HLS 13RS-3194 ORIGINAL Page 1 of 4 Regular Session, 2013 HOUSE CONCURRENT RESOLUTI ON NO. 148 BY REPRESENTATIVE STUART BISHOP PUBLIC CONTRACTS: To create and form an Overhead Power Line Identification Work Group to study the issues surrounding overhead power lines and construction projects A CONCURRENT RESOLUTI ON1 To create and form an Overhead Power Line Identification Work Group, led by the2 Department of Transportation and Development, to identify a solution to problems3 surrounding the identification of power lines for contractors prior to commencing4 work.5 WHEREAS, R.S. 45:141 et seq., the Louisiana Overhead Power Line Safety Act,6 prohibits any work whatsoever within ten feet of a power line carrying in excess of six7 hundred volts and requires a contractor to notify the owner of overhead lines at least forty-8 eight hours prior to commencement of work; and9 WHEREAS, there is a lack of information available for a contractor to readily10 identify a utility company or companies that must be notified of the risk of construction11 equipment coming into contact with, or in close enough proximity to cause arcing of12 electricity with accompanying injury to construction workers or bystanders; and13 WHEREAS, power lines are often in close proximity to construction projects, and14 there is no process in place for identification of the operators of such lines nor are there any15 laws in place to require overhead power line operators to locate and provide height and16 voltage information about power lines; and17 WHEREAS, the Louisiana Overhead Power Line Safety Act further requires that the18 parties come to a satisfactory and mutual agreement for safety procedures within a certain19 time frame; and20 HLS 13RS-3194 ORIGINAL HCR NO. 148 Page 2 of 4 WHEREAS, the Louisiana Overhead Power Line Act also prohibits work from being1 commenced by contractors until a "satisfactory mutual agreement" is reached; and2 WHEREAS, there is no procedure to address circumstances where a "satisfactory3 mutual agreement" is not reached and which party is then tasked with producing safety4 procedures or paying for the costs of those procedures; and5 WHEREAS, there are often costly delays to the completion of construction projects6 due to the lack of the identification of overhead power lines; and7 WHEREAS, contractors bear the responsibility and risk for working and operating8 cranes and other equipment in the vicinity of overhead power lines; and9 WHEREAS, House Bill No. 487 of the 2013 Regular Session of the Legislature by10 Representative Stuart Bishop sought to require designers of projects to identify the location,11 wattage, and height of power lines; and12 WHEREAS, House Bill No. 487 of the 2013 Regular Session of the Legislature13 sparked much discussion by contractors, utility companies, and design professionals; and14 WHEREAS, all parties decided that the matter of identification of location, wattage,15 and height of power lines is a complex issue that will require further formal study and16 discussion to formulate an equitable and reasonable solution to a problem that currently has17 none.18 THEREFORE, BE IT RESOLVED that the Legislature of Louisiana does hereby19 authorize and establish the Overhead Power Line Identification Work Group which shall20 report its recommendations regarding the identification of ownership, location, wattage, and21 height of power lines for contractors and related issues to the House and Senate committees22 on transportation, highways, and public works.23 BE IT FURTHER RESOLVED that the work group created herein shall consist of24 the following members:25 (1) The secretary of the Department of Transportation and Development or his26 designee.27 (2) The director of the office of facility planning and control or his designee.28 (3) The president of the Louisiana Associated General Contractors or his designee.29 HLS 13RS-3194 ORIGINAL HCR NO. 148 Page 3 of 4 (4) The vice president of regulatory and governmental affairs of Entergy Louisiana1 or his designee.2 (5) The senior vice president of commercial operations of Cleco Power, LLC,3 (CLECO) or his designee.4 (6) The vice president of external affairs for Southwestern Electric Power Company5 (SWEPCO) or his designee.6 (7) One member appointed by the Association of Louisiana Electric Cooperatives.7 (8) The president of the Police Jury Association of Louisiana or his designee.8 (9) The president of the Louisiana Municipal Association or his designee.9 (10) The president of the American Council of Engineering Companies of Louisiana10 or his designee.11 (11) The president of the Louisiana Society of Professional Surveyors or his12 designee.13 (12) The president of the Louisiana Architects Association or his designee.14 BE IT FURTHER RESOLVED that the work group shall identify the issues15 surrounding the identification of location, wattage, and height of power lines by design16 professionals for contractors, as well as related issues, and make specific recommendations17 regarding legislation to be introduced to address the issues identified.18 BE IT FURTHER RESOLVED that the work group shall convene its first meeting19 no later than August 1, 2013.20 BE IT FURTHER RESOLVED that the work group shall notify the following21 persons of the time, date, and location of each work group meeting: the chairwoman of the22 House Committee on Transportation, Highways and Public Works, the chairman of the23 Senate Committee on Transportation, Highways and Public Works, the chairman of the24 House Committee on Commerce, the chairman of the Senate Committee on Commerce,25 Consumer Protection, and International Affairs, the senator representing Senate District26 Number 27, and the member of the House of Representatives representing House District27 Number 43.28 HLS 13RS-3194 ORIGINAL HCR NO. 148 Page 4 of 4 BE IT FURTHER RESOLVED that the work group shall submit a written report of1 its findings and recommendations to the House and Senate committees on transportation,2 highways, and public works no later than January 1, 2014.3 BE IT FURTHER RESOLVED that a copy of this Resolution shall be transmitted4 to the secretary of the Department of Transportation and Development, the office of facility5 planning, Louisiana Associated General Contractors, Entergy Louisiana, LLC, Cleco Power,6 LLC, Southwestern Electric Power Company, the Association of Louisiana Electrical7 Cooperatives, the Police Jury Association of Louisiana, the Louisiana Municipal8 Association, the American Council of Engineering Companies of Louisiana, the Louisiana9 Society of Professional Surveyors, and the Louisiana Architects Association.10 DIGEST The digest printed below was prepared by House Legislative Services. It constitutes no part of the legislative instrument. The keyword, one-liner, abstract, and digest do not constitute part of the law or proof or indicia of legislative intent. [R.S. 1:13(B) and 24:177(E)] Stuart Bishop HCR No. 148 Creates and forms the Overhead Power Line Identification Work Group. Requires the work group to submit a written report of its findings to the House and Senate committees on transportation, highways, and public works by Jan. 1, 2014.