1 | 1 | | 104TH GENERAL ASSEMBLY
State of Illinois
2025 and 2026 HB3258 Introduced , by Rep. Brad Halbrook SYNOPSIS AS INTRODUCED: 20 ILCS 3855/1-75 Amends the Illinois Power Agency Act. Removes language regarding: diversity requirements related to the design of all programs and procurements; the development of methods that optimize procurement of renewable energy credits from proposed utility-scale projects that are located in communities eligible to receive Energy Transition Community Grants; diversity requirements related to the eligibility criteria for the selection as a supplier of renewable energy credits; the assessment of fees to recover specified costs incurred by the Illinois Power Agency; diversity requirements related to the criteria for an owner to receive grants from the Coal to Solar and Energy Storage Initiative Fund; the provision of information on renewable energy company diversity reporting via the Agency's public facing online tool; and diversity, equity, and inclusion plans. LRB104 06526 AAS 16562 b A BILL FOR 104TH GENERAL ASSEMBLY
State of Illinois
2025 and 2026 HB3258 Introduced , by Rep. Brad Halbrook SYNOPSIS AS INTRODUCED: 20 ILCS 3855/1-75 20 ILCS 3855/1-75 Amends the Illinois Power Agency Act. Removes language regarding: diversity requirements related to the design of all programs and procurements; the development of methods that optimize procurement of renewable energy credits from proposed utility-scale projects that are located in communities eligible to receive Energy Transition Community Grants; diversity requirements related to the eligibility criteria for the selection as a supplier of renewable energy credits; the assessment of fees to recover specified costs incurred by the Illinois Power Agency; diversity requirements related to the criteria for an owner to receive grants from the Coal to Solar and Energy Storage Initiative Fund; the provision of information on renewable energy company diversity reporting via the Agency's public facing online tool; and diversity, equity, and inclusion plans. LRB104 06526 AAS 16562 b LRB104 06526 AAS 16562 b A BILL FOR |
---|
2 | 2 | | 104TH GENERAL ASSEMBLY
State of Illinois
2025 and 2026 HB3258 Introduced , by Rep. Brad Halbrook SYNOPSIS AS INTRODUCED: |
---|
3 | 3 | | 20 ILCS 3855/1-75 20 ILCS 3855/1-75 |
---|
4 | 4 | | 20 ILCS 3855/1-75 |
---|
5 | 5 | | Amends the Illinois Power Agency Act. Removes language regarding: diversity requirements related to the design of all programs and procurements; the development of methods that optimize procurement of renewable energy credits from proposed utility-scale projects that are located in communities eligible to receive Energy Transition Community Grants; diversity requirements related to the eligibility criteria for the selection as a supplier of renewable energy credits; the assessment of fees to recover specified costs incurred by the Illinois Power Agency; diversity requirements related to the criteria for an owner to receive grants from the Coal to Solar and Energy Storage Initiative Fund; the provision of information on renewable energy company diversity reporting via the Agency's public facing online tool; and diversity, equity, and inclusion plans. |
---|
6 | 6 | | LRB104 06526 AAS 16562 b LRB104 06526 AAS 16562 b |
---|
7 | 7 | | LRB104 06526 AAS 16562 b |
---|
8 | 8 | | A BILL FOR |
---|
9 | 9 | | HB3258LRB104 06526 AAS 16562 b HB3258 LRB104 06526 AAS 16562 b |
---|
10 | 10 | | HB3258 LRB104 06526 AAS 16562 b |
---|
11 | 11 | | 1 AN ACT concerning State government. |
---|
12 | 12 | | 2 Be it enacted by the People of the State of Illinois, |
---|
13 | 13 | | 3 represented in the General Assembly: |
---|
14 | 14 | | 4 Section 5. The Illinois Power Agency Act is amended by |
---|
15 | 15 | | 5 changing Section 1-75 as follows: |
---|
16 | 16 | | 6 (20 ILCS 3855/1-75) |
---|
17 | 17 | | 7 Sec. 1-75. Planning and Procurement Bureau. The Planning |
---|
18 | 18 | | 8 and Procurement Bureau has the following duties and |
---|
19 | 19 | | 9 responsibilities: |
---|
20 | 20 | | 10 (a) The Planning and Procurement Bureau shall each year, |
---|
21 | 21 | | 11 beginning in 2008, develop procurement plans and conduct |
---|
22 | 22 | | 12 competitive procurement processes in accordance with the |
---|
23 | 23 | | 13 requirements of Section 16-111.5 of the Public Utilities Act |
---|
24 | 24 | | 14 for the eligible retail customers of electric utilities that |
---|
25 | 25 | | 15 on December 31, 2005 provided electric service to at least |
---|
26 | 26 | | 16 100,000 customers in Illinois. Beginning with the delivery |
---|
27 | 27 | | 17 year commencing on June 1, 2017, the Planning and Procurement |
---|
28 | 28 | | 18 Bureau shall develop plans and processes for the procurement |
---|
29 | 29 | | 19 of zero emission credits from zero emission facilities in |
---|
30 | 30 | | 20 accordance with the requirements of subsection (d-5) of this |
---|
31 | 31 | | 21 Section. Beginning on the effective date of this amendatory |
---|
32 | 32 | | 22 Act of the 102nd General Assembly, the Planning and |
---|
33 | 33 | | 23 Procurement Bureau shall develop plans and processes for the |
---|
34 | 34 | | |
---|
35 | 35 | | |
---|
36 | 36 | | |
---|
37 | 37 | | 104TH GENERAL ASSEMBLY
State of Illinois
2025 and 2026 HB3258 Introduced , by Rep. Brad Halbrook SYNOPSIS AS INTRODUCED: |
---|
38 | 38 | | 20 ILCS 3855/1-75 20 ILCS 3855/1-75 |
---|
39 | 39 | | 20 ILCS 3855/1-75 |
---|
40 | 40 | | Amends the Illinois Power Agency Act. Removes language regarding: diversity requirements related to the design of all programs and procurements; the development of methods that optimize procurement of renewable energy credits from proposed utility-scale projects that are located in communities eligible to receive Energy Transition Community Grants; diversity requirements related to the eligibility criteria for the selection as a supplier of renewable energy credits; the assessment of fees to recover specified costs incurred by the Illinois Power Agency; diversity requirements related to the criteria for an owner to receive grants from the Coal to Solar and Energy Storage Initiative Fund; the provision of information on renewable energy company diversity reporting via the Agency's public facing online tool; and diversity, equity, and inclusion plans. |
---|
41 | 41 | | LRB104 06526 AAS 16562 b LRB104 06526 AAS 16562 b |
---|
42 | 42 | | LRB104 06526 AAS 16562 b |
---|
43 | 43 | | A BILL FOR |
---|
44 | 44 | | |
---|
45 | 45 | | |
---|
46 | 46 | | |
---|
47 | 47 | | |
---|
48 | 48 | | |
---|
49 | 49 | | 20 ILCS 3855/1-75 |
---|
50 | 50 | | |
---|
51 | 51 | | |
---|
52 | 52 | | |
---|
53 | 53 | | LRB104 06526 AAS 16562 b |
---|
54 | 54 | | |
---|
55 | 55 | | |
---|
56 | 56 | | |
---|
57 | 57 | | |
---|
58 | 58 | | |
---|
59 | 59 | | |
---|
60 | 60 | | |
---|
61 | 61 | | |
---|
62 | 62 | | |
---|
63 | 63 | | HB3258 LRB104 06526 AAS 16562 b |
---|
64 | 64 | | |
---|
65 | 65 | | |
---|
66 | 66 | | HB3258- 2 -LRB104 06526 AAS 16562 b HB3258 - 2 - LRB104 06526 AAS 16562 b |
---|
67 | 67 | | HB3258 - 2 - LRB104 06526 AAS 16562 b |
---|
68 | 68 | | 1 procurement of carbon mitigation credits from carbon-free |
---|
69 | 69 | | 2 energy resources in accordance with the requirements of |
---|
70 | 70 | | 3 subsection (d-10) of this Section. The Planning and |
---|
71 | 71 | | 4 Procurement Bureau shall also develop procurement plans and |
---|
72 | 72 | | 5 conduct competitive procurement processes in accordance with |
---|
73 | 73 | | 6 the requirements of Section 16-111.5 of the Public Utilities |
---|
74 | 74 | | 7 Act for the eligible retail customers of small |
---|
75 | 75 | | 8 multi-jurisdictional electric utilities that (i) on December |
---|
76 | 76 | | 9 31, 2005 served less than 100,000 customers in Illinois and |
---|
77 | 77 | | 10 (ii) request a procurement plan for their Illinois |
---|
78 | 78 | | 11 jurisdictional load. This Section shall not apply to a small |
---|
79 | 79 | | 12 multi-jurisdictional utility until such time as a small |
---|
80 | 80 | | 13 multi-jurisdictional utility requests the Agency to prepare a |
---|
81 | 81 | | 14 procurement plan for their Illinois jurisdictional load. For |
---|
82 | 82 | | 15 the purposes of this Section, the term "eligible retail |
---|
83 | 83 | | 16 customers" has the same definition as found in Section |
---|
84 | 84 | | 17 16-111.5(a) of the Public Utilities Act. |
---|
85 | 85 | | 18 Beginning with the plan or plans to be implemented in the |
---|
86 | 86 | | 19 2017 delivery year, the Agency shall no longer include the |
---|
87 | 87 | | 20 procurement of renewable energy resources in the annual |
---|
88 | 88 | | 21 procurement plans required by this subsection (a), except as |
---|
89 | 89 | | 22 provided in subsection (q) of Section 16-111.5 of the Public |
---|
90 | 90 | | 23 Utilities Act, and shall instead develop a long-term renewable |
---|
91 | 91 | | 24 resources procurement plan in accordance with subsection (c) |
---|
92 | 92 | | 25 of this Section and Section 16-111.5 of the Public Utilities |
---|
93 | 93 | | 26 Act. |
---|
94 | 94 | | |
---|
95 | 95 | | |
---|
96 | 96 | | |
---|
97 | 97 | | |
---|
98 | 98 | | |
---|
99 | 99 | | HB3258 - 2 - LRB104 06526 AAS 16562 b |
---|
100 | 100 | | |
---|
101 | 101 | | |
---|
102 | 102 | | HB3258- 3 -LRB104 06526 AAS 16562 b HB3258 - 3 - LRB104 06526 AAS 16562 b |
---|
103 | 103 | | HB3258 - 3 - LRB104 06526 AAS 16562 b |
---|
104 | 104 | | 1 In accordance with subsection (c-5) of this Section, the |
---|
105 | 105 | | 2 Planning and Procurement Bureau shall oversee the procurement |
---|
106 | 106 | | 3 by electric utilities that served more than 300,000 retail |
---|
107 | 107 | | 4 customers in this State as of January 1, 2019 of renewable |
---|
108 | 108 | | 5 energy credits from new utility-scale solar projects to be |
---|
109 | 109 | | 6 installed, along with energy storage facilities, at or |
---|
110 | 110 | | 7 adjacent to the sites of electric generating facilities that, |
---|
111 | 111 | | 8 as of January 1, 2016, burned coal as their primary fuel |
---|
112 | 112 | | 9 source. |
---|
113 | 113 | | 10 (1) The Agency shall each year, beginning in 2008, as |
---|
114 | 114 | | 11 needed, issue a request for qualifications for experts or |
---|
115 | 115 | | 12 expert consulting firms to develop the procurement plans |
---|
116 | 116 | | 13 in accordance with Section 16-111.5 of the Public |
---|
117 | 117 | | 14 Utilities Act. In order to qualify an expert or expert |
---|
118 | 118 | | 15 consulting firm must have: |
---|
119 | 119 | | 16 (A) direct previous experience assembling |
---|
120 | 120 | | 17 large-scale power supply plans or portfolios for |
---|
121 | 121 | | 18 end-use customers; |
---|
122 | 122 | | 19 (B) an advanced degree in economics, mathematics, |
---|
123 | 123 | | 20 engineering, risk management, or a related area of |
---|
124 | 124 | | 21 study; |
---|
125 | 125 | | 22 (C) 10 years of experience in the electricity |
---|
126 | 126 | | 23 sector, including managing supply risk; |
---|
127 | 127 | | 24 (D) expertise in wholesale electricity market |
---|
128 | 128 | | 25 rules, including those established by the Federal |
---|
129 | 129 | | 26 Energy Regulatory Commission and regional transmission |
---|
130 | 130 | | |
---|
131 | 131 | | |
---|
132 | 132 | | |
---|
133 | 133 | | |
---|
134 | 134 | | |
---|
135 | 135 | | HB3258 - 3 - LRB104 06526 AAS 16562 b |
---|
136 | 136 | | |
---|
137 | 137 | | |
---|
138 | 138 | | HB3258- 4 -LRB104 06526 AAS 16562 b HB3258 - 4 - LRB104 06526 AAS 16562 b |
---|
139 | 139 | | HB3258 - 4 - LRB104 06526 AAS 16562 b |
---|
140 | 140 | | 1 organizations; |
---|
141 | 141 | | 2 (E) expertise in credit protocols and familiarity |
---|
142 | 142 | | 3 with contract protocols; |
---|
143 | 143 | | 4 (F) adequate resources to perform and fulfill the |
---|
144 | 144 | | 5 required functions and responsibilities; and |
---|
145 | 145 | | 6 (G) the absence of a conflict of interest and |
---|
146 | 146 | | 7 inappropriate bias for or against potential bidders or |
---|
147 | 147 | | 8 the affected electric utilities. |
---|
148 | 148 | | 9 (2) The Agency shall each year, as needed, issue a |
---|
149 | 149 | | 10 request for qualifications for a procurement administrator |
---|
150 | 150 | | 11 to conduct the competitive procurement processes in |
---|
151 | 151 | | 12 accordance with Section 16-111.5 of the Public Utilities |
---|
152 | 152 | | 13 Act. In order to qualify an expert or expert consulting |
---|
153 | 153 | | 14 firm must have: |
---|
154 | 154 | | 15 (A) direct previous experience administering a |
---|
155 | 155 | | 16 large-scale competitive procurement process; |
---|
156 | 156 | | 17 (B) an advanced degree in economics, mathematics, |
---|
157 | 157 | | 18 engineering, or a related area of study; |
---|
158 | 158 | | 19 (C) 10 years of experience in the electricity |
---|
159 | 159 | | 20 sector, including risk management experience; |
---|
160 | 160 | | 21 (D) expertise in wholesale electricity market |
---|
161 | 161 | | 22 rules, including those established by the Federal |
---|
162 | 162 | | 23 Energy Regulatory Commission and regional transmission |
---|
163 | 163 | | 24 organizations; |
---|
164 | 164 | | 25 (E) expertise in credit and contract protocols; |
---|
165 | 165 | | 26 (F) adequate resources to perform and fulfill the |
---|
166 | 166 | | |
---|
167 | 167 | | |
---|
168 | 168 | | |
---|
169 | 169 | | |
---|
170 | 170 | | |
---|
171 | 171 | | HB3258 - 4 - LRB104 06526 AAS 16562 b |
---|
172 | 172 | | |
---|
173 | 173 | | |
---|
174 | 174 | | HB3258- 5 -LRB104 06526 AAS 16562 b HB3258 - 5 - LRB104 06526 AAS 16562 b |
---|
175 | 175 | | HB3258 - 5 - LRB104 06526 AAS 16562 b |
---|
176 | 176 | | 1 required functions and responsibilities; and |
---|
177 | 177 | | 2 (G) the absence of a conflict of interest and |
---|
178 | 178 | | 3 inappropriate bias for or against potential bidders or |
---|
179 | 179 | | 4 the affected electric utilities. |
---|
180 | 180 | | 5 (3) The Agency shall provide affected utilities and |
---|
181 | 181 | | 6 other interested parties with the lists of qualified |
---|
182 | 182 | | 7 experts or expert consulting firms identified through the |
---|
183 | 183 | | 8 request for qualifications processes that are under |
---|
184 | 184 | | 9 consideration to develop the procurement plans and to |
---|
185 | 185 | | 10 serve as the procurement administrator. The Agency shall |
---|
186 | 186 | | 11 also provide each qualified expert's or expert consulting |
---|
187 | 187 | | 12 firm's response to the request for qualifications. All |
---|
188 | 188 | | 13 information provided under this subparagraph shall also be |
---|
189 | 189 | | 14 provided to the Commission. The Agency may provide by rule |
---|
190 | 190 | | 15 for fees associated with supplying the information to |
---|
191 | 191 | | 16 utilities and other interested parties. These parties |
---|
192 | 192 | | 17 shall, within 5 business days, notify the Agency in |
---|
193 | 193 | | 18 writing if they object to any experts or expert consulting |
---|
194 | 194 | | 19 firms on the lists. Objections shall be based on: |
---|
195 | 195 | | 20 (A) failure to satisfy qualification criteria; |
---|
196 | 196 | | 21 (B) identification of a conflict of interest; or |
---|
197 | 197 | | 22 (C) evidence of inappropriate bias for or against |
---|
198 | 198 | | 23 potential bidders or the affected utilities. |
---|
199 | 199 | | 24 The Agency shall remove experts or expert consulting |
---|
200 | 200 | | 25 firms from the lists within 10 days if there is a |
---|
201 | 201 | | 26 reasonable basis for an objection and provide the updated |
---|
202 | 202 | | |
---|
203 | 203 | | |
---|
204 | 204 | | |
---|
205 | 205 | | |
---|
206 | 206 | | |
---|
207 | 207 | | HB3258 - 5 - LRB104 06526 AAS 16562 b |
---|
208 | 208 | | |
---|
209 | 209 | | |
---|
210 | 210 | | HB3258- 6 -LRB104 06526 AAS 16562 b HB3258 - 6 - LRB104 06526 AAS 16562 b |
---|
211 | 211 | | HB3258 - 6 - LRB104 06526 AAS 16562 b |
---|
212 | 212 | | 1 lists to the affected utilities and other interested |
---|
213 | 213 | | 2 parties. If the Agency fails to remove an expert or expert |
---|
214 | 214 | | 3 consulting firm from a list, an objecting party may seek |
---|
215 | 215 | | 4 review by the Commission within 5 days thereafter by |
---|
216 | 216 | | 5 filing a petition, and the Commission shall render a |
---|
217 | 217 | | 6 ruling on the petition within 10 days. There is no right of |
---|
218 | 218 | | 7 appeal of the Commission's ruling. |
---|
219 | 219 | | 8 (4) The Agency shall issue requests for proposals to |
---|
220 | 220 | | 9 the qualified experts or expert consulting firms to |
---|
221 | 221 | | 10 develop a procurement plan for the affected utilities and |
---|
222 | 222 | | 11 to serve as procurement administrator. |
---|
223 | 223 | | 12 (5) The Agency shall select an expert or expert |
---|
224 | 224 | | 13 consulting firm to develop procurement plans based on the |
---|
225 | 225 | | 14 proposals submitted and shall award contracts of up to 5 |
---|
226 | 226 | | 15 years to those selected. |
---|
227 | 227 | | 16 (6) The Agency shall select an expert or expert |
---|
228 | 228 | | 17 consulting firm, with approval of the Commission, to serve |
---|
229 | 229 | | 18 as procurement administrator based on the proposals |
---|
230 | 230 | | 19 submitted. If the Commission rejects, within 5 days, the |
---|
231 | 231 | | 20 Agency's selection, the Agency shall submit another |
---|
232 | 232 | | 21 recommendation within 3 days based on the proposals |
---|
233 | 233 | | 22 submitted. The Agency shall award a 5-year contract to the |
---|
234 | 234 | | 23 expert or expert consulting firm so selected with |
---|
235 | 235 | | 24 Commission approval. |
---|
236 | 236 | | 25 (b) The experts or expert consulting firms retained by the |
---|
237 | 237 | | 26 Agency shall, as appropriate, prepare procurement plans, and |
---|
238 | 238 | | |
---|
239 | 239 | | |
---|
240 | 240 | | |
---|
241 | 241 | | |
---|
242 | 242 | | |
---|
243 | 243 | | HB3258 - 6 - LRB104 06526 AAS 16562 b |
---|
244 | 244 | | |
---|
245 | 245 | | |
---|
246 | 246 | | HB3258- 7 -LRB104 06526 AAS 16562 b HB3258 - 7 - LRB104 06526 AAS 16562 b |
---|
247 | 247 | | HB3258 - 7 - LRB104 06526 AAS 16562 b |
---|
248 | 248 | | 1 conduct a competitive procurement process as prescribed in |
---|
249 | 249 | | 2 Section 16-111.5 of the Public Utilities Act, to ensure |
---|
250 | 250 | | 3 adequate, reliable, affordable, efficient, and environmentally |
---|
251 | 251 | | 4 sustainable electric service at the lowest total cost over |
---|
252 | 252 | | 5 time, taking into account any benefits of price stability, for |
---|
253 | 253 | | 6 eligible retail customers of electric utilities that on |
---|
254 | 254 | | 7 December 31, 2005 provided electric service to at least |
---|
255 | 255 | | 8 100,000 customers in the State of Illinois, and for eligible |
---|
256 | 256 | | 9 Illinois retail customers of small multi-jurisdictional |
---|
257 | 257 | | 10 electric utilities that (i) on December 31, 2005 served less |
---|
258 | 258 | | 11 than 100,000 customers in Illinois and (ii) request a |
---|
259 | 259 | | 12 procurement plan for their Illinois jurisdictional load. |
---|
260 | 260 | | 13 (c) Renewable portfolio standard. |
---|
261 | 261 | | 14 (1)(A) The Agency shall develop a long-term renewable |
---|
262 | 262 | | 15 resources procurement plan that shall include procurement |
---|
263 | 263 | | 16 programs and competitive procurement events necessary to |
---|
264 | 264 | | 17 meet the goals set forth in this subsection (c). The |
---|
265 | 265 | | 18 initial long-term renewable resources procurement plan |
---|
266 | 266 | | 19 shall be released for comment no later than 160 days after |
---|
267 | 267 | | 20 June 1, 2017 (the effective date of Public Act 99-906). |
---|
268 | 268 | | 21 The Agency shall review, and may revise on an expedited |
---|
269 | 269 | | 22 basis, the long-term renewable resources procurement plan |
---|
270 | 270 | | 23 at least every 2 years, which shall be conducted in |
---|
271 | 271 | | 24 conjunction with the procurement plan under Section |
---|
272 | 272 | | 25 16-111.5 of the Public Utilities Act to the extent |
---|
273 | 273 | | 26 practicable to minimize administrative expense. No later |
---|
274 | 274 | | |
---|
275 | 275 | | |
---|
276 | 276 | | |
---|
277 | 277 | | |
---|
278 | 278 | | |
---|
279 | 279 | | HB3258 - 7 - LRB104 06526 AAS 16562 b |
---|
280 | 280 | | |
---|
281 | 281 | | |
---|
282 | 282 | | HB3258- 8 -LRB104 06526 AAS 16562 b HB3258 - 8 - LRB104 06526 AAS 16562 b |
---|
283 | 283 | | HB3258 - 8 - LRB104 06526 AAS 16562 b |
---|
284 | 284 | | 1 than 120 days after the effective date of this amendatory |
---|
285 | 285 | | 2 Act of the 103rd General Assembly, the Agency shall |
---|
286 | 286 | | 3 release for comment a revision to the long-term renewable |
---|
287 | 287 | | 4 resources procurement plan, updating elements of the most |
---|
288 | 288 | | 5 recently approved plan as needed to comply with this |
---|
289 | 289 | | 6 amendatory Act of the 103rd General Assembly, and any |
---|
290 | 290 | | 7 long-term renewable resources procurement plan update |
---|
291 | 291 | | 8 published by the Agency but not yet approved by the |
---|
292 | 292 | | 9 Illinois Commerce Commission shall be withdrawn. The |
---|
293 | 293 | | 10 long-term renewable resources procurement plans shall be |
---|
294 | 294 | | 11 subject to review and approval by the Commission under |
---|
295 | 295 | | 12 Section 16-111.5 of the Public Utilities Act. |
---|
296 | 296 | | 13 (B) Subject to subparagraph (F) of this paragraph (1), |
---|
297 | 297 | | 14 the long-term renewable resources procurement plan shall |
---|
298 | 298 | | 15 attempt to meet the goals for procurement of renewable |
---|
299 | 299 | | 16 energy credits at levels of at least the following overall |
---|
300 | 300 | | 17 percentages: 13% by the 2017 delivery year; increasing by |
---|
301 | 301 | | 18 at least 1.5% each delivery year thereafter to at least |
---|
302 | 302 | | 19 25% by the 2025 delivery year; increasing by at least 3% |
---|
303 | 303 | | 20 each delivery year thereafter to at least 40% by the 2030 |
---|
304 | 304 | | 21 delivery year, and continuing at no less than 40% for each |
---|
305 | 305 | | 22 delivery year thereafter. The Agency shall attempt to |
---|
306 | 306 | | 23 procure 50% by delivery year 2040. The Agency shall |
---|
307 | 307 | | 24 determine the annual increase between delivery year 2030 |
---|
308 | 308 | | 25 and delivery year 2040, if any, taking into account energy |
---|
309 | 309 | | 26 demand, other energy resources, and other public policy |
---|
310 | 310 | | |
---|
311 | 311 | | |
---|
312 | 312 | | |
---|
313 | 313 | | |
---|
314 | 314 | | |
---|
315 | 315 | | HB3258 - 8 - LRB104 06526 AAS 16562 b |
---|
316 | 316 | | |
---|
317 | 317 | | |
---|
318 | 318 | | HB3258- 9 -LRB104 06526 AAS 16562 b HB3258 - 9 - LRB104 06526 AAS 16562 b |
---|
319 | 319 | | HB3258 - 9 - LRB104 06526 AAS 16562 b |
---|
320 | 320 | | 1 goals. In the event of a conflict between these goals and |
---|
321 | 321 | | 2 the new wind, new photovoltaic, and hydropower procurement |
---|
322 | 322 | | 3 requirements described in items (i) through (iii) of |
---|
323 | 323 | | 4 subparagraph (C) of this paragraph (1), the long-term plan |
---|
324 | 324 | | 5 shall prioritize compliance with the new wind, new |
---|
325 | 325 | | 6 photovoltaic, and hydropower procurement requirements |
---|
326 | 326 | | 7 described in items (i) through (iii) of subparagraph (C) |
---|
327 | 327 | | 8 of this paragraph (1) over the annual percentage targets |
---|
328 | 328 | | 9 described in this subparagraph (B). The Agency shall not |
---|
329 | 329 | | 10 comply with the annual percentage targets described in |
---|
330 | 330 | | 11 this subparagraph (B) by procuring renewable energy |
---|
331 | 331 | | 12 credits that are unlikely to lead to the development of |
---|
332 | 332 | | 13 new renewable resources or new, modernized, or retooled |
---|
333 | 333 | | 14 hydropower facilities. |
---|
334 | 334 | | 15 For the delivery year beginning June 1, 2017, the |
---|
335 | 335 | | 16 procurement plan shall attempt to include, subject to the |
---|
336 | 336 | | 17 prioritization outlined in this subparagraph (B), |
---|
337 | 337 | | 18 cost-effective renewable energy resources equal to at |
---|
338 | 338 | | 19 least 13% of each utility's load for eligible retail |
---|
339 | 339 | | 20 customers and 13% of the applicable portion of each |
---|
340 | 340 | | 21 utility's load for retail customers who are not eligible |
---|
341 | 341 | | 22 retail customers, which applicable portion shall equal 50% |
---|
342 | 342 | | 23 of the utility's load for retail customers who are not |
---|
343 | 343 | | 24 eligible retail customers on February 28, 2017. |
---|
344 | 344 | | 25 For the delivery year beginning June 1, 2018, the |
---|
345 | 345 | | 26 procurement plan shall attempt to include, subject to the |
---|
346 | 346 | | |
---|
347 | 347 | | |
---|
348 | 348 | | |
---|
349 | 349 | | |
---|
350 | 350 | | |
---|
351 | 351 | | HB3258 - 9 - LRB104 06526 AAS 16562 b |
---|
352 | 352 | | |
---|
353 | 353 | | |
---|
354 | 354 | | HB3258- 10 -LRB104 06526 AAS 16562 b HB3258 - 10 - LRB104 06526 AAS 16562 b |
---|
355 | 355 | | HB3258 - 10 - LRB104 06526 AAS 16562 b |
---|
356 | 356 | | 1 prioritization outlined in this subparagraph (B), |
---|
357 | 357 | | 2 cost-effective renewable energy resources equal to at |
---|
358 | 358 | | 3 least 14.5% of each utility's load for eligible retail |
---|
359 | 359 | | 4 customers and 14.5% of the applicable portion of each |
---|
360 | 360 | | 5 utility's load for retail customers who are not eligible |
---|
361 | 361 | | 6 retail customers, which applicable portion shall equal 75% |
---|
362 | 362 | | 7 of the utility's load for retail customers who are not |
---|
363 | 363 | | 8 eligible retail customers on February 28, 2017. |
---|
364 | 364 | | 9 For the delivery year beginning June 1, 2019, and for |
---|
365 | 365 | | 10 each year thereafter, the procurement plans shall attempt |
---|
366 | 366 | | 11 to include, subject to the prioritization outlined in this |
---|
367 | 367 | | 12 subparagraph (B), cost-effective renewable energy |
---|
368 | 368 | | 13 resources equal to a minimum percentage of each utility's |
---|
369 | 369 | | 14 load for all retail customers as follows: 16% by June 1, |
---|
370 | 370 | | 15 2019; increasing by 1.5% each year thereafter to 25% by |
---|
371 | 371 | | 16 June 1, 2025; and 25% by June 1, 2026; increasing by at |
---|
372 | 372 | | 17 least 3% each delivery year thereafter to at least 40% by |
---|
373 | 373 | | 18 the 2030 delivery year, and continuing at no less than 40% |
---|
374 | 374 | | 19 for each delivery year thereafter. The Agency shall |
---|
375 | 375 | | 20 attempt to procure 50% by delivery year 2040. The Agency |
---|
376 | 376 | | 21 shall determine the annual increase between delivery year |
---|
377 | 377 | | 22 2030 and delivery year 2040, if any, taking into account |
---|
378 | 378 | | 23 energy demand, other energy resources, and other public |
---|
379 | 379 | | 24 policy goals. |
---|
380 | 380 | | 25 For each delivery year, the Agency shall first |
---|
381 | 381 | | 26 recognize each utility's obligations for that delivery |
---|
382 | 382 | | |
---|
383 | 383 | | |
---|
384 | 384 | | |
---|
385 | 385 | | |
---|
386 | 386 | | |
---|
387 | 387 | | HB3258 - 10 - LRB104 06526 AAS 16562 b |
---|
388 | 388 | | |
---|
389 | 389 | | |
---|
390 | 390 | | HB3258- 11 -LRB104 06526 AAS 16562 b HB3258 - 11 - LRB104 06526 AAS 16562 b |
---|
391 | 391 | | HB3258 - 11 - LRB104 06526 AAS 16562 b |
---|
392 | 392 | | 1 year under existing contracts. Any renewable energy |
---|
393 | 393 | | 2 credits under existing contracts, including renewable |
---|
394 | 394 | | 3 energy credits as part of renewable energy resources, |
---|
395 | 395 | | 4 shall be used to meet the goals set forth in this |
---|
396 | 396 | | 5 subsection (c) for the delivery year. |
---|
397 | 397 | | 6 (C) The long-term renewable resources procurement plan |
---|
398 | 398 | | 7 described in subparagraph (A) of this paragraph (1) shall |
---|
399 | 399 | | 8 include the procurement of renewable energy credits from |
---|
400 | 400 | | 9 new projects pursuant to the following terms: |
---|
401 | 401 | | 10 (i) At least 10,000,000 renewable energy credits |
---|
402 | 402 | | 11 delivered annually by the end of the 2021 delivery |
---|
403 | 403 | | 12 year, and increasing ratably to reach 45,000,000 |
---|
404 | 404 | | 13 renewable energy credits delivered annually from new |
---|
405 | 405 | | 14 wind and solar projects by the end of delivery year |
---|
406 | 406 | | 15 2030 such that the goals in subparagraph (B) of this |
---|
407 | 407 | | 16 paragraph (1) are met entirely by procurements of |
---|
408 | 408 | | 17 renewable energy credits from new wind and |
---|
409 | 409 | | 18 photovoltaic projects. Of that amount, to the extent |
---|
410 | 410 | | 19 possible, the Agency shall procure 45% from wind and |
---|
411 | 411 | | 20 hydropower projects and 55% from photovoltaic |
---|
412 | 412 | | 21 projects. Of the amount to be procured from |
---|
413 | 413 | | 22 photovoltaic projects, the Agency shall procure: at |
---|
414 | 414 | | 23 least 50% from solar photovoltaic projects using the |
---|
415 | 415 | | 24 program outlined in subparagraph (K) of this paragraph |
---|
416 | 416 | | 25 (1) from distributed renewable energy generation |
---|
417 | 417 | | 26 devices or community renewable generation projects; at |
---|
418 | 418 | | |
---|
419 | 419 | | |
---|
420 | 420 | | |
---|
421 | 421 | | |
---|
422 | 422 | | |
---|
423 | 423 | | HB3258 - 11 - LRB104 06526 AAS 16562 b |
---|
424 | 424 | | |
---|
425 | 425 | | |
---|
426 | 426 | | HB3258- 12 -LRB104 06526 AAS 16562 b HB3258 - 12 - LRB104 06526 AAS 16562 b |
---|
427 | 427 | | HB3258 - 12 - LRB104 06526 AAS 16562 b |
---|
428 | 428 | | 1 least 47% from utility-scale solar projects; at least |
---|
429 | 429 | | 2 3% from brownfield site photovoltaic projects that are |
---|
430 | 430 | | 3 not community renewable generation projects. |
---|
431 | 431 | | 4 In developing the long-term renewable resources |
---|
432 | 432 | | 5 procurement plan, the Agency shall consider other |
---|
433 | 433 | | 6 approaches, in addition to competitive procurements, |
---|
434 | 434 | | 7 that can be used to procure renewable energy credits |
---|
435 | 435 | | 8 from brownfield site photovoltaic projects and thereby |
---|
436 | 436 | | 9 help return blighted or contaminated land to |
---|
437 | 437 | | 10 productive use while enhancing public health and the |
---|
438 | 438 | | 11 well-being of Illinois residents, including those in |
---|
439 | 439 | | 12 environmental justice communities, as defined using |
---|
440 | 440 | | 13 existing methodologies and findings used by the Agency |
---|
441 | 441 | | 14 and its Administrator in its Illinois Solar for All |
---|
442 | 442 | | 15 Program. The Agency shall also consider other |
---|
443 | 443 | | 16 approaches, in addition to competitive procurements, |
---|
444 | 444 | | 17 to procure renewable energy credits from new and |
---|
445 | 445 | | 18 existing hydropower facilities to support the |
---|
446 | 446 | | 19 development and maintenance of these facilities. The |
---|
447 | 447 | | 20 Agency shall explore options to convert existing dams |
---|
448 | 448 | | 21 but shall not consider approaches to develop new dams |
---|
449 | 449 | | 22 where they do not already exist. |
---|
450 | 450 | | 23 (ii) In any given delivery year, if forecasted |
---|
451 | 451 | | 24 expenses are less than the maximum budget available |
---|
452 | 452 | | 25 under subparagraph (E) of this paragraph (1), the |
---|
453 | 453 | | 26 Agency shall continue to procure new renewable energy |
---|
454 | 454 | | |
---|
455 | 455 | | |
---|
456 | 456 | | |
---|
457 | 457 | | |
---|
458 | 458 | | |
---|
459 | 459 | | HB3258 - 12 - LRB104 06526 AAS 16562 b |
---|
460 | 460 | | |
---|
461 | 461 | | |
---|
462 | 462 | | HB3258- 13 -LRB104 06526 AAS 16562 b HB3258 - 13 - LRB104 06526 AAS 16562 b |
---|
463 | 463 | | HB3258 - 13 - LRB104 06526 AAS 16562 b |
---|
464 | 464 | | 1 credits until that budget is exhausted in the manner |
---|
465 | 465 | | 2 outlined in item (i) of this subparagraph (C). |
---|
466 | 466 | | 3 (iii) For purposes of this Section: |
---|
467 | 467 | | 4 "New wind projects" means wind renewable energy |
---|
468 | 468 | | 5 facilities that are energized after June 1, 2017 for |
---|
469 | 469 | | 6 the delivery year commencing June 1, 2017. |
---|
470 | 470 | | 7 "New photovoltaic projects" means photovoltaic |
---|
471 | 471 | | 8 renewable energy facilities that are energized after |
---|
472 | 472 | | 9 June 1, 2017. Photovoltaic projects developed under |
---|
473 | 473 | | 10 Section 1-56 of this Act shall not apply towards the |
---|
474 | 474 | | 11 new photovoltaic project requirements in this |
---|
475 | 475 | | 12 subparagraph (C). |
---|
476 | 476 | | 13 For purposes of calculating whether the Agency has |
---|
477 | 477 | | 14 procured enough new wind and solar renewable energy |
---|
478 | 478 | | 15 credits required by this subparagraph (C), renewable |
---|
479 | 479 | | 16 energy facilities that have a multi-year renewable |
---|
480 | 480 | | 17 energy credit delivery contract with the utility |
---|
481 | 481 | | 18 through at least delivery year 2030 shall be |
---|
482 | 482 | | 19 considered new, however no renewable energy credits |
---|
483 | 483 | | 20 from contracts entered into before June 1, 2021 shall |
---|
484 | 484 | | 21 be used to calculate whether the Agency has procured |
---|
485 | 485 | | 22 the correct proportion of new wind and new solar |
---|
486 | 486 | | 23 contracts described in this subparagraph (C) for |
---|
487 | 487 | | 24 delivery year 2021 and thereafter. |
---|
488 | 488 | | 25 (D) Renewable energy credits shall be cost effective. |
---|
489 | 489 | | 26 For purposes of this subsection (c), "cost effective" |
---|
490 | 490 | | |
---|
491 | 491 | | |
---|
492 | 492 | | |
---|
493 | 493 | | |
---|
494 | 494 | | |
---|
495 | 495 | | HB3258 - 13 - LRB104 06526 AAS 16562 b |
---|
496 | 496 | | |
---|
497 | 497 | | |
---|
498 | 498 | | HB3258- 14 -LRB104 06526 AAS 16562 b HB3258 - 14 - LRB104 06526 AAS 16562 b |
---|
499 | 499 | | HB3258 - 14 - LRB104 06526 AAS 16562 b |
---|
500 | 500 | | 1 means that the costs of procuring renewable energy |
---|
501 | 501 | | 2 resources do not cause the limit stated in subparagraph |
---|
502 | 502 | | 3 (E) of this paragraph (1) to be exceeded and, for |
---|
503 | 503 | | 4 renewable energy credits procured through a competitive |
---|
504 | 504 | | 5 procurement event, do not exceed benchmarks based on |
---|
505 | 505 | | 6 market prices for like products in the region. For |
---|
506 | 506 | | 7 purposes of this subsection (c), "like products" means |
---|
507 | 507 | | 8 contracts for renewable energy credits from the same or |
---|
508 | 508 | | 9 substantially similar technology, same or substantially |
---|
509 | 509 | | 10 similar vintage (new or existing), the same or |
---|
510 | 510 | | 11 substantially similar quantity, and the same or |
---|
511 | 511 | | 12 substantially similar contract length and structure. |
---|
512 | 512 | | 13 Benchmarks shall reflect development, financing, or |
---|
513 | 513 | | 14 related costs resulting from requirements imposed through |
---|
514 | 514 | | 15 other provisions of State law, including, but not limited |
---|
515 | 515 | | 16 to, requirements in subparagraph subparagraphs (P) and (Q) |
---|
516 | 516 | | 17 of this paragraph (1) and the Renewable Energy Facilities |
---|
517 | 517 | | 18 Agricultural Impact Mitigation Act. Confidential |
---|
518 | 518 | | 19 benchmarks shall be developed by the procurement |
---|
519 | 519 | | 20 administrator, in consultation with the Commission staff, |
---|
520 | 520 | | 21 Agency staff, and the procurement monitor and shall be |
---|
521 | 521 | | 22 subject to Commission review and approval. If price |
---|
522 | 522 | | 23 benchmarks for like products in the region are not |
---|
523 | 523 | | 24 available, the procurement administrator shall establish |
---|
524 | 524 | | 25 price benchmarks based on publicly available data on |
---|
525 | 525 | | 26 regional technology costs and expected current and future |
---|
526 | 526 | | |
---|
527 | 527 | | |
---|
528 | 528 | | |
---|
529 | 529 | | |
---|
530 | 530 | | |
---|
531 | 531 | | HB3258 - 14 - LRB104 06526 AAS 16562 b |
---|
532 | 532 | | |
---|
533 | 533 | | |
---|
534 | 534 | | HB3258- 15 -LRB104 06526 AAS 16562 b HB3258 - 15 - LRB104 06526 AAS 16562 b |
---|
535 | 535 | | HB3258 - 15 - LRB104 06526 AAS 16562 b |
---|
536 | 536 | | 1 regional energy prices. The benchmarks in this Section |
---|
537 | 537 | | 2 shall not be used to curtail or otherwise reduce |
---|
538 | 538 | | 3 contractual obligations entered into by or through the |
---|
539 | 539 | | 4 Agency prior to June 1, 2017 (the effective date of Public |
---|
540 | 540 | | 5 Act 99-906). |
---|
541 | 541 | | 6 (E) For purposes of this subsection (c), the required |
---|
542 | 542 | | 7 procurement of cost-effective renewable energy resources |
---|
543 | 543 | | 8 for a particular year commencing prior to June 1, 2017 |
---|
544 | 544 | | 9 shall be measured as a percentage of the actual amount of |
---|
545 | 545 | | 10 electricity (megawatt-hours) supplied by the electric |
---|
546 | 546 | | 11 utility to eligible retail customers in the delivery year |
---|
547 | 547 | | 12 ending immediately prior to the procurement, and, for |
---|
548 | 548 | | 13 delivery years commencing on and after June 1, 2017, the |
---|
549 | 549 | | 14 required procurement of cost-effective renewable energy |
---|
550 | 550 | | 15 resources for a particular year shall be measured as a |
---|
551 | 551 | | 16 percentage of the actual amount of electricity |
---|
552 | 552 | | 17 (megawatt-hours) delivered by the electric utility in the |
---|
553 | 553 | | 18 delivery year ending immediately prior to the procurement, |
---|
554 | 554 | | 19 to all retail customers in its service territory. For |
---|
555 | 555 | | 20 purposes of this subsection (c), the amount paid per |
---|
556 | 556 | | 21 kilowatthour means the total amount paid for electric |
---|
557 | 557 | | 22 service expressed on a per kilowatthour basis. For |
---|
558 | 558 | | 23 purposes of this subsection (c), the total amount paid for |
---|
559 | 559 | | 24 electric service includes without limitation amounts paid |
---|
560 | 560 | | 25 for supply, transmission, capacity, distribution, |
---|
561 | 561 | | 26 surcharges, and add-on taxes. |
---|
562 | 562 | | |
---|
563 | 563 | | |
---|
564 | 564 | | |
---|
565 | 565 | | |
---|
566 | 566 | | |
---|
567 | 567 | | HB3258 - 15 - LRB104 06526 AAS 16562 b |
---|
568 | 568 | | |
---|
569 | 569 | | |
---|
570 | 570 | | HB3258- 16 -LRB104 06526 AAS 16562 b HB3258 - 16 - LRB104 06526 AAS 16562 b |
---|
571 | 571 | | HB3258 - 16 - LRB104 06526 AAS 16562 b |
---|
572 | 572 | | 1 Notwithstanding the requirements of this subsection |
---|
573 | 573 | | 2 (c), the total of renewable energy resources procured |
---|
574 | 574 | | 3 under the procurement plan for any single year shall be |
---|
575 | 575 | | 4 subject to the limitations of this subparagraph (E). Such |
---|
576 | 576 | | 5 procurement shall be reduced for all retail customers |
---|
577 | 577 | | 6 based on the amount necessary to limit the annual |
---|
578 | 578 | | 7 estimated average net increase due to the costs of these |
---|
579 | 579 | | 8 resources included in the amounts paid by eligible retail |
---|
580 | 580 | | 9 customers in connection with electric service to no more |
---|
581 | 581 | | 10 than 4.25% of the amount paid per kilowatthour by those |
---|
582 | 582 | | 11 customers during the year ending May 31, 2009. To arrive |
---|
583 | 583 | | 12 at a maximum dollar amount of renewable energy resources |
---|
584 | 584 | | 13 to be procured for the particular delivery year, the |
---|
585 | 585 | | 14 resulting per kilowatthour amount shall be applied to the |
---|
586 | 586 | | 15 actual amount of kilowatthours of electricity delivered, |
---|
587 | 587 | | 16 or applicable portion of such amount as specified in |
---|
588 | 588 | | 17 paragraph (1) of this subsection (c), as applicable, by |
---|
589 | 589 | | 18 the electric utility in the delivery year immediately |
---|
590 | 590 | | 19 prior to the procurement to all retail customers in its |
---|
591 | 591 | | 20 service territory. The calculations required by this |
---|
592 | 592 | | 21 subparagraph (E) shall be made only once for each delivery |
---|
593 | 593 | | 22 year at the time that the renewable energy resources are |
---|
594 | 594 | | 23 procured. Once the determination as to the amount of |
---|
595 | 595 | | 24 renewable energy resources to procure is made based on the |
---|
596 | 596 | | 25 calculations set forth in this subparagraph (E) and the |
---|
597 | 597 | | 26 contracts procuring those amounts are executed, no |
---|
598 | 598 | | |
---|
599 | 599 | | |
---|
600 | 600 | | |
---|
601 | 601 | | |
---|
602 | 602 | | |
---|
603 | 603 | | HB3258 - 16 - LRB104 06526 AAS 16562 b |
---|
604 | 604 | | |
---|
605 | 605 | | |
---|
606 | 606 | | HB3258- 17 -LRB104 06526 AAS 16562 b HB3258 - 17 - LRB104 06526 AAS 16562 b |
---|
607 | 607 | | HB3258 - 17 - LRB104 06526 AAS 16562 b |
---|
608 | 608 | | 1 subsequent rate impact determinations shall be made and no |
---|
609 | 609 | | 2 adjustments to those contract amounts shall be allowed. |
---|
610 | 610 | | 3 All costs incurred under such contracts shall be fully |
---|
611 | 611 | | 4 recoverable by the electric utility as provided in this |
---|
612 | 612 | | 5 Section. |
---|
613 | 613 | | 6 (F) If the limitation on the amount of renewable |
---|
614 | 614 | | 7 energy resources procured in subparagraph (E) of this |
---|
615 | 615 | | 8 paragraph (1) prevents the Agency from meeting all of the |
---|
616 | 616 | | 9 goals in this subsection (c), the Agency's long-term plan |
---|
617 | 617 | | 10 shall prioritize compliance with the requirements of this |
---|
618 | 618 | | 11 subsection (c) regarding renewable energy credits in the |
---|
619 | 619 | | 12 following order: |
---|
620 | 620 | | 13 (i) renewable energy credits under existing |
---|
621 | 621 | | 14 contractual obligations as of June 1, 2021; |
---|
622 | 622 | | 15 (i-5) funding for the Illinois Solar for All |
---|
623 | 623 | | 16 Program, as described in subparagraph (O) of this |
---|
624 | 624 | | 17 paragraph (1); |
---|
625 | 625 | | 18 (ii) renewable energy credits necessary to comply |
---|
626 | 626 | | 19 with the new wind and new photovoltaic procurement |
---|
627 | 627 | | 20 requirements described in items (i) through (iii) of |
---|
628 | 628 | | 21 subparagraph (C) of this paragraph (1); and |
---|
629 | 629 | | 22 (iii) renewable energy credits necessary to meet |
---|
630 | 630 | | 23 the remaining requirements of this subsection (c). |
---|
631 | 631 | | 24 (G) The following provisions shall apply to the |
---|
632 | 632 | | 25 Agency's procurement of renewable energy credits under |
---|
633 | 633 | | 26 this subsection (c): |
---|
634 | 634 | | |
---|
635 | 635 | | |
---|
636 | 636 | | |
---|
637 | 637 | | |
---|
638 | 638 | | |
---|
639 | 639 | | HB3258 - 17 - LRB104 06526 AAS 16562 b |
---|
640 | 640 | | |
---|
641 | 641 | | |
---|
642 | 642 | | HB3258- 18 -LRB104 06526 AAS 16562 b HB3258 - 18 - LRB104 06526 AAS 16562 b |
---|
643 | 643 | | HB3258 - 18 - LRB104 06526 AAS 16562 b |
---|
644 | 644 | | 1 (i) Notwithstanding whether a long-term renewable |
---|
645 | 645 | | 2 resources procurement plan has been approved, the |
---|
646 | 646 | | 3 Agency shall conduct an initial forward procurement |
---|
647 | 647 | | 4 for renewable energy credits from new utility-scale |
---|
648 | 648 | | 5 wind projects within 160 days after June 1, 2017 (the |
---|
649 | 649 | | 6 effective date of Public Act 99-906). For the purposes |
---|
650 | 650 | | 7 of this initial forward procurement, the Agency shall |
---|
651 | 651 | | 8 solicit 15-year contracts for delivery of 1,000,000 |
---|
652 | 652 | | 9 renewable energy credits delivered annually from new |
---|
653 | 653 | | 10 utility-scale wind projects to begin delivery on June |
---|
654 | 654 | | 11 1, 2019, if available, but not later than June 1, 2021, |
---|
655 | 655 | | 12 unless the project has delays in the establishment of |
---|
656 | 656 | | 13 an operating interconnection with the applicable |
---|
657 | 657 | | 14 transmission or distribution system as a result of the |
---|
658 | 658 | | 15 actions or inactions of the transmission or |
---|
659 | 659 | | 16 distribution provider, or other causes for force |
---|
660 | 660 | | 17 majeure as outlined in the procurement contract, in |
---|
661 | 661 | | 18 which case, not later than June 1, 2022. Payments to |
---|
662 | 662 | | 19 suppliers of renewable energy credits shall commence |
---|
663 | 663 | | 20 upon delivery. Renewable energy credits procured under |
---|
664 | 664 | | 21 this initial procurement shall be included in the |
---|
665 | 665 | | 22 Agency's long-term plan and shall apply to all |
---|
666 | 666 | | 23 renewable energy goals in this subsection (c). |
---|
667 | 667 | | 24 (ii) Notwithstanding whether a long-term renewable |
---|
668 | 668 | | 25 resources procurement plan has been approved, the |
---|
669 | 669 | | 26 Agency shall conduct an initial forward procurement |
---|
670 | 670 | | |
---|
671 | 671 | | |
---|
672 | 672 | | |
---|
673 | 673 | | |
---|
674 | 674 | | |
---|
675 | 675 | | HB3258 - 18 - LRB104 06526 AAS 16562 b |
---|
676 | 676 | | |
---|
677 | 677 | | |
---|
678 | 678 | | HB3258- 19 -LRB104 06526 AAS 16562 b HB3258 - 19 - LRB104 06526 AAS 16562 b |
---|
679 | 679 | | HB3258 - 19 - LRB104 06526 AAS 16562 b |
---|
680 | 680 | | 1 for renewable energy credits from new utility-scale |
---|
681 | 681 | | 2 solar projects and brownfield site photovoltaic |
---|
682 | 682 | | 3 projects within one year after June 1, 2017 (the |
---|
683 | 683 | | 4 effective date of Public Act 99-906). For the purposes |
---|
684 | 684 | | 5 of this initial forward procurement, the Agency shall |
---|
685 | 685 | | 6 solicit 15-year contracts for delivery of 1,000,000 |
---|
686 | 686 | | 7 renewable energy credits delivered annually from new |
---|
687 | 687 | | 8 utility-scale solar projects and brownfield site |
---|
688 | 688 | | 9 photovoltaic projects to begin delivery on June 1, |
---|
689 | 689 | | 10 2019, if available, but not later than June 1, 2021, |
---|
690 | 690 | | 11 unless the project has delays in the establishment of |
---|
691 | 691 | | 12 an operating interconnection with the applicable |
---|
692 | 692 | | 13 transmission or distribution system as a result of the |
---|
693 | 693 | | 14 actions or inactions of the transmission or |
---|
694 | 694 | | 15 distribution provider, or other causes for force |
---|
695 | 695 | | 16 majeure as outlined in the procurement contract, in |
---|
696 | 696 | | 17 which case, not later than June 1, 2022. The Agency may |
---|
697 | 697 | | 18 structure this initial procurement in one or more |
---|
698 | 698 | | 19 discrete procurement events. Payments to suppliers of |
---|
699 | 699 | | 20 renewable energy credits shall commence upon delivery. |
---|
700 | 700 | | 21 Renewable energy credits procured under this initial |
---|
701 | 701 | | 22 procurement shall be included in the Agency's |
---|
702 | 702 | | 23 long-term plan and shall apply to all renewable energy |
---|
703 | 703 | | 24 goals in this subsection (c). |
---|
704 | 704 | | 25 (iii) Notwithstanding whether the Commission has |
---|
705 | 705 | | 26 approved the periodic long-term renewable resources |
---|
706 | 706 | | |
---|
707 | 707 | | |
---|
708 | 708 | | |
---|
709 | 709 | | |
---|
710 | 710 | | |
---|
711 | 711 | | HB3258 - 19 - LRB104 06526 AAS 16562 b |
---|
712 | 712 | | |
---|
713 | 713 | | |
---|
714 | 714 | | HB3258- 20 -LRB104 06526 AAS 16562 b HB3258 - 20 - LRB104 06526 AAS 16562 b |
---|
715 | 715 | | HB3258 - 20 - LRB104 06526 AAS 16562 b |
---|
716 | 716 | | 1 procurement plan revision described in Section |
---|
717 | 717 | | 2 16-111.5 of the Public Utilities Act, the Agency shall |
---|
718 | 718 | | 3 conduct at least one subsequent forward procurement |
---|
719 | 719 | | 4 for renewable energy credits from new utility-scale |
---|
720 | 720 | | 5 wind projects, new utility-scale solar projects, and |
---|
721 | 721 | | 6 new brownfield site photovoltaic projects within 240 |
---|
722 | 722 | | 7 days after the effective date of this amendatory Act |
---|
723 | 723 | | 8 of the 102nd General Assembly in quantities necessary |
---|
724 | 724 | | 9 to meet the requirements of subparagraph (C) of this |
---|
725 | 725 | | 10 paragraph (1) through the delivery year beginning June |
---|
726 | 726 | | 11 1, 2021. |
---|
727 | 727 | | 12 (iv) Notwithstanding whether the Commission has |
---|
728 | 728 | | 13 approved the periodic long-term renewable resources |
---|
729 | 729 | | 14 procurement plan revision described in Section |
---|
730 | 730 | | 15 16-111.5 of the Public Utilities Act, the Agency shall |
---|
731 | 731 | | 16 open capacity for each category in the Adjustable |
---|
732 | 732 | | 17 Block program within 90 days after the effective date |
---|
733 | 733 | | 18 of this amendatory Act of the 102nd General Assembly |
---|
734 | 734 | | 19 manner: |
---|
735 | 735 | | 20 (1) The Agency shall open the first block of |
---|
736 | 736 | | 21 annual capacity for the category described in item |
---|
737 | 737 | | 22 (i) of subparagraph (K) of this paragraph (1). The |
---|
738 | 738 | | 23 first block of annual capacity for item (i) shall |
---|
739 | 739 | | 24 be for at least 75 megawatts of total nameplate |
---|
740 | 740 | | 25 capacity. The price of the renewable energy credit |
---|
