Louisiana 2013 Regular Session

Louisiana House Bill HB2 Latest Draft

Bill / Chaptered Version

                            ENROLLED
Page 1 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
ACT No. 24
Regular Session, 2013
HOUSE BILL NO. 2
BY REPRESENTATIVE ROBIDEAUX
AN ACT1
To provide with respect to the capital outlay budget and the capital outlay program for state2
government, state institutions, and other public entities; to provide for the3
designation of projects and improvements; to provide for the financing thereof4
making appropriations from certain sources; and to provide for related matters.5
Be it enacted by the Legislature of Louisiana:6
Section 1. The following sums or so much thereof as may be necessary are hereby7
appropriated out of any monies in the state treasury from the sources specified, from federal8
funds and self-generated revenues belonging to the state of Louisiana and/or collected by9
boards, commissions, departments, and agencies thereof, all for making capital outlay and10
for the purposes and in the amounts specified herein for the Fiscal Year commencing July11
1, 2013, and ending June 30, 2014, subject to the conditions thereafter provided:12
A project with funding payable from General Obligation Bonds Priority 1 indicates13
that the funding for the project includes the reauthorization of funding which was previously14
on a line of credit granted by the State Bond Commission in Fiscal Year 2012-2013.  As15
used in this Section, the term "general obligation bonds" means state general obligation16
bonds or other evidences of indebtedness payable from the Bond Security and Redemption17
Fund. The amount set forth in this Section opposite each project, or so much thereof as may18
be necessary, is hereby appropriated and payable from the proceeds available from the sale19
of general obligation bonds, unless a different source of funding is indicated. Where such20
a different source of funding is indicated, the corresponding amount set forth, or so much21 ENROLLEDHB NO. 2
Page 2 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
thereof as may be necessary, is hereby appropriated and payable from the source of funding1
indicated; provided, however, amounts appropriated and payable from federal funds may be2
encumbered or expended only to the extent such amounts shall have been committed or3
received. Pursuant to the provisions of R.S. 39:82, funds for planning, acquisition,4
construction, and major repair projects appropriated by this act may be retained until5
completion of the project, even if no bona fide liability exists on the last day of the fiscal6
year. 7
This Act shall constitute the comprehensive state capital outlay budget for the 2013-8
2014 Fiscal Year. Projects set forth which are payable from the proceeds available from the9
sale of general obligation bonds shall have the priorities as indicated. The Request for Line10
of Credit form used by the Attorney General and Bond Counsel in evaluating Louisiana11
Constitutional, Internal Revenue Code, and applicable income tax regulations shall be filed12
with the Commissioner of Administration, State Bond Commission, and State Attorney13
General. No general obligation bonds shall be sold, nor cash lines of credit granted to fund14
any lower priority project prior to the sale of general obligation bonds or the granting of cash15
lines of credit to fund all higher priority projects (the "general rule"), except as hereinafter16
provided. This prohibition against funding a lower priority project shall not apply upon a17
showing of an impossibility or impracticality either to proceed with all unfunded higher18
priority projects or to proceed with the funding of such projects or any part thereof through19
the issuance of general obligation bonds for any reason. Such showing shall be stated in20
reasonable detail in a certificate or certificates signed by the state agency responsible for21
administering the funding, and filed with the Commissioner of Administration and the State22
Bond Commission (hereinafter referred to as "the Commission"). Upon a determination by23
the Commission that proceeding with such a project or the funding thereof through the24
issuance of general obligation bonds is impractical or impossible, the Commission may then25
proceed with the sale of general obligation bonds or the granting of cash lines of credit26
without regard to the priority of the unfunded projects determined to be impossible or27
impractical. 28
Upon recommendation by the state agency responsible for administering the funding,29
if it is determined at any time that proceeding with the project or with the funding thereof30 ENROLLEDHB NO. 2
Page 3 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
is no longer impossible or impractical, the State Bond Commission may rescind the1
certificate of impossibility or impracticality and may proceed with the project or with the2
issuance of general obligation bonds or the granting of cash lines of credit to fund the3
project. Alternatively, the Interim Emergency Board (hereinafter referred to as "the Board"),4
upon reviewing certificates as described above and determining that proceeding with such5
project or the funding thereof through the issuance of general obligation bonds is impossible6
or impractical, may designate a lower priority for such project.  The Board's determination7
and lower priority designation shall be submitted to the members of the Legislature for their8
approval in accordance with the provisions of Chapter 3-B of Subtitle I of Title 39 of the9
Louisiana Revised Statutes of 1950.  In accordance with the provisions of Chapter 3-B of10
Subtitle I of Title 39 of the Louisiana Revised Statutes of 1950, whenever at the written11
request of the appropriate legislators and agency, the Board determines that an adjustment12
to a project description originally set forth in such capital budget adopted by the Legislature13
for a current fiscal year is necessary to correct a mistake in a project description, clarify a14
description, change the scope of a description, or make any other adjustment the Board15
deems necessary to implement the purpose of the project, such adjustment shall only become16
effective upon the approval by majority vote of the elected members of each house of the17
Legislature in the manner provided for in Chapter 3-B of Subtitle I of Title 39 of the18
Louisiana Revised Statutes of 1950. 19
If such approval is granted, notification by the chair or secretary of the Board of the20
results of the balloting shall be transmitted to the State Bond Commission, which may then21
proceed with the sale of general obligation bonds or the granting of cash lines of credit for22
each change approved upon request of the Commissioner of Administration in accordance23
with the general rule. 24
With respect to Priorities 1 through 5, a lower priority project may be moved to a25
higher priority only upon a showing of an emergency or other cause not reasonably26
anticipated by the Legislature, which shall be stated in reasonable detail in a certificate27
signed by the head of the appropriate department, political subdivision, or agency and filed28
with the Commissioner of Administration and the Board.  Upon a determination by the29
Board that such project should be moved to a higher priority because of an emergency or30 ENROLLEDHB NO. 2
Page 4 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
other cause not reasonably anticipated by the Legislature, the Board shall designate a higher1
priority to the project.  The matter then shall be submitted to and be subject to the same2
approval by the members of the Legislature in the manner previously indicated in this3
Section. If such approval is granted, notification by the chair or secretary of the board of the4
change of priority shall be transmitted to the State Bond Commission, which then upon5
request of the Commissioner of Administration, may proceed with the sale of general6
obligation bonds or the granting of cash lines of credit in accordance with the general rule.7
As to projects within a priority, the State Bond Commission acting on requests submitted by8
the Commissioner of Administration shall determine when such project, or phases thereof,9
shall be funded. In making such determination, the State Bond Commission shall consider10
the amount of proceeds of general obligation bonds to be made available in light of money11
and capital market conditions; the expenditure requirements of the project; the time required12
for architectural plans and drawings, public bidding, and site acquisition and preparation;13
availability of receipt of federal monies; litigation affecting the undertaking or completion14
of a project; federal tax laws and regulations regarding the sale of municipal bonds; and15
other items of a similar nature bearing upon the possibility or the necessity to commence a16
project or any particular phase thereof. 17
Any other provision of this Act to the contrary notwithstanding, projects described18
in Priority 5 of this Act shall not be moved to a higher priority except upon one of the19
following conditions: (1) Funding is necessary to complete or additionally fund a project20
located elsewhere in the capital outlay act. Determination of such condition shall be made21
by the head of the appropriate department or agency by means of a certificate to that effect22
filed with the Interim Emergency Board, who shall, by mail ballot, request approval of such23
change and if approved by a majority of each house of the Legislature it shall be funded, or24
(2) unless required by an emergency or other cause not reasonably anticipated by the25
Legislature, to be in accordance with procedures set forth in this Section. However, the State26
Bond Commission may authorize a non-cash line of credit for any project in Priority 5 which27
represents that portion of construction contracts which were let during a previous fiscal year,28
or construction contracts which will be let during the current fiscal year, but which will not29
require cash expenditures during the year. Such non-cash lines of credit, when combined30 ENROLLEDHB NO. 2
Page 5 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
with previously sold bonds or with higher priority bonds or lines of credit, or with funds1
appropriated from other sources, will provide sufficient appropriated funds to award2
equipment or construction contracts. Contracts shall not be awarded without approval of the3
Division of Administration. 4
Upon approval by the State Bond Commission, and subject to compliance with its5
policies and procedures and the procedures set forth herein, a line of credit providing for the6
use of funds in anticipation of the sale of general obligation bonds may be granted to the7
appropriate administering agency or department from the Comprehensive Capital Outlay8
Escrow Account, or if there is not a sufficient amount available in such account, from other9
available state cash in the state treasury, for capital improvement projects for which bond10
proceeds are appropriated by a current capital budget, prior to the actual issuance of bonds11
for such projects, unless the attorney general advises that an impediment exists to the valid12
issuance of the bonds on the date such line of credit is granted. 13
All bonds that are to be repaid, in whole or in part, by revenues generated by the14
project shall be designated as "Reimbursement Bonds". The State Bond Commission shall15
enter into such agreements as are necessary to provide that the agency or subdivision, whose16
project is reimbursable, shall pay the bond debt costs into the Bond Security and Redemption17
Fund. Such costs may be paid annually or at the end of the term of the bonds issued as18
determined by the State Bond Commission. 19
Priority 1 general obligation bond funding shall be limited to: 20
(1) Projects and amounts which were previously authorized by Act 23 of the 201221
Regular Session of the Legislature; and which were granted cash lines of credit by the State22
Bond Commission.  The bonds to fund these projects were not sold in Fiscal Year 2012-23
2013.24
(2) The reauthorization of the portion of the outstanding Fiscal Year 2012-201325
Priority 5 Non-Cash Lines of Credit for projects which will require cash expenditures in26
Fiscal Year 2013-2014 and therefore must be converted to Cash Lines of Credit in Fiscal27
Year 2013-2014.28
(3) Commitments made in the Higher Education Desegregation Settlement29
Agreement. 30 ENROLLEDHB NO. 2
Page 6 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Priority 2 general obligation bond projects are for the completion of plans and1
specifications, land acquisition, site preparation, or for construction which will begin during2
the fiscal year. It is presently anticipated that the listed projects will require the sale of3
bonds or extension of lines of credit during the fiscal year after adoption of this Act. 4
Priority 3 general obligation bond projects are for the preparation of plans and5
specifications, land acquisition, site preparation, or for construction and shall be limited to6
funding for the portion of construction contracts which will not require cash expenditures7
during the fiscal year. The projects in this category shall be considered future year projects8
in the State's five year capital outlay plan. It is presently anticipated that the listed projects9
will not require the sale of bonds or extension of lines of credit during the fiscal year. 10
Priority 4 general obligation bond projects are for the preparation of plans and11
specifications, land acquisition, site preparation, or for construction and shall be limited to12
funding for the portion of construction contracts which will not require cash expenditures13
during the fiscal year. The projects in this category shall be considered future year projects14
in the State's five year capital outlay plan. It is presently anticipated that the listed projects15
will not require the sale of bonds or extension of lines of credit during the fiscal year. 16
Priority 5 general obligation bond funding shall be limited to funding for the portion17
of construction contracts which will not require cash expenditures during the fiscal year.18
These funds, when combined with previously sold bonds or with higher priority bonds on19
lines of credit, or with funds appropriated from other sources, will provide sufficient20
appropriated funds to award contracts. Non-cash lines of credit shall be required prior to the21
award of these contracts.22
In accordance with the cash management plan adopted pursuant to R.S. 48:251(D)23
and the provisions of Act 161 of the 1998 First Extraordinary Session, the Department of24
Transportation and Development is authorized to enter into contracts or agreements for25
projects approved pursuant to the Highway Priority Program, Airport Construction and26
Development Priority Program, Port Construction and Development Priority Program, and27
Statewide Flood Control Program for projects bid and awarded, authorized, or commenced28
during the fiscal year which do not require cash expenditures for the full contract or29
agreement amount. 30 ENROLLEDHB NO. 2
Page 7 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
EXECUTIVE DEPARTMENT1
01/107 DIVISION OF ADMINISTRATION2
(2060)Renovation of Uptown Campus, Planning3
and Construction4
(Orleans)5
Payable from General Obligation Bonds6
Priority 2	$10,000,0007
Priority 5	$10,000,0008
Total	$20,000,0009
(345) Local Government Assistance Program10
(Statewide)11
Payable from General Obligation Bonds12
Priority 1	$10,000,00013
Priority 2	$ 8,700,00014
Total	$18,700,00015
(346) Community Water Enrichment Program16
(Statewide)17
Payable from General Obligation Bonds18
Priority 1	$30,000,00019
Priority 5	$ 5,000,00020
Total	$35,000,00021
Provided, however, that all recipients comply with the applicable Department of Natural22
Resources rules and regulations, if any, on master meter installation.23
(948) Exterior Waterproofing at the State Capitol Building, 24
Planning and Construction25
(East Baton Rouge)26
Payable from General Obligation Bonds27
Priority 1	$ 360,00028
Priority 5	$ 3,800,00029
Total	$ 4,160,00030
(1335)Former McDonogh School Relocation, Renovations31
and Additions, Planning and Construction32
(Orleans)33
Payable from General Obligation Bonds34
Priority 2	$ 1,000,00035
Priority 5	$ 5,000,00036
Total	$ 6,000,00037
(1344)Old Governor's Mansion Exterior Waterproofing and 38
Plastering, Planning and Construction39
(East Baton Rouge)40
Payable from General Obligation Bonds41
Priority 1	$ 850,00042
(1345)Statewide Roofing, Waterproofing, and Related 43
Repairs and Equipment Replacement Program 44
(Statewide)45
Payable from General Obligation Bonds46
Priority 1	$10,000,00047
Priority 5	$33,000,00048
Total	$43,000,00049 ENROLLEDHB NO. 2
Page 8 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1346)Shreveport State Office Building Mechanical and 1
Electrical Renovations2
(Caddo)3
Payable from General Obligation Bonds4
Priority 1	$ 3,000,0005
Provided, however, the scope of this appropriation is deemed to also include a study of the6
feasibility of consolidating state office space in Shreveport into a central downtown location7
in accordance with HCR 202 of 2009, prior to proceeding with the mechanical and electrical8
renovations.9
(1347)Capitol Complex Acquisitions, Demolitions, Sitework, 10
Construction and Renovation of Facilities11
(East Baton Rouge)12
Payable from General Obligation Bonds13
Priority 5	$15,000,00014
(1348)DPS and ISB Data Centers, Planning, Construction 15
and Renovations16
(East Baton Rouge)17
Payable from General Obligation Bonds18
Priority 1	$ 2,750,00019
(1351)Repair, Restoration and Replacement for Hurricanes Katrina, 20
Rita, Gustav and Ike, Planning, Construction, Renovation,21
and Acquisition22
(Statewide)23
Payable from General Obligation Bonds24
Priority 1	$132,000,00025
Priority 2	$15,000,00026
Total	$147,000,00027
(1352)Louisiana Clerks of Court Data Networking System,28
Planning, Construction and Acquisition29
(Statewide)30
Payable from General Obligation Bonds31
Priority 5	$ 500,00032
(1353)Statewide Building Condition Assessments33
(Statewide)34
Payable from General Obligation Bonds35
Priority 1	$ 7,000,00036
(1354)State Office Buildings Major Repairs, Equipment 37
Replacement, and Renovations, Planning and Construction38
(Statewide)39
Payable from General Obligation Bonds40
Priority 1	$ 2,000,00041
Priority 5	$ 1,500,00042
Total	$ 3,500,00043
(1355)Statewide Replacement of Single Bottom Elevator Jacks 44
(Code Compliance), Planning and Construction45
(Statewide)46
Payable from General Obligation Bonds47
Priority 1	$ 765,00048 ENROLLEDHB NO. 2
Page 9 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1356)Americans With Disabilities Act Implementation for State 1
Facilities, Planning and Construction2
(Statewide)3
Payable from General Obligation Bonds4
Priority 5	$ 2,000,0005
(1357)Major Repairs for State Buildings Based on Statewide 6
Condition Assessment, and Infrastructure, Planning 7
and Construction8
(Statewide)9
Payable from General Obligation Bonds10
Priority 1	$41,400,00011
Priority 5	$79,145,00012
Payable from the balance of General Obligation Bond Proceeds previously13
allocated under the authority of Act 645 of 1993 for Education Elaine P. Nunez14
Community College, Planning for Construction of New Classroom Building and15
Expansion of Building "A" (St. Bernard); and Act 645 of 1993 for New Orleans,16
Planning, Design, Construction, Renovation, and Equipment for Alfred Lawless17
Senior High School Health Clinic (Orleans); and Act 45 of 1994 for Education18
Grambling State University, New Health, Physical Education and Recreation19
Building, Planning (Lincoln); and Act 1096 of 1995 for Natchitoches,20
Convention Center Acquisition of Land, Planning, Right of Way, and21
Construction (Natchitoches); and Act 20 of 1999 for Oak Grove, Building22
Expansion for Industrial Prospect, Planning and Construction ($1,200,000 In-23
Kind Local Match) (West Carroll); and Act 21 of 2000 for Department of24
Education Nunez Community College, New Library/Classrooms Building and25
Additions to Building A, Construction and Equipment (St. Bernard); and Act 2126
of 2000 for Evangeline Parish, Reconstruction of Parish Road 5-61 (Evangeline);27
and Act 22 of 2001 for Department of Public Safety and Corrections Allen28
Correctional Center, Door Locking System Replacement, Planning and29
Construction (Allen); and Act 22 of 2001 for Caddo Parish, Community30
Women's Health Center (Northwest Louisiana Breast Cancer Detection Center),31
Land and Building Acquisition, Planning, Construction, Renovation, and32
Equipment (Caddo); and Act 22 of 2001 for St. Martin Parish, Bayou Portage33
Gas System, Planning and Construction (St. Martin); and Act 22 of 2001 for34
Natchitoches, Convention Center Complex Land Acquisition and Construction35
($525,000 Non-State Match) (Natchitoches); and Act 22 of 2001 for Grand Isle,36
Waterline, Planning and Construction ($7,000,000 Federal; $6,000,000 Local37
Match) (Jefferson); and Act 22 of 2001 for New Orleans, Behrman Park38
Improvements, Planning and Construction (Orleans); and Act 22 of 2001 for39
Hammond Downtown Development District, Columbia Theater Regional Arts40
Facility, Planning and Renovation (Tangipahoa); and Act 22 of 2001 for St.41
Tammany Parish Industrial District, Land and Building Acquisition, Planning42
and Construction, Equipment and Infrastructure for an Industrial Prospect43
($1,000,000 Federal and $3,000,000 Other Match) (St. Tammany); and Act 2344
of 2002 for Department of Culture, Recreation and Tourism Office of State45
Parks, South Toledo Bend State Park, Planning and Construction (Sabine); and46
Act 23 of 2002 for Department of Public Safety and Corrections Office of Youth47
Development, Jetson Correctional Center for Youth, Medical and Mental Health48
Services Renovation/Replacement, Planning and Construction (Supplemental)49
(East Baton Rouge); and Act 23 of 2002 for Department of Public Safety and50
Corrections Office of Youth Development, Jetson Correctional Center for Youth,51
Juvenile Justice Renovations, Planning and Construction (Supplemental) (East52
Baton Rouge); and Act 23 of 2002 for Education Louisiana State University53
Baton Rouge, Wetland Resources and Environmental Sciences Facilities,54
Planning and Construction (East Baton Rouge); and Act 23 of 2002 for Jean55
Lafitte, Concrete Repairs at Town Hall and Civic Center (Jefferson); and Act 2356
of 2002 for Rayne, Rayne RV Park Improvements, Planning and Construction57 ENROLLEDHB NO. 2
Page 10 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(Acadia); and Act 23 of 2002 for Avoyelles Parish School Board, Louisiana High1
School for the Agricultural Sciences, Land Acquisition, Planning and2
Construction (Avoyelles); and Act 24 of 2003 for Education Nunez Community3
College, Site Development, Planning and Construction (St. Bernard); and Act 24
of 2004 for Department of Culture, Recreation and Tourism Office of State5
Parks, Longfellow Evangeline State Historic Site, Visitor Center/Farmstead,6
Planning and Construction (St. Martin); and Act 2 of 2004 for Education7
Louisiana State University Baton Rouge, Wetland Resources and Environmental8
Sciences Facilities, Planning and Construction (East Baton Rouge); and Act 2 of9
2004 for Education LA Health Sciences Center - Health Care Services Division,10
Master Planning for Charity Hospital (Orleans); and Act 2 of 2004 for Education11
Southern University Shreveport, Student Activity Center and Outdoor Facility12
Renovations and Addition, Planning and Construction (Caddo); and Act 2 of13
2004 for Education Nunez Community College, Site Development, Planning and14
Construction (St. Bernard); and Act 2 of 2004 for Education Louisiana Delta15
Community College, Campus Development, Planning and Construction16
(Ouachita); and Act 2 of 2004 for Concordia Parish, Concordia Parish Airport17
Overlay (Local Match Required) (Concordia); and Act 2 of 2004 for Iberia18
Parish, Acadiana Fairgrounds Conference Center, Fairgrounds, Sugarena RV19
Park, and Rally Park, Acquisitions, Infrastructure, Planning and Construction20
(Non-State Match Required) (Iberia); and Act 2 of 2004 for St. Mary Parish, St.21
Mary Community Action Agency Office Additions and Modifications, Planning22
and Construction ($200,000 Local Match) (St. Mary); and Act 2 of 2004 for23
Tensas Parish, Tensas Youth Agricultural Arena, Planning and Construction24
(Tensas); and Act 2 of 2004 for Alexandria, Implementation of Urban Master25
Plan, Acquisition, Parking and Streetscape ($2,000,000 Local Match) (Rapides);26
and Act 2 of 2004 for Natchitoches, Convention Center Complex, Land27
Acquisition, Planning and Construction ($3,155,000 Local Match)28
(Natchitoches); and Act 2 of 2004 for Crowley, Parkerson Avenue29
Redevelopment (LA Hwy. 13), Implementation of the Historic Parkerson Avenue30
Master Plan Improvements to Sidewalks, Lighting, Streetscape and Property31
Acquisition (Acadia); and Act 2 of 2004 for Pineville, Susek Drive32
Reconstruction ($645,000 Local Match and $4,885,000 Federal Match)33
(Rapides); and Act 2 of 2004 for New Orleans City Park, Botanical Garden34
Conservatory Expansion, Planning and Construction ($750,000 Local Match)35
(Orleans); and Act 2 of 2004 for Le Petit Theatre Du Vieux Carre, Le Petit36
Theatre Du Vieux Carre, Capital Improvements, Planning and Construction37
(Supplemental Funding) ($250,000 Local Match) (Orleans); and Act 2 of 200438
for YWCA of Northeast Louisiana, YWCA of Northeast Louisiana Transitional39
Housing Project, Planning and Construction ($200,000 Local Match) (Ouachita);40
and Act 27 of 2006 for Executive Department Division of Administration, Old41
Governor's Mansion Exterior Waterproofing and Plaster Repairs, Planning and42
Construction (East Baton Rouge); and Act 27 of 2006 for Department of Culture,43
Recreation & Tourism Office of State Parks, State Parks Lead Paint Abatement44
and Repainting Historic Buildings, Planning and Construction (Statewide); and45
Act 27 of 2006 for Department of Culture, Recreation & Tourism Office of State46
Parks, Fontainebleau State Park, Land Acquisition, Planning and Construction47
(St. Tammany); and Act 27 of 2006 for Department of Education LSU Health48
Sciences Center Shreveport, Allied Health Facility, Planning, Construction and49
Equipment (Caddo); and Act 27 of 2006 for Department of Education Grambling50
State University, Health and Physical Education and Recreation Assembly51
Center, Planning, Construction, and Equipment (Lincoln); and Act 27 of 200652
for Plaquemines Parish, Plaquemines Drainage Pumping Station, Belle Chasse53
No. 1 Improvements, Planning and Construction (Plaquemines); and Act 27 of54
2006 for Rapides Parish, Dean Lee Research Station, Planning and Construction55
(Rapides); and Act 27 of 2006 for Jeanerette, Jeanerette Law Enforcement56
Center, Planning and Construction (Iberia); and Act 27 of 2006 for Urban57
Restoration Enhancement, Restoration Village, Planning and Construction of58
Community Center/Emergency Shelter, Improvements at Urban Meadows59 ENROLLEDHB NO. 2
Page 11 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Apartments and Urban Villa Apartments (Housing Project) and Planning and1
Construction at Old Cohn Elementary Site (Supplemental Funding) (East Baton2
Rouge, West Baton Rouge); and Act 20 of 2009 for Elected Officials Secretary3
of State, Louisiana State Cotton Museum, Planning and Construction (East4
Carroll); and Act 20 of 2009 for Department of Culture, Recreation and Tourism5
Office of State Parks, Louisiana State Arboretum, Planning and Construction6
(Evangeline); and Act 20 of 2009 for Department of Public Safety and7
Corrections Public Safety - Office of Management & Finance, DPS Statewide8
Roofing Project, Planning and Construction (Statewide); and Act 21 of 2010 for9
Department of Culture, Recreation & Tourism Office of State Parks, Grand Isle10
State Park Erosion Controls, Planning and Construction (Jefferson); and Act 2111
of 2010 for Department of Health & Hospitals Southwest Developmental Center,12
HVAC Upgrade for Client Habilitation Services (2 Buildings) and13
Administrative Building (Acadia); and Act 21 of 2010 for Department of14
Education LSU Baton Rouge, Corporation Canal: Partial Enclosure15
(Supplemental Funding) (East Baton Rouge); and Act 21 of 2010 for Department16
of Education LSU Eunice, Cooling Tower Replacement (Acadia); and Act 21 of17
2010 for Department of Education Nicholls State University, Beauregard Hall18
Renovation, Planning and Construction (Lafourche); and Act 21 of 2010 for19
Department of Education Louisiana Tech University, Technology Transfer20
Center Foundation Repair, Planning and Construction (Caddo); and Act 21 of21
2010 for Haynesville, Wastewater Treatment Plant Improvements, Planning and22
Construction (Claiborne); and Act 21 of 2010 for Mandeville, Galvez Street, US23
190 Outfall, Drainage Improvements, Planning and Construction ($554,880 Non-24
State Match) (St. Tammany); and Act 21 of 2010 for Monroe, Civic Center Roof25
Restoration ($270,000 Local Match) (Ouachita); and Act 21 of 2010 for26
Northwest Louisiana Juvenile Detention Center, Ware Youth Center, Planning27
and Construction (Red River); and Act 22 of 2011 for Department of Health and28
Hospitals Southeast Louisiana Hospital, Replace Potable Water Distribution29
Lines (St. Tammany); and Act 22 of 2011 for Department of Health and30
Hospitals Southwest Developmental Center, Fire Alarm System Replacement,31
Planning and Construction (Acadia); and Act 22 of 2011 for Department of32
Education LSU Baton Rouge, Veterinary Medicine Roof Replacement and33
Facility Repairs (East Baton Rouge); and Act 22 of 2011 for Department of34
Education University of Louisiana - Lafayette, Burke Hawthorne Hall35
Renovation and Expansion, Planning and Construction (Lafayette); and Act 2236
of 2011 for Allen Parish, Pawnee Road Improvement, Planning and Construction37
(Allen); and Act 22 of 2011 for Beauregard Parish, Longville Pentecostal Church38
Road Improvements (Beauregard); and Act 22 of 2011 for Bossier Parish, Moore39
Road Reconstruction, Planning and Construction (Bossier); and Act 22 of 201140
for Catahoula Parish, Vick Road Reconstruction, Planning and Construction41
(Catahoula); and Act 22 of 2011 for Concordia Parish, Old Courthouse Air42
Conditioner Replacement (Concordia); and Act 22 of 2011 for Morehouse43
Parish, Activity Center, Planning and Construction (Morehouse); and Act 22 of44
2011 for St. Helena Parish, Fire Station, Planning and Construction (St. Helena);45
and Act 22 of 2011 for Breaux Bridge, Breaux Bridge City Hall Improvements,46
Planning and Construction (St. Martin); and Act 22 of 2011 for Carencro, Sewer47
Manhole Repairs (Lafayette); and Act 22 of 2011 for Choudrant, Choudrant Fire48
Station 2 (Lincoln); and Act 22 of 2011 for Cullen, Water and Wastewater49
System Improvements, Planning and Construction ($200,000 Local Match)50
(Webster); and Act 22 of 2011 for Farmerville, Sewer System Improvements51
Dozier Creek Subdivision, Planning and Construction (Local Match $100,000)52
(Union); and Act 22 of 2011 for Gibsland, Distribution Improvements, Planning53
and Construction (Bienville); and Act 22 of 2011 for Iota, Water Treatment Plant54
Expansion, Planning and Construction (Acadia); and Act 22 of 2011 for Kaplan,55
Kaplan Water Treatment Plant, Lime Sludge Thickener, Planning, Acquisitions,56
Construction (Vermilion); and Act 22 of 2011 for Kaplan, Water Treatment Plant57
Generator, Planning and Construction (Vermilion); and Act 22 of 2011 for58
Mansura, Senior Citizen Center, Planning and Construction (Avoyelles); and Act59 ENROLLEDHB NO. 2
Page 12 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
22 of 2011 for Natchitoches, Industrial Park South, Sewer Improvements, Access1
Road, and Land Acquisition, Planning and Construction ($1,100,000 Local2
Match) (Natchitoches); and Act 22 of 2011 for Plain Dealing, Water System3
Improvements (Bossier); and Act 22 of 2011 for Sarepta, Wastewater Collection4
System Improvements, Acquisitions, Planning and Construction (Non-State5
Match Required) (Webster); and Act 22 of 2011 for Sikes, Water System6
Improvements (Winn); and Act 22 of 2011 for Tangipahoa African-American7
Heritage Museum and Black Veteran's Archives, Tangipahoa African-American8
Heritage Museum and Black Veterans Archives (Tangipahoa); and Act 22 of9
2011 for Treme Community Education Program, Leverette Senior House,10
Planning and Construction (Orleans); and Act 22 of 2011 for Treme Community11
Education Program, Program Operations, Planning, Acquisitions, Renovations12
and/or Construction (Orleans); and Act 22 of 2011 for Pleasant Hill-Crossroads13
Water System, Inc., Pleasant Hill Crossroads Water System, New Well14
Construction, Planning and Construction (Winn)$ 9,587,25215
Payable from the balance of State General Fund (Direct) previously allocated16
under the authority of Act 28 of 1997 for East Jefferson Levee District, Jefferson17
Lakefront Linear Park Improvements, Planning and Construction (Jefferson); and18
Act 28 of 1997 for New Orleans, Behrman Park Improvements, Planning and19
Construction (Orleans); and Act 28 of 1997 for New Orleans Business and20
Industrial District, Enterprise Park, Land Acquisition, Access Roads And21
Infrastructure Improvements, Renovations, Planning And Construction22
(Orleans); and Act 29 of 1998 for Morehouse Parish, Sheriff and Jail Complex,23
Planning, Renovation and Construction ($2,550,000 Local Match) (Morehouse);24
and Act 20 of 1999 for Tensas Parish, Development of the Old Tensas25
Rosenwald High School Site, Restoration of Gym into Civic-Recreation and26
Heritage Culture Center, Outdoor Recreation, and Renovation of Classroom27
Buildings to House Various Social and Community Service Agencies and28
Activities, Planning and Construction (Tensas); and Act 20 of 1999 for Norwood,29
Water Well Improvements, Planning and Construction (East Feliciana); and Act30
21 of 2000 for Department of Education LSU Alexandria, Central Utilities31
System Repair and Upgrade, Planning and Construction (Rapides); and Act 2232
of 2001 for Jeanerette, Upgrade City Water System, Planning and Construction33
(Iberia); and Act 24 of 2003 for Morehouse Parish, Equine Center, Planning and34
Construction ($50,000 Local Match) (Morehouse); and Act 24 of 2003 for Pointe35
Coupee Parish, Continuation of the development of Multi-Use Facility, Planning36
and Construction ($110,000 Local Match) (Pointe Coupee); and Act 26 of 200537
for Iberia Parish, Weeks Park Open Air Pavillion, Planning and Construction38
(Iberia); and Act 26 of 2005 for Pearl River, Sewer Treatment Plant Upgrade,39
Planning and Construction (St. Tammany); and Act 27 of 2006 for Richland40
Parish, Kline Road Overlay, Widening and Other Improvements, Planning and41
Construction (Richland); and Act 27 of 2006 for Coordinating and Development42
Corporation, Sabine Parish Cooperative Extension and Workforce Investment43
Agency Office, Planning and Construction ($155,000 Local Match) (Sabine); and44
Act 27 of 2006 for Abita Springs, Abita Springs Trailhead, Planning and45
Construction (St. Tammany); and Act 28 of 2007 for Natchitoches Parish,46
Equipment Purchase (Pothole Patcher) for Road Improvements (Natchitoches);47
and Act 28 of 2007 for Natchitoches Parish, Overlayin g of Industrial Avenue48
(Natchitoches); and Act 28 of 2007 for Ball, Townside Wastewater Pump Station49
Rehabilitation (Rapides); and Act 28 of 2007 for Bastrop, Central Fire Station50
Roofing and Repairs, Planning and Construction (Morehouse); and Act 28 of51
2007 for Franklin, Public Safety and Security Improvements and Acquisitions,52
Planning and Construction (St. Mary); and Act 511 of 2008 for Winn Parish,53
Jeld-Wen Road Planning, Improvements, and Construction (Winn); and Act 51154
of 2008 for St. Francisville, St. Francisville Drainage and Canal Improvements,55
Planning and Construction (West Feliciana); and Act 511 of 2008 for Winnfield,56 ENROLLEDHB NO. 2
Page 13 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Winn Correctional Center Water Line Replacement, Planning and Construction1
(Winn); and Act 511 of 2008 for Bel Di Gil Water System, Inc., Bel Di Gil2
Water System Improvements (Caddo)	$ 793,4123
Payable from the balance of State General Fund Non-Recurring Revenues4
previously allocated under the authority of Act 20 of 1999 for St. Tammany5
Parish Industrial District, Land, Building Acquisition, and Infrastructure6
Improvement for an Industrial Prospect ($1,000,000 Federal and $500,000 Local7
Match) (St. Tammany); and Act 23 of 2002 for Executive Department Division8
of Administration, State Office Buildings Major Repairs - Baton Rouge State9
Office Building Renovations, Planning and Construction (East Baton Rouge);10
and Act 23 of 2002 for Education McNeese State University, Women's Sports11
Complex, including a Softball Facility, Planning and Construction (Supplemental12
Funding) (Calcasieu); and Act 23 of 2002 for Education Nunez Community13
College, Site Development, Planning and Construction (St. Bernard); and Act 2314
of 2002 for Morehouse Parish, Equine Center, Planning and Construction15
($50,000 Local Match) (Morehouse); and Act 23 of 2002 for Morgan City,16
Brashear Avenue and Highway 70 Drainage Improvements, Planning and17
Construction (St. Mary); and Act 23 of 2002 for New Orleans, Behrman Park18
Improvements, Planning and Construction (Orleans); and Act 23 of 2002 for19
Winnsboro, Museum Renovations, Planning and Construction (Local Match20
Required) (Franklin); and Act 23 of 2002 for Louisiana Leadership Institute,21
Multi-Purpose Enrichment and Sports Center, Acquisition, Planning and22
Construction (East Baton Rouge); and Act 2 of 2004 for Breaux Bridge, Water23
Line Extension, Planning and Construction (St. Martin); and Act 2 of 2004 for24
Crowley, Historic Building Acquisition, Renovations and Construction for an25
Interpretive Rice Center, Music Recording Studio Museum and Administrative26
Offices ($312,500 Local Match) (Supplemental Funding) (Acadia); and Act 2027
of 2009 for Iberia Parish, LeMaire Memorial Airport, T-Hangar Planning and28
Construction (Iberia); and Act 20 of 2009 for Patterson, Catherine Street Paving29
and Drainage, Engineering and Construction (St. Mary); and Act 20 of 2009 for30
St. Gabriel, Turn Lanes on Highway 30 (Iberville); and Act 21 of 2010 for Treme31
Community Education Program, Program Operations, Planning, Acquisitions,32
Renovations and/or Construction (Orleans) $ 916,86733
Payable from the balance of Interest Earnings previously allocated under the34
authority of the Joint Legislative Committee on the Budget in1999 for35
Department of Education Nunez Community College, New Classroom Building36
and Expansion of Building A (St. Bernard); and the Joint Legislative Committee37
on the Budget in 2000 for Executive Department Division of Administration,38
Insurance Building Replacement (East Baton Rouge); and the Joint Legislative39
Committee on the Budget in 2002 for Department of Education River Parishes40
Technical College, Purchase of Property (St. John the Baptist); and the Joint41
Legislative Committee on the Budget in 2003 for Department of Education42
Nunez Community College, Site Development, Planning and Construction (St.43
Bernard); and the Joint Legislative Committee on the Budget in 2007 for44
Department of Education Southern University Shreveport, Renovation and45
Addition to Student Activity Center and Outdoor Facility (Caddo); and the Joint46
Legislative Committee on the Budget in 2008 for Department of Education47
Grambling State University, Dunbar Hall Replacement (Lincoln); and Act 51148
of 2008 for Pinecrest Developmental Center, Hospital Air Conditioning System49
Repairs (Rapides)	$ 134,34850
Total	$131,976,87951
(1358)Hazardous Material Abatement Projects 52
(Statewide)53
Payable from General Obligation Bonds54
Priority 5	$ 2,000,00055 ENROLLEDHB NO. 2
