 8 annual percentage targets described in this subparagraph
328328 9 (B). The Agency shall not comply with the annual
329329 10 percentage targets described in this subparagraph (B) by
330330 11 procuring renewable energy credits that are unlikely to
331331 12 lead to the development of new renewable resources.
332332 13 For the delivery year beginning June 1, 2017, the
333333 14 procurement plan shall attempt to include, subject to the
334334 15 prioritization outlined in this subparagraph (B),
335335 16 cost-effective renewable energy resources equal to at
336336 17 least 13% of each utility's load for eligible retail
337337 18 customers and 13% of the applicable portion of each
338338 19 utility's load for retail customers who are not eligible
339339 20 retail customers, which applicable portion shall equal 50%
340340 21 of the utility's load for retail customers who are not
341341 22 eligible retail customers on February 28, 2017.
342342 23 For the delivery year beginning June 1, 2018, the
343343 24 procurement plan shall attempt to include, subject to the
344344 25 prioritization outlined in this subparagraph (B),
345345 26 cost-effective renewable energy resources equal to at
346346
347347
348348
349349
350350
351351 SB1789 - 9 - LRB103 26314 AMQ 52675 b
352352
353353
354354 SB1789- 10 -LRB103 26314 AMQ 52675 b SB1789 - 10 - LRB103 26314 AMQ 52675 b
355355 SB1789 - 10 - LRB103 26314 AMQ 52675 b
356356 1 least 14.5% of each utility's load for eligible retail
357357 2 customers and 14.5% of the applicable portion of each
358358 3 utility's load for retail customers who are not eligible
359359 4 retail customers, which applicable portion shall equal 75%
360360 5 of the utility's load for retail customers who are not
361361 6 eligible retail customers on February 28, 2017.
362362 7 For the delivery year beginning June 1, 2019, and for
363363 8 each year thereafter, the procurement plans shall attempt
364364 9 to include, subject to the prioritization outlined in this
365365 10 subparagraph (B), cost-effective renewable energy
366366 11 resources equal to a minimum percentage of each utility's
367367 12 load for all retail customers as follows: 16% by June 1,
368368 13 2019; increasing by 1.5% each year thereafter to 25% by
369369 14 June 1, 2025; and 25% by June 1, 2026; increasing by at
370370 15 least 3% each delivery year thereafter to at least 40% by
371371 16 the 2030 delivery year, and continuing at no less than 40%
372372 17 for each delivery year thereafter. The Agency shall
373373 18 attempt to procure 50% by delivery year 2040. The Agency
374374 19 shall determine the annual increase between delivery year
375375 20 2030 and delivery year 2040, if any, taking into account
376376 21 energy demand, other energy resources, and other public
377377 22 policy goals.
378378 23 For each delivery year, the Agency shall first
379379 24 recognize each utility's obligations for that delivery
380380 25 year under existing contracts. Any renewable energy
381381 26 credits under existing contracts, including renewable
382382
383383
384384
385385
386386
387387 SB1789 - 10 - LRB103 26314 AMQ 52675 b
388388
389389
390390 SB1789- 11 -LRB103 26314 AMQ 52675 b SB1789 - 11 - LRB103 26314 AMQ 52675 b
391391 SB1789 - 11 - LRB103 26314 AMQ 52675 b
392392 1 energy credits as part of renewable energy resources,
393393 2 shall be used to meet the goals set forth in this
394394 3 subsection (c) for the delivery year.
395395 4 (C) The long-term renewable resources procurement plan
396396 5 described in subparagraph (A) of this paragraph (1) shall
397397 6 include the procurement of renewable energy credits from
398398 7 new projects in amounts equal to at least the following:
399399 8 (i) 10,000,000 renewable energy credits delivered
400400 9 annually by the end of the 2021 delivery year, and
401401 10 increasing ratably to reach 45,000,000 renewable
402402 11 energy credits delivered annually from new wind and
403403 12 solar projects by the end of delivery year 2030 such
404404 13 that the goals in subparagraph (B) of this paragraph
405405 14 (1) are met entirely by procurements of renewable
406406 15 energy credits from new wind and photovoltaic
407407 16 projects. Of that amount, to the extent possible, the
408408 17 Agency shall procure 45% from wind projects and 55%
409409 18 from photovoltaic projects. Of the amount to be
410410 19 procured from photovoltaic projects, the Agency shall
411411 20 procure: at least 50% from solar photovoltaic projects
412412 21 using the program outlined in subparagraph (K) of this
413413 22 paragraph (1) from distributed renewable energy
414414 23 generation devices or community renewable generation
415415 24 projects; at least 47% from utility-scale solar
416416 25 projects; at least 3% from brownfield site
417417 26 photovoltaic projects that are not community renewable
418418
419419
420420
421421
422422
423423 SB1789 - 11 - LRB103 26314 AMQ 52675 b
424424
425425
426426 SB1789- 12 -LRB103 26314 AMQ 52675 b SB1789 - 12 - LRB103 26314 AMQ 52675 b
427427 SB1789 - 12 - LRB103 26314 AMQ 52675 b
428428 1 generation projects.
429429 2 In developing the long-term renewable resources
430430 3 procurement plan, the Agency shall consider other
431431 4 approaches, in addition to competitive procurements,
432432 5 that can be used to procure renewable energy credits
433433 6 from brownfield site photovoltaic projects and thereby
434434 7 help return blighted or contaminated land to
435435 8 productive use while enhancing public health and the
436436 9 well-being of Illinois residents, including those in
437437 10 environmental justice communities, as defined using
438438 11 existing methodologies and findings used by the Agency
439439 12 and its Administrator in its Illinois Solar for All
440440 13 Program.
441441 14 (ii) In any given delivery year, if forecasted
442442 15 expenses are less than the maximum budget available
443443 16 under subparagraph (E) of this paragraph (1), the
444444 17 Agency shall continue to procure new renewable energy
445445 18 credits until that budget is exhausted in the manner
446446 19 outlined in item (i) of this subparagraph (C).
447447 20 (iii) For purposes of this Section:
448448 21 "New wind projects" means wind renewable energy
449449 22 facilities that are energized after June 1, 2017 for
450450 23 the delivery year commencing June 1, 2017.
451451 24 "New photovoltaic projects" means photovoltaic
452452 25 renewable energy facilities that are energized after
453453 26 June 1, 2017. Photovoltaic projects developed under
454454
455455
456456
457457
458458
459459 SB1789 - 12 - LRB103 26314 AMQ 52675 b
460460
461461
462462 SB1789- 13 -LRB103 26314 AMQ 52675 b SB1789 - 13 - LRB103 26314 AMQ 52675 b
463463 SB1789 - 13 - LRB103 26314 AMQ 52675 b
464464 1 Section 1-56 of this Act shall not apply towards the
465465 2 new photovoltaic project requirements in this
466466 3 subparagraph (C).
467467 4 For purposes of calculating whether the Agency has
468468 5 procured enough new wind and solar renewable energy
469469 6 credits required by this subparagraph (C), renewable
470470 7 energy facilities that have a multi-year renewable
471471 8 energy credit delivery contract with the utility
472472 9 through at least delivery year 2030 shall be
473473 10 considered new, however no renewable energy credits
474474 11 from contracts entered into before June 1, 2021 shall
475475 12 be used to calculate whether the Agency has procured
476476 13 the correct proportion of new wind and new solar
477477 14 contracts described in this subparagraph (C) for
478478 15 delivery year 2021 and thereafter.
479479 16 (D) Renewable energy credits shall be cost effective.
480480 17 For purposes of this subsection (c), "cost effective"
481481 18 means that the costs of procuring renewable energy
482482 19 resources do not cause the limit stated in subparagraph
483483 20 (E) of this paragraph (1) to be exceeded and, for
484484 21 renewable energy credits procured through a competitive
485485 22 procurement event, do not exceed benchmarks based on
486486 23 market prices for like products in the region. For
487487 24 purposes of this subsection (c), "like products" means
488488 25 contracts for renewable energy credits from the same or
489489 26 substantially similar technology, same or substantially
490490
491491
492492
493493
494494
495495 SB1789 - 13 - LRB103 26314 AMQ 52675 b
496496
497497
498498 SB1789- 14 -LRB103 26314 AMQ 52675 b SB1789 - 14 - LRB103 26314 AMQ 52675 b
499499 SB1789 - 14 - LRB103 26314 AMQ 52675 b
500500 1 similar vintage (new or existing), the same or
501501 2 substantially similar quantity, and the same or
502502 3 substantially similar contract length and structure.
503503 4 Benchmarks shall reflect development, financing, or
504504 5 related costs resulting from requirements imposed through
505505 6 other provisions of State law, including, but not limited
506506 7 to, requirements in subparagraphs (P) and (Q) of this
507507 8 paragraph (1) and the Renewable Energy Facilities
508508 9 Agricultural Impact Mitigation Act. Confidential
509509 10 benchmarks shall be developed by the procurement
510510 11 administrator, in consultation with the Commission staff,
511511 12 Agency staff, and the procurement monitor and shall be
512512 13 subject to Commission review and approval. If price
513513 14 benchmarks for like products in the region are not
514514 15 available, the procurement administrator shall establish
515515 16 price benchmarks based on publicly available data on
516516 17 regional technology costs and expected current and future
517517 18 regional energy prices. The benchmarks in this Section
518518 19 shall not be used to curtail or otherwise reduce
519519 20 contractual obligations entered into by or through the
520520 21 Agency prior to June 1, 2017 (the effective date of Public
521521 22 Act 99-906).
522522 23 (E) For purposes of this subsection (c), the required
523523 24 procurement of cost-effective renewable energy resources
524524 25 for a particular year commencing prior to June 1, 2017
525525 26 shall be measured as a percentage of the actual amount of
526526
527527
528528
529529
530530
531531 SB1789 - 14 - LRB103 26314 AMQ 52675 b
532532
533533
534534 SB1789- 15 -LRB103 26314 AMQ 52675 b SB1789 - 15 - LRB103 26314 AMQ 52675 b
535535 SB1789 - 15 - LRB103 26314 AMQ 52675 b
536536 1 electricity (megawatt-hours) supplied by the electric
537537 2 utility to eligible retail customers in the delivery year
538538 3 ending immediately prior to the procurement, and, for
539539 4 delivery years commencing on and after June 1, 2017, the
540540 5 required procurement of cost-effective renewable energy
541541 6 resources for a particular year shall be measured as a
542542 7 percentage of the actual amount of electricity
543543 8 (megawatt-hours) delivered by the electric utility in the
544544 9 delivery year ending immediately prior to the procurement,
545545 10 to all retail customers in its service territory. For
546546 11 purposes of this subsection (c), the amount paid per
547547 12 kilowatthour means the total amount paid for electric
548548 13 service expressed on a per kilowatthour basis. For
549549 14 purposes of this subsection (c), the total amount paid for
550550 15 electric service includes without limitation amounts paid
551551 16 for supply, transmission, capacity, distribution,
552552 17 surcharges, and add-on taxes.
553553 18 Notwithstanding the requirements of this subsection
554554 19 (c), the total of renewable energy resources procured
555555 20 under the procurement plan for any single year shall be
556556 21 subject to the limitations of this subparagraph (E). Such
557557 22 procurement shall be reduced for all retail customers
558558 23 based on the amount necessary to limit the annual
559559 24 estimated average net increase due to the costs of these
560560 25 resources included in the amounts paid by eligible retail
561561 26 customers in connection with electric service to no more
562562
563563
564564
565565
566566
567567 SB1789 - 15 - LRB103 26314 AMQ 52675 b
568568
569569
570570 SB1789- 16 -LRB103 26314 AMQ 52675 b SB1789 - 16 - LRB103 26314 AMQ 52675 b
571571 SB1789 - 16 - LRB103 26314 AMQ 52675 b
572572 1 than 4.25% of the amount paid per kilowatthour by those
573573 2 customers during the year ending May 31, 2009. To arrive
574574 3 at a maximum dollar amount of renewable energy resources
575575 4 to be procured for the particular delivery year, the
576576 5 resulting per kilowatthour amount shall be applied to the
577577 6 actual amount of kilowatthours of electricity delivered,
578578 7 or applicable portion of such amount as specified in
579579 8 paragraph (1) of this subsection (c), as applicable, by
580580 9 the electric utility in the delivery year immediately
581581 10 prior to the procurement to all retail customers in its
582582 11 service territory. The calculations required by this
583583 12 subparagraph (E) shall be made only once for each delivery
584584 13 year at the time that the renewable energy resources are
585585 14 procured. Once the determination as to the amount of
586586 15 renewable energy resources to procure is made based on the
587587 16 calculations set forth in this subparagraph (E) and the
588588 17 contracts procuring those amounts are executed, no
589589 18 subsequent rate impact determinations shall be made and no
590590 19 adjustments to those contract amounts shall be allowed.
591591 20 All costs incurred under such contracts shall be fully
592592 21 recoverable by the electric utility as provided in this
593593 22 Section.
594594 23 (F) If the limitation on the amount of renewable
595595 24 energy resources procured in subparagraph (E) of this
596596 25 paragraph (1) prevents the Agency from meeting all of the
597597 26 goals in this subsection (c), the Agency's long-term plan
598598
599599
600600
601601
602602
603603 SB1789 - 16 - LRB103 26314 AMQ 52675 b
604604
605605
606606 SB1789- 17 -LRB103 26314 AMQ 52675 b SB1789 - 17 - LRB103 26314 AMQ 52675 b
607607 SB1789 - 17 - LRB103 26314 AMQ 52675 b
608608 1 shall prioritize compliance with the requirements of this
609609 2 subsection (c) regarding renewable energy credits in the
610610 3 following order:
611611 4 (i) renewable energy credits under existing
612612 5 contractual obligations as of June 1, 2021;
613613 6 (i-5) funding for the Illinois Solar for All
614614 7 Program, as described in subparagraph (O) of this
615615 8 paragraph (1);
616616 9 (ii) renewable energy credits necessary to comply
617617 10 with the new wind and new photovoltaic procurement
618618 11 requirements described in items (i) through (iii) of
619619 12 subparagraph (C) of this paragraph (1); and
620620 13 (iii) renewable energy credits necessary to meet
621621 14 the remaining requirements of this subsection (c).
622622 15 (G) The following provisions shall apply to the
623623 16 Agency's procurement of renewable energy credits under
624624 17 this subsection (c):
625625 18 (i) Notwithstanding whether a long-term renewable
626626 19 resources procurement plan has been approved, the
627627 20 Agency shall conduct an initial forward procurement
628628 21 for renewable energy credits from new utility-scale
629629 22 wind projects within 160 days after June 1, 2017 (the
630630 23 effective date of Public Act 99-906). For the purposes
631631 24 of this initial forward procurement, the Agency shall
632632 25 solicit 15-year contracts for delivery of 1,000,000
633633 26 renewable energy credits delivered annually from new
634634
635635
636636
637637
638638
639639 SB1789 - 17 - LRB103 26314 AMQ 52675 b
640640
641641
642642 SB1789- 18 -LRB103 26314 AMQ 52675 b SB1789 - 18 - LRB103 26314 AMQ 52675 b
643643 SB1789 - 18 - LRB103 26314 AMQ 52675 b
644644 1 utility-scale wind projects to begin delivery on June
645645 2 1, 2019, if available, but not later than June 1, 2021,
646646 3 unless the project has delays in the establishment of
647647 4 an operating interconnection with the applicable
648648 5 transmission or distribution system as a result of the
649649 6 actions or inactions of the transmission or
650650 7 distribution provider, or other causes for force
651651 8 majeure as outlined in the procurement contract, in
652652 9 which case, not later than June 1, 2022. Payments to
653653 10 suppliers of renewable energy credits shall commence
654654 11 upon delivery. Renewable energy credits procured under
655655 12 this initial procurement shall be included in the
656656 13 Agency's long-term plan and shall apply to all
657657 14 renewable energy goals in this subsection (c).
658658 15 (ii) Notwithstanding whether a long-term renewable
659659 16 resources procurement plan has been approved, the
660660 17 Agency shall conduct an initial forward procurement
661661 18 for renewable energy credits from new utility-scale
662662 19 solar projects and brownfield site photovoltaic
663663 20 projects within one year after June 1, 2017 (the
664664 21 effective date of Public Act 99-906). For the purposes
665665 22 of this initial forward procurement, the Agency shall
666666 23 solicit 15-year contracts for delivery of 1,000,000
667667 24 renewable energy credits delivered annually from new
668668 25 utility-scale solar projects and brownfield site
669669 26 photovoltaic projects to begin delivery on June 1,
670670
671671
672672
673673
674674
675675 SB1789 - 18 - LRB103 26314 AMQ 52675 b
676676
677677
678678 SB1789- 19 -LRB103 26314 AMQ 52675 b SB1789 - 19 - LRB103 26314 AMQ 52675 b
679679 SB1789 - 19 - LRB103 26314 AMQ 52675 b
680680 1 2019, if available, but not later than June 1, 2021,
681681 2 unless the project has delays in the establishment of
682682 3 an operating interconnection with the applicable
683683 4 transmission or distribution system as a result of the
684684 5 actions or inactions of the transmission or
685685 6 distribution provider, or other causes for force
686686 7 majeure as outlined in the procurement contract, in
687687 8 which case, not later than June 1, 2022. The Agency may
688688 9 structure this initial procurement in one or more
689689 10 discrete procurement events. Payments to suppliers of
690690 11 renewable energy credits shall commence upon delivery.
691691 12 Renewable energy credits procured under this initial
692692 13 procurement shall be included in the Agency's
693693 14 long-term plan and shall apply to all renewable energy
694694 15 goals in this subsection (c).
695695 16 (iii) Notwithstanding whether the Commission has
696696 17 approved the periodic long-term renewable resources
697697 18 procurement plan revision described in Section
698698 19 16-111.5 of the Public Utilities Act, the Agency shall
699699 20 conduct at least one subsequent forward procurement
700700 21 for renewable energy credits from new utility-scale
701701 22 wind projects, new utility-scale solar projects, and
702702 23 new brownfield site photovoltaic projects within 240
703703 24 days after the effective date of this amendatory Act
704704 25 of the 102nd General Assembly in quantities necessary
705705 26 to meet the requirements of subparagraph (C) of this
706706
707707
708708
709709
710710
711711 SB1789 - 19 - LRB103 26314 AMQ 52675 b
712712
713713
714714 SB1789- 20 -LRB103 26314 AMQ 52675 b SB1789 - 20 - LRB103 26314 AMQ 52675 b
715715 SB1789 - 20 - LRB103 26314 AMQ 52675 b
716716 1 paragraph (1) through the delivery year beginning June
717717 2 1, 2021.
718718 3 (iv) Notwithstanding whether the Commission has
719719 4 approved the periodic long-term renewable resources
720720 5 procurement plan revision described in Section
721721 6 16-111.5 of the Public Utilities Act, the Agency shall
722722 7 open capacity for each category in the Adjustable
723723 8 Block program within 90 days after the effective date
724724 9 of this amendatory Act of the 102nd General Assembly
725725 10 manner:
726726 11 (1) The Agency shall open the first block of
727727 12 annual capacity for the category described in item
728728 13 (i) of subparagraph (K) of this paragraph (1). The
729729 14 first block of annual capacity for item (i) shall
730730 15 be for at least 75 megawatts of total nameplate
731731 16 capacity. The price of the renewable energy credit
732732 17 for this block of capacity shall be 4% less than
733733 18 the price of the last open block in this category.
734734 19 Projects on a waitlist shall be awarded contracts
735735 20 first in the order in which they appear on the
736736 21 waitlist. Notwithstanding anything to the
737737 22 contrary, for those renewable energy credits that
738738 23 qualify and are procured under this subitem (1) of
739739 24 this item (iv), the renewable energy credit
740740 25 delivery contract value shall be paid in full,
741741 26 based on the estimated generation during the first
742742
743743
744744
745745
746746
747747 SB1789 - 20 - LRB103 26314 AMQ 52675 b
748748
749749
750750 SB1789- 21 -LRB103 26314 AMQ 52675 b SB1789 - 21 - LRB103 26314 AMQ 52675 b
751751 SB1789 - 21 - LRB103 26314 AMQ 52675 b
752752 1 15 years of operation, by the contracting
753753 2 utilities at the time that the facility producing
754754 3 the renewable energy credits is interconnected at
755755 4 the distribution system level of the utility and
756756 5 verified as energized and in compliance by the
757757 6 Program Administrator. The electric utility shall
758758 7 receive and retire all renewable energy credits
759759 8 generated by the project for the first 15 years of
760760 9 operation. Renewable energy credits generated by
761761 10 the project thereafter shall not be transferred
762762 11 under the renewable energy credit delivery
763763 12 contract with the counterparty electric utility.
764764 13 (2) The Agency shall open the first block of
765765 14 annual capacity for the category described in item
766766 15 (ii) of subparagraph (K) of this paragraph (1).
767767 16 The first block of annual capacity for item (ii)
768768 17 shall be for at least 75 megawatts of total
769769 18 nameplate capacity.
770770 19 (A) The price of the renewable energy
771771 20 credit for any project on a waitlist for this
772772 21 category before the opening of this block
773773 22 shall be 4% less than the price of the last
774774 23 open block in this category. Projects on the
775775 24 waitlist shall be awarded contracts first in
776776 25 the order in which they appear on the
777777 26 waitlist. Any projects that are less than or
778778
779779
780780
781781
782782
783783 SB1789 - 21 - LRB103 26314 AMQ 52675 b
784784
785785
786786 SB1789- 22 -LRB103 26314 AMQ 52675 b SB1789 - 22 - LRB103 26314 AMQ 52675 b
787787 SB1789 - 22 - LRB103 26314 AMQ 52675 b
788788 1 equal to 25 kilowatts in size on the waitlist
789789 2 for this capacity shall be moved to the
790790 3 waitlist for paragraph (1) of this item (iv).
791791 4 Notwithstanding anything to the contrary,
792792 5 projects that were on the waitlist prior to
793793 6 opening of this block shall not be required to
794794 7 be in compliance with the requirements of
795795 8 subparagraph (Q) of this paragraph (1) of this
796796 9 subsection (c). Notwithstanding anything to
797797 10 the contrary, for those renewable energy
798798 11 credits procured from projects that were on
799799 12 the waitlist for this category before the
800800 13 opening of this block 20% of the renewable
801801 14 energy credit delivery contract value, based
802802 15 on the estimated generation during the first
803803 16 15 years of operation, shall be paid by the
804804 17 contracting utilities at the time that the
805805 18 facility producing the renewable energy
806806 19 credits is interconnected at the distribution
807807 20 system level of the utility and verified as
808808 21 energized by the Program Administrator. The
809809 22 remaining portion shall be paid ratably over
810810 23 the subsequent 4-year period. The electric
811811 24 utility shall receive and retire all renewable
812812 25 energy credits generated by the project during
813813 26 the first 15 years of operation. Renewable
814814
815815
816816
817817
818818
819819 SB1789 - 22 - LRB103 26314 AMQ 52675 b
820820
821821
822822 SB1789- 23 -LRB103 26314 AMQ 52675 b SB1789 - 23 - LRB103 26314 AMQ 52675 b
823823 SB1789 - 23 - LRB103 26314 AMQ 52675 b
824824 1 energy credits generated by the project
825825 2 thereafter shall not be transferred under the
826826 3 renewable energy credit delivery contract with
827827 4 the counterparty electric utility.
828828 5 (B) The price of renewable energy credits
829829 6 for any project not on the waitlist for this
830830 7 category before the opening of the block shall
831831 8 be determined and published by the Agency.
832832 9 Projects not on a waitlist as of the opening
833833 10 of this block shall be subject to the
834834 11 requirements of subparagraph (Q) of this
835835 12 paragraph (1), as applicable. Projects not on
836836 13 a waitlist as of the opening of this block
837837 14 shall be subject to the contract provisions
838838 15 outlined in item (iii) of subparagraph (L) of
839839 16 this paragraph (1). The Agency shall strive to
840840 17 publish updated prices and an updated
841841 18 renewable energy credit delivery contract as
842842 19 quickly as possible.
843843 20 (3) For opening the first 2 blocks of annual
844844 21 capacity for projects participating in item (iii)
845845 22 of subparagraph (K) of paragraph (1) of subsection
846846 23 (c), projects shall be selected exclusively from
847847 24 those projects on the ordinal waitlists of
848848 25 community renewable generation projects
849849 26 established by the Agency based on the status of
850850
851851
852852
853853
854854
855855 SB1789 - 23 - LRB103 26314 AMQ 52675 b
856856
857857
858858 SB1789- 24 -LRB103 26314 AMQ 52675 b SB1789 - 24 - LRB103 26314 AMQ 52675 b
859859 SB1789 - 24 - LRB103 26314 AMQ 52675 b
860860 1 those ordinal waitlists as of December 31, 2020,
861861 2 and only those projects previously determined to
862862 3 be eligible for the Agency's April 2019 community
863863 4 solar project selection process.
864864 5 The first 2 blocks of annual capacity for item
865865 6 (iii) shall be for 250 megawatts of total
866866 7 nameplate capacity, with both blocks opening
867867 8 simultaneously under the schedule outlined in the
868868 9 paragraphs below. Projects shall be selected as
869869 10 follows:
870870 11 (A) The geographic balance of selected
871871 12 projects shall follow the Group classification
872872 13 found in the Agency's Revised Long-Term
873873 14 Renewable Resources Procurement Plan, with 70%
874874 15 of capacity allocated to projects on the Group
875875 16 B waitlist and 30% of capacity allocated to
876876 17 projects on the Group A waitlist.
877877 18 (B) Contract awards for waitlisted
878878 19 projects shall be allocated proportionate to
879879 20 the total nameplate capacity amount across
880880 21 both ordinal waitlists associated with that
881881 22 applicant firm or its affiliates, subject to
882882 23 the following conditions.
883883 24 (i) Each applicant firm having a
884884 25 waitlisted project eligible for selection
885885 26 shall receive no less than 500 kilowatts
886886
887887
888888
889889
890890
891891 SB1789 - 24 - LRB103 26314 AMQ 52675 b
892892
893893
894894 SB1789- 25 -LRB103 26314 AMQ 52675 b SB1789 - 25 - LRB103 26314 AMQ 52675 b
895895 SB1789 - 25 - LRB103 26314 AMQ 52675 b
896896 1 in awarded capacity across all groups, and
897897 2 no approved vendor may receive more than
898898 3 20% of each Group's waitlist allocation.
899899 4 (ii) Each applicant firm, upon
900900 5 receiving an award of program capacity
901901 6 proportionate to its waitlisted capacity,
902902 7 may then determine which waitlisted
903903 8 projects it chooses to be selected for a
904904 9 contract award up to that capacity amount.
905905 10 (iii) Assuming all other program
906906 11 requirements are met, applicant firms may
907907 12 adjust the nameplate capacity of applicant
908908 13 projects without losing waitlist
909909 14 eligibility, so long as no project is
910910 15 greater than 2,000 kilowatts in size.
911911 16 (iv) Assuming all other program
912912 17 requirements are met, applicant firms may
913913 18 adjust the expected production associated
914914 19 with applicant projects, subject to
915915 20 verification by the Program Administrator.
916916 21 (C) After a review of affiliate
917917 22 information and the current ordinal waitlists,
918918 23 the Agency shall announce the nameplate
919919 24 capacity award amounts associated with
920920 25 applicant firms no later than 90 days after
921921 26 the effective date of this amendatory Act of
922922
923923
924924
925925
926926
927927 SB1789 - 25 - LRB103 26314 AMQ 52675 b
928928
929929
930930 SB1789- 26 -LRB103 26314 AMQ 52675 b SB1789 - 26 - LRB103 26314 AMQ 52675 b
931931 SB1789 - 26 - LRB103 26314 AMQ 52675 b
932932 1 the 102nd General Assembly.
933933 2 (D) Applicant firms shall submit their
934934 3 portfolio of projects used to satisfy those
935935 4 contract awards no less than 90 days after the
936936 5 Agency's announcement. The total nameplate
937937 6 capacity of all projects used to satisfy that
938938 7 portfolio shall be no greater than the
939939 8 Agency's nameplate capacity award amount
940940 9 associated with that applicant firm. An
941941 10 applicant firm may decline, in whole or in
942942 11 part, its nameplate capacity award without
943943 12 penalty, with such unmet capacity rolled over
944944 13 to the next block opening for project
945945 14 selection under item (iii) of subparagraph (K)
946946 15 of this subsection (c). Any projects not
947947 16 included in an applicant firm's portfolio may
948948 17 reapply without prejudice upon the next block
949949 18 reopening for project selection under item
950950 19 (iii) of subparagraph (K) of this subsection
951951 20 (c).
952952 21 (E) The renewable energy credit delivery
953953 22 contract shall be subject to the contract and
954954 23 payment terms outlined in item (iv) of
955955 24 subparagraph (L) of this subsection (c).
956956 25 Contract instruments used for this
957957 26 subparagraph shall contain the following
958958
959959
960960
961961
962962
963963 SB1789 - 26 - LRB103 26314 AMQ 52675 b
964964
965965
966966 SB1789- 27 -LRB103 26314 AMQ 52675 b SB1789 - 27 - LRB103 26314 AMQ 52675 b
967967 SB1789 - 27 - LRB103 26314 AMQ 52675 b
968968 1 terms:
969969 2 (i) Renewable energy credit prices
970970 3 shall be fixed, without further adjustment
971971 4 under any other provision of this Act or
972972 5 for any other reason, at 10% lower than
973973 6 prices applicable to the last open block
974974 7 for this category, inclusive of any adders
975975 8 available for achieving a minimum of 50%
976976 9 of subscribers to the project's nameplate
977977 10 capacity being residential or small
978978 11 commercial customers with subscriptions of
979979 12 below 25 kilowatts in size;
980980 13 (ii) A requirement that a minimum of
981981 14 50% of subscribers to the project's
982982 15 nameplate capacity be residential or small
983983 16 commercial customers with subscriptions of
984984 17 below 25 kilowatts in size;
985985 18 (iii) Permission for the ability of a
986986 19 contract holder to substitute projects
987987 20 with other waitlisted projects without
988988 21 penalty should a project receive a
989989 22 non-binding estimate of costs to construct
990990 23 the interconnection facilities and any
991991 24 required distribution upgrades associated
992992 25 with that project of greater than 30 cents
993993 26 per watt AC of that project's nameplate
994994
995995
996996
997997
998998
999999 SB1789 - 27 - LRB103 26314 AMQ 52675 b
10001000
10011001
10021002 SB1789- 28 -LRB103 26314 AMQ 52675 b SB1789 - 28 - LRB103 26314 AMQ 52675 b
10031003 SB1789 - 28 - LRB103 26314 AMQ 52675 b
10041004 1 capacity. In developing the applicable
10051005 2 contract instrument, the Agency may
10061006 3 consider whether other circumstances
10071007 4 outside of the control of the applicant
10081008 5 firm should also warrant project
10091009 6 substitution rights.
10101010 7 The Agency shall publish a finalized
10111011 8 updated renewable energy credit delivery
10121012 9 contract developed consistent with these terms
10131013 10 and conditions no less than 30 days before
10141014 11 applicant firms must submit their portfolio of
10151015 12 projects pursuant to item (D).
10161016 13 (F) To be eligible for an award, the
10171017 14 applicant firm shall certify that not less
10181018 15 than prevailing wage, as determined pursuant
10191019 16 to the Illinois Prevailing Wage Act, was or
10201020 17 will be paid to employees who are engaged in
10211021 18 construction activities associated with a
10221022 19 selected project.
10231023 20 (4) The Agency shall open the first block of
10241024 21 annual capacity for the category described in item
10251025 22 (iv) of subparagraph (K) of this paragraph (1).
10261026 23 The first block of annual capacity for item (iv)
10271027 24 shall be for at least 50 megawatts of total
10281028 25 nameplate capacity. Renewable energy credit prices
10291029 26 shall be fixed, without further adjustment under
10301030
10311031
10321032
10331033
10341034
10351035 SB1789 - 28 - LRB103 26314 AMQ 52675 b
10361036
10371037
10381038 SB1789- 29 -LRB103 26314 AMQ 52675 b SB1789 - 29 - LRB103 26314 AMQ 52675 b
10391039 SB1789 - 29 - LRB103 26314 AMQ 52675 b
10401040 1 any other provision of this Act or for any other
10411041 2 reason, at the price in the last open block in the
10421042 3 category described in item (ii) of subparagraph
10431043 4 (K) of this paragraph (1). Pricing for future
10441044 5 blocks of annual capacity for this category may be
10451045 6 adjusted in the Agency's second revision to its
10461046 7 Long-Term Renewable Resources Procurement Plan.
10471047 8 Projects in this category shall be subject to the
10481048 9 contract terms outlined in item (iv) of
10491049 10 subparagraph (L) of this paragraph (1).
10501050 11 (5) The Agency shall open the equivalent of 2
10511051 12 years of annual capacity for the category
10521052 13 described in item (v) of subparagraph (K) of this
10531053 14 paragraph (1). The first block of annual capacity
10541054 15 for item (v) shall be for at least 10 megawatts of
10551055 16 total nameplate capacity. Notwithstanding the
10561056 17 provisions of item (v) of subparagraph (K) of this
10571057 18 paragraph (1), for the purpose of this initial
10581058 19 block, the agency shall accept new project
10591059 20 applications intended to increase the diversity of
10601060 21 areas hosting community solar projects, the
10611061 22 business models of projects, and the size of
10621062 23 projects, as described by the Agency in its
10631063 24 long-term renewable resources procurement plan
10641064 25 that is approved as of the effective date of this
10651065 26 amendatory Act of the 102nd General Assembly.
10661066
10671067
10681068
10691069
10701070
10711071 SB1789 - 29 - LRB103 26314 AMQ 52675 b
10721072
10731073
10741074 SB1789- 30 -LRB103 26314 AMQ 52675 b SB1789 - 30 - LRB103 26314 AMQ 52675 b
10751075 SB1789 - 30 - LRB103 26314 AMQ 52675 b
10761076 1 Projects in this category shall be subject to the
10771077 2 contract terms outlined in item (iii) of
10781078 3 subsection (L) of this paragraph (1).
10791079 4 (6) The Agency shall open the first blocks of
10801080 5 annual capacity for the category described in item
10811081 6 (vi) of subparagraph (K) of this paragraph (1),
10821082 7 with allocations of capacity within the block
10831083 8 generally matching the historical share of block
10841084 9 capacity allocated between the category described
10851085 10 in items (i) and (ii) of subparagraph (K) of this
10861086 11 paragraph (1). The first two blocks of annual
10871087 12 capacity for item (vi) shall be for at least 75
10881088 13 megawatts of total nameplate capacity. The price
10891089 14 of renewable energy credits for the blocks of
10901090 15 capacity shall be 4% less than the price of the
10911091 16 last open blocks in the categories described in
10921092 17 items (i) and (ii) of subparagraph (K) of this
10931093 18 paragraph (1). Pricing for future blocks of annual
10941094 19 capacity for this category may be adjusted in the
10951095 20 Agency's second revision to its Long-Term
10961096 21 Renewable Resources Procurement Plan. Projects in
10971097 22 this category shall be subject to the applicable
10981098 23 contract terms outlined in items (ii) and (iii) of
10991099 24 subparagraph (L) of this paragraph (1).
