CHAPTER 147 1 CHAPTER 147 ( HJR 92 ) A JOINT RESOLUTION relating to road projects. Be it resolved by the General Assembly of the Commonwealth of Kentucky: ď˘Section 1. Notwithstanding KRS 48.100, 48.110, 48.300, and 176.430, this Joint Resolution in conjunction with 2024 Regular Session HB 266 and 2024 Regular Session HJR 91 shall constitute the Six-Year Road Plan. The County Priority Projects are as follows: Signed by Governor April 9, 2024. County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Coffey RdC R-1507Adair PL90003 DN RW UT CN 23,000 CPP Project Cost: 0 23,000 0 R esurface Bird RdCR-1293Adair PL90007 DN RW UT CN 224,000 CPP Project Cost: 0 224,000 0 C ity of Columbia Resurface Lancaster StreetAdair PL90028 DN RW UT CN 17,000 CPP Project Cost: 0 17,000 0 T otal for Adair county PL Total Amounts: CN UT RW DN 264,000 0 264,000 0 R esurface Blakenship RoadCR-1208Allen PL90000 DN RW UT CN 102,000 CPP Project Cost: 0 102,000 0 Page 2 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Total for Allen county P L Total Amounts: CN UT RW DN 102,000 0 102,000 0 R esurface Lick SkilletCR-1215Anderson PL90001 DN RW UT CN 175,000 CPP Project Cost: 0 175,000 0 T otal for Anderson county PL Total Amounts: CN UT RW DN 175,000 0 175,000 0 R esurface Steve DentonCR-1315Ballard PL90001 DN RW UT CN 104,000 CPP Project Cost: 0 104,000 0 T otal for Ballard county PL Total Amounts: CN UT RW DN 104,000 0 104,000 0 Page 3 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Mt Pleasant RoadC R-1187Barren PL90001 DN RW UT CN 445,000 CPP Project Cost: 0 445,000 0 R esurface Glover RoadCR-1116Barren PL90002 DN RW UT CN 166,000 CPP Project Cost: 0 166,000 0 R esurface Mt Pleasant RoadCR-1187Barren PL90003 DN RW UT CN 400,000 CPP Project Cost: 0 400,000 0 R esurface Willie Groce RoadCR-1101Barren PL90004 DN RW UT CN 88,000 CPP Project Cost: 0 88,000 0 R esurface Millstown RoadCR-1419Barren PL90006 DN RW UT CN 69,000 CPP Project Cost: 0 69,000 0 Page 4 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 City of Cave City Sink Hole Repair 2nd StreetC S-4097Barren PL90021 DN RW UT CN 18,000 CPP Project Cost: 0 18,000 0 T otal for Barren county PL Total Amounts: CN UT RW DN 1,186,000 0 1,186,000 0 R esurface Mill CreekCR-1237Bath PL90002 DN RW UT CN 100,000 CPP Project Cost: 0 100,000 0 R esurface Ridge RoadCR-1229Bath PL90003 DN RW UT CN 156,000 CPP Project Cost: 0 156,000 0 R esurface Pergram RoadCR-1210Bath PL90006 DN RW UT CN 79,000 CPP Project Cost: 0 79,000 0 Page 5 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Hart GroveC R-1212Bath PL90008 DN RW UT CN 20,000 CPP Project Cost: 0 20,000 0 R esurface Hickory RoadCR-1313Bath PL90012 DN RW UT CN 68,000 CPP Project Cost: 0 68,000 0 R esurface Pergram RoadCR-1210Bath PL90015 DN RW UT CN 86,000 CPP Project Cost: 0 86,000 0 T otal for Bath county PL Total Amounts: CN UT RW DN 509,000 0 509,000 0 R esurface South Buster PikeCR-1038Boyle PL90004 DN RW UT CN 110,000 CPP Project Cost: 0 110,000 0 Page 6 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Total for Boyle county P L Total Amounts: CN UT RW DN 110,000 0 110,000 0 R esurface Parina RoadCR-1104Bracken PL90000 DN RW UT CN 90,000 CPP Project Cost: 0 90,000 0 T otal for Bracken county PL Total Amounts: CN UT RW DN 90,000 0 90,000 0 R esurface Woodsdale RoadCR-1120Bullitt PL90000 DN RW UT CN 185,000 CPP Project Cost: 0 185,000 0 T otal for Bullitt county PL Total Amounts: CN UT RW DN 185,000 0 185,000 0 Page 7 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Gilbert BordersC R-1192Butler PL90007 DN RW UT CN 126,000 CPP Project