741 | 741 | | 26 for this block of capacity shall be 4% less than |
---|
742 | 742 | | |
---|
743 | 743 | | |
---|
744 | 744 | | |
---|
745 | 745 | | |
---|
746 | 746 | | |
---|
747 | 747 | | HB3258 - 20 - LRB104 06526 AAS 16562 b |
---|
748 | 748 | | |
---|
749 | 749 | | |
---|
750 | 750 | | HB3258- 21 -LRB104 06526 AAS 16562 b HB3258 - 21 - LRB104 06526 AAS 16562 b |
---|
751 | 751 | | HB3258 - 21 - LRB104 06526 AAS 16562 b |
---|
752 | 752 | | 1 the price of the last open block in this category. |
---|
753 | 753 | | 2 Projects on a waitlist shall be awarded contracts |
---|
754 | 754 | | 3 first in the order in which they appear on the |
---|
755 | 755 | | 4 waitlist. Notwithstanding anything to the |
---|
756 | 756 | | 5 contrary, for those renewable energy credits that |
---|
757 | 757 | | 6 qualify and are procured under this subitem (1) of |
---|
758 | 758 | | 7 this item (iv), the renewable energy credit |
---|
759 | 759 | | 8 delivery contract value shall be paid in full, |
---|
760 | 760 | | 9 based on the estimated generation during the first |
---|
761 | 761 | | 10 15 years of operation, by the contracting |
---|
762 | 762 | | 11 utilities at the time that the facility producing |
---|
763 | 763 | | 12 the renewable energy credits is interconnected at |
---|
764 | 764 | | 13 the distribution system level of the utility and |
---|
765 | 765 | | 14 verified as energized and in compliance by the |
---|
766 | 766 | | 15 Program Administrator. The electric utility shall |
---|
767 | 767 | | 16 receive and retire all renewable energy credits |
---|
768 | 768 | | 17 generated by the project for the first 15 years of |
---|
769 | 769 | | 18 operation. Renewable energy credits generated by |
---|
770 | 770 | | 19 the project thereafter shall not be transferred |
---|
771 | 771 | | 20 under the renewable energy credit delivery |
---|
772 | 772 | | 21 contract with the counterparty electric utility. |
---|
773 | 773 | | 22 (2) The Agency shall open the first block of |
---|
774 | 774 | | 23 annual capacity for the category described in item |
---|
775 | 775 | | 24 (ii) of subparagraph (K) of this paragraph (1). |
---|
776 | 776 | | 25 The first block of annual capacity for item (ii) |
---|
777 | 777 | | 26 shall be for at least 75 megawatts of total |
---|
778 | 778 | | |
---|
779 | 779 | | |
---|
780 | 780 | | |
---|
781 | 781 | | |
---|
782 | 782 | | |
---|
783 | 783 | | HB3258 - 21 - LRB104 06526 AAS 16562 b |
---|
784 | 784 | | |
---|
785 | 785 | | |
---|
786 | 786 | | HB3258- 22 -LRB104 06526 AAS 16562 b HB3258 - 22 - LRB104 06526 AAS 16562 b |
---|
787 | 787 | | HB3258 - 22 - LRB104 06526 AAS 16562 b |
---|
788 | 788 | | 1 nameplate capacity. |
---|
789 | 789 | | 2 (A) The price of the renewable energy |
---|
790 | 790 | | 3 credit for any project on a waitlist for this |
---|
791 | 791 | | 4 category before the opening of this block |
---|
792 | 792 | | 5 shall be 4% less than the price of the last |
---|
793 | 793 | | 6 open block in this category. Projects on the |
---|
794 | 794 | | 7 waitlist shall be awarded contracts first in |
---|
795 | 795 | | 8 the order in which they appear on the |
---|
796 | 796 | | 9 waitlist. Any projects that are less than or |
---|
797 | 797 | | 10 equal to 25 kilowatts in size on the waitlist |
---|
798 | 798 | | 11 for this capacity shall be moved to the |
---|
799 | 799 | | 12 waitlist for paragraph (1) of this item (iv). |
---|
800 | 800 | | 13 Notwithstanding anything to the contrary, |
---|
801 | 801 | | 14 projects that were on the waitlist prior to |
---|
802 | 802 | | 15 opening of this block shall not be required to |
---|
803 | 803 | | 16 be in compliance with the requirements of |
---|
804 | 804 | | 17 subparagraph (Q) of this paragraph (1) of this |
---|
805 | 805 | | 18 subsection (c). Notwithstanding anything to |
---|
806 | 806 | | 19 the contrary, for those renewable energy |
---|
807 | 807 | | 20 credits procured from projects that were on |
---|
808 | 808 | | 21 the waitlist for this category before the |
---|
809 | 809 | | 22 opening of this block 20% of the renewable |
---|
810 | 810 | | 23 energy credit delivery contract value, based |
---|
811 | 811 | | 24 on the estimated generation during the first |
---|
812 | 812 | | 25 15 years of operation, shall be paid by the |
---|
813 | 813 | | 26 contracting utilities at the time that the |
---|
814 | 814 | | |
---|
815 | 815 | | |
---|
816 | 816 | | |
---|
817 | 817 | | |
---|
818 | 818 | | |
---|
819 | 819 | | HB3258 - 22 - LRB104 06526 AAS 16562 b |
---|
820 | 820 | | |
---|
821 | 821 | | |
---|
822 | 822 | | HB3258- 23 -LRB104 06526 AAS 16562 b HB3258 - 23 - LRB104 06526 AAS 16562 b |
---|
823 | 823 | | HB3258 - 23 - LRB104 06526 AAS 16562 b |
---|
824 | 824 | | 1 facility producing the renewable energy |
---|
825 | 825 | | 2 credits is interconnected at the distribution |
---|
826 | 826 | | 3 system level of the utility and verified as |
---|
827 | 827 | | 4 energized by the Program Administrator. The |
---|
828 | 828 | | 5 remaining portion shall be paid ratably over |
---|
829 | 829 | | 6 the subsequent 4-year period. The electric |
---|
830 | 830 | | 7 utility shall receive and retire all renewable |
---|
831 | 831 | | 8 energy credits generated by the project during |
---|
832 | 832 | | 9 the first 15 years of operation. Renewable |
---|
833 | 833 | | 10 energy credits generated by the project |
---|
834 | 834 | | 11 thereafter shall not be transferred under the |
---|
835 | 835 | | 12 renewable energy credit delivery contract with |
---|
836 | 836 | | 13 the counterparty electric utility. |
---|
837 | 837 | | 14 (B) The price of renewable energy credits |
---|
838 | 838 | | 15 for any project not on the waitlist for this |
---|
839 | 839 | | 16 category before the opening of the block shall |
---|
840 | 840 | | 17 be determined and published by the Agency. |
---|
841 | 841 | | 18 Projects not on a waitlist as of the opening |
---|
842 | 842 | | 19 of this block shall be subject to the |
---|
843 | 843 | | 20 requirements of subparagraph (Q) of this |
---|
844 | 844 | | 21 paragraph (1), as applicable. Projects not on |
---|
845 | 845 | | 22 a waitlist as of the opening of this block |
---|
846 | 846 | | 23 shall be subject to the contract provisions |
---|
847 | 847 | | 24 outlined in item (iii) of subparagraph (L) of |
---|
848 | 848 | | 25 this paragraph (1). The Agency shall strive to |
---|
849 | 849 | | 26 publish updated prices and an updated |
---|
850 | 850 | | |
---|
851 | 851 | | |
---|
852 | 852 | | |
---|
853 | 853 | | |
---|
854 | 854 | | |
---|
855 | 855 | | HB3258 - 23 - LRB104 06526 AAS 16562 b |
---|
856 | 856 | | |
---|
857 | 857 | | |
---|
858 | 858 | | HB3258- 24 -LRB104 06526 AAS 16562 b HB3258 - 24 - LRB104 06526 AAS 16562 b |
---|
859 | 859 | | HB3258 - 24 - LRB104 06526 AAS 16562 b |
---|
860 | 860 | | 1 renewable energy credit delivery contract as |
---|
861 | 861 | | 2 quickly as possible. |
---|
862 | 862 | | 3 (3) For opening the first 2 blocks of annual |
---|
863 | 863 | | 4 capacity for projects participating in item (iii) |
---|
864 | 864 | | 5 of subparagraph (K) of paragraph (1) of subsection |
---|
865 | 865 | | 6 (c), projects shall be selected exclusively from |
---|
866 | 866 | | 7 those projects on the ordinal waitlists of |
---|
867 | 867 | | 8 community renewable generation projects |
---|
868 | 868 | | 9 established by the Agency based on the status of |
---|
869 | 869 | | 10 those ordinal waitlists as of December 31, 2020, |
---|
870 | 870 | | 11 and only those projects previously determined to |
---|
871 | 871 | | 12 be eligible for the Agency's April 2019 community |
---|
872 | 872 | | 13 solar project selection process. |
---|
873 | 873 | | 14 The first 2 blocks of annual capacity for item |
---|
874 | 874 | | 15 (iii) shall be for 250 megawatts of total |
---|
875 | 875 | | 16 nameplate capacity, with both blocks opening |
---|
876 | 876 | | 17 simultaneously under the schedule outlined in the |
---|
877 | 877 | | 18 paragraphs below. Projects shall be selected as |
---|
878 | 878 | | 19 follows: |
---|
879 | 879 | | 20 (A) The geographic balance of selected |
---|
880 | 880 | | 21 projects shall follow the Group classification |
---|
881 | 881 | | 22 found in the Agency's Revised Long-Term |
---|
882 | 882 | | 23 Renewable Resources Procurement Plan, with 70% |
---|
883 | 883 | | 24 of capacity allocated to projects on the Group |
---|
884 | 884 | | 25 B waitlist and 30% of capacity allocated to |
---|
885 | 885 | | 26 projects on the Group A waitlist. |
---|
886 | 886 | | |
---|
887 | 887 | | |
---|
888 | 888 | | |
---|
889 | 889 | | |
---|
890 | 890 | | |
---|
891 | 891 | | HB3258 - 24 - LRB104 06526 AAS 16562 b |
---|
892 | 892 | | |
---|
893 | 893 | | |
---|
894 | 894 | | HB3258- 25 -LRB104 06526 AAS 16562 b HB3258 - 25 - LRB104 06526 AAS 16562 b |
---|
895 | 895 | | HB3258 - 25 - LRB104 06526 AAS 16562 b |
---|
896 | 896 | | 1 (B) Contract awards for waitlisted |
---|
897 | 897 | | 2 projects shall be allocated proportionate to |
---|
898 | 898 | | 3 the total nameplate capacity amount across |
---|
899 | 899 | | 4 both ordinal waitlists associated with that |
---|
900 | 900 | | 5 applicant firm or its affiliates, subject to |
---|
901 | 901 | | 6 the following conditions. |
---|
902 | 902 | | 7 (i) Each applicant firm having a |
---|
903 | 903 | | 8 waitlisted project eligible for selection |
---|
904 | 904 | | 9 shall receive no less than 500 kilowatts |
---|
905 | 905 | | 10 in awarded capacity across all groups, and |
---|
906 | 906 | | 11 no approved vendor may receive more than |
---|
907 | 907 | | 12 20% of each Group's waitlist allocation. |
---|
908 | 908 | | 13 (ii) Each applicant firm, upon |
---|
909 | 909 | | 14 receiving an award of program capacity |
---|
910 | 910 | | 15 proportionate to its waitlisted capacity, |
---|
911 | 911 | | 16 may then determine which waitlisted |
---|
912 | 912 | | 17 projects it chooses to be selected for a |
---|
913 | 913 | | 18 contract award up to that capacity amount. |
---|
914 | 914 | | 19 (iii) Assuming all other program |
---|
915 | 915 | | 20 requirements are met, applicant firms may |
---|
916 | 916 | | 21 adjust the nameplate capacity of applicant |
---|
917 | 917 | | 22 projects without losing waitlist |
---|
918 | 918 | | 23 eligibility, so long as no project is |
---|
919 | 919 | | 24 greater than 2,000 kilowatts in size. |
---|
920 | 920 | | 25 (iv) Assuming all other program |
---|
921 | 921 | | 26 requirements are met, applicant firms may |
---|
922 | 922 | | |
---|
923 | 923 | | |
---|
924 | 924 | | |
---|
925 | 925 | | |
---|
926 | 926 | | |
---|
927 | 927 | | HB3258 - 25 - LRB104 06526 AAS 16562 b |
---|
928 | 928 | | |
---|
929 | 929 | | |
---|
930 | 930 | | HB3258- 26 -LRB104 06526 AAS 16562 b HB3258 - 26 - LRB104 06526 AAS 16562 b |
---|
931 | 931 | | HB3258 - 26 - LRB104 06526 AAS 16562 b |
---|
932 | 932 | | 1 adjust the expected production associated |
---|
933 | 933 | | 2 with applicant projects, subject to |
---|
934 | 934 | | 3 verification by the Program Administrator. |
---|
935 | 935 | | 4 (C) After a review of affiliate |
---|
936 | 936 | | 5 information and the current ordinal waitlists, |
---|
937 | 937 | | 6 the Agency shall announce the nameplate |
---|
938 | 938 | | 7 capacity award amounts associated with |
---|
939 | 939 | | 8 applicant firms no later than 90 days after |
---|
940 | 940 | | 9 the effective date of this amendatory Act of |
---|
941 | 941 | | 10 the 102nd General Assembly. |
---|
942 | 942 | | 11 (D) Applicant firms shall submit their |
---|
943 | 943 | | 12 portfolio of projects used to satisfy those |
---|
944 | 944 | | 13 contract awards no less than 90 days after the |
---|
945 | 945 | | 14 Agency's announcement. The total nameplate |
---|
946 | 946 | | 15 capacity of all projects used to satisfy that |
---|
947 | 947 | | 16 portfolio shall be no greater than the |
---|
948 | 948 | | 17 Agency's nameplate capacity award amount |
---|
949 | 949 | | 18 associated with that applicant firm. An |
---|
950 | 950 | | 19 applicant firm may decline, in whole or in |
---|
951 | 951 | | 20 part, its nameplate capacity award without |
---|
952 | 952 | | 21 penalty, with such unmet capacity rolled over |
---|
953 | 953 | | 22 to the next block opening for project |
---|
954 | 954 | | 23 selection under item (iii) of subparagraph (K) |
---|
955 | 955 | | 24 of this subsection (c). Any projects not |
---|
956 | 956 | | 25 included in an applicant firm's portfolio may |
---|
957 | 957 | | 26 reapply without prejudice upon the next block |
---|
958 | 958 | | |
---|
959 | 959 | | |
---|
960 | 960 | | |
---|
961 | 961 | | |
---|
962 | 962 | | |
---|
963 | 963 | | HB3258 - 26 - LRB104 06526 AAS 16562 b |
---|
964 | 964 | | |
---|
965 | 965 | | |
---|
966 | 966 | | HB3258- 27 -LRB104 06526 AAS 16562 b HB3258 - 27 - LRB104 06526 AAS 16562 b |
---|
967 | 967 | | HB3258 - 27 - LRB104 06526 AAS 16562 b |
---|
968 | 968 | | 1 reopening for project selection under item |
---|
969 | 969 | | 2 (iii) of subparagraph (K) of this subsection |
---|
970 | 970 | | 3 (c). |
---|
971 | 971 | | 4 (E) The renewable energy credit delivery |
---|
972 | 972 | | 5 contract shall be subject to the contract and |
---|
973 | 973 | | 6 payment terms outlined in item (iv) of |
---|
974 | 974 | | 7 subparagraph (L) of this subsection (c). |
---|
975 | 975 | | 8 Contract instruments used for this |
---|
976 | 976 | | 9 subparagraph shall contain the following |
---|
977 | 977 | | 10 terms: |
---|
978 | 978 | | 11 (i) Renewable energy credit prices |
---|
979 | 979 | | 12 shall be fixed, without further adjustment |
---|
980 | 980 | | 13 under any other provision of this Act or |
---|
981 | 981 | | 14 for any other reason, at 10% lower than |
---|
982 | 982 | | 15 prices applicable to the last open block |
---|
983 | 983 | | 16 for this category, inclusive of any adders |
---|
984 | 984 | | 17 available for achieving a minimum of 50% |
---|
985 | 985 | | 18 of subscribers to the project's nameplate |
---|
986 | 986 | | 19 capacity being residential or small |
---|
987 | 987 | | 20 commercial customers with subscriptions of |
---|
988 | 988 | | 21 below 25 kilowatts in size; |
---|
989 | 989 | | 22 (ii) A requirement that a minimum of |
---|
990 | 990 | | 23 50% of subscribers to the project's |
---|
991 | 991 | | 24 nameplate capacity be residential or small |
---|
992 | 992 | | 25 commercial customers with subscriptions of |
---|
993 | 993 | | 26 below 25 kilowatts in size; |
---|
994 | 994 | | |
---|
995 | 995 | | |
---|
996 | 996 | | |
---|
997 | 997 | | |
---|
998 | 998 | | |
---|
999 | 999 | | HB3258 - 27 - LRB104 06526 AAS 16562 b |
---|
1000 | 1000 | | |
---|
1001 | 1001 | | |
---|
1002 | 1002 | | HB3258- 28 -LRB104 06526 AAS 16562 b HB3258 - 28 - LRB104 06526 AAS 16562 b |
---|
1003 | 1003 | | HB3258 - 28 - LRB104 06526 AAS 16562 b |
---|
1004 | 1004 | | 1 (iii) Permission for the ability of a |
---|
1005 | 1005 | | 2 contract holder to substitute projects |
---|
1006 | 1006 | | 3 with other waitlisted projects without |
---|
1007 | 1007 | | 4 penalty should a project receive a |
---|
1008 | 1008 | | 5 non-binding estimate of costs to construct |
---|
1009 | 1009 | | 6 the interconnection facilities and any |
---|
1010 | 1010 | | 7 required distribution upgrades associated |
---|
1011 | 1011 | | 8 with that project of greater than 30 cents |
---|
1012 | 1012 | | 9 per watt AC of that project's nameplate |
---|
1013 | 1013 | | 10 capacity. In developing the applicable |
---|
1014 | 1014 | | 11 contract instrument, the Agency may |
---|
1015 | 1015 | | 12 consider whether other circumstances |
---|
1016 | 1016 | | 13 outside of the control of the applicant |
---|
1017 | 1017 | | 14 firm should also warrant project |
---|
1018 | 1018 | | 15 substitution rights. |
---|
1019 | 1019 | | 16 The Agency shall publish a finalized |
---|
1020 | 1020 | | 17 updated renewable energy credit delivery |
---|
1021 | 1021 | | 18 contract developed consistent with these terms |
---|
1022 | 1022 | | 19 and conditions no less than 30 days before |
---|
1023 | 1023 | | 20 applicant firms must submit their portfolio of |
---|
1024 | 1024 | | 21 projects pursuant to item (D). |
---|
1025 | 1025 | | 22 (F) To be eligible for an award, the |
---|
1026 | 1026 | | 23 applicant firm shall certify that not less |
---|
1027 | 1027 | | 24 than prevailing wage, as determined pursuant |
---|
1028 | 1028 | | 25 to the Illinois Prevailing Wage Act, was or |
---|
1029 | 1029 | | 26 will be paid to employees who are engaged in |
---|
1030 | 1030 | | |
---|
1031 | 1031 | | |
---|
1032 | 1032 | | |
---|
1033 | 1033 | | |
---|
1034 | 1034 | | |
---|
1035 | 1035 | | HB3258 - 28 - LRB104 06526 AAS 16562 b |
---|
1036 | 1036 | | |
---|
1037 | 1037 | | |
---|
1038 | 1038 | | HB3258- 29 -LRB104 06526 AAS 16562 b HB3258 - 29 - LRB104 06526 AAS 16562 b |
---|
1039 | 1039 | | HB3258 - 29 - LRB104 06526 AAS 16562 b |
---|
1040 | 1040 | | 1 construction activities associated with a |
---|
1041 | 1041 | | 2 selected project. |
---|
1042 | 1042 | | 3 (4) The Agency shall open the first block of |
---|
1043 | 1043 | | 4 annual capacity for the category described in item |
---|
1044 | 1044 | | 5 (iv) of subparagraph (K) of this paragraph (1). |
---|
1045 | 1045 | | 6 The first block of annual capacity for item (iv) |
---|
1046 | 1046 | | 7 shall be for at least 50 megawatts of total |
---|
1047 | 1047 | | 8 nameplate capacity. Renewable energy credit prices |
---|
1048 | 1048 | | 9 shall be fixed, without further adjustment under |
---|
1049 | 1049 | | 10 any other provision of this Act or for any other |
---|
1050 | 1050 | | 11 reason, at the price in the last open block in the |
---|
1051 | 1051 | | 12 category described in item (ii) of subparagraph |
---|
1052 | 1052 | | 13 (K) of this paragraph (1). Pricing for future |
---|
1053 | 1053 | | 14 blocks of annual capacity for this category may be |
---|
1054 | 1054 | | 15 adjusted in the Agency's second revision to its |
---|
1055 | 1055 | | 16 Long-Term Renewable Resources Procurement Plan. |
---|
1056 | 1056 | | 17 Projects in this category shall be subject to the |
---|
1057 | 1057 | | 18 contract terms outlined in item (iv) of |
---|
1058 | 1058 | | 19 subparagraph (L) of this paragraph (1). |
---|
1059 | 1059 | | 20 (5) The Agency shall open the equivalent of 2 |
---|
1060 | 1060 | | 21 years of annual capacity for the category |
---|
1061 | 1061 | | 22 described in item (v) of subparagraph (K) of this |
---|
1062 | 1062 | | 23 paragraph (1). The first block of annual capacity |
---|
1063 | 1063 | | 24 for item (v) shall be for at least 10 megawatts of |
---|
1064 | 1064 | | 25 total nameplate capacity. Notwithstanding the |
---|
1065 | 1065 | | 26 provisions of item (v) of subparagraph (K) of this |
---|
1066 | 1066 | | |
---|
1067 | 1067 | | |
---|
1068 | 1068 | | |
---|
1069 | 1069 | | |
---|
1070 | 1070 | | |
---|
1071 | 1071 | | HB3258 - 29 - LRB104 06526 AAS 16562 b |
---|
1072 | 1072 | | |
---|
1073 | 1073 | | |
---|
1074 | 1074 | | HB3258- 30 -LRB104 06526 AAS 16562 b HB3258 - 30 - LRB104 06526 AAS 16562 b |
---|
1075 | 1075 | | HB3258 - 30 - LRB104 06526 AAS 16562 b |
---|
1076 | 1076 | | 1 paragraph (1), for the purpose of this initial |
---|
1077 | 1077 | | 2 block, the agency shall accept new project |
---|
1078 | 1078 | | 3 applications intended to increase the diversity of |
---|
1079 | 1079 | | 4 areas hosting community solar projects, the |
---|
1080 | 1080 | | 5 business models of projects, and the size of |
---|
1081 | 1081 | | 6 projects, as described by the Agency in its |
---|
1082 | 1082 | | 7 long-term renewable resources procurement plan |
---|
1083 | 1083 | | 8 that is approved as of the effective date of this |
---|
1084 | 1084 | | 9 amendatory Act of the 102nd General Assembly. |
---|
1085 | 1085 | | 10 Projects in this category shall be subject to the |
---|
1086 | 1086 | | 11 contract terms outlined in item (iii) of |
---|
1087 | 1087 | | 12 subsection (L) of this paragraph (1). |
---|
1088 | 1088 | | 13 (6) The Agency shall open the first blocks of |
---|
1089 | 1089 | | 14 annual capacity for the category described in item |
---|
1090 | 1090 | | 15 (vi) of subparagraph (K) of this paragraph (1), |
---|
1091 | 1091 | | 16 with allocations of capacity within the block |
---|
1092 | 1092 | | 17 generally matching the historical share of block |
---|
1093 | 1093 | | 18 capacity allocated between the category described |
---|
1094 | 1094 | | 19 in items (i) and (ii) of subparagraph (K) of this |
---|
1095 | 1095 | | 20 paragraph (1). The first two blocks of annual |
---|
1096 | 1096 | | 21 capacity for item (vi) shall be for at least 75 |
---|
1097 | 1097 | | 22 megawatts of total nameplate capacity. The price |
---|
1098 | 1098 | | 23 of renewable energy credits for the blocks of |
---|
1099 | 1099 | | 24 capacity shall be 4% less than the price of the |
---|
1100 | 1100 | | 25 last open blocks in the categories described in |
---|
1101 | 1101 | | 26 items (i) and (ii) of subparagraph (K) of this |
---|
1102 | 1102 | | |
---|
1103 | 1103 | | |
---|
1104 | 1104 | | |
---|
1105 | 1105 | | |
---|
1106 | 1106 | | |
---|
1107 | 1107 | | HB3258 - 30 - LRB104 06526 AAS 16562 b |
---|
1108 | 1108 | | |
---|
1109 | 1109 | | |
---|
1110 | 1110 | | HB3258- 31 -LRB104 06526 AAS 16562 b HB3258 - 31 - LRB104 06526 AAS 16562 b |
---|
1111 | 1111 | | HB3258 - 31 - LRB104 06526 AAS 16562 b |
---|
1112 | 1112 | | 1 paragraph (1). Pricing for future blocks of annual |
---|
1113 | 1113 | | 2 capacity for this category may be adjusted in the |
---|
1114 | 1114 | | 3 Agency's second revision to its Long-Term |
---|
1115 | 1115 | | 4 Renewable Resources Procurement Plan. Projects in |
---|
1116 | 1116 | | 5 this category shall be subject to the applicable |
---|
1117 | 1117 | | 6 contract terms outlined in items (ii) and (iii) of |
---|
1118 | 1118 | | 7 subparagraph (L) of this paragraph (1). |
---|
1119 | 1119 | | 8 (v) Upon the effective date of this amendatory Act |
---|
1120 | 1120 | | 9 of the 102nd General Assembly, for all competitive |
---|
1121 | 1121 | | 10 procurements and any procurements of renewable energy |
---|
1122 | 1122 | | 11 credit from new utility-scale wind and new |
---|
1123 | 1123 | | 12 utility-scale photovoltaic projects, the Agency shall |
---|
1124 | 1124 | | 13 procure indexed renewable energy credits and direct |
---|
1125 | 1125 | | 14 respondents to offer a strike price. |
---|
1126 | 1126 | | 15 (1) The purchase price of the indexed |
---|
1127 | 1127 | | 16 renewable energy credit payment shall be |
---|
1128 | 1128 | | 17 calculated for each settlement period. That |
---|
1129 | 1129 | | 18 payment, for any settlement period, shall be equal |
---|
1130 | 1130 | | 19 to the difference resulting from subtracting the |
---|
1131 | 1131 | | 20 strike price from the index price for that |
---|
1132 | 1132 | | 21 settlement period. If this difference results in a |
---|
1133 | 1133 | | 22 negative number, the indexed REC counterparty |
---|
1134 | 1134 | | 23 shall owe the seller the absolute value multiplied |
---|
1135 | 1135 | | 24 by the quantity of energy produced in the relevant |
---|
1136 | 1136 | | 25 settlement period. If this difference results in a |
---|
1137 | 1137 | | 26 positive number, the seller shall owe the indexed |
---|
1138 | 1138 | | |
---|
1139 | 1139 | | |
---|
1140 | 1140 | | |
---|
1141 | 1141 | | |
---|
1142 | 1142 | | |
---|
1143 | 1143 | | HB3258 - 31 - LRB104 06526 AAS 16562 b |
---|
1144 | 1144 | | |
---|
1145 | 1145 | | |
---|
1146 | 1146 | | HB3258- 32 -LRB104 06526 AAS 16562 b HB3258 - 32 - LRB104 06526 AAS 16562 b |
---|
1147 | 1147 | | HB3258 - 32 - LRB104 06526 AAS 16562 b |
---|
1148 | 1148 | | 1 REC counterparty this amount multiplied by the |
---|
1149 | 1149 | | 2 quantity of energy produced in the relevant |
---|
1150 | 1150 | | 3 settlement period. |
---|
1151 | 1151 | | 4 (2) Parties shall cash settle every month, |
---|
1152 | 1152 | | 5 summing up all settlements (both positive and |
---|
1153 | 1153 | | 6 negative, if applicable) for the prior month. |
---|
1154 | 1154 | | 7 (3) To ensure funding in the annual budget |
---|
1155 | 1155 | | 8 established under subparagraph (E) for indexed |
---|
1156 | 1156 | | 9 renewable energy credit procurements for each year |
---|
1157 | 1157 | | 10 of the term of such contracts, which must have a |
---|
1158 | 1158 | | 11 minimum tenure of 20 calendar years, the |
---|
1159 | 1159 | | 12 procurement administrator, Agency, Commission |
---|
1160 | 1160 | | 13 staff, and procurement monitor shall quantify the |
---|
1161 | 1161 | | 14 annual cost of the contract by utilizing an |
---|
1162 | 1162 | | 15 industry-standard, third-party forward price curve |
---|
1163 | 1163 | | 16 for energy at the appropriate hub or load zone, |
---|
1164 | 1164 | | 17 including the estimated magnitude and timing of |
---|
1165 | 1165 | | 18 the price effects related to federal carbon |
---|
1166 | 1166 | | 19 controls. Each forward price curve shall contain a |
---|
1167 | 1167 | | 20 specific value of the forecasted market price of |
---|
1168 | 1168 | | 21 electricity for each annual delivery year of the |
---|
1169 | 1169 | | 22 contract. For procurement planning purposes, the |
---|
1170 | 1170 | | 23 impact on the annual budget for the cost of |
---|
1171 | 1171 | | 24 indexed renewable energy credits for each delivery |
---|
1172 | 1172 | | 25 year shall be determined as the expected annual |
---|
1173 | 1173 | | 26 contract expenditure for that year, equaling the |
---|
1174 | 1174 | | |
---|
1175 | 1175 | | |
---|
1176 | 1176 | | |
---|
1177 | 1177 | | |
---|
1178 | 1178 | | |
---|
1179 | 1179 | | HB3258 - 32 - LRB104 06526 AAS 16562 b |
---|
1180 | 1180 | | |
---|
1181 | 1181 | | |
---|
1182 | 1182 | | HB3258- 33 -LRB104 06526 AAS 16562 b HB3258 - 33 - LRB104 06526 AAS 16562 b |
---|
1183 | 1183 | | HB3258 - 33 - LRB104 06526 AAS 16562 b |
---|
1184 | 1184 | | 1 difference between (i) the sum across all relevant |
---|
1185 | 1185 | | 2 contracts of the applicable strike price |
---|
1186 | 1186 | | 3 multiplied by contract quantity and (ii) the sum |
---|
1187 | 1187 | | 4 across all relevant contracts of the forward price |
---|
1188 | 1188 | | 5 curve for the applicable load zone for that year |
---|
1189 | 1189 | | 6 multiplied by contract quantity. The contracting |
---|
1190 | 1190 | | 7 utility shall not assume an obligation in excess |
---|
1191 | 1191 | | 8 of the estimated annual cost of the contracts for |
---|
1192 | 1192 | | 9 indexed renewable energy credits. Forward curves |
---|
1193 | 1193 | | 10 shall be revised on an annual basis as updated |
---|
1194 | 1194 | | 11 forward price curves are released and filed with |
---|
1195 | 1195 | | 12 the Commission in the proceeding approving the |
---|
1196 | 1196 | | 13 Agency's most recent long-term renewable resources |
---|
1197 | 1197 | | 14 procurement plan. If the expected contract spend |
---|
1198 | 1198 | | 15 is higher or lower than the total quantity of |
---|
1199 | 1199 | | 16 contracts multiplied by the forward price curve |
---|
1200 | 1200 | | 17 value for that year, the forward price curve shall |
---|
1201 | 1201 | | 18 be updated by the procurement administrator, in |
---|
1202 | 1202 | | 19 consultation with the Agency, Commission staff, |
---|
1203 | 1203 | | 20 and procurement monitors, using then-currently |
---|
1204 | 1204 | | 21 available price forecast data and additional |
---|
1205 | 1205 | | 22 budget dollars shall be obligated or reobligated |
---|
1206 | 1206 | | 23 as appropriate. |
---|
1207 | 1207 | | 24 (4) To ensure that indexed renewable energy |
---|
1208 | 1208 | | 25 credit prices remain predictable and affordable, |
---|
1209 | 1209 | | 26 the Agency may consider the institution of a price |
---|
1210 | 1210 | | |
---|
1211 | 1211 | | |
---|
1212 | 1212 | | |
---|
1213 | 1213 | | |
---|
1214 | 1214 | | |
---|
1215 | 1215 | | HB3258 - 33 - LRB104 06526 AAS 16562 b |
---|
1216 | 1216 | | |
---|
1217 | 1217 | | |
---|
1218 | 1218 | | HB3258- 34 -LRB104 06526 AAS 16562 b HB3258 - 34 - LRB104 06526 AAS 16562 b |
---|
1219 | 1219 | | HB3258 - 34 - LRB104 06526 AAS 16562 b |
---|
1220 | 1220 | | 1 collar on REC prices paid under indexed renewable |
---|
1221 | 1221 | | 2 energy credit procurements establishing floor and |
---|
1222 | 1222 | | 3 ceiling REC prices applicable to indexed REC |
---|
1223 | 1223 | | 4 contract prices. Any price collars applicable to |
---|
1224 | 1224 | | 5 indexed REC procurements shall be proposed by the |
---|
1225 | 1225 | | 6 Agency through its long-term renewable resources |
---|
1226 | 1226 | | 7 procurement plan. |
---|
1227 | 1227 | | 8 (vi) All procurements under this subparagraph (G), |
---|
1228 | 1228 | | 9 including the procurement of renewable energy credits |
---|
1229 | 1229 | | 10 from hydropower facilities, shall comply with the |
---|
1230 | 1230 | | 11 geographic requirements in subparagraph (I) of this |
---|
1231 | 1231 | | 12 paragraph (1) and shall follow the procurement |
---|
1232 | 1232 | | 13 processes and procedures described in this Section and |
---|
1233 | 1233 | | 14 Section 16-111.5 of the Public Utilities Act to the |
---|
1234 | 1234 | | 15 extent practicable, and these processes and procedures |
---|
1235 | 1235 | | 16 may be expedited to accommodate the schedule |
---|
1236 | 1236 | | 17 established by this subparagraph (G). |
---|
1237 | 1237 | | 18 (vii) On and after the effective date of this |
---|
1238 | 1238 | | 19 amendatory Act of the 103rd General Assembly, for all |
---|
1239 | 1239 | | 20 procurements of renewable energy credits from |
---|
1240 | 1240 | | 21 hydropower facilities, the Agency shall establish |
---|
1241 | 1241 | | 22 contract terms designed to optimize existing |
---|
1242 | 1242 | | 23 hydropower facilities through modernization or |
---|
1243 | 1243 | | 24 retooling and establish new hydropower facilities at |
---|
1244 | 1244 | | 25 existing dams. Procurements made under this item (vii) |
---|
1245 | 1245 | | 26 shall prioritize projects located in designated |
---|
1246 | 1246 | | |
---|
1247 | 1247 | | |
---|
1248 | 1248 | | |
---|
1249 | 1249 | | |
---|
1250 | 1250 | | |
---|
1251 | 1251 | | HB3258 - 34 - LRB104 06526 AAS 16562 b |
---|
1252 | 1252 | | |
---|
1253 | 1253 | | |
---|
1254 | 1254 | | HB3258- 35 -LRB104 06526 AAS 16562 b HB3258 - 35 - LRB104 06526 AAS 16562 b |
---|
1255 | 1255 | | HB3258 - 35 - LRB104 06526 AAS 16562 b |
---|
1256 | 1256 | | 1 environmental justice communities, as defined in |
---|
1257 | 1257 | | 2 subsection (b) of Section 1-56 of this Act, or in |
---|
1258 | 1258 | | 3 projects located in units of local government with |
---|
1259 | 1259 | | 4 median incomes that do not exceed 82% of the median |
---|
1260 | 1260 | | 5 income of the State. |
---|
1261 | 1261 | | 6 (H) The procurement of renewable energy resources for |
---|
1262 | 1262 | | 7 a given delivery year shall be reduced as described in |
---|
1263 | 1263 | | 8 this subparagraph (H) if an alternative retail electric |
---|
1264 | 1264 | | 9 supplier meets the requirements described in this |
---|
1265 | 1265 | | 10 subparagraph (H). |
---|
1266 | 1266 | | 11 (i) Within 45 days after June 1, 2017 (the |
---|
1267 | 1267 | | 12 effective date of Public Act 99-906), an alternative |
---|
1268 | 1268 | | 13 retail electric supplier or its successor shall submit |
---|
1269 | 1269 | | 14 an informational filing to the Illinois Commerce |
---|
1270 | 1270 | | 15 Commission certifying that, as of December 31, 2015, |
---|
1271 | 1271 | | 16 the alternative retail electric supplier owned one or |
---|
1272 | 1272 | | 17 more electric generating facilities that generates |
---|
1273 | 1273 | | 18 renewable energy resources as defined in Section 1-10 |
---|
1274 | 1274 | | 19 of this Act, provided that such facilities are not |
---|
1275 | 1275 | | 20 powered by wind or photovoltaics, and the facilities |
---|
1276 | 1276 | | 21 generate one renewable energy credit for each |
---|
1277 | 1277 | | 22 megawatthour of energy produced from the facility. |
---|
1278 | 1278 | | 23 The informational filing shall identify each |
---|
1279 | 1279 | | 24 facility that was eligible to satisfy the alternative |
---|
1280 | 1280 | | 25 retail electric supplier's obligations under Section |
---|
1281 | 1281 | | 26 16-115D of the Public Utilities Act as described in |
---|
1282 | 1282 | | |
---|
1283 | 1283 | | |
---|
1284 | 1284 | | |
---|
1285 | 1285 | | |
---|
1286 | 1286 | | |
---|
1287 | 1287 | | HB3258 - 35 - LRB104 06526 AAS 16562 b |
---|
1288 | 1288 | | |
---|
1289 | 1289 | | |
---|
1290 | 1290 | | HB3258- 36 -LRB104 06526 AAS 16562 b HB3258 - 36 - LRB104 06526 AAS 16562 b |
---|
1291 | 1291 | | HB3258 - 36 - LRB104 06526 AAS 16562 b |
---|
1292 | 1292 | | 1 this item (i). |
---|
1293 | 1293 | | 2 (ii) For a given delivery year, the alternative |
---|
1294 | 1294 | | 3 retail electric supplier may elect to supply its |
---|
1295 | 1295 | | 4 retail customers with renewable energy credits from |
---|
1296 | 1296 | | 5 the facility or facilities described in item (i) of |
---|
1297 | 1297 | | 6 this subparagraph (H) that continue to be owned by the |
---|
1298 | 1298 | | 7 alternative retail electric supplier. |
---|
1299 | 1299 | | 8 (iii) The alternative retail electric supplier |
---|
1300 | 1300 | | 9 shall notify the Agency and the applicable utility, no |
---|
1301 | 1301 | | 10 later than February 28 of the year preceding the |
---|
1302 | 1302 | | 11 applicable delivery year or 15 days after June 1, 2017 |
---|
1303 | 1303 | | 12 (the effective date of Public Act 99-906), whichever |
---|
1304 | 1304 | | 13 is later, of its election under item (ii) of this |
---|
1305 | 1305 | | 14 subparagraph (H) to supply renewable energy credits to |
---|
1306 | 1306 | | 15 retail customers of the utility. Such election shall |
---|
1307 | 1307 | | 16 identify the amount of renewable energy credits to be |
---|
1308 | 1308 | | 17 supplied by the alternative retail electric supplier |
---|
1309 | 1309 | | 18 to the utility's retail customers and the source of |
---|
1310 | 1310 | | 19 the renewable energy credits identified in the |
---|
1311 | 1311 | | 20 informational filing as described in item (i) of this |
---|
1312 | 1312 | | 21 subparagraph (H), subject to the following |
---|
1313 | 1313 | | 22 limitations: |
---|
1314 | 1314 | | 23 For the delivery year beginning June 1, 2018, |
---|
1315 | 1315 | | 24 the maximum amount of renewable energy credits to |
---|
1316 | 1316 | | 25 be supplied by an alternative retail electric |
---|
1317 | 1317 | | 26 supplier under this subparagraph (H) shall be 68% |
---|
1318 | 1318 | | |
---|
1319 | 1319 | | |
---|
1320 | 1320 | | |
---|
1321 | 1321 | | |
---|
1322 | 1322 | | |
---|
1323 | 1323 | | HB3258 - 36 - LRB104 06526 AAS 16562 b |
---|
1324 | 1324 | | |
---|
1325 | 1325 | | |
---|
1326 | 1326 | | HB3258- 37 -LRB104 06526 AAS 16562 b HB3258 - 37 - LRB104 06526 AAS 16562 b |
---|
1327 | 1327 | | HB3258 - 37 - LRB104 06526 AAS 16562 b |
---|
1328 | 1328 | | 1 multiplied by 25% multiplied by 14.5% multiplied |
---|
1329 | 1329 | | 2 by the amount of metered electricity |
---|
1330 | 1330 | | 3 (megawatt-hours) delivered by the alternative |
---|
1331 | 1331 | | 4 retail electric supplier to Illinois retail |
---|
1332 | 1332 | | 5 customers during the delivery year ending May 31, |
---|
1333 | 1333 | | 6 2016. |
---|
1334 | 1334 | | 7 For delivery years beginning June 1, 2019 and |
---|
1335 | 1335 | | 8 each year thereafter, the maximum amount of |
---|
1336 | 1336 | | 9 renewable energy credits to be supplied by an |
---|
1337 | 1337 | | 10 alternative retail electric supplier under this |
---|
1338 | 1338 | | 11 subparagraph (H) shall be 68% multiplied by 50% |
---|
1339 | 1339 | | 12 multiplied by 16% multiplied by the amount of |
---|
1340 | 1340 | | 13 metered electricity (megawatt-hours) delivered by |
---|
1341 | 1341 | | 14 the alternative retail electric supplier to |
---|
1342 | 1342 | | 15 Illinois retail customers during the delivery year |
---|
1343 | 1343 | | 16 ending May 31, 2016, provided that the 16% value |
---|
1344 | 1344 | | 17 shall increase by 1.5% each delivery year |
---|
1345 | 1345 | | 18 thereafter to 25% by the delivery year beginning |
---|
1346 | 1346 | | 19 June 1, 2025, and thereafter the 25% value shall |
---|
1347 | 1347 | | 20 apply to each delivery year. |
---|
1348 | 1348 | | 21 For each delivery year, the total amount of |
---|
1349 | 1349 | | 22 renewable energy credits supplied by all alternative |
---|
1350 | 1350 | | 23 retail electric suppliers under this subparagraph (H) |
---|
1351 | 1351 | | 24 shall not exceed 9% of the Illinois target renewable |
---|
1352 | 1352 | | 25 energy credit quantity. The Illinois target renewable |
---|
1353 | 1353 | | 26 energy credit quantity for the delivery year beginning |
---|
1354 | 1354 | | |
---|
1355 | 1355 | | |
---|
1356 | 1356 | | |
---|
1357 | 1357 | | |
---|
1358 | 1358 | | |
---|
1359 | 1359 | | HB3258 - 37 - LRB104 06526 AAS 16562 b |
---|
1360 | 1360 | | |
---|
1361 | 1361 | | |
---|
1362 | 1362 | | HB3258- 38 -LRB104 06526 AAS 16562 b HB3258 - 38 - LRB104 06526 AAS 16562 b |
---|
1363 | 1363 | | HB3258 - 38 - LRB104 06526 AAS 16562 b |
---|
1364 | 1364 | | 1 June 1, 2018 is 14.5% multiplied by the total amount of |
---|
1365 | 1365 | | 2 metered electricity (megawatt-hours) delivered in the |
---|
1366 | 1366 | | 3 delivery year immediately preceding that delivery |
---|
1367 | 1367 | | 4 year, provided that the 14.5% shall increase by 1.5% |
---|
1368 | 1368 | | 5 each delivery year thereafter to 25% by the delivery |
---|
1369 | 1369 | | 6 year beginning June 1, 2025, and thereafter the 25% |
---|
1370 | 1370 | | 7 value shall apply to each delivery year. |
---|
1371 | 1371 | | 8 If the requirements set forth in items (i) through |
---|
1372 | 1372 | | 9 (iii) of this subparagraph (H) are met, the charges |
---|
1373 | 1373 | | 10 that would otherwise be applicable to the retail |
---|
1374 | 1374 | | 11 customers of the alternative retail electric supplier |
---|
1375 | 1375 | | 12 under paragraph (6) of this subsection (c) for the |
---|
1376 | 1376 | | 13 applicable delivery year shall be reduced by the ratio |
---|
1377 | 1377 | | 14 of the quantity of renewable energy credits supplied |
---|
1378 | 1378 | | 15 by the alternative retail electric supplier compared |
---|
1379 | 1379 | | 16 to that supplier's target renewable energy credit |
---|
1380 | 1380 | | 17 quantity. The supplier's target renewable energy |
---|
1381 | 1381 | | 18 credit quantity for the delivery year beginning June |
---|
1382 | 1382 | | 19 1, 2018 is 14.5% multiplied by the total amount of |
---|
1383 | 1383 | | 20 metered electricity (megawatt-hours) delivered by the |
---|
1384 | 1384 | | 21 alternative retail supplier in that delivery year, |
---|
1385 | 1385 | | 22 provided that the 14.5% shall increase by 1.5% each |
---|
1386 | 1386 | | 23 delivery year thereafter to 25% by the delivery year |
---|
1387 | 1387 | | 24 beginning June 1, 2025, and thereafter the 25% value |
---|
1388 | 1388 | | 25 shall apply to each delivery year. |
---|
1389 | 1389 | | 26 On or before April 1 of each year, the Agency shall |
---|
1390 | 1390 | | |
---|
1391 | 1391 | | |
---|
1392 | 1392 | | |
---|
1393 | 1393 | | |
---|
1394 | 1394 | | |
---|
1395 | 1395 | | HB3258 - 38 - LRB104 06526 AAS 16562 b |
---|
1396 | 1396 | | |
---|
1397 | 1397 | | |
---|
1398 | 1398 | | HB3258- 39 -LRB104 06526 AAS 16562 b HB3258 - 39 - LRB104 06526 AAS 16562 b |
---|
1399 | 1399 | | HB3258 - 39 - LRB104 06526 AAS 16562 b |
---|
1400 | 1400 | | 1 annually publish a report on its website that |
---|
1401 | 1401 | | 2 identifies the aggregate amount of renewable energy |
---|
1402 | 1402 | | 3 credits supplied by alternative retail electric |
---|
1403 | 1403 | | 4 suppliers under this subparagraph (H). |
---|
1404 | 1404 | | 5 (I) The Agency shall design its long-term renewable |
---|
1405 | 1405 | | 6 energy procurement plan to maximize the State's interest |
---|
1406 | 1406 | | 7 in the health, safety, and welfare of its residents, |
---|
1407 | 1407 | | 8 including but not limited to minimizing sulfur dioxide, |
---|
1408 | 1408 | | 9 nitrogen oxide, particulate matter and other pollution |
---|
1409 | 1409 | | 10 that adversely affects public health in this State, |
---|
1410 | 1410 | | 11 increasing fuel and resource diversity in this State, |
---|
1411 | 1411 | | 12 enhancing the reliability and resiliency of the |
---|
1412 | 1412 | | 13 electricity distribution system in this State, meeting |
---|
1413 | 1413 | | 14 goals to limit carbon dioxide emissions under federal or |
---|
1414 | 1414 | | 15 State law, and contributing to a cleaner and healthier |
---|
1415 | 1415 | | 16 environment for the citizens of this State. In order to |
---|
1416 | 1416 | | 17 further these legislative purposes, renewable energy |
---|
1417 | 1417 | | 18 credits shall be eligible to be counted toward the |
---|
1418 | 1418 | | 19 renewable energy requirements of this subsection (c) if |
---|
1419 | 1419 | | 20 they are generated from facilities located in this State. |
---|
1420 | 1420 | | 21 The Agency may qualify renewable energy credits from |
---|
1421 | 1421 | | 22 facilities located in states adjacent to Illinois or |
---|
1422 | 1422 | | 23 renewable energy credits associated with the electricity |
---|
1423 | 1423 | | 24 generated by a utility-scale wind energy facility or |
---|
1424 | 1424 | | 25 utility-scale photovoltaic facility and transmitted by a |
---|
1425 | 1425 | | 26 qualifying direct current project described in subsection |
---|
1426 | 1426 | | |
---|
1427 | 1427 | | |
---|
1428 | 1428 | | |
---|
1429 | 1429 | | |
---|
1430 | 1430 | | |
---|
1431 | 1431 | | HB3258 - 39 - LRB104 06526 AAS 16562 b |
---|
1432 | 1432 | | |
---|
1433 | 1433 | | |
---|
1434 | 1434 | | HB3258- 40 -LRB104 06526 AAS 16562 b HB3258 - 40 - LRB104 06526 AAS 16562 b |
---|
1435 | 1435 | | HB3258 - 40 - LRB104 06526 AAS 16562 b |
---|
1436 | 1436 | | 1 (b-5) of Section 8-406 of the Public Utilities Act to a |
---|
1437 | 1437 | | 2 delivery point on the electric transmission grid located |
---|
1438 | 1438 | | 3 in this State or a state adjacent to Illinois, if the |
---|
1439 | 1439 | | 4 generator demonstrates and the Agency determines that the |
---|
1440 | 1440 | | 5 operation of such facility or facilities will help promote |
---|
1441 | 1441 | | 6 the State's interest in the health, safety, and welfare of |
---|
1442 | 1442 | | 7 its residents based on the public interest criteria |
---|
1443 | 1443 | | 8 described above. For the purposes of this Section, |
---|
1444 | 1444 | | 9 renewable resources that are delivered via a high voltage |
---|
1445 | 1445 | | 10 direct current converter station located in Illinois shall |
---|
1446 | 1446 | | 11 be deemed generated in Illinois at the time and location |
---|
1447 | 1447 | | 12 the energy is converted to alternating current by the high |
---|
1448 | 1448 | | 13 voltage direct current converter station if the high |
---|
1449 | 1449 | | 14 voltage direct current transmission line: (i) after the |
---|
1450 | 1450 | | 15 effective date of this amendatory Act of the 102nd General |
---|
1451 | 1451 | | 16 Assembly, was constructed with a project labor agreement; |
---|
1452 | 1452 | | 17 (ii) is capable of transmitting electricity at 525kv; |
---|
1453 | 1453 | | 18 (iii) has an Illinois converter station located and |
---|
1454 | 1454 | | 19 interconnected in the region of the PJM Interconnection, |
---|
1455 | 1455 | | 20 LLC; (iv) does not operate as a public utility; and (v) if |
---|
1456 | 1456 | | 21 the high voltage direct current transmission line was |
---|
1457 | 1457 | | 22 energized after June 1, 2023. To ensure that the public |
---|
1458 | 1458 | | 23 interest criteria are applied to the procurement and given |
---|
1459 | 1459 | | 24 full effect, the Agency's long-term procurement plan shall |
---|
1460 | 1460 | | 25 describe in detail how each public interest factor shall |
---|
1461 | 1461 | | 26 be considered and weighted for facilities located in |
---|
1462 | 1462 | | |
---|
1463 | 1463 | | |
---|
1464 | 1464 | | |
---|
1465 | 1465 | | |
---|
1466 | 1466 | | |
---|
1467 | 1467 | | HB3258 - 40 - LRB104 06526 AAS 16562 b |
---|
1468 | 1468 | | |
---|
1469 | 1469 | | |
---|
1470 | 1470 | | HB3258- 41 -LRB104 06526 AAS 16562 b HB3258 - 41 - LRB104 06526 AAS 16562 b |
---|
1471 | 1471 | | HB3258 - 41 - LRB104 06526 AAS 16562 b |
---|
1472 | 1472 | | 1 states adjacent to Illinois. |
---|
1473 | 1473 | | 2 (J) In order to promote the competitive development of |
---|
1474 | 1474 | | 3 renewable energy resources in furtherance of the State's |
---|
1475 | 1475 | | 4 interest in the health, safety, and welfare of its |
---|
1476 | 1476 | | 5 residents, renewable energy credits shall not be eligible |
---|
1477 | 1477 | | 6 to be counted toward the renewable energy requirements of |
---|
1478 | 1478 | | 7 this subsection (c) if they are sourced from a generating |
---|
1479 | 1479 | | 8 unit whose costs were being recovered through rates |
---|
1480 | 1480 | | 9 regulated by this State or any other state or states on or |
---|
1481 | 1481 | | 10 after January 1, 2017. Each contract executed to purchase |
---|
1482 | 1482 | | 11 renewable energy credits under this subsection (c) shall |
---|
1483 | 1483 | | 12 provide for the contract's termination if the costs of the |
---|
1484 | 1484 | | 13 generating unit supplying the renewable energy credits |
---|
1485 | 1485 | | 14 subsequently begin to be recovered through rates regulated |
---|
1486 | 1486 | | 15 by this State or any other state or states; and each |
---|
1487 | 1487 | | 16 contract shall further provide that, in that event, the |
---|
1488 | 1488 | | 17 supplier of the credits must return 110% of all payments |
---|
1489 | 1489 | | 18 received under the contract. Amounts returned under the |
---|
1490 | 1490 | | 19 requirements of this subparagraph (J) shall be retained by |
---|
1491 | 1491 | | 20 the utility and all of these amounts shall be used for the |
---|
1492 | 1492 | | 21 procurement of additional renewable energy credits from |
---|
1493 | 1493 | | 22 new wind or new photovoltaic resources as defined in this |
---|
1494 | 1494 | | 23 subsection (c). The long-term plan shall provide that |
---|
1495 | 1495 | | 24 these renewable energy credits shall be procured in the |
---|
1496 | 1496 | | 25 next procurement event. |
---|
1497 | 1497 | | 26 Notwithstanding the limitations of this subparagraph |
---|
1498 | 1498 | | |
---|
1499 | 1499 | | |
---|
1500 | 1500 | | |
---|
1501 | 1501 | | |
---|
1502 | 1502 | | |
---|
1503 | 1503 | | HB3258 - 41 - LRB104 06526 AAS 16562 b |
---|
1504 | 1504 | | |
---|
1505 | 1505 | | |
---|
1506 | 1506 | | HB3258- 42 -LRB104 06526 AAS 16562 b HB3258 - 42 - LRB104 06526 AAS 16562 b |
---|
1507 | 1507 | | HB3258 - 42 - LRB104 06526 AAS 16562 b |
---|
1508 | 1508 | | 1 (J), renewable energy credits sourced from generating |
---|
1509 | 1509 | | 2 units that are constructed, purchased, owned, or leased by |
---|
1510 | 1510 | | 3 an electric utility as part of an approved project, |
---|
1511 | 1511 | | 4 program, or pilot under Section 1-56 of this Act shall be |
---|
1512 | 1512 | | 5 eligible to be counted toward the renewable energy |
---|
1513 | 1513 | | 6 requirements of this subsection (c), regardless of how the |
---|
1514 | 1514 | | 7 costs of these units are recovered. As long as a |
---|
1515 | 1515 | | 8 generating unit or an identifiable portion of a generating |
---|
1516 | 1516 | | 9 unit has not had and does not have its costs recovered |
---|
1517 | 1517 | | 10 through rates regulated by this State or any other state, |
---|
1518 | 1518 | | 11 HVDC renewable energy credits associated with that |
---|
1519 | 1519 | | 12 generating unit or identifiable portion thereof shall be |
---|
1520 | 1520 | | 13 eligible to be counted toward the renewable energy |
---|
1521 | 1521 | | 14 requirements of this subsection (c). |
---|
1522 | 1522 | | 15 (K) The long-term renewable resources procurement plan |
---|
1523 | 1523 | | 16 developed by the Agency in accordance with subparagraph |
---|
1524 | 1524 | | 17 (A) of this paragraph (1) shall include an Adjustable |
---|
1525 | 1525 | | 18 Block program for the procurement of renewable energy |
---|
1526 | 1526 | | 19 credits from new photovoltaic projects that are |
---|
1527 | 1527 | | 20 distributed renewable energy generation devices or new |
---|
1528 | 1528 | | 21 photovoltaic community renewable generation projects. The |
---|
1529 | 1529 | | 22 Adjustable Block program shall be generally designed to |
---|
1530 | 1530 | | 23 provide for the steady, predictable, and sustainable |
---|
1531 | 1531 | | 24 growth of new solar photovoltaic development in Illinois. |
---|
1532 | 1532 | | 25 To this end, the Adjustable Block program shall provide a |
---|
1533 | 1533 | | 26 transparent annual schedule of prices and quantities to |
---|
1534 | 1534 | | |
---|
1535 | 1535 | | |
---|
1536 | 1536 | | |
---|
1537 | 1537 | | |
---|
1538 | 1538 | | |
---|
1539 | 1539 | | HB3258 - 42 - LRB104 06526 AAS 16562 b |
---|
1540 | 1540 | | |
---|
1541 | 1541 | | |
---|
1542 | 1542 | | HB3258- 43 -LRB104 06526 AAS 16562 b HB3258 - 43 - LRB104 06526 AAS 16562 b |
---|
1543 | 1543 | | HB3258 - 43 - LRB104 06526 AAS 16562 b |
---|
1544 | 1544 | | 1 enable the photovoltaic market to scale up and for |
---|
1545 | 1545 | | 2 renewable energy credit prices to adjust at a predictable |
---|
1546 | 1546 | | 3 rate over time. The prices set by the Adjustable Block |
---|
1547 | 1547 | | 4 program can be reflected as a set value or as the product |
---|
1548 | 1548 | | 5 of a formula. |
---|
1549 | 1549 | | 6 The Adjustable Block program shall include for each |
---|
1550 | 1550 | | 7 category of eligible projects for each delivery year: a |
---|
1551 | 1551 | | 8 single block of nameplate capacity, a price for renewable |
---|
1552 | 1552 | | 9 energy credits within that block, and the terms and |
---|
1553 | 1553 | | 10 conditions for securing a spot on a waitlist once the |
---|
1554 | 1554 | | 11 block is fully committed or reserved. Except as outlined |
---|