11001100 25 (v) Upon the effective date of this amendatory Act
11011101 26 of the 102nd General Assembly, for all competitive
11021102
11031103
11041104
11051105
11061106
11071107 SB1789 - 30 - LRB103 26314 AMQ 52675 b
11081108
11091109
11101110 SB1789- 31 -LRB103 26314 AMQ 52675 b SB1789 - 31 - LRB103 26314 AMQ 52675 b
11111111 SB1789 - 31 - LRB103 26314 AMQ 52675 b
11121112 1 procurements and any procurements of renewable energy
11131113 2 credit from new utility-scale wind and new
11141114 3 utility-scale photovoltaic projects, the Agency shall
11151115 4 procure indexed renewable energy credits and direct
11161116 5 respondents to offer a strike price.
11171117 6 (1) The purchase price of the indexed
11181118 7 renewable energy credit payment shall be
11191119 8 calculated for each settlement period. That
11201120 9 payment, for any settlement period, shall be equal
11211121 10 to the difference resulting from subtracting the
11221122 11 strike price from the index price for that
11231123 12 settlement period. If this difference results in a
11241124 13 negative number, the indexed REC counterparty
11251125 14 shall owe the seller the absolute value multiplied
11261126 15 by the quantity of energy produced in the relevant
11271127 16 settlement period. If this difference results in a
11281128 17 positive number, the seller shall owe the indexed
11291129 18 REC counterparty this amount multiplied by the
11301130 19 quantity of energy produced in the relevant
11311131 20 settlement period.
11321132 21 (2) Parties shall cash settle every month,
11331133 22 summing up all settlements (both positive and
11341134 23 negative, if applicable) for the prior month.
11351135 24 (3) To ensure funding in the annual budget
11361136 25 established under subparagraph (E) for indexed
11371137 26 renewable energy credit procurements for each year
11381138
11391139
11401140
11411141
11421142
11431143 SB1789 - 31 - LRB103 26314 AMQ 52675 b
11441144
11451145
11461146 SB1789- 32 -LRB103 26314 AMQ 52675 b SB1789 - 32 - LRB103 26314 AMQ 52675 b
11471147 SB1789 - 32 - LRB103 26314 AMQ 52675 b
11481148 1 of the term of such contracts, which must have a
11491149 2 minimum tenure of 20 calendar years, the
11501150 3 procurement administrator, Agency, Commission
11511151 4 staff, and procurement monitor shall quantify the
11521152 5 annual cost of the contract by utilizing an
11531153 6 industry-standard, third-party forward price curve
11541154 7 for energy at the appropriate hub or load zone,
11551155 8 including the estimated magnitude and timing of
11561156 9 the price effects related to federal carbon
11571157 10 controls. Each forward price curve shall contain a
11581158 11 specific value of the forecasted market price of
11591159 12 electricity for each annual delivery year of the
11601160 13 contract. For procurement planning purposes, the
11611161 14 impact on the annual budget for the cost of
11621162 15 indexed renewable energy credits for each delivery
11631163 16 year shall be determined as the expected annual
11641164 17 contract expenditure for that year, equaling the
11651165 18 difference between (i) the sum across all relevant
11661166 19 contracts of the applicable strike price
11671167 20 multiplied by contract quantity and (ii) the sum
11681168 21 across all relevant contracts of the forward price
11691169 22 curve for the applicable load zone for that year
11701170 23 multiplied by contract quantity. The contracting
11711171 24 utility shall not assume an obligation in excess
11721172 25 of the estimated annual cost of the contracts for
11731173 26 indexed renewable energy credits. Forward curves
11741174
11751175
11761176
11771177
11781178
11791179 SB1789 - 32 - LRB103 26314 AMQ 52675 b
11801180
11811181
11821182 SB1789- 33 -LRB103 26314 AMQ 52675 b SB1789 - 33 - LRB103 26314 AMQ 52675 b
11831183 SB1789 - 33 - LRB103 26314 AMQ 52675 b
11841184 1 shall be revised on an annual basis as updated
11851185 2 forward price curves are released and filed with
11861186 3 the Commission in the proceeding approving the
11871187 4 Agency's most recent long-term renewable resources
11881188 5 procurement plan. If the expected contract spend
11891189 6 is higher or lower than the total quantity of
11901190 7 contracts multiplied by the forward price curve
11911191 8 value for that year, the forward price curve shall
11921192 9 be updated by the procurement administrator, in
11931193 10 consultation with the Agency, Commission staff,
11941194 11 and procurement monitors, using then-currently
11951195 12 available price forecast data and additional
11961196 13 budget dollars shall be obligated or reobligated
11971197 14 as appropriate.
11981198 15 (4) To ensure that indexed renewable energy
11991199 16 credit prices remain predictable and affordable,
12001200 17 the Agency may consider the institution of a price
12011201 18 collar on REC prices paid under indexed renewable
12021202 19 energy credit procurements establishing floor and
12031203 20 ceiling REC prices applicable to indexed REC
12041204 21 contract prices. Any price collars applicable to
12051205 22 indexed REC procurements shall be proposed by the
12061206 23 Agency through its long-term renewable resources
12071207 24 procurement plan.
12081208 25 (vi) All procurements under this subparagraph (G)
12091209 26 shall comply with the geographic requirements in
12101210
12111211
12121212
12131213
12141214
12151215 SB1789 - 33 - LRB103 26314 AMQ 52675 b
12161216
12171217
12181218 SB1789- 34 -LRB103 26314 AMQ 52675 b SB1789 - 34 - LRB103 26314 AMQ 52675 b
12191219 SB1789 - 34 - LRB103 26314 AMQ 52675 b
12201220 1 subparagraph (I) of this paragraph (1) and shall
12211221 2 follow the procurement processes and procedures
12221222 3 described in this Section and Section 16-111.5 of the
12231223 4 Public Utilities Act to the extent practicable, and
12241224 5 these processes and procedures may be expedited to
12251225 6 accommodate the schedule established by this
12261226 7 subparagraph (G).
12271227 8 (H) The procurement of renewable energy resources for
12281228 9 a given delivery year shall be reduced as described in
12291229 10 this subparagraph (H) if an alternative retail electric
12301230 11 supplier meets the requirements described in this
12311231 12 subparagraph (H).
12321232 13 (i) Within 45 days after June 1, 2017 (the
12331233 14 effective date of Public Act 99-906), an alternative
12341234 15 retail electric supplier or its successor shall submit
12351235 16 an informational filing to the Illinois Commerce
12361236 17 Commission certifying that, as of December 31, 2015,
12371237 18 the alternative retail electric supplier owned one or
12381238 19 more electric generating facilities that generates
12391239 20 renewable energy resources as defined in Section 1-10
12401240 21 of this Act, provided that such facilities are not
12411241 22 powered by wind or photovoltaics, and the facilities
12421242 23 generate one renewable energy credit for each
12431243 24 megawatthour of energy produced from the facility.
12441244 25 The informational filing shall identify each
12451245 26 facility that was eligible to satisfy the alternative
12461246
12471247
12481248
12491249
12501250
12511251 SB1789 - 34 - LRB103 26314 AMQ 52675 b
12521252
12531253
12541254 SB1789- 35 -LRB103 26314 AMQ 52675 b SB1789 - 35 - LRB103 26314 AMQ 52675 b
12551255 SB1789 - 35 - LRB103 26314 AMQ 52675 b
12561256 1 retail electric supplier's obligations under Section
12571257 2 16-115D of the Public Utilities Act as described in
12581258 3 this item (i).
12591259 4 (ii) For a given delivery year, the alternative
12601260 5 retail electric supplier may elect to supply its
12611261 6 retail customers with renewable energy credits from
12621262 7 the facility or facilities described in item (i) of
12631263 8 this subparagraph (H) that continue to be owned by the
12641264 9 alternative retail electric supplier.
12651265 10 (iii) The alternative retail electric supplier
12661266 11 shall notify the Agency and the applicable utility, no
12671267 12 later than February 28 of the year preceding the
12681268 13 applicable delivery year or 15 days after June 1, 2017
12691269 14 (the effective date of Public Act 99-906), whichever
12701270 15 is later, of its election under item (ii) of this
12711271 16 subparagraph (H) to supply renewable energy credits to
12721272 17 retail customers of the utility. Such election shall
12731273 18 identify the amount of renewable energy credits to be
12741274 19 supplied by the alternative retail electric supplier
12751275 20 to the utility's retail customers and the source of
12761276 21 the renewable energy credits identified in the
12771277 22 informational filing as described in item (i) of this
12781278 23 subparagraph (H), subject to the following
12791279 24 limitations:
12801280 25 For the delivery year beginning June 1, 2018,
12811281 26 the maximum amount of renewable energy credits to
12821282
12831283
12841284
12851285
12861286
12871287 SB1789 - 35 - LRB103 26314 AMQ 52675 b
12881288
12891289
12901290 SB1789- 36 -LRB103 26314 AMQ 52675 b SB1789 - 36 - LRB103 26314 AMQ 52675 b
12911291 SB1789 - 36 - LRB103 26314 AMQ 52675 b
12921292 1 be supplied by an alternative retail electric
12931293 2 supplier under this subparagraph (H) shall be 68%
12941294 3 multiplied by 25% multiplied by 14.5% multiplied
12951295 4 by the amount of metered electricity
12961296 5 (megawatt-hours) delivered by the alternative
12971297 6 retail electric supplier to Illinois retail
12981298 7 customers during the delivery year ending May 31,
12991299 8 2016.
13001300 9 For delivery years beginning June 1, 2019 and
13011301 10 each year thereafter, the maximum amount of
13021302 11 renewable energy credits to be supplied by an
13031303 12 alternative retail electric supplier under this
13041304 13 subparagraph (H) shall be 68% multiplied by 50%
13051305 14 multiplied by 16% multiplied by the amount of
13061306 15 metered electricity (megawatt-hours) delivered by
13071307 16 the alternative retail electric supplier to
13081308 17 Illinois retail customers during the delivery year
13091309 18 ending May 31, 2016, provided that the 16% value
13101310 19 shall increase by 1.5% each delivery year
13111311 20 thereafter to 25% by the delivery year beginning
13121312 21 June 1, 2025, and thereafter the 25% value shall
13131313 22 apply to each delivery year.
13141314 23 For each delivery year, the total amount of
13151315 24 renewable energy credits supplied by all alternative
13161316 25 retail electric suppliers under this subparagraph (H)
13171317 26 shall not exceed 9% of the Illinois target renewable
13181318
13191319
13201320
13211321
13221322
13231323 SB1789 - 36 - LRB103 26314 AMQ 52675 b
13241324
13251325
13261326 SB1789- 37 -LRB103 26314 AMQ 52675 b SB1789 - 37 - LRB103 26314 AMQ 52675 b
13271327 SB1789 - 37 - LRB103 26314 AMQ 52675 b
13281328 1 energy credit quantity. The Illinois target renewable
13291329 2 energy credit quantity for the delivery year beginning
13301330 3 June 1, 2018 is 14.5% multiplied by the total amount of
13311331 4 metered electricity (megawatt-hours) delivered in the
13321332 5 delivery year immediately preceding that delivery
13331333 6 year, provided that the 14.5% shall increase by 1.5%
13341334 7 each delivery year thereafter to 25% by the delivery
13351335 8 year beginning June 1, 2025, and thereafter the 25%
13361336 9 value shall apply to each delivery year.
13371337 10 If the requirements set forth in items (i) through
13381338 11 (iii) of this subparagraph (H) are met, the charges
13391339 12 that would otherwise be applicable to the retail
13401340 13 customers of the alternative retail electric supplier
13411341 14 under paragraph (6) of this subsection (c) for the
13421342 15 applicable delivery year shall be reduced by the ratio
13431343 16 of the quantity of renewable energy credits supplied
13441344 17 by the alternative retail electric supplier compared
13451345 18 to that supplier's target renewable energy credit
13461346 19 quantity. The supplier's target renewable energy
13471347 20 credit quantity for the delivery year beginning June
13481348 21 1, 2018 is 14.5% multiplied by the total amount of
13491349 22 metered electricity (megawatt-hours) delivered by the
13501350 23 alternative retail supplier in that delivery year,
13511351 24 provided that the 14.5% shall increase by 1.5% each
13521352 25 delivery year thereafter to 25% by the delivery year
13531353 26 beginning June 1, 2025, and thereafter the 25% value
13541354
13551355
13561356
13571357
13581358
13591359 SB1789 - 37 - LRB103 26314 AMQ 52675 b
13601360
13611361
13621362 SB1789- 38 -LRB103 26314 AMQ 52675 b SB1789 - 38 - LRB103 26314 AMQ 52675 b
13631363 SB1789 - 38 - LRB103 26314 AMQ 52675 b
13641364 1 shall apply to each delivery year.
13651365 2 On or before April 1 of each year, the Agency shall
13661366 3 annually publish a report on its website that
13671367 4 identifies the aggregate amount of renewable energy
13681368 5 credits supplied by alternative retail electric
13691369 6 suppliers under this subparagraph (H).
13701370 7 (I) The Agency shall design its long-term renewable
13711371 8 energy procurement plan to maximize the State's interest
13721372 9 in the health, safety, and welfare of its residents,
13731373 10 including but not limited to minimizing sulfur dioxide,
13741374 11 nitrogen oxide, particulate matter and other pollution
13751375 12 that adversely affects public health in this State,
13761376 13 increasing fuel and resource diversity in this State,
13771377 14 enhancing the reliability and resiliency of the
13781378 15 electricity distribution system in this State, meeting
13791379 16 goals to limit carbon dioxide emissions under federal or
13801380 17 State law, and contributing to a cleaner and healthier
13811381 18 environment for the citizens of this State. In order to
13821382 19 further these legislative purposes, renewable energy
13831383 20 credits shall be eligible to be counted toward the
13841384 21 renewable energy requirements of this subsection (c) if
13851385 22 they are generated from facilities located in this State.
13861386 23 The Agency may qualify renewable energy credits from
13871387 24 facilities located in states adjacent to Illinois or
13881388 25 renewable energy credits associated with the electricity
13891389 26 generated by a utility-scale wind energy facility or
13901390
13911391
13921392
13931393
13941394
13951395 SB1789 - 38 - LRB103 26314 AMQ 52675 b
13961396
13971397
13981398 SB1789- 39 -LRB103 26314 AMQ 52675 b SB1789 - 39 - LRB103 26314 AMQ 52675 b
13991399 SB1789 - 39 - LRB103 26314 AMQ 52675 b
14001400 1 utility-scale photovoltaic facility and transmitted by a
14011401 2 qualifying direct current project described in subsection
14021402 3 (b-5) of Section 8-406 of the Public Utilities Act to a
14031403 4 delivery point on the electric transmission grid located
14041404 5 in this State or a state adjacent to Illinois, if the
14051405 6 generator demonstrates and the Agency determines that the
14061406 7 operation of such facility or facilities will help promote
14071407 8 the State's interest in the health, safety, and welfare of
14081408 9 its residents based on the public interest criteria
14091409 10 described above. For the purposes of this Section,
14101410 11 renewable resources that are delivered via a high voltage
14111411 12 direct current converter station located in Illinois shall
14121412 13 be deemed generated in Illinois at the time and location
14131413 14 the energy is converted to alternating current by the high
14141414 15 voltage direct current converter station if the high
14151415 16 voltage direct current transmission line: (i) after the
14161416 17 effective date of this amendatory Act of the 102nd General
14171417 18 Assembly, was constructed with a project labor agreement;
14181418 19 (ii) is capable of transmitting electricity at 525kv;
14191419 20 (iii) has an Illinois converter station located and
14201420 21 interconnected in the region of the PJM Interconnection,
14211421 22 LLC; (iv) does not operate as a public utility; and (v) if
14221422 23 the high voltage direct current transmission line was
14231423 24 energized after June 1, 2023. To ensure that the public
14241424 25 interest criteria are applied to the procurement and given
14251425 26 full effect, the Agency's long-term procurement plan shall
14261426
14271427
14281428
14291429
14301430
14311431 SB1789 - 39 - LRB103 26314 AMQ 52675 b
14321432
14331433
14341434 SB1789- 40 -LRB103 26314 AMQ 52675 b SB1789 - 40 - LRB103 26314 AMQ 52675 b
14351435 SB1789 - 40 - LRB103 26314 AMQ 52675 b
14361436 1 describe in detail how each public interest factor shall
14371437 2 be considered and weighted for facilities located in
14381438 3 states adjacent to Illinois.
14391439 4 (J) In order to promote the competitive development of
14401440 5 renewable energy resources in furtherance of the State's
14411441 6 interest in the health, safety, and welfare of its
14421442 7 residents, renewable energy credits shall not be eligible
14431443 8 to be counted toward the renewable energy requirements of
14441444 9 this subsection (c) if they are sourced from a generating
14451445 10 unit whose costs were being recovered through rates
14461446 11 regulated by this State or any other state or states on or
14471447 12 after January 1, 2017. Each contract executed to purchase
14481448 13 renewable energy credits under this subsection (c) shall
14491449 14 provide for the contract's termination if the costs of the
14501450 15 generating unit supplying the renewable energy credits
14511451 16 subsequently begin to be recovered through rates regulated
14521452 17 by this State or any other state or states; and each
14531453 18 contract shall further provide that, in that event, the
14541454 19 supplier of the credits must return 110% of all payments
14551455 20 received under the contract. Amounts returned under the
14561456 21 requirements of this subparagraph (J) shall be retained by
14571457 22 the utility and all of these amounts shall be used for the
14581458 23 procurement of additional renewable energy credits from
14591459 24 new wind or new photovoltaic resources as defined in this
14601460 25 subsection (c). The long-term plan shall provide that
14611461 26 these renewable energy credits shall be procured in the
14621462
14631463
14641464
14651465
14661466
14671467 SB1789 - 40 - LRB103 26314 AMQ 52675 b
14681468
14691469
14701470 SB1789- 41 -LRB103 26314 AMQ 52675 b SB1789 - 41 - LRB103 26314 AMQ 52675 b
14711471 SB1789 - 41 - LRB103 26314 AMQ 52675 b
14721472 1 next procurement event.
14731473 2 Notwithstanding the limitations of this subparagraph
14741474 3 (J), renewable energy credits sourced from generating
14751475 4 units that are constructed, purchased, owned, or leased by
14761476 5 an electric utility as part of an approved project,
14771477 6 program, or pilot under Section 1-56 of this Act shall be
14781478 7 eligible to be counted toward the renewable energy
14791479 8 requirements of this subsection (c), regardless of how the
14801480 9 costs of these units are recovered. As long as a
14811481 10 generating unit or an identifiable portion of a generating
14821482 11 unit has not had and does not have its costs recovered
14831483 12 through rates regulated by this State or any other state,
14841484 13 HVDC renewable energy credits associated with that
14851485 14 generating unit or identifiable portion thereof shall be
14861486 15 eligible to be counted toward the renewable energy
14871487 16 requirements of this subsection (c).
14881488 17 (K) The long-term renewable resources procurement plan
14891489 18 developed by the Agency in accordance with subparagraph
14901490 19 (A) of this paragraph (1) shall include an Adjustable
14911491 20 Block program for the procurement of renewable energy
14921492 21 credits from new photovoltaic projects that are
14931493 22 distributed renewable energy generation devices or new
14941494 23 photovoltaic community renewable generation projects. The
14951495 24 Adjustable Block program shall be generally designed to
14961496 25 provide for the steady, predictable, and sustainable
14971497 26 growth of new solar photovoltaic development in Illinois.
14981498
14991499
15001500
15011501
15021502
15031503 SB1789 - 41 - LRB103 26314 AMQ 52675 b
15041504
15051505
15061506 SB1789- 42 -LRB103 26314 AMQ 52675 b SB1789 - 42 - LRB103 26314 AMQ 52675 b
15071507 SB1789 - 42 - LRB103 26314 AMQ 52675 b
15081508 1 To this end, the Adjustable Block program shall provide a
15091509 2 transparent annual schedule of prices and quantities to
15101510 3 enable the photovoltaic market to scale up and for
15111511 4 renewable energy credit prices to adjust at a predictable
15121512 5 rate over time. The prices set by the Adjustable Block
15131513 6 program can be reflected as a set value or as the product
15141514 7 of a formula.
15151515 8 The Adjustable Block program shall include for each
15161516 9 category of eligible projects for each delivery year: a
15171517 10 single block of nameplate capacity, a price for renewable
15181518 11 energy credits within that block, and the terms and
15191519 12 conditions for securing a spot on a waitlist once the
15201520 13 block is fully committed or reserved. Except as outlined
15211521 14 below, the waitlist of projects in a given year will carry
15221522 15 over to apply to the subsequent year when another block is
15231523 16 opened. Only projects energized on or after June 1, 2017
15241524 17 shall be eligible for the Adjustable Block program. For
15251525 18 each category for each delivery year the Agency shall
15261526 19 determine the amount of generation capacity in each block,
15271527 20 and the purchase price for each block, provided that the
15281528 21 purchase price provided and the total amount of generation
15291529 22 in all blocks for all categories shall be sufficient to
15301530 23 meet the goals in this subsection (c). The Agency shall
15311531 24 strive to issue a single block sized to provide for
15321532 25 stability and market growth. The Agency shall establish
15331533 26 program eligibility requirements that ensure that projects
15341534
15351535
15361536
15371537
15381538
15391539 SB1789 - 42 - LRB103 26314 AMQ 52675 b
15401540
15411541
15421542 SB1789- 43 -LRB103 26314 AMQ 52675 b SB1789 - 43 - LRB103 26314 AMQ 52675 b
15431543 SB1789 - 43 - LRB103 26314 AMQ 52675 b
15441544 1 that enter the program are sufficiently mature to indicate
15451545 2 a demonstrable path to completion. The Agency may
15461546 3 periodically review its prior decisions establishing the
15471547 4 amount of generation capacity in each block, and the
15481548 5 purchase price for each block, and may propose, on an
15491549 6 expedited basis, changes to these previously set values,
15501550 7 including but not limited to redistributing these amounts
15511551 8 and the available funds as necessary and appropriate,
15521552 9 subject to Commission approval as part of the periodic
15531553 10 plan revision process described in Section 16-111.5 of the
15541554 11 Public Utilities Act. The Agency may define different
15551555 12 block sizes, purchase prices, or other distinct terms and
15561556 13 conditions for projects located in different utility
15571557 14 service territories if the Agency deems it necessary to
15581558 15 meet the goals in this subsection (c).
15591559 16 The Adjustable Block program shall include the
15601560 17 following categories in at least the following amounts:
15611561 18 (i) At least 20% from distributed renewable energy
15621562 19 generation devices with a nameplate capacity of no
15631563 20 more than 25 kilowatts.
15641564 21 (ii) At least 20% from distributed renewable
15651565 22 energy generation devices with a nameplate capacity of
15661566 23 more than 25 kilowatts and no more than 5,000
15671567 24 kilowatts. The Agency may create sub-categories within
15681568 25 this category to account for the differences between
15691569 26 projects for small commercial customers, large
15701570
15711571
15721572
15731573
15741574
15751575 SB1789 - 43 - LRB103 26314 AMQ 52675 b
15761576
15771577
15781578 SB1789- 44 -LRB103 26314 AMQ 52675 b SB1789 - 44 - LRB103 26314 AMQ 52675 b
15791579 SB1789 - 44 - LRB103 26314 AMQ 52675 b
15801580 1 commercial customers, and public or non-profit
15811581 2 customers.
15821582 3 (iii) At least 30% from photovoltaic community
15831583 4 renewable generation projects. Capacity for this
15841584 5 category for the first 2 delivery years after the
15851585 6 effective date of this amendatory Act of the 102nd
15861586 7 General Assembly shall be allocated to waitlist
15871587 8 projects as provided in paragraph (3) of item (iv) of
15881588 9 subparagraph (G). Starting in the third delivery year
15891589 10 after the effective date of this amendatory Act of the
15901590 11 102nd General Assembly or earlier if the Agency
15911591 12 determines there is additional capacity needed for to
15921592 13 meet previous delivery year requirements, the
15931593 14 following shall apply:
15941594 15 (1) the Agency shall select projects on a
15951595 16 first-come, first-serve basis, however the Agency
15961596 17 may suggest additional methods to prioritize
15971597 18 projects that are submitted at the same time;
15981598 19 (2) projects shall have subscriptions of 25 kW
15991599 20 or less for at least 50% of the facility's
16001600 21 nameplate capacity and the Agency shall price the
16011601 22 renewable energy credits with that as a factor;
16021602 23 (3) projects shall not be colocated with one
16031603 24 or more other community renewable generation
16041604 25 projects, as defined in the Agency's first revised
16051605 26 long-term renewable resources procurement plan
16061606
16071607
16081608
16091609
16101610
16111611 SB1789 - 44 - LRB103 26314 AMQ 52675 b
16121612
16131613
16141614 SB1789- 45 -LRB103 26314 AMQ 52675 b SB1789 - 45 - LRB103 26314 AMQ 52675 b
16151615 SB1789 - 45 - LRB103 26314 AMQ 52675 b
16161616 1 approved by the Commission on February 18, 2020,
16171617 2 such that the aggregate nameplate capacity exceeds
16181618 3 5,000 kilowatts; and
16191619 4 (4) projects greater than 2 MW may not apply
16201620 5 until after the approval of the Agency's revised
16211621 6 Long-Term Renewable Resources Procurement Plan
16221622 7 after the effective date of this amendatory Act of
16231623 8 the 102nd General Assembly.
16241624 9 (iv) At least 15% from distributed renewable
16251625 10 generation devices or photovoltaic community renewable
16261626 11 generation projects installed at public schools. The
16271627 12 Agency may create subcategories within this category
16281628 13 to account for the differences between project size or
16291629 14 location. Projects located within environmental
16301630 15 justice communities or within Organizational Units
16311631 16 that fall within Tier 1 or Tier 2 shall be given
16321632 17 priority. Each of the Agency's periodic updates to its
16331633 18 long-term renewable resources procurement plan to
16341634 19 incorporate the procurement described in this
16351635 20 subparagraph (iv) shall also include the proposed
16361636 21 quantities or blocks, pricing, and contract terms
16371637 22 applicable to the procurement as indicated herein. In
16381638 23 each such update and procurement, the Agency shall set
16391639 24 the renewable energy credit price and establish
16401640 25 payment terms for the renewable energy credits
16411641 26 procured pursuant to this subparagraph (iv) that make
16421642
16431643
16441644
16451645
16461646
16471647 SB1789 - 45 - LRB103 26314 AMQ 52675 b
16481648
16491649
16501650 SB1789- 46 -LRB103 26314 AMQ 52675 b SB1789 - 46 - LRB103 26314 AMQ 52675 b
16511651 SB1789 - 46 - LRB103 26314 AMQ 52675 b
16521652 1 it feasible and affordable for public schools to
16531653 2 install photovoltaic distributed renewable energy
16541654 3 devices on their premises, including, but not limited
16551655 4 to, those public schools subject to the prioritization
16561656 5 provisions of this subparagraph. For the purposes of
16571657 6 this item (iv):
16581658 7 "Environmental Justice Community" shall have the
16591659 8 same meaning set forth in the Agency's long-term
16601660 9 renewable resources procurement plan;
16611661 10 "Organization Unit", "Tier 1" and "Tier 2" shall
16621662 11 have the meanings set for in Section 18-8.15 of the
16631663 12 School Code;
16641664 13 "Public schools" shall have the meaning set forth
16651665 14 in Section 1-3 of the School Code.
16661666 15 (v) At least 5% from community-driven community
16671667 16 solar projects intended to provide more direct and
16681668 17 tangible connection and benefits to the communities
16691669 18 which they serve or in which they operate and,
16701670 19 additionally, to increase the variety of community
16711671 20 solar locations, models, and options in Illinois. As
16721672 21 part of its long-term renewable resources procurement
16731673 22 plan, the Agency shall develop selection criteria for
16741674 23 projects participating in this category. Nothing in
16751675 24 this Section shall preclude the Agency from creating a
16761676 25 selection process that maximizes community ownership
16771677 26 and community benefits in selecting projects to
16781678
16791679
16801680
16811681
16821682
16831683 SB1789 - 46 - LRB103 26314 AMQ 52675 b
16841684
16851685
16861686 SB1789- 47 -LRB103 26314 AMQ 52675 b SB1789 - 47 - LRB103 26314 AMQ 52675 b
16871687 SB1789 - 47 - LRB103 26314 AMQ 52675 b
16881688 1 receive renewable energy credits. Selection criteria
16891689 2 shall include:
16901690 3 (1) community ownership or community
16911691 4 wealth-building;
16921692 5 (2) additional direct and indirect community
16931693 6 benefit, beyond project participation as a
16941694 7 subscriber, including, but not limited to,
16951695 8 economic, environmental, social, cultural, and
16961696 9 physical benefits;
16971697 10 (3) meaningful involvement in project
16981698 11 organization and development by community members
16991699 12 or nonprofit organizations or public entities
17001700 13 located in or serving the community;
17011701 14 (4) engagement in project operations and
17021702 15 management by nonprofit organizations, public
17031703 16 entities, or community members; and
17041704 17 (5) whether a project is developed in response
17051705 18 to a site-specific RFP developed by community
17061706 19 members or a nonprofit organization or public
17071707 20 entity located in or serving the community.
17081708 21 Selection criteria may also prioritize projects
17091709 22 that:
17101710 23 (1) are developed in collaboration with or to
17111711 24 provide complementary opportunities for the Clean
17121712 25 Jobs Workforce Network Program, the Illinois
17131713 26 Climate Works Preapprenticeship Program, the
17141714
17151715
17161716
17171717
17181718
17191719 SB1789 - 47 - LRB103 26314 AMQ 52675 b
17201720
17211721
17221722 SB1789- 48 -LRB103 26314 AMQ 52675 b SB1789 - 48 - LRB103 26314 AMQ 52675 b
17231723 SB1789 - 48 - LRB103 26314 AMQ 52675 b
17241724 1 Returning Residents Clean Jobs Training Program,
17251725 2 the Clean Energy Contractor Incubator Program, or
17261726 3 the Clean Energy Primes Contractor Accelerator
17271727 4 Program;
17281728 5 (2) increase the diversity of locations of
17291729 6 community solar projects in Illinois, including by
17301730 7 locating in urban areas and population centers;
17311731 8 (3) are located in Equity Investment Eligible
17321732 9 Communities;
17331733 10 (4) are not greenfield projects;
17341734 11 (5) serve only local subscribers;
17351735 12 (6) have a nameplate capacity that does not
17361736 13 exceed 500 kW;
17371737 14 (7) are developed by an equity eligible
17381738 15 contractor; or
17391739 16 (8) otherwise meaningfully advance the goals
17401740 17 of providing more direct and tangible connection
17411741 18 and benefits to the communities which they serve
17421742 19 or in which they operate and increasing the
17431743 20 variety of community solar locations, models, and
17441744 21 options in Illinois.
17451745 22 For the purposes of this item (v):
17461746 23 "Community" means a social unit in which people
17471747 24 come together regularly to effect change; a social
17481748 25 unit in which participants are marked by a cooperative
17491749 26 spirit, a common purpose, or shared interests or
17501750
17511751
17521752
17531753
17541754
17551755 SB1789 - 48 - LRB103 26314 AMQ 52675 b
17561756
17571757
17581758 SB1789- 49 -LRB103 26314 AMQ 52675 b SB1789 - 49 - LRB103 26314 AMQ 52675 b
17591759 SB1789 - 49 - LRB103 26314 AMQ 52675 b
17601760 1 characteristics; or a space understood by its
17611761 2 residents to be delineated through geographic
17621762 3 boundaries or landmarks.
17631763 4 "Community benefit" means a range of services and
17641764 5 activities that provide affirmative, economic,
17651765 6 environmental, social, cultural, or physical value to
17661766 7 a community; or a mechanism that enables economic
17671767 8 development, high-quality employment, and education
17681768 9 opportunities for local workers and residents, or
17691769 10 formal monitoring and oversight structures such that
17701770 11 community members may ensure that those services and
17711771 12 activities respond to local knowledge and needs.
17721772 13 "Community ownership" means an arrangement in
17731773 14 which an electric generating facility is, or over time
17741774 15 will be, in significant part, owned collectively by
17751775 16 members of the community to which an electric
17761776 17 generating facility provides benefits; members of that
17771777 18 community participate in decisions regarding the
17781778 19 governance, operation, maintenance, and upgrades of
17791779 20 and to that facility; and members of that community
17801780 21 benefit from regular use of that facility.
17811781 22 Terms and guidance within these criteria that are
17821782 23 not defined in this item (v) shall be defined by the
17831783 24 Agency, with stakeholder input, during the development
17841784 25 of the Agency's long-term renewable resources
17851785 26 procurement plan. The Agency shall develop regular
17861786
17871787
17881788
17891789
17901790
17911791 SB1789 - 49 - LRB103 26314 AMQ 52675 b
17921792
17931793
17941794 SB1789- 50 -LRB103 26314 AMQ 52675 b SB1789 - 50 - LRB103 26314 AMQ 52675 b
17951795 SB1789 - 50 - LRB103 26314 AMQ 52675 b
17961796 1 opportunities for projects to submit applications for
17971797 2 projects under this category, and develop selection
17981798 3 criteria that gives preference to projects that better
17991799 4 meet individual criteria as well as projects that
18001800 5 address a higher number of criteria.
18011801 6 (vi) At least 10% from distributed renewable
18021802 7 energy generation devices, which includes distributed
18031803 8 renewable energy devices with a nameplate capacity
18041804 9 under 5,000 kilowatts or photovoltaic community
18051805 10 renewable generation projects, from applicants that
18061806 11 are equity eligible contractors. The Agency may create
18071807 12 subcategories within this category to account for the
18081808 13 differences between project size and type. The Agency
18091809 14 shall propose to increase the percentage in this item
18101810 15 (vi) over time to 40% based on factors, including, but
18111811 16 not limited to, the number of equity eligible
18121812 17 contractors and capacity used in this item (vi) in
18131813 18 previous delivery years.
18141814 19 The Agency shall propose a payment structure for
18151815 20 contracts executed pursuant to this paragraph under
18161816 21 which, upon a demonstration of qualification or need,
18171817 22 applicant firms are advanced capital disbursed after
18181818 23 contract execution but before the contracted project's
18191819 24 energization. The amount or percentage of capital
18201820 25 advanced prior to project energization shall be
18211821 26 sufficient to both cover any increase in development
18221822
18231823
18241824
18251825
18261826
18271827 SB1789 - 50 - LRB103 26314 AMQ 52675 b
18281828
18291829
18301830 SB1789- 51 -LRB103 26314 AMQ 52675 b SB1789 - 51 - LRB103 26314 AMQ 52675 b
18311831 SB1789 - 51 - LRB103 26314 AMQ 52675 b
18321832 1 costs resulting from prevailing wage requirements or
18331833 2 project-labor agreements, and designed to overcome
18341834 3 barriers in access to capital faced by equity eligible
18351835 4 contractors. The amount or percentage of advanced
18361836 5 capital may vary by subcategory within this category
18371837 6 and by an applicant's demonstration of need, with such
18381838 7 levels to be established through the Long-Term
18391839 8 Renewable Resources Procurement Plan authorized under
18401840 9 subparagraph (A) of paragraph (1) of subsection (c) of
18411841 10 this Section.
