104TH GENERAL ASSEMBLY State of Illinois 2025 and 2026 SB2401 Introduced 2/7/2025, by Sen. Laura Ellman SYNOPSIS AS INTRODUCED: See Index Creates the Wetlands Protection Act. Provides that no person may discharge dredged or fill material into a State jurisdictional wetland except with a permit issued by the Department of Natural Resources. Exempts certain activities from the requirements of the Act. Sets forth procedures for individual permit applications and other related procedural requirements. Provides that the Department shall not issue an individual permit unless the Environmental Protection Agency certifies to the Department that there will not be a violation of State water quality standards. Provides that the Department may issue an after-the-fact permit in certain emergency circumstances. Sets forth financial assurance requirements. Authorizes the Department to adopt general permits under the Act. Provides that any person who intends to conduct a regulated activity may do so in accordance with a general permit issued by the Department, which pre-authorizes a category of activities with minimal adverse effects. Provides procedures and requirements regarding preconstruction notifications. Provides that certain entities may establish and operate a mitigation bank or in lieu fee program. Describes procedures and requirements for mitigation banks. Grants the Department rulemaking powers. Provides that the Department shall prepare certain reports and studies. Provides for the review of final decisions of the Department. Provides for investigations by the Department and enforcement by a State's Attorney or the Attorney General. Provides for a civil penalty not to exceed $10,000 per day of violation, with interest after judgment, and with certain costs, fees, and expenses, payable to the Wetlands Protection Fund. Provides that any person may file a complaint with the Illinois Pollution Control Board concerning a violation of the Act, a rule adopted under the Act, a condition of a permit issued under the Act, or an order of the Pollution Control Board issued under the Act. Provides for county and special district stormwater program authorities to control or regulate activities in any wetlands within their jurisdiction. Establishes the Wetlands Protection Fund. Provides that a permit review fee for all permit applications is to be set by the Department by rule. Makes corresponding changes to the State Finance Act. Makes findings. Defines terms. Effective immediately. LRB104 09737 BDA 19803 b A BILL FOR 104TH GENERAL ASSEMBLY State of Illinois 2025 and 2026 SB2401 Introduced 2/7/2025, by Sen. Laura Ellman SYNOPSIS AS INTRODUCED: See Index See Index Creates the Wetlands Protection Act. Provides that no person may discharge dredged or fill material into a State jurisdictional wetland except with a permit issued by the Department of Natural Resources. Exempts certain activities from the requirements of the Act. Sets forth procedures for individual permit applications and other related procedural requirements. Provides that the Department shall not issue an individual permit unless the Environmental Protection Agency certifies to the Department that there will not be a violation of State water quality standards. Provides that the Department may issue an after-the-fact permit in certain emergency circumstances. Sets forth financial assurance requirements. Authorizes the Department to adopt general permits under the Act. Provides that any person who intends to conduct a regulated activity may do so in accordance with a general permit issued by the Department, which pre-authorizes a category of activities with minimal adverse effects. Provides procedures and requirements regarding preconstruction notifications. Provides that certain entities may establish and operate a mitigation bank or in lieu fee program. Describes procedures and requirements for mitigation banks. Grants the Department rulemaking powers. Provides that the Department shall prepare certain reports and studies. Provides for the review of final decisions of the Department. Provides for investigations by the Department and enforcement by a State's Attorney or the Attorney General. Provides for a civil penalty not to exceed $10,000 per day of violation, with interest after judgment, and with certain costs, fees, and expenses, payable to the Wetlands Protection Fund. Provides that any person may file a complaint with the Illinois Pollution Control Board concerning a violation of the Act, a rule adopted under the Act, a condition of a permit issued under the Act, or an order of the Pollution Control Board issued under the Act. Provides for county and special district stormwater program authorities to control or regulate activities in any wetlands within their jurisdiction. Establishes the Wetlands Protection Fund. Provides that a permit review fee for all permit applications is to be set by the Department by rule. Makes corresponding changes to the State Finance Act. Makes findings. Defines terms. Effective immediately. LRB104 09737 BDA 19803 b LRB104 09737 BDA 19803 b A BILL FOR 104TH GENERAL ASSEMBLY State of Illinois 2025 and 2026 SB2401 Introduced 2/7/2025, by Sen. Laura Ellman SYNOPSIS AS INTRODUCED: See Index See Index See Index Creates the Wetlands Protection Act. Provides that no person may discharge dredged or fill material into a State jurisdictional wetland except with a permit issued by the Department of Natural Resources. Exempts certain activities from the requirements of the Act. Sets forth procedures for individual permit applications and other related procedural requirements. Provides that the Department shall not issue an individual permit unless the Environmental Protection Agency certifies to the Department that there will not be a violation of State water quality standards. Provides that the Department may issue an after-the-fact permit in certain emergency circumstances. Sets forth financial assurance requirements. Authorizes the Department to adopt general permits under the Act. Provides that any person who intends to conduct a regulated activity may do so in accordance with a general permit issued by the Department, which pre-authorizes a category of activities with minimal adverse effects. Provides procedures and requirements regarding preconstruction notifications. Provides that certain entities may establish and operate a mitigation bank or in lieu fee program. Describes procedures and requirements for mitigation banks. Grants the Department rulemaking powers. Provides that the Department shall prepare certain reports and studies. Provides for the review of final decisions of the Department. Provides for investigations by the Department and enforcement by a State's Attorney or the Attorney General. Provides for a civil penalty not to exceed $10,000 per day of violation, with interest after judgment, and with certain costs, fees, and expenses, payable to the Wetlands Protection Fund. Provides that any person may file a complaint with the Illinois Pollution Control Board concerning a violation of the Act, a rule adopted under the Act, a condition of a permit issued under the Act, or an order of the Pollution Control Board issued under the Act. Provides for county and special district stormwater program authorities to control or regulate activities in any wetlands within their jurisdiction. Establishes the Wetlands Protection Fund. Provides that a permit review fee for all permit applications is to be set by the Department by rule. Makes corresponding changes to the State Finance Act. Makes findings. Defines terms. Effective immediately. LRB104 09737 BDA 19803 b LRB104 09737 BDA 19803 b LRB104 09737 BDA 19803 b A BILL FOR SB2401LRB104 09737 BDA 19803 b SB2401 LRB104 09737 BDA 19803 b SB2401 LRB104 09737 BDA 19803 b 1 AN ACT concerning safety. 2 Be it enacted by the People of the State of Illinois, 3 represented in the General Assembly: 4 Section 1. Short title. This Act may be cited as the 5 Wetlands Protection Act. 6 Section 5. Findings and intent. The General Assembly 7 finds: 8 (1) In 1818, Illinois contained an estimated 8.2 million 9 acres of wetlands. Based on the Illinois portion of the 10 National Wetlands Inventory, less than 9% of those original 11 acres of wetlands remain. 12 (2) As a result of the significant loss in wetland 13 acreage, there has been a corresponding loss in the functional 14 values and benefits that wetlands provide. 15 (3) Illinois is bordered by 880 miles of rivers, which are 16 critical to navigation, commerce, recreation, and ecosystem 17 health at home and downstream to the Gulf of Mexico, and the 18 health of Illinois rivers is heavily influenced by the health 19 of the tributaries and streams that flow into them. 20 (4) In Illinois, 9,894 total miles of streams provide 21 water for surface water intakes, supplying public drinking 22 water systems that rely at least in part on intermittent, 23 ephemeral, or headwater streams. 