Page 14 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1359)Mold Remediation and Indoor Air Quality, Planning 1
and Construction 2
(Statewide)3
Payable from General Obligation Bonds4
Priority 1	$ 2,000,0005
Priority 5	$ 1,000,0006
Total	$ 3,000,0007
(1363)Technical Colleges Campus Buildings Major Repairs, 8
Equipment Replacement and Site Work, Planning 9
and Construction10
(Statewide)11
Payable from General Obligation Bonds12
Priority 5	$ 50,00013
01/109OFFICE OF COASTAL PROTECTION AND RESTORATION14
(261) Westbank Hurricane Protection Project, Planning, Construction, 15
Right of Way and Utilities ($199,000,000 Federal Match and 16
$52,800,000 Local Match)17
(Jefferson, Orleans, Plaquemines)18
Payable from General Obligation Bonds19
Priority 1	$ 5,095,00020
(262) Morganza to Gulf of Mexico Flood Control Feasibility Study, 21
Planning, Design, Right of Way and Construction of Levees, 22
Floodgates and Other Flood Control Systems ($100,000,000 23
Local Match; $25,000,000 Local In-Kind Match; $442,000,000 24
Federal Match)25
(Ascension, Assumption, Iberia, Iberville, Lafourche, Pointe26
 Coupee, St. Martin, St. Mary, Terrebonne, West Baton Rouge)27
Payable from General Obligation Bonds28
Priority 1	$28,240,00029
Priority 2	$12,000,00030
Priority 5	$26,000,00031
Total	$66,240,00032
(390) Lafitte Area Tidal Protection, Planning33
and Construction34
(Jefferson)35
Payable from General Obligation Bonds36
Priority 2	$ 6,000,00037
(1364)Donaldsonville to the Gulf of Mexico Flood Study 38
($1,100,000 Local Match; $3,500,000 Federal Match)39
(Ascension, Assumption, Jefferson, Lafourche, St. Charles, 40
St. James, St. John the Baptist)41
Payable from General Obligation Bonds42
Priority 1	$ 100,00043
01/111HOMELAND SECURITY AND EMERGENCY PREPAREDNESS44
(1365)GOHSEP Building Expansion, Planning and Construction45
(East Baton Rouge)46
Payable from General Obligation Bonds47
Priority 1	$ 3,810,00048
Priority 5	$ 1,720,00049
Total	$ 5,530,00050 ENROLLEDHB NO. 2
Page 15 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
01/112DEPARTMENT OF MILITARY AFFAIRS1
(300) Multi-Purpose Machine Gun Range at Camp Beauregard,2
Planning and Construction3
(Rapides)4
Payable from Federal Funds	$ 500,0005
(302) Camp Minden, Infrastructure, Rehabilitation, Phase 2, 6
Planning and Construction7
(Webster)8
Payable from General Obligation Bonds9
Priority 1	$ 2,865,00010
Priority 5	$ 4,485,00011
Payable from Federal Funds	$ 689,00012
Total	$ 8,039,00013
(303) Statewide Backlog of Maintenance and Repair (BMAR), 14
Phase 3, and Statewide Infrastructure Rehabilitation, Phase 315
(Statewide)16
Payable from General Obligation Bonds17
Priority 1	$ 1,500,00018
Priority 5	$ 1,400,00019
Payable from Federal Funds	$ 6,700,00020
Total	$ 9,600,00021
(813) Readiness Center Replacement, Franklinton, LA,22
Planning and Construction23
(Washington)24
Payable from General Obligation Bonds25
Priority 2	$ 3,435,00026
(1366)State Emergency Warehouse at Camp Villere, Planning 27
and Construction28
(St. Tammany)29
Payable from General Obligation Bonds30
Priority 1	$ 3,400,00031
01/124LOUISIANA STADIUM AND EXPOSITION DISTRICT32
(1329)Bayou Segnette Sports Complex Improvements, 33
Including Hall B Expansion, Planning and Construction 34
(Jefferson)35
Payable from General Obligation Bonds36
Priority 1	$11,195,00037
Priority 5	$ 1,500,00038
Total	$12,695,00039
(1342)Bayou Segnette Festival Park, Land Acquisition, 40
Planning and Construction41
(Jefferson)42
Payable from General Obligation Bonds43
Priority 1	$13,000,00044
(1367)Zephyrs Baseball Facilities Repair, Renovation and Improvement 45
(Jefferson)46
Payable from General Obligation Bonds47
Priority 1	$ 2,970,00048 ENROLLEDHB NO. 2
Page 16 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1368)Professional Sports Facilities, Planning and Construction1
and Lease Hold Improvements2
(Jefferson, Orleans)3
Payable from General Obligation Bonds4
Priority 1	$27,500,0005
Provided that $8,500,000 in expenditures from this appropriation shall be consistent with the6
deliverables as enumerated in the Arena Use Agreement and Project Development7
Agreement.8
(1369)New Orleans Sports Arena Improvements, Planning and 9
Construction10
(Orleans)11
Payable from General Obligation Bonds12
Priority 1	$41,500,00013
Expenditures from this appropriation shall be consistent with the deliverables as enumerated14
in the Arena Use Agreement and Project Development Agreement.15
(2047)Bayou Segnette Recreation Complex,16
Planning and Construction17
(Jefferson)18
Payable from General Obligation Bonds19
Priority 2	$17,500,00020
Priority 5	$ 4,100,00021
Payable from the balance of State General Fund22
Non-Recurring Revenues previously allocated under23
the authority of Act 20 of 2009 for Jefferson Parish, 24
Bayou Segnette Festival Park, Land Acquisition,25
Planning and Construction (Jefferson) $ 976,40026
Total	$22,576,40027
(2055)Improvements to TPC Louisiana,28
Planning and Construction29
(Jefferson)30
Payable from General Obligation Bonds31
Priority 2	$ 400,00032
Priority 5	$ 3,600,00033
Total	$ 4,000,00034
Pending approval of a capital outlay budget request pursuant to the provisions of R.S.35
39:112.36
DEPARTMENT OF VETERANS AFFAIRS37
03/130VETERANS AFFAIRS38
(718) Northeast Louisiana State Cemetery, 39
Planning and Construction40
(Ouachita)41
Payable from General Obligation Bonds42
Priority 2	$ 800,00043
Payable from Federal Funds	$ 5,821,33844
Total	$ 6,621,33845
(1004)Fire Alarm/Call System, Planning and Construction46
(East Feliciana)47
Payable from General Obligation Bonds48
Priority 1	$ 180,00049 ENROLLEDHB NO. 2
Page 17 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1370)Southeast Louisiana State Cemetery, 1
Planning and Construction2
(St. Tammany)3
Payable from General Obligation Bonds4
Priority 1	$ 800,0005
03/134SOUTHWEST LOUISIANA WAR VETERANS HOME6
(1100)Chapel Expansion, Planning and Construction7
(Jefferson Davis)8
Payable from Fees and Self-Generated Revenues $ 97,7679
Payable from Federal Funds	$ 228,12410
Total	$ 325,89111
ELECTED OFFICIALS12
04/139SECRETARY OF STATE13
(1089)Old State Capitol Environmental Control Systems, 14
Planning and Construction15
(East Baton Rouge)16
Payable from General Obligation Bonds17
Priority 1	$ 845,00018
Priority 5	$ 500,00019
Total	$ 1,345,00020
(1090)Louisiana State Exhibit Museum, Planning and Construction21
(Caddo)22
Payable from General Obligation Bonds23
Priority 1	$ 200,00024
Priority 5	$ 2,250,00025
Total	$ 2,450,00026
(2050)Chennault Aviation and Military Museum27
Hangar Building and Equipment, Planning28
and Construction29
(Ouachita)30
Payable from General Obligation Bonds31
Priority 2	$ 50,00032
04/160AGRICULTURE AND FORESTRY33
(1376)Louisiana Animal Disease Diagnostic Laboratory, 34
Planning and Construction35
(East Baton Rouge)36
Payable from General Obligation Bonds37
Priority 1	$ 8,000,00038
DEPARTMENT OF ECONOMIC DEVELOPMENT39
05/252OFFICE OF BUSINESS DEVELOPMENT40
(1006)Economic Development Award Program For 41
Infrastructure Assistance (Supplemental Funding)42
(Statewide)43
Payable from General Obligation Bonds44
Priority 1	$27,200,00045
Priority 2	$ 5,000,00046
Priority 5	$ 5,000,00047
Total	$37,200,00048 ENROLLEDHB NO. 2
Page 18 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1323)Mega-Project Site Preparation, Planning and Construction1
(Statewide)2
Payable from General Obligation Bonds3
Priority 1	$40,000,0004
Priority 5	$10,000,0005
Total	$50,000,0006
(1377)Homeland Security and Environmental Technical Center, 7
Acquisition and Renovation, Planning and Construction 8
(East Baton Rouge)9
Payable from General Obligation Bonds10
Priority 1	$ 600,00011
(1378)Louisiana Gene Therapy Research Consortium, Inc., 12
SPECT/CT and microPET System for LSUHSC-Shreveport13
(Caddo)14
Payable from General Obligation Bonds15
Priority 1	$ 500,00016
(1379)Wet-Lab Business Incubators, Planning and Construction17
(Caddo, East Baton Rouge, Orleans)18
Payable from General Obligation Bonds19
Priority 1	$ 7,740,00020
Priority 5	$ 6,000,00021
Total	$13,740,00022
(1380)Louisiana Gene Therapy Research Consortium, Inc., 23
Renovation, Equipment, Planning and Construction24
(Caddo, Orleans, St. Tammany)25
Payable from General Obligation Bonds26
Priority 1	$ 2,275,00027
(1381)Dock Improvements, Office Space, and Housing 28
Project, Planning and Construction ($29,850,000 In-Kind 29
Local Match)30
(Calcasieu, East Baton Rouge, Iberia, Jefferson, Lafourche, 31
Orleans, St. Charles, St. James, St. John the Baptist, St. Mary, 32
Terrebonne, West Baton Rouge)33
Payable from General Obligation Bonds34
Priority 1	$17,850,00035
(1383)Aerospace Manufacturing Infrastructure 36
(Orleans)37
Payable from General Obligation Bonds38
Priority 1	$15,015,00039
(1384)Louisiana Gene Therapy Research Consortium, Inc., 40
Multi-Photon Microscope for LSUHSC-New Orleans41
(Orleans)42
Payable from General Obligation Bonds43
Priority 1	$ 700,00044
(1385)Equipment for Louisiana Immersive Technologies 45
Enterprise (LITE)46
(Lafayette)47
Payable from General Obligation Bonds48
Priority 1	$ 500,00049 ENROLLEDHB NO. 2
Page 19 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1386)Louisiana Cancer Research Center in New Orleans, 1
Planning, Construction, and Equipment2
(Orleans)3
Payable from General Obligation Bonds4
Priority 1	$ 8,000,0005
Priority 5	$ 7,000,0006
Total	$15,000,0007
(1387)Cold Storage Processing Facility8
(Orleans)9
Payable from General Obligation Bonds10
Priority 1	$ 150,00011
(1388)Louisiana Digital Computer Facility, Planning 12
and Construction 13
(East Baton Rouge)14
Payable from General Obligation Bonds15
Priority 1	$ 6,820,00016
Priority 2	$ 500,00017
Total	$ 7,320,00018
(1389)Bulk Grain Elevator, Rail Spur and Other Related 19
Infrastructure, Planning and Construction20
(Calcasieu)21
Payable from General Obligation Bonds22
Priority 1	$ 5,000,00023
(    )Capital Improvements Projects to Meet24
Economic Development Commitments,25
Planning, Construction and Equipment26
(Statewide)27
Payable from General Obligation Bonds28
Priority 2	$14,200,00029
Pending submittal and approval of a capital outlay budget request pursuant to the provisions30
of R.S. 39:112.31
DEPARTMENT OF CULTURE, RECREATION AND TOURISM32
06/263OFFICE OF STATE MUSEUM33
(488) Old U. S. Mint Museum Exhibit34
(Orleans)35
Payable from General Obligation Bonds36
Priority 1	$ 600,00037
Priority 5	$ 3,400,00038
Total	$ 4,000,00039
(515) Construction of Civil Rights Museum, Planning 40
and Construction41
(Orleans)42
Payable from General Obligation Bonds43
Priority 1	$ 500,00044
Priority 2	$ 450,00045
Priority 5	$ 400,00046
Total	$ 1,350,00047 ENROLLEDHB NO. 2
Page 20 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1317)Presbytere Exterior Restoration and Repair,1
Planning and Construction2
(Orleans)3
Payable from General Obligation Bonds4
Priority 2	$ 1,200,0005
(1318)Cabildo Exterior Restoration and Repair,6
Planning and Construction7
(Orleans)8
Payable from General Obligation Bonds9
Priority 2	$ 1,395,00010
06/264OFFICE OF STATE PARKS11
(361) Bayou Segnette State Park, Land Acquisition, 12
Additional Cabins, Planning and Construction13
(Jefferson)14
Payable from General Obligation Bonds15
Priority 1	$ 8,635,00016
Priority 5	$ 4,200,00017
Total	$12,835,00018
(379) Chemin-a-Haut State Park Acquisition, Planning and 19
Construction of New Group Camp, Vacation Cabins, 20
Visitor Center and Restrooms21
(Morehouse)22
Payable from General Obligation Bonds23
Priority 1	$ 270,00024
(380) Fort DeRussy State Historic Site, Planning, Development 25
and Acquisitions26
(Avoyelles)27
Payable from General Obligation Bonds28
Priority 1	$ 330,00029
(383) Tunica Hills State Preservation Area, Acquisition, 30
Planning and Construction31
(West Feliciana)32
Payable from General Obligation Bonds33
Priority 1	$ 2,095,00034
Priority 5	$ 8,595,00035
Total	$10,690,00036
(384) South Toledo Bend State Park Emergency Erosion 37
Controls, Planning and Construction38
(Sabine)39
Payable from General Obligation Bonds40
Priority 1	$ 1,380,00041
(385) Preventive Maintenance/Major Repairs and 42
Improvements43
(Statewide)44
Payable from General Obligation Bonds45
Priority 2	$ 6,300,00046 ENROLLEDHB NO. 2
Page 21 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1393)Poverty Point Reservoir State Park Group Camp, 1
Conference Center, Site Amenities, Acquisition, 2
Planning and Construction3
(Richland)4
Payable from General Obligation Bonds5
Priority 1	$ 500,0006
Priority 2	$ 1,000,0007
Priority 5	$ 5,800,0008
Total	$ 7,300,0009
(1394)St. Bernard State Park, Planning and Construction - 10
Supplemental11
(St. Bernard)12
Payable from General Obligation Bonds13
Priority 1	$ 20,00014
06/267OFFICE OF TOURISM15
(1398)I-10 Vinton Welcome Center16
(Calcasieu)17
Payable from General Obligation Bonds18
Priority 1	$ 235,00019
Priority 5	$ 2,565,00020
Total	$ 2,800,00021
06/A20NEW ORLEANS CITY PARK22
(310) City Park Maintenance Complex Improvements,23
Planning and Construction24
(Orleans)25
Payable from General Obligation Bonds26
Priority 1	$ 100,00027
Priority 5	$ 2,550,00028
Total	$ 2,650,00029
(1399)Splash Park, Planning and Construction30
(Orleans)31
Payable from General Obligation Bonds32
Priority 1	$ 500,00033
Priority 5	$ 4,500,00034
Total	$ 5,000,00035
(1400)City Park Golf Complex Improvements, Planning 36
and Construction37
(Orleans)38
Payable from General Obligation Bonds39
Priority 1	$ 6,600,00040
Priority 5	$ 3,300,00041
Total	$ 9,900,00042
(1401)Improvements to Amusement Area 43
at New Orleans City Park 44
(Orleans)45
Payable from General Obligation Bonds46
Priority 1	$ 2,000,00047 ENROLLEDHB NO. 2
Page 22 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1403)New Tennis Center Improvements,1
Planning and Construction2
(Orleans)3
Payable from General Obligation Bonds4
Priority 1	$ 50,0005
DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT6
07/270ADMINISTRATION7
(248) Essen Lane Widening, I-10 to Perkins Road, Planning,8
Utilities, Right of Way and Construction9
(East Baton Rouge)10
Payable from General Obligation Bonds11
Priority 1	$12,000,00012
(882) State Streets, Algiers, Planning and Construction13
(Orleans)14
Payable from General Obligation Bonds15
Priority 1	$ 1,400,00016
Priority 2	$ 175,00017
Priority 5	$ 1,125,00018
Total	$ 2,700,00019
(883) LA 64 Widening from LA 16 to Magnolia Bridge,20
Planning and Construction21
(Livingston)22
Payable from General Obligation Bonds23
Priority 1	$ 400,00024
(885) Tarbutton Road I-20 Interchange, Engineering,25
Right of Way, Utilities and Construction26
(Lincoln)27
Payable from General Obligation Bonds28
Priority 2	$ 5,000,00029
Priority 5	$ 9,100,00030
Total	$14,100,00031
(886) Port of Lake Charles Access Road, Planning and Construction 32
($3,500,000 Local Match, $17,500,000 Federal Match)33
(Calcasieu)34
Payable from General Obligation Bonds35
Priority 1	$ 1,000,00036
Priority 5	$ 8,500,00037
Total	$ 9,500,00038
(887) LA 42 (US 61 to LA 44) Widening39
(Ascension)40
Payable from General Obligation Bonds41
Priority 1	$12,000,00042
Priority 5	$17,000,00043
Total	$29,000,00044
(892) I-10, Calcasieu River Bridge, Environmental,45
Planning, Engineering, Right of Way, 46
Utilities, Demolition and Construction47
(Calcasieu)48
Payable from General Obligation Bonds49
Priority 2	$ 100,00050
Priority 5 	$ 160,00051
Total	$ 260,00052 ENROLLEDHB NO. 2
Page 23 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(893) LA 112 (E. Davis Road to Union Hill)1
Rehabilitation, Planning and Construction 2
(Rapides)3
Payable from General Obligation Bonds4
Priority 2	$ 50,0005
(895) LA 1 Improvements, Phase 2, Planning, Engineering,6
Right of Way, Utilities and Construction7
(Lafourche)8
Payable from General Obligation Bonds9
Priority 5	$40,000,00010
(902) El Camino Corridor Commission, El Camino East 11
West Corridor, Planning and Construction12
(Catahoula, Concordia, La Salle, Natchitoches, Sabine, 13
Winn)14
Payable from General Obligation Bonds15
Priority 1	$ 1,500,00016
(904) Secretary's Emergency Fund for Bridge Damages, 17
Other Reimbursements, Local Matching Dollars, 18
Federal Funds, and Opportunity Grants Subject to the 19
Provisions of R.S. 48:23220
(Statewide)21
Payable from General Obligation Bonds22
Priority 1	$ 2,500,00023
Payable from Interagency Transfers	$12,500,00024
Payable from Fees and Self Generated Revenues $15,000,00025
Payable from Transportation Trust Fund - Federal $25,000,00026
Payable from Federal Funds	$ 5,000,00027
Total	$60,000,00028
(905) Highway Program 29
(Up to $4,000,000 for Secretary’s Emergency Fund) 30
(Statewide)31
Payable from General Obligation Bonds32
Priority 2	$ 2,260,00033
Payable from Transportation Trust Fund - Federal $686,133,00034
Payable from Transportation Trust Fund-Regular $33,900,00035
Payable from the balance of General Obligation Bond proceeds previously36
allocated under the authority of Act 22 of 2001 for Department of Transportation37
and Development Public Improvements, Reservoir Embankment/Structures38
Rehabilitation, Planning, Right of Way, Utilities and Construction (Statewide);39
and Act 22 of 2001 for Natchitoches Parish Port, Relocation of LA Highway 48640
at the Natchitoches Parish Port Near Its Intersection with LA Highway 6 (0.841
Miles) ($225,000 Local Match) (Natchitoches); and Act 22 of 2001 for Monroe,42
North 18th Street Extension, Construction (Ouachita); and Act 22 of 2001 for43
Natchitoches Parish, La 480 Four-Laning in the Vicinity of Willamette Industries44
and Dobson Chip Plants (Natchitoches); and Act 22 of 2001 for Pollock, Access45
Road for U.S. Federal Correctional Complex, Land Acquisition, Planning and46
Construction (Grant); and Act 23 of 2002 for Department of Transportation and47
Development Public Improvements, Vermilion River Flood Study and48
Construction (Lafayette, St. Martin); and Act 23 of 2002 for Pollock, Access49
Road for U.S. Federal Correction Complex, Land Acquisition, Planning and50
Construction (Grant)	$ 740,88751 ENROLLEDHB NO. 2
Page 24 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Payable from the balance of State General Fund Non-Recurring Revenues1
previously allocated under the authority of Act 20 of 2009 for Department of2
Transportation and Development Administration, Common Street (Airport3
Service Road - Petro Point Drive), Construction, Right of Way, and Utilities4
(Calcasieu); and Act 20 of 2009 for Department of Transportation and5
Development Administration, Homer Bypass, LA 2, Construction (Claiborne);6
and Act 20 of 2009 for Department of Transportation and Development7
Administration, Turn Lanes on LA 3125 at LA 3274 (St. James); and Act 20 of8
2009 for Department of Transportation of Development Administration, US 3719
Improvements (Passing Lanes), Planning and Construction10
(Webster)	$ 3,747,23111
Total	$726,781,11812
Provided, however, that the Department of Transportation and Development is authorized13
to implement or commence projects approved in this program for Fiscal Year 2013-201414
identified for phased funding pursuant to the cash management plan established pursuant to15
R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing16
unspent cash balances appropriated in prior years’ programs, which funds when combined17
with current appropriations will provide sufficient appropriated funds to award contracts.18
Provided, however, that the Department of Transportation and Development shall use the19
re-allocated General Obligation Bond proceeds and Priority 2 General Obligation Bonds to20
administer the Off-System Roads and Bridges Match Program.21
(906) Hazard Elimination Projects 22
(Statewide)23
Payable from Interagency Transfers	$11,000,00024
(907) Non-Federal Aid Eligible Highway Program 25
(Statewide)26
Payable from General Obligation Bonds27
Priority 1	$ 1,000,00028
Payable from State Highway Improvement Fund	$48,000,00029
Total	$49,000,00030
Provided, however, that monies herein appropriated from the State Highway Improvement31
Fund may be used to pay the costs of issuance in the event that bonds are sold during Fiscal32
Year 2013-2014.33
(909) Relocate Hickory Avenue (LA Hwy. 48-11th Street) 34
(Mounes) (LA Hwy. 3154) Construction, Right of Way, 35
and Utilities36
(Jefferson)37
Payable from General Obligation Bonds38
Priority 1	$ 4,650,00039
(910) US 167 Corridor Study40
(Evangeline, St. Landry)41
Payable from General Obligation Bonds42
Priority 1	$ 100,00043
(911) I-20 Interchange Improvement and Kansas-Garrett 44
Connector, Planning, Engineering, Environmental, 45
and Right of Way Acquisition ($500,000 Local Match; 46
$1,000,000 Federal Match)47
(Ouachita)48
Payable from General Obligation Bonds49
Priority 1	$ 250,00050 ENROLLEDHB NO. 2
Page 25 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(913) Cove Lane Interchange and Improvements,1
Planning and Construction2
(Calcasieu)3
Payable from General Obligation Bonds4
Priority 5	$20,000,0005
(919) Intersection Improvement Program, Real Estate 6
Acquisition, Planning and Construction7
(Ascension)8
Payable from General Obligation Bonds9
Priority 1	$ 2,700,00010
Priority 5	$ 1,000,00011
Total	$ 3,700,00012
(923) Juban Road (LA 1026) Widening (I-12 to US 190) 13
(Livingston)14
Payable from General Obligation Bonds15
Priority 1	$ 5,800,00016
Priority 5	$12,400,00017
Total	$18,200,00018
(924) I-12 O'Neal Lane to Walker/Satsuma Widening, 19
Planning and Construction (Supplemental)20
(East Baton Rouge, Livingston)21
Payable from General Obligation Bonds22
Priority 1	$48,000,00023
(1105)Pecue Lane/I-10 Interchange, Planning, Design, 24
Rights of Way, Utilities and Construction25
(East Baton Rouge)26
Payable from General Obligation Bonds27
Priority 5	$11,000,00028
(1106)Verot School Road, Construction29
(Lafayette)30
Payable from General Obligation Bonds31
Priority 1	$ 500,00032
Priority 5	$24,000,00033
Total	$24,500,00034
(1109)Globalplex Intermodal Access Road35
(St. John the Baptist)36
Payable from General Obligation Bonds37
Priority 1	$ 1,200,00038
Priority 5	$ 5,100,00039
Total	$ 6,300,00040
(1111)LA Hwy 616 (Caldwell Road to LA Hwy 143), 41
Planning and Construction42
(Ouachita)43
Payable from General Obligation Bonds44
Priority 1	$ 150,00045
Priority 2	$ 2,000,00046
Priority 5	$ 9,600,00047
Total	$11,750,00048
(1153)Highway 23 Elevation for Three Miles of Emergency 49
Route Flood Protection, Planning and Construction50
(Plaquemines)51
Payable from General Obligation Bonds52
Priority 1	$ 6,000,00053 ENROLLEDHB NO. 2
Page 26 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1154)Louisiana Highway 1 Resurfacing - Plaquemine to1
White Castle, Planning and Construction2
(Iberville)3
Payable from General Obligation Bonds4
Priority 1	$ 2,000,0005
Priority 5	$ 8,100,0006
Total	$10,100,0007
(1405)Safety Improvements Hwy 15 between 8
US 80 and LA 616, Planning and Construction9
(Ouachita)10
Payable from General Obligation Bonds11
Priority 1	$ 225,00012
(1406)I-49 from I-220 in the City of Shreveport to Arkansas13
Line, Lafayette to the Westbank Expressway, 14
Construction,  Right of Way and Utilities15
(Caddo, Iberia, Jefferson, Lafayette, Lafourche, 16
St. Charles, St. Martin, St. Mary, Terrebonne)17
Payable from the Unclaimed Property Leverage Fund	$15,000,00018
Provided, however, that fifty percent of these funds are to be used for I-49 from I-220 in the19
city of Shreveport to the Arkansas line and fifty percent of these funds are to be used for I-4920
from Lafayette to the Westbank Expressway.21
Provided, however, that monies herein appropriated from the Unclaimed Property Leverage22
Fund may be used to pay the costs of issuance in the event that bonds are sold during Fiscal23
Year 2013-2014.24
(1407)Hooper Road Extension Study 25
(East Baton Rouge, Livingston)26
Payable from General Obligation Bonds27
Priority 1	$ 1,000,00028
(1412)LA 3034 Improvements29
(East Baton Rouge)30
Payable from General Obligation Bonds31
Priority 1	$ 3,590,00032
Priority 5	$ 1,500,00033
Total	$ 5,090,00034
(1421)I-49 from I-220 in the City of Shreveport to Arkansas State35
Line, Construction, Right of Way and Utilities36
(Caddo)37
Payable from General Obligation Bonds38
Priority 1	$24,710,00039
Priority 5	$63,000,00040
Total	$87,710,00041
(1424)Island Road (LA 413) Reconstruction from LA 414 42
South to LA 414 North43
(Pointe Coupee)44
Payable from General Obligation Bonds45
Priority 1	$ 1,500,00046 ENROLLEDHB NO. 2
Page 27 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1426)LA 930 Reconstruction1
(Ascension)2
Payable from General Obligation Bonds3
Priority 1	$ 2,750,0004
Priority 2	$ 200,0005
Priority 5	$ 7,750,0006
Total	$10,700,0007
(1427)Peters Road Bridge and Extension, Phase 1, 8
Planning and Construction9
(Jefferson, Plaquemines)10
Payable from General Obligation Bonds11
Priority 1	$ 1,500,00012
(1428)Hooper Road Extension (LA 3034 to LA 16), 13
Environmental, Planning, Engineering, 14
Right of Way, Utilities and Construction15
(East Baton Rouge, Livingston)16
Payable from General Obligation Bonds17
Priority 1	$ 2,700,00018
(    )LA 22 Improvements (LA 16 to Diversion19
Canal), Planning and Construction20
(Livingston)21
Payable from General Obligation Bonds22
Priority 2	$ 500,00023
Pending submittal and approval of a capital outlay budget request pursuant to the provisions24
of R.S. 39:112.25
(    )LA 3102 (Vick Road) Improvements (LA 12426
to Avoyelles/Catahoula Parish Line), Planning 27
and Construction28
(Catahoula)29
Payable from General Obligation Bonds30
Priority 2	$ 3,000,00031
Pending submittal and approval of a capital outlay budget request pursuant to the provisions32
of R.S. 39:112.33
(2054)Jimmie Davis Bridge Rehabilitation and Lighting,34
Planning and Construction35
(Bossier, Caddo)36
Payable from General Obligation Bonds37
Priority 1	$ 1,300,00038
Priority 5	$10,300,00039
Total	$11,600,00040
(    )LA 182 Improvements (Iberia Parish Line to LA 670),41
Planning and Construction42
(St. Mary)43
Payable from General Obligation Bonds44
Priority 2	$ 500,00045
Pending submittal and approval of a capital outlay budget request pursuant to the provisions46
of R.S. 39:112.47 ENROLLEDHB NO. 2
Page 28 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(    )Highway 397 in Calcasieu Parish, North and South1
Turning Lanes at Farmers Rice Mill, Planning2
and Construction3
(Calcasieu)4
Payable from General Obligation Bonds5
Priority 2	$ 100,0006
Priority 5	$ 300,0007
Total	$ 400,0008
Pending approval and submittal of a capital outlay budget request pursuant to the provisions9
of R.S. 39:112.10
07/274PUBLIC IMPROVEMENTS11
(254) Comite River Diversion Canal, Planning and Construction 12
($135,000,000 Federal Match and $33,790,000 Local Match)13
(Ascension, East Baton Rouge, Livingston)14
Payable from General Obligation Bonds15
Priority 1	$13,500,00016
(255) Mississippi River Levee Raising, Arkansas to Old River, 17
Planning and Construction18
(Avoyelles, Concordia, East Carroll, 19
Madison, Pointe Coupee, Tensas)20
Payable from General Obligation Bonds21
Priority 1	$ 4,000,00022
Priority 5	$ 500,00023
Total	$ 4,500,00024
(284) Port Construction and Development Priority Program 25
(Statewide)26
Payable from General Obligation Bonds27
Priority 2	$ 3,600,00028
Payable from Transportation Trust Fund - Regular $16,100,00029
Total	$19,700,00030
Provided, however, that the Department of Transportation and Development is authorized31
to implement or commence projects approved in this program for Fiscal Year 2013-201432
identified for phased funding pursuant to the cash management plan established pursuant to33
R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing34
unspent cash balances appropriated in prior years’ programs, which funds when combined35
with current appropriations will provide sufficient appropriated funds to award contracts.36
(306) Statewide Flood Control Program37
(Statewide)38
Payable from Transportation Trust Fund - Regular $ 8,910,00039
Provided, however, that the Department of Transportation and Development is authorized40
to implement or commence projects approved in this program for Fiscal Year 2013-201441
identified for phased funding pursuant to the cash management plan established pursuant to42
R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing43
unspent cash balances appropriated in prior years’ programs, which funds when combined44
with current appropriations will provide sufficient appropriated funds to award contracts.45
(338) Baptiste Collette Deepening Project, Planning, 46
Construction, Rights-of-Way, Relocations and Utilities47
(Plaquemines)48
Payable from General Obligation Bonds49
Priority 1	$ 3,750,00050 ENROLLEDHB NO. 2
Page 29 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(393) Ouachita Water Supply Reservoir1
(Ouachita)2
Payable from General Obligation Bonds3
Priority 1	$ 400,0004
(394) Castor Creek - Little River Reservoir 5
(Local Match Required)6
(La Salle)7
Payable from General Obligation Bonds8
Priority 1	$ 100,0009
(397) Water Resources Management Program, Studies, 10
Planning and Construction 11
(Statewide)12
Payable from General Obligation Bonds13
Priority 1	$ 1,000,00014
Priority 5	$ 1,000,00015
Total	$ 2,000,00016
Provided, however, that the Department of Transportation and Development prepare and17
maintain a Water Resources Management Master Plan along with an annual Program of18
projects to support implementation of the Master Plan. The Department of Transportation19
and Development shall adopt the necessary rules for proper management of the Master Plan20
and Program, with the intended rules subject to the approval of the Joint Legislative21
Committee on the Budget prior to adoption. The Master Plan and Program, and any revisions22
thereto, are subject to approval of the Joint Legislative Committee on the Budget.23
(400)Bundicks Lake Level Control Structure, Planning 24
and Construction 25
(Beauregard)26
Payable from General Obligation Bonds27
Priority 1	$ 400,00028
(402) Washington Parish Reservoir Commission Feasibility Study, 29
Planning and Construction ($50,000 Local Match)30
(Washington)31
Payable from General Obligation Bonds32
Priority 1	$ 2,625,00033
(509) Lake D'Arbonne Alternative Spillway, Planning, 34
Construction and Repairs35
(Lincoln, Union)36
Payable from General Obligation Bonds37
Priority 1	$ 9,700,00038
Priority 5	$ 1,250,00039
Total	$10,950,00040
(521) Lake Bistineau Erosion Remediation, Planning 41
and Construction42
(Bienville, Bossier)43
Payable from General Obligation Bonds44
Priority 5	$ 1,700,00045
(1429)Bayou Dechene Reservoir, Planning, Land Acquisition 46
and Construction47
(Caldwell)48
Payable from General Obligation Bonds49
Priority 1	$ 7,415,00050
Priority 5	$12,000,00051
Total	$19,415,00052 ENROLLEDHB NO. 2
Page 30 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1431)LA 18 (4th Street) Highway Drainage, 1
Planning and Construction2
(Jefferson)3
Payable from General Obligation Bonds4
Priority 1	$ 700,0005
(1432)Morganza to Gulf of Mexico Flood Control 6
Feasibility Study, Planning, Design, Right of Way 7
and Construction of Levees, Floodgates 8
and Other Flood Control Systems 9
($100,000,000 Local Match; $25,000,000 Local 10
In-Kind Match; $442,000,000 Federal Match)11
(Ascension, Assumption, Iberia, Iberville, Lafourche, 12
Pointe Coupee, St. Martin, St. Mary, Terrebonne, 13
West Baton Rouge)14
Payable from General Obligation Bonds15
Priority 1	$19,515,00016
(1433)Donaldsonville to the Gulf of Mexico Flood Study 17
($1,100,000 Local Match; $3,500,000 Federal Match)18
(Ascension, Assumption, Jefferson, Lafourche, 19
St. Charles, St. James, St. John the Baptist)20
Payable from General Obligation Bonds21
Priority 1	$ 2,300,00022
(1434)Westbank Hurricane Protection Project, Planning, 23
Construction, Right of Way and Utilities ($199,000,000 24
Federal Match and $52,800,000 Local Match)25
(Jefferson, Orleans, Plaquemines)26
Payable from General Obligation Bonds27
Priority 1	$ 905,00028
(1436)Acadiana Gulf of Mexico Access Channel, 29
Port of Iberia, Planning, Construction, 30
Right of Way, Relocations and Utilities31
(Iberia, Vermilion)32
Payable from General Obligation Bonds33
Priority 1	$15,455,00034
(1437)Allen Parish Reservoir, Land Acquisition, Planning, 35
Right of Way, Utilities, Equipment and Construction36
(Allen)37
Payable from General Obligation Bonds38
Priority 1	$ 800,00039
(1438)Poverty Point Reservoir, Real Estate Acquisition, 40
Planning, Equipment, Right of Way, Utilities, 41
Acquisition, Facilities, Construction and Maintenance42
(Richland)43
Payable from General Obligation Bonds44
Priority 1	$ 1,700,00045
(    )Boat Launch Rehabilitation (LA Hwy 42 at Amite River),46
Planning and Construction47
(Ascension)48
Payable from General Obligation Bonds49
Priority 2	$ 800,00050
Pending submittal and approval of a capital outlay budget request pursuant to the provisions51
of R.S. 39:112.52 ENROLLEDHB NO. 2
Page 31 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(    )Northwest Louisiana Council of Governments 1
North Louisiana High Speed Rail Corridor 2
Study and Inter-modal Facility, 3
Planning, Study, and Design4
(Bienville, Bossier, Caddo, Claiborne, 5
Lincoln, Madison, Ouachita, Richland, Webster)6
Payable from General Obligation Bonds7
Priority 2	$ 250,0008
Pending submittal and approval of a capital outlay budget request pursuant to the provisions9
of R.S. 39:112.10
07/276ENGINEERING AND OPERATIONS11
(1046)Facilities Program Major Repairs, Renovations, Additions, 12
New Facilities, Equipment Replacement at Various DOTD 13
Sites, Planning and Construction14
(Statewide)15
Payable from Transportation Trust Fund-16
Regular 	$ 1,500,00017
Payable from the balance of Transportation18
Trust Fund - Regular previously allocated19
under the authority of Act 20 of 1999 for 20
Department of Transportation and 21
Development, Engineering and Operations, 22
Fleet Landing Facility Relocation 23
(West Baton Rouge)	$ 210,59024
Total	$ 1,710,59025
(1047)Motor Vessel and Equipment Drydocking, Repairs, 26
Various Locations27
(Statewide)28
Payable from Transportation Trust Fund-29
Regular 	$ 2,000,00030
Payable from the balance of Transportation31
Trust Fund - Regular previously allocated32
under the authority of Act 21 of 2000 for 33
Department of Transportation and 34
Development, Engineering and Operations, 35
Fleet Landing Facility Relocation 36
(West Baton Rouge)	$ 250,00037
Total	$ 2,250,00038
(    )Capital Project for Ferries formerly operated39
by CCCD, Planning and Construction40
(Jefferson, Orleans, St. Bernard)41
Payable from General Obligation Bonds42
Priority 5	$ 1,400,00043
Pending submittal and approval of a capital outlay budget request pursuant to the provisions44
of R.S. 39:112.45
07/277AVIATION IMPROVEMENTS46
(1041)State Aviation and Airport Improvement Program 47
(Statewide)48
Payable from Transportation Trust Fund - Regular $28,462,19049 ENROLLEDHB NO. 2
Page 32 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS1
08/400ADMINISTRATION2
(216) Statewide Fencing Project, Planning and Construction 3
(Statewide)4
Payable from General Obligation Bonds5
Priority 1	$ 600,0006
Priority 5	$ 9,400,0007
Total	$10,000,0008
08/402LOUISIANA STATE PENITENTIARY9
(223) Main Prison Shower and Cellblock Plumbing Upgrade, 10
Planning and Construction11
(West Feliciana)12
Payable from General Obligation Bonds13
Priority 1	$ 165,00014
Priority 5	$ 1,000,00015
Total	$ 1,165,00016
(257) Emergency Water Filter System Replacement,17
Planning and Construction18
(West Feliciana)19
Payable from General Obligation Bonds20
Priority 2	$ 170,00021
Priority 5	$ 1,850,00022
Total	$ 2,020,00023
(258) Electrical Distribution System Upgrade, 24
Planning and Construction25
(West Feliciana)26
Payable from General Obligation Bonds27
Priority 1	$ 300,00028
Priority 5	$ 2,680,00029
Total	$ 2,980,00030
(1439)Fire Marshal, Health Department Violations, 31
Supplemental, Planning and Construction32
(West Feliciana)33
Payable from General Obligation Bonds34
Priority 1	$ 2,500,00035
Priority 5	$ 2,000,00036
Total	$ 4,500,00037
08/403OFFICE OF JUVENILE JUSTICE38
(1340)Bridge City Center for Youth - Replace Main 39
Electrical Switchboard, Planning and Construction40
(Jefferson)41
Payable from General Obligation Bonds42
Priority 2	$ 180,00043
(1441)Community Based Program, Juvenile Justice 44
Improvements, Planning, Construction, Renovation, 45
Acquisition, and Equipment46
(Statewide)47
Payable from General Obligation Bonds48
Priority 1	$ 6,000,00049
Priority 5	$14,000,00050
Total	$20,000,00051 ENROLLEDHB NO. 2
Page 33 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1442)Bridge City Center for Youth, Sewer System Renovation, 1
Planning and Construction2
(Jefferson)3
Payable from General Obligation Bonds4
Priority 1	$ 235,0005
08/406LOUISIANA CORRECTIONAL INSTITUTE FOR WOMEN6
(157) Air Handler Units for Pisces and Gemini Dormitories,7
Planning and Construction8
(Iberville)9
Payable from General Obligation Bonds10
Priority 2	$ 900,00011
08/407WINN CORRECTIONAL CENTER12
(572) Improvements to Sewerage Ponds and Wastewater System, 13
Supplemental14
(Winn)15
Payable from General Obligation Bonds16
Priority 1	$ 105,00017
(1446)Sanitation Code Violations, Planning and Construction18
(Winn)19
Payable from General Obligation Bonds20
Priority 1	$ 660,00021
08/408ALLEN CORRECTIONAL CENTER22
(1447)Sanitation Code Violations, Repair and Upgrade23
(Allen)24
Payable from General Obligation Bonds25
Priority 1	$ 600,00026
08/409DIXON CORRECTIONAL INSTITUTE27
(217) Emergency Generators, Planning and Construction28
(East Feliciana)29
Payable from General Obligation Bonds30
Priority 2	$ 720,00031
(240) Roof Replacement of Vocational Technical School, 32
Planning and Construction33
(East Feliciana)34
Payable from General Obligation Bonds35
Priority 2	$ 135,00036
08/414DAVID WADE CORRECTIONAL CENTER37
(1326)Fire Alarm System Renovations, Planning and Construction38
(Claiborne)39
Payable from General Obligation Bonds40
Priority 1	$ 300,00041
08/416RAYBURN CORRECTIONAL CENTER42
(250) Security Perimeter Fence, Planning and Construction 43
(Washington)44
Payable from General Obligation Bonds45
Priority 1	$ 200,00046
Priority 5	$ 2,000,00047
Total	$ 2,200,00048 ENROLLEDHB NO. 2
Page 34 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
08/419OFFICE OF STATE POLICE1
(1034)State Police, Troop L and Bureau of Investigations, 2
Planning and Construction3
(St. Tammany)4
Payable from General Obligation Bonds5
Priority 1	$ 100,0006
(1448)Renovate Training Academy, Planning and Construction7
(East Baton Rouge)8
Payable from General Obligation Bonds9
Priority 1	$ 900,00010
Priority 5	$16,100,00011
Total	$17,000,00012
08/420OFFICE OF MOTOR VEHICLES13
(1449)Parking and Utility Tie-In for OMV Veteran's, 14
Planning and Construction15
(Orleans)16
Payable from General Obligation Bonds17
Priority 1	$ 660,00018
DEPARTMENT OF HEALTH AND HOSPITALS19
09/304METROPOLITAN HUMAN SERVICE DISTRICT20
(783) New Mental Health Center for Desire/Florida Mental21
Health Clinic, Including the Purchase, Construction or 22
Renovation of a New Facility in New Orleans East, 23
Planning and Construction24
(Orleans)25
Payable from General Obligation Bonds26
Priority 1	$ 2,040,00027
Priority 2	$ 25,00028
Total	$ 2,065,00029
(1450)New Mental Health Clinic for New Orleans Behavior, 30
Social, and Medical Support Detox Clinic, Including 31
Expansion and Renovation of the Existing Facility, 32
Planning and Construction33
(Orleans)34
Payable from General Obligation Bonds35
Priority 1	$ 3,000,00036
Priority 5	$ 2,500,00037
Total	$ 5,500,00038
09/319VILLA FELICIANA MEDICAL COMPLEX39
(1451)Replace HVAC Systems in Three Patient Buildings, 40
Planning and Construction41
(East Feliciana)42
Payable from General Obligation Bonds43
Priority 1	$ 3,465,00044 ENROLLEDHB NO. 2
Page 35 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
09/320OFFICE OF AGING AND ADULT SERVICES1
(1021)Water Tower Repairs and Improvements, 2
Planning and Construction3
(East Feliciana)4
Payable from General Obligation Bonds5
Priority 2	$ 160,0006
(1023)Replace Fire Alarm and Sprinkler System, Planning 7
and Construction8
(East Feliciana)9
Payable from General Obligation Bonds10
Priority 1	$ 220,00011
(1025)Replace Roof and Storm Drains on all Patient Buildings, 12
Planning and Construction13
(East Feliciana)14
Payable from General Obligation Bonds15