Cost: 0 126,000 0 R esurface Arnold Ridge RoadCR-1296Butler PL90008 DN RW UT CN 103,000 CPP Project Cost: 0 103,000 0 R esurface Youngs Ferry RoadCR-1154Butler PL90009 DN RW UT CN 180,000 CPP Project Cost: 0 180,000 0 T otal for Butler county PL Total Amounts: CN UT RW DN 409,000 0 409,000 0 R esurface Harmony Church RoadCR-1148Caldwell PL90000 DN RW UT CN 108,000 CPP Project Cost: 0 108,000 0 Page 8 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Holeman Hill RoadC R-1080Caldwell PL90001 DN RW UT CN 162,000 CPP Project Cost: 0 162,000 0 R esurface Shad Grove RoadCR-1074Caldwell PL90003 DN RW UT CN 115,000 CPP Project Cost: 0 115,000 0 R esurface Donaldson RoadCR-1320Caldwell PL90005 DN RW UT CN 209,000 CPP Project Cost: 0 209,000 0 T otal for Caldwell county PL Total Amounts: CN UT RW DN 594,000 0 594,000 0 R esurface Crider RoadCR-1116Carlisle PL90003 DN RW UT CN 89,000 CPP Project Cost: 0 89,000 0 Page 9 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Total for Carlisle county P L Total Amounts: CN UT RW DN 89,000 0 89,000 0 R esurface Iron Hill RoadCR-1002Carter PL90020 DN RW UT CN 95,000 CPP Project Cost: 0 95,000 0 R esurface Prater RoadCR-1410Carter PL90021 DN RW UT CN 90,000 CPP Project Cost: 0 90,000 0 R esurface Four Mile RoadCR-1077Carter PL90022 DN RW UT CN 137,000 CPP Project Cost: 0 137,000 0 R esurface Powell Hollow RoadCR-1222Carter PL90023 DN RW UT CN 63,000 CPP Project Cost: 0 63,000 0 Page 10 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Total for Carter county P L Total Amounts: CN UT RW DN 385,000 0 385,000 0 R esurface Canoe Creek RoadCR-1255Casey PL90013 DN RW UT CN 175,000 CPP Project Cost: 0 175,000 0 R esurface Black Ridge RoadCR-1136Casey PL90014 DN RW UT CN 75,000 CPP Project Cost: 0 75,000 0 R esurface Turkey Creek RoadCR-1120Casey PL90015 DN RW UT CN 175,000 CPP Project Cost: 0 175,000 0 R esurface Sloan Fork RoadCR-1169Casey PL90016 DN RW UT CN 275,000 CPP Project Cost: 0 275,000 0 Page 11 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Minor's Branch RoadC R-1352Casey PL90017 DN RW UT CN 175,000 CPP Project Cost: 0 175,000 0 T otal for Casey county PL Total Amounts: CN UT RW DN 875,000 0 875,000 0 R esurface Coal Creek RoadCR-1392Christian PL90007 DN RW UT CN 545,000 CPP Project Cost: 0 545,000 0 T otal for Christian county PL Total Amounts: CN UT RW DN 545,000 0 545,000 0 R esurface Dry Fork RoadCR-1130Clark PL90011 DN RW UT CN 279,000 CPP Project Cost: 0 279,000 0 Page 12 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Howards Creek RoadC R-1125Clark PL90013 DN RW UT CN 62,000 CPP Project Cost: 0 62,000 0 T otal for Clark county PL Total Amounts: CN UT RW DN 341,000 0 341,000 0 C ity of Manchester Resurface Thorn Hill RoadCS-1062Clay PL90007 DN RW UT CN 25,000 CPP Project Cost: 0 25,000 0 R esurface Collins Gibson RoadCR-1429Clay PL90008 DN RW UT CN 110,000 CPP Project Cost: 0 110,000 0 R esurface 3rd StreetCS-1001Clay PL90051 DN RW UT CN 28,000 CPP Project Cost: 0 28,000 0 Page 13 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Railroad AvenueC S-1071Clay PL90052 DN RW UT CN 39,000 CPP Project Cost: 0 39,000 0 T otal for Clay county PL Total Amounts: CN UT RW DN 202,000 0 202,000 0 C ity of Burkesville Resurface Herd StreetCS-1058Clinton PL90022 DN RW UT CN 22,000 CPP Project Cost: 0 22,000 0 R esurface Joyce Conner RoadCR-1069Clinton PL90034 DN RW UT CN 25,000 CPP Project Cost: 0 25,000 0 T otal for Clinton county PL Total Amounts: CN UT RW DN 47,000 0 47,000 0 Page 14 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Aunt Jane Tabernacle RoadC R-1364Crittenden