104TH GENERAL ASSEMBLY State of Illinois 2025 and 2026 SB2401 Introduced 2/7/2025, by Sen. Laura Ellman SYNOPSIS AS INTRODUCED: See Index See Index See Index Creates the Wetlands Protection Act. Provides that no person may discharge dredged or fill material into a State jurisdictional wetland except with a permit issued by the Department of Natural Resources. Exempts certain activities from the requirements of the Act. Sets forth procedures for individual permit applications and other related procedural requirements. Provides that the Department shall not issue an individual permit unless the Environmental Protection Agency certifies to the Department that there will not be a violation of State water quality standards. Provides that the Department may issue an after-the-fact permit in certain emergency circumstances. Sets forth financial assurance requirements. Authorizes the Department to adopt general permits under the Act. Provides that any person who intends to conduct a regulated activity may do so in accordance with a general permit issued by the Department, which pre-authorizes a category of activities with minimal adverse effects. Provides procedures and requirements regarding preconstruction notifications. Provides that certain entities may establish and operate a mitigation bank or in lieu fee program. Describes procedures and requirements for mitigation banks. Grants the Department rulemaking powers. Provides that the Department shall prepare certain reports and studies. Provides for the review of final decisions of the Department. Provides for investigations by the Department and enforcement by a State's Attorney or the Attorney General. Provides for a civil penalty not to exceed $10,000 per day of violation, with interest after judgment, and with certain costs, fees, and expenses, payable to the Wetlands Protection Fund. Provides that any person may file a complaint with the Illinois Pollution Control Board concerning a violation of the Act, a rule adopted under the Act, a condition of a permit issued under the Act, or an order of the Pollution Control Board issued under the Act. Provides for county and special district stormwater program authorities to control or regulate activities in any wetlands within their jurisdiction. Establishes the Wetlands Protection Fund. Provides that a permit review fee for all permit applications is to be set by the Department by rule. Makes corresponding changes to the State Finance Act. Makes findings. Defines terms. Effective immediately. LRB104 09737 BDA 19803 b LRB104 09737 BDA 19803 b LRB104 09737 BDA 19803 b A BILL FOR See Index LRB104 09737 BDA 19803 b SB2401 LRB104 09737 BDA 19803 b SB2401- 2 -LRB104 09737 BDA 19803 b SB2401 - 2 - LRB104 09737 BDA 19803 b SB2401 - 2 - LRB104 09737 BDA 19803 b 1 (5) Continued loss of Illinois' wetlands and streams may 2 deprive the People of the State of some or all of the benefits 3 that they provide, including: 4 (A) reducing flood damages and protecting vulnerable 5 communities by absorbing, storing, and conveying peak 6 flows from storms; 7 (B) improving water quality by serving as 8 sedimentation and filtering basins and as natural 9 biological treatment areas; 10 (C) providing breeding, nesting, foraging, and 11 protective habitat for approximately 40% of the State's 12 threatened and endangered plants and animals, in addition 13 to other forms of fish, wildlife, game, waterfowl, and 14 shorebirds; 15 (D) protecting underground water resources and helping 16 to recharge rivers, streams, and local or regional 17 underground water supplies; 18 (E) serving as recreational areas for hunting, 19 fishing, boating, hiking, bird watching, photography, and 20 other uses; 21 (F) providing open space and aesthetic values, 22 particularly in rapidly developing areas; 23 (G) providing unique educational and research 24 opportunities because of their high diversity of plants 25 and animals, their support for a high incidence of 26 threatened and endangered species, and their function as a SB2401 - 2 - LRB104 09737 BDA 19803 b SB2401- 3 -LRB104 09737 BDA 19803 b SB2401 - 3 - LRB104 09737 BDA 19803 b SB2401 - 3 - LRB104 09737 BDA 19803 b 1 natural buffer for rivers, lakes, and streams; 2 (H) supplying nutrients in freshwater food cycles and 3 serving as nursery areas and sanctuaries for young fish; 4 and 5 (I) helping to protect shorelines from the forces of 6 water erosion. 7 (6) Our changing climate and its more extreme and less 8 predictable weather patterns heighten the need for some or all 9 of the benefits that Illinois' wetlands provide, including 10 flood control, coastal resilience, water quality, aquifer 11 recharge, habitat, and maintenance of baseflow to recharge 12 rivers, streams, and local or regional underground water 13 supplies. 14 (7) Illinois historically relied on the federal Clean 15 Water Act's permit program administered by the U.S. Army Corps 16 of Engineers and the U.S. Environmental Protection Agency to 17 prevent harm to aquatic resources from unauthorized discharges 18 of dredge or fill material. 19 (8) After rejection of the 1989 Wetland Delineation Manual 20 and in light of uncertainty about federal protections for some 21 "isolated" wetlands, the General Assembly passed the 22 Interagency Wetland Policy Act of 1989 to protect these 23 wetlands from State agency actions and achieve no net loss of 24 wetlands. 25 (9) The Supreme Court's May 25, 2023 decision in Sackett 26 v. EPA rolled back the scope of waters of the United States, SB2401 - 3 - LRB104 09737 BDA 19803 b SB2401- 4 -LRB104 09737 BDA 19803 b SB2401 - 4 - LRB104 09737 BDA 19803 b SB2401 - 4 - LRB104 09737 BDA 19803 b 1 thereby removing federal Clean Water Act protections for many 2 waters of the United States, including wetlands that provide 3 significant flood control protections, such as bottomland 4 hardwood forested wetlands that are separated from the 5 Illinois River by levees. 6 (10) It is important for Illinois to adopt protections 7 under State law to reinstate protections lost by rolling back 8 the scope of the federal Clean Water Act. 9 Section 10. Definitions. As used in this Act: 10 "Adjacent" means bordering, contiguous, or neighboring. 11 "Adjacent wetlands" includes wetlands separated from 12 waters of the United States by man-made dikes or barriers, 13 natural river berms, beach dunes, and other man-made or 14 natural structures. 15 "Affected property" means any property upon which a 16 regulated activity is conducted. 17 "Agency" means the Illinois Environmental Protection 18 Agency. 19 "Approved county or district" means a county or special 20 district with a stormwater program that has been approved 21 under Section 55 to issue permits under this Act instead of the 22 Department of Natural Resources. 23 "Approved wetland specialist" means a person who has met 24 the educational, training, and field experience requirements 25 that have been adopted, by rule, under this Act or set forth in SB2401 - 4 - LRB104 09737 BDA 19803 b SB2401- 5 -LRB104 09737 BDA 19803 b SB2401 - 5 - LRB104 09737 BDA 19803 b SB2401 - 5 - LRB104 09737 BDA 19803 b 1 an approved county or district code and that assure 2 knowledgeable wetland delineations using the Corps of 3 Engineers Wetland Delineation Manual in a manner that is 4 consistent with subsection (f) of Section 25 of this Act. 5 "Avoidance" means any action that is taken in a manner 6 that will cause a regulated activity not to occur and that is 7 consistent with the federal Clean Water Act 404(b)(1) 8 Guidelines developed by the U.S. Environmental Protection 9 Agency and the U.S. Army Corps of Engineers. 10 "Bog" means a peat-accumulating wetland that has no 11 significant inflows or outflows and that supports acidophilic 12 mosses, particularly sphagnum, resulting in highly acidic 13 conditions. 14 "Bottomland hardwood" means forested riverine floodplain 15 forest, including flatwoods in northeastern Illinois, that are 16 located in the 100-year flood plain of Illinois rivers and 17 streams and that are at least seasonally flooded. 18 "Class I wetland" means a top tier wetland as indicated by 19 type (such as bog, bottomland hardwood forest, or panne), 20 designation (such as Ramsar wetland of international 21 importance), or function (such as threatened or endangered 22 species habitat or important flood protection) consistent with 23 Section 25 of this Act. Class I wetlands do not include waters 24 of the United States. 25 "Class II wetland" means a wetland, including its 26 contiguous area, that is larger than 0.5 acres and is not a SB2401 - 5 - LRB104 09737 BDA 19803 b SB2401- 6 -LRB104 09737 BDA 19803 b SB2401 - 6 - LRB104 09737 BDA 19803 b SB2401 - 6 - LRB104 09737 BDA 19803 b 1 Class I wetland. Class II wetlands do not include waters of the 2 United States. 3 "Class III wetland" means a wetland, including its 4 contiguous area, that is between 0.1 acres and 0.5 acres and is 5 not a Class I wetland. Class III wetlands do not include waters 6 of the United States. 7 "Commercial battery energy storage system" means a type of 8 energy storage system that uses batteries to store and 9 distribute energy in the form of electricity for the primary 10 purpose of wholesale or retail sale and is not intended 11 primarily for use on the property on which the device or 12 devices reside. 13 "Commercial solar energy facility" means a "commercial 14 solar energy system" as defined in Section 10-720 of the 15 Illinois Property Tax Code. 16 "Contiguous area" means the portion of a wetland that 17 extends beyond the property boundary of the affected property. 18 "Corps of Engineers" means the U.S. Army Corps of 19 Engineers. 20 "Corps of Engineers Wetlands Delineation Manual" means the 21 1987 U.S. Army Corps of Engineers, Wetlands Delineation 22 Manual, Research Program Technical Report Y-87-1, and any 23 applicable Regional Supplements thereto in effect May 24, 24 2023. 