Priority 1	$ 2,200,00016
09/325ACADIANA AREA HUMAN SERVICES DISTRICT17
(687) Resurfacing of the Parking Lot - Crowley18
Behavioral Health Clinic (Region 4),19
Planning and Construction20
(Acadia)21
Payable from General Obligation Bonds22
Priority 2	$ 250,00023
09/326OFFICE OF PUBLIC HEALTH24
(1452)New Office of Public Health Central Laboratory Facility, 25
Planning and Construction26
(Statewide)27
Payable from General Obligation Bonds28
Priority 1	$11,600,00029
Priority 5	$ 1,000,00030
Total	$12,600,00031
09/330OFFICE OF MENTAL HEALTH32
(1453)Regional Pharmacies Emergency Power and Backup HVAC 33
Units to Protect Drug Supplies, Planning and Construction34
(Orleans)35
Payable from General Obligation Bonds36
Priority 1	$ 1,100,00037
(1454)Roof Replacement - Tyler Mental Health Center, 38
Planning and Construction39
(Lafayette)40
Payable from General Obligation Bonds41
Priority 1	$ 1,180,00042
(1455)Emergency Generator for ASSA Forensic Campus, 43
Planning and Construction44
(East Feliciana)45
Payable from General Obligation Bonds46
Priority 1	$ 750,00047 ENROLLEDHB NO. 2
Page 36 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1456)Emergency Generators for Greenwell Springs Campus, 1
Planning and Construction2
(East Baton Rouge)3
Payable from General Obligation Bonds4
Priority 5	$ 1,200,0005
09/331CENTRAL LOUISIANA STATE HOSPITAL6
(528) Electrical System Sub-Station Upgrade7
(Rapides)8
Payable from General Obligation Bonds9
Priority 1	$ 200,00010
Priority 5	$ 2,300,00011
Total	$ 2,500,00012
(1458)Expansion of Shreveport Mental Health Center, 13
Planning and Construction14
(Caddo)15
Payable from General Obligation Bonds16
Priority 1	$ 100,00017
09/332EASTERN LOUISIANA MENTAL HEALTH SYSTEM18
(1461)Center Building and Fire Alarm System Renovation and 19
Restoration, East Louisiana State Hospital, Planning 20
and Construction21
(East Feliciana)22
Payable from General Obligation Bonds23
Priority 1	$ 1,305,00024
Priority 5	$ 5,300,00025
Total	$ 6,605,00026
(1463)Oakcrest Sprinkler System 27
(East Feliciana)28
Payable from General Obligation Bonds29
Priority 1	$ 500,00030
09/333SOUTHEAST LOUISIANA HOSPITAL31
(1465)Emergency Generator for Children's Complex, SELH, 32
Planning and Construction33
(St. Tammany)34
Payable from General Obligation Bonds35
Priority 1	$ 290,00036
(1467)New South Louisiana Human Services Authority 37
Administrative Building, Land Acquisition, Planning38
and Construction39
(Terrebonne)40
Payable from General Obligation Bonds41
Priority 1	$ 985,00042
09/340OFFICE OF DEVELOPMENTAL DISABILITIES43
(1339)Central Louisiana State Hospital Relocation to Pinecrest,44
Planning and Construction45
(Rapides)46
Payable from General Obligation Bonds47
Priority 1	$ 2,000,00048
Priority 5	$24,000,00049
Total	$26,000,00050 ENROLLEDHB NO. 2
Page 37 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
09/344NORTH LAKE SUPPORTS AND SERVICES CENTER1
(1469)Replace Rooftop Air Conditioning Units on Residential 2
Homes, Planning and Construction3
(Tangipahoa)4
Payable from General Obligation Bonds5
Priority 1	$ 2,320,0006
(1470)Replace Cooling Tower, Planning and Construction7
(Tangipahoa)8
Payable from General Obligation Bonds9
Priority 1	$ 340,00010
(1471)Replacement of Underground High Temperature Hot Water 11
System, Planning and Construction12
(Tangipahoa)13
Payable from General Obligation Bonds14
Priority 1	$ 1,800,00015
(1472)Installation of Sprinkler Systems/Protection of Beams 16
(Tangipahoa)17
Payable from General Obligation Bonds18
Priority 1	$ 500,00019
(1473)Repairs and Renovation at the North Lake Supports 20
and Services Center, Planning and Construction21
(Tangipahoa)22
Payable from General Obligation Bonds23
Priority 1	$ 500,00024
09/347PINECREST SUPPORTS AND SERVICES CENTER25
(282) Sprinkler Systems for Residences, Porches and Walkways,26
Planning and Construction 27
(Rapides)28
Payable from General Obligation Bonds29
Priority 2	$ 60,00030
(1474)Emergency Generators for Homes and Medical Complex 31
(Rapides)32
Payable from General Obligation Bonds33
Priority 1	$ 1,000,00034
DEPARTMENT OF NATURAL RESOURCES35
11/431OFFICE OF THE SECRETARY36
(960) Atchafalaya Basin Protection and Enhancement37
(Federal Match and Local/Sponsor Match)38
(Assumption, Avoyelles, Iberia, Iberville, Pointe Coupee, 39
St. Landry, St. Martin, St. Mary)40
Payable from General Obligation Bonds41
Priority 1	$15,480,00042
Priority 2	$ 200,00043
Priority 5	$ 4,000,00044
Total	$19,680,00045
Provided, however, that $50,000 of this appropriation will be used to fund House Concurrent46
Resolution No. 168 of 2011.47 ENROLLEDHB NO. 2
Page 38 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
LOUISIANA WORKFORCE COMMISSION1
14/474OFFICE OF WORKFORCE DEVELOPMENT2
(1343)Renovations to Louisiana Workforce Commission’s 3
Administrative Headquarters, Planning and Construction4
(East Baton Rouge)5
Payable from General Obligation Bonds6
Priority 2	$ 2,700,0007
DEPARTMENT OF WILDLIFE AND FISHERIES8
16/512OFFICE OF THE SECRETARY9
(2030)Wildlife and Fisheries Enforcement Training Academy 10
and Emergency Facility, Planning and Construction11
(East Baton Rouge)12
Payable from Federal Funds	$ 300,00013
Payable from General Obligation Bonds14
Priority 2	$ 130,00015
Priority 5	$ 165,00016
Total	$ 595,00017
16/513OFFICE OF WILDLIFE18
(1143)Replace Bridge at Fools Bay, Grassy Lake WMA,19
Planning and Construction20
(Avoyelles)21
Payable from Russell Sage Fund #2	$ 930,00022
(1319)Replace Red River Yakey Road Bridge,23
Planning and Construction24
(Concordia)25
Payable from Russell Sage Fund #2	$ 912,00026
(940) Region 5/Lake Charles Office, Planning and Construction27
(Calcasieu)28
Payable from General Obligation Bonds29
Priority 1	$ 900,00030
Priority 5	$ 8,100,00031
Total	$ 9,000,00032
(1220)Rockefeller Refuge Marsh Terraces, 33
Planning and Construction 34
(Cameron)35
Payable from the Rockefeller Wildlife Refuge 36
and Game Preserve Fund	$ 600,00037
(1239)Rockefeller Refuge Water Control Structure 38
Replacements, Planning and Construction 39
(Cameron)40
Payable from the Rockefeller Wildlife Refuge 41
and Game Preserve Fund	$ 1,880,00042
(1243)Rockefeller Refuge LSU Water Control 43
Replacement, Planning and Construction 44
(Cameron)45
Payable from the Rockefeller Wildlife Refuge 46
and Game Preserve Fund	$ 1,000,00047 ENROLLEDHB NO. 2
Page 39 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(2048)Replace Bayou Natchitoches Bridge, Grassy Lake1
WMA, Planning and Construction2
(Avoyelles)3
Payable from Russell Sage Fund #2	$ 686,0004
Payable from Federal Funds	$ 160,0005
Total	$ 846,0006
(2049)Replace Roaring Bayou Bridge, Big Lake WMA,7
Planning and Construction8
(Franklin)9
Payable from Russell Sage Fund #2	$ 1,002,00010
16/514OFFICE OF FISHERIES11
(984) Booker Fowler Fish Hatchery Renovations,12
Planning and Construction13
(Rapides)14
Payable from Federal Funds	$ 1,200,00015
Payable from the Conservation Fund	$ 49,00016
Total	$ 1,249,00017
(1185)Rosedale Warehouse Construction 18
(Iberville)19
Payable from the Conservation Fund	$ 732,40020
DEPARTMENT OF EDUCATION21
19/600LSU BOARD OF SUPERVISORS22
(1477)Major Repairs and Reroofing for Campus23
Buildings, Planning and Construction24
(Acadia, Caddo, East Baton Rouge25
Orleans, Rapides)26
Payable from General Obligation Bonds27
Priority 5	$ 55,00028
(    )Maintenance, Deferred Maintenance, and Repairs of29
Campus Buildings, Planning and Construction30
(Statewide)31
Payable from General Obligation Bonds32
    Priority 2	$19,000,00033
Pending submittal and approval of a capital outlay budget request pursuant to the provisions34
of R.S. 39:112.35
19/601LSU BATON ROUGE36
(4) New Residence Hall, Planning and Construction37
(East Baton Rouge)38
Payable from Revenue Bonds	$65,000,00039
Provided, however, that this appropriation is in lieu of Revenue Bonds appropriated in Act40
23 of 2012 to LSU Baton Rouge for New Residence Hall, Planning and Construction41
(5) University Recreation Facility Expansion and42
Additions, Acquisition, Planning and Construction43
(East Baton Rouge)44
Payable from Revenue Bonds	$78,350,00045 ENROLLEDHB NO. 2
Page 40 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Provided, however, that this appropriation is in lieu of Revenue Bonds appropriated in Act1
23 of 2012 to LSU Baton Rouge for University Recreation Facility Expansion and2
Additions, Acquisition, Planning and Construction3
(6) Evangeline Residence Hall Renovation,4
Planning and Construction5
(East Baton Rouge)6
Payable from Revenue Bonds	$16,600,0007
Provided, however, that this appropriation is in lieu of Revenue Bonds appropriated in Act8
23 of 2012 to LSU Baton Rouge for Evangeline Residence Hall, Planning and Construction9
(7) Kirby Smith Hall Upgrades, Planning and Construction10
(East Baton Rouge)11
Payable from Fees and Self Generated Revenues $ 6,500,00012
(8) New Greek House, Planning and Construction13
(East Baton Rouge)14
Payable from Fees and Self Generated Revenues $ 500,00015
Payable from Revenue Bonds	$ 6,000,00016
Total	$ 6,500,00017
(9) New Gymnastics Facility, Planning and Construction18
(East Baton Rouge)19
Payable from Fees and Self Generated Revenues $20,000,00020
(10) New Tennis Facility, Planning and Construction21
(East Baton Rouge)22
Payable from Fees and Self Generated Revenues $15,000,00023
(11) South Campus, Land Acquisition24
(East Baton Rouge)25
Payable from General Obligation Bonds26
Priority 5	$ 4,375,00027
(12) Patrick F. Taylor Hall Renovations and Expansion,28
Planning and Construction29
(East Baton Rouge)30
Payable from General Obligation Bonds31
Priority 5	$50,000,00032
Payable from Fees and Self-Generated Revenues $50,000,00033
Total	$100,000,00034
35
Provided, however, that this appropriation of Fees and Self-Generated Revenues is in lieu36
of Fees and Self-Generated Revenues appropriated in Act 22 of 2011 to LSU Baton Rouge37
for Patrick Taylor Hall Renovation, Planning and Construction.38
(1478)French House Renovation, Acquisition, 39
Planning and Construction40
(East Baton Rouge)41
Payable from General Obligation Bonds42
Priority 1	$ 2,000,00043
Priority 5	$ 3,325,00044
Total	$ 5,325,00045 ENROLLEDHB NO. 2
Page 41 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1479)Renovate Old Engineering Shops for Art Department, 1
Planning and Construction2
(East Baton Rouge)3
Payable from General Obligation Bonds4
Priority 1	$ 2,300,0005
Priority 5	$13,000,0006
Total	$15,300,0007
(2042)Nicholson Gateway: Infrastructure Improvements,8
Planning and Construction9
(East Baton Rouge)10
Payable from General Obligation Bonds11
Priority 2	$ 2,500,00012
Priority 5	$22,500,00013
Total	$25,000,00014
19/602LSU ALEXANDRIA15
(47) Infrastructure Improvements, Construction16
(Rapides)17
Payable from General Obligation Bonds18
Priority 2	$ 450,00019
Priority 5	$ 4,950,00020
Total	$ 5,400,00021
(1485)Multi-Purpose Academic Center, Planning and Construction22
(Rapides)23
Payable from General Obligation Bonds24
Priority 5	$ 2,000,00025
(1486)Alexandria Central Utilities Systems Repair26
and Upgrade, Planning and Construction27
(Rapides)28
Payable from General Obligation Bonds29
Priority 2	$ 75,00030
Priority 5	$ 60,00031
Total	$ 135,00032
19/603UNIVERSITY OF NEW ORLEANS33
(1487)Human Performance Center Renovations for Fine Arts 34
and Music Departments, Planning and Construction35
(Orleans)36
Payable from General Obligation Bonds37
Priority 1	$ 500,00038
Priority 5	$ 5,600,00039
Total	$ 6,100,00040
(1488)Library Fourth Floor Completion Information Resource Center41
(Orleans)42
Payable from General Obligation Bonds43
Priority 1	$ 510,00044
Priority 5	$ 5,420,00045
Total	$ 5,930,00046
(1489)Science Building Mechanical Renovations, 47
Planning and Construction48
(Orleans)49
Payable from General Obligation Bonds50
Priority 5	$ 3,275,00051 ENROLLEDHB NO. 2
Page 42 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
19/604NLSU HEALTH SCIENCES CENTER NEW ORLEANS1
(1490)Human Development Center, Planning and Construction2
(Orleans)3
Payable from General Obligation Bonds4
Priority 1	$10,095,0005
(    )University Medical Center,6
Acquisition of Equipment7
(Orleans)8
Payable from General Obligation Bonds9
Priority 2	$10,000,00010
Priority 5	$10,000,00011
Total	$20,000,00012
Pending submittal and approval of a capital outlay budget request pursuant to the provisions13
of R.S. 39:11214
19/604SLSU HEALTH SCIENCES CENTER SHREVEPORT15
(52) Surgery and Radiology Equipment16
(Caddo)17
Payable from General Obligation Bonds18
Priority 2	$ 5,000,00019
(53) Feist-Weiller Cancer Research Center20
Planning and Construction21
(Caddo)22
Payable from General Obligation Bonds23
Priority 2	$ 3,000,00024
Priority 5	$22,540,00025
Total	$25,540,00026
(54) Patient Care HVAC Replacement, Planning 27
and Construction28
(Caddo)29
Payable from General Obligation Bonds30
Priority 1	$ 3,000,00031
(55) High Voltage Electrical Distribution System Upgrade,32
Planning and Construction33
(Caddo)34
Payable from General Obligation Bonds35
Priority 1	$ 1,550,00036
Priority 5	$ 3,850,00037
Total	$ 5,400,00038
(57) Inpatient Critical Care Renovation,39
Planning and Construction40
(Caddo)41
Payable from General Obligation Bonds42
Priority 2	$ 375,00043
Priority 5	$ 5,145,00044
Total	$ 5,520,00045 ENROLLEDHB NO. 2
Page 43 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1491)Children's Hospital, Renovation and Expansion,1
Planning and Construction2
(Caddo)3
Payable from General Obligation Bonds4
Priority 1	$ 1,000,0005
Priority 5	$ 9,000,0006
Total	$10,000,0007
(    )Capital Improvement Projects,8
Design and Engineering9
(Caddo)10
Payable from General Obligation Bonds11
Priority 2	$ 5,000,00012
13
Pending submittal and approval of a capital outlay budget request pursuant to the provisions14
of R.S. 39:112.15
(    )Boiler Replacement, Planning and Construction16
(Caddo)17
Payable from General Obligation Bonds18
Priority 2	$ 400,00019
Priority 5	$ 5,000,00020
Total	$ 5,400,00021
Pending submittal and approval of a capital outlay budget request pursuant to the provisions22
of R.S. 39:112.23
19/605LSU EUNICE24
(41) Replacement of Science Laboratory Fume Hoods,25
Planning and Construction26
(Acadia)27
Payable from General Obligation Bonds28
Priority 2	$ 1,670,00029
19/607LSU AGRICULTURAL CENTER30
(208) EBR Parish Cooperative Extension Outreach and31
Education Facility 32
(East Baton Rouge)33
Payable from Fees and Self-Generated Revenues $ 2,400,00034
(1494)Animal and Food Science Facilities Renovations and 35
Modernizations, Phase II, Planning and Construction36
(East Baton Rouge)37
Payable from General Obligation Bonds38
Priority 1	$ 9,000,00039
(1495)Livestock Education Facility, Planning and Construction40
(East Baton Rouge)41
Payable from General Obligation Bonds42
Priority 1	$ 5,000,00043
19/609PENNINGTON BIOMEDICAL RESEARCH CENTER44
(1496)Pennington Biomedical Clinical Research Building, Imaging 45
Center and High Tech Research Instrumentation Equipment46
(East Baton Rouge)47
Payable from General Obligation Bonds48
Priority 5	$ 1,000,00049 ENROLLEDHB NO. 2
Page 44 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
19/610LSU HEALTH SCIENCES CENTER HEALTH CARE SERVICES1
DIVISION2
(1497)New Emergency Generator and Chillers, UMC, Planning 3
and Construction4
(Lafayette)5
Payable from General Obligation Bonds6
Priority 1	$ 3,200,0007
(1498)University Medical Center in New Orleans 8
(Orleans)9
Payable from General Obligation Bonds10
Priority 1	$155,500,00011
(1499)Replacement of Air Handlers and Chillers, WO Moss, 12
Planning and Construction13
(Calcasieu)14
Payable from General Obligation Bonds15
Priority 1	$ 175,00016
Priority 5	$ 1,740,00017
Total	$ 1,915,00018
(1502)Air Handler Replacement, Planning and Construction19
(Lafayette)20
Payable from General Obligation Bonds21
Priority 1	$ 200,00022
Priority 5	$ 1,780,00023
Total	$ 1,980,00024
(1503)University Medical Center in Baton Rouge 25
(East Baton Rouge)26
Payable from General Obligation Bonds27
Priority 1	$ 5,000,00028
Provided, however, that the scope of this appropriation is deemed to also include the29
demolition of the Earl K. Long Hospital facility in Baton Rouge and further provided that30
$1,000,000 of this appropriation shall be used to demolish the Earl K. Long Hospital facility31
in Baton Rouge.32
(1504)Land Acquisition and Parking Adjacent to N. Baton 33
Rouge Clinic, Planning and Construction34
(East Baton Rouge)35
Payable from General Obligation Bonds36
Priority 1	$ 450,00037
(1505)Emergency Room Expansion, University Medical 38
Center, Planning and Construction39
(Lafayette)40
Payable from General Obligation Bonds41
Priority 1	$ 2,045,00042
Priority 5	$ 2,800,00043
Total	$ 4,845,00044
(1506)Construction of Levee Around the Chabert 45
Medical Center, Planning and Construction46
(Terrebonne)47
Payable from General Obligation Bonds48
Priority 1	$ 250,00049 ENROLLEDHB NO. 2
Page 45 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1509)Air Handling Unit Replacement, Chabert, 1
Planning and Construction2
(Terrebonne)3
Payable from General Obligation Bonds4
Priority 1	$ 500,0005
(1510)Refurbish Elevators, UMC, Planning and Construction6
(Lafayette)7
Payable from General Obligation Bonds8
Priority 1	$ 1,490,0009
Pending submittal and approval of capital outlay budget request pursuant to the provisions10
of R.S. 39:112.11
19/612BATON ROUGE COMMUNITY COLLEGE12
(1511)Office of Motor Vehicle Building and Campus 13
Renovation, Demolition and Improvements,14
Planning and Construction15
(East Baton Rouge)16
Payable from General Obligation Bonds17
Priority 5	$ 585,00018
19/615SOUTHERN UNIVERSITY BOARD OF SUPERVISORS19
(1512)Major Repairs and Reroofing, ADA Compliance and20
Life Safety Code Corrections to Campus Buildings, 21
Planning and Construction22
(Caddo, East Baton Rouge, Orleans)23
Payable from General Obligation Bonds24
Priority 1	$ 850,00025
(1513)Major Repairs and Reroofing for Campus Buildings,26
Planning and Construction27
(Caddo, East Baton Rouge, Orleans)28
Payable from General Obligation Bonds29
Priority 5	$ 60,00030
(    )Maintenance, Deferred Maintenance, and Repairs of31
Campus Buildings, Planning and Construction32
(Caddo, East Baton Rouge, Orleans)33
Payable from General Obligation Bonds34
Priority 2	$19,000,00035
Pending submittal and approval of a capital outlay budget request pursuant to the provisions36
of R.S. 39:112.37
19/616SOUTHERN UNIVERSITY BATON ROUGE38
(222) SU Laboratory School Addition39
and Upgrades, Planning and Construction40
(East Baton Rouge)41
Payable from General Obligation Bonds42
Priority 2	$ 55,00043
(492) A. W. Mumford Stadium Parking and Intramural 44
Complex, Planning and Construction 45
(East Baton Rouge)46
Payable from Fees and Self-Generated Revenues $ 600,00047 ENROLLEDHB NO. 2
Page 46 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(644) Sewer and Street Improvements near Intersection1
of Jesse Stone Avenue and E. C. Harrison Drive,2
Planning and Construction3
(East Baton Rouge)4
Payable from General Obligation Bonds5
Priority 2	$ 385,0006
(646) Fire Detection and Alarm System Upgrades,7
Planning and Construction8
(East Baton Rouge)9
Payable from General Obligation Bonds 10
    Priority 2	$ 80,00011
(1066)F.G. Clark Activity Center Roof Replacement,12
Planning and Construction13
(East Baton Rouge)14
Payable from General Obligation Bonds15
Priority 2	$ 1,250,00016
(1188)Replacement of Underground Fuel Tanks17
and Pumps at Motor Pool, Planning and18
Construction19
(East Baton Rouge)20
Payable from General Obligation Bonds 21
    Priority 2	$ 30,00022
(1514)Southern University Laboratory School Addition23
and Upgrades, Planning and Construction24
(East Baton Rouge)25
Payable from General Obligation Bonds26
Priority 1	$ 1,200,00027
(1515)Repair/Replacement of Hot Water Pipes for Heating28
(East Baton Rouge)29
Payable from General Obligation Bonds30
Priority 2	$ 2,250,00031
(1516)Major Repairs to F. G. Clark Activity Center32
(East Baton Rouge)33
Payable from General Obligation Bonds34
Priority 5	$ 20,00035
19/617SOUTHERN UNIVERSITY NEW ORLEANS36
(318) Replace Chilled Water and High Temperature Water Lines37
(Orleans)38
Payable from General Obligation Bonds39
Priority 1	$ 150,00040
(1517)College of Business and Social Work Building, 41
Renovation/Demolition/Construction, 42
Planning and Construction43
(Orleans)44
Payable from General Obligation Bonds45
Priority 1	$ 80,00046 ENROLLEDHB NO. 2
Page 47 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
19/618SOUTHERN UNIVERSITY SHREVEPORT1
(231) Renovations of Allen Building, Planning2
and Construction3
(Caddo)4
Payable from General Obligation Bonds5
Priority 2	$ 200,0006
(232) New Classroom Building, Southern University - Shreveport, 7
Planning and Construction8
(Caddo)9
Payable from General Obligation Bonds10
Priority 1	$ 5,850,00011
Priority 5	$ 1,650,00012
Total	$ 7,500,00013
(234) Child Care Development Center, Planning and Construction14
(Caddo)15
Payable from Fees and Self Generated Revenues $ 30,58916
(1519)Site Improvement, Drainage and Security Lights, 17
Planning and Construction18
(Caddo)19
Payable from General Obligation Bonds20
Priority 1	$ 15,00021
(1520)Building Acquisitions and Renovations School of Nursing22
(Caddo)23
Payable from General Obligation Bonds24
Priority 2	$ 1,000,00025
Priority 5	$ 2,585,00026
Total	$ 3,585,00027
19/620UNIVERSITY OF LOUISIANA SYSTEM28
(1521)Major Repairs and Reroofing, ADA Compliance 29
and Life Safety Code Corrections to Campus Building, 30
Planning and Construction31
(Calcasieu, East Baton Rouge, Lafayette, Lafourche, 32
Lincoln, Natchitoches, Ouachita, Tangipahoa)33
Payable from General Obligation Bonds34
Priority 1	$ 85,00035
(1522)Major Repairs and Reroofing for Campus Buildings, 36
Planning and Construction 37
(Calcasieu, Lafayette, Lafourche, Lincoln, Natchitoches, 38
Orleans, Ouachita, St. Bernard, Tangipahoa)39
Payable from General Obligation Bonds40
Priority 5	$ 265,00041
(1523)Life Safety Code Corrections, Planning and Construction42
(Ascension, Bossier, Calcasieu, Iberia, Lafayette,43
Lafourche, Lincoln, Natchitoches, Orleans,44
Ouachita, St. Bernard, Tangipahoa)45
Payable from General Obligation Bonds46
Priority 5	$ 185,00047 ENROLLEDHB NO. 2
Page 48 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(    )Maintenance, Deferred Maintenance, and Repairs of1
Campus Buildings, Planning and Construction2
(Calcasieu, East Baton Rouge, Lafayette, Lafourche,3
Lincoln, Natchitoches, Orleans, Ouachita, Tangipahoa)4
Payable from General Obligation Bonds5
Priority 2	$19,000,0006
7
Pending submittal and approval of a capital outlay budget request pursuant to the provisions8
of R.S. 39:112.9
19/621NICHOLLS STATE UNIVERSITY10
(2058)Athletic Facilities - Didier Field, Renovation,11
Planning and Construction12
(Lafourche)13
Payable from General Obligation Bonds14
Priority 1	$ 200,00015
Priority 2	$ 300,00016
Total	$ 500,00017
(2031)Talbot Hall Renovation and Roof Replacement,18
Planning and Construction19
(Lafourche)20
Payable from General Obligation Bonds21
Priority 2	$ 425,00022
Priority 5	$ 3,975,00023
Total	$ 4,400,00024
(    )Building Renovation, Planning and Construction25
(Lafourche)26
Payable from General Obligation Bonds27
Priority 2	$ 330,00028
Pending submittal and approval of a capital outlay budget request pursuant to the provisions29
of R.S. 39:112.30
19/623GRAMBLING STATE UNIVERSITY31
(176) Roof Replacement for Identified Campus Buildings,32
Planning and Construction33
(Lincoln)34
Payable from General Obligation Bonds35
Priority 2	$ 2,250,00036
(184) Campus Utility Infrastructure Assessment, Planning 37
and Emergency Repairs and/or Replacement, 38
Planning and Construction39
(Lincoln)40
Payable from General Obligation Bonds41
Priority 1	$ 1,575,00042
Priority 5	$ 925,00043
Total	$ 2,500,00044
(185) Intramural Center Renovations and45
Expansion, Planning and Construction46
(Supplemental Funding)47
(Lincoln)48
Payable from Fees and Self-generated Revenues $ 1,500,00049 ENROLLEDHB NO. 2
Page 49 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(187) Library Deficiencies (A.C. Lewis Main/Annex),1
Planning and Construction2
(Lincoln)3
Payable from General Obligation Bonds4
Priority 2	$ 1,200,0005
Priority 5	$ 8,800,0006
Total	$10,000,0007
(1527)Long-Jones Hall Renovation, Planning and Construction8
(Lincoln)9
Payable from General Obligation Bonds10
Priority 1	$ 1,000,00011
Priority 5	$ 1,000,00012
Total	$ 2,000,00013
(1528)Dunbar Hall Replacement, Planning and Construction14
(Lincoln)15
Payable from General Obligation Bonds16
Priority 5	$ 175,00017
(1529)Library Deficiencies, Planning and Construction18
(Lincoln)19
Payable from General Obligation Bonds20
Priority 1	$ 2,800,00021
19/625LOUISIANA TECH UNIVERSITY22
(158) Bogard Hall Roof Replacement and Waterproofing,23
Planning and Construction24
(Lincoln)25
Payable from General Obligation Bonds26
Priority 2	$ 950,00027
Priority 5	$ 950,00028
Total	$1,900,000029
(159) Water Distribution System Repairs and Improvements30
(Lincoln)31
Payable from General Obligation Bonds32
Priority 1	$ 1,300,00033
Priority 2	$ 75,00034
Priority 5	$ 1,650,00035
Total	$ 3,025,00036
(163) Louisiana Tech Research Park, Real Estate Acquisition,37
Planning and Construction38
(Lincoln)39
Payable from General Obligation Bonds40
Priority 1	$ 1,250,00041
Priority 5	$ 4,000,00042
Total	$ 5,250,00043
(1530)Business Building Replacement, Planning and Construction44
(Lincoln)45
Payable from General Obligation Bonds46
Priority 5	$ 1,680,00047 ENROLLEDHB NO. 2
Page 50 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1531)Visual Arts Building Renovation for Business,1
Planning and Construction2
(Lincoln)3
Payable from General Obligation Bonds4
Priority 1	$ 500,0005
Priority 5	$ 100,0006
Total	$ 600,0007
19/627MCNEESE STATE UNIVERSITY8
(42) Health/Human Performance Education Complex,9
Planning and Construction10
(Calcasieu)11
Payable from General Obligation Bonds12
Priority 1	$ 1,000,00013
Priority 2	$ 2,500,00014
Priority 5	$20,885,00015
Total	$24,385,00016
(43) Alpha Hall Renovations, Planning and Construction17
(Calcasieu)18
Payable from General Obligation Bonds19
Priority 1	$ 1,500,00020
(44) Shearman Fine Arts Building - Renovation of Existing21
Space, Planning and Construction22
(Calcasieu)23
Payable from General Obligation Bonds24
Priority 1	$ 3,340,00025
Priority 5	$ 1,060,00026
Total	$ 4,400,00027
(45) Frazar Memorial Library Renovation and Repairs, 28
Planning and Construction29
(Calcasieu)30
Payable from General Obligation Bonds31
Priority 1	$ 8,215,00032
(151) ADA Upgrades Campus-Wide, Planning and Construction33
(Calcasieu)34
Payable from General Obligation Bonds35
Priority 1	$ 4,500,00036
Priority 5	$ 1,000,00037
Total	$ 5,500,00038
(1532)Campus-Wide Elevator Repairs, Planning and 39
Construction40
(Calcasieu)41
Payable from General Obligation Bonds42
Priority 1	$ 750,00043
(2028)Contraband Bayou Erosion Retaining Wall44
Phase II, Planning and Construction45
(Calcasieu)46
Payable from General Obligation Bonds47
Priority 1	$ 350,00048
Priority 5	$ 3,875,00049
Total	$ 4,225,00050 ENROLLEDHB NO. 2
Page 51 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
19/629UNIVERSITY OF LOUISIANA - MONROE1
(31) Stubbs Hall Reroofing, Planning and Construction2
(Ouachita)3
Payable from General Obligation Bonds4
Priority 1	$ 635,0005
Priority 5	$ 100,0006
Total	$ 735,0007
(32) Underground Electrical Distribution System,8
Planning and Construction9
(Ouachita)10
Payable from General Obligation Bonds11
Priority 2	$ 360,00012
Priority 5	$ 3,240,00013
Total	$ 3,600,00014
(34) Sandel Hall Renovation, Planning and Construction15
(Ouachita)16
Payable from General Obligation Bonds17
Priority 1	$ 9,100,00018
Priority 5	$ 8,000,00019
Total	$17,100,00020
19/631NORTHWESTERN STATE UNIVERSITY21
(2056)Roof Replacement and Associated22
Repairs, Planning and Construction23
(Caddo)24
Payable from General Obligation Bonds25
Priority 2	$ 200,00026
(    )Parking Lot Repairs, Planning and Construction27
(Natchitoches)28
Payable from General Obligation Bonds29
Priority 2	$ 200,00030
Priority 5	$ 200,00031
Total	$ 400,00032
Pending submittal and approval of a capital outlay budget request pursuant to the provisions33
of R.S. 39:112.34
19/634SOUTHEASTERN LOUISIANA UNIVERSITY35
(17) Computer Science and Technology Facility Improvements 36
and Expansion,  Planning and Construction37
(Tangipahoa)38
Payable from General Obligation Bonds39
Priority 1	$ 3,100,00040
Priority 5	$17,000,00041
Total	$20,100,00042 ENROLLEDHB NO. 2
Page 52 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
19/640UNIVERSITY OF LOUISIANA - LAFAYETTE1
(174) Fletcher Hall Exterior Repairs, Planning and 2
Construction3
(Lafayette)4
Payable from General Obligation Bonds5
Priority 1	$ 650,0006
Priority 5	$ 2,850,0007
Payable from Fees and Self Generated Revenues $ 2,205,1338
Total	$ 5,705,1339
19/641DELGADO COMMUNITY COLLEGE10
(1542)Facilities Improvement for Economic Development, 11
Planning and Construction12
(Orleans)13
Payable from General Obligation Bonds14
Priority 1	$ 40,00015
19/649LOUISIANA COMMUNITY AND TECHNICAL COLLEGE SYSTEM16
(551) Winnsboro Campus of Delta Community College,17
Acquisition, Planning, and Construction18
(Franklin)19
Payable from General Obligation Bonds20
Priority 5	$ 900,00021
(809) Automotive Training Facility, Planning and Construction22
(East Baton Rouge)23
Payable from General Obligation Bonds24
Priority 1	$ 2,400,00025
Priority 5	$22,750,00026
Total	$25,150,00027
(    )Maintenance, Deferred Maintenance, and Repairs of28
Campus Buildings, Planning and Construction29
(Statewide)30
Payable from General Obligation Bonds31
   Priority 2 $19,000,00032
33
Pending submittal and approval of a capital outlay budget request pursuant to the provisions34
of R.S. 39:112.35
19/651LOUISIANA SCHOOL FOR THE VISUALLY IMPAIRED36
(1544)Replace Existing Air Conditioning Systems 37
in Auditorium and Administration Offices38
(East Baton Rouge)39
Payable from General Obligation Bonds40
Priority 1	$ 200,00041
(1545)Removal of Existing Modular Building 42
and Replacement Modular Building43
(East Baton Rouge)44
Payable from General Obligation Bonds45
Priority 1	$ 20,00046 ENROLLEDHB NO. 2
Page 53 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
19/655LOUISIANA SPECIAL EDUCATION CENTER1
(1093)Vehicular Cover and Storage Unit,2
Planning and Construction3
(Rapides)4
Payable from Interagency Transfers	$ 542,2845
(1094)Demolition and Reconstruction of Residence No. 1,6
Planning and Construction 7
(Rapides)8
Payable from Interagency Transfers	$ 555,4409
(1116)Replacement of Transition Center and Education 10
Buildings, Planning and Construction11
(Rapides)12
Payable from Interagency Transfers	$ 750,00013
19/657LOUISIANA SCHOOL FOR MATH, SCIENCE AND THE ARTS14
(969) HVAC Issues in Caddo Hall, Planning and Construction 15
(Natchitoches)16
Payable from General Obligation Bonds17
Priority 1	$ 600,00018
(970) Stair Railings - Addressing Code Violations, 19
Planning and Construction20
(Natchitoches)21
Payable from General Obligation Bonds22
Priority 1	$ 70,00023
Priority 2	$ 70,00024
Total	$ 140,00025
(971) New Dormitory Building, Planning and Construction26
(Natchitoches)27
Payable from General Obligation Bonds28
Priority 2	$ 1,850,00029
Priority 5	$22,150,00030
Total	$24,000,00031
19/662LOUISIANA EDUCATIONAL TELEVISION AUTHORITY32
(232) Tower Repair 33
(Statewide)34
Payable from General Obligation Bonds35
Priority 1	$ 800,00036
19/671BOARD OF REGENTS37
(1289)Land Acquisition for Post Secondary Educational 38
Institutions 39
(Statewide)40
Payable from General Obligation Bonds41
Priority 1	$ 2,500,00042
Provided that $2,500,000 of this appropriation shall be used for the acquisition of the former43
Our Lady of Lourdes Hospital facility.44
(1548)Jefferson West Learning Center, Land Acquisition, 45
Planning and Construction46
(Jefferson)47
Payable from General Obligation Bonds48
Priority 1	$ 500,00049 ENROLLEDHB NO. 2
Page 54 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1549)System-Wide Telecommunications Wiring 1
and Equipment, Planning and Construction2
(Statewide)3
Payable from General Obligation Bonds4
Priority 5	$ 1,500,0005
(1550)Feasibility Study for New Campus for Northwest 6
Campus of the Louisiana Technical College, 7
Planning and Construction8
(Webster)9
Payable from General Obligation Bonds10
Priority 1	$ 100,00011
(1555)Library, Instructional and Scientific Equipment12
Acquisitions for Higher Education Institutions13
(Statewide)14
Payable from General Obligation Bonds15
Priority 5	$ 1,870,00016
(1556)Technical Colleges Campuses Equipment Acquisitions17
(Statewide)18
Payable from General Obligation Bonds19
Priority 5	$ 105,00020
19/673NEW ORLEANS CENTER FOR THE CREATIVE ARTS21
(1027)Replace HVAC System, Planning and Construction22
(Orleans)23
Payable from General Obligation Bonds24
Priority 1	$ 750,00025
(1028)Press Street Studios, Furniture/Fixtures/Equipment,26
Planning and Construction27
(Orleans)28
Payable from General Obligation Bonds29
Priority 5	$ 900,00030
19/731L.E. FLETCHER TECHNICAL COMMUNITY COLLEGE31
(549) Integrated Petroleum Technologies Program (IPT) 32
Lab and Classroom Building, Planning and Construction33
(Terrebonne)34
Payable from General Obligation Bonds35
Priority 1	$ 4,000,00036
(1557)Diesel Marine, Welding and Transportation Building 37
for Fletcher Technical Community College38
(Terrebonne)39
Payable from General Obligation Bonds40
Priority 1	$ 200,00041
Priority 2	$ 200,00042
Total	$ 400,00043
19/741LOUISIANA TECHNICAL COLLEGE - LAFAYETTE CAMPUS44
(1558)LTC Lafayette Campus - HVAC Replacement, 45
Planning and Construction46
(Lafayette)47
Payable from General Obligation Bonds48
Priority 1	$ 2,610,00049 ENROLLEDHB NO. 2
Page 55 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
19/752LOUISIANA TECHNICAL COLLEGE - MORGAN SMITH CAMPUS1
(803) New Construction or Renovations to Morgan 2
Smith Campus, Planning and Construction3
(Jefferson Davis)4
Payable from General Obligation Bonds5
Priority 2	$ 500,0006
Priority 5	$ 9,850,0007
Total	$10,350,0008
JUDICIAL EXPENSES9
23/949LOUISIANA JUDICIARY10
(1327)Land Acquisition, Planning, and Construction 11
of  New Courthouse for the Louisiana Court 12
of Appeal, Third Circuit 13
(Calcasieu)14
Payable from General Obligation Bonds15
Priority 1	$ 1,250,00016
LEGISLATIVE EXPENSES17
24/960LEGISLATIVE BUDGETARY CONTROL COUNCIL18
(1559)State Capitol HVAC Replacement and Renovations19
(East Baton Rouge)20
Payable from General Obligation Bonds21
Priority 1	$11,000,00022
(    )State Capitol Security Improvements,23
Planning and Construction24
(East Baton Rouge)25
Payable from General Obligation Bonds26
Priority 2	$ 1,000,00027
Priority 5	$ 1,800,00028
Total 	$ 2,800,00029
(    )Legislative Office Building Located at old Insurance Building 30
Site, Design, Planning, Construction and Demolition 31
(East Baton Rouge)32
Payable from Legislative Capitol Technology33
Enhancement Fund	$ 3,000,00034
Provided, however, that the Insurance Building property shall be transferred by the Division35
of Administration to the Legislature at no cost for the use of the legislative auditor and the36
legislature.37
LEVEE DISTRICTS AND PORTS38
36/L08LAKE BORGNE BASIN LEVEE DISTRICT39
(766) Drainage Improvements to LA 46 Roadway Drainage 40
Improvement Project Between Parish Road and Webster 41
Road, Planning and Construction 42
(St. Bernard)43
Payable from General Obligation Bonds44
Priority 1	$ 320,00045
Priority 5	$ 1,200,00046
Total	$ 1,520,00047
(768) Drainage Pump Stations and Channel Improvements, 48
Land Acquisitions, Planning and Construction49
(St. Bernard)50
Payable from General Obligation Bonds51
Priority 1	$ 20,00052 ENROLLEDHB NO. 2
Page 56 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
36/L10ORLEANS LEVEE DISTRICT1
(805) Southeast Louisiana Flood Protection Authority - 2
East for Bayou St. John, Maintenance and Improvements, 3
Perimeter Elevation, Hydrology Study, Planning 4
and Construction5
(Orleans)6
Payable from General Obligation Bonds7
Priority 1	$ 250,0008
36/L13PONTCHARTRAIN LEVEE DISTRICT9
(1560)Lake Pontchartrain West Shore Hurricane Protection Project10
(Ascension, St. Charles, St. James, St. John the Baptist)11
Payable from General Obligation Bonds12
Priority 1	$ 2,330,00013
Priority 5	$ 8,500,00014
Total	$10,830,00015
(1562)East St. Charles Urban Flood Control Project, 16
Planning and Construction17
(St. Charles)18
Payable from General Obligation Bonds19
Priority 1	$ 1,500,00020
Priority 5	$ 500,00021
Total	$ 2,000,00022
36/L16SOUTH LAFOURCHE LEVEE DISTRICT23
(806) Larose to Golden Meadow Hurricane24
Protection System, Planning and Construction25
(Lafourche)26
Payable from General Obligation Bonds27
Priority 2	$ 5,000,00028
Priority 5	$ 7,000,00029
Total	$12,000,00030
36/L25GRAND ISLE INDEPENDENT LEVEE DISTRICT31
(1278)Breakwater Protection, Planning and Construction 32
(Jefferson)33
Payable from General Obligation Bonds34
Priority 1	$ 100,00035
Priority 2	$ 1,000,00036
Total	$ 1,100,00037
36/L26NATCHITOCHES LEVEE AND DRAINAGE DISTRICT38
(1563)Lower Cane River Area Flood Gates Replacement Program 39
(Natchitoches)40
Payable from General Obligation Bonds41
Priority 1	$ 1,000,00042
36/L29BOSSIER LEVEE DISTRICT43
(1564)Flat River Bank Stabilization, Planning and Construction44
(Bossier)45
Payable from General Obligation Bonds46
Priority 1	$ 950,00047
Priority 5	$ 1,100,00048
Total	$ 2,050,00049 ENROLLEDHB NO. 2
Page 57 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
36/L34ORLEANS NON-FLOOD PROTECTION ASSET1
MANAGEMENT AUTHORITY2
(1258)Lakeshore Drive and Stars and Stripes Blvd.3
Safety Striping and Pavement Markers,4
Planning and Construction5
(Orleans)6
Payable from General Obligation Bonds7
Priority 2	$ 100,0008
(1259)New Basin Canal Park Bicycle and9
Jogging Path, Planning and Construction10
(Orleans)11
Payable from General Obligation Bonds12
Priority 2	$ 100,00013
36/L35ST MARY PARISH LEVEE DISTRICT14
(1565)Franklin Canal Levee and Floodgate Project, 15
Planning and Construction16
(St. Mary)17
Payable from General Obligation Bonds18
Priority 1	$ 640,00019
36/L37IBERIA PARISH LEVEE HURRICANE AND20
CONSERVATION DISTRICT21
(665) Planning, Permitting, Engineering and Right of Way22
Acquisition for the Iberia Hurricane Protection Master Plan23
(Iberia)24
Payable from General Obligation Bonds25
Priority 1	$ 250,00026
36/P01ABBEVILLE HARBOR AND TERMINAL DISTRICT27
(1072)Bulkheading and Dredging at Port Vermilion 28
($1,000,000 Cash and/or In Kind Match)29
(Vermilion)30
Payable from General Obligation Bonds31
Priority 5	$ 680,00032
36/P03GREATER BATON ROUGE PORT COMMISSION33
(807) Inland River Marine Terminal Dock and Access Roadway34
Construction Project, Planning and Construction35
(West Baton Rouge)36
Payable from General Obligation Bonds37
Priority 1	$ 1,000,00038
Priority 5	$ 2,200,00039
Total	$ 3,200,00040
36/P05WEST CALCASIEU PORT41
(857) Land Acquisition and Rehabilitation of Existing Bulkhead, 42
Planning and Construction ($1,305,000 Local Match)43
(Calcasieu)44
Payable from General Obligation Bonds45
Priority 2	$ 1,305,00046 ENROLLEDHB NO. 2
Page 58 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
36/P10GREATER LAFOURCHE PORT COMMISSION1
(837) Nolty J. Theriot Road Elevation Project,2
Planning and Construction3
(Lafourche)4
Payable from General Obligation Bonds5
Priority 5	$ 1,400,0006
36/P12LAKE PROVIDENCE PORT COMMISSION7
(824) Railroad Rehabilitation, Planning and Construction8
(East Carroll)9
Payable from General Obligation Bonds10
Priority 2	$ 1,500,00011
(1566)Coal Pad Repair 12
(East Carroll)13
Payable from General Obligation Bonds14
Priority 1	$ 10,00015
(1567)Succinic Acid Biorefinery, Planning and Construction16
(East Carroll)17
Payable from General Obligation Bonds18
Priority 1	$ 1,010,00019
36/P14MADISON PARISH PORT20
(1568)Railroad Rehabilitation/Improvement and New Rail 21
Spur for Avondale Facility, and Improvements Required22
for Levee Raising Including Raise Rail, Road and Utilities23
($221,000 Local Match)24
(Madison)25
Payable from General Obligation Bonds26
Priority 1	$ 710,00027
(1569)Improvements to Madison Parish Port 28
Northrop Grumman Shipbuilding Expansion29
(Madison)30
Payable from General Obligation Bonds31
Priority 1	$ 20,00032
(1570)Complex Chemical Entrance Road, Planning 33
and Construction34
(Madison)35