1555 | 1555 | | 12 below, the waitlist of projects in a given year will carry |
---|
1556 | 1556 | | 13 over to apply to the subsequent year when another block is |
---|
1557 | 1557 | | 14 opened. Only projects energized on or after June 1, 2017 |
---|
1558 | 1558 | | 15 shall be eligible for the Adjustable Block program. For |
---|
1559 | 1559 | | 16 each category for each delivery year the Agency shall |
---|
1560 | 1560 | | 17 determine the amount of generation capacity in each block, |
---|
1561 | 1561 | | 18 and the purchase price for each block, provided that the |
---|
1562 | 1562 | | 19 purchase price provided and the total amount of generation |
---|
1563 | 1563 | | 20 in all blocks for all categories shall be sufficient to |
---|
1564 | 1564 | | 21 meet the goals in this subsection (c). The Agency shall |
---|
1565 | 1565 | | 22 strive to issue a single block sized to provide for |
---|
1566 | 1566 | | 23 stability and market growth. The Agency shall establish |
---|
1567 | 1567 | | 24 program eligibility requirements that ensure that projects |
---|
1568 | 1568 | | 25 that enter the program are sufficiently mature to indicate |
---|
1569 | 1569 | | 26 a demonstrable path to completion. The Agency may |
---|
1570 | 1570 | | |
---|
1571 | 1571 | | |
---|
1572 | 1572 | | |
---|
1573 | 1573 | | |
---|
1574 | 1574 | | |
---|
1575 | 1575 | | HB3258 - 43 - LRB104 06526 AAS 16562 b |
---|
1576 | 1576 | | |
---|
1577 | 1577 | | |
---|
1578 | 1578 | | HB3258- 44 -LRB104 06526 AAS 16562 b HB3258 - 44 - LRB104 06526 AAS 16562 b |
---|
1579 | 1579 | | HB3258 - 44 - LRB104 06526 AAS 16562 b |
---|
1580 | 1580 | | 1 periodically review its prior decisions establishing the |
---|
1581 | 1581 | | 2 amount of generation capacity in each block, and the |
---|
1582 | 1582 | | 3 purchase price for each block, and may propose, on an |
---|
1583 | 1583 | | 4 expedited basis, changes to these previously set values, |
---|
1584 | 1584 | | 5 including but not limited to redistributing these amounts |
---|
1585 | 1585 | | 6 and the available funds as necessary and appropriate, |
---|
1586 | 1586 | | 7 subject to Commission approval as part of the periodic |
---|
1587 | 1587 | | 8 plan revision process described in Section 16-111.5 of the |
---|
1588 | 1588 | | 9 Public Utilities Act. The Agency may define different |
---|
1589 | 1589 | | 10 block sizes, purchase prices, or other distinct terms and |
---|
1590 | 1590 | | 11 conditions for projects located in different utility |
---|
1591 | 1591 | | 12 service territories if the Agency deems it necessary to |
---|
1592 | 1592 | | 13 meet the goals in this subsection (c). |
---|
1593 | 1593 | | 14 The Adjustable Block program shall include the |
---|
1594 | 1594 | | 15 following categories in at least the following amounts: |
---|
1595 | 1595 | | 16 (i) At least 20% from distributed renewable energy |
---|
1596 | 1596 | | 17 generation devices with a nameplate capacity of no |
---|
1597 | 1597 | | 18 more than 25 kilowatts. |
---|
1598 | 1598 | | 19 (ii) At least 20% from distributed renewable |
---|
1599 | 1599 | | 20 energy generation devices with a nameplate capacity of |
---|
1600 | 1600 | | 21 more than 25 kilowatts and no more than 5,000 |
---|
1601 | 1601 | | 22 kilowatts. The Agency may create sub-categories within |
---|
1602 | 1602 | | 23 this category to account for the differences between |
---|
1603 | 1603 | | 24 projects for small commercial customers, large |
---|
1604 | 1604 | | 25 commercial customers, and public or non-profit |
---|
1605 | 1605 | | 26 customers. |
---|
1606 | 1606 | | |
---|
1607 | 1607 | | |
---|
1608 | 1608 | | |
---|
1609 | 1609 | | |
---|
1610 | 1610 | | |
---|
1611 | 1611 | | HB3258 - 44 - LRB104 06526 AAS 16562 b |
---|
1612 | 1612 | | |
---|
1613 | 1613 | | |
---|
1614 | 1614 | | HB3258- 45 -LRB104 06526 AAS 16562 b HB3258 - 45 - LRB104 06526 AAS 16562 b |
---|
1615 | 1615 | | HB3258 - 45 - LRB104 06526 AAS 16562 b |
---|
1616 | 1616 | | 1 (iii) At least 30% from photovoltaic community |
---|
1617 | 1617 | | 2 renewable generation projects. Capacity for this |
---|
1618 | 1618 | | 3 category for the first 2 delivery years after the |
---|
1619 | 1619 | | 4 effective date of this amendatory Act of the 102nd |
---|
1620 | 1620 | | 5 General Assembly shall be allocated to waitlist |
---|
1621 | 1621 | | 6 projects as provided in paragraph (3) of item (iv) of |
---|
1622 | 1622 | | 7 subparagraph (G). Starting in the third delivery year |
---|
1623 | 1623 | | 8 after the effective date of this amendatory Act of the |
---|
1624 | 1624 | | 9 102nd General Assembly or earlier if the Agency |
---|
1625 | 1625 | | 10 determines there is additional capacity needed for to |
---|
1626 | 1626 | | 11 meet previous delivery year requirements, the |
---|
1627 | 1627 | | 12 following shall apply: |
---|
1628 | 1628 | | 13 (1) the Agency shall select projects on a |
---|
1629 | 1629 | | 14 first-come, first-serve basis, however the Agency |
---|
1630 | 1630 | | 15 may suggest additional methods to prioritize |
---|
1631 | 1631 | | 16 projects that are submitted at the same time; |
---|
1632 | 1632 | | 17 (2) projects shall have subscriptions of 25 kW |
---|
1633 | 1633 | | 18 or less for at least 50% of the facility's |
---|
1634 | 1634 | | 19 nameplate capacity and the Agency shall price the |
---|
1635 | 1635 | | 20 renewable energy credits with that as a factor; |
---|
1636 | 1636 | | 21 (3) projects shall not be colocated with one |
---|
1637 | 1637 | | 22 or more other community renewable generation |
---|
1638 | 1638 | | 23 projects, as defined in the Agency's first revised |
---|
1639 | 1639 | | 24 long-term renewable resources procurement plan |
---|
1640 | 1640 | | 25 approved by the Commission on February 18, 2020, |
---|
1641 | 1641 | | 26 such that the aggregate nameplate capacity exceeds |
---|
1642 | 1642 | | |
---|
1643 | 1643 | | |
---|
1644 | 1644 | | |
---|
1645 | 1645 | | |
---|
1646 | 1646 | | |
---|
1647 | 1647 | | HB3258 - 45 - LRB104 06526 AAS 16562 b |
---|
1648 | 1648 | | |
---|
1649 | 1649 | | |
---|
1650 | 1650 | | HB3258- 46 -LRB104 06526 AAS 16562 b HB3258 - 46 - LRB104 06526 AAS 16562 b |
---|
1651 | 1651 | | HB3258 - 46 - LRB104 06526 AAS 16562 b |
---|
1652 | 1652 | | 1 5,000 kilowatts; and |
---|
1653 | 1653 | | 2 (4) projects greater than 2 MW may not apply |
---|
1654 | 1654 | | 3 until after the approval of the Agency's revised |
---|
1655 | 1655 | | 4 Long-Term Renewable Resources Procurement Plan |
---|
1656 | 1656 | | 5 after the effective date of this amendatory Act of |
---|
1657 | 1657 | | 6 the 102nd General Assembly. |
---|
1658 | 1658 | | 7 (iv) At least 15% from distributed renewable |
---|
1659 | 1659 | | 8 generation devices or photovoltaic community renewable |
---|
1660 | 1660 | | 9 generation projects installed on public school land. |
---|
1661 | 1661 | | 10 The Agency may create subcategories within this |
---|
1662 | 1662 | | 11 category to account for the differences between |
---|
1663 | 1663 | | 12 project size or location. Projects located within |
---|
1664 | 1664 | | 13 environmental justice communities or within |
---|
1665 | 1665 | | 14 Organizational Units that fall within Tier 1 or Tier 2 |
---|
1666 | 1666 | | 15 shall be given priority. Each of the Agency's periodic |
---|
1667 | 1667 | | 16 updates to its long-term renewable resources |
---|
1668 | 1668 | | 17 procurement plan to incorporate the procurement |
---|
1669 | 1669 | | 18 described in this subparagraph (iv) shall also include |
---|
1670 | 1670 | | 19 the proposed quantities or blocks, pricing, and |
---|
1671 | 1671 | | 20 contract terms applicable to the procurement as |
---|
1672 | 1672 | | 21 indicated herein. In each such update and procurement, |
---|
1673 | 1673 | | 22 the Agency shall set the renewable energy credit price |
---|
1674 | 1674 | | 23 and establish payment terms for the renewable energy |
---|
1675 | 1675 | | 24 credits procured pursuant to this subparagraph (iv) |
---|
1676 | 1676 | | 25 that make it feasible and affordable for public |
---|
1677 | 1677 | | 26 schools to install photovoltaic distributed renewable |
---|
1678 | 1678 | | |
---|
1679 | 1679 | | |
---|
1680 | 1680 | | |
---|
1681 | 1681 | | |
---|
1682 | 1682 | | |
---|
1683 | 1683 | | HB3258 - 46 - LRB104 06526 AAS 16562 b |
---|
1684 | 1684 | | |
---|
1685 | 1685 | | |
---|
1686 | 1686 | | HB3258- 47 -LRB104 06526 AAS 16562 b HB3258 - 47 - LRB104 06526 AAS 16562 b |
---|
1687 | 1687 | | HB3258 - 47 - LRB104 06526 AAS 16562 b |
---|
1688 | 1688 | | 1 energy devices on their premises, including, but not |
---|
1689 | 1689 | | 2 limited to, those public schools subject to the |
---|
1690 | 1690 | | 3 prioritization provisions of this subparagraph. For |
---|
1691 | 1691 | | 4 the purposes of this item (iv): |
---|
1692 | 1692 | | 5 "Environmental Justice Community" shall have the |
---|
1693 | 1693 | | 6 same meaning set forth in the Agency's long-term |
---|
1694 | 1694 | | 7 renewable resources procurement plan; |
---|
1695 | 1695 | | 8 "Organization Unit", "Tier 1" and "Tier 2" shall |
---|
1696 | 1696 | | 9 have the meanings set for in Section 18-8.15 of the |
---|
1697 | 1697 | | 10 School Code; |
---|
1698 | 1698 | | 11 "Public schools" shall have the meaning set forth |
---|
1699 | 1699 | | 12 in Section 1-3 of the School Code and includes public |
---|
1700 | 1700 | | 13 institutions of higher education, as defined in the |
---|
1701 | 1701 | | 14 Board of Higher Education Act. |
---|
1702 | 1702 | | 15 (v) At least 5% from community-driven community |
---|
1703 | 1703 | | 16 solar projects intended to provide more direct and |
---|
1704 | 1704 | | 17 tangible connection and benefits to the communities |
---|
1705 | 1705 | | 18 which they serve or in which they operate and, |
---|
1706 | 1706 | | 19 additionally, to increase the variety of community |
---|
1707 | 1707 | | 20 solar locations, models, and options in Illinois. As |
---|
1708 | 1708 | | 21 part of its long-term renewable resources procurement |
---|
1709 | 1709 | | 22 plan, the Agency shall develop selection criteria for |
---|
1710 | 1710 | | 23 projects participating in this category. Nothing in |
---|
1711 | 1711 | | 24 this Section shall preclude the Agency from creating a |
---|
1712 | 1712 | | 25 selection process that maximizes community ownership |
---|
1713 | 1713 | | 26 and community benefits in selecting projects to |
---|
1714 | 1714 | | |
---|
1715 | 1715 | | |
---|
1716 | 1716 | | |
---|
1717 | 1717 | | |
---|
1718 | 1718 | | |
---|
1719 | 1719 | | HB3258 - 47 - LRB104 06526 AAS 16562 b |
---|
1720 | 1720 | | |
---|
1721 | 1721 | | |
---|
1722 | 1722 | | HB3258- 48 -LRB104 06526 AAS 16562 b HB3258 - 48 - LRB104 06526 AAS 16562 b |
---|
1723 | 1723 | | HB3258 - 48 - LRB104 06526 AAS 16562 b |
---|
1724 | 1724 | | 1 receive renewable energy credits. Selection criteria |
---|
1725 | 1725 | | 2 shall include: |
---|
1726 | 1726 | | 3 (1) community ownership or community |
---|
1727 | 1727 | | 4 wealth-building; |
---|
1728 | 1728 | | 5 (2) additional direct and indirect community |
---|
1729 | 1729 | | 6 benefit, beyond project participation as a |
---|
1730 | 1730 | | 7 subscriber, including, but not limited to, |
---|
1731 | 1731 | | 8 economic, environmental, social, cultural, and |
---|
1732 | 1732 | | 9 physical benefits; |
---|
1733 | 1733 | | 10 (3) meaningful involvement in project |
---|
1734 | 1734 | | 11 organization and development by community members |
---|
1735 | 1735 | | 12 or nonprofit organizations or public entities |
---|
1736 | 1736 | | 13 located in or serving the community; |
---|
1737 | 1737 | | 14 (4) engagement in project operations and |
---|
1738 | 1738 | | 15 management by nonprofit organizations, public |
---|
1739 | 1739 | | 16 entities, or community members; and |
---|
1740 | 1740 | | 17 (5) whether a project is developed in response |
---|
1741 | 1741 | | 18 to a site-specific RFP developed by community |
---|
1742 | 1742 | | 19 members or a nonprofit organization or public |
---|
1743 | 1743 | | 20 entity located in or serving the community. |
---|
1744 | 1744 | | 21 Selection criteria may also prioritize projects |
---|
1745 | 1745 | | 22 that: |
---|
1746 | 1746 | | 23 (1) are developed in collaboration with or to |
---|
1747 | 1747 | | 24 provide complementary opportunities for the Clean |
---|
1748 | 1748 | | 25 Jobs Workforce Network Program, the Illinois |
---|
1749 | 1749 | | 26 Climate Works Preapprenticeship Program, the |
---|
1750 | 1750 | | |
---|
1751 | 1751 | | |
---|
1752 | 1752 | | |
---|
1753 | 1753 | | |
---|
1754 | 1754 | | |
---|
1755 | 1755 | | HB3258 - 48 - LRB104 06526 AAS 16562 b |
---|
1756 | 1756 | | |
---|
1757 | 1757 | | |
---|
1758 | 1758 | | HB3258- 49 -LRB104 06526 AAS 16562 b HB3258 - 49 - LRB104 06526 AAS 16562 b |
---|
1759 | 1759 | | HB3258 - 49 - LRB104 06526 AAS 16562 b |
---|
1760 | 1760 | | 1 Returning Residents Clean Jobs Training Program, |
---|
1761 | 1761 | | 2 the Clean Energy Contractor Incubator Program, or |
---|
1762 | 1762 | | 3 the Clean Energy Primes Contractor Accelerator |
---|
1763 | 1763 | | 4 Program; |
---|
1764 | 1764 | | 5 (2) increase the diversity of locations of |
---|
1765 | 1765 | | 6 community solar projects in Illinois, including by |
---|
1766 | 1766 | | 7 locating in urban areas and population centers; |
---|
1767 | 1767 | | 8 (3) are located in Equity Investment Eligible |
---|
1768 | 1768 | | 9 Communities; |
---|
1769 | 1769 | | 10 (4) are not greenfield projects; |
---|
1770 | 1770 | | 11 (5) serve only local subscribers; |
---|
1771 | 1771 | | 12 (6) have a nameplate capacity that does not |
---|
1772 | 1772 | | 13 exceed 500 kW; |
---|
1773 | 1773 | | 14 (7) are developed by an equity eligible |
---|
1774 | 1774 | | 15 contractor; or |
---|
1775 | 1775 | | 16 (8) otherwise meaningfully advance the goals |
---|
1776 | 1776 | | 17 of providing more direct and tangible connection |
---|
1777 | 1777 | | 18 and benefits to the communities which they serve |
---|
1778 | 1778 | | 19 or in which they operate and increasing the |
---|
1779 | 1779 | | 20 variety of community solar locations, models, and |
---|
1780 | 1780 | | 21 options in Illinois. |
---|
1781 | 1781 | | 22 For the purposes of this item (v): |
---|
1782 | 1782 | | 23 "Community" means a social unit in which people |
---|
1783 | 1783 | | 24 come together regularly to effect change; a social |
---|
1784 | 1784 | | 25 unit in which participants are marked by a cooperative |
---|
1785 | 1785 | | 26 spirit, a common purpose, or shared interests or |
---|
1786 | 1786 | | |
---|
1787 | 1787 | | |
---|
1788 | 1788 | | |
---|
1789 | 1789 | | |
---|
1790 | 1790 | | |
---|
1791 | 1791 | | HB3258 - 49 - LRB104 06526 AAS 16562 b |
---|
1792 | 1792 | | |
---|
1793 | 1793 | | |
---|
1794 | 1794 | | HB3258- 50 -LRB104 06526 AAS 16562 b HB3258 - 50 - LRB104 06526 AAS 16562 b |
---|
1795 | 1795 | | HB3258 - 50 - LRB104 06526 AAS 16562 b |
---|
1796 | 1796 | | 1 characteristics; or a space understood by its |
---|
1797 | 1797 | | 2 residents to be delineated through geographic |
---|
1798 | 1798 | | 3 boundaries or landmarks. |
---|
1799 | 1799 | | 4 "Community benefit" means a range of services and |
---|
1800 | 1800 | | 5 activities that provide affirmative, economic, |
---|
1801 | 1801 | | 6 environmental, social, cultural, or physical value to |
---|
1802 | 1802 | | 7 a community; or a mechanism that enables economic |
---|
1803 | 1803 | | 8 development, high-quality employment, and education |
---|
1804 | 1804 | | 9 opportunities for local workers and residents, or |
---|
1805 | 1805 | | 10 formal monitoring and oversight structures such that |
---|
1806 | 1806 | | 11 community members may ensure that those services and |
---|
1807 | 1807 | | 12 activities respond to local knowledge and needs. |
---|
1808 | 1808 | | 13 "Community ownership" means an arrangement in |
---|
1809 | 1809 | | 14 which an electric generating facility is, or over time |
---|
1810 | 1810 | | 15 will be, in significant part, owned collectively by |
---|
1811 | 1811 | | 16 members of the community to which an electric |
---|
1812 | 1812 | | 17 generating facility provides benefits; members of that |
---|
1813 | 1813 | | 18 community participate in decisions regarding the |
---|
1814 | 1814 | | 19 governance, operation, maintenance, and upgrades of |
---|
1815 | 1815 | | 20 and to that facility; and members of that community |
---|
1816 | 1816 | | 21 benefit from regular use of that facility. |
---|
1817 | 1817 | | 22 Terms and guidance within these criteria that are |
---|
1818 | 1818 | | 23 not defined in this item (v) shall be defined by the |
---|
1819 | 1819 | | 24 Agency, with stakeholder input, during the development |
---|
1820 | 1820 | | 25 of the Agency's long-term renewable resources |
---|
1821 | 1821 | | 26 procurement plan. The Agency shall develop regular |
---|
1822 | 1822 | | |
---|
1823 | 1823 | | |
---|
1824 | 1824 | | |
---|
1825 | 1825 | | |
---|
1826 | 1826 | | |
---|
1827 | 1827 | | HB3258 - 50 - LRB104 06526 AAS 16562 b |
---|
1828 | 1828 | | |
---|
1829 | 1829 | | |
---|
1830 | 1830 | | HB3258- 51 -LRB104 06526 AAS 16562 b HB3258 - 51 - LRB104 06526 AAS 16562 b |
---|
1831 | 1831 | | HB3258 - 51 - LRB104 06526 AAS 16562 b |
---|
1832 | 1832 | | 1 opportunities for projects to submit applications for |
---|
1833 | 1833 | | 2 projects under this category, and develop selection |
---|
1834 | 1834 | | 3 criteria that gives preference to projects that better |
---|
1835 | 1835 | | 4 meet individual criteria as well as projects that |
---|
1836 | 1836 | | 5 address a higher number of criteria. |
---|
1837 | 1837 | | 6 (vi) At least 10% from distributed renewable |
---|
1838 | 1838 | | 7 energy generation devices, which includes distributed |
---|
1839 | 1839 | | 8 renewable energy devices with a nameplate capacity |
---|
1840 | 1840 | | 9 under 5,000 kilowatts or photovoltaic community |
---|
1841 | 1841 | | 10 renewable generation projects, from applicants that |
---|
1842 | 1842 | | 11 are equity eligible contractors. The Agency may create |
---|
1843 | 1843 | | 12 subcategories within this category to account for the |
---|
1844 | 1844 | | 13 differences between project size and type. The Agency |
---|
1845 | 1845 | | 14 shall propose to increase the percentage in this item |
---|
1846 | 1846 | | 15 (vi) over time to 40% based on factors, including, but |
---|
1847 | 1847 | | 16 not limited to, the number of equity eligible |
---|
1848 | 1848 | | 17 contractors and capacity used in this item (vi) in |
---|
1849 | 1849 | | 18 previous delivery years. |
---|
1850 | 1850 | | 19 The Agency shall propose a payment structure for |
---|
1851 | 1851 | | 20 contracts executed pursuant to this paragraph under |
---|
1852 | 1852 | | 21 which, upon a demonstration of qualification or need, |
---|
1853 | 1853 | | 22 applicant firms are advanced capital disbursed after |
---|
1854 | 1854 | | 23 contract execution but before the contracted project's |
---|
1855 | 1855 | | 24 energization. The amount or percentage of capital |
---|
1856 | 1856 | | 25 advanced prior to project energization shall be |
---|
1857 | 1857 | | 26 sufficient to both cover any increase in development |
---|
1858 | 1858 | | |
---|
1859 | 1859 | | |
---|
1860 | 1860 | | |
---|
1861 | 1861 | | |
---|
1862 | 1862 | | |
---|
1863 | 1863 | | HB3258 - 51 - LRB104 06526 AAS 16562 b |
---|
1864 | 1864 | | |
---|
1865 | 1865 | | |
---|
1866 | 1866 | | HB3258- 52 -LRB104 06526 AAS 16562 b HB3258 - 52 - LRB104 06526 AAS 16562 b |
---|
1867 | 1867 | | HB3258 - 52 - LRB104 06526 AAS 16562 b |
---|
1868 | 1868 | | 1 costs resulting from prevailing wage requirements or |
---|
1869 | 1869 | | 2 project-labor agreements, and designed to overcome |
---|
1870 | 1870 | | 3 barriers in access to capital faced by equity eligible |
---|
1871 | 1871 | | 4 contractors. The amount or percentage of advanced |
---|
1872 | 1872 | | 5 capital may vary by subcategory within this category |
---|
1873 | 1873 | | 6 and by an applicant's demonstration of need, with such |
---|
1874 | 1874 | | 7 levels to be established through the Long-Term |
---|
1875 | 1875 | | 8 Renewable Resources Procurement Plan authorized under |
---|
1876 | 1876 | | 9 subparagraph (A) of paragraph (1) of subsection (c) of |
---|
1877 | 1877 | | 10 this Section. |
---|
1878 | 1878 | | 11 Contracts developed featuring capital advanced |
---|
1879 | 1879 | | 12 prior to a project's energization shall feature |
---|
1880 | 1880 | | 13 provisions to ensure both the successful development |
---|
1881 | 1881 | | 14 of applicant projects and the delivery of the |
---|
1882 | 1882 | | 15 renewable energy credits for the full term of the |
---|
1883 | 1883 | | 16 contract, including ongoing collateral requirements |
---|
1884 | 1884 | | 17 and other provisions deemed necessary by the Agency, |
---|
1885 | 1885 | | 18 and may include energization timelines longer than for |
---|
1886 | 1886 | | 19 comparable project types. The percentage or amount of |
---|
1887 | 1887 | | 20 capital advanced prior to project energization shall |
---|
1888 | 1888 | | 21 not operate to increase the overall contract value, |
---|
1889 | 1889 | | 22 however contracts executed under this subparagraph may |
---|
1890 | 1890 | | 23 feature renewable energy credit prices higher than |
---|
1891 | 1891 | | 24 those offered to similar projects participating in |
---|
1892 | 1892 | | 25 other categories. Capital advanced prior to |
---|
1893 | 1893 | | 26 energization shall serve to reduce the ratable |
---|
1894 | 1894 | | |
---|
1895 | 1895 | | |
---|
1896 | 1896 | | |
---|
1897 | 1897 | | |
---|
1898 | 1898 | | |
---|
1899 | 1899 | | HB3258 - 52 - LRB104 06526 AAS 16562 b |
---|
1900 | 1900 | | |
---|
1901 | 1901 | | |
---|
1902 | 1902 | | HB3258- 53 -LRB104 06526 AAS 16562 b HB3258 - 53 - LRB104 06526 AAS 16562 b |
---|
1903 | 1903 | | HB3258 - 53 - LRB104 06526 AAS 16562 b |
---|
1904 | 1904 | | 1 payments made after energization under items (ii) and |
---|
1905 | 1905 | | 2 (iii) of subparagraph (L) or payments made for each |
---|
1906 | 1906 | | 3 renewable energy credit delivery under item (iv) of |
---|
1907 | 1907 | | 4 subparagraph (L). |
---|
1908 | 1908 | | 5 (vii) The remaining capacity shall be allocated by |
---|
1909 | 1909 | | 6 the Agency in order to respond to market demand. The |
---|
1910 | 1910 | | 7 Agency shall allocate any discretionary capacity prior |
---|
1911 | 1911 | | 8 to the beginning of each delivery year. |
---|
1912 | 1912 | | 9 To the extent there is uncontracted capacity from any |
---|
1913 | 1913 | | 10 block in any of categories (i) through (vi) at the end of a |
---|
1914 | 1914 | | 11 delivery year, the Agency shall redistribute that capacity |
---|
1915 | 1915 | | 12 to one or more other categories giving priority to |
---|
1916 | 1916 | | 13 categories with projects on a waitlist. The redistributed |
---|
1917 | 1917 | | 14 capacity shall be added to the annual capacity in the |
---|
1918 | 1918 | | 15 subsequent delivery year, and the price for renewable |
---|
1919 | 1919 | | 16 energy credits shall be the price for the new delivery |
---|
1920 | 1920 | | 17 year. Redistributed capacity shall not be considered |
---|
1921 | 1921 | | 18 redistributed when determining whether the goals in this |
---|
1922 | 1922 | | 19 subsection (K) have been met. |
---|
1923 | 1923 | | 20 Notwithstanding anything to the contrary, as the |
---|
1924 | 1924 | | 21 Agency increases the capacity in item (vi) to 40% over |
---|
1925 | 1925 | | 22 time, the Agency may reduce the capacity of items (i) |
---|
1926 | 1926 | | 23 through (v) proportionate to the capacity of the |
---|
1927 | 1927 | | 24 categories of projects in item (vi), to achieve a balance |
---|
1928 | 1928 | | 25 of project types. |
---|
1929 | 1929 | | 26 The Adjustable Block program shall be designed to |
---|
1930 | 1930 | | |
---|
1931 | 1931 | | |
---|
1932 | 1932 | | |
---|
1933 | 1933 | | |
---|
1934 | 1934 | | |
---|
1935 | 1935 | | HB3258 - 53 - LRB104 06526 AAS 16562 b |
---|
1936 | 1936 | | |
---|
1937 | 1937 | | |
---|
1938 | 1938 | | HB3258- 54 -LRB104 06526 AAS 16562 b HB3258 - 54 - LRB104 06526 AAS 16562 b |
---|
1939 | 1939 | | HB3258 - 54 - LRB104 06526 AAS 16562 b |
---|
1940 | 1940 | | 1 ensure that renewable energy credits are procured from |
---|
1941 | 1941 | | 2 projects in diverse locations and are not concentrated in |
---|
1942 | 1942 | | 3 a few regional areas. |
---|
1943 | 1943 | | 4 (L) Notwithstanding provisions for advancing capital |
---|
1944 | 1944 | | 5 prior to project energization found in item (vi) of |
---|
1945 | 1945 | | 6 subparagraph (K), the procurement of photovoltaic |
---|
1946 | 1946 | | 7 renewable energy credits under items (i) through (vi) of |
---|
1947 | 1947 | | 8 subparagraph (K) of this paragraph (1) shall otherwise be |
---|
1948 | 1948 | | 9 subject to the following contract and payment terms: |
---|
1949 | 1949 | | 10 (i) (Blank). |
---|
1950 | 1950 | | 11 (ii) For those renewable energy credits that |
---|
1951 | 1951 | | 12 qualify and are procured under item (i) of |
---|
1952 | 1952 | | 13 subparagraph (K) of this paragraph (1), and any |
---|
1953 | 1953 | | 14 similar category projects that are procured under item |
---|
1954 | 1954 | | 15 (vi) of subparagraph (K) of this paragraph (1) that |
---|
1955 | 1955 | | 16 qualify and are procured under item (vi), the contract |
---|
1956 | 1956 | | 17 length shall be 15 years. The renewable energy credit |
---|
1957 | 1957 | | 18 delivery contract value shall be paid in full, based |
---|
1958 | 1958 | | 19 on the estimated generation during the first 15 years |
---|
1959 | 1959 | | 20 of operation, by the contracting utilities at the time |
---|
1960 | 1960 | | 21 that the facility producing the renewable energy |
---|
1961 | 1961 | | 22 credits is interconnected at the distribution system |
---|
1962 | 1962 | | 23 level of the utility and verified as energized and |
---|
1963 | 1963 | | 24 compliant by the Program Administrator. The electric |
---|
1964 | 1964 | | 25 utility shall receive and retire all renewable energy |
---|
1965 | 1965 | | 26 credits generated by the project for the first 15 |
---|
1966 | 1966 | | |
---|
1967 | 1967 | | |
---|
1968 | 1968 | | |
---|
1969 | 1969 | | |
---|
1970 | 1970 | | |
---|
1971 | 1971 | | HB3258 - 54 - LRB104 06526 AAS 16562 b |
---|
1972 | 1972 | | |
---|
1973 | 1973 | | |
---|
1974 | 1974 | | HB3258- 55 -LRB104 06526 AAS 16562 b HB3258 - 55 - LRB104 06526 AAS 16562 b |
---|
1975 | 1975 | | HB3258 - 55 - LRB104 06526 AAS 16562 b |
---|
1976 | 1976 | | 1 years of operation. Renewable energy credits generated |
---|
1977 | 1977 | | 2 by the project thereafter shall not be transferred |
---|
1978 | 1978 | | 3 under the renewable energy credit delivery contract |
---|
1979 | 1979 | | 4 with the counterparty electric utility. |
---|
1980 | 1980 | | 5 (iii) For those renewable energy credits that |
---|
1981 | 1981 | | 6 qualify and are procured under item (ii) and (v) of |
---|
1982 | 1982 | | 7 subparagraph (K) of this paragraph (1) and any like |
---|
1983 | 1983 | | 8 projects similar category that qualify and are |
---|
1984 | 1984 | | 9 procured under item (vi), the contract length shall be |
---|
1985 | 1985 | | 10 15 years. 15% of the renewable energy credit delivery |
---|
1986 | 1986 | | 11 contract value, based on the estimated generation |
---|
1987 | 1987 | | 12 during the first 15 years of operation, shall be paid |
---|
1988 | 1988 | | 13 by the contracting utilities at the time that the |
---|
1989 | 1989 | | 14 facility producing the renewable energy credits is |
---|
1990 | 1990 | | 15 interconnected at the distribution system level of the |
---|
1991 | 1991 | | 16 utility and verified as energized and compliant by the |
---|
1992 | 1992 | | 17 Program Administrator. The remaining portion shall be |
---|
1993 | 1993 | | 18 paid ratably over the subsequent 6-year period. The |
---|
1994 | 1994 | | 19 electric utility shall receive and retire all |
---|
1995 | 1995 | | 20 renewable energy credits generated by the project for |
---|
1996 | 1996 | | 21 the first 15 years of operation. Renewable energy |
---|
1997 | 1997 | | 22 credits generated by the project thereafter shall not |
---|
1998 | 1998 | | 23 be transferred under the renewable energy credit |
---|
1999 | 1999 | | 24 delivery contract with the counterparty electric |
---|
2000 | 2000 | | 25 utility. |
---|
2001 | 2001 | | 26 (iv) For those renewable energy credits that |
---|
2002 | 2002 | | |
---|
2003 | 2003 | | |
---|
2004 | 2004 | | |
---|
2005 | 2005 | | |
---|
2006 | 2006 | | |
---|
2007 | 2007 | | HB3258 - 55 - LRB104 06526 AAS 16562 b |
---|
2008 | 2008 | | |
---|
2009 | 2009 | | |
---|
2010 | 2010 | | HB3258- 56 -LRB104 06526 AAS 16562 b HB3258 - 56 - LRB104 06526 AAS 16562 b |
---|
2011 | 2011 | | HB3258 - 56 - LRB104 06526 AAS 16562 b |
---|
2012 | 2012 | | 1 qualify and are procured under items (iii) and (iv) of |
---|
2013 | 2013 | | 2 subparagraph (K) of this paragraph (1), and any like |
---|
2014 | 2014 | | 3 projects that qualify and are procured under item |
---|
2015 | 2015 | | 4 (vi), the renewable energy credit delivery contract |
---|
2016 | 2016 | | 5 length shall be 20 years and shall be paid over the |
---|
2017 | 2017 | | 6 delivery term, not to exceed during each delivery year |
---|
2018 | 2018 | | 7 the contract price multiplied by the estimated annual |
---|
2019 | 2019 | | 8 renewable energy credit generation amount. If |
---|
2020 | 2020 | | 9 generation of renewable energy credits during a |
---|
2021 | 2021 | | 10 delivery year exceeds the estimated annual generation |
---|
2022 | 2022 | | 11 amount, the excess renewable energy credits shall be |
---|
2023 | 2023 | | 12 carried forward to future delivery years and shall not |
---|
2024 | 2024 | | 13 expire during the delivery term. If generation of |
---|
2025 | 2025 | | 14 renewable energy credits during a delivery year, |
---|
2026 | 2026 | | 15 including carried forward excess renewable energy |
---|
2027 | 2027 | | 16 credits, if any, is less than the estimated annual |
---|
2028 | 2028 | | 17 generation amount, payments during such delivery year |
---|
2029 | 2029 | | 18 will not exceed the quantity generated plus the |
---|
2030 | 2030 | | 19 quantity carried forward multiplied by the contract |
---|
2031 | 2031 | | 20 price. The electric utility shall receive all |
---|
2032 | 2032 | | 21 renewable energy credits generated by the project |
---|
2033 | 2033 | | 22 during the first 20 years of operation and retire all |
---|
2034 | 2034 | | 23 renewable energy credits paid for under this item (iv) |
---|
2035 | 2035 | | 24 and return at the end of the delivery term all |
---|
2036 | 2036 | | 25 renewable energy credits that were not paid for. |
---|
2037 | 2037 | | 26 Renewable energy credits generated by the project |
---|
2038 | 2038 | | |
---|
2039 | 2039 | | |
---|
2040 | 2040 | | |
---|
2041 | 2041 | | |
---|
2042 | 2042 | | |
---|
2043 | 2043 | | HB3258 - 56 - LRB104 06526 AAS 16562 b |
---|
2044 | 2044 | | |
---|
2045 | 2045 | | |
---|
2046 | 2046 | | HB3258- 57 -LRB104 06526 AAS 16562 b HB3258 - 57 - LRB104 06526 AAS 16562 b |
---|
2047 | 2047 | | HB3258 - 57 - LRB104 06526 AAS 16562 b |
---|
2048 | 2048 | | 1 thereafter shall not be transferred under the |
---|
2049 | 2049 | | 2 renewable energy credit delivery contract with the |
---|
2050 | 2050 | | 3 counterparty electric utility. Notwithstanding the |
---|
2051 | 2051 | | 4 preceding, for those projects participating under item |
---|
2052 | 2052 | | 5 (iii) of subparagraph (K), the contract price for a |
---|
2053 | 2053 | | 6 delivery year shall be based on subscription levels as |
---|
2054 | 2054 | | 7 measured on the higher of the first business day of the |
---|
2055 | 2055 | | 8 delivery year or the first business day 6 months after |
---|
2056 | 2056 | | 9 the first business day of the delivery year. |
---|
2057 | 2057 | | 10 Subscription of 90% of nameplate capacity or greater |
---|
2058 | 2058 | | 11 shall be deemed to be fully subscribed for the |
---|
2059 | 2059 | | 12 purposes of this item (iv). For projects receiving a |
---|
2060 | 2060 | | 13 20-year delivery contract, REC prices shall be |
---|
2061 | 2061 | | 14 adjusted downward for consistency with the incentive |
---|
2062 | 2062 | | 15 levels previously determined to be necessary to |
---|
2063 | 2063 | | 16 support projects under 15-year delivery contracts, |
---|
2064 | 2064 | | 17 taking into consideration any additional new |
---|
2065 | 2065 | | 18 requirements placed on the projects, including, but |
---|
2066 | 2066 | | 19 not limited to, labor standards. |
---|
2067 | 2067 | | 20 (v) Each contract shall include provisions to |
---|
2068 | 2068 | | 21 ensure the delivery of the estimated quantity of |
---|
2069 | 2069 | | 22 renewable energy credits and ongoing collateral |
---|
2070 | 2070 | | 23 requirements and other provisions deemed appropriate |
---|
2071 | 2071 | | 24 by the Agency. |
---|
2072 | 2072 | | 25 (vi) The utility shall be the counterparty to the |
---|
2073 | 2073 | | 26 contracts executed under this subparagraph (L) that |
---|
2074 | 2074 | | |
---|
2075 | 2075 | | |
---|
2076 | 2076 | | |
---|
2077 | 2077 | | |
---|
2078 | 2078 | | |
---|
2079 | 2079 | | HB3258 - 57 - LRB104 06526 AAS 16562 b |
---|
2080 | 2080 | | |
---|
2081 | 2081 | | |
---|
2082 | 2082 | | HB3258- 58 -LRB104 06526 AAS 16562 b HB3258 - 58 - LRB104 06526 AAS 16562 b |
---|
2083 | 2083 | | HB3258 - 58 - LRB104 06526 AAS 16562 b |
---|
2084 | 2084 | | 1 are approved by the Commission under the process |
---|
2085 | 2085 | | 2 described in Section 16-111.5 of the Public Utilities |
---|
2086 | 2086 | | 3 Act. No contract shall be executed for an amount that |
---|
2087 | 2087 | | 4 is less than one renewable energy credit per year. |
---|
2088 | 2088 | | 5 (vii) If, at any time, approved applications for |
---|
2089 | 2089 | | 6 the Adjustable Block program exceed funds collected by |
---|
2090 | 2090 | | 7 the electric utility or would cause the Agency to |
---|
2091 | 2091 | | 8 exceed the limitation described in subparagraph (E) of |
---|
2092 | 2092 | | 9 this paragraph (1) on the amount of renewable energy |
---|
2093 | 2093 | | 10 resources that may be procured, then the Agency may |
---|
2094 | 2094 | | 11 consider future uncommitted funds to be reserved for |
---|
2095 | 2095 | | 12 these contracts on a first-come, first-served basis. |
---|
2096 | 2096 | | 13 (viii) Nothing in this Section shall require the |
---|
2097 | 2097 | | 14 utility to advance any payment or pay any amounts that |
---|
2098 | 2098 | | 15 exceed the actual amount of revenues anticipated to be |
---|
2099 | 2099 | | 16 collected by the utility under paragraph (6) of this |
---|
2100 | 2100 | | 17 subsection (c) and subsection (k) of Section 16-108 of |
---|
2101 | 2101 | | 18 the Public Utilities Act inclusive of eligible funds |
---|
2102 | 2102 | | 19 collected in prior years and alternative compliance |
---|
2103 | 2103 | | 20 payments for use by the utility, and contracts |
---|
2104 | 2104 | | 21 executed under this Section shall expressly |
---|
2105 | 2105 | | 22 incorporate this limitation. |
---|
2106 | 2106 | | 23 (ix) Notwithstanding other requirements of this |
---|
2107 | 2107 | | 24 subparagraph (L), no modification shall be required to |
---|
2108 | 2108 | | 25 Adjustable Block program contracts if they were |
---|
2109 | 2109 | | 26 already executed prior to the establishment, approval, |
---|
2110 | 2110 | | |
---|
2111 | 2111 | | |
---|
2112 | 2112 | | |
---|
2113 | 2113 | | |
---|
2114 | 2114 | | |
---|
2115 | 2115 | | HB3258 - 58 - LRB104 06526 AAS 16562 b |
---|
2116 | 2116 | | |
---|
2117 | 2117 | | |
---|
2118 | 2118 | | HB3258- 59 -LRB104 06526 AAS 16562 b HB3258 - 59 - LRB104 06526 AAS 16562 b |
---|
2119 | 2119 | | HB3258 - 59 - LRB104 06526 AAS 16562 b |
---|
2120 | 2120 | | 1 and implementation of new contract forms as a result |
---|
2121 | 2121 | | 2 of this amendatory Act of the 102nd General Assembly. |
---|
2122 | 2122 | | 3 (x) Contracts may be assignable, but only to |
---|
2123 | 2123 | | 4 entities first deemed by the Agency to have met |
---|
2124 | 2124 | | 5 program terms and requirements applicable to direct |
---|
2125 | 2125 | | 6 program participation. In developing contracts for the |
---|
2126 | 2126 | | 7 delivery of renewable energy credits, the Agency shall |
---|
2127 | 2127 | | 8 be permitted to establish fees applicable to each |
---|
2128 | 2128 | | 9 contract assignment. |
---|
2129 | 2129 | | 10 (M) The Agency shall be authorized to retain one or |
---|
2130 | 2130 | | 11 more experts or expert consulting firms to develop, |
---|
2131 | 2131 | | 12 administer, implement, operate, and evaluate the |
---|
2132 | 2132 | | 13 Adjustable Block program described in subparagraph (K) of |
---|
2133 | 2133 | | 14 this paragraph (1), and the Agency shall retain the |
---|
2134 | 2134 | | 15 consultant or consultants in the same manner, to the |
---|
2135 | 2135 | | 16 extent practicable, as the Agency retains others to |
---|
2136 | 2136 | | 17 administer provisions of this Act, including, but not |
---|
2137 | 2137 | | 18 limited to, the procurement administrator. The selection |
---|
2138 | 2138 | | 19 of experts and expert consulting firms and the procurement |
---|
2139 | 2139 | | 20 process described in this subparagraph (M) are exempt from |
---|
2140 | 2140 | | 21 the requirements of Section 20-10 of the Illinois |
---|
2141 | 2141 | | 22 Procurement Code, under Section 20-10 of that Code. The |
---|
2142 | 2142 | | 23 Agency shall strive to minimize administrative expenses in |
---|
2143 | 2143 | | 24 the implementation of the Adjustable Block program. |
---|
2144 | 2144 | | 25 The Program Administrator may charge application fees |
---|
2145 | 2145 | | 26 to participating firms to cover the cost of program |
---|
2146 | 2146 | | |
---|
2147 | 2147 | | |
---|
2148 | 2148 | | |
---|
2149 | 2149 | | |
---|
2150 | 2150 | | |
---|
2151 | 2151 | | HB3258 - 59 - LRB104 06526 AAS 16562 b |
---|
2152 | 2152 | | |
---|
2153 | 2153 | | |
---|
2154 | 2154 | | HB3258- 60 -LRB104 06526 AAS 16562 b HB3258 - 60 - LRB104 06526 AAS 16562 b |
---|
2155 | 2155 | | HB3258 - 60 - LRB104 06526 AAS 16562 b |
---|
2156 | 2156 | | 1 administration. Any application fee amounts shall |
---|
2157 | 2157 | | 2 initially be determined through the long-term renewable |
---|
2158 | 2158 | | 3 resources procurement plan, and modifications to any |
---|
2159 | 2159 | | 4 application fee that deviate more than 25% from the |
---|
2160 | 2160 | | 5 Commission's approved value must be approved by the |
---|
2161 | 2161 | | 6 Commission as a long-term plan revision under Section |
---|
2162 | 2162 | | 7 16-111.5 of the Public Utilities Act. The Agency shall |
---|
2163 | 2163 | | 8 consider stakeholder feedback when making adjustments to |
---|
2164 | 2164 | | 9 application fees and shall notify stakeholders in advance |
---|
2165 | 2165 | | 10 of any planned changes. |
---|
2166 | 2166 | | 11 In addition to covering the costs of program |
---|
2167 | 2167 | | 12 administration, the Agency, in conjunction with its |
---|
2168 | 2168 | | 13 Program Administrator, may also use the proceeds of such |
---|
2169 | 2169 | | 14 fees charged to participating firms to support public |
---|
2170 | 2170 | | 15 education and ongoing regional and national coordination |
---|
2171 | 2171 | | 16 with nonprofit organizations, public bodies, and others |
---|
2172 | 2172 | | 17 engaged in the implementation of renewable energy |
---|
2173 | 2173 | | 18 incentive programs or similar initiatives. This work may |
---|
2174 | 2174 | | 19 include developing papers and reports, hosting regional |
---|
2175 | 2175 | | 20 and national conferences, and other work deemed necessary |
---|
2176 | 2176 | | 21 by the Agency to position the State of Illinois as a |
---|
2177 | 2177 | | 22 national leader in renewable energy incentive program |
---|
2178 | 2178 | | 23 development and administration. |
---|
2179 | 2179 | | 24 The Agency and its consultant or consultants shall |
---|
2180 | 2180 | | 25 monitor block activity, share program activity with |
---|
2181 | 2181 | | 26 stakeholders and conduct quarterly meetings to discuss |
---|
2182 | 2182 | | |
---|
2183 | 2183 | | |
---|
2184 | 2184 | | |
---|
2185 | 2185 | | |
---|
2186 | 2186 | | |
---|
2187 | 2187 | | HB3258 - 60 - LRB104 06526 AAS 16562 b |
---|
2188 | 2188 | | |
---|
2189 | 2189 | | |
---|
2190 | 2190 | | HB3258- 61 -LRB104 06526 AAS 16562 b HB3258 - 61 - LRB104 06526 AAS 16562 b |
---|
2191 | 2191 | | HB3258 - 61 - LRB104 06526 AAS 16562 b |
---|
2192 | 2192 | | 1 program activity and market conditions. If necessary, the |
---|
2193 | 2193 | | 2 Agency may make prospective administrative adjustments to |
---|
2194 | 2194 | | 3 the Adjustable Block program design, such as making |
---|
2195 | 2195 | | 4 adjustments to purchase prices as necessary to achieve the |
---|
2196 | 2196 | | 5 goals of this subsection (c). Program modifications to any |
---|
2197 | 2197 | | 6 block price that do not deviate from the Commission's |
---|
2198 | 2198 | | 7 approved value by more than 10% shall take effect |
---|
2199 | 2199 | | 8 immediately and are not subject to Commission review and |
---|
2200 | 2200 | | 9 approval. Program modifications to any block price that |
---|
2201 | 2201 | | 10 deviate more than 10% from the Commission's approved value |
---|
2202 | 2202 | | 11 must be approved by the Commission as a long-term plan |
---|
2203 | 2203 | | 12 amendment under Section 16-111.5 of the Public Utilities |
---|
2204 | 2204 | | 13 Act. The Agency shall consider stakeholder feedback when |
---|
2205 | 2205 | | 14 making adjustments to the Adjustable Block design and |
---|
2206 | 2206 | | 15 shall notify stakeholders in advance of any planned |
---|
2207 | 2207 | | 16 changes. |
---|
2208 | 2208 | | 17 The Agency and its program administrators for both the |
---|
2209 | 2209 | | 18 Adjustable Block program and the Illinois Solar for All |
---|
2210 | 2210 | | 19 Program, consistent with the requirements of this |
---|
2211 | 2211 | | 20 subsection (c) and subsection (b) of Section 1-56 of this |
---|
2212 | 2212 | | 21 Act, shall propose the Adjustable Block program terms, |
---|
2213 | 2213 | | 22 conditions, and requirements, including the prices to be |
---|
2214 | 2214 | | 23 paid for renewable energy credits, where applicable, and |
---|
2215 | 2215 | | 24 requirements applicable to participating entities and |
---|
2216 | 2216 | | 25 project applications, through the development, review, and |
---|
2217 | 2217 | | 26 approval of the Agency's long-term renewable resources |
---|
2218 | 2218 | | |
---|
2219 | 2219 | | |
---|
2220 | 2220 | | |
---|
2221 | 2221 | | |
---|
2222 | 2222 | | |
---|
2223 | 2223 | | HB3258 - 61 - LRB104 06526 AAS 16562 b |
---|
2224 | 2224 | | |
---|
2225 | 2225 | | |
---|
2226 | 2226 | | HB3258- 62 -LRB104 06526 AAS 16562 b HB3258 - 62 - LRB104 06526 AAS 16562 b |
---|
2227 | 2227 | | HB3258 - 62 - LRB104 06526 AAS 16562 b |
---|
2228 | 2228 | | 1 procurement plan described in this subsection (c) and |
---|
2229 | 2229 | | 2 paragraph (5) of subsection (b) of Section 16-111.5 of the |
---|
2230 | 2230 | | 3 Public Utilities Act. Terms, conditions, and requirements |
---|
2231 | 2231 | | 4 for program participation shall include the following: |
---|
2232 | 2232 | | 5 (i) The Agency shall establish a registration |
---|
2233 | 2233 | | 6 process for entities seeking to qualify for |
---|
2234 | 2234 | | 7 program-administered incentive funding and establish |
---|
2235 | 2235 | | 8 baseline qualifications for vendor approval. The |
---|
2236 | 2236 | | 9 Agency must maintain a list of approved entities on |
---|
2237 | 2237 | | 10 each program's website, and may revoke a vendor's |
---|
2238 | 2238 | | 11 ability to receive program-administered incentive |
---|
2239 | 2239 | | 12 funding status upon a determination that the vendor |
---|
2240 | 2240 | | 13 failed to comply with contract terms, the law, or |
---|
2241 | 2241 | | 14 other program requirements. |
---|
2242 | 2242 | | 15 (ii) The Agency shall establish program |
---|
2243 | 2243 | | 16 requirements and minimum contract terms to ensure |
---|
2244 | 2244 | | 17 projects are properly installed and produce their |
---|
2245 | 2245 | | 18 expected amounts of energy. Program requirements may |
---|
2246 | 2246 | | 19 include on-site inspections and photo documentation of |
---|
2247 | 2247 | | 20 projects under construction. The Agency may require |
---|
2248 | 2248 | | 21 repairs, alterations, or additions to remedy any |
---|
2249 | 2249 | | 22 material deficiencies discovered. Vendors who have a |
---|
2250 | 2250 | | 23 disproportionately high number of deficient systems |
---|
2251 | 2251 | | 24 may lose their eligibility to continue to receive |
---|
2252 | 2252 | | 25 State-administered incentive funding through Agency |
---|
2253 | 2253 | | 26 programs and procurements. |
---|
2254 | 2254 | | |
---|
2255 | 2255 | | |
---|
2256 | 2256 | | |
---|
2257 | 2257 | | |
---|
2258 | 2258 | | |
---|
2259 | 2259 | | HB3258 - 62 - LRB104 06526 AAS 16562 b |
---|
2260 | 2260 | | |
---|
2261 | 2261 | | |
---|
2262 | 2262 | | HB3258- 63 -LRB104 06526 AAS 16562 b HB3258 - 63 - LRB104 06526 AAS 16562 b |
---|
2263 | 2263 | | HB3258 - 63 - LRB104 06526 AAS 16562 b |
---|
2264 | 2264 | | 1 (iii) To discourage deceptive marketing or other |
---|
2265 | 2265 | | 2 bad faith business practices, the Agency may require |
---|
2266 | 2266 | | 3 direct program participants, including agents |
---|
2267 | 2267 | | 4 operating on their behalf, to provide standardized |
---|
2268 | 2268 | | 5 disclosures to a customer prior to that customer's |
---|
2269 | 2269 | | 6 execution of a contract for the development of a |
---|
2270 | 2270 | | 7 distributed generation system or a subscription to a |
---|
2271 | 2271 | | 8 community solar project. |
---|
2272 | 2272 | | 9 (iv) The Agency shall establish one or multiple |
---|
2273 | 2273 | | 10 Consumer Complaints Centers to accept complaints |
---|
2274 | 2274 | | 11 regarding businesses that participate in, or otherwise |
---|
2275 | 2275 | | 12 benefit from, State-administered incentive funding |
---|
2276 | 2276 | | 13 through Agency-administered programs. The Agency shall |
---|
2277 | 2277 | | 14 maintain a public database of complaints with any |
---|
2278 | 2278 | | 15 confidential or particularly sensitive information |
---|
2279 | 2279 | | 16 redacted from public entries. |
---|
2280 | 2280 | | 17 (v) Through a filing in the proceeding for the |
---|
2281 | 2281 | | 18 approval of its long-term renewable energy resources |
---|
2282 | 2282 | | 19 procurement plan, the Agency shall provide an annual |
---|
2283 | 2283 | | 20 written report to the Illinois Commerce Commission |
---|
2284 | 2284 | | 21 documenting the frequency and nature of complaints and |
---|
2285 | 2285 | | 22 any enforcement actions taken in response to those |
---|
2286 | 2286 | | 23 complaints. |
---|
2287 | 2287 | | 24 (vi) The Agency shall schedule regular meetings |
---|
2288 | 2288 | | 25 with representatives of the Office of the Attorney |
---|
2289 | 2289 | | 26 General, the Illinois Commerce Commission, consumer |
---|
2290 | 2290 | | |
---|
2291 | 2291 | | |
---|
2292 | 2292 | | |
---|
2293 | 2293 | | |
---|
2294 | 2294 | | |
---|
2295 | 2295 | | HB3258 - 63 - LRB104 06526 AAS 16562 b |
---|
2296 | 2296 | | |
---|
2297 | 2297 | | |
---|
2298 | 2298 | | HB3258- 64 -LRB104 06526 AAS 16562 b HB3258 - 64 - LRB104 06526 AAS 16562 b |
---|
2299 | 2299 | | HB3258 - 64 - LRB104 06526 AAS 16562 b |
---|
2300 | 2300 | | 1 protection groups, and other interested stakeholders |
---|
2301 | 2301 | | 2 to share relevant information about consumer |
---|
2302 | 2302 | | 3 protection, project compliance, and complaints |
---|
2303 | 2303 | | 4 received. |
---|
2304 | 2304 | | 5 (vii) To the extent that complaints received |
---|
2305 | 2305 | | 6 implicate the jurisdiction of the Office of the |
---|
2306 | 2306 | | 7 Attorney General, the Illinois Commerce Commission, or |
---|
2307 | 2307 | | 8 local, State, or federal law enforcement, the Agency |
---|
2308 | 2308 | | 9 shall also refer complaints to those entities as |
---|
2309 | 2309 | | 10 appropriate. |
---|
2310 | 2310 | | 11 (N) The Agency shall establish the terms, conditions, |
---|
2311 | 2311 | | 12 and program requirements for photovoltaic community |
---|
2312 | 2312 | | 13 renewable generation projects with a goal to expand access |
---|
2313 | 2313 | | 14 to a broader group of energy consumers, to ensure robust |
---|
2314 | 2314 | | 15 participation opportunities for residential and small |
---|
2315 | 2315 | | 16 commercial customers and those who cannot install |
---|
2316 | 2316 | | 17 renewable energy on their own properties. Subject to |
---|
2317 | 2317 | | 18 reasonable limitations, any plan approved by the |
---|
2318 | 2318 | | 19 Commission shall allow subscriptions to community |
---|
2319 | 2319 | | 20 renewable generation projects to be portable and |
---|
2320 | 2320 | | 21 transferable. For purposes of this subparagraph (N), |
---|
2321 | 2321 | | 22 "portable" means that subscriptions may be retained by the |
---|
2322 | 2322 | | 23 subscriber even if the subscriber relocates or changes its |
---|
2323 | 2323 | | 24 address within the same utility service territory; and |
---|
2324 | 2324 | | 25 "transferable" means that a subscriber may assign or sell |
---|
2325 | 2325 | | 26 subscriptions to another person within the same utility |
---|
2326 | 2326 | | |
---|
2327 | 2327 | | |
---|
2328 | 2328 | | |
---|
2329 | 2329 | | |
---|
2330 | 2330 | | |
---|
2331 | 2331 | | HB3258 - 64 - LRB104 06526 AAS 16562 b |
---|
2332 | 2332 | | |
---|
2333 | 2333 | | |
---|
2334 | 2334 | | HB3258- 65 -LRB104 06526 AAS 16562 b HB3258 - 65 - LRB104 06526 AAS 16562 b |
---|
2335 | 2335 | | HB3258 - 65 - LRB104 06526 AAS 16562 b |
---|
2336 | 2336 | | 1 service territory. |
---|
2337 | 2337 | | 2 Through the development of its long-term renewable |
---|
2338 | 2338 | | 3 resources procurement plan, the Agency may consider |
---|
2339 | 2339 | | 4 whether community renewable generation projects utilizing |
---|