25 "Cypress swamp" means forested, permanent, or 26 semi-permanent bodies of water, with species assemblages SB2401 - 6 - LRB104 09737 BDA 19803 b SB2401- 7 -LRB104 09737 BDA 19803 b SB2401 - 7 - LRB104 09737 BDA 19803 b SB2401 - 7 - LRB104 09737 BDA 19803 b 1 characteristic of the Gulf of Mexico and Southeastern Coastal 2 Plains and including bald cypress, which are typically found 3 in far southern Illinois. 4 "Department" means the Department of Natural Resources. 5 "Director" means the Director of Natural Resources. 6 "Discharge" means any addition of dredged or fill material 7 into, including redeposit of dredged material other than 8 incidental fallback within, State jurisdictional wetlands. 9 "Dredged material" means material that is excavated or 10 dredged from waters of the U.S. and waters of the State. 11 "Fen" means a wetland fed by an alkaline water source, 12 such as a calcareous spring or seep. 13 "Fill material" means material placed in a State 14 jurisdictional wetland where the material has the effect of 15 replacing any portion of a State jurisdictional wetland with 16 dry land or changing the bottom elevation of any portion of a 17 State jurisdictional wetland. 18 "General permit" means a permit issued by an approved 19 county or district, or the Department, in a manner that is 20 authorized under Section 40 of this Act. "General permit" 21 includes a U.S. Army Corps of Engineers nationwide permit. 22 "High-Quality Aquatic Resources" or "HQAR" means 23 high-quality aquatic resources consistent with the guidelines 24 of the Chicago District of the U.S. Army Corps of Engineers or 25 approved county or district codes. 26 "Individual permit" means a permit issued by the SB2401 - 7 - LRB104 09737 BDA 19803 b SB2401- 8 -LRB104 09737 BDA 19803 b SB2401 - 8 - LRB104 09737 BDA 19803 b SB2401 - 8 - LRB104 09737 BDA 19803 b 1 Department under Section 25 of this Act after case-specific 2 sequenced review (avoidance, minimization, mitigation) of the 3 proposed project and certification of compliance with State 4 water quality standards. 5 "In lieu fee mitigation" means a payment to an approved in 6 lieu fee program made by a permittee to satisfy a mitigation 7 requirement in accordance with this Act and implementing 8 rules. 9 "Maintenance" means work to repair and keep in good 10 working order existing structures in wetlands, including 11 emergency reconstruction of recently damaged parts of 12 currently serviceable structures, including dikes, dams, 13 levees, groins, riprap, breakwaters, causeways, and bridge 14 abutments or approaches, and transportation structures. 15 "Maintenance" does not include any modification that changes 16 the character, scope, or size of the original fill design but 17 such a modification may be eligible to use Nationwide Permit 18 3, Maintenance. 19 "Metropolitan Water Reclamation District" or "district" 20 means a special district organized under the Metropolitan 21 Water Reclamation District Act. 22 "Minimization" means reducing, as much as practicable, the 23 adverse environmental impact of an unavoidable regulated 24 activity in a manner that is consistent with this Act and the 25 federal Clean Water Act 404(b)(1) Guidelines developed by the 26 U.S. Environmental Protection Agency and the U.S. Army Corps SB2401 - 8 - LRB104 09737 BDA 19803 b SB2401- 9 -LRB104 09737 BDA 19803 b SB2401 - 9 - LRB104 09737 BDA 19803 b SB2401 - 9 - LRB104 09737 BDA 19803 b 1 of Engineers. 2 "Mitigation" means the restoration, establishment, 3 enhancement, or protection and maintenance of wetlands and 4 other aquatic resources for the purpose of compensating for 5 unavoidable adverse impacts that remain after all appropriate 6 and practicable avoidance and minimization have been achieved. 7 Mitigation must be consistent with the requirements of this 8 Act. Mitigation may include wetlands creation if authorized by 9 the Department in situations in which other mitigation is 10 impractical and the likelihood of success is high. Wetland 11 creation is restricted to areas that are currently 12 non-wetlands. 13 "Mitigation bank" means a site, or suite of sites, where 14 aquatic resources, such as wetlands, streams, wetland buffers, 15 and riparian areas, are restored, established, enhanced, or 16 preserved for the purpose of providing compensatory mitigation 17 for impacts authorized by permits under this Act. 18 "Nationwide permit" means a nationwide permit issued by 19 the U.S. Army Corps of Engineers as of the effective date of 20 this Act. 21 "Navigable water" means traditionally navigable waters 22 that were historically navigable, are presently navigable, or 23 are susceptible to future navigable use. Navigable water also 24 includes interstate waters (including interstate wetlands), 25 impoundments of traditionally navigable waters and interstate 26 waters (including interstate wetlands), and tributaries. SB2401 - 9 - LRB104 09737 BDA 19803 b SB2401- 10 -LRB104 09737 BDA 19803 b SB2401 - 10 - LRB104 09737 BDA 19803 b SB2401 - 10 - LRB104 09737 BDA 19803 b 1 "Ordinary high water mark" means that line on the shore 2 established by the fluctuations of water and indicated by 3 physical characteristics, such as a clear, natural line 4 impressed on the bank, shelving, changes in the character of 5 soil, destruction of terrestrial vegetation, the presence of 6 litter and debris, or other appropriate means that consider 7 the characteristics of the surrounding areas. 8 "Panne" means wet interdunal flats located near Lake 9 Michigan. "Panne" includes dune and swale wetlands. 10 "Permit" means a written authorization issued by the 11 Department of Natural Resources under this Act and 12 implementing rules. "Permit" includes general permits and 13 individual permits. 14 "Person" means an individual, partnership, co-partnership, 15 firm, company, limited liability company, corporation, 16 association, joint-stock company, trust, estate, political 17 subdivision, state or federal agency or other legal entity, or 18 its legal representative, employee, agent or assigns. 19 "Preconstruction notification" means notice that a 20 permittee must provide the Department before undertaking an 21 activity authorized by a general permit. 22 "Prior converted cropland" means a wetland that was 23 converted to agricultural use before December 23, 1985, that 24 had an agricultural commodity produced on it at least once 25 before December 23, 1985, that remains available for 26 agricultural commodity production, and that, as of December SB2401 - 10 - LRB104 09737 BDA 19803 b SB2401- 11 -LRB104 09737 BDA 19803 b SB2401 - 11 - LRB104 09737 BDA 19803 b SB2401 - 11 - LRB104 09737 BDA 19803 b 1 23, 1985, did not support woody vegetation and met the 2 following hydrologic criteria for a farmed wetland: (i) 3 inundation was less than 15 consecutive days during the 4 growing season or 10% of the growing season, whichever is 5 less, in most years (50% chance or more); and (ii) if a 6 pothole, ponding was less than 7 consecutive days during the 7 growing season in most years (50% chance or more) and 8 saturation was less than 14 consecutive days during the 9 growing season most years (50% chance or more). However, if 10 the prior converted cropland is changed out of agricultural 11 use (including conservation) and the area reverts to a 12 wetland, the area may become subject to this Act under Section 13 15. 14 "Regulated activity" means the discharge of dredged or 15 fill material into a State jurisdictional wetland subject to 16 this Act. 17 "Renewable energy facility" means (i) a commercial solar 18 energy facility or commercial battery energy storage system; 19 or (ii) supporting facilities. Supporting facilities mean 20 transmission lines, substations, access roads, meteorological 21 towers, storage containers, and equipment associated with the 22 generation and storage of electricity by a commercial solar 23 energy facility. 24 "Significant nexus" means connectivity or nexus to 25 maintaining the chemical, physical, or biological integrity of 26 navigable waters. SB2401 - 11 - LRB104 09737 BDA 19803 b SB2401- 12 -LRB104 09737 BDA 19803 b SB2401 - 12 - LRB104 09737 BDA 19803 b SB2401 - 12 - LRB104 09737 BDA 19803 b 1 "State jurisdictional wetland" means a wetland that is 2 protected by the requirements of this Act and is identified 3 consistent with Department rules adopted under Section 40 of 4 this Act. State jurisdictional wetlands are adjacent to or 5 otherwise have a significant nexus to maintaining the 6 chemical, physical, or biological integrity of navigable 7 waters. A State jurisdictional wetland does not include waters 8 of the United States. 9 "Threatened or endangered species" means those species 10 that have been designated as threatened or endangered under 11 the Illinois Endangered Species Protection Act and those 12 species that have been listed as threatened or endangered 13 under the federal Endangered Species Act. 14 "Upland" means non-wetland, dry land. 15 "Voluntary aquatic habitat restoration project" means 16 activities that are voluntarily undertaken (not as required 17 mitigation) to restore, reestablish, rehabilitate, or enhance 18 altered, degraded, or former aquatic habitats that result in a 19 net increase in aquatic habitat functions and services 20 consistent with historic, pre-disturbance functions and 21 services of the aquatic habitat. 