1 | 1 | | 104TH GENERAL ASSEMBLY
State of Illinois
2025 and 2026 HB3814 Introduced , by Rep. Jay Hoffman SYNOPSIS AS INTRODUCED: 430 ILCS 75/10 from Ch. 111 1/2, par. 3211 Amends the Boiler and Pressure Vessel Safety Act. Provides that the standards of inspection and repair of pressure vessels in service by an owner-user shall, at the option of the owner-user, be either (1) the applicable rules and regulations in the National Board Inspection Code or (2) the applicable provisions of the American Petroleum Institute API-510, "API Recommended Practice for Inspection, Repair, and Rating of Pressure Vessels in Petroleum Refining Service". Prohibits the period of time between inspections from being longer than 5 years. LRB104 10721 BDA 20800 b A BILL FOR 104TH GENERAL ASSEMBLY
State of Illinois
2025 and 2026 HB3814 Introduced , by Rep. Jay Hoffman SYNOPSIS AS INTRODUCED: 430 ILCS 75/10 from Ch. 111 1/2, par. 3211 430 ILCS 75/10 from Ch. 111 1/2, par. 3211 Amends the Boiler and Pressure Vessel Safety Act. Provides that the standards of inspection and repair of pressure vessels in service by an owner-user shall, at the option of the owner-user, be either (1) the applicable rules and regulations in the National Board Inspection Code or (2) the applicable provisions of the American Petroleum Institute API-510, "API Recommended Practice for Inspection, Repair, and Rating of Pressure Vessels in Petroleum Refining Service". Prohibits the period of time between inspections from being longer than 5 years. LRB104 10721 BDA 20800 b LRB104 10721 BDA 20800 b A BILL FOR |
---|
2 | 2 | | 104TH GENERAL ASSEMBLY
State of Illinois
2025 and 2026 HB3814 Introduced , by Rep. Jay Hoffman SYNOPSIS AS INTRODUCED: |
---|
3 | 3 | | 430 ILCS 75/10 from Ch. 111 1/2, par. 3211 430 ILCS 75/10 from Ch. 111 1/2, par. 3211 |
---|
4 | 4 | | 430 ILCS 75/10 from Ch. 111 1/2, par. 3211 |
---|
5 | 5 | | Amends the Boiler and Pressure Vessel Safety Act. Provides that the standards of inspection and repair of pressure vessels in service by an owner-user shall, at the option of the owner-user, be either (1) the applicable rules and regulations in the National Board Inspection Code or (2) the applicable provisions of the American Petroleum Institute API-510, "API Recommended Practice for Inspection, Repair, and Rating of Pressure Vessels in Petroleum Refining Service". Prohibits the period of time between inspections from being longer than 5 years. |
---|
6 | 6 | | LRB104 10721 BDA 20800 b LRB104 10721 BDA 20800 b |
---|
7 | 7 | | LRB104 10721 BDA 20800 b |
---|
8 | 8 | | A BILL FOR |
---|
9 | 9 | | HB3814LRB104 10721 BDA 20800 b HB3814 LRB104 10721 BDA 20800 b |
---|
10 | 10 | | HB3814 LRB104 10721 BDA 20800 b |
---|
11 | 11 | | 1 AN ACT concerning safety. |
---|
12 | 12 | | 2 Be it enacted by the People of the State of Illinois, |
---|
13 | 13 | | 3 represented in the General Assembly: |
---|
14 | 14 | | 4 Section 5. The Boiler and Pressure Vessel Safety Act is |
---|
15 | 15 | | 5 amended by changing Section 10 as follows: |
---|
16 | 16 | | 6 (430 ILCS 75/10) (from Ch. 111 1/2, par. 3211) |
---|
17 | 17 | | 7 Sec. 10. Inspection of boilers and pressure vessels. |
---|
18 | 18 | | 8 (a) Each boiler or pressure vessel used or proposed to be |
---|
19 | 19 | | 9 used within this State, except boilers or pressure vessels |
---|
20 | 20 | | 10 exempt under this Act or rules and regulations of the Board, |
---|
21 | 21 | | 11 shall be thoroughly inspected as to its construction, |
---|
22 | 22 | | 12 installation, condition, and operation as follows: |
---|
23 | 23 | | 13 (1) Power boilers shall be inspected annually both |
---|