18421842 11 Contracts developed featuring capital advanced
18431843 12 prior to a project's energization shall feature
18441844 13 provisions to ensure both the successful development
18451845 14 of applicant projects and the delivery of the
18461846 15 renewable energy credits for the full term of the
18471847 16 contract, including ongoing collateral requirements
18481848 17 and other provisions deemed necessary by the Agency,
18491849 18 and may include energization timelines longer than for
18501850 19 comparable project types. The percentage or amount of
18511851 20 capital advanced prior to project energization shall
18521852 21 not operate to increase the overall contract value,
18531853 22 however contracts executed under this subparagraph may
18541854 23 feature renewable energy credit prices higher than
18551855 24 those offered to similar projects participating in
18561856 25 other categories. Capital advanced prior to
18571857 26 energization shall serve to reduce the ratable
18581858
18591859
18601860
18611861
18621862
18631863 SB1789 - 51 - LRB103 26314 AMQ 52675 b
18641864
18651865
18661866 SB1789- 52 -LRB103 26314 AMQ 52675 b SB1789 - 52 - LRB103 26314 AMQ 52675 b
18671867 SB1789 - 52 - LRB103 26314 AMQ 52675 b
18681868 1 payments made after energization under items (ii) and
18691869 2 (iii) of subparagraph (L) or payments made for each
18701870 3 renewable energy credit delivery under item (iv) of
18711871 4 subparagraph (L).
18721872 5 (vii) The remaining capacity shall be allocated by
18731873 6 the Agency in order to respond to market demand. The
18741874 7 Agency shall allocate any discretionary capacity prior
18751875 8 to the beginning of each delivery year.
18761876 9 To the extent there is uncontracted capacity from any
18771877 10 block in any of categories (i) through (vi) at the end of a
18781878 11 delivery year, the Agency shall redistribute that capacity
18791879 12 to one or more other categories giving priority to
18801880 13 categories with projects on a waitlist. The redistributed
18811881 14 capacity shall be added to the annual capacity in the
18821882 15 subsequent delivery year, and the price for renewable
18831883 16 energy credits shall be the price for the new delivery
18841884 17 year. Redistributed capacity shall not be considered
18851885 18 redistributed when determining whether the goals in this
18861886 19 subsection (K) have been met.
18871887 20 Notwithstanding anything to the contrary, as the
18881888 21 Agency increases the capacity in item (vi) to 40% over
18891889 22 time, the Agency may reduce the capacity of items (i)
18901890 23 through (v) proportionate to the capacity of the
18911891 24 categories of projects in item (vi), to achieve a balance
18921892 25 of project types.
18931893 26 The Adjustable Block program shall be designed to
18941894
18951895
18961896
18971897
18981898
18991899 SB1789 - 52 - LRB103 26314 AMQ 52675 b
19001900
19011901
19021902 SB1789- 53 -LRB103 26314 AMQ 52675 b SB1789 - 53 - LRB103 26314 AMQ 52675 b
19031903 SB1789 - 53 - LRB103 26314 AMQ 52675 b
19041904 1 ensure that renewable energy credits are procured from
19051905 2 projects in diverse locations and are not concentrated in
19061906 3 a few regional areas.
19071907 4 (L) Notwithstanding provisions for advancing capital
19081908 5 prior to project energization found in item (vi) of
19091909 6 subparagraph (K), the procurement of photovoltaic
19101910 7 renewable energy credits under items (i) through (vi) of
19111911 8 subparagraph (K) of this paragraph (1) shall otherwise be
19121912 9 subject to the following contract and payment terms:
19131913 10 (i) (Blank).
19141914 11 (ii) For those renewable energy credits that
19151915 12 qualify and are procured under item (i) of
19161916 13 subparagraph (K) of this paragraph (1), and any
19171917 14 similar category projects that are procured under item
19181918 15 (vi) of subparagraph (K) of this paragraph (1) that
19191919 16 qualify and are procured under item (vi), the contract
19201920 17 length shall be 15 years. The renewable energy credit
19211921 18 delivery contract value shall be paid in full, based
19221922 19 on the estimated generation during the first 15 years
19231923 20 of operation, by the contracting utilities at the time
19241924 21 that the facility producing the renewable energy
19251925 22 credits is interconnected at the distribution system
19261926 23 level of the utility and verified as energized and
19271927 24 compliant by the Program Administrator. The electric
19281928 25 utility shall receive and retire all renewable energy
19291929 26 credits generated by the project for the first 15
19301930
19311931
19321932
19331933
19341934
19351935 SB1789 - 53 - LRB103 26314 AMQ 52675 b
19361936
19371937
19381938 SB1789- 54 -LRB103 26314 AMQ 52675 b SB1789 - 54 - LRB103 26314 AMQ 52675 b
19391939 SB1789 - 54 - LRB103 26314 AMQ 52675 b
19401940 1 years of operation. Renewable energy credits generated
19411941 2 by the project thereafter shall not be transferred
19421942 3 under the renewable energy credit delivery contract
19431943 4 with the counterparty electric utility.
19441944 5 (iii) For those renewable energy credits that
19451945 6 qualify and are procured under item (ii) and (v) of
19461946 7 subparagraph (K) of this paragraph (1) and any like
19471947 8 projects similar category that qualify and are
19481948 9 procured under item (vi), the contract length shall be
19491949 10 15 years. 15% of the renewable energy credit delivery
19501950 11 contract value, based on the estimated generation
19511951 12 during the first 15 years of operation, shall be paid
19521952 13 by the contracting utilities at the time that the
19531953 14 facility producing the renewable energy credits is
19541954 15 interconnected at the distribution system level of the
19551955 16 utility and verified as energized and compliant by the
19561956 17 Program Administrator. The remaining portion shall be
19571957 18 paid ratably over the subsequent 6-year period. The
19581958 19 electric utility shall receive and retire all
19591959 20 renewable energy credits generated by the project for
19601960 21 the first 15 years of operation. Renewable energy
19611961 22 credits generated by the project thereafter shall not
19621962 23 be transferred under the renewable energy credit
19631963 24 delivery contract with the counterparty electric
19641964 25 utility.
19651965 26 (iv) For those renewable energy credits that
19661966
19671967
19681968
19691969
19701970
19711971 SB1789 - 54 - LRB103 26314 AMQ 52675 b
19721972
19731973
19741974 SB1789- 55 -LRB103 26314 AMQ 52675 b SB1789 - 55 - LRB103 26314 AMQ 52675 b
19751975 SB1789 - 55 - LRB103 26314 AMQ 52675 b
19761976 1 qualify and are procured under items (iii) and (iv) of
19771977 2 subparagraph (K) of this paragraph (1), and any like
19781978 3 projects that qualify and are procured under item
19791979 4 (vi), the renewable energy credit delivery contract
19801980 5 length shall be 20 years and shall be paid over the
19811981 6 delivery term, not to exceed during each delivery year
19821982 7 the contract price multiplied by the estimated annual
19831983 8 renewable energy credit generation amount. If
19841984 9 generation of renewable energy credits during a
19851985 10 delivery year exceeds the estimated annual generation
19861986 11 amount, the excess renewable energy credits shall be
19871987 12 carried forward to future delivery years and shall not
19881988 13 expire during the delivery term. If generation of
19891989 14 renewable energy credits during a delivery year,
19901990 15 including carried forward excess renewable energy
19911991 16 credits, if any, is less than the estimated annual
19921992 17 generation amount, payments during such delivery year
19931993 18 will not exceed the quantity generated plus the
19941994 19 quantity carried forward multiplied by the contract
19951995 20 price. The electric utility shall receive all
19961996 21 renewable energy credits generated by the project
19971997 22 during the first 20 years of operation and retire all
19981998 23 renewable energy credits paid for under this item (iv)
19991999 24 and return at the end of the delivery term all
20002000 25 renewable energy credits that were not paid for.
20012001 26 Renewable energy credits generated by the project
20022002
20032003
20042004
20052005
20062006
20072007 SB1789 - 55 - LRB103 26314 AMQ 52675 b
20082008
20092009
20102010 SB1789- 56 -LRB103 26314 AMQ 52675 b SB1789 - 56 - LRB103 26314 AMQ 52675 b
20112011 SB1789 - 56 - LRB103 26314 AMQ 52675 b
20122012 1 thereafter shall not be transferred under the
20132013 2 renewable energy credit delivery contract with the
20142014 3 counterparty electric utility. Notwithstanding the
20152015 4 preceding, for those projects participating under item
20162016 5 (iii) of subparagraph (K), the contract price for a
20172017 6 delivery year shall be based on subscription levels as
20182018 7 measured on the higher of the first business day of the
20192019 8 delivery year or the first business day 6 months after
20202020 9 the first business day of the delivery year.
20212021 10 Subscription of 90% of nameplate capacity or greater
20222022 11 shall be deemed to be fully subscribed for the
20232023 12 purposes of this item (iv). For projects receiving a
20242024 13 20-year delivery contract, REC prices shall be
20252025 14 adjusted downward for consistency with the incentive
20262026 15 levels previously determined to be necessary to
20272027 16 support projects under 15-year delivery contracts,
20282028 17 taking into consideration any additional new
20292029 18 requirements placed on the projects, including, but
20302030 19 not limited to, labor standards.
20312031 20 (v) Each contract shall include provisions to
20322032 21 ensure the delivery of the estimated quantity of
20332033 22 renewable energy credits and ongoing collateral
20342034 23 requirements and other provisions deemed appropriate
20352035 24 by the Agency.
20362036 25 (vi) The utility shall be the counterparty to the
20372037 26 contracts executed under this subparagraph (L) that
20382038
20392039
20402040
20412041
20422042
20432043 SB1789 - 56 - LRB103 26314 AMQ 52675 b
20442044
20452045
20462046 SB1789- 57 -LRB103 26314 AMQ 52675 b SB1789 - 57 - LRB103 26314 AMQ 52675 b
20472047 SB1789 - 57 - LRB103 26314 AMQ 52675 b
20482048 1 are approved by the Commission under the process
20492049 2 described in Section 16-111.5 of the Public Utilities
20502050 3 Act. No contract shall be executed for an amount that
20512051 4 is less than one renewable energy credit per year.
20522052 5 (vii) If, at any time, approved applications for
20532053 6 the Adjustable Block program exceed funds collected by
20542054 7 the electric utility or would cause the Agency to
20552055 8 exceed the limitation described in subparagraph (E) of
20562056 9 this paragraph (1) on the amount of renewable energy
20572057 10 resources that may be procured, then the Agency may
20582058 11 consider future uncommitted funds to be reserved for
20592059 12 these contracts on a first-come, first-served basis.
20602060 13 (viii) Nothing in this Section shall require the
20612061 14 utility to advance any payment or pay any amounts that
20622062 15 exceed the actual amount of revenues anticipated to be
20632063 16 collected by the utility under paragraph (6) of this
20642064 17 subsection (c) and subsection (k) of Section 16-108 of
20652065 18 the Public Utilities Act inclusive of eligible funds
20662066 19 collected in prior years and alternative compliance
20672067 20 payments for use by the utility, and contracts
20682068 21 executed under this Section shall expressly
20692069 22 incorporate this limitation.
20702070 23 (ix) Notwithstanding other requirements of this
20712071 24 subparagraph (L), no modification shall be required to
20722072 25 Adjustable Block program contracts if they were
20732073 26 already executed prior to the establishment, approval,
20742074
20752075
20762076
20772077
20782078
20792079 SB1789 - 57 - LRB103 26314 AMQ 52675 b
20802080
20812081
20822082 SB1789- 58 -LRB103 26314 AMQ 52675 b SB1789 - 58 - LRB103 26314 AMQ 52675 b
20832083 SB1789 - 58 - LRB103 26314 AMQ 52675 b
20842084 1 and implementation of new contract forms as a result
20852085 2 of this amendatory Act of the 102nd General Assembly.
20862086 3 (x) Contracts may be assignable, but only to
20872087 4 entities first deemed by the Agency to have met
20882088 5 program terms and requirements applicable to direct
20892089 6 program participation. In developing contracts for the
20902090 7 delivery of renewable energy credits, the Agency shall
20912091 8 be permitted to establish fees applicable to each
20922092 9 contract assignment.
20932093 10 (M) The Agency shall be authorized to retain one or
20942094 11 more experts or expert consulting firms to develop,
20952095 12 administer, implement, operate, and evaluate the
20962096 13 Adjustable Block program described in subparagraph (K) of
20972097 14 this paragraph (1), and the Agency shall retain the
20982098 15 consultant or consultants in the same manner, to the
20992099 16 extent practicable, as the Agency retains others to
21002100 17 administer provisions of this Act, including, but not
21012101 18 limited to, the procurement administrator. The selection
21022102 19 of experts and expert consulting firms and the procurement
21032103 20 process described in this subparagraph (M) are exempt from
21042104 21 the requirements of Section 20-10 of the Illinois
21052105 22 Procurement Code, under Section 20-10 of that Code. The
21062106 23 Agency shall strive to minimize administrative expenses in
21072107 24 the implementation of the Adjustable Block program.
21082108 25 The Program Administrator may charge application fees
21092109 26 to participating firms to cover the cost of program
21102110
21112111
21122112
21132113
21142114
21152115 SB1789 - 58 - LRB103 26314 AMQ 52675 b
21162116
21172117
21182118 SB1789- 59 -LRB103 26314 AMQ 52675 b SB1789 - 59 - LRB103 26314 AMQ 52675 b
21192119 SB1789 - 59 - LRB103 26314 AMQ 52675 b
21202120 1 administration. Any application fee amounts shall
21212121 2 initially be determined through the long-term renewable
21222122 3 resources procurement plan, and modifications to any
21232123 4 application fee that deviate more than 25% from the
21242124 5 Commission's approved value must be approved by the
21252125 6 Commission as a long-term plan revision under Section
21262126 7 16-111.5 of the Public Utilities Act. The Agency shall
21272127 8 consider stakeholder feedback when making adjustments to
21282128 9 application fees and shall notify stakeholders in advance
21292129 10 of any planned changes.
21302130 11 In addition to covering the costs of program
21312131 12 administration, the Agency, in conjunction with its
21322132 13 Program Administrator, may also use the proceeds of such
21332133 14 fees charged to participating firms to support public
21342134 15 education and ongoing regional and national coordination
21352135 16 with nonprofit organizations, public bodies, and others
21362136 17 engaged in the implementation of renewable energy
21372137 18 incentive programs or similar initiatives. This work may
21382138 19 include developing papers and reports, hosting regional
21392139 20 and national conferences, and other work deemed necessary
21402140 21 by the Agency to position the State of Illinois as a
21412141 22 national leader in renewable energy incentive program
21422142 23 development and administration.
21432143 24 The Agency and its consultant or consultants shall
21442144 25 monitor block activity, share program activity with
21452145 26 stakeholders and conduct quarterly meetings to discuss
21462146
21472147
21482148
21492149
21502150
21512151 SB1789 - 59 - LRB103 26314 AMQ 52675 b
21522152
21532153
21542154 SB1789- 60 -LRB103 26314 AMQ 52675 b SB1789 - 60 - LRB103 26314 AMQ 52675 b
21552155 SB1789 - 60 - LRB103 26314 AMQ 52675 b
21562156 1 program activity and market conditions. If necessary, the
21572157 2 Agency may make prospective administrative adjustments to
21582158 3 the Adjustable Block program design, such as making
21592159 4 adjustments to purchase prices as necessary to achieve the
21602160 5 goals of this subsection (c). Program modifications to any
21612161 6 block price that do not deviate from the Commission's
21622162 7 approved value by more than 10% shall take effect
21632163 8 immediately and are not subject to Commission review and
21642164 9 approval. Program modifications to any block price that
21652165 10 deviate more than 10% from the Commission's approved value
21662166 11 must be approved by the Commission as a long-term plan
21672167 12 amendment under Section 16-111.5 of the Public Utilities
21682168 13 Act. The Agency shall consider stakeholder feedback when
21692169 14 making adjustments to the Adjustable Block design and
21702170 15 shall notify stakeholders in advance of any planned
21712171 16 changes.
21722172 17 The Agency and its program administrators for both the
21732173 18 Adjustable Block program and the Illinois Solar for All
21742174 19 Program, consistent with the requirements of this
21752175 20 subsection (c) and subsection (b) of Section 1-56 of this
21762176 21 Act, shall propose the Adjustable Block program terms,
21772177 22 conditions, and requirements, including the prices to be
21782178 23 paid for renewable energy credits, where applicable, and
21792179 24 requirements applicable to participating entities and
21802180 25 project applications, through the development, review, and
21812181 26 approval of the Agency's long-term renewable resources
21822182
21832183
21842184
21852185
21862186
21872187 SB1789 - 60 - LRB103 26314 AMQ 52675 b
21882188
21892189
21902190 SB1789- 61 -LRB103 26314 AMQ 52675 b SB1789 - 61 - LRB103 26314 AMQ 52675 b
21912191 SB1789 - 61 - LRB103 26314 AMQ 52675 b
21922192 1 procurement plan described in this subsection (c) and
21932193 2 paragraph (5) of subsection (b) of Section 16-111.5 of the
21942194 3 Public Utilities Act. Terms, conditions, and requirements
21952195 4 for program participation shall include the following:
21962196 5 (i) The Agency shall establish a registration
21972197 6 process for entities seeking to qualify for
21982198 7 program-administered incentive funding and establish
21992199 8 baseline qualifications for vendor approval. The
22002200 9 Agency must maintain a list of approved entities on
22012201 10 each program's website, and may revoke a vendor's
22022202 11 ability to receive program-administered incentive
22032203 12 funding status upon a determination that the vendor
22042204 13 failed to comply with contract terms, the law, or
22052205 14 other program requirements.
22062206 15 (ii) The Agency shall establish program
22072207 16 requirements and minimum contract terms to ensure
22082208 17 projects are properly installed and produce their
22092209 18 expected amounts of energy. Program requirements may
22102210 19 include on-site inspections and photo documentation of
22112211 20 projects under construction. The Agency may require
22122212 21 repairs, alterations, or additions to remedy any
22132213 22 material deficiencies discovered. Vendors who have a
22142214 23 disproportionately high number of deficient systems
22152215 24 may lose their eligibility to continue to receive
22162216 25 State-administered incentive funding through Agency
22172217 26 programs and procurements.
22182218
22192219
22202220
22212221
22222222
22232223 SB1789 - 61 - LRB103 26314 AMQ 52675 b
22242224
22252225
22262226 SB1789- 62 -LRB103 26314 AMQ 52675 b SB1789 - 62 - LRB103 26314 AMQ 52675 b
22272227 SB1789 - 62 - LRB103 26314 AMQ 52675 b
22282228 1 (iii) To discourage deceptive marketing or other
22292229 2 bad faith business practices, the Agency may require
22302230 3 direct program participants, including agents
22312231 4 operating on their behalf, to provide standardized
22322232 5 disclosures to a customer prior to that customer's
22332233 6 execution of a contract for the development of a
22342234 7 distributed generation system or a subscription to a
22352235 8 community solar project.
22362236 9 (iv) The Agency shall establish one or multiple
22372237 10 Consumer Complaints Centers to accept complaints
22382238 11 regarding businesses that participate in, or otherwise
22392239 12 benefit from, State-administered incentive funding
22402240 13 through Agency-administered programs. The Agency shall
22412241 14 maintain a public database of complaints with any
22422242 15 confidential or particularly sensitive information
22432243 16 redacted from public entries.
22442244 17 (v) Through a filing in the proceeding for the
22452245 18 approval of its long-term renewable energy resources
22462246 19 procurement plan, the Agency shall provide an annual
22472247 20 written report to the Illinois Commerce Commission
22482248 21 documenting the frequency and nature of complaints and
22492249 22 any enforcement actions taken in response to those
22502250 23 complaints.
22512251 24 (vi) The Agency shall schedule regular meetings
22522252 25 with representatives of the Office of the Attorney
22532253 26 General, the Illinois Commerce Commission, consumer
22542254
22552255
22562256
22572257
22582258
22592259 SB1789 - 62 - LRB103 26314 AMQ 52675 b
22602260
22612261
22622262 SB1789- 63 -LRB103 26314 AMQ 52675 b SB1789 - 63 - LRB103 26314 AMQ 52675 b
22632263 SB1789 - 63 - LRB103 26314 AMQ 52675 b
22642264 1 protection groups, and other interested stakeholders
22652265 2 to share relevant information about consumer
22662266 3 protection, project compliance, and complaints
22672267 4 received.
22682268 5 (vii) To the extent that complaints received
22692269 6 implicate the jurisdiction of the Office of the
22702270 7 Attorney General, the Illinois Commerce Commission, or
22712271 8 local, State, or federal law enforcement, the Agency
22722272 9 shall also refer complaints to those entities as
22732273 10 appropriate.
22742274 11 (N) The Agency shall establish the terms, conditions,
22752275 12 and program requirements for photovoltaic community
22762276 13 renewable generation projects with a goal to expand access
22772277 14 to a broader group of energy consumers, to ensure robust
22782278 15 participation opportunities for residential and small
22792279 16 commercial customers and those who cannot install
22802280 17 renewable energy on their own properties. Subject to
22812281 18 reasonable limitations, any plan approved by the
22822282 19 Commission shall allow subscriptions to community
22832283 20 renewable generation projects to be portable and
22842284 21 transferable. For purposes of this subparagraph (N),
22852285 22 "portable" means that subscriptions may be retained by the
22862286 23 subscriber even if the subscriber relocates or changes its
22872287 24 address within the same utility service territory; and
22882288 25 "transferable" means that a subscriber may assign or sell
22892289 26 subscriptions to another person within the same utility
22902290
22912291
22922292
22932293
22942294
22952295 SB1789 - 63 - LRB103 26314 AMQ 52675 b
22962296
22972297
22982298 SB1789- 64 -LRB103 26314 AMQ 52675 b SB1789 - 64 - LRB103 26314 AMQ 52675 b
22992299 SB1789 - 64 - LRB103 26314 AMQ 52675 b
23002300 1 service territory.
23012301 2 Through the development of its long-term renewable
23022302 3 resources procurement plan, the Agency may consider
23032303 4 whether community renewable generation projects utilizing
23042304 5 technologies other than photovoltaics should be supported
23052305 6 through State-administered incentive funding, and may
23062306 7 issue requests for information to gauge market demand.
23072307 8 Electric utilities shall provide a monetary credit to
23082308 9 a subscriber's subsequent bill for service for the
23092309 10 proportional output of a community renewable generation
23102310 11 project attributable to that subscriber as specified in
23112311 12 Section 16-107.5 of the Public Utilities Act.
23122312 13 The Agency shall purchase renewable energy credits
23132313 14 from subscribed shares of photovoltaic community renewable
23142314 15 generation projects through the Adjustable Block program
23152315 16 described in subparagraph (K) of this paragraph (1) or
23162316 17 through the Illinois Solar for All Program described in
23172317 18 Section 1-56 of this Act. The electric utility shall
23182318 19 purchase any unsubscribed energy from community renewable
23192319 20 generation projects that are Qualifying Facilities ("QF")
23202320 21 under the electric utility's tariff for purchasing the
23212321 22 output from QFs under Public Utilities Regulatory Policies
23222322 23 Act of 1978.
23232323 24 The owners of and any subscribers to a community
23242324 25 renewable generation project shall not be considered
23252325 26 public utilities or alternative retail electricity
23262326
23272327
23282328
23292329
23302330
23312331 SB1789 - 64 - LRB103 26314 AMQ 52675 b
23322332
23332333
23342334 SB1789- 65 -LRB103 26314 AMQ 52675 b SB1789 - 65 - LRB103 26314 AMQ 52675 b
23352335 SB1789 - 65 - LRB103 26314 AMQ 52675 b
23362336 1 suppliers under the Public Utilities Act solely as a
23372337 2 result of their interest in or subscription to a community
23382338 3 renewable generation project and shall not be required to
23392339 4 become an alternative retail electric supplier by
23402340 5 participating in a community renewable generation project
23412341 6 with a public utility.
23422342 7 (O) For the delivery year beginning June 1, 2018, the
23432343 8 long-term renewable resources procurement plan required by
23442344 9 this subsection (c) shall provide for the Agency to
23452345 10 procure contracts to continue offering the Illinois Solar
23462346 11 for All Program described in subsection (b) of Section
23472347 12 1-56 of this Act, and the contracts approved by the
23482348 13 Commission shall be executed by the utilities that are
23492349 14 subject to this subsection (c). The long-term renewable
23502350 15 resources procurement plan shall allocate up to
23512351 16 $50,000,000 per delivery year to fund the programs, and
23522352 17 the plan shall determine the amount of funding to be
23532353 18 apportioned to the programs identified in subsection (b)
23542354 19 of Section 1-56 of this Act; provided that for the
23552355 20 delivery years beginning June 1, 2021, June 1, 2022, and
23562356 21 June 1, 2023, the long-term renewable resources
23572357 22 procurement plan may average the annual budgets over a
23582358 23 3-year period to account for program ramp-up. For the
23592359 24 delivery years beginning June 1, 2021, June 1, 2024, June
23602360 25 1, 2027, and June 1, 2030 and additional $10,000,000 shall
23612361 26 be provided to the Department of Commerce and Economic
23622362
23632363
23642364
23652365
23662366
23672367 SB1789 - 65 - LRB103 26314 AMQ 52675 b
23682368
23692369
23702370 SB1789- 66 -LRB103 26314 AMQ 52675 b SB1789 - 66 - LRB103 26314 AMQ 52675 b
23712371 SB1789 - 66 - LRB103 26314 AMQ 52675 b
23722372 1 Opportunity to implement the workforce development
23732373 2 programs and reporting as outlined in Section 16-108.12 of
23742374 3 the Public Utilities Act. In making the determinations
23752375 4 required under this subparagraph (O), the Commission shall
23762376 5 consider the experience and performance under the programs
23772377 6 and any evaluation reports. The Commission shall also
23782378 7 provide for an independent evaluation of those programs on
23792379 8 a periodic basis that are funded under this subparagraph
23802380 9 (O).
23812381 10 (P) All programs and procurements under this
23822382 11 subsection (c) shall be designed to encourage
23832383 12 participating projects to use a diverse and equitable
23842384 13 workforce and a diverse set of contractors, including
23852385 14 minority-owned businesses, disadvantaged businesses,
23862386 15 trade unions, graduates of any workforce training programs
23872387 16 administered under this Act, and small businesses.
23882388 17 The Agency shall develop a method to optimize
23892389 18 procurement of renewable energy credits from proposed
23902390 19 utility-scale projects that are located in communities
23912391 20 eligible to receive Energy Transition Community Grants
23922392 21 pursuant to Section 10-20 of the Energy Community
23932393 22 Reinvestment Act. If this requirement conflicts with other
23942394 23 provisions of law or the Agency determines that full
23952395 24 compliance with the requirements of this subparagraph (P)
23962396 25 would be unreasonably costly or administratively
23972397 26 impractical, the Agency is to propose alternative
23982398
23992399
24002400
24012401
24022402
24032403 SB1789 - 66 - LRB103 26314 AMQ 52675 b
24042404
24052405
24062406 SB1789- 67 -LRB103 26314 AMQ 52675 b SB1789 - 67 - LRB103 26314 AMQ 52675 b
24072407 SB1789 - 67 - LRB103 26314 AMQ 52675 b
24082408 1 approaches to achieve development of renewable energy
24092409 2 resources in communities eligible to receive Energy
24102410 3 Transition Community Grants pursuant to Section 10-20 of
24112411 4 the Energy Community Reinvestment Act or seek an exemption
24122412 5 from this requirement from the Commission.
24132413 6 (Q) Each facility listed in subitems (i) through
24142414 7 (viii) of item (1) of this subparagraph (Q) for which a
24152415 8 renewable energy credit delivery contract is signed after
24162416 9 the effective date of this amendatory Act of the 102nd
24172417 10 General Assembly is subject to the following requirements
24182418 11 through the Agency's long-term renewable resources
24192419 12 procurement plan:
24202420 13 (1) Each facility shall be subject to the
24212421 14 prevailing wage requirements included in the
24222422 15 Prevailing Wage Act. The Agency shall require
24232423 16 verification that all construction performed on the
24242424 17 facility by the renewable energy credit delivery
24252425 18 contract holder, its contractors, or its
24262426 19 subcontractors relating to construction of the
24272427 20 facility is performed by construction employees
24282428 21 receiving an amount for that work equal to or greater
24292429 22 than the general prevailing rate, as that term is
24302430 23 defined in Section 3 of the Prevailing Wage Act. For
24312431 24 purposes of this item (1), "house of worship" means
24322432 25 property that is both (1) used exclusively by a
24332433 26 religious society or body of persons as a place for
24342434
24352435
24362436
24372437
24382438
24392439 SB1789 - 67 - LRB103 26314 AMQ 52675 b
24402440
24412441
24422442 SB1789- 68 -LRB103 26314 AMQ 52675 b SB1789 - 68 - LRB103 26314 AMQ 52675 b
24432443 SB1789 - 68 - LRB103 26314 AMQ 52675 b
24442444 1 religious exercise or religious worship and (2)
24452445 2 recognized as exempt from taxation pursuant to Section
24462446 3 15-40 of the Property Tax Code. This item (1) shall
24472447 4 apply to any the following:
24482448 5 (i) all new utility-scale wind projects;
24492449 6 (ii) all new utility-scale photovoltaic
24502450 7 projects;
24512451 8 (iii) all new brownfield photovoltaic
24522452 9 projects;
24532453 10 (iv) all new photovoltaic community renewable
24542454 11 energy facilities that qualify for item (iii) of
24552455 12 subparagraph (K) of this paragraph (1);
24562456 13 (v) all new community driven community
24572457 14 photovoltaic projects that qualify for item (v) of
24582458 15 subparagraph (K) of this paragraph (1);
24592459 16 (vi) all new photovoltaic distributed
24602460 17 renewable energy generation devices on schools
24612461 18 that qualify for item (iv) of subparagraph (K) of
24622462 19 this paragraph (1);
24632463 20 (vii) all new photovoltaic distributed
24642464 21 renewable energy generation devices that (1)
24652465 22 qualify for item (i) of subparagraph (K) of this
24662466 23 paragraph (1); (2) are not projects that serve
24672467 24 single-family or multi-family residential
24682468 25 buildings; and (3) are not houses of worship where
24692469 26 the aggregate capacity including collocated
24702470
24712471
24722472
24732473
24742474
24752475 SB1789 - 68 - LRB103 26314 AMQ 52675 b
24762476
24772477
24782478 SB1789- 69 -LRB103 26314 AMQ 52675 b SB1789 - 69 - LRB103 26314 AMQ 52675 b
24792479 SB1789 - 69 - LRB103 26314 AMQ 52675 b
24802480 1 projects would not exceed 100 kilowatts;
24812481 2 (viii) all new photovoltaic distributed
24822482 3 renewable energy generation devices that (1)
24832483 4 qualify for item (ii) of subparagraph (K) of this
24842484 5 paragraph (1); (2) are not projects that serve
24852485 6 single-family or multi-family residential
24862486 7 buildings; and (3) are not houses of worship where
24872487 8 the aggregate capacity including collocated
24882488 9 projects would not exceed 100 kilowatts.
24892489 10 (2) Renewable energy credits procured from new
24902490 11 utility-scale wind projects, new utility-scale solar
24912491 12 projects, and new brownfield solar projects pursuant
24922492 13 to Agency procurement events occurring after the
24932493 14 effective date of this amendatory Act of the 102nd
24942494 15 General Assembly must be from facilities built by
24952495 16 general contractors that must enter into a project
24962496 17 labor agreement, as defined by this Act, with 2 or more
24972497 18 labor organizations prior to construction. The project
24982498 19 labor agreement shall be filed with the Director in
24992499 20 accordance with procedures established by the Agency
25002500 21 through its long-term renewable resources procurement
25012501 22 plan. Any information submitted to the Agency in this
25022502 23 item (2) shall be considered commercially sensitive
25032503 24 information. At a minimum, the project labor agreement
25042504 25 must provide the names, addresses, and occupations of
25052505 26 the owner of the plant and the individuals
25062506
25072507
25082508
25092509
25102510
25112511 SB1789 - 69 - LRB103 26314 AMQ 52675 b
25122512
25132513
25142514 SB1789- 70 -LRB103 26314 AMQ 52675 b SB1789 - 70 - LRB103 26314 AMQ 52675 b
25152515 SB1789 - 70 - LRB103 26314 AMQ 52675 b
25162516 1 representing the labor organization employees
25172517 2 participating in the project labor agreement
25182518 3 consistent with the Project Labor Agreements Act. The
25192519 4 agreement must also specify the terms and conditions
25202520 5 as defined by this Act.
25212521 6 (3) It is the intent of this Section to ensure that
25222522 7 economic development occurs across Illinois
25232523 8 communities, that emerging businesses may grow, and
25242524 9 that there is improved access to the clean energy
25252525 10 economy by persons who have greater economic burdens
25262526 11 to success. The Agency shall take into consideration
25272527 12 the unique cost of compliance of this subparagraph (Q)
25282528 13 that might be borne by equity eligible contractors,
25292529 14 shall include such costs when determining the price of
25302530 15 renewable energy credits in the Adjustable Block
25312531 16 program, and shall take such costs into consideration
25322532 17 in a nondiscriminatory manner when comparing bids for
25332533 18 competitive procurements. The Agency shall consider
25342534 19 costs associated with compliance whether in the
25352535 20 development, financing, or construction of projects.
25362536 21 The Agency shall periodically review the assumptions
25372537 22 in these costs and may adjust prices, in compliance
25382538 23 with subparagraph (M) of this paragraph (1).
25392539 24 (R) In its long-term renewable resources procurement
25402540 25 plan, the Agency shall establish a self-direct renewable
25412541 26 portfolio standard compliance program for eligible
25422542
25432543
25442544
25452545
25462546
25472547 SB1789 - 70 - LRB103 26314 AMQ 52675 b
25482548
25492549
25502550 SB1789- 71 -LRB103 26314 AMQ 52675 b SB1789 - 71 - LRB103 26314 AMQ 52675 b
25512551 SB1789 - 71 - LRB103 26314 AMQ 52675 b
25522552 1 self-direct customers that purchase renewable energy
25532553 2 credits from utility-scale wind and solar projects through
25542554 3 long-term agreements for purchase of renewable energy
25552555 4 credits as described in this Section. Such long-term
25562556 5 agreements may include the purchase of energy or other
25572557 6 products on a physical or financial basis and may involve
25582558 7 an alternative retail electric supplier as defined in
25592559 8 Section 16-102 of the Public Utilities Act. This program
25602560 9 shall take effect in the delivery year commencing June 1,
25612561 10 2023.
25622562 11 (1) For the purposes of this subparagraph:
25632563 12 "Eligible self-direct customer" means any retail
25642564 13 customers of an electric utility that serves 3,000,000
25652565 14 or more retail customers in the State and whose total
25662566 15 highest 30-minute demand was more than 10,000
25672567 16 kilowatts, or any retail customers of an electric
25682568 17 utility that serves less than 3,000,000 retail
25692569 18 customers but more than 500,000 retail customers in
25702570 19 the State and whose total highest 15-minute demand was
25712571 20 more than 10,000 kilowatts.