PL90006 DN RW UT CN 75,000 CPP Project Cost: 0 75,000 0 T otal for Crittenden county PL Total Amounts: CN UT RW DN 75,000 0 75,000 0 R esurface Midway Church RoadCR-1132Cumberland PL90041 DN RW UT CN 19,000 CPP Project Cost: 0 19,000 0 T otal for Cumberland county PL Total Amounts: CN UT RW DN 19,000 0 19,000 0 R esurface Owens Chapel RoadCR-1420Graves PL90008 DN RW UT CN 177,000 CPP Project Cost: 0 177,000 0 Page 15 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Total for Graves county P L Total Amounts: CN UT RW DN 177,000 0 177,000 0 R esurface Blue Creek RoadCR-1358Grayson PL90000 DN RW UT CN 108,000 CPP Project Cost: 0 108,000 0 R esurface Blue Creek RoadCR-1340Grayson PL90001 DN RW UT CN 76,000 CPP Project Cost: 0 76,000 0 R esurface Hooper Barton RdCR-1260Grayson PL90003 DN RW UT CN 226,000 CPP Project Cost: 0 226,000 0 T otal for Grayson county PL Total Amounts: CN UT RW DN 410,000 0 410,000 0 Page 16 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Matney RoadC R-1214Green PL90005 DN RW UT CN 85,000 CPP Project Cost: 0 85,000 0 R esurface Blowing Springs RoadCR-1169Green PL90006 DN RW UT CN 187,000 CPP Project Cost: 0 187,000 0 R esurface Gabe-Webb RoadCR-1284Green PL90007 DN RW UT CN 82,000 CPP Project Cost: 0 82,000 0 R esurface Elmore Hodges RoadCR-1057Green PL90010 DN RW UT CN 61,000 CPP Project Cost: 0 61,000 0 R esurface West Buckner Hill RoadCR-1102Green PL90014 DN RW UT CN 262,000 CPP Project Cost: 0 262,000 0 T otal for Green county PL Total Amounts: CN UT RW DN 677,000 0 677,000 0 Page 17 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 City of Russell Resurface Our Lady WayC S-3052Greenup PL90034 DN RW UT CN 234,000 CPP Project Cost: 0 234,000 0 T otal for Greenup county PL Total Amounts: CN UT RW DN 234,000 0 234,000 0 C ity of Lewisport Resurface Old Mill RoadCS-2034Hancock PL90010 DN RW UT CN 22,000 CPP Project Cost: 0 22,000 0 R esurface Crowe RoadCR-1213Hancock PL90013 DN RW UT CN 171,000 CPP Project Cost: 0 171,000 0 T otal for Hancock county PL Total Amounts: CN UT RW DN 193,000 0 193,000 0 Page 18 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Tabbs Hollow RoadC R-1297Hardin PL90016 DN RW UT CN 320,000 CPP Project Cost: 0 320,000 0 T otal for Hardin county PL Total Amounts: CN UT RW DN 320,000 0 320,000 0 R esurface Mildred StCR-1453Harlan PL90009 DN RW UT CN 17,000 CPP Project Cost: 0 17,000 0 R esurface Hall StCR-1133Harlan PL90011 DN RW UT CN 20,000 CPP Project Cost: 0 20,000 0 R esurface Brown Court RoadCR-1339Harlan PL90015 DN RW UT CN 22,000 CPP Project Cost: 0 22,000 0 Page 19 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Total for Harlan county P L Total Amounts: CN UT RW DN 59,000 0 59,000 0 R esurface DW Meredith RoadCR-1096Hart PL90018 DN RW UT CN 50,000 CPP Project Cost: 0 50,000 0 T otal for Hart county PL Total Amounts: CN UT RW DN 50,000 0 50,000 0 R esurface Spraggs RdCR-1050Hickman PL90010 DN RW UT CN 27,000 CPP Project Cost: 0 27,000 0 R esurface Deweese RoadCR-1213Hickman PL90011 DN RW UT CN 91,000 CPP Project Cost: 0 91,000 0 Page 20 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Campbell RdC R-1210Hickman PL90012 DN RW UT CN 98,000 CPP Project Cost: 0 98,000 0 R esurface Morris RoadCR-1224Hickman PL90013 DN RW UT CN 41,000 CPP Project Cost: 0 41,000 0 R esurface Laine RoadCR-1126Hickman PL90014 DN RW UT CN 31,000 CPP Project Cost: 0 31,000 0 R esurface Elam RoadCR-1156Hickman PL90015 DN RW UT CN 22,000 CPP Project Cost: 0 22,000 0 R esurface Rook RoadCR-1042Hickman PL90016 DN RW UT CN 20,000 CPP Project Cost: 0 20,000 0 Page 21 