24 | 24 | | 14 internally and externally while not under pressure and |
---|
25 | 25 | | 15 shall also be inspected annually externally while under |
---|
26 | 26 | | 16 pressure if possible; provided that any power boiler or |
---|
27 | 27 | | 17 steam generator, the operation of which is an integral |
---|
28 | 28 | | 18 part of or a necessary adjunct to other continuous |
---|
29 | 29 | | 19 processing operations, shall be inspected internally at |
---|
30 | 30 | | 20 such intervals as are permitted by the shutting down of |
---|
31 | 31 | | 21 the processing operations. The Board may provide by rules |
---|
32 | 32 | | 22 and regulations for extension of time within which power |
---|
33 | 33 | | 23 boilers are required to be inspected based upon type, |
---|
34 | 34 | | |
---|
35 | 35 | | |
---|
36 | 36 | | |
---|
37 | 37 | | 104TH GENERAL ASSEMBLY
State of Illinois
2025 and 2026 HB3814 Introduced , by Rep. Jay Hoffman SYNOPSIS AS INTRODUCED: |
---|
38 | 38 | | 430 ILCS 75/10 from Ch. 111 1/2, par. 3211 430 ILCS 75/10 from Ch. 111 1/2, par. 3211 |
---|
39 | 39 | | 430 ILCS 75/10 from Ch. 111 1/2, par. 3211 |
---|
40 | 40 | | Amends the Boiler and Pressure Vessel Safety Act. Provides that the standards of inspection and repair of pressure vessels in service by an owner-user shall, at the option of the owner-user, be either (1) the applicable rules and regulations in the National Board Inspection Code or (2) the applicable provisions of the American Petroleum Institute API-510, "API Recommended Practice for Inspection, Repair, and Rating of Pressure Vessels in Petroleum Refining Service". Prohibits the period of time between inspections from being longer than 5 years. |
---|
41 | 41 | | LRB104 10721 BDA 20800 b LRB104 10721 BDA 20800 b |
---|
42 | 42 | | LRB104 10721 BDA 20800 b |
---|
43 | 43 | | A BILL FOR |
---|
44 | 44 | | |
---|
45 | 45 | | |
---|
46 | 46 | | |
---|
47 | 47 | | |
---|
48 | 48 | | |
---|
49 | 49 | | 430 ILCS 75/10 from Ch. 111 1/2, par. 3211 |
---|
50 | 50 | | |
---|
51 | 51 | | |
---|
52 | 52 | | |
---|
53 | 53 | | LRB104 10721 BDA 20800 b |
---|
54 | 54 | | |
---|
55 | 55 | | |
---|
56 | 56 | | |
---|
57 | 57 | | |
---|
58 | 58 | | |
---|
59 | 59 | | |
---|
60 | 60 | | |
---|
61 | 61 | | |
---|
62 | 62 | | |
---|
63 | 63 | | HB3814 LRB104 10721 BDA 20800 b |
---|
64 | 64 | | |
---|
65 | 65 | | |
---|
66 | 66 | | HB3814- 2 -LRB104 10721 BDA 20800 b HB3814 - 2 - LRB104 10721 BDA 20800 b |
---|
67 | 67 | | HB3814 - 2 - LRB104 10721 BDA 20800 b |
---|
68 | 68 | | 1 function, or manner of operation. However, the standards |
---|
69 | 69 | | 2 of inspection and repair of pressure vessels in service by |
---|
70 | 70 | | 3 an owner-user authorized under Section 15 shall, at the |
---|
71 | 71 | | 4 option of the owner-user, be either (1) the applicable |
---|
72 | 72 | | 5 rules and regulations in the National Board Inspection |
---|
73 | 73 | | 6 Code or (2) the applicable provisions of the American |
---|
74 | 74 | | 7 Petroleum Institute API-510, "API Recommended Practice for |
---|
75 | 75 | | 8 Inspection, Repair, and Rating of Pressure Vessels in |
---|
76 | 76 | | 9 Petroleum Refining Service". In no event should the period |
---|
77 | 77 | | 10 of time between inspections covered by this Section be |
---|
78 | 78 | | 11 longer than 5 years. |
---|
79 | 79 | | 12 (2) Low pressure steam, hot water heating, and hot |
---|
80 | 80 | | 13 water supply boilers shall be inspected biennially as |
---|
81 | 81 | | 14 required by the rules and regulations of the Board. |
---|
82 | 82 | | 15 (3) Traction steam engine boilers and other boilers |
---|