25722572 21 "Retail customer" has the meaning set forth in
25732573 22 Section 16-102 of the Public Utilities Act and
25742574 23 multiple retail customer accounts under the same
25752575 24 corporate parent may aggregate their account demands
25762576 25 to meet the 10,000 kilowatt threshold. The criteria
25772577 26 for determining whether this subparagraph is
25782578
25792579
25802580
25812581
25822582
25832583 SB1789 - 71 - LRB103 26314 AMQ 52675 b
25842584
25852585
25862586 SB1789- 72 -LRB103 26314 AMQ 52675 b SB1789 - 72 - LRB103 26314 AMQ 52675 b
25872587 SB1789 - 72 - LRB103 26314 AMQ 52675 b
25882588 1 applicable to a retail customer shall be based on the
25892589 2 12 consecutive billing periods prior to the start of
25902590 3 the year in which the application is filed.
25912591 4 (2) For renewable energy credits to count toward
25922592 5 the self-direct renewable portfolio standard
25932593 6 compliance program, they must:
25942594 7 (i) qualify as renewable energy credits as
25952595 8 defined in Section 1-10 of this Act;
25962596 9 (ii) be sourced from one or more renewable
25972597 10 energy generating facilities that comply with the
25982598 11 geographic requirements as set forth in
25992599 12 subparagraph (I) of paragraph (1) of subsection
26002600 13 (c) as interpreted through the Agency's long-term
26012601 14 renewable resources procurement plan, or, where
26022602 15 applicable, the geographic requirements that
26032603 16 governed utility-scale renewable energy credits at
26042604 17 the time the eligible self-direct customer entered
26052605 18 into the applicable renewable energy credit
26062606 19 purchase agreement;
26072607 20 (iii) be procured through long-term contracts
26082608 21 with term lengths of at least 10 years either
26092609 22 directly with the renewable energy generating
26102610 23 facility or through a bundled power purchase
26112611 24 agreement, a virtual power purchase agreement, an
26122612 25 agreement between the renewable generating
26132613 26 facility, an alternative retail electric supplier,
26142614
26152615
26162616
26172617
26182618
26192619 SB1789 - 72 - LRB103 26314 AMQ 52675 b
26202620
26212621
26222622 SB1789- 73 -LRB103 26314 AMQ 52675 b SB1789 - 73 - LRB103 26314 AMQ 52675 b
26232623 SB1789 - 73 - LRB103 26314 AMQ 52675 b
26242624 1 and the customer, or such other structure as is
26252625 2 permissible under this subparagraph (R);
26262626 3 (iv) be equivalent in volume to at least 40%
26272627 4 of the eligible self-direct customer's usage,
26282628 5 determined annually by the eligible self-direct
26292629 6 customer's usage during the previous delivery
26302630 7 year, measured to the nearest megawatt-hour;
26312631 8 (v) be retired by or on behalf of the large
26322632 9 energy customer;
26332633 10 (vi) be sourced from new utility-scale wind
26342634 11 projects or new utility-scale solar projects; and
26352635 12 (vii) if the contracts for renewable energy
26362636 13 credits are entered into after the effective date
26372637 14 of this amendatory Act of the 102nd General
26382638 15 Assembly, the new utility-scale wind projects or
26392639 16 new utility-scale solar projects must comply with
26402640 17 the requirements established in subparagraphs (P)
26412641 18 and (Q) of paragraph (1) of this subsection (c)
26422642 19 and subsection (c-10).
26432643 20 (3) The self-direct renewable portfolio standard
26442644 21 compliance program shall be designed to allow eligible
26452645 22 self-direct customers to procure new renewable energy
26462646 23 credits from new utility-scale wind projects or new
26472647 24 utility-scale photovoltaic projects. The Agency shall
26482648 25 annually determine the amount of utility-scale
26492649 26 renewable energy credits it will include each year
26502650
26512651
26522652
26532653
26542654
26552655 SB1789 - 73 - LRB103 26314 AMQ 52675 b
26562656
26572657
26582658 SB1789- 74 -LRB103 26314 AMQ 52675 b SB1789 - 74 - LRB103 26314 AMQ 52675 b
26592659 SB1789 - 74 - LRB103 26314 AMQ 52675 b
26602660 1 from the self-direct renewable portfolio standard
26612661 2 compliance program, subject to receiving qualifying
26622662 3 applications. In making this determination, the Agency
26632663 4 shall evaluate publicly available analyses and studies
26642664 5 of the potential market size for utility-scale
26652665 6 renewable energy long-term purchase agreements by
26662666 7 commercial and industrial energy customers and make
26672667 8 that report publicly available. If demand for
26682668 9 participation in the self-direct renewable portfolio
26692669 10 standard compliance program exceeds availability, the
26702670 11 Agency shall ensure participation is evenly split
26712671 12 between commercial and industrial users to the extent
26722672 13 there is sufficient demand from both customer classes.
26732673 14 Each renewable energy credit procured pursuant to this
26742674 15 subparagraph (R) by a self-direct customer shall
26752675 16 reduce the total volume of renewable energy credits
26762676 17 the Agency is otherwise required to procure from new
26772677 18 utility-scale projects pursuant to subparagraph (C) of
26782678 19 paragraph (1) of this subsection (c) on behalf of
26792679 20 contracting utilities where the eligible self-direct
26802680 21 customer is located. The self-direct customer shall
26812681 22 file an annual compliance report with the Agency
26822682 23 pursuant to terms established by the Agency through
26832683 24 its long-term renewable resources procurement plan to
26842684 25 be eligible for participation in this program.
26852685 26 Customers must provide the Agency with their most
26862686
26872687
26882688
26892689
26902690
26912691 SB1789 - 74 - LRB103 26314 AMQ 52675 b
26922692
26932693
26942694 SB1789- 75 -LRB103 26314 AMQ 52675 b SB1789 - 75 - LRB103 26314 AMQ 52675 b
26952695 SB1789 - 75 - LRB103 26314 AMQ 52675 b
26962696 1 recent electricity billing statements or other
26972697 2 information deemed necessary by the Agency to
26982698 3 demonstrate they are an eligible self-direct customer.
26992699 4 (4) The Commission shall approve a reduction in
27002700 5 the volumetric charges collected pursuant to Section
27012701 6 16-108 of the Public Utilities Act for approved
27022702 7 eligible self-direct customers equivalent to the
27032703 8 anticipated cost of renewable energy credit deliveries
27042704 9 under contracts for new utility-scale wind and new
27052705 10 utility-scale solar entered for each delivery year
27062706 11 after the large energy customer begins retiring
27072707 12 eligible new utility scale renewable energy credits
27082708 13 for self-compliance. The self-direct credit amount
27092709 14 shall be determined annually and is equal to the
27102710 15 estimated portion of the cost authorized by
27112711 16 subparagraph (E) of paragraph (1) of this subsection
27122712 17 (c) that supported the annual procurement of
27132713 18 utility-scale renewable energy credits in the prior
27142714 19 delivery year using a methodology described in the
27152715 20 long-term renewable resources procurement plan,
27162716 21 expressed on a per kilowatthour basis, and does not
27172717 22 include (i) costs associated with any contracts
27182718 23 entered into before the delivery year in which the
27192719 24 customer files the initial compliance report to be
27202720 25 eligible for participation in the self-direct program,
27212721 26 and (ii) costs associated with procuring renewable
27222722
27232723
27242724
27252725
27262726
27272727 SB1789 - 75 - LRB103 26314 AMQ 52675 b
27282728
27292729
27302730 SB1789- 76 -LRB103 26314 AMQ 52675 b SB1789 - 76 - LRB103 26314 AMQ 52675 b
27312731 SB1789 - 76 - LRB103 26314 AMQ 52675 b
27322732 1 energy credits through existing and future contracts
27332733 2 through the Adjustable Block Program, subsection (c-5)
27342734 3 of this Section 1-75, and the Solar for All Program.
27352735 4 The Agency shall assist the Commission in determining
27362736 5 the current and future costs. The Agency must
27372737 6 determine the self-direct credit amount for new and
27382738 7 existing eligible self-direct customers and submit
27392739 8 this to the Commission in an annual compliance filing.
27402740 9 The Commission must approve the self-direct credit
27412741 10 amount by June 1, 2023 and June 1 of each delivery year
27422742 11 thereafter.
27432743 12 (5) Customers described in this subparagraph (R)
27442744 13 shall apply, on a form developed by the Agency, to the
27452745 14 Agency to be designated as a self-direct eligible
27462746 15 customer. Once the Agency determines that a
27472747 16 self-direct customer is eligible for participation in
27482748 17 the program, the self-direct customer will remain
27492749 18 eligible until the end of the term of the contract.
27502750 19 Thereafter, application may be made not less than 12
27512751 20 months before the filing date of the long-term
27522752 21 renewable resources procurement plan described in this
27532753 22 Act. At a minimum, such application shall contain the
27542754 23 following:
27552755 24 (i) the customer's certification that, at the
27562756 25 time of the customer's application, the customer
27572757 26 qualifies to be a self-direct eligible customer,
27582758
27592759
27602760
27612761
27622762
27632763 SB1789 - 76 - LRB103 26314 AMQ 52675 b
27642764
27652765
27662766 SB1789- 77 -LRB103 26314 AMQ 52675 b SB1789 - 77 - LRB103 26314 AMQ 52675 b
27672767 SB1789 - 77 - LRB103 26314 AMQ 52675 b
27682768 1 including documents demonstrating that
27692769 2 qualification;
27702770 3 (ii) the customer's certification that the
27712771 4 customer has entered into or will enter into by
27722772 5 the beginning of the applicable procurement year,
27732773 6 one or more bilateral contracts for new wind
27742774 7 projects or new photovoltaic projects, including
27752775 8 supporting documentation;
27762776 9 (iii) certification that the contract or
27772777 10 contracts for new renewable energy resources are
27782778 11 long-term contracts with term lengths of at least
27792779 12 10 years, including supporting documentation;
27802780 13 (iv) certification of the quantities of
27812781 14 renewable energy credits that the customer will
27822782 15 purchase each year under such contract or
27832783 16 contracts, including supporting documentation;
27842784 17 (v) proof that the contract is sufficient to
27852785 18 produce renewable energy credits to be equivalent
27862786 19 in volume to at least 40% of the large energy
27872787 20 customer's usage from the previous delivery year,
27882788 21 measured to the nearest megawatt-hour; and
27892789 22 (vi) certification that the customer intends
27902790 23 to maintain the contract for the duration of the
27912791 24 length of the contract.
27922792 25 (6) If a customer receives the self-direct credit
27932793 26 but fails to properly procure and retire renewable
27942794
27952795
27962796
27972797
27982798
27992799 SB1789 - 77 - LRB103 26314 AMQ 52675 b
28002800
28012801
28022802 SB1789- 78 -LRB103 26314 AMQ 52675 b SB1789 - 78 - LRB103 26314 AMQ 52675 b
28032803 SB1789 - 78 - LRB103 26314 AMQ 52675 b
28042804 1 energy credits as required under this subparagraph
28052805 2 (R), the Commission, on petition from the Agency and
28062806 3 after notice and hearing, may direct such customer's
28072807 4 utility to recover the cost of the wrongfully received
28082808 5 self-direct credits plus interest through an adder to
28092809 6 charges assessed pursuant to Section 16-108 of the
28102810 7 Public Utilities Act. Self-direct customers who
28112811 8 knowingly fail to properly procure and retire
28122812 9 renewable energy credits and do not notify the Agency
28132813 10 are ineligible for continued participation in the
28142814 11 self-direct renewable portfolio standard compliance
28152815 12 program.
28162816 13 (2) (Blank).
28172817 14 (3) (Blank).
28182818 15 (4) The electric utility shall retire all renewable
28192819 16 energy credits used to comply with the standard.
28202820 17 (5) Beginning with the 2010 delivery year and ending
28212821 18 June 1, 2017, an electric utility subject to this
28222822 19 subsection (c) shall apply the lesser of the maximum
28232823 20 alternative compliance payment rate or the most recent
28242824 21 estimated alternative compliance payment rate for its
28252825 22 service territory for the corresponding compliance period,
28262826 23 established pursuant to subsection (d) of Section 16-115D
28272827 24 of the Public Utilities Act to its retail customers that
28282828 25 take service pursuant to the electric utility's hourly
28292829 26 pricing tariff or tariffs. The electric utility shall
28302830
28312831
28322832
28332833
28342834
28352835 SB1789 - 78 - LRB103 26314 AMQ 52675 b
28362836
28372837
28382838 SB1789- 79 -LRB103 26314 AMQ 52675 b SB1789 - 79 - LRB103 26314 AMQ 52675 b
28392839 SB1789 - 79 - LRB103 26314 AMQ 52675 b
28402840 1 retain all amounts collected as a result of the
28412841 2 application of the alternative compliance payment rate or
28422842 3 rates to such customers, and, beginning in 2011, the
28432843 4 utility shall include in the information provided under
28442844 5 item (1) of subsection (d) of Section 16-111.5 of the
28452845 6 Public Utilities Act the amounts collected under the
28462846 7 alternative compliance payment rate or rates for the prior
28472847 8 year ending May 31. Notwithstanding any limitation on the
28482848 9 procurement of renewable energy resources imposed by item
28492849 10 (2) of this subsection (c), the Agency shall increase its
28502850 11 spending on the purchase of renewable energy resources to
28512851 12 be procured by the electric utility for the next plan year
28522852 13 by an amount equal to the amounts collected by the utility
28532853 14 under the alternative compliance payment rate or rates in
28542854 15 the prior year ending May 31.
28552855 16 (6) The electric utility shall be entitled to recover
28562856 17 all of its costs associated with the procurement of
28572857 18 renewable energy credits under plans approved under this
28582858 19 Section and Section 16-111.5 of the Public Utilities Act.
28592859 20 These costs shall include associated reasonable expenses
28602860 21 for implementing the procurement programs, including, but
28612861 22 not limited to, the costs of administering and evaluating
28622862 23 the Adjustable Block program, through an automatic
28632863 24 adjustment clause tariff in accordance with subsection (k)
28642864 25 of Section 16-108 of the Public Utilities Act.
28652865 26 (7) Renewable energy credits procured from new
28662866
28672867
28682868
28692869
28702870
28712871 SB1789 - 79 - LRB103 26314 AMQ 52675 b
28722872
28732873
28742874 SB1789- 80 -LRB103 26314 AMQ 52675 b SB1789 - 80 - LRB103 26314 AMQ 52675 b
28752875 SB1789 - 80 - LRB103 26314 AMQ 52675 b
28762876 1 photovoltaic projects or new distributed renewable energy
28772877 2 generation devices under this Section after June 1, 2017
28782878 3 (the effective date of Public Act 99-906) must be procured
28792879 4 from devices installed by a qualified person in compliance
28802880 5 with the requirements of Section 16-128A of the Public
28812881 6 Utilities Act and any rules or regulations adopted
28822882 7 thereunder.
28832883 8 In meeting the renewable energy requirements of this
28842884 9 subsection (c), to the extent feasible and consistent with
28852885 10 State and federal law, the renewable energy credit
28862886 11 procurements, Adjustable Block solar program, and
28872887 12 community renewable generation program shall provide
28882888 13 employment opportunities for all segments of the
28892889 14 population and workforce, including minority-owned and
28902890 15 female-owned business enterprises, and shall not,
28912891 16 consistent with State and federal law, discriminate based
28922892 17 on race or socioeconomic status.
28932893 18 (c-5) Procurement of renewable energy credits from new
28942894 19 renewable energy facilities installed at or adjacent to the
28952895 20 sites of electric generating facilities that burn or burned
28962896 21 coal as their primary fuel source.
28972897 22 (1) In addition to the procurement of renewable energy
28982898 23 credits pursuant to long-term renewable resources
28992899 24 procurement plans in accordance with subsection (c) of
29002900 25 this Section and Section 16-111.5 of the Public Utilities
29012901 26 Act, the Agency shall conduct procurement events in
29022902
29032903
29042904
29052905
29062906
29072907 SB1789 - 80 - LRB103 26314 AMQ 52675 b
29082908
29092909
29102910 SB1789- 81 -LRB103 26314 AMQ 52675 b SB1789 - 81 - LRB103 26314 AMQ 52675 b
29112911 SB1789 - 81 - LRB103 26314 AMQ 52675 b
29122912 1 accordance with this subsection (c-5) for the procurement
29132913 2 by electric utilities that served more than 300,000 retail
29142914 3 customers in this State as of January 1, 2019 of renewable
29152915 4 energy credits from new renewable energy facilities to be
29162916 5 installed at or adjacent to the sites of electric
29172917 6 generating facilities that, as of January 1, 2016, burned
29182918 7 coal as their primary fuel source and meet the other
29192919 8 criteria specified in this subsection (c-5). For purposes
29202920 9 of this subsection (c-5), "new renewable energy facility"
29212921 10 means a new utility-scale solar project as defined in this
29222922 11 Section 1-75. The renewable energy credits procured
29232923 12 pursuant to this subsection (c-5) may be included or
29242924 13 counted for purposes of compliance with the amounts of
29252925 14 renewable energy credits required to be procured pursuant
29262926 15 to subsection (c) of this Section to the extent that there
29272927 16 are otherwise shortfalls in compliance with such
29282928 17 requirements. The procurement of renewable energy credits
29292929 18 by electric utilities pursuant to this subsection (c-5)
29302930 19 shall be funded solely by revenues collected from the Coal
29312931 20 to Solar and Energy Storage Initiative Charge provided for
29322932 21 in this subsection (c-5) and subsection (i-5) of Section
29332933 22 16-108 of the Public Utilities Act, shall not be funded by
29342934 23 revenues collected through any of the other funding
29352935 24 mechanisms provided for in subsection (c) of this Section,
29362936 25 and shall not be subject to the limitation imposed by
29372937 26 subsection (c) on charges to retail customers for costs to
29382938
29392939
29402940
29412941
29422942
29432943 SB1789 - 81 - LRB103 26314 AMQ 52675 b
29442944
29452945
29462946 SB1789- 82 -LRB103 26314 AMQ 52675 b SB1789 - 82 - LRB103 26314 AMQ 52675 b
29472947 SB1789 - 82 - LRB103 26314 AMQ 52675 b
29482948 1 procure renewable energy resources pursuant to subsection
29492949 2 (c), and shall not be subject to any other requirements or
29502950 3 limitations of subsection (c).
29512951 4 (2) The Agency shall conduct 2 procurement events to
29522952 5 select owners of electric generating facilities meeting
29532953 6 the eligibility criteria specified in this subsection
29542954 7 (c-5) to enter into long-term contracts to sell renewable
29552955 8 energy credits to electric utilities serving more than
29562956 9 300,000 retail customers in this State as of January 1,
29572957 10 2019. The first procurement event shall be conducted no
29582958 11 later than March 31, 2022, unless the Agency elects to
29592959 12 delay it, until no later than May 1, 2022, due to its
29602960 13 overall volume of work, and shall be to select owners of
29612961 14 electric generating facilities located in this State and
29622962 15 south of federal Interstate Highway 80 that meet the
29632963 16 eligibility criteria specified in this subsection (c-5).
29642964 17 The second procurement event shall be conducted no sooner
29652965 18 than September 30, 2022 and no later than October 31, 2022
29662966 19 and shall be to select owners of electric generating
29672967 20 facilities located anywhere in this State that meet the
29682968 21 eligibility criteria specified in this subsection (c-5).
29692969 22 The Agency shall establish and announce a time period,
29702970 23 which shall begin no later than 30 days prior to the
29712971 24 scheduled date for the procurement event, during which
29722972 25 applicants may submit applications to be selected as
29732973 26 suppliers of renewable energy credits pursuant to this
29742974
29752975
29762976
29772977
29782978
29792979 SB1789 - 82 - LRB103 26314 AMQ 52675 b
29802980
29812981
29822982 SB1789- 83 -LRB103 26314 AMQ 52675 b SB1789 - 83 - LRB103 26314 AMQ 52675 b
29832983 SB1789 - 83 - LRB103 26314 AMQ 52675 b
29842984 1 subsection (c-5). The eligibility criteria for selection
29852985 2 as a supplier of renewable energy credits pursuant to this
29862986 3 subsection (c-5) shall be as follows:
29872987 4 (A) The applicant owns an electric generating
29882988 5 facility located in this State that: (i) as of January
29892989 6 1, 2016, burned coal as its primary fuel to generate
29902990 7 electricity; and (ii) has, or had prior to retirement,
29912991 8 an electric generating capacity of at least 150
29922992 9 megawatts. The electric generating facility can be
29932993 10 either: (i) retired as of the date of the procurement
29942994 11 event; or (ii) still operating as of the date of the
29952995 12 procurement event.
29962996 13 (B) The applicant is not (i) an electric
29972997 14 cooperative as defined in Section 3-119 of the Public
29982998 15 Utilities Act, or (ii) an entity described in
29992999 16 subsection (b)(1) of Section 3-105 of the Public
30003000 17 Utilities Act, or an association or consortium of or
30013001 18 an entity owned by entities described in (i) or (ii);
30023002 19 and the coal-fueled electric generating facility was
30033003 20 at one time owned, in whole or in part, by a public
30043004 21 utility as defined in Section 3-105 of the Public
30053005 22 Utilities Act.
30063006 23 (C) If participating in the first procurement
30073007 24 event, the applicant proposes and commits to construct
30083008 25 and operate, at the site, and if necessary for
30093009 26 sufficient space on property adjacent to the existing
30103010
30113011
30123012
30133013
30143014
30153015 SB1789 - 83 - LRB103 26314 AMQ 52675 b
30163016
30173017
30183018 SB1789- 84 -LRB103 26314 AMQ 52675 b SB1789 - 84 - LRB103 26314 AMQ 52675 b
30193019 SB1789 - 84 - LRB103 26314 AMQ 52675 b
30203020 1 property, at which the electric generating facility
30213021 2 identified in paragraph (A) is located: (i) a new
30223022 3 renewable energy facility of at least 20 megawatts but
30233023 4 no more than 100 megawatts of electric generating
30243024 5 capacity, and (ii) an energy storage facility having a
30253025 6 storage capacity equal to at least 2 megawatts and at
30263026 7 most 10 megawatts. If participating in the second
30273027 8 procurement event, the applicant proposes and commits
30283028 9 to construct and operate, at the site, and if
30293029 10 necessary for sufficient space on property adjacent to
30303030 11 the existing property, at which the electric
30313031 12 generating facility identified in paragraph (A) is
30323032 13 located: (i) a new renewable energy facility of at
30333033 14 least 5 megawatts but no more than 20 megawatts of
30343034 15 electric generating capacity, and (ii) an energy
30353035 16 storage facility having a storage capacity equal to at
30363036 17 least 0.5 megawatts and at most one megawatt.
30373037 18 (D) The applicant agrees that the new renewable
30383038 19 energy facility and the energy storage facility will
30393039 20 be constructed or installed by a qualified entity or
30403040 21 entities in compliance with the requirements of
30413041 22 subsection (g) of Section 16-128A of the Public
30423042 23 Utilities Act and any rules adopted thereunder.
30433043 24 (E) The applicant agrees that personnel operating
30443044 25 the new renewable energy facility and the energy
30453045 26 storage facility will have the requisite skills,
30463046
30473047
30483048
30493049
30503050
30513051 SB1789 - 84 - LRB103 26314 AMQ 52675 b
30523052
30533053
30543054 SB1789- 85 -LRB103 26314 AMQ 52675 b SB1789 - 85 - LRB103 26314 AMQ 52675 b
30553055 SB1789 - 85 - LRB103 26314 AMQ 52675 b
30563056 1 knowledge, training, experience, and competence, which
30573057 2 may be demonstrated by completion or current
30583058 3 participation and ultimate completion by employees of
30593059 4 an accredited or otherwise recognized apprenticeship
30603060 5 program for the employee's particular craft, trade, or
30613061 6 skill, including through training and education
30623062 7 courses and opportunities offered by the owner to
30633063 8 employees of the coal-fueled electric generating
30643064 9 facility or by previous employment experience
30653065 10 performing the employee's particular work skill or
30663066 11 function.
30673067 12 (F) The applicant commits that not less than the
30683068 13 prevailing wage, as determined pursuant to the
30693069 14 Prevailing Wage Act, will be paid to the applicant's
30703070 15 employees engaged in construction activities
30713071 16 associated with the new renewable energy facility and
30723072 17 the new energy storage facility and to the employees
30733073 18 of applicant's contractors engaged in construction
30743074 19 activities associated with the new renewable energy
30753075 20 facility and the new energy storage facility, and
30763076 21 that, on or before the commercial operation date of
30773077 22 the new renewable energy facility, the applicant shall
30783078 23 file a report with the Agency certifying that the
30793079 24 requirements of this subparagraph (F) have been met.
30803080 25 (G) The applicant commits that if selected, it
30813081 26 will negotiate a project labor agreement for the
30823082
30833083
30843084
30853085
30863086
30873087 SB1789 - 85 - LRB103 26314 AMQ 52675 b
30883088
30893089
30903090 SB1789- 86 -LRB103 26314 AMQ 52675 b SB1789 - 86 - LRB103 26314 AMQ 52675 b
30913091 SB1789 - 86 - LRB103 26314 AMQ 52675 b
30923092 1 construction of the new renewable energy facility and
30933093 2 associated energy storage facility that includes
30943094 3 provisions requiring the parties to the agreement to
30953095 4 work together to establish diversity threshold
30963096 5 requirements and to ensure best efforts to meet
30973097 6 diversity targets, improve diversity at the applicable
30983098 7 job site, create diverse apprenticeship opportunities,
30993099 8 and create opportunities to employ former coal-fired
31003100 9 power plant workers.
31013101 10 (H) The applicant commits to enter into a contract
31023102 11 or contracts for the applicable duration to provide
31033103 12 specified numbers of renewable energy credits each
31043104 13 year from the new renewable energy facility to
31053105 14 electric utilities that served more than 300,000
31063106 15 retail customers in this State as of January 1, 2019,
31073107 16 at a price of $30 per renewable energy credit. The
31083108 17 price per renewable energy credit shall be fixed at
31093109 18 $30 for the applicable duration and the renewable
31103110 19 energy credits shall not be indexed renewable energy
31113111 20 credits as provided for in item (v) of subparagraph
31123112 21 (G) of paragraph (1) of subsection (c) of Section 1-75
31133113 22 of this Act. The applicable duration of each contract
31143114 23 shall be 20 years, unless the applicant is physically
31153115 24 interconnected to the PJM Interconnection, LLC
31163116 25 transmission grid and had a generating capacity of at
31173117 26 least 1,200 megawatts as of January 1, 2021, in which
31183118
31193119
31203120
31213121
31223122
31233123 SB1789 - 86 - LRB103 26314 AMQ 52675 b
31243124
31253125
31263126 SB1789- 87 -LRB103 26314 AMQ 52675 b SB1789 - 87 - LRB103 26314 AMQ 52675 b
31273127 SB1789 - 87 - LRB103 26314 AMQ 52675 b
31283128 1 case the applicable duration of the contract shall be
31293129 2 15 years.
31303130 3 (I) The applicant's application is certified by an
31313131 4 officer of the applicant and by an officer of the
31323132 5 applicant's ultimate parent company, if any.
31333133 6 (3) An applicant may submit applications to contract
31343134 7 to supply renewable energy credits from more than one new
31353135 8 renewable energy facility to be constructed at or adjacent
31363136 9 to one or more qualifying electric generating facilities
31373137 10 owned by the applicant. The Agency may select new
31383138 11 renewable energy facilities to be located at or adjacent
31393139 12 to the sites of more than one qualifying electric
31403140 13 generation facility owned by an applicant to contract with
31413141 14 electric utilities to supply renewable energy credits from
31423142 15 such facilities.
31433143 16 (4) The Agency shall assess fees to each applicant to
31443144 17 recover the Agency's costs incurred in receiving and
31453145 18 evaluating applications, conducting the procurement event,
31463146 19 developing contracts for sale, delivery and purchase of
31473147 20 renewable energy credits, and monitoring the
31483148 21 administration of such contracts, as provided for in this
31493149 22 subsection (c-5), including fees paid to a procurement
31503150 23 administrator retained by the Agency for one or more of
31513151 24 these purposes.
31523152 25 (5) The Agency shall select the applicants and the new
31533153 26 renewable energy facilities to contract with electric
31543154
31553155
31563156
31573157
31583158
31593159 SB1789 - 87 - LRB103 26314 AMQ 52675 b
31603160
31613161
31623162 SB1789- 88 -LRB103 26314 AMQ 52675 b SB1789 - 88 - LRB103 26314 AMQ 52675 b
31633163 SB1789 - 88 - LRB103 26314 AMQ 52675 b
31643164 1 utilities to supply renewable energy credits in accordance
31653165 2 with this subsection (c-5). In the first procurement
31663166 3 event, the Agency shall select applicants and new
31673167 4 renewable energy facilities to supply renewable energy
31683168 5 credits, at a price of $30 per renewable energy credit,
31693169 6 aggregating to no less than 400,000 renewable energy
31703170 7 credits per year for the applicable duration, assuming
31713171 8 sufficient qualifying applications to supply, in the
31723172 9 aggregate, at least that amount of renewable energy
31733173 10 credits per year; and not more than 580,000 renewable
31743174 11 energy credits per year for the applicable duration. In
31753175 12 the second procurement event, the Agency shall select
31763176 13 applicants and new renewable energy facilities to supply
31773177 14 renewable energy credits, at a price of $30 per renewable
31783178 15 energy credit, aggregating to no more than 625,000
31793179 16 renewable energy credits per year less the amount of
31803180 17 renewable energy credits each year contracted for as a
31813181 18 result of the first procurement event, for the applicable
31823182 19 durations. The number of renewable energy credits to be
31833183 20 procured as specified in this paragraph (5) shall not be
31843184 21 reduced based on renewable energy credits procured in the
31853185 22 self-direct renewable energy credit compliance program
31863186 23 established pursuant to subparagraph (R) of paragraph (1)
31873187 24 of subsection (c) of Section 1-75.
31883188 25 (6) The obligation to purchase renewable energy
31893189 26 credits from the applicants and their new renewable energy
31903190
31913191
31923192
31933193
31943194
31953195 SB1789 - 88 - LRB103 26314 AMQ 52675 b
31963196
31973197
31983198 SB1789- 89 -LRB103 26314 AMQ 52675 b SB1789 - 89 - LRB103 26314 AMQ 52675 b
31993199 SB1789 - 89 - LRB103 26314 AMQ 52675 b
32003200 1 facilities selected by the Agency shall be allocated to
32013201 2 the electric utilities based on their respective
32023202 3 percentages of kilowatthours delivered to delivery
32033203 4 services customers to the aggregate kilowatthour
32043204 5 deliveries by the electric utilities to delivery services
32053205 6 customers for the year ended December 31, 2021. In order
32063206 7 to achieve these allocation percentages between or among
32073207 8 the electric utilities, the Agency shall require each
32083208 9 applicant that is selected in the procurement event to
32093209 10 enter into a contract with each electric utility for the
32103210 11 sale and purchase of renewable energy credits from each
32113211 12 new renewable energy facility to be constructed and
32123212 13 operated by the applicant, with the sale and purchase
32133213 14 obligations under the contracts to aggregate to the total
32143214 15 number of renewable energy credits per year to be supplied
32153215 16 by the applicant from the new renewable energy facility.
32163216 17 (7) The Agency shall submit its proposed selection of
32173217 18 applicants, new renewable energy facilities to be
32183218 19 constructed, and renewable energy credit amounts for each
32193219 20 procurement event to the Commission for approval. The
32203220 21 Commission shall, within 2 business days after receipt of
32213221 22 the Agency's proposed selections, approve the proposed
32223222 23 selections if it determines that the applicants and the
32233223 24 new renewable energy facilities to be constructed meet the
32243224 25 selection criteria set forth in this subsection (c-5) and
32253225 26 that the Agency seeks approval for contracts of applicable
32263226
32273227
32283228
32293229
32303230
32313231 SB1789 - 89 - LRB103 26314 AMQ 52675 b
32323232
32333233
32343234 SB1789- 90 -LRB103 26314 AMQ 52675 b SB1789 - 90 - LRB103 26314 AMQ 52675 b
32353235 SB1789 - 90 - LRB103 26314 AMQ 52675 b
32363236 1 durations aggregating to no more than the maximum amount
32373237 2 of renewable energy credits per year authorized by this
32383238 3 subsection (c-5) for the procurement event, at a price of
32393239 4 $30 per renewable energy credit.
32403240 5 (8) The Agency, in conjunction with its procurement
32413241 6 administrator if one is retained, the electric utilities,
32423242 7 and potential applicants for contracts to produce and
32433243 8 supply renewable energy credits pursuant to this
32443244 9 subsection (c-5), shall develop a standard form contract
32453245 10 for the sale, delivery and purchase of renewable energy
32463246 11 credits pursuant to this subsection (c-5). Each contract
32473247 12 resulting from the first procurement event shall allow for
32483248 13 a commercial operation date for the new renewable energy
32493249 14 facility of either June 1, 2023 or June 1, 2024, with such
32503250 15 dates subject to adjustment as provided in this paragraph.
32513251 16 Each contract resulting from the second procurement event
32523252 17 shall provide for a commercial operation date on June 1
32533253 18 next occurring up to 48 months after execution of the
32543254 19 contract. Each contract shall provide that the owner shall
32553255 20 receive payments for renewable energy credits for the
32563256 21 applicable durations beginning with the commercial
32573257 22 operation date of the new renewable energy facility. The
32583258 23 form contract shall provide for adjustments to the
32593259 24 commercial operation and payment start dates as needed due
32603260 25 to any delays in completing the procurement and
32613261 26 contracting processes, in finalizing interconnection
32623262
32633263
32643264
32653265
32663266
32673267 SB1789 - 90 - LRB103 26314 AMQ 52675 b
32683268
32693269
32703270 SB1789- 91 -LRB103 26314 AMQ 52675 b SB1789 - 91 - LRB103 26314 AMQ 52675 b
32713271 SB1789 - 91 - LRB103 26314 AMQ 52675 b
32723272 1 agreements and installing interconnection facilities, and
32733273 2 in obtaining other necessary governmental permits and
32743274 3 approvals. The form contract shall be, to the maximum
32753275 4 extent possible, consistent with standard electric
32763276 5 industry contracts for sale, delivery, and purchase of
32773277 6 renewable energy credits while taking into account the
32783278 7 specific requirements of this subsection (c-5). The form
32793279 8 contract shall provide for over-delivery and
32803280 9 under-delivery of renewable energy credits within
32813281 10 reasonable ranges during each 12-month period and penalty,
32823282 11 default, and enforcement provisions for failure of the
32833283 12 selling party to deliver renewable energy credits as
32843284 13 specified in the contract and to comply with the
32853285 14 requirements of this subsection (c-5). The standard form
32863286 15 contract shall specify that all renewable energy credits
32873287 16 delivered to the electric utility pursuant to the contract
32883288 17 shall be retired. The Agency shall make the proposed
32893289 18 contracts available for a reasonable period for comment by
32903290 19 potential applicants, and shall publish the final form
32913291 20 contract at least 30 days before the date of the first
32923292 21 procurement event.