2340 | 2340 | | 5 technologies other than photovoltaics should be supported |
---|
2341 | 2341 | | 6 through State-administered incentive funding, and may |
---|
2342 | 2342 | | 7 issue requests for information to gauge market demand. |
---|
2343 | 2343 | | 8 Electric utilities shall provide a monetary credit to |
---|
2344 | 2344 | | 9 a subscriber's subsequent bill for service for the |
---|
2345 | 2345 | | 10 proportional output of a community renewable generation |
---|
2346 | 2346 | | 11 project attributable to that subscriber as specified in |
---|
2347 | 2347 | | 12 Section 16-107.5 of the Public Utilities Act. |
---|
2348 | 2348 | | 13 The Agency shall purchase renewable energy credits |
---|
2349 | 2349 | | 14 from subscribed shares of photovoltaic community renewable |
---|
2350 | 2350 | | 15 generation projects through the Adjustable Block program |
---|
2351 | 2351 | | 16 described in subparagraph (K) of this paragraph (1) or |
---|
2352 | 2352 | | 17 through the Illinois Solar for All Program described in |
---|
2353 | 2353 | | 18 Section 1-56 of this Act. The electric utility shall |
---|
2354 | 2354 | | 19 purchase any unsubscribed energy from community renewable |
---|
2355 | 2355 | | 20 generation projects that are Qualifying Facilities ("QF") |
---|
2356 | 2356 | | 21 under the electric utility's tariff for purchasing the |
---|
2357 | 2357 | | 22 output from QFs under Public Utilities Regulatory Policies |
---|
2358 | 2358 | | 23 Act of 1978. |
---|
2359 | 2359 | | 24 The owners of and any subscribers to a community |
---|
2360 | 2360 | | 25 renewable generation project shall not be considered |
---|
2361 | 2361 | | 26 public utilities or alternative retail electricity |
---|
2362 | 2362 | | |
---|
2363 | 2363 | | |
---|
2364 | 2364 | | |
---|
2365 | 2365 | | |
---|
2366 | 2366 | | |
---|
2367 | 2367 | | HB3258 - 65 - LRB104 06526 AAS 16562 b |
---|
2368 | 2368 | | |
---|
2369 | 2369 | | |
---|
2370 | 2370 | | HB3258- 66 -LRB104 06526 AAS 16562 b HB3258 - 66 - LRB104 06526 AAS 16562 b |
---|
2371 | 2371 | | HB3258 - 66 - LRB104 06526 AAS 16562 b |
---|
2372 | 2372 | | 1 suppliers under the Public Utilities Act solely as a |
---|
2373 | 2373 | | 2 result of their interest in or subscription to a community |
---|
2374 | 2374 | | 3 renewable generation project and shall not be required to |
---|
2375 | 2375 | | 4 become an alternative retail electric supplier by |
---|
2376 | 2376 | | 5 participating in a community renewable generation project |
---|
2377 | 2377 | | 6 with a public utility. |
---|
2378 | 2378 | | 7 (O) For the delivery year beginning June 1, 2018, the |
---|
2379 | 2379 | | 8 long-term renewable resources procurement plan required by |
---|
2380 | 2380 | | 9 this subsection (c) shall provide for the Agency to |
---|
2381 | 2381 | | 10 procure contracts to continue offering the Illinois Solar |
---|
2382 | 2382 | | 11 for All Program described in subsection (b) of Section |
---|
2383 | 2383 | | 12 1-56 of this Act, and the contracts approved by the |
---|
2384 | 2384 | | 13 Commission shall be executed by the utilities that are |
---|
2385 | 2385 | | 14 subject to this subsection (c). The long-term renewable |
---|
2386 | 2386 | | 15 resources procurement plan shall allocate up to |
---|
2387 | 2387 | | 16 $50,000,000 per delivery year to fund the programs, and |
---|
2388 | 2388 | | 17 the plan shall determine the amount of funding to be |
---|
2389 | 2389 | | 18 apportioned to the programs identified in subsection (b) |
---|
2390 | 2390 | | 19 of Section 1-56 of this Act; provided that for the |
---|
2391 | 2391 | | 20 delivery years beginning June 1, 2021, June 1, 2022, and |
---|
2392 | 2392 | | 21 June 1, 2023, the long-term renewable resources |
---|
2393 | 2393 | | 22 procurement plan may average the annual budgets over a |
---|
2394 | 2394 | | 23 3-year period to account for program ramp-up. For the |
---|
2395 | 2395 | | 24 delivery years beginning June 1, 2021, June 1, 2024, June |
---|
2396 | 2396 | | 25 1, 2027, and June 1, 2030 and additional $10,000,000 shall |
---|
2397 | 2397 | | 26 be provided to the Department of Commerce and Economic |
---|
2398 | 2398 | | |
---|
2399 | 2399 | | |
---|
2400 | 2400 | | |
---|
2401 | 2401 | | |
---|
2402 | 2402 | | |
---|
2403 | 2403 | | HB3258 - 66 - LRB104 06526 AAS 16562 b |
---|
2404 | 2404 | | |
---|
2405 | 2405 | | |
---|
2406 | 2406 | | HB3258- 67 -LRB104 06526 AAS 16562 b HB3258 - 67 - LRB104 06526 AAS 16562 b |
---|
2407 | 2407 | | HB3258 - 67 - LRB104 06526 AAS 16562 b |
---|
2408 | 2408 | | 1 Opportunity to implement the workforce development |
---|
2409 | 2409 | | 2 programs and reporting as outlined in Section 16-108.12 of |
---|
2410 | 2410 | | 3 the Public Utilities Act. In making the determinations |
---|
2411 | 2411 | | 4 required under this subparagraph (O), the Commission shall |
---|
2412 | 2412 | | 5 consider the experience and performance under the programs |
---|
2413 | 2413 | | 6 and any evaluation reports. The Commission shall also |
---|
2414 | 2414 | | 7 provide for an independent evaluation of those programs on |
---|
2415 | 2415 | | 8 a periodic basis that are funded under this subparagraph |
---|
2416 | 2416 | | 9 (O). |
---|
2417 | 2417 | | 10 (P) (Blank). All programs and procurements under this |
---|
2418 | 2418 | | 11 subsection (c) shall be designed to encourage |
---|
2419 | 2419 | | 12 participating projects to use a diverse and equitable |
---|
2420 | 2420 | | 13 workforce and a diverse set of contractors, including |
---|
2421 | 2421 | | 14 minority-owned businesses, disadvantaged businesses, |
---|
2422 | 2422 | | 15 trade unions, graduates of any workforce training programs |
---|
2423 | 2423 | | 16 administered under this Act, and small businesses. |
---|
2424 | 2424 | | 17 The Agency shall develop a method to optimize |
---|
2425 | 2425 | | 18 procurement of renewable energy credits from proposed |
---|
2426 | 2426 | | 19 utility-scale projects that are located in communities |
---|
2427 | 2427 | | 20 eligible to receive Energy Transition Community Grants |
---|
2428 | 2428 | | 21 pursuant to Section 10-20 of the Energy Community |
---|
2429 | 2429 | | 22 Reinvestment Act. If this requirement conflicts with other |
---|
2430 | 2430 | | 23 provisions of law or the Agency determines that full |
---|
2431 | 2431 | | 24 compliance with the requirements of this subparagraph (P) |
---|
2432 | 2432 | | 25 would be unreasonably costly or administratively |
---|
2433 | 2433 | | 26 impractical, the Agency is to propose alternative |
---|
2434 | 2434 | | |
---|
2435 | 2435 | | |
---|
2436 | 2436 | | |
---|
2437 | 2437 | | |
---|
2438 | 2438 | | |
---|
2439 | 2439 | | HB3258 - 67 - LRB104 06526 AAS 16562 b |
---|
2440 | 2440 | | |
---|
2441 | 2441 | | |
---|
2442 | 2442 | | HB3258- 68 -LRB104 06526 AAS 16562 b HB3258 - 68 - LRB104 06526 AAS 16562 b |
---|
2443 | 2443 | | HB3258 - 68 - LRB104 06526 AAS 16562 b |
---|
2444 | 2444 | | 1 approaches to achieve development of renewable energy |
---|
2445 | 2445 | | 2 resources in communities eligible to receive Energy |
---|
2446 | 2446 | | 3 Transition Community Grants pursuant to Section 10-20 of |
---|
2447 | 2447 | | 4 the Energy Community Reinvestment Act or seek an exemption |
---|
2448 | 2448 | | 5 from this requirement from the Commission. |
---|
2449 | 2449 | | 6 (Q) Each facility listed in subitems (i) through (ix) |
---|
2450 | 2450 | | 7 of item (1) of this subparagraph (Q) for which a renewable |
---|
2451 | 2451 | | 8 energy credit delivery contract is signed after the |
---|
2452 | 2452 | | 9 effective date of this amendatory Act of the 102nd General |
---|
2453 | 2453 | | 10 Assembly is subject to the following requirements through |
---|
2454 | 2454 | | 11 the Agency's long-term renewable resources procurement |
---|
2455 | 2455 | | 12 plan: |
---|
2456 | 2456 | | 13 (1) Each facility shall be subject to the |
---|
2457 | 2457 | | 14 prevailing wage requirements included in the |
---|
2458 | 2458 | | 15 Prevailing Wage Act. The Agency shall require |
---|
2459 | 2459 | | 16 verification that all construction performed on the |
---|
2460 | 2460 | | 17 facility by the renewable energy credit delivery |
---|
2461 | 2461 | | 18 contract holder, its contractors, or its |
---|
2462 | 2462 | | 19 subcontractors relating to construction of the |
---|
2463 | 2463 | | 20 facility is performed by construction employees |
---|
2464 | 2464 | | 21 receiving an amount for that work equal to or greater |
---|
2465 | 2465 | | 22 than the general prevailing rate, as that term is |
---|
2466 | 2466 | | 23 defined in Section 3 of the Prevailing Wage Act. For |
---|
2467 | 2467 | | 24 purposes of this item (1), "house of worship" means |
---|
2468 | 2468 | | 25 property that is both (1) used exclusively by a |
---|
2469 | 2469 | | 26 religious society or body of persons as a place for |
---|
2470 | 2470 | | |
---|
2471 | 2471 | | |
---|
2472 | 2472 | | |
---|
2473 | 2473 | | |
---|
2474 | 2474 | | |
---|
2475 | 2475 | | HB3258 - 68 - LRB104 06526 AAS 16562 b |
---|
2476 | 2476 | | |
---|
2477 | 2477 | | |
---|
2478 | 2478 | | HB3258- 69 -LRB104 06526 AAS 16562 b HB3258 - 69 - LRB104 06526 AAS 16562 b |
---|
2479 | 2479 | | HB3258 - 69 - LRB104 06526 AAS 16562 b |
---|
2480 | 2480 | | 1 religious exercise or religious worship and (2) |
---|
2481 | 2481 | | 2 recognized as exempt from taxation pursuant to Section |
---|
2482 | 2482 | | 3 15-40 of the Property Tax Code. This item (1) shall |
---|
2483 | 2483 | | 4 apply to any the following: |
---|
2484 | 2484 | | 5 (i) all new utility-scale wind projects; |
---|
2485 | 2485 | | 6 (ii) all new utility-scale photovoltaic |
---|
2486 | 2486 | | 7 projects; |
---|
2487 | 2487 | | 8 (iii) all new brownfield photovoltaic |
---|
2488 | 2488 | | 9 projects; |
---|
2489 | 2489 | | 10 (iv) all new photovoltaic community renewable |
---|
2490 | 2490 | | 11 energy facilities that qualify for item (iii) of |
---|
2491 | 2491 | | 12 subparagraph (K) of this paragraph (1); |
---|
2492 | 2492 | | 13 (v) all new community driven community |
---|
2493 | 2493 | | 14 photovoltaic projects that qualify for item (v) of |
---|
2494 | 2494 | | 15 subparagraph (K) of this paragraph (1); |
---|
2495 | 2495 | | 16 (vi) all new photovoltaic projects on public |
---|
2496 | 2496 | | 17 school land that qualify for item (iv) of |
---|
2497 | 2497 | | 18 subparagraph (K) of this paragraph (1); |
---|
2498 | 2498 | | 19 (vii) all new photovoltaic distributed |
---|
2499 | 2499 | | 20 renewable energy generation devices that (1) |
---|
2500 | 2500 | | 21 qualify for item (i) of subparagraph (K) of this |
---|
2501 | 2501 | | 22 paragraph (1); (2) are not projects that serve |
---|
2502 | 2502 | | 23 single-family or multi-family residential |
---|
2503 | 2503 | | 24 buildings; and (3) are not houses of worship where |
---|
2504 | 2504 | | 25 the aggregate capacity including collocated |
---|
2505 | 2505 | | 26 projects would not exceed 100 kilowatts; |
---|
2506 | 2506 | | |
---|
2507 | 2507 | | |
---|
2508 | 2508 | | |
---|
2509 | 2509 | | |
---|
2510 | 2510 | | |
---|
2511 | 2511 | | HB3258 - 69 - LRB104 06526 AAS 16562 b |
---|
2512 | 2512 | | |
---|
2513 | 2513 | | |
---|
2514 | 2514 | | HB3258- 70 -LRB104 06526 AAS 16562 b HB3258 - 70 - LRB104 06526 AAS 16562 b |
---|
2515 | 2515 | | HB3258 - 70 - LRB104 06526 AAS 16562 b |
---|
2516 | 2516 | | 1 (viii) all new photovoltaic distributed |
---|
2517 | 2517 | | 2 renewable energy generation devices that (1) |
---|
2518 | 2518 | | 3 qualify for item (ii) of subparagraph (K) of this |
---|
2519 | 2519 | | 4 paragraph (1); (2) are not projects that serve |
---|
2520 | 2520 | | 5 single-family or multi-family residential |
---|
2521 | 2521 | | 6 buildings; and (3) are not houses of worship where |
---|
2522 | 2522 | | 7 the aggregate capacity including collocated |
---|
2523 | 2523 | | 8 projects would not exceed 100 kilowatts; |
---|
2524 | 2524 | | 9 (ix) all new, modernized, or retooled |
---|
2525 | 2525 | | 10 hydropower facilities. |
---|
2526 | 2526 | | 11 (2) Renewable energy credits procured from new |
---|
2527 | 2527 | | 12 utility-scale wind projects, new utility-scale solar |
---|
2528 | 2528 | | 13 projects, and new brownfield solar projects pursuant |
---|
2529 | 2529 | | 14 to Agency procurement events occurring after the |
---|
2530 | 2530 | | 15 effective date of this amendatory Act of the 102nd |
---|
2531 | 2531 | | 16 General Assembly must be from facilities built by |
---|
2532 | 2532 | | 17 general contractors that must enter into a project |
---|
2533 | 2533 | | 18 labor agreement, as defined by this Act, prior to |
---|
2534 | 2534 | | 19 construction. The project labor agreement shall be |
---|
2535 | 2535 | | 20 filed with the Director in accordance with procedures |
---|
2536 | 2536 | | 21 established by the Agency through its long-term |
---|
2537 | 2537 | | 22 renewable resources procurement plan. Any information |
---|
2538 | 2538 | | 23 submitted to the Agency in this item (2) shall be |
---|
2539 | 2539 | | 24 considered commercially sensitive information. At a |
---|
2540 | 2540 | | 25 minimum, the project labor agreement must provide the |
---|
2541 | 2541 | | 26 names, addresses, and occupations of the owner of the |
---|
2542 | 2542 | | |
---|
2543 | 2543 | | |
---|
2544 | 2544 | | |
---|
2545 | 2545 | | |
---|
2546 | 2546 | | |
---|
2547 | 2547 | | HB3258 - 70 - LRB104 06526 AAS 16562 b |
---|
2548 | 2548 | | |
---|
2549 | 2549 | | |
---|
2550 | 2550 | | HB3258- 71 -LRB104 06526 AAS 16562 b HB3258 - 71 - LRB104 06526 AAS 16562 b |
---|
2551 | 2551 | | HB3258 - 71 - LRB104 06526 AAS 16562 b |
---|
2552 | 2552 | | 1 plant and the individuals representing the labor |
---|
2553 | 2553 | | 2 organization employees participating in the project |
---|
2554 | 2554 | | 3 labor agreement consistent with the Project Labor |
---|
2555 | 2555 | | 4 Agreements Act. The agreement must also specify the |
---|
2556 | 2556 | | 5 terms and conditions as defined by this Act. |
---|
2557 | 2557 | | 6 (3) It is the intent of this Section to ensure that |
---|
2558 | 2558 | | 7 economic development occurs across Illinois |
---|
2559 | 2559 | | 8 communities, that emerging businesses may grow, and |
---|
2560 | 2560 | | 9 that there is improved access to the clean energy |
---|
2561 | 2561 | | 10 economy by persons who have greater economic burdens |
---|
2562 | 2562 | | 11 to success. The Agency shall take into consideration |
---|
2563 | 2563 | | 12 the unique cost of compliance of this subparagraph (Q) |
---|
2564 | 2564 | | 13 that might be borne by equity eligible contractors, |
---|
2565 | 2565 | | 14 shall include such costs when determining the price of |
---|
2566 | 2566 | | 15 renewable energy credits in the Adjustable Block |
---|
2567 | 2567 | | 16 program, and shall take such costs into consideration |
---|
2568 | 2568 | | 17 in a nondiscriminatory manner when comparing bids for |
---|
2569 | 2569 | | 18 competitive procurements. The Agency shall consider |
---|
2570 | 2570 | | 19 costs associated with compliance whether in the |
---|
2571 | 2571 | | 20 development, financing, or construction of projects. |
---|
2572 | 2572 | | 21 The Agency shall periodically review the assumptions |
---|
2573 | 2573 | | 22 in these costs and may adjust prices, in compliance |
---|
2574 | 2574 | | 23 with subparagraph (M) of this paragraph (1). |
---|
2575 | 2575 | | 24 (R) In its long-term renewable resources procurement |
---|
2576 | 2576 | | 25 plan, the Agency shall establish a self-direct renewable |
---|
2577 | 2577 | | 26 portfolio standard compliance program for eligible |
---|
2578 | 2578 | | |
---|
2579 | 2579 | | |
---|
2580 | 2580 | | |
---|
2581 | 2581 | | |
---|
2582 | 2582 | | |
---|
2583 | 2583 | | HB3258 - 71 - LRB104 06526 AAS 16562 b |
---|
2584 | 2584 | | |
---|
2585 | 2585 | | |
---|
2586 | 2586 | | HB3258- 72 -LRB104 06526 AAS 16562 b HB3258 - 72 - LRB104 06526 AAS 16562 b |
---|
2587 | 2587 | | HB3258 - 72 - LRB104 06526 AAS 16562 b |
---|
2588 | 2588 | | 1 self-direct customers that purchase renewable energy |
---|
2589 | 2589 | | 2 credits from utility-scale wind and solar projects through |
---|
2590 | 2590 | | 3 long-term agreements for purchase of renewable energy |
---|
2591 | 2591 | | 4 credits as described in this Section. Such long-term |
---|
2592 | 2592 | | 5 agreements may include the purchase of energy or other |
---|
2593 | 2593 | | 6 products on a physical or financial basis and may involve |
---|
2594 | 2594 | | 7 an alternative retail electric supplier as defined in |
---|
2595 | 2595 | | 8 Section 16-102 of the Public Utilities Act. This program |
---|
2596 | 2596 | | 9 shall take effect in the delivery year commencing June 1, |
---|
2597 | 2597 | | 10 2023. |
---|
2598 | 2598 | | 11 (1) For the purposes of this subparagraph: |
---|
2599 | 2599 | | 12 "Eligible self-direct customer" means any retail |
---|
2600 | 2600 | | 13 customers of an electric utility that serves 3,000,000 |
---|
2601 | 2601 | | 14 or more retail customers in the State and whose total |
---|
2602 | 2602 | | 15 highest 30-minute demand was more than 10,000 |
---|
2603 | 2603 | | 16 kilowatts, or any retail customers of an electric |
---|
2604 | 2604 | | 17 utility that serves less than 3,000,000 retail |
---|
2605 | 2605 | | 18 customers but more than 500,000 retail customers in |
---|
2606 | 2606 | | 19 the State and whose total highest 15-minute demand was |
---|
2607 | 2607 | | 20 more than 10,000 kilowatts. |
---|
2608 | 2608 | | 21 "Retail customer" has the meaning set forth in |
---|
2609 | 2609 | | 22 Section 16-102 of the Public Utilities Act and |
---|
2610 | 2610 | | 23 multiple retail customer accounts under the same |
---|
2611 | 2611 | | 24 corporate parent may aggregate their account demands |
---|
2612 | 2612 | | 25 to meet the 10,000 kilowatt threshold. The criteria |
---|
2613 | 2613 | | 26 for determining whether this subparagraph is |
---|
2614 | 2614 | | |
---|
2615 | 2615 | | |
---|
2616 | 2616 | | |
---|
2617 | 2617 | | |
---|
2618 | 2618 | | |
---|
2619 | 2619 | | HB3258 - 72 - LRB104 06526 AAS 16562 b |
---|
2620 | 2620 | | |
---|
2621 | 2621 | | |
---|
2622 | 2622 | | HB3258- 73 -LRB104 06526 AAS 16562 b HB3258 - 73 - LRB104 06526 AAS 16562 b |
---|
2623 | 2623 | | HB3258 - 73 - LRB104 06526 AAS 16562 b |
---|
2624 | 2624 | | 1 applicable to a retail customer shall be based on the |
---|
2625 | 2625 | | 2 12 consecutive billing periods prior to the start of |
---|
2626 | 2626 | | 3 the year in which the application is filed. |
---|
2627 | 2627 | | 4 (2) For renewable energy credits to count toward |
---|
2628 | 2628 | | 5 the self-direct renewable portfolio standard |
---|
2629 | 2629 | | 6 compliance program, they must: |
---|
2630 | 2630 | | 7 (i) qualify as renewable energy credits as |
---|
2631 | 2631 | | 8 defined in Section 1-10 of this Act; |
---|
2632 | 2632 | | 9 (ii) be sourced from one or more renewable |
---|
2633 | 2633 | | 10 energy generating facilities that comply with the |
---|
2634 | 2634 | | 11 geographic requirements as set forth in |
---|
2635 | 2635 | | 12 subparagraph (I) of paragraph (1) of subsection |
---|
2636 | 2636 | | 13 (c) as interpreted through the Agency's long-term |
---|
2637 | 2637 | | 14 renewable resources procurement plan, or, where |
---|
2638 | 2638 | | 15 applicable, the geographic requirements that |
---|
2639 | 2639 | | 16 governed utility-scale renewable energy credits at |
---|
2640 | 2640 | | 17 the time the eligible self-direct customer entered |
---|
2641 | 2641 | | 18 into the applicable renewable energy credit |
---|
2642 | 2642 | | 19 purchase agreement; |
---|
2643 | 2643 | | 20 (iii) be procured through long-term contracts |
---|
2644 | 2644 | | 21 with term lengths of at least 10 years either |
---|
2645 | 2645 | | 22 directly with the renewable energy generating |
---|
2646 | 2646 | | 23 facility or through a bundled power purchase |
---|
2647 | 2647 | | 24 agreement, a virtual power purchase agreement, an |
---|
2648 | 2648 | | 25 agreement between the renewable generating |
---|
2649 | 2649 | | 26 facility, an alternative retail electric supplier, |
---|
2650 | 2650 | | |
---|
2651 | 2651 | | |
---|
2652 | 2652 | | |
---|
2653 | 2653 | | |
---|
2654 | 2654 | | |
---|
2655 | 2655 | | HB3258 - 73 - LRB104 06526 AAS 16562 b |
---|
2656 | 2656 | | |
---|
2657 | 2657 | | |
---|
2658 | 2658 | | HB3258- 74 -LRB104 06526 AAS 16562 b HB3258 - 74 - LRB104 06526 AAS 16562 b |
---|
2659 | 2659 | | HB3258 - 74 - LRB104 06526 AAS 16562 b |
---|
2660 | 2660 | | 1 and the customer, or such other structure as is |
---|
2661 | 2661 | | 2 permissible under this subparagraph (R); |
---|
2662 | 2662 | | 3 (iv) be equivalent in volume to at least 40% |
---|
2663 | 2663 | | 4 of the eligible self-direct customer's usage, |
---|
2664 | 2664 | | 5 determined annually by the eligible self-direct |
---|
2665 | 2665 | | 6 customer's usage during the previous delivery |
---|
2666 | 2666 | | 7 year, measured to the nearest megawatt-hour; |
---|
2667 | 2667 | | 8 (v) be retired by or on behalf of the large |
---|
2668 | 2668 | | 9 energy customer; |
---|
2669 | 2669 | | 10 (vi) be sourced from new utility-scale wind |
---|
2670 | 2670 | | 11 projects or new utility-scale solar projects; and |
---|
2671 | 2671 | | 12 (vii) if the contracts for renewable energy |
---|
2672 | 2672 | | 13 credits are entered into after the effective date |
---|
2673 | 2673 | | 14 of this amendatory Act of the 102nd General |
---|
2674 | 2674 | | 15 Assembly, the new utility-scale wind projects or |
---|
2675 | 2675 | | 16 new utility-scale solar projects must comply with |
---|
2676 | 2676 | | 17 the requirements established in subparagraph |
---|
2677 | 2677 | | 18 subparagraphs (P) and (Q) of paragraph (1) of this |
---|
2678 | 2678 | | 19 subsection (c) and subsection (c-10). |
---|
2679 | 2679 | | 20 (3) The self-direct renewable portfolio standard |
---|
2680 | 2680 | | 21 compliance program shall be designed to allow eligible |
---|
2681 | 2681 | | 22 self-direct customers to procure new renewable energy |
---|
2682 | 2682 | | 23 credits from new utility-scale wind projects or new |
---|
2683 | 2683 | | 24 utility-scale photovoltaic projects. The Agency shall |
---|
2684 | 2684 | | 25 annually determine the amount of utility-scale |
---|
2685 | 2685 | | 26 renewable energy credits it will include each year |
---|
2686 | 2686 | | |
---|
2687 | 2687 | | |
---|
2688 | 2688 | | |
---|
2689 | 2689 | | |
---|
2690 | 2690 | | |
---|
2691 | 2691 | | HB3258 - 74 - LRB104 06526 AAS 16562 b |
---|
2692 | 2692 | | |
---|
2693 | 2693 | | |
---|
2694 | 2694 | | HB3258- 75 -LRB104 06526 AAS 16562 b HB3258 - 75 - LRB104 06526 AAS 16562 b |
---|
2695 | 2695 | | HB3258 - 75 - LRB104 06526 AAS 16562 b |
---|
2696 | 2696 | | 1 from the self-direct renewable portfolio standard |
---|
2697 | 2697 | | 2 compliance program, subject to receiving qualifying |
---|
2698 | 2698 | | 3 applications. In making this determination, the Agency |
---|
2699 | 2699 | | 4 shall evaluate publicly available analyses and studies |
---|
2700 | 2700 | | 5 of the potential market size for utility-scale |
---|
2701 | 2701 | | 6 renewable energy long-term purchase agreements by |
---|
2702 | 2702 | | 7 commercial and industrial energy customers and make |
---|
2703 | 2703 | | 8 that report publicly available. If demand for |
---|
2704 | 2704 | | 9 participation in the self-direct renewable portfolio |
---|
2705 | 2705 | | 10 standard compliance program exceeds availability, the |
---|
2706 | 2706 | | 11 Agency shall ensure participation is evenly split |
---|
2707 | 2707 | | 12 between commercial and industrial users to the extent |
---|
2708 | 2708 | | 13 there is sufficient demand from both customer classes. |
---|
2709 | 2709 | | 14 Each renewable energy credit procured pursuant to this |
---|
2710 | 2710 | | 15 subparagraph (R) by a self-direct customer shall |
---|
2711 | 2711 | | 16 reduce the total volume of renewable energy credits |
---|
2712 | 2712 | | 17 the Agency is otherwise required to procure from new |
---|
2713 | 2713 | | 18 utility-scale projects pursuant to subparagraph (C) of |
---|
2714 | 2714 | | 19 paragraph (1) of this subsection (c) on behalf of |
---|
2715 | 2715 | | 20 contracting utilities where the eligible self-direct |
---|
2716 | 2716 | | 21 customer is located. The self-direct customer shall |
---|
2717 | 2717 | | 22 file an annual compliance report with the Agency |
---|
2718 | 2718 | | 23 pursuant to terms established by the Agency through |
---|
2719 | 2719 | | 24 its long-term renewable resources procurement plan to |
---|
2720 | 2720 | | 25 be eligible for participation in this program. |
---|
2721 | 2721 | | 26 Customers must provide the Agency with their most |
---|
2722 | 2722 | | |
---|
2723 | 2723 | | |
---|
2724 | 2724 | | |
---|
2725 | 2725 | | |
---|
2726 | 2726 | | |
---|
2727 | 2727 | | HB3258 - 75 - LRB104 06526 AAS 16562 b |
---|
2728 | 2728 | | |
---|
2729 | 2729 | | |
---|
2730 | 2730 | | HB3258- 76 -LRB104 06526 AAS 16562 b HB3258 - 76 - LRB104 06526 AAS 16562 b |
---|
2731 | 2731 | | HB3258 - 76 - LRB104 06526 AAS 16562 b |
---|
2732 | 2732 | | 1 recent electricity billing statements or other |
---|
2733 | 2733 | | 2 information deemed necessary by the Agency to |
---|
2734 | 2734 | | 3 demonstrate they are an eligible self-direct customer. |
---|
2735 | 2735 | | 4 (4) The Commission shall approve a reduction in |
---|
2736 | 2736 | | 5 the volumetric charges collected pursuant to Section |
---|
2737 | 2737 | | 6 16-108 of the Public Utilities Act for approved |
---|
2738 | 2738 | | 7 eligible self-direct customers equivalent to the |
---|
2739 | 2739 | | 8 anticipated cost of renewable energy credit deliveries |
---|
2740 | 2740 | | 9 under contracts for new utility-scale wind and new |
---|
2741 | 2741 | | 10 utility-scale solar entered for each delivery year |
---|
2742 | 2742 | | 11 after the large energy customer begins retiring |
---|
2743 | 2743 | | 12 eligible new utility scale renewable energy credits |
---|
2744 | 2744 | | 13 for self-compliance. The self-direct credit amount |
---|
2745 | 2745 | | 14 shall be determined annually and is equal to the |
---|
2746 | 2746 | | 15 estimated portion of the cost authorized by |
---|
2747 | 2747 | | 16 subparagraph (E) of paragraph (1) of this subsection |
---|
2748 | 2748 | | 17 (c) that supported the annual procurement of |
---|
2749 | 2749 | | 18 utility-scale renewable energy credits in the prior |
---|
2750 | 2750 | | 19 delivery year using a methodology described in the |
---|
2751 | 2751 | | 20 long-term renewable resources procurement plan, |
---|
2752 | 2752 | | 21 expressed on a per kilowatthour basis, and does not |
---|
2753 | 2753 | | 22 include (i) costs associated with any contracts |
---|
2754 | 2754 | | 23 entered into before the delivery year in which the |
---|
2755 | 2755 | | 24 customer files the initial compliance report to be |
---|
2756 | 2756 | | 25 eligible for participation in the self-direct program, |
---|
2757 | 2757 | | 26 and (ii) costs associated with procuring renewable |
---|
2758 | 2758 | | |
---|
2759 | 2759 | | |
---|
2760 | 2760 | | |
---|
2761 | 2761 | | |
---|
2762 | 2762 | | |
---|
2763 | 2763 | | HB3258 - 76 - LRB104 06526 AAS 16562 b |
---|
2764 | 2764 | | |
---|
2765 | 2765 | | |
---|
2766 | 2766 | | HB3258- 77 -LRB104 06526 AAS 16562 b HB3258 - 77 - LRB104 06526 AAS 16562 b |
---|
2767 | 2767 | | HB3258 - 77 - LRB104 06526 AAS 16562 b |
---|
2768 | 2768 | | 1 energy credits through existing and future contracts |
---|
2769 | 2769 | | 2 through the Adjustable Block Program, subsection (c-5) |
---|
2770 | 2770 | | 3 of this Section 1-75, and the Solar for All Program. |
---|
2771 | 2771 | | 4 The Agency shall assist the Commission in determining |
---|
2772 | 2772 | | 5 the current and future costs. The Agency must |
---|
2773 | 2773 | | 6 determine the self-direct credit amount for new and |
---|
2774 | 2774 | | 7 existing eligible self-direct customers and submit |
---|
2775 | 2775 | | 8 this to the Commission in an annual compliance filing. |
---|
2776 | 2776 | | 9 The Commission must approve the self-direct credit |
---|
2777 | 2777 | | 10 amount by June 1, 2023 and June 1 of each delivery year |
---|
2778 | 2778 | | 11 thereafter. |
---|
2779 | 2779 | | 12 (5) Customers described in this subparagraph (R) |
---|
2780 | 2780 | | 13 shall apply, on a form developed by the Agency, to the |
---|
2781 | 2781 | | 14 Agency to be designated as a self-direct eligible |
---|
2782 | 2782 | | 15 customer. Once the Agency determines that a |
---|
2783 | 2783 | | 16 self-direct customer is eligible for participation in |
---|
2784 | 2784 | | 17 the program, the self-direct customer will remain |
---|
2785 | 2785 | | 18 eligible until the end of the term of the contract. |
---|
2786 | 2786 | | 19 Thereafter, application may be made not less than 12 |
---|
2787 | 2787 | | 20 months before the filing date of the long-term |
---|
2788 | 2788 | | 21 renewable resources procurement plan described in this |
---|
2789 | 2789 | | 22 Act. At a minimum, such application shall contain the |
---|
2790 | 2790 | | 23 following: |
---|
2791 | 2791 | | 24 (i) the customer's certification that, at the |
---|
2792 | 2792 | | 25 time of the customer's application, the customer |
---|
2793 | 2793 | | 26 qualifies to be a self-direct eligible customer, |
---|
2794 | 2794 | | |
---|
2795 | 2795 | | |
---|
2796 | 2796 | | |
---|
2797 | 2797 | | |
---|
2798 | 2798 | | |
---|
2799 | 2799 | | HB3258 - 77 - LRB104 06526 AAS 16562 b |
---|
2800 | 2800 | | |
---|
2801 | 2801 | | |
---|
2802 | 2802 | | HB3258- 78 -LRB104 06526 AAS 16562 b HB3258 - 78 - LRB104 06526 AAS 16562 b |
---|
2803 | 2803 | | HB3258 - 78 - LRB104 06526 AAS 16562 b |
---|
2804 | 2804 | | 1 including documents demonstrating that |
---|
2805 | 2805 | | 2 qualification; |
---|
2806 | 2806 | | 3 (ii) the customer's certification that the |
---|
2807 | 2807 | | 4 customer has entered into or will enter into by |
---|
2808 | 2808 | | 5 the beginning of the applicable procurement year, |
---|
2809 | 2809 | | 6 one or more bilateral contracts for new wind |
---|
2810 | 2810 | | 7 projects or new photovoltaic projects, including |
---|
2811 | 2811 | | 8 supporting documentation; |
---|
2812 | 2812 | | 9 (iii) certification that the contract or |
---|
2813 | 2813 | | 10 contracts for new renewable energy resources are |
---|
2814 | 2814 | | 11 long-term contracts with term lengths of at least |
---|
2815 | 2815 | | 12 10 years, including supporting documentation; |
---|
2816 | 2816 | | 13 (iv) certification of the quantities of |
---|
2817 | 2817 | | 14 renewable energy credits that the customer will |
---|
2818 | 2818 | | 15 purchase each year under such contract or |
---|
2819 | 2819 | | 16 contracts, including supporting documentation; |
---|
2820 | 2820 | | 17 (v) proof that the contract is sufficient to |
---|
2821 | 2821 | | 18 produce renewable energy credits to be equivalent |
---|
2822 | 2822 | | 19 in volume to at least 40% of the large energy |
---|
2823 | 2823 | | 20 customer's usage from the previous delivery year, |
---|
2824 | 2824 | | 21 measured to the nearest megawatt-hour; and |
---|
2825 | 2825 | | 22 (vi) certification that the customer intends |
---|
2826 | 2826 | | 23 to maintain the contract for the duration of the |
---|
2827 | 2827 | | 24 length of the contract. |
---|
2828 | 2828 | | 25 (6) If a customer receives the self-direct credit |
---|
2829 | 2829 | | 26 but fails to properly procure and retire renewable |
---|
2830 | 2830 | | |
---|
2831 | 2831 | | |
---|
2832 | 2832 | | |
---|
2833 | 2833 | | |
---|
2834 | 2834 | | |
---|
2835 | 2835 | | HB3258 - 78 - LRB104 06526 AAS 16562 b |
---|
2836 | 2836 | | |
---|
2837 | 2837 | | |
---|
2838 | 2838 | | HB3258- 79 -LRB104 06526 AAS 16562 b HB3258 - 79 - LRB104 06526 AAS 16562 b |
---|
2839 | 2839 | | HB3258 - 79 - LRB104 06526 AAS 16562 b |
---|
2840 | 2840 | | 1 energy credits as required under this subparagraph |
---|
2841 | 2841 | | 2 (R), the Commission, on petition from the Agency and |
---|
2842 | 2842 | | 3 after notice and hearing, may direct such customer's |
---|
2843 | 2843 | | 4 utility to recover the cost of the wrongfully received |
---|
2844 | 2844 | | 5 self-direct credits plus interest through an adder to |
---|
2845 | 2845 | | 6 charges assessed pursuant to Section 16-108 of the |
---|
2846 | 2846 | | 7 Public Utilities Act. Self-direct customers who |
---|
2847 | 2847 | | 8 knowingly fail to properly procure and retire |
---|
2848 | 2848 | | 9 renewable energy credits and do not notify the Agency |
---|
2849 | 2849 | | 10 are ineligible for continued participation in the |
---|
2850 | 2850 | | 11 self-direct renewable portfolio standard compliance |
---|
2851 | 2851 | | 12 program. |
---|
2852 | 2852 | | 13 (2) (Blank). |
---|
2853 | 2853 | | 14 (3) (Blank). |
---|
2854 | 2854 | | 15 (4) The electric utility shall retire all renewable |
---|
2855 | 2855 | | 16 energy credits used to comply with the standard. |
---|
2856 | 2856 | | 17 (5) Beginning with the 2010 delivery year and ending |
---|
2857 | 2857 | | 18 June 1, 2017, an electric utility subject to this |
---|
2858 | 2858 | | 19 subsection (c) shall apply the lesser of the maximum |
---|
2859 | 2859 | | 20 alternative compliance payment rate or the most recent |
---|
2860 | 2860 | | 21 estimated alternative compliance payment rate for its |
---|
2861 | 2861 | | 22 service territory for the corresponding compliance period, |
---|
2862 | 2862 | | 23 established pursuant to subsection (d) of Section 16-115D |
---|
2863 | 2863 | | 24 of the Public Utilities Act to its retail customers that |
---|
2864 | 2864 | | 25 take service pursuant to the electric utility's hourly |
---|
2865 | 2865 | | 26 pricing tariff or tariffs. The electric utility shall |
---|
2866 | 2866 | | |
---|
2867 | 2867 | | |
---|
2868 | 2868 | | |
---|
2869 | 2869 | | |
---|
2870 | 2870 | | |
---|
2871 | 2871 | | HB3258 - 79 - LRB104 06526 AAS 16562 b |
---|
2872 | 2872 | | |
---|
2873 | 2873 | | |
---|
2874 | 2874 | | HB3258- 80 -LRB104 06526 AAS 16562 b HB3258 - 80 - LRB104 06526 AAS 16562 b |
---|
2875 | 2875 | | HB3258 - 80 - LRB104 06526 AAS 16562 b |
---|
2876 | 2876 | | 1 retain all amounts collected as a result of the |
---|
2877 | 2877 | | 2 application of the alternative compliance payment rate or |
---|
2878 | 2878 | | 3 rates to such customers, and, beginning in 2011, the |
---|
2879 | 2879 | | 4 utility shall include in the information provided under |
---|
2880 | 2880 | | 5 item (1) of subsection (d) of Section 16-111.5 of the |
---|
2881 | 2881 | | 6 Public Utilities Act the amounts collected under the |
---|
2882 | 2882 | | 7 alternative compliance payment rate or rates for the prior |
---|
2883 | 2883 | | 8 year ending May 31. Notwithstanding any limitation on the |
---|
2884 | 2884 | | 9 procurement of renewable energy resources imposed by item |
---|
2885 | 2885 | | 10 (2) of this subsection (c), the Agency shall increase its |
---|
2886 | 2886 | | 11 spending on the purchase of renewable energy resources to |
---|
2887 | 2887 | | 12 be procured by the electric utility for the next plan year |
---|
2888 | 2888 | | 13 by an amount equal to the amounts collected by the utility |
---|
2889 | 2889 | | 14 under the alternative compliance payment rate or rates in |
---|
2890 | 2890 | | 15 the prior year ending May 31. |
---|
2891 | 2891 | | 16 (6) The electric utility shall be entitled to recover |
---|
2892 | 2892 | | 17 all of its costs associated with the procurement of |
---|
2893 | 2893 | | 18 renewable energy credits under plans approved under this |
---|
2894 | 2894 | | 19 Section and Section 16-111.5 of the Public Utilities Act. |
---|
2895 | 2895 | | 20 These costs shall include associated reasonable expenses |
---|
2896 | 2896 | | 21 for implementing the procurement programs, including, but |
---|
2897 | 2897 | | 22 not limited to, the costs of administering and evaluating |
---|
2898 | 2898 | | 23 the Adjustable Block program, through an automatic |
---|
2899 | 2899 | | 24 adjustment clause tariff in accordance with subsection (k) |
---|
2900 | 2900 | | 25 of Section 16-108 of the Public Utilities Act. |
---|
2901 | 2901 | | 26 (7) Renewable energy credits procured from new |
---|
2902 | 2902 | | |
---|
2903 | 2903 | | |
---|
2904 | 2904 | | |
---|
2905 | 2905 | | |
---|
2906 | 2906 | | |
---|
2907 | 2907 | | HB3258 - 80 - LRB104 06526 AAS 16562 b |
---|
2908 | 2908 | | |
---|
2909 | 2909 | | |
---|
2910 | 2910 | | HB3258- 81 -LRB104 06526 AAS 16562 b HB3258 - 81 - LRB104 06526 AAS 16562 b |
---|
2911 | 2911 | | HB3258 - 81 - LRB104 06526 AAS 16562 b |
---|
2912 | 2912 | | 1 photovoltaic projects or new distributed renewable energy |
---|
2913 | 2913 | | 2 generation devices under this Section after June 1, 2017 |
---|
2914 | 2914 | | 3 (the effective date of Public Act 99-906) must be procured |
---|
2915 | 2915 | | 4 from devices installed by a qualified person in compliance |
---|
2916 | 2916 | | 5 with the requirements of Section 16-128A of the Public |
---|
2917 | 2917 | | 6 Utilities Act and any rules or regulations adopted |
---|
2918 | 2918 | | 7 thereunder. |
---|
2919 | 2919 | | 8 In meeting the renewable energy requirements of this |
---|
2920 | 2920 | | 9 subsection (c), to the extent feasible and consistent with |
---|
2921 | 2921 | | 10 State and federal law, the renewable energy credit |
---|
2922 | 2922 | | 11 procurements, Adjustable Block solar program, and |
---|
2923 | 2923 | | 12 community renewable generation program shall provide |
---|
2924 | 2924 | | 13 employment opportunities for all segments of the |
---|
2925 | 2925 | | 14 population and workforce, including minority-owned and |
---|
2926 | 2926 | | 15 female-owned business enterprises, and shall not, |
---|
2927 | 2927 | | 16 consistent with State and federal law, discriminate based |
---|
2928 | 2928 | | 17 on race or socioeconomic status. |
---|
2929 | 2929 | | 18 (c-5) Procurement of renewable energy credits from new |
---|
2930 | 2930 | | 19 renewable energy facilities installed at or adjacent to the |
---|
2931 | 2931 | | 20 sites of electric generating facilities that burn or burned |
---|
2932 | 2932 | | 21 coal as their primary fuel source. |
---|
2933 | 2933 | | 22 (1) In addition to the procurement of renewable energy |
---|
2934 | 2934 | | 23 credits pursuant to long-term renewable resources |
---|
2935 | 2935 | | 24 procurement plans in accordance with subsection (c) of |
---|
2936 | 2936 | | 25 this Section and Section 16-111.5 of the Public Utilities |
---|
2937 | 2937 | | 26 Act, the Agency shall conduct procurement events in |
---|
2938 | 2938 | | |
---|
2939 | 2939 | | |
---|
2940 | 2940 | | |
---|
2941 | 2941 | | |
---|
2942 | 2942 | | |
---|
2943 | 2943 | | HB3258 - 81 - LRB104 06526 AAS 16562 b |
---|
2944 | 2944 | | |
---|
2945 | 2945 | | |
---|
2946 | 2946 | | HB3258- 82 -LRB104 06526 AAS 16562 b HB3258 - 82 - LRB104 06526 AAS 16562 b |
---|
2947 | 2947 | | HB3258 - 82 - LRB104 06526 AAS 16562 b |
---|
2948 | 2948 | | 1 accordance with this subsection (c-5) for the procurement |
---|
2949 | 2949 | | 2 by electric utilities that served more than 300,000 retail |
---|
2950 | 2950 | | 3 customers in this State as of January 1, 2019 of renewable |
---|
2951 | 2951 | | 4 energy credits from new renewable energy facilities to be |
---|
2952 | 2952 | | 5 installed at or adjacent to the sites of electric |
---|
2953 | 2953 | | 6 generating facilities that, as of January 1, 2016, burned |
---|
2954 | 2954 | | 7 coal as their primary fuel source and meet the other |
---|
2955 | 2955 | | 8 criteria specified in this subsection (c-5). For purposes |
---|
2956 | 2956 | | 9 of this subsection (c-5), "new renewable energy facility" |
---|
2957 | 2957 | | 10 means a new utility-scale solar project as defined in this |
---|
2958 | 2958 | | 11 Section 1-75. The renewable energy credits procured |
---|
2959 | 2959 | | 12 pursuant to this subsection (c-5) may be included or |
---|
2960 | 2960 | | 13 counted for purposes of compliance with the amounts of |
---|
2961 | 2961 | | 14 renewable energy credits required to be procured pursuant |
---|
2962 | 2962 | | 15 to subsection (c) of this Section to the extent that there |
---|
2963 | 2963 | | 16 are otherwise shortfalls in compliance with such |
---|
2964 | 2964 | | 17 requirements. The procurement of renewable energy credits |
---|
2965 | 2965 | | 18 by electric utilities pursuant to this subsection (c-5) |
---|
2966 | 2966 | | 19 shall be funded solely by revenues collected from the Coal |
---|
2967 | 2967 | | 20 to Solar and Energy Storage Initiative Charge provided for |
---|
2968 | 2968 | | 21 in this subsection (c-5) and subsection (i-5) of Section |
---|
2969 | 2969 | | 22 16-108 of the Public Utilities Act, shall not be funded by |
---|
2970 | 2970 | | 23 revenues collected through any of the other funding |
---|
2971 | 2971 | | 24 mechanisms provided for in subsection (c) of this Section, |
---|
2972 | 2972 | | 25 and shall not be subject to the limitation imposed by |
---|
2973 | 2973 | | 26 subsection (c) on charges to retail customers for costs to |
---|
2974 | 2974 | | |
---|
2975 | 2975 | | |
---|
2976 | 2976 | | |
---|
2977 | 2977 | | |
---|
2978 | 2978 | | |
---|
2979 | 2979 | | HB3258 - 82 - LRB104 06526 AAS 16562 b |
---|
2980 | 2980 | | |
---|
2981 | 2981 | | |
---|
2982 | 2982 | | HB3258- 83 -LRB104 06526 AAS 16562 b HB3258 - 83 - LRB104 06526 AAS 16562 b |
---|
2983 | 2983 | | HB3258 - 83 - LRB104 06526 AAS 16562 b |
---|
2984 | 2984 | | 1 procure renewable energy resources pursuant to subsection |
---|
2985 | 2985 | | 2 (c), and shall not be subject to any other requirements or |
---|
2986 | 2986 | | 3 limitations of subsection (c). |
---|
2987 | 2987 | | 4 (2) The Agency shall conduct 2 procurement events to |
---|
2988 | 2988 | | 5 select owners of electric generating facilities meeting |
---|
2989 | 2989 | | 6 the eligibility criteria specified in this subsection |
---|
2990 | 2990 | | 7 (c-5) to enter into long-term contracts to sell renewable |
---|
2991 | 2991 | | 8 energy credits to electric utilities serving more than |
---|
2992 | 2992 | | 9 300,000 retail customers in this State as of January 1, |
---|
2993 | 2993 | | 10 2019. The first procurement event shall be conducted no |
---|
2994 | 2994 | | 11 later than March 31, 2022, unless the Agency elects to |
---|
2995 | 2995 | | 12 delay it, until no later than May 1, 2022, due to its |
---|
2996 | 2996 | | 13 overall volume of work, and shall be to select owners of |
---|
2997 | 2997 | | 14 electric generating facilities located in this State and |
---|
2998 | 2998 | | 15 south of federal Interstate Highway 80 that meet the |
---|
2999 | 2999 | | 16 eligibility criteria specified in this subsection (c-5). |
---|
3000 | 3000 | | 17 The second procurement event shall be conducted no sooner |
---|
3001 | 3001 | | 18 than September 30, 2022 and no later than October 31, 2022 |
---|
3002 | 3002 | | 19 and shall be to select owners of electric generating |
---|
3003 | 3003 | | 20 facilities located anywhere in this State that meet the |
---|
3004 | 3004 | | 21 eligibility criteria specified in this subsection (c-5). |
---|
3005 | 3005 | | 22 The Agency shall establish and announce a time period, |
---|
3006 | 3006 | | 23 which shall begin no later than 30 days prior to the |
---|
3007 | 3007 | | 24 scheduled date for the procurement event, during which |
---|
3008 | 3008 | | 25 applicants may submit applications to be selected as |
---|
3009 | 3009 | | 26 suppliers of renewable energy credits pursuant to this |
---|
3010 | 3010 | | |
---|
3011 | 3011 | | |
---|
3012 | 3012 | | |
---|
3013 | 3013 | | |
---|
3014 | 3014 | | |
---|
3015 | 3015 | | HB3258 - 83 - LRB104 06526 AAS 16562 b |
---|
3016 | 3016 | | |
---|
3017 | 3017 | | |
---|
3018 | 3018 | | HB3258- 84 -LRB104 06526 AAS 16562 b HB3258 - 84 - LRB104 06526 AAS 16562 b |
---|
3019 | 3019 | | HB3258 - 84 - LRB104 06526 AAS 16562 b |
---|
3020 | 3020 | | 1 subsection (c-5). The eligibility criteria for selection |
---|
3021 | 3021 | | 2 as a supplier of renewable energy credits pursuant to this |
---|
3022 | 3022 | | 3 subsection (c-5) shall be as follows: |
---|
3023 | 3023 | | 4 (A) The applicant owns an electric generating |
---|
3024 | 3024 | | 5 facility located in this State that: (i) as of January |
---|
3025 | 3025 | | 6 1, 2016, burned coal as its primary fuel to generate |
---|
3026 | 3026 | | 7 electricity; and (ii) has, or had prior to retirement, |
---|
3027 | 3027 | | 8 an electric generating capacity of at least 150 |
---|
3028 | 3028 | | 9 megawatts. The electric generating facility can be |
---|
3029 | 3029 | | 10 either: (i) retired as of the date of the procurement |
---|
3030 | 3030 | | 11 event; or (ii) still operating as of the date of the |
---|
3031 | 3031 | | 12 procurement event. |
---|
3032 | 3032 | | 13 (B) The applicant is not (i) an electric |
---|
3033 | 3033 | | 14 cooperative as defined in Section 3-119 of the Public |
---|
3034 | 3034 | | 15 Utilities Act, or (ii) an entity described in |
---|
3035 | 3035 | | 16 subsection (b)(1) of Section 3-105 of the Public |
---|
3036 | 3036 | | 17 Utilities Act, or an association or consortium of or |
---|
3037 | 3037 | | 18 an entity owned by entities described in (i) or (ii); |
---|
3038 | 3038 | | 19 and the coal-fueled electric generating facility was |
---|
3039 | 3039 | | 20 at one time owned, in whole or in part, by a public |
---|
3040 | 3040 | | 21 utility as defined in Section 3-105 of the Public |
---|
3041 | 3041 | | 22 Utilities Act. |
---|
3042 | 3042 | | 23 (C) If participating in the first procurement |
---|
3043 | 3043 | | 24 event, the applicant proposes and commits to construct |
---|
3044 | 3044 | | 25 and operate, at the site, and if necessary for |
---|
3045 | 3045 | | 26 sufficient space on property adjacent to the existing |
---|
3046 | 3046 | | |
---|
3047 | 3047 | | |
---|
3048 | 3048 | | |
---|
3049 | 3049 | | |
---|
3050 | 3050 | | |
---|
3051 | 3051 | | HB3258 - 84 - LRB104 06526 AAS 16562 b |
---|
3052 | 3052 | | |
---|
3053 | 3053 | | |
---|
3054 | 3054 | | HB3258- 85 -LRB104 06526 AAS 16562 b HB3258 - 85 - LRB104 06526 AAS 16562 b |
---|
3055 | 3055 | | HB3258 - 85 - LRB104 06526 AAS 16562 b |
---|
3056 | 3056 | | 1 property, at which the electric generating facility |
---|
3057 | 3057 | | 2 identified in paragraph (A) is located: (i) a new |
---|
3058 | 3058 | | 3 renewable energy facility of at least 20 megawatts but |
---|
3059 | 3059 | | 4 no more than 100 megawatts of electric generating |
---|
3060 | 3060 | | 5 capacity, and (ii) an energy storage facility having a |
---|
3061 | 3061 | | 6 storage capacity equal to at least 2 megawatts and at |
---|
3062 | 3062 | | 7 most 10 megawatts. If participating in the second |
---|
3063 | 3063 | | 8 procurement event, the applicant proposes and commits |
---|
3064 | 3064 | | 9 to construct and operate, at the site, and if |
---|
3065 | 3065 | | 10 necessary for sufficient space on property adjacent to |
---|
3066 | 3066 | | 11 the existing property, at which the electric |
---|
3067 | 3067 | | 12 generating facility identified in paragraph (A) is |
---|
3068 | 3068 | | 13 located: (i) a new renewable energy facility of at |
---|
3069 | 3069 | | 14 least 5 megawatts but no more than 20 megawatts of |
---|
3070 | 3070 | | 15 electric generating capacity, and (ii) an energy |
---|
3071 | 3071 | | 16 storage facility having a storage capacity equal to at |
---|
3072 | 3072 | | 17 least 0.5 megawatts and at most one megawatt. |
---|
3073 | 3073 | | 18 (D) The applicant agrees that the new renewable |
---|
3074 | 3074 | | 19 energy facility and the energy storage facility will |
---|
3075 | 3075 | | 20 be constructed or installed by a qualified entity or |
---|
3076 | 3076 | | 21 entities in compliance with the requirements of |
---|
3077 | 3077 | | 22 subsection (g) of Section 16-128A of the Public |
---|
3078 | 3078 | | 23 Utilities Act and any rules adopted thereunder. |
---|
3079 | 3079 | | 24 (E) The applicant agrees that personnel operating |
---|
3080 | 3080 | | 25 the new renewable energy facility and the energy |
---|
3081 | 3081 | | 26 storage facility will have the requisite skills, |
---|
3082 | 3082 | | |
---|
3083 | 3083 | | |
---|
3084 | 3084 | | |
---|
3085 | 3085 | | |
---|
3086 | 3086 | | |
---|
3087 | 3087 | | HB3258 - 85 - LRB104 06526 AAS 16562 b |
---|
3088 | 3088 | | |
---|
3089 | 3089 | | |
---|
3090 | 3090 | | HB3258- 86 -LRB104 06526 AAS 16562 b HB3258 - 86 - LRB104 06526 AAS 16562 b |
---|
3091 | 3091 | | HB3258 - 86 - LRB104 06526 AAS 16562 b |
---|
3092 | 3092 | | 1 knowledge, training, experience, and competence, which |
---|
3093 | 3093 | | 2 may be demonstrated by completion or current |
---|
3094 | 3094 | | 3 participation and ultimate completion by employees of |
---|
3095 | 3095 | | 4 an accredited or otherwise recognized apprenticeship |
---|
3096 | 3096 | | 5 program for the employee's particular craft, trade, or |
---|
3097 | 3097 | | 6 skill, including through training and education |
---|
3098 | 3098 | | 7 courses and opportunities offered by the owner to |
---|
3099 | 3099 | | 8 employees of the coal-fueled electric generating |
---|
3100 | 3100 | | 9 facility or by previous employment experience |
---|
3101 | 3101 | | 10 performing the employee's particular work skill or |
---|
3102 | 3102 | | 11 function. |
---|
3103 | 3103 | | 12 (F) The applicant commits that not less than the |
---|
3104 | 3104 | | 13 prevailing wage, as determined pursuant to the |
---|
3105 | 3105 | | 14 Prevailing Wage Act, will be paid to the applicant's |
---|
3106 | 3106 | | 15 employees engaged in construction activities |
---|
3107 | 3107 | | 16 associated with the new renewable energy facility and |
---|
3108 | 3108 | | 17 the new energy storage facility and to the employees |
---|
3109 | 3109 | | 18 of applicant's contractors engaged in construction |
---|
3110 | 3110 | | 19 activities associated with the new renewable energy |
---|
3111 | 3111 | | 20 facility and the new energy storage facility, and |
---|
3112 | 3112 | | 21 that, on or before the commercial operation date of |
---|
3113 | 3113 | | 22 the new renewable energy facility, the applicant shall |
---|