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Powell RoadC R-1129Hickman PL90017 DN RW UT CN 16,000 CPP Project Cost: 0 16,000 0 T otal for Hickman county PL Total Amounts: CN UT RW DN 346,000 0 346,000 0 R esurface Johnson Island Cemetery RoadCR-1473Hopkins PL90015 DN RW UT CN 118,000 CPP Project Cost: 0 118,000 0 R esurface Long Pond RoadCR-1156Hopkins PL90016 DN RW UT CN 62,000 CPP Project Cost: 0 62,000 0 R esurface Fox RoadCR-1304Hopkins PL90017 DN RW UT CN 50,000 CPP Project Cost: 0 50,000 0 Page 22 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Frostburg RoadC R-1034Hopkins PL90018 DN RW UT CN 112,000 CPP Project Cost: 0 112,000 0 R esurface Irvin Edwards LaneCR-1081Hopkins PL90019 DN RW UT CN 26,000 CPP Project Cost: 0 26,000 0 T otal for Hopkins county PL Total Amounts: CN UT RW DN 368,000 0 368,000 0 R esurface Black Lick RdCR-1346Jackson PL90025 DN RW UT CN 197,000 CPP Project Cost: 0 197,000 0 T otal for Jackson county PL Total Amounts: CN UT RW DN 197,000 0 197,000 0 Page 23 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Dix DriveC R-1225Jessamine PL90015 DN RW UT CN 71,000 CPP Project Cost: 0 71,000 0 T otal for Jessamine county PL Total Amounts: CN UT RW DN 71,000 0 71,000 0 C ity of Paintsville Resurface Riverview LnCS-1004Johnson PL90003 DN RW UT CN 61,000 CPP Project Cost: 0 61,000 0 C ity of Paintsville Resurface Jefferson St/10th AveCS-1031Johnson PL90004 DN RW UT CN 40,000 CPP Project Cost: 0 40,000 0 R esurface Buffalo Pigeon Roost RoadCR-1122Johnson PL90012 DN RW UT CN 112,000 CPP Project Cost: 0 112,000 0 Page 24 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Cantrell Fork RoadC R-1226Johnson PL90013 DN RW UT CN 104,000 CPP Project Cost: 0 104,000 0 R esurface Right Fork Burchett HollowCR-1063Johnson PL90014 DN RW UT CN 88,000 CPP Project Cost: 0 88,000 0 R esurface Rt 580 Subdivision RoadCR-1291Johnson PL90016 DN RW UT CN 29,000 CPP Project Cost: 0 29,000 0 R esurface Hilton Hollow RoadCR-1220Johnson PL90020 DN RW UT CN 62,000 CPP Project Cost: 0 62,000 0 R esurface Greenrock Fork RoadCR-1235Johnson PL90021 DN RW UT CN 72,000 CPP Project Cost: 0 72,000 0 T otal for Johnson county PL Total Amounts: CN UT RW DN 568,000 0 568,000 0 Page 25 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Bit Patching Middle Quicksand RoadC R-1312Knott PL90023 DN RW UT CN 25,000 CPP Project Cost: 0 25,000 0 T otal for Knott county PL Total Amounts: CN UT RW DN 25,000 0 25,000 0 R esurface Disappointment Hollow RoadCR-1053Knox PL90030 DN RW UT CN 53,000 CPP Project Cost: 0 53,000 0 R esurface East Lewis StreetCR-1418Knox PL90035 DN RW UT CN 21,000 CPP Project Cost: 0 21,000 0 R esurface Shelby StCS-1062Knox PL90055 DN RW UT CN 28,000 CPP Project Cost: 0 28,000 0 Page 26 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Total for Knox county P L Total Amounts: CN UT RW DN 102,000 0 102,000 0 R esurface Hoskins LaneCR-1075Laurel PL90036 DN RW UT CN 53,000 CPP Project Cost: 0 53,000 0 T otal for Laurel county PL Total Amounts: CN UT RW DN 53,000 0 53,000 0 P atching Bells TraceCR-1322Lawrence PL90025 DN RW UT CN 89,000 CPP Project Cost: 0 89,000 0 T otal for Lawrence county PL Total Amounts: CN UT RW DN 89,000 0 89,000 0 Page 27 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Old Highway 11C R-1076Lee PL90014 DN RW UT CN 336,000 CPP Project Cost: 0 336,000 0 T otal for Lee county PL Total Amounts: CN UT RW DN 336,000 0 336,000 0 C ity of Hyden Resurface Hickory StreetCS-1011Leslie PL90002 DN RW UT CN 163,000 CPP Project Cost: 0 163,000 0 C ity of Hyden Patching Maple StreetCS-1006Leslie PL90003 DN RW UT CN 