32933293 22 (9) Coal to Solar and Energy Storage Initiative
32943294 23 Charge.
32953295 24 (A) By no later than July 1, 2022, each electric
32963296 25 utility that served more than 300,000 retail customers
32973297 26 in this State as of January 1, 2019 shall file a tariff
32983298
32993299
33003300
33013301
33023302
33033303 SB1789 - 91 - LRB103 26314 AMQ 52675 b
33043304
33053305
33063306 SB1789- 92 -LRB103 26314 AMQ 52675 b SB1789 - 92 - LRB103 26314 AMQ 52675 b
33073307 SB1789 - 92 - LRB103 26314 AMQ 52675 b
33083308 1 with the Commission for the billing and collection of
33093309 2 a Coal to Solar and Energy Storage Initiative Charge
33103310 3 in accordance with subsection (i-5) of Section 16-108
33113311 4 of the Public Utilities Act, with such tariff to be
33123312 5 effective, following review and approval or
33133313 6 modification by the Commission, beginning January 1,
33143314 7 2023. The tariff shall provide for the calculation and
33153315 8 setting of the electric utility's Coal to Solar and
33163316 9 Energy Storage Initiative Charge to collect revenues
33173317 10 estimated to be sufficient, in the aggregate, (i) to
33183318 11 enable the electric utility to pay for the renewable
33193319 12 energy credits it has contracted to purchase in the
33203320 13 delivery year beginning June 1, 2023 and each delivery
33213321 14 year thereafter from new renewable energy facilities
33223322 15 located at the sites of qualifying electric generating
33233323 16 facilities, and (ii) to fund the grant payments to be
33243324 17 made in each delivery year by the Department of
33253325 18 Commerce and Economic Opportunity, or any successor
33263326 19 department or agency, which shall be referred to in
33273327 20 this subsection (c-5) as the Department, pursuant to
33283328 21 paragraph (10) of this subsection (c-5). The electric
33293329 22 utility's tariff shall provide for the billing and
33303330 23 collection of the Coal to Solar and Energy Storage
33313331 24 Initiative Charge on each kilowatthour of electricity
33323332 25 delivered to its delivery services customers within
33333333 26 its service territory and shall provide for an annual
33343334
33353335
33363336
33373337
33383338
33393339 SB1789 - 92 - LRB103 26314 AMQ 52675 b
33403340
33413341
33423342 SB1789- 93 -LRB103 26314 AMQ 52675 b SB1789 - 93 - LRB103 26314 AMQ 52675 b
33433343 SB1789 - 93 - LRB103 26314 AMQ 52675 b
33443344 1 reconciliation of revenues collected with actual
33453345 2 costs, in accordance with subsection (i-5) of Section
33463346 3 16-108 of the Public Utilities Act.
33473347 4 (B) Each electric utility shall remit on a monthly
33483348 5 basis to the State Treasurer, for deposit in the Coal
33493349 6 to Solar and Energy Storage Initiative Fund provided
33503350 7 for in this subsection (c-5), the electric utility's
33513351 8 collections of the Coal to Solar and Energy Storage
33523352 9 Initiative Charge in the amount estimated to be needed
33533353 10 by the Department for grant payments pursuant to grant
33543354 11 contracts entered into by the Department pursuant to
33553355 12 paragraph (10) of this subsection (c-5).
33563356 13 (10) Coal to Solar and Energy Storage Initiative Fund.
33573357 14 (A) The Coal to Solar and Energy Storage
33583358 15 Initiative Fund is established as a special fund in
33593359 16 the State treasury. The Coal to Solar and Energy
33603360 17 Storage Initiative Fund is authorized to receive, by
33613361 18 statutory deposit, that portion specified in item (B)
33623362 19 of paragraph (9) of this subsection (c-5) of moneys
33633363 20 collected by electric utilities through imposition of
33643364 21 the Coal to Solar and Energy Storage Initiative Charge
33653365 22 required by this subsection (c-5). The Coal to Solar
33663366 23 and Energy Storage Initiative Fund shall be
33673367 24 administered by the Department to provide grants to
33683368 25 support the installation and operation of energy
33693369 26 storage facilities at the sites of qualifying electric
33703370
33713371
33723372
33733373
33743374
33753375 SB1789 - 93 - LRB103 26314 AMQ 52675 b
33763376
33773377
33783378 SB1789- 94 -LRB103 26314 AMQ 52675 b SB1789 - 94 - LRB103 26314 AMQ 52675 b
33793379 SB1789 - 94 - LRB103 26314 AMQ 52675 b
33803380 1 generating facilities meeting the criteria specified
33813381 2 in this paragraph (10).
33823382 3 (B) The Coal to Solar and Energy Storage
33833383 4 Initiative Fund shall not be subject to sweeps,
33843384 5 administrative charges, or chargebacks, including, but
33853385 6 not limited to, those authorized under Section 8h of
33863386 7 the State Finance Act, that would in any way result in
33873387 8 the transfer of those funds from the Coal to Solar and
33883388 9 Energy Storage Initiative Fund to any other fund of
33893389 10 this State or in having any such funds utilized for any
33903390 11 purpose other than the express purposes set forth in
33913391 12 this paragraph (10).
33923392 13 (C) The Department shall utilize up to
33933393 14 $280,500,000 in the Coal to Solar and Energy Storage
33943394 15 Initiative Fund for grants, assuming sufficient
33953395 16 qualifying applicants, to support installation of
33963396 17 energy storage facilities at the sites of up to 3
33973397 18 qualifying electric generating facilities located in
33983398 19 the Midcontinent Independent System Operator, Inc.,
33993399 20 region in Illinois and the sites of up to 2 qualifying
34003400 21 electric generating facilities located in the PJM
34013401 22 Interconnection, LLC region in Illinois that meet the
34023402 23 criteria set forth in this subparagraph (C). The
34033403 24 criteria for receipt of a grant pursuant to this
34043404 25 subparagraph (C) are as follows:
34053405 26 (1) the electric generating facility at the
34063406
34073407
34083408
34093409
34103410
34113411 SB1789 - 94 - LRB103 26314 AMQ 52675 b
34123412
34133413
34143414 SB1789- 95 -LRB103 26314 AMQ 52675 b SB1789 - 95 - LRB103 26314 AMQ 52675 b
34153415 SB1789 - 95 - LRB103 26314 AMQ 52675 b
34163416 1 site has, or had prior to retirement, an electric
34173417 2 generating capacity of at least 150 megawatts;
34183418 3 (2) the electric generating facility burns (or
34193419 4 burned prior to retirement) coal as its primary
34203420 5 source of fuel;
34213421 6 (3) if the electric generating facility is
34223422 7 retired, it was retired subsequent to January 1,
34233423 8 2016;
34243424 9 (4) the owner of the electric generating
34253425 10 facility has not been selected by the Agency
34263426 11 pursuant to this subsection (c-5) of this Section
34273427 12 to enter into a contract to sell renewable energy
34283428 13 credits to one or more electric utilities from a
34293429 14 new renewable energy facility located or to be
34303430 15 located at or adjacent to the site at which the
34313431 16 electric generating facility is located;
34323432 17 (5) the electric generating facility located
34333433 18 at the site was at one time owned, in whole or in
34343434 19 part, by a public utility as defined in Section
34353435 20 3-105 of the Public Utilities Act;
34363436 21 (6) the electric generating facility at the
34373437 22 site is not owned by (i) an electric cooperative
34383438 23 as defined in Section 3-119 of the Public
34393439 24 Utilities Act, or (ii) an entity described in
34403440 25 subsection (b)(1) of Section 3-105 of the Public
34413441 26 Utilities Act, or an association or consortium of
34423442
34433443
34443444
34453445
34463446
34473447 SB1789 - 95 - LRB103 26314 AMQ 52675 b
34483448
34493449
34503450 SB1789- 96 -LRB103 26314 AMQ 52675 b SB1789 - 96 - LRB103 26314 AMQ 52675 b
34513451 SB1789 - 96 - LRB103 26314 AMQ 52675 b
34523452 1 or an entity owned by entities described in items
34533453 2 (i) or (ii);
34543454 3 (7) the proposed energy storage facility at
34553455 4 the site will have energy storage capacity of at
34563456 5 least 37 megawatts;
34573457 6 (8) the owner commits to place the energy
34583458 7 storage facility into commercial operation on
34593459 8 either June 1, 2023, June 1, 2024, or June 1, 2025,
34603460 9 with such date subject to adjustment as needed due
34613461 10 to any delays in completing the grant contracting
34623462 11 process, in finalizing interconnection agreements
34633463 12 and in installing interconnection facilities, and
34643464 13 in obtaining necessary governmental permits and
34653465 14 approvals;
34663466 15 (9) the owner agrees that the new energy
34673467 16 storage facility will be constructed or installed
34683468 17 by a qualified entity or entities consistent with
34693469 18 the requirements of subsection (g) of Section
34703470 19 16-128A of the Public Utilities Act and any rules
34713471 20 adopted under that Section;
34723472 21 (10) the owner agrees that personnel operating
34733473 22 the energy storage facility will have the
34743474 23 requisite skills, knowledge, training, experience,
34753475 24 and competence, which may be demonstrated by
34763476 25 completion or current participation and ultimate
34773477 26 completion by employees of an accredited or
34783478
34793479
34803480
34813481
34823482
34833483 SB1789 - 96 - LRB103 26314 AMQ 52675 b
34843484
34853485
34863486 SB1789- 97 -LRB103 26314 AMQ 52675 b SB1789 - 97 - LRB103 26314 AMQ 52675 b
34873487 SB1789 - 97 - LRB103 26314 AMQ 52675 b
34883488 1 otherwise recognized apprenticeship program for
34893489 2 the employee's particular craft, trade, or skill,
34903490 3 including through training and education courses
34913491 4 and opportunities offered by the owner to
34923492 5 employees of the coal-fueled electric generating
34933493 6 facility or by previous employment experience
34943494 7 performing the employee's particular work skill or
34953495 8 function;
34963496 9 (11) the owner commits that not less than the
34973497 10 prevailing wage, as determined pursuant to the
34983498 11 Prevailing Wage Act, will be paid to the owner's
34993499 12 employees engaged in construction activities
35003500 13 associated with the new energy storage facility
35013501 14 and to the employees of the owner's contractors
35023502 15 engaged in construction activities associated with
35033503 16 the new energy storage facility, and that, on or
35043504 17 before the commercial operation date of the new
35053505 18 energy storage facility, the owner shall file a
35063506 19 report with the Department certifying that the
35073507 20 requirements of this subparagraph (11) have been
35083508 21 met; and
35093509 22 (12) the owner commits that if selected to
35103510 23 receive a grant, it will negotiate a project labor
35113511 24 agreement for the construction of the new energy
35123512 25 storage facility that includes provisions
35133513 26 requiring the parties to the agreement to work
35143514
35153515
35163516
35173517
35183518
35193519 SB1789 - 97 - LRB103 26314 AMQ 52675 b
35203520
35213521
35223522 SB1789- 98 -LRB103 26314 AMQ 52675 b SB1789 - 98 - LRB103 26314 AMQ 52675 b
35233523 SB1789 - 98 - LRB103 26314 AMQ 52675 b
35243524 1 together to establish diversity threshold
35253525 2 requirements and to ensure best efforts to meet
35263526 3 diversity targets, improve diversity at the
35273527 4 applicable job site, create diverse apprenticeship
35283528 5 opportunities, and create opportunities to employ
35293529 6 former coal-fired power plant workers.
35303530 7 The Department shall accept applications for this
35313531 8 grant program until March 31, 2022 and shall announce
35323532 9 the award of grants no later than June 1, 2022. The
35333533 10 Department shall make the grant payments to a
35343534 11 recipient in equal annual amounts for 10 years
35353535 12 following the date the energy storage facility is
35363536 13 placed into commercial operation. The annual grant
35373537 14 payments to a qualifying energy storage facility shall
35383538 15 be $110,000 per megawatt of energy storage capacity,
35393539 16 with total annual grant payments pursuant to this
35403540 17 subparagraph (C) for qualifying energy storage
35413541 18 facilities not to exceed $28,050,000 in any year.
35423542 19 (D) Grants of funding for energy storage
35433543 20 facilities pursuant to subparagraph (C) of this
35443544 21 paragraph (10), from the Coal to Solar and Energy
35453545 22 Storage Initiative Fund, shall be memorialized in
35463546 23 grant contracts between the Department and the
35473547 24 recipient. The grant contracts shall specify the date
35483548 25 or dates in each year on which the annual grant
35493549 26 payments shall be paid.
35503550
35513551
35523552
35533553
35543554
35553555 SB1789 - 98 - LRB103 26314 AMQ 52675 b
35563556
35573557
35583558 SB1789- 99 -LRB103 26314 AMQ 52675 b SB1789 - 99 - LRB103 26314 AMQ 52675 b
35593559 SB1789 - 99 - LRB103 26314 AMQ 52675 b
35603560 1 (E) All disbursements from the Coal to Solar and
35613561 2 Energy Storage Initiative Fund shall be made only upon
35623562 3 warrants of the Comptroller drawn upon the Treasurer
35633563 4 as custodian of the Fund upon vouchers signed by the
35643564 5 Director of the Department or by the person or persons
35653565 6 designated by the Director of the Department for that
35663566 7 purpose. The Comptroller is authorized to draw the
35673567 8 warrants upon vouchers so signed. The Treasurer shall
35683568 9 accept all written warrants so signed and shall be
35693569 10 released from liability for all payments made on those
35703570 11 warrants.
35713571 12 (11) Diversity, equity, and inclusion plans.
35723572 13 (A) Each applicant selected in a procurement event
35733573 14 to contract to supply renewable energy credits in
35743574 15 accordance with this subsection (c-5) and each owner
35753575 16 selected by the Department to receive a grant or
35763576 17 grants to support the construction and operation of a
35773577 18 new energy storage facility or facilities in
35783578 19 accordance with this subsection (c-5) shall, within 60
35793579 20 days following the Commission's approval of the
35803580 21 applicant to contract to supply renewable energy
35813581 22 credits or within 60 days following execution of a
35823582 23 grant contract with the Department, as applicable,
35833583 24 submit to the Commission a diversity, equity, and
35843584 25 inclusion plan setting forth the applicant's or
35853585 26 owner's numeric goals for the diversity composition of
35863586
35873587
35883588
35893589
35903590
35913591 SB1789 - 99 - LRB103 26314 AMQ 52675 b
35923592
35933593
35943594 SB1789- 100 -LRB103 26314 AMQ 52675 b SB1789 - 100 - LRB103 26314 AMQ 52675 b
35953595 SB1789 - 100 - LRB103 26314 AMQ 52675 b
35963596 1 its supplier entities for the new renewable energy
35973597 2 facility or new energy storage facility, as
35983598 3 applicable, which shall be referred to for purposes of
35993599 4 this paragraph (11) as the project, and the
36003600 5 applicant's or owner's action plan and schedule for
36013601 6 achieving those goals.
36023602 7 (B) For purposes of this paragraph (11), diversity
36033603 8 composition shall be based on the percentage, which
36043604 9 shall be a minimum of 25%, of eligible expenditures
36053605 10 for contract awards for materials and services (which
36063606 11 shall be defined in the plan) to business enterprises
36073607 12 owned by minority persons, women, or persons with
36083608 13 disabilities as defined in Section 2 of the Business
36093609 14 Enterprise for Minorities, Women, and Persons with
36103610 15 Disabilities Act, to LGBTQ business enterprises, to
36113611 16 veteran-owned business enterprises, and to business
36123612 17 enterprises located in environmental justice
36133613 18 communities. The diversity composition goals of the
36143614 19 plan may include eligible expenditures in areas for
36153615 20 vendor or supplier opportunities in addition to
36163616 21 development and construction of the project, and may
36173617 22 exclude from eligible expenditures materials and
36183618 23 services with limited market availability, limited
36193619 24 production and availability from suppliers in the
36203620 25 United States, such as solar panels and storage
36213621 26 batteries, and material and services that are subject
36223622
36233623
36243624
36253625
36263626
36273627 SB1789 - 100 - LRB103 26314 AMQ 52675 b
36283628
36293629
36303630 SB1789- 101 -LRB103 26314 AMQ 52675 b SB1789 - 101 - LRB103 26314 AMQ 52675 b
36313631 SB1789 - 101 - LRB103 26314 AMQ 52675 b
36323632 1 to critical energy infrastructure or cybersecurity
36333633 2 requirements or restrictions. The plan may provide
36343634 3 that the diversity composition goals may be met
36353635 4 through Tier 1 Direct or Tier 2 subcontracting
36363636 5 expenditures or a combination thereof for the project.
36373637 6 (C) The plan shall provide for, but not be limited
36383638 7 to: (i) internal initiatives, including multi-tier
36393639 8 initiatives, by the applicant or owner, or by its
36403640 9 engineering, procurement and construction contractor
36413641 10 if one is used for the project, which for purposes of
36423642 11 this paragraph (11) shall be referred to as the EPC
36433643 12 contractor, to enable diverse businesses to be
36443644 13 considered fairly for selection to provide materials
36453645 14 and services; (ii) requirements for the applicant or
36463646 15 owner or its EPC contractor to proactively solicit and
36473647 16 utilize diverse businesses to provide materials and
36483648 17 services; and (iii) requirements for the applicant or
36493649 18 owner or its EPC contractor to hire a diverse
36503650 19 workforce for the project. The plan shall include a
36513651 20 description of the applicant's or owner's diversity
36523652 21 recruiting efforts both for the project and for other
36533653 22 areas of the applicant's or owner's business
36543654 23 operations. The plan shall provide for the imposition
36553655 24 of financial penalties on the applicant's or owner's
36563656 25 EPC contractor for failure to exercise best efforts to
36573657 26 comply with and execute the EPC contractor's diversity
36583658
36593659
36603660
36613661
36623662
36633663 SB1789 - 101 - LRB103 26314 AMQ 52675 b
36643664
36653665
36663666 SB1789- 102 -LRB103 26314 AMQ 52675 b SB1789 - 102 - LRB103 26314 AMQ 52675 b
36673667 SB1789 - 102 - LRB103 26314 AMQ 52675 b
36683668 1 obligations under the plan. The plan may provide for
36693669 2 the applicant or owner to set aside a portion of the
36703670 3 work on the project to serve as an incubation program
36713671 4 for qualified businesses, as specified in the plan,
36723672 5 owned by minority persons, women, persons with
36733673 6 disabilities, LGBTQ persons, and veterans, and
36743674 7 businesses located in environmental justice
36753675 8 communities, seeking to enter the renewable energy
36763676 9 industry.
36773677 10 (D) The applicant or owner may submit a revised or
36783678 11 updated plan to the Commission from time to time as
36793679 12 circumstances warrant. The applicant or owner shall
36803680 13 file annual reports with the Commission detailing the
36813681 14 applicant's or owner's progress in implementing its
36823682 15 plan and achieving its goals and any modifications the
36833683 16 applicant or owner has made to its plan to better
36843684 17 achieve its diversity, equity and inclusion goals. The
36853685 18 applicant or owner shall file a final report on the
36863686 19 fifth June 1 following the commercial operation date
36873687 20 of the new renewable energy resource or new energy
36883688 21 storage facility, but the applicant or owner shall
36893689 22 thereafter continue to be subject to applicable
36903690 23 reporting requirements of Section 5-117 of the Public
36913691 24 Utilities Act.
36923692 25 (c-10) Equity accountability system. It is the purpose of
36933693 26 this subsection (c-10) to create an equity accountability
36943694
36953695
36963696
36973697
36983698
36993699 SB1789 - 102 - LRB103 26314 AMQ 52675 b
37003700
37013701
37023702 SB1789- 103 -LRB103 26314 AMQ 52675 b SB1789 - 103 - LRB103 26314 AMQ 52675 b
37033703 SB1789 - 103 - LRB103 26314 AMQ 52675 b
37043704 1 system, which includes the minimum equity standards for all
37053705 2 renewable energy procurements, the equity category of the
37063706 3 Adjustable Block Program, and the equity prioritization for
37073707 4 noncompetitive procurements, that is successful in advancing
37083708 5 priority access to the clean energy economy for businesses and
37093709 6 workers from communities that have been excluded from economic
37103710 7 opportunities in the energy sector, have been subject to
37113711 8 disproportionate levels of pollution, and have
37123712 9 disproportionately experienced negative public health
37133713 10 outcomes. Further, it is the purpose of this subsection to
37143714 11 ensure that this equity accountability system is successful in
37153715 12 advancing equity across Illinois by providing access to the
37163716 13 clean energy economy for businesses and workers from
37173717 14 communities that have been historically excluded from economic
37183718 15 opportunities in the energy sector, have been subject to
37193719 16 disproportionate levels of pollution, and have
37203720 17 disproportionately experienced negative public health
37213721 18 outcomes.
37223722 19 (1) Minimum equity standards. The Agency shall create
37233723 20 programs with the purpose of increasing access to and
37243724 21 development of equity eligible contractors, who are prime
37253725 22 contractors and subcontractors, across all of the programs
37263726 23 it manages. All applications for renewable energy credit
37273727 24 procurements shall comply with specific minimum equity
37283728 25 commitments. Starting in the delivery year immediately
37293729 26 following the next long-term renewable resources
37303730
37313731
37323732
37333733
37343734
37353735 SB1789 - 103 - LRB103 26314 AMQ 52675 b
37363736
37373737
37383738 SB1789- 104 -LRB103 26314 AMQ 52675 b SB1789 - 104 - LRB103 26314 AMQ 52675 b
37393739 SB1789 - 104 - LRB103 26314 AMQ 52675 b
37403740 1 procurement plan, at least 10% of the project workforce
37413741 2 for each entity participating in a procurement program
37423742 3 outlined in this subsection (c-10) must be done by equity
37433743 4 eligible persons or equity eligible contractors. The
37443744 5 Agency shall increase the minimum percentage each delivery
37453745 6 year thereafter by increments that ensure a statewide
37463746 7 average of 30% of the project workforce for each entity
37473747 8 participating in a procurement program is done by equity
37483748 9 eligible persons or equity eligible contractors by 2030.
37493749 10 The Agency shall propose a schedule of percentage
37503750 11 increases to the minimum equity standards in its draft
37513751 12 revised renewable energy resources procurement plan
37523752 13 submitted to the Commission for approval pursuant to
37533753 14 paragraph (5) of subsection (b) of Section 16-111.5 of the
37543754 15 Public Utilities Act. In determining these annual
37553755 16 increases, the Agency shall have the discretion to
37563756 17 establish different minimum equity standards for different
37573757 18 types of procurements and different regions of the State
37583758 19 if the Agency finds that doing so will further the
37593759 20 purposes of this subsection (c-10). The proposed schedule
37603760 21 of annual increases shall be revisited and updated on an
37613761 22 annual basis. Revisions shall be developed with
37623762 23 stakeholder input, including from equity eligible persons,
37633763 24 equity eligible contractors, clean energy industry
37643764 25 representatives, and community-based organizations that
37653765 26 work with such persons and contractors.
37663766
37673767
37683768
37693769
37703770
37713771 SB1789 - 104 - LRB103 26314 AMQ 52675 b
37723772
37733773
37743774 SB1789- 105 -LRB103 26314 AMQ 52675 b SB1789 - 105 - LRB103 26314 AMQ 52675 b
37753775 SB1789 - 105 - LRB103 26314 AMQ 52675 b
37763776 1 (A) At the start of each delivery year, the Agency
37773777 2 shall require a compliance plan from each entity
37783778 3 participating in a procurement program of subsection
37793779 4 (c) of this Section that demonstrates how they will
37803780 5 achieve compliance with the minimum equity standard
37813781 6 percentage for work completed in that delivery year.
37823782 7 If an entity applies for its approved vendor or
37833783 8 designee status between delivery years, the Agency
37843784 9 shall require a compliance plan at the time of
37853785 10 application.
37863786 11 (B) Halfway through each delivery year, the Agency
37873787 12 shall require each entity participating in a
37883788 13 procurement program to confirm that it will achieve
37893789 14 compliance in that delivery year, when applicable. The
37903790 15 Agency may offer corrective action plans to entities
37913791 16 that are not on track to achieve compliance.
37923792 17 (C) At the end of each delivery year, each entity
37933793 18 participating and completing work in that delivery
37943794 19 year in a procurement program of subsection (c) shall
37953795 20 submit a report to the Agency that demonstrates how it
37963796 21 achieved compliance with the minimum equity standards
37973797 22 percentage for that delivery year.
37983798 23 (D) The Agency shall prohibit participation in
37993799 24 procurement programs by an approved vendor or
38003800 25 designee, as applicable, or entities with which an
38013801 26 approved vendor or designee, as applicable, shares a
38023802
38033803
38043804
38053805
38063806
38073807 SB1789 - 105 - LRB103 26314 AMQ 52675 b
38083808
38093809
38103810 SB1789- 106 -LRB103 26314 AMQ 52675 b SB1789 - 106 - LRB103 26314 AMQ 52675 b
38113811 SB1789 - 106 - LRB103 26314 AMQ 52675 b
38123812 1 common parent company if an approved vendor or
38133813 2 designee, as applicable, failed to meet the minimum
38143814 3 equity standards for the prior delivery year. Waivers
38153815 4 approved for lack of equity eligible persons or equity
38163816 5 eligible contractors in a geographic area of a project
38173817 6 shall not count against the approved vendor or
38183818 7 designee. The Agency shall offer a corrective action
38193819 8 plan for any such entities to assist them in obtaining
38203820 9 compliance and shall allow continued access to
38213821 10 procurement programs upon an approved vendor or
38223822 11 designee demonstrating compliance.
38233823 12 (E) The Agency shall pursue efficiencies achieved
38243824 13 by combining with other approved vendor or designee
38253825 14 reporting.
38263826 15 (2) Equity accountability system within the Adjustable
38273827 16 Block program. The equity category described in item (vi)
38283828 17 of subparagraph (K) of subsection (c) is only available to
38293829 18 applicants that are equity eligible contractors.
38303830 19 (3) Equity accountability system within competitive
38313831 20 procurements. Through its long-term renewable resources
38323832 21 procurement plan, the Agency shall develop requirements
38333833 22 for ensuring that competitive procurement processes,
38343834 23 including utility-scale solar, utility-scale wind, and
38353835 24 brownfield site photovoltaic projects, advance the equity
38363836 25 goals of this subsection (c-10). Subject to Commission
38373837 26 approval, the Agency shall develop bid application
38383838
38393839
38403840
38413841
38423842
38433843 SB1789 - 106 - LRB103 26314 AMQ 52675 b
38443844
38453845
38463846 SB1789- 107 -LRB103 26314 AMQ 52675 b SB1789 - 107 - LRB103 26314 AMQ 52675 b
38473847 SB1789 - 107 - LRB103 26314 AMQ 52675 b
38483848 1 requirements and a bid evaluation methodology for ensuring
38493849 2 that utilization of equity eligible contractors, whether
38503850 3 as bidders or as participants on project development, is
38513851 4 optimized, including requiring that winning or successful
38523852 5 applicants for utility-scale projects are or will partner
38533853 6 with equity eligible contractors and giving preference to
38543854 7 bids through which a higher portion of contract value
38553855 8 flows to equity eligible contractors. To the extent
38563856 9 practicable, entities participating in competitive
38573857 10 procurements shall also be required to meet all the equity
38583858 11 accountability requirements for approved vendors and their
38593859 12 designees under this subsection (c-10). In developing
38603860 13 these requirements, the Agency shall also consider whether
38613861 14 equity goals can be further advanced through additional
38623862 15 measures.
38633863 16 (4) In the first revision to the long-term renewable
38643864 17 energy resources procurement plan and each revision
38653865 18 thereafter, the Agency shall include the following:
38663866 19 (A) The current status and number of equity
38673867 20 eligible contractors listed in the Energy Workforce
38683868 21 Equity Database designed in subsection (c-25),
38693869 22 including the number of equity eligible contractors
38703870 23 with current certifications as issued by the Agency.
38713871 24 (B) A mechanism for measuring, tracking, and
38723872 25 reporting project workforce at the approved vendor or
38733873 26 designee level, as applicable, which shall include a
38743874
38753875
38763876
38773877
38783878
38793879 SB1789 - 107 - LRB103 26314 AMQ 52675 b
38803880
38813881
38823882 SB1789- 108 -LRB103 26314 AMQ 52675 b SB1789 - 108 - LRB103 26314 AMQ 52675 b
38833883 SB1789 - 108 - LRB103 26314 AMQ 52675 b
38843884 1 measurement methodology and records to be made
38853885 2 available for audit by the Agency or the Program
38863886 3 Administrator.
38873887 4 (C) A program for approved vendors, designees,
38883888 5 eligible persons, and equity eligible contractors to
38893889 6 receive trainings, guidance, and other support from
38903890 7 the Agency or its designee regarding the equity
38913891 8 category outlined in item (vi) of subparagraph (K) of
38923892 9 paragraph (1) of subsection (c) and in meeting the
38933893 10 minimum equity standards of this subsection (c-10).
38943894 11 (D) A process for certifying equity eligible
38953895 12 contractors and equity eligible persons. The
38963896 13 certification process shall coordinate with the Energy
38973897 14 Workforce Equity Database set forth in subsection
38983898 15 (c-25).
38993899 16 (E) An application for waiver of the minimum
39003900 17 equity standards of this subsection, which the Agency
39013901 18 shall have the discretion to grant in rare
39023902 19 circumstances. The Agency may grant such a waiver
39033903 20 where the applicant provides evidence of significant
39043904 21 efforts toward meeting the minimum equity commitment,
39053905 22 including: use of the Energy Workforce Equity
39063906 23 Database; efforts to hire or contract with entities
39073907 24 that hire eligible persons; and efforts to establish
39083908 25 contracting relationships with eligible contractors.
39093909 26 The Agency shall support applicants in understanding
39103910
39113911
39123912
39133913
39143914
39153915 SB1789 - 108 - LRB103 26314 AMQ 52675 b
39163916
39173917
39183918 SB1789- 109 -LRB103 26314 AMQ 52675 b SB1789 - 109 - LRB103 26314 AMQ 52675 b
39193919 SB1789 - 109 - LRB103 26314 AMQ 52675 b
39203920 1 the Energy Workforce Equity Database and other
39213921 2 resources for pursuing compliance of the minimum
39223922 3 equity standards. Waivers shall be project-specific,
39233923 4 unless the Agency deems it necessary to grant a waiver
39243924 5 across a portfolio of projects, and in effect for no
39253925 6 longer than one year. Any waiver extension or
39263926 7 subsequent waiver request from an applicant shall be
39273927 8 subject to the requirements of this Section and shall
39283928 9 specify efforts made to reach compliance. When
39293929 10 considering whether to grant a waiver, and to what
39303930 11 extent, the Agency shall consider the degree to which
39313931 12 similarly situated applicants have been able to meet
39323932 13 these minimum equity commitments. For repeated waiver
39333933 14 requests for specific lack of eligible persons or
39343934 15 eligible contractors available, the Agency shall make
39353935 16 recommendations to target recruitment to add such
39363936 17 eligible persons or eligible contractors to the
39373937 18 database.
39383938 19 (5) The Agency shall collect information about work on
39393939 20 projects or portfolios of projects subject to these
39403940 21 minimum equity standards to ensure compliance with this
39413941 22 subsection (c-10). Reporting in furtherance of this
39423942 23 requirement may be combined with other annual reporting
39433943 24 requirements. Such reporting shall include proof of
39443944 25 certification of each equity eligible contractor or equity
39453945 26 eligible person during the applicable time period.
39463946
39473947
39483948
39493949
39503950
39513951 SB1789 - 109 - LRB103 26314 AMQ 52675 b
39523952
39533953
39543954 SB1789- 110 -LRB103 26314 AMQ 52675 b SB1789 - 110 - LRB103 26314 AMQ 52675 b
39553955 SB1789 - 110 - LRB103 26314 AMQ 52675 b
39563956 1 (6) The Agency shall keep confidential all information
39573957 2 and communication that provides private or personal
39583958 3 information.
39593959 4 (7) Modifications to the equity accountability system.
39603960 5 As part of the update of the long-term renewable resources
39613961 6 procurement plan to be initiated in 2023, or sooner if the
39623962 7 Agency deems necessary, the Agency shall determine the
39633963 8 extent to which the equity accountability system described
39643964 9 in this subsection (c-10) has advanced the goals of this
39653965 10 amendatory Act of the 102nd General Assembly, including
39663966 11 through the inclusion of equity eligible persons and
39673967 12 equity eligible contractors in renewable energy credit
39683968 13 projects. If the Agency finds that the equity
39693969 14 accountability system has failed to meet those goals to
39703970 15 its fullest potential, the Agency may revise the following
39713971 16 criteria for future Agency procurements: (A) the
39723972 17 percentage of project workforce, or other appropriate
39733973 18 workforce measure, certified as equity eligible persons or
39743974 19 equity eligible contractors; (B) definitions for equity
39753975 20 investment eligible persons and equity investment eligible
39763976 21 community; and (C) such other modifications necessary to
39773977 22 advance the goals of this amendatory Act of the 102nd
39783978 23 General Assembly effectively. Such revised criteria may
39793979 24 also establish distinct equity accountability systems for
39803980 25 different types of procurements or different regions of
39813981 26 the State if the Agency finds that doing so will further
39823982
39833983
39843984
39853985
39863986
39873987 SB1789 - 110 - LRB103 26314 AMQ 52675 b
39883988
39893989
39903990 SB1789- 111 -LRB103 26314 AMQ 52675 b SB1789 - 111 - LRB103 26314 AMQ 52675 b
39913991 SB1789 - 111 - LRB103 26314 AMQ 52675 b
39923992 1 the purposes of such programs. Revisions shall be
39933993 2 developed with stakeholder input, including from equity
39943994 3 eligible persons, equity eligible contractors, and
39953995 4 community-based organizations that work with such persons
39963996 5 and contractors.
39973997 6 (c-15) Racial discrimination elimination powers and
39983998 7 process.
39993999 8 (1) Purpose. It is the purpose of this subsection to
40004000 9 empower the Agency and other State actors to remedy racial
40014001 10 discrimination in Illinois' clean energy economy as
40024002 11 effectively and expediently as possible, including through
40034003 12 the use of race-conscious remedies, such as race-conscious
40044004 13 contracting and hiring goals, as consistent with State and
40054005 14 federal law.
40064006 15 (2) Racial disparity and discrimination review
40074007 16 process.
40084008 17 (A) Within one year after awarding contracts using
40094009 18 the equity actions processes established in this
40104010 19 Section, the Agency shall publish a report evaluating
40114011 20 the effectiveness of the equity actions point criteria
40124012 21 of this Section in increasing participation of equity
40134013 22 eligible persons and equity eligible contractors. The
40144014 23 report shall disaggregate participating workers and
40154015 24 contractors by race and ethnicity. The report shall be
40164016 25 forwarded to the Governor, the General Assembly, and
40174017 26 the Illinois Commerce Commission and be made available
40184018
40194019
40204020
40214021
40224022
40234023 SB1789 - 111 - LRB103 26314 AMQ 52675 b
40244024
40254025
40264026 SB1789- 112 -LRB103 26314 AMQ 52675 b SB1789 - 112 - LRB103 26314 AMQ 52675 b
40274027 SB1789 - 112 - LRB103 26314 AMQ 52675 b
40284028 1 to the public.