Payable from General Obligation Bonds36
Priority 1	$ 500,00037
36/P15MORGAN CITY HARBOR & TERMINAL38
DISTRICT39
(175) Governmental Operations and Emergency40
Center, Planning and Construction41
(St. Mary)42
Payable from General Obligation Bonds43
Priority 2	$ 100,00044
Priority 5	$ 7,000,00045
Total	$ 7,100,00046 ENROLLEDHB NO. 2
Page 59 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
36/P17PORT OF NEW ORLEANS1
(1571)Cruise Ship Terminal, Planning and Construction2
(Orleans)3
Payable from General Obligation Bonds4
Priority 1	$ 1,500,0005
Priority 5	$ 6,000,0006
Total	$ 7,500,0007
(1572)Milan Upland Yard Improvements, 8
Planning and Construction9
(Orleans)10
Payable from General Obligation Bonds11
Priority 1	$ 1,000,00012
Priority 5	$ 9,165,00013
Total	$10,165,00014
36/P20ST BERNARD PORT15
(1574)Rehabilitation of Dock #1 Section A Seawall, 16
Planning and Construction17
(St. Bernard)18
Payable from General Obligation Bonds19
Priority 1	$ 3,800,00020
36/P21PORT OF SOUTH LOUISIANA21
(950) Globalplex Rail Siding 22
($5,577,932 Local/Federal/Other Match)23
(St. John the Baptist)24
Payable from General Obligation Bonds25
Priority 1	$ 3,000,00026
(954) Globalplex Terminal Building #71 and Other 27
Globalplex Terminal Building Upgrades, 28
Planning and Construction29
(St. John the Baptist)30
Payable from General Obligation Bonds31
Priority 1	$ 2,850,00032
(1005)Warehouse, Planning and Construction33
(St. John the Baptist)34
Payable from General Obligation Bonds35
Priority 1	$ 100,00036
(1575)St. John the Baptist Parish Airport Expansion, 37
Land Acquisition, Wetland Mitigation, and 38
Avionics Shop, Planning and Construction39
(St. John the Baptist)40
Payable from General Obligation Bonds41
Priority 1	$ 575,00042
(1576)Dock, Planning and Construction43
(St. John the Baptist)44
Payable from General Obligation Bonds45
Priority 1	$ 500,00046 ENROLLEDHB NO. 2
Page 60 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
36/P23TERREBONNE PORT COMMISSION1
(494) Slip Dredging and Improvements for Terrebonne2
Port Commission Government Multi-Use Complex 3
(Terrebonne)4
Payable from General Obligation Bonds5
Priority 1	$ 710,0006
Priority 5	$ 550,0007
Total	$ 1,260,0008
9
36/P26PORT OF LAKE CHARLES10
(475) Relocation of Railroad Tracks along Sallier Street,11
Planning and Construction ($3,000,000 Local Match)12
(Calcasieu)13
Payable from General Obligation Bonds14
Priority 2	$ 1,000,00015
(476) Dredging of Berth 8 at City Docks, Planning 16
and Construction ($1,000,000 Local Match)17
(Calcasieu)18
Payable from General Obligation Bonds19
Priority 2	$ 250,00020
(477) New Administration Building, Planning and Construction21
($1,500,000 Local Match)22
(Calcasieu)23
Payable from General Obligation Bonds24
Priority 2	$ 500,00025
(961) Industrial Canal Dockside Monopile Improvements26
(LEEVAC), Planning and Construction27
(Calcasieu)28
Payable from General Obligation Bonds29
Priority 1	$ 195,00030
(962) Command and Control Center at City Docks,31
Planning and Construction 32
($1,125,000 Federal and/or Local Match)33
(Calcasieu)34
Payable from General Obligation Bonds35
Priority 1	$ 300,00036
36/P33SOUTH TANGIPAHOA PARISH PORT COMMISSION37
(1579)Port Manchac Terminal Improvements,38
Planning and Construction39
(Tangipahoa)40
Payable from General Obligation Bonds41
Priority 1	$ 470,00042
36/P35MERMENTAU RIVER HARBOR AND TERMINAL DISTRICT43
(736) Land Acquisition for New Slip Construction 44
(Mermentau River Harbor Terminal District), 45
Planning and Construction46
(Acadia)47
Payable from General Obligation Bonds48
Priority 1	$ 225,00049 ENROLLEDHB NO. 2
Page 61 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
36/P40GRAND ISLE PORT COMMISSION1
(1287)Port Access Road and New Commercial Boat Slip Facility2
(Jefferson)3
Payable from General Obligation Bonds4
Priority 1	$ 95,0005
Priority 2	$ 1,000,0006
Total	$ 1,095,0007
36/P41JEFFERSON PARISH PORT DISTRICT8
(1581)Jefferson Parish Business Park: Science and Technology 9
Academy and Conference Center10
(Jefferson)11
Payable from General Obligation Bonds12
Priority 1	$23,250,00013
Priority 5	$ 5,500,00014
Total	$28,750,00015
36/P43COLUMBIA PORT COMMISSION16
(560) Railroad Spur, Planning and Construction17
(Caldwell)18
Payable from General Obligation Bonds19
Priority 1	$ 670,00020
Priority 5	$ 1,340,00021
Total	$ 2,010,00022
36/P47GREATER OUACHITA PORT COMMISSION23
(1582)Rail Extension, Planning and Construction24
(Ouachita)25
Payable from General Obligation Bonds26
Priority 1	$ 1,500,00027
36/P49POINTE COUPEE PORT COMMISSION28
(1130)Pointe Coupee Parish Port Capital Improvements,29
Planning and Construction30
(Pointe Coupee)31
Payable from General Obligation Bonds32
Priority 1	$ 300,00033
Priority 5	$ 500,00034
Total	$ 800,00035
MISCELLANEOUS NON-STATE36
50/C03OFFICE FACILITIES CORPORATION37
(1334)Capital Repairs and Improvements, 38
Planning and Construction39
(Statewide)40
Payable from General Obligation Bonds41
Priority 2	$ 3,000,00042
Priority 5	$12,000,00043
Total	$15,000,00044 ENROLLEDHB NO. 2
Page 62 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/J03ASCENSION PARISH1
(1086)Lamar Dixon Expo Center Recreational2
Complex, Planning and Construction3
(Ascension)4
Payable from General Obligation Bonds5
Priority 2	$ 300,0006
Priority 5	$ 700,0007
Total	$ 1,000,0008
(1583)Oak Grove Community and Recreational Center, 9
Planning and Construction 10
(Ascension)11
Payable from General Obligation Bonds12
Priority 1	$ 245,00013
(1584)Lamar Dixon Development, Purchase and Land Acquisition14
(Ascension)15
Payable from General Obligation Bonds16
Priority 1	$ 380,00017
(1585)Ascension-Livingston Parkway Feasibility Study 18
(Ascension)19
Payable from General Obligation Bonds20
Priority 1	$ 150,00021
50/J04ASSUMPTION PARISH22
(1586)Overlay of Bayou Drive, Planning and Construction23
(Assumption)24
Payable from General Obligation Bonds25
Priority 1	$ 125,00026
50/J05AVOYELLES PARISH27
(1587)Multipurpose Evacuation Shelter/Community Center 28
and Training Facility in Moreauville, Renovations, 29
Acquisitions, Utilities, Planning and Construction30
(Avoyelles)31
Payable from General Obligation Bonds32
Priority 1	$ 450,00033
(1588)Avoyelles Parish Police Jury Cooperative Extension 34
Building, Acquisitions, Planning and Construction 35
($50,000 Non-State Match)36
(Avoyelles)37
Payable from General Obligation Bonds38
Priority 1	$ 1,570,00039
50/J06BEAUREGARD PARISH40
(708) Lumas Road, Planning and Construction41
(Beauregard)42
Payable from General Obligation Bonds43
Priority 1	$ 400,00044
Priority 5	$ 100,00045
Total	$ 500,00046 ENROLLEDHB NO. 2
Page 63 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1589)Overlay a Portion of Gaytine Road in Ward 6, 1
Planning and Construction2
(Beauregard)3
Payable from General Obligation Bonds4
Priority 1	$ 275,0005
50/J07BIENVILLE PARISH6
(1591)Blue Ridge Water System 7
(Bienville)8
Payable from General Obligation Bonds9
Priority 1	$ 500,00010
(1592)Bienville Parish Jail 11
($5,034,000 Cash and/or In-Kind Match)12
(Bienville)13
Payable from General Obligation Bonds14
Priority 1	$ 50,00015
(1593)Courthouse Improvements in Arcadia, Planning 16
and Construction ($115,000 Non-State Match)17
(Bienville)18
Payable from General Obligation Bonds19
Priority 1	$ 115,00020
50/J08BOSSIER PARISH21
(656) Sewerage District 1 of the Parish of Bossier, Planning 22
and Construction ($28,000,000 Local Match)23
(Bossier)24
Payable from General Obligation Bonds25
Priority 1	$15,235,00026
Priority 5	$ 255,00027
Total	$15,490,00028
(661) Extension of Crouch Road to Swan Lake Road/29
Reconstruction of Swan Lake Road To I-220, 30
Planning and Construction (Local Match Required)31
(Bossier)32
Payable from General Obligation Bonds33
Priority 1	$ 600,00034
(1291)Cotton Valley Road Reconstruction, Planning and 35
Construction36
(Bossier)37
Payable from General Obligation Bonds38
Priority 1	$ 95,00039
Priority 5	$ 255,00040
Total	$ 350,00041
(1594)Princeton Sports Complex – Fencing and Lighting at 42
New Ball Fields, Planning and Construction43
(Bossier)44
Payable from General Obligation Bonds45
Priority 1	$ 200,00046 ENROLLEDHB NO. 2
Page 64 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/J09CADDO PARISH1
(544) Caddo Parish Fire District No. 3, Station #4 Addition2
Planning and Construction3
(Caddo)4
Payable from General Obligation Bonds5
Priority 1	$ 165,0006
50/J10CALCASIEU PARISH7
(798) Gravity Sewer Trunk Mains and Pumping Stations, 8
South Ward 3 and South Ward 4, Planning and Construction9
(Calcasieu)10
Payable from General Obligation Bonds11
Priority 1	$ 3,900,00012
Priority 5	$ 6,900,00013
Total	$10,800,00014
(1596)Burton Memorial Coliseum Complex - Arena 15
Reconstruction and Coliseum Renovation, 16
Planning and Construction17
(Calcasieu)18
Payable from General Obligation Bonds19
Priority 1	$ 395,00020
50/J11CALDWELL PARISH21
(1148)Wiles Road Reconstruction, Planning 22
and Construction23
(Caldwell)24
Payable from General Obligation Bonds25
Priority 1	$ 80,00026
Priority 2	$ 430,00027
Total	$ 510,00028
(1149)Parish Detention Facility, Planning and Construction29
(Caldwell)30
Payable from General Obligation Bonds31
Priority 1	$ 250,00032
Priority 5	$ 1,370,00033
Total	$ 1,620,00034
50/J12CAMERON PARISH35
(1598)Holly Beach Sewer, Planning and Construction36
(Cameron)37
Payable from General Obligation Bonds38
Priority 1	$ 5,100,00039
50/J13CATAHOULA PARISH40
(1009)Catahoula Parish Courthouse Roof,41
Planning and Renovations42
(Catahoula)43
Payable from General Obligation Bonds44
Priority 2	$ 325,00045
Priority 5	$ 650,00046
Total	$ 975,00047 ENROLLEDHB NO. 2
Page 65 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/J14CLAIBORNE PARISH1
(1599)Street and Road Improvements, Planning and Construction2
(Claiborne)3
Payable from General Obligation Bonds4
Priority 1	$ 395,0005
50/J15CONCORDIA PARISH6
(1055)Concordia Parish Public Health Center7
Renovation, Planning and Construction8
(Concordia)9
Payable from General Obligation Bonds10
Priority 2	$ 200,00011
50/J16DE SOTO PARISH12
(987) DeSoto Parish Police Jury -13
Alumni Park Phase II, Planning and14
Construction15
(DeSoto)16
Payable from General Obligation Bonds17
Priority 2 $ 50,00018
(1601)Airport Industrial Park, Planning and Construction 19
($811,300 Federal Match and $50,000 Local Match)20
(De Soto)21
Payable from General Obligation Bonds22
Priority 1	$ 300,00023
50/J18EAST CARROLL PARISH24
(823) East Carroll Parish Road Improvements,25
Planning and Construction26
(East Carroll)27
Payable from General Obligation Bonds28
Priority 2	$ 15,00029
(1602)Industrial Site Development and Road Improvements 30
(For Economic Development Purposes, Including but not 31
Limited to an Ethanol Plant), Planning and Construction32
(East Carroll)33
Payable from General Obligation Bonds34
Priority 1	$ 1,020,00035
(1604)Courthouse and Jail Renovations36
(East Carroll)37
Payable from General Obligation Bonds38
Priority 1	$ 565,00039
50/J19EAST FELICIANA PARISH40
(1605)Courthouse Improvements, Planning, 41
Acquisitions, Renovations and Construction 42
($1,000,000 Cash and/or In-Kind Match)43
(East Feliciana)44
Payable from General Obligation Bonds45
Priority 1	$ 2,750,00046
Priority 5	$ 2,700,00047
Total	$ 5,450,00048 ENROLLEDHB NO. 2
Page 66 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/J20EVANGELINE PARISH1
(1606)New Industrial Facility and Related Infrastructure 2
(Construction or Acquisition)3
(Evangeline)4
Payable from General Obligation Bonds5
Priority 1	$ 500,0006
50/J21FRANKLIN PARISH7
(1088)Franklin Parish Activity Center, Planning8
and Construction ($250,000 Local Match)9
(Franklin)10
Payable from General Obligation Bonds11
Priority 1	$ 1,325,00012
Priority 5	$ 70,00013
Total	$ 1,395,00014
(1136)Parish Road Improvements15
(Franklin)16
Payable from General Obligation Bonds17
Priority 2	$ 200,00018
(1328)Courthouse Renovations, Planning and Construction19
(Franklin)20
Payable from General Obligation Bonds21
Priority 1	$ 50,00022
(1607)Union Church Road Improvements, Planning 23
and Construction24
(Franklin)25
Payable from General Obligation Bonds26
Priority 1	$ 45,00027
50/J22GRANT PARISH28
(1609)Southern Grant Sewerage System Improvements, 29
Study and Design30
(Grant)31
Payable from General Obligation Bonds32
Priority 1	$ 730,00033
Priority 2	$ 75,00034
Priority 5	$ 730,00035
Total	$ 1,535,00036
(1610)Regional Economic Development Building,37
Rehabilitation, Planning and Construction38
(Grant)39
Payable from General Obligation Bonds40
Priority 1	$ 300,00041 ENROLLEDHB NO. 2
Page 67 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/J23IBERIA PARISH1
(983) Robert B. Green Veterans Memorial2
Building Renovation, Upgrade and3
Expansion Project for Robert B. Green4
American Legion Post 533 and Perry5
Thompson VFW Post 12065, Planning6
and Construction7
(Iberia)8
Payable from General Obligation Bonds9
Priority 2 	$ 200,00010
(1611)Walking Track - Rynella Park, Planning and11
Construction12
(Iberia)13
Payable from General Obligation Bonds14
Priority 1	$ 70,00015
(1612)Wastewater System Improvements for the Acadiana 16
Regional Airport ($667,000 Non-State Match)17
(Iberia)18
Payable from General Obligation Bonds19
Priority 1	$ 635,00020
(1613)Sugar Cane Festival Building Improvements, 21
Planning and Construction22
(Iberia)23
Payable from General Obligation Bonds24
Priority 1	$ 25,00025
(1616)Five Lane Road Extension from Highway 675 26
to Highway 3212, Planning and Construction27
(Iberia)28
Payable from General Obligation Bonds29
Priority 1	$ 1,070,00030
Priority 2	$ 200,00031
Priority 5	$ 1,600,00032
Total	$ 2,870,00033
(1617)Recreational Complex, Sports Including Baseball, 34
Planning and Construction (Supplemental Funding)35
(Iberia)36
Payable from General Obligation Bonds37
Priority 1	$ 185,00038
Priority 2	$ 150,00039
Total	$ 335,00040
(1618)Road Extension from Sidney Blanchard Road to Ed 41
Broussard Road, Planning and Construction42
(Iberia)43
Payable from General Obligation Bonds44
Priority 1	$ 150,00045
50/J24IBERVILLE PARISH46
(1007)New Iberville Parish Hospital - Acquisition47
of Property, Planning and Construction48
(Iberville)49
Payable from General Obligation Bonds50
Priority 1	$ 3,000,00051 ENROLLEDHB NO. 2
Page 68 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1619)North Iberville Community Center, Planning and 1
Construction ($200,000 Cash and/or In-Kind Match)2
(Iberville)3
Payable from General Obligation Bonds4
Priority 1	$ 2,025,0005
50/J26JEFFERSON PARISH6
(62) 18th Street Drainage Improvements, Edenborn Avenue7
Phase 2 (18th Street to West Esplanade Avenue Canal)8
(Jefferson)9
Payable from General Obligation Bonds10
Priority 1	$ 100,00011
(65) Airline Drive (US61) At 17th Street Canal12
Drainage Crossing and Railroad Bridge 13
Replacement, Planning and Construction14
(Jefferson)15
Payable from General Obligation Bonds16
Priority 1	$ 2,000,00017
(66) Ames Boulevard Widening from Two Lanes to Three Lanes 18
Between Barataria Boulevard and Bayou Boeuf 19
(2.0 miles) with Installation of Subsurface Drainage 20
(Jefferson)21
Payable from General Obligation Bonds22
Priority 1	$ 1,500,00023
Priority 5	$ 3,340,00024
Total	$ 4,840,00025
(73) Bike Path along Leo Kerner Parkway (Barataria Blvd. to 26
Parc des Familles Entrance, Planning and Construction27
(Jefferson)28
Payable from General Obligation Bonds29
Priority 1	$ 65,00030
(75) Bonnabel Canal Rehabilitation and Bank Stabilization31
(Veterans Boulevard to West Esplanade), Planning32
and Construction33
(Jefferson)34
Payable from General Obligation Bonds35
Priority 1	$ 2,150,00036
Priority 5	$ 2,200,00037
Total	$ 4,350,00038
(76) Breaux Ditch Improvements (U-Channel Installation 39
from East Ames to Lafitte Larose Highway), Planning 40
and Construction 41
(Jefferson)42
Payable from General Obligation Bonds43
Priority 1	$ 125,00044
Priority 5	$ 1,225,00045
Total	$ 1,350,00046
(78) Canal #13 Concrete Lining (Loyola47
Drive to Butler Canal), Planning and48
Construction49
(Jefferson)50
Payable from General Obligation Bonds51
Priority 2	$ 150,00052 ENROLLEDHB NO. 2
Page 69 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(79) Canal 10 Concrete Lining and Widening between 1
Canal 7 and West Esplanade Avenue, Planning and 2
Construction3
(Jefferson)4
Payable from General Obligation Bonds5
Priority 2	$ 65,0006
Priority 5	$ 50,0007
Total	$ 115,0008
(80) Canal Street Roadway Reconstruction and Installation 9
of Subsurface Drainage between I-10 and Lake Avenue 10
(Jefferson)11
Payable from General Obligation Bonds12
Priority 1	$ 25,00013
Priority 2	$ 175,00014
Priority 5	$ 225,00015
Total	$ 425,00016
(81) Carol Sue Avenue Drainage Improvements, 17
Planning and Construction18
(Jefferson)19
Payable from General Obligation Bonds20
Priority 1	$ 1,600,00021
(85) Codifer Boulevard, Homestead Avenue, and 22
Brockenbraugh Court Subsurface Drainage23
Improvements, Planning and Construction 24
(Jefferson)25
Payable from General Obligation Bonds26
Priority 1	$ 200,00027
(91) East Jefferson Drainage Relief: Subsurface Drainage 28
Improvements to Garden Road, Tallulah, Sauve Road, 29
and Midway Drive, and Replacement of the Citrus and 30
Sauve Bridges over Soniat Canal31
(Jefferson)32
Payable from General Obligation Bonds33
Priority 1	$ 100,00034
(96) Jefferson Community Health Center Expansion to the 35
Existing River Ridge Facility in order to Implement a 36
Dental Program, Planning and Construction37
(Jefferson)38
Payable from General Obligation Bonds39
Priority 1	$ 50,00040
(99) Jefferson Parish Housing Authority Street Lighting and 41
Security Upgrades (Between Betty and Julie Street in the 42
East-West Direction and Acre and Lapalco in the North-43
South Direction), Planning and Construction44
(Jefferson)45
Payable from General Obligation Bonds46
Priority 1	$ 300,00047
Priority 5	$ 25,00048
Total	$ 325,00049 ENROLLEDHB NO. 2
Page 70 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(106) Livingston Place (Metairie Road to Loumor Avenue)1
(Jefferson)2
Payable from General Obligation Bonds3
Priority 1	$ 3,740,0004
(109) Manson Ditch Subsurface Drainage Installation5
from the ICC Railroad Ditch to the West Metairie6
Canal, Planning and Construction7
(Jefferson)8
Payable from General Obligation Bonds9
Priority 2	$ 200,00010
(110) Marrero Community/Senior Center,11
Planning and Construction12
(Jefferson)13
Payable from General Obligation Bonds14
Priority 2	$ 50,00015
(111) Martin Luther King Playground Improvements,16
Planning and Construction17
(Jefferson)18
Payable from General Obligation Bonds19
Priority 1	$ 100,00020
(114) Multi-Purpose Recreational and Achievement Center 21
(Jefferson)22
Payable from General Obligation Bonds23
Priority 1	$ 5,210,00024
(118) Parc des Familles, Construction of Utilities, Restrooms, 25
Pavilions and Roadways in Raw Undeveloped Wooded 26
Area in order to Initiate Construction of Regional Park, 27
Planning and Construction28
(Jefferson)29
Payable from General Obligation Bonds30
Priority 1	$ 3,535,00031
(120) Parish Line Drainage Pump Station Capacity Increase,32
Planning and Construction33
(Jefferson)34
Payable from General Obligation Bonds35
Priority 2	$ 75,00036
Priority 5	$ 75,00037
Total	$ 150,00038
(121) Performing Arts Center Modifications 39
(Jefferson)40
Payable from General Obligation Bonds41
Priority 1	$ 6,750,00042
(122) Performing Arts Center, Planning and Construction 43
($1,250,000 Local Match) 44
(Jefferson)45
Payable from General Obligation Bonds46
Priority 1	$ 9,155,00047 ENROLLEDHB NO. 2
Page 71 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(131) South Kenner Road Rehabilitation from Live Oak 1
Boulevard to River Road, Planning and Construction2
(Jefferson)3
Payable from General Obligation Bonds4
Priority 1	$ 300,0005
Priority 5	$ 3,700,0006
Total	$ 4,000,0007
(133) Terry Parkway Drainage Between Carol Sue Drive8
and Industry Canal, Planning and Construction9
($500,000 Local Match)10
(Jefferson)11
Payable from General Obligation Bonds12
Priority 1	$ 5,000,00013
Priority 5	$ 3,000,00014
Total	$ 8,000,00015
(135) Upper Kraak Ditch Drainage, Pump Station Pump 16
Replacement and Generator Installation17
(Jefferson)18
Payable from General Obligation Bonds19
Priority 1	$ 1,650,00020
(136) Upper Kraak Ditch Subsurface Drainage Improvement 21
(Upper Kraak Drainage Pump Station to Earhart 22
Expressway), Planning and Construction23
(Jefferson)24
Payable from General Obligation Bonds25
Priority 1	$ 250,00026
Priority 2	$ 50,00027
Priority 5	$ 50,00028
Total	$ 350,00029
(139) Waggaman Subsurface Drainage Improvements,30
Planning and Construction31
(Jefferson)32
Payable from General Obligation Bonds33
Priority 1	$ 740,00034
(140) Walkertown Bus Terminal, Planning and Construction35
(Jefferson)36
Payable from General Obligation Bonds37
Priority 1	$ 100,00038
Priority 2	$ 75,00039
Total	$ 175,00040
(147) Woodland West Drainage Improvements 41
(Jefferson)42
Payable from General Obligation Bonds43
Priority 1	$ 150,00044
(148) Woodmere Community Center, Real Estate Acquisition, 45
Planning, and Construction ($15,000 Match)46
(Jefferson)47
Payable from General Obligation Bonds48
Priority 1	$ 735,00049
Priority 5	$ 50,00050
Total	$ 785,00051 ENROLLEDHB NO. 2
Page 72 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(215) Canal 10 Concrete Lining and Box Culvert 1
Installation at Vintage Drive, Planning and 2
Construction3
(Jefferson)4
Payable from General Obligation Bonds5
Priority 2	$ 65,0006
Priority 5	$ 50,0007
Total	$ 115,0008
(1621)Canal 10 Concrete Lining Widening Between Canal 7 9
and West Esplanade Avenue, Planning and Construction10
(Jefferson)11
Payable from General Obligation Bonds12
Priority 1	$ 50,00013
(1995)Avondale Booster Club and Playground Upgrades,14
Planning and Construction15
(Jefferson)16
Payable from General Obligation Bonds17
Priority 1	$ 400,00018
Priority 5	$ 200,00019
Total 	$ 600,00020
(2032)Canal 10 Concrete Lining and Box Culvert Installation21
at Vintage Drive, Planning and Construction22
(Jefferson)23
Payable from General Obligation Bonds24
Priority 1	$ 100,00025
50/J27JEFFERSON DAVIS PARISH26
(1177)Regional Consolidated Jail Facility,27
Planning and Construction28
(Jefferson Davis)29
Payable from General Obligation Bonds30
Priority 2	$ 835,00031
Priority 5	$ 9,165,00032
Total	$10,000,00033
(1623)Rail Loading Facility at The Agri-Industrial Park 34
at Lacassine, Planning and Construction35
(Jefferson Davis)36
Payable from General Obligation Bonds37
Priority 1	$ 2,300,00038
(1625)Third Street West Bridge Repair, 39
Planning and Construction40
(Jefferson Davis)41
Payable from General Obligation Bonds42
Priority 1	$ 140,00043
50/J28LAFAYETTE PARISH44
(152) Parish Governmental Complex - Parish45
Courthouse, Planning and Construction46
(Lafayette)47
Payable from General Obligation Bonds48
Priority 2	$ 200,00049
Priority 5	$ 40,00050
Total	$ 240,00051 ENROLLEDHB NO. 2
Page 73 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(153) Kaliste Saloom Widening1
(Lafayette)2
Payable from General Obligation Bonds3
Priority 1	$ 3,955,0004
Priority 5	$ 5,945,0005
Total	$ 9,900,0006
(154) Governmental Complex, Jail Physical Plant Upgrade, 7
Planning and Construction ($4,980,000 Non-State Match)8
(Lafayette)9
Payable from General Obligation Bonds10
Priority 5	$ 2,000,00011
50/J29LAFOURCHE PARISH12
(1076)Fishing Pier at the Leeville13
Boat Launch, Planning and Construction14
(Lafourche)15
Payable from General Obligation Bonds16
Priority 2	$ 500,00017
Pending approval of the capital outlay budget request pursuant to the provisions of R.S.18
39:112.19
(1627)Company Canal Pump Station, Planning and Construction 20
($283,236 Cash and/or In-Kind Match)21
(Lafourche)22
Payable from General Obligation Bonds23
Priority 1	$ 1,000,00024
50/J30LASALLE PARISH 25
(558) Pine Hill Road Improvements, Planning and Construction26
(LaSalle)27
Payable from General Obligation Bonds28
Priority 1	$ 665,00029
50/J32LIVINGSTON PARISH30
(227) Cook Road Extension Economic Development Corridor 31
(Pete's Highway Frontage Road) 32
(Livingston)33
Payable from General Obligation Bonds34
Priority 1	$ 1,000,00035
Priority 5	$ 4,000,00036
Total	$ 5,000,00037
(928) Livingston Parish Regional Airport, Planning and38
Construction ($900,000 Federal Funds)39
(Livingston)40
Payable from General Obligation Bonds41
Priority 1	$ 50,00042
Priority 2	$ 100,00043
Total	$ 150,00044
45
(1628)Livingston Parish Animal Shelter 46
(Livingston)47
Payable from General Obligation Bonds48
Priority 1	$ 200,00049
Priority 2	$ 100,00050
Total	$ 300,00051 ENROLLEDHB NO. 2
Page 74 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1629)Livingston Parish Recreation District 2 Equipment1
(Livingston)2
Payable from General Obligation Bonds3
Priority 1	$ 25,0004
(1630)Twenty-First Judicial District Complex5
(Livingston)6
Payable from General Obligation Bonds7
Priority 1	$ 1,700,0008
(    )District 9 Fire Station, Planning and Construction9
(Livingston)10
Payable from General Obligation Bonds11
Priority 2	$ 100,00012
Pending submittal and approval of a capital outlay budget request pursuant to the provisions13
of R.S. 39:112.14
50/J33MADISON PARISH15
(1632)Courthouse Renovations, Planning and Construction 16
(Madison)17
Payable from General Obligation Bonds18
Priority 1	$ 85,00019
(1633)Health Unit, Planning and Construction 20
($200,000 Cash or In-Kind Match Required)21
(Madison)22
Payable from General Obligation Bonds23
Priority 1	$ 845,00024
Priority 5	$ 405,00025
Total	$ 1,250,00026
(1634)Charles Brown Road (Tendal Road) Repairs, 27
Planning and Construction28
(Madison)29
Payable from General Obligation Bonds30
Priority 1	$ 200,00031
50/J34MOREHOUSE PARISH32
(1236)Carl Road Improvements, Construction33
(Morehouse)34
Payable from General Obligation Bonds35
Priority 2	$ 500,00036
50/J35NATCHITOCHES PARISH37
(777) Natchitoches Parish Police Jury Office of 38
Community Services, Addition and Renovation39
(Natchitoches)40
Payable from General Obligation Bonds41
Priority 1	$ 50,00042
(1301)Hard Surfacing of Coco Bed Road, 43
Phase 1, Planning and Construction44
(Natchitoches)45
Payable from General Obligation Bonds46
Priority 5	$ 100,00047 ENROLLEDHB NO. 2
Page 75 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1321)Old River Bridge, Planning and Construction1
(Natchitoches)2
Payable from General Obligation Bonds3
Priority 1	$ 535,0004
50/J37OUACHITA PARISH5
(1637)Bayou DeSiard Ecosystem Restoration 6
($1,915,368 Federal Match)7
(Ouachita)8
Payable from General Obligation Bonds9
Priority 1	$ 890,00010
Priority 5	$ 100,00011
Total	$ 990,00012
(1638)Extension of Interstate 20 Frontage Road East, Including13
a Bridge across Bennett Bayou, Acquisitions, Planning 14
and Construction ($1,114,000 Cash and/or In-Kind Match, 15
of which no more than $250,000 will be Expended in Year 1)16
(Ouachita)17
Payable from General Obligation Bonds18
Priority 1	$ 1,115,00019
50/J38PLAQUEMINES PARISH20
(606) Peters Road Bridge and Extension, 21
Planning and Construction 22
(Jefferson, Plaquemines)23
Payable from General Obligation Bonds24
Priority 1	$ 4,400,00025
Priority 5	$51,800,00026
Total	$56,200,00027
(607) Emergency Evacuation Complex, 28
Planning and Construction29
(Plaquemines)30
Payable from General Obligation Bonds31
Priority 1	$ 500,00032
Priority 5	$ 1,750,00033
Total	$ 2,250,00034
(1640)Belle Chasse Parks, Planning and Construction35
(Plaquemines)36
Payable from General Obligation Bonds37
Priority 1	$ 100,00038
Priority 2	$ 25,00039
Priority 5	$ 25,00040
Total	$ 150,00041
(1641)Belle Chasse Water Tower, Planning and Construction42
(Plaquemines)43
Payable from General Obligation Bonds44
Priority 5	$ 20,00045 ENROLLEDHB NO. 2
Page 76 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/J39POINTE COUPEE PARISH1
(1144)False River Ecosystem Restoration Project,2
Planning and Construction3
(Pointe Coupee)4
Payable from General Obligation Bonds5
Priority 1	$ 1,500,0006
Priority 5	$ 1,200,0007
Total	$ 2,700,0008
(    )Regional Fence Line Monitoring,9
Planning and Equipment10
(Pointe Coupee)11
Payable from General Obligation Bonds12
Priority 2	$ 200,00013
Pending submittal and approval of a capital outlay budget request pursuant to the provisions14
of R.S. 39:112.15
50/J40RAPIDES PARISH16
(1643)Dean Lee Research Station, Planning and Construction17
(Rapides)18
Payable from General Obligation Bonds19
Priority 1	$ 500,00020
(1644)Cotile Indian Creek and Kincaid Outflow Gate 21
Repair/Replacement (Cash and/or In-Kind Match Required)22
(Rapides)23
Payable from General Obligation Bonds24
Priority 1	$ 205,00025
50/J41RED RIVER PARISH26
(614) Health Unit and Administrative Offices, 27
Planning and Construction28
(Red River)29
Payable from General Obligation Bonds30
Priority 1	$ 240,00031
50/J42RICHLAND PARISH32
(580) Richland Parish Courthouse Renovations 33
(Richland)34
Payable from General Obligation Bonds35
Priority 1	$ 35,00036
(1213)Sapa Drive Improvements, Planning and Construction37
(Richland)38
Payable from General Obligation Bonds39
Priority 1	$ 250,00040
50/J43SABINE PARISH41
(800) Water Treatment and Supply System Study42
(Sabine)43
Payable from General Obligation Bonds44
Priority 2	$ 300,00045 ENROLLEDHB NO. 2
Page 77 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(801) Plainview Road Rehabilitation, Planning and Construction1
(Sabine)2
Payable from General Obligation Bonds3
Priority 1	$ 2,890,0004
Priority 5	$ 3,000,0005
Total	$ 5,890,0006
50/J44ST. BERNARD PARISH7
(1645)Judicial Government Complex Renovation 8
and Expansion, Planning and Construction 9
(St. Bernard)10
Payable from General Obligation Bonds11
Priority 1	$ 500,00012
(1646)St. Bernard Parish Tourist Commission, 13
Planning and Construction 14
(St. Bernard)15
Payable from General Obligation Bonds16
Priority 1	$ 25,00017
(1647)New Hospital and Medical Office Building, Real 18
Estate Acquisition, Planning and Construction19
(St. Bernard)20
Payable from General Obligation Bonds21
Priority 1	$17,000,00022
50/J45ST. CHARLES PARISH23
(654) West Bank Hurricane Protection Levee24
(St. Charles)25
Payable from General Obligation Bonds26
Priority 1	$ 1,025,00027
(655) Courthouse Third Floor Renovations,28
Planning and Construction29
(St. Charles)30
Payable from General Obligation Bonds31
Priority 5	$ 130,00032
(1071)Airline Drive (US 61) at the St. Charles/33
Jefferson Parish Line Raising, Planning34
and Construction35
(Jefferson, St. Charles)36
Payable from General Obligation Bonds37
   Priority 2 $ 90,00038
Pending approval of the capital outlay budget request pursuant to the provisions of R.S.39
39:112.40
(1648)East Bank Clarifier, Planning and Construction41
(St. Charles)42
Payable from General Obligation Bonds43
Priority 1	$ 140,00044
(1649)St. Charles West Bank Ground Storage Tank 45
(St. Charles)46
Payable from General Obligation Bonds47
Priority 1	$ 175,00048 ENROLLEDHB NO. 2
Page 78 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1650)East Bank Ground Storage Tanks, 1
Planning and Construction2
(St. Charles)3
Payable from General Obligation Bonds4
Priority 1	$ 3,040,0005
(1651)St. Charles Emergency Operations Center 6
(St. Charles)7
Payable from General Obligation Bonds8
Priority 1	$ 540,0009
50/J46ST. HELENA PARISH10
(1151)Emergency ADA and Life Safety Renovations 11
to the Court House, Planning and Construction 12
($2,680,000 Federal Funds)13
(St. Helena)14
Payable from General Obligation Bonds15
Priority 1	$ 400,00016
(1652)Eddy Road Improvements, Planning and Construction17
(St. Helena)18
Payable from General Obligation Bonds19
Priority 1	$ 50,00020
50/J47ST. JAMES PARISH21
(316) St. James Parish Land Acquisition, 22
Planning and Construction 23
(St. James)24
Payable from General Obligation Bonds25
Priority 1	$12,300,00026
Priority 5	$ 5,800,00027
Total	$18,100,00028
(881) St. James Parish Eastbank Master Drainage Plan,29
Planning and Construction30
(St. James)31
Payable from General Obligation Bonds32
Priority 2	$ 85,00033
50/J48ST. JOHN THE BAPTIST PARISH34
(1133)West Bank Courthouse Security System,35
Planning and Construction36
(St. John the Baptist)37
Payable from General Obligation Bonds38
Priority 2	$ 90,00039
(1240)East Bank Courthouse, Planning and40
Construction41
(St. John the Baptist)42
Payable from General Obligation Bonds43
Priority 2	$ 30,00044
Priority 5	$ 30,00045
Total	$ 60,00046 ENROLLEDHB NO. 2
Page 79 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1241)River Forest Canal Extension Project,1
Planning and Construction2
(St. John the Baptist)3
Payable from General Obligation Bonds4
Priority 2	$ 100,0005
Priority 5	$ 155,0006
Total	$ 255,0007
(1653)Woodland Road between Cambridge and Belle Terre, 8
LA Hwy 3188 9
(St. John the Baptist)10
Payable from General Obligation Bonds11
Priority 1	$ 100,00012
50/J49ST. LANDRY PARISH 13
(1654)Hurricane Evacuations and Homeland 14
Security Coordination and Related 15
Renovations, Planning and Construction16
(St. Landry)17
Payable from General Obligation Bonds18
Priority 1	$ 195,00019
50/J50ST. MARTIN PARISH20
(447) Road Improvements on the Four-Mile Bayou Road,21
Planning and Construction22
(St. Martin)23
Payable from General Obligation Bonds24
Priority 1	$ 200,00025
Priority 2	$ 100,00026
Total	$ 300,00027
(456) I-10 Frontage Road, LA 328 to LA 347, Planning 28
and Construction29
(St. Martin)30
Payable from General Obligation Bonds31
Priority 5	$ 4,550,00032
(457) T-Bayou Drainage Improvements (Local Match Required)33
(St. Martin)34
Payable from General Obligation Bonds35
Priority 1	$ 100,00036
(1656)Courthouse Expansion and Renovations, 37
Planning and Construction38
(St. Martin)39
Payable from General Obligation Bonds40
Priority 1	$ 3,400,00041
(1657)Coteau Holmes Civic Center, Planning and Construction42
(St. Martin)43
Payable from General Obligation Bonds44
Priority 1	$ 220,00045 ENROLLEDHB NO. 2
Page 80 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/J51ST. MARY PARISH1
(529) Infrastructure Improvements at the Charenton Canal 2
Industrial Park3
(St. Mary)4
Payable from General Obligation Bonds5
Priority 1	$ 2,350,0006
(531) Reconstruction of Charenton Beach Road from LA 87 7
to the West Atchafalaya Basin Protection Levee, 8
Planning and Construction9
(St. Mary)10
Payable from General Obligation Bonds11
Priority 2	$ 500,00012
(532) Installation of Culverts and Associated Infrastructure13
in Middle Road Drainage Canal - Bayou Vista La. for14
Sub-Gravity Drainage District #1 of St. Mary Parish15
Gravity Drainage District #2, Planning and Construction16
(St. Mary)17
Payable from General Obligation Bonds18
Priority 1	$ 460,00019
(536) Recreation and Infrastructure Improvements20
at Centerville Park, Planning and Construction21
(St. Mary)22
Payable from General Obligation Bonds23
Priority 2	$ 75,00024
(1658)Recreational Improvements at Kemper Williams Park, 25
Acquisitions, Installation, Planning and Construction 26
($50,000 Local Match)27
(St. Mary)28
Payable from General Obligation Bonds29
Priority 1	$ 300,00030
(1659)St. Mary Parish Sewage District #5 Sewer Lift 31
Station Improvements32
(St. Mary)33
Payable from General Obligation Bonds34
Priority 1	$ 100,00035
(1660)DeGravelle Access Road to Duhon Bi-Pass Road in Amelia,36
Planning and Construction37
(St. Mary)38
Payable from General Obligation Bonds39
Priority 1	$ 180,00040
(1662)Plantation Pump Station Replacement for Sub-Gravity 41
Drainage District #1 of St. Mary Parish Gravity Drainage 42
District #2, Planning and Construction43
(St. Mary)44
Payable from General Obligation Bonds45
Priority 1	$ 1,925,00046 ENROLLEDHB NO. 2
Page 81 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1663)Cajun Coast Welcome Center and Tower Overlook 1
for the Tourist Commission dba Cajun Coast Visitors 2
and Convention Bureau, Planning and Construction 3
($2,121,324 Local Funds)4
(St. Mary)5
Payable from General Obligation Bonds6
Priority 1	$ 125,0007
Priority 5	$ 1,000,0008
Total	$ 1,125,0009
(1664)Access Road from Baker Hughes to Port Road 10
in Morgan City, Planning and Construction 11
($200,000 Local Match)12
(St. Mary)13
Payable from General Obligation Bonds14
Priority 1	$ 820,00015
50/J52ST. TAMMANY PARISH16
(675) South Slidell Levee Protection Rehabilitation 17
(USACE 533d Report for Levees West and East of I-10)18
Planning and Construction19
(St. Tammany)20
Payable from General Obligation Bonds21
Priority 1	$ 4,000,00022
Priority 2	$ 4,130,00023
Priority 5	$ 4,405,00024
Total	$12,535,00025
(677) St. Tammany Parish Fishing Pier, 26
Planning and Construction27
(St. Tammany)28
Payable from General Obligation Bonds29
Priority 1	$ 400,00030
Priority 2	$ 935,00031
Priority 5	$ 535,00032
Total	$ 1,870,00033
(678) University Square Learning Center Facilities,34
Planning and Construction 35
(St. Tammany)36
Payable from General Obligation Bonds37
Priority 1	$ 150,00038
Priority 2	$ 1,275,00039
Priority 5	$ 1,275,00040
Total	$ 2,700,00041
(788) Bush Emergency Shelter and Community Center,42
Land, Planning, Construction, and Equipment43
(St. Tammany)44
Payable from General Obligation Bonds45
Priority 5	$ 50,00046
(1665)Camp Salmen Acquisition and Improvements, Planning 47
and Construction ($449,000 Non-State Match)48
(St. Tammany)49
Payable from General Obligation Bonds50
Priority 1	$ 230,00051
Priority 2	$ 400,00052
Priority 5	$ 300,00053
Total	$ 930,00054 ENROLLEDHB NO. 2
Page 82 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1666)UNO Technology Park Drainage Sewer and Water 1
Extensions and Road2
(St. Tammany)3
Payable from General Obligation Bonds4
Priority 1	$ 45,0005
(1669)Covington Emergency Shelter, Community Health6
Center and Livestock Facility Addition,7
Planning and Construction8
(St. Tammany)9
Payable from General Obligation Bonds10
Priority 1	$ 980,00011
Priority 2	$ 185,00012
Total	$ 1,165,00013
50/J53TANGIPAHOA PARISH14
(191) Courthouse and Courthouse Annex Renovations 15
and Expansions, Acquisitions, Planning and Construction16
($500,000 Local Match)17
(Tangipahoa)18
Payable from General Obligation Bonds19
Priority 1	$ 515,00020
Priority 2	$ 200,00021
Total	$ 715,00022
(220) Tangipahoa Parish Multipurpose Livestock23
and Agricultural Facility, Planning and24
Construction, Supplemental Funding25
(Tangipahoa)26
Payable from General Obligation Bonds27
Priority 2	$ 400,00028
(259) Juvenile Court Building Renovation, 21st District,29
Planning and Construction30
(Tangipahoa)31
Payable from General Obligation Bonds32
Priority 5	$ 50,00033
50/J54TENSAS PARISH34
(1672)Tensas Parish Port/Port Priority Site Plan, 35
Planning and Construction36
(Tensas)37
Payable from General Obligation Bonds38
Priority 1	$ 15,00039
Priority 2	$ 100,00040
Priority 5	$ 115,00041
Total	$ 230,00042
50/J55TERREBONNE PARISH43
(698) Thompson Road Extension, Land Acquisition, 44
Planning and Construction ($2,000,000 Local Match)45
(Terrebonne)46
Payable from General Obligation Bonds47
Priority 1	$ 250,00048
Priority 5	$ 3,210,00049
Total	$ 3,460,00050 ENROLLEDHB NO. 2
Page 83 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(715) Terrebonne Parish Emergency Operations1
Center, Planning and Construction2
(Terrebonne)3
Payable from General Obligation Bonds4
Priority 2	$ 600,0005
Priority 5	$ 3,150,0006
Total	$ 3,750,0007
(1252)Fireman's Skate and Bike Park,8
Planning and Construction9
(Terrebonne)10
Payable from General Obligation Bonds11
Priority 2	$ 300,00012
(1673)Bayou Terrebonne Boardwalk, Planning and13
Construction ($1,000,000 Cash and/or In-kind14
Match)15
(Terrebonne)16
Payable from General Obligation Bonds17
Priority 1	$ 845,00018
Priority 2	$ 200,00019
Total	$ 1,045,00020
(1674)Terrebonne Parish Consolidated Government, Upper 21
Bayou Dularge Pump Station, Planning and Construction22
(Terrebonne)23
Payable from General Obligation Bonds24
Priority 1	$ 200,00025
50/J57VERMILION PARISH26
(1675)Vermilion Parish Road Improvements 27
(Vermilion)28
Payable from General Obligation Bonds29
Priority 5	$ 320,00030
50/J58VERNON PARISH31
(516) Extension of Potable Water Line to Hutton,32
Planning and Construction33
(Vernon)34
Payable from General Obligation Bonds35
Priority 2	$ 745,00036
(1056)Vernon/Fort Polk Thoroughfare, Planning and Construction37
(Vernon)38
Payable from General Obligation Bonds39
Priority 1	$ 9,375,00040
(1678)Creation of Vernon Lake Cultural Center, Recreation 41
and Tourism Park, Planning and Construction42
(Vernon)43
Payable from General Obligation Bonds44