46,000 CPP Project Cost: 0 46,000 0 C ity of Hyden Patching Oak StreetCS-1002Leslie PL90004 DN RW UT CN 16,000 CPP Project Cost: 0 16,000 0 Page 28 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Big Rock RoadC R-1226Leslie PL90037 DN RW UT CN 72,000 CPP Project Cost: 0 72,000 0 R esurface Hazelnut DriveCR-1113Leslie PL90038 DN RW UT CN 106,000 CPP Project Cost: 0 106,000 0 R esurface Levi BranchCR-1011Leslie PL90039 DN RW UT CN 65,000 CPP Project Cost: 0 65,000 0 R esurface Long BranchCR-1118Leslie PL90040 DN RW UT CN 53,000 CPP Project Cost: 0 53,000 0 R esurface Crystal LaneCR-1115Leslie PL90041 DN RW UT CN 37,000 CPP Project Cost: 0 37,000 0 Page 29 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Beech Bottom RoadC R-1114Leslie PL90042 DN RW UT CN 33,000 CPP Project Cost: 0 33,000 0 T otal for Leslie county PL Total Amounts: CN UT RW DN 591,000 0 591,000 0 R esurface Pine ValleyCR-1253Lewis PL90042 DN RW UT CN 52,000 CPP Project Cost: 0 52,000 0 R esurface Ribolt-EpworthCR-1249Lewis PL90043 DN RW UT CN 26,000 CPP Project Cost: 0 26,000 0 T otal for Lewis county PL Total Amounts: CN UT RW DN 78,000 0 78,000 0 Page 30 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Brock RoadC R-1136Lincoln PL90046 DN RW UT CN 74,000 CPP Project Cost: 0 74,000 0 R esurface Martins TrailCR-1303Lincoln PL90047 DN RW UT CN 95,000 CPP Project Cost: 0 95,000 0 R esurface Ash RoadCR-1408Lincoln PL90048 DN RW UT CN 58,000 CPP Project Cost: 0 58,000 0 T otal for Lincoln county PL Total Amounts: CN UT RW DN 227,000 0 227,000 0 R esurface Edmonds LaneCR-1280Livingston PL90019 DN RW UT CN 20,000 CPP Project Cost: 0 20,000 0 Page 31 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Teeny CircleC R-1123Livingston PL90020 DN RW UT CN 25,000 CPP Project Cost: 0 25,000 0 R esurface Birdville RoadCR-1368Livingston PL90023 DN RW UT CN 40,000 CPP Project Cost: 0 40,000 0 R esurface Barnett Chapel RoadCR-1066Livingston PL90024 DN RW UT CN 30,000 CPP Project Cost: 0 30,000 0 R esurface Farris Spring RoadCR-1020Livingston PL90025 DN RW UT CN 40,000 CPP Project Cost: 0 40,000 0 R esurface Bishop RoadCR-1231Livingston PL90026 DN RW UT CN 30,000 CPP Project Cost: 0 30,000 0 T otal for Livingston county PL Total Amounts: CN UT RW DN 185,000 0 185,000 0 Page 32 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Drainage/Chipseal Ausenbaugh RoadC R-1003Lyon PL90027 DN RW UT CN 34,000 CPP Project Cost: 0 34,000 0 T otal for Lyon county PL Total Amounts: CN UT RW DN 34,000 0 34,000 0 R esurface Maple DrCR-1163Madison PL90019 DN RW UT CN 16,000 CPP Project Cost: 0 16,000 0 T otal for Madison county PL Total Amounts: CN UT RW DN 16,000 0 16,000 0 R esurface Matt Wireman CemeteryCR-1158Magoffin PL90019 DN RW UT CN 76,000 CPP Project Cost: 0 76,000 0 Page 33 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Limestone Branch RoadC R-1007Magoffin PL90025 DN RW UT CN 60,000 CPP Project Cost: 0 60,000 0 R esurface Howard Branch RoadCR-1215Magoffin PL90026 DN RW UT CN 105,000 CPP Project Cost: 0 105,000 0 R esurface Patton Branch RoadCR-1213Magoffin PL90031 DN RW UT CN 60,000 CPP Project Cost: 0 60,000 0 R esurface Shady Lane RoadCR-1163Magoffin PL90036 DN RW UT CN 32,000 CPP Project Cost: 0 32,000 0 R esurface Whitt Branch RoadCR-1332Magoffin PL90038 DN RW UT CN 24,000 CPP Project Cost: 0 24,000 0 Page 34 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Will Bailey RoadC R-1202Magoffin PL90039 DN RW UT CN 24,000 CPP Project Cost: 0 24,000 0 T otal for Magoffin county PL Total Amounts: CN UT RW DN 381,000 0 381,000 0 R esurface Crum BranchMartin PL90027 DN