83 | 83 | | 16 constructed before the effective date of this amendatory |
---|
84 | 84 | | 17 Act of 1992 and operated solely for exhibition purposes |
---|
85 | 85 | | 18 may be issued an inspection certificate by the Chief or |
---|
86 | 86 | | 19 Deputy Inspector, provided the owner can establish and |
---|
87 | 87 | | 20 document that the design, materials, fabrication, |
---|
88 | 88 | | 21 examination, testing, and operation are in accordance with |
---|
89 | 89 | | 22 the rules and regulations of the Board. Traction engine |
---|
90 | 90 | | 23 boilers and other boilers used solely for exhibition |
---|
91 | 91 | | 24 purposes shall be inspected every 2 years. |
---|
92 | 92 | | 25 (4) Pressure vessels subject to internal corrosion |
---|
93 | 93 | | 26 shall receive a certificate inspection every 3 years as |
---|
94 | 94 | | |
---|
95 | 95 | | |
---|
96 | 96 | | |
---|
97 | 97 | | |
---|
98 | 98 | | |
---|
99 | 99 | | HB3814 - 2 - LRB104 10721 BDA 20800 b |
---|
100 | 100 | | |
---|
101 | 101 | | |
---|
102 | 102 | | HB3814- 3 -LRB104 10721 BDA 20800 b HB3814 - 3 - LRB104 10721 BDA 20800 b |
---|
103 | 103 | | HB3814 - 3 - LRB104 10721 BDA 20800 b |
---|
104 | 104 | | 1 required by rules and regulations of the Board. However, |
---|
105 | 105 | | 2 the standards of inspection and repair of pressure vessels |
---|
106 | 106 | | 3 in service by an owner-user authorized under Section 15 |
---|
107 | 107 | | 4 shall, at the option of the owner-user, be either (1) the |
---|
108 | 108 | | 5 applicable rules and regulations in the National Board |
---|
109 | 109 | | 6 Inspection Code, or (2) the applicable section in the |
---|
110 | 110 | | 7 American Petroleum Institute API-510, "API Recommended |
---|
111 | 111 | | 8 Practice for Inspection, Repair, and Rating of Pressure |
---|
112 | 112 | | 9 Vessels in Petroleum Refining Service". |
---|
113 | 113 | | 10 (5) Pressure vessels not subject to internal corrosion |
---|
114 | 114 | | 11 shall receive certificate inspection at intervals set by |
---|
115 | 115 | | 12 the Board, but internal inspection shall not be required |
---|
116 | 116 | | 13 of pressure vessels containing materials that are known to |
---|
117 | 117 | | 14 be noncorrosive to the material of which the shell, heads, |
---|
118 | 118 | | 15 or fittings are constructed, either from the chemical |
---|
119 | 119 | | 16 composition of the materials or from evidence that the |
---|
120 | 120 | | 17 materials are adequately treated with a corrosion |
---|
121 | 121 | | 18 inhibitor, provided that the vessels are constructed in |
---|
122 | 122 | | 19 accordance with the rules and regulations of the Board. |
---|
123 | 123 | | 20 A grace period of 2 months beyond the period specified in |
---|
124 | 124 | | 21 this Section may elapse between internal inspections of a |
---|
125 | 125 | | 22 boiler while it is not under pressure and between external |
---|
126 | 126 | | 23 inspections of a boiler while it is under pressure. The Board |
---|
127 | 127 | | 24 may, in its discretion, permit longer periods between |
---|
128 | 128 | | 25 certificate inspection. |
---|
129 | 129 | | 26 The inspections herein required shall be made by the Chief |
---|
130 | 130 | | |
---|
131 | 131 | | |
---|
132 | 132 | | |
---|
133 | 133 | | |
---|
134 | 134 | | |
---|
135 | 135 | | HB3814 - 3 - LRB104 10721 BDA 20800 b |
---|
136 | 136 | | |
---|
137 | 137 | | |
---|
138 | 138 | | HB3814- 4 -LRB104 10721 BDA 20800 b HB3814 - 4 - LRB104 10721 BDA 20800 b |
---|
139 | 139 | | HB3814 - 4 - LRB104 10721 BDA 20800 b |
---|
140 | 140 | | |
---|
141 | 141 | | |
---|
142 | 142 | | |
---|
143 | 143 | | |
---|
144 | 144 | | |
---|