Priority 1	$ 210,00045
Priority 5	$ 300,00046
Total	$ 510,00047 ENROLLEDHB NO. 2
Page 84 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1680)Anacoco Recreation Complex Building Restroom, Office, 1
Concession Stand, and Press Box, Planning and Construction2
(Vernon)3
Payable from General Obligation Bonds4
Priority 1	$ 180,0005
(1681)Extension of Pavilion, Sidewalk Awning, Wastewater Line 6
Extension, Storm Drainage Relocation, Foundations, and 7
other Associated Infrastructure at Rodeo Arena, Planning 8
and Construction9
(Vernon)10
Payable from General Obligation Bonds11
Priority 1	$ 180,00012
(1682)Visitor Center, Planning and Construction13
(Vernon)14
Payable from General Obligation Bonds15
Priority 1	$ 550,00016
Priority 5	$ 935,00017
Total	$ 1,485,00018
(1684)Plainview Road Improvements, Planning and Construction19
(Vernon)20
Payable from General Obligation Bonds21
Priority 1	$ 1,860,00022
50/J59WASHINGTON PARISH23
(993) Emergency Operations, 911 and Multi-Agency 24
Communications Center, Real Estate, Planning 25
and Construction ($125,000 Local Match)26
(Washington)27
Payable from General Obligation Bonds28
Priority 1	$ 700,00029
(1248)Roadway Rehabilitation/Infrastructure Improvements,30
Planning and Construction31
(Washington)32
Payable from General Obligation Bonds33
Priority 2	$ 50,00034
(1249)Washington Parish Bridges - Reconstruction, 35
Planning and Construction36
(Washington)37
Payable from General Obligation Bonds38
    Priority 2 $ 145,00039
The capital outlay budget request for this project was submitted after the November 1st40
deadline, but it has been approved by the Joint Legislative Committee on Capital Outlay41
pursuant to the provisions of R.S. 39:112.42
(1685)Recreation Area at or on the Pearl River Canal, 43
Planning and Construction44
(Washington)45
Payable from General Obligation Bonds46
Priority 1	$ 280,00047 ENROLLEDHB NO. 2
Page 85 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1686)Animal Shelter, Planning and Construction1
(Washington)2
Payable from General Obligation Bonds3
Priority 1	$ 85,0004
50/J60WEBSTER PARISH5
(1687)Union Grove Water System 6
(Webster)7
Payable from General Obligation Bonds8
Priority 1	$ 15,0009
(1688)Webster Parish Health Unit Springhill Branch, 10
Renovations, Planning and Construction11
(Webster)12
Payable from General Obligation Bonds13
Priority 1	$ 375,00014
50/J61WEST BATON ROUGE PARISH15
(1689)Water Distribution Improvements, Install Additional 16
Hydraulic Loop, Planning and/or Construction17
(West Baton Rouge)18
Payable from General Obligation Bonds19
Priority 1	$ 70,00020
(1690)Regional Sewer System Located South of the 21
Intra-Coastal Waterway and North of Brusly22
(West Baton Rouge)23
Payable from General Obligation Bonds24
Priority 1	$ 75,00025
(1691)LA 415 Bridge at Intracoastal Canal,26
Planning and Construction27
(West Baton Rouge)28
Payable from General Obligation Bonds29
Priority 1	$ 1,000,00030
50/J62WEST CARROLL PARISH31
(1226)Chip and Seal Road Repair32
(West Carroll)33
Payable from General Obligation Bonds34
Priority 2	$ 160,00035
(1692)West Carroll Parish Governmental Office, 36
Planning and Construction37
(West Carroll)38
Payable from General Obligation Bonds39
Priority 1	$ 180,00040
50/J64WINN PARISH41
(1694)Country Club Road, Planning and Construction42
(Winn)43
Payable from General Obligation Bonds44
Priority 1	$ 920,00045 ENROLLEDHB NO. 2
Page 86 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/M01ABBEVILLE1
2
(555) Hangar Rehabilitation, 3
Planning and Construction4
(Vermilion)5
Payable from General Obligation Bonds6
Priority 2	$ 150,0007
50/M02ABITA SPRINGS8
(1696)Water Lines and Sewer Lines, Extensions 9
and Upgrades, Planning and Construction 10
(Cash and/or In-Kind Match Required)11
(St. Tammany)12
Payable from General Obligation Bonds13
Priority 1	$ 15,00014
Priority 2	$ 15,00015
Total	$ 30,00016
50/M04ALBANY17
(780) Sewer System Improvements for18
Town of Albany (North of I-12)19
(Livingston)20
Payable from General Obligation Bonds21
Priority 2	$ 250,00022
Priority 5	$ 350,00023
Total	$ 600,00024
50/M05ALEXANDRIA25
(543) Sugarhouse Road/Eddie Williams Blvd. to LA Hwy. 1, 26
Phase I and Phase II, Planning and Construction 27
($5,000,000 Local Match)28
(Rapides)29
Payable from General Obligation Bonds30
Priority 1	$ 500,00031
Priority 2	$ 200,00032
Priority 5	$ 6,930,00033
Total	$ 7,630,00034
50/M09ARCADIA35
(706) Multi-Purpose Community Center, Planning 36
and Construction ($350,000 Local Match)37
(Bienville)38
Payable from General Obligation Bonds39
Priority 1	$ 2,320,00040
50/M10ARNAUDVILLE41
(1697)Multipurpose Aquatic Recreational Facility42
(St. Landry)43
Payable from General Obligation Bonds44
Priority 1	$ 270,00045 ENROLLEDHB NO. 2
Page 87 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/M14BAKER1
(1304)Baker Fire Training Facility,2
Planning and Construction3
(East Baton Rouge)4
Payable from General Obligation Bonds5
Priority 2	$ 170,0006
50/M15BALDWIN7
(1699)Fire Station and Public Service Center, 8
Planning and Construction9
(St. Mary)10
Payable from General Obligation Bonds11
Priority 1	$ 1,030,00012
Priority 2	$ 75,00013
Total	$ 1,105,00014
50/M16BALL15
(840) Sewer Extensions in the Springhill Road Area,16
Planning and Construction17
(Rapides)18
Payable from General Obligation Bonds19
Priority 2	$ 50,00020
(1700)Sewer Extensions in the Springhill Road Area 21
(Rapides)22
Payable from General Obligation Bonds23
Priority 1	$ 150,00024
50/M17BASILE25
(932) Town of Basile Public Accommodation26
Facility Improvements for Meeting/27
Recreation, Planning and Construction28
(Evangeline)29
Payable from General Obligation Bonds30
Priority 2	$ 75,00031
50/M19BASTROP32
(994) Bastrop City Hall - Roof Construction &33
Green Lighting, Planning and Construction34
(Morehouse)35
Payable from General Obligation Bonds36
   Priority 2 	$ 20,00037
(1702)Bastrop Central Fire Station, Replace Driveway City38
Hall, Roof Construction, Planning and Construction39
(Morehouse)40
Payable from General Obligation Bonds41
Priority 1	$ 200,00042
Priority 5	$ 250,00043
Total	$ 450,00044 ENROLLEDHB NO. 2
Page 88 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/M20BATON ROUGE1
(207) Baton Rouge Fire Department Brookstown2
Fire Station #4, Planning and Construction3
(East Baton Rouge)4
Payable from General Obligation Bonds5
    Priority 2 	$ 200,0006
Pending approval of the capital outlay budget request pursuant to the provisions of R.S.7
39:112.8
(1703)Drainage Improvements in Old Goodwood Area, 9
Planning and Construction10
(East Baton Rouge)11
Payable from General Obligation Bonds12
Priority 1	$ 170,00013
(1704)River Center Arena and Theatre Renovation, 14
Exhibition Center Expansion, Parking Facilities 15
and Street Realignment, Planning and Construction 16
($28,500,000 Local Match)17
(East Baton Rouge)18
Payable from General Obligation Bonds19
Priority 1	$ 4,600,00020
(1705)Hooper Road Sewer Improvements 21
($1,200,000 Local Match)22
(East Baton Rouge)23
Payable from General Obligation Bonds24
Priority 1	$ 1,300,00025
(1706)Jefferson Highway Signal Improvements, Government26
Street to Drusilla Lane, Planning and Construction 27
($150,000 Local Match)28
(East Baton Rouge)29
Payable from General Obligation Bonds30
Priority 1	$ 1,725,00031
(1707)Stanford Avenue Improvements, Sidewalk Widening, 32
Planning and Construction 33
(East Baton Rouge)34
Payable from General Obligation Bonds35
Priority 1	$ 75,00036
(1709)Baseball Stadium Improvements 37
(East Baton Rouge)38
Payable from General Obligation Bonds39
Priority 1	$ 1,400,00040
(1710)Extension of Stumberg Lane from Jefferson Hwy. 41
to Airline Hwy., Planning and Construction42
(East Baton Rouge)43
Payable from General Obligation Bonds44
Priority 1	$ 1,000,00045 ENROLLEDHB NO. 2
Page 89 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(    )Hooper Road Widening to Four Lanes1
(Blackwater Bayou to Sullivan Road), Planning, 2
Engineering, Utilities and Construction3
(East Baton Rouge)4
Payable from General Obligation Bonds5
Priority 2	$ 2,000,0006
Priority 5	$ 8,165,0007
Total	$10,165,0008
Pending submittal and approval of a capital outlay budget request pursuant to the provisions9
of R.S. 39:112.10
50/M22BENTON11
(762) Town of Benton Wastewater Collection System12
Improvements, Planning and Construction13
(Bossier)14
Payable from General Obligation Bonds15
Priority 2	$ 250,00016
Priority 5	$ 225,00017
Total	$ 475,00018
(1711)Wastewater System Improvements, Collection System, 19
Planning and Construction ($73,000 Local Match)20
(Bossier)21
Payable from General Obligation Bonds22
Priority 1	$ 700,00023
50/M24BERWICK24
(545) Sewer Rehabilitation on Fourth, Sixth, Texas,25
Francis & Utah Streets, Planning and26
Construction27
(St. Mary)28
Payable from General Obligation Bonds29
Priority 2 $ 150,00030
(546) Sewerage Collection System Along Old Spanish31
Trail and LA. 182, Planning and Construction32
(St. Mary)33
Payable from General Obligation Bonds34
Priority 2	$ 350,00035
Priority 5	$ 2,115,00036
Total 	$ 2,465,00037
(1712)Sewer Rehabilitation on Third and Fourth38
Streets and Sinclair Alley, Planning 39
and Construction40
(St. Mary)41
Payable from General Obligation Bonds42
Priority 5	$ 45,00043
50/M25BIENVILLE44
(1235)Village of Bienville, Water System Improvements45
(Bienville)46
Payable from General Obligation Bonds47
Priority 2	$ 100,00048
Priority 5	$ 125,00049
Total	$ 225,00050 ENROLLEDHB NO. 2
Page 90 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/M27BOGALUSA1
(464) Drainage, Paving and Water System Improvements,2
Planning and Construction3
(Washington)4
Payable from General Obligation Bonds5
Priority 2	$ 100,0006
(466) Extension of Willis Avenue to Highway 21,7
Planning and Construction8
(Washington)9
Payable from General Obligation Bonds10
Priority 2	$ 145,00011
(1714)City Hall Restoration and Renovations, Planning 12
and Construction ($98,768 Federal Match)13
(Washington)14
Payable from General Obligation Bonds15
Priority 1	$ 300,00016
(1715)Emergency Sewer Collection System Evaluation17
and Repairs, Planning and Construction18
(Washington )19
Payable from General Obligation Bonds20
Priority 1	$ 440,00021
50/M29BOSSIER CITY22
(307) Center for Creative Digital Media (CCDM)23
(Bossier)24
Payable from General Obligation Bonds25
Priority 1	$ 500,00026
Priority 2	$ 3,000,00027
Priority 5	$23,000,00028
Total	$26,500,00029
(886) Hwy. 71 Street Lighting Project from LA 303230
(Westgate Drive) to LA 511 (Jimmie Davis Hwy),31
Planning and Construction32
(Bossier)33
Payable from General Obligation Bonds34
Priority 1	$ 780,00035
50/M32BROUSSARD36
(719) Rehabilitate LA Hwy 182 from US 9037
to LA Hwy 89, Planning and Construction38
(Lafayette)39
Payable from General Obligation Bonds40
Priority 1	$ 250,00041
(720) Three Lane LA Hwy 182 in the City of Broussard,42
Planning and Construction ($750,000 Local Match)43
(Lafayette)44
Payable from General Obligation Bonds45
Priority 1	$ 1,650,00046
Priority 5	$ 600,00047
Total	$ 2,250,00048 ENROLLEDHB NO. 2
Page 91 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(721) South Bernard from Ambassador Caffery to LA Hwy 182,1
Planning and Construction,2
(Lafayette)3
Payable from General Obligation Bonds4
Priority 2	$ 705,0005
(722) Reconstruct South Bernard Road from LA Hwy 1826
to US Hwy 90, Planning and Construction7
(Lafayette)8
Payable from General Obligation Bonds9
Priority 1	$ 150,00010
Priority 2	$ 500,00011
Total	$ 650,00012
(1716)U.S. Highway 90 Intersection Improvements 13
at Bercegeay Road, Planning and Construction14
(Lafayette)15
Payable from General Obligation Bonds16
Priority 1	$ 15,00017
50/M33BRUSLY18
(1294)New Police Department Headquarters, Maintenance,19
Material Storage and Annex Buildings20
(West Baton Rouge)21
Payable from General Obligation Bonds22
Priority 1	$ 2,530,00023
50/M35BUNKIE24
(1717)Water System Improvements, Water Main Replacement 25
Along US 71 Main Street, Planning and Construction 26
($500,000 Local Match)27
(Avoyelles)28
Payable from General Obligation Bonds29
Priority 1	$ 340,00030
50/M36CALVIN31
(1718)Water System Expansion, Including In-Line Booster 32
System Facility, Planning and Construction33
(Winn)34
Payable from General Obligation Bonds35
Priority 1	$ 875,00036
50/M37CAMPTI37
(1719)Town of Campti Multi-Purpose Community Center, 38
Planning and Construction39
(Natchitoches)40
Payable from General Obligation Bonds41
Priority 1	$ 250,00042
Priority 5	$ 50,00043
Total	$ 300,00044 ENROLLEDHB NO. 2
Page 92 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/M39CARENCRO1
(630) City of Carencro City Hall Renovations2
to Include New Roof, Planning and3
Construction4
(Lafayette)5
Payable from General Obligation Bonds6
   Priority 2 	$ 65,0007
(631) Wastewater and City Infrastructure Flood Damages,8
Planning and Construction9
(Lafayette)10
Payable from General Obligation Bonds11
Priority 1	$ 1,200,00012
Priority 5	$ 4,770,00013
Total	$ 5,970,00014
(839) Water and Sewer Infrastructure Improvement15
Project, Planning and Construction16
(Lafayette)17
Payable from General Obligation Bonds18
    Priority 2 	$ 40,00019
(867) Arceneaux Road Drainage Improvements, 20
Site Work and Culverting, Planning and Construction 21
(50% Local Match)22
(Lafayette)23
Payable from General Obligation Bonds24
Priority 2	$ 205,00025
(873) Gaston Coulee Cleaning, Planning and Improvements26
(Lafayette)27
Payable from General Obligation Bonds28
Priority 2	$ 190,00029
50/M40CASTOR30
(1299)New Water Well and Related System Improvements,31
Planning and Construction32
(Bienville)33
Payable from General Obligation Bonds34
Priority 2	$ 310,00035
50/M44CHOUDRANT36
(1721)Village of Choudrant Town Hall 37
(Lincoln)38
Payable from General Obligation Bonds39
Priority 1	$ 100,00040
50/M46CLARENCE41
(615) Clarence, Wastewater System Improvements, 42
Planning and Construction43
(Natchitoches)44
Payable from General Obligation Bonds45
Priority 1	$ 50,00046 ENROLLEDHB NO. 2
Page 93 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/M48CLAYTON1
(1722)Clayton School Gymnasium, Planning and Construction2
(Concordia)3
Payable from General Obligation Bonds4
Priority 5	$ 100,0005
50/M50COLFAX6
(407) Street Improvements, Planning and Construction7
(Grant)8
Payable from General Obligation Bonds9
Priority 2	$ 100,00010
50/M52COLUMBIA11
(1723)Repair of Existing Water Well, Planning and Construction12
(Caldwell)13
Payable from General Obligation Bonds14
Priority 1	$ 90,00015
50/M54COTTON VALLEY16
(1724)Cotton Valley Sewerage System Improvements, 17
Planning and Construction18
(Webster)19
Payable from General Obligation Bonds20
Priority 2	$ 300,00021
Priority 5	$ 300,00022
Total	$ 600,00023
50/M56COUSHATTA24
(968) Install New Streetlights and Sidewalks for25
the Town of Coushatta, Planning and26
Construction27
(Red River)28
Payable from General Obligation Bonds29
   Priority 2 $ 50,00030
50/M57COVINGTON31
(653) Extensions and Improvements to32
Water Distribution System, Planning33
and Construction34
(St. Tammany)35
Payable from General Obligation Bonds36
Priority 2	$ 125,00037
Priority 5	$ 140,00038
Total	$ 265,00039
50/M58CROWLEY40
(1725)Wastewater Treatment Facility Improvements 41
($250,000 Local Match)42
(Acadia)43
Payable from General Obligation Bonds44
Priority 1	$ 210,00045 ENROLLEDHB NO. 2
Page 94 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1726)South Avenue H at Bayou Blanc, Bridge Replacement, 1
Planning and Construction2
(Acadia)3
Payable from General Obligation Bonds4
Priority 1	$ 965,0005
50/M59CULLEN6
(1727)Potable Water and Distribution System Improvements, 7
Planning and Construction8
(Webster)9
Payable from General Obligation Bonds10
Priority 1	$ 85,00011
Priority 2	$ 100,00012
Priority 5	$ 250,00013
Total	$ 435,00014
50/M60DELCAMBRE15
(556) Water Distribution and Storage System Improvements,16
Planning and Construction17
(Vermilion)18
Payable from General Obligation Bonds19
Priority 1	$ 450,00020
(1730)Delcambre Shrimp Festival Pavilion, Planning21
and Construction22
(Iberia)23
Payable from General Obligation Bonds24
Priority 1	$ 150,00025
50/M61DELHI26
(680) Richland Parish Recreational and Learning Center, 27
Planning and Construction28
(Richland)29
Payable from General Obligation Bonds30
Priority 1	$ 800,00031
Priority 2	$ 60,00032
Priority 5	$ 100,00033
Total	$ 960,00034
50/M64DEQUINCY35
(649) New City Hall, Planning and Construction36
(Calcasieu)37
Payable from General Obligation Bonds38
Priority 5	$ 1,150,00039
(1731)Buxton Creek Improvements, Planning and Construction40
(Calcasieu)41
Payable from General Obligation Bonds42
Priority 1	$ 475,00043 ENROLLEDHB NO. 2
Page 95 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1732)Sewer Rehabilitation of 8" Sewer on Holly 1
and North Division Streets and 18" Sewer 2
on William Still Road - City of Dequincy3
(Calcasieu)4
Payable from General Obligation Bonds5
Priority 1	$ 500,0006
Priority 5	$ 50,0007
Total	$ 550,0008
50/M65DERIDDER9
(1115)City of DeRidder - Cecil Doyle Road10
Railroad Crossing and Sewer System11
Expansion, Planning and Construction12
(Beauregard)13
Payable from General Obligation Bonds14
Priority 2 $ 150,00015
(1733)Community Recreational Building and Shelter, 16
Planning and Construction and/or Acquisition 17
and Rehabilitation of the Existing Facility 18
($1,500,000 Local Match)19
(Beauregard)20
Payable from General Obligation Bonds21
Priority 1	$ 1,250,00022
Priority 2	$ 100,00023
Priority 5	$ 1,975,00024
Total	$ 3,325,00025
50/M68DONALDSONVILLE26
(1734)Riverfront Development, Planning and Construction27
(Ascension)28
Payable from General Obligation Bonds29
Priority 1	$ 780,00030
50/M69DOWNSVILLE31
(1736)Downsville Recreational Facility Improvements,32
Planning and Construction33
(Lincoln)34
Payable from General Obligation Bonds35
Priority 1	$ 145,00036
50/M74DUSON37
(557) Duson Street Improvements, Planning38
and Construction39
(Acadia)40
Payable from General Obligation Bonds41
 Priority 2 $ 150,00042
50/M75EAST HODGE43
(1279)Village Hall Improvements, Planning and Construction44
(Jackson)45
Payable from General Obligation Bonds46
Priority 2	$ 250,00047
Pending approval of the capital outlay budget request pursuant to the provisions of R.S.48
39:112.49 ENROLLEDHB NO. 2
Page 96 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/M80ERATH1
(1737)Wastewater Treatment Plant Improvement, 2
Planning and Construction3
(Vermilion)4
Payable from General Obligation Bonds5
Priority 1	$ 140,0006
(1738)Public Works Facility, Planning and Construction7
(Vermilion)8
Payable from General Obligation Bonds9
Priority 1	$ 450,00010
50/M85FARMERVILLE11
(1739)Sewage, Water, Lift Station, and Other Infrastructure, 12
Planning and Construction13
(Union)14
Payable from General Obligation Bonds15
Priority 1	$ 1,300,00016
50/M87FERRIDAY17
(1741)Downtown Revitalization, Planning and Construction 18
($253,750 In-Kind Local Match)19
(Concordia)20
Payable from General Obligation Bonds21
Priority 1	$ 1,395,00022
50/M89FLORIEN23
(1742)Water Facility Improvements, Planning and Construction24
(Sabine)25
Payable from General Obligation Bonds26
Priority 1	$ 465,00027
50/M90FOLSOM28
(1743)Road and Street Repairs, Planning and Construction 29
(Cash and/or In-Kind Match Required)30
(St. Tammany)31
Payable from General Obligation Bonds32
Priority 1	$ 30,00033
Priority 5	$ 20,00034
Total	$ 50,00035
50/M93FOREST HILL36
(658) Renovation of Community Facilities, Planning 37
and Construction ($375,000 Local Match)38
(Rapides)39
Payable from General Obligation Bonds40
Priority 1	$ 330,00041
Priority 2	$ 50,00042
Priority 5	$ 620,00043
Total	$ 1,000,00044 ENROLLEDHB NO. 2
Page 97 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/M94FRANKLIN1
(    )Renovation of Old Crowell Elementary2
Building, Planning and Construction3
(St. Mary)4
Payable from General Obligation Bonds5
Priority 2	$ 1,825,0006
Pending approval of a capital outlay budget request pursuant to the provisions of R.S.7
39:112.8
50/M95FRANKLINTON9
(817) Industrial Park Property and Acquisition and Development10
(Washington)11
Payable from General Obligation Bonds12
Priority 1	$ 115,00013
Priority 2	$ 60,00014
Total	$ 175,00015
50/MA3GOLDEN MEADOW16
(818) Upgrade to North Sewerage Treatment Plant,17
Planning and Construction18
(Lafourche)19
Payable from General Obligation Bonds20
Priority 5	$ 175,00021
50/MA5GONZALES22
(1330)Improvements on LA 3038, Including Patching, Repairing, 23
and Overlaying of the Highway, Planning and Construction24
(Ascension)25
Payable from General Obligation Bonds26
Priority 1	$ 800,00027
(    )City of Gonzales GO Program LA Highway 3028
Corridor, Planning and Construction29
(Ascension)30
Payable from General Obligation Bonds31
Priority 5	$ 55,00032
50/MA6GRAMBLING33
(878) Community Center Expansion,34
Planning and Construction35
(Lincoln)36
Payable from General Obligation Bonds37
Priority 2	$ 125,00038
(1745)Wastewater System Expansion 39
(Lincoln)40
Payable from General Obligation Bonds41
Priority 1	$ 295,00042 ENROLLEDHB NO. 2
Page 98 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MA9GRAND COTEAU1
(1747)Fire Truck and Fire Station Upgrades 2
(St. Landry)3
Payable from General Obligation Bonds4
Priority 1	$ 10,0005
(1748)Police and Utility Departments Roof, Air 6
Conditioning Unit for Town Hall, Handheld 7
Meter Reader, Abandon and Plug Water Well8
(St. Landry)9
Payable from General Obligation Bonds10
Priority 1	$ 60,00011
Priority 2	$ 25,00012
Priority 5	$ 65,00013
Total	$ 150,00014
50/MB1GRAND ISLE15
(713) Historic Recreation Center/Community Center, 16
Planning and Construction17
(Jefferson)18
Payable from General Obligation Bonds19
Priority 1	$ 100,00020
Priority 2	$ 465,00021
Priority 5	$ 175,00022
Total	$ 740,00023
50/MB2GRAYSON24
(1749)Infrastructure Improvements, Planning and Construction25
(Caldwell)26
Payable from General Obligation Bonds27
Priority 1	$ 85,00028
(1750)Children's Playground and Pavilion, Planning and 29
Construction (Cash and/or In-Kind Match Required)30
(Caldwell)31
Payable from General Obligation Bonds32
Priority 1	$ 60,00033
50/MB4GREENWOOD34
(501) Multipurpose Community Center, Planning 35
and Construction ($200,000 Local Match)36
(Caddo)37
Payable from General Obligation Bonds38
Priority 1	$ 200,00039
50/MB5GRETNA40
(618) McDonoghville Fire Station, Land Acquisition,41
Planning and Construction42
(Jefferson)43
Payable from General Obligation Bonds44
Priority 1	$ 1,000,00045
Priority 5	$ 175,00046
Total	$ 1,175,00047 ENROLLEDHB NO. 2
Page 99 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(620) City Hall Exterior and Interior Renovation,1
Planning and Construction2
(Jefferson)3
Payable from General Obligation Bonds4
Priority 2	$ 150,0005
Priority 5	$ 250,0006
Total	$ 400,0007
(621) Lion's Club Conversion to Gretna Senior Center8
Planning and Construction9
(Jefferson)10
Payable from General Obligation Bonds11
Priority 5	$ 300,00012
(1751)Gretna Water Tower, Planning and Construction13
(Jefferson)14
Payable from General Obligation Bonds15
Priority 1	$ 200,00016
(1752)Cultural Center for the Arts, Planning and Construction 17
($300,000 Local Match, $500,000 Parish Match)18
(Jefferson)19
Payable from General Obligation Bonds20
Priority 1	$ 1,600,00021
(1753)New Garden Park Street Lighting, Planning and Construction22
(Jefferson)23
Payable from General Obligation Bonds24
Priority 1	$ 530,00025
(1754)Mel Ott Multipurpose Center, Planning and Construction 26
($150,000 Cash and/or In-Kind Local Match)27
(Jefferson)28
Payable from General Obligation Bonds29
Priority 1	$ 250,00030
(1755)Jefferson Parish Courthouse Drainage Project, 31
Planning and Construction 32
(Jefferson)33
Payable from General Obligation Bonds34
Priority 1	$ 3,700,00035
(1756)Sewer Plant Primary Clarifier, Planning and Construction36
(Jefferson)37
Payable from General Obligation Bonds38
Priority 1	$ 200,00039
(1757)Mel Ott Exterior Lighting and Improvements40
(Jefferson)41
Payable from General Obligation Bonds42
Priority 1	$ 225,00043
(1758)Hancock Street Canal Improvements (Kepler Street 44
- Virgil Street), Planning and Construction45
(Jefferson)46
Payable from General Obligation Bonds47
Priority 1	$ 250,00048
Priority 5	$ 1,700,00049
Total	$ 1,950,00050 ENROLLEDHB NO. 2
Page 100 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MB6GROSSE TETE1
(1760)Sewer System Improvements, Planning and Construction2
(Iberville)3
Payable from General Obligation Bonds4
Priority 1	$ 1,050,0005
(1761)Road Rehabilitation and Improvement Program6
(Iberville)7
Payable from General Obligation Bonds8
Priority 1	$ 350,0009
50/MB7GUEYDAN10
(1762)Street Improvements, Planning and Construction 11
($112,000 Local Match)12
(Vermilion)13
Payable from General Obligation Bonds14
Priority 1	$ 300,00015
50/MB9HAMMOND16
(478) Pine Hill Sewer System Improvements and Municipal17
Tie-In, Planning and Construction18
(Tangipahoa)19
Payable from General Obligation Bonds20
Priority 2	$ 300,00021
(479) Sewer System Improvements, Oxidation Ditch22
Conversion, Sequencing Batch Reactor and 23
Pump Station, Planning and Construction24
(Tangipahoa)25
Payable from General Obligation Bonds26
Priority 2	$ 175,00027
Priority 5	$ 725,00028
Total	$ 900,00029
(626) Police Station, Acquisition and Renovation,30
Planning and Construction31
(Tangipahoa)32
Payable from General Obligation Bonds33
Priority 1	$ 600,00034
(627) Air Traffic Control Tower, Planning and Construction35
($450,000 Local Match)36
(Tangipahoa)37
Payable from General Obligation Bonds38
Priority 1	$ 750,00039
50/MC1HARAHAN40
(1764)Magnolia Boulevard Drainage - West Magnolia41
to Jefferson Highway, Planning and Construction42
(Jefferson)43
Payable from General Obligation Bonds44
Priority 1	$ 45,00045 ENROLLEDHB NO. 2
Page 101 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1765)Penfold Place Drainage, Planning and Construction1
(Jefferson)2
Payable from General Obligation Bonds3
Priority 1	$ 50,0004
50/MC3HAUGHTON5
(1766)Additional Water Supply Wells, Planning and Construction6
(Bossier)7
Payable from General Obligation Bonds8
Priority 1	$ 325,0009
50/MC5HEFLIN10
(1283)Conversion of Gym into Multipurpose Facility, 11
Planning and Construction12
(Webster)13
Payable from General Obligation Bonds14
Priority 1	$ 150,00015
Priority 5	$ 335,00016
Total	$ 485,00017
50/MC9HOMER18
(460) Town of Homer, Town Hall Renovations, 19
Planning and Construction20
(Claiborne)21
Payable from General Obligation Bonds22
Priority 1	$ 150,00023
Priority 2	$ 225,00024
Total	$ 375,00025
50/MD1HORNBECK26
(415) Emergency Connection with Anacoco Water System,27
Planning and Construction28
(Vernon)29
Payable from General Obligation Bonds30
Priority 1	$ 300,00031
Priority 2	$ 200,00032
Total	$ 500,00033
(491) Emergency Connection with Sabine Parish 34
Water Works District 1, Planning and 35
Construction36
(Sabine)37
Payable from General Obligation Bonds38
Priority 2	$ 500,00039
(599) Rehabilitation of Elevated Water Tank,40
Planning and Construction41
(Vernon)42
Payable from General Obligation Bonds43
Priority 2	$ 180,00044
(1767)New City Hall, Planning and Construction45
(Vernon)46
Payable from General Obligation Bonds47
Priority 1	$ 550,00048 ENROLLEDHB NO. 2
Page 102 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1768)Emergency Connection with West Vernon 1
Waterworks District and Inline Booster Station, 2
Planning and Construction3
(Vernon)4
Payable from General Obligation Bonds5
Priority 1	$ 300,0006
Priority 5	$ 600,0007
Total	$ 900,0008
50/MD5INDEPENDENCE9
(304) Independence Area Community Pavilion,10
Planning and Construction11
(Tangipahoa)12
Payable from General Obligation Bonds13
Priority 1	$ 155,00014
(305) Italian Cultural Museum, Planning 15
and Construction16
(Tangipahoa)17
Payable from General Obligation Bonds18
Priority 5	$ 25,00019
(1770)Sewerage Treatment and Sewer/Water Lines 20
Repairs, Planning and Construction 21
(Cash and/or In-Kind Match Required)22
(Tangipahoa)23
Payable from General Obligation Bonds24
Priority 1	$ 50,00025
50/MD6IOTA26
(727) Town of Iota Street Improvements,27
Planning and Construction28
(Acadia)29
Payable from General Obligation Bonds30
Priority 2	$ 125,00031
50/ME1JEAN LAFITTE32
(1772)Lafitte Seafood Pavilion, Planning and Construction 33
(Jefferson)34
Payable from General Obligation Bonds35
Priority 1	$ 1,235,00036
Priority 2	$ 100,00037
Total	$ 1,325,00038
50/ME2JEANERETTE39
(559) Sewer Treatment Facility Upgrade, Planning and 40
Construction ($912,500 Federal and/or Local Match)41
(Iberia)42
Payable from General Obligation Bonds43
Priority 2	$ 190,00044
50/ME6JONESVILLE45
(1189)Drainage Improvements, Planning and Construction46
(Catahoula)47
Payable from General Obligation Bonds48
Priority 2	$ 1,580,00049 ENROLLEDHB NO. 2
Page 103 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1777)Pumping Station Upgrade, Planning and Construction1
(Catahoula)2
Payable from General Obligation Bonds3
Priority 1	$ 60,0004
50/ME8KAPLAN5
(725) City of Kaplan Street Improvements,6
Reconstruction, and 8th Street Bank7
Stabilization/Shoulder Mitigation,8
Planning and Construction9
(Vermilion)10
Payable from General Obligation Bonds11
Priority 2	$ 150,00012
(731) Public Safety Complex, Planning and Construction13
(Vermilion)14
Payable from General Obligation Bonds15
Priority 1	$ 300,00016
50/MF1KENNER17
(972) Kenner City Park, Phase 2, Planning and 18
Construction19
(Jefferson)20
Payable from General Obligation Bonds21
Priority 2	$ 40,00022
(973) Railroad Crossing Signal at Taylor and Kenner 23
Avenue, Planning and Construction 24
(Jefferson)25
Payable from General Obligation Bonds26
Priority 2	$ 100,00027
(974) Lincoln Manor Subdivision Drainage28
Improvements, Planning and Construction29
(Jefferson)30
Payable from General Obligation Bonds31
Priority 5	$ 150,00032
(977) Third Street Corridor Improvements - South 33
Kenner (includes Rivertown and Armstrong 34
Airport Buyout Property)35
(Jefferson)36
Payable from General Obligation Bonds37
Priority 2	$ 25,00038
(979) City of Kenner Emergency Operations 39
Center, Planning and Construction40
(Jefferson)41
Payable from General Obligation Bonds42
Priority 2	$ 25,00043
(980) Wastewater System Corrective Measures 44
(Jefferson)45
Payable from General Obligation Bonds46
Priority 1	$ 525,00047
Priority 2	$ 65,00048
Total	$ 590,00049 ENROLLEDHB NO. 2
Page 104 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(981) Drainage Improvements Along Idaho Avenue, 26th Street1
to West Napoleon Canal, Planning and Construction2
(Jefferson)3
Payable from General Obligation Bonds4
Priority 1	$ 150,0005
Priority 2	$ 25,0006
Total	$ 175,0007
(986) Lake Trail Drainage Improvement, Planning 8
and Construction9
(Jefferson)10
Payable from General Obligation Bonds11
Priority 2	$ 40,00012
50/MF2KENTWOOD13
(434) Recreational Facility Property Acquisition, Planning, 14
Site Preparation, Master Recreation Plan and Construction15
(Tangipahoa)16
Payable from General Obligation Bonds17
Priority 1	$ 375,00018
Priority 5	$ 50,00019
Total	$ 425,00020
50/MF9LAKE CHARLES21
(436) National Hurricane Museum and Science Center, 22
Planning and Construction23
(Calcasieu)24
Payable from General Obligation Bonds25
Priority 1	$ 300,00026
(439) Riverside Park Improvements, Planning27
and Construction ($750,000 Local Match)28
(Calcasieu)29
Payable from General Obligation Bonds30
Priority 2	$ 100,00031
Priority 5	$ 650,00032
Total	$ 750,00033
(584) Infrastructure Improvements for Economic Development, 34
Planning and Construction ($3,000,000 Local Match)35
(Calcasieu)36
Payable from General Obligation Bonds37
Priority 2	$ 1,000,00038
Priority 5	$ 6,000,00039
Total	$ 7,000,00040
(1030)Wastewater Treatment Plant B/C Force Main41
Segment No. 2, Planning and Construction42
($4,195,000 Local Match)43
(Calcasieu)44
Payable from General Obligation Bonds45
Priority 2	$ 1,000,00046
Priority 5	$ 8,530,00047
Total	$ 9,530,00048 ENROLLEDHB NO. 2
Page 105 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1779)Relocation of Lakeshore Drive, to Include Eastbound1
and Westbound I-10 Ramps to Ryan Street, 2
Planning and Construction3
(Calcasieu)4
Payable from General Obligation Bonds5
Priority 1	$ 400,0006
50/MG2 LECOMPTE7
(1104)Sewerage System, Planning and8
Construction9
(Rapides)10
Payable from General Obligation Bonds11
Priority 2	$ 120,00012
50/MG3LEESVILLE13
(603) Rehabilitation and/or Replacement of Lift Stations14
and Equipment, Planning and Construction15
(Vernon)16
Payable from General Obligation Bonds17
Priority 2	$ 600,00018
(604) City of Leesville, Acquisition of East19
Central Water System, Planning and20
Construction21
(Vernon)22
Payable from General Obligation Bonds23
   Priority 2 	$ 280,00024
(2059)University Parkway Sewer System and 25
Wastewater Treatment Facilities Enhancements,26
Planning and Construction27
(Vernon)28
Payable from General Obligation Bonds29
Priority 1	$ 3,190,00030
(1782)Highway 28 and 171 Sewer and Water Extension31
(Vernon)32
Payable from General Obligation Bonds33
Priority 1	$ 795,00034
(1783)Recreational Complex Renovations and Improvements, 35
Including New Swimming Facility, Planning and Construction36
 ($500,000 Local Match and $150,000 Federal Match)37
(Vernon)38
Payable from General Obligation Bonds39
Priority 1	$ 155,00040
50/MG4LEONVILLE41
(869) Leonville Boat Launch Facility42
Improvements - Phase II, Planning and43
Construction44
(St. Landry)45
Payable from General Obligation Bonds46
   Priority 2 $ 150,00047 ENROLLEDHB NO. 2
Page 106 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MG8LIVONIA1
(833) Purchase and Installation of Law Enforcement 2
Surveillance System, Planning and Construction3
(Pointe Coupee)4
Payable from General Obligation Bonds5
Priority 2	$ 120,0006
50/MG9 LOCKPORT7
(684) Lockport Sewer Collection System Rehabilitation,8
Planning, Inspection and Repairs9
(Lafourche)10
Payable from General Obligation Bonds11
Priority 5	$ 110,00012
50/MH1LOGANSPORT13
(1786)Wastewater System Improvements, Planning and 14
Construction ($150,000 Cash and/or In-Kind Match)15
(De Soto)16
Payable from General Obligation Bonds17
Priority 1	$ 100,00018
(1787)Logansport Industrial Buildings, Planning and Construction19
(De Soto)20
Payable from General Obligation Bonds21
Priority 1	$ 50,00022
50/MH3LOREAUVILLE23
(568) Loreauville Water Tower Improvements, Planning 24
and Construction25
(Iberia)26
Payable from General Obligation Bonds27
Priority 1	$ 75,00028
Priority 2	$ 50,00029
Total	$ 125,00030
(1788)Loreauville Wastewater Treatment Plant Improvements 31
and Demolition Project, Planning and Construction32
(Iberia)33
Payable from General Obligation Bonds34
Priority 1	$ 265,00035
50/MH6MADISONVILLE36
(1789)Emergency Facilities, Renovations, 37
Planning and Construction38
(St. Tammany)39
Payable from General Obligation Bonds40
Priority 1	$ 70,00041
(1790)Madisonville Bulkhead 42
(St. Tammany)43
Payable from General Obligation Bonds44
Priority 1	$ 100,00045 ENROLLEDHB NO. 2
Page 107 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MH8MANDEVILLE1
(1331)Mandeville Trailhead Property Acquisition,2
Planning and Construction3
(St. Tammany)4
Payable from General Obligation Bonds5
Priority 1	$ 400,0006
(1791)Water Tower, Construction7
(St. Tammany)8
Payable from General Obligation Bonds9
Priority 1	$ 2,200,00010
(2046)Mandeville Police Surveillance Cameras11
(St. Tammany)12
Payable from General Obligation Bonds13
Priority 2	$ 325,00014
Priority 5	$ 125,00015
Total	$ 450,00016
50/MI1MANSFIELD17
(616) City of Mansfield, Wastewater Collection18
System Improvements, Planning and19
Construction20
(DeSoto)21
Payable from General Obligation Bonds22
   Priority 2 	$ 50,00023
(1792)Turn Lane US Highway 84 (McArthur Drive) 24
and Highway 175 (The Lake Road)25
(De Soto)26
Payable from General Obligation Bonds27
Priority 1	$ 240,00028
50/MI4MARINGOUIN29
(243) Governmental/Multi-Purpose Facility, Planning 30
and Construction31
(Iberville)32
Payable from General Obligation Bonds33
Priority 2	$ 120,00034
50/MI6MARKSVILLE35
(703) Mary Bethune Community Center, previously 36
known as D.A. Jordan Community Center, for 37
the City of Marksville, Planning and 38
Construction39
(Avoyelles)40
Payable from General Obligation Bonds41
Priority 2	$ 475,00042
Priority 5	$ 225,00043
Total	$ 700,00044 ENROLLEDHB NO. 2
Page 108 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MI8MAURICE1
(1794)Civic Center - Post Hurricane Shelter 2
($400,000 Local Match)3
(Vermilion)4
Payable from General Obligation Bonds5
Priority 1	$ 250,0006
(1795)Wastewater Treatment Facility and Collection System 7
Upgrade ($1,792,800 Federal Match)8
(Vermilion)9
Payable from General Obligation Bonds10
Priority 1	$ 600,00011
50/MJ1MELVILLE12
(409) Multi-Purpose Community Center, 13
Planning and Construction 14
(St. Landry)15
Payable from General Obligation Bonds16
Priority 1	$ 50,00017
(410) Police Department Renovation,18
Planning and Construction19
(St. Landry)20
Payable from General Obligation Bonds21
Priority 2	$ 50,00022
50/MJ3MER ROUGE23
(1796)Boutz Lane Renovations24
(Morehouse)25
Payable from General Obligation Bonds 26
Priority 1	$ 500,00027
50/MJ4MERRYVILLE28
(518) Rehabilitation of Water Tank, Town of29
Merryville, LA., Planning and Construction30
(Beauregard)31
Payable from General Obligation Bonds32
   Priority 2 	$ 215,00033
(519) Sewerage Pump Station and Aeration System 34
Improvements, Planning and Construction35
(Beauregard)36
Payable from General Obligation Bonds37
Priority 2	$ 225,00038
50/MJ5MINDEN39
(1102)Potable Water Ground Storage Tank, 40
Planning and Construction41
(Webster)42
Payable from General Obligation Bonds43
Priority 1	$ 215,00044
Priority 2	$ 250,00045
Priority 5	$ 400,00046
Total	$ 865,00047 ENROLLEDHB NO. 2
Page 109 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MJ6MONROE1
(1215)I-20 Interchange Improvement and Kansas Garrett Connector, 2
Kansas Lane Connector, Planning and Construction 3
($1,000,000 Local and $6,000,000 Federal Match)4
(Ouachita)5
Payable from General Obligation Bonds6
Priority 1	$ 3,850,0007
(1217)Monroe Regional Airport Terminal, Planning and8
Construction ($40,500,000 Federal and/or Local Match)9
(Ouachita)10
Payable from General Obligation Bonds11
Priority 2	$ 2,000,00012
(1315)US Highway 165 South; US Highway 16513
Business Route Connector Phase I, 14
Planning and Construction15
(Ouachita)16
Payable from General Obligation Bonds17
  Priority 2 $ 75,00018
(1798)Downtown Development District Facilities and Infrastructure 19
for River Front, Design and Construction 20
(Ouachita)21
Payable from General Obligation Bonds22
Priority 5	$ 250,00023
(1799)US Highway 165 South, US Highway 165 Business 24
Route Connector ($450,000 Local Match)25
(Ouachita)26
Payable from General Obligation Bonds27
Priority 1	$ 3,125,00028
50/MJ7MONTGOMERY29
(1206)Town Hall and Community Center,30
Planning and Construction31
(Grant)32
Payable from General Obligation Bonds33
Priority 2	$ 175,00034
Priority 5	$ 215,00035
Total	$ 390,00036
50/MJ8MONTPELIER37
(1332)Administration Building, Acquisition, 38
Planning and Construction39
(St. Helena)40
Payable from General Obligation Bonds41
Priority 1	$ 190,00042
50/MK2MORGAN CITY43
(1169)Lake End Parkway Cabins, Planning and Construction44
(St. Mary)45
Payable from General Obligation Bonds46
Priority 1	$ 1,000,00047 ENROLLEDHB NO. 2
Page 110 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1173)LA Hwy. 70 Drainage Improvements,1
Planning and Construction2
(St. Mary)3
Payable from General Obligation Bonds4
Priority 2	$ 1,470,0005
(1174)Brashear Avenue Drainage Canal Conversion to 6
Subsurface Drainage, Planning and Construction7
(St. Mary)8
Payable from General Obligation Bonds9
Priority 1	$ 3,590,00010
(1800)Martin Luther King Jr. Boulevard Reconstruction 11
(St. Mary)12
Payable from General Obligation Bonds13
Priority 1	$ 500,00014
Priority 5	$ 500,00015
Total	$ 1,000,00016
(1801)Docking Facility on Lake Palourde, Planning and17
Construction ($20,000 Cash and/or In-Kind Match)18
(St. Mary)19
Payable from General Obligation Bonds20
Priority 1	$ 300,00021
50/MK7NAPOLEONVILLE22
(704) Village of Napoleonville Catch Basin Project,23
Planning and Construction24
(Assumption)25
Payable from General Obligation Bonds26
Priority 2	$ 75,00027
(1802)Community Center Improvements28
(Assumption)29
Payable from General Obligation Bonds30
Priority 5	$ 25,00031
50/MK9NATCHITOCHES32