40294029 2 (B) As soon as is practicable thereafter, the
40304030 3 Agency, in consultation with the Department of
40314031 4 Commerce and Economic Opportunity, Department of
40324032 5 Labor, and other agencies that may be relevant, shall
40334033 6 commission and publish a disparity and availability
40344034 7 study that measures the presence and impact of
40354035 8 discrimination on minority businesses and workers in
40364036 9 Illinois' clean energy economy. The Agency may hire
40374037 10 consultants and experts to conduct the disparity and
40384038 11 availability study, with the retention of those
40394039 12 consultants and experts exempt from the requirements
40404040 13 of Section 20-10 of the Illinois Procurement Code. The
40414041 14 Illinois Power Agency shall forward a copy of its
40424042 15 findings and recommendations to the Governor, the
40434043 16 General Assembly, and the Illinois Commerce
40444044 17 Commission. If the disparity and availability study
40454045 18 establishes a strong basis in evidence that there is
40464046 19 discrimination in Illinois' clean energy economy, the
40474047 20 Agency, Department of Commerce and Economic
40484048 21 Opportunity, Department of Labor, Department of
40494049 22 Corrections, and other appropriate agencies shall take
40504050 23 appropriate remedial actions, including race-conscious
40514051 24 remedial actions as consistent with State and federal
40524052 25 law, to effectively remedy this discrimination. Such
40534053 26 remedies may include modification of the equity
40544054
40554055
40564056
40574057
40584058
40594059 SB1789 - 112 - LRB103 26314 AMQ 52675 b
40604060
40614061
40624062 SB1789- 113 -LRB103 26314 AMQ 52675 b SB1789 - 113 - LRB103 26314 AMQ 52675 b
40634063 SB1789 - 113 - LRB103 26314 AMQ 52675 b
40644064 1 accountability system as described in subsection
40654065 2 (c-10).
40664066 3 (c-20) Program data collection.
40674067 4 (1) Purpose. Data collection, data analysis, and
40684068 5 reporting are critical to ensure that the benefits of the
40694069 6 clean energy economy provided to Illinois residents and
40704070 7 businesses are equitably distributed across the State. The
40714071 8 Agency shall collect data from program applicants in order
40724072 9 to track and improve equitable distribution of benefits
40734073 10 across Illinois communities for all procurements the
40744074 11 Agency conducts. The Agency shall use this data to, among
40754075 12 other things, measure any potential impact of racial
40764076 13 discrimination on the distribution of benefits and provide
40774077 14 information necessary to correct any discrimination
40784078 15 through methods consistent with State and federal law.
40794079 16 (2) Agency collection of program data. The Agency
40804080 17 shall collect demographic and geographic data for each
40814081 18 entity awarded contracts under any Agency-administered
40824082 19 program.
40834083 20 (3) Required information to be collected. The Agency
40844084 21 shall collect the following information from applicants
40854085 22 and program participants where applicable:
40864086 23 (A) demographic information, including racial or
40874087 24 ethnic identity for real persons employed, contracted,
40884088 25 or subcontracted through the program and owners of
40894089 26 businesses or entities that apply to receive renewable
40904090
40914091
40924092
40934093
40944094
40954095 SB1789 - 113 - LRB103 26314 AMQ 52675 b
40964096
40974097
40984098 SB1789- 114 -LRB103 26314 AMQ 52675 b SB1789 - 114 - LRB103 26314 AMQ 52675 b
40994099 SB1789 - 114 - LRB103 26314 AMQ 52675 b
41004100 1 energy credits from the Agency;
41014101 2 (B) geographic location of the residency of real
41024102 3 persons employed, contracted, or subcontracted through
41034103 4 the program and geographic location of the
41044104 5 headquarters of the business or entity that applies to
41054105 6 receive renewable energy credits from the Agency; and
41064106 7 (C) any other information the Agency determines is
41074107 8 necessary for the purpose of achieving the purpose of
41084108 9 this subsection.
41094109 10 (4) Publication of collected information. The Agency
41104110 11 shall publish, at least annually, information on the
41114111 12 demographics of program participants on an aggregate
41124112 13 basis.
41134113 14 (5) Nothing in this subsection shall be interpreted to
41144114 15 limit the authority of the Agency, or other agency or
41154115 16 department of the State, to require or collect demographic
41164116 17 information from applicants of other State programs.
41174117 18 (c-25) Energy Workforce Equity Database.
41184118 19 (1) The Agency, in consultation with the Department of
41194119 20 Commerce and Economic Opportunity, shall create an Energy
41204120 21 Workforce Equity Database, and may contract with a third
41214121 22 party to do so ("database program administrator"). If the
41224122 23 Department decides to contract with a third party, that
41234123 24 third party shall be exempt from the requirements of
41244124 25 Section 20-10 of the Illinois Procurement Code. The Energy
41254125 26 Workforce Equity Database shall be a searchable database
41264126
41274127
41284128
41294129
41304130
41314131 SB1789 - 114 - LRB103 26314 AMQ 52675 b
41324132
41334133
41344134 SB1789- 115 -LRB103 26314 AMQ 52675 b SB1789 - 115 - LRB103 26314 AMQ 52675 b
41354135 SB1789 - 115 - LRB103 26314 AMQ 52675 b
41364136 1 of suppliers, vendors, and subcontractors for clean energy
41374137 2 industries that is:
41384138 3 (A) publicly accessible;
41394139 4 (B) easy for people to find and use;
41404140 5 (C) organized by company specialty or field;
41414141 6 (D) region-specific; and
41424142 7 (E) populated with information including, but not
41434143 8 limited to, contacts for suppliers, vendors, or
41444144 9 subcontractors who are minority and women-owned
41454145 10 business enterprise certified or who participate or
41464146 11 have participated in any of the programs described in
41474147 12 this Act.
41484148 13 (2) The Agency shall create an easily accessible,
41494149 14 public facing online tool using the database information
41504150 15 that includes, at a minimum, the following:
41514151 16 (A) a map of environmental justice and equity
41524152 17 investment eligible communities;
41534153 18 (B) job postings and recruiting opportunities;
41544154 19 (C) a means by which recruiting clean energy
41554155 20 companies can find and interact with current or former
41564156 21 participants of clean energy workforce training
41574157 22 programs;
41584158 23 (D) information on workforce training service
41594159 24 providers and training opportunities available to
41604160 25 prospective workers;
41614161 26 (E) renewable energy company diversity reporting;
41624162
41634163
41644164
41654165
41664166
41674167 SB1789 - 115 - LRB103 26314 AMQ 52675 b
41684168
41694169
41704170 SB1789- 116 -LRB103 26314 AMQ 52675 b SB1789 - 116 - LRB103 26314 AMQ 52675 b
41714171 SB1789 - 116 - LRB103 26314 AMQ 52675 b
41724172 1 (F) a list of equity eligible contractors with
41734173 2 their contact information, types of work performed,
41744174 3 and locations worked in;
41754175 4 (G) reporting on outcomes of the programs
41764176 5 described in the workforce programs of the Energy
41774177 6 Transition Act, including information such as, but not
41784178 7 limited to, retention rate, graduation rate, and
41794179 8 placement rates of trainees; and
41804180 9 (H) information about the Jobs and Environmental
41814181 10 Justice Grant Program, the Clean Energy Jobs and
41824182 11 Justice Fund, and other sources of capital.
41834183 12 (3) The Agency shall ensure the database is regularly
41844184 13 updated to ensure information is current and shall
41854185 14 coordinate with the Department of Commerce and Economic
41864186 15 Opportunity to ensure that it includes information on
41874187 16 individuals and entities that are or have participated in
41884188 17 the Clean Jobs Workforce Network Program, Clean Energy
41894189 18 Contractor Incubator Program, Returning Residents Clean
41904190 19 Jobs Training Program, or Clean Energy Primes Contractor
41914191 20 Accelerator Program.
41924192 21 (c-30) Enforcement of minimum equity standards. All
41934193 22 entities seeking renewable energy credits must submit an
41944194 23 annual report to demonstrate compliance with each of the
41954195 24 equity commitments required under subsection (c-10). If the
41964196 25 Agency concludes the entity has not met or maintained its
41974197 26 minimum equity standards required under the applicable
41984198
41994199
42004200
42014201
42024202
42034203 SB1789 - 116 - LRB103 26314 AMQ 52675 b
42044204
42054205
42064206 SB1789- 117 -LRB103 26314 AMQ 52675 b SB1789 - 117 - LRB103 26314 AMQ 52675 b
42074207 SB1789 - 117 - LRB103 26314 AMQ 52675 b
42084208 1 subparagraphs under subsection (c-10), the Agency shall deny
42094209 2 the entity's ability to participate in procurement programs in
42104210 3 subsection (c), including by withholding approved vendor or
42114211 4 designee status. The Agency may require the entity to enter
42124212 5 into a corrective action plan. An entity that is not
42134213 6 recertified for failing to meet required equity actions in
42144214 7 subparagraph (c-10) may reapply once they have a corrective
42154215 8 action plan and achieve compliance with the minimum equity
42164216 9 standards.
42174217 10 (d) Clean coal portfolio standard.
42184218 11 (1) The procurement plans shall include electricity
42194219 12 generated using clean coal. Each utility shall enter into
42204220 13 one or more sourcing agreements with the initial clean
42214221 14 coal facility, as provided in paragraph (3) of this
42224222 15 subsection (d), covering electricity generated by the
42234223 16 initial clean coal facility representing at least 5% of
42244224 17 each utility's total supply to serve the load of eligible
42254225 18 retail customers in 2015 and each year thereafter, as
42264226 19 described in paragraph (3) of this subsection (d), subject
42274227 20 to the limits specified in paragraph (2) of this
42284228 21 subsection (d). It is the goal of the State that by January
42294229 22 1, 2025, 25% of the electricity used in the State shall be
42304230 23 generated by cost-effective clean coal facilities. For
42314231 24 purposes of this subsection (d), "cost-effective" means
42324232 25 that the expenditures pursuant to such sourcing agreements
42334233 26 do not cause the limit stated in paragraph (2) of this
42344234
42354235
42364236
42374237
42384238
42394239 SB1789 - 117 - LRB103 26314 AMQ 52675 b
42404240
42414241
42424242 SB1789- 118 -LRB103 26314 AMQ 52675 b SB1789 - 118 - LRB103 26314 AMQ 52675 b
42434243 SB1789 - 118 - LRB103 26314 AMQ 52675 b
42444244 1 subsection (d) to be exceeded and do not exceed cost-based
42454245 2 benchmarks, which shall be developed to assess all
42464246 3 expenditures pursuant to such sourcing agreements covering
42474247 4 electricity generated by clean coal facilities, other than
42484248 5 the initial clean coal facility, by the procurement
42494249 6 administrator, in consultation with the Commission staff,
42504250 7 Agency staff, and the procurement monitor and shall be
42514251 8 subject to Commission review and approval.
42524252 9 A utility party to a sourcing agreement shall
42534253 10 immediately retire any emission credits that it receives
42544254 11 in connection with the electricity covered by such
42554255 12 agreement.
42564256 13 Utilities shall maintain adequate records documenting
42574257 14 the purchases under the sourcing agreement to comply with
42584258 15 this subsection (d) and shall file an accounting with the
42594259 16 load forecast that must be filed with the Agency by July 15
42604260 17 of each year, in accordance with subsection (d) of Section
42614261 18 16-111.5 of the Public Utilities Act.
42624262 19 A utility shall be deemed to have complied with the
42634263 20 clean coal portfolio standard specified in this subsection
42644264 21 (d) if the utility enters into a sourcing agreement as
42654265 22 required by this subsection (d).
42664266 23 (2) For purposes of this subsection (d), the required
42674267 24 execution of sourcing agreements with the initial clean
42684268 25 coal facility for a particular year shall be measured as a
42694269 26 percentage of the actual amount of electricity
42704270
42714271
42724272
42734273
42744274
42754275 SB1789 - 118 - LRB103 26314 AMQ 52675 b
42764276
42774277
42784278 SB1789- 119 -LRB103 26314 AMQ 52675 b SB1789 - 119 - LRB103 26314 AMQ 52675 b
42794279 SB1789 - 119 - LRB103 26314 AMQ 52675 b
42804280 1 (megawatt-hours) supplied by the electric utility to
42814281 2 eligible retail customers in the planning year ending
42824282 3 immediately prior to the agreement's execution. For
42834283 4 purposes of this subsection (d), the amount paid per
42844284 5 kilowatthour means the total amount paid for electric
42854285 6 service expressed on a per kilowatthour basis. For
42864286 7 purposes of this subsection (d), the total amount paid for
42874287 8 electric service includes without limitation amounts paid
42884288 9 for supply, transmission, distribution, surcharges and
42894289 10 add-on taxes.
42904290 11 Notwithstanding the requirements of this subsection
42914291 12 (d), the total amount paid under sourcing agreements with
42924292 13 clean coal facilities pursuant to the procurement plan for
42934293 14 any given year shall be reduced by an amount necessary to
42944294 15 limit the annual estimated average net increase due to the
42954295 16 costs of these resources included in the amounts paid by
42964296 17 eligible retail customers in connection with electric
42974297 18 service to:
42984298 19 (A) in 2010, no more than 0.5% of the amount paid
42994299 20 per kilowatthour by those customers during the year
43004300 21 ending May 31, 2009;
43014301 22 (B) in 2011, the greater of an additional 0.5% of
43024302 23 the amount paid per kilowatthour by those customers
43034303 24 during the year ending May 31, 2010 or 1% of the amount
43044304 25 paid per kilowatthour by those customers during the
43054305 26 year ending May 31, 2009;
43064306
43074307
43084308
43094309
43104310
43114311 SB1789 - 119 - LRB103 26314 AMQ 52675 b
43124312
43134313
43144314 SB1789- 120 -LRB103 26314 AMQ 52675 b SB1789 - 120 - LRB103 26314 AMQ 52675 b
43154315 SB1789 - 120 - LRB103 26314 AMQ 52675 b
43164316 1 (C) in 2012, the greater of an additional 0.5% of
43174317 2 the amount paid per kilowatthour by those customers
43184318 3 during the year ending May 31, 2011 or 1.5% of the
43194319 4 amount paid per kilowatthour by those customers during
43204320 5 the year ending May 31, 2009;
43214321 6 (D) in 2013, the greater of an additional 0.5% of
43224322 7 the amount paid per kilowatthour by those customers
43234323 8 during the year ending May 31, 2012 or 2% of the amount
43244324 9 paid per kilowatthour by those customers during the
43254325 10 year ending May 31, 2009; and
43264326 11 (E) thereafter, the total amount paid under
43274327 12 sourcing agreements with clean coal facilities
43284328 13 pursuant to the procurement plan for any single year
43294329 14 shall be reduced by an amount necessary to limit the
43304330 15 estimated average net increase due to the cost of
43314331 16 these resources included in the amounts paid by
43324332 17 eligible retail customers in connection with electric
43334333 18 service to no more than the greater of (i) 2.015% of
43344334 19 the amount paid per kilowatthour by those customers
43354335 20 during the year ending May 31, 2009 or (ii) the
43364336 21 incremental amount per kilowatthour paid for these
43374337 22 resources in 2013. These requirements may be altered
43384338 23 only as provided by statute.
43394339 24 No later than June 30, 2015, the Commission shall
43404340 25 review the limitation on the total amount paid under
43414341 26 sourcing agreements, if any, with clean coal facilities
43424342
43434343
43444344
43454345
43464346
43474347 SB1789 - 120 - LRB103 26314 AMQ 52675 b
43484348
43494349
43504350 SB1789- 121 -LRB103 26314 AMQ 52675 b SB1789 - 121 - LRB103 26314 AMQ 52675 b
43514351 SB1789 - 121 - LRB103 26314 AMQ 52675 b
43524352 1 pursuant to this subsection (d) and report to the General
43534353 2 Assembly its findings as to whether that limitation unduly
43544354 3 constrains the amount of electricity generated by
43554355 4 cost-effective clean coal facilities that is covered by
43564356 5 sourcing agreements.
43574357 6 (3) Initial clean coal facility. In order to promote
43584358 7 development of clean coal facilities in Illinois, each
43594359 8 electric utility subject to this Section shall execute a
43604360 9 sourcing agreement to source electricity from a proposed
43614361 10 clean coal facility in Illinois (the "initial clean coal
43624362 11 facility") that will have a nameplate capacity of at least
43634363 12 500 MW when commercial operation commences, that has a
43644364 13 final Clean Air Act permit on June 1, 2009 (the effective
43654365 14 date of Public Act 95-1027), and that will meet the
43664366 15 definition of clean coal facility in Section 1-10 of this
43674367 16 Act when commercial operation commences. The sourcing
43684368 17 agreements with this initial clean coal facility shall be
43694369 18 subject to both approval of the initial clean coal
43704370 19 facility by the General Assembly and satisfaction of the
43714371 20 requirements of paragraph (4) of this subsection (d) and
43724372 21 shall be executed within 90 days after any such approval
43734373 22 by the General Assembly. The Agency and the Commission
43744374 23 shall have authority to inspect all books and records
43754375 24 associated with the initial clean coal facility during the
43764376 25 term of such a sourcing agreement. A utility's sourcing
43774377 26 agreement for electricity produced by the initial clean
43784378
43794379
43804380
43814381
43824382
43834383 SB1789 - 121 - LRB103 26314 AMQ 52675 b
43844384
43854385
43864386 SB1789- 122 -LRB103 26314 AMQ 52675 b SB1789 - 122 - LRB103 26314 AMQ 52675 b
43874387 SB1789 - 122 - LRB103 26314 AMQ 52675 b
43884388 1 coal facility shall include:
43894389 2 (A) a formula contractual price (the "contract
43904390 3 price") approved pursuant to paragraph (4) of this
43914391 4 subsection (d), which shall:
43924392 5 (i) be determined using a cost of service
43934393 6 methodology employing either a level or deferred
43944394 7 capital recovery component, based on a capital
43954395 8 structure consisting of 45% equity and 55% debt,
43964396 9 and a return on equity as may be approved by the
43974397 10 Federal Energy Regulatory Commission, which in any
43984398 11 case may not exceed the lower of 11.5% or the rate
43994399 12 of return approved by the General Assembly
44004400 13 pursuant to paragraph (4) of this subsection (d);
44014401 14 and
44024402 15 (ii) provide that all miscellaneous net
44034403 16 revenue, including but not limited to net revenue
44044404 17 from the sale of emission allowances, if any,
44054405 18 substitute natural gas, if any, grants or other
44064406 19 support provided by the State of Illinois or the
44074407 20 United States Government, firm transmission
44084408 21 rights, if any, by-products produced by the
44094409 22 facility, energy or capacity derived from the
44104410 23 facility and not covered by a sourcing agreement
44114411 24 pursuant to paragraph (3) of this subsection (d)
44124412 25 or item (5) of subsection (d) of Section 16-115 of
44134413 26 the Public Utilities Act, whether generated from
44144414
44154415
44164416
44174417
44184418
44194419 SB1789 - 122 - LRB103 26314 AMQ 52675 b
44204420
44214421
44224422 SB1789- 123 -LRB103 26314 AMQ 52675 b SB1789 - 123 - LRB103 26314 AMQ 52675 b
44234423 SB1789 - 123 - LRB103 26314 AMQ 52675 b
44244424 1 the synthesis gas derived from coal, from SNG, or
44254425 2 from natural gas, shall be credited against the
44264426 3 revenue requirement for this initial clean coal
44274427 4 facility;
44284428 5 (B) power purchase provisions, which shall:
44294429 6 (i) provide that the utility party to such
44304430 7 sourcing agreement shall pay the contract price
44314431 8 for electricity delivered under such sourcing
44324432 9 agreement;
44334433 10 (ii) require delivery of electricity to the
44344434 11 regional transmission organization market of the
44354435 12 utility that is party to such sourcing agreement;
44364436 13 (iii) require the utility party to such
44374437 14 sourcing agreement to buy from the initial clean
44384438 15 coal facility in each hour an amount of energy
44394439 16 equal to all clean coal energy made available from
44404440 17 the initial clean coal facility during such hour
44414441 18 times a fraction, the numerator of which is such
44424442 19 utility's retail market sales of electricity
44434443 20 (expressed in kilowatthours sold) in the State
44444444 21 during the prior calendar month and the
44454445 22 denominator of which is the total retail market
44464446 23 sales of electricity (expressed in kilowatthours
44474447 24 sold) in the State by utilities during such prior
44484448 25 month and the sales of electricity (expressed in
44494449 26 kilowatthours sold) in the State by alternative
44504450
44514451
44524452
44534453
44544454
44554455 SB1789 - 123 - LRB103 26314 AMQ 52675 b
44564456
44574457
44584458 SB1789- 124 -LRB103 26314 AMQ 52675 b SB1789 - 124 - LRB103 26314 AMQ 52675 b
44594459 SB1789 - 124 - LRB103 26314 AMQ 52675 b
44604460 1 retail electric suppliers during such prior month
44614461 2 that are subject to the requirements of this
44624462 3 subsection (d) and paragraph (5) of subsection (d)
44634463 4 of Section 16-115 of the Public Utilities Act,
44644464 5 provided that the amount purchased by the utility
44654465 6 in any year will be limited by paragraph (2) of
44664466 7 this subsection (d); and
44674467 8 (iv) be considered pre-existing contracts in
44684468 9 such utility's procurement plans for eligible
44694469 10 retail customers;
44704470 11 (C) contract for differences provisions, which
44714471 12 shall:
44724472 13 (i) require the utility party to such sourcing
44734473 14 agreement to contract with the initial clean coal
44744474 15 facility in each hour with respect to an amount of
44754475 16 energy equal to all clean coal energy made
44764476 17 available from the initial clean coal facility
44774477 18 during such hour times a fraction, the numerator
44784478 19 of which is such utility's retail market sales of
44794479 20 electricity (expressed in kilowatthours sold) in
44804480 21 the utility's service territory in the State
44814481 22 during the prior calendar month and the
44824482 23 denominator of which is the total retail market
44834483 24 sales of electricity (expressed in kilowatthours
44844484 25 sold) in the State by utilities during such prior
44854485 26 month and the sales of electricity (expressed in
44864486
44874487
44884488
44894489
44904490
44914491 SB1789 - 124 - LRB103 26314 AMQ 52675 b
44924492
44934493
44944494 SB1789- 125 -LRB103 26314 AMQ 52675 b SB1789 - 125 - LRB103 26314 AMQ 52675 b
44954495 SB1789 - 125 - LRB103 26314 AMQ 52675 b
44964496 1 kilowatthours sold) in the State by alternative
44974497 2 retail electric suppliers during such prior month
44984498 3 that are subject to the requirements of this
44994499 4 subsection (d) and paragraph (5) of subsection (d)
45004500 5 of Section 16-115 of the Public Utilities Act,
45014501 6 provided that the amount paid by the utility in
45024502 7 any year will be limited by paragraph (2) of this
45034503 8 subsection (d);
45044504 9 (ii) provide that the utility's payment
45054505 10 obligation in respect of the quantity of
45064506 11 electricity determined pursuant to the preceding
45074507 12 clause (i) shall be limited to an amount equal to
45084508 13 (1) the difference between the contract price
45094509 14 determined pursuant to subparagraph (A) of
45104510 15 paragraph (3) of this subsection (d) and the
45114511 16 day-ahead price for electricity delivered to the
45124512 17 regional transmission organization market of the
45134513 18 utility that is party to such sourcing agreement
45144514 19 (or any successor delivery point at which such
45154515 20 utility's supply obligations are financially
45164516 21 settled on an hourly basis) (the "reference
45174517 22 price") on the day preceding the day on which the
45184518 23 electricity is delivered to the initial clean coal
45194519 24 facility busbar, multiplied by (2) the quantity of
45204520 25 electricity determined pursuant to the preceding
45214521 26 clause (i); and
45224522
45234523
45244524
45254525
45264526
45274527 SB1789 - 125 - LRB103 26314 AMQ 52675 b
45284528
45294529
45304530 SB1789- 126 -LRB103 26314 AMQ 52675 b SB1789 - 126 - LRB103 26314 AMQ 52675 b
45314531 SB1789 - 126 - LRB103 26314 AMQ 52675 b
45324532 1 (iii) not require the utility to take physical
45334533 2 delivery of the electricity produced by the
45344534 3 facility;
45354535 4 (D) general provisions, which shall:
45364536 5 (i) specify a term of no more than 30 years,
45374537 6 commencing on the commercial operation date of the
45384538 7 facility;
45394539 8 (ii) provide that utilities shall maintain
45404540 9 adequate records documenting purchases under the
45414541 10 sourcing agreements entered into to comply with
45424542 11 this subsection (d) and shall file an accounting
45434543 12 with the load forecast that must be filed with the
45444544 13 Agency by July 15 of each year, in accordance with
45454545 14 subsection (d) of Section 16-111.5 of the Public
45464546 15 Utilities Act;
45474547 16 (iii) provide that all costs associated with
45484548 17 the initial clean coal facility will be
45494549 18 periodically reported to the Federal Energy
45504550 19 Regulatory Commission and to purchasers in
45514551 20 accordance with applicable laws governing
45524552 21 cost-based wholesale power contracts;
45534553 22 (iv) permit the Illinois Power Agency to
45544554 23 assume ownership of the initial clean coal
45554555 24 facility, without monetary consideration and
45564556 25 otherwise on reasonable terms acceptable to the
45574557 26 Agency, if the Agency so requests no less than 3
45584558
45594559
45604560
45614561
45624562
45634563 SB1789 - 126 - LRB103 26314 AMQ 52675 b
45644564
45654565
45664566 SB1789- 127 -LRB103 26314 AMQ 52675 b SB1789 - 127 - LRB103 26314 AMQ 52675 b
45674567 SB1789 - 127 - LRB103 26314 AMQ 52675 b
45684568 1 years prior to the end of the stated contract
45694569 2 term;
45704570 3 (v) require the owner of the initial clean
45714571 4 coal facility to provide documentation to the
45724572 5 Commission each year, starting in the facility's
45734573 6 first year of commercial operation, accurately
45744574 7 reporting the quantity of carbon emissions from
45754575 8 the facility that have been captured and
45764576 9 sequestered and report any quantities of carbon
45774577 10 released from the site or sites at which carbon
45784578 11 emissions were sequestered in prior years, based
45794579 12 on continuous monitoring of such sites. If, in any
45804580 13 year after the first year of commercial operation,
45814581 14 the owner of the facility fails to demonstrate
45824582 15 that the initial clean coal facility captured and
45834583 16 sequestered at least 50% of the total carbon
45844584 17 emissions that the facility would otherwise emit
45854585 18 or that sequestration of emissions from prior
45864586 19 years has failed, resulting in the release of
45874587 20 carbon dioxide into the atmosphere, the owner of
45884588 21 the facility must offset excess emissions. Any
45894589 22 such carbon offsets must be permanent, additional,
45904590 23 verifiable, real, located within the State of
45914591 24 Illinois, and legally and practicably enforceable.
45924592 25 The cost of such offsets for the facility that are
45934593 26 not recoverable shall not exceed $15 million in
45944594
45954595
45964596
45974597
45984598
45994599 SB1789 - 127 - LRB103 26314 AMQ 52675 b
46004600
46014601
46024602 SB1789- 128 -LRB103 26314 AMQ 52675 b SB1789 - 128 - LRB103 26314 AMQ 52675 b
46034603 SB1789 - 128 - LRB103 26314 AMQ 52675 b
46044604 1 any given year. No costs of any such purchases of
46054605 2 carbon offsets may be recovered from a utility or
46064606 3 its customers. All carbon offsets purchased for
46074607 4 this purpose and any carbon emission credits
46084608 5 associated with sequestration of carbon from the
46094609 6 facility must be permanently retired. The initial
46104610 7 clean coal facility shall not forfeit its
46114611 8 designation as a clean coal facility if the
46124612 9 facility fails to fully comply with the applicable
46134613 10 carbon sequestration requirements in any given
46144614 11 year, provided the requisite offsets are
46154615 12 purchased. However, the Attorney General, on
46164616 13 behalf of the People of the State of Illinois, may
46174617 14 specifically enforce the facility's sequestration
46184618 15 requirement and the other terms of this contract
46194619 16 provision. Compliance with the sequestration
46204620 17 requirements and offset purchase requirements
46214621 18 specified in paragraph (3) of this subsection (d)
46224622 19 shall be reviewed annually by an independent
46234623 20 expert retained by the owner of the initial clean
46244624 21 coal facility, with the advance written approval
46254625 22 of the Attorney General. The Commission may, in
46264626 23 the course of the review specified in item (vii),
46274627 24 reduce the allowable return on equity for the
46284628 25 facility if the facility willfully fails to comply
46294629 26 with the carbon capture and sequestration
46304630
46314631
46324632
46334633
46344634
46354635 SB1789 - 128 - LRB103 26314 AMQ 52675 b
46364636
46374637
46384638 SB1789- 129 -LRB103 26314 AMQ 52675 b SB1789 - 129 - LRB103 26314 AMQ 52675 b
46394639 SB1789 - 129 - LRB103 26314 AMQ 52675 b
46404640 1 requirements set forth in this item (v);
46414641 2 (vi) include limits on, and accordingly
46424642 3 provide for modification of, the amount the
46434643 4 utility is required to source under the sourcing
46444644 5 agreement consistent with paragraph (2) of this
46454645 6 subsection (d);
46464646 7 (vii) require Commission review: (1) to
46474647 8 determine the justness, reasonableness, and
46484648 9 prudence of the inputs to the formula referenced
46494649 10 in subparagraphs (A)(i) through (A)(iii) of
46504650 11 paragraph (3) of this subsection (d), prior to an
46514651 12 adjustment in those inputs including, without
46524652 13 limitation, the capital structure and return on
46534653 14 equity, fuel costs, and other operations and
46544654 15 maintenance costs and (2) to approve the costs to
46554655 16 be passed through to customers under the sourcing
46564656 17 agreement by which the utility satisfies its
46574657 18 statutory obligations. Commission review shall
46584658 19 occur no less than every 3 years, regardless of
46594659 20 whether any adjustments have been proposed, and
46604660 21 shall be completed within 9 months;
46614661 22 (viii) limit the utility's obligation to such
46624662 23 amount as the utility is allowed to recover
46634663 24 through tariffs filed with the Commission,
46644664 25 provided that neither the clean coal facility nor
46654665 26 the utility waives any right to assert federal
46664666
46674667
46684668
46694669
46704670
46714671 SB1789 - 129 - LRB103 26314 AMQ 52675 b
46724672
46734673
46744674 SB1789- 130 -LRB103 26314 AMQ 52675 b SB1789 - 130 - LRB103 26314 AMQ 52675 b
46754675 SB1789 - 130 - LRB103 26314 AMQ 52675 b
46764676 1 pre-emption or any other argument in response to a
46774677 2 purported disallowance of recovery costs;
46784678 3 (ix) limit the utility's or alternative retail
46794679 4 electric supplier's obligation to incur any
46804680 5 liability until such time as the facility is in
46814681 6 commercial operation and generating power and
46824682 7 energy and such power and energy is being
46834683 8 delivered to the facility busbar;
46844684 9 (x) provide that the owner or owners of the
46854685 10 initial clean coal facility, which is the
46864686 11 counterparty to such sourcing agreement, shall
46874687 12 have the right from time to time to elect whether
46884688 13 the obligations of the utility party thereto shall
46894689 14 be governed by the power purchase provisions or
46904690 15 the contract for differences provisions;
46914691 16 (xi) append documentation showing that the
46924692 17 formula rate and contract, insofar as they relate
46934693 18 to the power purchase provisions, have been
46944694 19 approved by the Federal Energy Regulatory
46954695 20 Commission pursuant to Section 205 of the Federal
46964696 21 Power Act;
46974697 22 (xii) provide that any changes to the terms of
46984698 23 the contract, insofar as such changes relate to
46994699 24 the power purchase provisions, are subject to
47004700 25 review under the public interest standard applied
47014701 26 by the Federal Energy Regulatory Commission
47024702
47034703
47044704
47054705
47064706
47074707 SB1789 - 130 - LRB103 26314 AMQ 52675 b
47084708
47094709
47104710 SB1789- 131 -LRB103 26314 AMQ 52675 b SB1789 - 131 - LRB103 26314 AMQ 52675 b
47114711 SB1789 - 131 - LRB103 26314 AMQ 52675 b
47124712 1 pursuant to Sections 205 and 206 of the Federal
47134713 2 Power Act; and
47144714 3 (xiii) conform with customary lender
47154715 4 requirements in power purchase agreements used as
47164716 5 the basis for financing non-utility generators.
47174717 6 (4) Effective date of sourcing agreements with the
47184718 7 initial clean coal facility. Any proposed sourcing
47194719 8 agreement with the initial clean coal facility shall not
47204720 9 become effective unless the following reports are prepared
47214721 10 and submitted and authorizations and approvals obtained:
47224722 11 (i) Facility cost report. The owner of the initial
47234723 12 clean coal facility shall submit to the Commission,
47244724 13 the Agency, and the General Assembly a front-end
47254725 14 engineering and design study, a facility cost report,
47264726 15 method of financing (including but not limited to
47274727 16 structure and associated costs), and an operating and
47284728 17 maintenance cost quote for the facility (collectively
47294729 18 "facility cost report"), which shall be prepared in
47304730 19 accordance with the requirements of this paragraph (4)
47314731 20 of subsection (d) of this Section, and shall provide
47324732 21 the Commission and the Agency access to the work
47334733 22 papers, relied upon documents, and any other backup
47344734 23 documentation related to the facility cost report.
47354735 24 (ii) Commission report. Within 6 months following
47364736 25 receipt of the facility cost report, the Commission,
47374737 26 in consultation with the Agency, shall submit a report
47384738
47394739
47404740
47414741
47424742
47434743 SB1789 - 131 - LRB103 26314 AMQ 52675 b
47444744
47454745
47464746 SB1789- 132 -LRB103 26314 AMQ 52675 b SB1789 - 132 - LRB103 26314 AMQ 52675 b
47474747 SB1789 - 132 - LRB103 26314 AMQ 52675 b
47484748 1 to the General Assembly setting forth its analysis of
47494749 2 the facility cost report. Such report shall include,
47504750 3 but not be limited to, a comparison of the costs
47514751 4 associated with electricity generated by the initial
47524752 5 clean coal facility to the costs associated with
47534753 6 electricity generated by other types of generation
47544754 7 facilities, an analysis of the rate impacts on
47554755 8 residential and small business customers over the life
47564756 9 of the sourcing agreements, and an analysis of the
47574757 10 likelihood that the initial clean coal facility will
47584758 11 commence commercial operation by and be delivering
47594759 12 power to the facility's busbar by 2016. To assist in
47604760 13 the preparation of its report, the Commission, in
47614761 14 consultation with the Agency, may hire one or more
47624762 15 experts or consultants, the costs of which shall be
47634763 16 paid for by the owner of the initial clean coal
47644764 17 facility. The Commission and Agency may begin the
47654765 18 process of selecting such experts or consultants prior
47664766 19 to receipt of the facility cost report.
47674767 20 (iii) General Assembly approval. The proposed
47684768 21 sourcing agreements shall not take effect unless,
47694769 22 based on the facility cost report and the Commission's
47704770 23 report, the General Assembly enacts authorizing
47714771 24 legislation approving (A) the projected price, stated
47724772 25 in cents per kilowatthour, to be charged for
47734773 26 electricity generated by the initial clean coal
47744774
47754775
47764776
47774777
47784778
47794779 SB1789 - 132 - LRB103 26314 AMQ 52675 b
47804780
47814781
47824782 SB1789- 133 -LRB103 26314 AMQ 52675 b SB1789 - 133 - LRB103 26314 AMQ 52675 b
47834783 SB1789 - 133 - LRB103 26314 AMQ 52675 b
47844784 1 facility, (B) the projected impact on residential and
47854785 2 small business customers' bills over the life of the
47864786 3 sourcing agreements, and (C) the maximum allowable
47874787 4 return on equity for the project; and
47884788 5 (iv) Commission review. If the General Assembly
47894789 6 enacts authorizing legislation pursuant to
47904790 7 subparagraph (iii) approving a sourcing agreement, the
47914791 8 Commission shall, within 90 days of such enactment,
47924792 9 complete a review of such sourcing agreement. During
47934793 10 such time period, the Commission shall implement any
47944794 11 directive of the General Assembly, resolve any
47954795 12 disputes between the parties to the sourcing agreement
47964796 13 concerning the terms of such agreement, approve the
47974797 14 form of such agreement, and issue an order finding
47984798 15 that the sourcing agreement is prudent and reasonable.
47994799 16 The facility cost report shall be prepared as follows:
48004800 17 (A) The facility cost report shall be prepared by
48014801 18 duly licensed engineering and construction firms
48024802 19 detailing the estimated capital costs payable to one
48034803 20 or more contractors or suppliers for the engineering,
48044804 21 procurement and construction of the components
48054805 22 comprising the initial clean coal facility and the
48064806 23 estimated costs of operation and maintenance of the
48074807 24 facility. The facility cost report shall include:
48084808 25 (i) an estimate of the capital cost of the
48094809 26 core plant based on one or more front end
48104810
48114811
48124812
48134813
48144814
48154815 SB1789 - 133 - LRB103 26314 AMQ 52675 b
48164816
48174817
48184818 SB1789- 134 -LRB103 26314 AMQ 52675 b SB1789 - 134 - LRB103 26314 AMQ 52675 b
48194819 SB1789 - 134 - LRB103 26314 AMQ 52675 b
48204820 1 engineering and design studies for the
48214821 2 gasification island and related facilities. The
48224822 3 core plant shall include all civil, structural,
48234823 4 mechanical, electrical, control, and safety
48244824 5 systems.
48254825 6 (ii) an estimate of the capital cost of the
48264826 7 balance of the plant, including any capital costs
48274827 8 associated with sequestration of carbon dioxide
48284828 9 emissions and all interconnects and interfaces
48294829 10 required to operate the facility, such as
48304830 11 transmission of electricity, construction or
48314831 12 backfeed power supply, pipelines to transport
48324832 13 substitute natural gas or carbon dioxide, potable
48334833 14 water supply, natural gas supply, water supply,
48344834 15 water discharge, landfill, access roads, and coal
48354835 16 delivery.
48364836 17 The quoted construction costs shall be expressed
48374837 18 in nominal dollars as of the date that the quote is
48384838 19 prepared and shall include capitalized financing costs
48394839 20 during construction, taxes, insurance, and other
48404840 21 owner's costs, and an assumed escalation in materials
48414841 22 and labor beyond the date as of which the construction
48424842 23 cost quote is expressed.
48434843 24 (B) The front end engineering and design study for
48444844 25 the gasification island and the cost study for the
48454845 26 balance of plant shall include sufficient design work
48464846
48474847
48484848
48494849
48504850
48514851 SB1789 - 134 - LRB103 26314 AMQ 52675 b
48524852
48534853
48544854 SB1789- 135 -LRB103 26314 AMQ 52675 b SB1789 - 135 - LRB103 26314 AMQ 52675 b
48554855 SB1789 - 135 - LRB103 26314 AMQ 52675 b
48564856 1 to permit quantification of major categories of
48574857 2 materials, commodities and labor hours, and receipt of
48584858 3 quotes from vendors of major equipment required to
48594859 4 construct and operate the clean coal facility.
48604860 5 (C) The facility cost report shall also include an
48614861 6 operating and maintenance cost quote that will provide
48624862 7 the estimated cost of delivered fuel, personnel,
48634863 8 maintenance contracts, chemicals, catalysts,
48644864 9 consumables, spares, and other fixed and variable
48654865 10 operations and maintenance costs. The delivered fuel
48664866 11 cost estimate will be provided by a recognized third
48674867 12 party expert or experts in the fuel and transportation
48684868 13 industries. The balance of the operating and
48694869 14 maintenance cost quote, excluding delivered fuel
48704870 15 costs, will be developed based on the inputs provided
48714871 16 by duly licensed engineering and construction firms
48724872 17 performing the construction cost quote, potential
48734873 18 vendors under long-term service agreements and plant
48744874 19 operating agreements, or recognized third party plant
48754875 20 operator or operators.
48764876 21 The operating and maintenance cost quote
48774877 22 (including the cost of the front end engineering and
48784878 23 design study) shall be expressed in nominal dollars as
48794879 24 of the date that the quote is prepared and shall
48804880 25 include taxes, insurance, and other owner's costs, and
48814881 26 an assumed escalation in materials and labor beyond
48824882
48834883
48844884
48854885
48864886
48874887 SB1789 - 135 - LRB103 26314 AMQ 52675 b
48884888
48894889
48904890 SB1789- 136 -LRB103 26314 AMQ 52675 b SB1789 - 136 - LRB103 26314 AMQ 52675 b
48914891 SB1789 - 136 - LRB103 26314 AMQ 52675 b
48924892 1 the date as of which the operating and maintenance
48934893 2 cost quote is expressed.
48944894 3 (D) The facility cost report shall also include an
48954895 4 analysis of the initial clean coal facility's ability
48964896 5 to deliver power and energy into the applicable
48974897 6 regional transmission organization markets and an
48984898 7 analysis of the expected capacity factor for the
48994899 8 initial clean coal facility.
49004900 9 (E) Amounts paid to third parties unrelated to the
49014901 10 owner or owners of the initial clean coal facility to
49024902 11 prepare the core plant construction cost quote,
49034903 12 including the front end engineering and design study,
49044904 13 and the operating and maintenance cost quote will be
49054905 14 reimbursed through Coal Development Bonds.
49064906 15 (5) Re-powering and retrofitting coal-fired power
49074907 16 plants previously owned by Illinois utilities to qualify
49084908 17 as clean coal facilities. During the 2009 procurement
49094909 18 planning process and thereafter, the Agency and the
49104910 19 Commission shall consider sourcing agreements covering
49114911 20 electricity generated by power plants that were previously
49124912 21 owned by Illinois utilities and that have been or will be
49134913 22 converted into clean coal facilities, as defined by
49144914 23 Section 1-10 of this Act. Pursuant to such procurement
49154915 24 planning process, the owners of such facilities may
49164916 25 propose to the Agency sourcing agreements with utilities
49174917 26 and alternative retail electric suppliers required to
49184918
49194919
49204920
49214921
49224922
49234923 SB1789 - 136 - LRB103 26314 AMQ 52675 b
49244924
49254925
49264926 SB1789- 137 -LRB103 26314 AMQ 52675 b SB1789 - 137 - LRB103 26314 AMQ 52675 b
49274927 SB1789 - 137 - LRB103 26314 AMQ 52675 b
49284928 1 comply with subsection (d) of this Section and item (5) of
49294929 2 subsection (d) of Section 16-115 of the Public Utilities
49304930 3 Act, covering electricity generated by such facilities. In
49314931 4 the case of sourcing agreements that are power purchase
49324932 5 agreements, the contract price for electricity sales shall
49334933 6 be established on a cost of service basis. In the case of
49344934 7 sourcing agreements that are contracts for differences,
49354935 8 the contract price from which the reference price is
49364936 9 subtracted shall be established on a cost of service
49374937 10 basis. The Agency and the Commission may approve any such
49384938 11 utility sourcing agreements that do not exceed cost-based
49394939 12 benchmarks developed by the procurement administrator, in
49404940 13 consultation with the Commission staff, Agency staff and
49414941 14 the procurement monitor, subject to Commission review and
49424942 15 approval. The Commission shall have authority to inspect
49434943 16 all books and records associated with these clean coal
49444944 17 facilities during the term of any such contract.
49454945 18 (6) Costs incurred under this subsection (d) or
49464946 19 pursuant to a contract entered into under this subsection
49474947 20 (d) shall be deemed prudently incurred and reasonable in
49484948 21 amount and the electric utility shall be entitled to full
49494949 22 cost recovery pursuant to the tariffs filed with the
49504950 23 Commission.
49514951 24 (d-5) Zero emission standard.
49524952 25 (1) Beginning with the delivery year commencing on
49534953 26 June 1, 2017, the Agency shall, for electric utilities
49544954
49554955
49564956
49574957
49584958
49594959 SB1789 - 137 - LRB103 26314 AMQ 52675 b
49604960
49614961
49624962 SB1789- 138 -LRB103 26314 AMQ 52675 b SB1789 - 138 - LRB103 26314 AMQ 52675 b
49634963 SB1789 - 138 - LRB103 26314 AMQ 52675 b
49644964 1 that serve at least 100,000 retail customers in this
49654965 2 State, procure contracts with zero emission facilities
49664966 3 that are reasonably capable of generating cost-effective
49674967 4 zero emission credits in an amount approximately equal to
49684968 5 16% of the actual amount of electricity delivered by each
49694969 6 electric utility to retail customers in the State during
49704970 7 calendar year 2014. For an electric utility serving fewer
49714971 8 than 100,000 retail customers in this State that
49724972 9 requested, under Section 16-111.5 of the Public Utilities
49734973 10 Act, that the Agency procure power and energy for all or a
49744974 11 portion of the utility's Illinois load for the delivery
49754975 12 year commencing June 1, 2016, the Agency shall procure
49764976 13 contracts with zero emission facilities that are
49774977 14 reasonably capable of generating cost-effective zero
49784978 15 emission credits in an amount approximately equal to 16%
49794979 16 of the portion of power and energy to be procured by the
49804980 17 Agency for the utility. The duration of the contracts
49814981 18 procured under this subsection (d-5) shall be for a term
49824982 19 of 10 years ending May 31, 2027. The quantity of zero
49834983 20 emission credits to be procured under the contracts shall
49844984 21 be all of the zero emission credits generated by the zero
49854985 22 emission facility in each delivery year; however, if the
49864986 23 zero emission facility is owned by more than one entity,
49874987 24 then the quantity of zero emission credits to be procured
49884988 25 under the contracts shall be the amount of zero emission
49894989 26 credits that are generated from the portion of the zero
49904990
49914991
49924992
49934993
49944994
49954995 SB1789 - 138 - LRB103 26314 AMQ 52675 b
49964996
49974997
49984998 SB1789- 139 -LRB103 26314 AMQ 52675 b SB1789 - 139 - LRB103 26314 AMQ 52675 b
49994999 SB1789 - 139 - LRB103 26314 AMQ 52675 b
50005000 1 emission facility that is owned by the winning supplier.
50015001 2 The 16% value identified in this paragraph (1) is the
50025002 3 average of the percentage targets in subparagraph (B) of
50035003 4 paragraph (1) of subsection (c) of this Section for the 5
50045004 5 delivery years beginning June 1, 2017.
50055005 6 The procurement process shall be subject to the
50065006 7 following provisions:
50075007 8 (A) Those zero emission facilities that intend to
50085008 9 participate in the procurement shall submit to the
50095009 10 Agency the following eligibility information for each
50105010 11 zero emission facility on or before the date
50115011 12 established by the Agency:
50125012 13 (i) the in-service date and remaining useful
50135013 14 life of the zero emission facility;
50145014 15 (ii) the amount of power generated annually
50155015 16 for each of the years 2005 through 2015, and the
50165016 17 projected zero emission credits to be generated
50175017 18 over the remaining useful life of the zero
50185018 19 emission facility, which shall be used to
50195019 20 determine the capability of each facility;
50205020 21 (iii) the annual zero emission facility cost
50215021 22 projections, expressed on a per megawatthour
50225022 23 basis, over the next 6 delivery years, which shall
50235023 24 include the following: operation and maintenance
50245024 25 expenses; fully allocated overhead costs, which
50255025 26 shall be allocated using the methodology developed
50265026
50275027
50285028
50295029
50305030
50315031 SB1789 - 139 - LRB103 26314 AMQ 52675 b
50325032
50335033
50345034 SB1789- 140 -LRB103 26314 AMQ 52675 b SB1789 - 140 - LRB103 26314 AMQ 52675 b
50355035 SB1789 - 140 - LRB103 26314 AMQ 52675 b
50365036 1 by the Institute for Nuclear Power Operations;
50375037 2 fuel expenditures; non-fuel capital expenditures;
50385038 3 spent fuel expenditures; a return on working
50395039 4 capital; the cost of operational and market risks
50405040 5 that could be avoided by ceasing operation; and
50415041 6 any other costs necessary for continued
50425042 7 operations, provided that "necessary" means, for
50435043 8 purposes of this item (iii), that the costs could
50445044 9 reasonably be avoided only by ceasing operations
50455045 10 of the zero emission facility; and
50465046 11 (iv) a commitment to continue operating, for
50475047 12 the duration of the contract or contracts executed
50485048 13 under the procurement held under this subsection
50495049 14 (d-5), the zero emission facility that produces
50505050 15 the zero emission credits to be procured in the
50515051 16 procurement.
50525052 17 The information described in item (iii) of this
50535053 18 subparagraph (A) may be submitted on a confidential
50545054 19 basis and shall be treated and maintained by the
50555055 20 Agency, the procurement administrator, and the
50565056 21 Commission as confidential and proprietary and exempt
50575057 22 from disclosure under subparagraphs (a) and (g) of
50585058 23 paragraph (1) of Section 7 of the Freedom of
50595059 24 Information Act. The Office of Attorney General shall
50605060 25 have access to, and maintain the confidentiality of,
50615061 26 such information pursuant to Section 6.5 of the
50625062
50635063
50645064
50655065
50665066
50675067 SB1789 - 140 - LRB103 26314 AMQ 52675 b
50685068
50695069
50705070 SB1789- 141 -LRB103 26314 AMQ 52675 b SB1789 - 141 - LRB103 26314 AMQ 52675 b
50715071 SB1789 - 141 - LRB103 26314 AMQ 52675 b
50725072 1 Attorney General Act.
50735073 2 (B) The price for each zero emission credit
50745074 3 procured under this subsection (d-5) for each delivery
50755075 4 year shall be in an amount that equals the Social Cost
50765076 5 of Carbon, expressed on a price per megawatthour
50775077 6 basis. However, to ensure that the procurement remains
50785078 7 affordable to retail customers in this State if
50795079 8 electricity prices increase, the price in an
50805080 9 applicable delivery year shall be reduced below the
50815081 10 Social Cost of Carbon by the amount ("Price
50825082 11 Adjustment") by which the market price index for the
50835083 12 applicable delivery year exceeds the baseline market
50845084 13 price index for the consecutive 12-month period ending
50855085 14 May 31, 2016. If the Price Adjustment is greater than
50865086 15 or equal to the Social Cost of Carbon in an applicable
50875087 16 delivery year, then no payments shall be due in that
50885088 17 delivery year. The components of this calculation are
50895089 18 defined as follows:
50905090 19 (i) Social Cost of Carbon: The Social Cost of
50915091 20 Carbon is $16.50 per megawatthour, which is based
50925092 21 on the U.S. Interagency Working Group on Social
50935093 22 Cost of Carbon's price in the August 2016
50945094 23 Technical Update using a 3% discount rate,
50955095 24 adjusted for inflation for each year of the
50965096 25 program. Beginning with the delivery year
50975097 26 commencing June 1, 2023, the price per
50985098
50995099
51005100
51015101
51025102
51035103 SB1789 - 141 - LRB103 26314 AMQ 52675 b
51045104
51055105
51065106 SB1789- 142 -LRB103 26314 AMQ 52675 b SB1789 - 142 - LRB103 26314 AMQ 52675 b
51075107 SB1789 - 142 - LRB103 26314 AMQ 52675 b
51085108 1 megawatthour shall increase by $1 per
51095109 2 megawatthour, and continue to increase by an
51105110 3 additional $1 per megawatthour each delivery year
51115111 4 thereafter.
51125112 5 (ii) Baseline market price index: The baseline
51135113 6 market price index for the consecutive 12-month
51145114 7 period ending May 31, 2016 is $31.40 per
51155115 8 megawatthour, which is based on the sum of (aa)
51165116 9 the average day-ahead energy price across all
51175117 10 hours of such 12-month period at the PJM
51185118 11 Interconnection LLC Northern Illinois Hub, (bb)
51195119 12 50% multiplied by the Base Residual Auction, or
51205120 13 its successor, capacity price for the rest of the
51215121 14 RTO zone group determined by PJM Interconnection
51225122 15 LLC, divided by 24 hours per day, and (cc) 50%
51235123 16 multiplied by the Planning Resource Auction, or
51245124 17 its successor, capacity price for Zone 4
51255125 18 determined by the Midcontinent Independent System
51265126 19 Operator, Inc., divided by 24 hours per day.
51275127 20 (iii) Market price index: The market price
51285128 21 index for a delivery year shall be the sum of
51295129 22 projected energy prices and projected capacity
51305130 23 prices determined as follows:
51315131 24 (aa) Projected energy prices: the
51325132 25 projected energy prices for the applicable
51335133 26 delivery year shall be calculated once for the
51345134
51355135
51365136
51375137
51385138
51395139 SB1789 - 142 - LRB103 26314 AMQ 52675 b
51405140
51415141
51425142 SB1789- 143 -LRB103 26314 AMQ 52675 b SB1789 - 143 - LRB103 26314 AMQ 52675 b
51435143 SB1789 - 143 - LRB103 26314 AMQ 52675 b
51445144 1 year using the forward market price for the
51455145 2 PJM Interconnection, LLC Northern Illinois
51465146 3 Hub. The forward market price shall be
51475147 4 calculated as follows: the energy forward
51485148 5 prices for each month of the applicable
51495149 6 delivery year averaged for each trade date
51505150 7 during the calendar year immediately preceding
51515151 8 that delivery year to produce a single energy
51525152 9 forward price for the delivery year. The
51535153 10 forward market price calculation shall use
51545154 11 data published by the Intercontinental
51555155 12 Exchange, or its successor.
51565156 13 (bb) Projected capacity prices:
51575157 14 (I) For the delivery years commencing
51585158 15 June 1, 2017, June 1, 2018, and June 1,
51595159 16 2019, the projected capacity price shall
51605160 17 be equal to the sum of (1) 50% multiplied
51615161 18 by the Base Residual Auction, or its
51625162 19 successor, price for the rest of the RTO
51635163 20 zone group as determined by PJM
51645164 21 Interconnection LLC, divided by 24 hours
51655165 22 per day and, (2) 50% multiplied by the
51665166 23 resource auction price determined in the
51675167 24 resource auction administered by the
51685168 25 Midcontinent Independent System Operator,
51695169 26 Inc., in which the largest percentage of
51705170
51715171
51725172
51735173
51745174
51755175 SB1789 - 143 - LRB103 26314 AMQ 52675 b
51765176
51775177
51785178 SB1789- 144 -LRB103 26314 AMQ 52675 b SB1789 - 144 - LRB103 26314 AMQ 52675 b
51795179 SB1789 - 144 - LRB103 26314 AMQ 52675 b
51805180 1 load cleared for Local Resource Zone 4,
51815181 2 divided by 24 hours per day, and where
51825182 3 such price is determined by the
51835183 4 Midcontinent Independent System Operator,
51845184 5 Inc.
51855185 6 (II) For the delivery year commencing
51865186 7 June 1, 2020, and each year thereafter,
51875187 8 the projected capacity price shall be
51885188 9 equal to the sum of (1) 50% multiplied by
51895189 10 the Base Residual Auction, or its
51905190 11 successor, price for the ComEd zone as
51915191 12 determined by PJM Interconnection LLC,
51925192 13 divided by 24 hours per day, and (2) 50%
51935193 14 multiplied by the resource auction price
51945194 15 determined in the resource auction
51955195 16 administered by the Midcontinent
51965196 17 Independent System Operator, Inc., in
51975197 18 which the largest percentage of load
51985198 19 cleared for Local Resource Zone 4, divided
51995199 20 by 24 hours per day, and where such price
52005200 21 is determined by the Midcontinent
52015201 22 Independent System Operator, Inc.
52025202 23 For purposes of this subsection (d-5):
52035203 24 "Rest of the RTO" and "ComEd Zone" shall have
52045204 25 the meaning ascribed to them by PJM
52055205 26 Interconnection, LLC.
52065206
52075207
52085208
52095209
52105210
52115211 SB1789 - 144 - LRB103 26314 AMQ 52675 b
52125212
52135213
52145214 SB1789- 145 -LRB103 26314 AMQ 52675 b SB1789 - 145 - LRB103 26314 AMQ 52675 b
52155215 SB1789 - 145 - LRB103 26314 AMQ 52675 b
52165216 1 "RTO" means regional transmission
52175217 2 organization.
52185218 3 (C) No later than 45 days after June 1, 2017 (the
52195219 4 effective date of Public Act 99-906), the Agency shall
52205220 5 publish its proposed zero emission standard
52215221 6 procurement plan. The plan shall be consistent with
52225222 7 the provisions of this paragraph (1) and shall provide
52235223 8 that winning bids shall be selected based on public
52245224 9 interest criteria that include, but are not limited
52255225 10 to, minimizing carbon dioxide emissions that result
52265226 11 from electricity consumed in Illinois and minimizing
52275227 12 sulfur dioxide, nitrogen oxide, and particulate matter
52285228 13 emissions that adversely affect the citizens of this
52295229 14 State. In particular, the selection of winning bids
52305230 15 shall take into account the incremental environmental
52315231 16 benefits resulting from the procurement, such as any
52325232 17 existing environmental benefits that are preserved by
52335233 18 the procurements held under Public Act 99-906 and
52345234 19 would cease to exist if the procurements were not
52355235 20 held, including the preservation of zero emission
52365236 21 facilities. The plan shall also describe in detail how
52375237 22 each public interest factor shall be considered and
52385238 23 weighted in the bid selection process to ensure that
52395239 24 the public interest criteria are applied to the
52405240 25 procurement and given full effect.
52415241 26 For purposes of developing the plan, the Agency
52425242
52435243
52445244
52455245
52465246
52475247 SB1789 - 145 - LRB103 26314 AMQ 52675 b
52485248
52495249
52505250 SB1789- 146 -LRB103 26314 AMQ 52675 b SB1789 - 146 - LRB103 26314 AMQ 52675 b
52515251 SB1789 - 146 - LRB103 26314 AMQ 52675 b
52525252 1 shall consider any reports issued by a State agency,
52535253 2 board, or commission under House Resolution 1146 of
52545254 3 the 98th General Assembly and paragraph (4) of
52555255 4 subsection (d) of this Section, as well as publicly
52565256 5 available analyses and studies performed by or for
52575257 6 regional transmission organizations that serve the
52585258 7 State and their independent market monitors.
52595259 8 Upon publishing of the zero emission standard
52605260 9 procurement plan, copies of the plan shall be posted
52615261 10 and made publicly available on the Agency's website.
52625262 11 All interested parties shall have 10 days following
52635263 12 the date of posting to provide comment to the Agency on
52645264 13 the plan. All comments shall be posted to the Agency's
52655265 14 website. Following the end of the comment period, but
52665266 15 no more than 60 days later than June 1, 2017 (the
52675267 16 effective date of Public Act 99-906), the Agency shall
52685268 17 revise the plan as necessary based on the comments
52695269 18 received and file its zero emission standard
52705270 19 procurement plan with the Commission.
52715271 20 If the Commission determines that the plan will
52725272 21 result in the procurement of cost-effective zero
52735273 22 emission credits, then the Commission shall, after
52745274 23 notice and hearing, but no later than 45 days after the
52755275 24 Agency filed the plan, approve the plan or approve
52765276 25 with modification. For purposes of this subsection
52775277 26 (d-5), "cost effective" means the projected costs of
52785278
52795279
52805280
52815281
52825282
52835283 SB1789 - 146 - LRB103 26314 AMQ 52675 b
52845284
52855285
52865286 SB1789- 147 -LRB103 26314 AMQ 52675 b SB1789 - 147 - LRB103 26314 AMQ 52675 b
52875287 SB1789 - 147 - LRB103 26314 AMQ 52675 b
52885288 1 procuring zero emission credits from zero emission
52895289 2 facilities do not cause the limit stated in paragraph
52905290 3 (2) of this subsection to be exceeded.
52915291 4 (C-5) As part of the Commission's review and
52925292 5 acceptance or rejection of the procurement results,
52935293 6 the Commission shall, in its public notice of
52945294 7 successful bidders:
52955295 8 (i) identify how the winning bids satisfy the
52965296 9 public interest criteria described in subparagraph
52975297 10 (C) of this paragraph (1) of minimizing carbon
52985298 11 dioxide emissions that result from electricity
52995299 12 consumed in Illinois and minimizing sulfur
53005300 13 dioxide, nitrogen oxide, and particulate matter
53015301 14 emissions that adversely affect the citizens of
53025302 15 this State;
53035303 16 (ii) specifically address how the selection of
53045304 17 winning bids takes into account the incremental
53055305 18 environmental benefits resulting from the
53065306 19 procurement, including any existing environmental
53075307 20 benefits that are preserved by the procurements
53085308 21 held under Public Act 99-906 and would have ceased
53095309 22 to exist if the procurements had not been held,
53105310 23 such as the preservation of zero emission
53115311 24 facilities;
53125312 25 (iii) quantify the environmental benefit of
53135313 26 preserving the resources identified in item (ii)
53145314
53155315
53165316
53175317
53185318
53195319 SB1789 - 147 - LRB103 26314 AMQ 52675 b
53205320
53215321
53225322 SB1789- 148 -LRB103 26314 AMQ 52675 b SB1789 - 148 - LRB103 26314 AMQ 52675 b
53235323 SB1789 - 148 - LRB103 26314 AMQ 52675 b
53245324 1 of this subparagraph (C-5), including the
53255325 2 following:
53265326 3 (aa) the value of avoided greenhouse gas
53275327 4 emissions measured as the product of the zero
53285328 5 emission facilities' output over the contract
53295329 6 term multiplied by the U.S. Environmental
53305330 7 Protection Agency eGrid subregion carbon
53315331 8 dioxide emission rate and the U.S. Interagency
53325332 9 Working Group on Social Cost of Carbon's price
53335333 10 in the August 2016 Technical Update using a 3%
53345334 11 discount rate, adjusted for inflation for each
53355335 12 delivery year; and
53365336 13 (bb) the costs of replacement with other
53375337 14 zero carbon dioxide resources, including wind
53385338 15 and photovoltaic, based upon the simple
53395339 16 average of the following:
53405340 17 (I) the price, or if there is more
53415341 18 than one price, the average of the prices,
53425342 19 paid for renewable energy credits from new
53435343 20 utility-scale wind projects in the
53445344 21 procurement events specified in item (i)
53455345 22 of subparagraph (G) of paragraph (1) of
53465346 23 subsection (c) of this Section; and
53475347 24 (II) the price, or if there is more
53485348 25 than one price, the average of the prices,
53495349 26 paid for renewable energy credits from new
53505350
53515351
53525352
53535353
53545354
53555355 SB1789 - 148 - LRB103 26314 AMQ 52675 b
53565356
53575357
53585358 SB1789- 149 -LRB103 26314 AMQ 52675 b SB1789 - 149 - LRB103 26314 AMQ 52675 b
53595359 SB1789 - 149 - LRB103 26314 AMQ 52675 b
53605360 1 utility-scale solar projects and
53615361 2 brownfield site photovoltaic projects in
53625362 3 the procurement events specified in item
53635363 4 (ii) of subparagraph (G) of paragraph (1)
53645364 5 of subsection (c) of this Section and,
53655365 6 after January 1, 2015, renewable energy
53665366 7 credits from photovoltaic distributed
53675367 8 generation projects in procurement events
53685368 9 held under subsection (c) of this Section.
53695369 10 Each utility shall enter into binding contractual
53705370 11 arrangements with the winning suppliers.
53715371 12 The procurement described in this subsection
53725372 13 (d-5), including, but not limited to, the execution of
53735373 14 all contracts procured, shall be completed no later
53745374 15 than May 10, 2017. Based on the effective date of
53755375 16 Public Act 99-906, the Agency and Commission may, as
53765376 17 appropriate, modify the various dates and timelines
53775377 18 under this subparagraph and subparagraphs (C) and (D)
53785378 19 of this paragraph (1). The procurement and plan
53795379 20 approval processes required by this subsection (d-5)
53805380 21 shall be conducted in conjunction with the procurement
53815381 22 and plan approval processes required by subsection (c)
53825382 23 of this Section and Section 16-111.5 of the Public
53835383 24 Utilities Act, to the extent practicable.
53845384 25 Notwithstanding whether a procurement event is
53855385 26 conducted under Section 16-111.5 of the Public
53865386
53875387
53885388
53895389
53905390
53915391 SB1789 - 149 - LRB103 26314 AMQ 52675 b
53925392
53935393
53945394 SB1789- 150 -LRB103 26314 AMQ 52675 b SB1789 - 150 - LRB103 26314 AMQ 52675 b
53955395 SB1789 - 150 - LRB103 26314 AMQ 52675 b
53965396 1 Utilities Act, the Agency shall immediately initiate a
53975397 2 procurement process on June 1, 2017 (the effective
53985398 3 date of Public Act 99-906).
53995399 4 (D) Following the procurement event described in
54005400 5 this paragraph (1) and consistent with subparagraph
54015401 6 (B) of this paragraph (1), the Agency shall calculate
54025402 7 the payments to be made under each contract for the
54035403 8 next delivery year based on the market price index for
54045404 9 that delivery year. The Agency shall publish the
54055405 10 payment calculations no later than May 25, 2017 and
54065406 11 every May 25 thereafter.
54075407 12 (E) Notwithstanding the requirements of this
54085408 13 subsection (d-5), the contracts executed under this
54095409 14 subsection (d-5) shall provide that the zero emission
54105410 15 facility may, as applicable, suspend or terminate
54115411 16 performance under the contracts in the following
54125412 17 instances:
54135413 18 (i) A zero emission facility shall be excused
54145414 19 from its performance under the contract for any
54155415 20 cause beyond the control of the resource,
54165416 21 including, but not restricted to, acts of God,
54175417 22 flood, drought, earthquake, storm, fire,
54185418 23 lightning, epidemic, war, riot, civil disturbance
54195419 24 or disobedience, labor dispute, labor or material
54205420 25 shortage, sabotage, acts of public enemy,
54215421 26 explosions, orders, regulations or restrictions
54225422
54235423
54245424
54255425
54265426
54275427 SB1789 - 150 - LRB103 26314 AMQ 52675 b
54285428
54295429
54305430 SB1789- 151 -LRB103 26314 AMQ 52675 b SB1789 - 151 - LRB103 26314 AMQ 52675 b
54315431 SB1789 - 151 - LRB103 26314 AMQ 52675 b
54325432 1 imposed by governmental, military, or lawfully
54335433 2 established civilian authorities, which, in any of
54345434 3 the foregoing cases, by exercise of commercially
54355435 4 reasonable efforts the zero emission facility
54365436 5 could not reasonably have been expected to avoid,
54375437 6 and which, by the exercise of commercially
54385438 7 reasonable efforts, it has been unable to
54395439 8 overcome. In such event, the zero emission
54405440 9 facility shall be excused from performance for the
54415441 10 duration of the event, including, but not limited
54425442 11 to, delivery of zero emission credits, and no
54435443 12 payment shall be due to the zero emission facility
54445444 13 during the duration of the event.
54455445 14 (ii) A zero emission facility shall be
54465446 15 permitted to terminate the contract if legislation
54475447 16 is enacted into law by the General Assembly that
54485448 17 imposes or authorizes a new tax, special
54495449 18 assessment, or fee on the generation of
54505450 19 electricity, the ownership or leasehold of a
54515451 20 generating unit, or the privilege or occupation of
54525452 21 such generation, ownership, or leasehold of
54535453 22 generation units by a zero emission facility.
54545454 23 However, the provisions of this item (ii) do not
54555455 24 apply to any generally applicable tax, special
54565456 25 assessment or fee, or requirements imposed by
54575457 26 federal law.
54585458
54595459
54605460
54615461
54625462
54635463 SB1789 - 151 - LRB103 26314 AMQ 52675 b
54645464
54655465
54665466 SB1789- 152 -LRB103 26314 AMQ 52675 b SB1789 - 152 - LRB103 26314 AMQ 52675 b
54675467 SB1789 - 152 - LRB103 26314 AMQ 52675 b
54685468 1 (iii) A zero emission facility shall be
54695469 2 permitted to terminate the contract in the event
54705470 3 that the resource requires capital expenditures in
54715471 4 excess of $40,000,000 that were neither known nor
54725472 5 reasonably foreseeable at the time it executed the
54735473 6 contract and that a prudent owner or operator of
54745474 7 such resource would not undertake.
54755475 8 (iv) A zero emission facility shall be
54765476 9 permitted to terminate the contract in the event
54775477 10 the Nuclear Regulatory Commission terminates the
54785478 11 resource's license.
54795479 12 (F) If the zero emission facility elects to
54805480 13 terminate a contract under subparagraph (E) of this
54815481 14 paragraph (1), then the Commission shall reopen the
54825482 15 docket in which the Commission approved the zero
54835483 16 emission standard procurement plan under subparagraph
54845484 17 (C) of this paragraph (1) and, after notice and
54855485 18 hearing, enter an order acknowledging the contract
54865486 19 termination election if such termination is consistent
54875487 20 with the provisions of this subsection (d-5).
54885488 21 (2) For purposes of this subsection (d-5), the amount
54895489 22 paid per kilowatthour means the total amount paid for
54905490 23 electric service expressed on a per kilowatthour basis.
54915491 24 For purposes of this subsection (d-5), the total amount
54925492 25 paid for electric service includes, without limitation,
54935493 26 amounts paid for supply, transmission, distribution,
54945494
54955495
54965496
54975497
54985498
54995499 SB1789 - 152 - LRB103 26314 AMQ 52675 b
55005500
55015501
55025502 SB1789- 153 -LRB103 26314 AMQ 52675 b SB1789 - 153 - LRB103 26314 AMQ 52675 b
55035503 SB1789 - 153 - LRB103 26314 AMQ 52675 b
55045504 1 surcharges, and add-on taxes.