3114 | 3114 | | 23 file a report with the Agency certifying that the |
---|
3115 | 3115 | | 24 requirements of this subparagraph (F) have been met. |
---|
3116 | 3116 | | 25 (G) (Blank). The applicant commits that if |
---|
3117 | 3117 | | 26 selected, it will negotiate a project labor agreement |
---|
3118 | 3118 | | |
---|
3119 | 3119 | | |
---|
3120 | 3120 | | |
---|
3121 | 3121 | | |
---|
3122 | 3122 | | |
---|
3123 | 3123 | | HB3258 - 86 - LRB104 06526 AAS 16562 b |
---|
3124 | 3124 | | |
---|
3125 | 3125 | | |
---|
3126 | 3126 | | HB3258- 87 -LRB104 06526 AAS 16562 b HB3258 - 87 - LRB104 06526 AAS 16562 b |
---|
3127 | 3127 | | HB3258 - 87 - LRB104 06526 AAS 16562 b |
---|
3128 | 3128 | | 1 for the construction of the new renewable energy |
---|
3129 | 3129 | | 2 facility and associated energy storage facility that |
---|
3130 | 3130 | | 3 includes provisions requiring the parties to the |
---|
3131 | 3131 | | 4 agreement to work together to establish diversity |
---|
3132 | 3132 | | 5 threshold requirements and to ensure best efforts to |
---|
3133 | 3133 | | 6 meet diversity targets, improve diversity at the |
---|
3134 | 3134 | | 7 applicable job site, create diverse apprenticeship |
---|
3135 | 3135 | | 8 opportunities, and create opportunities to employ |
---|
3136 | 3136 | | 9 former coal-fired power plant workers. |
---|
3137 | 3137 | | 10 (H) The applicant commits to enter into a contract |
---|
3138 | 3138 | | 11 or contracts for the applicable duration to provide |
---|
3139 | 3139 | | 12 specified numbers of renewable energy credits each |
---|
3140 | 3140 | | 13 year from the new renewable energy facility to |
---|
3141 | 3141 | | 14 electric utilities that served more than 300,000 |
---|
3142 | 3142 | | 15 retail customers in this State as of January 1, 2019, |
---|
3143 | 3143 | | 16 at a price of $30 per renewable energy credit. The |
---|
3144 | 3144 | | 17 price per renewable energy credit shall be fixed at |
---|
3145 | 3145 | | 18 $30 for the applicable duration and the renewable |
---|
3146 | 3146 | | 19 energy credits shall not be indexed renewable energy |
---|
3147 | 3147 | | 20 credits as provided for in item (v) of subparagraph |
---|
3148 | 3148 | | 21 (G) of paragraph (1) of subsection (c) of Section 1-75 |
---|
3149 | 3149 | | 22 of this Act. The applicable duration of each contract |
---|
3150 | 3150 | | 23 shall be 20 years, unless the applicant is physically |
---|
3151 | 3151 | | 24 interconnected to the PJM Interconnection, LLC |
---|
3152 | 3152 | | 25 transmission grid and had a generating capacity of at |
---|
3153 | 3153 | | 26 least 1,200 megawatts as of January 1, 2021, in which |
---|
3154 | 3154 | | |
---|
3155 | 3155 | | |
---|
3156 | 3156 | | |
---|
3157 | 3157 | | |
---|
3158 | 3158 | | |
---|
3159 | 3159 | | HB3258 - 87 - LRB104 06526 AAS 16562 b |
---|
3160 | 3160 | | |
---|
3161 | 3161 | | |
---|
3162 | 3162 | | HB3258- 88 -LRB104 06526 AAS 16562 b HB3258 - 88 - LRB104 06526 AAS 16562 b |
---|
3163 | 3163 | | HB3258 - 88 - LRB104 06526 AAS 16562 b |
---|
3164 | 3164 | | 1 case the applicable duration of the contract shall be |
---|
3165 | 3165 | | 2 15 years. |
---|
3166 | 3166 | | 3 (I) The applicant's application is certified by an |
---|
3167 | 3167 | | 4 officer of the applicant and by an officer of the |
---|
3168 | 3168 | | 5 applicant's ultimate parent company, if any. |
---|
3169 | 3169 | | 6 (3) An applicant may submit applications to contract |
---|
3170 | 3170 | | 7 to supply renewable energy credits from more than one new |
---|
3171 | 3171 | | 8 renewable energy facility to be constructed at or adjacent |
---|
3172 | 3172 | | 9 to one or more qualifying electric generating facilities |
---|
3173 | 3173 | | 10 owned by the applicant. The Agency may select new |
---|
3174 | 3174 | | 11 renewable energy facilities to be located at or adjacent |
---|
3175 | 3175 | | 12 to the sites of more than one qualifying electric |
---|
3176 | 3176 | | 13 generation facility owned by an applicant to contract with |
---|
3177 | 3177 | | 14 electric utilities to supply renewable energy credits from |
---|
3178 | 3178 | | 15 such facilities. |
---|
3179 | 3179 | | 16 (4) (Blank). The Agency shall assess fees to each |
---|
3180 | 3180 | | 17 applicant to recover the Agency's costs incurred in |
---|
3181 | 3181 | | 18 receiving and evaluating applications, conducting the |
---|
3182 | 3182 | | 19 procurement event, developing contracts for sale, delivery |
---|
3183 | 3183 | | 20 and purchase of renewable energy credits, and monitoring |
---|
3184 | 3184 | | 21 the administration of such contracts, as provided for in |
---|
3185 | 3185 | | 22 this subsection (c-5), including fees paid to a |
---|
3186 | 3186 | | 23 procurement administrator retained by the Agency for one |
---|
3187 | 3187 | | 24 or more of these purposes. |
---|
3188 | 3188 | | 25 (5) The Agency shall select the applicants and the new |
---|
3189 | 3189 | | 26 renewable energy facilities to contract with electric |
---|
3190 | 3190 | | |
---|
3191 | 3191 | | |
---|
3192 | 3192 | | |
---|
3193 | 3193 | | |
---|
3194 | 3194 | | |
---|
3195 | 3195 | | HB3258 - 88 - LRB104 06526 AAS 16562 b |
---|
3196 | 3196 | | |
---|
3197 | 3197 | | |
---|
3198 | 3198 | | HB3258- 89 -LRB104 06526 AAS 16562 b HB3258 - 89 - LRB104 06526 AAS 16562 b |
---|
3199 | 3199 | | HB3258 - 89 - LRB104 06526 AAS 16562 b |
---|
3200 | 3200 | | 1 utilities to supply renewable energy credits in accordance |
---|
3201 | 3201 | | 2 with this subsection (c-5). In the first procurement |
---|
3202 | 3202 | | 3 event, the Agency shall select applicants and new |
---|
3203 | 3203 | | 4 renewable energy facilities to supply renewable energy |
---|
3204 | 3204 | | 5 credits, at a price of $30 per renewable energy credit, |
---|
3205 | 3205 | | 6 aggregating to no less than 400,000 renewable energy |
---|
3206 | 3206 | | 7 credits per year for the applicable duration, assuming |
---|
3207 | 3207 | | 8 sufficient qualifying applications to supply, in the |
---|
3208 | 3208 | | 9 aggregate, at least that amount of renewable energy |
---|
3209 | 3209 | | 10 credits per year; and not more than 580,000 renewable |
---|
3210 | 3210 | | 11 energy credits per year for the applicable duration. In |
---|
3211 | 3211 | | 12 the second procurement event, the Agency shall select |
---|
3212 | 3212 | | 13 applicants and new renewable energy facilities to supply |
---|
3213 | 3213 | | 14 renewable energy credits, at a price of $30 per renewable |
---|
3214 | 3214 | | 15 energy credit, aggregating to no more than 625,000 |
---|
3215 | 3215 | | 16 renewable energy credits per year less the amount of |
---|
3216 | 3216 | | 17 renewable energy credits each year contracted for as a |
---|
3217 | 3217 | | 18 result of the first procurement event, for the applicable |
---|
3218 | 3218 | | 19 durations. The number of renewable energy credits to be |
---|
3219 | 3219 | | 20 procured as specified in this paragraph (5) shall not be |
---|
3220 | 3220 | | 21 reduced based on renewable energy credits procured in the |
---|
3221 | 3221 | | 22 self-direct renewable energy credit compliance program |
---|
3222 | 3222 | | 23 established pursuant to subparagraph (R) of paragraph (1) |
---|
3223 | 3223 | | 24 of subsection (c) of Section 1-75. |
---|
3224 | 3224 | | 25 (6) The obligation to purchase renewable energy |
---|
3225 | 3225 | | 26 credits from the applicants and their new renewable energy |
---|
3226 | 3226 | | |
---|
3227 | 3227 | | |
---|
3228 | 3228 | | |
---|
3229 | 3229 | | |
---|
3230 | 3230 | | |
---|
3231 | 3231 | | HB3258 - 89 - LRB104 06526 AAS 16562 b |
---|
3232 | 3232 | | |
---|
3233 | 3233 | | |
---|
3234 | 3234 | | HB3258- 90 -LRB104 06526 AAS 16562 b HB3258 - 90 - LRB104 06526 AAS 16562 b |
---|
3235 | 3235 | | HB3258 - 90 - LRB104 06526 AAS 16562 b |
---|
3236 | 3236 | | 1 facilities selected by the Agency shall be allocated to |
---|
3237 | 3237 | | 2 the electric utilities based on their respective |
---|
3238 | 3238 | | 3 percentages of kilowatthours delivered to delivery |
---|
3239 | 3239 | | 4 services customers to the aggregate kilowatthour |
---|
3240 | 3240 | | 5 deliveries by the electric utilities to delivery services |
---|
3241 | 3241 | | 6 customers for the year ended December 31, 2021. In order |
---|
3242 | 3242 | | 7 to achieve these allocation percentages between or among |
---|
3243 | 3243 | | 8 the electric utilities, the Agency shall require each |
---|
3244 | 3244 | | 9 applicant that is selected in the procurement event to |
---|
3245 | 3245 | | 10 enter into a contract with each electric utility for the |
---|
3246 | 3246 | | 11 sale and purchase of renewable energy credits from each |
---|
3247 | 3247 | | 12 new renewable energy facility to be constructed and |
---|
3248 | 3248 | | 13 operated by the applicant, with the sale and purchase |
---|
3249 | 3249 | | 14 obligations under the contracts to aggregate to the total |
---|
3250 | 3250 | | 15 number of renewable energy credits per year to be supplied |
---|
3251 | 3251 | | 16 by the applicant from the new renewable energy facility. |
---|
3252 | 3252 | | 17 (7) The Agency shall submit its proposed selection of |
---|
3253 | 3253 | | 18 applicants, new renewable energy facilities to be |
---|
3254 | 3254 | | 19 constructed, and renewable energy credit amounts for each |
---|
3255 | 3255 | | 20 procurement event to the Commission for approval. The |
---|
3256 | 3256 | | 21 Commission shall, within 2 business days after receipt of |
---|
3257 | 3257 | | 22 the Agency's proposed selections, approve the proposed |
---|
3258 | 3258 | | 23 selections if it determines that the applicants and the |
---|
3259 | 3259 | | 24 new renewable energy facilities to be constructed meet the |
---|
3260 | 3260 | | 25 selection criteria set forth in this subsection (c-5) and |
---|
3261 | 3261 | | 26 that the Agency seeks approval for contracts of applicable |
---|
3262 | 3262 | | |
---|
3263 | 3263 | | |
---|
3264 | 3264 | | |
---|
3265 | 3265 | | |
---|
3266 | 3266 | | |
---|
3267 | 3267 | | HB3258 - 90 - LRB104 06526 AAS 16562 b |
---|
3268 | 3268 | | |
---|
3269 | 3269 | | |
---|
3270 | 3270 | | HB3258- 91 -LRB104 06526 AAS 16562 b HB3258 - 91 - LRB104 06526 AAS 16562 b |
---|
3271 | 3271 | | HB3258 - 91 - LRB104 06526 AAS 16562 b |
---|
3272 | 3272 | | 1 durations aggregating to no more than the maximum amount |
---|
3273 | 3273 | | 2 of renewable energy credits per year authorized by this |
---|
3274 | 3274 | | 3 subsection (c-5) for the procurement event, at a price of |
---|
3275 | 3275 | | 4 $30 per renewable energy credit. |
---|
3276 | 3276 | | 5 (8) The Agency, in conjunction with its procurement |
---|
3277 | 3277 | | 6 administrator if one is retained, the electric utilities, |
---|
3278 | 3278 | | 7 and potential applicants for contracts to produce and |
---|
3279 | 3279 | | 8 supply renewable energy credits pursuant to this |
---|
3280 | 3280 | | 9 subsection (c-5), shall develop a standard form contract |
---|
3281 | 3281 | | 10 for the sale, delivery and purchase of renewable energy |
---|
3282 | 3282 | | 11 credits pursuant to this subsection (c-5). Each contract |
---|
3283 | 3283 | | 12 resulting from the first procurement event shall allow for |
---|
3284 | 3284 | | 13 a commercial operation date for the new renewable energy |
---|
3285 | 3285 | | 14 facility of either June 1, 2023 or June 1, 2024, with such |
---|
3286 | 3286 | | 15 dates subject to adjustment as provided in this paragraph. |
---|
3287 | 3287 | | 16 Each contract resulting from the second procurement event |
---|
3288 | 3288 | | 17 shall provide for a commercial operation date on June 1 |
---|
3289 | 3289 | | 18 next occurring up to 48 months after execution of the |
---|
3290 | 3290 | | 19 contract. Each contract shall provide that the owner shall |
---|
3291 | 3291 | | 20 receive payments for renewable energy credits for the |
---|
3292 | 3292 | | 21 applicable durations beginning with the commercial |
---|
3293 | 3293 | | 22 operation date of the new renewable energy facility. The |
---|
3294 | 3294 | | 23 form contract shall provide for adjustments to the |
---|
3295 | 3295 | | 24 commercial operation and payment start dates as needed due |
---|
3296 | 3296 | | 25 to any delays in completing the procurement and |
---|
3297 | 3297 | | 26 contracting processes, in finalizing interconnection |
---|
3298 | 3298 | | |
---|
3299 | 3299 | | |
---|
3300 | 3300 | | |
---|
3301 | 3301 | | |
---|
3302 | 3302 | | |
---|
3303 | 3303 | | HB3258 - 91 - LRB104 06526 AAS 16562 b |
---|
3304 | 3304 | | |
---|
3305 | 3305 | | |
---|
3306 | 3306 | | HB3258- 92 -LRB104 06526 AAS 16562 b HB3258 - 92 - LRB104 06526 AAS 16562 b |
---|
3307 | 3307 | | HB3258 - 92 - LRB104 06526 AAS 16562 b |
---|
3308 | 3308 | | 1 agreements and installing interconnection facilities, and |
---|
3309 | 3309 | | 2 in obtaining other necessary governmental permits and |
---|
3310 | 3310 | | 3 approvals. The form contract shall be, to the maximum |
---|
3311 | 3311 | | 4 extent possible, consistent with standard electric |
---|
3312 | 3312 | | 5 industry contracts for sale, delivery, and purchase of |
---|
3313 | 3313 | | 6 renewable energy credits while taking into account the |
---|
3314 | 3314 | | 7 specific requirements of this subsection (c-5). The form |
---|
3315 | 3315 | | 8 contract shall provide for over-delivery and |
---|
3316 | 3316 | | 9 under-delivery of renewable energy credits within |
---|
3317 | 3317 | | 10 reasonable ranges during each 12-month period and penalty, |
---|
3318 | 3318 | | 11 default, and enforcement provisions for failure of the |
---|
3319 | 3319 | | 12 selling party to deliver renewable energy credits as |
---|
3320 | 3320 | | 13 specified in the contract and to comply with the |
---|
3321 | 3321 | | 14 requirements of this subsection (c-5). The standard form |
---|
3322 | 3322 | | 15 contract shall specify that all renewable energy credits |
---|
3323 | 3323 | | 16 delivered to the electric utility pursuant to the contract |
---|
3324 | 3324 | | 17 shall be retired. The Agency shall make the proposed |
---|
3325 | 3325 | | 18 contracts available for a reasonable period for comment by |
---|
3326 | 3326 | | 19 potential applicants, and shall publish the final form |
---|
3327 | 3327 | | 20 contract at least 30 days before the date of the first |
---|
3328 | 3328 | | 21 procurement event. |
---|
3329 | 3329 | | 22 (9) Coal to Solar and Energy Storage Initiative |
---|
3330 | 3330 | | 23 Charge. |
---|
3331 | 3331 | | 24 (A) By no later than July 1, 2022, each electric |
---|
3332 | 3332 | | 25 utility that served more than 300,000 retail customers |
---|
3333 | 3333 | | 26 in this State as of January 1, 2019 shall file a tariff |
---|
3334 | 3334 | | |
---|
3335 | 3335 | | |
---|
3336 | 3336 | | |
---|
3337 | 3337 | | |
---|
3338 | 3338 | | |
---|
3339 | 3339 | | HB3258 - 92 - LRB104 06526 AAS 16562 b |
---|
3340 | 3340 | | |
---|
3341 | 3341 | | |
---|
3342 | 3342 | | HB3258- 93 -LRB104 06526 AAS 16562 b HB3258 - 93 - LRB104 06526 AAS 16562 b |
---|
3343 | 3343 | | HB3258 - 93 - LRB104 06526 AAS 16562 b |
---|
3344 | 3344 | | 1 with the Commission for the billing and collection of |
---|
3345 | 3345 | | 2 a Coal to Solar and Energy Storage Initiative Charge |
---|
3346 | 3346 | | 3 in accordance with subsection (i-5) of Section 16-108 |
---|
3347 | 3347 | | 4 of the Public Utilities Act, with such tariff to be |
---|
3348 | 3348 | | 5 effective, following review and approval or |
---|
3349 | 3349 | | 6 modification by the Commission, beginning January 1, |
---|
3350 | 3350 | | 7 2023. The tariff shall provide for the calculation and |
---|
3351 | 3351 | | 8 setting of the electric utility's Coal to Solar and |
---|
3352 | 3352 | | 9 Energy Storage Initiative Charge to collect revenues |
---|
3353 | 3353 | | 10 estimated to be sufficient, in the aggregate, (i) to |
---|
3354 | 3354 | | 11 enable the electric utility to pay for the renewable |
---|
3355 | 3355 | | 12 energy credits it has contracted to purchase in the |
---|
3356 | 3356 | | 13 delivery year beginning June 1, 2023 and each delivery |
---|
3357 | 3357 | | 14 year thereafter from new renewable energy facilities |
---|
3358 | 3358 | | 15 located at the sites of qualifying electric generating |
---|
3359 | 3359 | | 16 facilities, and (ii) to fund the grant payments to be |
---|
3360 | 3360 | | 17 made in each delivery year by the Department of |
---|
3361 | 3361 | | 18 Commerce and Economic Opportunity, or any successor |
---|
3362 | 3362 | | 19 department or agency, which shall be referred to in |
---|
3363 | 3363 | | 20 this subsection (c-5) as the Department, pursuant to |
---|
3364 | 3364 | | 21 paragraph (10) of this subsection (c-5). The electric |
---|
3365 | 3365 | | 22 utility's tariff shall provide for the billing and |
---|
3366 | 3366 | | 23 collection of the Coal to Solar and Energy Storage |
---|
3367 | 3367 | | 24 Initiative Charge on each kilowatthour of electricity |
---|
3368 | 3368 | | 25 delivered to its delivery services customers within |
---|
3369 | 3369 | | 26 its service territory and shall provide for an annual |
---|
3370 | 3370 | | |
---|
3371 | 3371 | | |
---|
3372 | 3372 | | |
---|
3373 | 3373 | | |
---|
3374 | 3374 | | |
---|
3375 | 3375 | | HB3258 - 93 - LRB104 06526 AAS 16562 b |
---|
3376 | 3376 | | |
---|
3377 | 3377 | | |
---|
3378 | 3378 | | HB3258- 94 -LRB104 06526 AAS 16562 b HB3258 - 94 - LRB104 06526 AAS 16562 b |
---|
3379 | 3379 | | HB3258 - 94 - LRB104 06526 AAS 16562 b |
---|
3380 | 3380 | | 1 reconciliation of revenues collected with actual |
---|
3381 | 3381 | | 2 costs, in accordance with subsection (i-5) of Section |
---|
3382 | 3382 | | 3 16-108 of the Public Utilities Act. |
---|
3383 | 3383 | | 4 (B) Each electric utility shall remit on a monthly |
---|
3384 | 3384 | | 5 basis to the State Treasurer, for deposit in the Coal |
---|
3385 | 3385 | | 6 to Solar and Energy Storage Initiative Fund provided |
---|
3386 | 3386 | | 7 for in this subsection (c-5), the electric utility's |
---|
3387 | 3387 | | 8 collections of the Coal to Solar and Energy Storage |
---|
3388 | 3388 | | 9 Initiative Charge in the amount estimated to be needed |
---|
3389 | 3389 | | 10 by the Department for grant payments pursuant to grant |
---|
3390 | 3390 | | 11 contracts entered into by the Department pursuant to |
---|
3391 | 3391 | | 12 paragraph (10) of this subsection (c-5). |
---|
3392 | 3392 | | 13 (10) Coal to Solar and Energy Storage Initiative Fund. |
---|
3393 | 3393 | | 14 (A) The Coal to Solar and Energy Storage |
---|
3394 | 3394 | | 15 Initiative Fund is established as a special fund in |
---|
3395 | 3395 | | 16 the State treasury. The Coal to Solar and Energy |
---|
3396 | 3396 | | 17 Storage Initiative Fund is authorized to receive, by |
---|
3397 | 3397 | | 18 statutory deposit, that portion specified in item (B) |
---|
3398 | 3398 | | 19 of paragraph (9) of this subsection (c-5) of moneys |
---|
3399 | 3399 | | 20 collected by electric utilities through imposition of |
---|
3400 | 3400 | | 21 the Coal to Solar and Energy Storage Initiative Charge |
---|
3401 | 3401 | | 22 required by this subsection (c-5). The Coal to Solar |
---|
3402 | 3402 | | 23 and Energy Storage Initiative Fund shall be |
---|
3403 | 3403 | | 24 administered by the Department to provide grants to |
---|
3404 | 3404 | | 25 support the installation and operation of energy |
---|
3405 | 3405 | | 26 storage facilities at the sites of qualifying electric |
---|
3406 | 3406 | | |
---|
3407 | 3407 | | |
---|
3408 | 3408 | | |
---|
3409 | 3409 | | |
---|
3410 | 3410 | | |
---|
3411 | 3411 | | HB3258 - 94 - LRB104 06526 AAS 16562 b |
---|
3412 | 3412 | | |
---|
3413 | 3413 | | |
---|
3414 | 3414 | | HB3258- 95 -LRB104 06526 AAS 16562 b HB3258 - 95 - LRB104 06526 AAS 16562 b |
---|
3415 | 3415 | | HB3258 - 95 - LRB104 06526 AAS 16562 b |
---|
3416 | 3416 | | 1 generating facilities meeting the criteria specified |
---|
3417 | 3417 | | 2 in this paragraph (10). |
---|
3418 | 3418 | | 3 (B) The Coal to Solar and Energy Storage |
---|
3419 | 3419 | | 4 Initiative Fund shall not be subject to sweeps, |
---|
3420 | 3420 | | 5 administrative charges, or chargebacks, including, but |
---|
3421 | 3421 | | 6 not limited to, those authorized under Section 8h of |
---|
3422 | 3422 | | 7 the State Finance Act, that would in any way result in |
---|
3423 | 3423 | | 8 the transfer of those funds from the Coal to Solar and |
---|
3424 | 3424 | | 9 Energy Storage Initiative Fund to any other fund of |
---|
3425 | 3425 | | 10 this State or in having any such funds utilized for any |
---|
3426 | 3426 | | 11 purpose other than the express purposes set forth in |
---|
3427 | 3427 | | 12 this paragraph (10). |
---|
3428 | 3428 | | 13 (C) The Department shall utilize up to |
---|
3429 | 3429 | | 14 $280,500,000 in the Coal to Solar and Energy Storage |
---|
3430 | 3430 | | 15 Initiative Fund for grants, assuming sufficient |
---|
3431 | 3431 | | 16 qualifying applicants, to support installation of |
---|
3432 | 3432 | | 17 energy storage facilities at the sites of up to 3 |
---|
3433 | 3433 | | 18 qualifying electric generating facilities located in |
---|
3434 | 3434 | | 19 the Midcontinent Independent System Operator, Inc., |
---|
3435 | 3435 | | 20 region in Illinois and the sites of up to 2 qualifying |
---|
3436 | 3436 | | 21 electric generating facilities located in the PJM |
---|
3437 | 3437 | | 22 Interconnection, LLC region in Illinois that meet the |
---|
3438 | 3438 | | 23 criteria set forth in this subparagraph (C). The |
---|
3439 | 3439 | | 24 criteria for receipt of a grant pursuant to this |
---|
3440 | 3440 | | 25 subparagraph (C) are as follows: |
---|
3441 | 3441 | | 26 (1) the electric generating facility at the |
---|
3442 | 3442 | | |
---|
3443 | 3443 | | |
---|
3444 | 3444 | | |
---|
3445 | 3445 | | |
---|
3446 | 3446 | | |
---|
3447 | 3447 | | HB3258 - 95 - LRB104 06526 AAS 16562 b |
---|
3448 | 3448 | | |
---|
3449 | 3449 | | |
---|
3450 | 3450 | | HB3258- 96 -LRB104 06526 AAS 16562 b HB3258 - 96 - LRB104 06526 AAS 16562 b |
---|
3451 | 3451 | | HB3258 - 96 - LRB104 06526 AAS 16562 b |
---|
3452 | 3452 | | 1 site has, or had prior to retirement, an electric |
---|
3453 | 3453 | | 2 generating capacity of at least 150 megawatts; |
---|
3454 | 3454 | | 3 (2) the electric generating facility burns (or |
---|
3455 | 3455 | | 4 burned prior to retirement) coal as its primary |
---|
3456 | 3456 | | 5 source of fuel; |
---|
3457 | 3457 | | 6 (3) if the electric generating facility is |
---|
3458 | 3458 | | 7 retired, it was retired subsequent to January 1, |
---|
3459 | 3459 | | 8 2016; |
---|
3460 | 3460 | | 9 (4) the owner of the electric generating |
---|
3461 | 3461 | | 10 facility has not been selected by the Agency |
---|
3462 | 3462 | | 11 pursuant to this subsection (c-5) of this Section |
---|
3463 | 3463 | | 12 to enter into a contract to sell renewable energy |
---|
3464 | 3464 | | 13 credits to one or more electric utilities from a |
---|
3465 | 3465 | | 14 new renewable energy facility located or to be |
---|
3466 | 3466 | | 15 located at or adjacent to the site at which the |
---|
3467 | 3467 | | 16 electric generating facility is located; |
---|
3468 | 3468 | | 17 (5) the electric generating facility located |
---|
3469 | 3469 | | 18 at the site was at one time owned, in whole or in |
---|
3470 | 3470 | | 19 part, by a public utility as defined in Section |
---|
3471 | 3471 | | 20 3-105 of the Public Utilities Act; |
---|
3472 | 3472 | | 21 (6) the electric generating facility at the |
---|
3473 | 3473 | | 22 site is not owned by (i) an electric cooperative |
---|
3474 | 3474 | | 23 as defined in Section 3-119 of the Public |
---|
3475 | 3475 | | 24 Utilities Act, or (ii) an entity described in |
---|
3476 | 3476 | | 25 subsection (b)(1) of Section 3-105 of the Public |
---|
3477 | 3477 | | 26 Utilities Act, or an association or consortium of |
---|
3478 | 3478 | | |
---|
3479 | 3479 | | |
---|
3480 | 3480 | | |
---|
3481 | 3481 | | |
---|
3482 | 3482 | | |
---|
3483 | 3483 | | HB3258 - 96 - LRB104 06526 AAS 16562 b |
---|
3484 | 3484 | | |
---|
3485 | 3485 | | |
---|
3486 | 3486 | | HB3258- 97 -LRB104 06526 AAS 16562 b HB3258 - 97 - LRB104 06526 AAS 16562 b |
---|
3487 | 3487 | | HB3258 - 97 - LRB104 06526 AAS 16562 b |
---|
3488 | 3488 | | 1 or an entity owned by entities described in items |
---|
3489 | 3489 | | 2 (i) or (ii); |
---|
3490 | 3490 | | 3 (7) the proposed energy storage facility at |
---|
3491 | 3491 | | 4 the site will have energy storage capacity of at |
---|
3492 | 3492 | | 5 least 37 megawatts; |
---|
3493 | 3493 | | 6 (8) the owner commits to place the energy |
---|
3494 | 3494 | | 7 storage facility into commercial operation on |
---|
3495 | 3495 | | 8 either June 1, 2023, June 1, 2024, or June 1, 2025, |
---|
3496 | 3496 | | 9 with such date subject to adjustment as needed due |
---|
3497 | 3497 | | 10 to any delays in completing the grant contracting |
---|
3498 | 3498 | | 11 process, in finalizing interconnection agreements |
---|
3499 | 3499 | | 12 and in installing interconnection facilities, and |
---|
3500 | 3500 | | 13 in obtaining necessary governmental permits and |
---|
3501 | 3501 | | 14 approvals; |
---|
3502 | 3502 | | 15 (9) the owner agrees that the new energy |
---|
3503 | 3503 | | 16 storage facility will be constructed or installed |
---|
3504 | 3504 | | 17 by a qualified entity or entities consistent with |
---|
3505 | 3505 | | 18 the requirements of subsection (g) of Section |
---|
3506 | 3506 | | 19 16-128A of the Public Utilities Act and any rules |
---|
3507 | 3507 | | 20 adopted under that Section; |
---|
3508 | 3508 | | 21 (10) the owner agrees that personnel operating |
---|
3509 | 3509 | | 22 the energy storage facility will have the |
---|
3510 | 3510 | | 23 requisite skills, knowledge, training, experience, |
---|
3511 | 3511 | | 24 and competence, which may be demonstrated by |
---|
3512 | 3512 | | 25 completion or current participation and ultimate |
---|
3513 | 3513 | | 26 completion by employees of an accredited or |
---|
3514 | 3514 | | |
---|
3515 | 3515 | | |
---|
3516 | 3516 | | |
---|
3517 | 3517 | | |
---|
3518 | 3518 | | |
---|
3519 | 3519 | | HB3258 - 97 - LRB104 06526 AAS 16562 b |
---|
3520 | 3520 | | |
---|
3521 | 3521 | | |
---|
3522 | 3522 | | HB3258- 98 -LRB104 06526 AAS 16562 b HB3258 - 98 - LRB104 06526 AAS 16562 b |
---|
3523 | 3523 | | HB3258 - 98 - LRB104 06526 AAS 16562 b |
---|
3524 | 3524 | | 1 otherwise recognized apprenticeship program for |
---|
3525 | 3525 | | 2 the employee's particular craft, trade, or skill, |
---|
3526 | 3526 | | 3 including through training and education courses |
---|
3527 | 3527 | | 4 and opportunities offered by the owner to |
---|
3528 | 3528 | | 5 employees of the coal-fueled electric generating |
---|
3529 | 3529 | | 6 facility or by previous employment experience |
---|
3530 | 3530 | | 7 performing the employee's particular work skill or |
---|
3531 | 3531 | | 8 function; |
---|
3532 | 3532 | | 9 (11) the owner commits that not less than the |
---|
3533 | 3533 | | 10 prevailing wage, as determined pursuant to the |
---|
3534 | 3534 | | 11 Prevailing Wage Act, will be paid to the owner's |
---|
3535 | 3535 | | 12 employees engaged in construction activities |
---|
3536 | 3536 | | 13 associated with the new energy storage facility |
---|
3537 | 3537 | | 14 and to the employees of the owner's contractors |
---|
3538 | 3538 | | 15 engaged in construction activities associated with |
---|
3539 | 3539 | | 16 the new energy storage facility, and that, on or |
---|
3540 | 3540 | | 17 before the commercial operation date of the new |
---|
3541 | 3541 | | 18 energy storage facility, the owner shall file a |
---|
3542 | 3542 | | 19 report with the Department certifying that the |
---|
3543 | 3543 | | 20 requirements of this subparagraph (11) have been |
---|
3544 | 3544 | | 21 met; and |
---|
3545 | 3545 | | 22 (12) (blank). the owner commits that if |
---|
3546 | 3546 | | 23 selected to receive a grant, it will negotiate a |
---|
3547 | 3547 | | 24 project labor agreement for the construction of |
---|
3548 | 3548 | | 25 the new energy storage facility that includes |
---|
3549 | 3549 | | 26 provisions requiring the parties to the agreement |
---|
3550 | 3550 | | |
---|
3551 | 3551 | | |
---|
3552 | 3552 | | |
---|
3553 | 3553 | | |
---|
3554 | 3554 | | |
---|
3555 | 3555 | | HB3258 - 98 - LRB104 06526 AAS 16562 b |
---|
3556 | 3556 | | |
---|
3557 | 3557 | | |
---|
3558 | 3558 | | HB3258- 99 -LRB104 06526 AAS 16562 b HB3258 - 99 - LRB104 06526 AAS 16562 b |
---|
3559 | 3559 | | HB3258 - 99 - LRB104 06526 AAS 16562 b |
---|
3560 | 3560 | | 1 to work together to establish diversity threshold |
---|
3561 | 3561 | | 2 requirements and to ensure best efforts to meet |
---|
3562 | 3562 | | 3 diversity targets, improve diversity at the |
---|
3563 | 3563 | | 4 applicable job site, create diverse apprenticeship |
---|
3564 | 3564 | | 5 opportunities, and create opportunities to employ |
---|
3565 | 3565 | | 6 former coal-fired power plant workers. |
---|
3566 | 3566 | | 7 The Department shall accept applications for this |
---|
3567 | 3567 | | 8 grant program until March 31, 2022 and shall announce |
---|
3568 | 3568 | | 9 the award of grants no later than June 1, 2022. The |
---|
3569 | 3569 | | 10 Department shall make the grant payments to a |
---|
3570 | 3570 | | 11 recipient in equal annual amounts for 10 years |
---|
3571 | 3571 | | 12 following the date the energy storage facility is |
---|
3572 | 3572 | | 13 placed into commercial operation. The annual grant |
---|
3573 | 3573 | | 14 payments to a qualifying energy storage facility shall |
---|
3574 | 3574 | | 15 be $110,000 per megawatt of energy storage capacity, |
---|
3575 | 3575 | | 16 with total annual grant payments pursuant to this |
---|
3576 | 3576 | | 17 subparagraph (C) for qualifying energy storage |
---|
3577 | 3577 | | 18 facilities not to exceed $28,050,000 in any year. |
---|
3578 | 3578 | | 19 (D) Grants of funding for energy storage |
---|
3579 | 3579 | | 20 facilities pursuant to subparagraph (C) of this |
---|
3580 | 3580 | | 21 paragraph (10), from the Coal to Solar and Energy |
---|
3581 | 3581 | | 22 Storage Initiative Fund, shall be memorialized in |
---|
3582 | 3582 | | 23 grant contracts between the Department and the |
---|
3583 | 3583 | | 24 recipient. The grant contracts shall specify the date |
---|
3584 | 3584 | | 25 or dates in each year on which the annual grant |
---|
3585 | 3585 | | 26 payments shall be paid. |
---|
3586 | 3586 | | |
---|
3587 | 3587 | | |
---|
3588 | 3588 | | |
---|
3589 | 3589 | | |
---|
3590 | 3590 | | |
---|
3591 | 3591 | | HB3258 - 99 - LRB104 06526 AAS 16562 b |
---|
3592 | 3592 | | |
---|
3593 | 3593 | | |
---|
3594 | 3594 | | HB3258- 100 -LRB104 06526 AAS 16562 b HB3258 - 100 - LRB104 06526 AAS 16562 b |
---|
3595 | 3595 | | HB3258 - 100 - LRB104 06526 AAS 16562 b |
---|
3596 | 3596 | | 1 (E) All disbursements from the Coal to Solar and |
---|
3597 | 3597 | | 2 Energy Storage Initiative Fund shall be made only upon |
---|
3598 | 3598 | | 3 warrants of the Comptroller drawn upon the Treasurer |
---|
3599 | 3599 | | 4 as custodian of the Fund upon vouchers signed by the |
---|
3600 | 3600 | | 5 Director of the Department or by the person or persons |
---|
3601 | 3601 | | 6 designated by the Director of the Department for that |
---|
3602 | 3602 | | 7 purpose. The Comptroller is authorized to draw the |
---|
3603 | 3603 | | 8 warrants upon vouchers so signed. The Treasurer shall |
---|
3604 | 3604 | | 9 accept all written warrants so signed and shall be |
---|
3605 | 3605 | | 10 released from liability for all payments made on those |
---|
3606 | 3606 | | 11 warrants. |
---|
3607 | 3607 | | 12 (11) (Blank). Diversity, equity, and inclusion plans. |
---|
3608 | 3608 | | 13 (A) Each applicant selected in a procurement event |
---|
3609 | 3609 | | 14 to contract to supply renewable energy credits in |
---|
3610 | 3610 | | 15 accordance with this subsection (c-5) and each owner |
---|
3611 | 3611 | | 16 selected by the Department to receive a grant or |
---|
3612 | 3612 | | 17 grants to support the construction and operation of a |
---|
3613 | 3613 | | 18 new energy storage facility or facilities in |
---|
3614 | 3614 | | 19 accordance with this subsection (c-5) shall, within 60 |
---|
3615 | 3615 | | 20 days following the Commission's approval of the |
---|
3616 | 3616 | | 21 applicant to contract to supply renewable energy |
---|
3617 | 3617 | | 22 credits or within 60 days following execution of a |
---|
3618 | 3618 | | 23 grant contract with the Department, as applicable, |
---|
3619 | 3619 | | 24 submit to the Commission a diversity, equity, and |
---|
3620 | 3620 | | 25 inclusion plan setting forth the applicant's or |
---|
3621 | 3621 | | 26 owner's numeric goals for the diversity composition of |
---|
3622 | 3622 | | |
---|
3623 | 3623 | | |
---|
3624 | 3624 | | |
---|
3625 | 3625 | | |
---|
3626 | 3626 | | |
---|
3627 | 3627 | | HB3258 - 100 - LRB104 06526 AAS 16562 b |
---|
3628 | 3628 | | |
---|
3629 | 3629 | | |
---|
3630 | 3630 | | HB3258- 101 -LRB104 06526 AAS 16562 b HB3258 - 101 - LRB104 06526 AAS 16562 b |
---|
3631 | 3631 | | HB3258 - 101 - LRB104 06526 AAS 16562 b |
---|
3632 | 3632 | | 1 its supplier entities for the new renewable energy |
---|
3633 | 3633 | | 2 facility or new energy storage facility, as |
---|
3634 | 3634 | | 3 applicable, which shall be referred to for purposes of |
---|
3635 | 3635 | | 4 this paragraph (11) as the project, and the |
---|
3636 | 3636 | | 5 applicant's or owner's action plan and schedule for |
---|
3637 | 3637 | | 6 achieving those goals. |
---|
3638 | 3638 | | 7 (B) For purposes of this paragraph (11), diversity |
---|
3639 | 3639 | | 8 composition shall be based on the percentage, which |
---|
3640 | 3640 | | 9 shall be a minimum of 25%, of eligible expenditures |
---|
3641 | 3641 | | 10 for contract awards for materials and services (which |
---|
3642 | 3642 | | 11 shall be defined in the plan) to business enterprises |
---|
3643 | 3643 | | 12 owned by minority persons, women, or persons with |
---|
3644 | 3644 | | 13 disabilities as defined in Section 2 of the Business |
---|
3645 | 3645 | | 14 Enterprise for Minorities, Women, and Persons with |
---|
3646 | 3646 | | 15 Disabilities Act, to LGBTQ business enterprises, to |
---|
3647 | 3647 | | 16 veteran-owned business enterprises, and to business |
---|
3648 | 3648 | | 17 enterprises located in environmental justice |
---|
3649 | 3649 | | 18 communities. The diversity composition goals of the |
---|
3650 | 3650 | | 19 plan may include eligible expenditures in areas for |
---|
3651 | 3651 | | 20 vendor or supplier opportunities in addition to |
---|
3652 | 3652 | | 21 development and construction of the project, and may |
---|
3653 | 3653 | | 22 exclude from eligible expenditures materials and |
---|
3654 | 3654 | | 23 services with limited market availability, limited |
---|
3655 | 3655 | | 24 production and availability from suppliers in the |
---|
3656 | 3656 | | 25 United States, such as solar panels and storage |
---|
3657 | 3657 | | 26 batteries, and material and services that are subject |
---|
3658 | 3658 | | |
---|
3659 | 3659 | | |
---|
3660 | 3660 | | |
---|
3661 | 3661 | | |
---|
3662 | 3662 | | |
---|
3663 | 3663 | | HB3258 - 101 - LRB104 06526 AAS 16562 b |
---|
3664 | 3664 | | |
---|
3665 | 3665 | | |
---|
3666 | 3666 | | HB3258- 102 -LRB104 06526 AAS 16562 b HB3258 - 102 - LRB104 06526 AAS 16562 b |
---|
3667 | 3667 | | HB3258 - 102 - LRB104 06526 AAS 16562 b |
---|
3668 | 3668 | | 1 to critical energy infrastructure or cybersecurity |
---|
3669 | 3669 | | 2 requirements or restrictions. The plan may provide |
---|
3670 | 3670 | | 3 that the diversity composition goals may be met |
---|
3671 | 3671 | | 4 through Tier 1 Direct or Tier 2 subcontracting |
---|
3672 | 3672 | | 5 expenditures or a combination thereof for the project. |
---|
3673 | 3673 | | 6 (C) The plan shall provide for, but not be limited |
---|
3674 | 3674 | | 7 to: (i) internal initiatives, including multi-tier |
---|
3675 | 3675 | | 8 initiatives, by the applicant or owner, or by its |
---|
3676 | 3676 | | 9 engineering, procurement and construction contractor |
---|
3677 | 3677 | | 10 if one is used for the project, which for purposes of |
---|
3678 | 3678 | | 11 this paragraph (11) shall be referred to as the EPC |
---|
3679 | 3679 | | 12 contractor, to enable diverse businesses to be |
---|
3680 | 3680 | | 13 considered fairly for selection to provide materials |
---|
3681 | 3681 | | 14 and services; (ii) requirements for the applicant or |
---|
3682 | 3682 | | 15 owner or its EPC contractor to proactively solicit and |
---|
3683 | 3683 | | 16 utilize diverse businesses to provide materials and |
---|
3684 | 3684 | | 17 services; and (iii) requirements for the applicant or |
---|
3685 | 3685 | | 18 owner or its EPC contractor to hire a diverse |
---|
3686 | 3686 | | 19 workforce for the project. The plan shall include a |
---|
3687 | 3687 | | 20 description of the applicant's or owner's diversity |
---|
3688 | 3688 | | 21 recruiting efforts both for the project and for other |
---|
3689 | 3689 | | 22 areas of the applicant's or owner's business |
---|
3690 | 3690 | | 23 operations. The plan shall provide for the imposition |
---|
3691 | 3691 | | 24 of financial penalties on the applicant's or owner's |
---|
3692 | 3692 | | 25 EPC contractor for failure to exercise best efforts to |
---|
3693 | 3693 | | 26 comply with and execute the EPC contractor's diversity |
---|
3694 | 3694 | | |
---|
3695 | 3695 | | |
---|
3696 | 3696 | | |
---|
3697 | 3697 | | |
---|
3698 | 3698 | | |
---|
3699 | 3699 | | HB3258 - 102 - LRB104 06526 AAS 16562 b |
---|
3700 | 3700 | | |
---|
3701 | 3701 | | |
---|
3702 | 3702 | | HB3258- 103 -LRB104 06526 AAS 16562 b HB3258 - 103 - LRB104 06526 AAS 16562 b |
---|
3703 | 3703 | | HB3258 - 103 - LRB104 06526 AAS 16562 b |
---|
3704 | 3704 | | 1 obligations under the plan. The plan may provide for |
---|
3705 | 3705 | | 2 the applicant or owner to set aside a portion of the |
---|
3706 | 3706 | | 3 work on the project to serve as an incubation program |
---|
3707 | 3707 | | 4 for qualified businesses, as specified in the plan, |
---|
3708 | 3708 | | 5 owned by minority persons, women, persons with |
---|
3709 | 3709 | | 6 disabilities, LGBTQ persons, and veterans, and |
---|
3710 | 3710 | | 7 businesses located in environmental justice |
---|
3711 | 3711 | | 8 communities, seeking to enter the renewable energy |
---|
3712 | 3712 | | 9 industry. |
---|
3713 | 3713 | | 10 (D) The applicant or owner may submit a revised or |
---|
3714 | 3714 | | 11 updated plan to the Commission from time to time as |
---|
3715 | 3715 | | 12 circumstances warrant. The applicant or owner shall |
---|
3716 | 3716 | | 13 file annual reports with the Commission detailing the |
---|
3717 | 3717 | | 14 applicant's or owner's progress in implementing its |
---|
3718 | 3718 | | 15 plan and achieving its goals and any modifications the |
---|
3719 | 3719 | | 16 applicant or owner has made to its plan to better |
---|
3720 | 3720 | | 17 achieve its diversity, equity and inclusion goals. The |
---|
3721 | 3721 | | 18 applicant or owner shall file a final report on the |
---|
3722 | 3722 | | 19 fifth June 1 following the commercial operation date |
---|
3723 | 3723 | | 20 of the new renewable energy resource or new energy |
---|
3724 | 3724 | | 21 storage facility, but the applicant or owner shall |
---|
3725 | 3725 | | 22 thereafter continue to be subject to applicable |
---|
3726 | 3726 | | 23 reporting requirements of Section 5-117 of the Public |
---|
3727 | 3727 | | 24 Utilities Act. |
---|
3728 | 3728 | | 25 (c-10) Equity accountability system. It is the purpose of |
---|
3729 | 3729 | | 26 this subsection (c-10) to create an equity accountability |
---|
3730 | 3730 | | |
---|
3731 | 3731 | | |
---|
3732 | 3732 | | |
---|
3733 | 3733 | | |
---|
3734 | 3734 | | |
---|
3735 | 3735 | | HB3258 - 103 - LRB104 06526 AAS 16562 b |
---|
3736 | 3736 | | |
---|
3737 | 3737 | | |
---|
3738 | 3738 | | HB3258- 104 -LRB104 06526 AAS 16562 b HB3258 - 104 - LRB104 06526 AAS 16562 b |
---|
3739 | 3739 | | HB3258 - 104 - LRB104 06526 AAS 16562 b |
---|
3740 | 3740 | | 1 system, which includes the minimum equity standards for all |
---|
3741 | 3741 | | 2 renewable energy procurements, the equity category of the |
---|
3742 | 3742 | | 3 Adjustable Block Program, and the equity prioritization for |
---|
3743 | 3743 | | 4 noncompetitive procurements, that is successful in advancing |
---|
3744 | 3744 | | 5 priority access to the clean energy economy for businesses and |
---|
3745 | 3745 | | 6 workers from communities that have been excluded from economic |
---|
3746 | 3746 | | 7 opportunities in the energy sector, have been subject to |
---|
3747 | 3747 | | 8 disproportionate levels of pollution, and have |
---|
3748 | 3748 | | 9 disproportionately experienced negative public health |
---|
3749 | 3749 | | 10 outcomes. Further, it is the purpose of this subsection to |
---|
3750 | 3750 | | 11 ensure that this equity accountability system is successful in |
---|
3751 | 3751 | | 12 advancing equity across Illinois by providing access to the |
---|
3752 | 3752 | | 13 clean energy economy for businesses and workers from |
---|
3753 | 3753 | | 14 communities that have been historically excluded from economic |
---|
3754 | 3754 | | 15 opportunities in the energy sector, have been subject to |
---|
3755 | 3755 | | 16 disproportionate levels of pollution, and have |
---|
3756 | 3756 | | 17 disproportionately experienced negative public health |
---|
3757 | 3757 | | 18 outcomes. |
---|
3758 | 3758 | | 19 (1) Minimum equity standards. The Agency shall create |
---|
3759 | 3759 | | 20 programs with the purpose of increasing access to and |
---|
3760 | 3760 | | 21 development of equity eligible contractors, who are prime |
---|
3761 | 3761 | | 22 contractors and subcontractors, across all of the programs |
---|
3762 | 3762 | | 23 it manages. All applications for renewable energy credit |
---|
3763 | 3763 | | 24 procurements shall comply with specific minimum equity |
---|
3764 | 3764 | | 25 commitments. Starting in the delivery year immediately |
---|
3765 | 3765 | | 26 following the next long-term renewable resources |
---|
3766 | 3766 | | |
---|
3767 | 3767 | | |
---|
3768 | 3768 | | |
---|
3769 | 3769 | | |
---|
3770 | 3770 | | |
---|
3771 | 3771 | | HB3258 - 104 - LRB104 06526 AAS 16562 b |
---|
3772 | 3772 | | |
---|
3773 | 3773 | | |
---|
3774 | 3774 | | HB3258- 105 -LRB104 06526 AAS 16562 b HB3258 - 105 - LRB104 06526 AAS 16562 b |
---|
3775 | 3775 | | HB3258 - 105 - LRB104 06526 AAS 16562 b |
---|
3776 | 3776 | | 1 procurement plan, at least 10% of the project workforce |
---|
3777 | 3777 | | 2 for each entity participating in a procurement program |
---|
3778 | 3778 | | 3 outlined in this subsection (c-10) must be done by equity |
---|
3779 | 3779 | | 4 eligible persons or equity eligible contractors. The |
---|
3780 | 3780 | | 5 Agency shall increase the minimum percentage each delivery |
---|
3781 | 3781 | | 6 year thereafter by increments that ensure a statewide |
---|
3782 | 3782 | | 7 average of 30% of the project workforce for each entity |
---|
3783 | 3783 | | 8 participating in a procurement program is done by equity |
---|
3784 | 3784 | | 9 eligible persons or equity eligible contractors by 2030. |
---|
3785 | 3785 | | 10 The Agency shall propose a schedule of percentage |
---|
3786 | 3786 | | 11 increases to the minimum equity standards in its draft |
---|
3787 | 3787 | | 12 revised renewable energy resources procurement plan |
---|
3788 | 3788 | | 13 submitted to the Commission for approval pursuant to |
---|
3789 | 3789 | | 14 paragraph (5) of subsection (b) of Section 16-111.5 of the |
---|
3790 | 3790 | | 15 Public Utilities Act. In determining these annual |
---|
3791 | 3791 | | 16 increases, the Agency shall have the discretion to |
---|
3792 | 3792 | | 17 establish different minimum equity standards for different |
---|
3793 | 3793 | | 18 types of procurements and different regions of the State |
---|
3794 | 3794 | | 19 if the Agency finds that doing so will further the |
---|
3795 | 3795 | | 20 purposes of this subsection (c-10). The proposed schedule |
---|
3796 | 3796 | | 21 of annual increases shall be revisited and updated on an |
---|
3797 | 3797 | | 22 annual basis. Revisions shall be developed with |
---|
3798 | 3798 | | 23 stakeholder input, including from equity eligible persons, |
---|
3799 | 3799 | | 24 equity eligible contractors, clean energy industry |
---|
3800 | 3800 | | 25 representatives, and community-based organizations that |
---|
3801 | 3801 | | 26 work with such persons and contractors. |
---|
3802 | 3802 | | |
---|
3803 | 3803 | | |
---|
3804 | 3804 | | |
---|
3805 | 3805 | | |
---|
3806 | 3806 | | |
---|
3807 | 3807 | | HB3258 - 105 - LRB104 06526 AAS 16562 b |
---|
3808 | 3808 | | |
---|
3809 | 3809 | | |
---|
3810 | 3810 | | HB3258- 106 -LRB104 06526 AAS 16562 b HB3258 - 106 - LRB104 06526 AAS 16562 b |
---|
3811 | 3811 | | HB3258 - 106 - LRB104 06526 AAS 16562 b |
---|
3812 | 3812 | | 1 (A) At the start of each delivery year, the Agency |
---|
3813 | 3813 | | 2 shall require a compliance plan from each entity |
---|
3814 | 3814 | | 3 participating in a procurement program of subsection |
---|
3815 | 3815 | | 4 (c) of this Section that demonstrates how they will |
---|
3816 | 3816 | | 5 achieve compliance with the minimum equity standard |
---|
3817 | 3817 | | 6 percentage for work completed in that delivery year. |
---|
3818 | 3818 | | 7 If an entity applies for its approved vendor or |
---|
3819 | 3819 | | 8 designee status between delivery years, the Agency |
---|
3820 | 3820 | | 9 shall require a compliance plan at the time of |
---|
3821 | 3821 | | 10 application. |
---|
3822 | 3822 | | 11 (B) Halfway through each delivery year, the Agency |
---|
3823 | 3823 | | 12 shall require each entity participating in a |
---|
3824 | 3824 | | 13 procurement program to confirm that it will achieve |
---|
3825 | 3825 | | 14 compliance in that delivery year, when applicable. The |
---|
3826 | 3826 | | 15 Agency may offer corrective action plans to entities |
---|
3827 | 3827 | | 16 that are not on track to achieve compliance. |
---|
3828 | 3828 | | 17 (C) At the end of each delivery year, each entity |
---|
3829 | 3829 | | 18 participating and completing work in that delivery |
---|
3830 | 3830 | | 19 year in a procurement program of subsection (c) shall |
---|
3831 | 3831 | | 20 submit a report to the Agency that demonstrates how it |
---|
3832 | 3832 | | 21 achieved compliance with the minimum equity standards |
---|
3833 | 3833 | | 22 percentage for that delivery year. |
---|
3834 | 3834 | | 23 (D) The Agency shall prohibit participation in |
---|
3835 | 3835 | | 24 procurement programs by an approved vendor or |
---|
3836 | 3836 | | 25 designee, as applicable, or entities with which an |
---|
3837 | 3837 | | 26 approved vendor or designee, as applicable, shares a |
---|
3838 | 3838 | | |
---|
3839 | 3839 | | |
---|
3840 | 3840 | | |
---|
3841 | 3841 | | |
---|
3842 | 3842 | | |
---|
3843 | 3843 | | HB3258 - 106 - LRB104 06526 AAS 16562 b |
---|
3844 | 3844 | | |
---|
3845 | 3845 | | |
---|
3846 | 3846 | | HB3258- 107 -LRB104 06526 AAS 16562 b HB3258 - 107 - LRB104 06526 AAS 16562 b |
---|
3847 | 3847 | | HB3258 - 107 - LRB104 06526 AAS 16562 b |
---|
3848 | 3848 | | 1 common parent company if an approved vendor or |
---|
3849 | 3849 | | 2 designee, as applicable, failed to meet the minimum |
---|
3850 | 3850 | | 3 equity standards for the prior delivery year. Waivers |
---|
3851 | 3851 | | 4 approved for lack of equity eligible persons or equity |
---|
3852 | 3852 | | 5 eligible contractors in a geographic area of a project |
---|
3853 | 3853 | | 6 shall not count against the approved vendor or |
---|
3854 | 3854 | | 7 designee. The Agency shall offer a corrective action |
---|
3855 | 3855 | | 8 plan for any such entities to assist them in obtaining |
---|
3856 | 3856 | | 9 compliance and shall allow continued access to |
---|
3857 | 3857 | | 10 procurement programs upon an approved vendor or |
---|
3858 | 3858 | | 11 designee demonstrating compliance. |
---|
3859 | 3859 | | 12 (E) The Agency shall pursue efficiencies achieved |
---|
3860 | 3860 | | 13 by combining with other approved vendor or designee |
---|
3861 | 3861 | | 14 reporting. |
---|
3862 | 3862 | | 15 (2) Equity accountability system within the Adjustable |
---|
3863 | 3863 | | 16 Block program. The equity category described in item (vi) |
---|
3864 | 3864 | | 17 of subparagraph (K) of subsection (c) is only available to |
---|
3865 | 3865 | | 18 applicants that are equity eligible contractors. |
---|
3866 | 3866 | | 19 (3) Equity accountability system within competitive |
---|
3867 | 3867 | | 20 procurements. Through its long-term renewable resources |
---|
3868 | 3868 | | 21 procurement plan, the Agency shall develop requirements |
---|
3869 | 3869 | | 22 for ensuring that competitive procurement processes, |
---|
3870 | 3870 | | 23 including utility-scale solar, utility-scale wind, and |
---|
3871 | 3871 | | 24 brownfield site photovoltaic projects, advance the equity |
---|
3872 | 3872 | | 25 goals of this subsection (c-10). Subject to Commission |
---|
3873 | 3873 | | 26 approval, the Agency shall develop bid application |
---|
3874 | 3874 | | |
---|
3875 | 3875 | | |
---|
3876 | 3876 | | |
---|
3877 | 3877 | | |
---|
3878 | 3878 | | |
---|
3879 | 3879 | | HB3258 - 107 - LRB104 06526 AAS 16562 b |
---|
3880 | 3880 | | |
---|
3881 | 3881 | | |
---|
3882 | 3882 | | HB3258- 108 -LRB104 06526 AAS 16562 b HB3258 - 108 - LRB104 06526 AAS 16562 b |
---|
3883 | 3883 | | HB3258 - 108 - LRB104 06526 AAS 16562 b |
---|
3884 | 3884 | | 1 requirements and a bid evaluation methodology for ensuring |
---|
3885 | 3885 | | 2 that utilization of equity eligible contractors, whether |
---|
3886 | 3886 | | 3 as bidders or as participants on project development, is |
---|
3887 | 3887 | | 4 optimized, including requiring that winning or successful |
---|
3888 | 3888 | | 5 applicants for utility-scale projects are or will partner |
---|