22 "Wetlands" means those areas that are inundated or 23 saturated by surface or groundwater at a frequency and 24 duration sufficient to support, and that under normal 25 circumstances do support, a prevalence of vegetation typically 26 adapted for life in saturated soil conditions. "Wetlands" SB2401 - 12 - LRB104 09737 BDA 19803 b SB2401- 13 -LRB104 09737 BDA 19803 b SB2401 - 13 - LRB104 09737 BDA 19803 b SB2401 - 13 - LRB104 09737 BDA 19803 b 1 includes areas that are delineated in accordance with the 2 Corps of Engineers Wetland Delineation Manual. 3 Section 15. Exemptions. 4 (a) Consistent with Section 404(f) of the federal Clean 5 Water Act, as long as they do not have as their purpose 6 bringing a wetland into a use to which it was not previously 7 subject where the flow or circulation of navigable waters may 8 be impaired or the reach of such waters be reduced and do not 9 entail discharge of toxic pollutants consistent with Section 10 307 of the Clean Water Act, the following activities are not 11 prohibited by or otherwise subject to regulation under this 12 Act: 13 (1) Normal farming, silviculture, and ranching 14 activities, including plowing, seeding, cultivating, minor 15 drainage, and harvesting for the production of food, 16 fiber, and forest products, or upland soil and water 17 conservation practices. 18 (2) Maintenance, including emergency reconstruction of 19 recently damaged parts, of currently serviceable 20 structures, such as dikes, dams, levees, groins, riprap, 21 breakwaters, causeways, bridge abutments or approaches, 22 and transportation structures. Maintenance does not 23 include any modification that changes the character, 24 scope, or size of the original fill design. Emergency 25 reconstruction must occur within a reasonable period of SB2401 - 13 - LRB104 09737 BDA 19803 b SB2401- 14 -LRB104 09737 BDA 19803 b SB2401 - 14 - LRB104 09737 BDA 19803 b SB2401 - 14 - LRB104 09737 BDA 19803 b 1 time after damage occurs in order to qualify for this 2 exemption. 3 (3) Construction or maintenance of farm or stock ponds 4 or irrigation ditches, or the maintenance (but not 5 construction) of drainage ditches. Discharge associated 6 with siphons, pumps, headgates, wingwalls, weirs, 7 diversion structures, and such other facilities as are 8 appurtenant and functionally related to irrigation and 9 ditches are included in this definition. 10 (4) Construction of temporary sedimentation basins on 11 a construction site which does not include any regulated 12 activities within a wetland. As used in this paragraph, 13 the term "construction site" means any site involving the 14 erection of buildings, roads, and other discrete 15 structures and the installation of support facilities 16 necessary for construction and utilization of such 17 structures. "Construction site" also includes any other 18 land areas which involve land-disturbing excavation 19 activities, including quarrying or other mining 20 activities, where an increase in the runoff of sediment is 21 controlled through the use of temporary sedimentation 22 basins. 23 (5) Construction or maintenance of farm roads or 24 forest roads or temporary roads for moving mining 25 equipment, where such roads are constructed and 26 maintained, in accordance with best management practices, SB2401 - 14 - LRB104 09737 BDA 19803 b SB2401- 15 -LRB104 09737 BDA 19803 b SB2401 - 15 - LRB104 09737 BDA 19803 b SB2401 - 15 - LRB104 09737 BDA 19803 b 1 to assure that flow and circulation patterns and chemical 2 and biological characteristics of the wetland are not 3 impaired, that the reach of the wetland is not reduced, 4 and that any adverse effect on the aquatic environment 5 will be otherwise minimized. 6 (6) Activities for the placement of pilings for linear 7 projects, including bridges, elevated walkways, and power 8 line structures in accordance with best management 9 practices, to assure that the flow and circulation 10 patterns and chemical and biological characteristics of 11 the wetland are not impaired, that the reach of the 12 wetland is not reduced, and that any adverse effect on the 13 aquatic environment will be otherwise minimized. 14 (b) Any exemption that is authorized by and pertaining to 15 wetlands that are subject to regulation under the federal 16 Clean Water Act, or regulations promulgated thereunder, at the 17 time of enactment of this Act, shall also be an exemption for 18 the purpose of this Act. 19 (c) The following are exempt from regulation as State 20 jurisdictional wetlands under this Act: 21 (1) Waste treatment systems, including treatment ponds 22 or lagoons designed to meet the requirements of the 23 federal Clean Water Act and comply with State water 24 quality standards. 25 (2) Prior converted cropland unless there has been a 26 change in use out of agricultural or conservation use and SB2401 - 15 - LRB104 09737 BDA 19803 b SB2401- 16 -LRB104 09737 BDA 19803 b SB2401 - 16 - LRB104 09737 BDA 19803 b SB2401 - 16 - LRB104 09737 BDA 19803 b 1 the area reverts to a wetland. 2 (3) Ditches (including roadside ditches) excavated 3 wholly in and draining only dry land and that do not carry 4 a relatively permanent flow of water. 5 (4) An artificially irrigated area that would revert 6 to upland if the irrigation ceased. This shall also 7 include the pumping of water for purposes of waterfowl 8 hunting or creating waterfowl habitat. 9 (5) An artificial lake or pond created by excavating 10 or diking upland to collect and retain water and which are 11 used exclusively for such purposes as stock watering, 12 irrigation, settling basins, or rice growing. 13 (6) Artificial reflecting or swimming pools or other 14 small ornamental bodies of water created by excavating or 15 diking dry land to retain water for primarily aesthetic 16 reasons. 17 (7) A water-filled depression created in dry land 18 incidental to construction activity and pits excavated in 19 dry land for the purpose of obtaining fill, sand, or 20 gravel unless and until the construction or excavation 21 operation is abandoned and the resulting water body meets 22 the definition of "waters of the State" consistent with 23 the Environmental Protection Act, including Section 3.550 24 of the Environmental Protection Act. 25 (8) Swales and erosional features, including gullies, 26 rills, and small washes, characterized by low volume, SB2401 - 16 - LRB104 09737 BDA 19803 b SB2401- 17 -LRB104 09737 BDA 19803 b SB2401 - 17 - LRB104 09737 BDA 19803 b SB2401 - 17 - LRB104 09737 BDA 19803 b 1 infrequent, or short duration flow. 2 (9) Wetlands created by the construction of stormwater 3 facilities in upland areas, provided that the facility was 4 not created for the purpose of wetland mitigation. 5 (d) Any activity with respect to which a county or special 6 district has an approved program under Section 55 of this Act. 7 Section 20. Applicability. 8 (a) The requirements of this Act apply to all State 9 jurisdictional wetlands as that term is defined in this Act. 10 If a wetland ceases to meet that definition because it becomes 11 subject to regulation under the federal Clean Water Act, it 12 shall no longer be subject to the provisions of this Act. The 13 Department may enter into an agreement with the Corps of 14 Engineers to coordinate the permit program under this Act with 15 the Corps of Engineers permit program under Section 404 of the 16 federal Clean Water Act. 17 (b) The following are presumed to be adjacent or have a 18 significant nexus to maintaining the chemical, physical, or 19 biological integrity of a navigable water and as such are 20 State jurisdictional wetlands for purposes of this Act: 21 (1) wetlands that are wholly or partially located 22 within 100 feet of the ordinary high water mark of a 23 navigable water, interstate water, or tributary; 24 (2) wetlands that are wholly or partially located in 25 the 100-year floodplain and are within 1,500 feet of the SB2401 - 17 - LRB104 09737 BDA 19803 b SB2401- 18 -LRB104 09737 BDA 19803 b SB2401 - 18 - LRB104 09737 BDA 19803 b SB2401 - 18 - LRB104 09737 BDA 19803 b 1 ordinary high water mark of a navigable water, interstate 2 water, or tributary; 3 (3) wetlands that are wholly or partially within 1,500 4 feet of the ordinary high water mark of Lake Michigan; or 5 (4) wetlands that have a visible surface water or a 6 regular shallow subsurface water connection to a navigable 7 water. 8 (c) An affected property owner or developer may introduce 9 information that is relevant to demonstrate that a particular 10 wetland is not a State jurisdictional wetland, thereby 11 rebutting the presumption in subsection (b). The Department 12 shall consider information presented to rebut the presumption 13 and determine whether the presumption has been rebutted. If 14 the Department determines that the presumption is rebutted and 15 the wetland is not a jurisdictional wetland for the purpose of 16 this Act, the wetland shall not be subject to this Act. 17 Section 25. Regulated activities; individual permits; 18 wetland classification; mitigation; delineation. 