(1122)Texas and Pacific Railway Natchitoches Depot33
Redevelopment 34
(Natchitoches)35
Payable from General Obligation Bonds36
Priority 1	$ 200,00037
(1124)East Natchitoches By-Pass Project - Phase I 38
(LA Hwy 6 East to LA Hwy 1226/Williams Avenue), 39
Planning and Construction40
(Natchitoches)41
Payable from General Obligation Bonds42
Priority 1	$ 250,00043
Priority 2	$ 350,00044
Priority 5	$ 5,400,00045
Total	$ 6,000,00046 ENROLLEDHB NO. 2
Page 111 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1803)Industrial Park South, Sewer Improvements, Access Road, 1
and Land Acquisition, Planning and Construction 2
($1,100,000 Local Match)3
(Natchitoches)4
Payable from General Obligation Bonds5
Priority 1	$ 625,0006
(1804)South Natchitoches Drainage Improvements, including 7
Adjacent Roadwork, Planning and Construction8
(Natchitoches)9
Payable from General Obligation Bonds10
Priority 1	$ 50,00011
Priority 5	$ 1,475,00012
Total	$ 1,525,00013
50/ML1NEW IBERIA14
(1805)Frontage Road Improvements, Real Estate, 15
Planning and Construction16
(Iberia)17
Payable from General Obligation Bonds18
Priority 1	$ 150,00019
(1806)Sewer System Upgrade Area D Tributary, Planning 20
and Construction ($360,000 Local Match)21
(Iberia)22
Payable from General Obligation Bonds23
Priority 1	$ 1,080,00024
Priority 2	$ 420,00025
Priority 5	$ 160,00026
Total	$ 1,660,00027
(1807)Armenco Branch Canal Drainage Improvements 28
(Non-State Match Required)29
(Iberia)30
Payable from General Obligation Bonds31
Priority 1	$ 2,250,00032
50/ML2NEW LLANO33
(1808)Expansion of Wastewater System South of Fort Polk34
Entrance Road, Real Estate, Acquisition, Planning35
and Construction36
(Vernon)37
Payable from General Obligation Bonds38
Priority 1	$ 1,650,00039
(1809)Water System Improvements, Construction 40
($800,000 Local Match)41
(Vernon)42
Payable from General Obligation Bonds43
Priority 1	$ 1,500,00044
(1810)Street Improvements, Planning and Construction45
(Vernon)46
Payable from General Obligation Bonds47
Priority 1	$ 75,00048
Priority 2	$ 245,00049
Total	$ 320,00050 ENROLLEDHB NO. 2
Page 112 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/ML3NEW ORLEANS1
(189) Behrman Park Improvements - New Soccer Facility, 2
Planning and Construction, Master Planning3
(Orleans)4
Payable from General Obligation Bonds5
Priority 1	$12,000,0006
(444) Eastern New Orleans Hospital, Planning, 7
Design, and Construction 8
(Orleans)9
Payable from General Obligation Bonds10
Priority 1	$15,130,00011
(462) Old Charity Hospital Adaptive Re-Use,12
Planning and Construction13
(Orleans)14
Payable from the balance of the State General Fund by 15
Statutory Dedications out of the 2004 Overcollections 16
Fund previously allocated under the authority of Act 203 17
of 2007 for Higher Education, LSU Health Sciences 18
Center - Health Care Services Division, Medical Center 19
of Louisiana at New Orleans Planning, Land Acquisition 20
and Construction21
(Orleans)	$13,000,00022
Provided, however, that this appropriation is contingent upon the obligation of an equal23
amount of funding from the Hazard Mitigation Grant Program by the Federal Emergency24
Management Agency for the University Medical Center in New Orleans project.25
(934) George W. Carver Playground, Renovations and 26
Upgrades, Including Repair and Renovation of 27
Basketball Courts and Pavilion, Renovations to 28
Bathrooms and Concession Building, Demolition 29
of Existing Playground and Installation of New 30
Play Equipment, Planning and Construction31
(Orleans)32
Payable from General Obligation Bonds33
Priority 1	$ 450,00034
(935) Taylor Pool and Playground, Renovations and Upgrades,35
Including Repair and Renovation of Basketball Courts36
and Pavilion, Replacing Perimeter Fencing, Installation37
of New Water Fountains, and Re-Grade Fields, Planning38
and Construction39
(Orleans)40
Payable from General Obligation Bonds41
Priority 1	$ 250,00042
(1811)Construction of Opelousas Street Extension from 43
Behrman Avenue to Obannon Street and Construction44
of Patterson Drive Extension from Hendee Street to 45
Obannon Street, Planning and Construction46
(Orleans)47
Payable from General Obligation Bonds48
Priority 1	$ 3,325,00049 ENROLLEDHB NO. 2
Page 113 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1812)Norman Playground Basketball Gym, 1
Planning and Construction2
(Orleans)3
Payable from General Obligation Bonds4
Priority 1	$ 1,980,0005
Priority 5	$ 1,000,0006
Total	$ 2,980,0007
(1813)Holiday Drive Roadway Construction 8
(Gen. MacArthur to Behrman) 9
(Orleans)10
Payable from General Obligation Bonds11
Priority 1	$ 1,300,00012
(1814)New Multi-Department Facility, Planning and Construction13
(Orleans)14
Payable from General Obligation Bonds15
Priority 1	$ 200,00016
(1815)Treme Center Improvements, Planning and Construction17
(Orleans)18
Payable from General Obligation Bonds19
Priority 1	$ 200,00020
(1816)Rosenwald Community Center, Planning and Construction21
(Orleans)22
Payable from General Obligation Bonds23
Priority 1	$ 400,00024
(1817)Fourth District Police Station, Planning and Construction25
(Orleans)26
Payable from General Obligation Bonds27
Priority 1	$ 300,00028
(1818)Algiers Playgrounds and Parks, Renovation of Restrooms,29
Lighting, Fencing, and Playground Equipment30
(Orleans)31
Payable from General Obligation Bonds32
Priority 1	$ 225,00033
Priority 2	$ 25,00034
Priority 5	$ 25,00035
Total	$ 275,00036
(1819)Algiers Fire Station, Planning and Construction 37
(Orleans)38
Payable from General Obligation Bonds39
Priority 1	$ 150,00040
Priority 2	$ 50,00041
Total	$ 200,00042
(1820)Historic Algiers Courthouse Renovation, Planning 43
and Construction (Cash and/or In- Kind Match Required)44
(Orleans)45
Payable from General Obligation Bonds46
Priority 2	$ 25,00047
Priority 5	$ 100,00048
Total	$ 125,00049 ENROLLEDHB NO. 2
Page 114 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/ML4NEW ROADS1
(1191)Community Park Redevelopment, 2
Planning and Construction3
(Pointe Coupee)4
Payable from General Obligation Bonds5
Priority 2	$ 260,0006
(1821)Railroad Avenue Sewer Lift Station, 7
Planning and Construction8
(Pointe Coupee)9
Payable from General Obligation Bonds10
Priority 1	$ 150,00011
50/MM4OIL CITY12
(1823)Highway 538 Water Line Extension, 13
Planning and Construction14
(Caddo)15
Payable from General Obligation Bonds16
Priority 1	$ 425,00017
50/MM6OPELOUSAS18
(1232)Opelousas Infrastructure Renovation19
Program, Planning and Construction20
(St. Landry)21
Payable from General Obligation Bonds22
Priority 2	$ 200,00023
Priority 5	$ 60,00024
Total	$ 260,00025
(1824)Tourism Center and South Park Project26
(St. Landry)27
Payable from General Obligation Bonds28
Priority 1	$ 140,00029
50/MM8PARKS30
(422) Municipal Complex, Planning and Construction31
(St. Martin)32
Payable from General Obligation Bonds33
Priority 1	$ 150,00034
Priority 2	$ 250,00035
Total	$ 400,00036
50/MM9PATTERSON37
(691) Replacement of Water and Gas Meters in38
Patterson, Planning and Construction39
(St. Mary)40
Payable from General Obligation Bonds41
Priority 2	$ 150,00042
Priority 5	$ 50,00043
Total	$ 200,00044
(1826)Catherine Street Paving and Drainage, Engineering 45
and Construction46
(St. Mary)47
Payable from General Obligation Bonds48
Priority 1	$ 100,00049 ENROLLEDHB NO. 2
Page 115 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MN1PEARL RIVER1
(1827)Sewer Treatment Plant Upgrade, Planning 2
and Construction (Supplemental Funding)3
(St. Tammany)4
Payable from General Obligation Bonds5
Priority 1	$ 250,0006
(1828)River Dredging, Planning and Construction7
(St. Tammany)8
Payable from General Obligation Bonds9
Priority 1	$ 420,00010
50/MN3PINEVILLE11
(1830)Pinecrest Roadway/Sidewalk Improvements,12
Planning and Construction13
(Rapides)14
Payable from General Obligation Bonds15
Priority 1	$ 305,00016
50/MN5PLAIN DEALING17
(484) Wastewater Treatment Plant Improvements,18
Planning and Construction19
(Bossier)20
Payable from General Obligation Bonds21
Priority 1	$ 160,00022
Priority 5	$ 160,00023
Total	$ 320,00024
50/MN8PLEASANT HILL25
(1832)Street Reconstruction and Overlay, Planning 26
and Construction27
(Sabine)28
Payable from General Obligation Bonds29
Priority 1	$ 140,00030
(1833)Rehabilitate Two Elevated Water Tanks and 31
Rehabilitate Water Well, Planning and Construction32
(Sabine)33
Payable from General Obligation Bonds34
Priority 1	$ 160,00035
50/MO1PONCHATOULA36
(871) Consolidated Law Enforcement Complex,37
Acquisition, Planning and Construction38
(Tangipahoa)39
Payable from General Obligation Bonds40
Priority 5	$ 1,250,00041
(1187)Downtown Parking Lot, Acquisition,42
Planning and Construction43
(Tangipahoa)44
Payable from General Obligation Bonds45
Priority 5	$ 500,00046 ENROLLEDHB NO. 2
Page 116 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MO2PORT ALLEN1
(1834)New Water Well at Avenue D2
(West Baton Rouge)3
Payable from General Obligation Bonds4
Priority 1	$ 10,0005
50/MO7QUITMAN6
(1835)Repair of Wastewater Treatment Facility7
(Jackson)8
Payable from General Obligation Bonds9
Priority 1	$ 120,00010
50/MO9RAYVILLE11
(1306)Railroad Spur, Planning and Construction12
(Richland)13
Payable from General Obligation Bonds14
Priority 1	$ 250,00015
(1837)Hangar, T-Hangar, Paved Areas and Utilities for Rayville 16
Airport, Town of Rayville, Planning and Construction17
(Richland)18
Payable from General Obligation Bonds19
Priority 1	$ 300,00020
50/MP3RICHWOOD21
(1082)Richwood Municipal Complex, Planning, Construction, 22
and Land Acquisition (Local Match Required)23
(Ouachita)24
Payable from General Obligation Bonds25
Priority 1	$ 270,00026
50/MP5RINGGOLD27
(763) Town Hall/Civic Center Renovations, and Remodeling, 28
Planning and Construction29
(Bienville)30
Payable from General Obligation Bonds31
Priority 1	$ 100,00032
50/MP8ROSEDALE33
(1219)Village of Rosedale Drainage Improvement34
Project - Griffin, Deer Buck and Hunters Run,35
Planning and Construction36
(Iberville)37
Payable from General Obligation Bonds38
Priority 2	$ 60,00039
50/MQ1ROSEPINE40
(522) Water System Improvements, Town of Rosepine,41
Planning and Construction42
(Vernon)43
Payable from General Obligation Bonds44
Priority 1	$ 200,00045 ENROLLEDHB NO. 2
Page 117 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(523) Rehabilitation of Elevated Water Tank, 1
Planning and Construction2
(Vernon)3
Payable from General Obligation Bonds4
Priority 2	$ 245,0005
(561) Rosepine Wastewater Treatment Plant Improvements,6
Planning and Construction7
(Vernon)8
Payable from General Obligation Bonds9
Priority 1	$ 550,00010
Priority 5	$ 1,070,00011
Total	$ 1,620,00012
(1840)Rosepine Recreational Ball Park Acquisition, Planning 13
and Construction 14
(Vernon)15
Payable from General Obligation Bonds16
Priority 1	$ 75,00017
50/MQ2RUSTON18
(1841)Goodwin Road Reconstruction, Planning and Construction 19
($350,000 Local Match)20
(Lincoln)21
Payable from General Obligation Bonds22
Priority 1	$ 100,00023
50/MQ3ST. FRANCISVILLE24
(474) Natural Gas Distribution System Rehabilitation 25
and Improvement, Planning and Construction26
(West Feliciana)27
Payable from General Obligation Bonds28
Priority 1	$ 305,00029
(1842)Sewer System Rehabilitation and Improvement, 30
Planning and Construction 31
(West Feliciana)32
Payable from General Obligation Bonds33
Priority 1	$ 395,00034
50/MQ4ST. JOSEPH35
(1843)Proposed City Hall/Convention Center, 36
Planning and Construction37
(Tensas)38
Payable from General Obligation Bonds39
Priority 1	$ 250,00040
(    )Repairs and Upgrades to Water System,41
Planning and Construction42
(Tensas)43
Payable from General Obligation Bonds44
Priority 2	$ 600,00045
Priority 5	$ 5,400,00046
Total	$ 6,000,00047
Pending submittal and approval of a capital outlay budget request pursuant to the provisions48
of R.S. 39:112.49 ENROLLEDHB NO. 2
Page 118 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MQ5ST. MARTINVILLE1
(1844)Sewer Upgrade, Planning and Construction2
(St. Martin)3
Payable from General Obligation Bonds4
Priority 1	$ 350,0005
Priority 2	$ 60,0006
Total	$ 410,0007
(1845)Sewer Lift Station Improvements 8
(St. Martin)9
Payable from General Obligation Bonds10
Priority 1	$ 205,00011
(1846)Upgrade Wastewater Treatment Plant 12
and Wastewater Pre-Treatment System13
(St. Martin)14
Payable from General Obligation Bonds15
Priority 1	$ 900,00016
50/MQ6SALINE17
(1847)Water Tower Repairs, Planning and Construction 18
(Non-State Match Required)19
(Bienville)20
Payable from General Obligation Bonds21
Priority 1	$ 15,00022
50/MQ8SCOTT23
(751) Apollo Road Extension (Rue Du Belier and Dulles Drive24
Intersection to Old Spanish Trail and Apollo Road25
Intersection), Planning, Construction, and Land Acquisition26
(Lafayette)27
Payable from General Obligation Bonds28
Priority 1	$ 2,500,00029
Priority 5	$12,500,00030
Total	$15,000,00031
(753) Scott Events Center, Planning and Construction32
(Lafayette)33
Payable from General Obligation Bonds34
Priority 1	$ 60,00035
Priority 5	$ 50,00036
Total	$ 110,00037
(754) I-10 North Frontage Road, Planning and Construction38
(Lafayette)39
Payable from General Obligation Bonds40
Priority 1	$ 990,00041
(1296)Water and Sewer Line Installation along Apollo Road42
Extension, Planning and Construction43
(Lafayette)44
Payable from General Obligation Bonds45
Priority 2	$ 375,00046
(1848)I-10 North Frontage Road Sewer and Water, 47
Planning and Construction48
(Lafayette)49
Payable from General Obligation Bonds50
Priority 1	$ 900,00051 ENROLLEDHB NO. 2
Page 119 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1849)Frontage Road Along Interstate 10, 1
Planning and Construction 2
(Non-State Match Required)3
(Lafayette)4
Payable from General Obligation Bonds5
Priority 1	$ 720,0006
50/MR1SHREVEPORT7
(635) Junior Golf Training Facilities (The First Tee) for 8
Jerry Tim Brooks Lakeside Golf Course, Planning 9
and Construction10
(Caddo)11
Payable from General Obligation Bonds12
Priority 1	$ 200,00013
(636) ARTSPACE at the West Edge - Downtown Shreveport, 14
Planning and Construction15
(Caddo)16
Payable from General Obligation Bonds17
Priority 1	$ 700,00018
(1850)Shreveport Arts Center Replacement, Planning, Construction 19
and Equipment 20
(Caddo)21
Payable from General Obligation Bonds22
Priority 1	$ 505,00023
Priority 5	$ 255,00024
Total	$ 760,00025
(1851)Convention Center Complex, Planning and Construction 26
($85,000,000 Local Funds)27
(Caddo)28
Payable from General Obligation Bonds29
Priority 1	$12,000,00030
(2061)C.C. Antoine Park, Planning and Construction31
(Caddo)32
Payable from General Obligation Bonds33
Priority 2	$ 175,00034
Priority 5	$ 225,00035
Total	$ 400,00036
Pending submittal and approval of a capital outlay budget request pursuant to the provisions37
of R.S. 39:112.38
50/MR2SIBLEY39
(662) Wastewater Collection Improvements, Planning 40
and Construction41
(Webster)42
Payable from General Obligation Bonds43
Priority 1	$ 100,00044
Priority 5	$ 365,00045
Total	$ 465,00046 ENROLLEDHB NO. 2
Page 120 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(663) Wastewater Treatment Facilities Improvements1
(Webster)2
Payable from General Obligation Bonds3
Priority 1	$ 110,0004
Priority 2	$ 200,0005
Total	$ 310,0006
(1853)Water Wells and Distribution System, Land Acquisition, 7
Planning and Construction8
(Webster)9
Payable from General Obligation Bonds10
Priority 1	$ 550,00011
50/MR4SIKES12
(997) Village of Sikes Water System Extensions and13
Improvements, Planning and Construction14
(Winn)15
Payable from General Obligation Bonds16
 Priority 1	$ 1,700,00017
50/MR5SIMMESPORT18
(1855)Multipurpose Evacuation Shelter/Community Center in 19
Simmesport, Acquisitions, Utilities, Planning 20
and Construction21
(Avoyelles)22
Payable from General Obligation Bonds23
Priority 1	$ 400,00024
50/MR7SIMSBORO25
(794) Village of Simsboro Renovate "Old"26
Fire Station Into Town Hall, Planning27
and Construction28
(Lincoln)29
Payable from General Obligation Bonds30
   Priority 2 $ 100,00031
(1856)Water Well and Water Main32
(Lincoln)33
Payable from General Obligation Bonds34
Priority 1	$ 150,00035
(1857)Village of Simsboro, Extend Sewer Line/New Subdivision36
(Lincoln)37
Payable from General Obligation Bonds38
Priority 1	$ 130,00039
(1858)Village of Simsboro Renovate "Old" Fire Station 40
into Town Hall, Planning and Construction41
(Lincoln)42
Payable from General Obligation Bonds43
Priority 1	$ 100,00044 ENROLLEDHB NO. 2
Page 121 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MR9SLIDELL1
(1859)W-14 Culverting Project2
(St. Tammany)3
Payable from General Obligation Bonds4
Priority 1	$ 2,000,0005
(1860)City Barn Flood Gates, Planning and Construction6
(St. Tammany)7
Payable from General Obligation Bonds8
Priority 1	$ 25,0009
50/MS4SPRINGFIELD10
(470) Water System Planning and Construction11
(Livingston)12
Payable from General Obligation Bonds13
Priority 1	$ 800,00014
Priority 5	$ 455,00015
Total	$ 1,255,00016
50/MS5SPRINGHILL17
(1861)Wastewater Collection System Improvements, 18
Planning and Construction19
(Webster)20
Payable from General Obligation Bonds21
Priority 1	$ 75,00022
50/MS7STERLINGTON23
(1146)Service Road, Planning and Construction24
(Ouachita)25
Payable from General Obligation Bonds26
Priority 1	$ 120,00027
(1156)Wastewater Treatment Improvements - Headworks 28
Structure, Planning and Construction29
(Ouachita)30
Payable from General Obligation Bonds31
Priority 1	$ 50,00032
Priority 5	$ 160,00033
Total	$ 210,00034
(1862)Sanitary Sewer Collection System Along US 165 Corridor, 35
and Sewer Treatment Facility Upgrade/Improvements, 36
Planning, Construction, Land Acquisition ($1,000,000 37
Local Match)38
(Ouachita)39
Payable from General Obligation Bonds40
Priority 1	$ 900,00041
50/MS9SULPHUR42
(1058)City of Sulphur, East Mimosa Street, Planning 43
and Construction44
(Calcasieu)45
Payable from General Obligation Bonds46
Priority 2	$ 230,00047 ENROLLEDHB NO. 2
Page 122 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1864)Regional Wastewater Treatment Facility 1
Sludge Belt Press and Conveyor System 2
(Calcasieu)3
Payable from General Obligation Bonds4
Priority 1	$ 240,0005
(1865)Northside Industrial Park Rail Spur Extension, Planning 6
($692,960 Cash and/or In-Kind Match)7
(Calcasieu)8
Payable from General Obligation Bonds9
Priority 1	$ 2,210,00010
50/MT1SUN11
(773) Renovate and Repair Water Tank, Planning12
and Construction13
(St. Tammany)14
Payable from General Obligation Bonds15
   Priority 2 $ 130,00016
(1866)Town Hall Renovations, Planning and Construction17
(St. Tammany)18
Payable from General Obligation Bonds19
Priority 1	$ 100,00020
Priority 5	$ 20,00021
Total	$ 120,00022
50/MT2SUNSET23
(1867)Sunset Municipal Complex 24
(St. Landry)25
Payable from General Obligation Bonds26
Priority 1	$ 120,00027
Priority 2	$ 70,00028
Total	$ 190,00029
50/MT3TALLULAH30
(1868)Improvements to Sewer System, Planning and Construction31
(Madison)32
Payable from General Obligation Bonds33
Priority 1	$ 180,00034
(1869)Sewer Treatment Plant Improvements City of Tallulah 35
(Madison)36
Payable from General Obligation Bonds37
Priority 1	$ 120,00038
(1871)Industrial Park Development, Planning and Construction39
(Non-State Match Required)40
(Madison)41
Payable from General Obligation Bonds42
Priority 1	$ 5,00043
Priority 2	$ 500,00044
Total	$ 505,00045
(1872)City Hall Repairs and Renovation46
(Madison)47
Payable from General Obligation Bonds48
Priority 1	$ 70,00049 ENROLLEDHB NO. 2
Page 123 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MT5THIBODAUX1
(612) LA Hwy 20 (N. Canal Blvd.) Widening, 2
Planning and Construction3
(Lafourche)4
Payable from General Obligation Bonds5
Priority 1	$ 1,400,0006
Priority 2	$ 250,0007
Priority 5	$ 540,0008
Total	$ 2,190,0009
(1873)Tiger Drive Bridge Replacement, Planning and 10
Construction ($1,742,200 Local Match)11
(Lafourche)12
Payable from General Obligation Bonds13
Priority 1	$ 250,00014
50/MT6TICKFAW15
(685) Waste Water Treatment Facility Generators,16
Planning and Construction17
(Tangipahoa)18
Payable from General Obligation Bonds19
Priority 5	$ 25,00020
(1874)Drainage Improvements on Highway 442 East 21
and West, Planning and Construction22
(Tangipahoa)23
Payable from General Obligation Bonds24
Priority 1	$ 115,00025
50/MU2VIDALIA26
(469) Development of a Slackwater Port on the Mississippi27
River, Planning and Construction28
(Concordia)29
Payable from General Obligation Bonds30
Priority 1	$ 5,000,00031
Priority 5	$ 5,000,00032
Total	$10,000,00033
(1875)Vidalia River Front Development, Design, Planning 34
and Construction of Emergency Shelter35
(Concordia)36
Payable from General Obligation Bonds37
Priority 1	$ 1,100,00038
(1877)Vidalia Industrial Park Development, Planning and 39
Construction ($16,710,800 Local, Federal, Other and 40
In-Kind Match to be Provided in Phases as Indicated in 41
the Capital Outlay Request)42
(Concordia)43
Payable from General Obligation Bonds44
Priority 1	$ 750,00045 ENROLLEDHB NO. 2
Page 124 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MU4VILLE PLATTE1
(1292)City of Ville Platte Infrastructure Improvements,2
Planning and Construction3
(Evangeline)4
Payable from General Obligation Bonds5
Priority 2 	$ 500,0006
50/MU5VINTON7
(689) Town of Vinton, Vinton Street Improvements8
(Calcasieu)9
Payable from General Obligation Bonds10
Priority 1	$ 200,00011
(1880)Water Treatment Plant Improvements, 12
Including Rehabilitation of Elevated Water 13
Storage Tank, Site and Electrical Improvements, 14
Planning and Construction15
(Calcasieu)16
Payable from General Obligation Bonds17
Priority 1	$ 250,00018
50/MU6VIVIAN19
(486) Town of Vivian, Street Improvements, Planning 20
and Construction21
(Caddo)22
Payable from General Obligation Bonds23
Priority 1	$ 400,00024
(500) Water and Wastewater System Improvements 25
and Extension, Planning and Construction26
(Caddo)27
Payable from General Obligation Bonds28
Priority 1	$ 525,00029
Priority 5	$ 1,140,00030
Total	$ 1,665,00031
50/MU7WALKER32
(150) Widening of Highway 447 and I-12 Overpass33
 Improvements, Environmental Phase 34
Commencement, Planning and Construction35
(Livingston)36
Payable from General Obligation Bonds37
Priority 1	$ 300,00038
50/MV2WEST MONROE39
(1127)West Ouachita Senior Center Facility - ADA, 40
Federal Confidentiality Requirements, and 41
Building Code Improvement Project, 42
Planning and Construction43
(Ouachita)44
Payable from General Obligation Bonds45
Priority 1	$ 150,00046 ENROLLEDHB NO. 2
Page 125 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1128)Creation of a Hurricane/Disaster Shelter by 1
Expanding the West Ouachita Senior Center, 2
Planning and Construction3
(Ouachita)4
Payable from General Obligation Bonds5
Priority 1	$ 530,0006
Priority 5	$ 700,0007
Total	$ 1,230,0008
(1881)Sparta Reuse Demonstration Project 9
($4,000,000 Local Match) 10
(Ouachita)11
Payable from General Obligation Bonds12
Priority 1	$ 320,00013
50/MV3WESTLAKE14
(344) New Water Well, Planning and Construction15
(Calcasieu)16
Payable from General Obligation Bonds17
Priority 2	$ 425,00018
(648) Ellis and Linda Drive Improvements, City of Westlake, 19
Planning and Construction20
(Calcasieu)21
Payable from General Obligation Bonds22
Priority 1	$ 1,000,00023
Priority 5	$ 1,125,00024
Total	$ 2,125,00025
(827) Police and Emergency Response Facility, 26
Planning and Construction ($800,000 Local Match)27
(Calcasieu)28
Payable from General Obligation Bonds29
Priority 2	$ 150,00030
Priority 5	$ 850,00031
Total	$ 1,000,00032
(1883)Golf Course Development, Planning and Development 33
($5,000,000 Local/Other Match Consisting of Cash 34
and/or In-Kind, with First Year not to Exceed $200,000)35
(Calcasieu)36
Payable from General Obligation Bonds37
Priority 1	$ 4,175,00038
50/MV4WESTWEGO39
(741) Sala Avenue Street and Infrastructure Improvements 40
(Jefferson)41
Payable from General Obligation Bonds42
Priority 1	$ 850,00043
Priority 2	$ 250,00044
Total	$ 1,100,00045
(743) Water Plant Improvements, Planning and 46
Construction (50% Local Match)47
(Jefferson)48
Payable from General Obligation Bonds49
Priority 1	$ 1,000,00050 ENROLLEDHB NO. 2
Page 126 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(744) Fire Station, Planning and Construction1
(Jefferson)2
Payable from General Obligation Bonds3
Priority 5	$ 3,135,0004
(747) Drainage Improvements, Phase I5
(Jefferson)6
Payable from General Obligation Bonds7
Priority 1	$ 500,0008
(750) Street Improvements, Planning and9
Construction10
(Jefferson)11
Payable from General Obligation Bonds12
Priority 5	$ 1,000,00013
(1884)Emergency Preparedness Building, 14
Planning and Construction15
(Jefferson)16
Payable from General Obligation Bonds17
Priority 1	$ 1,250,00018
(1885)Farmers/Fisheries Market, Planning and Construction 19
(Supplemental Funding)20
(Jefferson)21
Payable from General Obligation Bonds22
Priority 1	$ 1,410,00023
(1887)Performing Arts Center/Community Center 24
Phase III, IV, and Equipment25
(Jefferson)26
Payable from General Obligation Bonds27
Priority 1	$ 250,00028
Priority 2	$ 350,00029
Total	$ 600,00030
(1888)Park Land and Improvements, Including 31
Improvements to Existing Parks and Land 32
Acquisition, Planning and Construction33
(Jefferson)34
Payable from General Obligation Bonds35
Priority 1	$ 1,850,00036
Priority 5	$ 275,00037
Total	$ 2,125,00038
(2040)Riverboat Landing Phase IV, Planning and Construction 39
($200,000 Local Match)40
(Jefferson)41
Payable from General Obligation Bonds42
Priority 1	$ 150,00043
50/MV7WINNFIELD44
(1889)Winn Correctional Center Water Line Replacement, 45
Planning and Construction46
(Winn)47
Payable from General Obligation Bonds48
Priority 1	$ 200,00049 ENROLLEDHB NO. 2
Page 127 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MV8WINNSBORO1
(1890)Winnsboro Farmer's Market, Planning and 2
Construction3
(Franklin)4
Payable from General Obligation Bonds5
Priority 1	$ 220,0006
(1891)Community Center, Renovations, Planning and Construction7
(Franklin)8
Payable from General Obligation Bonds9
Priority 1	$ 215,00010
(1892)Winnsboro Industrial Park Street Reconstruction, Planning 11
and Construction12
(Franklin)13
Payable from General Obligation Bonds14
Priority 1	$ 320,00015
50/MW2YOUNGSVILLE16
(421) Community Center, Planning and Construction17
(Lafayette)18
Payable from General Obligation Bonds19
Priority 1	$ 3,000,00020
Priority 2	$ 175,00021
Priority 5	$ 215,00022
Total	$ 3,390,00023
(1893)Highway 92 Realignment Near Youngsville, 24
Construction, Right of Way, and Utilities25
(Lafayette)26
Payable from General Obligation Bonds27
Priority 1	$ 700,00028
(1894)Youngsville Parkway Road Project, Including29
Waterline Improvement and Roadway Lighting, 30
Planning and Construction31
(Lafayette)32
Payable from General Obligation Bonds33
Priority 1	$ 7,150,00034
(1895)Beltway Road Project, Planning and Construction 35
(Local Match Required)36
(Lafayette)37
Payable from General Obligation Bonds38
Priority 1	$ 5,785,00039
50/MW3ZACHARY40
(467) Water System Improvements, Planning41
and Construction42
(East Baton Rouge)43
Payable from General Obligation Bonds44
Priority 2	$ 70,00045
Priority 5	$ 230,00046
Total	$ 300,00047 ENROLLEDHB NO. 2
Page 128 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(468) Natural Gas Distribution System Improvements,1
Planning and Construction2
(East Baton Rouge)3
Payable from General Obligation Bonds4
Priority 1	$ 100,0005
(1896)Annison Plantation Renovation 6
(East Baton Rouge)7
Payable from General Obligation Bonds8
Priority 1	$ 140,0009
(1897)Sewer Testing and Rehabilitation, Planning and Construction10
(East Baton Rouge)11
Payable from General Obligation Bonds12
Priority 1	$ 2,275,00013
50/MW4ZWOLLE14
(842) North Zwolle Sanitary Sewer Improvements, 15
Planning and Construction16
(Sabine)17
Payable from the balance of General Obligation18
Bond proceeds previously allocated under the19
authority of Act 22 of 2011 for Zwolle 20
Installation of Sewer System Improvements,21
Planning and Construction (Sabine) $ 60,21322
(1285)Installation of New 6" Waterline and Water Well, 23
Planning and Construction ($25,000 Local Match)24
(Sabine)25
Payable from General Obligation Bonds26
Priority 1	$ 395,00027
50/MW6ST. GABRIEL28
(1338)St. Gabriel Police Department  - Land/29
Building Acquisition Project, Planning30
and Construction31
(Iberville)32
Payable from General Obligation Bonds33
   Priority 2 	$ 200,00034
50/MW8CENTRAL35
(412) Administration Building36
(East Baton Rouge)37
Payable from General Obligation Bonds38
Priority 1	$ 200,00039
Priority 5	$ 1,715,00040
Total	$ 1,915,00041
(413) Expand, Repair, and Modify City of Central 42
Drainage System, Planning and Construction43
(East Baton Rouge)44
Payable from General Obligation Bonds45
Priority 1	$ 100,00046
Priority 2	$ 275,00047
Total	$ 375,00048 ENROLLEDHB NO. 2
Page 129 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/N03AUDUBON NATURE INSTITUTE, INC.1
(1898)Audubon 2020 Exhibits (50% Local Match)2
(Orleans)3
Payable from General Obligation Bonds4
Priority 1	$10,000,0005
Priority 2	$ 1,200,0006
Priority 5	$12,000,0007
Total	$23,200,0008
(1899)Audubon 2000 Renovations, Planning and Construction 9
($25,300,000 Local Match) 10
(Orleans)11
Payable from General Obligation Bonds12
Priority 1	$ 3,410,00013
50/N05NEW ORLEANS EXHIBITION HALL AUTHORITY14
(403) Hall A Renovation, Planning and Construction15
(Orleans)16
Payable from General Obligation Bonds17
Priority 1	$20,000,00018
50/N06STATE FAIR OF LOUISIANA19
(286) Hirsch Memorial Coliseum/Evacuation Shelter 20
Rehabilitation, Planning and Construction21
(Caddo)22
Payable from General Obligation Bonds23
Priority 1	$ 100,00024
50/N07ST. BERNARD PARISH SHERIFF25
(1901)Arabi Sub-Station, Planning and Construction26
(St. Bernard)27
Payable from General Obligation Bonds28
Priority 1	$ 20,00029
Priority 2	$ 75,00030
Total	$ 95,00031
50/N12LOUISIANA CHILDREN'S MUSEUM32
(957) Early Learning Village, Planning, Design, Construction 33
and Equipment ($18,750,000 Local Match)34
(Orleans)35
Payable from General Obligation Bonds36
Priority 1	$ 3,185,00037
Priority 5	$14,115,00038
Total	$17,300,00039
50/N13CHENNAULT INDUSTRIAL AIRPARK AUTHORITY 40
(230) New Air Cargo Facility, Planning and Construction41
($1,100,000 Local Match)42
(Calcasieu)43
Payable from General Obligation Bonds44
Priority 2	$ 350,00045
Priority 5	$ 2,750,00046
Total	$ 3,100,00047 ENROLLEDHB NO. 2
Page 130 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(411) New Aviation Hangar and Ground Support 1
Equipment Facility, Planning and Construction 2
($1,000,000 Local Match)3
(Calcasieu)4
Payable from General Obligation Bonds5
Priority 2	$ 260,0006
Priority 5	$ 1,825,0007
Total	$ 2,085,0008
(1903)Multi Purpose Building, Planning and Construction 9
($1,825,000 Local Match)10
(Calcasieu)11
Payable from General Obligation Bonds12
Priority 1	$ 725,00013
(1904)New Hangar, Planning and Construction14
(Calcasieu)15
Payable from General Obligation Bonds16
Priority 1	$ 3,100,00017
50/N21BIOMEDICAL RESEARCH FOUNDATION18
(821) P.E.T. Clinical and Research Imaging Equipment19
(Caddo)20
Payable from General Obligation Bonds21
Priority 2	$ 4,800,00022
50/N25WYES TV NEW ORLEANS23
(214) WYES Katrina Rebuilding/Equipment Project,24
Planning and Construction25
(Orleans)26
Payable from General Obligation Bonds27
Priority 1	$ 1,000,00028
Priority 5	$ 2,400,00029
Total	$ 3,400,00030
50/N33ENGLAND ECONOMIC AND INDUSTRIAL  31
DEVELOPMENT DISTRICT32
(    )England Airpark Hospital Renovations,33
Planning and Construction34
(Rapides)35
Payable from General Obligation Bonds36
Priority 2	$13,600,00037
Payable from the balance of General Obligation38
Bond Proceeds previously allocated under 39
the authority of Act 27 of 2006 for 40
Department of Health and Hospitals Office41
of Public Health, New Office of Public Health42
Central Laboratory Facility, Planning and 43
Construction (Orleans) 	$ 1,400,00044
Total	$15,000,00045
Pending submittal and approval of a capital outlay budget request pursuant to the provisions46
of R.S. 39:112.47 ENROLLEDHB NO. 2
Page 131 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/N38NEW ORLEANS REGIONAL BUSINESS PARK1
(1905)Multi-Purpose Athletic Complex, Planning and Construction2
(Orleans)3
Payable from General Obligation Bonds4
Priority 1	$ 100,0005
50/N41BATON ROUGE METRO AIRPORT6
(929) Airport Aviation Business Park, 7
Planning and Construction8
(East Baton Rouge)9
Payable from General Obligation Bonds10
Priority 2	$ 350,00011
Priority 5	$ 250,00012
Total	$ 600,00013
50/N49ST. HELENA SHERIFF’S OFFICE14
(566) Renovation of Sheriff’s Office Administration Building15
in Greensburg, Planning and Construction16
(St. Helena)17
Payable from General Obligation Bonds18
Priority 2	$ 190,00019
Priority 5	$ 50,00020
Total	$ 240,00021
50/N51NEW ORLEANS JAZZ & HERITAGE FOUNDATION22
(256) The Jazz & Heritage Center Renovation and Addition,23
1225 North Rampart, Planning and Construction24
(Orleans)25
Payable from General Obligation Bonds26
Priority 1	$ 75,00027
Priority 5	$ 100,00028
Total	$ 175,00029
50/N62PLAQUEMINES PARISH LAW ENFORCEMENT DISTRICT30
(1266)Sheriff's Training Center, Planning and Construction31
(Plaquemines)32
Payable from General Obligation Bonds33
Priority 1	$ 1,875,00034
50/N70REGIONAL TRANSIT AUTHORITY35
(1907)Airport to CBD Regional Rail Line 36
($5,000,000 Local and $10,000,000 Federal Match)37
(Orleans)38
Payable from General Obligation Bonds39
Priority 1	$ 500,00040
Priority 5	$ 4,500,00041
Total	$ 5,000,00042 ENROLLEDHB NO. 2
Page 132 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/N71NORTH LAFOURCHE CONSERVATION1
LEVEE & DRAINAGE DISTRICT2
(785) 80 Arpent Canal Dredging, Caldwell3
Plantation to Laurel Valley, Planning 4
and Construction5
(Lafourche)6
Payable from General Obligation Bonds7
Priority 2	$ 550,0008
Priority 5	$ 560,0009
Total	$ 1,110,00010
(786) Lockport to Larose Levee Project East, Phase 1,11
Valentine to Larose, Planning and Construction12
(Lafourche)13
Payable from General Obligation Bonds14
   Priority 2 	$ 300,00015
(791) Zeller/Larousse Forced Drainage Area16
System Improvements, Planning and 17
Construction18
(Lafourche)19
Payable from General Obligation Bonds20
Priority 2	$ 145,00021
50/N74NATIONAL WORLD WAR II MUSEUM22
(790) Capital Expansion Project, Including Parking23
Structure, Skybridge, Andrew Higgins Plaza, 24
Train Station Experience and Canopy,25
Planning and Construction26
(Orleans)27
Payable from General Obligation Bonds28
Priority 1	$ 2,000,00029
Priority 5	$15,000,00030
Total	$17,000,00031
(1908)National D-Day Museum Expansion, Design, 32
Planning, Acquisition, and Construction 33
($2,000,000 Federal/Local Match) 34
(Orleans)35
Payable from General Obligation Bonds36
Priority 1	$11,520,00037
50/N98KINGSLEY HOUSE38
(1305)Kingsley House Acquisition, Renovations, 39
New Construction and Major Repairs 40
(Orleans)41
Payable from General Obligation Bonds42
Priority 1	$ 550,00043
Priority 2	$ 200,00044
Priority 5	$ 5,140,00045
Total	$ 5,890,00046 ENROLLEDHB NO. 2
Page 133 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NA2LAFAYETTE AIRPORT COMMISSION1
(605) Construction of Cargo Facilities, 2
Planning and Construction3
(Lafayette)4
Payable from General Obligation Bonds5
Priority 1	$ 5,000,0006
50/NACWARD 9 RECREATION DISTRICT RAPIDES7
(1912)Hard Surfaced Parking Lot Improvements, 8
Planning and Construction9
(Rapides)10
Payable from General Obligation Bonds11
Priority 1	$ 425,00012
50/NAGRECREATION DISTRICT NO. 6 ALLEN13
PARISH14
(292) Recreation Complex Final Phase - 8 Lane15
Track & Oval, Multi - Purpose Building, and16
Other Recreational Improvements Recreation17
District 6, Allen Parish, Planning and Construction18
(Allen)19
Payable from General Obligation Bonds20
  Priority 2 $ 75,00021
50/NAJEFFORTS OF GRACE, INC.22
(1914)Ashe Too, Planning and Construction23
(Orleans)24
Payable from General Obligation Bonds25
Priority 1	$ 910,00026
50/NAYOGDEN MUSEUM OF SOUTHERN ART 27
(1228)Ogden Museum/Taylor Library Renovation,28
Planning and Construction29
(Orleans)30
Payable from General Obligation Bonds31
Priority 1	$ 265,00032
Priority 5	$ 1,000,00033
Total	$ 1,265,00034
50/NB3MCKINLEY HIGH SCHOOL ALUMNI35
(2052)Equipment and Renovations, Planning and Construction36
(East Baton Rouge)37
Payable from General Obligation Bonds38
Priority 1	$ 155,00039
50/NBBLIGHTHOUSE FOR THE BLIND40
(2039)Economic Development Project, 41
Planning and Construction42
(Orleans)43
Payable from General Obligation Bonds44
Priority 1	$ 2,850,00045
Priority 5	$ 1,450,00046
Total	$ 4,300,00047 ENROLLEDHB NO. 2
Page 134 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NBCCAPITOL CITY FAMILY HEALTH CENTER1
(1916)New Federally Qualified Health Center, Acquisitions, 2
Planning and Construction ($71,000 Federal Match) 3
(Supplemental Funding)4
(Ascension, East Baton Rouge)5
Payable from General Obligation Bonds6
Priority 1	$ 4,250,0007
50/NBGSOUTH LOUISIANA DEVELOPMENT COUNCIL8
(834) Additions/Modifications to the Center for Economic9
Growth and Technology, Planning and Construction10
(Assumption, Lafourche, St. Charles, St. James,11
St. John the Baptist, St. Mary, Terrebonne)12
Payable from General Obligation Bonds13
Priority 2	$ 260,00014
(1096)SLEC/Nicholls Field and Drainage Improvements,15
Planning and Construction16
(Lafourche)17
Payable from General Obligation Bonds18
Priority 2	$ 1,000,00019
(1917)Center for Economic Growth and Technology20
(Lafourche)21
Payable from General Obligation Bonds22
Priority 1	$ 375,00023
50/NBMBLACK RIVER LAKE COMMISSION24
(1918)Black River Lake Drainage Structure Installation, 25
Studies, Permits, Planning and Construction26
(Concordia)27
Payable from General Obligation Bonds28
Priority 1	$ 1,000,00029
Priority 5	$ 2,500,00030
Total	$ 3,500,00031
50/NBTDISTRICT 2 ENHANCEMENT CORPORATION32
(1138)St. Claude Community Development and 33
Beautification Project, Planning and Construction34
(Orleans)35
Payable from General Obligation Bonds36
Priority 1	$ 35,00037
(1139)New Orleans East Walking and Bike Trail, 38
Planning and Construction39
(Orleans)40
Payable from General Obligation Bonds41
Priority 1	$ 45,00042
(1141)Eastern New Orleans Senior Center,43
Planning and Construction44
(Orleans)45
Payable from General Obligation Bonds46
Priority 2	$ 25,00047
Pending approval of capital outlay budget request pursuant to the provisions of R.S. 39:112.48 ENROLLEDHB NO. 2
Page 135 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NC2BATON ROUGE RECREATION AND PARKS COMMISSION1
(671) Central Community Sports Park, 2
Planning and Construction3
(East Baton Rouge)4
Payable from General Obligation Bonds5
Priority 1	$ 1,050,0006
Priority 2	$ 100,0007
Total	$ 1,150,0008
(1131)Anna T. Jordan Site and Facility Improvements 9
(Non-State Match Required)10
(East Baton Rouge)11
Payable from General Obligation Bonds12
Priority 1	$ 480,00013
Priority 5	$ 965,00014
Total	$ 1,445,00015
(1135)Bluebonnet Swamp Nature Center Education 16
Building /Conference Center, Planning and Construction17
(East Baton Rouge)18
Payable from General Obligation Bonds19
Priority 1	$ 660,00020
Priority 5	$ 500,00021
Total	$ 1,160,00022
(1919)Children's Museum, Planning and Construction 23
($5,000,000 Local Match)24
(East Baton Rouge)25
Payable from General Obligation Bonds26
Priority 1	$ 425,00027
Priority 5	$ 600,00028
Total	$ 1,025,00029
(1921)Pete Goldsby Field Renovations 30
(Non-State Cash and/or In-Kind Match Required)31
(East Baton Rouge)32
Payable from General Obligation Bonds33
Priority 1	$ 50,00034
50/NCJWATER WORKS DISTRICT 14 CALCASIEU 35
(1924)Complete New Water System Water Works District 14, 36
Ward 5, Calcasieu Parish37
(Calcasieu)38
Payable from General Obligation Bonds39
Priority 1	$ 250,00040
50/NCNSOUTH TOLEDO BEND WATERWORKS DISTRICT41
(1926)Esto Booster Station Discharge and Supply Line 42
Replacement43
(Sabine)44
Payable from General Obligation Bonds45
Priority 1	$ 635,00046 ENROLLEDHB NO. 2
Page 136 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NCYRECONCILE NEW ORLEANS, INC.1
(1927)Reconcile New Orleans, Renovation and Expansion Project, 2
Central City New Orleans, Planning and Construction3
(Orleans)4
Payable from General Obligation Bonds5
Priority 1	$ 625,0006
50/NCZLOUISIANA ASSOCIATION FOR THE BLIND7
(188) Louisiana Association for the Blind8
Manufacturing Facility and Organization9
Headquarters, Planning and Construction10
(Caddo)11