RW UT CN 32,000 CPP Project Cost: 0 32,000 0 T otal for Martin county PL Total Amounts: CN UT RW DN 32,000 0 32,000 0 R esurface Richland LaneCR-1004McLean PL90022 DN RW UT CN 216,000 CPP Project Cost: 0 216,000 0 Page 35 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Howards Mill RoadC R-1305McLean PL90023 DN RW UT CN 104,000 CPP Project Cost: 0 104,000 0 R esurface City LaneCR-1130McLean PL90024 DN RW UT CN 41,000 CPP Project Cost: 0 41,000 0 R esurface Stroud LevyCR-1103McLean PL90025 DN RW UT CN 34,000 CPP Project Cost: 0 34,000 0 T otal for McLean county PL Total Amounts: CN UT RW DN 395,000 0 395,000 0 R esurface Allen CopeCR-1201Menifee PL90042 DN RW UT CN 24,000 CPP Project Cost: 0 24,000 0 Page 36 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface BlackberryC R-1345Menifee PL90045 DN RW UT CN 23,000 CPP Project Cost: 0 23,000 0 R esurface Doc MullinsCR-1126Menifee PL90046 DN RW UT CN 84,000 CPP Project Cost: 0 84,000 0 R esurface Brushy ForkCR-1008Menifee PL90047 DN RW UT CN 163,000 CPP Project Cost: 0 163,000 0 R esurface Arthur Sexton RoadCR-1216Menifee PL90053 DN RW UT CN 63,000 CPP Project Cost: 0 63,000 0 T otal for Menifee county PL Total Amounts: CN UT RW DN 357,000 0 357,000 0 Page 37 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Southworth RdC R-1318Mercer PL90022 DN RW UT CN 51,000 CPP Project Cost: 0 51,000 0 T otal for Mercer county PL Total Amounts: CN UT RW DN 51,000 0 51,000 0 C ity of Edmonton Resurface Scott DriveCS-1056Metcalfe PL90010 DN RW UT CN 21,000 CPP Project Cost: 0 21,000 0 C ity of Edmonton Resurface Shirley StreetCS-1013Metcalfe PL90012 DN RW UT CN 33,000 CPP Project Cost: 0 33,000 0 R esurface Lone Star Ridge RdCR-1137Metcalfe PL90013 DN RW UT CN 508,000 CPP Project Cost: 0 508,000 0 Page 38 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Wilbur Glass RoadC R-1264Metcalfe PL90014 DN RW UT CN 182,000 CPP Project Cost: 0 182,000 0 R esurface Reese Hurt RdCR-1114Metcalfe PL90015 DN RW UT CN 482,000 CPP Project Cost: 0 482,000 0 T otal for Metcalfe county PL Total Amounts: CN UT RW DN 1,226,000 0 1,226,000 0 R esurface Leatherwood RoadCR-1033Monroe PL90016 DN RW UT CN 45,000 CPP Project Cost: 0 45,000 0 R esurface Persimmon Kesslar RidgeCR-1032Monroe PL90017 DN RW UT CN 72,000 CPP Project Cost: 0 72,000 0 Page 39 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Total for Monroe county P L Total Amounts: CN UT RW DN 117,000 0 117,000 0 C ity of Camargo Resurface Valleyview DrCS-2019Montgomery PL90006 DN RW UT CN 30,000 CPP Project Cost: 0 30,000 0 C ity of Camargo Resurface Gateway AveCS-2017Montgomery PL90007 DN RW UT CN 18,000 CPP Project Cost: 0 18,000 0 C ity of Camargo Resurface Camargo Hts DrCS-2020Montgomery PL90008 DN RW UT CN 35,000 CPP Project Cost: 0 35,000 0 C ity of Camargo Resurface Valleyview DrCS-2019Montgomery PL90009 DN RW UT CN 30,000 CPP Project Cost: 0 30,000 0 Page 40 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 City of Camargo Resurface Gateway AveC S-2017Montgomery PL90010 DN RW UT CN 18,000 CPP Project Cost: 0 18,000 0 T otal for Montgomery county PL Total Amounts: CN UT RW DN 131,000 0 131,000 0 P atching Phills BranchCR-1236Morgan PL90054 DN RW UT CN 54,000 CPP Project Cost: 0 54,000 0 R esurface Robinson BranchCR-1708Morgan PL90055 DN RW UT CN 90,000 CPP Project Cost: 0 90,000 0 T otal for Morgan county PL Total Amounts: CN UT RW DN 144,000 0 144,000 0 Page 41 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 City of Greenville Resurface Joyce AveC S-1059Muhlenberg PL90008 DN RW UT CN 52,000 CPP Project Cost: 0 52,000 0 T otal