19 (a) No person may discharge dredged or fill material into 20 a State jurisdictional wetland protected by this Act except in 21 accordance with the terms of an individual or general permit 22 issued by the Department under this Section or Section 30 of 23 this Act. This subsection (a) becomes effective on the date 24 the Department adopts rules under Section 40 of this Act. 25 (b) No permit shall be required under this Act, and the SB2401 - 18 - LRB104 09737 BDA 19803 b SB2401- 19 -LRB104 09737 BDA 19803 b SB2401 - 19 - LRB104 09737 BDA 19803 b SB2401 - 19 - LRB104 09737 BDA 19803 b 1 requirements of the Act shall not apply to, renewable energy 2 facility construction, maintenance, repair, improvement, or 3 reconstruction that commenced construction before the 4 effective date of rules adopted under Section 40 of this Act. 5 For purposes of this subsection, "commenced construction" 6 means: 7 (1) to have begun a continuous program of on-site 8 physical construction, such as the placement, assembly, or 9 installation of facilities or equipment or the conducting 10 of site preparation work, including clearing, excavation, 11 or removal of existing structures; 12 (2) to have submitted a binding application or bid to 13 the Illinois Power Agency to execute a Renewable Energy 14 Credit Contract under Section 1-75 of the Illinois Power 15 Agency Act; 16 (3) to have entered into a binding contractual 17 agreement for the purchase and sale of electricity; or 18 (4) to have obtained municipal or county siting 19 approval, a special use permit, or building approval. 20 (c) Wetlands shall be classified as follows: 21 (1) The Department shall classify a wetland as Class I 22 if the wetland: 23 (A) is or encompasses a bog, bottomland hardwood 24 forest, fen, panne, or cypress swamp; 25 (B) has been designated a Ramsar wetland of 26 international importance under the Convention on SB2401 - 19 - LRB104 09737 BDA 19803 b SB2401- 20 -LRB104 09737 BDA 19803 b SB2401 - 20 - LRB104 09737 BDA 19803 b SB2401 - 20 - LRB104 09737 BDA 19803 b 1 Wetlands; 2 (C) is designated for important flood protection 3 services under paragraph (3); 4 (D) is occupied or suitable habitat for a 5 threatened or endangered species listed under State or 6 federal law; 7 (E) has a Floristic Quality Index that is equal to 8 or greater than 20 or a mean coefficient of 9 conservatism (Mean C) equal to or greater than 3.5, 10 determined in accordance with rules adopted by the 11 Department; or 12 (F) is a High-Quality Aquatic Resource. 13 (2) The Department shall classify a non-Class I 14 wetland as a Class II wetland if the wetland, including 15 its contiguous area, is larger than 0.5 acres. However, if 16 a non-Class I wetland is smaller than 0.5 acres it shall be 17 designated a Class III wetland. If a Class III wetland is 18 1/10th of an acre or smaller, there is no permit required. 19 (3) The Department may, in consultation with the 20 Illinois Emergency Management Agency and Office of 21 Homeland Security, the Federal Emergency Management Agency 22 or local authorities, designate a wetland as a Class I 23 wetland due to important flood protection services 24 protecting human life and property if the wetland is no 25 longer protected under the federal Clean Water Act. 26 (c) Mitigation shall be required in accordance with this SB2401 - 20 - LRB104 09737 BDA 19803 b SB2401- 21 -LRB104 09737 BDA 19803 b SB2401 - 21 - LRB104 09737 BDA 19803 b SB2401 - 21 - LRB104 09737 BDA 19803 b 1 Act for permitted activities and shall be conducted according 2 to the following preferred order: 3 (1) Discharges impacting Class I wetlands shall be 4 mitigated through either on-site mitigation or off-site 5 mitigation at an approved wetland mitigation bank within 6 the same watershed as the location of the proposed fill. 7 Mitigation shall be in kind, restoring to the maximum 8 degree practicable, as determined by the Department, both 9 the type and functions of the wetland that will be 10 affected by the regulated activity. The mitigation ratio 11 shall be 5:1 unless the Director, for good cause shown and 12 on a case-by-case basis, authorizes a higher mitigation 13 ratio not to exceed 6:1 or a lower mitigation ratio not 14 less than 4:1. In lieu fee mitigation may be used for 15 mitigation when there are no available mitigation credits 16 within the watershed. 17 (2) Discharges impacting Class II wetlands shall be 18 mitigated through either on-site mitigation or off-site 19 mitigation at an approved wetland mitigation bank within 20 the same watershed as the location of the proposed fill. 21 Mitigation shall be in kind, restoring to the maximum 22 degree practicable as determined by the Department, both 23 the type and functions of the wetland that will be 24 affected by the regulated activity. The mitigation ratio 25 shall be 3:1 unless the Director, for good cause shown and 26 on a case-by-case basis, authorizes a higher mitigation SB2401 - 21 - LRB104 09737 BDA 19803 b SB2401- 22 -LRB104 09737 BDA 19803 b SB2401 - 22 - LRB104 09737 BDA 19803 b SB2401 - 22 - LRB104 09737 BDA 19803 b 1 ratio not to exceed 3.5:1 or a lower mitigation ratio not 2 less than 2.5:1. In lieu fee mitigation may be used for 3 mitigation when there are no available mitigation credits 4 within the watershed. 5 (3) Discharges impacting Class III wetlands shall be 6 mitigated through either participation in an approved 7 wetland mitigation bank or an approved in-lieu fee 8 program, unless the Department for good cause requires in 9 kind on-site mitigation or off-site mitigation at an 10 approved mitigation bank. The mitigation ratio shall be 11 1.5:1 for compensation through an approved wetland 12 mitigation bank and 2:1 for compensation through an 13 approved in-lieu fee program. The Director, for good cause 14 shown and on a case-by-case basis, may authorize a higher 15 or lower mitigation ratio. 16 (d) Persons seeking a permit are responsible for wetland 17 delineation and classification made by or under the 18 supervision of an approved wetland specialist. Wetland 19 delineations shall be made in accordance with the Corps of 20 Engineers Wetland Delineation Manual. Classifications shall be 21 in accordance with this Section or an approved program under 22 Section 55. Delineations by the Corps of Engineers, by 23 approved counties, or by Corps of Engineers approved agencies 24 shall be honored. 25 (e) Persons seeking an individual permit shall provide the 26 Department with a complete application, including, at a SB2401 - 22 - LRB104 09737 BDA 19803 b SB2401- 23 -LRB104 09737 BDA 19803 b SB2401 - 23 - LRB104 09737 BDA 19803 b SB2401 - 23 - LRB104 09737 BDA 19803 b 1 minimum, the following items: (i) a map of the area that will 2 be affected by the activity, including wetland and water 3 boundaries for the areas affected and the existing uses and 4 structures; (ii) a wetland delineation made in accordance with 5 the Corps of Engineers Wetland Delineation Manual by or under 6 the supervision of an approved wetland specialist and this 7 Section; (iii) a description of the proposed activity, 8 including its purpose, the location and dimensions of any 9 structures, grading or fills, drainage, roads, sewers and 10 water supply, parking lots, stormwater facilities, discharge 11 of pollutants and on-site waste disposal; (iv) a description 12 of any public benefit to be derived from the proposed project; 13 (v) a description of avoidance, minimization, and mitigation, 14 including a mitigation plan; and (vi) the names and addresses 15 of adjacent landowners as determined by the current tax 16 assessment rolls. The Department shall notify the applicant 17 within 20 business days if the permit application is 18 incomplete and provide a reasonable time for the applicant to 19 correct deficiencies in the permit application. Within 90 20 business days of receipt of a complete permit application, the 21 Department shall either issue the permit, deny the permit, or 22 issue the permit with conditions. All individual permit 23 decisions are subject to public comment. If a public hearing 24 is held, the deadline to make a permit determination is 25 extended by 45 business days. 26 (f) The Department shall evaluate individual permit SB2401 - 23 - LRB104 09737 BDA 19803 b SB2401- 24 -LRB104 09737 BDA 19803 b SB2401 - 24 - LRB104 09737 BDA 19803 b SB2401 - 24 - LRB104 09737 BDA 19803 b 1 requests through the following sequence: (i) avoidance of 2 impacts to aquatic resources if a less environmentally 3 damaging practicable alternative exists; (ii) minimization of 4 unavoidable impacts by taking appropriate and practicable 5 steps such as reduction of the footprint of the fill; (iii) 6 compensatory mitigation for any remaining impacts to aquatic 7 resources in accordance with this Act. The Department shall 8 not issue an individual permit pursuant to this Section unless 9 the Agency has certified to the Department that the proposed 10 activity will not cause or contribute to a violation of a State 11 water quality standard. The Agency shall, within 80 business 12 days of receipt of a complete application, approve, deny, or 13 approve with conditions the water quality certification. The 14 applicant for a permit may mutually agree to extend the 80-day 15 deadline up to an additional 80 business days in which the 16 Agency must take final action on the water quality 17 certification under this paragraph. If the Agency does not 18 approve, deny, or approve with conditions the water quality 19 certification within the extended time period, the 20 certification requirements shall be waived and the Department 21 may issue their permit decision consistent with the sections 22 of this Act. 23 (g) Upon request by an applicant, the Department may issue 24 an after-the-fact permit if the Department determines that the 25 activities covered by the after-the-fact permit were 26 undertaken and conducted in response to emergency SB2401 - 24 - LRB104 09737 BDA 19803 b SB2401- 25 -LRB104 09737 BDA 19803 b SB2401 - 25 - LRB104 09737 BDA 19803 b SB2401 - 25 - LRB104 09737 BDA 19803 b 1 circumstances that constituted an imminent threat to persons, 2 public infrastructure, personal property, or uninterrupted 3 utility service. The request for an after-the-fact permit must 4 be made as soon as reasonably possible after the event. The 5 Department shall require compensatory mitigation. If the 6 Department for good cause shown denies an after-the-fact 7 permit, the applicant shall be in violation of this Act. 8 However, the applicant and Department may, through mutual 9 agreement, provide for compensatory mitigation, restoration, 10 or other measures to resolve the violation. In such an 11 instance, the applicant may appeal the denial of an 12 after-the-fact permit consistent with the appeals procedures 13 in this Act. 14 (h) The permit applicant and the Department may waive or 15 extend the permit deadlines in this Section through mutual 16 agreement. If the Department is unable to comply with the 17 permit deadlines and they are not waived or extended through 18 mutual agreement, the permit application will be denied 19 without prejudice. 