3889 | 3889 | | 6 with equity eligible contractors and giving preference to |
---|
3890 | 3890 | | 7 bids through which a higher portion of contract value |
---|
3891 | 3891 | | 8 flows to equity eligible contractors. To the extent |
---|
3892 | 3892 | | 9 practicable, entities participating in competitive |
---|
3893 | 3893 | | 10 procurements shall also be required to meet all the equity |
---|
3894 | 3894 | | 11 accountability requirements for approved vendors and their |
---|
3895 | 3895 | | 12 designees under this subsection (c-10). In developing |
---|
3896 | 3896 | | 13 these requirements, the Agency shall also consider whether |
---|
3897 | 3897 | | 14 equity goals can be further advanced through additional |
---|
3898 | 3898 | | 15 measures. |
---|
3899 | 3899 | | 16 (4) In the first revision to the long-term renewable |
---|
3900 | 3900 | | 17 energy resources procurement plan and each revision |
---|
3901 | 3901 | | 18 thereafter, the Agency shall include the following: |
---|
3902 | 3902 | | 19 (A) The current status and number of equity |
---|
3903 | 3903 | | 20 eligible contractors listed in the Energy Workforce |
---|
3904 | 3904 | | 21 Equity Database designed in subsection (c-25), |
---|
3905 | 3905 | | 22 including the number of equity eligible contractors |
---|
3906 | 3906 | | 23 with current certifications as issued by the Agency. |
---|
3907 | 3907 | | 24 (B) A mechanism for measuring, tracking, and |
---|
3908 | 3908 | | 25 reporting project workforce at the approved vendor or |
---|
3909 | 3909 | | 26 designee level, as applicable, which shall include a |
---|
3910 | 3910 | | |
---|
3911 | 3911 | | |
---|
3912 | 3912 | | |
---|
3913 | 3913 | | |
---|
3914 | 3914 | | |
---|
3915 | 3915 | | HB3258 - 108 - LRB104 06526 AAS 16562 b |
---|
3916 | 3916 | | |
---|
3917 | 3917 | | |
---|
3918 | 3918 | | HB3258- 109 -LRB104 06526 AAS 16562 b HB3258 - 109 - LRB104 06526 AAS 16562 b |
---|
3919 | 3919 | | HB3258 - 109 - LRB104 06526 AAS 16562 b |
---|
3920 | 3920 | | 1 measurement methodology and records to be made |
---|
3921 | 3921 | | 2 available for audit by the Agency or the Program |
---|
3922 | 3922 | | 3 Administrator. |
---|
3923 | 3923 | | 4 (C) A program for approved vendors, designees, |
---|
3924 | 3924 | | 5 eligible persons, and equity eligible contractors to |
---|
3925 | 3925 | | 6 receive trainings, guidance, and other support from |
---|
3926 | 3926 | | 7 the Agency or its designee regarding the equity |
---|
3927 | 3927 | | 8 category outlined in item (vi) of subparagraph (K) of |
---|
3928 | 3928 | | 9 paragraph (1) of subsection (c) and in meeting the |
---|
3929 | 3929 | | 10 minimum equity standards of this subsection (c-10). |
---|
3930 | 3930 | | 11 (D) A process for certifying equity eligible |
---|
3931 | 3931 | | 12 contractors and equity eligible persons. The |
---|
3932 | 3932 | | 13 certification process shall coordinate with the Energy |
---|
3933 | 3933 | | 14 Workforce Equity Database set forth in subsection |
---|
3934 | 3934 | | 15 (c-25). |
---|
3935 | 3935 | | 16 (E) An application for waiver of the minimum |
---|
3936 | 3936 | | 17 equity standards of this subsection, which the Agency |
---|
3937 | 3937 | | 18 shall have the discretion to grant in rare |
---|
3938 | 3938 | | 19 circumstances. The Agency may grant such a waiver |
---|
3939 | 3939 | | 20 where the applicant provides evidence of significant |
---|
3940 | 3940 | | 21 efforts toward meeting the minimum equity commitment, |
---|
3941 | 3941 | | 22 including: use of the Energy Workforce Equity |
---|
3942 | 3942 | | 23 Database; efforts to hire or contract with entities |
---|
3943 | 3943 | | 24 that hire eligible persons; and efforts to establish |
---|
3944 | 3944 | | 25 contracting relationships with eligible contractors. |
---|
3945 | 3945 | | 26 The Agency shall support applicants in understanding |
---|
3946 | 3946 | | |
---|
3947 | 3947 | | |
---|
3948 | 3948 | | |
---|
3949 | 3949 | | |
---|
3950 | 3950 | | |
---|
3951 | 3951 | | HB3258 - 109 - LRB104 06526 AAS 16562 b |
---|
3952 | 3952 | | |
---|
3953 | 3953 | | |
---|
3954 | 3954 | | HB3258- 110 -LRB104 06526 AAS 16562 b HB3258 - 110 - LRB104 06526 AAS 16562 b |
---|
3955 | 3955 | | HB3258 - 110 - LRB104 06526 AAS 16562 b |
---|
3956 | 3956 | | 1 the Energy Workforce Equity Database and other |
---|
3957 | 3957 | | 2 resources for pursuing compliance of the minimum |
---|
3958 | 3958 | | 3 equity standards. Waivers shall be project-specific, |
---|
3959 | 3959 | | 4 unless the Agency deems it necessary to grant a waiver |
---|
3960 | 3960 | | 5 across a portfolio of projects, and in effect for no |
---|
3961 | 3961 | | 6 longer than one year. Any waiver extension or |
---|
3962 | 3962 | | 7 subsequent waiver request from an applicant shall be |
---|
3963 | 3963 | | 8 subject to the requirements of this Section and shall |
---|
3964 | 3964 | | 9 specify efforts made to reach compliance. When |
---|
3965 | 3965 | | 10 considering whether to grant a waiver, and to what |
---|
3966 | 3966 | | 11 extent, the Agency shall consider the degree to which |
---|
3967 | 3967 | | 12 similarly situated applicants have been able to meet |
---|
3968 | 3968 | | 13 these minimum equity commitments. For repeated waiver |
---|
3969 | 3969 | | 14 requests for specific lack of eligible persons or |
---|
3970 | 3970 | | 15 eligible contractors available, the Agency shall make |
---|
3971 | 3971 | | 16 recommendations to target recruitment to add such |
---|
3972 | 3972 | | 17 eligible persons or eligible contractors to the |
---|
3973 | 3973 | | 18 database. |
---|
3974 | 3974 | | 19 (5) The Agency shall collect information about work on |
---|
3975 | 3975 | | 20 projects or portfolios of projects subject to these |
---|
3976 | 3976 | | 21 minimum equity standards to ensure compliance with this |
---|
3977 | 3977 | | 22 subsection (c-10). Reporting in furtherance of this |
---|
3978 | 3978 | | 23 requirement may be combined with other annual reporting |
---|
3979 | 3979 | | 24 requirements. Such reporting shall include proof of |
---|
3980 | 3980 | | 25 certification of each equity eligible contractor or equity |
---|
3981 | 3981 | | 26 eligible person during the applicable time period. |
---|
3982 | 3982 | | |
---|
3983 | 3983 | | |
---|
3984 | 3984 | | |
---|
3985 | 3985 | | |
---|
3986 | 3986 | | |
---|
3987 | 3987 | | HB3258 - 110 - LRB104 06526 AAS 16562 b |
---|
3988 | 3988 | | |
---|
3989 | 3989 | | |
---|
3990 | 3990 | | HB3258- 111 -LRB104 06526 AAS 16562 b HB3258 - 111 - LRB104 06526 AAS 16562 b |
---|
3991 | 3991 | | HB3258 - 111 - LRB104 06526 AAS 16562 b |
---|
3992 | 3992 | | 1 (6) The Agency shall keep confidential all information |
---|
3993 | 3993 | | 2 and communication that provides private or personal |
---|
3994 | 3994 | | 3 information. |
---|
3995 | 3995 | | 4 (7) Modifications to the equity accountability system. |
---|
3996 | 3996 | | 5 As part of the update of the long-term renewable resources |
---|
3997 | 3997 | | 6 procurement plan to be initiated in 2023, or sooner if the |
---|
3998 | 3998 | | 7 Agency deems necessary, the Agency shall determine the |
---|
3999 | 3999 | | 8 extent to which the equity accountability system described |
---|
4000 | 4000 | | 9 in this subsection (c-10) has advanced the goals of this |
---|
4001 | 4001 | | 10 amendatory Act of the 102nd General Assembly, including |
---|
4002 | 4002 | | 11 through the inclusion of equity eligible persons and |
---|
4003 | 4003 | | 12 equity eligible contractors in renewable energy credit |
---|
4004 | 4004 | | 13 projects. If the Agency finds that the equity |
---|
4005 | 4005 | | 14 accountability system has failed to meet those goals to |
---|
4006 | 4006 | | 15 its fullest potential, the Agency may revise the following |
---|
4007 | 4007 | | 16 criteria for future Agency procurements: (A) the |
---|
4008 | 4008 | | 17 percentage of project workforce, or other appropriate |
---|
4009 | 4009 | | 18 workforce measure, certified as equity eligible persons or |
---|
4010 | 4010 | | 19 equity eligible contractors; (B) definitions for equity |
---|
4011 | 4011 | | 20 investment eligible persons and equity investment eligible |
---|
4012 | 4012 | | 21 community; and (C) such other modifications necessary to |
---|
4013 | 4013 | | 22 advance the goals of this amendatory Act of the 102nd |
---|
4014 | 4014 | | 23 General Assembly effectively. Such revised criteria may |
---|
4015 | 4015 | | 24 also establish distinct equity accountability systems for |
---|
4016 | 4016 | | 25 different types of procurements or different regions of |
---|
4017 | 4017 | | 26 the State if the Agency finds that doing so will further |
---|
4018 | 4018 | | |
---|
4019 | 4019 | | |
---|
4020 | 4020 | | |
---|
4021 | 4021 | | |
---|
4022 | 4022 | | |
---|
4023 | 4023 | | HB3258 - 111 - LRB104 06526 AAS 16562 b |
---|
4024 | 4024 | | |
---|
4025 | 4025 | | |
---|
4026 | 4026 | | HB3258- 112 -LRB104 06526 AAS 16562 b HB3258 - 112 - LRB104 06526 AAS 16562 b |
---|
4027 | 4027 | | HB3258 - 112 - LRB104 06526 AAS 16562 b |
---|
4028 | 4028 | | 1 the purposes of such programs. Revisions shall be |
---|
4029 | 4029 | | 2 developed with stakeholder input, including from equity |
---|
4030 | 4030 | | 3 eligible persons, equity eligible contractors, and |
---|
4031 | 4031 | | 4 community-based organizations that work with such persons |
---|
4032 | 4032 | | 5 and contractors. |
---|
4033 | 4033 | | 6 (c-15) Racial discrimination elimination powers and |
---|
4034 | 4034 | | 7 process. |
---|
4035 | 4035 | | 8 (1) Purpose. It is the purpose of this subsection to |
---|
4036 | 4036 | | 9 empower the Agency and other State actors to remedy racial |
---|
4037 | 4037 | | 10 discrimination in Illinois' clean energy economy as |
---|
4038 | 4038 | | 11 effectively and expediently as possible, including through |
---|
4039 | 4039 | | 12 the use of race-conscious remedies, such as race-conscious |
---|
4040 | 4040 | | 13 contracting and hiring goals, as consistent with State and |
---|
4041 | 4041 | | 14 federal law. |
---|
4042 | 4042 | | 15 (2) Racial disparity and discrimination review |
---|
4043 | 4043 | | 16 process. |
---|
4044 | 4044 | | 17 (A) Within one year after awarding contracts using |
---|
4045 | 4045 | | 18 the equity actions processes established in this |
---|
4046 | 4046 | | 19 Section, the Agency shall publish a report evaluating |
---|
4047 | 4047 | | 20 the effectiveness of the equity actions point criteria |
---|
4048 | 4048 | | 21 of this Section in increasing participation of equity |
---|
4049 | 4049 | | 22 eligible persons and equity eligible contractors. The |
---|
4050 | 4050 | | 23 report shall disaggregate participating workers and |
---|
4051 | 4051 | | 24 contractors by race and ethnicity. The report shall be |
---|
4052 | 4052 | | 25 forwarded to the Governor, the General Assembly, and |
---|
4053 | 4053 | | 26 the Illinois Commerce Commission and be made available |
---|
4054 | 4054 | | |
---|
4055 | 4055 | | |
---|
4056 | 4056 | | |
---|
4057 | 4057 | | |
---|
4058 | 4058 | | |
---|
4059 | 4059 | | HB3258 - 112 - LRB104 06526 AAS 16562 b |
---|
4060 | 4060 | | |
---|
4061 | 4061 | | |
---|
4062 | 4062 | | HB3258- 113 -LRB104 06526 AAS 16562 b HB3258 - 113 - LRB104 06526 AAS 16562 b |
---|
4063 | 4063 | | HB3258 - 113 - LRB104 06526 AAS 16562 b |
---|
4064 | 4064 | | 1 to the public. |
---|
4065 | 4065 | | 2 (B) As soon as is practicable thereafter, the |
---|
4066 | 4066 | | 3 Agency, in consultation with the Department of |
---|
4067 | 4067 | | 4 Commerce and Economic Opportunity, Department of |
---|
4068 | 4068 | | 5 Labor, and other agencies that may be relevant, shall |
---|
4069 | 4069 | | 6 commission and publish a disparity and availability |
---|
4070 | 4070 | | 7 study that measures the presence and impact of |
---|
4071 | 4071 | | 8 discrimination on minority businesses and workers in |
---|
4072 | 4072 | | 9 Illinois' clean energy economy. The Agency may hire |
---|
4073 | 4073 | | 10 consultants and experts to conduct the disparity and |
---|
4074 | 4074 | | 11 availability study, with the retention of those |
---|
4075 | 4075 | | 12 consultants and experts exempt from the requirements |
---|
4076 | 4076 | | 13 of Section 20-10 of the Illinois Procurement Code. The |
---|
4077 | 4077 | | 14 Illinois Power Agency shall forward a copy of its |
---|
4078 | 4078 | | 15 findings and recommendations to the Governor, the |
---|
4079 | 4079 | | 16 General Assembly, and the Illinois Commerce |
---|
4080 | 4080 | | 17 Commission. If the disparity and availability study |
---|
4081 | 4081 | | 18 establishes a strong basis in evidence that there is |
---|
4082 | 4082 | | 19 discrimination in Illinois' clean energy economy, the |
---|
4083 | 4083 | | 20 Agency, Department of Commerce and Economic |
---|
4084 | 4084 | | 21 Opportunity, Department of Labor, Department of |
---|
4085 | 4085 | | 22 Corrections, and other appropriate agencies shall take |
---|
4086 | 4086 | | 23 appropriate remedial actions, including race-conscious |
---|
4087 | 4087 | | 24 remedial actions as consistent with State and federal |
---|
4088 | 4088 | | 25 law, to effectively remedy this discrimination. Such |
---|
4089 | 4089 | | 26 remedies may include modification of the equity |
---|
4090 | 4090 | | |
---|
4091 | 4091 | | |
---|
4092 | 4092 | | |
---|
4093 | 4093 | | |
---|
4094 | 4094 | | |
---|
4095 | 4095 | | HB3258 - 113 - LRB104 06526 AAS 16562 b |
---|
4096 | 4096 | | |
---|
4097 | 4097 | | |
---|
4098 | 4098 | | HB3258- 114 -LRB104 06526 AAS 16562 b HB3258 - 114 - LRB104 06526 AAS 16562 b |
---|
4099 | 4099 | | HB3258 - 114 - LRB104 06526 AAS 16562 b |
---|
4100 | 4100 | | 1 accountability system as described in subsection |
---|
4101 | 4101 | | 2 (c-10). |
---|
4102 | 4102 | | 3 (c-20) Program data collection. |
---|
4103 | 4103 | | 4 (1) Purpose. Data collection, data analysis, and |
---|
4104 | 4104 | | 5 reporting are critical to ensure that the benefits of the |
---|
4105 | 4105 | | 6 clean energy economy provided to Illinois residents and |
---|
4106 | 4106 | | 7 businesses are equitably distributed across the State. The |
---|
4107 | 4107 | | 8 Agency shall collect data from program applicants in order |
---|
4108 | 4108 | | 9 to track and improve equitable distribution of benefits |
---|
4109 | 4109 | | 10 across Illinois communities for all procurements the |
---|
4110 | 4110 | | 11 Agency conducts. The Agency shall use this data to, among |
---|
4111 | 4111 | | 12 other things, measure any potential impact of racial |
---|
4112 | 4112 | | 13 discrimination on the distribution of benefits and provide |
---|
4113 | 4113 | | 14 information necessary to correct any discrimination |
---|
4114 | 4114 | | 15 through methods consistent with State and federal law. |
---|
4115 | 4115 | | 16 (2) Agency collection of program data. The Agency |
---|
4116 | 4116 | | 17 shall collect demographic and geographic data for each |
---|
4117 | 4117 | | 18 entity awarded contracts under any Agency-administered |
---|
4118 | 4118 | | 19 program. |
---|
4119 | 4119 | | 20 (3) Required information to be collected. The Agency |
---|
4120 | 4120 | | 21 shall collect the following information from applicants |
---|
4121 | 4121 | | 22 and program participants where applicable: |
---|
4122 | 4122 | | 23 (A) demographic information, including racial or |
---|
4123 | 4123 | | 24 ethnic identity for real persons employed, contracted, |
---|
4124 | 4124 | | 25 or subcontracted through the program and owners of |
---|
4125 | 4125 | | 26 businesses or entities that apply to receive renewable |
---|
4126 | 4126 | | |
---|
4127 | 4127 | | |
---|
4128 | 4128 | | |
---|
4129 | 4129 | | |
---|
4130 | 4130 | | |
---|
4131 | 4131 | | HB3258 - 114 - LRB104 06526 AAS 16562 b |
---|
4132 | 4132 | | |
---|
4133 | 4133 | | |
---|
4134 | 4134 | | HB3258- 115 -LRB104 06526 AAS 16562 b HB3258 - 115 - LRB104 06526 AAS 16562 b |
---|
4135 | 4135 | | HB3258 - 115 - LRB104 06526 AAS 16562 b |
---|
4136 | 4136 | | 1 energy credits from the Agency; |
---|
4137 | 4137 | | 2 (B) geographic location of the residency of real |
---|
4138 | 4138 | | 3 persons employed, contracted, or subcontracted through |
---|
4139 | 4139 | | 4 the program and geographic location of the |
---|
4140 | 4140 | | 5 headquarters of the business or entity that applies to |
---|
4141 | 4141 | | 6 receive renewable energy credits from the Agency; and |
---|
4142 | 4142 | | 7 (C) any other information the Agency determines is |
---|
4143 | 4143 | | 8 necessary for the purpose of achieving the purpose of |
---|
4144 | 4144 | | 9 this subsection. |
---|
4145 | 4145 | | 10 (4) Publication of collected information. The Agency |
---|
4146 | 4146 | | 11 shall publish, at least annually, information on the |
---|
4147 | 4147 | | 12 demographics of program participants on an aggregate |
---|
4148 | 4148 | | 13 basis. |
---|
4149 | 4149 | | 14 (5) Nothing in this subsection shall be interpreted to |
---|
4150 | 4150 | | 15 limit the authority of the Agency, or other agency or |
---|
4151 | 4151 | | 16 department of the State, to require or collect demographic |
---|
4152 | 4152 | | 17 information from applicants of other State programs. |
---|
4153 | 4153 | | 18 (c-25) Energy Workforce Equity Database. |
---|
4154 | 4154 | | 19 (1) The Agency, in consultation with the Department of |
---|
4155 | 4155 | | 20 Commerce and Economic Opportunity, shall create an Energy |
---|
4156 | 4156 | | 21 Workforce Equity Database, and may contract with a third |
---|
4157 | 4157 | | 22 party to do so ("database program administrator"). If the |
---|
4158 | 4158 | | 23 Department decides to contract with a third party, that |
---|
4159 | 4159 | | 24 third party shall be exempt from the requirements of |
---|
4160 | 4160 | | 25 Section 20-10 of the Illinois Procurement Code. The Energy |
---|
4161 | 4161 | | 26 Workforce Equity Database shall be a searchable database |
---|
4162 | 4162 | | |
---|
4163 | 4163 | | |
---|
4164 | 4164 | | |
---|
4165 | 4165 | | |
---|
4166 | 4166 | | |
---|
4167 | 4167 | | HB3258 - 115 - LRB104 06526 AAS 16562 b |
---|
4168 | 4168 | | |
---|
4169 | 4169 | | |
---|
4170 | 4170 | | HB3258- 116 -LRB104 06526 AAS 16562 b HB3258 - 116 - LRB104 06526 AAS 16562 b |
---|
4171 | 4171 | | HB3258 - 116 - LRB104 06526 AAS 16562 b |
---|
4172 | 4172 | | 1 of suppliers, vendors, and subcontractors for clean energy |
---|
4173 | 4173 | | 2 industries that is: |
---|
4174 | 4174 | | 3 (A) publicly accessible; |
---|
4175 | 4175 | | 4 (B) easy for people to find and use; |
---|
4176 | 4176 | | 5 (C) organized by company specialty or field; |
---|
4177 | 4177 | | 6 (D) region-specific; and |
---|
4178 | 4178 | | 7 (E) populated with information including, but not |
---|
4179 | 4179 | | 8 limited to, contacts for suppliers, vendors, or |
---|
4180 | 4180 | | 9 subcontractors who are minority and women-owned |
---|
4181 | 4181 | | 10 business enterprise certified or who participate or |
---|
4182 | 4182 | | 11 have participated in any of the programs described in |
---|
4183 | 4183 | | 12 this Act. |
---|
4184 | 4184 | | 13 (2) The Agency shall create an easily accessible, |
---|
4185 | 4185 | | 14 public facing online tool using the database information |
---|
4186 | 4186 | | 15 that includes, at a minimum, the following: |
---|
4187 | 4187 | | 16 (A) a map of environmental justice and equity |
---|
4188 | 4188 | | 17 investment eligible communities; |
---|
4189 | 4189 | | 18 (B) job postings and recruiting opportunities; |
---|
4190 | 4190 | | 19 (C) a means by which recruiting clean energy |
---|
4191 | 4191 | | 20 companies can find and interact with current or former |
---|
4192 | 4192 | | 21 participants of clean energy workforce training |
---|
4193 | 4193 | | 22 programs; |
---|
4194 | 4194 | | 23 (D) information on workforce training service |
---|
4195 | 4195 | | 24 providers and training opportunities available to |
---|
4196 | 4196 | | 25 prospective workers; |
---|
4197 | 4197 | | 26 (E) (blank); renewable energy company diversity |
---|
4198 | 4198 | | |
---|
4199 | 4199 | | |
---|
4200 | 4200 | | |
---|
4201 | 4201 | | |
---|
4202 | 4202 | | |
---|
4203 | 4203 | | HB3258 - 116 - LRB104 06526 AAS 16562 b |
---|
4204 | 4204 | | |
---|
4205 | 4205 | | |
---|
4206 | 4206 | | HB3258- 117 -LRB104 06526 AAS 16562 b HB3258 - 117 - LRB104 06526 AAS 16562 b |
---|
4207 | 4207 | | HB3258 - 117 - LRB104 06526 AAS 16562 b |
---|
4208 | 4208 | | 1 reporting; |
---|
4209 | 4209 | | 2 (F) a list of equity eligible contractors with |
---|
4210 | 4210 | | 3 their contact information, types of work performed, |
---|
4211 | 4211 | | 4 and locations worked in; |
---|
4212 | 4212 | | 5 (G) reporting on outcomes of the programs |
---|
4213 | 4213 | | 6 described in the workforce programs of the Energy |
---|
4214 | 4214 | | 7 Transition Act, including information such as, but not |
---|
4215 | 4215 | | 8 limited to, retention rate, graduation rate, and |
---|
4216 | 4216 | | 9 placement rates of trainees; and |
---|
4217 | 4217 | | 10 (H) information about the Jobs and Environmental |
---|
4218 | 4218 | | 11 Justice Grant Program, the Clean Energy Jobs and |
---|
4219 | 4219 | | 12 Justice Fund, and other sources of capital. |
---|
4220 | 4220 | | 13 (3) The Agency shall ensure the database is regularly |
---|
4221 | 4221 | | 14 updated to ensure information is current and shall |
---|
4222 | 4222 | | 15 coordinate with the Department of Commerce and Economic |
---|
4223 | 4223 | | 16 Opportunity to ensure that it includes information on |
---|
4224 | 4224 | | 17 individuals and entities that are or have participated in |
---|
4225 | 4225 | | 18 the Clean Jobs Workforce Network Program, Clean Energy |
---|
4226 | 4226 | | 19 Contractor Incubator Program, Returning Residents Clean |
---|
4227 | 4227 | | 20 Jobs Training Program, or Clean Energy Primes Contractor |
---|
4228 | 4228 | | 21 Accelerator Program. |
---|
4229 | 4229 | | 22 (c-30) Enforcement of minimum equity standards. All |
---|
4230 | 4230 | | 23 entities seeking renewable energy credits must submit an |
---|
4231 | 4231 | | 24 annual report to demonstrate compliance with each of the |
---|
4232 | 4232 | | 25 equity commitments required under subsection (c-10). If the |
---|
4233 | 4233 | | 26 Agency concludes the entity has not met or maintained its |
---|
4234 | 4234 | | |
---|
4235 | 4235 | | |
---|
4236 | 4236 | | |
---|
4237 | 4237 | | |
---|
4238 | 4238 | | |
---|
4239 | 4239 | | HB3258 - 117 - LRB104 06526 AAS 16562 b |
---|
4240 | 4240 | | |
---|
4241 | 4241 | | |
---|
4242 | 4242 | | HB3258- 118 -LRB104 06526 AAS 16562 b HB3258 - 118 - LRB104 06526 AAS 16562 b |
---|
4243 | 4243 | | HB3258 - 118 - LRB104 06526 AAS 16562 b |
---|
4244 | 4244 | | 1 minimum equity standards required under the applicable |
---|
4245 | 4245 | | 2 subparagraphs under subsection (c-10), the Agency shall deny |
---|
4246 | 4246 | | 3 the entity's ability to participate in procurement programs in |
---|
4247 | 4247 | | 4 subsection (c), including by withholding approved vendor or |
---|
4248 | 4248 | | 5 designee status. The Agency may require the entity to enter |
---|
4249 | 4249 | | 6 into a corrective action plan. An entity that is not |
---|
4250 | 4250 | | 7 recertified for failing to meet required equity actions in |
---|
4251 | 4251 | | 8 subparagraph (c-10) may reapply once they have a corrective |
---|
4252 | 4252 | | 9 action plan and achieve compliance with the minimum equity |
---|
4253 | 4253 | | 10 standards. |
---|
4254 | 4254 | | 11 (d) Clean coal portfolio standard. |
---|
4255 | 4255 | | 12 (1) The procurement plans shall include electricity |
---|
4256 | 4256 | | 13 generated using clean coal. Each utility shall enter into |
---|
4257 | 4257 | | 14 one or more sourcing agreements with the initial clean |
---|
4258 | 4258 | | 15 coal facility, as provided in paragraph (3) of this |
---|
4259 | 4259 | | 16 subsection (d), covering electricity generated by the |
---|
4260 | 4260 | | 17 initial clean coal facility representing at least 5% of |
---|
4261 | 4261 | | 18 each utility's total supply to serve the load of eligible |
---|
4262 | 4262 | | 19 retail customers in 2015 and each year thereafter, as |
---|
4263 | 4263 | | 20 described in paragraph (3) of this subsection (d), subject |
---|
4264 | 4264 | | 21 to the limits specified in paragraph (2) of this |
---|
4265 | 4265 | | 22 subsection (d). It is the goal of the State that by January |
---|
4266 | 4266 | | 23 1, 2025, 25% of the electricity used in the State shall be |
---|
4267 | 4267 | | 24 generated by cost-effective clean coal facilities. For |
---|
4268 | 4268 | | 25 purposes of this subsection (d), "cost-effective" means |
---|
4269 | 4269 | | 26 that the expenditures pursuant to such sourcing agreements |
---|
4270 | 4270 | | |
---|
4271 | 4271 | | |
---|
4272 | 4272 | | |
---|
4273 | 4273 | | |
---|
4274 | 4274 | | |
---|
4275 | 4275 | | HB3258 - 118 - LRB104 06526 AAS 16562 b |
---|
4276 | 4276 | | |
---|
4277 | 4277 | | |
---|
4278 | 4278 | | HB3258- 119 -LRB104 06526 AAS 16562 b HB3258 - 119 - LRB104 06526 AAS 16562 b |
---|
4279 | 4279 | | HB3258 - 119 - LRB104 06526 AAS 16562 b |
---|
4280 | 4280 | | 1 do not cause the limit stated in paragraph (2) of this |
---|
4281 | 4281 | | 2 subsection (d) to be exceeded and do not exceed cost-based |
---|
4282 | 4282 | | 3 benchmarks, which shall be developed to assess all |
---|
4283 | 4283 | | 4 expenditures pursuant to such sourcing agreements covering |
---|
4284 | 4284 | | 5 electricity generated by clean coal facilities, other than |
---|
4285 | 4285 | | 6 the initial clean coal facility, by the procurement |
---|
4286 | 4286 | | 7 administrator, in consultation with the Commission staff, |
---|
4287 | 4287 | | 8 Agency staff, and the procurement monitor and shall be |
---|
4288 | 4288 | | 9 subject to Commission review and approval. |
---|
4289 | 4289 | | 10 A utility party to a sourcing agreement shall |
---|
4290 | 4290 | | 11 immediately retire any emission credits that it receives |
---|
4291 | 4291 | | 12 in connection with the electricity covered by such |
---|
4292 | 4292 | | 13 agreement. |
---|
4293 | 4293 | | 14 Utilities shall maintain adequate records documenting |
---|
4294 | 4294 | | 15 the purchases under the sourcing agreement to comply with |
---|
4295 | 4295 | | 16 this subsection (d) and shall file an accounting with the |
---|
4296 | 4296 | | 17 load forecast that must be filed with the Agency by July 15 |
---|
4297 | 4297 | | 18 of each year, in accordance with subsection (d) of Section |
---|
4298 | 4298 | | 19 16-111.5 of the Public Utilities Act. |
---|
4299 | 4299 | | 20 A utility shall be deemed to have complied with the |
---|
4300 | 4300 | | 21 clean coal portfolio standard specified in this subsection |
---|
4301 | 4301 | | 22 (d) if the utility enters into a sourcing agreement as |
---|
4302 | 4302 | | 23 required by this subsection (d). |
---|
4303 | 4303 | | 24 (2) For purposes of this subsection (d), the required |
---|
4304 | 4304 | | 25 execution of sourcing agreements with the initial clean |
---|
4305 | 4305 | | 26 coal facility for a particular year shall be measured as a |
---|
4306 | 4306 | | |
---|
4307 | 4307 | | |
---|
4308 | 4308 | | |
---|
4309 | 4309 | | |
---|
4310 | 4310 | | |
---|
4311 | 4311 | | HB3258 - 119 - LRB104 06526 AAS 16562 b |
---|
4312 | 4312 | | |
---|
4313 | 4313 | | |
---|
4314 | 4314 | | HB3258- 120 -LRB104 06526 AAS 16562 b HB3258 - 120 - LRB104 06526 AAS 16562 b |
---|
4315 | 4315 | | HB3258 - 120 - LRB104 06526 AAS 16562 b |
---|
4316 | 4316 | | 1 percentage of the actual amount of electricity |
---|
4317 | 4317 | | 2 (megawatt-hours) supplied by the electric utility to |
---|
4318 | 4318 | | 3 eligible retail customers in the planning year ending |
---|
4319 | 4319 | | 4 immediately prior to the agreement's execution. For |
---|
4320 | 4320 | | 5 purposes of this subsection (d), the amount paid per |
---|
4321 | 4321 | | 6 kilowatthour means the total amount paid for electric |
---|
4322 | 4322 | | 7 service expressed on a per kilowatthour basis. For |
---|
4323 | 4323 | | 8 purposes of this subsection (d), the total amount paid for |
---|
4324 | 4324 | | 9 electric service includes without limitation amounts paid |
---|
4325 | 4325 | | 10 for supply, transmission, distribution, surcharges and |
---|
4326 | 4326 | | 11 add-on taxes. |
---|
4327 | 4327 | | 12 Notwithstanding the requirements of this subsection |
---|
4328 | 4328 | | 13 (d), the total amount paid under sourcing agreements with |
---|
4329 | 4329 | | 14 clean coal facilities pursuant to the procurement plan for |
---|
4330 | 4330 | | 15 any given year shall be reduced by an amount necessary to |
---|
4331 | 4331 | | 16 limit the annual estimated average net increase due to the |
---|
4332 | 4332 | | 17 costs of these resources included in the amounts paid by |
---|
4333 | 4333 | | 18 eligible retail customers in connection with electric |
---|
4334 | 4334 | | 19 service to: |
---|
4335 | 4335 | | 20 (A) in 2010, no more than 0.5% of the amount paid |
---|
4336 | 4336 | | 21 per kilowatthour by those customers during the year |
---|
4337 | 4337 | | 22 ending May 31, 2009; |
---|
4338 | 4338 | | 23 (B) in 2011, the greater of an additional 0.5% of |
---|
4339 | 4339 | | 24 the amount paid per kilowatthour by those customers |
---|
4340 | 4340 | | 25 during the year ending May 31, 2010 or 1% of the amount |
---|
4341 | 4341 | | 26 paid per kilowatthour by those customers during the |
---|
4342 | 4342 | | |
---|
4343 | 4343 | | |
---|
4344 | 4344 | | |
---|
4345 | 4345 | | |
---|
4346 | 4346 | | |
---|
4347 | 4347 | | HB3258 - 120 - LRB104 06526 AAS 16562 b |
---|
4348 | 4348 | | |
---|
4349 | 4349 | | |
---|
4350 | 4350 | | HB3258- 121 -LRB104 06526 AAS 16562 b HB3258 - 121 - LRB104 06526 AAS 16562 b |
---|
4351 | 4351 | | HB3258 - 121 - LRB104 06526 AAS 16562 b |
---|
4352 | 4352 | | 1 year ending May 31, 2009; |
---|
4353 | 4353 | | 2 (C) in 2012, the greater of an additional 0.5% of |
---|
4354 | 4354 | | 3 the amount paid per kilowatthour by those customers |
---|
4355 | 4355 | | 4 during the year ending May 31, 2011 or 1.5% of the |
---|
4356 | 4356 | | 5 amount paid per kilowatthour by those customers during |
---|
4357 | 4357 | | 6 the year ending May 31, 2009; |
---|
4358 | 4358 | | 7 (D) in 2013, the greater of an additional 0.5% of |
---|
4359 | 4359 | | 8 the amount paid per kilowatthour by those customers |
---|
4360 | 4360 | | 9 during the year ending May 31, 2012 or 2% of the amount |
---|
4361 | 4361 | | 10 paid per kilowatthour by those customers during the |
---|
4362 | 4362 | | 11 year ending May 31, 2009; and |
---|
4363 | 4363 | | 12 (E) thereafter, the total amount paid under |
---|
4364 | 4364 | | 13 sourcing agreements with clean coal facilities |
---|
4365 | 4365 | | 14 pursuant to the procurement plan for any single year |
---|
4366 | 4366 | | 15 shall be reduced by an amount necessary to limit the |
---|
4367 | 4367 | | 16 estimated average net increase due to the cost of |
---|
4368 | 4368 | | 17 these resources included in the amounts paid by |
---|
4369 | 4369 | | 18 eligible retail customers in connection with electric |
---|
4370 | 4370 | | 19 service to no more than the greater of (i) 2.015% of |
---|
4371 | 4371 | | 20 the amount paid per kilowatthour by those customers |
---|
4372 | 4372 | | 21 during the year ending May 31, 2009 or (ii) the |
---|
4373 | 4373 | | 22 incremental amount per kilowatthour paid for these |
---|
4374 | 4374 | | 23 resources in 2013. These requirements may be altered |
---|
4375 | 4375 | | 24 only as provided by statute. |
---|
4376 | 4376 | | 25 No later than June 30, 2015, the Commission shall |
---|
4377 | 4377 | | 26 review the limitation on the total amount paid under |
---|
4378 | 4378 | | |
---|
4379 | 4379 | | |
---|
4380 | 4380 | | |
---|
4381 | 4381 | | |
---|
4382 | 4382 | | |
---|
4383 | 4383 | | HB3258 - 121 - LRB104 06526 AAS 16562 b |
---|
4384 | 4384 | | |
---|
4385 | 4385 | | |
---|
4386 | 4386 | | HB3258- 122 -LRB104 06526 AAS 16562 b HB3258 - 122 - LRB104 06526 AAS 16562 b |
---|
4387 | 4387 | | HB3258 - 122 - LRB104 06526 AAS 16562 b |
---|
4388 | 4388 | | 1 sourcing agreements, if any, with clean coal facilities |
---|
4389 | 4389 | | 2 pursuant to this subsection (d) and report to the General |
---|
4390 | 4390 | | 3 Assembly its findings as to whether that limitation unduly |
---|
4391 | 4391 | | 4 constrains the amount of electricity generated by |
---|
4392 | 4392 | | 5 cost-effective clean coal facilities that is covered by |
---|
4393 | 4393 | | 6 sourcing agreements. |
---|
4394 | 4394 | | 7 (3) Initial clean coal facility. In order to promote |
---|
4395 | 4395 | | 8 development of clean coal facilities in Illinois, each |
---|
4396 | 4396 | | 9 electric utility subject to this Section shall execute a |
---|
4397 | 4397 | | 10 sourcing agreement to source electricity from a proposed |
---|
4398 | 4398 | | 11 clean coal facility in Illinois (the "initial clean coal |
---|
4399 | 4399 | | 12 facility") that will have a nameplate capacity of at least |
---|
4400 | 4400 | | 13 500 MW when commercial operation commences, that has a |
---|
4401 | 4401 | | 14 final Clean Air Act permit on June 1, 2009 (the effective |
---|
4402 | 4402 | | 15 date of Public Act 95-1027), and that will meet the |
---|
4403 | 4403 | | 16 definition of clean coal facility in Section 1-10 of this |
---|
4404 | 4404 | | 17 Act when commercial operation commences. The sourcing |
---|
4405 | 4405 | | 18 agreements with this initial clean coal facility shall be |
---|
4406 | 4406 | | 19 subject to both approval of the initial clean coal |
---|
4407 | 4407 | | 20 facility by the General Assembly and satisfaction of the |
---|
4408 | 4408 | | 21 requirements of paragraph (4) of this subsection (d) and |
---|
4409 | 4409 | | 22 shall be executed within 90 days after any such approval |
---|
4410 | 4410 | | 23 by the General Assembly. The Agency and the Commission |
---|
4411 | 4411 | | 24 shall have authority to inspect all books and records |
---|
4412 | 4412 | | 25 associated with the initial clean coal facility during the |
---|
4413 | 4413 | | 26 term of such a sourcing agreement. A utility's sourcing |
---|
4414 | 4414 | | |
---|
4415 | 4415 | | |
---|
4416 | 4416 | | |
---|
4417 | 4417 | | |
---|
4418 | 4418 | | |
---|
4419 | 4419 | | HB3258 - 122 - LRB104 06526 AAS 16562 b |
---|
4420 | 4420 | | |
---|
4421 | 4421 | | |
---|
4422 | 4422 | | HB3258- 123 -LRB104 06526 AAS 16562 b HB3258 - 123 - LRB104 06526 AAS 16562 b |
---|
4423 | 4423 | | HB3258 - 123 - LRB104 06526 AAS 16562 b |
---|
4424 | 4424 | | 1 agreement for electricity produced by the initial clean |
---|
4425 | 4425 | | 2 coal facility shall include: |
---|
4426 | 4426 | | 3 (A) a formula contractual price (the "contract |
---|
4427 | 4427 | | 4 price") approved pursuant to paragraph (4) of this |
---|
4428 | 4428 | | 5 subsection (d), which shall: |
---|
4429 | 4429 | | 6 (i) be determined using a cost of service |
---|
4430 | 4430 | | 7 methodology employing either a level or deferred |
---|
4431 | 4431 | | 8 capital recovery component, based on a capital |
---|
4432 | 4432 | | 9 structure consisting of 45% equity and 55% debt, |
---|
4433 | 4433 | | 10 and a return on equity as may be approved by the |
---|
4434 | 4434 | | 11 Federal Energy Regulatory Commission, which in any |
---|
4435 | 4435 | | 12 case may not exceed the lower of 11.5% or the rate |
---|
4436 | 4436 | | 13 of return approved by the General Assembly |
---|
4437 | 4437 | | 14 pursuant to paragraph (4) of this subsection (d); |
---|
4438 | 4438 | | 15 and |
---|
4439 | 4439 | | 16 (ii) provide that all miscellaneous net |
---|
4440 | 4440 | | 17 revenue, including but not limited to net revenue |
---|
4441 | 4441 | | 18 from the sale of emission allowances, if any, |
---|
4442 | 4442 | | 19 substitute natural gas, if any, grants or other |
---|
4443 | 4443 | | 20 support provided by the State of Illinois or the |
---|
4444 | 4444 | | 21 United States Government, firm transmission |
---|
4445 | 4445 | | 22 rights, if any, by-products produced by the |
---|
4446 | 4446 | | 23 facility, energy or capacity derived from the |
---|
4447 | 4447 | | 24 facility and not covered by a sourcing agreement |
---|
4448 | 4448 | | 25 pursuant to paragraph (3) of this subsection (d) |
---|
4449 | 4449 | | 26 or item (5) of subsection (d) of Section 16-115 of |
---|
4450 | 4450 | | |
---|
4451 | 4451 | | |
---|
4452 | 4452 | | |
---|
4453 | 4453 | | |
---|
4454 | 4454 | | |
---|
4455 | 4455 | | HB3258 - 123 - LRB104 06526 AAS 16562 b |
---|
4456 | 4456 | | |
---|
4457 | 4457 | | |
---|
4458 | 4458 | | HB3258- 124 -LRB104 06526 AAS 16562 b HB3258 - 124 - LRB104 06526 AAS 16562 b |
---|
4459 | 4459 | | HB3258 - 124 - LRB104 06526 AAS 16562 b |
---|
4460 | 4460 | | 1 the Public Utilities Act, whether generated from |
---|
4461 | 4461 | | 2 the synthesis gas derived from coal, from SNG, or |
---|
4462 | 4462 | | 3 from natural gas, shall be credited against the |
---|
4463 | 4463 | | 4 revenue requirement for this initial clean coal |
---|
4464 | 4464 | | 5 facility; |
---|
4465 | 4465 | | 6 (B) power purchase provisions, which shall: |
---|
4466 | 4466 | | 7 (i) provide that the utility party to such |
---|
4467 | 4467 | | 8 sourcing agreement shall pay the contract price |
---|
4468 | 4468 | | 9 for electricity delivered under such sourcing |
---|
4469 | 4469 | | 10 agreement; |
---|
4470 | 4470 | | 11 (ii) require delivery of electricity to the |
---|
4471 | 4471 | | 12 regional transmission organization market of the |
---|
4472 | 4472 | | 13 utility that is party to such sourcing agreement; |
---|
4473 | 4473 | | 14 (iii) require the utility party to such |
---|
4474 | 4474 | | 15 sourcing agreement to buy from the initial clean |
---|
4475 | 4475 | | 16 coal facility in each hour an amount of energy |
---|
4476 | 4476 | | 17 equal to all clean coal energy made available from |
---|
4477 | 4477 | | 18 the initial clean coal facility during such hour |
---|
4478 | 4478 | | 19 times a fraction, the numerator of which is such |
---|
4479 | 4479 | | 20 utility's retail market sales of electricity |
---|
4480 | 4480 | | 21 (expressed in kilowatthours sold) in the State |
---|
4481 | 4481 | | 22 during the prior calendar month and the |
---|
4482 | 4482 | | 23 denominator of which is the total retail market |
---|
4483 | 4483 | | 24 sales of electricity (expressed in kilowatthours |
---|
4484 | 4484 | | 25 sold) in the State by utilities during such prior |
---|
4485 | 4485 | | 26 month and the sales of electricity (expressed in |
---|
4486 | 4486 | | |
---|
4487 | 4487 | | |
---|
4488 | 4488 | | |
---|
4489 | 4489 | | |
---|
4490 | 4490 | | |
---|
4491 | 4491 | | HB3258 - 124 - LRB104 06526 AAS 16562 b |
---|
4492 | 4492 | | |
---|
4493 | 4493 | | |
---|
4494 | 4494 | | HB3258- 125 -LRB104 06526 AAS 16562 b HB3258 - 125 - LRB104 06526 AAS 16562 b |
---|
4495 | 4495 | | HB3258 - 125 - LRB104 06526 AAS 16562 b |
---|
4496 | 4496 | | 1 kilowatthours sold) in the State by alternative |
---|
4497 | 4497 | | 2 retail electric suppliers during such prior month |
---|
4498 | 4498 | | 3 that are subject to the requirements of this |
---|
4499 | 4499 | | 4 subsection (d) and paragraph (5) of subsection (d) |
---|
4500 | 4500 | | 5 of Section 16-115 of the Public Utilities Act, |
---|
4501 | 4501 | | 6 provided that the amount purchased by the utility |
---|
4502 | 4502 | | 7 in any year will be limited by paragraph (2) of |
---|
4503 | 4503 | | 8 this subsection (d); and |
---|
4504 | 4504 | | 9 (iv) be considered pre-existing contracts in |
---|
4505 | 4505 | | 10 such utility's procurement plans for eligible |
---|
4506 | 4506 | | 11 retail customers; |
---|
4507 | 4507 | | 12 (C) contract for differences provisions, which |
---|
4508 | 4508 | | 13 shall: |
---|
4509 | 4509 | | 14 (i) require the utility party to such sourcing |
---|
4510 | 4510 | | 15 agreement to contract with the initial clean coal |
---|
4511 | 4511 | | 16 facility in each hour with respect to an amount of |
---|
4512 | 4512 | | 17 energy equal to all clean coal energy made |
---|
4513 | 4513 | | 18 available from the initial clean coal facility |
---|
4514 | 4514 | | 19 during such hour times a fraction, the numerator |
---|
4515 | 4515 | | 20 of which is such utility's retail market sales of |
---|
4516 | 4516 | | 21 electricity (expressed in kilowatthours sold) in |
---|
4517 | 4517 | | 22 the utility's service territory in the State |
---|
4518 | 4518 | | 23 during the prior calendar month and the |
---|
4519 | 4519 | | 24 denominator of which is the total retail market |
---|
4520 | 4520 | | 25 sales of electricity (expressed in kilowatthours |
---|
4521 | 4521 | | 26 sold) in the State by utilities during such prior |
---|
4522 | 4522 | | |
---|
4523 | 4523 | | |
---|
4524 | 4524 | | |
---|
4525 | 4525 | | |
---|
4526 | 4526 | | |
---|
4527 | 4527 | | HB3258 - 125 - LRB104 06526 AAS 16562 b |
---|
4528 | 4528 | | |
---|
4529 | 4529 | | |
---|
4530 | 4530 | | HB3258- 126 -LRB104 06526 AAS 16562 b HB3258 - 126 - LRB104 06526 AAS 16562 b |
---|
4531 | 4531 | | HB3258 - 126 - LRB104 06526 AAS 16562 b |
---|
4532 | 4532 | | 1 month and the sales of electricity (expressed in |
---|
4533 | 4533 | | 2 kilowatthours sold) in the State by alternative |
---|
4534 | 4534 | | 3 retail electric suppliers during such prior month |
---|
4535 | 4535 | | 4 that are subject to the requirements of this |
---|
4536 | 4536 | | 5 subsection (d) and paragraph (5) of subsection (d) |
---|
4537 | 4537 | | 6 of Section 16-115 of the Public Utilities Act, |
---|
4538 | 4538 | | 7 provided that the amount paid by the utility in |
---|
4539 | 4539 | | 8 any year will be limited by paragraph (2) of this |
---|
4540 | 4540 | | 9 subsection (d); |
---|
4541 | 4541 | | 10 (ii) provide that the utility's payment |
---|
4542 | 4542 | | 11 obligation in respect of the quantity of |
---|
4543 | 4543 | | 12 electricity determined pursuant to the preceding |
---|
4544 | 4544 | | 13 clause (i) shall be limited to an amount equal to |
---|
4545 | 4545 | | 14 (1) the difference between the contract price |
---|
4546 | 4546 | | 15 determined pursuant to subparagraph (A) of |
---|
4547 | 4547 | | 16 paragraph (3) of this subsection (d) and the |
---|
4548 | 4548 | | 17 day-ahead price for electricity delivered to the |
---|
4549 | 4549 | | 18 regional transmission organization market of the |
---|
4550 | 4550 | | 19 utility that is party to such sourcing agreement |
---|
4551 | 4551 | | 20 (or any successor delivery point at which such |
---|
4552 | 4552 | | 21 utility's supply obligations are financially |
---|
4553 | 4553 | | 22 settled on an hourly basis) (the "reference |
---|
4554 | 4554 | | 23 price") on the day preceding the day on which the |
---|
4555 | 4555 | | 24 electricity is delivered to the initial clean coal |
---|
4556 | 4556 | | 25 facility busbar, multiplied by (2) the quantity of |
---|
4557 | 4557 | | 26 electricity determined pursuant to the preceding |
---|
4558 | 4558 | | |
---|
4559 | 4559 | | |
---|
4560 | 4560 | | |
---|
4561 | 4561 | | |
---|
4562 | 4562 | | |
---|
4563 | 4563 | | HB3258 - 126 - LRB104 06526 AAS 16562 b |
---|
4564 | 4564 | | |
---|
4565 | 4565 | | |
---|
4566 | 4566 | | HB3258- 127 -LRB104 06526 AAS 16562 b HB3258 - 127 - LRB104 06526 AAS 16562 b |
---|
4567 | 4567 | | HB3258 - 127 - LRB104 06526 AAS 16562 b |
---|
4568 | 4568 | | 1 clause (i); and |
---|
4569 | 4569 | | 2 (iii) not require the utility to take physical |
---|
4570 | 4570 | | 3 delivery of the electricity produced by the |
---|
4571 | 4571 | | 4 facility; |
---|
4572 | 4572 | | 5 (D) general provisions, which shall: |
---|
4573 | 4573 | | 6 (i) specify a term of no more than 30 years, |
---|
4574 | 4574 | | 7 commencing on the commercial operation date of the |
---|
4575 | 4575 | | 8 facility; |
---|
4576 | 4576 | | 9 (ii) provide that utilities shall maintain |
---|
4577 | 4577 | | 10 adequate records documenting purchases under the |
---|
4578 | 4578 | | 11 sourcing agreements entered into to comply with |
---|
4579 | 4579 | | 12 this subsection (d) and shall file an accounting |
---|
4580 | 4580 | | 13 with the load forecast that must be filed with the |
---|
4581 | 4581 | | 14 Agency by July 15 of each year, in accordance with |
---|
4582 | 4582 | | 15 subsection (d) of Section 16-111.5 of the Public |
---|
4583 | 4583 | | 16 Utilities Act; |
---|
4584 | 4584 | | 17 (iii) provide that all costs associated with |
---|
4585 | 4585 | | 18 the initial clean coal facility will be |
---|
4586 | 4586 | | 19 periodically reported to the Federal Energy |
---|
4587 | 4587 | | 20 Regulatory Commission and to purchasers in |
---|
4588 | 4588 | | 21 accordance with applicable laws governing |
---|
4589 | 4589 | | 22 cost-based wholesale power contracts; |
---|
4590 | 4590 | | 23 (iv) permit the Illinois Power Agency to |
---|
4591 | 4591 | | 24 assume ownership of the initial clean coal |
---|
4592 | 4592 | | 25 facility, without monetary consideration and |
---|
4593 | 4593 | | 26 otherwise on reasonable terms acceptable to the |
---|
4594 | 4594 | | |
---|
4595 | 4595 | | |
---|
4596 | 4596 | | |
---|
4597 | 4597 | | |
---|
4598 | 4598 | | |
---|
4599 | 4599 | | HB3258 - 127 - LRB104 06526 AAS 16562 b |
---|
4600 | 4600 | | |
---|
4601 | 4601 | | |
---|
4602 | 4602 | | HB3258- 128 -LRB104 06526 AAS 16562 b HB3258 - 128 - LRB104 06526 AAS 16562 b |
---|
4603 | 4603 | | HB3258 - 128 - LRB104 06526 AAS 16562 b |
---|
4604 | 4604 | | 1 Agency, if the Agency so requests no less than 3 |
---|
4605 | 4605 | | 2 years prior to the end of the stated contract |
---|
4606 | 4606 | | 3 term; |
---|
4607 | 4607 | | 4 (v) require the owner of the initial clean |
---|
4608 | 4608 | | 5 coal facility to provide documentation to the |
---|
4609 | 4609 | | 6 Commission each year, starting in the facility's |
---|
4610 | 4610 | | 7 first year of commercial operation, accurately |
---|
4611 | 4611 | | 8 reporting the quantity of carbon emissions from |
---|
4612 | 4612 | | 9 the facility that have been captured and |
---|
4613 | 4613 | | 10 sequestered and report any quantities of carbon |
---|
4614 | 4614 | | 11 released from the site or sites at which carbon |
---|
4615 | 4615 | | 12 emissions were sequestered in prior years, based |
---|
4616 | 4616 | | 13 on continuous monitoring of such sites. If, in any |
---|
4617 | 4617 | | 14 year after the first year of commercial operation, |
---|
4618 | 4618 | | 15 the owner of the facility fails to demonstrate |
---|
4619 | 4619 | | 16 that the initial clean coal facility captured and |
---|
4620 | 4620 | | 17 sequestered at least 50% of the total carbon |
---|
4621 | 4621 | | 18 emissions that the facility would otherwise emit |
---|
4622 | 4622 | | 19 or that sequestration of emissions from prior |
---|
4623 | 4623 | | 20 years has failed, resulting in the release of |
---|
4624 | 4624 | | 21 carbon dioxide into the atmosphere, the owner of |
---|
4625 | 4625 | | 22 the facility must offset excess emissions. Any |
---|
4626 | 4626 | | 23 such carbon offsets must be permanent, additional, |
---|
4627 | 4627 | | 24 verifiable, real, located within the State of |
---|
4628 | 4628 | | 25 Illinois, and legally and practicably enforceable. |
---|
4629 | 4629 | | 26 The cost of such offsets for the facility that are |
---|
4630 | 4630 | | |
---|
4631 | 4631 | | |
---|
4632 | 4632 | | |
---|
4633 | 4633 | | |
---|
4634 | 4634 | | |
---|
4635 | 4635 | | HB3258 - 128 - LRB104 06526 AAS 16562 b |
---|
4636 | 4636 | | |
---|
4637 | 4637 | | |
---|
4638 | 4638 | | HB3258- 129 -LRB104 06526 AAS 16562 b HB3258 - 129 - LRB104 06526 AAS 16562 b |
---|
4639 | 4639 | | HB3258 - 129 - LRB104 06526 AAS 16562 b |
---|
4640 | 4640 | | 1 not recoverable shall not exceed $15 million in |
---|
4641 | 4641 | | 2 any given year. No costs of any such purchases of |
---|
4642 | 4642 | | 3 carbon offsets may be recovered from a utility or |
---|
4643 | 4643 | | 4 its customers. All carbon offsets purchased for |
---|
4644 | 4644 | | 5 this purpose and any carbon emission credits |
---|
4645 | 4645 | | 6 associated with sequestration of carbon from the |
---|
4646 | 4646 | | 7 facility must be permanently retired. The initial |
---|
4647 | 4647 | | 8 clean coal facility shall not forfeit its |
---|
4648 | 4648 | | 9 designation as a clean coal facility if the |
---|
4649 | 4649 | | 10 facility fails to fully comply with the applicable |
---|
4650 | 4650 | | 11 carbon sequestration requirements in any given |
---|
4651 | 4651 | | 12 year, provided the requisite offsets are |
---|
4652 | 4652 | | 13 purchased. However, the Attorney General, on |
---|
4653 | 4653 | | 14 behalf of the People of the State of Illinois, may |
---|
4654 | 4654 | | 15 specifically enforce the facility's sequestration |
---|
4655 | 4655 | | 16 requirement and the other terms of this contract |
---|
4656 | 4656 | | 17 provision. Compliance with the sequestration |
---|
4657 | 4657 | | 18 requirements and offset purchase requirements |
---|
4658 | 4658 | | 19 specified in paragraph (3) of this subsection (d) |
---|
4659 | 4659 | | 20 shall be reviewed annually by an independent |
---|
4660 | 4660 | | 21 expert retained by the owner of the initial clean |
---|
4661 | 4661 | | 22 coal facility, with the advance written approval |
---|
4662 | 4662 | | 23 of the Attorney General. The Commission may, in |
---|
4663 | 4663 | | 24 the course of the review specified in item (vii), |
---|
4664 | 4664 | | 25 reduce the allowable return on equity for the |
---|
4665 | 4665 | | 26 facility if the facility willfully fails to comply |
---|
4666 | 4666 | | |
---|
4667 | 4667 | | |
---|
4668 | 4668 | | |
---|
4669 | 4669 | | |
---|
4670 | 4670 | | |
---|
4671 | 4671 | | HB3258 - 129 - LRB104 06526 AAS 16562 b |
---|
4672 | 4672 | | |
---|
4673 | 4673 | | |
---|
4674 | 4674 | | HB3258- 130 -LRB104 06526 AAS 16562 b HB3258 - 130 - LRB104 06526 AAS 16562 b |
---|
4675 | 4675 | | HB3258 - 130 - LRB104 06526 AAS 16562 b |
---|
4676 | 4676 | | 1 with the carbon capture and sequestration |
---|
4677 | 4677 | | 2 requirements set forth in this item (v); |
---|
4678 | 4678 | | 3 (vi) include limits on, and accordingly |
---|
4679 | 4679 | | 4 provide for modification of, the amount the |
---|