Payable from General Obligation Bonds12
   Priority 2 	$ 200,00013
(1928)Louisiana Association for the Blind Safety Walk 14
Manufacturing Facility, Planning and Construction15
(Caddo)16
Payable from General Obligation Bonds17
Priority 1	$ 250,00018
50/ND3ORLEANS PARISH SHERIFF19
(793) Mental Health Facility, Planning and Construction20
(Orleans)21
Payable from General Obligation Bonds22
Priority 1	$ 100,00023
Priority 5	$ 2,400,00024
Total	$ 2,500,00025
50/ND6LAFOURCHE PARISH RECREATION DISTRICT26
(1103)Shower Facilities for Recreation Center,27
Planning and Construction28
(Lafourche)29
Payable from General Obligation Bonds30
Priority 2	$ 50,00031
50/NDCPOINTE COUPEE PARISH LIBRARY32
(1929)Innis Library Emergency Center Construction 33
(Pointe Coupee)34
Payable from General Obligation Bonds35
Priority 1	$ 1,830,00036
50/NDNOPPORTUNITIES INDUSTRIALIZATION37
CENTER OF OUACHITA38
(1081)A New Vocational - Technical Center for39
Opportunities Industrialization of Ouachita,40
Inc., Planning and Construction41
(Ouachita)42
Payable from General Obligation Bonds43
   Priority 2	$ 125,00044 ENROLLEDHB NO. 2
Page 137 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1227)A New Educational Building for 1
Opportunities Industrialization Center of2
Ouachita, Inc., Planning and Construction3
(Ouachita)4
Payable from General Obligation Bonds 5
Priority 2	$ 500,0006
Priority 5	$ 180,0007
Total	$ 680,0008
50/NDXNEW ORLEANS COUNCIL ON AGING9
(985) Office and Senior Community Center, 10
Planning, Land Acquisition, and Construction11
(Orleans)12
Payable from General Obligation Bonds13
Priority 1	$ 125,00014
50/NE7WEST CALCASIEU COMMUNITY CENTER15
(1930)Community Center - Phase 2, Event Center, Planning 16
and Construction17
(Calcasieu)18
Payable from General Obligation Bonds19
Priority 1	$ 5,500,00020
50/NEBLIVINGSTON PARISH FAIRGROUND AUTHORITY21
(1931)Livingston Parish Fairgrounds, Livestock Exhibition 22
Building, Planning and Construction23
(Livingston)24
Payable from General Obligation Bonds25
Priority 1	$ 250,00026
50/NERST. HELENA HOSPITAL SERVICE DISTRICT #127
(1932)Drainage and Parking Improvements, 28
Planning and Construction 29
(St. Helena)30
Payable from General Obligation Bonds31
Priority 1	$ 200,00032
50/NEZLOUISIANA ALLIANCE OF BOYS AND GIRLS CLUB33
(1935)Louisiana Alliance of Boys and Girls Club, Inc., 34
Planning, Acquisitions, and Construction35
(Statewide)36
Payable from General Obligation Bonds37
Priority 1	$ 35,00038
Priority 5	$ 150,00039
Total	$ 185,00040
50/NF8CENTRAL LOUISIANA DETENTION CENTER AUTHORITY41
(430) Central Louisiana Juvenile Detention Center, 42
Planning and Construction43
(Grant)44
Payable from General Obligation Bonds45
Priority 1	$ 1,000,00046 ENROLLEDHB NO. 2
Page 138 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NFECAJUNDOME1
(1936)Cajundome Improvements, Planning and Construction2
(Lafayette)3
Payable from General Obligation Bonds4
Priority 1	$ 750,0005
50/NFLBOGALUSA YMCA6
(1937)Bogalusa YMCA, Master Planning, Design, 7
Construction, Renovations and Equipment Acquisitions8
(Washington)9
Payable from General Obligation Bonds10
Priority 1	$ 85,00011
50/NFNDOC-DHL, INC12
(1938)Cohn Senior High Renovation, Planning and Construction13
(West Baton Rouge)14
Payable from General Obligation Bonds15
Priority 5	$ 400,00016
50/NFQALGIERS DEVELOPMENT DISTRICT17
(1166)Algiers Levee Bike-Hike Trail, Planning18
and Construction19
(Orleans)20
Payable from General Obligation Bonds21
Priority 2	$ 200,00022
(1939)New Westbank YMCA23
(Orleans)24
Payable from General Obligation Bonds25
Priority 1	$ 3,865,00026
Priority 2	$ 1,680,00027
Total	$ 5,545,00028
50/NFSSHREVEPORT-RUSTON METHODIST CAMP29
(1940)Caney Conference Center Remodel Project, 30
Planning and Construction31
(Webster)32
Payable from General Obligation Bonds33
Priority 1	$ 1,750,00034
50/NFUJACKSON PARISH DUGDEMONA 35
WATER AUTHORITY36
(432) Jackson-Bienville Reservoir, Planning37
and Construction38
(Jackson)39
Payable from General Obligation Bonds40
Priority 5	$ 100,00041 ENROLLEDHB NO. 2
Page 139 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NG2NORTHSHORE HARBOR CENTER1
(1941)Northshore Harbor Center Purchase of Additional Equipment2
(St. Tammany)3
Payable from General Obligation Bonds4
Priority 1	$ 200,0005
Priority 2	$ 75,0006
Total	$ 275,0007
50/NG6LOUISIANA BLACK HISTORY HALL OF FAME8
(1179)Museum and Cultural Center, Land Acquisition, 9
Planning and Construction10
($100,000 Cash and/or In-Kind Match)11
(East Baton Rouge)12
Payable from General Obligation Bonds13
Priority 1	$ 350,00014
Priority 2	$ 350,00015
Priority 5	$ 1,520,00016
Total	$ 2,220,00017
50/NGALINCOLN PARISH FIRE PROTECTION DISTRICT #118
(1943)Renovations to Existing Facility and Additional Buildings, 19
Acquisition, Planning and Construction20
(Lincoln)21
Payable from General Obligation Bonds22
Priority 1	$ 885,00023
50/NGEWEST VERNON WATERWORKS DISTRICT24
(1945)Expansion of Water Distribution System 25
and Booster Station West Vernon Waterworks 26
District, Planning and Construction27
(Vernon)28
Payable from General Obligation Bonds29
Priority 1	$ 900,00030
50/NGFFAMILY CENTER OF LIFE, INC31
(1946)Family Center of Hope Community Center 32
in New Orleans, Planning and Construction 33
($600,000 Local Match)34
(Orleans)35
Payable from General Obligation Bonds36
Priority 1	$ 100,00037
50/NGQSTRAND THEATRE OF SHREVEPORT38
(822) Repair and Renovation to the Strand Theatre of Shreveport39
(Caddo)40
Payable from General Obligation Bonds41
Priority 2	$ 185,00042
Priority 5	$ 1,110,00043
Total	$ 1,295,00044 ENROLLEDHB NO. 2
Page 140 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NGSRURAL FRANKLINTON WATER CORPORATION1
(1948)Black Jack Road Water Well 2
(Washington)3
Payable from General Obligation Bonds4
Priority 1	$ 25,0005
50/NGXCANE RIVER WATERWAY COMMISSION6
(480) Cane River Lake Drainage Study 7
(Natchitoches)8
Payable from General Obligation Bonds9
Priority 1	$ 75,00010
50/NGYLINCOLN PARISH SHERIFF’S OFFICE11
(1949)Public Safety Complex, Planning and Construction12
(Lincoln)13
Payable from General Obligation Bonds14
Priority 1	$ 5,050,00015
50/NHAWASHINGTON PARISH FAIR ASSOCIATION16
(1950)Replacement of and Repairs and Additions to Buildings 17
on Fairgrounds and Renovations and Repairs to Historic 18
Buildings at Mile Branch Settlement and Improvements 19
at Fairgrounds, Planning and Conservation20
(Washington)21
Payable from General Obligation Bonds22
Priority 1	$ 150,00023
50/NHCARC OF OUACHITA24
(1951)Emergency Shelter and Therapeutic Center for the 25
Developmentally Disabled, Acquisition, Planning, 26
Construction and Renovation27
(Ouachita)28
Payable from General Obligation Bonds29
Priority 1	$ 100,00030
Priority 5	$ 900,00031
Total	$ 1,000,00032
50/NHFNEW ORLEANS NEIGHBORHOOD DEVELOPMENT33
(2029)NDF Homeownership Center, Planning and Construction34
(Orleans)35
Payable from General Obligation Bonds36
Priority 5	$ 230,00037
50/NHLBOGALUSA COMMUNITY MEDICAL CENTER FOUNDATION38
(1953)Capital Improvements at Washington St. Tammany 39
Regional Medical Center40
(St. Tammany, Washington)41
Payable from General Obligation Bonds42
Priority 1	$ 3,800,00043
Priority 5	$ 2,700,00044
Total	$ 6,500,00045 ENROLLEDHB NO. 2
Page 141 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NHMTRINITY CHRISTIAN COMMUNITY1
(1954)Carrollton Community Center Renovations, 2
Land Acquisition, Site Work, Planning and Construction3
(Orleans)4
Payable from General Obligation Bonds5
Priority 1	$ 1,385,0006
50/NHNNEW ORLEANS MUSIC HALL OF FAME7
(709) South Rampart Street Historic Development Project, 8
Planning and Construction, ($300,000 Non-State Match)9
(Orleans)10
Payable from General Obligation Bonds11
Priority 1	$ 800,00012
50/NHSPLEASANT HILL-CROSSROADS WATER SYSTEM, INC.13
(1955)Pleasant Hill/Crossroads Water System, Repairs 14
and Extension, Planning and Construction15
(Winn)16
Payable from General Obligation Bonds17
Priority 1	$ 140,00018
50/NI9 ASCENSION - ST. JAMES AIRPORT19
(856) Automobile Parking Lot Improvements 20
for the Louisiana Regional Airport21
(Ascension)22
Payable from General Obligation Bonds23
Priority 1	$ 50,00024
50/NICTRIUMPH OF SPECIAL PEOPLE, INC.25
(1956)Housing for Disabled Recipients of Waiver Services, 26
Acquisition, Planning and Construction27
(Jefferson)28
Payable from General Obligation Bonds29
Priority 1	$ 370,00030
50/NIGPECAN ISLAND WATERWORKS DISTRICT #331
(1957)Pecan Island Waterworks, District No. 3 Water System 32
Improvements, Including Automatic Read Meters for 33
Entire System34
(Vermilion)35
Payable from General Obligation Bonds36
Priority 1	$ 600,00037
50/NIKLOUISIANA 4-H FOUNDATION38
(1958)Louisiana 4-H Foundation Youth Educational 39
Development Center, Camp Windy Wood Property,40
Including Multipurpose Educational Building, 41
Planning, Construction and Acquisition42
(Grant)43
Payable from General Obligation Bonds44
Priority 1	$ 400,00045 ENROLLEDHB NO. 2
Page 142 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NIQWEST CARROLL PARISH AIRPORT AUTHORITY1
(1959)T-Hangars at Kelly Airport Authority, Planning 2
and Construction3
(West Carroll)4
Payable from General Obligation Bonds5
Priority 1	$ 400,0006
50/NIXBELLWOOD WATER SYSTEM, INC.7
(1960)Bellwood Water System, Planning and Construction8
(Natchitoches)9
Payable from General Obligation Bonds10
Priority 1	$ 50,00011
(1961)Bellwood Water System Generator, Back-up Power 12
Source, Planning and Construction13
(Natchitoches)14
Payable from General Obligation Bonds15
Priority 1	$ 35,00016
50/NJ2CONTEMPORARY ARTS CENTER17
(1962)Contemporary Arts Center Renovation, Planning 18
and Construction ($6,131,272 Local Match)19
(Orleans)20
Payable from General Obligation Bonds21
Priority 1	$ 300,00022
Priority 5	$ 300,00023
Total	$ 600,00024
50/NJ8NORTH LOUISIANA CRIMINALISTICS LAB25
(1963)Replacement of Shreveport Facility, 26
Planning and Construction27
(Caddo)28
Payable from General Obligation Bonds29
Priority 1	$18,875,00030
Priority 5	$ 5,125,00031
Total	$24,000,00032
50/NJ9DRYADES YMCA33
(1964)Technical Training Center, Planning and Construction34
(Orleans)35
Payable from General Obligation Bonds36
Priority 1	$ 1,300,00037
Priority 5	$ 3,700,00038
Total	$ 5,000,00039
(1965)Dryades YMCA Reconstruction, Planning and Construction40
(Orleans)41
Payable from General Obligation Bonds42
Priority 1	$ 1,500,00043 ENROLLEDHB NO. 2
Page 143 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NJPWATERWORKS DISTRICT #1 DESOTO PARISH1
(965) Water System Improvements and Extension,2
Planning and Construction ($1,977,300 Local Match)3
(DeSoto)4
Payable from General Obligation Bonds5
Priority 1	$ 100,0006
Priority 5	$ 965,0007
Total	$ 1,065,0008
50/NJURED HILL WATERWORKS9
(816) Replacement Water Well, Connections and Equipment,10
Planning and Construction11
(Winn)12
Payable from General Obligation Bonds13
Priority 2	$ 315,00014
50/NJVHARVEY-STEVENS MEMORIAL FOUNDATION15
(1967)Tutorial and Learning Resource Center Renovations, 16
Planning and Construction 17
(St. Landry)18
Payable from General Obligation Bonds19
Priority 1	$ 70,00020
50/NJYEAST COLUMBIA WATER DISTRICT21
(1968)East Columbia Water System Improvements, 22
Planning and Construction 23
(Caldwell)24
Payable from General Obligation Bonds25
Priority 1	$ 685,00026
50/NK2COMMUNITY OUTREACH PROGRAMS27
(1969)Willow Glen River Road Senior Resource Center, 28
Planning, Construction and Equipment29
(Rapides)30
Payable from General Obligation Bonds31
Priority 1	$ 1,270,00032
50/NK8FRANKLIN MEDICAL CENTER33
(1970)Franklin Medical Center Renovations, Planning 34
and Construction35
(Franklin)36
Payable from General Obligation Bonds37
Priority 1	$ 100,00038
50/NKCWEBSTER PARISH COUNCIL ON AGING39
(1971)New Building for Webster Parish Council on40
Aging, Planning and Construction41
(Webster)42
Payable from General Obligation Bonds43
Priority 1	$ 1,500,00044 ENROLLEDHB NO. 2
Page 144 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NKHALLUME SOCIETY1
(1972)Frank's Theatre Restoration, Planning, 2
Acquisition, Renovation, and Construction 3
($100,000 Cash and/or In-Kind Match)4
(Vermilion)5
Payable from General Obligation Bonds6
Priority 1	$ 200,0007
50/NKYHOLUM WATER SYSTEM, INC.8
(1973)Holum Water System Improvements Including New 9
Water Well, Planning and Construction10
(Caldwell)11
Payable from General Obligation Bonds12
Priority 1	$ 300,00013
50/NLACENTENARY COLLEGE OF LOUISIANA14
(1974)Science Building, Planning and Construction15
(Caddo)16
Payable from General Obligation Bonds17
Priority 1	$ 900,00018
50/NLMFOUNDATION FOR SCIENCE AND MATH EDUCATION19
(1977)A Model for a 21st Century Workforce Development 20
Urban High School - New Orleans Science and 21
Mathematics High School, Planning and Construction22
and Land Acquisition23
(Orleans)24
Payable from General Obligation Bonds25
Priority 1	$ 200,00026
50/NLNMIDWAY WATERWORKS, INC.27
(1978)Midway Water System, Planning and Construction28
(Webster)29
Payable from General Obligation Bonds30
Priority 1	$ 100,00031
Priority 5	$ 505,00032
Total	$ 605,00033
50/NLQSAREPTA WATER WORKS DISTRICT34
(1979)Sarepta Water Works 35
(Webster)36
Payable from General Obligation Bonds37
Priority 5	$ 715,00038
50/NLRHORSESHOE ROAD WATER SYSTEM, INC.39
(1980)Horseshoe Water System, Planning and Construction40
(Webster)41
Payable from General Obligation Bonds42
Priority 1	$ 150,00043
Priority 5	$ 80,00044
Total	$ 230,00045 ENROLLEDHB NO. 2
Page 145 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NLYWEST OUACHITA YOUTH SPORTS ASSOCIATION1
(1981)West Ouachita Youth Sports Association Site 2
Renovations, Planning and Construction3
(Ouachita)4
Payable from General Obligation Bonds5
Priority 1	$ 125,0006
50/NM1RAPIDES WATER WORKS DISTRICT NO. 37
(659) Color Removal from Well No. 2 and Well No. 7 at8
LA Army National Guard, Camp Beauregard,9
Pineville, LA, Planning and Construction10
(Rapides)11
Payable from General Obligation Bonds12
Priority 2	$ 50,00013
50/NM3NATCHITOCHES COUNCIL ON AGING14
(1001)Reconstruction and Renovations to15
Natchitoches Parish Council on16
Aging Office and Activities Building,17
Planning and Construction18
(Natchitoches)19
Payable from General Obligation Bonds20
   Priority 2 	$ 50,00021
(1982)Reconstruct Natchitoches Parish Council on Aging22
Activities Building, Planning and Construction23
(Natchitoches)24
Payable from General Obligation Bonds25
Priority 1	$ 875,00026
50/NM6CENTRAL WATER SYSTEM27
(1983)Central Water System, Planning and Construction28
(Webster)29
Payable from General Obligation Bonds30
Priority 1	$ 50,00031
50/NMAST. CHARLES COMMUNITY HEALTH CENTER32
(1984)Public Health Facility - Norco (Federal Funds $150,000)33
(St. Charles)34
Payable from General Obligation Bonds35
Priority 1	$ 500,00036
50/NMDBELMONT WATERWORKS37
(1985)Water System Improvements, Planning and Construction 38
(Sabine)39
Payable from General Obligation Bonds40
Priority 1	$ 1,455,00041 ENROLLEDHB NO. 2
Page 146 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NMGLIVINGSTON ASSOCIATION FOR RETARDED CHILDREN, INC.1
(1986)New Facility for Livingston Association for Retarded 2
Children, Inc. Planning and Construction3
(Livingston)4
Payable from General Obligation Bonds5
Priority 1	$ 415,0006
Priority 5	$ 80,0007
Total	$ 495,0008
50/NMLGRETNA POLICE DEPARTMENT9
(1987)Gretna Police Department Critical Radio 10
Infrastructure Digital Bridging11
(Jefferson)12
Payable from General Obligation Bonds13
Priority 1	$ 75,00014
(1989)Gretna Police Department Crime Cameras15
(Jefferson)16
Payable from General Obligation Bonds17
Priority 1	$ 50,00018
(1990)Gretna Police Department, Construction of Armory,19
Elevation/Flood Proofing/Wind Retrofit, Planning20
and Construction21
(Jefferson)22
Payable from General Obligation Bonds23
Priority 1	$ 940,00024
Priority 2	$ 150,00025
Priority 5	$ 200,00026
Total	$ 1,290,00027
50/NNB PROFESSIONAL SPECIALTIES28
(293) USDA Veterinary Biologic Facility,29
Planning and Construction30
(East Baton Rouge)31
Payable from General Obligation Bonds32
Priority 2	$ 200,00033
50/NNLHUNGARIAN SETTLEMENT HISTORICAL SOCIETY34
(1991)Hungarian Settlement Historical Museum, 35
Planning and Construction36
(Livingston)37
Payable from General Obligation Bonds38
Priority 1	$ 170,00039
50/NNOGRANT PARISH FIRE DISTRICT #740
(1992)New Fire Station in Verda41
(Grant)42
Payable from General Obligation Bonds43
Priority 1	$ 90,00044
Priority 5	$ 480,00045
Total	$ 570,00046 ENROLLEDHB NO. 2
Page 147 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NNRWASHINGTON PARISH RECREATION DISTRICT #11
(1993)Multi-Purpose Recreation Facility, Land Acquisition, 2
Master Planning, Design and Construction3
(Washington)4
Payable from General Obligation Bonds5
Priority 1	$ 75,0006
Priority 2	$ 50,0007
Total	$ 125,0008
50/NPDIBERIA ECONOMIC DEVELOPMENT AUTHORITY9
(629) Progress Point Business Park and Airport Gateway,10
Land Acquisition11
(Iberia)12
Payable from General Obligation Bonds13
Priority 1	$ 1,575,00014
50/NPGLIVINGSTON ECONOMIC DEVELOPMENT COUNCIL, INC.15
(229) Buildings and Parking, The Livingston Parish16
Literacy and Technology Center (LPLTC) Site,17
Planning and Construction18
(Livingston)19
Payable from General Obligation Bonds20
Priority 2	$ 200,00021
50/NPPALLEN PARISH FIRE DISTRICT #322
(1994)Station Expansion, Planning and Construction23
(Allen)24
Payable from General Obligation Bonds25
Priority 1	$ 150,00026
Priority 2	$ 75,00027
Total	$ 225,00028
50/NQ2GRAVITY DRAINAGE DISTRICT #6 CALCASIEU PARISH29
(1996)Drainage Improvement and Infrastructure Development 30
in High Hope Area, Planning and Construction 31
($263,000 Non-State Match)32
(Calcasieu)33
Payable from General Obligation Bonds34
Priority 1	$ 325,00035
50/NQ3NIBLETTS BLUFF PARK COMMISSION36
(1997)Bulkhead Along Sabine River, Planning and 37
Construction ($50,000 Non-State Match)38
(Calcasieu)39
Payable from General Obligation Bonds40
Priority 1	$ 100,00041
50/NQEFREED MEN, INC.42
(330) Freed Men, Inc., Planning and Construction43
(Ouachita)44
Payable from General Obligation Bonds45
Priority 2	$ 80,00046 ENROLLEDHB NO. 2
Page 148 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1999)Freed Men Housing Renovations, 1
Planning and Construction2
(Ouachita)3
Payable from General Obligation Bonds4
Priority 1	$ 50,0005
50/NQFGENTILLY DEVELOPMENT DISTRICT6
(2000)Milne Boys Home, Planning and Construction7
(Orleans)8
Payable from General Obligation Bonds9
Priority 1	$ 600,00010
Priority 2	$ 200,00011
Total	$ 800,00012
50/NQGLAFAYETTE METROPOLITAN EXPRESSWAY COMMISSION13
(2001)Lafayette Loop Project, Planning and Construction14
(Lafayette)15
Payable from General Obligation Bonds16
Priority 5	$ 1,000,00017
50/NQQACADIA PARISH TOURIST COMMISSION18
(2002)Acadia Parish Convention and Visitors Commission 19
Regional Conference Center, Planning and Construction20
(Acadia)21
Payable from General Obligation Bonds22
Priority 1	$ 260,00023
Priority 5	$ 1,920,00024
Total	$ 2,180,00025
50/NQVBEAUREGARD PARISH WATERWORKS DISTRICT #626
(332) Water System Improvements, Planning and Construction27
(Beauregard)28
Payable from General Obligation Bonds29
Priority 1	$ 25,00030
Priority 2	$ 375,00031
Priority 5	$ 1,100,00032
Total	$ 1,500,00033
50/NQWCALCASIEU PARISH WATERWORKS DISTRICT #1034
(711) New Water System, Planning and Construction35
(Calcasieu)36
Payable from General Obligation Bonds37
Priority 1	$ 250,00038
Priority 5	$ 2,500,00039
Total	$ 2,750,00040
50/NQYWESTON WATER SYSTEM, INC.41
(755) Water Mains Extensions with Connections, Booster42
Station and Emergency Power Improvements,43
Planning and Construction44
(Jackson)45
Payable from General Obligation Bonds46
Priority 2	$ 735,00047 ENROLLEDHB NO. 2
Page 149 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(2003)Water Distribution System Enhancements, 1
Weston/ Ebeneezer Connection, Planning and 2
Construction3
(Jackson)4
Payable from General Obligation Bonds5
Priority 1	$ 540,0006
50/NR9LONGUE VUE HOUSE AND GARDENS7
(2004)Restoration and Master Site Planning 8
($498,760 Non-State Match)9
(Orleans)10
Payable from General Obligation Bonds11
Priority 1	$ 100,00012
50/NRDSOUTH BEAUREGARD PARISH RECREATION DISTRICT #213
(2005)Multipurpose Recreational Facility, Planning 14
and Construction15
(Beauregard)16
Payable from General Obligation Bonds17
Priority 1	$ 250,00018
Priority 5	$ 465,00019
Total	$ 715,00020
50/NRJKINGWOOD HOMEOWNERS' ASSOCIATION21
(2006)New Fence Kingwood Subdivision, Planning and Construction22
(Orleans)23
Payable from General Obligation Bonds24
Priority 1	$ 140,00025
50/NRLLOUISIANA ARTIST GUILD26
(2007)Louisiana Artist Guild Arts Incubator, Planning 27
and Construction ($6,321,375 Local Match)28
(Orleans)29
Payable from General Obligation Bonds30
Priority 1	$ 4,675,00031
50/NRONATCHITOCHES COMMUNICATIONS DISTRICT32
(2008)Natchitoches Parish Emergency Communications District,33
Planning and Construction34
(Natchitoches)35
Payable from General Obligation Bonds36
Priority 1	$ 500,00037
Priority 5	$ 2,400,00038
Total	$ 2,900,00039
50/NRSNORTH DESOTO WATER SYSTEM INC40
(643) Land Acquisition, Expansion and Improvements41
to the Water System, Planning and42
Construction43
(De Soto)44
Payable from General Obligation Bonds45
Priority 2	$ 200,00046 ENROLLEDHB NO. 2
Page 150 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(2009)Expansion and Improvements to the Water System,1
Planning and Construction2
(DeSoto)3
Payable from General Obligation Bonds4
Priority 1	$ 100,0005
50/NRVMADISON VOLUNTARY COUNCIL ON AGING6
(757) Expansion and Improvements to Activities7
Building, Planning and Construction8
(Madison)9
Payable from General Obligation Bonds10
Priority 2	$ 200,00011
50/NSACALCASIEU DRAINAGE DISTRICT 7, WARD 812
(291) L-14 Improvements, Gravity Drainage District 7,13
Ward 8 of Calcasieu Parish14
(Calcasieu)15
Payable from General Obligation Bonds16
Priority 2	$ 50,00017
50/NSIWALKER COMMUNITY WATER SYSTEM, INC.18
(2010)Water Distribution System Expansion, LA 810 Extension,19
Planning and Construction20
(Jackson)21
Payable from General Obligation Bonds22
Priority 1	$ 800,00023
50/NSKRAYS OF SONSHINE24
(1229)Project Elevate!, Planning and Construction25
(Ouachita)26
Payable from General Obligation Bonds27
Priority 2	$ 35,00028
50/NSMNATCHITOCHES VETERANS MEMORIAL PARK COMMISSION29
(2011)Natchitoches Veterans and Memorial Park, 30
Planning and Construction31
(Natchitoches)32
Payable from General Obligation Bonds33
Priority 1	$ 50,00034
50/NSNLOUISIANA COALITION FOR ACCESSIBLE AND35
SUSTAINABLE HEALTHCARE36
(2012)Town of Stonewall, Rural Medical Facility, 37
Planning and Construction38
(De Soto)39
Payable from General Obligation Bonds40
Priority 1	$ 150,00041
Priority 2	$ 150,00042
Priority 5	$ 150,00043
Total	$ 450,00044 ENROLLEDHB NO. 2
Page 151 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NSRJUNIOR LEAGUE OF GREATER NEW ORLEANS1
(1223)Renovate Thrift Shop and Annex, Including 2
Parking Lot, Planning and Construction3
(Orleans)4
Payable from General Obligation Bonds5
Priority 1	$ 135,0006
(1224)Renovate Annex Building and Re-Purpose Space,7
Including Installation of Handicap Accessibility8
Ramp and Bathroom Upgrades, Planning and Construction9
(Orleans)10
Payable from General Obligation Bonds11
Priority 1	$ 200,00012
(1225)Renovate Headquarters Building, Including 13
HVAC System, Planning and Construction14
(Orleans)15
Payable from General Obligation Bonds16
Priority 1	$ 65,00017
50/NSSLOUISIANA EMERGENCY MEDICAL UNIT18
(1194)Louisiana Emergency Medical Unit Storage Facility,19
Planning and Construction20
(Lafayette)21
Payable from General Obligation Bonds22
Priority 1	$ 125,00023
50/NSTDOWNTOWN DEVELOPMENT DISTRICT OF NEW ORLEANS24
(633) Improvements to Girod Street, Planning and Construction25
(Orleans)26
Payable from General Obligation Bonds27
Priority 1	$ 300,00028
50/NSUBAYOU CIVIC CLUB29
(2013)Facilities Upgrade / Roof and Kitchen 30
Planning and Construction31
(Lafourche)32
Payable from General Obligation Bonds33
Priority 1	$ 135,00034
50/NSXMOREHOUSE PARISH SHERIFF35
(58) Operations Center Relocation, Site Development,36
Renovations and Improvements, Planning and37
Construction ($130,000 Local Match)38
(Morehouse)39
Payable from General Obligation Bonds40
Priority 2	$ 375,00041 ENROLLEDHB NO. 2
Page 152 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NT2MERCY ENDEAVORS1
(2014)Irish Channel St. Andrew Street Elderly Resource Center,2
Planning and Construction3
(Orleans)4
Payable from General Obligation Bonds5
Priority 1	$ 75,0006
Priority 2	$ 400,0007
Total	$ 475,0008
50/NTB CALCASIEU WATERWORKS DISTRICT 12 WARD 39
(868) Waterworks District 12, Ward 3 - Water System10
Improvements, Planning and Construction11
(Calcasieu)12
Payable from General Obligation Bonds13
Priority 2	$ 315,00014
Priority 5	$ 1,665,00015
Total	$ 1,980,00016
50/NTCFAUBOURG ST. ROCH IMPROVEMENT ASSOCIATION17
(548) Natatorium at St. Roch, Planning and18
Construction19
(Orleans)20
Payable from General Obligation Bonds21
Priority 2	$ 25,00022
Pending approval of capital outlay budget request pursuant to the provisions of R.S. 39:112.23
50/NTEBATON ROUGE AREA ALCOHOL AND DRUG CENTER24
(666) Baton Rouge Area Alcohol and Drug Center, Inc.,25
Expansion Project, Planning and Construction26
(East Baton Rouge)27
Payable from General Obligation Bonds28
Priority 2	$ 50,00029
The capital outlay budget request for this project was submitted after the November 1st30
deadline, but it has been approved by the Joint Legislative Committee on Capital Outlay31
pursuant to the provisions of R.S. 39:112.32
50/NTG TERREBONNE PARISH RECREATION33
DISTRICTS 2 AND 334
(694) Terrebonne Sports Complex, Phase I 35
Infrastructure Improvements, Acquisition, 36
Planning and Construction37
(Terrebonne)38
Payable from General Obligation Bonds39
Priority 5	$ 2,900,00040
50/NTIJACKSON TOURISM ENHANCEMENT COMMITTEE41
(672) Feliciana Veterans Memorial,42
Planning and Construction43
(East Feliciana)44
Payable from General Obligation Bonds45
Priority 2	$ 30,00046 ENROLLEDHB NO. 2
Page 153 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NTJCADEVILLE WATER DISTRICT1
(724) Site No. 4 Water System Renovations and Improvements,2
Planning and Construction (50% Local Match)3
(Ouachita)4
Payable from General Obligation Bonds5
Priority 2	$ 200,0006
50/NTQ EAST FELICIANA EMERGENCY COMMUNICATIONS DISTRICT7
(1218)Emergency Communications Center,8
Planning and Construction9
(East Feliciana)10
Payable from General Obligation Bonds11
Priority 2	$ 270,00012
Priority 5	$ 200,00013
Total	$ 470,00014
50/NTSSOUTHERN UNITED NEIGHBORHOOD15
(1247)Lower 9th Ward Walking Trail and Community 16
Health Project, Planning and Construction17
(Orleans)18
Payable from General Obligation Bonds19
Priority 2	$ 25,00020
50/NTTHOMER MEMORIAL HOSPITAL21
(1267)Digital Mammography Machine,22
Acquisition and Installation23
(Claiborne)24
Payable from General Obligation Bonds25
Priority 2	$ 225,00026
Pending approval of the capital outlay budget request pursuant to the provisions of R.S.27
39:112.28
(1273)Bone Density Machine, Acquisition29
and Installation30
(Claiborne)31
Payable from General Obligation Bonds32
Priority 2	$ 50,00033
(1274)Upper Parking Lot Expansion, Planning and34
Construction35
(Claiborne)36
Payable from General Obligation Bonds37
Priority 2	$ 110,00038
50/NTULAKE FOREST ELEMENTARY CHARTER SCHOOL39
(1260)Lake Forest Elementary Charter School,40
Planning and Construction41
(Orleans)42
Payable from General Obligation Bonds43
Priority 2	$ 100,00044 ENROLLEDHB NO. 2
Page 154 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NTVSEEKER SPRINGS MINISTRY1
(1276)Seeker Springs Renovation, Planning and2
Construction3
(Ouachita)4
Payable from General Obligation Bonds5
Priority 2	$ 130,0006
Priority 5	$ 30,0007
Total	$ 160,0008
50/NTWWARD 3 RECREATION DISTRICT OF CALCASIEU PARISH9
(1297)Renovations to Lake Charles Boston Stadium,10
Planning and Construction11
(Calcasieu)12
Payable from General Obligation Bonds13
Priority 2	$ 400,00014
50/NTYNEW ORLEANS JAZZ ORCHESTRA15
(2043)The New Orleans Jazz Market: A Home for the 16
New Orleans Jazz Orchestra at 1436 Oretha 17
Castle Haley, Planning and Construction18
(Orleans)19
Payable from General Obligation Bonds20
Priority 2	$ 1,050,00021
Priority 5	$ 60,00022
Total	$ 1,110,00023
Pending approval of capital outlay budget request pursuant to the provisions of R.S. 39:112.24
50/NTZBROADMOOR NEIGHBORHOOD IMPROVEMENT25
DISTRICT26
(247) Community Art and Wellness Center in New Orleans,27
Planning, Construction and Equipment28
(Orleans)29
Payable from General Obligation Bonds30
Priority 2	$ 280,00031
Priority 5	$ 100,00032
Total	$ 380,00033
50/NU4RED RIVER REVEL ARTS FESTIVAL34
(2016)Covered Pavilion #2 for Shreveport Festival Plaza, 35
Planning and Construction36
(Caddo)37
Payable from General Obligation Bonds38
Priority 1	$ 250,00039
50/NU8MULTICULTURAL TOURISM COMMISSION40
(2017)C.C. Antoine Museum and Arts Center, 41
Planning and Construction ($64,000 Local Match)42
(Caddo)43
Payable from General Obligation Bonds44
Priority 1	$ 335,00045 ENROLLEDHB NO. 2
Page 155 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NV5SOUTHWEST LOUISIANA CENTER HEALTH SERVICES1
(2019)SWLA Center for Health Services - Healing Center, 2
Planning and Construction3
(Calcasieu)4
Payable from General Obligation Bonds5
Priority 1	$ 365,0006
50/NV6EAST CARROLL PARISH HOSPITAL7
(2020)East Carroll Parish Hospital Capital Improvement,8
Emergency Repairs, Planning and Construction9
(East Carroll)10
Payable from General Obligation Bonds11
Priority 1	$ 685,00012
50/NV9ALEXANDRIA CENTRAL ECONOMIC DEVELOPMENT DISTRICT13
(2021)Alexandria Riverfront Development, Phase 1, Technical 14
Planning and Construction ($250,000 Local Match)15
(Rapides)16
Payable from General Obligation Bonds17
Priority 1	$ 170,00018
50/NW1UNION PARISH LAW ENFORCEMENT DISTRICT19
(1070)New Law Enforcement/Services/Training/Emergency 20
Shelter Complex, Planning and Construction 21
($500,000 Local In-Kind Match; $1,100,000 22
Federal Match)23
(Union)24
Payable from General Obligation Bonds25
Priority 1	$ 2,450,00026
50/NW9RED RIVER FILM SOCIETY27
(2022)The Robinson Film Center (Formerly Known as 28
Red River Art Film Theater), Planning and Construction29
(Caddo)30
Payable from General Obligation Bonds31
Priority 1	$ 1,800,00032
50/NX9PROGRESS 63, INC.33
(2023)Progress 63 Center Providing Senior Center Services, 34
Veteran's Services, and Tutoring Services, Building 35
Acquisition, Planning and Construction36
(East Baton Rouge)37
Payable from General Obligation Bonds38
Priority 1	$ 90,00039
50/S17EAST BATON ROUGE PARISH SCHOOL BOARD40
(    )School Improvements and Infrastructure, 41
Planning and Construction42
(East Baton Rouge)43
Payable from General Obligation Bonds44
Priority 2	$ 125,00045 ENROLLEDHB NO. 2
Page 156 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Pending submittal and approval of capital outlay budget request pursuant to the provisions1
of R.S. 39:112.2
50/S26JEFFERSON PARISH SCHOOL SYSTEM3
(2024)Multipurpose Fine Arts Building Renovation 4
(Jefferson)5
Payable from General Obligation Bonds6
Priority 1	$ 100,0007
50/S39POINTE COUPEE PARISH SCHOOL BOARD8
(1333)Pointe Coupee Parish School Board Central Office 9
Relocation, Renovation and Rebuilding Due to Flooding 10
Caused By Hurricane Gustav11
(Pointe Coupee)12
Payable from General Obligation Bonds13
Priority 1	$ 100,00014
Priority 5	$ 3,385,00015
Total	$ 3,485,00016
50/S42RICHLAND PARISH SCHOOL BOARD17
(2025)Archibald Alternative Center Improvements 18
(Richland)19
Payable from General Obligation Bonds20
Priority 1	$ 25,00021
50/S58VERNON PARISH SCHOOL BOARD22
(2026)Renovations to South Polk Elementary School23
(Vernon)24
Payable from General Obligation Bonds25
Priority 1	$ 1,000,00026
50/S61WEST BATON ROUGE PARISH SCHOOL BOARD27
(    )School Improvements and Infrastructure, 28
Planning and Construction29
(West Baton Rouge)30
Payable from General Obligation Bonds31
Priority 2	$ 25,00032
Pending submittal and approval of capital outlay budget request pursuant to the provisions33
of R.S. 39:112.34
50/S63WEST FELICIANA PARISH SCHOOL BOARD35
(420) Julius Freyhan Cultural/Conference Center,36
Planning and Construction37
(West Feliciana)38
Payable from General Obligation Bonds39
Priority 2	$ 360,00040
Priority 5	$ 2,890,00041
Total	$ 3,250,00042
Section 1A. Notwithstanding any other provision of this Act or any other provision43
of law to the contrary, one million, one hundred eighty-one thousand, one hundred and forty-44 ENROLLEDHB NO. 2
Page 157 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
seven dollars of the appropriation from State General Fund (Direct) for Department of1
Economic Development, Office of Business Development, Port of Terrebonne Bulkhead,2
Land Improvements, Bank Stabilization, Navigational Improvements, Dredging, Drainage,3
Sewerage, Slip for Dry-Dock, and Other Related Infrastructure Improvements, Planning and4
Construction (Terrebonne) contained in Act 7 of the 2008 Second Extraordinary Session is5
hereby rescinded.  Notwithstanding any other provision of this Act or any other provision6
of law to the contrary, one million, fifty thousand dollars of the appropriation from the7
Penalty and Interest Account for Louisiana Workforce Commission, Office of Workforce8
Development, Renovations to Louisiana Workforce Commission’s Administrative9
Headquarters, Planning and Construction (East Baton Rouge) contained in Act 21 of the10
2010 Regular Session is hereby rescinded contingent upon action by the State Bond11
Commission granting the project a cash line of credit for Priority 2 General Obligation12
Bonds. Notwithstanding any other provision of this Act on any other provision of law to the13
contrary, one million dollars of the appropriation from the Penalty and Interest Account for14
Louisiana Workforce Commission, Office of Workforce Development, Renovations to15
Louisiana Workforce Commission’s Administrative Headquarters, Planning and16
Construction (East Baton Rouge) by letter of the Joint Legislative Committee on the Budget17
approved September 21, 2012 is hereby rescinded contingent upon action by the State Bond18
Commission granting this project a cash line of credit for Priority 2 General Obligation19
Bonds. Notwithstanding any other provision of this Act or any other provision of law to the20
contrary, six hundred and fifty thousand dollars of the appropriation from the Penalty and21
Interest Account for Louisiana Workforce Commission, Office of Workforce Development,22
Renovations to Louisiana Workforce Commission’s Administrative Headquarters, Planning23
and Construction (East Baton Rouge) by letter of the Joint Legislative Committee on the24
Budget approved December 20, 2012 is hereby rescinded contingent upon action by the State25
Bond Commission granting this project a cash line of credit for Priority 2 General Obligation26
Bonds.27
Section 2. The expenditure of funds appropriated in this Act, except appropriations28
made to non-profit economic development corporations, shall be in conformity to all existing29
statutes relative to public bidding, contractual review, and R.S. 39:101 through 128 and any30 ENROLLEDHB NO. 2
Page 158 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
other statutes affecting the capital outlay program for state government, state institutions,1
and political entities. No contract shall be awarded for any project prior to the granting of2
a line of credit or the sale of bonds by the State Bond Commission, determination by the3
State Treasurer that cash funding is available in the Comprehensive Capital Outlay Escrow4
Account for the project, or delivery of revenue bonds whose issuance is authorized in5
Section 1 of this Act. 6
Section 3. Payment for projects specified in this Act must be made by warrant7
submitted to the Division of Administration, Department of Transportation and8
Development, the State Treasurer or other administering agency as provided in Section 8,9
whichever is appropriate, only to the extent of funds required for immediate payment.10
Copies of invoices or other supporting documentation shall be submitted with warrants. In11
the event that any equipment included in this Act, is procured pursuant to the provisions of12
the State Lease Purchase Act, R. S. 39:1761 et seq., the amounts included in this Act for13
each such piece of equipment shall not be appropriated.  The provisions of R.S. 39:177114
which require equipment to be leased under the State Lease Purchase Act to be included in15
the executive budget and approved by the Legislature through inclusion in the General16
Appropriation Act shall be considered waived upon the inclusion of such equipment in this17
Act.  Projects contained in this Act may, at the direction of the Division of Administration18
and with the approval of the State Bond Commission, alternatively be funded through19
financing programs heretofore or hereafter provided by a public trust and public corporation20
duly organized pursuant to R.S. 9:2341 et seq., having for its beneficiary the State and the21
Louisiana Local Government Environmental Facilities and Community Development22
Authority, pursuant to R.S. 33:4548.1 et seq. 23
Section 4. If at any time during the Fiscal Year 2013-2014, the Governor should24
find, or the Joint Legislative Committee on the Budget or the Commissioner of25
Administration should report to the Governor, that the receipts of the treasury are falling26
short or appear likely to fall short of the revenue estimates for the fiscal year and that a cash27
deficit is likely to be incurred, the Governor shall take such steps as deemed necessary to28
prevent the occurrence of a cash deficit. In the event that a capital outlay project funded in29
this Act falls under an agency which is abolished or for which funds are not appropriated in30 ENROLLEDHB NO. 2
Page 159 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
the 2013-2014 General Appropriation Act, then the funds appropriated in this Act for such1
capital outlay projects shall not be expended unless deemed necessary by the Governor to2
protect life or property.  In the event that legislation is enacted which transfers facilities or3
programs for which projects are funded in this Act, on behalf of one agency, institution,4
department, or management board to another agency, institution, department, or management5
board, then the projects in this Act shall be deemed transferred also.6
Section 5.  All monies appropriated by this Act and any applicable funds of a prior7
capital outlay budget act adopted by the Legislature shall be deposited by the State Treasurer8
in the Comprehensive Capital Outlay Escrow Account, established by this Section, in the9
state treasury.  In accordance with R.S. 36:764, no later than 60 days following the end of10
each quarter, the state treasurer shall report to the Joint Legislative Committee on the Budget11
and the Commissioner of Administration, all funds contained in the Miscellaneous Fund of12
the Comprehensive Capital Outlay Escrow Account. Notwithstanding any provisions13
contained herein or other law to the contrary, any original issue premium or accrued interest14
proceeds received pursuant to the sale of general obligation bonds shall remain on deposit15
to the credit of the Bond Security and Redemption Fund until such time as they may be16
utilized in accordance with U.S. Department of Treasury Regulations promulgated pursuant17
to the Internal Revenue Code of 1986. All such monies shall be administered according to18
the particular act pertaining to the fiscal year in which such monies were appropriated.  If19
it is determined by the Director of the Office of Facility Planning and Control, Division of20
Administration, that the funds appropriated by this Act or any prior capital outlay budget act21
are not sufficient to complete the projects contained in any capital outlay budget act, through22
unavoidable deficiencies in appropriation, including administrative and legal requirements,23
the Commissioner of Administration, subject to approval of the Joint Legislative Committee24
on the Budget, may direct the use of interest earned from the investment of general25
obligation bond or note proceeds in the Comprehensive Capital Outlay Escrow Account, not26