20 Section 30. General permits. 21 (a) Notwithstanding Section 25, any person who intends to 22 conduct a regulated activity within the State may do so in 23 accordance with a general permit issued by the Department 24 under this Section. A general permit pre-authorizes a category 25 of activities that are similar in nature and impact on water SB2401 - 25 - LRB104 09737 BDA 19803 b SB2401- 26 -LRB104 09737 BDA 19803 b SB2401 - 26 - LRB104 09737 BDA 19803 b SB2401 - 26 - LRB104 09737 BDA 19803 b 1 quality, will have only minimal adverse effects when performed 2 separately, will have minimal cumulative impacts on water 3 quality provided the permittee complies with all of the 4 conditions of the general permit, and will not cause or 5 contribute to a violation of State water quality standards. 6 (b) Permits for all categories of activities, subject to 7 the same permit limitations and conditions, that are the 8 subject of a nationwide permit issued by the Corps of 9 Engineers, in effect on the date of the enactment of this Act, 10 are adopted as general permits covering regulated activities 11 subject to this Act. Notwithstanding the foregoing, all such 12 permits will include a preconstruction notification 13 requirement and compensatory mitigation, unless the permit 14 states compensatory mitigation is not required because the 15 work is designed to improve water quality or, with respect to 16 voluntary aquatic habitat restoration, to provide net increase 17 in wetland function. In any case, compensatory mitigation is 18 not required for impacts below 1/10 of an acre. 19 (c) The Department may, through rulemaking in accordance 20 with the Illinois Administrative Procedure Act, adopt general 21 permits covering activities not covered by general permits 22 under subsection (b) of this Section if the Department 23 determines that the activities in the category would be 24 subject to the same permit limitations and conditions and will 25 cause only minimal adverse environmental effects when 26 performed separately, will have only minimal cumulative SB2401 - 26 - LRB104 09737 BDA 19803 b SB2401- 27 -LRB104 09737 BDA 19803 b SB2401 - 27 - LRB104 09737 BDA 19803 b SB2401 - 27 - LRB104 09737 BDA 19803 b 1 adverse effect on the environment, will not cause or 2 contribute to a violation of State water quality standards 3 when performed separately, and will have only a minimal 4 cumulative adverse effect on water quality. The Department 5 shall prescribe best management practices for any general 6 permit issued under this Section. The Department shall include 7 compensatory mitigation requirements in general permits for 8 impacts that exceed 1/10 of an acre. 9 (d) The Department shall adopt a general permit for: 10 (1) construction or maintenance of access roads for 11 utility lines, substations, or related equipment or 12 facilities with adequate culverts, bridges, or other 13 structures to provide freshwater connectivity and passage 14 for fish or other aquatic life; 15 (2) activities for the purpose of preserving and 16 enhancing aviation safety or to prevent an airport hazard; 17 and 18 (3) conservation activities, such as voluntary aquatic 19 habitat restoration and fish passage. 20 The Department shall develop the general permit under 21 paragraph (3) in consultation with local, state, and federal 22 resource agencies, such as the U.S. Fish and Wildlife Service, 23 and qualified non-profit organizations engaged in aquatic 24 habitat restoration as a central part of their mission. 25 (e) No general permit adopted under subsection (b), (c), 26 or (d) of this Section shall be for a period of more than 5 SB2401 - 27 - LRB104 09737 BDA 19803 b SB2401- 28 -LRB104 09737 BDA 19803 b SB2401 - 28 - LRB104 09737 BDA 19803 b SB2401 - 28 - LRB104 09737 BDA 19803 b 1 years after the date of its adoption, and the Department shall 2 revoke or modify such a general permit, after opportunity for 3 public hearing, if the Department determines that the 4 activities authorized by the general permit have an adverse 5 impact on the environment, cause or contribute to a violation 6 of State water quality standards, or are more appropriately 7 authorized by individual permits. 8 (f) Compliance with the terms of a general permit shall be 9 deemed compliance with the provisions of this Act if the 10 applicant: 11 (1) files a preconstruction notification in accordance 12 with regulations adopted under this Act, including the 13 specific requirements of the general permit; 14 (2) files all reports required by the general permit; 15 (3) complies with all limitations required by the 16 general permit; and 17 (4) complies with applicable compensatory mitigation 18 requirements. 19 (g) The Department may respond to a preconstruction 20 notification issued under this Section within 30 days after 21 the Department receives the notice. In any response, the 22 Department may require the applicant to: 23 (1) provide more information to determine whether the 24 applicant's proposed regulated activity is covered by the 25 general permit; 26 (2) file a preconstruction notification for a SB2401 - 28 - LRB104 09737 BDA 19803 b SB2401- 29 -LRB104 09737 BDA 19803 b SB2401 - 29 - LRB104 09737 BDA 19803 b SB2401 - 29 - LRB104 09737 BDA 19803 b 1 different general permit if the Department determines the 2 applicant's proposed activity is not covered by the 3 general permit for which the notification was filed; or 4 (3) apply for an individual permit if the Department 5 determines that the proposed activity does not fall within 6 the scope of any valid general permit. 7 (h) If a person files a preconstruction discharge 8 notification and receives no response under subsection (g) of 9 this Section for a general permit that is valid at the time of 10 the notification but that general permit is later modified, 11 revoked, or expires, that person may proceed as if that 12 general permit were still valid for the purposes of the 13 project for which the preconstruction discharge notification 14 was filed. 15 (i) The Department may require bonds or letters of credit 16 in favor of the State, including conditions sufficient to 17 secure compliance with conditions and limitations of a permit 18 under this Act. 19 Section 35. In lieu fee program; permittee responsible for 20 on-site mitigation and mitigation banking. 21 (a) The following entities may establish and operate a 22 mitigation bank or in lieu fee program consistent with this 23 Act and rules implementing this Act: 24 (1) State agencies; 25 (2) qualified for-profit and non-profit entities; and SB2401 - 29 - LRB104 09737 BDA 19803 b SB2401- 30 -LRB104 09737 BDA 19803 b SB2401 - 30 - LRB104 09737 BDA 19803 b SB2401 - 30 - LRB104 09737 BDA 19803 b 1 (3) units of local government, including, but not 2 limited to, counties, the Metropolitan Water Reclamation 3 District of Greater Chicago (MWRD), soil and water 4 conservation districts, and county forest districts. 5 (b) Mitigation banks may be established on public or 6 private lands and must be located on sites that possess the 7 physical, chemical, and biological characteristics to support 8 establishment of the desired aquatic resources and functions, 9 such as wetland hydrology. 10 A mitigation bank may be approved to provide mitigation 11 for impacts to wetlands that have been approved by the Corps of 12 Engineers under Section 404 of the federal Clean Water Act, 13 for impacts to wetlands under the Illinois Interagency 14 Wetlands Policy Act of 1989, or for both. A mitigation bank 15 must be approved by the Department in accordance with this Act 16 and implementing rules, by an approved county, or by the Corps 17 of Engineers in accordance with the process established in 33 18 CFR 332.8 and 40 CFR 230.98. 19 (c) The requirements for mitigation banks shall include a 20 mitigation bank instrument, long-term management and 21 protection, monitoring requirements, remedial action 22 procedures, reporting requirements, and financial assurances, 23 such as performance bonds. 