HLS 13RS-1115 ORIGINAL Page 1 of 2 CODING: Words in struck through type are deletions from existing law; words underscored are additions. Regular Session, 2013 HOUSE BILL NO. 487 BY REPRESENTATIVE STUART BISHOP Prefiled pursuant to Article III, Section 2(A)(4)(b)(i) of the Constitution of Louisiana. PUBLIC CONTRACTS: Provides relative to plans for public works projects and above ground power lines AN ACT1 To enact R.S. 38:2223(A)(4), relative to public works projects and overhead power lines; to2 require a public entity to provide certain information pertaining to overhead power3 lines on plans for any public works project; to provide relative to liability for4 damages in the event that such information is not provided; and to provide for related5 matters.6 Be it enacted by the Legislature of Louisiana:7 Section 1. R.S. 38:2223(A)(4) is hereby enacted to read as follows:8 ยง2223. Issuance of work orders and commencement of work; underground utilities;9 overhead power lines10 A.11 * * *12 (4) On the plans for any public works project, the public entity or design13 professional of record shall locate and illustrate all overhead power lines and wattage14 thereof and identify the owner of each and all such lines. If the public entity or15 design professional of record fails to locate and illustrate all overhead power lines16 and indicate the wattage and owner of each and all such lines, the contractor shall be17 released from any liability in connection with their damage unless such damage is18 caused by the negligence of the contractor.19 * * *20 HLS 13RS-1115 ORIGINAL HB NO. 487 Page 2 of 2 CODING: Words in struck through type are deletions from existing law; words underscored are additions. DIGEST The digest printed below was prepared by House Legislative Services. It constitutes no part of the legislative instrument. The keyword, one-liner, abstract, and digest do not constitute part of the law or proof or indicia of legislative intent. [R.S. 1:13(B) and 24:177(E)] Stuart Bishop HB No. 487 Abstract: Requires all overhead power lines, their wattage, and owner to be illustrated or identified on plans for public works projects. Provides that a contractor shall not be liable to any damage caused should this not be done unless that damage was caused by the gross negligence of the contractor. Proposed law requires the public entity or design professional on the plans for any public works project, to locate and illustrate all overhead power lines and indicate the wattage and identify the owner of each and all such lines. Proposed law provides that if the public entity or design professional of record fails to locate and illustrate all overhead power lines and indicate the wattage thereof and identify the owner of each and all such lines. Specifies that the contractor shall be released from any liability in connection with their damage unless such damage is caused by the negligence of the contractor. (Adds R.S. 38:2223(A)(4))