4680 | 4680 | | 5 utility is required to source under the sourcing |
---|
4681 | 4681 | | 6 agreement consistent with paragraph (2) of this |
---|
4682 | 4682 | | 7 subsection (d); |
---|
4683 | 4683 | | 8 (vii) require Commission review: (1) to |
---|
4684 | 4684 | | 9 determine the justness, reasonableness, and |
---|
4685 | 4685 | | 10 prudence of the inputs to the formula referenced |
---|
4686 | 4686 | | 11 in subparagraphs (A)(i) through (A)(iii) of |
---|
4687 | 4687 | | 12 paragraph (3) of this subsection (d), prior to an |
---|
4688 | 4688 | | 13 adjustment in those inputs including, without |
---|
4689 | 4689 | | 14 limitation, the capital structure and return on |
---|
4690 | 4690 | | 15 equity, fuel costs, and other operations and |
---|
4691 | 4691 | | 16 maintenance costs and (2) to approve the costs to |
---|
4692 | 4692 | | 17 be passed through to customers under the sourcing |
---|
4693 | 4693 | | 18 agreement by which the utility satisfies its |
---|
4694 | 4694 | | 19 statutory obligations. Commission review shall |
---|
4695 | 4695 | | 20 occur no less than every 3 years, regardless of |
---|
4696 | 4696 | | 21 whether any adjustments have been proposed, and |
---|
4697 | 4697 | | 22 shall be completed within 9 months; |
---|
4698 | 4698 | | 23 (viii) limit the utility's obligation to such |
---|
4699 | 4699 | | 24 amount as the utility is allowed to recover |
---|
4700 | 4700 | | 25 through tariffs filed with the Commission, |
---|
4701 | 4701 | | 26 provided that neither the clean coal facility nor |
---|
4702 | 4702 | | |
---|
4703 | 4703 | | |
---|
4704 | 4704 | | |
---|
4705 | 4705 | | |
---|
4706 | 4706 | | |
---|
4707 | 4707 | | HB3258 - 130 - LRB104 06526 AAS 16562 b |
---|
4708 | 4708 | | |
---|
4709 | 4709 | | |
---|
4710 | 4710 | | HB3258- 131 -LRB104 06526 AAS 16562 b HB3258 - 131 - LRB104 06526 AAS 16562 b |
---|
4711 | 4711 | | HB3258 - 131 - LRB104 06526 AAS 16562 b |
---|
4712 | 4712 | | 1 the utility waives any right to assert federal |
---|
4713 | 4713 | | 2 pre-emption or any other argument in response to a |
---|
4714 | 4714 | | 3 purported disallowance of recovery costs; |
---|
4715 | 4715 | | 4 (ix) limit the utility's or alternative retail |
---|
4716 | 4716 | | 5 electric supplier's obligation to incur any |
---|
4717 | 4717 | | 6 liability until such time as the facility is in |
---|
4718 | 4718 | | 7 commercial operation and generating power and |
---|
4719 | 4719 | | 8 energy and such power and energy is being |
---|
4720 | 4720 | | 9 delivered to the facility busbar; |
---|
4721 | 4721 | | 10 (x) provide that the owner or owners of the |
---|
4722 | 4722 | | 11 initial clean coal facility, which is the |
---|
4723 | 4723 | | 12 counterparty to such sourcing agreement, shall |
---|
4724 | 4724 | | 13 have the right from time to time to elect whether |
---|
4725 | 4725 | | 14 the obligations of the utility party thereto shall |
---|
4726 | 4726 | | 15 be governed by the power purchase provisions or |
---|
4727 | 4727 | | 16 the contract for differences provisions; |
---|
4728 | 4728 | | 17 (xi) append documentation showing that the |
---|
4729 | 4729 | | 18 formula rate and contract, insofar as they relate |
---|
4730 | 4730 | | 19 to the power purchase provisions, have been |
---|
4731 | 4731 | | 20 approved by the Federal Energy Regulatory |
---|
4732 | 4732 | | 21 Commission pursuant to Section 205 of the Federal |
---|
4733 | 4733 | | 22 Power Act; |
---|
4734 | 4734 | | 23 (xii) provide that any changes to the terms of |
---|
4735 | 4735 | | 24 the contract, insofar as such changes relate to |
---|
4736 | 4736 | | 25 the power purchase provisions, are subject to |
---|
4737 | 4737 | | 26 review under the public interest standard applied |
---|
4738 | 4738 | | |
---|
4739 | 4739 | | |
---|
4740 | 4740 | | |
---|
4741 | 4741 | | |
---|
4742 | 4742 | | |
---|
4743 | 4743 | | HB3258 - 131 - LRB104 06526 AAS 16562 b |
---|
4744 | 4744 | | |
---|
4745 | 4745 | | |
---|
4746 | 4746 | | HB3258- 132 -LRB104 06526 AAS 16562 b HB3258 - 132 - LRB104 06526 AAS 16562 b |
---|
4747 | 4747 | | HB3258 - 132 - LRB104 06526 AAS 16562 b |
---|
4748 | 4748 | | 1 by the Federal Energy Regulatory Commission |
---|
4749 | 4749 | | 2 pursuant to Sections 205 and 206 of the Federal |
---|
4750 | 4750 | | 3 Power Act; and |
---|
4751 | 4751 | | 4 (xiii) conform with customary lender |
---|
4752 | 4752 | | 5 requirements in power purchase agreements used as |
---|
4753 | 4753 | | 6 the basis for financing non-utility generators. |
---|
4754 | 4754 | | 7 (4) Effective date of sourcing agreements with the |
---|
4755 | 4755 | | 8 initial clean coal facility. Any proposed sourcing |
---|
4756 | 4756 | | 9 agreement with the initial clean coal facility shall not |
---|
4757 | 4757 | | 10 become effective unless the following reports are prepared |
---|
4758 | 4758 | | 11 and submitted and authorizations and approvals obtained: |
---|
4759 | 4759 | | 12 (i) Facility cost report. The owner of the initial |
---|
4760 | 4760 | | 13 clean coal facility shall submit to the Commission, |
---|
4761 | 4761 | | 14 the Agency, and the General Assembly a front-end |
---|
4762 | 4762 | | 15 engineering and design study, a facility cost report, |
---|
4763 | 4763 | | 16 method of financing (including but not limited to |
---|
4764 | 4764 | | 17 structure and associated costs), and an operating and |
---|
4765 | 4765 | | 18 maintenance cost quote for the facility (collectively |
---|
4766 | 4766 | | 19 "facility cost report"), which shall be prepared in |
---|
4767 | 4767 | | 20 accordance with the requirements of this paragraph (4) |
---|
4768 | 4768 | | 21 of subsection (d) of this Section, and shall provide |
---|
4769 | 4769 | | 22 the Commission and the Agency access to the work |
---|
4770 | 4770 | | 23 papers, relied upon documents, and any other backup |
---|
4771 | 4771 | | 24 documentation related to the facility cost report. |
---|
4772 | 4772 | | 25 (ii) Commission report. Within 6 months following |
---|
4773 | 4773 | | 26 receipt of the facility cost report, the Commission, |
---|
4774 | 4774 | | |
---|
4775 | 4775 | | |
---|
4776 | 4776 | | |
---|
4777 | 4777 | | |
---|
4778 | 4778 | | |
---|
4779 | 4779 | | HB3258 - 132 - LRB104 06526 AAS 16562 b |
---|
4780 | 4780 | | |
---|
4781 | 4781 | | |
---|
4782 | 4782 | | HB3258- 133 -LRB104 06526 AAS 16562 b HB3258 - 133 - LRB104 06526 AAS 16562 b |
---|
4783 | 4783 | | HB3258 - 133 - LRB104 06526 AAS 16562 b |
---|
4784 | 4784 | | 1 in consultation with the Agency, shall submit a report |
---|
4785 | 4785 | | 2 to the General Assembly setting forth its analysis of |
---|
4786 | 4786 | | 3 the facility cost report. Such report shall include, |
---|
4787 | 4787 | | 4 but not be limited to, a comparison of the costs |
---|
4788 | 4788 | | 5 associated with electricity generated by the initial |
---|
4789 | 4789 | | 6 clean coal facility to the costs associated with |
---|
4790 | 4790 | | 7 electricity generated by other types of generation |
---|
4791 | 4791 | | 8 facilities, an analysis of the rate impacts on |
---|
4792 | 4792 | | 9 residential and small business customers over the life |
---|
4793 | 4793 | | 10 of the sourcing agreements, and an analysis of the |
---|
4794 | 4794 | | 11 likelihood that the initial clean coal facility will |
---|
4795 | 4795 | | 12 commence commercial operation by and be delivering |
---|
4796 | 4796 | | 13 power to the facility's busbar by 2016. To assist in |
---|
4797 | 4797 | | 14 the preparation of its report, the Commission, in |
---|
4798 | 4798 | | 15 consultation with the Agency, may hire one or more |
---|
4799 | 4799 | | 16 experts or consultants, the costs of which shall be |
---|
4800 | 4800 | | 17 paid for by the owner of the initial clean coal |
---|
4801 | 4801 | | 18 facility. The Commission and Agency may begin the |
---|
4802 | 4802 | | 19 process of selecting such experts or consultants prior |
---|
4803 | 4803 | | 20 to receipt of the facility cost report. |
---|
4804 | 4804 | | 21 (iii) General Assembly approval. The proposed |
---|
4805 | 4805 | | 22 sourcing agreements shall not take effect unless, |
---|
4806 | 4806 | | 23 based on the facility cost report and the Commission's |
---|
4807 | 4807 | | 24 report, the General Assembly enacts authorizing |
---|
4808 | 4808 | | 25 legislation approving (A) the projected price, stated |
---|
4809 | 4809 | | 26 in cents per kilowatthour, to be charged for |
---|
4810 | 4810 | | |
---|
4811 | 4811 | | |
---|
4812 | 4812 | | |
---|
4813 | 4813 | | |
---|
4814 | 4814 | | |
---|
4815 | 4815 | | HB3258 - 133 - LRB104 06526 AAS 16562 b |
---|
4816 | 4816 | | |
---|
4817 | 4817 | | |
---|
4818 | 4818 | | HB3258- 134 -LRB104 06526 AAS 16562 b HB3258 - 134 - LRB104 06526 AAS 16562 b |
---|
4819 | 4819 | | HB3258 - 134 - LRB104 06526 AAS 16562 b |
---|
4820 | 4820 | | 1 electricity generated by the initial clean coal |
---|
4821 | 4821 | | 2 facility, (B) the projected impact on residential and |
---|
4822 | 4822 | | 3 small business customers' bills over the life of the |
---|
4823 | 4823 | | 4 sourcing agreements, and (C) the maximum allowable |
---|
4824 | 4824 | | 5 return on equity for the project; and |
---|
4825 | 4825 | | 6 (iv) Commission review. If the General Assembly |
---|
4826 | 4826 | | 7 enacts authorizing legislation pursuant to |
---|
4827 | 4827 | | 8 subparagraph (iii) approving a sourcing agreement, the |
---|
4828 | 4828 | | 9 Commission shall, within 90 days of such enactment, |
---|
4829 | 4829 | | 10 complete a review of such sourcing agreement. During |
---|
4830 | 4830 | | 11 such time period, the Commission shall implement any |
---|
4831 | 4831 | | 12 directive of the General Assembly, resolve any |
---|
4832 | 4832 | | 13 disputes between the parties to the sourcing agreement |
---|
4833 | 4833 | | 14 concerning the terms of such agreement, approve the |
---|
4834 | 4834 | | 15 form of such agreement, and issue an order finding |
---|
4835 | 4835 | | 16 that the sourcing agreement is prudent and reasonable. |
---|
4836 | 4836 | | 17 The facility cost report shall be prepared as follows: |
---|
4837 | 4837 | | 18 (A) The facility cost report shall be prepared by |
---|
4838 | 4838 | | 19 duly licensed engineering and construction firms |
---|
4839 | 4839 | | 20 detailing the estimated capital costs payable to one |
---|
4840 | 4840 | | 21 or more contractors or suppliers for the engineering, |
---|
4841 | 4841 | | 22 procurement and construction of the components |
---|
4842 | 4842 | | 23 comprising the initial clean coal facility and the |
---|
4843 | 4843 | | 24 estimated costs of operation and maintenance of the |
---|
4844 | 4844 | | 25 facility. The facility cost report shall include: |
---|
4845 | 4845 | | 26 (i) an estimate of the capital cost of the |
---|
4846 | 4846 | | |
---|
4847 | 4847 | | |
---|
4848 | 4848 | | |
---|
4849 | 4849 | | |
---|
4850 | 4850 | | |
---|
4851 | 4851 | | HB3258 - 134 - LRB104 06526 AAS 16562 b |
---|
4852 | 4852 | | |
---|
4853 | 4853 | | |
---|
4854 | 4854 | | HB3258- 135 -LRB104 06526 AAS 16562 b HB3258 - 135 - LRB104 06526 AAS 16562 b |
---|
4855 | 4855 | | HB3258 - 135 - LRB104 06526 AAS 16562 b |
---|
4856 | 4856 | | 1 core plant based on one or more front end |
---|
4857 | 4857 | | 2 engineering and design studies for the |
---|
4858 | 4858 | | 3 gasification island and related facilities. The |
---|
4859 | 4859 | | 4 core plant shall include all civil, structural, |
---|
4860 | 4860 | | 5 mechanical, electrical, control, and safety |
---|
4861 | 4861 | | 6 systems. |
---|
4862 | 4862 | | 7 (ii) an estimate of the capital cost of the |
---|
4863 | 4863 | | 8 balance of the plant, including any capital costs |
---|
4864 | 4864 | | 9 associated with sequestration of carbon dioxide |
---|
4865 | 4865 | | 10 emissions and all interconnects and interfaces |
---|
4866 | 4866 | | 11 required to operate the facility, such as |
---|
4867 | 4867 | | 12 transmission of electricity, construction or |
---|
4868 | 4868 | | 13 backfeed power supply, pipelines to transport |
---|
4869 | 4869 | | 14 substitute natural gas or carbon dioxide, potable |
---|
4870 | 4870 | | 15 water supply, natural gas supply, water supply, |
---|
4871 | 4871 | | 16 water discharge, landfill, access roads, and coal |
---|
4872 | 4872 | | 17 delivery. |
---|
4873 | 4873 | | 18 The quoted construction costs shall be expressed |
---|
4874 | 4874 | | 19 in nominal dollars as of the date that the quote is |
---|
4875 | 4875 | | 20 prepared and shall include capitalized financing costs |
---|
4876 | 4876 | | 21 during construction, taxes, insurance, and other |
---|
4877 | 4877 | | 22 owner's costs, and an assumed escalation in materials |
---|
4878 | 4878 | | 23 and labor beyond the date as of which the construction |
---|
4879 | 4879 | | 24 cost quote is expressed. |
---|
4880 | 4880 | | 25 (B) The front end engineering and design study for |
---|
4881 | 4881 | | 26 the gasification island and the cost study for the |
---|
4882 | 4882 | | |
---|
4883 | 4883 | | |
---|
4884 | 4884 | | |
---|
4885 | 4885 | | |
---|
4886 | 4886 | | |
---|
4887 | 4887 | | HB3258 - 135 - LRB104 06526 AAS 16562 b |
---|
4888 | 4888 | | |
---|
4889 | 4889 | | |
---|
4890 | 4890 | | HB3258- 136 -LRB104 06526 AAS 16562 b HB3258 - 136 - LRB104 06526 AAS 16562 b |
---|
4891 | 4891 | | HB3258 - 136 - LRB104 06526 AAS 16562 b |
---|
4892 | 4892 | | 1 balance of plant shall include sufficient design work |
---|
4893 | 4893 | | 2 to permit quantification of major categories of |
---|
4894 | 4894 | | 3 materials, commodities and labor hours, and receipt of |
---|
4895 | 4895 | | 4 quotes from vendors of major equipment required to |
---|
4896 | 4896 | | 5 construct and operate the clean coal facility. |
---|
4897 | 4897 | | 6 (C) The facility cost report shall also include an |
---|
4898 | 4898 | | 7 operating and maintenance cost quote that will provide |
---|
4899 | 4899 | | 8 the estimated cost of delivered fuel, personnel, |
---|
4900 | 4900 | | 9 maintenance contracts, chemicals, catalysts, |
---|
4901 | 4901 | | 10 consumables, spares, and other fixed and variable |
---|
4902 | 4902 | | 11 operations and maintenance costs. The delivered fuel |
---|
4903 | 4903 | | 12 cost estimate will be provided by a recognized third |
---|
4904 | 4904 | | 13 party expert or experts in the fuel and transportation |
---|
4905 | 4905 | | 14 industries. The balance of the operating and |
---|
4906 | 4906 | | 15 maintenance cost quote, excluding delivered fuel |
---|
4907 | 4907 | | 16 costs, will be developed based on the inputs provided |
---|
4908 | 4908 | | 17 by duly licensed engineering and construction firms |
---|
4909 | 4909 | | 18 performing the construction cost quote, potential |
---|
4910 | 4910 | | 19 vendors under long-term service agreements and plant |
---|
4911 | 4911 | | 20 operating agreements, or recognized third party plant |
---|
4912 | 4912 | | 21 operator or operators. |
---|
4913 | 4913 | | 22 The operating and maintenance cost quote |
---|
4914 | 4914 | | 23 (including the cost of the front end engineering and |
---|
4915 | 4915 | | 24 design study) shall be expressed in nominal dollars as |
---|
4916 | 4916 | | 25 of the date that the quote is prepared and shall |
---|
4917 | 4917 | | 26 include taxes, insurance, and other owner's costs, and |
---|
4918 | 4918 | | |
---|
4919 | 4919 | | |
---|
4920 | 4920 | | |
---|
4921 | 4921 | | |
---|
4922 | 4922 | | |
---|
4923 | 4923 | | HB3258 - 136 - LRB104 06526 AAS 16562 b |
---|
4924 | 4924 | | |
---|
4925 | 4925 | | |
---|
4926 | 4926 | | HB3258- 137 -LRB104 06526 AAS 16562 b HB3258 - 137 - LRB104 06526 AAS 16562 b |
---|
4927 | 4927 | | HB3258 - 137 - LRB104 06526 AAS 16562 b |
---|
4928 | 4928 | | 1 an assumed escalation in materials and labor beyond |
---|
4929 | 4929 | | 2 the date as of which the operating and maintenance |
---|
4930 | 4930 | | 3 cost quote is expressed. |
---|
4931 | 4931 | | 4 (D) The facility cost report shall also include an |
---|
4932 | 4932 | | 5 analysis of the initial clean coal facility's ability |
---|
4933 | 4933 | | 6 to deliver power and energy into the applicable |
---|
4934 | 4934 | | 7 regional transmission organization markets and an |
---|
4935 | 4935 | | 8 analysis of the expected capacity factor for the |
---|
4936 | 4936 | | 9 initial clean coal facility. |
---|
4937 | 4937 | | 10 (E) Amounts paid to third parties unrelated to the |
---|
4938 | 4938 | | 11 owner or owners of the initial clean coal facility to |
---|
4939 | 4939 | | 12 prepare the core plant construction cost quote, |
---|
4940 | 4940 | | 13 including the front end engineering and design study, |
---|
4941 | 4941 | | 14 and the operating and maintenance cost quote will be |
---|
4942 | 4942 | | 15 reimbursed through Coal Development Bonds. |
---|
4943 | 4943 | | 16 (5) Re-powering and retrofitting coal-fired power |
---|
4944 | 4944 | | 17 plants previously owned by Illinois utilities to qualify |
---|
4945 | 4945 | | 18 as clean coal facilities. During the 2009 procurement |
---|
4946 | 4946 | | 19 planning process and thereafter, the Agency and the |
---|
4947 | 4947 | | 20 Commission shall consider sourcing agreements covering |
---|
4948 | 4948 | | 21 electricity generated by power plants that were previously |
---|
4949 | 4949 | | 22 owned by Illinois utilities and that have been or will be |
---|
4950 | 4950 | | 23 converted into clean coal facilities, as defined by |
---|
4951 | 4951 | | 24 Section 1-10 of this Act. Pursuant to such procurement |
---|
4952 | 4952 | | 25 planning process, the owners of such facilities may |
---|
4953 | 4953 | | 26 propose to the Agency sourcing agreements with utilities |
---|
4954 | 4954 | | |
---|
4955 | 4955 | | |
---|
4956 | 4956 | | |
---|
4957 | 4957 | | |
---|
4958 | 4958 | | |
---|
4959 | 4959 | | HB3258 - 137 - LRB104 06526 AAS 16562 b |
---|
4960 | 4960 | | |
---|
4961 | 4961 | | |
---|
4962 | 4962 | | HB3258- 138 -LRB104 06526 AAS 16562 b HB3258 - 138 - LRB104 06526 AAS 16562 b |
---|
4963 | 4963 | | HB3258 - 138 - LRB104 06526 AAS 16562 b |
---|
4964 | 4964 | | 1 and alternative retail electric suppliers required to |
---|
4965 | 4965 | | 2 comply with subsection (d) of this Section and item (5) of |
---|
4966 | 4966 | | 3 subsection (d) of Section 16-115 of the Public Utilities |
---|
4967 | 4967 | | 4 Act, covering electricity generated by such facilities. In |
---|
4968 | 4968 | | 5 the case of sourcing agreements that are power purchase |
---|
4969 | 4969 | | 6 agreements, the contract price for electricity sales shall |
---|
4970 | 4970 | | 7 be established on a cost of service basis. In the case of |
---|
4971 | 4971 | | 8 sourcing agreements that are contracts for differences, |
---|
4972 | 4972 | | 9 the contract price from which the reference price is |
---|
4973 | 4973 | | 10 subtracted shall be established on a cost of service |
---|
4974 | 4974 | | 11 basis. The Agency and the Commission may approve any such |
---|
4975 | 4975 | | 12 utility sourcing agreements that do not exceed cost-based |
---|
4976 | 4976 | | 13 benchmarks developed by the procurement administrator, in |
---|
4977 | 4977 | | 14 consultation with the Commission staff, Agency staff and |
---|
4978 | 4978 | | 15 the procurement monitor, subject to Commission review and |
---|
4979 | 4979 | | 16 approval. The Commission shall have authority to inspect |
---|
4980 | 4980 | | 17 all books and records associated with these clean coal |
---|
4981 | 4981 | | 18 facilities during the term of any such contract. |
---|
4982 | 4982 | | 19 (6) Costs incurred under this subsection (d) or |
---|
4983 | 4983 | | 20 pursuant to a contract entered into under this subsection |
---|
4984 | 4984 | | 21 (d) shall be deemed prudently incurred and reasonable in |
---|
4985 | 4985 | | 22 amount and the electric utility shall be entitled to full |
---|
4986 | 4986 | | 23 cost recovery pursuant to the tariffs filed with the |
---|
4987 | 4987 | | 24 Commission. |
---|
4988 | 4988 | | 25 (d-5) Zero emission standard. |
---|
4989 | 4989 | | 26 (1) Beginning with the delivery year commencing on |
---|
4990 | 4990 | | |
---|
4991 | 4991 | | |
---|
4992 | 4992 | | |
---|
4993 | 4993 | | |
---|
4994 | 4994 | | |
---|
4995 | 4995 | | HB3258 - 138 - LRB104 06526 AAS 16562 b |
---|
4996 | 4996 | | |
---|
4997 | 4997 | | |
---|
4998 | 4998 | | HB3258- 139 -LRB104 06526 AAS 16562 b HB3258 - 139 - LRB104 06526 AAS 16562 b |
---|
4999 | 4999 | | HB3258 - 139 - LRB104 06526 AAS 16562 b |
---|
5000 | 5000 | | 1 June 1, 2017, the Agency shall, for electric utilities |
---|
5001 | 5001 | | 2 that serve at least 100,000 retail customers in this |
---|
5002 | 5002 | | 3 State, procure contracts with zero emission facilities |
---|
5003 | 5003 | | 4 that are reasonably capable of generating cost-effective |
---|
5004 | 5004 | | 5 zero emission credits in an amount approximately equal to |
---|
5005 | 5005 | | 6 16% of the actual amount of electricity delivered by each |
---|
5006 | 5006 | | 7 electric utility to retail customers in the State during |
---|
5007 | 5007 | | 8 calendar year 2014. For an electric utility serving fewer |
---|
5008 | 5008 | | 9 than 100,000 retail customers in this State that |
---|
5009 | 5009 | | 10 requested, under Section 16-111.5 of the Public Utilities |
---|
5010 | 5010 | | 11 Act, that the Agency procure power and energy for all or a |
---|
5011 | 5011 | | 12 portion of the utility's Illinois load for the delivery |
---|
5012 | 5012 | | 13 year commencing June 1, 2016, the Agency shall procure |
---|
5013 | 5013 | | 14 contracts with zero emission facilities that are |
---|
5014 | 5014 | | 15 reasonably capable of generating cost-effective zero |
---|
5015 | 5015 | | 16 emission credits in an amount approximately equal to 16% |
---|
5016 | 5016 | | 17 of the portion of power and energy to be procured by the |
---|
5017 | 5017 | | 18 Agency for the utility. The duration of the contracts |
---|
5018 | 5018 | | 19 procured under this subsection (d-5) shall be for a term |
---|
5019 | 5019 | | 20 of 10 years ending May 31, 2027. The quantity of zero |
---|
5020 | 5020 | | 21 emission credits to be procured under the contracts shall |
---|
5021 | 5021 | | 22 be all of the zero emission credits generated by the zero |
---|
5022 | 5022 | | 23 emission facility in each delivery year; however, if the |
---|
5023 | 5023 | | 24 zero emission facility is owned by more than one entity, |
---|
5024 | 5024 | | 25 then the quantity of zero emission credits to be procured |
---|
5025 | 5025 | | 26 under the contracts shall be the amount of zero emission |
---|
5026 | 5026 | | |
---|
5027 | 5027 | | |
---|
5028 | 5028 | | |
---|
5029 | 5029 | | |
---|
5030 | 5030 | | |
---|
5031 | 5031 | | HB3258 - 139 - LRB104 06526 AAS 16562 b |
---|
5032 | 5032 | | |
---|
5033 | 5033 | | |
---|
5034 | 5034 | | HB3258- 140 -LRB104 06526 AAS 16562 b HB3258 - 140 - LRB104 06526 AAS 16562 b |
---|
5035 | 5035 | | HB3258 - 140 - LRB104 06526 AAS 16562 b |
---|
5036 | 5036 | | 1 credits that are generated from the portion of the zero |
---|
5037 | 5037 | | 2 emission facility that is owned by the winning supplier. |
---|
5038 | 5038 | | 3 The 16% value identified in this paragraph (1) is the |
---|
5039 | 5039 | | 4 average of the percentage targets in subparagraph (B) of |
---|
5040 | 5040 | | 5 paragraph (1) of subsection (c) of this Section for the 5 |
---|
5041 | 5041 | | 6 delivery years beginning June 1, 2017. |
---|
5042 | 5042 | | 7 The procurement process shall be subject to the |
---|
5043 | 5043 | | 8 following provisions: |
---|
5044 | 5044 | | 9 (A) Those zero emission facilities that intend to |
---|
5045 | 5045 | | 10 participate in the procurement shall submit to the |
---|
5046 | 5046 | | 11 Agency the following eligibility information for each |
---|
5047 | 5047 | | 12 zero emission facility on or before the date |
---|
5048 | 5048 | | 13 established by the Agency: |
---|
5049 | 5049 | | 14 (i) the in-service date and remaining useful |
---|
5050 | 5050 | | 15 life of the zero emission facility; |
---|
5051 | 5051 | | 16 (ii) the amount of power generated annually |
---|
5052 | 5052 | | 17 for each of the years 2005 through 2015, and the |
---|
5053 | 5053 | | 18 projected zero emission credits to be generated |
---|
5054 | 5054 | | 19 over the remaining useful life of the zero |
---|
5055 | 5055 | | 20 emission facility, which shall be used to |
---|
5056 | 5056 | | 21 determine the capability of each facility; |
---|
5057 | 5057 | | 22 (iii) the annual zero emission facility cost |
---|
5058 | 5058 | | 23 projections, expressed on a per megawatthour |
---|
5059 | 5059 | | 24 basis, over the next 6 delivery years, which shall |
---|
5060 | 5060 | | 25 include the following: operation and maintenance |
---|
5061 | 5061 | | 26 expenses; fully allocated overhead costs, which |
---|
5062 | 5062 | | |
---|
5063 | 5063 | | |
---|
5064 | 5064 | | |
---|
5065 | 5065 | | |
---|
5066 | 5066 | | |
---|
5067 | 5067 | | HB3258 - 140 - LRB104 06526 AAS 16562 b |
---|
5068 | 5068 | | |
---|
5069 | 5069 | | |
---|
5070 | 5070 | | HB3258- 141 -LRB104 06526 AAS 16562 b HB3258 - 141 - LRB104 06526 AAS 16562 b |
---|
5071 | 5071 | | HB3258 - 141 - LRB104 06526 AAS 16562 b |
---|
5072 | 5072 | | 1 shall be allocated using the methodology developed |
---|
5073 | 5073 | | 2 by the Institute for Nuclear Power Operations; |
---|
5074 | 5074 | | 3 fuel expenditures; non-fuel capital expenditures; |
---|
5075 | 5075 | | 4 spent fuel expenditures; a return on working |
---|
5076 | 5076 | | 5 capital; the cost of operational and market risks |
---|
5077 | 5077 | | 6 that could be avoided by ceasing operation; and |
---|
5078 | 5078 | | 7 any other costs necessary for continued |
---|
5079 | 5079 | | 8 operations, provided that "necessary" means, for |
---|
5080 | 5080 | | 9 purposes of this item (iii), that the costs could |
---|
5081 | 5081 | | 10 reasonably be avoided only by ceasing operations |
---|
5082 | 5082 | | 11 of the zero emission facility; and |
---|
5083 | 5083 | | 12 (iv) a commitment to continue operating, for |
---|
5084 | 5084 | | 13 the duration of the contract or contracts executed |
---|
5085 | 5085 | | 14 under the procurement held under this subsection |
---|
5086 | 5086 | | 15 (d-5), the zero emission facility that produces |
---|
5087 | 5087 | | 16 the zero emission credits to be procured in the |
---|
5088 | 5088 | | 17 procurement. |
---|
5089 | 5089 | | 18 The information described in item (iii) of this |
---|
5090 | 5090 | | 19 subparagraph (A) may be submitted on a confidential |
---|
5091 | 5091 | | 20 basis and shall be treated and maintained by the |
---|
5092 | 5092 | | 21 Agency, the procurement administrator, and the |
---|
5093 | 5093 | | 22 Commission as confidential and proprietary and exempt |
---|
5094 | 5094 | | 23 from disclosure under subparagraphs (a) and (g) of |
---|
5095 | 5095 | | 24 paragraph (1) of Section 7 of the Freedom of |
---|
5096 | 5096 | | 25 Information Act. The Office of Attorney General shall |
---|
5097 | 5097 | | 26 have access to, and maintain the confidentiality of, |
---|
5098 | 5098 | | |
---|
5099 | 5099 | | |
---|
5100 | 5100 | | |
---|
5101 | 5101 | | |
---|
5102 | 5102 | | |
---|
5103 | 5103 | | HB3258 - 141 - LRB104 06526 AAS 16562 b |
---|
5104 | 5104 | | |
---|
5105 | 5105 | | |
---|
5106 | 5106 | | HB3258- 142 -LRB104 06526 AAS 16562 b HB3258 - 142 - LRB104 06526 AAS 16562 b |
---|
5107 | 5107 | | HB3258 - 142 - LRB104 06526 AAS 16562 b |
---|
5108 | 5108 | | 1 such information pursuant to Section 6.5 of the |
---|
5109 | 5109 | | 2 Attorney General Act. |
---|
5110 | 5110 | | 3 (B) The price for each zero emission credit |
---|
5111 | 5111 | | 4 procured under this subsection (d-5) for each delivery |
---|
5112 | 5112 | | 5 year shall be in an amount that equals the Social Cost |
---|
5113 | 5113 | | 6 of Carbon, expressed on a price per megawatthour |
---|
5114 | 5114 | | 7 basis. However, to ensure that the procurement remains |
---|
5115 | 5115 | | 8 affordable to retail customers in this State if |
---|
5116 | 5116 | | 9 electricity prices increase, the price in an |
---|
5117 | 5117 | | 10 applicable delivery year shall be reduced below the |
---|
5118 | 5118 | | 11 Social Cost of Carbon by the amount ("Price |
---|
5119 | 5119 | | 12 Adjustment") by which the market price index for the |
---|
5120 | 5120 | | 13 applicable delivery year exceeds the baseline market |
---|
5121 | 5121 | | 14 price index for the consecutive 12-month period ending |
---|
5122 | 5122 | | 15 May 31, 2016. If the Price Adjustment is greater than |
---|
5123 | 5123 | | 16 or equal to the Social Cost of Carbon in an applicable |
---|
5124 | 5124 | | 17 delivery year, then no payments shall be due in that |
---|
5125 | 5125 | | 18 delivery year. The components of this calculation are |
---|
5126 | 5126 | | 19 defined as follows: |
---|
5127 | 5127 | | 20 (i) Social Cost of Carbon: The Social Cost of |
---|
5128 | 5128 | | 21 Carbon is $16.50 per megawatthour, which is based |
---|
5129 | 5129 | | 22 on the U.S. Interagency Working Group on Social |
---|
5130 | 5130 | | 23 Cost of Carbon's price in the August 2016 |
---|
5131 | 5131 | | 24 Technical Update using a 3% discount rate, |
---|
5132 | 5132 | | 25 adjusted for inflation for each year of the |
---|
5133 | 5133 | | 26 program. Beginning with the delivery year |
---|
5134 | 5134 | | |
---|
5135 | 5135 | | |
---|
5136 | 5136 | | |
---|
5137 | 5137 | | |
---|
5138 | 5138 | | |
---|
5139 | 5139 | | HB3258 - 142 - LRB104 06526 AAS 16562 b |
---|
5140 | 5140 | | |
---|
5141 | 5141 | | |
---|
5142 | 5142 | | HB3258- 143 -LRB104 06526 AAS 16562 b HB3258 - 143 - LRB104 06526 AAS 16562 b |
---|
5143 | 5143 | | HB3258 - 143 - LRB104 06526 AAS 16562 b |
---|
5144 | 5144 | | 1 commencing June 1, 2023, the price per |
---|
5145 | 5145 | | 2 megawatthour shall increase by $1 per |
---|
5146 | 5146 | | 3 megawatthour, and continue to increase by an |
---|
5147 | 5147 | | 4 additional $1 per megawatthour each delivery year |
---|
5148 | 5148 | | 5 thereafter. |
---|
5149 | 5149 | | 6 (ii) Baseline market price index: The baseline |
---|
5150 | 5150 | | 7 market price index for the consecutive 12-month |
---|
5151 | 5151 | | 8 period ending May 31, 2016 is $31.40 per |
---|
5152 | 5152 | | 9 megawatthour, which is based on the sum of (aa) |
---|
5153 | 5153 | | 10 the average day-ahead energy price across all |
---|
5154 | 5154 | | 11 hours of such 12-month period at the PJM |
---|
5155 | 5155 | | 12 Interconnection LLC Northern Illinois Hub, (bb) |
---|
5156 | 5156 | | 13 50% multiplied by the Base Residual Auction, or |
---|
5157 | 5157 | | 14 its successor, capacity price for the rest of the |
---|
5158 | 5158 | | 15 RTO zone group determined by PJM Interconnection |
---|
5159 | 5159 | | 16 LLC, divided by 24 hours per day, and (cc) 50% |
---|
5160 | 5160 | | 17 multiplied by the Planning Resource Auction, or |
---|
5161 | 5161 | | 18 its successor, capacity price for Zone 4 |
---|
5162 | 5162 | | 19 determined by the Midcontinent Independent System |
---|
5163 | 5163 | | 20 Operator, Inc., divided by 24 hours per day. |
---|
5164 | 5164 | | 21 (iii) Market price index: The market price |
---|
5165 | 5165 | | 22 index for a delivery year shall be the sum of |
---|
5166 | 5166 | | 23 projected energy prices and projected capacity |
---|
5167 | 5167 | | 24 prices determined as follows: |
---|
5168 | 5168 | | 25 (aa) Projected energy prices: the |
---|
5169 | 5169 | | 26 projected energy prices for the applicable |
---|
5170 | 5170 | | |
---|
5171 | 5171 | | |
---|
5172 | 5172 | | |
---|
5173 | 5173 | | |
---|
5174 | 5174 | | |
---|
5175 | 5175 | | HB3258 - 143 - LRB104 06526 AAS 16562 b |
---|
5176 | 5176 | | |
---|
5177 | 5177 | | |
---|
5178 | 5178 | | HB3258- 144 -LRB104 06526 AAS 16562 b HB3258 - 144 - LRB104 06526 AAS 16562 b |
---|
5179 | 5179 | | HB3258 - 144 - LRB104 06526 AAS 16562 b |
---|
5180 | 5180 | | 1 delivery year shall be calculated once for the |
---|
5181 | 5181 | | 2 year using the forward market price for the |
---|
5182 | 5182 | | 3 PJM Interconnection, LLC Northern Illinois |
---|
5183 | 5183 | | 4 Hub. The forward market price shall be |
---|
5184 | 5184 | | 5 calculated as follows: the energy forward |
---|
5185 | 5185 | | 6 prices for each month of the applicable |
---|
5186 | 5186 | | 7 delivery year averaged for each trade date |
---|
5187 | 5187 | | 8 during the calendar year immediately preceding |
---|
5188 | 5188 | | 9 that delivery year to produce a single energy |
---|
5189 | 5189 | | 10 forward price for the delivery year. The |
---|
5190 | 5190 | | 11 forward market price calculation shall use |
---|
5191 | 5191 | | 12 data published by the Intercontinental |
---|
5192 | 5192 | | 13 Exchange, or its successor. |
---|
5193 | 5193 | | 14 (bb) Projected capacity prices: |
---|
5194 | 5194 | | 15 (I) For the delivery years commencing |
---|
5195 | 5195 | | 16 June 1, 2017, June 1, 2018, and June 1, |
---|
5196 | 5196 | | 17 2019, the projected capacity price shall |
---|
5197 | 5197 | | 18 be equal to the sum of (1) 50% multiplied |
---|
5198 | 5198 | | 19 by the Base Residual Auction, or its |
---|
5199 | 5199 | | 20 successor, price for the rest of the RTO |
---|
5200 | 5200 | | 21 zone group as determined by PJM |
---|
5201 | 5201 | | 22 Interconnection LLC, divided by 24 hours |
---|
5202 | 5202 | | 23 per day and, (2) 50% multiplied by the |
---|
5203 | 5203 | | 24 resource auction price determined in the |
---|
5204 | 5204 | | 25 resource auction administered by the |
---|
5205 | 5205 | | 26 Midcontinent Independent System Operator, |
---|
5206 | 5206 | | |
---|
5207 | 5207 | | |
---|
5208 | 5208 | | |
---|
5209 | 5209 | | |
---|
5210 | 5210 | | |
---|
5211 | 5211 | | HB3258 - 144 - LRB104 06526 AAS 16562 b |
---|
5212 | 5212 | | |
---|
5213 | 5213 | | |
---|
5214 | 5214 | | HB3258- 145 -LRB104 06526 AAS 16562 b HB3258 - 145 - LRB104 06526 AAS 16562 b |
---|
5215 | 5215 | | HB3258 - 145 - LRB104 06526 AAS 16562 b |
---|
5216 | 5216 | | 1 Inc., in which the largest percentage of |
---|
5217 | 5217 | | 2 load cleared for Local Resource Zone 4, |
---|
5218 | 5218 | | 3 divided by 24 hours per day, and where |
---|
5219 | 5219 | | 4 such price is determined by the |
---|
5220 | 5220 | | 5 Midcontinent Independent System Operator, |
---|
5221 | 5221 | | 6 Inc. |
---|
5222 | 5222 | | 7 (II) For the delivery year commencing |
---|
5223 | 5223 | | 8 June 1, 2020, and each year thereafter, |
---|
5224 | 5224 | | 9 the projected capacity price shall be |
---|
5225 | 5225 | | 10 equal to the sum of (1) 50% multiplied by |
---|
5226 | 5226 | | 11 the Base Residual Auction, or its |
---|
5227 | 5227 | | 12 successor, price for the ComEd zone as |
---|
5228 | 5228 | | 13 determined by PJM Interconnection LLC, |
---|
5229 | 5229 | | 14 divided by 24 hours per day, and (2) 50% |
---|
5230 | 5230 | | 15 multiplied by the resource auction price |
---|
5231 | 5231 | | 16 determined in the resource auction |
---|
5232 | 5232 | | 17 administered by the Midcontinent |
---|
5233 | 5233 | | 18 Independent System Operator, Inc., in |
---|
5234 | 5234 | | 19 which the largest percentage of load |
---|
5235 | 5235 | | 20 cleared for Local Resource Zone 4, divided |
---|
5236 | 5236 | | 21 by 24 hours per day, and where such price |
---|
5237 | 5237 | | 22 is determined by the Midcontinent |
---|
5238 | 5238 | | 23 Independent System Operator, Inc. |
---|
5239 | 5239 | | 24 For purposes of this subsection (d-5): |
---|
5240 | 5240 | | 25 "Rest of the RTO" and "ComEd Zone" shall have |
---|
5241 | 5241 | | 26 the meaning ascribed to them by PJM |
---|
5242 | 5242 | | |
---|
5243 | 5243 | | |
---|
5244 | 5244 | | |
---|
5245 | 5245 | | |
---|
5246 | 5246 | | |
---|
5247 | 5247 | | HB3258 - 145 - LRB104 06526 AAS 16562 b |
---|
5248 | 5248 | | |
---|
5249 | 5249 | | |
---|
5250 | 5250 | | HB3258- 146 -LRB104 06526 AAS 16562 b HB3258 - 146 - LRB104 06526 AAS 16562 b |
---|
5251 | 5251 | | HB3258 - 146 - LRB104 06526 AAS 16562 b |
---|
5252 | 5252 | | 1 Interconnection, LLC. |
---|
5253 | 5253 | | 2 "RTO" means regional transmission |
---|
5254 | 5254 | | 3 organization. |
---|
5255 | 5255 | | 4 (C) No later than 45 days after June 1, 2017 (the |
---|
5256 | 5256 | | 5 effective date of Public Act 99-906), the Agency shall |
---|
5257 | 5257 | | 6 publish its proposed zero emission standard |
---|
5258 | 5258 | | 7 procurement plan. The plan shall be consistent with |
---|
5259 | 5259 | | 8 the provisions of this paragraph (1) and shall provide |
---|
5260 | 5260 | | 9 that winning bids shall be selected based on public |
---|
5261 | 5261 | | 10 interest criteria that include, but are not limited |
---|
5262 | 5262 | | 11 to, minimizing carbon dioxide emissions that result |
---|
5263 | 5263 | | 12 from electricity consumed in Illinois and minimizing |
---|
5264 | 5264 | | 13 sulfur dioxide, nitrogen oxide, and particulate matter |
---|
5265 | 5265 | | 14 emissions that adversely affect the citizens of this |
---|
5266 | 5266 | | 15 State. In particular, the selection of winning bids |
---|
5267 | 5267 | | 16 shall take into account the incremental environmental |
---|
5268 | 5268 | | 17 benefits resulting from the procurement, such as any |
---|
5269 | 5269 | | 18 existing environmental benefits that are preserved by |
---|
5270 | 5270 | | 19 the procurements held under Public Act 99-906 and |
---|
5271 | 5271 | | 20 would cease to exist if the procurements were not |
---|
5272 | 5272 | | 21 held, including the preservation of zero emission |
---|
5273 | 5273 | | 22 facilities. The plan shall also describe in detail how |
---|
5274 | 5274 | | 23 each public interest factor shall be considered and |
---|
5275 | 5275 | | 24 weighted in the bid selection process to ensure that |
---|
5276 | 5276 | | 25 the public interest criteria are applied to the |
---|
5277 | 5277 | | 26 procurement and given full effect. |
---|
5278 | 5278 | | |
---|
5279 | 5279 | | |
---|
5280 | 5280 | | |
---|
5281 | 5281 | | |
---|
5282 | 5282 | | |
---|
5283 | 5283 | | HB3258 - 146 - LRB104 06526 AAS 16562 b |
---|
5284 | 5284 | | |
---|
5285 | 5285 | | |
---|
5286 | 5286 | | HB3258- 147 -LRB104 06526 AAS 16562 b HB3258 - 147 - LRB104 06526 AAS 16562 b |
---|
5287 | 5287 | | HB3258 - 147 - LRB104 06526 AAS 16562 b |
---|
5288 | 5288 | | 1 For purposes of developing the plan, the Agency |
---|
5289 | 5289 | | 2 shall consider any reports issued by a State agency, |
---|
5290 | 5290 | | 3 board, or commission under House Resolution 1146 of |
---|
5291 | 5291 | | 4 the 98th General Assembly and paragraph (4) of |
---|
5292 | 5292 | | 5 subsection (d) of this Section, as well as publicly |
---|
5293 | 5293 | | 6 available analyses and studies performed by or for |
---|
5294 | 5294 | | 7 regional transmission organizations that serve the |
---|
5295 | 5295 | | 8 State and their independent market monitors. |
---|
5296 | 5296 | | 9 Upon publishing of the zero emission standard |
---|
5297 | 5297 | | 10 procurement plan, copies of the plan shall be posted |
---|
5298 | 5298 | | 11 and made publicly available on the Agency's website. |
---|
5299 | 5299 | | 12 All interested parties shall have 10 days following |
---|
5300 | 5300 | | 13 the date of posting to provide comment to the Agency on |
---|
5301 | 5301 | | 14 the plan. All comments shall be posted to the Agency's |
---|
5302 | 5302 | | 15 website. Following the end of the comment period, but |
---|
5303 | 5303 | | 16 no more than 60 days later than June 1, 2017 (the |
---|
5304 | 5304 | | 17 effective date of Public Act 99-906), the Agency shall |
---|
5305 | 5305 | | 18 revise the plan as necessary based on the comments |
---|
5306 | 5306 | | 19 received and file its zero emission standard |
---|
5307 | 5307 | | 20 procurement plan with the Commission. |
---|
5308 | 5308 | | 21 If the Commission determines that the plan will |
---|
5309 | 5309 | | 22 result in the procurement of cost-effective zero |
---|
5310 | 5310 | | 23 emission credits, then the Commission shall, after |
---|
5311 | 5311 | | 24 notice and hearing, but no later than 45 days after the |
---|
5312 | 5312 | | 25 Agency filed the plan, approve the plan or approve |
---|
5313 | 5313 | | 26 with modification. For purposes of this subsection |
---|
5314 | 5314 | | |
---|
5315 | 5315 | | |
---|
5316 | 5316 | | |
---|
5317 | 5317 | | |
---|
5318 | 5318 | | |
---|
5319 | 5319 | | HB3258 - 147 - LRB104 06526 AAS 16562 b |
---|
5320 | 5320 | | |
---|
5321 | 5321 | | |
---|
5322 | 5322 | | HB3258- 148 -LRB104 06526 AAS 16562 b HB3258 - 148 - LRB104 06526 AAS 16562 b |
---|
5323 | 5323 | | HB3258 - 148 - LRB104 06526 AAS 16562 b |
---|
5324 | 5324 | | 1 (d-5), "cost effective" means the projected costs of |
---|
5325 | 5325 | | 2 procuring zero emission credits from zero emission |
---|
5326 | 5326 | | 3 facilities do not cause the limit stated in paragraph |
---|
5327 | 5327 | | 4 (2) of this subsection to be exceeded. |
---|
5328 | 5328 | | 5 (C-5) As part of the Commission's review and |
---|
5329 | 5329 | | 6 acceptance or rejection of the procurement results, |
---|
5330 | 5330 | | 7 the Commission shall, in its public notice of |
---|
5331 | 5331 | | 8 successful bidders: |
---|
5332 | 5332 | | 9 (i) identify how the winning bids satisfy the |
---|
5333 | 5333 | | 10 public interest criteria described in subparagraph |
---|
5334 | 5334 | | 11 (C) of this paragraph (1) of minimizing carbon |
---|
5335 | 5335 | | 12 dioxide emissions that result from electricity |
---|
5336 | 5336 | | 13 consumed in Illinois and minimizing sulfur |
---|
5337 | 5337 | | 14 dioxide, nitrogen oxide, and particulate matter |
---|
5338 | 5338 | | 15 emissions that adversely affect the citizens of |
---|
5339 | 5339 | | 16 this State; |
---|
5340 | 5340 | | 17 (ii) specifically address how the selection of |
---|
5341 | 5341 | | 18 winning bids takes into account the incremental |
---|
5342 | 5342 | | 19 environmental benefits resulting from the |
---|
5343 | 5343 | | 20 procurement, including any existing environmental |
---|
5344 | 5344 | | 21 benefits that are preserved by the procurements |
---|
5345 | 5345 | | 22 held under Public Act 99-906 and would have ceased |
---|
5346 | 5346 | | 23 to exist if the procurements had not been held, |
---|
5347 | 5347 | | 24 such as the preservation of zero emission |
---|
5348 | 5348 | | 25 facilities; |
---|
5349 | 5349 | | 26 (iii) quantify the environmental benefit of |
---|
5350 | 5350 | | |
---|
5351 | 5351 | | |
---|
5352 | 5352 | | |
---|
5353 | 5353 | | |
---|
5354 | 5354 | | |
---|
5355 | 5355 | | HB3258 - 148 - LRB104 06526 AAS 16562 b |
---|
5356 | 5356 | | |
---|
5357 | 5357 | | |
---|
5358 | 5358 | | HB3258- 149 -LRB104 06526 AAS 16562 b HB3258 - 149 - LRB104 06526 AAS 16562 b |
---|
5359 | 5359 | | HB3258 - 149 - LRB104 06526 AAS 16562 b |
---|
5360 | 5360 | | 1 preserving the resources identified in item (ii) |
---|
5361 | 5361 | | 2 of this subparagraph (C-5), including the |
---|
5362 | 5362 | | 3 following: |
---|
5363 | 5363 | | 4 (aa) the value of avoided greenhouse gas |
---|
5364 | 5364 | | 5 emissions measured as the product of the zero |
---|
5365 | 5365 | | 6 emission facilities' output over the contract |
---|
5366 | 5366 | | 7 term multiplied by the U.S. Environmental |
---|
5367 | 5367 | | 8 Protection Agency eGrid subregion carbon |
---|
5368 | 5368 | | 9 dioxide emission rate and the U.S. Interagency |
---|
5369 | 5369 | | 10 Working Group on Social Cost of Carbon's price |
---|
5370 | 5370 | | 11 in the August 2016 Technical Update using a 3% |
---|
5371 | 5371 | | 12 discount rate, adjusted for inflation for each |
---|
5372 | 5372 | | 13 delivery year; and |
---|
5373 | 5373 | | 14 (bb) the costs of replacement with other |
---|
5374 | 5374 | | 15 zero carbon dioxide resources, including wind |
---|
5375 | 5375 | | 16 and photovoltaic, based upon the simple |
---|
5376 | 5376 | | 17 average of the following: |
---|
5377 | 5377 | | 18 (I) the price, or if there is more |
---|
5378 | 5378 | | 19 than one price, the average of the prices, |
---|
5379 | 5379 | | 20 paid for renewable energy credits from new |
---|
5380 | 5380 | | 21 utility-scale wind projects in the |
---|
5381 | 5381 | | 22 procurement events specified in item (i) |
---|
5382 | 5382 | | 23 of subparagraph (G) of paragraph (1) of |
---|
5383 | 5383 | | 24 subsection (c) of this Section; and |
---|
5384 | 5384 | | 25 (II) the price, or if there is more |
---|
5385 | 5385 | | 26 than one price, the average of the prices, |
---|
5386 | 5386 | | |
---|
5387 | 5387 | | |
---|
5388 | 5388 | | |
---|
5389 | 5389 | | |
---|
5390 | 5390 | | |
---|
5391 | 5391 | | HB3258 - 149 - LRB104 06526 AAS 16562 b |
---|
5392 | 5392 | | |
---|
5393 | 5393 | | |
---|
5394 | 5394 | | HB3258- 150 -LRB104 06526 AAS 16562 b HB3258 - 150 - LRB104 06526 AAS 16562 b |
---|
5395 | 5395 | | HB3258 - 150 - LRB104 06526 AAS 16562 b |
---|
5396 | 5396 | | 1 paid for renewable energy credits from new |
---|
5397 | 5397 | | 2 utility-scale solar projects and |
---|
5398 | 5398 | | 3 brownfield site photovoltaic projects in |
---|
5399 | 5399 | | 4 the procurement events specified in item |
---|
5400 | 5400 | | 5 (ii) of subparagraph (G) of paragraph (1) |
---|
5401 | 5401 | | 6 of subsection (c) of this Section and, |
---|
5402 | 5402 | | 7 after January 1, 2015, renewable energy |
---|
5403 | 5403 | | 8 credits from photovoltaic distributed |
---|
5404 | 5404 | | 9 generation projects in procurement events |
---|
5405 | 5405 | | 10 held under subsection (c) of this Section. |
---|
5406 | 5406 | | 11 Each utility shall enter into binding contractual |
---|
5407 | 5407 | | 12 arrangements with the winning suppliers. |
---|
5408 | 5408 | | 13 The procurement described in this subsection |
---|
5409 | 5409 | | 14 (d-5), including, but not limited to, the execution of |
---|
5410 | 5410 | | 15 all contracts procured, shall be completed no later |
---|
5411 | 5411 | | 16 than May 10, 2017. Based on the effective date of |
---|
5412 | 5412 | | 17 Public Act 99-906, the Agency and Commission may, as |
---|
5413 | 5413 | | 18 appropriate, modify the various dates and timelines |
---|
5414 | 5414 | | 19 under this subparagraph and subparagraphs (C) and (D) |
---|
5415 | 5415 | | 20 of this paragraph (1). The procurement and plan |
---|
5416 | 5416 | | 21 approval processes required by this subsection (d-5) |
---|
5417 | 5417 | | 22 shall be conducted in conjunction with the procurement |
---|
5418 | 5418 | | 23 and plan approval processes required by subsection (c) |
---|
5419 | 5419 | | 24 of this Section and Section 16-111.5 of the Public |
---|
5420 | 5420 | | 25 Utilities Act, to the extent practicable. |
---|
5421 | 5421 | | 26 Notwithstanding whether a procurement event is |
---|
5422 | 5422 | | |
---|
5423 | 5423 | | |
---|
5424 | 5424 | | |
---|
5425 | 5425 | | |
---|
5426 | 5426 | | |
---|
5427 | 5427 | | HB3258 - 150 - LRB104 06526 AAS 16562 b |
---|
5428 | 5428 | | |
---|
5429 | 5429 | | |
---|
5430 | 5430 | | HB3258- 151 -LRB104 06526 AAS 16562 b HB3258 - 151 - LRB104 06526 AAS 16562 b |
---|
5431 | 5431 | | HB3258 - 151 - LRB104 06526 AAS 16562 b |
---|
5432 | 5432 | | 1 conducted under Section 16-111.5 of the Public |
---|
5433 | 5433 | | 2 Utilities Act, the Agency shall immediately initiate a |
---|
5434 | 5434 | | 3 procurement process on June 1, 2017 (the effective |
---|
5435 | 5435 | | 4 date of Public Act 99-906). |
---|
5436 | 5436 | | 5 (D) Following the procurement event described in |
---|
5437 | 5437 | | 6 this paragraph (1) and consistent with subparagraph |
---|
5438 | 5438 | | 7 (B) of this paragraph (1), the Agency shall calculate |
---|
5439 | 5439 | | 8 the payments to be made under each contract for the |
---|
5440 | 5440 | | 9 next delivery year based on the market price index for |
---|
5441 | 5441 | | 10 that delivery year. The Agency shall publish the |
---|
5442 | 5442 | | 11 payment calculations no later than May 25, 2017 and |
---|
5443 | 5443 | | 12 every May 25 thereafter. |
---|
5444 | 5444 | | 13 (E) Notwithstanding the requirements of this |
---|
5445 | 5445 | | 14 subsection (d-5), the contracts executed under this |
---|
5446 | 5446 | | 15 subsection (d-5) shall provide that the zero emission |
---|
5447 | 5447 | | 16 facility may, as applicable, suspend or terminate |
---|
5448 | 5448 | | 17 performance under the contracts in the following |
---|
5449 | 5449 | | 18 instances: |
---|
5450 | 5450 | | 19 (i) A zero emission facility shall be excused |
---|
5451 | 5451 | | 20 from its performance under the contract for any |
---|
5452 | 5452 | | 21 cause beyond the control of the resource, |
---|
5453 | 5453 | | 22 including, but not restricted to, acts of God, |
---|
5454 | 5454 | | 23 flood, drought, earthquake, storm, fire, |
---|
5455 | 5455 | | 24 lightning, epidemic, war, riot, civil disturbance |
---|
5456 | 5456 | | 25 or disobedience, labor dispute, labor or material |
---|
5457 | 5457 | | 26 shortage, sabotage, acts of public enemy, |
---|
5458 | 5458 | | |
---|
5459 | 5459 | | |
---|
5460 | 5460 | | |
---|
5461 | 5461 | | |
---|
5462 | 5462 | | |
---|
5463 | 5463 | | HB3258 - 151 - LRB104 06526 AAS 16562 b |
---|
5464 | 5464 | | |
---|
5465 | 5465 | | |
---|
5466 | 5466 | | HB3258- 152 -LRB104 06526 AAS 16562 b HB3258 - 152 - LRB104 06526 AAS 16562 b |
---|
5467 | 5467 | | HB3258 - 152 - LRB104 06526 AAS 16562 b |
---|
5468 | 5468 | | 1 explosions, orders, regulations or restrictions |
---|
5469 | 5469 | | 2 imposed by governmental, military, or lawfully |
---|
5470 | 5470 | | 3 established civilian authorities, which, in any of |
---|
5471 | 5471 | | 4 the foregoing cases, by exercise of commercially |
---|
5472 | 5472 | | 5 reasonable efforts the zero emission facility |
---|
5473 | 5473 | | 6 could not reasonably have been expected to avoid, |
---|
5474 | 5474 | | 7 and which, by the exercise of commercially |
---|
5475 | 5475 | | 8 reasonable efforts, it has been unable to |
---|
5476 | 5476 | | 9 overcome. In such event, the zero emission |
---|
5477 | 5477 | | 10 facility shall be excused from performance for the |
---|
5478 | 5478 | | 11 duration of the event, including, but not limited |
---|
5479 | 5479 | | 12 to, delivery of zero emission credits, and no |
---|
5480 | 5480 | | 13 payment shall be due to the zero emission facility |
---|
5481 | 5481 | | 14 during the duration of the event. |
---|
5482 | 5482 | | 15 (ii) A zero emission facility shall be |
---|
5483 | 5483 | | 16 permitted to terminate the contract if legislation |
---|
5484 | 5484 | | 17 is enacted into law by the General Assembly that |
---|
5485 | 5485 | | 18 imposes or authorizes a new tax, special |
---|
5486 | 5486 | | 19 assessment, or fee on the generation of |
---|
5487 | 5487 | | 20 electricity, the ownership or leasehold of a |
---|
5488 | 5488 | | 21 generating unit, or the privilege or occupation of |
---|
5489 | 5489 | | 22 such generation, ownership, or leasehold of |
---|
5490 | 5490 | | 23 generation units by a zero emission facility. |
---|
5491 | 5491 | | 24 However, the provisions of this item (ii) do not |
---|
5492 | 5492 | | 25 apply to any generally applicable tax, special |
---|
5493 | 5493 | | 26 assessment or fee, or requirements imposed by |
---|
5494 | 5494 | | |
---|
5495 | 5495 | | |
---|
5496 | 5496 | | |
---|
5497 | 5497 | | |
---|
5498 | 5498 | | |
---|
5499 | 5499 | | HB3258 - 152 - LRB104 06526 AAS 16562 b |
---|
5500 | 5500 | | |
---|
5501 | 5501 | | |
---|
5502 | 5502 | | HB3258- 153 -LRB104 06526 AAS 16562 b HB3258 - 153 - LRB104 06526 AAS 16562 b |
---|
5503 | 5503 | | HB3258 - 153 - LRB104 06526 AAS 16562 b |
---|
5504 | 5504 | | 1 federal law. |
---|
5505 | 5505 | | 2 (iii) A zero emission facility shall be |
---|
5506 | 5506 | | 3 permitted to terminate the contract in the event |
---|
5507 | 5507 | | 4 that the resource requires capital expenditures in |
---|
5508 | 5508 | | 5 excess of $40,000,000 that were neither known nor |
---|
5509 | 5509 | | 6 reasonably foreseeable at the time it executed the |
---|
5510 | 5510 | | 7 contract and that a prudent owner or operator of |
---|
5511 | 5511 | | 8 such resource would not undertake. |
---|
5512 | 5512 | | 9 (iv) A zero emission facility shall be |
---|
5513 | 5513 | | 10 permitted to terminate the contract in the event |
---|
5514 | 5514 | | 11 the Nuclear Regulatory Commission terminates the |
---|
5515 | 5515 | | 12 resource's license. |
---|
5516 | 5516 | | 13 (F) If the zero emission facility elects to |
---|
5517 | 5517 | | 14 terminate a contract under subparagraph (E) of this |
---|
5518 | 5518 | | 15 paragraph (1), then the Commission shall reopen the |
---|
5519 | 5519 | | 16 docket in which the Commission approved the zero |
---|
5520 | 5520 | | 17 emission standard procurement plan under subparagraph |
---|
5521 | 5521 | | 18 (C) of this paragraph (1) and, after notice and |
---|
5522 | 5522 | | 19 hearing, enter an order acknowledging the contract |
---|
5523 | 5523 | | 20 termination election if such termination is consistent |
---|
5524 | 5524 | | 21 with the provisions of this subsection (d-5). |
---|
5525 | 5525 | | 22 (2) For purposes of this subsection (d-5), the amount |
---|
5526 | 5526 | | 23 paid per kilowatthour means the total amount paid for |
---|
5527 | 5527 | | 24 electric service expressed on a per kilowatthour basis. |
---|
5528 | 5528 | | 25 For purposes of this subsection (d-5), the total amount |
---|
5529 | 5529 | | 26 paid for electric service includes, without limitation, |
---|
5530 | 5530 | | |
---|
5531 | 5531 | | |
---|
5532 | 5532 | | |
---|
5533 | 5533 | | |
---|
5534 | 5534 | | |
---|
5535 | 5535 | | HB3258 - 153 - LRB104 06526 AAS 16562 b |
---|
5536 | 5536 | | |
---|
5537 | 5537 | | |
---|
5538 | 5538 | | HB3258- 154 -LRB104 06526 AAS 16562 b HB3258 - 154 - LRB104 06526 AAS 16562 b |
---|
5539 | 5539 | | HB3258 - 154 - LRB104 06526 AAS 16562 b |
---|
5540 | 5540 | | 1 amounts paid for supply, transmission, distribution, |
---|
5541 | 5541 | | 2 surcharges, and add-on taxes. |
---|
5542 | 5542 | | 3 Notwithstanding the requirements of this subsection |
---|
5543 | 5543 | | 4 (d-5), the contracts executed under this subsection (d-5) |
---|
5544 | 5544 | | 5 shall provide that the total of zero emission credits |
---|
5545 | 5545 | | 6 procured under a procurement plan shall be subject to the |
---|
5546 | 5546 | | 7 limitations of this paragraph (2). For each delivery year, |
---|
5547 | 5547 | | 8 the contractual volume receiving payments in such year |
---|
5548 | 5548 | | 9 shall be reduced for all retail customers based on the |
---|
5549 | 5549 | | 10 amount necessary to limit the net increase that delivery |
---|
5550 | 5550 | | 11 year to the costs of those credits included in the amounts |
---|
5551 | 5551 | | 12 paid by eligible retail customers in connection with |
---|
5552 | 5552 | | 13 electric service to no more than 1.65% of the amount paid |
---|
5553 | 5553 | | 14 per kilowatthour by eligible retail customers during the |
---|
5554 | 5554 | | 15 year ending May 31, 2009. The result of this computation |
---|
5555 | 5555 | | 16 shall apply to and reduce the procurement for all retail |
---|
5556 | 5556 | | 17 customers, and all those customers shall pay the same |
---|
5557 | 5557 | | 18 single, uniform cents per kilowatthour charge under |
---|
5558 | 5558 | | 19 subsection (k) of Section 16-108 of the Public Utilities |
---|
5559 | 5559 | | 20 Act. To arrive at a maximum dollar amount of zero emission |
---|
5560 | 5560 | | 21 credits to be paid for the particular delivery year, the |
---|
5561 | 5561 | | 22 resulting per kilowatthour amount shall be applied to the |
---|
5562 | 5562 | | 23 actual amount of kilowatthours of electricity delivered by |
---|
5563 | 5563 | | 24 the electric utility in the delivery year immediately |
---|
5564 | 5564 | | 25 prior to the procurement, to all retail customers in its |
---|
5565 | 5565 | | 26 service territory. Unpaid contractual volume for any |
---|
5566 | 5566 | | |
---|
5567 | 5567 | | |
---|
5568 | 5568 | | |
---|
5569 | 5569 | | |
---|
5570 | 5570 | | |
---|
5571 | 5571 | | HB3258 - 154 - LRB104 06526 AAS 16562 b |
---|
5572 | 5572 | | |
---|
5573 | 5573 | | |
---|
5574 | 5574 | | HB3258- 155 -LRB104 06526 AAS 16562 b HB3258 - 155 - LRB104 06526 AAS 16562 b |
---|
5575 | 5575 | | HB3258 - 155 - LRB104 06526 AAS 16562 b |
---|
5576 | 5576 | | 1 delivery year shall be paid in any subsequent delivery |
---|
5577 | 5577 | | 2 year in which such payments can be made without exceeding |
---|
5578 | 5578 | | 3 the amount specified in this paragraph (2). The |
---|
5579 | 5579 | | 4 calculations required by this paragraph (2) shall be made |
---|
5580 | 5580 | | 5 only once for each procurement plan year. Once the |
---|
5581 | 5581 | | 6 determination as to the amount of zero emission credits to |
---|
5582 | 5582 | | 7 be paid is made based on the calculations set forth in this |
---|
5583 | 5583 | | 8 paragraph (2), no subsequent rate impact determinations |
---|
5584 | 5584 | | 9 shall be made and no adjustments to those contract amounts |
---|
5585 | 5585 | | 10 shall be allowed. All costs incurred under those contracts |
---|
5586 | 5586 | | 11 and in implementing this subsection (d-5) shall be |
---|
5587 | 5587 | | 12 recovered by the electric utility as provided in this |
---|
5588 | 5588 | | 13 Section. |
---|
5589 | 5589 | | 14 No later than June 30, 2019, the Commission shall |
---|
5590 | 5590 | | 15 review the limitation on the amount of zero emission |
---|
5591 | 5591 | | 16 credits procured under this subsection (d-5) and report to |
---|
5592 | 5592 | | 17 the General Assembly its findings as to whether that |
---|
5593 | 5593 | | 18 limitation unduly constrains the procurement of |
---|
5594 | 5594 | | 19 cost-effective zero emission credits. |
---|
5595 | 5595 | | 20 (3) Six years after the execution of a contract under |
---|
5596 | 5596 | | 21 this subsection (d-5), the Agency shall determine whether |
---|
5597 | 5597 | | 22 the actual zero emission credit payments received by the |
---|
5598 | 5598 | | 23 supplier over the 6-year period exceed the Average ZEC |
---|
5599 | 5599 | | 24 Payment. In addition, at the end of the term of a contract |
---|
5600 | 5600 | | 25 executed under this subsection (d-5), or at the time, if |
---|
5601 | 5601 | | 26 any, a zero emission facility's contract is terminated |
---|
5602 | 5602 | | |
---|
5603 | 5603 | | |
---|
5604 | 5604 | | |
---|
5605 | 5605 | | |
---|
5606 | 5606 | | |
---|
5607 | 5607 | | HB3258 - 155 - LRB104 06526 AAS 16562 b |
---|
5608 | 5608 | | |
---|
5609 | 5609 | | |
---|
5610 | 5610 | | HB3258- 156 -LRB104 06526 AAS 16562 b HB3258 - 156 - LRB104 06526 AAS 16562 b |
---|
5611 | 5611 | | HB3258 - 156 - LRB104 06526 AAS 16562 b |
---|
5612 | 5612 | | 1 under subparagraph (E) of paragraph (1) of this subsection |
---|
5613 | 5613 | | 2 (d-5), then the Agency shall determine whether the actual |
---|
5614 | 5614 | | 3 zero emission credit payments received by the supplier |
---|
5615 | 5615 | | 4 over the term of the contract exceed the Average ZEC |
---|
5616 | 5616 | | 5 Payment, after taking into account any amounts previously |
---|
5617 | 5617 | | 6 credited back to the utility under this paragraph (3). If |
---|
5618 | 5618 | | 7 the Agency determines that the actual zero emission credit |
---|
5619 | 5619 | | 8 payments received by the supplier over the relevant period |
---|
5620 | 5620 | | 9 exceed the Average ZEC Payment, then the supplier shall |
---|
5621 | 5621 | | 10 credit the difference back to the utility. The amount of |
---|
5622 | 5622 | | 11 the credit shall be remitted to the applicable electric |
---|
5623 | 5623 | | 12 utility no later than 120 days after the Agency's |
---|
5624 | 5624 | | 13 determination, which the utility shall reflect as a credit |
---|
5625 | 5625 | | 14 on its retail customer bills as soon as practicable; |
---|
5626 | 5626 | | 15 however, the credit remitted to the utility shall not |
---|
5627 | 5627 | | 16 exceed the total amount of payments received by the |
---|
5628 | 5628 | | 17 facility under its contract. |
---|
5629 | 5629 | | 18 For purposes of this Section, the Average ZEC Payment |
---|
5630 | 5630 | | 19 shall be calculated by multiplying the quantity of zero |
---|
5631 | 5631 | | 20 emission credits delivered under the contract times the |
---|
5632 | 5632 | | 21 average contract price. The average contract price shall |
---|
5633 | 5633 | | 22 be determined by subtracting the amount calculated under |
---|
5634 | 5634 | | 23 subparagraph (B) of this paragraph (3) from the amount |
---|
5635 | 5635 | | 24 calculated under subparagraph (A) of this paragraph (3), |
---|
5636 | 5636 | | 25 as follows: |
---|
5637 | 5637 | | 26 (A) The average of the Social Cost of Carbon, as |
---|
5638 | 5638 | | |
---|
5639 | 5639 | | |
---|
5640 | 5640 | | |
---|
5641 | 5641 | | |
---|
5642 | 5642 | | |
---|
5643 | 5643 | | HB3258 - 156 - LRB104 06526 AAS 16562 b |
---|
5644 | 5644 | | |
---|
5645 | 5645 | | |
---|
5646 | 5646 | | HB3258- 157 -LRB104 06526 AAS 16562 b HB3258 - 157 - LRB104 06526 AAS 16562 b |
---|
5647 | 5647 | | HB3258 - 157 - LRB104 06526 AAS 16562 b |
---|
5648 | 5648 | | 1 defined in subparagraph (B) of paragraph (1) of this |
---|
5649 | 5649 | | 2 subsection (d-5), during the term of the contract. |
---|
5650 | 5650 | | 3 (B) The average of the market price indices, as |
---|
5651 | 5651 | | 4 defined in subparagraph (B) of paragraph (1) of this |
---|
5652 | 5652 | | 5 subsection (d-5), during the term of the contract, |
---|
5653 | 5653 | | 6 minus the baseline market price index, as defined in |
---|
5654 | 5654 | | 7 subparagraph (B) of paragraph (1) of this subsection |
---|
5655 | 5655 | | 8 (d-5). |
---|
5656 | 5656 | | 9 If the subtraction yields a negative number, then the |
---|
5657 | 5657 | | 10 Average ZEC Payment shall be zero. |
---|
5658 | 5658 | | 11 (4) Cost-effective zero emission credits procured from |
---|
5659 | 5659 | | 12 zero emission facilities shall satisfy the applicable |
---|
5660 | 5660 | | 13 definitions set forth in Section 1-10 of this Act. |
---|
5661 | 5661 | | 14 (5) The electric utility shall retire all zero |
---|
5662 | 5662 | | 15 emission credits used to comply with the requirements of |
---|
5663 | 5663 | | 16 this subsection (d-5). |
---|
5664 | 5664 | | 17 (6) Electric utilities shall be entitled to recover |
---|
5665 | 5665 | | 18 all of the costs associated with the procurement of zero |
---|
5666 | 5666 | | 19 emission credits through an automatic adjustment clause |
---|
5667 | 5667 | | 20 tariff in accordance with subsection (k) and (m) of |
---|
5668 | 5668 | | 21 Section 16-108 of the Public Utilities Act, and the |
---|
5669 | 5669 | | 22 contracts executed under this subsection (d-5) shall |
---|
5670 | 5670 | | 23 provide that the utilities' payment obligations under such |
---|
5671 | 5671 | | 24 contracts shall be reduced if an adjustment is required |
---|
5672 | 5672 | | 25 under subsection (m) of Section 16-108 of the Public |
---|
5673 | 5673 | | 26 Utilities Act. |
---|
5674 | 5674 | | |
---|
5675 | 5675 | | |
---|
5676 | 5676 | | |
---|
5677 | 5677 | | |
---|
5678 | 5678 | | |
---|
5679 | 5679 | | HB3258 - 157 - LRB104 06526 AAS 16562 b |
---|
5680 | 5680 | | |
---|
5681 | 5681 | | |
---|
5682 | 5682 | | HB3258- 158 -LRB104 06526 AAS 16562 b HB3258 - 158 - LRB104 06526 AAS 16562 b |
---|
5683 | 5683 | | HB3258 - 158 - LRB104 06526 AAS 16562 b |
---|
5684 | 5684 | | 1 (7) This subsection (d-5) shall become inoperative on |
---|
5685 | 5685 | | 2 January 1, 2028. |
---|
5686 | 5686 | | 3 (d-10) Nuclear Plant Assistance; carbon mitigation |
---|
5687 | 5687 | | 4 credits. |
---|
5688 | 5688 | | 5 (1) The General Assembly finds: |
---|
5689 | 5689 | | 6 (A) The health, welfare, and prosperity of all |
---|
5690 | 5690 | | 7 Illinois citizens require that the State of Illinois act |
---|
5691 | 5691 | | 8 to avoid and not increase carbon emissions from electric |
---|
5692 | 5692 | | 9 generation sources while continuing to ensure affordable, |
---|
5693 | 5693 | | 10 stable, and reliable electricity to all citizens. |
---|
5694 | 5694 | | 11 (B) Absent immediate action by the State to preserve |
---|
5695 | 5695 | | 12 existing carbon-free energy resources, those resources may |
---|
5696 | 5696 | | 13 retire, and the electric generation needs of Illinois' |
---|
5697 | 5697 | | 14 retail customers may be met instead by facilities that |
---|
5698 | 5698 | | 15 emit significant amounts of carbon pollution and other |
---|
5699 | 5699 | | 16 harmful air pollutants at a high social and economic cost |
---|
5700 | 5700 | | 17 until Illinois is able to develop other forms of clean |
---|
5701 | 5701 | | 18 energy. |
---|
5702 | 5702 | | 19 (C) The General Assembly finds that nuclear power |
---|
5703 | 5703 | | 20 generation is necessary for the State's transition to 100% |
---|
5704 | 5704 | | 21 clean energy, and ensuring continued operation of nuclear |
---|
5705 | 5705 | | 22 plants advances environmental and public health interests |
---|
5706 | 5706 | | 23 through providing carbon-free electricity while reducing |
---|
5707 | 5707 | | 24 the air pollution profile of the Illinois energy |
---|
5708 | 5708 | | 25 generation fleet. |
---|
5709 | 5709 | | 26 (D) The clean energy attributes of nuclear generation |
---|
5710 | 5710 | | |
---|
5711 | 5711 | | |
---|
5712 | 5712 | | |
---|
5713 | 5713 | | |
---|
5714 | 5714 | | |
---|
5715 | 5715 | | HB3258 - 158 - LRB104 06526 AAS 16562 b |
---|
5716 | 5716 | | |
---|
5717 | 5717 | | |
---|
5718 | 5718 | | HB3258- 159 -LRB104 06526 AAS 16562 b HB3258 - 159 - LRB104 06526 AAS 16562 b |
---|
5719 | 5719 | | HB3258 - 159 - LRB104 06526 AAS 16562 b |
---|
5720 | 5720 | | 1 facilities support the State in its efforts to achieve |
---|
5721 | 5721 | | 2 100% clean energy. |
---|
5722 | 5722 | | 3 (E) The State currently invests in various forms of |
---|
5723 | 5723 | | 4 clean energy, including, but not limited to, renewable |
---|
5724 | 5724 | | 5 energy, energy efficiency, and low-emission vehicles, |
---|
5725 | 5725 | | 6 among others. |
---|
5726 | 5726 | | 7 (F) The Environmental Protection Agency commissioned |
---|
5727 | 5727 | | 8 an independent audit which provided a detailed assessment |
---|
5728 | 5728 | | 9 of the financial condition of the Illinois nuclear fleet |
---|
5729 | 5729 | | 10 to evaluate its financial viability and whether the |
---|
5730 | 5730 | | 11 environmental benefits of such resources were at risk. The |
---|
5731 | 5731 | | 12 report identified the risk of losing the environmental |
---|
5732 | 5732 | | 13 benefits of several specific nuclear units. The report |
---|
5733 | 5733 | | 14 also identified that the LaSalle County Generating Station |
---|
5734 | 5734 | | 15 will continue to operate through 2026 and therefore is not |
---|
5735 | 5735 | | 16 eligible to participate in the carbon mitigation credit |
---|
5736 | 5736 | | 17 program. |
---|
5737 | 5737 | | 18 (G) Nuclear plants provide carbon-free energy, which |
---|
5738 | 5738 | | 19 helps to avoid many health-related negative impacts for |
---|
5739 | 5739 | | 20 Illinois residents. |
---|
5740 | 5740 | | 21 (H) The procurement of carbon mitigation credits |
---|
5741 | 5741 | | 22 representing the environmental benefits of carbon-free |
---|
5742 | 5742 | | 23 generation will further the State's efforts at achieving |
---|
5743 | 5743 | | 24 100% clean energy and decarbonizing the electricity sector |
---|
5744 | 5744 | | 25 in a safe, reliable, and affordable manner. Further, the |
---|
5745 | 5745 | | 26 procurement of carbon emission credits will enhance the |
---|
5746 | 5746 | | |
---|
5747 | 5747 | | |
---|
5748 | 5748 | | |
---|
5749 | 5749 | | |
---|
5750 | 5750 | | |
---|
5751 | 5751 | | HB3258 - 159 - LRB104 06526 AAS 16562 b |
---|
5752 | 5752 | | |
---|
5753 | 5753 | | |
---|
5754 | 5754 | | HB3258- 160 -LRB104 06526 AAS 16562 b HB3258 - 160 - LRB104 06526 AAS 16562 b |
---|
5755 | 5755 | | HB3258 - 160 - LRB104 06526 AAS 16562 b |
---|
5756 | 5756 | | 1 health and welfare of Illinois residents through decreased |
---|
5757 | 5757 | | 2 reliance on more highly polluting generation. |
---|
5758 | 5758 | | 3 (I) The General Assembly therefore finds it necessary |
---|
5759 | 5759 | | 4 to establish carbon mitigation credits to ensure decreased |
---|
5760 | 5760 | | 5 reliance on more carbon-intensive energy resources, for |
---|
5761 | 5761 | | 6 transitioning to a fully decarbonized electricity sector, |
---|
5762 | 5762 | | 7 and to help ensure health and welfare of the State's |
---|
5763 | 5763 | | 8 residents. |
---|
5764 | 5764 | | 9 (2) As used in this subsection: |
---|
5765 | 5765 | | 10 "Baseline costs" means costs used to establish a customer |
---|
5766 | 5766 | | 11 protection cap that have been evaluated through an independent |
---|
5767 | 5767 | | 12 audit of a carbon-free energy resource conducted by the |
---|
5768 | 5768 | | 13 Environmental Protection Agency that evaluated projected |
---|
5769 | 5769 | | 14 annual costs for operation and maintenance expenses; fully |
---|
5770 | 5770 | | 15 allocated overhead costs, which shall be allocated using the |
---|
5771 | 5771 | | 16 methodology developed by the Institute for Nuclear Power |
---|
5772 | 5772 | | 17 Operations; fuel expenditures; nonfuel capital expenditures; |
---|
5773 | 5773 | | 18 spent fuel expenditures; a return on working capital; the cost |
---|
5774 | 5774 | | 19 of operational and market risks that could be avoided by |
---|
5775 | 5775 | | 20 ceasing operation; and any other costs necessary for continued |
---|
5776 | 5776 | | 21 operations, provided that "necessary" means, for purposes of |
---|
5777 | 5777 | | 22 this definition, that the costs could reasonably be avoided |
---|
5778 | 5778 | | 23 only by ceasing operations of the carbon-free energy resource. |
---|
5779 | 5779 | | 24 "Carbon mitigation credit" means a tradable credit that |
---|
5780 | 5780 | | 25 represents the carbon emission reduction attributes of one |
---|
5781 | 5781 | | 26 megawatt-hour of energy produced from a carbon-free energy |
---|
5782 | 5782 | | |
---|
5783 | 5783 | | |
---|
5784 | 5784 | | |
---|
5785 | 5785 | | |
---|
5786 | 5786 | | |
---|
5787 | 5787 | | HB3258 - 160 - LRB104 06526 AAS 16562 b |
---|
5788 | 5788 | | |
---|
5789 | 5789 | | |
---|
5790 | 5790 | | HB3258- 161 -LRB104 06526 AAS 16562 b HB3258 - 161 - LRB104 06526 AAS 16562 b |
---|
5791 | 5791 | | HB3258 - 161 - LRB104 06526 AAS 16562 b |
---|
5792 | 5792 | | 1 resource. |
---|
5793 | 5793 | | 2 "Carbon-free energy resource" means a generation facility |
---|
5794 | 5794 | | 3 that: (1) is fueled by nuclear power; and (2) is |
---|
5795 | 5795 | | 4 interconnected to PJM Interconnection, LLC. |
---|
5796 | 5796 | | 5 (3) Procurement. |
---|
5797 | 5797 | | 6 (A) Beginning with the delivery year commencing on |
---|
5798 | 5798 | | 7 June 1, 2022, the Agency shall, for electric utilities |
---|
5799 | 5799 | | 8 serving at least 3,000,000 retail customers in the State, |
---|
5800 | 5800 | | 9 seek to procure contracts for no more than approximately |
---|
5801 | 5801 | | 10 54,500,000 cost-effective carbon mitigation credits from |
---|
5802 | 5802 | | 11 carbon-free energy resources because such credits are |
---|
5803 | 5803 | | 12 necessary to support current levels of carbon-free energy |
---|
5804 | 5804 | | 13 generation and ensure the State meets its carbon dioxide |
---|
5805 | 5805 | | 14 emissions reduction goals. The Agency shall not make a |
---|
5806 | 5806 | | 15 partial award of a contract for carbon mitigation credits |
---|
5807 | 5807 | | 16 covering a fractional amount of a carbon-free energy |
---|
5808 | 5808 | | 17 resource's projected output. |
---|
5809 | 5809 | | 18 (B) Each carbon-free energy resource that intends to |
---|
5810 | 5810 | | 19 participate in a procurement shall be required to submit |
---|
5811 | 5811 | | 20 to the Agency the following information for the resource |
---|
5812 | 5812 | | 21 on or before the date established by the Agency: |
---|
5813 | 5813 | | 22 (i) the in-service date and remaining useful life |
---|
5814 | 5814 | | 23 of the carbon-free energy resource; |
---|
5815 | 5815 | | 24 (ii) the amount of power generated annually for |
---|
5816 | 5816 | | 25 each of the past 10 years, which shall be used to |
---|
5817 | 5817 | | 26 determine the capability of each facility; |
---|
5818 | 5818 | | |
---|
5819 | 5819 | | |
---|
5820 | 5820 | | |
---|
5821 | 5821 | | |
---|
5822 | 5822 | | |
---|
5823 | 5823 | | HB3258 - 161 - LRB104 06526 AAS 16562 b |
---|
5824 | 5824 | | |
---|
5825 | 5825 | | |
---|
5826 | 5826 | | HB3258- 162 -LRB104 06526 AAS 16562 b HB3258 - 162 - LRB104 06526 AAS 16562 b |
---|
5827 | 5827 | | HB3258 - 162 - LRB104 06526 AAS 16562 b |
---|
5828 | 5828 | | 1 (iii) a commitment to be reflected in any contract |
---|
5829 | 5829 | | 2 entered into pursuant to this subsection (d-10) to |
---|
5830 | 5830 | | 3 continue operating the carbon-free energy resource at |
---|
5831 | 5831 | | 4 a capacity factor of at least 88% annually on average |
---|
5832 | 5832 | | 5 for the duration of the contract or contracts executed |
---|
5833 | 5833 | | 6 under the procurement held under this subsection |
---|
5834 | 5834 | | 7 (d-10), except in an instance described in |
---|
5835 | 5835 | | 8 subparagraph (E) of paragraph (1) of subsection (d-5) |
---|
5836 | 5836 | | 9 of this Section or made impracticable as a result of |
---|
5837 | 5837 | | 10 compliance with law or regulation; |
---|
5838 | 5838 | | 11 (iv) financial need and the risk of loss of the |
---|
5839 | 5839 | | 12 environmental benefits of such resource, which shall |
---|
5840 | 5840 | | 13 include the following information: |
---|
5841 | 5841 | | 14 (I) the carbon-free energy resource's cost |
---|
5842 | 5842 | | 15 projections, expressed on a per megawatt-hour |
---|
5843 | 5843 | | 16 basis, over the next 5 delivery years, which shall |
---|
5844 | 5844 | | 17 include the following: operation and maintenance |
---|
5845 | 5845 | | 18 expenses; fully allocated overhead costs, which |
---|
5846 | 5846 | | 19 shall be allocated using the methodology developed |
---|
5847 | 5847 | | 20 by the Institute for Nuclear Power Operations; |
---|
5848 | 5848 | | 21 fuel expenditures; nonfuel capital expenditures; |
---|
5849 | 5849 | | 22 spent fuel expenditures; a return on working |
---|
5850 | 5850 | | 23 capital; the cost of operational and market risks |
---|
5851 | 5851 | | 24 that could be avoided by ceasing operation; and |
---|
5852 | 5852 | | 25 any other costs necessary for continued |
---|
5853 | 5853 | | 26 operations, provided that "necessary" means, for |
---|
5854 | 5854 | | |
---|
5855 | 5855 | | |
---|
5856 | 5856 | | |
---|
5857 | 5857 | | |
---|
5858 | 5858 | | |
---|
5859 | 5859 | | HB3258 - 162 - LRB104 06526 AAS 16562 b |
---|
5860 | 5860 | | |
---|
5861 | 5861 | | |
---|
5862 | 5862 | | HB3258- 163 -LRB104 06526 AAS 16562 b HB3258 - 163 - LRB104 06526 AAS 16562 b |
---|
5863 | 5863 | | HB3258 - 163 - LRB104 06526 AAS 16562 b |
---|
5864 | 5864 | | 1 purposes of this subitem (I), that the costs could |
---|
5865 | 5865 | | 2 reasonably be avoided only by ceasing operations |
---|
5866 | 5866 | | 3 of the carbon-free energy resource; and |
---|
5867 | 5867 | | 4 (II) the carbon-free energy resource's revenue |
---|
5868 | 5868 | | 5 projections, including energy, capacity, ancillary |
---|
5869 | 5869 | | 6 services, any other direct State support, known or |
---|
5870 | 5870 | | 7 anticipated federal attribute credits, known or |
---|
5871 | 5871 | | 8 anticipated tax credits, and any other direct |
---|
5872 | 5872 | | 9 federal support. |
---|
5873 | 5873 | | 10 The information described in this subparagraph (B) may |
---|
5874 | 5874 | | 11 be submitted on a confidential basis and shall be treated |
---|
5875 | 5875 | | 12 and maintained by the Agency, the procurement |
---|
5876 | 5876 | | 13 administrator, and the Commission as confidential and |
---|
5877 | 5877 | | 14 proprietary and exempt from disclosure under subparagraphs |
---|
5878 | 5878 | | 15 (a) and (g) of paragraph (1) of Section 7 of the Freedom of |
---|
5879 | 5879 | | 16 Information Act. The Office of the Attorney General shall |
---|
5880 | 5880 | | 17 have access to, and maintain the confidentiality of, such |
---|
5881 | 5881 | | 18 information pursuant to Section 6.5 of the Attorney |
---|
5882 | 5882 | | 19 General Act. |
---|
5883 | 5883 | | 20 (C) The Agency shall solicit bids for the contracts |
---|
5884 | 5884 | | 21 described in this subsection (d-10) from carbon-free |
---|
5885 | 5885 | | 22 energy resources that have satisfied the requirements of |
---|
5886 | 5886 | | 23 subparagraph (B) of this paragraph (3). The contracts |
---|
5887 | 5887 | | 24 procured pursuant to a procurement event shall reflect, |
---|
5888 | 5888 | | 25 and be subject to, the following terms, requirements, and |
---|
5889 | 5889 | | 26 limitations: |
---|
5890 | 5890 | | |
---|
5891 | 5891 | | |
---|
5892 | 5892 | | |
---|
5893 | 5893 | | |
---|
5894 | 5894 | | |
---|
5895 | 5895 | | HB3258 - 163 - LRB104 06526 AAS 16562 b |
---|
5896 | 5896 | | |
---|
5897 | 5897 | | |
---|
5898 | 5898 | | HB3258- 164 -LRB104 06526 AAS 16562 b HB3258 - 164 - LRB104 06526 AAS 16562 b |
---|
5899 | 5899 | | HB3258 - 164 - LRB104 06526 AAS 16562 b |
---|
5900 | 5900 | | 1 (i) Contracts are for delivery of carbon |
---|
5901 | 5901 | | 2 mitigation credits, and are not energy or capacity |
---|
5902 | 5902 | | 3 sales contracts requiring physical delivery. Pursuant |
---|
5903 | 5903 | | 4 to item (iii), contract payments shall fully deduct |
---|
5904 | 5904 | | 5 the value of any monetized federal production tax |
---|
5905 | 5905 | | 6 credits, credits issued pursuant to a federal clean |
---|
5906 | 5906 | | 7 energy standard, and other federal credits if |
---|
5907 | 5907 | | 8 applicable. |
---|
5908 | 5908 | | 9 (ii) Contracts for carbon mitigation credits shall |
---|
5909 | 5909 | | 10 commence with the delivery year beginning on June 1, |
---|
5910 | 5910 | | 11 2022 and shall be for a term of 5 delivery years |
---|
5911 | 5911 | | 12 concluding on May 31, 2027. |
---|
5912 | 5912 | | 13 (iii) The price per carbon mitigation credit to be |
---|
5913 | 5913 | | 14 paid under a contract for a given delivery year shall |
---|
5914 | 5914 | | 15 be equal to an accepted bid price less the sum of: |
---|
5915 | 5915 | | 16 (I) one of the following energy price indices, |
---|
5916 | 5916 | | 17 selected by the bidder at the time of the bid for |
---|
5917 | 5917 | | 18 the term of the contract: |
---|
5918 | 5918 | | 19 (aa) the weighted-average hourly day-ahead |
---|
5919 | 5919 | | 20 price for the applicable delivery year at the |
---|
5920 | 5920 | | 21 busbar of all resources procured pursuant to |
---|
5921 | 5921 | | 22 this subsection (d-10), weighted by actual |
---|
5922 | 5922 | | 23 production from the resources; or |
---|
5923 | 5923 | | 24 (bb) the projected energy price for the |
---|
5924 | 5924 | | 25 PJM Interconnection, LLC Northern Illinois Hub |
---|
5925 | 5925 | | 26 for the applicable delivery year determined |
---|
5926 | 5926 | | |
---|
5927 | 5927 | | |
---|
5928 | 5928 | | |
---|
5929 | 5929 | | |
---|
5930 | 5930 | | |
---|
5931 | 5931 | | HB3258 - 164 - LRB104 06526 AAS 16562 b |
---|
5932 | 5932 | | |
---|
5933 | 5933 | | |
---|
5934 | 5934 | | HB3258- 165 -LRB104 06526 AAS 16562 b HB3258 - 165 - LRB104 06526 AAS 16562 b |
---|
5935 | 5935 | | HB3258 - 165 - LRB104 06526 AAS 16562 b |
---|
5936 | 5936 | | 1 according to subitem (aa) of item (iii) of |
---|
5937 | 5937 | | 2 subparagraph (B) of paragraph (1) of |
---|
5938 | 5938 | | 3 subsection (d-5). |
---|
5939 | 5939 | | 4 (II) the Base Residual Auction Capacity Price |
---|
5940 | 5940 | | 5 for the ComEd zone as determined by PJM |
---|
5941 | 5941 | | 6 Interconnection, LLC, divided by 24 hours per day, |
---|
5942 | 5942 | | 7 for the applicable delivery year for the first 3 |
---|
5943 | 5943 | | 8 delivery years, and then any subsequent delivery |
---|
5944 | 5944 | | 9 years unless the PJM Interconnection, LLC applies |
---|
5945 | 5945 | | 10 the Minimum Offer Price Rule to participating |
---|
5946 | 5946 | | 11 carbon-free energy resources because they supply |
---|
5947 | 5947 | | 12 carbon mitigation credits pursuant to this Section |
---|
5948 | 5948 | | 13 at which time, upon notice by the carbon-free |
---|
5949 | 5949 | | 14 energy resource to the Commission and subject to |
---|
5950 | 5950 | | 15 the Commission's confirmation, the value under |
---|
5951 | 5951 | | 16 this subitem shall be zero, as further described |
---|
5952 | 5952 | | 17 in the carbon mitigation credit procurement plan; |
---|
5953 | 5953 | | 18 and |
---|
5954 | 5954 | | 19 (III) any value of monetized federal tax |
---|
5955 | 5955 | | 20 credits, direct payments, or similar subsidy |
---|
5956 | 5956 | | 21 provided to the carbon-free energy resource from |
---|
5957 | 5957 | | 22 any unit of government that is not already |
---|
5958 | 5958 | | 23 reflected in energy prices. |
---|
5959 | 5959 | | 24 If the price-per-megawatt-hour calculation |
---|
5960 | 5960 | | 25 performed under item (iii) of this subparagraph (C) |
---|
5961 | 5961 | | 26 for a given delivery year results in a net positive |
---|
5962 | 5962 | | |
---|
5963 | 5963 | | |
---|
5964 | 5964 | | |
---|
5965 | 5965 | | |
---|
5966 | 5966 | | |
---|
5967 | 5967 | | HB3258 - 165 - LRB104 06526 AAS 16562 b |
---|
5968 | 5968 | | |
---|
5969 | 5969 | | |
---|
5970 | 5970 | | HB3258- 166 -LRB104 06526 AAS 16562 b HB3258 - 166 - LRB104 06526 AAS 16562 b |
---|
5971 | 5971 | | HB3258 - 166 - LRB104 06526 AAS 16562 b |
---|
5972 | 5972 | | 1 value, then the electric utility counterparty to the |
---|
5973 | 5973 | | 2 contract shall multiply such net value by the |
---|
5974 | 5974 | | 3 applicable contract quantity and remit the amount to |
---|
5975 | 5975 | | 4 the supplier. |
---|
5976 | 5976 | | 5 To protect retail customers from retail rate |
---|
5977 | 5977 | | 6 impacts that may arise upon the initiation of carbon |
---|
5978 | 5978 | | 7 policy changes, if the price-per-megawatt-hour |
---|
5979 | 5979 | | 8 calculation performed under item (iii) of this |
---|
5980 | 5980 | | 9 subparagraph (C) for a given delivery year results in |
---|
5981 | 5981 | | 10 a net negative value, then the supplier counterparty |
---|
5982 | 5982 | | 11 to the contract shall multiply such net value by the |
---|
5983 | 5983 | | 12 applicable contract quantity and remit such amount to |
---|
5984 | 5984 | | 13 the electric utility counterparty. The electric |
---|
5985 | 5985 | | 14 utility shall reflect such amounts remitted by |
---|
5986 | 5986 | | 15 suppliers as a credit on its retail customer bills as |
---|
5987 | 5987 | | 16 soon as practicable. |
---|
5988 | 5988 | | 17 (iv) To ensure that retail customers in Northern |
---|
5989 | 5989 | | 18 Illinois do not pay more for carbon mitigation credits |
---|
5990 | 5990 | | 19 than the value such credits provide, and |
---|
5991 | 5991 | | 20 notwithstanding the provisions of this subsection |
---|
5992 | 5992 | | 21 (d-10), the Agency shall not accept bids for contracts |
---|
5993 | 5993 | | 22 that exceed a customer protection cap equal to the |
---|
5994 | 5994 | | 23 baseline costs of carbon-free energy resources. |
---|
5995 | 5995 | | 24 The baseline costs for the applicable year shall |
---|
5996 | 5996 | | 25 be the following: |
---|
5997 | 5997 | | 26 (I) For the delivery year beginning June 1, |
---|
5998 | 5998 | | |
---|
5999 | 5999 | | |
---|
6000 | 6000 | | |
---|
6001 | 6001 | | |
---|
6002 | 6002 | | |
---|
6003 | 6003 | | HB3258 - 166 - LRB104 06526 AAS 16562 b |
---|
6004 | 6004 | | |
---|
6005 | 6005 | | |
---|
6006 | 6006 | | HB3258- 167 -LRB104 06526 AAS 16562 b HB3258 - 167 - LRB104 06526 AAS 16562 b |
---|
6007 | 6007 | | HB3258 - 167 - LRB104 06526 AAS 16562 b |
---|
6008 | 6008 | | 1 2022, the baseline costs shall be an amount equal |
---|
6009 | 6009 | | 2 to $30.30 per megawatt-hour. |
---|
6010 | 6010 | | 3 (II) For the delivery year beginning June 1, |
---|
6011 | 6011 | | 4 2023, the baseline costs shall be an amount equal |
---|
6012 | 6012 | | 5 to $32.50 per megawatt-hour. |
---|
6013 | 6013 | | 6 (III) For the delivery year beginning June 1, |
---|
6014 | 6014 | | 7 2024, the baseline costs shall be an amount equal |
---|
6015 | 6015 | | 8 to $33.43 per megawatt-hour. |
---|
6016 | 6016 | | 9 (IV) For the delivery year beginning June 1, |
---|
6017 | 6017 | | 10 2025, the baseline costs shall be an amount equal |
---|
6018 | 6018 | | 11 to $33.50 per megawatt-hour. |
---|
6019 | 6019 | | 12 (V) For the delivery year beginning June 1, |
---|
6020 | 6020 | | 13 2026, the baseline costs shall be an amount equal |
---|
6021 | 6021 | | 14 to $34.50 per megawatt-hour. |
---|
6022 | 6022 | | 15 An Environmental Protection Agency consultant |
---|
6023 | 6023 | | 16 forecast, included in a report issued April 14, 2021, |
---|
6024 | 6024 | | 17 projects that a carbon-free energy resource has the |
---|
6025 | 6025 | | 18 opportunity to earn on average approximately $30.28 |
---|
6026 | 6026 | | 19 per megawatt-hour, for the sale of energy and capacity |
---|
6027 | 6027 | | 20 during the time period between 2022 and 2027. |
---|
6028 | 6028 | | 21 Therefore, the sale of carbon mitigation credits |
---|
6029 | 6029 | | 22 provides the opportunity to receive an additional |
---|
6030 | 6030 | | 23 amount per megawatt-hour in addition to the projected |
---|
6031 | 6031 | | 24 prices for energy and capacity. |
---|
6032 | 6032 | | 25 Although actual energy and capacity prices may |
---|
6033 | 6033 | | 26 vary from year-to-year, the General Assembly finds |
---|
6034 | 6034 | | |
---|
6035 | 6035 | | |
---|
6036 | 6036 | | |
---|
6037 | 6037 | | |
---|
6038 | 6038 | | |
---|
6039 | 6039 | | HB3258 - 167 - LRB104 06526 AAS 16562 b |
---|
6040 | 6040 | | |
---|
6041 | 6041 | | |
---|
6042 | 6042 | | HB3258- 168 -LRB104 06526 AAS 16562 b HB3258 - 168 - LRB104 06526 AAS 16562 b |
---|
6043 | 6043 | | HB3258 - 168 - LRB104 06526 AAS 16562 b |
---|
6044 | 6044 | | 1 that this customer protection cap will help ensure |
---|
6045 | 6045 | | 2 that the cost of carbon mitigation credits will be |
---|
6046 | 6046 | | 3 less than its value, based upon the social cost of |
---|
6047 | 6047 | | 4 carbon identified in the Technical Support Document |
---|
6048 | 6048 | | 5 issued in February 2021 by the U.S. Interagency |
---|
6049 | 6049 | | 6 Working Group on Social Cost of Greenhouse Gases and |
---|
6050 | 6050 | | 7 the PJM Interconnection, LLC carbon dioxide marginal |
---|
6051 | 6051 | | 8 emission rate for 2020, and that a carbon-free energy |
---|
6052 | 6052 | | 9 resource receiving payment for carbon mitigation |
---|
6053 | 6053 | | 10 credits receives no more than necessary to keep those |
---|
6054 | 6054 | | 11 units in operation. |
---|
6055 | 6055 | | 12 (D) No later than 7 days after the effective date of |
---|
6056 | 6056 | | 13 this amendatory Act of the 102nd General Assembly, the |
---|
6057 | 6057 | | 14 Agency shall publish its proposed carbon mitigation credit |
---|
6058 | 6058 | | 15 procurement plan. The Plan shall provide that winning bids |
---|
6059 | 6059 | | 16 shall be selected by taking into consideration which |
---|
6060 | 6060 | | 17 resources best match public interest criteria that |
---|
6061 | 6061 | | 18 include, but are not limited to, minimizing carbon dioxide |
---|
6062 | 6062 | | 19 emissions that result from electricity consumed in |
---|
6063 | 6063 | | 20 Illinois and minimizing sulfur dioxide, nitrogen oxide, |
---|
6064 | 6064 | | 21 and particulate matter emissions that adversely affect the |
---|
6065 | 6065 | | 22 citizens of this State. The selection of winning bids |
---|
6066 | 6066 | | 23 shall also take into account the incremental environmental |
---|
6067 | 6067 | | 24 benefits resulting from the procurement or procurements, |
---|
6068 | 6068 | | 25 such as any existing environmental benefits that are |
---|
6069 | 6069 | | 26 preserved by a procurement held under this subsection |
---|
6070 | 6070 | | |
---|
6071 | 6071 | | |
---|
6072 | 6072 | | |
---|
6073 | 6073 | | |
---|
6074 | 6074 | | |
---|
6075 | 6075 | | HB3258 - 168 - LRB104 06526 AAS 16562 b |
---|
6076 | 6076 | | |
---|
6077 | 6077 | | |
---|
6078 | 6078 | | HB3258- 169 -LRB104 06526 AAS 16562 b HB3258 - 169 - LRB104 06526 AAS 16562 b |
---|
6079 | 6079 | | HB3258 - 169 - LRB104 06526 AAS 16562 b |
---|
6080 | 6080 | | 1 (d-10) and would cease to exist if the procurement were |
---|
6081 | 6081 | | 2 not held, including the preservation of carbon-free energy |
---|
6082 | 6082 | | 3 resources. For those bidders having the same public |
---|
6083 | 6083 | | 4 interest criteria score, the relative ranking of such |
---|
6084 | 6084 | | 5 bidders shall be determined by price. The Plan shall |
---|
6085 | 6085 | | 6 describe in detail how each public interest factor shall |
---|
6086 | 6086 | | 7 be considered and weighted in the bid selection process to |
---|
6087 | 6087 | | 8 ensure that the public interest criteria are applied to |
---|
6088 | 6088 | | 9 the procurement. The Plan shall, to the extent practical |
---|
6089 | 6089 | | 10 and permissible by federal law, ensure that successful |
---|
6090 | 6090 | | 11 bidders make commercially reasonable efforts to apply for |
---|
6091 | 6091 | | 12 federal tax credits, direct payments, or similar subsidy |
---|
6092 | 6092 | | 13 programs that support carbon-free generation and for which |
---|
6093 | 6093 | | 14 the successful bidder is eligible. Upon publishing of the |
---|
6094 | 6094 | | 15 carbon mitigation credit procurement plan, copies of the |
---|
6095 | 6095 | | 16 plan shall be posted and made publicly available on the |
---|
6096 | 6096 | | 17 Agency's website. All interested parties shall have 7 days |
---|
6097 | 6097 | | 18 following the date of posting to provide comment to the |
---|
6098 | 6098 | | 19 Agency on the plan. All comments shall be posted to the |
---|
6099 | 6099 | | 20 Agency's website. Following the end of the comment period, |
---|
6100 | 6100 | | 21 but no more than 19 days later than the effective date of |
---|
6101 | 6101 | | 22 this amendatory Act of the 102nd General Assembly, the |
---|
6102 | 6102 | | 23 Agency shall revise the plan as necessary based on the |
---|
6103 | 6103 | | 24 comments received and file its carbon mitigation credit |
---|
6104 | 6104 | | 25 procurement plan with the Commission. |
---|
6105 | 6105 | | 26 (E) If the Commission determines that the plan is |
---|
6106 | 6106 | | |
---|
6107 | 6107 | | |
---|
6108 | 6108 | | |
---|
6109 | 6109 | | |
---|
6110 | 6110 | | |
---|
6111 | 6111 | | HB3258 - 169 - LRB104 06526 AAS 16562 b |
---|
6112 | 6112 | | |
---|
6113 | 6113 | | |
---|
6114 | 6114 | | HB3258- 170 -LRB104 06526 AAS 16562 b HB3258 - 170 - LRB104 06526 AAS 16562 b |
---|
6115 | 6115 | | HB3258 - 170 - LRB104 06526 AAS 16562 b |
---|
6116 | 6116 | | 1 likely to result in the procurement of cost-effective |
---|
6117 | 6117 | | 2 carbon mitigation credits, then the Commission shall, |
---|
6118 | 6118 | | 3 after notice and hearing and opportunity for comment, but |
---|
6119 | 6119 | | 4 no later than 42 days after the Agency filed the plan, |
---|
6120 | 6120 | | 5 approve the plan or approve it with modification. For |
---|
6121 | 6121 | | 6 purposes of this subsection (d-10), "cost-effective" means |
---|
6122 | 6122 | | 7 carbon mitigation credits that are procured from |
---|
6123 | 6123 | | 8 carbon-free energy resources at prices that are within the |
---|
6124 | 6124 | | 9 limits specified in this paragraph (3). As part of the |
---|
6125 | 6125 | | 10 Commission's review and acceptance or rejection of the |
---|
6126 | 6126 | | 11 procurement results, the Commission shall, in its public |
---|
6127 | 6127 | | 12 notice of successful bidders: |
---|
6128 | 6128 | | 13 (i) identify how the selected carbon-free energy |
---|
6129 | 6129 | | 14 resources satisfy the public interest criteria |
---|
6130 | 6130 | | 15 described in this paragraph (3) of minimizing carbon |
---|
6131 | 6131 | | 16 dioxide emissions that result from electricity |
---|
6132 | 6132 | | 17 consumed in Illinois and minimizing sulfur dioxide, |
---|
6133 | 6133 | | 18 nitrogen oxide, and particulate matter emissions that |
---|
6134 | 6134 | | 19 adversely affect the citizens of this State; |
---|
6135 | 6135 | | 20 (ii) specifically address how the selection of |
---|
6136 | 6136 | | 21 carbon-free energy resources takes into account the |
---|
6137 | 6137 | | 22 incremental environmental benefits resulting from the |
---|
6138 | 6138 | | 23 procurement, including any existing environmental |
---|
6139 | 6139 | | 24 benefits that are preserved by the procurements held |
---|
6140 | 6140 | | 25 under this amendatory Act of the 102nd General |
---|
6141 | 6141 | | 26 Assembly and would have ceased to exist if the |
---|
6142 | 6142 | | |
---|
6143 | 6143 | | |
---|
6144 | 6144 | | |
---|
6145 | 6145 | | |
---|
6146 | 6146 | | |
---|
6147 | 6147 | | HB3258 - 170 - LRB104 06526 AAS 16562 b |
---|
6148 | 6148 | | |
---|
6149 | 6149 | | |
---|
6150 | 6150 | | HB3258- 171 -LRB104 06526 AAS 16562 b HB3258 - 171 - LRB104 06526 AAS 16562 b |
---|
6151 | 6151 | | HB3258 - 171 - LRB104 06526 AAS 16562 b |
---|
6152 | 6152 | | 1 procurements had not been held, such as the |
---|
6153 | 6153 | | 2 preservation of carbon-free energy resources; |
---|
6154 | 6154 | | 3 (iii) quantify the environmental benefit of |
---|
6155 | 6155 | | 4 preserving the carbon-free energy resources procured |
---|
6156 | 6156 | | 5 pursuant to this subsection (d-10), including the |
---|
6157 | 6157 | | 6 following: |
---|
6158 | 6158 | | 7 (I) an assessment value of avoided greenhouse |
---|
6159 | 6159 | | 8 gas emissions measured as the product of the |
---|
6160 | 6160 | | 9 carbon-free energy resources' output over the |
---|
6161 | 6161 | | 10 contract term, using generally accepted |
---|
6162 | 6162 | | 11 methodologies for the valuation of avoided |
---|
6163 | 6163 | | 12 emissions; and |
---|
6164 | 6164 | | 13 (II) an assessment of costs of replacement |
---|
6165 | 6165 | | 14 with other carbon-free energy resources and |
---|
6166 | 6166 | | 15 renewable energy resources, including wind and |
---|
6167 | 6167 | | 16 photovoltaic generation, based upon an assessment |
---|
6168 | 6168 | | 17 of the prices paid for renewable energy credits |
---|
6169 | 6169 | | 18 through programs and procurements conducted |
---|
6170 | 6170 | | 19 pursuant to subsection (c) of Section 1-75 of this |
---|
6171 | 6171 | | 20 Act, and the additional storage necessary to |
---|
6172 | 6172 | | 21 produce the same or similar capability of matching |
---|
6173 | 6173 | | 22 customer usage patterns. |
---|
6174 | 6174 | | 23 (F) The procurements described in this paragraph (3), |
---|
6175 | 6175 | | 24 including, but not limited to, the execution of all |
---|
6176 | 6176 | | 25 contracts procured, shall be completed no later than |
---|
6177 | 6177 | | 26 December 3, 2021. The procurement and plan approval |
---|
6178 | 6178 | | |
---|
6179 | 6179 | | |
---|
6180 | 6180 | | |
---|
6181 | 6181 | | |
---|
6182 | 6182 | | |
---|
6183 | 6183 | | HB3258 - 171 - LRB104 06526 AAS 16562 b |
---|
6184 | 6184 | | |
---|
6185 | 6185 | | |
---|
6186 | 6186 | | HB3258- 172 -LRB104 06526 AAS 16562 b HB3258 - 172 - LRB104 06526 AAS 16562 b |
---|
6187 | 6187 | | HB3258 - 172 - LRB104 06526 AAS 16562 b |
---|
6188 | 6188 | | 1 processes required by this paragraph (3) shall be |
---|
6189 | 6189 | | 2 conducted in conjunction with the procurement and plan |
---|
6190 | 6190 | | 3 approval processes required by Section 16-111.5 of the |
---|
6191 | 6191 | | 4 Public Utilities Act, to the extent practicable. However, |
---|
6192 | 6192 | | 5 the Agency and Commission may, as appropriate, modify the |
---|
6193 | 6193 | | 6 various dates and timelines under this subparagraph and |
---|
6194 | 6194 | | 7 subparagraphs (D) and (E) of this paragraph (3) to meet |
---|
6195 | 6195 | | 8 the December 3, 2021 contract execution deadline. |
---|
6196 | 6196 | | 9 Following the completion of such procurements, and |
---|
6197 | 6197 | | 10 consistent with this paragraph (3), the Agency shall |
---|
6198 | 6198 | | 11 calculate the payments to be made under each contract in a |
---|
6199 | 6199 | | 12 timely fashion. |
---|
6200 | 6200 | | 13 (F-1) Costs incurred by the electric utility pursuant |
---|
6201 | 6201 | | 14 to a contract authorized by this subsection (d-10) shall |
---|
6202 | 6202 | | 15 be deemed prudently incurred and reasonable in amount, and |
---|
6203 | 6203 | | 16 the electric utility shall be entitled to full cost |
---|
6204 | 6204 | | 17 recovery pursuant to a tariff or tariffs filed with the |
---|
6205 | 6205 | | 18 Commission. |
---|
6206 | 6206 | | 19 (G) The counterparty electric utility shall retire all |
---|
6207 | 6207 | | 20 carbon mitigation credits used to comply with the |
---|
6208 | 6208 | | 21 requirements of this subsection (d-10). |
---|
6209 | 6209 | | 22 (H) If a carbon-free energy resource is sold to |
---|
6210 | 6210 | | 23 another owner, the rights, obligations, and commitments |
---|
6211 | 6211 | | 24 under this subsection (d-10) shall continue to the |
---|
6212 | 6212 | | 25 subsequent owner. |
---|
6213 | 6213 | | 26 (I) This subsection (d-10) shall become inoperative on |
---|
6214 | 6214 | | |
---|
6215 | 6215 | | |
---|
6216 | 6216 | | |
---|
6217 | 6217 | | |
---|
6218 | 6218 | | |
---|
6219 | 6219 | | HB3258 - 172 - LRB104 06526 AAS 16562 b |
---|
6220 | 6220 | | |
---|
6221 | 6221 | | |
---|
6222 | 6222 | | HB3258- 173 -LRB104 06526 AAS 16562 b HB3258 - 173 - LRB104 06526 AAS 16562 b |
---|
6223 | 6223 | | HB3258 - 173 - LRB104 06526 AAS 16562 b |
---|
6224 | 6224 | | 1 January 1, 2028. |
---|
6225 | 6225 | | 2 (e) The draft procurement plans are subject to public |
---|
6226 | 6226 | | 3 comment, as required by Section 16-111.5 of the Public |
---|
6227 | 6227 | | 4 Utilities Act. |
---|
6228 | 6228 | | 5 (f) The Agency shall submit the final procurement plan to |
---|
6229 | 6229 | | 6 the Commission. The Agency shall revise a procurement plan if |
---|
6230 | 6230 | | 7 the Commission determines that it does not meet the standards |
---|
6231 | 6231 | | 8 set forth in Section 16-111.5 of the Public Utilities Act. |
---|
6232 | 6232 | | 9 (g) The Agency shall assess fees to each affected utility |
---|
6233 | 6233 | | 10 to recover the costs incurred in preparation of the annual |
---|
6234 | 6234 | | 11 procurement plan for the utility. |
---|
6235 | 6235 | | 12 (h) The Agency shall assess fees to each bidder to recover |
---|
6236 | 6236 | | 13 the costs incurred in connection with a competitive |
---|
6237 | 6237 | | 14 procurement process. |
---|
6238 | 6238 | | 15 (i) A renewable energy credit, carbon emission credit, |
---|
6239 | 6239 | | 16 zero emission credit, or carbon mitigation credit can only be |
---|
6240 | 6240 | | 17 used once to comply with a single portfolio or other standard |
---|
6241 | 6241 | | 18 as set forth in subsection (c), subsection (d), or subsection |
---|
6242 | 6242 | | 19 (d-5) of this Section, respectively. A renewable energy |
---|
6243 | 6243 | | 20 credit, carbon emission credit, zero emission credit, or |
---|
6244 | 6244 | | 21 carbon mitigation credit cannot be used to satisfy the |
---|
6245 | 6245 | | 22 requirements of more than one standard. If more than one type |
---|
6246 | 6246 | | 23 of credit is issued for the same megawatt hour of energy, only |
---|
6247 | 6247 | | 24 one credit can be used to satisfy the requirements of a single |
---|
6248 | 6248 | | 25 standard. After such use, the credit must be retired together |
---|
6249 | 6249 | | 26 with any other credits issued for the same megawatt hour of |
---|
6250 | 6250 | | |
---|
6251 | 6251 | | |
---|
6252 | 6252 | | |
---|
6253 | 6253 | | |
---|
6254 | 6254 | | |
---|
6255 | 6255 | | HB3258 - 173 - LRB104 06526 AAS 16562 b |
---|
6256 | 6256 | | |
---|
6257 | 6257 | | |
---|
6258 | 6258 | | HB3258- 174 -LRB104 06526 AAS 16562 b HB3258 - 174 - LRB104 06526 AAS 16562 b |
---|
6259 | 6259 | | HB3258 - 174 - LRB104 06526 AAS 16562 b |
---|
6260 | 6260 | | |
---|
6261 | 6261 | | |
---|
6262 | 6262 | | |
---|
6263 | 6263 | | |
---|
6264 | 6264 | | |
---|
6265 | 6265 | | HB3258 - 174 - LRB104 06526 AAS 16562 b |
---|