55055505 2 Notwithstanding the requirements of this subsection
55065506 3 (d-5), the contracts executed under this subsection (d-5)
55075507 4 shall provide that the total of zero emission credits
55085508 5 procured under a procurement plan shall be subject to the
55095509 6 limitations of this paragraph (2). For each delivery year,
55105510 7 the contractual volume receiving payments in such year
55115511 8 shall be reduced for all retail customers based on the
55125512 9 amount necessary to limit the net increase that delivery
55135513 10 year to the costs of those credits included in the amounts
55145514 11 paid by eligible retail customers in connection with
55155515 12 electric service to no more than 1.65% of the amount paid
55165516 13 per kilowatthour by eligible retail customers during the
55175517 14 year ending May 31, 2009. The result of this computation
55185518 15 shall apply to and reduce the procurement for all retail
55195519 16 customers, and all those customers shall pay the same
55205520 17 single, uniform cents per kilowatthour charge under
55215521 18 subsection (k) of Section 16-108 of the Public Utilities
55225522 19 Act. To arrive at a maximum dollar amount of zero emission
55235523 20 credits to be paid for the particular delivery year, the
55245524 21 resulting per kilowatthour amount shall be applied to the
55255525 22 actual amount of kilowatthours of electricity delivered by
55265526 23 the electric utility in the delivery year immediately
55275527 24 prior to the procurement, to all retail customers in its
55285528 25 service territory. Unpaid contractual volume for any
55295529 26 delivery year shall be paid in any subsequent delivery
55305530
55315531
55325532
55335533
55345534
55355535 SB1789 - 153 - LRB103 26314 AMQ 52675 b
55365536
55375537
55385538 SB1789- 154 -LRB103 26314 AMQ 52675 b SB1789 - 154 - LRB103 26314 AMQ 52675 b
55395539 SB1789 - 154 - LRB103 26314 AMQ 52675 b
55405540 1 year in which such payments can be made without exceeding
55415541 2 the amount specified in this paragraph (2). The
55425542 3 calculations required by this paragraph (2) shall be made
55435543 4 only once for each procurement plan year. Once the
55445544 5 determination as to the amount of zero emission credits to
55455545 6 be paid is made based on the calculations set forth in this
55465546 7 paragraph (2), no subsequent rate impact determinations
55475547 8 shall be made and no adjustments to those contract amounts
55485548 9 shall be allowed. All costs incurred under those contracts
55495549 10 and in implementing this subsection (d-5) shall be
55505550 11 recovered by the electric utility as provided in this
55515551 12 Section.
55525552 13 No later than June 30, 2019, the Commission shall
55535553 14 review the limitation on the amount of zero emission
55545554 15 credits procured under this subsection (d-5) and report to
55555555 16 the General Assembly its findings as to whether that
55565556 17 limitation unduly constrains the procurement of
55575557 18 cost-effective zero emission credits.
55585558 19 (3) Six years after the execution of a contract under
55595559 20 this subsection (d-5), the Agency shall determine whether
55605560 21 the actual zero emission credit payments received by the
55615561 22 supplier over the 6-year period exceed the Average ZEC
55625562 23 Payment. In addition, at the end of the term of a contract
55635563 24 executed under this subsection (d-5), or at the time, if
55645564 25 any, a zero emission facility's contract is terminated
55655565 26 under subparagraph (E) of paragraph (1) of this subsection
55665566
55675567
55685568
55695569
55705570
55715571 SB1789 - 154 - LRB103 26314 AMQ 52675 b
55725572
55735573
55745574 SB1789- 155 -LRB103 26314 AMQ 52675 b SB1789 - 155 - LRB103 26314 AMQ 52675 b
55755575 SB1789 - 155 - LRB103 26314 AMQ 52675 b
55765576 1 (d-5), then the Agency shall determine whether the actual
55775577 2 zero emission credit payments received by the supplier
55785578 3 over the term of the contract exceed the Average ZEC
55795579 4 Payment, after taking into account any amounts previously
55805580 5 credited back to the utility under this paragraph (3). If
55815581 6 the Agency determines that the actual zero emission credit
55825582 7 payments received by the supplier over the relevant period
55835583 8 exceed the Average ZEC Payment, then the supplier shall
55845584 9 credit the difference back to the utility. The amount of
55855585 10 the credit shall be remitted to the applicable electric
55865586 11 utility no later than 120 days after the Agency's
55875587 12 determination, which the utility shall reflect as a credit
55885588 13 on its retail customer bills as soon as practicable;
55895589 14 however, the credit remitted to the utility shall not
55905590 15 exceed the total amount of payments received by the
55915591 16 facility under its contract.
55925592 17 For purposes of this Section, the Average ZEC Payment
55935593 18 shall be calculated by multiplying the quantity of zero
55945594 19 emission credits delivered under the contract times the
55955595 20 average contract price. The average contract price shall
55965596 21 be determined by subtracting the amount calculated under
55975597 22 subparagraph (B) of this paragraph (3) from the amount
55985598 23 calculated under subparagraph (A) of this paragraph (3),
55995599 24 as follows:
56005600 25 (A) The average of the Social Cost of Carbon, as
56015601 26 defined in subparagraph (B) of paragraph (1) of this
56025602
56035603
56045604
56055605
56065606
56075607 SB1789 - 155 - LRB103 26314 AMQ 52675 b
56085608
56095609
56105610 SB1789- 156 -LRB103 26314 AMQ 52675 b SB1789 - 156 - LRB103 26314 AMQ 52675 b
56115611 SB1789 - 156 - LRB103 26314 AMQ 52675 b
56125612 1 subsection (d-5), during the term of the contract.
56135613 2 (B) The average of the market price indices, as
56145614 3 defined in subparagraph (B) of paragraph (1) of this
56155615 4 subsection (d-5), during the term of the contract,
56165616 5 minus the baseline market price index, as defined in
56175617 6 subparagraph (B) of paragraph (1) of this subsection
56185618 7 (d-5).
56195619 8 If the subtraction yields a negative number, then the
56205620 9 Average ZEC Payment shall be zero.
56215621 10 (4) Cost-effective zero emission credits procured from
56225622 11 zero emission facilities shall satisfy the applicable
56235623 12 definitions set forth in Section 1-10 of this Act.
56245624 13 (5) The electric utility shall retire all zero
56255625 14 emission credits used to comply with the requirements of
56265626 15 this subsection (d-5).
56275627 16 (6) Electric utilities shall be entitled to recover
56285628 17 all of the costs associated with the procurement of zero
56295629 18 emission credits through an automatic adjustment clause
56305630 19 tariff in accordance with subsection (k) and (m) of
56315631 20 Section 16-108 of the Public Utilities Act, and the
56325632 21 contracts executed under this subsection (d-5) shall
56335633 22 provide that the utilities' payment obligations under such
56345634 23 contracts shall be reduced if an adjustment is required
56355635 24 under subsection (m) of Section 16-108 of the Public
56365636 25 Utilities Act.
56375637 26 (7) This subsection (d-5) shall become inoperative on
56385638
56395639
56405640
56415641
56425642
56435643 SB1789 - 156 - LRB103 26314 AMQ 52675 b
56445644
56455645
56465646 SB1789- 157 -LRB103 26314 AMQ 52675 b SB1789 - 157 - LRB103 26314 AMQ 52675 b
56475647 SB1789 - 157 - LRB103 26314 AMQ 52675 b
56485648 1 January 1, 2028.
56495649 2 (d-10) Nuclear Plant Assistance; carbon mitigation
56505650 3 credits.
56515651 4 (1) The General Assembly finds:
56525652 5 (A) The health, welfare, and prosperity of all
56535653 6 Illinois citizens require that the State of Illinois act
56545654 7 to avoid and not increase carbon emissions from electric
56555655 8 generation sources while continuing to ensure affordable,
56565656 9 stable, and reliable electricity to all citizens.
56575657 10 (B) Absent immediate action by the State to preserve
56585658 11 existing carbon-free energy resources, those resources may
56595659 12 retire, and the electric generation needs of Illinois'
56605660 13 retail customers may be met instead by facilities that
56615661 14 emit significant amounts of carbon pollution and other
56625662 15 harmful air pollutants at a high social and economic cost
56635663 16 until Illinois is able to develop other forms of clean
56645664 17 energy.
56655665 18 (C) The General Assembly finds that nuclear power
56665666 19 generation is necessary for the State's transition to 100%
56675667 20 clean energy, and ensuring continued operation of nuclear
56685668 21 plants advances environmental and public health interests
56695669 22 through providing carbon-free electricity while reducing
56705670 23 the air pollution profile of the Illinois energy
56715671 24 generation fleet.
56725672 25 (D) The clean energy attributes of nuclear generation
56735673 26 facilities support the State in its efforts to achieve
56745674
56755675
56765676
56775677
56785678
56795679 SB1789 - 157 - LRB103 26314 AMQ 52675 b
56805680
56815681
56825682 SB1789- 158 -LRB103 26314 AMQ 52675 b SB1789 - 158 - LRB103 26314 AMQ 52675 b
56835683 SB1789 - 158 - LRB103 26314 AMQ 52675 b
56845684 1 100% clean energy.
56855685 2 (E) The State currently invests in various forms of
56865686 3 clean energy, including, but not limited to, renewable
56875687 4 energy, energy efficiency, and low-emission vehicles,
56885688 5 among others.
56895689 6 (F) The Environmental Protection Agency commissioned
56905690 7 an independent audit which provided a detailed assessment
56915691 8 of the financial condition of the Illinois nuclear fleet
56925692 9 to evaluate its financial viability and whether the
56935693 10 environmental benefits of such resources were at risk. The
56945694 11 report identified the risk of losing the environmental
56955695 12 benefits of several specific nuclear units. The report
56965696 13 also identified that the LaSalle County Generating Station
56975697 14 will continue to operate through 2026 and therefore is not
56985698 15 eligible to participate in the carbon mitigation credit
56995699 16 program.
57005700 17 (G) Nuclear plants provide carbon-free energy, which
57015701 18 helps to avoid many health-related negative impacts for
57025702 19 Illinois residents.
57035703 20 (H) The procurement of carbon mitigation credits
57045704 21 representing the environmental benefits of carbon-free
57055705 22 generation will further the State's efforts at achieving
57065706 23 100% clean energy and decarbonizing the electricity sector
57075707 24 in a safe, reliable, and affordable manner. Further, the
57085708 25 procurement of carbon emission credits will enhance the
57095709 26 health and welfare of Illinois residents through decreased
57105710
57115711
57125712
57135713
57145714
57155715 SB1789 - 158 - LRB103 26314 AMQ 52675 b
57165716
57175717
57185718 SB1789- 159 -LRB103 26314 AMQ 52675 b SB1789 - 159 - LRB103 26314 AMQ 52675 b
57195719 SB1789 - 159 - LRB103 26314 AMQ 52675 b
57205720 1 reliance on more highly polluting generation.
57215721 2 (I) The General Assembly therefore finds it necessary
57225722 3 to establish carbon mitigation credits to ensure decreased
57235723 4 reliance on more carbon-intensive energy resources, for
57245724 5 transitioning to a fully decarbonized electricity sector,
57255725 6 and to help ensure health and welfare of the State's
57265726 7 residents.
57275727 8 (2) As used in this subsection:
57285728 9 "Baseline costs" means costs used to establish a customer
57295729 10 protection cap that have been evaluated through an independent
57305730 11 audit of a carbon-free energy resource conducted by the
57315731 12 Environmental Protection Agency that evaluated projected
57325732 13 annual costs for operation and maintenance expenses; fully
57335733 14 allocated overhead costs, which shall be allocated using the
57345734 15 methodology developed by the Institute for Nuclear Power
57355735 16 Operations; fuel expenditures; nonfuel capital expenditures;
57365736 17 spent fuel expenditures; a return on working capital; the cost
57375737 18 of operational and market risks that could be avoided by
57385738 19 ceasing operation; and any other costs necessary for continued
57395739 20 operations, provided that "necessary" means, for purposes of
57405740 21 this definition, that the costs could reasonably be avoided
57415741 22 only by ceasing operations of the carbon-free energy resource.
57425742 23 "Carbon mitigation credit" means a tradable credit that
57435743 24 represents the carbon emission reduction attributes of one
57445744 25 megawatt-hour of energy produced from a carbon-free energy
57455745 26 resource.
57465746
57475747
57485748
57495749
57505750
57515751 SB1789 - 159 - LRB103 26314 AMQ 52675 b
57525752
57535753
57545754 SB1789- 160 -LRB103 26314 AMQ 52675 b SB1789 - 160 - LRB103 26314 AMQ 52675 b
57555755 SB1789 - 160 - LRB103 26314 AMQ 52675 b
57565756 1 "Carbon-free energy resource" means a generation facility
57575757 2 that: (1) is fueled by nuclear power; and (2) is
57585758 3 interconnected to PJM Interconnection, LLC.
57595759 4 (3) Procurement.
57605760 5 (A) Beginning with the delivery year commencing on
57615761 6 June 1, 2022, the Agency shall, for electric utilities
57625762 7 serving at least 3,000,000 retail customers in the State,
57635763 8 seek to procure contracts for no more than approximately
57645764 9 54,500,000 cost-effective carbon mitigation credits from
57655765 10 carbon-free energy resources because such credits are
57665766 11 necessary to support current levels of carbon-free energy
57675767 12 generation and ensure the State meets its carbon dioxide
57685768 13 emissions reduction goals. The Agency shall not make a
57695769 14 partial award of a contract for carbon mitigation credits
57705770 15 covering a fractional amount of a carbon-free energy
57715771 16 resource's projected output.
57725772 17 (B) Each carbon-free energy resource that intends to
57735773 18 participate in a procurement shall be required to submit
57745774 19 to the Agency the following information for the resource
57755775 20 on or before the date established by the Agency:
57765776 21 (i) the in-service date and remaining useful life
57775777 22 of the carbon-free energy resource;
57785778 23 (ii) the amount of power generated annually for
57795779 24 each of the past 10 years, which shall be used to
57805780 25 determine the capability of each facility;
57815781 26 (iii) a commitment to be reflected in any contract
57825782
57835783
57845784
57855785
57865786
57875787 SB1789 - 160 - LRB103 26314 AMQ 52675 b
57885788
57895789
57905790 SB1789- 161 -LRB103 26314 AMQ 52675 b SB1789 - 161 - LRB103 26314 AMQ 52675 b
57915791 SB1789 - 161 - LRB103 26314 AMQ 52675 b
57925792 1 entered into pursuant to this subsection (d-10) to
57935793 2 continue operating the carbon-free energy resource at
57945794 3 a capacity factor of at least 88% annually on average
57955795 4 for the duration of the contract or contracts executed
57965796 5 under the procurement held under this subsection
57975797 6 (d-10), except in an instance described in
57985798 7 subparagraph (E) of paragraph (1) of subsection (d-5)
57995799 8 of this Section or made impracticable as a result of
58005800 9 compliance with law or regulation;
58015801 10 (iv) financial need and the risk of loss of the
58025802 11 environmental benefits of such resource, which shall
58035803 12 include the following information:
58045804 13 (I) the carbon-free energy resource's cost
58055805 14 projections, expressed on a per megawatt-hour
58065806 15 basis, over the next 5 delivery years, which shall
58075807 16 include the following: operation and maintenance
58085808 17 expenses; fully allocated overhead costs, which
58095809 18 shall be allocated using the methodology developed
58105810 19 by the Institute for Nuclear Power Operations;
58115811 20 fuel expenditures; nonfuel capital expenditures;
58125812 21 spent fuel expenditures; a return on working
58135813 22 capital; the cost of operational and market risks
58145814 23 that could be avoided by ceasing operation; and
58155815 24 any other costs necessary for continued
58165816 25 operations, provided that "necessary" means, for
58175817 26 purposes of this subitem (I), that the costs could
58185818
58195819
58205820
58215821
58225822
58235823 SB1789 - 161 - LRB103 26314 AMQ 52675 b
58245824
58255825
58265826 SB1789- 162 -LRB103 26314 AMQ 52675 b SB1789 - 162 - LRB103 26314 AMQ 52675 b
58275827 SB1789 - 162 - LRB103 26314 AMQ 52675 b
58285828 1 reasonably be avoided only by ceasing operations
58295829 2 of the carbon-free energy resource; and
58305830 3 (II) the carbon-free energy resource's revenue
58315831 4 projections, including energy, capacity, ancillary
58325832 5 services, any other direct State support, known or
58335833 6 anticipated federal attribute credits, known or
58345834 7 anticipated tax credits, and any other direct
58355835 8 federal support.
58365836 9 The information described in this subparagraph (B) may
58375837 10 be submitted on a confidential basis and shall be treated
58385838 11 and maintained by the Agency, the procurement
58395839 12 administrator, and the Commission as confidential and
58405840 13 proprietary and exempt from disclosure under subparagraphs
58415841 14 (a) and (g) of paragraph (1) of Section 7 of the Freedom of
58425842 15 Information Act. The Office of the Attorney General shall
58435843 16 have access to, and maintain the confidentiality of, such
58445844 17 information pursuant to Section 6.5 of the Attorney
58455845 18 General Act.
58465846 19 (C) The Agency shall solicit bids for the contracts
58475847 20 described in this subsection (d-10) from carbon-free
58485848 21 energy resources that have satisfied the requirements of
58495849 22 subparagraph (B) of this paragraph (3). The contracts
58505850 23 procured pursuant to a procurement event shall reflect,
58515851 24 and be subject to, the following terms, requirements, and
58525852 25 limitations:
58535853 26 (i) Contracts are for delivery of carbon
58545854
58555855
58565856
58575857
58585858
58595859 SB1789 - 162 - LRB103 26314 AMQ 52675 b
58605860
58615861
58625862 SB1789- 163 -LRB103 26314 AMQ 52675 b SB1789 - 163 - LRB103 26314 AMQ 52675 b
58635863 SB1789 - 163 - LRB103 26314 AMQ 52675 b
58645864 1 mitigation credits, and are not energy or capacity
58655865 2 sales contracts requiring physical delivery. Pursuant
58665866 3 to item (iii), contract payments shall fully deduct
58675867 4 the value of any monetized federal production tax
58685868 5 credits, credits issued pursuant to a federal clean
58695869 6 energy standard, and other federal credits if
58705870 7 applicable.
58715871 8 (ii) Contracts for carbon mitigation credits shall
58725872 9 commence with the delivery year beginning on June 1,
58735873 10 2022 and shall be for a term of 5 delivery years
58745874 11 concluding on May 31, 2027.
58755875 12 (iii) The price per carbon mitigation credit to be
58765876 13 paid under a contract for a given delivery year shall
58775877 14 be equal to an accepted bid price less the sum of:
58785878 15 (I) one of the following energy price indices,
58795879 16 selected by the bidder at the time of the bid for
58805880 17 the term of the contract:
58815881 18 (aa) the weighted-average hourly day-ahead
58825882 19 price for the applicable delivery year at the
58835883 20 busbar of all resources procured pursuant to
58845884 21 this subsection (d-10), weighted by actual
58855885 22 production from the resources; or
58865886 23 (bb) the projected energy price for the
58875887 24 PJM Interconnection, LLC Northern Illinois Hub
58885888 25 for the applicable delivery year determined
58895889 26 according to subitem (aa) of item (iii) of
58905890
58915891
58925892
58935893
58945894
58955895 SB1789 - 163 - LRB103 26314 AMQ 52675 b
58965896
58975897
58985898 SB1789- 164 -LRB103 26314 AMQ 52675 b SB1789 - 164 - LRB103 26314 AMQ 52675 b
58995899 SB1789 - 164 - LRB103 26314 AMQ 52675 b
59005900 1 subparagraph (B) of paragraph (1) of
59015901 2 subsection (d-5).
59025902 3 (II) the Base Residual Auction Capacity Price
59035903 4 for the ComEd zone as determined by PJM
59045904 5 Interconnection, LLC, divided by 24 hours per day,
59055905 6 for the applicable delivery year for the first 3
59065906 7 delivery years, and then any subsequent delivery
59075907 8 years unless the PJM Interconnection, LLC applies
59085908 9 the Minimum Offer Price Rule to participating
59095909 10 carbon-free energy resources because they supply
59105910 11 carbon mitigation credits pursuant to this Section
59115911 12 at which time, upon notice by the carbon-free
59125912 13 energy resource to the Commission and subject to
59135913 14 the Commission's confirmation, the value under
59145914 15 this subitem shall be zero, as further described
59155915 16 in the carbon mitigation credit procurement plan;
59165916 17 and
59175917 18 (III) any value of monetized federal tax
59185918 19 credits, direct payments, or similar subsidy
59195919 20 provided to the carbon-free energy resource from
59205920 21 any unit of government that is not already
59215921 22 reflected in energy prices.
59225922 23 If the price-per-megawatt-hour calculation
59235923 24 performed under item (iii) of this subparagraph (C)
59245924 25 for a given delivery year results in a net positive
59255925 26 value, then the electric utility counterparty to the
59265926
59275927
59285928
59295929
59305930
59315931 SB1789 - 164 - LRB103 26314 AMQ 52675 b
59325932
59335933
59345934 SB1789- 165 -LRB103 26314 AMQ 52675 b SB1789 - 165 - LRB103 26314 AMQ 52675 b
59355935 SB1789 - 165 - LRB103 26314 AMQ 52675 b
59365936 1 contract shall multiply such net value by the
59375937 2 applicable contract quantity and remit the amount to
59385938 3 the supplier.
59395939 4 To protect retail customers from retail rate
59405940 5 impacts that may arise upon the initiation of carbon
59415941 6 policy changes, if the price-per-megawatt-hour
59425942 7 calculation performed under item (iii) of this
59435943 8 subparagraph (C) for a given delivery year results in
59445944 9 a net negative value, then the supplier counterparty
59455945 10 to the contract shall multiply such net value by the
59465946 11 applicable contract quantity and remit such amount to
59475947 12 the electric utility counterparty. The electric
59485948 13 utility shall reflect such amounts remitted by
59495949 14 suppliers as a credit on its retail customer bills as
59505950 15 soon as practicable.
59515951 16 (iv) To ensure that retail customers in Northern
59525952 17 Illinois do not pay more for carbon mitigation credits
59535953 18 than the value such credits provide, and
59545954 19 notwithstanding the provisions of this subsection
59555955 20 (d-10), the Agency shall not accept bids for contracts
59565956 21 that exceed a customer protection cap equal to the
59575957 22 baseline costs of carbon-free energy resources.
59585958 23 The baseline costs for the applicable year shall
59595959 24 be the following:
59605960 25 (I) For the delivery year beginning June 1,
59615961 26 2022, the baseline costs shall be an amount equal
59625962
59635963
59645964
59655965
59665966
59675967 SB1789 - 165 - LRB103 26314 AMQ 52675 b
59685968
59695969
59705970 SB1789- 166 -LRB103 26314 AMQ 52675 b SB1789 - 166 - LRB103 26314 AMQ 52675 b
59715971 SB1789 - 166 - LRB103 26314 AMQ 52675 b
59725972 1 to $30.30 per megawatt-hour.
59735973 2 (II) For the delivery year beginning June 1,
59745974 3 2023, the baseline costs shall be an amount equal
59755975 4 to $32.50 per megawatt-hour.
59765976 5 (III) For the delivery year beginning June 1,
59775977 6 2024, the baseline costs shall be an amount equal
59785978 7 to $33.43 per megawatt-hour.
59795979 8 (IV) For the delivery year beginning June 1,
59805980 9 2025, the baseline costs shall be an amount equal
59815981 10 to $33.50 per megawatt-hour.
59825982 11 (V) For the delivery year beginning June 1,
59835983 12 2026, the baseline costs shall be an amount equal
59845984 13 to $34.50 per megawatt-hour.
59855985 14 An Environmental Protection Agency consultant
59865986 15 forecast, included in a report issued April 14, 2021,
59875987 16 projects that a carbon-free energy resource has the
59885988 17 opportunity to earn on average approximately $30.28
59895989 18 per megawatt-hour, for the sale of energy and capacity
59905990 19 during the time period between 2022 and 2027.
59915991 20 Therefore, the sale of carbon mitigation credits
59925992 21 provides the opportunity to receive an additional
59935993 22 amount per megawatt-hour in addition to the projected
59945994 23 prices for energy and capacity.
59955995 24 Although actual energy and capacity prices may
59965996 25 vary from year-to-year, the General Assembly finds
59975997 26 that this customer protection cap will help ensure
59985998
59995999
60006000
60016001
60026002
60036003 SB1789 - 166 - LRB103 26314 AMQ 52675 b
60046004
60056005
60066006 SB1789- 167 -LRB103 26314 AMQ 52675 b SB1789 - 167 - LRB103 26314 AMQ 52675 b
60076007 SB1789 - 167 - LRB103 26314 AMQ 52675 b
60086008 1 that the cost of carbon mitigation credits will be
60096009 2 less than its value, based upon the social cost of
60106010 3 carbon identified in the Technical Support Document
60116011 4 issued in February 2021 by the U.S. Interagency
60126012 5 Working Group on Social Cost of Greenhouse Gases and
60136013 6 the PJM Interconnection, LLC carbon dioxide marginal
60146014 7 emission rate for 2020, and that a carbon-free energy
60156015 8 resource receiving payment for carbon mitigation
60166016 9 credits receives no more than necessary to keep those
60176017 10 units in operation.
60186018 11 (D) No later than 7 days after the effective date of
60196019 12 this amendatory Act of the 102nd General Assembly, the
60206020 13 Agency shall publish its proposed carbon mitigation credit
60216021 14 procurement plan. The Plan shall provide that winning bids
60226022 15 shall be selected by taking into consideration which
60236023 16 resources best match public interest criteria that
60246024 17 include, but are not limited to, minimizing carbon dioxide
60256025 18 emissions that result from electricity consumed in
60266026 19 Illinois and minimizing sulfur dioxide, nitrogen oxide,
60276027 20 and particulate matter emissions that adversely affect the
60286028 21 citizens of this State. The selection of winning bids
60296029 22 shall also take into account the incremental environmental
60306030 23 benefits resulting from the procurement or procurements,
60316031 24 such as any existing environmental benefits that are
60326032 25 preserved by a procurement held under this subsection
60336033 26 (d-10) and would cease to exist if the procurement were
60346034
60356035
60366036
60376037
60386038
60396039 SB1789 - 167 - LRB103 26314 AMQ 52675 b
60406040
60416041
60426042 SB1789- 168 -LRB103 26314 AMQ 52675 b SB1789 - 168 - LRB103 26314 AMQ 52675 b
60436043 SB1789 - 168 - LRB103 26314 AMQ 52675 b
60446044 1 not held, including the preservation of carbon-free energy
60456045 2 resources. For those bidders having the same public
60466046 3 interest criteria score, the relative ranking of such
60476047 4 bidders shall be determined by price. The Plan shall
60486048 5 describe in detail how each public interest factor shall
60496049 6 be considered and weighted in the bid selection process to
60506050 7 ensure that the public interest criteria are applied to
60516051 8 the procurement. The Plan shall, to the extent practical
60526052 9 and permissible by federal law, ensure that successful
60536053 10 bidders make commercially reasonable efforts to apply for
60546054 11 federal tax credits, direct payments, or similar subsidy
60556055 12 programs that support carbon-free generation and for which
60566056 13 the successful bidder is eligible. Upon publishing of the
60576057 14 carbon mitigation credit procurement plan, copies of the
60586058 15 plan shall be posted and made publicly available on the
60596059 16 Agency's website. All interested parties shall have 7 days
60606060 17 following the date of posting to provide comment to the
60616061 18 Agency on the plan. All comments shall be posted to the
60626062 19 Agency's website. Following the end of the comment period,
60636063 20 but no more than 19 days later than the effective date of
60646064 21 this amendatory Act of the 102nd General Assembly, the
60656065 22 Agency shall revise the plan as necessary based on the
60666066 23 comments received and file its carbon mitigation credit
60676067 24 procurement plan with the Commission.
60686068 25 (E) If the Commission determines that the plan is
60696069 26 likely to result in the procurement of cost-effective
60706070
60716071
60726072
60736073
60746074
60756075 SB1789 - 168 - LRB103 26314 AMQ 52675 b
60766076
60776077
60786078 SB1789- 169 -LRB103 26314 AMQ 52675 b SB1789 - 169 - LRB103 26314 AMQ 52675 b
60796079 SB1789 - 169 - LRB103 26314 AMQ 52675 b
60806080 1 carbon mitigation credits, then the Commission shall,
60816081 2 after notice and hearing and opportunity for comment, but
60826082 3 no later than 42 days after the Agency filed the plan,
60836083 4 approve the plan or approve it with modification. For
60846084 5 purposes of this subsection (d-10), "cost-effective" means
60856085 6 carbon mitigation credits that are procured from
60866086 7 carbon-free energy resources at prices that are within the
60876087 8 limits specified in this paragraph (3). As part of the
60886088 9 Commission's review and acceptance or rejection of the
60896089 10 procurement results, the Commission shall, in its public
60906090 11 notice of successful bidders:
60916091 12 (i) identify how the selected carbon-free energy
60926092 13 resources satisfy the public interest criteria
60936093 14 described in this paragraph (3) of minimizing carbon
60946094 15 dioxide emissions that result from electricity
60956095 16 consumed in Illinois and minimizing sulfur dioxide,
60966096 17 nitrogen oxide, and particulate matter emissions that
60976097 18 adversely affect the citizens of this State;
60986098 19 (ii) specifically address how the selection of
60996099 20 carbon-free energy resources takes into account the
61006100 21 incremental environmental benefits resulting from the
61016101 22 procurement, including any existing environmental
61026102 23 benefits that are preserved by the procurements held
61036103 24 under this amendatory Act of the 102nd General
61046104 25 Assembly and would have ceased to exist if the
61056105 26 procurements had not been held, such as the
61066106
61076107
61086108
61096109
61106110
61116111 SB1789 - 169 - LRB103 26314 AMQ 52675 b
61126112
61136113
61146114 SB1789- 170 -LRB103 26314 AMQ 52675 b SB1789 - 170 - LRB103 26314 AMQ 52675 b
61156115 SB1789 - 170 - LRB103 26314 AMQ 52675 b
61166116 1 preservation of carbon-free energy resources;
61176117 2 (iii) quantify the environmental benefit of
61186118 3 preserving the carbon-free energy resources procured
61196119 4 pursuant to this subsection (d-10), including the
61206120 5 following:
61216121 6 (I) an assessment value of avoided greenhouse
61226122 7 gas emissions measured as the product of the
61236123 8 carbon-free energy resources' output over the
61246124 9 contract term, using generally accepted
61256125 10 methodologies for the valuation of avoided
61266126 11 emissions; and
61276127 12 (II) an assessment of costs of replacement
61286128 13 with other carbon-free energy resources and
61296129 14 renewable energy resources, including wind and
61306130 15 photovoltaic generation, based upon an assessment
61316131 16 of the prices paid for renewable energy credits
61326132 17 through programs and procurements conducted
61336133 18 pursuant to subsection (c) of Section 1-75 of this
61346134 19 Act, and the additional storage necessary to
61356135 20 produce the same or similar capability of matching
61366136 21 customer usage patterns.
61376137 22 (F) The procurements described in this paragraph (3),
61386138 23 including, but not limited to, the execution of all
61396139 24 contracts procured, shall be completed no later than
61406140 25 December 3, 2021. The procurement and plan approval
61416141 26 processes required by this paragraph (3) shall be
61426142
61436143
61446144
61456145
61466146
61476147 SB1789 - 170 - LRB103 26314 AMQ 52675 b
61486148
61496149
61506150 SB1789- 171 -LRB103 26314 AMQ 52675 b SB1789 - 171 - LRB103 26314 AMQ 52675 b
61516151 SB1789 - 171 - LRB103 26314 AMQ 52675 b
61526152 1 conducted in conjunction with the procurement and plan
61536153 2 approval processes required by Section 16-111.5 of the
61546154 3 Public Utilities Act, to the extent practicable. However,
61556155 4 the Agency and Commission may, as appropriate, modify the
61566156 5 various dates and timelines under this subparagraph and
61576157 6 subparagraphs (D) and (E) of this paragraph (3) to meet
61586158 7 the December 3, 2021 contract execution deadline.
61596159 8 Following the completion of such procurements, and
61606160 9 consistent with this paragraph (3), the Agency shall
61616161 10 calculate the payments to be made under each contract in a
61626162 11 timely fashion.
61636163 12 (F-1) Costs incurred by the electric utility pursuant
61646164 13 to a contract authorized by this subsection (d-10) shall
61656165 14 be deemed prudently incurred and reasonable in amount, and
61666166 15 the electric utility shall be entitled to full cost
61676167 16 recovery pursuant to a tariff or tariffs filed with the
61686168 17 Commission.
61696169 18 (G) The counterparty electric utility shall retire all
61706170 19 carbon mitigation credits used to comply with the
61716171 20 requirements of this subsection (d-10).
61726172 21 (H) If a carbon-free energy resource is sold to
61736173 22 another owner, the rights, obligations, and commitments
61746174 23 under this subsection (d-10) shall continue to the
61756175 24 subsequent owner.
61766176 25 (I) This subsection (d-10) shall become inoperative on
61776177 26 January 1, 2028.
61786178
61796179
61806180
61816181
61826182
61836183 SB1789 - 171 - LRB103 26314 AMQ 52675 b
61846184
61856185
61866186 SB1789- 172 -LRB103 26314 AMQ 52675 b SB1789 - 172 - LRB103 26314 AMQ 52675 b
61876187 SB1789 - 172 - LRB103 26314 AMQ 52675 b
61886188 1 (e) The draft procurement plans are subject to public
61896189 2 comment, as required by Section 16-111.5 of the Public
61906190 3 Utilities Act.
61916191 4 (f) The Agency shall submit the final procurement plan to
61926192 5 the Commission. The Agency shall revise a procurement plan if
61936193 6 the Commission determines that it does not meet the standards
61946194 7 set forth in Section 16-111.5 of the Public Utilities Act.
61956195 8 (g) The Agency shall assess fees to each affected utility
61966196 9 to recover the costs incurred in preparation of the annual
61976197 10 procurement plan for the utility.
61986198 11 (h) The Agency shall assess fees to each bidder to recover
61996199 12 the costs incurred in connection with a competitive
62006200 13 procurement process.
62016201 14 (i) A renewable energy credit, carbon emission credit,
62026202 15 zero emission credit, or carbon mitigation credit can only be
62036203 16 used once to comply with a single portfolio or other standard
62046204 17 as set forth in subsection (c), subsection (d), or subsection
62056205 18 (d-5) of this Section, respectively. A renewable energy
62066206 19 credit, carbon emission credit, zero emission credit, or
62076207 20 carbon mitigation credit cannot be used to satisfy the
62086208 21 requirements of more than one standard. If more than one type
62096209 22 of credit is issued for the same megawatt hour of energy, only
62106210 23 one credit can be used to satisfy the requirements of a single
62116211 24 standard. After such use, the credit must be retired together
62126212 25 with any other credits issued for the same megawatt hour of
62136213 26 energy.
62146214
62156215
62166216
62176217
62186218
62196219 SB1789 - 172 - LRB103 26314 AMQ 52675 b
62206220
62216221
62226222 SB1789- 173 -LRB103 26314 AMQ 52675 b SB1789 - 173 - LRB103 26314 AMQ 52675 b
62236223 SB1789 - 173 - LRB103 26314 AMQ 52675 b
62246224 1 (Source: P.A. 101-81, eff. 7-12-19; 101-113, eff. 1-1-20;
62256225 2 102-662, eff. 9-15-21.)
62266226
62276227
62286228
62296229
62306230
62316231 SB1789 - 173 - LRB103 26314 AMQ 52675 b