24 (d) In lieu fee programs must include (i) an agreement 25 between an operating entity listed in subsection (a) and the 26 Department that is similar to a mitigation bank instrument, SB2401 - 30 - LRB104 09737 BDA 19803 b SB2401- 31 -LRB104 09737 BDA 19803 b SB2401 - 31 - LRB104 09737 BDA 19803 b SB2401 - 31 - LRB104 09737 BDA 19803 b 1 (ii) a time-table, such as a requirement to use funds to design 2 and implement restoration projects within 3 years, (iii) 3 accounting requirements, including, but not limited to, 4 watershed-based accounting, (iv) monitoring requirements, (v) 5 reporting requirements, and (vi) financial assurances. Any 6 agency in lieu fee program must have provisions that protect 7 the integrity of the fund and prevent this funding from being 8 reassigned to other uses. 9 (e) The permittee is responsible for on-site mitigation as 10 approved by the Department on a case-by-case basis in 11 accordance with this Act and implementing rules if (i) on-site 12 mitigation has a strong likelihood of success, (ii) the 13 permittee has a Department approved monitoring plan, and (iii) 14 sufficient financial assurances, such as bonds or letters of 15 credit in favor of the State, have been provided as required by 16 the Department to assure long-term success. 17 Section 40. Rulemaking and reporting. 18 (a) The Department shall adopt rules pursuant to the 19 Illinois Administrative Procedure Act: 20 (1) to implement Sections 25 and 30 of this Act within 21 one year after the effective date of this Act, including: 22 (A) rules for the review, issuance, denial, or 23 issuance with conditions of individual permits; and 24 (B) rules to promulgate, revise, or revoke general 25 permits; SB2401 - 31 - LRB104 09737 BDA 19803 b SB2401- 32 -LRB104 09737 BDA 19803 b SB2401 - 32 - LRB104 09737 BDA 19803 b SB2401 - 32 - LRB104 09737 BDA 19803 b 1 (2) to administer and prioritize use of funding from 2 the Wetlands Protection Fund under Section 60 of this Act; 3 (3) to approve mitigation banks and in lieu fee 4 programs under Section 35 of this Act, including: 5 (A) criteria that an applicant to operate a 6 mitigation or in lieu fee program under Section 35 of 7 this Act shall meet and that are at least as stringent 8 as the U.S. Army Corps of Engineers requirements set 9 out in 33 CFR Part 332; 10 (B) requirements for in lieu fee agreements 11 consistent with subsection (d) of Section 35 of this 12 Act; 13 (C) priority for mitigation banks and in lieu fee 14 programs that restore previously existing wetlands and 15 small streams; and 16 (D) surety provisions for permittee-responsible 17 on-site mitigation, mitigation banks, and in lieu fee 18 programs; 19 (4) to establish, within one year after the effective 20 date of this Act, the procedures under which a 21 governmental body with a stormwater management program 22 under Section 5-1062 of the Counties Code or under Section 23 7h of the Metropolitan Water Reclamation District Act 24 shall be recognized to have met the conditions of 25 subsection (b) of Section 55 of this Act; 26 (5) to govern State jurisdictional wetlands SB2401 - 32 - LRB104 09737 BDA 19803 b SB2401- 33 -LRB104 09737 BDA 19803 b SB2401 - 33 - LRB104 09737 BDA 19803 b SB2401 - 33 - LRB104 09737 BDA 19803 b 1 determinations; State jurisdictional wetlands are adjacent 2 to or otherwise have a significant nexus to maintaining 3 the chemical, physical or biological integrity of 4 navigable waters; 5 (6) to establish procedures and standards for 6 rebutting a significant nexus presumption under Section 20 7 of this Act; 8 (7) to provide for approval of wetland delineators 9 consistent with subsection (f) of Section 25 of this Act, 10 including recognition of existing county, special 11 district, or U.S. Army Corps of Engineers wetland 12 delineator training programs, approval programs, or both; 13 and 14 (8) to otherwise implement and administer this Act. 15 (b) The Department may provide by rule for any 16 requirements regarding bonds or letters of credit in favor of 17 the State, including conditions sufficient to secure 18 compliance with conditions and limitations of a permit. 19 (c) The Department may consult with the Illinois Water 20 Plan Task Force. 21 (d) The Department shall seek to create a joint permit 22 process with the U.S. Army Corps of Engineers. 23 (e) Subject to appropriation, the Department shall do all 24 of the following: 25 (1) provide a report to the Governor and the Illinois 26 General Assembly regarding implementation of this Act and SB2401 - 33 - LRB104 09737 BDA 19803 b SB2401- 34 -LRB104 09737 BDA 19803 b SB2401 - 34 - LRB104 09737 BDA 19803 b SB2401 - 34 - LRB104 09737 BDA 19803 b 1 recommendations, including legislative proposals, to 2 enhance the effectiveness of this Act; 3 (2) provide recommendations to harmonize these 4 wetlands protections with the Illinois Interagency 5 Wetlands Policy Act of 1989; and 6 (3) study the impact of federal rollback of protection 7 for waters beyond wetlands, such as ephemeral streams, in 8 Illinois and provide recommendations, including possible 9 legislative proposals, to protect the citizens of Illinois 10 and waters of the State. 11 Section 45. Appeal of final Department decisions; judicial 12 review. 13 (a) Any permit applicant who has been denied a permit in 14 whole or in part, and any person who participated in the permit 15 proceeding and who is aggrieved by a decision of the 16 Department to grant a permit in whole or in part, may appeal 17 the decision to the Director within 60 calendar days of the 18 date the permit is granted or denied. In all such appeals, the 19 burden of persuasion shall be on the party appealing the 20 Department's decision. Appeals shall be in accordance with 21 administrative rules set out by the Department, including 22 allowed basis for appeals. 23 (b) A person who is aggrieved by a final decision made 24 under this Act and who has participated in an appeal to the 25 Director under subsection (a) of this Section, including SB2401 - 34 - LRB104 09737 BDA 19803 b SB2401- 35 -LRB104 09737 BDA 19803 b SB2401 - 35 - LRB104 09737 BDA 19803 b SB2401 - 35 - LRB104 09737 BDA 19803 b 1 parties that have participated in the permit process if a 2 permit was granted, may seek judicial review of the Director's 3 decision under the Administrative Review Law. 4 Section 50. Investigation; enforcement. 5 (a) In accordance with constitutional limitations, the 6 Department shall have authority to enter at all reasonable 7 times upon any private or public lands for the purpose of 8 inspecting and investigating to ascertain compliance and 9 possible violations of this Act, implementing rules, or permit 10 terms or conditions. 11 (b) The civil penalties provided for in this Section may 12 be recovered in a civil action that may be instituted in a 13 court with jurisdiction over the place where the violation 14 occurred. The State's Attorney of the county in which the 15 alleged violation occurred, or the Attorney General may, at 16 the request of the Department or on the State's Attorney's or 17 Attorney General's own motion, institute a civil action in a 18 court of competent jurisdiction to recover civil penalties and 19 to obtain an injunction to restrain violations of this Act and 20 to compel compliance with this Act. 21 (c) Any person who violates any provision of this Act, any 22 rule adopted under this Act, any permit issued under this Act, 23 or any term or condition of a permit issued under this Act 24 shall be liable for a civil penalty not to exceed $10,000 per 25 day of violation. Any such penalty shall be made payable to the SB2401 - 35 - LRB104 09737 BDA 19803 b SB2401- 36 -LRB104 09737 BDA 19803 b SB2401 - 36 - LRB104 09737 BDA 19803 b SB2401 - 36 - LRB104 09737 BDA 19803 b 1 Wetlands Protection Fund and shall be deposited into that Fund 2 as provided in Section 60. In assessing a penalty, courts 3 shall consider any matters of record including: 4 (1) the duration and gravity of the violation; 5 (2) the presence or absence of due diligence on the 6 part of the violator in attempting to comply with the Act; 7 (3) any economic benefits accrued by the violator 8 through the violation; 9 (4) the likely deterrence effect of the penalty; 10 (5) any history on the part of the violator of past 11 violations of this Act; and 12 (6) a recommendation by the Department to limit or 13 waive penalties. 14 (d) All final orders imposing civil penalties under this 15 Section shall prescribe the deadline for payment. If such a 16 penalty is not paid within the time prescribed, interest on 17 the penalty shall be charged at the rate set forth in 18 subsection (a) of Section 1003 of the Illinois Income Tax Act 19 unless the deadline for payment is stayed by a court pending 20 appeal. 21 (e) The Department may terminate a permit if the permittee 22 violated the terms or conditions of the permit, obtained the 23 permit by misrepresentation, or failed to disclose relevant 24 facts. 25 (f) The Attorney General or State's Attorney of the county 26 where the affected wetland is located, may, upon his or her own SB2401 - 36 - LRB104 09737 BDA 19803 b SB2401- 37 -LRB104 09737 BDA 19803 b SB2401 - 37 - LRB104 09737 BDA 19803 b SB2401 - 37 - LRB104 09737 BDA 19803 b 1 motion or upon request of the Department, institute a civil 2 action in circuit court for an injunction or other appropriate 3 legal action to restrain a violation of this Act. In the 4 proceeding, the court shall determine whether a violation of 5 this Act has been committed, and shall enter any order it 6 considers necessary to remove the effects of the violation and 7 to prevent the violation from occurring, continuing or being 8 renewed in the future. An order may include a requirement that 9 the violator restore the affected wetland area, including a 10 provision that, if the violator does not comply by restoring 11 the wetland within a reasonable time, the Department may 12 restore the wetland to its condition prior to the violation 13 and the violator shall be liable to the Department for the cost 14 of the restoration. However, the Department retains the right 15 to act to remedy emergency situations, such as threats to 16 public safety, and the violator shall be liable to the 17 Department for the cost of the restoration. 