for Muhlenberg county PL Total Amounts: CN UT RW DN 52,000 0 52,000 0 R esurface Highview Church RoadCR-1034Nelson PL90019 DN RW UT CN 190,000 CPP Project Cost: 0 190,000 0 R esurface Eddie Miles RoadCR-1149Nelson PL90020 DN RW UT CN 174,000 CPP Project Cost: 0 174,000 0 R esurface Greens Chapel RoadCR-1035Nelson PL90021 DN RW UT CN 130,000 CPP Project Cost: 0 130,000 0 Page 42 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Ritchie LaneC R-1152Nelson PL90022 DN RW UT CN 59,000 CPP Project Cost: 0 59,000 0 R esurface Francis DriveCR-1385Nelson PL90023 DN RW UT CN 39,000 CPP Project Cost: 0 39,000 0 R esurface Timber Creek RoadCR-1036Nelson PL90024 DN RW UT CN 32,000 CPP Project Cost: 0 32,000 0 R esurface Pembrooke DriveCR-1283Nelson PL90025 DN RW UT CN 42,000 CPP Project Cost: 0 42,000 0 R esurface Eastland DriveCR-1081Nelson PL90027 DN RW UT CN 31,000 CPP Project Cost: 0 31,000 0 Page 43 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface McDonald DriveC R-1081Nelson PL90029 DN RW UT CN 26,000 CPP Project Cost: 0 26,000 0 R esurface Hill StreetCR-1081Nelson PL90030 DN RW UT CN 54,000 CPP Project Cost: 0 54,000 0 T otal for Nelson county PL Total Amounts: CN UT RW DN 777,000 0 777,000 0 R esurface Burns RoadCR-1209Nicholas PL90046 DN RW UT CN 139,000 CPP Project Cost: 0 139,000 0 R esurface Ratliff RoadCR-1135Nicholas PL90048 DN RW UT CN 97,000 CPP Project Cost: 0 97,000 0 Page 44 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Total for Nicholas county P L Total Amounts: CN UT RW DN 236,000 0 236,000 0 R esurface Milford RoadCR-1110Pendleton PL90006 DN RW UT CN 63,000 CPP Project Cost: 0 63,000 0 T otal for Pendleton county PL Total Amounts: CN UT RW DN 63,000 0 63,000 0 C ity of Hazard Resurface Locust StCS-1016Perry PL90008 DN RW UT CN 21,000 CPP Project Cost: 0 21,000 0 T otal for Perry county PL Total Amounts: CN UT RW DN 21,000 0 21,000 0 Page 45 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Pigeon RoostC R-1571Pike PL90028 DN RW UT CN 118,000 CPP Project Cost: 0 118,000 0 R esurface SycamoreCR-1981Pike PL90029 DN RW UT CN 118,000 CPP Project Cost: 0 118,000 0 T otal for Pike county PL Total Amounts: CN UT RW DN 236,000 0 236,000 0 R esurface Yellow Apple Ridge RoadCR-1035Russell PL90054 DN RW UT CN 144,000 CPP Project Cost: 0 144,000 0 R esurface Little Clifty Creek RoadCR-1393Russell PL90055 DN RW UT CN 79,000 CPP Project Cost: 0 79,000 0 Page 46 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Melson Ridge RoadC R-1282Russell PL90057 DN RW UT CN 153,000 CPP Project Cost: 0 153,000 0 T otal for Russell county PL Total Amounts: CN UT RW DN 376,000 0 376,000 0 R esurface Triport RoadCR-1124Scott PL90023 DN RW UT CN 480,000 CPP Project Cost: 0 480,000 0 T otal for Scott county PL Total Amounts: CN UT RW DN 480,000 0 480,000 0 R esurface Evans RdCR-1040Simpson PL90020 DN RW UT CN 77,000 CPP Project Cost: 0 77,000 0 Page 47 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Total for Simpson county P L Total Amounts: CN UT RW DN 77,000 0 77,000 0 R esurface Houghlin RoadCR-1049Spencer PL90002 DN RW UT CN 93,000 CPP Project Cost: 0 93,000 0 R esurface Shultz LaneCR-1162Spencer PL90006 DN RW UT CN 68,000 CPP Project Cost: 0 68,000 0 R esurface Cooks LaneCR-1047Spencer PL90010 DN RW UT CN 116,000 CPP Project Cost: 0 116,000 0 T otal for Spencer county PL Total Amounts: CN UT RW DN 277,000 0 277,000 0 Page 48 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Daugherty Creek RoadC R-1119Trimble PL90018 DN RW UT CN 147,000 CPP Project Cost: 0 147,000 0 T otal for Trimble county PL Total Amounts: CN UT RW DN 147,000 0 147,000 0 R esurface T Frank Wathen RoadCR-1096Union PL90031 DN RW UT CN 26,000 CPP Project Cost: 0 26,000 0 T otal for Union county PL Total Amounts: CN UT RW DN 26,000 0 26,000 0 R esurface White Hall RoadCR-1004Washington PL90032 DN RW UT CN 210,000 CPP Project Cost: 0 210,000 0 Page 49 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Old Perryville RoadC R-1158Washington PL90034 DN RW UT CN 51,000 CPP Project Cost: 0 51,000 0 T otal for Washington county PL Total Amounts: CN UT RW DN 261,000 0 261,000 0 C ity of Monticello Resurface Alexander StreetCS-1110Wayne PL90029 DN RW UT CN 12,000 CPP Project Cost: 0 12,000 0 R esurface Morris HillCR-1307Wayne PL90068 DN RW UT CN 54,000 CPP Project Cost: 0 54,000 0 R esurface Parmleysville RoadCR-1137Wayne PL90074 DN RW UT CN 124,000 CPP Project Cost: 0 124,000 0 Page 50 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Total for Wayne county P L Total Amounts: CN UT RW DN 190,000 0 190,000 0 R esurface Burnt Mill RoadCR-1301Webster PL90033 DN RW UT CN 91,000 CPP Project Cost: 0 91,000 0 R esurface Vanderburg LismanCR-1146Webster PL90034 DN RW UT CN 317,000 CPP Project Cost: 0 317,000 0 R esurface West ElmCR-1247Webster PL90035 DN RW UT CN 91,000 CPP Project Cost: 0 91,000 0 R esurface Smith BrantlyCR-1260Webster PL90036 DN RW UT CN 162,000 CPP Project Cost: 0 162,000 0 Page 51 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Old Dixon SlaughtersC R-1124Webster PL90037 DN RW UT CN 228,000 CPP Project Cost: 0 228,000 0 R esurface Gooch JonesCR-1128Webster PL90038 DN RW UT CN 125,000 CPP Project Cost: 0 125,000 0 R esurface Baptist HillCR-3133Webster PL90039 DN RW UT CN 96,000 CPP Project Cost: 0 96,000 0 R esurface Ritz RoadCR-1107Webster PL90040 DN RW UT CN 98,000 CPP Project Cost: 0 98,000 0 R esurface JZ SheltonCR-1029Webster PL90041 DN RW UT CN 108,000 CPP Project Cost: 0 108,000 0 Page 52 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Poole Mill RoadC R-1056Webster PL90042 DN RW UT CN 62,000 CPP Project Cost: 0 62,000 0 T otal for Webster county PL Total Amounts: CN UT RW DN 1,378,000 0 1,378,000 0 R esurface Oak Dale RoadCR-1792Whitley PL90043 DN RW UT CN 30,000 CPP Project Cost: 0 30,000 0 R esurface Rosetown Church RoadCR-1434Whitley PL90044 DN RW UT CN 90,000 CPP Project Cost: 0 90,000 0 R esurface Lydia HaunCR-1240Whitley PL90045 DN RW UT CN 49,000 CPP Project Cost: 0 49,000 0 Page 53 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Brays ChapelC R-1445Whitley PL90048 DN RW UT CN 87,000 CPP Project Cost: 0 87,000 0 R esurface Tiny Branch RoadCR-1208Whitley PL90049 DN RW UT CN 287,000 CPP Project Cost: 0 287,000 0 T otal for Whitley county PL Total Amounts: CN UT RW DN 543,000 0 543,000 0 R esurface Dry Ridge RoadCR-1106Woodford PL90025 DN RW UT CN 95,000 CPP Project Cost: 0 95,000 0 R esurface Paynes Mill RoadCR-1004Woodford PL90026 DN RW UT CN 115,000 CPP Project Cost: 0 115,000 0 Page 54 of 57 County FundPhaseDescriptionRouteItem No. COUNTY PRIORITY PROJECTS PLAN FY2024 FY2025 FY2026 Resurface Paynes Mill RoadC R-1004Woodford PL90027 DN RW UT CN 95,000 CPP Project Cost: 0 95,000 0 T otal for Woodford county PL Total Amounts: CN UT RW DN 305,000 0 305,000 0 Page 55 of 57 COUNTY PRIORITY PROJECTS PLAN Biennium Fund Summary Fund D FY 2025 FY 2026 Total CPP COUNTY PRIORITY PROJECTS 19,991,000 0 19,991,000 Total Amount 19,991,000 0 19,991,000 Page 56 of 57 COUNTY PRIORITY PROJECTS PLAN Fund Summary Fund D FY 2024 FY 2025 FY 2026 Total CPP COUNTY PRIORITY PROJECTS 0 19,991,000 0 19,991,000 Total Amount 0 19,991,000 0 19,991,000 Page 57 of 57