Indiana 2025 Regular Session

Indiana House Bill HB1563 Latest Draft

Bill / Introduced Version Filed 01/15/2025

                             
Introduced Version
HOUSE BILL No. 1563
_____
DIGEST OF INTRODUCED BILL
Citations Affected:  IC 8-1-8.5-2.3.
Synopsis:  Alternative and nuclear energy generation. Requires: (1) a
public utility to notify the Indiana utility regulatory commission
(commission) of the public utility's intention to retire an electric
generation facility not later than 18 months before the planned
retirement date; and (2) the commission to conduct a study to
determine the feasibility of using the location and infrastructure of the
electric generation facility for development of alternative energy
generation projects, including consideration of the suitability of the
location and infrastructure for use in developing a nuclear energy
facility.
Effective:  July 1, 2025.
Smith H, DeVon
January 21, 2025, read first time and referred to Committee on Utilities, Energy and
Telecommunications.
2025	IN 1563—LS 7607/DI 119 Introduced
First Regular Session of the 124th General Assembly (2025)
PRINTING CODE. Amendments: Whenever an existing statute (or a section of the Indiana
Constitution) is being amended, the text of the existing provision will appear in this style type,
additions will appear in this style type, and deletions will appear in this style type.
  Additions: Whenever a new statutory provision is being enacted (or a new constitutional
provision adopted), the text of the new provision will appear in  this  style  type. Also, the
word NEW will appear in that style type in the introductory clause of each SECTION that adds
a new provision to the Indiana Code or the Indiana Constitution.
  Conflict reconciliation: Text in a statute in this style type or this style type reconciles conflicts
between statutes enacted by the 2024 Regular Session of the General Assembly.
HOUSE BILL No. 1563
A BILL FOR AN ACT to amend the Indiana Code concerning
utilities.
Be it enacted by the General Assembly of the State of Indiana:
1 SECTION 1. IC 8-1-8.5-2.3 IS ADDED TO THE INDIANA CODE
2 AS A NEW SECTION TO READ AS FOLLOWS [EFFECTIVE JULY
3 1, 2025]: Sec. 2.3. (a) A public utility shall notify the commission of
4 the public utility's intention to retire an electric generation facility
5 not later than eighteen (18) months before the public utility's
6 planned retirement date for the electric generation facility.
7 (b) After receiving notice under subsection (a), the commission
8 shall conduct a study to determine the feasibility of using the
9 location and infrastructure of the electric generation facility for
10 development of alternative energy generation projects, including
11 consideration of the suitability of the location and infrastructure
12 for use in developing a nuclear energy production or generating
13 facility (as defined by IC 8-1-8.8-8.5).
2025	IN 1563—LS 7607/DI 119