18 (g) Any person, other than the Attorney General or the 19 State's Attorney, may file a complaint with the Illinois 20 Pollution Control Board against any person allegedly violating 21 this Act, any rule adopted under this Act, any permit issued 22 under this Act, or any term or condition of a permit issued 23 under this Act, or any relevant Board order. The Board shall 24 have authority to conduct proceedings upon complaints charging 25 such violations of this Act unless the Board determines that 26 such complaint is duplicative or frivolous. The Board may SB2401 - 37 - LRB104 09737 BDA 19803 b SB2401- 38 -LRB104 09737 BDA 19803 b SB2401 - 38 - LRB104 09737 BDA 19803 b SB2401 - 38 - LRB104 09737 BDA 19803 b 1 impose civil penalties for a violation of this Act as 2 described in subsection (c). 3 (h) Any penalty assessed under this Act, including costs 4 of wetland restoration and any restoration requirement, shall 5 be recorded by the clerk of the court as a lien against the 6 property and shall not be removed until the penalty is paid or 7 the restoration is completed. 8 (i) All costs, fees, and expenses in connection with an 9 enforcement or restoration action shall be assessed as damages 10 against the violator. 11 (j) Enforcement actions under this Section may be 12 concurrent or separate. 13 Section 55. County and special district authority. 14 (a) Nothing in this Act preempts or denies the right of any 15 governmental body with a stormwater management program under 16 Section 5-1062 of the Counties Code or a special district with 17 a stormwater program under Section 7h of the Metropolitan 18 Water Reclamation District Act from controlling or regulating 19 activities in any wetlands within the jurisdiction of the 20 governmental body. 21 (b) Upon the request of a governmental body with a 22 stormwater management program under Section 5-1062 of the 23 Counties Code or under Section 7h of the Metropolitan Water 24 Reclamation District Act, the Director shall, within 30 25 calendar days of receiving the written request or, in the case SB2401 - 38 - LRB104 09737 BDA 19803 b SB2401- 39 -LRB104 09737 BDA 19803 b SB2401 - 39 - LRB104 09737 BDA 19803 b SB2401 - 39 - LRB104 09737 BDA 19803 b 1 of subsection (d), within 30 calendar days after the effective 2 date of this Act, provide a letter of recognition delegating 3 permitting authority under this Act to the county or special 4 district stormwater program. Subject to subsection (c), the 5 letter of recognition shall be provided if the governmental 6 body's stormwater management program: 7 (1) provides wetlands protections that are consistent 8 with the scope and intent of this Act and that are at least 9 as stringent as those in this Act; 10 (2) has an administration and qualified staff to 11 implement the governmental body's stormwater management 12 program; and 13 (3) is implementing and enforcing its stormwater 14 management program. 15 (c) Activities within or affecting wetlands that occur in 16 the jurisdiction of a governmental body with a stormwater 17 management program under Section 5-1062 of the Counties Code 18 or under Section 7h of the Metropolitan Water Reclamation 19 District Act and that meet the requirements of paragraphs (1), 20 (2), and (3) of subsection (b) of this Section are deemed to be 21 in compliance with the requirements of this Act, but must meet 22 those county or special district stormwater management 23 requirements, at a minimum. This also applies during the 24 period that the Department is considering a county's request 25 under subsection (b), but the requirements of this Act do 26 apply until the county has requested recognition under SB2401 - 39 - LRB104 09737 BDA 19803 b SB2401- 40 -LRB104 09737 BDA 19803 b SB2401 - 40 - LRB104 09737 BDA 19803 b SB2401 - 40 - LRB104 09737 BDA 19803 b 1 subsection (b). 2 (d) Lake, Cook, Kane, McHenry, and DuPage Counties and the 3 Metropolitan Water Reclamation District of Greater Chicago are 4 deemed to have requested recognition as of the effective date 5 of this Act, and their programs are deemed to meet the 6 requirements of paragraph (b) of this Section. 7 (e) The Director may rescind recognition status, or place 8 conditions on recognition status, for any county or special 9 district program as set out in administrative rule, if the 10 defect with regard to subsection (b) is not resolved. However, 11 notwithstanding any other provision of this Section, a county 12 or special district delegation will not be revoked or modified 13 if the local program remains at least as stringent as it was on 14 the effective date of this Act. 15 (f) A governmental body with a stormwater management 16 program under Section 5-1062 of the Counties Code or under 17 Section 7h of the Metropolitan Water Reclamation District Act 18 that has obtained recognition by the Director under this 19 Section shall submit an annual report to the Director. 20 (g) Nothing in this Act shall be construed as a limitation 21 or preemption of any home rule power. 22 (h) The Department may provide technical assistance and 23 grant funding under Section 60 to governmental bodies with 24 approved programs under this Section. 25 Section 60. Wetlands Protection Fund. SB2401 - 40 - LRB104 09737 BDA 19803 b SB2401- 41 -LRB104 09737 BDA 19803 b SB2401 - 41 - LRB104 09737 BDA 19803 b SB2401 - 41 - LRB104 09737 BDA 19803 b 1 (a) The Wetlands Protection Fund shall be established as a 2 special fund in the State treasury, to be managed by the 3 Department, separate and distinct from the General Revenue 4 Fund. Any interest earned by the Wetlands Protection Fund 5 shall be credited to the Fund. The purpose of the Wetlands 6 Protection Fund is to further wetlands and small streams 7 protection and management. Its purpose is to supplement, not 8 supplant, existing Department resources. The Wetlands 9 Protection Fund may not be used to pay for compensatory 10 mitigation obligations under this Act. 11 (b) Pursuant to Section 50, all penalties collected by the 12 Department under this Act shall be deposited into the Wetlands 13 Protection Fund. 14 (c) The Illinois General Assembly may appropriate 15 additional moneys to the Wetlands Protection Fund to implement 16 this Act. 17 (d) The Department shall use the moneys in the Wetlands 18 Protection Fund to further wetlands and small streams 19 protection and management. Eligible uses of moneys in the Fund 20 include: 21 (1) providing technical assistance and grant funding 22 to counties or special districts with approved programs 23 under Section 55 to restore, preserve, enhance, protect, 24 or maintain wetlands, streams, and upland buffers, 25 particularly Class I areas or wetlands, waters, and 26 buffers that provide floodwater storage and flood risk SB2401 - 41 - LRB104 09737 BDA 19803 b SB2401- 42 -LRB104 09737 BDA 19803 b SB2401 - 42 - LRB104 09737 BDA 19803 b SB2401 - 42 - LRB104 09737 BDA 19803 b 1 reduction; 2 (2) supplementing other State, local, or private 3 funding for non-compensatory wetlands and small streams 4 restoration, enhancement, preservation and maintenance; 5 (3) providing matching funds for wetland and stream 6 inventories, mapping, watershed planning and wetland 7 program development grants; and 8 (4) covering staffing, administrative, and enforcement 9 costs for the Department to implement this Act. 10 Section 65. Review fee. All inquiries to determine whether 11 or not the proposed activity requires permit authorization by 12 the Department under this Act will be reviewed by the 13 Department free of charge. A permit review fee that is to be 14 set by the Department by rule is required for all permit 15 applications under this Act. The Department shall establish a 16 graduated review fee payment schedule depending on the 17 intensity of required review and the size of the individual 18 project. Accordingly, the highest review fees will be charged 19 for individual permits to authorize major projects. The 20 Department may, by rule, impose a reasonable fee for wetlands 21 delineation and classification. 22 Section 90. The State Finance Act is amended by adding 23 Section 5.1030 as follows: SB2401 - 42 - LRB104 09737 BDA 19803 b SB2401- 43 -LRB104 09737 BDA 19803 b SB2401 - 43 - LRB104 09737 BDA 19803 b SB2401 - 43 - LRB104 09737 BDA 19803 b 1 (30 ILCS 105/5.1030 new) 2 Sec. 5.1030. The Wetlands Protection Fund. 3 Section 97. Severability. The provisions of this Act are 4 severable under Section 1.31 of the Statute on Statutes.". 5 Section 99. Effective date. This Act takes effect upon 6 becoming law. SB2401- 44 -LRB104 09737 BDA 19803 b 1 INDEX 2 Statutes amended in order of appearance SB2401- 44 -LRB104 09737 BDA 19803 b SB2401 - 44 - LRB104 09737 BDA 19803 b 1 INDEX 2 Statutes amended in order of appearance SB2401- 44 -LRB104 09737 BDA 19803 b SB2401 - 44 - LRB104 09737 BDA 19803 b SB2401 - 44 - LRB104 09737 BDA 19803 b 1 INDEX 2 Statutes amended in order of appearance SB2401 - 43 - LRB104 09737 BDA 19803 b SB2401- 44 -LRB104 09737 BDA 19803 b SB2401 - 44 - LRB104 09737 BDA 19803 b SB2401 - 44 - LRB104 09737 BDA 19803 b 1 INDEX 2 Statutes amended in order of appearance SB2401 - 44 - LRB104 09737 BDA 19803 b