to exceed an aggregate of five million dollars in any one fiscal year, for the purpose of27
completing the projects contained in any capital outlay budget act and such money shall be28
deemed appropriated in specific amounts necessary for such purpose. All appropriations in29
this Act which are made as additions to funds for previously authorized projects shall be30 ENROLLEDHB NO. 2
Page 160 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
included, for accounting purposes, in the account of said previously authorized projects. If1
it is determined by the Director of the Office of Facility Planning and Control, Division of2
Administration, that it is cost effective and practical to combine individual appropriations,3
the Commissioner of Administration, subject to the approval of the Joint Legislative4
Committee on the Budget, may direct that two or more appropriations or parts thereof may5
be combined into a single project for accounting and audit purposes. The Commissioner of6
Administration may direct that funding in the various statewide and/or multiple parish7
projects for improvements for state facilities may be transferred to any project, in this Act8
or any previous Capital Outlay Act, which require supplemental funding for improvements9
for state facilities which qualify for funding through the various statewide and/or multiple10
parish projects for improvements for state facilities. The Office of Facility Planning and11
Control, Division of Administration is authorized to receive settlements and vendor rebates12
not in excess of $50,000 unless approved by the Joint Legislative Committee on the Budget,13
and to add those receipts to the funding for projects in this Act or any previous Capital14
Outlay Act for which project funds are received.  The Office of Facility Planning and15
Control, Division of Administration is authorized to receive insurance payments and are16
hereby authorized to immediately repair facilities that suffer insurance losses without those17
projects being included in the Act and shall report to the Joint Legislative Committee on the18
Budget any expenditures from insurance funds received pursuant to this section. A portion,19
as determined by the Commissioner of Administration and not to exceed one percent (1%),20
of the funding for projects which qualify for the Percent for Art Program, may be transferred21
from the qualifying project budgets, to the Department of Culture, Recreation and Tourism22
for costs of acquiring art and administering the program.  For all Percent for Art Program23
projects in this or any previous capital outlay, up to ten percent (10%) of the aforementioned24
one percent (1%) may be used for the costs of administering the projects.  25
Section 6. Prior to March 1, 2014, the Commissioner of Administration shall submit26
to the Legislature a list of projects that are completed and the cash balances remaining in27
each project. 28
Section 7. The Commissioner of Administration, with the approval of the Joint29
Legislative Committee on the Budget, is authorized to supplement or substitute the30 ENROLLEDHB NO. 2
Page 161 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
appropriations specified in this or previous capital outlay acts with any federal or other funds1
which are or may become available and such funds shall be deemed appropriated in specific2
amounts necessary for the purposes of this Act. Any funds received by the State Bond3
Commission as a result of a prepayment of reimbursement contracts as authorized by law4
and the Policy and Procedure for Reimbursement Contracts of the Department of Treasury,5
Office of State Bond Commission, shall be deposited as set forth in such Policy and6
Procedure and shall be deemed available and appropriated in specific amounts necessary for7
the purposes of this Act pursuant to the procedure set forth in this section.8
Section 8. All of the funds herein appropriated, except for appropriations made to9
the Department of Military Affairs, the Legislature, the Louisiana Stadium and Exposition10
District, the Department of Economic Development prior to the 2004 Regular Legislative11
Session, the Office of Coastal Protection and Restoration, the Department of Economic12
Development for the Aerospace Manufacturing Infrastructure appropriation, the Department13
of Economic Development for the LITE Equipment appropriation, the Department of14
Economic Development for the Louisiana Gene Therapy Consortium appropriations, the15
Department of Economic Development for the Economic Development Award Program, the16
Department of Economic Development for the Bulk Grain Elevator, Rail Spur, and Other17
Related Infrastructure appropriation, the Department of Economic Development for the18
Louisiana Digital Computer Facility, the Division of Administration for Supplemental State19
Funds for Local Government Assistance Program, the Division of Administration for the20
Community Water Enrichment Program or the Department of Transportation and21
Development, shall be considered as having been appropriated directly to the Office of22
Facility Planning and Control, Division of Administration, and all projects herein authorized23
and funded shall be subject to the provisions of R.S. 39:101 through 128.  All of the funds24
herein appropriated under the name of non-state entities, shall be considered as having been25
appropriated directly to the Office of Facility Planning and Control, Division of26
Administration, and shall be administered by the Office of Facility Planning and Control,27
Division of Administration, under cooperative endeavor agreements.  All cooperative28
endeavor agreements for non-state entities shall be prepared by the Office of Facility29
Planning and Control and the Commissioner of Administration is hereby authorized and  30 ENROLLEDHB NO. 2
Page 162 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
directed to effectuate any necessary transfer of funds from the Department of Justice to the1
Office of Facility Planning and Control in order to accomplish this purpose. However, all2
cooperative endeavor agreements between the Department of Transportation and3
Development and non-state entities entered into prior to the passage of this Act shall4
continue to be administered by the Department of Transportation and Development.5
Cooperative endeavor agreements entered into pursuant to this Act, and approved by the6
Commissioner of Administration or his designee, or the Secretary of the Department of7
Transportation and Development for projects appropriated to or administered by the8
Department of Transportation and Development, shall not be required to be submitted to the9
Division of Administration, Office of Contractual Review. For all projects in this or any10
previous Capital Outlay Act appropriated to the Office of Facility Planning and Control,11
Division of Administration, including those administered by cooperative endeavor12
agreements, up to six percent of each line-item may be used for costs of administering the13
projects. For all projects in this or any previous Capital Outlay Act appropriated to the14
Department of Transportation and Development, up to six percent of each line-item may be15
used for costs of administering the projects, or for field engineering/construction16
supervision. Line-item general obligation bond projects appropriated to the Department of17
Transportation and Development in this or any previous Capital Outlay Act shall be18
authorized to draw Transportation Trust Funds from the Highway Program appropriation,19
for supplemental funding on overruns in excess of the original estimated project cost as20
determined by the Department of Transportation and Development, provided however that21
said projects are in the state or federal highway system and in the priority program, and the22
overrun is less than $50,000. Any such overrun of $50,000 or more must be approved by23
the Joint Legislative Committee on the Budget.  Furthermore, all ports, levee districts and24
other non-state entities must have a fully executed cooperative endeavor agreement, from25
the Office of Facility Planning and Control, Department of Transportation and Development,26
or the State Treasurer, whichever is appropriate, before entering into any contracts which27
obligate state funding and must follow all laws pertaining to public bidding. If a port, levee28
district or other non-state entity enters into a contract prior to receipt of funding, or prior to29
execution of a cooperative endeavor agreement, then payments under such contracts are30 ENROLLEDHB NO. 2
Page 163 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
prohibited from capital outlay appropriations, and are the sole responsibility of the port,1
levee district, or other non-state entity.  Notwithstanding the provisions of this Section or any2
other capital outlay act, contracts may be entered into for the Atchafalaya Basin Protection3
and Enhancement Kemper Williams project in St. Mary Parish prior to a cooperative4
endeavor agreement being entered into with the state. Notwithstanding anything contained5
in this or any other capital outlay act, contracts may be entered into for the Louisiana Artist6
Guild project prior to receipt of funding. Notwithstanding anything contained in this or any7
other capital outlay act, contracts may be entered into for the Natchitoches Industrial Park8
South project prior to receipt of funding and prior to execution of a cooperative endeavor9
agreement. Notwithstanding anything contained in this Act to the contrary or any other10
provision of law, contracts may be entered into for the Livingston Parish Twenty-First11
District Complex prior to receipt of funding and prior to execution of the cooperative12
endeavor agreement. Notwithstanding R.S. 39:112.A, subject to all other applicable statutes,13
the Department of Transportation and Development may execute a contractual instrument14
for the I-12 O’Neal Lane to Walker Widening project prior to receipt of a line of credit.15
Notwithstanding the provisions of R.S. 39:112(E)(2), the project for Independence,16
Independence Area Community Pavilion, Planning and Construction, shall be exempt from17
all local match requirements. Notwithstanding anything contained in this Act to the contrary18
or any other provision of law, the scope of the appropriations made in this or any other19
Capital Outlay Act for the St. Mary Parish Plantation Pump Station Replacement project20
shall be deemed to include repair, equipment, rehabilitation and infrastructure improvements21
at the existing Plantation Pump Station. Notwithstanding anything contained in this Act to22
the contrary or any other provision of law, the scope of the appropriations made in this or23
any other Capital Outlay Act for the Louisiana 4-H Foundation, Youth Education24
Development Camp Windy Wood project, shall be deemed to include planning, construction,25
and acquisition.  Notwithstanding any other provision of this Act or any other provision of26
law to the contrary, the scope of the appropriation made for the Foundation for Science and27
Math Education shall be deemed to include land acquisition. Notwithstanding anything28
contained in this Act to the contrary or any other provision of law, the scope of the29
appropriations made in this or any other Capital Outlay Act for the Youngsville Parkway30 ENROLLEDHB NO. 2
Page 164 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Road project shall be deemed to include waterline improvements and roadway lighting.1
Notwithstanding anything contained in this Act to the contrary or any other provision of law,2
the scope of the appropriations made in this or any other Capital Outlay Act for the West3
Baton Rouge Parish Water Distribution Improvements project shall be deemed to include4
the planning and/or construction of installation of an additional hydraulic loop.5
Notwithstanding anything contained in this Act to the contrary or any other provision of law,6
the scope of the appropriations made in this or any other Capital Outlay Act for the Village7
of Calvin, Water System Expansion, Planning and Construction project shall be deemed to8
include an In-Line Booster System Facility.  Notwithstanding anything contained in this Act9
to the contrary or any other provision of law, the scope of the appropriations made in this10
or any other Capital Outlay Act for the New Mental Health Clinic for New Orleans11
Behavior, Social, and Medical Support Detox Clinic project for the Metropolitan Human12
Service District shall be deemed to include the expansion and renovation of the existing13
facility. Notwithstanding anything contained in this Act to the contrary or any other14
provision of law, the scope of the appropriations made in this or any other Capital Outlay15
Act for the New Mental Health Center for Desire/Florida Mental Health Clinic project for16
the Metropolitan Human Service District shall be deemed to include the purchase,17
construction, or renovation of a new facility in New Orleans East. Notwithstanding anything18
contained in this Act to the contrary, or any other provision of law, the scope of the19
appropriations made in this or any other Capital Outlay Act for the City of New Orleans,20
Eastern New Orleans Hospital and Medical Office Building, Real Estate Acquisition,21
Planning, Design, Construction, Renovation and Equipment, project, the City of New22
Orleans may make such capital outlay funds available to the Parish Hospital Service District23
of the Parish of Orleans District "A" in furtherance of the District's planning, design,24
acquisition, development, renovation, construction, equipment and operation of a hospital25
and medical office building in Eastern New Orleans. Notwithstanding anything contained26
herein, or in any cooperative endeavor agreement between the Office of Facility Planning27
and Control and the City of New Orleans or the Hospital Service District to the contrary, the28
Hospital Service District may mortgage or otherwise encumber any and all land, real29
property, including buildings and equipment, and appurtenances acquired, in whole or part,30 ENROLLEDHB NO. 2
Page 165 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
with state capital outlay funds provided that bond counsel to the state opines that such1
mortgage shall not affect the tax-exempt status of the bonds to be issued by the state for the2
project. Notwithstanding anything in this Act to the contrary, contracts may be entered into3
for the City of New Orleans, Eastern New Orleans Hospital and Medical Office Building,4
Real Estate Acquisition, Planning, Design, Construction, Renovation and Equipment project5
prior to receipt of funding and prior to execution of the cooperative endeavor agreement.6
Notwithstanding anything contained in this Act to the contrary, or any other provision of7
law, or the cooperative endeavor agreement between the Ouachita Parish Police Jury and the8
Office of Facility Planning and Control, or the capital outlay request submitted for the9
Ouachita Parish, Extension of I-20 Frontage Road East, including a Bridge across Bennett10
Bayou, Acquisitions, Planning and Construction project, contracts may be entered into prior11
to a cooperative endeavor agreement being entered into with the Office of Facility Planning12
and Control, contracts may be entered into prior to approval of the plans, specifications or13
contracts by Facility Planning and Control, and funds for the appropriation made in this or14
any other Capital Outlay Act for this project may be made available to the Ouachita Parish15
Police Jury, the City of Monroe, or the City of Monroe's I-20 Economic Development16
Corporation in furtherance of the project. Notwithstanding anything contained in this Act17
to the contrary or any other provision of law, the scope of the appropriations made in this18
or any other Capital Outlay Act for the Vermilion Parish Pecan Island Waterworks District19
No. 3 Water System Improvements project shall be deemed to include automatic read meters20
for the entire system. Notwithstanding anything contained in this Act to the contrary or any21
other provision of law, the scope of the appropriations made in this or any other Capital22
Outlay Act for the Louisiana Technical College New Construction or Renovations to23
Morgan Smith Campus, Planning and Construction project shall be used for new24
construction or renovations to Morgan Smith Campus. Notwithstanding anything contained25
in this Act to the contrary or any other provision of law, the scope of the appropriations26
made in this or any other Capital Outlay Act for the Jefferson Parish Bonnabel Canal27
Rehabilitation and Bank Stabilization (Veterans Boulevard to West Esplanade), Planning28
and Construction project shall be deemed to include steel sheet pile bulkhead, and/or bank29
excavation and reshaping, bridge replacement, property acquisition, demolition and30 ENROLLEDHB NO. 2
Page 166 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
improvements needed to stabilize the canal bank along the Bonnabel Drainage Canal in1
order to address canal bank failures between Veterans Boulevard and West Esplanade2
Avenue. Notwithstanding anything contained in this Act to the contrary or any other3
provision of law, the scope of the appropriations made in this or any other Capital Outlay4
Act for the City of Broussard Rehabilitate LA Hwy 182 from US 90 to LA Hwy 89,5
Planning and Construction project shall be deemed to include deleting four thousand two6
hundred feet of two-lane rehabilitation in downtown Broussard and widening from two lanes7
to three lanes, the section of roadway from the western terminus of the City of Broussard8
Three-lane LA Hwy 182 in the city of Broussard, Planning and Construction ($750,0009
Local Match) project in downtown Broussard to South Broussard Road.  Notwithstanding10
anything contained in this Act to the contrary or any other provision of law, the scope of the11
appropriations made in this or any other Capital Outlay Act for the St. Martin Parish I-1012
Frontage Road Project shall be deemed to include the planning, designing, and construction13
of public infrastructure improvements, including but not limited to roadways, water, sewer,14
lighting, and drainage improvements, adjacent to said frontage roads for the purposes of15
economic development and job creation as certified and audited by the St. Martin Economic16
Development Authority.  Notwithstanding anything contained in this act to the contrary or17
any other Act or provision of law, the appropriations made for the Executive Department for18
facilities which promote economic development included in the Repair, Restoration, and19
Replacement for Hurricanes Katrina and Rita project, and the Department of Economic20
Development projects are for public purposes pursuant to the provisions of Article VII,21
Section 14 of the Constitution of Louisiana primarily for economic development, including22
the generation of tax revenues, creation of jobs, promotion of tourism, and creation of23
facilities for charitable, cultural, artistic, educational, social, civic, research, service,24
economic development activities, or provide facilities for professional golf events, pursuant25
to the terms of cooperative endeavor agreements, including leases and all expenditures of26
these appropriations and may be exempted, by the Commissioner of Administration, from27
all statutes relative to public bidding, contractual review and the provisions of R.S.28
33:9029.2(D) and in lieu thereof be allowed to use alternative competitive contracting29
arrangements where the appropriate administering entity submits documentation to the30 ENROLLEDHB NO. 2
Page 167 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Commissioner of Administration substantiating that it is in the best interest of the citizens1
of the state, due to economic and/or operational benefits, and the necessity to complete the2
projects in a timely manner; and, the appropriate administering entity shall have the3
authority to directly appoint the design professional from a list of a minimum of three design4
firms or joint ventures with the appropriate specialized facility design experience submitted5
to and acceptable to the Commissioner of Administration and shall be exempt from other6
state requirements for selection of designers, and may include expenditures for computers,7
fixtures, furniture, and other equipment as such is deemed to be capital outlay in nature, and8
unless the Commissioner of Administration is advised by bond counsel to the State that such9
may violate federal tax law, may be used to reimburse any expenditure made prior to the10
granting of a line of credit or the sale of bonds by the State Bond Commission, determination11
by the State Treasurer that cash funding has been deposited in the Comprehensive Capital12
Outlay Escrow Account for the project or the execution of a cooperative agreement from the13
Office of Facility Planning and Control, and may be used to acquire land or real property,14
the title to which is held in the name of an entity exempt from taxation under the provisions15
of Title 26, Section 501(c)(3) of the United States Code.  Notwithstanding anything16
contained in this Act to the contrary or any other provision of law, all of the funds herein17
appropriated to the Department of Economic Development in connection with the Capital18
Improvements Project to Meet Economic Development Commitments for which the19
Department of Economic Development utilizes a cooperative endeavor agreement to further20
economic development as permitted under Article VII, Section 14 of the Louisiana21
Constitution, including the generation of tax revenues and creation of jobs, shall be22
considered as having been appropriated to the Department of Economic Development, may23
be used to reimburse any expenditure made prior to the granting of a line of credit and made24
prior to the execution of a cooperative endeavor agreement and shall be administered solely25
by the Department of Economic Development pursuant to, in compliance with, and on the26
terms contained in such cooperative endeavor agreements. Notwithstanding any provision27
of law to the contrary, the Commissioner of Administration is hereby authorized to take such28
actions as are necessary, including using such funds as may be available including those29
appropriated and available under this Act for professional sports facilities through the30 ENROLLEDHB NO. 2
Page 168 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Louisiana Stadium and Exposition District and that are otherwise available, executing on1
behalf of the State such documents as are necessary in order to terminate the ground lease2
between the State and the PGA and thereby acquiring all leasehold improvements for the3
State, extending the management agreement between the State and the PGA, and extending4
the sponsorship and presence of the Zurich Classic in the Greater New Orleans area.5
Notwithstanding anything contained in this or any other capital outlay act, contracts may be6
entered into for the Tulane National Primate Research Center prior to receipt of funding and7
prior to execution of a cooperative endeavor agreement and the project is exempted from all8
statutes relative to public bidding and contractual review and in lieu thereof the appropriate9
administering entity shall have the authority to directly appoint design professionals and10
construction managers in accordance with National Institute of Health Design and11
Construction Guidelines.  Notwithstanding anything contained in this or any other capital12
outlay act, contracts may be entered into for Grosse Tete, Sewer System Improvements,13
Planning and Construction project prior to receipt of funding and prior to execution of a14
cooperative endeavor agreement.  Notwithstanding anything contained in this or any other15
capital outlay act, contracts may be entered into for the Port of South Louisiana, St. John the16
Baptist Parish Airport Expansion, Land Acquisition, Wetland Mitigation, and Avionics17
Shop, Planning and Construction; Land Acquisition, Planning, Engineering, Infrastructure18
Construction and Development of Public Port/Industrial Park Facilities; Installation of New19
Dock/Building/Equipment and Land Acquisition; Dock, Planning and Construction;20
Globalplex Rail Siding; Liquid Petroleum Dock Facility in St. James Parish; Globalplex21
Terminal Building #71 Upgrade, Planning and Construction; Globalplex Dock Access22
Bridge and Equipment Replacement /Repair; Warehouse Planning and Construction;23
Globalplex Intermodal Access Road and Railsiding prior to receipt of funding and prior to24
execution of a cooperative endeavor agreement. Notwithstanding anything in this Act, any25
previous capital outlay act, or other provision of law to the contrary, the scope of the26
appropriation for the Port of South Louisiana Globalplex Terminal Building #71 Upgrade27
project shall be deemed to also include similar upgrades for other Globalplex Terminal28
Buildings. Notwithstanding the provisions of this Act or any other capital outlay act,29
contracts may be entered into for the Iberville Parish North Iberville Community Center,30 ENROLLEDHB NO. 2
Page 169 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Planning and Construction project prior to receipt of funding and prior to execution of a1
cooperative endeavor agreement.  Notwithstanding anything in this Act to the contrary or2
any other provision of law, contracts may be entered into for the Jefferson Parish Performing3
Arts project prior to receipt of funding and prior to the execution of a cooperative endeavor4
agreement, and the State is authorized to financially participate in change orders approved5
by the Parish. Notwithstanding anything contained in this act to the contrary or any other6
provision of law, the appropriations made for the Louisiana Stadium and Exposition District7
shall be appropriated directly to the Louisiana Stadium and Exposition District, and are8
public purposes pursuant to the provisions of Article VII, Section 14 of the Constitution of9
Louisiana primarily for economic development, including the generation of tax revenue,10
creation of jobs, and the generation of tourism, and may be used to reimburse any11
expenditure made prior to the granting of a line of credit or the sale of bonds by the State12
Bond Commission, determination by the State Treasurer that cash funding has been13
deposited in the Comprehensive Capital Outlay Escrow Account for the project. The14
Louisiana Stadium and Exposition District may apply up to $10,000,000 to reimburse the15
New Orleans Hornets NBA, LLC for costs incurred in constructing a new training facility16
as contemplated by the Amended and Restated Arena Use Agreement dated July, 1 2012;17
but, otherwise, contracts for projects funded through this appropriation shall be awarded18
utilizing the public bid and contractual review process set forth in Chapter 10 of Title 38 and19
Chapter 16 of Title 39 of the Louisiana Revised Statutes of 1950, except with respect to time20
requirements, or, in order to encourage competition for the projects funded through this21
appropriation and to complete the projects in a timely manner, the Louisiana Stadium and22
Exposition District shall have the authority to select a general contractor through an RFP23
process whereby general contractors will bid general conditions and contractor's fee based24
on the direct construction budget.  The alternative time requirements shall be approved by25
the Commissioner of Administration before the awarding of any such contracts.  The26
Louisiana Stadium and Exposition District shall have the authority to directly appoint the27
design professional from a list of a minimum of three architectural firms or joint ventures28
with professional sports facility design experience acceptable to the Commissioner of29
Administration and shall be exempt from other state requirements for selection of designers.30 ENROLLEDHB NO. 2
Page 170 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
The design professional fee shall be in accordance with state guidelines administered by the1
Office of Facility Planning and Control, Division of Administration. Eligible expenses for2
Economic Development Award Program funds may include documented project expenses3
beginning on the date of LEDC Board approval of the project and may be reimbursed upon4
execution of the cooperative endeavor agreement for the project.  The new University5
Medical Center in New Orleans project in Orleans Parish shall be exempt from the state's6
requirements for selection of designers and the Commissioner of Administration shall have7
the authority to approve a design professional selection process. The design professional fee8
shall be in accordance with state guidelines administered by the Office of Facility Planning9
and Control, Division of Administration. The Division of Administration, Office of Facility10
Planning and Control, with approval of the Commissioner of Administration and the Joint11
Legislative Committee on the Budget, is authorized to use alternative delivery strategies in12
implementing the University Medical Center in New Orleans project, hurricane damage13
repairs to Southern University at New Orleans, Hazardous Material Abatement Projects, the14
City Park Golf Complex Improvements project, the Oakcrest Sprinkler System project, the15
Sprinkler Systems for Residences, Porches and Walkways project, and the Patrick Taylor16
Hall Renovation and Expansion project. For all projects administered by the Office of17
Facility Planning and Control and payable from proceeds of self-generated revenues, funds18
shall be remitted to the Office of Facility Planning and Control for deposit in the state19
treasury at such time as may be deemed necessary by the Office of Facility Planning and20
Control in order to cover the amount of contracts or other project expenses. Notwithstanding21
anything contained in this or any other capital outlay act to the contrary, for projects22
administered by the Office of Facility Planning and Control which are payable from the23
proceeds of self-generated revenues and other means of finance, the Office of Facility24
Planning and Control shall consider expenditures to be paid first from sources other than25
self-generated revenues and then to self-generated revenues. The State Treasurer shall refund26
to the appropriate source any surplus self-generated funds, advanced insurance funds27
received by the Office of Facility Planning and Control as Interagency Transfer from Office28
of Risk Management associated with hurricane damage recovery, and interest earned on29
these funds, provided the Treasurer's Office is notified, when these funds are deposited in30 ENROLLEDHB NO. 2
Page 171 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
the state treasury, that the user agency or Office of Risk Management intends to request a1
refund of this interest. Any revenue bonds appropriated in Section 1 of this Act shall not be2
secured by the full faith and credit of the state. Notwithstanding anything in this Act to the3
contrary or any other provision of law, contracts may be entered into for the Mississippi4
River Levee Raising, Arkansas to Old River project prior to receipt of funding, and the State5
is authorized to financially participate in obligations created by such contracts.6
Notwithstanding anything in this Act to the contrary or any other provisions of law, contracts7
may be entered into for the Ernest N. Morial New Orleans Exhibition Hall Authority, Hall8
A Renovation, Planning and Construction project prior to receipt of funding and prior to9
execution of the cooperative endeavor agreement. Notwithstanding anything in this Act to10
the contrary or any other provision of law, contracts may be entered into for the11
Rehabilitation of Dock #1 Section A Seawall project for the St. Bernard Port prior to receipt12
of funding, and the State is authorized to financially participate in obligations created by13
such contracts. Notwithstanding any contrary provision of Act 27 of the 2006 Regular14
Session or any other capital outlay act, the appropriation from the State General Fund15
(Direct) in the amount of $300,000 contained in the 2006 Act under Schedule 50/NET NIA16
Foundation for the project designated (1415) Multi-Purpose Center and Youth Facility,17
Planning and Construction (East Baton Rouge Parish) shall be null, void and of no effect on18
the effective date of this Act. Notwithstanding any contrary provision of Act 28 of the 200719
Regular Session or any other capital outlay act, the appropriation from the State General20
Fund (Direct) contained in the 2007 Act under Schedule 50/NET NIA Foundation for the21
project designated (1689) NIA Foundation Multi-Purpose Facility, Planning and22
Construction (East Baton Rouge Parish) is hereby reduced by $342,500. The appropriation23
from the State General Fund (Direct) for that project is and shall be deemed to be $0.24
Section 9. Notwithstanding any provisions contained herein or any other law to the25
contrary, the provisions of Chapter 16 of Subtitle III of Title 39 of the Louisiana Revised26
Statutes of 1950 as amended, shall not apply to architectural and engineering contracts,27
administered by the Office of Facility Planning and Control, Division of Administration28
pursuant to this or any other capital outlay act.29 ENROLLEDHB NO. 2
Page 172 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Section 10. All funds appropriated herein to the Office of Facility Planning and1
Control, Division of Administration, on behalf of non-state entities, and administered by2
cooperative endeavor agreements pursuant to this Act shall be expended within two (2) years3
from the date of the issuance of the bonds.  The Office of Facility Planning and Control,4
Division of Administration, agrees that it will notify the non-state entity of the date the5
bonds are issued within three (3) months from the issuance thereof.  The non-state entity6
understands and agrees that if the funds appropriated herein and administered under7
cooperative endeavor agreements pursuant to this Act are not totally expended within two8
(2) years from the issuance of the bonds, the Office of Facility Planning and Control,9
Division of Administration, can close the project and recommend that the Legislature10
reallocate any unexpended proceeds to other projects.11
Section 11. Notwithstanding any provisions contained herein or law to the contrary,12
the proceeds of revenue bonds to be utilized to fund certain projects authorized in Section13
1 hereof may, in accordance with Article VII, Section 9 of the Louisiana Constitution of14
1974, be deposited in special accounts held outside the state treasury in accordance with the15
provisions of any bond resolution, indenture, reimbursement contract, or other bond or16
financing covenant which provides for the pledge of such funds in connection with the17
issuance of revenue bonds. For all projects administered by the Office of Facility Planning18
and Control, Division of Administration, authorized in Section 1 hereof which are payable19
from the proceeds of revenue bonds, only the Office of Facility Planning and Control,20
Division of Administration, will be authorized to requisition funds from the special accounts21
described immediately above, at such time or times as may be deemed necessary by the22
Office of Facility Planning and Control, Division of Administration, in order to cover23
contract amounts or other project expenses. 24
Section 12.  The Governor shall have the power to veto any line-item in this Act. 25
Section 13. Except as otherwise provided herein, no funds shall be expended on any26
highway projects on highways within the state highway system as defined in R.S. 48:19127
under the jurisdiction of the Department of Transportation and Development unless and until28
such project is in the Highway Program, R.S. 48:228 through 232, approved by the Joint29
Legislative Committee on Transportation, Highways and Public Works.30 ENROLLEDHB NO. 2
Page 173 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Section 14. The word "statewide" used in place of the specific parish designation for1
projects contained in this Act indicates that the project or program is applicable to all sixty2
four parishes in the state. The description of any project in this Act shall be deemed to3
include planning, design, master planning, studies, permits, surveys, testing, construction,4
land and/or building/improvement acquisition, reconstruction, renovation, repair, right of5
way and utilities, site and other improvements, miscellaneous/contingencies, lease hold6
improvements ultimately owned by the State or a political subdivision of the State,7
equipment and other acquisitions, and any other component of the project if such are8
included or indicated in the capital outlay request for such projects required by R. S. 39:1019
subject to the provisions of Title 39 of the Louisiana Revised Statutes. For new construction10
or renovation projects, equipment or other acquisitions, which can reasonably be considered11
necessary for the facility to be functional, may be deemed to be included in the project, even12
if such equipment or other acquisitions are not included or indicated in the project name or13
the capital outlay request.  When local or federal match is referenced in a project title, but14
only a portion of the state appropriation is granted a line of credit or otherwise funded, then15
the amount of local or federal match, required to be made available, may be prorated relative16
to the amount of state appropriation made available through lines of credit. 17
Section 15.  The provisions, items, and projects contained in this Act are severable18
and if any provision, item, or project contained herein, or the application of any such19
provision, item, or project, is held invalid, such invalidity shall not affect other provisions,20
items, projects, or applications of the Act which can be given effect without the invalid21
provision, project, item, or application. 22
Section 16. Notwithstanding any other provisions of law to the contrary, the State23
shall not grant cash lines of credit, or authorize or issue general obligation bonds in a24
principal amount in excess of $1,746,475,000 for Fiscal Year 2013-2014. 25
Section 17. Notwithstanding the provisions of Act 422 of 1988, which mandates that26
high rise state buildings must have sprinklers by January of 1999, the deadline is hereby27
extended until December 31, 2014, to allow the completion of ongoing capital outlay28
sprinkler installation projects.29 ENROLLEDHB NO. 2
Page 174 of 174
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Section 18. Notwithstanding any contrary provision of this Act or any contrary1
provision of law, no funds appropriated by this Act shall be released or provided to any2
recipient of an appropriation made in this Act if, when, and for as long as, the recipient fails3
or refuses to comply with the provisions of R.S. 24:513. No recipient shall be considered4
to fail or refuse to comply with the provisions of R.S. 24:513 pursuant to this Section during5
any extension of time granted by the Legislative Auditor to the recipient to comply.  The6
Legislative Auditor is authorized to grant an extension of time to comply with the provisions7
of R.S. 24:513 for recipient entities of an appropriation contained in this Act.8
Section 19. This Act shall become effective upon signature by the Governor or, if9
not signed by the Governor, upon expiration of the time for bills to become law without10
signature by the Governor, as provided in Article III, Section 18 of the Constitution of11
Louisiana. If vetoed by the Governor and subsequently approved by the Legislature, this Act12
shall become effective on the day following such approval.13
SPEAKER OF THE HOUSE OF REPRESENTATI VES
PRESIDENT OF THE SENATE
GOVERNOR OF THE STATE OF LOUISIANA
APPROVED: