HLS 172ES-17 ORIGINAL 2017 Second Extraordinary Session HOUSE BILL NO. 12 BY REPRESENTATIVE JONES CAPITAL OUTLAY: Provides for the comprehensive Capital Outlay budget (Item #3) 1 AN ACT 2To provide with respect to the capital outlay budget and the capital outlay program for state 3 government, state institutions, and other public entities; to provide for the 4 designation of projects and improvements; to provide for the financing thereof 5 making appropriations from certain sources; and to provide for related matters. 6Be it enacted by the Legislature of Louisiana: 7 Section 1. The following sums or so much thereof as may be necessary are hereby 8appropriated out of any monies in the state treasury from the sources specified, from federal 9funds and self-generated revenues belonging to the state of Louisiana and/or collected by 10boards, commissions, departments, and agencies thereof, all for making capital outlay and 11for the purposes and in the amounts specified herein for the Fiscal Year commencing July 121, 2017, and ending June 30, 2018, subject to the conditions thereafter provided: 13 A project with funding payable from General Obligation Bonds Priority 1 indicates 14that the funding for the project includes the reauthorization of funding which was previously 15on a line of credit granted by the State Bond Commission in Fiscal Year 2016-2017. As 16used in this Section, the term "general obligation bonds" means state general obligation 17bonds or other evidences of indebtedness payable from the Bond Security and Redemption 18Fund. The amount set forth in this Section opposite each project, or so much thereof as may 19be necessary, is hereby appropriated and payable from the proceeds available from the sale 20of general obligation bonds, unless a different source of funding is indicated. Where such 21a different source of funding is indicated, the corresponding amount set forth, or so much Page 1 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1thereof as may be necessary, is hereby appropriated and payable from the source of funding 2indicated; provided, however, amounts appropriated and payable from federal funds may be 3encumbered or expended only to the extent such amounts shall have been committed or 4received. Pursuant to the provisions of R.S. 39:82, funds for planning, acquisition, 5construction, and major repair projects appropriated by this Act may be retained until 6completion of the project, even if no bona fide liability exists on the last day of the fiscal 7year. 8 This Act shall constitute the comprehensive state capital outlay budget for the 2017- 92018 Fiscal Year. Projects set forth which are payable from the proceeds available from the 10sale of general obligation bonds shall have the priorities as indicated. The Request for Line 11of Credit form used by the attorney general and Bond Counsel in evaluating Louisiana 12Constitutional, Internal Revenue Code, and applicable income tax regulations shall be filed 13with the commissioner of administration, State Bond Commission, and state attorney 14general. No general obligation bonds shall be sold, nor cash lines of credit granted to fund 15any lower priority project prior to the sale of general obligation bonds or the granting of cash 16lines of credit to fund all higher priority projects (the "general rule"), except as hereinafter 17provided. This prohibition against funding a lower priority project shall not apply upon a 18showing of an impossibility or impracticality either to proceed with all unfunded higher 19priority projects or to proceed with the funding of such projects or any part thereof through 20the issuance of general obligation bonds for any reason. Such showing shall be stated in 21reasonable detail in a certificate or certificates signed by the state agency responsible for 22administering the funding, and filed with the commissioner of administration and the State 23Bond Commission (hereinafter referred to as "the Commission"). Upon a determination by 24the Commission that proceeding with such a project or the funding thereof through the 25issuance of general obligation bonds is impractical or impossible, the Commission may then 26proceed with the sale of general obligation bonds or the granting of cash lines of credit 27without regard to the priority of the unfunded projects determined to be impossible or 28impractical. 29 Upon recommendation by the state agency responsible for administering the funding, 30if it is determined at any time that proceeding with the project or with the funding thereof Page 2 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1is no longer impossible or impractical, the State Bond Commission may rescind the 2certificate of impossibility or impracticality and may proceed with the project or with the 3issuance of general obligation bonds or the granting of cash lines of credit to fund the 4project. Alternatively, the Interim Emergency Board (hereinafter referred to as "the Board"), 5upon reviewing certificates as described above and determining that proceeding with such 6project or the funding thereof through the issuance of general obligation bonds is impossible 7or impractical, may designate a lower priority for such project. The Board's determination 8and lower priority designation shall be submitted to the members of the legislature for their 9approval in accordance with the provisions of Chapter 3-B of Subtitle I of Title 39 of the 10Louisiana Revised Statutes of 1950. In accordance with the provisions of Chapter 3-B of 11Subtitle I of Title 39 of the Louisiana Revised Statutes of 1950, whenever at the written 12request of the appropriate legislators and agency, the Board determines that an adjustment 13to a project description originally set forth in such capital budget adopted by the legislature 14for a current fiscal year is necessary to correct a mistake in a project description, clarify a 15description, change the scope of a description, or make any other adjustment the Board 16deems necessary to implement the purpose of the project, such adjustment shall become 17effective only upon the approval by majority vote of the elected members of each house of 18the legislature in the manner provided for in Chapter 3-B of Subtitle I of Title 39 of the 19Louisiana Revised Statutes of 1950. 20 If such approval is granted, notification by the chair or secretary of the Board of the 21results of the balloting shall be transmitted to the State Bond Commission, which may then 22proceed with the sale of general obligation bonds or the granting of cash lines of credit for 23each change approved upon request of the commissioner of administration in accordance 24with the general rule. 25 With respect to Priorities 1 through 5, a lower priority project may be moved to a 26higher priority only upon a showing of an emergency or other cause not reasonably 27anticipated by the legislature, which shall be stated in reasonable detail in a certificate signed 28by the head of the appropriate department, political subdivision, or agency and filed with the 29commissioner of administration and the Board. Upon a determination by the Board that such 30project should be moved to a higher priority because of an emergency or other cause not Page 3 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1reasonably anticipated by the legislature, the Board shall designate a higher priority to the 2project. The matter then shall be submitted to and be subject to the same approval by the 3members of the legislature in the manner previously indicated in this Section. If such 4approval is granted, notification by the chair or secretary of the board of the change of 5priority shall be transmitted to the State Bond Commission, which then upon request of the 6commissioner of administration, may proceed with the sale of general obligation bonds or 7the granting of cash lines of credit in accordance with the general rule. As to projects within 8a priority, the State Bond Commission acting on requests submitted by the commissioner of 9administration shall determine when such project, or phases thereof, shall be funded. In 10making such determination, the State Bond Commission shall consider the amount of 11proceeds of general obligation bonds to be made available in light of money and capital 12market conditions; the expenditure requirements of the project; the time required for 13architectural plans and drawings, public bidding, and site acquisition and preparation; 14availability of receipt of federal monies; litigation affecting the undertaking or completion 15of a project; federal tax laws and regulations regarding the sale of municipal bonds; and 16other items of a similar nature bearing upon the possibility or the necessity to commence a 17project or any particular phase thereof. 18 Any other provision of this Act to the contrary notwithstanding, projects described 19in Priority 5 of this Act shall not be moved to a higher priority except upon one of the 20following conditions: (1) Funding is necessary to complete or additionally fund a project 21located elsewhere in the Capital Outlay Act. Determination of such condition shall be made 22by the head of the appropriate department or agency by means of a certificate to that effect 23filed with the Interim Emergency Board, who shall, by mail ballot, request approval of such 24change and if approved by a majority of each house of the legislature it shall be funded, or 25(2) unless required by an emergency or other cause not reasonably anticipated by the 26legislature, to be in accordance with procedures set forth in this Section. However, the State 27Bond Commission may authorize a non-cash line of credit for any project in Priority 5 which 28represents that portion of construction contracts which were let during a previous fiscal year, 29or construction contracts which will be let during the current fiscal year, but which will not 30require cash expenditures during the year. Such non-cash lines of credit, when combined Page 4 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1with previously sold bonds or with higher priority bonds or lines of credit, or with funds 2appropriated from other sources, will provide sufficient appropriated funds to award 3equipment or construction contracts. Contracts shall not be awarded without approval of the 4division of administration. 5 Upon approval by the State Bond Commission, and subject to compliance with its 6policies and procedures and the procedures set forth herein, a line of credit providing for the 7use of funds in anticipation of the sale of general obligation bonds may be granted to the 8appropriate administering agency or department from the Comprehensive Capital Outlay 9Escrow Account, or if there is not a sufficient amount available in such account, from other 10available state cash in the state treasury, for capital improvement projects for which bond 11proceeds are appropriated by a current capital budget, prior to the actual issuance of bonds 12for such projects, unless the attorney general advises that an impediment exists to the valid 13issuance of the bonds on the date such line of credit is granted. 14 All bonds that are to be repaid, in whole or in part, by revenues generated by the 15project shall be designated as "Reimbursement Bonds". The State Bond Commission shall 16enter into such agreements as are necessary to provide that the agency or subdivision, whose 17project is reimbursable, shall pay the bond debt costs into the Bond Security and Redemption 18Fund. Such costs may be paid annually or at the end of the term of the bonds issued as 19determined by the State Bond Commission. 20 Priority 1 general obligation bond funding shall be limited to: 21 (1) Projects and amounts which were previously authorized by Act 16 of the 2016 22Second Extraordinary Session of the Legislature; and which were granted cash lines of credit 23by the State Bond Commission. The bonds to fund these projects were not sold in Fiscal 24Year 2016-2017. 25 (2) The reauthorization of the portion of the outstanding Fiscal Year 2016-2017 26Priority 5 Non-Cash Lines of Credit for projects which will require cash expenditures in 27Fiscal Year 2017-2018 and therefore must be converted to Cash Lines of Credit in Fiscal 28Year 2017-2018. 29 (3) Commitments made in the Higher Education Desegregation Settlement 30Agreement. Page 5 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1 Priority 2 general obligation bond projects are for the completion of plans and 2specifications, land acquisition, site preparation, or for construction which will begin during 3the fiscal year. It is presently anticipated that the listed projects will require the sale of 4bonds or extension of lines of credit during the fiscal year after adoption of this Act. 5 Priority 3 general obligation bond projects are for the preparation of plans and 6specifications, land acquisition, site preparation, or for construction and shall be limited to 7funding for the portion of construction contracts which will not require cash expenditures 8during the fiscal year. The projects in this category shall be considered future year projects 9in the state's five-year capital outlay plan. It is presently anticipated that the listed projects 10will not require the sale of bonds or extension of lines of credit during the fiscal year. 11 Priority 4 general obligation bond projects are for the preparation of plans and 12specifications, land acquisition, site preparation, or for construction and shall be limited to 13funding for the portion of construction contracts which will not require cash expenditures 14during the fiscal year. The projects in this category shall be considered future year projects 15in the state's five-year capital outlay plan. It is presently anticipated that the listed projects 16will not require the sale of bonds or extension of lines of credit during the fiscal year. 17 Priority 5 general obligation bond funding shall be limited to funding for the portion 18of construction contracts which will not require cash expenditures during the fiscal year. 19These funds, when combined with previously sold bonds or with higher priority bonds on 20lines of credit, or with funds appropriated from other sources, will provide sufficient 21appropriated funds to award contracts. Non-cash lines of credit shall be required prior to the 22award of these contracts. 23 In accordance with the cash management plan adopted pursuant to R.S. 48:251(D) 24and the provisions of Act 161 of the 1998 First Extraordinary Session, the Department of 25Transportation and Development is authorized to enter into contracts or agreements for 26projects approved pursuant to the Highway Priority Program, Airport Construction and 27Development Priority Program, Port Construction and Development Priority Program, and 28Statewide Flood Control Program for projects bid and awarded, authorized, or commenced 29during the fiscal year which do not require cash expenditures for the full contract or 30agreement amount. Page 6 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 EXECUTIVE DEPARTMENT1 01/107DIVISION OF ADMINISTRATION2 3(1277)Local Government Assistance Program 4 (Statewide) 5 Payable from General Obligation Bonds 6 Priority 1 $ 8,614,200 7(1278)Community Water Enrichment Program 8 (Statewide) 9 Payable from General Obligation Bonds 10 Priority 1 $13,693,600 11 Priority 5 $ 5,000,000 12 Total $18,693,600 13Provided, however, that all recipients comply with the applicable Department of Natural 14Resources rules and regulations, if any, regarding master meter installation. 15(1330)Louisiana Cancer Research Center in New Orleans, 16 Planning and Construction 17 (Orleans) 18 Payable from General Obligation Bonds 19 Priority 1 $ 5,170,100 20 Priority 2 $ 3,000,000 21 Total $ 8,170,100 22(1343)State Office Buildings Major Repairs, Equipment 23 Replacement, and Renovations, Planning and Construction 24 (Statewide) 25 Payable from General Obligation Bonds 26 Priority 1 $ 1,610,700 27(1345)Exterior Waterproofing at the State Capitol Building, 28 Planning and Construction 29 (East Baton Rouge) 30 Payable from General Obligation Bonds 31 Priority 1 $ 3,996,400 32 Priority 2 $ 5,300,000 33 Total $ 9,296,400 34(1346)Repair, Restoration and Replacement for Hurricanes 35 Katrina, Rita, Gustav and Ike, Planning, Construction, 36 Renovation, and Acquisition 37 (Statewide) 38 Payable from General Obligation Bonds 39 Priority 1 $100,039,000 40(1347)Outpatient Clinics in Rapides Parish, Planning and 41 Construction 42 (Rapides) 43 Payable from General Obligation Bonds 44 Priority 1 $10,349,300 45 Priority 5 $ 121,700 46 Total $10,471,000 Page 7 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(1348)Major Repairs for State Buildings Based on Statewide 2 Condition Assessment, and Infrastructure, Planning and 3 Construction 4 (Statewide) 5 Payable from General Obligation Bonds 6 Priority 1 $40,961,000 7 Priority 2 $20,000,000 8 Total $60,961,000 9(1349)Statewide Roofing, Waterproofing, and Related Repairs 10 and Equipment Replacement Program 11 (Statewide) 12 Payable from General Obligation Bonds 13 Priority 1 $ 1,650,100 14(1350)Mold Remediation and Indoor Air Quality, Planning 15 and Construction 16 (Statewide) 17 Payable from General Obligation Bonds 18 Priority 1 $ 200,000 19 Priority 5 $ 250,000 20 Total $ 450,000 21(1352)Land Acquisition for Mitigation 22 (Richland) 23 Payable from General Obligation Bonds 24 Priority 1 $ 10,000 25(1353)Statewide Roofing Asset Management Program 26 and Waterproofing, Related Repairs and Equipment 27 Replacement Program 28 (Statewide) 29 Payable from General Obligation Bonds 30 Priority 1 $ 8,500,000 31 Priority 2 $ 5,000,000 32 Priority 5 $ 6,500,000 33 Payable from Fees and Self Generated Revenues $ 250,000 34 Total $20,250,000 35(1354)Americans With Disabilities Act Implementation for 36 State Facilities, Planning and Construction 37 (Statewide) 38 Payable from General Obligation Bonds 39 Priority 1 $ 1,894,900 40 Priority 5 $ 2,500,000 41 Total $ 4,394,900 42(1358)Louisiana Property Assistance Agency Relocation 43 of Facility, Planning and Construction 44 (East Baton Rouge) 45 Payable from Interagency Transfers $ 243,000 46 Payable from Fees and Self Generated Revenues $ 757,000 47 Total $ 1,000,000 48(1634)Shreveport State Office Building Mechanical and 49 Electrical Renovations 50 (Caddo) 51 Payable from the balance of Series 94A (08T-02)$ 316 Page 8 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 01/109COASTAL PROTECTION AND RESTORATION AUTHORITY1 2(199) Coastal Protection Projects, Planning and Construction 3 (Statewide) 4 Payable from Interagency Transfers $ 250,000 5 Payable from Coastal Protection and Restoration Fund $224,377,888 6 Payable from Federal Funds $55,250,000 7 Total $279,877,888 8(201) Westbank Hurricane Protection Project, Planning, 9 Construction, Right of Way and Utilities 10 ($199,000,000 Federal Match and $52,800,000 11 Local Match) 12 (Jefferson, Orleans, Plaquemines, St. Charles) 13 Payable from General Obligation Bonds 14 Priority 1 $ 597,600 15(204) Morganza to Gulf of Mexico Flood Control Feasibility 16 Study, Planning, Design, Right of Way and Construction 17 of Levees, Floodgates and Other Flood Control Systems 18 ($100,000,000 Local Match) 19 (Ascension, Assumption, Iberia, Iberville, Lafourche, 20 Pointe Coupee, St. Martin, St. Mary, Terrebonne, 21 West Baton Rouge) 22 Payable from General Obligation Bonds 23 Priority 1 $20,000,000 24 Priority 5 $34,300,000 25 Total $54,300,000 26(213) Lafitte Area Tidal Protection, Planning and Construction 27 (Jefferson) 28 Payable from General Obligation Bonds 29 Priority 1 $ 2,402,900 30 Priority 5 $11,000,000 31 Total $13,402,900 01/112DEPARTMENT OF MILITARY AFFAIRS32 33(412) Statewide Backlog of Maintenance and Repair (BMAR), 34 Phase 3, and Statewide Infrastructure Rehabilitation, Phase 3 35 (Statewide) 36 Payable from General Obligation Bonds 37 Priority 1 $ 3,602,300 38 Priority 5 $ 2,960,000 39 Payable from Federal Funds $ 4,000,000 40 Total $10,562,300 41(461) Camp Minden, Infrastructure, Rehabilitation, Phase 2, 42 Planning and Construction 43 (Webster) 44 Payable from General Obligation Bonds 45 Priority 1 $ 1,740,000 46 Payable from Federal Funds $ 963,000 47 Total $ 2,703,000 48(1035)Readiness Center Replacement, Franklinton, LA, 49 Planning and Construction 50 (Washington) 51 Payable from General Obligation Bonds 52 Priority 1 $ 214,200 Page 9 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(1090)State Emergency Warehouse at Camp Villere, 2 Planning and Construction 3 (St. Tammany) 4 Payable from General Obligation Bonds 5 Priority 1 $ 3,290,000 01/124LOUISIANA STADIUM AND EXP OSITION DISTRICT6 7(1385)Bayou Segnette Sports Complex Improvements, 8 Including Hall B Expansion, Planning and Construction 9 (Jefferson) 10 Payable from General Obligation Bonds 11 Priority 1 $ 2,897,900 12(1386)Improvements to TPC Louisiana, Planning and 13 Construction 14 (Jefferson) 15 Payable from General Obligation Bonds 16 Priority 1 $ 3,549,100 17(1387)Zephyr Field Improvements 18 (Jefferson) 19 Payable from General Obligation Bonds 20 Priority 2 $ 363,500 21 Priority 5 $ 3,000,000 22 Total $ 3,363,500 23(1388)Improvements to the Superdome 24 (Orleans) 25 Payable from General Obligation Bonds 26 Priority 1 $ 5,172,400 27(1390)Bayou Segnette Recreation Complex, Land Acquisition, 28 Planning and Construction 29 (Jefferson) 30 Payable from General Obligation Bonds 31 Priority 1 $ 7,367,100 32 Priority 5 $18,100,000 33 Total $25,467,100 DEPARTMENT OF VETERANS AFFAIRS34 03/130DEPARTMENT OF VETERANS AFFAIRS35 36(440) Veterans Cemetery in Jennings, LA 37 (Jefferson Davis) 38 Priority 2 $ 1,000,000 39 Payable from Federal Funds via Interagency Transfers $ 6,486,250 40 Total $ 7,486,250 41(462) Southeast LA Veterans Cemetery Expansion, Columbarium 42 (St. Tammany) 43 Payable from General Obligation Bonds 44 Priority 2 $ 175,000 45 Payable from Federal Funds via Interagency Transfers $ 1,521,886 46 Total $ 1,696,886 Page 10 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 03/132NORTHEAST LOUISIANA WAR VETERANS HOME1 2(1112)New Generator, Planning and Construction 3 (Ouachita) 4 Payable from Federal Funds via Interagency Transfers $ 850,000 5(1119)Replacement of Walk-in Coolers and Freezer 6 (Ouachita) 7 Payable from Federal Funds via Interagency Transfers $ 75,000 8(1123)Replacement and Expanded Capacity of Existing 9 Cooling Tower 10 (Ouachita) 11 Payable from Federal Funds via Interagency Transfers $ 257,900 12(1450)Exterior and Interior Door Replacements 13 (Ouachita) 14 Payable from General Obligation Bonds 15 Priority 1 $ 8,000 16 17Pending submittal and approval of capital outlay budget request pursuant to the 18provisions of R.S. 39:112 03/134SOUTHWEST LOUISIANA WAR VETERANS HOME19 20(937) Walk-in-the-Park Alzheimers "Reflections" Unit Expansion 21 (Jefferson Davis) 22 Payable from Federal Funds via Interagency Transfers $ 354,000 23 Payable from Fees and Self Generated Revenues $ 246,000 24 Total $ 600,000 25(1005)HVAC Attic and Hallway Unit Replacement 26 (Jefferson Davis) 27 Payable from Federal Funds via Interagency Transfers $ 508,234 28 Payable from Fees and Self Generated Revenues $ 353,179 29 Total $ 861,413 03/136SOUTHEAST LOUISIANA WAR VETERANS HOME30 31(424) Southeast LA Veterans Home Facility Preservation 32 (St. John the Baptist) 33 Payable from Fees and Self Generated Revenues $ 168,791 ELECTED OFFICIALS34 04/139SECRETARY OF STATE35 36(1052)Louisiana State Exhibit Museum - Regional Archives 37 and Office Facility, Planning and Construction 38 (Caddo) 39 Payable from General Obligation Bonds 40 Priority 1 $ 2,362,600 Page 11 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 DEPARTMENT OF ECONOMIC DEVELOP MENT1 05/252OFFICE OF BUSINESS DEVELOPMENT2 3(1161)Economic Development Award Program for Infrastructure 4 Assistance 5 (Statewide) 6 Payable from General Obligation Bonds 7 Priority 1 $ 8,857,700 8 Priority 2 $ 3,000,000 9 Priority 5 $ 7,000,000 10 Total $18,857,700 11(1403)Capital Improvements Projects to Meet Economic 12 Development Commitments, Planning, Construction, 13 and Equipment 14 (Statewide) 15 Payable from General Obligation Bonds 16 Priority 1 $ 72,055 17(1404)Water Conference and Education Center, Planning, 18 Engineering, Design and Construction 19 (East Baton Rouge) 20 Payable from General Obligation Bonds 21 Priority 1 $13,400,000 DEPARTMENT OF CULTURE, RECREATION AND TOURISM22 06/263OFFICE OF STATE MUSEUM23 24(429) Construction of Civil Rights Museum, Planning 25 and Construction 26 (Orleans) 27 Payable from General Obligation Bonds 28 Priority 5 $ 765,000 29(430) Old U. S. Mint Museum Exhibit 30 (Orleans) 31 Payable from General Obligation Bonds 32 Priority 1 $ 215,000 33(1030)Presbytere Exterior Restoration and Repair, Planning 34 and Construction 35 (Orleans) 36 Payable from General Obligation Bonds 37 Priority 1 $ 322,700 38 Priority 2 $ 1,920,000 39 Total $ 2,242,700 40(1031)Cabildo Exterior Restoration and Repair, Planning 41 and Construction 42 (Orleans) 43 Payable from General Obligation Bonds 44 Priority 1 $ 150,900 45 Priority 2 $ 2,360,000 46 Total $ 2,510,900 Page 12 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 06/264OFFICE OF STATE PARKS1 2(613) Preventive Maintenance/Major Repairs and Improvements 3 (Statewide) 4 Payable from General Obligation Bonds 5 Priority 1 $ 3,986,800 6 Priority 5 $ 3,427,800 7 Total $ 7,414,600 8(616) Bayou Segnette State Park, Land Acquisition, 9 Additional Cabins, Planning and Construction 10 (Jefferson) 11 Payable from General Obligation Bonds 12 Priority 1 $ 1,603,300 13 Priority 5 $ 9,565,000 14 Total $11,168,300 15(617) Poverty Point Reservoir State Park Group Camp, 16 Conference Center, Site Amenities, Acquisition, 17 Planning and Construction 18 (Richland) 19 Payable from General Obligation Bonds 20 Priority 1 $ 2,142,800 21 Priority 5 $ 6,678,000 22 Total $ 8,820,800 23(618) Tunica Hills State Preservation Area, Acquisition, 24 Planning and Construction 25 (West Feliciana) 26 Payable from General Obligation Bonds 27 Priority 1 $ 161,200 28 Priority 5 $10,242,100 29 Total $10,403,300 30(642) Chemin-a-Haut State Park Acquisition, Planning and 31 Construction of New Group Camp, Vacation Cabins, 32 Visitor Center and Restrooms 33 (Morehouse) 34 Payable from General Obligation Bonds 35 Priority 1 $ 1,100 36(643) Fort Pike State Historic Site, Planning and Construction 37 (Orleans) 38 Payable from General Obligation Bonds 39 Priority 5 $ 117,900 06/267OFFICE OF TOURISM40 41(459) I-10 Vinton Welcome Center 42 (Calcasieu) 43 Payable from General Obligation Bonds 44 Priority 1 $ 934,800 06/A20NEW ORLEANS CITY P ARK45 46(1457)City Park Maintenance Complex Improvements, 47 Planning and Construction 48 (Orleans) 49 Payable from General Obligation Bonds 50 Priority 5 $ 2,525,300 Page 13 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 DEPARTMENT OF TRANSPORTATION AND DEVELOP MENT1 07/270ADMINISTRATION2 3(719) Highway Program (Up to $4,000,000 for Secretary's 4 Emergency Fund) 5 (Statewide) 6 Payable from General Obligation Bonds 7 Priority 1 $147,324,300 8 Priority 5 $70,000,000 9 Payable from Transportation Trust Fund - Regular $87,196,874 10 Payable from Transportation Trust Fund - Federal $612,761,670 11 Payable from the balance of General Obligation Bonds 12 previously allocated under the authority of Act 27 of 2006 for 13 Department of Transportation and Development, 14 Administration, LA 118 Bridge, Planning and Construction 15 (Sabine); and Act 20 of 2009 for Department of 16 Transportation and Development, Administration, US 167 17 Corridor Study (Evangeline, St. Landry) $ 74,141 18 Total $917,356,985 19Provided, however, that the Department of Transportation and Development is authorized 20to implement or commence projects approved in this program for Fiscal Year 2017-2018 21identified for phased funding pursuant to the cash management plan established pursuant to 22R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing 23unspent cash balances appropriated in prior years’ programs, which funds when combined 24with current appropriations will provide sufficient appropriated funds to award contracts. 25(723) Secretary's Emergency Fund for Bridge Damages, 26 Other Reimbursements, Local Matching Dollars, 27 Federal Funds, and Opportunity Grants Subject to 28 the Provisions of R.S. 48:232 29 (Statewide) 30 Payable from Interagency Transfers $15,000,000 31 Payable from Fees and Self Generated Revenues $25,000,000 32 Payable from Transportation Trust Fund - Federal 33 Receipts $25,000,000 34 Payable from Federal Funds $ 2,500,000 35 Total $67,500,000 36(769) LA 42 (US 61 to LA 44) Widening 37 (Ascension) 38 Payable from General Obligation Bonds 39 Priority 1 $23,783,900 40(773) Harding Boulevard Improvements and Southern 41 University Information Center 42 (East Baton Rouge) 43 Payable from General Obligation Bonds 44 Priority 1 $ 825,000 45 Priority 2 $ 1,175,000 46 Total $ 2,000,000 47(776) Highway 397 in Calcasieu Parish, North and South 48 Turning Lanes 49 (Calcasieu) 50 Payable from General Obligation Bonds 51 Priority 5 $ 2,000,000 Page 14 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(784) Pecue Lane/I-10 Interchange, Planning, Design, 2 Rights of Way, Utilities and Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 1 $13,000,000 6 Priority 5 $38,500,000 7 Total $51,500,000 8(807) Hooper Road Extension and Widening, Environmental, 9 Planning, Engineering, Right of Way, Utilities and 10 Construction 11 (East Baton Rouge, Livingston) 12 Payable from General Obligation Bonds 13 Priority 1 $ 1,591,400 14 Priority 5 $ 4,200,000 15 Total $ 5,791,400 16(814) Evaluation of Regional Freeway System Expansion 17 (East Baton Rouge, West Baton Rouge) 18 Payable from General Obligation Bonds 19 Priority 1 $ 540,000 20 Priority 5 $ 2,500,000 21 Total $ 3,040,000 22(913) Widening of Highway 447 and I-12 Overpass 23 Improvements, Environmental Phase Commencement, 24 Planning and Construction 25 (Livingston) 26 Payable from General Obligation Bonds 27 Priority 1 $ 290,000 28 Priority 5 $ 1,000,000 29 Total $ 1,290,000 30(939) Essen Lane Widening, I-10 to Perkins Road, Planning, 31 Utilities, Right of Way and Construction 32 (East Baton Rouge) 33 Payable from General Obligation Bonds 34 Priority 1 $ 6,382,300 35 Priority 2 $ 1,200,000 36 Total $ 7,582,300 37(944) LA 38 and Avenue F Railroad Safety Improvements, 38 Planning and Construction 39 (Tangipahoa) 40 Payable from General Obligation Bonds 41 Priority 1 $ 500,000 42(948) LA 22 Improvements (LA 16 to Diversion Canal), 43 Including the Overlay of LA 22 from Head of Island 44 to Chinquapin Bridge, Planning and Construction 45 (Livingston) 46 Payable from General Obligation Bonds 47 Priority 1 $ 4,300 48 Priority 2 $ 3,400,000 49 Total $ 3,404,300 Page 15 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(953) Hooper Road Widening and Sewer Improvements 2 (Blackwater Bayou to Sullivan Road) Planning, 3 Engineering, Utilities and Construction 4 (East Baton Rouge) 5 Payable from General Obligation Bonds 6 Priority 1 $ 2,690,000 7 Priority 5 $ 9,575,000 8 Total $12,265,000 9(962) Juban Road (LA 1026) Widening (I-12 to US 190) 10 (Livingston) 11 Payable from General Obligation Bonds 12 Priority 1 $16,269,200 13(968) LA 44 Widening, I-10 to LA 22, Planning, Utilities, 14 Right of Way and Construction 15 (Ascension) 16 Payable from General Obligation Bonds 17 Priority 1 $ 1,500,000 18 Priority 5 $ 9,500,000 19 Total $11,000,000 20(971) LA 930 Reconstruction 21 (Ascension) 22 Payable from General Obligation Bonds 23 Priority 1 $ 6,260,100 24 Priority 2 $ 1,300,000 25 Total $ 7,560,100 26Provided, however, that this appropriation is contingent upon Ascension Parish agreeing to 27accept ownership of LA 930 upon completion of construction. 28(1008)LA 64 Capacity Improvements (LA 1019 to LA 16) 29 Planning and Construction 30 (Livingston) 31 Payable from General Obligation Bonds 32 Priority 1 $ 1,000,000 33 Priority 5 $ 8,650,000 34 Total $ 9,650,000 35(1009)LA 1 Improvements, Phase 2, Planning, Engineering, 36 Right of Way, Utilities and Construction 37 (Lafourche) 38 Payable from General Obligation Bonds 39 Priority 1 $ 5,000,000 40 Priority 5 $75,000,000 41 Total $80,000,000 42(1010)Loyola/I-10 Interchange Improvements, Feasibility 43 Study, Interchange Modification Report, Environmental 44 Assessment, Engineering, Right of Ways, Utilities and 45 Construction 46 (Jefferson, Orleans) 47 Payable from General Obligation Bonds 48 Priority 1 $ 3,117,800 49 Priority 5 $ 2,315,000 50 Total $ 5,432,800 Page 16 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(1014)Jimmie Davis Bridge Rehabilitation and Lighting, 2 or Design, Engineering, Planning and Construction 3 (Bossier, Caddo) 4 Payable from General Obligation Bonds 5 Priority 1 $ 9,336,500 6(1084)Non-Federal Aid Eligible Highway Program 7 (Statewide) 8 Payable from State Highway Improvement Fund $41,400,000 9(1092)LA 89 Box Culvert Planning and Construction 10 (Lafayette) 11 Payable from General Obligation Bonds 12 Priority 2 $ 255,000 13(1101)LA 3034 Improvements 14 (East Baton Rouge) 15 Payable from General Obligation Bonds 16 Priority 1 $ 3,987,800 17 Priority 5 $14,000,000 18 Total $17,987,800 19(1102)Peters Road Bridge and Extension, Planning and 20 Construction 21 (Plaquemines) 22 Payable from General Obligation Bonds 23 Priority 1 $ 4,000,000 24(1118)City of Gonzales - GO Program LA Highway 30 25 Corridor, Planning and Construction 26 (Ascension) 27 Payable from General Obligation Bonds 28 Priority 1 $ 1,440,000 29(1159)Improvements on LA 3038, Including Patching, 30 Repairing and Overlaying of the Highway, Planning 31 and Construction 32 (Ascension) 33 Payable from General Obligation Bonds 34 Priority 1 $ 800,000 35(1189)State Streets, Algiers, Planning and Construction 36 (Jefferson, Orleans) 37 Payable from General Obligation Bonds 38 Priority 1 $ 2,347,400 07/274PUBLIC IMPROVEMENTS39 40(286) Comite River Diversion Canal Planning, Right of Way, 41 Utilities and Construction 42 (Ascension, East Baton Rouge, Livingston) 43 Payable from General Obligation Bonds 44 Priority 1 $15,000,000 45 Priority 5 $72,000,000 46 Total $87,000,000 Page 17 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(287) Mississippi River Levee Raising, Arkansas to Old River, 2 Planning and Construction 3 (Avoyelles, Concordia, East Carroll, Madison, 4 Pointe Coupee, Tensas) 5 Payable from General Obligation Bonds 6 Priority 1 $ 500,000 7(351) Bayou Dechene Reservoir, Planning, Land Acquisition 8 and Construction 9 (Caldwell) 10 Payable from General Obligation Bonds 11 Priority 1 $ 6,433,800 12 Priority 5 $ 2,000,000 13 Total $ 8,433,800 14(360) Water Resources Management Program, Studies, 15 Planning and Construction 16 (Statewide) 17 Payable from General Obligation Bonds 18 Priority 5 $ 1,000,000 19Provided, however, that the Department of Transportation and Development prepare and 20maintain a Water Resources Management Master Plan along with an annual Program of 21projects to support implementation of the Master Plan. The Department of Transportation 22and Development shall adopt the necessary rules for proper management of the Master Plan 23and Program, with the intended rules subject to the approval of the Joint Legislative 24Committee on the Budget prior to adoption. The Master Plan and Program, and any revisions 25thereto, are subject to approval of the Joint Legislative Committee on the Budget. 26(362) Port Construction and Development Priority Program 27 (Statewide) 28 Payable from Transportation Trust Fund - Regular $39,400,000 29Provided, however, that the Department of Transportation and Development is authorized 30to implement or commence projects approved in this program for Fiscal Year 2017-2018 31identified for phased funding pursuant to the cash management plan established pursuant to 32R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing 33unspent cash balances appropriated in prior years’ programs, which funds when combined 34with current appropriations will provide sufficient appropriated funds to award contracts. 35(483) Mississippi River Deepening, Phase 3, Planning, Design, 36 Construction, Rights-of-Way, Relocations and Utilities 37 (Federal Match $154,500,000) 38 (Ascension, East Baton Rouge, Jefferson, Orleans, 39 Plaquemines, St. Bernard, St. Charles, St. James, 40 St. John the Baptist, West Baton Rouge) 41 Payable from General Obligation Bonds 42 Priority 1 $ 400,000 43(484) Houma Navigational Canal Deepening Project, Planning, 44 Design, Construction, Rights-of-Ways, Relocations and 45 Utilities (Federal Match $191,000,000) 46 (Terrebonne) 47 Payable from General Obligation Bonds 48 Priority 1 $ 498,600 Page 18 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(485) Acadiana Gulf of Mexico Access Channel (AGMAC), 2 Port of Iberia, Planning, Design, Construction, 3 Rights-of-Way, Relocations and Utilities (Federal 4 Match $100,000,000) 5 (Iberia, Vermilion) 6 Payable from General Obligation Bonds 7 Priority 1 $ 3,500,000 8 Priority 5 $ 5,000,000 9 Total $ 8,500,000 10(1086)Statewide Flood Control Program 11 (Statewide) 12 Payable from Transportation Trust Fund - Regular $ 9,900,000 13 Payable from the balance of General Obligation Bonds 14 previously allocated under the authority of Act 24 of 2003 for 15 Department of Transportation and Development, Public 16 Improvements, Allen Parish Reservoir, Land Acquisition, 17 Planning, Right of Way, Utilities, Equipment and 18 Construction (Allen); and Act 24 of 2003 for Department of 19 Transportation and Development, Public Improvements, 20 Alexandria to Gulf of Mexico Flood Study (Rapides); and 21 Act 24 of 2013 for Department of Transportation and 22 Development, Public Improvements, Boat Launch 23 Rehabilitation (LA Hwy 42 at Amite River), Planning and 24 Construction (Ascension) $ 22,323 25 Total $ 9,922,323 26Provided, however, that the Department of Transportation and Development is authorized 27to implement or commence projects approved in this program for Fiscal Year 2017-2018 28identified for phased funding pursuant to the cash management plan established pursuant to 29R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing 30unspent cash balances appropriated in prior years’ programs, which funds when combined 31with current appropriations will provide sufficient appropriated funds to award contracts. 07/276ENGINEERING AND OPERATIONS32 33(1087)Motor Vessel and Equipment Drydocking, Repairs, 34 Various Locations 35 (Statewide) 36 Payable from Transportation Trust Fund - Regular $ 1,500,000 37(1088)Facilities Program Major Repairs, Renovations, 38 Additions, New Facilities, Equipment Replacement at 39 Various DOTD Sites, Planning and Construction 40 (Statewide) 41 Payable from Transportation Trust Fund - Regular $ 2,000,000 07/277AVIATION IMPROVEMENTS42 43(1085)State Aviation and Airport Improvement Program 44 (Statewide) 45 Payable from Transportation Trust Fund - Regular $28,268,784 Page 19 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS1 08/402LOUISIANA STATE PENITENTIARY2 3(1044)Emergency Water Filter System Replacement, 4 Planning and Construction 5 (West Feliciana) 6 Payable from General Obligation Bonds 7 Priority 1 $ 1,400 8 Priority 5 $ 618,600 9 Total $ 620,000 10(1050)Electrical Distribution System Upgrade, Planning 11 and Construction 12 (West Feliciana) 13 Payable from General Obligation Bonds 14 Priority 1 $ 68,500 15 Priority 5 $ 4,535,500 16 Total $ 4,604,000 17(1120)Main Prison Shower and Cellblock Plumbing Upgrade, 18 Planning and Construction 19 (West Feliciana) 20 Payable from General Obligation Bonds 21 Priority 1 $ 43,400 22 Priority 5 $ 1,607,600 23 Total $ 1,651,000 08/403OFFICE OF JUVENILE JUSTICE24 25(786) HVAC System Replacement at Columbia, Planning and 26 Construction 27 (Ouachita) 28 Payable from General Obligation Bonds 29 Priority 1 $ 180,000 30 Priority 2 $ 25,000 31 Total $ 205,000 32(958) Community Based Program, Juvenile Justice 33 Improvements, Planning, Construction, Renovation, 34 Acquisition, and Equipment 35 (Statewide) 36 Payable from General Obligation Bonds 37 Priority 1 $ 2,396,700 38(1202)Bridge City Center for Youth, Sewer System Renovation, 39 Planning and Construction 40 (Jefferson) 41 Payable from General Obligation Bonds 42 Priority 1 $ 235,000 43(1203)Major Repairs and Equipment Replacement, Planning and 44 Construction 45 (Statewide) 46 Payable from General Obligation Bonds 47 Priority 1 $ 13,200 Page 20 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 08/416RAYBURN CORRECTIONAL CENTER1 2(1051)Security Perimeter Fence, Planning and Construction 3 (Washington) 4 Payable from General Obligation Bonds 5 Priority 1 $ 61,900 6 Priority 5 $ 2,033,100 7 Total $ 2,095,000 08/419OFFICE OF STATE POLICE8 9(842) Crime Lab Expansion, Planning and Construction 10 (East Baton Rouge) 11 Payable from General Obligation Bonds 12 Priority 1 $ 36,000 13(880) Renovate Training Academy, Planning and Construction 14 (East Baton Rouge) 15 Payable from General Obligation Bonds 16 Priority 5 $16,175,000 LOUISIANA DEPARTMENT OF HEALTH17 09/320OFFICE OF AGING AND ADULT SERVICES18 19(823) Repair and Upgrade to Sewer System, Planning and 20 Construction 21 (East Feliciana) 22 Payable from General Obligation Bonds 23 Priority 1 $ 265,000 24 Priority 5 $ 4,535,000 25 Total $ 4,800,000 26(825) Water Tower Repairs and Improvements, Planning and 27 Construction 28 (East Feliciana) 29 Payable from General Obligation Bonds 30 Priority 1 $ 120,300 31 Priority 2 $ 340,000 32 Total $ 460,300 09/330OFFICE OF BEHAVIORAL HEALTH33 34(709) Central Louisiana State Hospital Relocation to Pinecrest, 35 Planning and Construction 36 (Rapides) 37 Payable from General Obligation Bonds 38 Priority 1 $ 800,500 39 Priority 5 $28,013,200 40 Total $28,813,700 41(736) Center Building and Fire Alarm System Renovation and 42 Restoration, East Louisiana State Hospital, Planning and 43 Construction 44 (East Feliciana) 45 Payable from General Obligation Bonds 46 Priority 1 $ 66,700 47 Priority 5 $ 7,600,000 48 Total $ 7,666,700 Page 21 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(737) Fire Alarm System Replacement for Ten Buildings, 2 Planning and Construction 3 (East Feliciana) 4 Payable from General Obligation Bonds 5 Priority 1 $ 95,600 6 Priority 5 $ 7,200,000 7 Total $ 7,295,600 DEPARTMENT OF NATURAL RESOURCES8 11/431OFFICE OF THE SECRETARY9 10(1381)Atchafalaya Basin Protection and Enhancement (Federal 11 Match and Local/Sponsor Match) 12 (Assumption, Avoyelles, Iberia, Iberville, Pointe Coupee, 13 St. Landry, St. Martin, St. Mary) 14 Payable from General Obligation Bonds 15 Priority 1 $ 8,642,900 DEPARTMENT OF WILDLIFE AND FISHERIES16 16/512OFFICE OF THE SECRETARY17 18(195) Wildlife and Fisheries Enforcement Training Academy 19 and Emergency Facility Complex, Planning and 20 Construction 21 (East Baton Rouge) 22 Payable from Federal Funds via Interagency Transfers $ 1,630,836 23 Payable from Conservation Fund $ 1,401,929 24 Total $ 3,032,765 16/513OFFICE OF WILDLIFE25 26(972) Woodworth Central Office Complex 27 (Rapides) 28 Payable from General Obligation Bonds 29 Priority 1 $ 288,900 30 Priority 5 $13,800,000 31 Total $14,088,900 32(973) Region 5/Lake Charles Office, Planning and Construction 33 (Calcasieu) 34 Payable from General Obligation Bonds 35 Priority 1 $ 734,400 36 Priority 5 $10,660,600 37 Total $11,395,000 38(975) Monroe Headquarters, District 2, Planning and 39 Construction 40 (Ouachita) 41 Payable from General Obligation Bonds 42 Priority 1 $ 130,500 43(977) Wildlife Land Acquisition 44 (Statewide) 45 Payable from Rockefeller Wildlife Refuge Trust 46 and Protection Fund $ 2,000,000 Page 22 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(1107)Rockefeller Refuge Office Replacement 2 (Cameron) 3 Payable from Rockefeller Wildlife Refuge and Game 4 Preserve Fund $ 2,694,400 5(1622)Replace Two Water Control Structures at Pointe Aux 6 Chenes Unit at Pointe Aux Chenes Wildlife Management 7 Area 8 (Terrebonne) 9 Payable from Rockefeller Wildlife Refuge Trust 10 and Protection Fund $ 1,440,000 11Provided, however, that this appropriation is in lieu of funds appropriated in Act 26 of 2015 12for Department of Wildlife and Fisheries, Office of Wildlife, Replace Two Water Control 13Structures at Pointe Aux Chenes Unit and Pointe Aux Chenes Wildlife Management Area 16/514OFFICE OF FISHERIES14 15(951) Science Center and Educational Complex 16 (Calcasieu) 17 Payable from Federal Funds via Interagency Transfers $ 8,000,000 18(954) Elmer's Island Access Enhancement 19 (Jefferson) 20 Payable from Federal Funds via Interagency Transfers $ 5,000,000 21(1048)16-Bay Boatshed LDWF Headquarters District #7 22 (East Baton Rouge) 23 Payable from Conservation Fund $ 321,840 DEPARTMENT OF EDUCATION24 19/600LSU BOARD OF SUPERVISORS25 26(37) Major Repairs and Deferred Maintenance of Buildings 27 and Facilities, Planning and Construction 28 (Acadia, Caddo, East Baton Rouge, Orleans, Rapides) 29 Payable from General Obligation Bonds 30 Priority 1 $ 5,000,000 19/601LSU BATON ROUG E31 32(20) H. P. Long Field House Renovation, Planning 33 and Construction 34 (East Baton Rouge) 35 Payable from General Obligation Bonds 36 Priority 2 $ 1,800,000 37(21) Renovate Old Engineering Shops for Art Department, 38 Planning and Construction 39 (East Baton Rouge) 40 Payable from General Obligation Bonds 41 Priority 1 $ 1,922,300 42 Priority 5 $11,937,700 43 Total $13,860,000 Page 23 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(22) Patrick F. Taylor Hall Renovations and Expansion, 2 Planning and Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 1 $ 9,800,000 6(38) Highland Hall Renovation, Planning and Construction 7 (East Baton Rouge) 8 Payable from Revenue Bonds $12,350,000 9Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue 10Bonds appropriated in Act 16 of the 2016 Second Extraordinary Session to LSU Baton 11Rouge for Highland Hall Renovation, Planning and Construction 12(39) New Residence Hall, Planning and Construction 13 (East Baton Rouge) 14 Payable from Revenue Bonds $80,450,000 15Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue 16Bonds appropriated in Act 16 of the 2016 Second Extraordinary Session to LSU Baton 17Rouge for New Residence Hall, Planning and Construction 18(40) Greenhouse Relocation, Planning and Construction 19 (East Baton Rouge) 20 Payable from Revenue Bonds $14,550,000 21Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue 22Bonds appropriated in Act 16 of the 2016 Second Extraordinary Session to LSU Baton 23Rouge for Greenhouse Relocation, Planning and Construction 24(41) Enclose Corporation Canal, Planning and Construction 25 (East Baton Rouge) 26 Payable from Revenue Bonds $13,750,000 27Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue 28Bonds appropriated in Act 16 of the 2016 Second Extraordinary Session to LSU Baton 29Rouge for Enclose Corporation Canal, Planning and Construction 30(42) Evangeline Residence Hall Renovation, Planning and 31 Construction 32 (East Baton Rouge) 33 Payable from Revenue Bonds $18,650,000 34Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue 35Bonds appropriated in Act 16 of the 2016 Second Extraordinary Session to LSU Baton 36Rouge for Evangeline Residence Hall, Planning and Construction 37(43) Family Housing Complex, Planning and Construction 38 (East Baton Rouge) 39 Payable from Revenue Bonds $50,235,000 40Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue 41Bonds appropriated in Act 16 of the 2016 Second Extraordinary Session to LSU Baton 42Rouge for Family Housing Complex, Planning and Construction Page 24 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(44) Student Health Center Renovation and Addition, Planning 2 and Construction 3 (East Baton Rouge) 4 Payable from Revenue Bonds $23,890,000 5Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue 6Bonds appropriated in Act 16 of the 2016 Second Extraordinary Session to LSU Baton 7Rouge for Student Health Center Renovation and Addition, Planning and Construction 8(45) Louise Garig Hall Renovation, Planning and Construction 9 (East Baton Rouge) 10 Payable from Revenue Bonds $ 5,100,000 11Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue 12Bonds appropriated in Act 16 of the 2016 Second Extraordinary Session to LSU Baton 13Rouge for Louise Garig Hall Renovation, Planning and Construction 14(46) New Residence Hall 2, Planning and Construction 15 (East Baton Rouge) 16 Payable from Revenue Bonds $47,650,000 17Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue 18Bonds appropriated in Act 16 of the 2016 Second Extraordinary Session to LSU Baton 19Rouge for New Residence Hall 2, Planning and Construction 20(47) French House Renovation, Acquisition, Planning and 21 Construction 22 (East Baton Rouge) 23 Payable from General Obligation Bonds 24 Priority 1 $ 208,000 25(48) Nicholson Gateway: Infrastructure Improvements, 26 Planning and Construction 27 (East Baton Rouge) 28 Payable from General Obligation Bonds 29 Priority 1 $ 676,700 30(1402)LSU Memorial Tower Renovations 31 (East Baton Rouge) 32 Payable from General Obligation Bonds 33 Priority 5 $ 4,000,000 34 Payable from Fees and Self Generated Revenues$ 4,000,000 35 Total $ 8,000,000 19/602LSU ALEXANDRIA36 37(19) Infrastructure Improvements, Construction 38 (Rapides) 39 Payable from General Obligation Bonds 40 Priority 5 $ 6,090,700 41(50) Drainage Outfall Improvements, Planning and Construction 42 (Rapides) 43 Payable from General Obligation Bonds 44 Priority 1 $ 55,400 45(1626)Network and Telephone Cabling Infrastructure, Planning and 46 Construction 47 (Rapides) 48 Payable from the balance of Series 94A (08T-02)$ 100 Page 25 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 19/603UNIVERSITY OF NEW ORLEANS1 2(1291)Library Fourth Floor Completion Information Resource 3 Center 4 (Orleans) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,327,800 7(1292)Science Building Mechanical Renovations, Planning and 8 Construction 9 (Orleans) 10 Payable from General Obligation Bonds 11 Priority 1 $ 1,013,200 19/604NLSU HEALTH SCIENCES CENTER - NEW ORLEANS12 13(1) Interim Hospital Repurposing, Construction 14 (Orleans) 15 Payable from General Obligation Bonds 16 Priority 5 $34,500,000 17(5) Land Acquisition 18 (Orleans) 19 Payable from Fees and Self Generated Revenues $ 6,500,000 20(16) Human Development Center, Planning and Construction 21 (Orleans) 22 Payable from General Obligation Bonds 23 Priority 1 $ 353,900 24(17) Health Science Center Facility Renovations - Dental 25 School Simulation Facility 26 (Orleans) 27 Payable from General Obligation Bonds 28 Priority 1 $ 806,300 19/604SLSU HEALTH SCIENCES CENTER - SHREVEP ORT29 30(9) Medical School B-Building HVAC Replacement 31 (Caddo) 32 Payable from General Obligation Bonds 33 Priority 2 $ 500,000 34 Priority 5 $ 4,600,000 35 Total $ 5,100,000 36(62) Boiler Replacement, Planning and Construction 37 (Caddo) 38 Payable from General Obligation Bonds 39 Priority 1 $ 5,211,100 40(63) Patient Care HVAC Replacement, Planning and 41 Construction 42 (Caddo) 43 Payable from General Obligation Bonds 44 Priority 1 $ 1,873,400 Page 26 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(64) Capital Improvement Projects, Design and Engineering 2 (Caddo) 3 Payable from General Obligation Bonds 4 Priority 1 $ 3,748,300 5 Priority 5 $ 1,067,400 6 Total $ 4,815,700 7(65) Inpatient Critical Care Renovation, Planning and 8 Construction 9 (Caddo) 10 Payable from General Obligation Bonds 11 Priority 1 $ 143,900 12 Priority 5 $ 3,428,200 13 Total $ 3,572,100 14(66) High Voltage Electrical Distribution System Upgrade, 15 Planning and Construction 16 (Caddo) 17 Payable from General Obligation Bonds 18 Priority 1 $ 13,700 19/607LSU AGRICULTURAL CENTER19 20(11) Animal and Food Science Facilities Renovations and 21 Modernizations, Phase II, Planning and Construction 22 (East Baton Rouge) 23 Payable from General Obligation Bonds 24 Priority 1 $ 823,500 25 Priority 5 $ 168,500 26 Total $ 992,000 19/609PENNINGTON BIOMEDICAL RESEARCH CENTER27 28(69) Pennington Biomedical Clinical Research Building, 29 Imaging Center and High Tech Research Instrumentation 30 Equipment 31 (East Baton Rouge) 32 Payable from General Obligation Bonds 33 Priority 1 $ 1,000,000 19/610LSU HEALTH CARE SERVICES DIVISION34 35(52) Replacement of Air Handlers and Chillers, WO Moss, 36 Planning and Construction 37 (Calcasieu) 38 Payable from General Obligation Bonds 39 Priority 1 $ 44,000 40(54) Emergency Room Expansion, University Medical Center, 41 Planning and Construction 42 (Lafayette) 43 Payable from General Obligation Bonds 44 Priority 1 $ 548,200 45(55) Air Handling Unit Replacement, Chabert, Planning and 46 Construction 47 (Terrebonne) 48 Payable from General Obligation Bonds 49 Priority 5 $ 38,000 Page 27 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(56) New Emergency Generator and Chillers, UMC, Planning 2 and Construction 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 1 $ 10,000 6(135) Air Handler Replacement, Planning and Construction 7 (Lafayette) 8 Payable from General Obligation Bonds 9 Priority 1 $ 47,500 10(1627)Refurbish Elevators, UMC, Planning and Construction 11 (Lafayette) 12 Payable from the balance Series 94A (08T-02) $ 100 13(1628)University Medical Center in Baton Rouge 14 (East Baton Rouge) 15 Payable from the balance Series 94A (08T-02) $ 100 19/615SOUTHERN UNIVERSITY BOARD OF16 17 SUPERVISORS 18(250) Major Repairs and Deferred Maintenance of Buildings 19 and Facilities, Including HVAC, Planning and 20 Construction 21 (Caddo, East Baton Rouge, Orleans) 22 Payable from General Obligation Bonds 23 Priority 1 $ 3,000,000 24 State General Fund (Direct) $ 1,000,000 25 Total $ 4,000,000 26Provided that the State General Fund (Direct) appropriation shall be used for HVAC at 27Southern University. 19/616SOUTHERN UNIVERSITY - BATON ROUG E28 29(1172)A.W. Mumford, Americans with Disabilities Act 30 Compliance and Upgrades, Planning and Construction 31 (East Baton Rouge) 32 Payable from General Obligation Bonds 33 Priority 1 $ 7,900,000 34(1174)Repair of Sloughing Off of Ravine, Planning and 35 Construction 36 (East Baton Rouge) 37 Payable from General Obligation Bonds 38 Priority 1 $ 6,900 39 Priority 5 $ 1,000,600 40 Total $ 1,007,500 41(1176)T.T. Allain Hall, Americans with Disabilities Act 42 Compliance Upgrades, Planning and Construction 43 (East Baton Rouge) 44 Payable from General Obligation Bonds 45 Priority 1 $ 1,010,000 Page 28 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(1186)F.G. Clark Activity Center, Americans with Disabilities 2 Act Compliance and Upgrades, Planning and 3 Construction 4 (East Baton Rouge) 5 Payable from General Obligation Bonds 6 Priority 1 $ 7,450,000 7(1192)Southern University Laboratory School Addition and 8 Upgrades, Planning and Construction 9 (East Baton Rouge) 10 Payable from General Obligation Bonds 11 Priority 1 $ 54,100 12 Priority 5 $ 6,600,000 13 Total $ 6,654,100 19/618SOUTHERN UNIVERSITY - SHREVEP ORT14 15(136) Workforce Training and Technology Center, Planning 16 and Construction 17 (Caddo) 18 Payable from General Obligation Bonds 19 Priority 2 $ 200,000 20 Priority 5 $ 476,000 21 Total $ 676,000 22(138) Renovations of Allen Building, Planning and 23 Construction 24 (Caddo) 25 Payable from General Obligation Bonds 26 Priority 1 $ 3,433,800 27(142) New Classroom Building, Southern University - 28 Shreveport, Planning and Construction 29 (Caddo) 30 Payable from General Obligation Bonds 31 Priority 1 $ 641,900 19/620UNIVERSITY OF LOUISIANA SYSTEM 32 33 BOARD OF SUPERVISORS 34(1392)Major Repairs and Deferred Maintenance of 35 Buildings and Facilities, Including HVAC, 36 Planning and Construction 37 (Calcasieu, Lafayette, Lafourche, Lincoln, 38 Natchitoches, Orleans, Ouachita, Tangipahoa) 39 Payable from General Obligation Bonds 40 Priority 1 $ 3,000,000 41 State General Fund (Direct) $ 500,000 42 Total $ 3,500,000 43Provided that the State General Fund (Direct) appropriation shall be used for HVAC at 44Grambling State University. 19/621NICHOLLS STATE UNIVERSITY45 46(29) Athletic Facilities - Didier Field, Renovation, 47 Planning and Construction 48 (Lafourche) 49 Payable from General Obligation Bonds 50 Priority 1 $ 497,000 Page 29 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(1317)Talbot Hall Renovation and Roof Replacement, 2 Planning and Construction 3 (Lafourche) 4 Payable from General Obligation Bonds 5 Priority 1 $ 512,600 6(1473)Fieldhouse, Planning and Construction 7 (Lafourche) 8 Payable from General Obligation Bonds 9 Priority 2 $ 1,850,000 10 Priority 5 $ 2,000,000 11 Total $ 3,850,000 19/623GRAMBLING STATE UNIVERSITY12 13(198) Campus Utility Infrastructure Assessment, 14 Planning and Emergency Repairs and/or 15 Replacement, Planning and Construction 16 (Lincoln) 17 Payable from General Obligation Bonds 18 Priority 1 $ 123,400 19(239) Library Replacement, Planning and Construction 20 (Lincoln) 21 Payable from General Obligation Bonds 22 Priority 1 $ 893,300 23 Priority 5 $24,106,700 24 Total $25,000,000 19/625LOUISIANA TECH UNIVERSITY25 26(181) Louisiana Tech Research Park, Real Estate 27 Acquisition, Planning and Construction 28 (Lincoln) 29 Payable from General Obligation Bonds 30 Priority 1 $ 59,000 31(182) Integrated Engineering and Science Building 32 (Lincoln) 33 Payable from General Obligation Bonds 34 Priority 1 $ 5,181,200 35 Priority 5 $24,069,600 36 Payable from Fees and Self Generated Revenues $ 6,300,000 37 Total $35,550,800 38(1320)Business Building Replacement and Addition, Planning 39 and Construction 40 (Lincoln) 41 Payable from General Obligation Bonds 42 Priority 1 $ 1,499,800 19/627MCNEESE STATE UNIVERSITY43 44(33) Contraband Bayou Erosion Retaining Wall Phase II, 45 Planning and Construction 46 (Calcasieu) 47 Payable from General Obligation Bonds 48 Priority 1 $ 2,031,900 49 Priority 5 $ 3,622,000 50 Total $ 5,653,900 Page 30 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(34) Health/Human Performance Education Complex, 2 Planning and Construction 3 (Calcasieu) 4 Payable from General Obligation Bonds 5 Priority 1 $24,860,600 6(58) Shearman Fine Arts Building Renovation and Addition, 7 Planning and Construction 8 (Calcasieu) 9 Payable from General Obligation Bonds 10 Priority 1 $ 1,025,000 11(1321)ADA Upgrades Campus-Wide, Planning and 12 Construction 13 (Calcasieu) 14 Payable from General Obligation Bonds 15 Priority 1 $ 2,910,100 19/629UNIVERSITY OF LOUISIANA - MONROE16 17(1322)Sandel Hall Renovation, Planning and Construction 18 (Ouachita) 19 Payable from General Obligation Bonds 20 Priority 1 $ 1,178,200 19/631NORTHWESTERN STATE UNIVERSITY21 22(158) South Jefferson Street Extension 23 (Natchitoches) 24 Payable from General Obligation Bonds 25 Priority 5 $ 59,000 19/634SOUTHEASTERN LOUISIANA UNIVERSITY26 27(143) Computer Science and Technology Facility 28 Improvements and Expansion, Planning and Construction 29 (Tangipahoa) 30 Payable from General Obligation Bonds 31 Priority 1 $10,247,000 19/640UNIVERSITY OF LOUISIANA - LAFAYETTE32 33(205) Fletcher Hall Exterior Repairs, Planning and Construction 34 (Lafayette) 35 Payable from General Obligation Bonds 36 Priority 1 $ 187,700 37 Priority 5 $ 186,300 38 Total $ 374,000 19/649LOUISIANA COMMUNITY AND TECHNICAL 39 40 COLLEGE SYSTEM 41(270) Major Repairs and Deferred Maintenance of Buildings 42 and Facilities, Planning and Construction 43 (Statewide) 44 Payable from General Obligation Bonds 45 Priority 1 $ 3,000,000 Page 31 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(1293)Automotive Training Facility, Planning and Construction 2 (East Baton Rouge) 3 Payable from General Obligation Bonds 4 Priority 1 $ 5,711,700 19/655LOUISIANA SPECIAL EDUCATION CENTER5 6(1300)Global Infrastructure Improvements 7 (Rapides) 8 Payable from Interagency Transfers $ 1,200,000 19/657LOUISIANA SCHOOL F OR MATH, SCIENCE AND THE ARTS9 10(1294)New Dormitory Building, Planning and Construction 11 (Natchitoches) 12 Payable from General Obligation Bonds 13 Priority 1 $ 2,964,000 14 Priority 5 $23,360,100 15 Total $26,324,100 16(1295)HVAC Issues in Caddo Hall, Planning and Construction 17 (Natchitoches) 18 Payable from General Obligation Bonds 19 Priority 1 $ 1,500 20(1296)Stair Railings - Addressing Code Violations, Planning 21 and Construction 22 (Natchitoches) 23 Payable from General Obligation Bonds 24 Priority 1 $ 3,800 19/671BOARD OF REGENTS25 26(1366)System-Wide Telecommunications Wiring and 27 Equipment, Planning and Construction 28 (Statewide) 29 Payable from General Obligation Bonds 30 Priority 1 $ 3,315,800 31(1367)Land Acquisition for Post Secondary 32 Educational Institutions 33 (Statewide) 34 Payable from General Obligation Bonds 35 Priority 1 $ 2,000,000 36 Priority 2 $ 1,000,000 37 Priority 5 $ 2,000,000 38 Total $ 5,000,000 39Provided that $2,500,000 of this appropriation shall be used for the acquisition of the former 40Our Lady of Lourdes Hospital facility. 19/673NEW ORLEANS CENTER FOR THE CREATIVE41 42 ARTS 43(1177)Replace HVAC System, Planning and Construction 44 (Orleans) 45 Payable from General Obligation Bonds 46 Priority 1 $ 120,900 Page 32 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 19/752SOWELA TECHNICAL COMMUNITY COLLEG E - 1 2 MORGAN SMITH CAMPUS 3(1369)New Construction or Renovations to Morgan Smith 4 Campus, Planning and Construction 5 (Jefferson Davis) 6 Payable from General Obligation Bonds 7 Priority 1 $ 6,146,800 LEVEE DISTRICTS AND PORTS8 36/L10ORLEANS LEVEE DISTRICT9 10(466) Southeast Louisiana Flood Protection Authority - East for 11 Bayou St. John, Maintenance and Improvements, 12 Perimeter Elevation, Hydrology Study, Planning and 13 Construction 14 (Orleans) 15 Payable from General Obligation Bonds 16 Priority 5 $ 4,600 17(559) New Police Complex - Elysian Fields, 18 Planning and Construction 19 (Orleans) 20 Payable from General Obligation Bonds 21 Priority 5 $ 1,000,000 36/L13PONTCHARTRAIN LEVEE DISTRICT22 23(465) Lake Pontchartrain West Shore Hurricane 24 Protection Project 25 (St. Charles, St. James, St. John the Baptist) 26 Payable from General Obligation Bonds 27 Priority 2 $ 2,330,000 28 Priority 5 $ 8,500,000 29 Total $10,830,000 36/L16SOUTH LAFOURCHE LEVEE DISTRICT30 31(224) Larose to Golden Meadow Hurricane Protection System, 32 Planning and Construction 33 (Lafourche) 34 Payable from General Obligation Bonds 35 Priority 1 $ 2,033,900 36 Priority 5 $12,000,000 37 Total $14,033,900 36/L25GRAND ISLE INDEPENDENT LEVEE DISTRICT38 39(1029)Breakwater Protection, Planning and Construction 40 (Jefferson) 41 Payable from General Obligation Bonds 42 Priority 1 $ 416,300 43 Priority 5 $ 678,700 44 Total $ 1,095,000 Page 33 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 36/L36LAFITTE AREA INDEPENDENT LEVEE DISTRICT1 2(1374)Lower Lafitte Orange Street Basin, 3 Planning and Construction 4 (Jefferson) 5 Payable from General Obligation Bonds 6 Priority 2 $ 2,500,000 7 Priority 5 $14,500,000 8 Total $17,000,000 36/L37IBERIA PARISH LEVEE HURRICANE 9 10 AND CONSERVATION DISTRICT 11(777) Planning, Permitting, Engineering and Right of Way 12 Acquisitions for the Iberia Hurricane Protection Master 13 Plan 14 (Iberia) 15 Payable from General Obligation Bonds 16 Priority 1 $ 4,300 17 Priority 2 $ 300,000 18 Total $ 304,300 36/P03GREATER BATON ROUG E PORT COMMISSION19 20(1106)Inland Rivers Marine Terminal Dock and Access 21 Roadway Construction Project, Planning and 22 Construction 23 (West Baton Rouge) 24 Payable from General Obligation Bonds 25 Priority 1 $ 6,567,800 26 Priority 5 $15,652,600 27 Total $22,220,400 36/P05WEST CALCASIEU PORT28 29(474) New Bulkhead along Gulf Intracoastal Waterway - West 30 Calcasieu Port 31 (Calcasieu) 32 Payable from General Obligation Bonds 33 Priority 1 $ 200,000 36/P10GREATER LAFOURCHE PORT COMMISSION34 35(645) Minor Cheramie Road Paving, Planning 36 and Construction 37 (Lafourche) 38 Payable from General Obligation Bonds 39 Priority 1 $ 500,000 40 Priority 5 $ 2,400,000 41 Total $ 2,900,000 36/P15MORGAN CITY HARBOR AND TERMINAL DISTRICT42 43(404) Governmental Operations and Emergency Center, 44 Planning and Construction 45 (St. Mary) 46 Payable from General Obligation Bonds 47 Priority 1 $ 33,900 Page 34 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 36/P17PORT OF NEW ORLEANS1 2(236) Milan Upland Yard Improvements 3 (Orleans) 4 Payable from General Obligation Bonds 5 Priority 1 $ 3,000,000 6 Priority 2 $ 372,700 7 Priority 5 $ 7,777,300 8 Total $11,150,000 9(237) Cruise Ship Terminal, Planning and Construction 10 (Orleans) 11 Payable from General Obligation Bonds 12 Priority 1 $ 197,200 13 Priority 5 $ 6,690,000 14 Total $ 6,887,200 36/P20ST. BERNARD PORT, HARBOR AND 15 16 TERMINAL DISTRICT 17(396) Rehabilitation of Chalmette Slip, 18 Planning and Construction 19 (St. Bernard) 20 Payable from General Obligation Bonds 21 Priority 2 $ 100,000 22 Priority 5 $ 200,000 23 Total $ 300,000 36/P21PORT OF SOUTH LOUISIANA24 25(340) Administration Building, also known as the Business 26 Development Center 27 (St. John the Baptist) 28 Payable from General Obligation Bonds 29 Priority 1 $ 1,500,000 30 Priority 5 $ 2,629,550 31 Total $ 4,129,550 32(341) Globalplex Terminal Building #71 and Other Globalplex 33 Terminal Building Upgrades, Planning and Construction 34 (St. John the Baptist) 35 Payable from General Obligation Bonds 36 Priority 1 $ 2,840,000 37(342) Globalplex Dock Access Bridge and 38 Equipment Replacement/Repair 39 (St. John the Baptist) 40 Payable from General Obligation Bonds 41 Priority 2 $ 975,000 42 Priority 5 $ 7,705,000 43 Total $ 8,680,000 44(344) Warehouse and Property Acquisition and 45 Improvements, Planning and Construction 46 (St. John the Baptist) 47 Payable from General Obligation Bonds 48 Priority 1 $ 90,000 Page 35 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(348) Globalplex Rail Siding 2 ($5,577,932 Local/Federal/Other Match) 3 (St. John the Baptist) 4 Payable from General Obligation Bonds 5 Priority 1 $ 346,700 6 Priority 5 $ 2,516,800 7 Total $ 2,863,500 36/P23TERREBONNE PORT COMMISSION8 9(160) Maintenance Dredging of Houma Navigation 10 Canal by U.S. Corps of Engineers 11 (Terrebonne) 12 Payable from General Obligation Bonds 13 Priority 2 $ 500,000 14 Priority 5 $ 1,500,000 15 Total $ 2,000,000 16(161) Slip Dredging, Houma Navigation Canal Dredging 17 and Improvements for Terrebonne Port Commission 18 Government Multi-Use Complex, Planning 19 and Construction 20 (Terrebonne) 21 Payable from General Obligation Bonds 22 Priority 1 $ 990,700 23 Priority 5 $ 3,770,300 24 Total $ 4,761,000 36/P41JEFFERSON PARISH ECONOMIC DEVELOP MENT 25 26 AND PORT DISTRICT 27(112) New Access Road in the Churchill Technology 28 and Business Park for Delgado Community 29 College's Advanced Manufacturing and River 30 City Campus, Planning and Construction 31 (Jefferson) 32 Payable from General Obligation Bonds 33 Priority 2 $ 1,548,648 34 Priority 5 $ 2,382,535 35 Total $ 3,931,183 36(1435)Jefferson Parish Business Park: Science and Technology 37 Academy and Conference Center 38 (Jefferson) 39 Payable from General Obligation Bonds 40 Priority 1 $ 1,821,200 41 Priority 2 $ 5,503,800 42 Total $ 7,325,000 36/P43COLUMBIA PORT COMMISSION43 44(197) Railroad Spur, Planning and Construction 45 (Caldwell) 46 Payable from General Obligation Bonds 47 Priority 1 $ 155,000 48 Priority 5 $ 1,841,000 49 Total $ 1,996,000 Page 36 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 MISCELLANEOUS NON-STATE1 250/J04ASSUMPTION PARISH 3(1210)Parishwide Fire Hydrant Installation, 4 Planning and Construction 5 (Avoyelles) 6 Payable from General Obligation Bonds 7 Priority 2 $ 756,000 50/J05AVOYELLES PARISH8 9(1056)Parishwide Roadway Improvements, Planning and 10 Construction 11 (Avoyelles) 12 Payable from General Obligation Bonds 13 Priority 1 $ 745,000 50/J08BOSSIER PARISH14 15(279) Acceleration Lane on US 71, Planning and Construction 16 (Bossier) 17 Payable from General Obligation Bonds 18 Priority 1 $ 150,000 19(283) Extension of Crouch Road to Swan 20 Lake Road/Reconstruction of Swan Lake 21 Road To I-220, Planning and Construction 22 (Local Match Required) 23 (Bossier) 24 Payable from General Obligation Bonds 25 Priority 1 $ 101,300 26 Priority 5 $ 124,200 27 Total $ 225,500 28(284) Sewerage District No. 1 of the Parish of Bossier, Planning 29 and Construction ($28,000,000 Local Match) 30 (Bossier) 31 Payable from General Obligation Bonds 32 Priority 1 $ 354,200 33 Priority 5 $ 255,000 34 Total $ 609,200 50/J10CALCASIEU PARISH35 36(403) Gravity Sewer Trunk Mains and Pumping Stations South 37 Ward 3 and South Ward 4, Planning and Construction 38 (Calcasieu) 39 Payable from General Obligation Bonds 40 Priority 1 $ 2,081,900 41 Priority 5 $ 9,300,000 42 Total $11,381,900 50/J11CALDWELL PARISH43 44(1138)Wiles Road and Kountry Korner Road Reconstruction, 45 Planning and Construction 46 (Caldwell) 47 Payable from General Obligation Bonds 48 Priority 5 $ 433,400 Page 37 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(1153)Recreation Facilities Construction, Reconstruction, 2 Planning and Construction 3 (Caldwell) 4 Payable from General Obligation Bonds 5 Priority 1 $ 37,000 50/J15CONCORDIA PARISH6 7(879) Concordia Parish Courthouse District Courtroom Security 8 and Safety Renovations 9 (Concordia) 10 Payable from General Obligation Bonds 11 Priority 1 $ 315,000 50/J16DESOTO PARISH12 13(934) DeSoto Sports Complex, Planning and Construction 14 (DeSoto) 15 Payable from General Obligation Bonds 16 Priority 5 $ 50,000 50/J21FRANKLIN PARISH17 18(288) Franklin Parish Activity Center, Planning and 19 Construction ($250,000 Local Match) 20 (Franklin) 21 Payable from General Obligation Bonds 22 Priority 1 $ 67,700 23 Priority 5 $ 1,360,000 24 Total $ 1,427,700 25(1065)Bayou Macon Cut-Off No. 1 Drainage Structure 26 Improvements, Planning and Construction 27 (Franklin) 28 Payable from General Obligation Bonds 29 Priority 1 $ 415,000 50/J22GRANT PARISH30 31(447) Southern Grant Sewerage System Improvements, Study, 32 Design, Planning and Construction 33 (Grant) 34 Payable from General Obligation Bonds 35 Priority 1 $ 1,325,100 36 Priority 2 $ 1,597,100 37 Total $ 2,922,200 38(558) Regional Economic Development Building, 39 Rehabilitation, Planning and Construction 40 (Grant) 41 Payable from General Obligation Bonds 42 Priority 1 $ 28,900 Page 38 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/J23IBERIA PARISH1 2(774) Robert B. Green Veterans Memorial Building Renovation, 3 Upgrade and Expansion Project for Robert B. Green 4 American Legion Post 533 and Perry Thompson VFW Post 5 12065, Planning and Construction 6 (Iberia) 7 Payable from General Obligation Bonds 8 Priority 1 $ 200,000 9 Priority 2 $ 50,000 10 Total $ 250,000 11(1431)Iberia Parish Highway 90 West 12 Drainage Improvements 13 (Iberia) 14 Payable from General Obligation Bonds 15 Priority 5 $ 200,000 50/J25JACKSON PARISH16 17(481) Jackson Parish Riding Arena and Livestock Pavilion, 18 Planning and Construction 19 (Jackson) 20 Payable from General Obligation Bonds 21 Priority 1 $ 276,800 22 Priority 2 $ 500,000 23 Priority 5 $ 917,600 24 Total $ 1,694,400 50/J26JEFFERSON PARISH25 26(71) 11 th Street Roadway Replacement and Upgrade 27 of Subsurface Drainage System between Queens 28 Blvd. and Manhattan Blvd., Planning and Construction 29 (Jefferson) 30 Payable From General Obligation Bonds 31 Priority 2 $ 1,400,000 32 Priority 5 $ 7,850,000 33 Total $ 9,250,000 34(72) Airline Drive (US 61) at 17th Street Canal 35 Drainage Crossing Railroad Bridge Replacement, 36 Planning and Construction 37 (Jefferson) 38 Payable from General Obligation Bonds 39 Priority 5 $ 1,990,000 40(73) Ames Boulevard Widening from Two Lanes to Three Lanes 41 between Barataria Boulevard and Bayou Boeuf Drive (2.0 42 miles) with Installation of Subsurface Drainage 43 (Jefferson) 44 Payable from General Obligation Bonds 45 Priority 1 $ 338,700 46 Priority 5 $ 3,576,300 47 Total $ 3,915,000 Page 39 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(76) Avondale Booster Club and Playground Upgrades, 2 Planning and Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 758,300 6(78) Bike Path Along Leo Kerner Parkway (Barataria Blvd. to 7 Parc des Familles Entrance), Planning and Construction 8 (Jefferson) 9 Payable from General Obligation Bonds 10 Priority 1 $ 43,800 11(79) Bonnabel Canal Rehabilitation and Bank Stabilization 12 (Veterans Boulevard to West Esplanade), Planning and 13 Construction 14 (Jefferson) 15 Payable from General Obligation Bonds 16 Priority 1 $ 1,508,500 17 Priority 5 $ 370,800 18 Total $ 1,879,300 19(81) Brown Avenue Canal Improvements Between the 20 Westbank Expressway and Harold Street, Planning and 21 Construction 22 (Jefferson) 23 Payable from General Obligation Bonds 24 Priority 1 $ 400,000 25 Priority 5 $ 600,000 26 Total $ 1,000,000 27( 82 )Brown Avenue Roadway Reconstruction between 28 the Westbank Expressway and 36th Street, Planning 29 and Construction 30 (Jefferson) 31 Payable from General Obligation Bonds 32 Priority 5 $ 1,000,000 33(97) Gretna Government Complex Parking Lot, Planning and 34 Construction 35 (Jefferson) 36 Payable from General Obligation Bonds 37 Priority 1 $ 111,600 38 Priority 5 $ 328,400 39 Total $ 440,000 40(100) Kennedy Heights Playground Improvements, Planning 41 and Construction 42 (Jefferson) 43 Payable from General Obligation Bonds 44 Priority 5 $ 65,000 45(101) Lafreniere Park Marsh Island Restoration, Planning and 46 Construction 47 (Jefferson) 48 Payable from General Obligation Bonds 49 Priority 5 $ 1,125,000 Page 40 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(106) Latigue Street Roadway Improvements, Planning and 2 Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 5 $ 70,000 6(111) Multi-Purpose Recreational and Achievement Center 7 (Jefferson) 8 Payable from General Obligation Bonds 9 Priority 1 $ 436,400 10(113) Parc des Familles, Construction of Utilities, Restrooms, 11 Pavilions and Roadways in Raw Undeveloped Wooded 12 Area in Order to Initiate Construction of Regional Park, 13 Planning and Construction 14 (Jefferson) 15 Payable from General Obligation Bonds 16 Priority 5 $ 743,300 17(114) Parish Line Drainage Pump Station Capacity Increase, 18 Planning and Construction 19 (Jefferson) 20 Payable from General Obligation Bonds 21 Priority 1 $ 3,350,000 22 Priority 5 $ 1,600,000 23 Total $ 4,950,000 24(116) Riverside Senior Center, Planning and Construction 25 (Jefferson) 26 Payable from General Obligation Bonds 27 Priority 1 $ 61,900 28 Priority 5 $ 1,455,000 29 Total $ 1,516,900 30(121) South Kenner Road Rehabilitation from Live Oak 31 Boulevard to River Road, Planning and Construction 32 (Jefferson) 33 Payable from General Obligation Bonds 34 Priority 1 $ 2,478,700 35 Priority 5 $ 4,794,400 36 Total $ 7,273,100 37(122) Terry Parkway Drainage Between Carol Sue Drive and 38 Industry Canal ($500,000 Local Match) 39 (Jefferson) 40 Payable from General Obligation Bonds 41 Priority 1 $ 3,000,000 42(123) Upper Kraak Ditch Subsurface Drainage Improvement 43 (Upper Kraak Drainage Pump Station to Earhart 44 Expressway), Planning and Construction 45 (Jefferson) 46 Payable from General Obligation Bonds 47 Priority 1 $ 207,400 48(124) Waggaman Playground Improvements, Planning and 49 Construction 50 (Jefferson) 51 Payable from General Obligation Bonds 52 Priority 5 $ 50,000 Page 41 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(126) Waggaman Subsurface Drainage Improvements, Planning 2 and Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 54,700 6(127) Walkertown Bus Terminal, Planning and Construction 7 (Jefferson) 8 Payable from General Obligation Bonds 9 Priority 5 $ 95,000 10(128) Woodland West Drainage Improvements, 11 Planning and Construction 12 (Jefferson) 13 Payable from General Obligation Bonds 14 Priority 2 $ 225,000 15 Priority 5 $ 1,875,000 16 Total $ 2,100,000 17(130) Woodmere Community Center, Real Estate Acquisition, 18 Planning and Construction ($15,000 Local Match) 19 (Jefferson) 20 Payable from General Obligation Bonds 21 Priority 1 $ 341,400 22 Priority 5 $ 191,800 23 Total $ 533,200 50/J27JEFFERSON DAVIS PARISH24 25(1245)Acquisition and Renovation of Existing Building and site 26 for Regional Consolidated Jail Facility, Acquisition, 27 Planning and Construction 28 (Jefferson Davis) 29 Payable from General Obligation Bonds 30 Priority 1 $ 9,727,600 50/J28LAFAYETTE PARISH31 32(262) Governmental Complex, Jail Physical Plant Upgrade, 33 Planning and Construction ($4,980,000 Non-State Match) 34 (Lafayette) 35 Payable from General Obligation Bonds 36 Priority 1 $ 1,401,500 37 Priority 5 $ 100,000 38 Total $ 1,501,500 39(263) Parish Governmental Complex - Parish Courthouse, 40 Planning and Construction 41 (Lafayette) 42 Payable from General Obligation Bonds 43 Priority 1 $ 8,600 44 Priority 2 $ 1,000,000 45 Priority 5 $ 6,000,000 46 Total $ 7,008,600 47(264) Kaliste Saloom Widening 48 (Lafayette) 49 Payable from General Obligation Bonds 50 Priority 1 $ 190,500 51 Priority 5 $10,633,300 52 Total $10,823,800 Page 42 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/J29LAFOURCHE PARISH1 2(1145)South Lafourche Airport Corridor Project 3 (Lafourche) 4 Payable from General Obligation Bonds 5 Priority 1 $ 341,400 6 Priority 5 $ 122,000 7 Total $ 463,400 8(1173)Kraemer Water Line Improvements 9 (Lafourche) 10 Payable from General Obligation Bonds 11 Priority 2 $ 100,000 50/J34MOREHOUSE PARISH12 13(477) Public Works Center, 14 Planning and Construction 15 (Morehouse) 16 Priority 5 $ 325,000 50/J35NATCHITOCHES P ARISH17 18(597) Hard Surfacing of Coco Bed Road, Phase 1, Planning and Construction 19 (Natchitoches) 20 Payable from General Obligation Bonds 21 Priority 1 $ 280,000 22(599) Resurfacing of Fish Hatchery Road 23 (Natchitoches) 24 Payable from General Obligation Bonds 25 Priority 5 $ 125,000 26(660) Courthouse Security Improvements, 27 Planning and Construction 28 (Natchitoches) 29 Payable from General Obligation Bonds 30 Priority 1 $ 480,000 31(671) Resurfacing of Roads in Payne Subdivision, 32 Planning and Construction 33 (Natchitoches) 34 Payable from General Obligation Bonds 35 Priority 1 $ 200,000 36 Priority 5 $ 300,000 37 Total $ 500,000 38(869) Resurfacing of Blanchard Road, 39 Planning and Construction 40 (Natchitoches) 41 Payable from General Obligation Bonds 42 Priority 5 $ 280,000 43(870) Old River Bridge, Planning and Construction 44 (Natchitoches) 45 Payable from General Obligation Bonds 46 Priority 5 $ 610,000 Page 43 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/J37OUACHITA PARISH1 2(561) Steep Bayou Sewer - Phase 2, 3 Planning and Construction 4 (Ouachita) 5 Payable from General Obligation Bonds 6 Priority 2 $ 500,000 7(606) Hannah's Run Control Structure, 8 Planning and Construction 9 (Ouachita) 10 Payable from General Obligation Bonds 11 Priority 1 $ 500,000 50/J38PLAQUEMINES PARISH12 13(184) Belle Chasse Parks, Planning and Construction 14 (Plaquemines) 15 Payable from General Obligation Bonds 16 Priority 5 $ 120,000 17(185) Empire Bridge Lighting, Planning and 18 Construction 19 (Plaquemines) 20 Payable from General Obligation Bonds 21 Priority 1 $ 100,000 22 Priority 5 $ 200,000 23 Total $ 300,000 50/J40RAPIDES PARISH24 25(1279)Renovation of Elevators at Rapides Parish Courthouse 26 (Rapides) 27 Payable from General Obligation Bonds 28 Priority 2 $ 375,000 50/J42RICHLAND PARISH29 30(952) Richland Parish Courthouse Renovations 31 (Richland) 32 Payable from General Obligation Bonds 33 Priority 1 $ 27,600 34 Priority 5 $ 2,400 35 Total $ 30,000 50/J43SABINE PARISH36 37(60) Water Treatment and Supply System Study 38 (Sabine) 39 Payable from General Obligation Bonds 40 Priority 1 $ 197,700 41(61) Plainview Road Rehabilitation, Planning and 42 Construction 43 (Sabine) 44 Payable from General Obligation Bonds 45 Priority 1 $ 30,700 46 Priority 5 $ 4,305,600 47 Total $ 4,336,300 Page 44 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/J45ST. CHARLES PARISH1 2(1442)West Bank Hurricane Protection Levee 3 (St. Charles) 4 Payable from General Obligation Bonds 5 Priority 2 $ 43,200 50/J47ST. JAMES PARISH6 7(268) St. James Parish Land Acquisition, 8 Planning and Construction 9 (St. James) 10 Payable from General Obligation Bonds 11 Priority 5 $ 5,000,000 12(923) Blind River Freshwater Diversion 13 (St. James) 14 Payable from General Obligation Bonds 15 Priority 5 $ 350,000 50/J48ST. JOHN THE BAPTIST PARISH16 17(1332)East Bank Courthouse, Planning and Construction 18 (St. John the Baptist) 19 Payable from General Obligation Bonds 20 Priority 1 $ 30,000 21 Priority 2 $ 45,000 22 Total $ 75,000 50/J49ST. LANDRY PARISH23 24(1213)Hurricane Evacuations and Homeland Security 25 Coordination and Related Renovations, Planning and 26 Construction 27 (St. Landry) 28 Payable from General Obligation Bonds 29 Priority 1 $ 86,300 30(1223)Harry Guilbeau Road Economic Development District, 31 Infrastructure Improvements, Planning, Engineering, 32 Utilities, and Construction 33 (St. Landry) 34 Payable from General Obligation Bonds 35 Priority 1 $ 186,300 50/J50ST. MARTIN PARISH36 37(670) I-10 Frontage Road, LA 328 to LA 347 38 (St. Martin) 39 Payable from General Obligation Bonds 40 Priority 5 $ 750,000 41(673) Road Improvements on Four-Mile Bayou Road 42 (St. Martin) 43 Payable from General Obligation Bonds 44 Priority 1 $ 645,000 Page 45 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/J51ST. MARY PARISH1 2(370) Reconstruction of Chitimacha Trail Road from LA 328 to 3 LA 670 for St. Mary Parish Government Within Existing 4 Rights-of-Way 5 (St. Mary) 6 Payable from General Obligation Bonds 7 Priority 1 $ 760,000 8(371) Reconstruction of Flattown Road from Chitimacha Trail 9 to Ralph Darden Memorial Parkway for St. Mary Parish 10 Government Within Existing Rights-of-Way 11 (St. Mary) 12 Payable from General Obligation Bonds 13 Priority 1 $ 450,000 14(372) Reconstruction of Charenton Beach Road from 15 LA Hwy 87 to the West Atchafalaya Basin 16 Protection Levee, Planning and Construction 17 (St. Mary) 18 Payable from General Obligation Bonds 19 Priority 5 $ 500,000 20(375) Infrastructure Improvements at the Charenton Canal 21 Industrial Park 22 (St. Mary) 23 Payable from General Obligation Bonds 24 Priority 1 $ 421,800 25 Priority 5 $ 27,000 26 Total $ 448,800 27(376) Installation of Culverts and Associated Infrastructure in 28 Middle Road Drainage Canal - Bayou Vista LA for Sub- 29 Gravity Drainage District #1 of St. Mary Parish Gravity 30 Drainage District #2 31 (St. Mary) 32 Payable from General Obligation Bonds 33 Priority 1 $ 2,800 34(382) Reconstruction of Martin Luther King Road 35 in Charenton for St. Mary Parish Government 36 within Existing Right of Way 37 (St. Mary) 38 Payable from General Obligation Bonds 39 Priority 5 $ 750,000 40(442) Recreation and Infrastructure Improvements 41 at Centerville Park, Planning and Construction 42 (St. Mary) 43 Payable from General Obligation Bonds 44 Priority 1 $ 1,500 45(443) Plantation Pump Station Replacement for Sub-Gravity 46 Drainage District #1 of St. Mary Parish Gravity Drainage 47 District #2, Planning and Construction 48 (St. Mary) 49 Payable from General Obligation Bonds 50 Priority 1 $ 95,500 Page 46 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(445) St. Mary Parish Sewage District #5 Sewer Lift Station 2 Improvements 3 (St. Mary) 4 Payable from General Obligation Bonds 5 Priority 1 $ 95,000 50/J52ST. TAMMANY PARISH6 7(406) University Square Learning Center Facilities, 8 Planning and Construction 9 (St. Tammany) 10 Payable from General Obligation Bonds 11 Priority 1 $ 210,000 12 Priority 2 $ 500,000 13 Priority 5 $11,740,000 14 Total $12,450,000 15(407) Safe Haven Campus for Behavioral and Mental 16 Health, Planning and Construction 17 (St. Tammany) 18 Payable from General Obligation Bonds 19 Priority 2 $ 500,000 20 Priority 5 $ 2,220,000 21 Total $ 2,720,000 22(408) South Slidell Levee Protection Rehabilitation (USACE 533d 23 Report for Levees West and East of I-10) Planning and 24 Construction 25 (St. Tammany) 26 Payable from General Obligation Bonds 27 Priority 5 $ 9,585,200 28(409) St. Tammany Parish Fishing Pier, Planning and 29 Construction 30 (St. Tammany) 31 Payable from General Obligation Bonds 32 Priority 1 $ 390,000 50/J53TANGIPAHOA PARISH33 34(759) Wardline Road, Widening and Improvements 35 (Tangipahoa) 36 Payable from General Obligation Bonds 37 Priority 1 $ 53,900 38(760) South Airport Road - North Hoover Road Improvements 39 (Tangipahoa) 40 Payable from General Obligation Bonds 41 Priority 1 $ 131,700 50/J55TERREBONNE PARISH42 43(1083)Bayou LaCarpe Watershed Project, Location C, Design 44 and Construction 45 (Terrebonne) 46 Payable from General Obligation Bonds 47 Priority 5 $ 750,000 Page 47 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(1270)South Louisiana Wetland Discovery Center - 2 Phase 2 - Bayou Country Institute, 3 Planning and Construction 4 (Terrebonne) 5 Payable from General Obligation Bonds 6 Priority 1 $ 250,000 7 Priority 5 $ 740,000 8 Total $ 990,000 50/J58VERNON PARISH9 10(997) Visitor Center, Planning and Construction 11 (Vernon) 12 Payable from General Obligation Bonds 13 Priority 5 $ 350,000 14(999) Creation of Vernon Lake Cultural Center, Recreation 15 and Tourism Park, Planning and Construction 16 (Vernon) 17 Payable from General Obligation Bonds 18 Priority 5 $ 260,000 19(1003)Pickering School Parking Lot, Planning and 20 Construction 21 (Vernon) 22 Payable from General Obligation Bonds 23 Priority 1 $ 90,000 24(1004)Catfish Hut Road and Bridge Repair and/or 25 Replacement, Planning and Construction 26 (Vernon) 27 Payable from General Obligation Bonds 28 Priority 1 $ 325,000 29(1043)Vernon/Fort Polk Thoroughfare Electrical Power 30 Extension, and Utilities Including Generators 31 (Vernon) 32 Payable from General Obligation Bonds 33 Priority 5 $ 480,000 34(1163)Vernon/Fort Polk Thoroughfare Plan, Planning 35 and Construction 36 (Vernon) 37 Payable from General Obligation Bonds 38 Priority 1 $ 1,712,100 39 Priority 5 $ 7,461,500 40 Total $ 9,173,600 50/J59WASHINGTON PARISH41 42(1232)Animal Shelter Construction and Furnishings 43 (Washington) 44 Payable from General Obligation Bonds 45 Priority 1 $ 80,000 Page 48 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/J61WEST BATON ROUG E PARISH1 2(653) Sid Richardson Road Extension, Planning and 3 Construction 4 (West Baton Rouge) 5 Payable from General Obligation Bonds 6 Priority 1 $ 150,000 50/J62WEST CARROLL P ARISH7 8(265) West Carroll Parish Courthouse Renovations, 9 Planning and Construction 10 (West Carroll) 11 Payable from General Obligation Bonds 12 Priority 1 $ 300,000 50/J63WEST FELICIANA PARISH13 14(554) Port of West Feliciana Parish, Planning 15 and Construction 16 (West Feliciana) 17 Payable from General Obligation Bonds 18 Priority 2 $ 160,000 19 Priority 5 $ 1,440,000 20 Total $ 1,600,000 50/J64WINN PARISH21 22(1265)Roadway Reconstruction, Planning and Construction 23 (Winn) 24 Payable from General Obligation Bonds 25 Priority 2 $ 200,000 26 Priority 5 $ 295,000 27 Total $ 495,000 50/M01ABBEVILLE28 29(1023)City of Abbeville Flood Damage Reduction & 30 Drainage Improvement Projects, Planning and Construction 31 (Vermilion) 32 Payable from General Obligation Bonds 33 Priority 5 $ 375,000 50/M05ALEXANDRIA34 35(1162)Sugarhouse Road/Eddie Williams Boulevard to 36 LA Highway 1, Phase I and II, Planning and 37 Construction ($5,000,000 Local Match) 38 (Rapides) 39 Payable from General Obligation Bonds 40 Priority 2 $ 3,810,000 41 Priority 5 $ 7,620,000 42 Total $11,430,000 Page 49 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/M06AMITE1 2(232) Town of Amite City Water Improvement Project, 3 Planning and Construction 4 (Tangipahoa) 5 Payable from General Obligation Bonds 6 Priority 1 $ 69,000 7 Priority 5 $ 600,000 8 Total $ 669,000 50/M07ANACOCO9 10(303) Anacoco Street Rehabilitation - Liles Road and 11 East Road, Planning and Construction 12 (Vernon) 13 Payable from General Obligation Bonds 14 Priority 5 $ 110,000 50/M19BASTROP15 16(912) Bastrop City Hall - Roof Construction and Green 17 Lighting, Planning and Construction 18 (Morehouse) 19 Payable from General Obligation Bonds 20 Priority 1 $ 20,000 50/M27BOGALUSA21 22(1018)Drainage, Paving and Water System Improvements, 23 Planning and Construction 24 (Washington) 25 Payable from General Obligation Bonds 26 Priority 1 $ 8,100 27(1019)Emergency Sewer Collection System Evaluation 28 and Repairs, Planning and Construction 29 (Washington) 30 Payable from General Obligation Bonds 31 Priority 1 $ 38,300 50/M29BOSSIER CITY32 33(152) Louisiana Technology Research Institute 34 (Bossier) 35 Payable from General Obligation Bonds 36 Priority 1 $ 124,000 37 Priority 5 $ 1,329,700 38 Total $ 1,453,700 50/M31BREAUX BRIDGE39 40(549) Breaux Bridge Sewer System Improvements, 41 Planning and Construction 42 (St. Martin) 43 Payable from General Obligation Bonds 44 Priority 5 $ 250,000 Page 50 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/M39CARENCRO1 2(166) Wastewater and City Infrastructure Flood Damages, 3 Planning and Construction 4 (Lafayette) 5 Payable from General Obligation Bonds 6 Priority 1 $ 5,386,400 7(168) Gaston Coulee Cleaning, Planning and 8 Improvements 9 (Lafayette) 10 Payable from General Obligation Bonds 11 Priority 1 $ 37,600 50/M43CHENEYVILLE12 13(557) After School Education Center, Planning and 14 Construction 15 (Rapides) 16 Payable from General Obligation Bonds 17 Priority 5 $ 510,000 50/M44CHOUDRANT18 19(1194)Village of Choudrant Town Hall 20 (Lincoln) 21 Payable from General Obligation Bonds 22 Priority 1 $ 13,500 23 Priority 5 $ 6,500 24 Total $ 20,000 50/M45CHURCH POINT25 26(547) Church Point Sewer System Improvements, 27 Planning and Construction 28 (Acadia) 29 Payable from General Obligation Bonds 30 Priority 5 $ 300,000 50/M59CULLEN31 32(989) Potable Water and Distribution System Improvements, 33 Planning and Construction 34 (Webster) 35 Payable from General Obligation Bonds 36 Priority 5 $ 80,000 50/M60DELCAMBRE37 38(1006)Water Distribution and Storage System Improvements, 39 Planning and Construction 40 (Vermilion) 41 Payable from General Obligation Bonds 42 Priority 1 $ 5,700 43 Priority 5 $ 216,500 44 Total $ 222,200 Page 51 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/M61DELHI1 2(1160)Richland Parish Recreational and Learning Center, 3 Planning and Construction 4 (Richland) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,400 7 Priority 5 $ 302,300 8 Total $ 303,700 50/M65DERIDDER9 10(324) Education and Job Training Center, Planning and 11 Construction 12 (Beauregard) 13 Payable from General Obligation Bonds 14 Priority 5 $ 205,000 15(325) Community Recreational Building and Shelter, 16 Planning and Construction and/or Acquisition and 17 Rehabilitation of the Existing Facility ($1,500,000 18 Local Match) 19 (Beauregard) 20 Payable from General Obligation Bonds 21 Priority 5 $ 2,063,100 50/M70DOYLINE22 23(698) Village of Doyline Wastewater Treatment Facility 24 Upgrades 25 (Webster) 26 Payable from General Obligation Bonds 27 Priority 1 $ 45,000 28 Priority 5 $ 370,000 29 Total $ 415,000 50/M74DUSON30 31(441) Duson Sewer System and Street Infrastructure 32 Improvements, 33 Planning and Construction 34 (Acadia) 35 Payable from General Obligation Bonds 36 Priority 1 $ 505,000 50/M80ERATH37 38(366) Wastewater Treatment Plant Improvement, 39 Planning and Construction 40 (Vermilion) 41 Payable from General Obligation Bonds 42 Priority 1 $ 15,600 43(1013)Public Works Facility, Planning and Construction 44 (Vermilion) 45 Payable from General Obligation Bonds 46 Priority 1 $ 7,000 47 Priority 5 $ 40,000 48 Total $ 47,000 Page 52 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/M85FARMERVILLE1 2(159) Highway 33 South Pump Station and Force 3 Main in Farmerville, Planning and Construction 4 (Union) 5 Payable from General Obligation Bonds 6 Priority 2 $ 550,000 50/M89FLORIEN7 8(911) Village of Florien Town Hall, Planning and 9 Construction 10 (Sabine) 11 Payable from General Obligation Bonds 12 Priority 1 $ 425,000 50/M90FOLSOM13 14(580) Recreational Park and Trails, 15 Planning and Construction 16 (St. Tammany) 17 Payable from General Obligation Bonds 18 Priority 5 $ 200,000 19(826) Sewer Treatment and Potable Water 20 System Upgrades, Planning and Construction 21 (St. Tammany) 22 Payable from General Obligation Bonds 23 Priority 5 $ 200,000 50/M93FOREST HILL24 25(581) Renovation of Community Facilities, Planning and 26 Construction ($375,000 Local Match) 27 (Rapides) 28 Payable from General Obligation Bonds 29 Priority 1 $ 39,900 30 Priority 5 $ 523,700 31 Total $ 563,600 50/M94FRANKLIN32 33(151) Cayce Street Repair, Planning and Construction 34 St. Mary) 35 Payable from General Obligation Bonds 36 Priority 2 $ 150,000 37 Priority 5 $ 2,500,000 38 Total $2,650,000 39(1021)Renovation of Old Crowell Elementary Building, 40 Planning and Construction 41 (St. Mary) 42 Payable from General Obligation Bonds 43 Priority 1 $ 223,800 44 Priority 2 $ 300,000 45 Priority 5 $ 1,065,300 46 Total $ 1,589,100 Page 53 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/MA3GOLDEN MEADOW1 2(229) Median Turning Lane near Town Hall 3 (Lafourche) 4 Payable from General Obligation Bonds 5 Priority 1 $ 103,600 6 Priority 5 $ 16,400 7 Total $ 120,000 8(230) Upgrade to North Sewerage Treatment Plant, 9 Planning and Construction 10 (Lafourche) 11 Payable from General Obligation Bonds 12 Priority 1 $ 15,200 13 Priority 5 $ 159,800 14 Total $ 175,000 50/MA6GRAMBLING15 16(1260)Wastewater System Expansion 17 (Lincoln) 18 Payable from General Obligation Bonds 19 Priority 1 $ 5,000 20 Priority 5 $ 190,000 21 Total $ 195,000 50/MB1GRAND ISLE22 23(852) Historic Recreation Center/Community Center, 24 Planning and Construction 25 (Jefferson) 26 Payable from General Obligation Bonds 27 Priority 1 $ 17,000 28 Priority 5 $ 824,600 29 Total $ 841,600 50/MB5GRETNA30 31(925) Hancock Street Canal Improvements (Kepler Street - 32 Virgil Street), Planning and Construction 33 (Jefferson) 34 Payable from General Obligation Bonds 35 Priority 1 $ 240,300 36 Priority 5 $ 608,700 37 Total $ 849,000 38(926) Cultural Center for the Arts, Planning and 39 Construction ($300,000 Local Match, $500,000 40 Parish Match) 41 (Jefferson) 42 Payable from General Obligation Bonds 43 Priority 1 $ 202,700 Page 54 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(927) Downtown Drainage Improvements, Planning 2 and Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $1,300,,000 6 Priority 5 $ 1,515,000 7 Total $ 2,815,000 8(928) City Hall Exterior and Interior Renovation, 9 Planning and Construction 10 (Jefferson) 11 Payable from General Obligation Bonds 12 Priority 1 $ 60,600 13 Priority 5 $ 2,960,900 14 Total $ 3,021,500 15(929) Mel Ott Exterior Lighting and Improvements 16 (Jefferson) 17 Payable from General Obligation Bonds 18 Priority 1 $ 23,800 50/MB9HAMMOND19 20(517) Air Traffic Control Tower Elevator, Planning 21 and Construction 22 (Tangipahoa) 23 Payable from General Obligation Bonds 24 Priority 5 $ 140,000 25(1032)Gateway to Hammond, Phase I, Planning and 26 Construction 27 (Tangipahoa) 28 Payable from General Obligation Bonds 29 Priority 1 $ 600,000 50/MC6HENDERSON30 31(546) Henderson Municipal Complex, 32 Planning and Construction 33 (St. Martin) 34 Payable from General Obligation Bonds 35 Priority 1 $ 185,000 36 Priority 5 $ 65,000 37 Total $ 250,000 50/MD1HORNBECK38 39(469) Improvements to the Compressed Natural Gas 40 System, Acquisition, Planning and Construction 41 (Vernon) 42 Payable from General Obligation Bonds 43 Priority 1 $ 412,000 Page 55 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(610) Emergency Connection with West Vernon 2 Waterworks District and Inline Booster Station, 3 Planning and Construction 4 (Vernon) 5 Payable from General Obligation Bonds 6 Priority 1 $ 75,900 7 Priority 5 $ 95,700 8 Total $ 171,600 50/ME1JEAN LAFITTE9 10(431) Lafitte Wetlands Museum Addition, 11 Planning and Construction 12 (Jefferson) 13 Payable from General Obligation Bonds 14 Priority 2 $ 700,000 50/ME2JEANERETTE15 16(910) Sewer Treatment Facility Upgrade, Planning and 17 Construction ($912,500 Federal and/or Local Match) 18 (Iberia) 19 Payable from General Obligation Bonds 20 Priority 1 $ 171,500 21 Priority 5 $ 138,000 22 Total $ 309,500 50/ME6JONESVILLE23 24(985) Renovations to National Guard Armory Building 25 (Catahoula) 26 Payable from General Obligation Bonds 27 Priority 1 $ 34,300 28 Priority 5 $ 285,700 29 Total $ 320,000 30(1183)Pumping Station Upgrade, Planning and Construction 31 (Catahoula) 32 Payable from General Obligation Bonds 33 Priority 5 $ 55,000 50/ME8KAPLAN34 35(502) City of Kaplan Street Improvements, Reconstruction 36 and Drainage Improvements Project, 37 Planning and Construction 38 (Vermilion) 39 Payable from General Obligation Bonds 40 Priority 2 $ 500,000 50/MF4KILLIAN41 42(1336)Killian Police and Fire Joint Operation Building, 43 Planning and Construction 44 (Livingston) 45 Payable from General Obligation Bonds 46 Priority 1 $ 250,000 Page 56 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/MF9LAKE CHARLES1 2(254) Infrastructure Improvements for Economic Development, 3 Planning and Construction ($2,000,000 Local Match) 4 (Calcasieu) 5 Payable from General Obligation Bonds 6 Priority 5 $ 2,250,000 7(259) Lakefront Development 8 (Calcasieu) 9 Payable from General Obligation Bonds 10 Priority 5 $ 200,000 11(260) Wastewater Treatment Plant, Plant B/C Force Main 12 Segment No. 2, Planning and Construction ($4,195,000 13 Local Match) 14 (Calcasieu) 15 Payable from General Obligation Bonds 16 Priority 1 $ 2,499,800 17 Priority 5 $ 5,530,000 18 Total $ 8,029,800 50/MG3LEESVILLE19 20(242) Water System Rehabilitation Including 21 Generators, Planning and Construction 22 (Vernon) 23 Payable from General Obligation Bonds 24 Priority 5 $ 375,000 25(243) Acquisition of East Central Water System 26 (Vernon) 27 Payable from General Obligation Bonds 28 Priority 1 $ 235,000 29(401) Street Rehabilitation and Extension 30 (Vernon) 31 Payable from General Obligation Bonds 32 Priority 1 $ 755,000 50/MG4LEONVILLE33 34(657) Leonville Boat Launch Facility Improvements 35 Phase II, Planning and Construction 36 (St. Landry) 37 Payable from General Obligation Bonds 38 Priority 2 $ 150,000 50/MG8LIVONIA39 40(196) Sewer Infrastructure Expansion and Improvements 41 (Pointe Coupee) 42 Payable from General Obligation Bonds 43 Priority 1 $ 1,500 Page 57 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/MG9LOCKPORT1 2(862) Lockport Street Improvements, Planning and 3 Construction 4 (Lafourche) 5 Payable from General Obligation Bonds 6 Priority 1 $ 990,000 50/MH9MANGHAM7 8(410) Mangham Recreation Complex 9 (Richland) 10 Payable from General Obligation Bonds 11 Priority 1 $ 48,400 12 Priority 5 $ 1,520,000 13 Total $ 1,568,400 50/MI1MANSFIELD14 15(1143)Wastewater Collection System Improvements, 16 Planning and Construction 17 (DeSoto) 18 Payable from General Obligation Bonds 19 Priority 5 $ 50,000 50/MI4MARINGOUIN20 21(299) Governmental/Multi-Purpose Facility, 22 Planning and Construction 23 (Iberville) 24 Payable from General Obligation Bonds 25 Priority 1 $ 11,900 26 Priority 5 $ 300,000 27 Total $ 311,900 2850/MI8MAURICE 29(1036)New Village Hall for the Village of Maurice, 30 Planning and Construction 31 (Vermilion) 32 Payable from General Obligation Bonds 33 Priority 5 $ 720,000 50/MJ1MELVILLE34 35(1407)Police Department Renovation, Planning 36 and Construction 37 (St. Landry) 38 Payable from General Obligation Bonds 39 Priority 2 $ 205,000 50/MJ5MINDEN40 41(479) Potable Water Ground Storage Tank, Planning 42 and Construction 43 (Webster) 44 Payable from General Obligation Bonds 45 Priority 1 $ 145,100 46 Priority 5 $ 686,300 47 Total $ 831,400 Page 58 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/MJ6MONROE1 2(1286)I-20 Interchange Improvement and Kansas Garrett 3 Connector, Kansas Lane Connector, Planning and 4 Construction ($1,000,000 Local and $6,000,000 5 Federal Match) 6 (Ouachita) 7 Payable from General Obligation Bonds 8 Priority 1 $ 6,369,900 9 Priority 5 $25,600,000 10 Total $31,969,900 11(1289)Downtown Development District Facilities and 12 Infrastructure for River Front, Design and Construction 13 (Ouachita) 14 Payable from General Obligation Bonds 15 Priority 2 $ 150,000 16 Priority 5 $ 100,000 17 Total $ 250,000 50/MK2MORGAN CITY18 19(1305)Water Plant Improvements, Planning and Construction 20 (St. Mary) 21 Payable from General Obligation Bonds 22 Priority 5 $ 50,000 23(1308)Lake End Parkway Cabins, Planning and Construction 24 (St. Mary) 25 Payable from General Obligation Bonds 26 Priority 1 $ 9,700 50/MK9NATCHITOCHES27 28(1079)Blanchard Road Development, Planning and Construction 29 (Natchitoches) 30 Payable from General Obligation Bonds 31 Priority 5 $ 200,000 32(1080)South Natchitoches Drainage Improvements, including 33 Adjacent Roadwork, Planning and Construction 34 (Natchitoches) 35 Payable from General Obligation Bonds 36 Priority 1 $ 39,000 37 Priority 5 $ 6,000 38 Total $ 45,000 39(1081)Highland Park Road Bridge, Environmental, 40 Planning and Construction 41 (Natchitoches) 42 Payable from General Obligation Bonds 43 Priority 5 $ 250,000 50/ML1NEW IBERIA44 45(402) Bayou Teche Museum Expansion and George Rodrigue 46 Park 47 (Iberia) 48 Payable from General Obligation Bonds 49 Priority 2 $ 750,000 Page 59 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(552) Sewer System Improvements, 2 Planning and Construction 3 (Iberia) 4 Payable from General Obligation Bonds 5 Priority 5 $ 250,000 50/ML3NEW ORLEANS6 7(520) Landside Roadways - Louis Armstrong International 8 North Terminal Project, Planning and Construction 9 (Orleans) 10 Payable from General Obligation Bonds 11 Priority 2 $ 2,000,000 12 Priority 5 $ 2,300,000 13 Total $ 4,300,000 14(523) Fourth District Police Station, Planning and Construction 15 (Orleans) 16 Payable from General Obligation Bonds 17 Priority 1 $ 300,000 18(525) Canal Street East-Bank Ferry Terminal, 19 Planning and Construction 20 (Orleans) 21 Payable from General Obligation Bonds 22 Priority 2 $ 600,000 23 Priority 5 $ 1,000,000 24 Total $ 1,600,000 25(527) West Bank Park Improvements and George W. 26 Carver Playground Renovations, Including New 27 Soccer and Recreational Facilities, and Skateboard 28 Park Planning and Construction 29 (Orleans) 30 Payable from General Obligation Bonds 31 Priority 1 $ 910,900 32 Priority 5 $12,775,400 33 Total $13,686,300 34Provided, however, that $450,000 of the Priority 1 appropriation and $200,000 of the 35Priority 1 appropriation shall be used to fund the George W. Carver Playground Renovations 36project and the Skateboard Park at the West Bank Park project, respectively. 37(529) New Consolidated Westbank Fire Station, 38 Planning and Construction 39 (Orleans) 40 Payable from General Obligation Bonds 41 Priority 1 $ 375,000 42(531) Milne Boys Home, Planning and Construction 43 (Orleans) 44 Payable from General Obligation Bonds 45 Priority 1 $ 90,000 46 Priority 2 $ 390,000 47 Priority 5 $ 3,300,000 48 Total $ 3,780,000 49Provided that the issuance of a line of credit for all or a portion of the funds in Priority 2 or 50Priority 5 shall be subject to the submission of a duly adopted resolution of the City Council 51of New Orleans in support of the Gentilly Development District, which resolution shall be Page 60 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1submitted to the commissioner of administration, the State Bond Commission, and the 2attorney general. 3(532) West Bank Ferry Terminal Renovations, 4 Planning and Construction 5 (Orleans) 6 Payable from General Obligation Bonds 7 Priority 2 $ 300,000 8 Priority 5 $ 300,000 9 Total $ 600,000 10(533) Norman Playground Basketball Gym, and 11 Park Enhancements, Planning and Construction 12 (Orleans) 13 Payable from General Obligation Bonds 14 Priority 1 $ 82,400 15 Priority 5 $ 2,700 16 Total $ 85,100 17(1113)Historic Algiers Courthouse Renovation, 18 Planning and Construction 19 (Orleans) 20 Payable from General Obligation Bonds 21 Priority 1 $ 125,000 22(1135)Algiers Playgrounds and Parks, Renovation of Restrooms, 23 Lighting, Fencing, and Playground Equipment 24 (Orleans) 25 Payable from General Obligation Bonds 26 Priority 1 $ 225,900 27 Priority 5 $ 49,100 28 Total $ 275,000 29(1247)Eastern New Orleans Hospital, Equipment, Acquisition, 30 Installation, Planning and Construction 31 (Orleans) 32 Payable from General Obligation Bonds 33 Priority 1 $ 2,613,000 50/ML4NEW ROADS34 35(1446)Industrial Park Development Project, Planning 36 and Construction 37 (Pointe Coupee) 38 Payable from General Obligation Bonds 39 Priority 5 $ 1,000,000 50/MM3OBERLIN40 41(399) Lift Station Pump and Control Replacement 42 (Allen) 43 Payable from General Obligation Bonds 44 Priority 2 $ 150,000 Page 61 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/MM4OIL CITY1 2(846) Water Distribution System Improvements, 3 Planning and Construction 4 (Caddo) 5 Payable from General Obligation Bonds 6 Priority 5 $ 335,000 7(847) Water Treatment Plant Improvements, Planning and 8 Construction 9 (Caddo) 10 Payable from General Obligation Bonds 11 Priority 1 $ 1,970,000 12 Priority 5 $ 500,000 13 Total $ 2,470,000 14 50/MM5OLLA15 16(1264)Downtown Area Sidewalk, Ramps, Curbing, and Fencing 17 Enhancements 18 (LaSalle) 19 Payable from General Obligation Bonds 20 Priority 1 $ 16,200 21 Priority 5 $ 240,000 22 Total $ 256,200 50/MM6OPELOUSAS23 24(1378)Opelousas Infrastructure Renovation Program, Planning 25 and Construction 26 (St. Landry) 27 Payable from General Obligation Bonds 28 Priority 5 $ 200,000 50/MM8PARKS29 30(708) Municipal Complex, Village Hall, Acquisition, Planning, 31 Construction and Renovation 32 (St. Martin) 33 Payable from General Obligation Bonds 34 Priority 1 $ 185,000 35 Priority 5 $ 680,000 36 Total $ 865,000 50/MM9PATTERSON37 38(68) Replacement of Water and Gas Meters in Patterson, 39 Planning and Construction 40 (St. Mary) 41 Payable from General Obligation Bonds 42 Priority 5 $ 460,000 Page 62 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/MN5PLAIN DEALING1 2(768) Wastewater Treatment Plant Improvement, Planning and 3 Construction 4 (Bossier) 5 Payable from General Obligation Bonds 6 Priority 1 $ 13,600 7 Priority 5 $ 277,900 8 Total $ 291,500 50/MN8PLEASANT HILL9 10(1011)Rehabilitate Two Elevated Water Tanks and Rehabilitate 11 Water Well, Planning and Construction 12 (Sabine) 13 Payable from General Obligation Bonds 14 Priority 1 $ 150,000 50/MO1PONCHATOULA15 16(1324)Downtown Parking Lot, Acquisition, Planning and 17 Construction 18 (Tangipahoa) 19 Payable from General Obligation Bonds 20 Priority 1 $ 257,800 50/MO7QUITMAN21 22(986) Wastewater Treatment Plant, Planning and Construction 23 (Jackson) 24 Payable from General Obligation Bonds 25 Priority 2 $ 230,000 50/MO8RAYNE26 27(512) Martin Luther King Community Center Improvements, 28 Planning and Construction 29 (Acadia) 30 Payable from General Obligation Bonds 31 Priority 5 $ 315,000 50/MO9RAYVILLE32 33(984) Water Service Facilities for Economic Development, 34 Planning and Construction 35 (Richland) 36 Payable from General Obligation Bonds 37 Priority 1 $ 672,200 38 Priority 5 $ 8,022,300 39 Total $ 8,694,500 40(1105)Wastewater Transport and Treatment Facilities for Economic 41 Development 42 (Richland) 43 Payable from General Obligation Bonds 44 Priority 1 $ 765,400 Page 63 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/MP5RINGGOLD1 2(905) Town Hall/Civic Center Renovations, and Remodeling, 3 Planning and Construction 4 (Bienville) 5 Payable from General Obligation Bonds 6 Priority 1 $ 45,000 7 Priority 2 $ 705,000 8 Total $ 750,000 50/MP8ROSEDALE9 10(1319)New Fire Station, Planning and Construction 11 (Iberville) 12 Payable from General Obligation Bonds 13 Priority 2 $ 435,000 50/MP9ROSELAND14 15(1158)Community Center, Planning and 16 Construction 17 (Tangipahoa) 18 Payable from General Obligation Bonds 19 Priority 2 $ 100,000 20 Priority 5 $ 600,000 21 Total $ 700,000 50/MQ1ROSEPINE22 23(837) Rosepine Wastewater Treatment Plant Improvement, 24 Planning and Construction 25 (Vernon) 26 Payable from General Obligation Bonds 27 Priority 5 $ 1,610,000 50/MQ3ST. FRANCISVILLE28 29(369) Burnet Road Bridge Replacement, Planning and 30 Construction 31 (West Feliciana) 32 Payable from General Obligation Bonds 33 Priority 1 $ 494,300 50/MQ8SCOTT34 35(446) Apollo Road Extension (Rue Du Belie and 36 Dulles Drive Intersection to Old Spanish Trail 37 and Apollo Road Intersection), Planning and 38 Construction and Acquisition 39 (Lafayette) 40 Payable from General Obligation Bonds 41 Priority 2 $ 2,000,000 42 Priority 5 $12,990,000 43 Total $14,990,000 Page 64 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/MR1SHREVEPORT1 2(1426)C.C. Antoine Museum and Arts Center, Planning and 3 Construction ($64,000 Local Match) 4 (Caddo) 5 Payable from General Obligation Bonds 6 Priority 1 $ 400,000 50/MR2SIBLEY7 8(906) Wastewater Treatment Facilities Improvements, Planning 9 and Construction 10 (Webster) 11 Payable from General Obligation Bonds 12 Priority 1 $ 303,800 50/MS4SPRINGFIELD13 14(434) Water System Planning and Construction 15 (Livingston) 16 Payable from General Obligation Bonds 17 Priority 1 $ 731,900 18 Priority 2 $ 971,000 19 Total $ 1,702,900 50/MS5SPRINGHILL20 21(365) Recreational Complex 22 (Webster) 23 Payable from General Obligation Bonds 24 Priority 1 $ 500,000 25 Priority 5 $ 2,975,000 26 Total $ 3,475,000 27(1195)Wastewater Collection System Improvements, Planning 28 and Construction 29 (Webster) 30 Payable from General Obligation Bonds 31 Priority 5 $ 70,000 50/MS7STERLINGTON32 33(1208)Wastewater Treatment Improvements - Headworks 34 Structure, Planning and Construction 35 (Ouachita) 36 Payable from General Obligation Bonds 37 Priority 1 $ 12,500 38 Priority 5 $ 147,500 39 Total $ 160,000 50/MS9SULPHUR40 41(222) Upgrade Regional Sewerage Pumping Stations (Arizona 42 and Highway 108), Planning and Construction 43 (Calcasieu) 44 Payable from General Obligation Bonds 45 Priority 1 $ 700,000 46 Priority 5 $ 2,000,000 47 Total $ 2,700,000 Page 65 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/MT3TALLULAH1 2(974) Emergency Water Production, Transmission and 3 Treatment, Acquisition, Planning and Construction 4 (Madison) 5 Payable from General Obligation Bonds 6 Priority 5 $ 500,000 50/MT4TANGIPAHOA7 8(1327)Community Center, Planning and Construction 9 (Tangipahoa) 10 Payable from General Obligation Bonds 11 Priority 5 $ 621,000 50/MT6TICKFAW12 13(715) Tickfaw Police Station, 14 Planning and Construction 15 (Tangipahoa) 16 Payable from General Obligation Bonds 17 Priority 5 $ 250,000 50/MU2VIDALIA18 19(806) Development of a Slackwater Port on the Mississippi 20 River, Planning and Construction 21 (Concordia) 22 Payable from General Obligation Bonds 23 Priority 1 $ 8,908,400 24 Priority 5 $ 4,250,000 25 Total $13,158,400 50/MU4VILLE PLATTE26 27(1047)Ville Platte Evangeline Recreational 28 Park, Planning and Construction, Infrastructure 29 and Improvements 30 (Evangeline) 31 Payable from General Obligation Bonds 32 Priority 2 $ 1,500,000 50/MU6VIVIAN33 34(947) Water and Wastewater System Improvements and 35 Extension, Planning and Construction 36 (Caddo) 37 Payable from General Obligation Bonds 38 Priority 1 $ 60,500 39 Priority 5 $ 872,100 40 Total $ 932,600 50/MV3WESTLAKE41 42(593) Police and Emergency Response Facility, Planning and 43 Construction 44 (Calcasieu) 45 Payable from General Obligation Bonds 46 Priority 1 $ 1,000,000 Page 66 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(659) Golf Course Development, Planning and Development 2 ($5,000,000 Local/Other Match Consisting of Cash 3 and/or In-Kind, with First Year not to Exceed $200,000) 4 (Calcasieu) 5 Payable from General Obligation Bonds 6 Priority 5 $ 2,110,000 7(914) New Water Well, Planning and Construction 8 (Calcasieu) 9 Payable from General Obligation Bonds 10 Priority 1 $ 550,000 50/MV4WESTWEGO11 12(572) The WHARF, Planning, Construction, 13 and Site Preparation 14 (Jefferson) 15 Payable from General Obligation Bonds 16 Priority 1 $ 200,000 17 Priority 5 $ 7,200,000 18 Total $ 7,400,000 19(594) Park Land and Improvements, Including Improvements 20 to Existing Parks and Land Acquisition, Planning and 21 Construction 22 (Jefferson) 23 Payable from General Obligation Bonds 24 Priority 1 $ 1,402,200 25 Priority 2 $ 723,500 26 Total $ 2,125,700 27(650) Sala Avenue Street and Infrastructure Improvements 28 (Jefferson) 29 Payable from General Obligation Bonds 30 Priority 1 $ 400,000 31 Priority 5 $ 600,000 32 Total $ 1,000,000 33(658) Riverboat Landing Phase IV, Planning and Construction 34 ($200,000 Local Match) 35 (Jefferson) 36 Payable from General Obligation Bonds 37 Priority 1 $ 143,100 38(676) Drainage Improvements, Phase I 39 (Jefferson) 40 Payable from General Obligation Bonds 41 Priority 1 $ 47,300 42 Priority 5 $ 26,700 43 Total $ 74,000 44(706) Street Improvements, including the Placement of Fire 45 Hydrants, Planning and Construction 46 (Jefferson) 47 Payable from General Obligation Bonds 48 Priority 1 $ 500,000 49 Priority 5 $ 500,000 50 Total $ 1,000,000 Page 67 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(710) Emergency Preparedness Building, Planning and 2 Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,105,000 6 Priority 5 $ 600,000 7 Total $ 1,705,000 8(717) Farmers/Fisheries Market, Planning and Construction 9 (Jefferson) 10 Payable from General Obligation Bonds 11 Priority 5 $ 66,600 12(725) Water Tower, Line and Improvements 13 (Jefferson) 14 Payable from General Obligation Bonds 15 Priority 1 $ 450,000 16(733) Water Plant Improvements, Planning and Construction 17 (Jefferson) 18 Payable from General Obligation Bonds 19 Priority 1 $ 2,883,200 20(775) Performing Arts Center/Community Center Renovations, 21 Planning, Construction and Equipment 22 (Jefferson) 23 Payable from General Obligation Bonds 24 Priority 5 $ 1,000,000 25 Payable from the balance of Series 94A (08T-02)$ 400 26 Total $ 1,000,400 27(1061)Fire Station, Planning and Construction 28 (Jefferson) 29 Payable from General Obligation Bonds 30 Priority 1 $ 4,100,000 31 Priority 5 $ 300,000 32 Total $ 4,400,000 50/MV7WINNFIELD33 34(1171)Port DeLuce Reservoir, Planning and Construction 35 (Winn) 36 Payable from General Obligation Bonds 37 Priority 1 $ 496,200 38 Priority 5 $ 3,800 39 Total $ 500,000 50/MV8WINNSBORO40 41(1033)Winnsboro Farmer's Market, Planning and Construction 42 (Franklin) 43 Payable from General Obligation Bonds 44 Priority 1 $ 203,800 Page 68 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/MW2YOUNGSVILLE1 2(541) Infrastructure Improvements for the Youngsville Sports 3 Complex, Planning and Construction 4 (Lafayette) 5 Payable from General Obligation Bonds 6 Priority 1 $ 112,800 7 Priority 5 $ 150,000 8 Total $ 262,800 50/MW3ZACHARY9 10(275) Water System Improvements, Planning and Construction 11 (East Baton Rouge) 12 Payable from General Obligation Bonds 13 Priority 1 $ 1,300,000 14 Priority 2 $ 250,000 15 Priority 5 $ 330,000 16 Total $ 1,880,000 50/MW8CENTRAL17 18(859) Administration Building 19 (East Baton Rouge) 20 Payable from General Obligation Bonds 21 Priority 1 $ 61,800 22 Priority 5 $ 399,500 23 Total $ 461,300 50/N02TULANE UNIVERSITY24 25(436) Tulane River and Coastal Center, Planning and 26 Construction 27 (Orleans) 28 Payable from General Obligation Bonds 29 Priority 1 $ 1,500,000 30 Priority 2 $ 1,000,000 31 Total $ 2,500,000 50/N03THE AUDUBON INSTITUTE, INC.32 33(967) Audubon 2020 Exhibits 34 (Orleans) 35 Payable from General Obligation Bonds 36 Priority 1 $ 4,711,100 37 Priority 2 $ 5,000,000 38 Priority 5 $42,000,000 39 Total $51,711,100 40Provided that the Priority 2 appropriation shall be used for the Audubon Aquarium in 41Downtown New Orleans. 50/N05NEW ORLEANS EXHIBITION HALL AUTHORITY42 43(920) Property Development Project 44 (Orleans) 45 Payable from General Obligation Bonds 46 Priority 5 $25,000,000 Page 69 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/N12LOUISIANA CHILDREN'S MUSEUM1 2(1049)Early Learning Village, Planning, Design, Construction 3 and Equipment 4 (Orleans) 5 Payable from General Obligation Bonds 6 Priority 1 $15,851,700 7 Priority 5 $11,471,300 8 Total $27,323,000 50/N18IBERIA PARISH AIRPORT AUTHORITY9 10(1111)Rehabilitation of Hangar #88 and Associated Parking Lot, 11 Planning and Construction 12 (Iberia) 13 Payable from General Obligation Bonds 14 Priority 1 $ 500,000 15 Priority 2 $ 1,000,000 16 Total $ 1,500,000 50/N25WYES TV NEW ORLEANS17 18(1046)WYES Katrina Rebuilding/Equipment Project 19 (Orleans) 20 Payable from General Obligation Bonds 21 Priority 1 $ 2,504,600 50/N33ENGLAND ECONOMIC AND INDUSTRIAL 22 23 DEVELOPMENT DISTRICT 24(536) New Town Industrial Park Infrastructures Westside 25 of Airfield, Acquisition, Planning and Construction 26 (Rapides) 27 Payable from General Obligation Bonds 28 Priority 1 $ 1,000,000 29 Priority 2 $ 1,300,000 30 Priority 5 $ 8,510,000 31 Total $10,810,000 32(537) Warehouse/Distribution Complex, Planning and 33 Construction 34 (Rapides) 35 Payable from General Obligation Bonds 36 Priority 5 $ 200,000 50/N34ODYSSEY HOUSE LOUISIANA, INC.37 38(652) Odyssey House Louisiana Renovation Project, Planning 39 and Construction 40 (Orleans) 41 Payable from General Obligation Bonds 42 Priority 1 $ 2,022,700 43 Priority 5 $ 3,877,300 44 Total $ 5,900,000 Page 70 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/N41BATON ROUGE METRO AIRPORT1 2(516) Airport Aviation Business Park, Planning and 3 Construction 4 (East Baton Rouge) 5 Payable from General Obligation Bonds 6 Priority 1 $ 700,000 7 Priority 5 $ 500,000 8 Total $ 1,200,000 950/N71NORTH LAFOURCHE CONSERVATION LEVEE 10 AND DRAINAGE DISTRICT 11(979) Bayou Blue - Hollywood Flood Protection 12 Project, Planning and Construction 13 (Lafourche) 14 Payable from General Obligation Bonds 15 Priority 2 $ 500,000 16 Priority 5 $ 1,145,000 17 Total $ 1,645,000 50/N74THE NATIONAL WORLD WAR II MUSEUM, INC.18 19(364) Capital Expansion Project, including Parking Structure, 20 Skybridge, Andrew Higgins Plaza, Train Station 21 Experience and Canopy, Planning and Construction 22 (Orleans) 23 Payable from General Obligation Bonds 24 Priority 1 $ 6,260,000 25 Priority 5 $13,900,000 26 Total $20,160,000 50/N98KINGSLEY HOUSE, INC.27 28(832) Kingsley House Acquisition, Renovations, New 29 Construction and Major Repairs 30 (Orleans) 31 Payable from General Obligation Bonds 32 Priority 1 $ 171,700 33 Priority 5 $ 100 34 Total $ 171,800 50/NA2LAFAYETTE AIRPORT COMMISSION35 36(895) Construction of a New Passenger Facility Terminal at 37 Lafayette Regional Airport, Planning and Construction 38 (Lafayette) 39 Payable from General Obligation Bonds 40 Priority 1 $ 1,300,000 41 Priority 2 $ 2,000,000 42 Priority 5 $10,200,000 43 Total $13,500,000 Page 71 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/NAJEFFORTS OF GRACE, INC.1 2(932) Ashe Too, Planning and Construction 3 (Orleans) 4 Payable from General Obligation Bonds 5 Priority 1 $ 11,700 6 Priority 5 $ 3,300 7 Total $ 15,000 50/NBBTHE LIGHTHOUSE FOR THE BLIND 8 9 IN NEW ORLEANS, INCORP ORATED 10(1315)Economic Development Project, Planning and 11 Construction 12 (Orleans) 13 Payable from General Obligation Bonds 14 Priority 1 $ 4,205,100 15 50/NBCCAPITOL CITY FAMILY HEALTH CENTER16 17(663) Federally Qualified Health Centers, Acquisitions, 18 Planning and Construction 19 (Ascension, East Baton Rouge) 20 Payable from General Obligation Bonds 21 Priority 1 $ 35,000 22 Priority 5 $ 100,000 23 Total $ 135,000 50/NBKYMCA OF THE CAPITAL AREA24 25(70) Capital Area YMCA - Long Farms, Acquisition, 26 Planning and Construction 27 (East Baton Rouge) 28 Payable from General Obligation Bonds 29 Priority 5 $ 100,000 50/NC2BATON ROUGE RECREATION AND PARKS COMMISSION30 31(694) Children's Museum, Planning and Construction 32 ($5,000,000 Local Match) 33 (East Baton Rouge) 34 Payable from General Obligation Bonds 35 Priority 1 $ 174,700 36 Priority 5 $ 145,000 37 Total $ 319,700 38(695) Anna T. Jordan Site and Facility Improvements 39 (Non-State Match Required) 40 (East Baton Rouge) 41 Payable from General Obligation Bonds 42 Priority 1 $ 93,100 43 Priority 5 $ 150,000 44 Total $ 243,100 Page 72 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(696) Central Community Sports Park, Planning and 2 Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 1 $ 16,600 6 Priority 5 $ 255,000 7 Total $ 271,600 50/NCCARCHDIOCESE OF NEW ORLEANS8 9(1028)Preservation and Restoration of Historic Structures for 10 Hope Haven/Madonna Manor Campus, Planning and 11 Construction 12 (Jefferson) 13 Payable from General Obligation Bonds 14 Priority 1 $ 1,000,000 15 Priority 5 $ 4,000,000 16 Total $ 5,000,000 50/NCJWATERWORK S DISTRICT 14 CALCASIEU PARISH17 18(221) Replacement of Old Starks Water System Lines and 19 Plugging of Old Wells, Planning and Construction 20 (Calcasieu) 21 Payable from General Obligation Bonds 22 Priority 5 $ 50,000 50/NDNOPPORTUNITIES INDUSTRIALIZ ATION 23 24 CENTER INCORPORATED OF OUACHITA 25(582) New Education Building, Planning and Construction 26 (Ouachita) 27 Payable from General Obligation Bonds 28 Priority 1 $ 100,000 29 Priority 2 $ 50,000 30 Priority 5 $ 255,000 31 Total $ 405,000 50/NGALINCOLN PARISH FIRE PROTECTION DISTRICT #132 33(1313)Renovations to Existing Facility and Additional 34 Buildings, Acquisition, Planning and Construction 35 (Lincoln) 36 Payable from General Obligation Bonds 37 Priority 5 $ 120,000 50/NGQTHE STRAND THEATRE OF SHREVEPORT 38 39 CORPORATION 40(460) Repair and Renovation to the Strand Theatre of 41 Shreveport 42 (Caddo) 43 Payable from General Obligation Bonds 44 Priority 1 $ 26,600 45 Priority 5 $ 984,000 46 Total $ 1,010,600 Page 73 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/NGYLINCOLN PARISH SHERIFF'S OFFICE1 2(1007)Safety Town, Planning and Construction 3 (Lincoln) 4 Payable from General Obligation Bonds 5 Priority 2 $ 323,750 50/NJ7BLOOD CENTER PROPERTIES, INC.6 7(1199)Generator, Auxiliary Tank, and Transfer Switch Project 8 for Blood Center Properties in Lake Charles, Planning 9 and Construction 10 (Calcasieu) 11 Payable from General Obligation Bonds 12 Priority 2 $ 60,000 50/NJ9DRYADES YMCA13 14(1026)Major Repairs and Deferred Maintenance to Dryades 15 YMCA Building and Facilities, Planning 16 and Construction 17 (Orleans) 18 Payable from General Obligation Bonds 19 Priority 2 $ 500,000 50/NJPWATERWORK S DISTRICT #1 DESOTO PARISH20 21(1325)Water System Improvements and Extension, 22 Planning and Construction ($1,977,300 Local Match) 23 (DeSoto) 24 Payable from General Obligation Bonds 25 Priority 1 $ 5,000 26 Priority 5 $ 290,000 27 Total $ 295,000 50/NJZGRAVITY DRAINAGE DISTRICT #8 CALCASIEU28 29(397) Belfield Ditch Drainage Improvement Project, Planning 30 and Construction 31 (Calcasieu) 32 Payable from General Obligation Bonds 33 Priority 1 $ 910,000 50/NLMFOUNDATION FOR SCIENCE AND 34 35 MATHEMATICS EDUCATION 36(983) Model for a 21st Century Workforce 37 Development Urban High School - 38 New Orleans Science and Mathematics 39 High School 40 (Orleans) 41 Payable from General Obligation Bonds 42 Priority 5 $ 3,000,000 Page 74 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/NM3NATCHITOCHES VOLUNTEER COUNCIL 1 2 ON AGING, INC. 3(1246)Reconstruction and Renovations to Natchitoches Parish 4 Council on Aging Office and Activities Building, 5 Planning and Construction 6 (Natchitoches) 7 Payable from General Obligation Bonds 8 Priority 1 $ 4,000 50/NMBWATERWORK S DISTRICT #1 OF WARD #1 9 10 OF CALCASIEU PARISH 11(891) Topsy Road Waterline Improvements (Welcome Road to 12 Parish Road), Planning and Construction 13 (Calcasieu) 14 Payable from General Obligation Bonds 15 Priority 1 $ 225,000 50/NMDBELMONT WATERWORK S, INC.16 17(1204)Water System Improvements, Planning and Construction 18 (Sabine) 19 Payable from General Obligation Bonds 20 Priority 1 $ 499,700 21 Priority 5 $ 875,700 22 Total $ 1,375,400 50/NMGLIVINGSTON ASSOCIATION FOR RETARDED 23 24 CHILDREN, INC. 25(1215)New Facility for Livingston Association for Retarded 26 Children, Inc. Planning and Construction 27 (Livingston) 28 Payable from General Obligation Bonds 29 Priority 1 $ 530,000 50/NMLCITY OF GRETNA POLICE DEPARTMENT30 31(584) Gretna Police Department, Construction of Armory, 32 Elevation/Flood Proofing/Wind Retrofit, Planning and 33 Construction 34 (Jefferson) 35 Payable from General Obligation Bonds 36 Priority 1 $ 3,106,400 50/NNLHUNGARIAN SETTLEMENT HISTORICAL 37 38 SOCIETY, INC. 39(993) Hungarian Settlement Historical Museum, Planning and 40 Construction 41 (Livingston) 42 Payable from General Obligation Bonds 43 Priority 1 $ 172,000 44 Priority 5 $ 360,200 45 Total $ 532,200 Page 75 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/NNRWASHINGTON PARISH RECREATION 1 2 DISTRICT #1 3(388) Multi-Purpose Recreation Facility, Land 4 Acquisition, Master Planning, Design, and 5 Construction 6 (Washington) 7 Payable from General Obligation Bonds 8 Priority 2 $ 246,000 9 Priority 5 $ 100,000 10 Total $ 346,000 11(918) Right Turn Lane Entrance into Recreation 12 Facility, Planning and Construction 13 (Washington) 14 Payable from General Obligation Bonds 15 Priority 2 $ 204,000 50/NNWBEAUREGARD PARISH WATERWORK S 16 17 DISTRICT #3 18(322) Longacre Road Water Plant Improvements, Planning and 19 Construction 20 (Beauregard) 21 Payable from General Obligation Bonds 22 Priority 5 $ 50,000 50/NP1ACADIANA CRIMINALITIES LAB23 24(534) New Crime Laboratory, Planning, Design, Construction 25 and Equipment 26 (Iberia) 27 Payable from General Obligation Bonds 28 Priority 2 $ 2,000,000 29 Priority 5 $ 2,000,000 30 Total $ 4,000,000 50/NP3BAYOU LAFOURCHE FRESH WATER DISTRICT31 32(991) Donaldsonville Flood Control, Planning and Construction 33 (Ascension, Assumption, Lafourche, Terrebonne) 34 Payable from General Obligation Bonds 35 Priority 1 $ 765,000 50/NPDIBERIA ECONOMIC DEVELOP MENT AUTHORITY36 37(711) Progress Point Business Park and Airport Gateway, Land 38 Acquisition, Planning and Construction 39 (Iberia) 40 Payable from General Obligation Bonds 41 Priority 1 $ 2,352,200 50/NQVBEAUREGARD WATERWORK S DISTRICT #642 43(323) Water System Improvements, Planning and Construction 44 (Beauregard) 45 Payable from General Obligation Bonds 46 Priority 1 $ 78,500 47 Priority 5 $ 1,505,000 48 Total $ 1,583,500 Page 76 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/NQWCALCASIEU WATERWORK S DISTRICT #101 2(246) New Water System, Planning and Construction 3 (Calcasieu) 4 Payable from General Obligation Bonds 5 Priority 5 $ 750,000 50/NQYWESTON WATER SYSTEM, INC.6 7(1266)Water Distribution System Expansion - 8 Caney Lake Extension 9 (Jackson) 10 Payable from General Obligation Bonds 11 Priority 1 $ 278,800 50/NRDSOUTH BEAUREG ARD PARISH RECREATION 12 13 DISTRICT #2 14(1133)Multi-Purpose Recreation Facility, Planning 15 and Construction 16 (Beauregard) 17 Payable from General Obligation Bonds 18 Priority 1 $ 93,000 50/NRHDIXIE BUSINESS CENTER19 20(896) Demco Drive Improvements, Planning, 21 Acquisition, Demolition and Construction 22 (Livingston) 23 Payable from General Obligation Bonds 24 Priority 2 $ 325,000 50/NRONATCHITOCHES COMMUNICATIONS DISTRICT25 26(413) Natchitoches Parish Emergency Communications 27 District, Planning and Construction 28 (Natchitoches) 29 Payable from General Obligation Bonds 30 Priority 1 $ 2,800,000 50/NSESABINE PARISH WATER DISTRICT #131 32(1275)New Production Water Well, Planning and Construction 33 (Sabine) 34 Payable from General Obligation Bonds 35 Priority 1 $ 23,600 36 Priority 5 $ 6,700 37 Total $ 30,300 50/NSMNATCHITOCHES VETERANS MEMORIAL 38 39 PARK COMMISSION 40(1375)Natchitoches Veterans and Memorial Park, 41 Planning and Construction 42 (Natchitoches) 43 Payable from General Obligation Bonds 44 Priority 1 $ 26,600 Page 77 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/NSPEDEN HOUSE1 2(1064)New Facility, Acquisition, Planning and Construction 3 (Orleans) 4 Payable from General Obligation Bonds 5 Priority 1 $ 11,700 6 Priority 5 $ 500,100 7 Total $ 511,800 50/NSXMOREHOUSE PARISH SHERIFF8 9(1206)Operations Center Relocation, Site Development, 10 Renovations and Improvements, Planning and 11 Construction ($130,000 Local Match) 12 (Morehouse) 13 Payable from General Obligation Bonds 14 Priority 1 $ 273,300 15 Priority 5 $ 14,400 16 Total $ 287,700 50/NTBCALCASIEU WATERWORK S DISTRICT 12 WARD 317 18(730) Waterworks District 12, Ward 3 - Water System 19 Improvements, Planning and Construction 20 (Calcasieu) 21 Payable from General Obligation Bonds 22 Priority 1 $ 1,734,000 50/NTGTERREBONNE PARISH RECREATION 23 24 DISTRICTS 2 AND 3 25(488) Terrebonne Sports Complex, Phase I, Infrastructure 26 Improvements, Acquisition, Planning and Construction 27 (Terrebonne) 28 Payable from General Obligation Bonds 29 Priority 1 $ 677,700 30 Priority 5 $ 1,984,000 31 Total $ 2,661,700 50/NTKTHE UNION LINCOLN REG IONAL WATER 32 33 SUPPLY INITIATIVE 34(1175)Development of Alternative Water Supply from Lake 35 D'Arbonne for Lincoln and Union Parishes 36 (Lincoln, Union) 37 Payable from General Obligation Bonds 38 Priority 1 $ 1,710,000 39 Priority 5 $ 2,400,000 40 Total $ 4,110,000 50/NTLGIRL SCOUTS LOUISIANA EAST41 42(575) Emergency Repairs to Lake Valve and 43 Spillway at Girl Scout Camp Whispering Pines 44 (Tangipahoa) 45 Payable from General Obligation Bonds 46 Priority 2 $ 100,000 47 Priority 5 $ 850,000 48 Total $ 950,000 Page 78 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/NUJHAMMOND AREA RECREATION DISTRICT 11 2(933) Parking Lot for Hammond Area Recreation District No. 3 1, Planning and Construction 4 (Tangipahoa) 5 Payable from General Obligation Bonds 6 Priority 1 $ 80,500 7 Priority 5 $ 100,500 8 Total $ 181,000 50/NUOHOUSTON RIVER WATERWORK S DISTRICT 119 10(247) Elevated Water Tank and Associated Piping, Planning 11 and Construction 12 (Calcasieu) 13 Payable from General Obligation Bonds 14 Priority 1 $ 605,000 50/NUVMONROE DOWNTOWN ECONOMIC 15 16 DEVELOPMENT DISTRICT 17(887) Monroe Riverwalk, Planning and Construction 18 (Ouachita) 19 Payable from General Obligation Bonds 20 Priority 1 $ 113,500 21 Priority 5 $ 76,200 22 Total $ 189,700 50/NUWTERREBONNE PARISH RECREATION DISTRICT #1123 24(367) Mechanicville Gym - Multi-Purpose Building, Planning 25 and Construction 26 (Terrebonne) 27 Payable from General Obligation Bonds 28 Priority 1 $ 231,700 29 Priority 5 $ 16,500 30 Total $ 248,200 50/NVZBORDELONVILLE VOLUNTEER F IRE DEPARTMENT31 32(535) Roof Repairs to Fire Department Building, Planning and 33 Construction 34 (Avoyelles) 35 Payable from General Obligation Bonds 36 Priority 1 $ 105,000 50/NWBLOUISIANA LAKES CONSERVANCY37 38(605) Louisiana Lakes Conservancy, Planning and Construction 39 (East Baton Rouge) 40 Payable from General Obligation Bonds 41 Priority 5 $ 50,000 Page 79 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/NWMNORTH DELTA REG IONAL PLANNING AND1 2 ECONOMIC DEVELOP MENT DISTRICT, INC. 3(1256)North Delta Innovation Technology and 4 Disaster Recovery Center 5 (Ouachita) 6 Payable from General Obligation Bonds 7 Priority 5 $ 950,000 50/NWQCHENIER PLAIN COASTAL RESTORATION 8 9 AND PROTECTION AUTHORITY 10(1309)Boston Canal/Vermilion Bay Bank Stabilization 11 (Vermilion) 12 Payable from General Obligation Bonds 13 Priority 1 $ 65,000 14 Priority 2 $ 500,000 15 Priority 5 $ 250,000 16 Total $ 815,000 17 50/NWRLOUISIANA SWAMP BASE, INC.18 19(302) Camp Atchafalaya Swamp Base, Planning, Design and 20 Construction 21 (St. Martin) 22 Payable from General Obligation Bonds 23 Priority 5 $ 1,780,000 50/NWSLAFAYETTE CENTRAL P ARK, INC.24 25(317) Lafayette Central Park Improvements 26 (Lafayette) 27 Payable from General Obligation Bonds 28 Priority 5 $ 2,000,000 50/NXAOUR LADY OF THE LAKE REGIONAL 29 30 MEDICAL CENTER 31(779) Our Lady of the Lake Regional Medical Center, Mid-City 32 Neighborhood Clinic and Urgent Care Center, Planning 33 and Construction 34 (East Baton Rouge) 35 Payable from General Obligation Bonds 36 Priority 1 $ 1,500,000 37 Priority 2 $ 1,000,000 38 Priority 5 $10,000,000 39 Total $12,500,000 4050/NXBGLOBAL FOUNDATION FOR BETTER EDUCATION, 41 HEALTH, AND ENVIRONMENT, INC. 42(604) Urgent Care Facility, Planning and Construction 43 (East Baton Rouge) 44 Payable from General Obligation Bonds 45 Priority 2 $ 50,000 Page 80 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/NXEOCHSNER HEALTH SYSTEM1 2(57) Ochsner Transplant Center of Excellence, 3 Planning and Construction 4 (Jefferson) 5 Payable from General Obligation Bonds 6 Priority 1 $ 2,500,000 7 Priority 5 $12,500,000 8 Total $15,000,000 50/NXNLOUISIANA CHILDREN'S MEDICAL CENTER HEALTH9 10(1284)Children's Hospital New Orleans Behavioral Health 11 Hospital, Planning and Construction 12 (Orleans) 13 Payable from General Obligation Bonds 14 Priority 2 $ 2,000,000 15 Priority 5 $11,000,000 16 Total $13,000,000 50/NYIKENNER DISCOVERY HEALTH SCIENCES17 18 ACADEMY HIGH SCHOOL 19(1401)Installation of Temporary, Modular Space for 20 Kenner Discovery Health Sciences Academy 21 High School, Planning and Construction 22 (Jefferson) 23 Payable from General Obligation Bonds 24 Priority 2 $ 350,000 50/S10CALCASIEU PARISH SCHOOL BOARD25 26(1034)Renovations to Lake Charles Boston Stadium, Planning 27 and Construction 28 (Calcasieu) 29 Payable from General Obligation Bonds 30 Priority 1 $ 177,000 31 Priority 5 $ 823,000 32 Total $ 1,000,000 50/S18EAST CARROLL PARISH SCHOOL BOARD33 34(352) Administration Building, Acquisition and Renovation, 35 Planning and Construction 36 (East Carroll) 37 Payable from General Obligation Bonds 38 Priority 5 $ 280,000 50/S63WEST FELICIANA PARISH SCHOOL BOARD39 40(343) Julius Freyhan Cultural/Conference Center, Planning and 41 Construction 42 (West Feliciana) 43 Payable from General Obligation Bonds 44 Priority 1 $ 101,000 45 Priority 5 $ 2,999,000 46 Total $ 3,100,000 Page 81 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1 Section 1.A. The projects in this Section did not submit a capital outlay request for 2Fiscal Year 2017-2018 by November 1, 2016, in compliance with the provisions of Act 419 3of the 2016 Regular Session of the Legislature and therefore these projects are not eligible 4for cash or non-cash lines of credit for Fiscal Year 2017-2018. The appropriations made in 5this Section are intended to provide funding to satisfy commitments made against general 6obligation bond cash lines of credit granted for appropriations in Act 16 of the 2016 Second 7Extraordinary Session of the Louisiana Legislature. However, because the projects in this 8Section are not in compliance with the provisions of Act 419 of the 2016 Regular Session 9of the Legislature, the appropriations for the projects in this Section require separate 10statutory change to existing law in order to be eligible for cash and non-cash lines of credit 11and therefore, the proposed appropriations for these projects are pending that effective 12statutory change. ELECTED OFFICIALS13 04/160DEPARTMENT OF AGRICULTURE AND FORESTRY14 15(1451)Louisiana Animal Disease Diagnostic Laboratory, 16 Planning and Construction 17 (Statewide) 18 Payable from General Obligation Bonds 19 Priority 1 $ 9,600 DEPARTMENT OF CULTURE, RECREATION, AND TOURISM20 06/A20NEW ORLEANS CITY P ARK21 22(1458)City Park Golf Complex Improvements, Planning and 23 Construction 24 (Orleans) 25 Payable from General Obligation Bonds 26 Priority 1 $ 919,300 27(1459)Splash Park, Planning and Construction 28 (Orleans) 29 Payable from General Obligation Bonds 30 Priority 1 $ 189,000 06/A98LOUISIANA NAVAL WAR MEMORIAL COMMISSION31 32(1447)HVAC Replacement and Repair, Planning 33 and Construction 34 (East Baton Rouge) 35 Payable from General Obligation Bonds 36 Priority 2 $ 139,000 Page 82 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 DEPARTMENT OF TRANSPORTATION AND DEVELOP MENT1 07/270ADMINISTRATION2 3(1640)Highway 91 Overlay within the City Limits 4 of Eunice 5 (Acadia, St. Landry) 6 Payable from General Obligation Bonds 7 Priority 2 $ 500,000 8 Priority 5 $ 1,200,000 9 Total $ 1,700,000 DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS10 08/407WINN CORRECTIONAL CENTER11 12(1462)Sanitation Code Violations, Planning and Construction 13 (Winn) 14 Payable from General Obligation Bonds 15 Priority 1 $ 3,400 08/409DIXON CORRECTIONAL INSTITUTE16 17(1624)Emergency Generators, Planning and Construction 18 (East Feliciana) 19 Payable from the balance of Series 94A (08T-02)$ 562 LOUISIANA DEPARTMENT OF HEALTH20 09/320OFFICE OF AGING AND ADULT SERVICES21 22(1464)Replace Roof and Storm Drains on all Patient 23 Buildings, Planning and Construction 24 (East Feliciana) 25 Payable from General Obligation Bonds 26 Priority 1 $ 606,800 27(1625 )Replace Fire Alarm and Sprinkler System, 28 Planning and Construction 29 (East Feliciana) 30 Payable from the balance of Series 94A (08T-02) $ 188 09/330OFFICE OF BEHAVIORAL HEALTH31 32(1465)New South Louisiana Human Services Authority 33 Administrative Building, Land Acquisition, Planning 34 and Construction 35 (Terrebonne) 36 Payable from General Obligation Bonds 37 Priority 1 $ 985,000 09/340OFFICE FOR CITIZENS WITH DEVELOP MENTAL 38 39 DISABILITIES 40(1466)Replace Rooftop Air Conditioning Units on Residential 41 Homes, Planning and Construction 42 (Tangipahoa) 43 Payable from General Obligation Bonds 44 Priority 1 $ 143,700 Page 83 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 LOUISIANA WORK FORCE COMMISSION1 14/474OFFICE OF WORKFORCE DEVELOPMENT2 3(1467)Renovations to Louisiana Workforce Commission's 4 Administrative Headquarters, Planning and 5 Construction 6 (East Baton Rouge) 7 Payable from General Obligation Bonds 8 Priority 1 $ 32,100 DEPARTMENT OF EDUCATION9 19/612BATON ROUGE COMMUNITY COLLEG E10 11(1468)Office of Motor Vehicle Building and Campus 12 Renovation, Demolition and Improvements, Planning 13 and Construction 14 (East Baton Rouge) 15 Payable from General Obligation Bonds 16 Priority 1 $ 53,100 19/616SOUTHERN UNIVERSITY BATON ROUG E17 18(1469)Fire Detection and Alarm System Upgrades, Planning 19 and Construction 20 (East Baton Rouge) 21 Payable from General Obligation Bonds 22 Priority 1 $ 29,600 23(1470)Major Repairs to F.G. Clark Activity Center 24 (East Baton Rouge) 25 Payable from General Obligation Bonds 26 Priority 1 $ 163,100 27(1471)A.O. Williams Hall Renovations 28 (East Baton Rouge) 29 Payable from General Obligation Bonds 30 Priority 1 $ 160,400 31(1629 )Provide Localized Boilers and Replace Chilled Water Loop 32 (East Baton Rouge) 33 Payable from the balance of Series 94A (08T-02)$ 400 19/621NICHOLLS STATE UNIVERSITY34 35(1472)Renovation of Athletic Training and Meeting Facility, 36 Planning and Construction 37 (Lafourche) 38 Payable from General Obligation Bonds 39 Priority 1 $ 254,600 40(1473)Fieldhouse, Planning and Construction 41 (Lafourche) 42 Payable from General Obligation Bonds 43 Priority 1 $ 84,700 Page 84 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 19/625LOUISIANA TECH UNIVERSITY1 2(1474)Water Distribution System Repairs and Improvements 3 (Lincoln) 4 Payable from General Obligation Bonds 5 Priority 1 $ 31,400 6(1475)Visual Arts Building Renovation for Business, Planning 7 and Construction 8 (Lincoln) 9 Payable from General Obligation Bonds 10 Priority 1 $ 53,000 19/627MCNEESE STATE UNIVERSITY11 12(1476)Alpha Hall Renovations, Planning and Construction 13 (Calcasieu) 14 Payable from General Obligation Bonds 15 Priority 1 $ 531,700 16(1477)Frazar Memorial Library Renovation and Repairs, 17 Planning and Construction 18 (Calcasieu) 19 Payable from General Obligation Bonds 20 Priority 1 $ 420,000 21(1478)Campus-Wide Elevator Repairs, Planning and 22 Construction 23 (Calcasieu) 24 Payable from General Obligation Bonds 25 Priority 1 $ 3,150 19/631NORTHWESTERN STATE UNIVERSITY26 27(1479)Williamson Hall Renovation for Engineering 28 Technology, Planning and Construction 29 (Natchitoches) 30 Payable from General Obligation Bonds 31 Priority 1 $ 45,000 19/644BOSSIER COMMUNITY COLLEG E32 33(1480)Parking Lot, Planning and Construction 34 (Bossier) 35 Payable from General Obligation Bonds 36 Priority 1 $ 2,000 19/657LOUISIANA SCHOOL F OR MATH, SCIENCE 37 38 AND THE ARTS 39(1481)Renovation, Expansion and Replacement of Annex 40 Building, Existing Auditorium and Cafeteria Areas, 41 Planning and Construction 42 (Natchitoches) 43 Payable from General Obligation Bonds 44 Priority 1 $ 112,700 Page 85 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 19/731L.E. FLETCHER TECHNICAL COMMUNITY COLLEG E1 2(1482)Integrated Petroleum Technologies Program (IPT) Lab 3 and Classroom Building, Planning and Construction 4 (Terrebonne) 5 Payable from General Obligation Bonds 6 Priority 1 $ 32,700 7(1483)Diesel Marine, Welding and Transportation Building 8 for Fletcher Technical Community College 9 (Terrebonne) 10 Payable from General Obligation Bonds 11 Priority 1 $ 52,700 19/741SOUTH LOUISIANA COMMUNITY COLLEG E - 12 13 LAFAYETTE CAMPUS 14(1484)HVAC Replacement, Planning and Construction 15 (Lafayette) 16 Payable from General Obligation Bonds 17 Priority 1 $ 46,700 JUDICIAL EXPENSES18 23/949LOUISIANA JUDICIARY19 20(1485)Land Acquisition, Planning, and Construction of New 21 Courthouse for the Louisiana Court of Appeal, Third 22 Circuit 23 (Calcasieu) 24 Payable from General Obligation Bonds 25 Priority 1 $ 268,700 LEVEE DISTRICTS AND PORTS26 36/L13PONTCHARTRAIN LEVEE DISTRICT27 28 29(131) East St. Charles Urban Flood Control Project 30 (St. Charles) 31 Payable from General Obligation Bonds 32 Priority 2 $ 1,500,000 33 Priority 5 $ 500,000 34 Total $ 2,000,000 36/L35ST. MARY LEVEE DISTRICT35 36(1486)Franklin Canal Levee and Floodgate Project, Planning 37 and Construction 38 (St. Mary) 39 Payable from General Obligation Bonds 40 Priority 1 $ 630,000 36/P05WEST CALCASIEU PORT41 42(1487)Land Acquisition and Rehabilitation of Existing 43 Bulkhead, Planning and Construction ($1,305,000 44 Local Match) 45 (Calcasieu) 46 Payable from General Obligation Bonds 47 Priority 1 $ 73,900 Page 86 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 36/P12LAKE PROVIDENCE PORT COMMISSION1 2(1488)Railroad Rehabilitation, Planning and Construction 3 (East Carroll) 4 Payable from General Obligation Bonds 5 Priority 1 $ 112,200 36/P14MADISON PARISH PORT, HARBOR AND 6 7 TERMINAL DISTRICT 8(1489)Railroad Rehabilitation/ Improvement and New Rail 9 Spur for Avondale Facility, and Improvements 10 Required for Levee Raising Including Raise Rail, Road 11 and Utilities ($221,000 Local Match) 12 (Madison) 13 Payable from General Obligation Bonds 14 Priority 1 $ 130,000 15(1490)Improvements to Madison Parish Port former Northrop 16 Grumman Shipbuilding Expansion 17 (Madison) 18 Payable from General Obligation Bonds 19 Priority 1 $ 15,000 36/P26LAKE CHARLES HARBOR AND TERMINAL 20 21 DISTRICT 22(1491)New Administration Building, Planning and 23 Construction ($1,500,000 Local Match) 24 (Calcasieu) 25 Payable from General Obligation Bonds 26 Priority 1 $ 119,200 36/P40GRAND ISLE PORT COMMISSION27 28(1492)Port Access Road and New Commercial Boat Slip 29 Facility 30 (Jefferson) 31 Payable from General Obligation Bonds 32 Priority 1 $ 27,800 36/P49POINTE COUPEE PORT, HARBOR AND 33 34 TERMINAL DISTRICT 35(1494)Pointe Coupee Parish Port Capital Improvements, 36 Planning and Construction 37 (Pointe Coupee) 38 Payable from General Obligation Bonds 39 Priority 1 $ 11,800 MISCELLANEOUS NON-STATE40 50/J03ASCENSION PARISH41 42(1495)Lamar Dixon Expo Center Recreational Complex, 43 Planning and Construction 44 (Ascension) 45 Payable from General Obligation Bonds 46 Priority 1 $ 300,000 Page 87 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(1496)Lamar Dixon Development, Purchase and Land 2 Acquisition 3 (Ascension) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,600 50/J06BEAUREGARD PARISH6 7(1497)Crosby, Butler and Pleasant Hill Roads 8 (Beauregard) 9 Payable from General Obligation Bonds 10 Priority 1 $ 12,000 50/J07BIENVILLE PARISH11 12(1498)Courthouse Improvements in Arcadia, Planning and 13 Construction ($115,000 Non-State Match) 14 (Bienville) 15 Payable from General Obligation Bonds 16 Priority 1 $ 40,000 50/J18EAST CARROLL PARISH17 18(1499)Industrial Site Development and Road Improvements 19 (For Economic Development Purposes, Including but 20 not Limited to an Ethanol Plant), Planning and 21 Construction 22 (East Carroll) 23 Payable from General Obligation Bonds 24 Priority 1 $ 42,500 25(1500)Courthouse and Jail Renovations 26 (East Carroll) 27 Payable from General Obligation Bonds 28 Priority 1 $ 55,200 50/J21FRANKLIN PARISH29 30(1501)Courthouse Renovations, Planning and Construction 31 (Franklin) 32 Payable from General Obligation Bonds 33 Priority 1 $ 43,200 34(1502)Parish Road Improvements 35 (Franklin) 36 Payable from General Obligation Bonds 37 Priority 1 $ 31,500 50/J23IBERIA PARISH38 39(1503)Wastewater System Improvements for the Acadiana 40 Regional Airport ($667,000 Non-State Match) 41 (Iberia) 42 Payable from General Obligation Bonds 43 Priority 1 $ 409,600 Page 88 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(1504)Five Lane Road Extension from Highway 675 to 2 Highway 3212, Planning and Construction 3 (Iberia) 4 Payable from General Obligation Bonds 5 Priority 1 $ 2,660,000 50/J26JEFFERSON PARISH6 7(1505)Martin Luther King Playground Improvements, 8 Planning and Construction 9 (Jefferson) 10 Payable from General Obligation Bonds 11 Priority 1 $ 2,000 12(1506)Livingston Place (Metairie Road to Loumor Avenue) 13 (Jefferson) 14 Payable from General Obligation Bonds 15 Priority 1 $ 17,700 16(1507)Upper Kraak Ditch Drainage Pump Station Pump 17 Replacement and Generator Installation 18 (Jefferson) 19 Payable from General Obligation Bonds 20 Priority 1 $ 150,850 50/J29LAFOURCHE PARISH21 22(1508)Company Canal Pump Station, Planning and 23 Construction ($283,236 Cash and/or In-Kind Match) 24 (Lafourche) 25 Payable from General Obligation Bonds 26 Priority 1 $ 30,000 50/J30LASALLE PARISH27 28(1509)Pine Hill Road Improvements, Planning and 29 Construction 30 (LaSalle) 31 Payable from General Obligation Bonds 32 Priority 1 $ 16,200 50/J32LIVINGSTON PARISH33 34(1510)Livingston Parish Regional Airport, Planning and 35 Construction ($900,000 Federal Funds) 36 (Livingston) 37 Payable from General Obligation Bonds 38 Priority 1 $ 39,500 39 Priority 2 $ 600,000 40 Priority 5 $ 1,000,000 41 Total $ 1,639,500 42(1511)Cook Road Extension Economic Development Corridor 43 (Pete's Highway Frontage Road) 44 (Livingston) 45 Payable from General Obligation Bonds 46 Priority 1 $ 1,551,900 47 Priority 5 $ 3,000,000 48 Total $ 4,551,900 Page 89 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(1512)District 9 Fire Station, Planning and Construction 2 (Livingston) 3 Payable from General Obligation Bonds 4 Priority 1 $ 100,000 5(1513)Livingston Parish Animal Shelter 6 (Livingston) 7 Payable from General Obligation Bonds 8 Priority 1 $ 5,200 50/J33MADISON PARISH9 10(1514)Charles Brown Road (Tendal Road) Repairs, Planning 11 and Construction 12 (Madison) 13 Payable from General Obligation Bonds 14 Priority 1 $ 189,100 50/J34MOREHOUSE PARISH15 16(1515)Carl Road Improvements, Construction 17 (Morehouse) 18 Payable from General Obligation Bonds 19 Priority 1 $ 1,500 50/J37OUACHITA PARISH20 21(1440)River Styx, Pump Station and Force Main 22 Replacement, Planning and Construction 23 (Ouachita) 24 Payable from General Obligation Bonds 25 Priority 5 $ 1,485,000 50/J39POINTE COUPEE PARISH26 27(1516)False River Ecosystem Restoration Project, Planning 28 and Construction 29 (Pointe Coupee) 30 Payable from General Obligation Bonds 31 Priority 1 $ 688,900 32 Priority 5 $ 2,189,300 33 Total $ 2,878,200 34(1517)Regional Fence Line Monitoring, Planning and 35 Equipment 36 (Pointe Coupee) 37 Payable from General Obligation Bonds 38 Priority 1 $ 21,600 39(1518)Emergency Communications Equipment 40 (Pointe Coupee) 41 Payable from General Obligation Bonds 42 Priority 1 $ 6,100 Page 90 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/J46ST. HELENA PARISH1 2(1093)Audubon Library, Planning and Construction 3 (St. Helena) 4 Payable from General Obligation Bonds 5 Priority 1 $ 300,000 6 Priority 5 $ 1,140,000 7 Total $ 1,440,000 8(1519)Emergency ADA and Life Safety Renovations to the 9 Court House, Planning and Construction ($2,680,000 10 Federal Funds) 11 (St. Helena) 12 Payable from General Obligation Bonds 13 Priority 1 $ 4,100 14(1520)Eddy Road Improvements, Planning and Construction 15 (St. Helena) 16 Payable from General Obligation Bonds 17 Priority 1 $ 5,000 50/J53TANGIPAHOA PARISH18 19(1521)Courthouse and Courthouse Annex Renovations and 20 Expansions, Planning and Construction ($500,000 21 Local Match) 22 (Tangipahoa) 23 Payable from General Obligation Bonds 24 Priority 1 $ 12,700 25(1522)Tangipahoa Parish Multipurpose Livestock and 26 Agricultural Facility, Planning and Construction, 27 Supplemental Funding 28 (Tangipahoa) 29 Payable from General Obligation Bonds 30 Priority 1 $ 36,000 50/J55TERREBONNE PARISH31 32(1068)Renovate the LePetit Terrebonne Theater 33 Building, Planning and Construction 34 (Terrebonne) 35 Payable from General Obligation Bonds 36 Priority 1 $ 350,000 37 Priority 5 $ 350,000 38 Total $ 700,000 39(1523)Terrebonne Parish Animal Shelter Facility, Planning, 40 Construction, and Equipment 41 (Terrebonne) 42 Payable from General Obligation Bonds 43 Priority 1 $ 33,900 44(1524)Thompson Road Extension, Land Acquisition, Planning 45 and Construction ($2,000,000 Local Match) 46 (Terrebonne) 47 Payable from General Obligation Bonds 48 Priority 1 $ 2,707,000 Page 91 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(1525)Terrebonne Parish Emergency Operations Center, 2 Planning and Construction 3 (Terrebonne) 4 Payable from General Obligation Bonds 5 Priority 1 $ 2,122,900 50/J58VERNON PARISH6 7(1526)Plainview Road Improvements, Planning and 8 Construction 9 (Vernon) 10 Payable from General Obligation Bonds 11 Priority 1 $ 82,900 12(1527)Lift Station and Force Main for Vernon Parish Jail 13 (Vernon) 14 Payable from General Obligation Bonds 15 Priority 1 $ 32,000 50/J60WEBSTER PARISH16 17(1528)Courthouse HVAC Renovations, Planning and 18 Construction 19 (Webster) 20 Payable from General Obligation Bonds 21 Priority 1 $ 205,600 50/J64WINN PARISH22 23(1529)Beulah Road Reconstruction, Planning and 24 Construction 25 (Winn) 26 Payable from General Obligation Bonds 27 Priority 1 $ 12,000 28(1530)Parish-Wide Roadway Projects 29 (Winn) 30 Payable from General Obligation Bonds 31 Priority 1 $ 11,600 50/M02ABITA SPRINGS32 33(1531)Water Lines and Sewer Lines, Extensions and 34 Upgrades, Planning and Construction (Cash and/or In- 35 Kind Match Required) 36 (St. Tammany) 37 Payable from General Obligation Bonds 38 Priority 1 $ 4,800 50/M10ARNAUDVILLE39 40(1532)Multipurpose Aquatic Recreational Facility 41 (St. Landry) 42 Payable from General Obligation Bonds 43 Priority 1 $ 5,000 Page 92 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/M14BAKER1 2(1533)Baker Fire Training Facility, Planning and Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 1 $ 170,000 50/M20BATON ROUGE6 7(1534)Drainage Improvements in Old Goodwood Area, 8 Planning and Construction 9 (East Baton Rouge) 10 Payable from General Obligation Bonds 11 Priority 1 $ 5,000 50/M22BENTON12 13(1535)Town of Benton Wastewater Collection System 14 Improvements, Planning and Construction 15 (Bossier) 16 Payable from General Obligation Bonds 17 Priority 1 $ 10,100 50/M24BERWICK18 19(1536)Sewerage Collection System Along Old Spanish Trail 20 and LA 182, Planning and Construction 21 (St. Mary) 22 Payable from General Obligation Bonds 23 Priority 1 $ 1,394,200 50/M25BIENVILLE24 25(1537)Village of Bienville, Water System Improvements 26 (Bienville) 27 Payable from General Obligation Bonds 28 Priority 1 $ 2,000 50/M32BROUSSARD29 30(1037)Rehabilitate LA Hwy 182 from US 90 to LA Hwy 89, 31 Planning and Construction 32 (Lafayette) 33 Payable from General Obligation Bonds 34 Priority 1 $ 245,000 35(1039)Three-Lane LA 182 in the City of Broussard, 36 Planning and Construction ($750,000 Match) 37 (Lafayette) 38 Payable from General Obligation Bonds 39 Priority 5 $ 2,240,000 40(1538)Reconstruct South Bernard Road From LA Hwy 182 to 41 US Hwy 90, Planning and Construction 42 (Lafayette) 43 Payable from General Obligation Bonds 44 Priority 1 $ 995,000 45 Priority 5 $ 4,000,000 46 Total $ 4,995,000 Page 93 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/M52COLUMBIA1 2(1539)Water Well, Planning and Construction 3 (Caldwell) 4 Payable from General Obligation Bonds 5 Priority 1 $ 6,500 50/M54COTTON VALLEY6 7(1638)Sewerage System Improvements, Planning 8 and Construction 9 (Webster) 10 Payable from General Obligation Bonds 11 Priority 1 $ 1,260,000 50/M58CROWLEY12 13(1540)North Avenue O Drainage Improvements, Planning and 14 Construction 15 (Acadia) 16 Payable from General Obligation Bonds 17 Priority 1 $ 35,000 50/M64DEQUINCY18 19(1541)Buxton Creek Emergency Drainage Improvements, 20 Planning and Construction 21 (Calcasieu) 22 Payable from General Obligation Bonds 23 Priority 1 $ 690,000 50/M68DONALDSONVILLE24 25(1542)Riverfront Development, Planning and Construction 26 (Ascension) 27 Payable from General Obligation Bonds 28 Priority 1 $ 196,100 50/M87FERRIDAY29 30(1543)Downtown Revitalization, Planning and Construction 31 ($253,750 In-Kind Local Match) 32 (Concordia) 33 Payable from General Obligation Bonds 34 Priority 1 $ 12,400 50/MB2GRAYSON35 36(1544)Streets and Drainage Improvements 37 (Caldwell) 38 Payable from General Obligation Bonds 39 Priority 1 $ 11,200 50/MB5GRETNA40 41(1545)McDonoghville Fire Station, Planning and Construction 42 (Jefferson) 43 Payable from General Obligation Bonds 44 Priority 1 $ 73,700 Page 94 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(1546)Lion's Club Conversion to Gretna Senior Center, 2 Planning and Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 91,700 50/MB9HAMMOND6 7(1630 )Pine Hill Sewer System Improvements and Municipal Tie- 8 In, Planning and Construction 9 (Tangipahoa) 10 Payable from the balance of Series 94A (08T-02)$ 100 50/MC1HARAHAN11 12(1547)Magnolia Boulevard Drainage - West Magnolia to 13 Jefferson Highway, Planning and Construction 14 (Jefferson) 15 Payable from General Obligation Bonds 16 Priority 1 $ 16,500 50/MC3HAUGHTON17 18(1548)Additional Water Supply Wells, Planning and 19 Construction 20 (Bossier) 21 Payable from General Obligation Bonds 22 Priority 1 $ 4,100 50/MC9HOMER23 24(1549)Town of Homer, Town Hall Renovations, Planning and 25 Construction 26 (Claiborne) 27 Payable from General Obligation Bonds 28 Priority 1 $ 7,700 50/MD1HORNBECK29 30(1550)Emergency Connection with Sabine Parish Water 31 Works District 1, Planning and Construction 32 (Sabine) 33 Payable from General Obligation Bonds 34 Priority 1 $ 18,600 35(1551)Rehabilitation of Elevated Water Tank, Planning and 36 Construction 37 (Vernon) 38 Payable from General Obligation Bonds 39 Priority 1 $ 3,600 50/MD5INDEPENDENCE40 41(1552)Independence Area Community Pavilion, Planning and 42 Construction 43 (Tangipahoa) 44 Payable from General Obligation Bonds 45 Priority 1 $ 1,000 Page 95 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/ME1JEAN LAFITTE1 2(1553)Lafitte Seafood Pavilion, Planning and Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 61,800 50/MF1KENNER6 7(1554)Lake Trail Drainage Improvement, Planning and 8 Construction 9 (Jefferson) 10 Payable from General Obligation Bonds 11 Priority 1 $ 367,300 50/MF2KENTWOOD12 13(1555)Recreational Facility Property Acquisition, Planning, 14 Site Preparation, Master Recreation Plan and 15 Construction 16 (Tangipahoa) 17 Payable from General Obligation Bonds 18 Priority 1 $ 200,000 19 Priority 5 $ 300,000 20 Total $ 500,000 50/MF9LAKE CHARLES21 22(1556)Riverside Park Improvements, Planning and 23 Construction 24 (Calcasieu) 25 Payable from General Obligation Bonds 26 Priority 1 $ 261,700 50/MG3LEESVILLE27 28(1557)University Parkway Sewer System and Wastewater 29 Treatment Facilities Enhancements, Planning and 30 Construction 31 (Vernon) 32 Payable from General Obligation Bonds 33 Priority 1 $ 19,300 50/MG7LIVINGSTON34 35(1558)Water Tower and Well, Acquisition, Planning and 36 Construction 37 (Livingston) 38 Payable from General Obligation Bonds 39 Priority 1 $ 500,000 50/MG8LIVONIA40 41(1631)Purchase and Installation of Law Enforcement Surveillance 42 System, Planning and Construction 43 (Pointe Coupee) 44 Payable from the balance of Series 94A (08T-02)$ 500 Page 96 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/MH3LOREAUVILLE1 2(1559)Loreauville Wastewater Treatment Plant Improvements 3 and Demolition Project, Planning and Construction 4 (Iberia) 5 Payable from General Obligation Bonds 6 Priority 1 $ 10,200 7 Priority 5 $ 840,000 8 Total $ 850,200 50/MH8MANDEVILLE9 10(1560)Water Tower, Construction 11 (St. Tammany) 12 Payable from General Obligation Bonds 13 Priority 1 $ 325,300 50/MI6MARKSVILLE14 15(1561)Mary Bethune Community Center, previously known as 16 D.A. Jordan Community Center, for the City of 17 Marksville, Planning and Construction 18 (Avoyelles) 19 Payable from General Obligation Bonds 20 Priority 1 $ 59,900 50/MJ3MER ROUGE21 22(1562)Boutz Lane Renovations 23 (Morehouse) 24 Payable from General Obligation Bonds 25 Priority 1 $ 15,000 50/MJ4MERRYVILLE26 27(1563)Sewerage Pump Station and Aeration System 28 Improvements, Planning and Construction 29 (Beauregard) 30 Payable from General Obligation Bonds 31 Priority 1 $ 24,300 50/MJ6MONROE32 33(1564)Monroe Regional Airport Terminal, Planning and 34 Construction ($40,500,000 Federal and/or Local Match) 35 (Ouachita) 36 Payable from General Obligation Bonds 37 Priority 1 $ 696,100 38 50/ML1NEW IBERIA39 40(1565)Armenco Branch Canal Drainage Improvements (Non- 41 State Match Required) 42 (Iberia) 43 Payable from General Obligation Bonds 44 Priority 1 $ 74,500 Page 97 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/ML2NEW LLANO1 2(1566)Raymond Street Rehabilitation 3 (Vernon) 4 Payable from General Obligation Bonds 5 Priority 1 $ 23,600 6(1567)Expansion of Wastewater System South to Fort Polk 7 Entrance Road ($750,000 Local Match) Real Estate 8 Acquisition, and/or Street Lighting Improvements, 9 Planning and Construction 10 (Vernon) 11 Payable from General Obligation Bonds 12 Priority 1 $ 171,800 13(1568)Water System Improvements, Construction ($800,000 14 Local Match) 15 (Vernon) 16 Payable from General Obligation Bonds 17 Priority 1 $ 643,300 18(1569)Street Improvements, Planning and Construction 19 (Vernon) 20 Payable from General Obligation Bonds 21 Priority 1 $ 14,800 50/ML3NEW ORLEANS22 23(1570)Rosenwald Community Center, Planning and 24 Construction 25 (Orleans) 26 Payable from General Obligation Bonds 27 Priority 1 $ 889,800 50/MO1PONCHATOULA28 29(1571)Consolidated Law Enforcement Complex, Acquisition, 30 Planning and Construction 31 (Tangipahoa) 32 Payable from General Obligation Bonds 33 Priority 1 $ 12,000 34 Priority 2 $ 250,000 35 Total $ 262,000 50/MQ1ROSEPINE36 37(1572)Water System Improvements, Town of Rosepine, 38 Planning and Construction 39 (Vernon) 40 Payable from General Obligation Bonds 41 Priority 1 $ 1,000 42(1573)Rehabilitation of Elevated Water Tank, Planning and 43 Construction 44 (Vernon) 45 Payable from General Obligation Bonds 46 Priority 1 $ 235,400 Page 98 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1(1574)Improvements to Sewer Collection System 2 (Vernon) 3 Payable from General Obligation Bonds 4 Priority 1 $ 150,900 50/MQ4ST. JOSEPH5 6(1575)Repairs and Upgrades to Water System, Planning and 7 Construction 8 (Tensas) 9 Payable from General Obligation Bonds 10 Priority 1 $ 7,458,800 11(1576)Proposed City Hall/Convention Center, Planning and 12 Construction 13 (Tensas) 14 Payable from General Obligation Bonds 15 Priority 1 $ 15,000 50/MQ5ST. MARTINVILLE16 17(1577)Sewer and Water Updates, Planning and Construction 18 (St. Martin) 19 Payable from General Obligation Bonds 20 Priority 1 $ 19,500 21 Priority 5 $ 50,000 22 Total $ 69,500 23(1578)Sewer Lift Station Improvements 24 (St. Martin) 25 Payable from General Obligation Bonds 26 Priority 1 $ 30,900 50/MQ8SCOTT27 28(1579)Water and Sewer Line Installation along Apollo Road 29 Extension, Planning and Construction 30 (Lafayette) 31 Payable from General Obligation Bonds 32 Priority 1 $ 358,900 50/MR1SHREVEPORT33 34(1580)C.C. Antoine Park, Planning and Construction 35 (Caddo) 36 Payable from General Obligation Bonds 37 Priority 1 $ 277,300 38 Priority 2 $ 200,000 39 Priority 5 $ 822,700 40 Total $ 1,300,000 50/MR2SIBLEY41 42(1581)Town of Sibley, Water Tank Rehabilitations, Planning 43 and Construction 44 (Webster) 45 Payable from General Obligation Bonds 46 Priority 1 $ 6,100 Page 99 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/MR7SIMSBORO1 2(1582)Water Well and Water Main 3 (Lincoln) 4 Payable from General Obligation Bonds 5 Priority 1 $ 28,000 50/MT3TALLULAH6 7(1583)Improvements to Sewer System, Planning and 8 Construction 9 (Madison) 10 Payable from General Obligation Bonds 11 Priority 1 $ 13,600 12(1584)Sewer Treatment Plant Improvements City of Tallulah 13 (Madison) 14 Payable from General Obligation Bonds 15 Priority 1 $ 92,600 50/MT5THIBODAUX16 17(1585)LA Hwy 20 (N. Canal Blvd.) Widening, Planning and 18 Construction 19 (Lafourche) 20 Payable from General Obligation Bonds 21 Priority 1 $ 30,900 50/MU5VINTON22 23(1586)Water Treatment Plant Improvements, Including 24 Rehabilitation of Elevated Water Storage Tank, Site 25 and Electrical Improvements, Planning and 26 Construction 27 (Calcasieu) 28 Payable from General Obligation Bonds 29 Priority 1 $ 26,800 30(1587)Reconstruction of Big Woods Road, Planning and 31 Construction 32 (Calcasieu) 33 Payable from General Obligation Bonds 34 Priority 1 $ 70,300 50/MW2YOUNGSVILLE35 36(1588)Youngsville Parkway Road Project, Including 37 Waterline Improvements, Roadway Lighting, and Other 38 Infrastructure Improvements, Planning and 39 Construction 40 (Lafayette) 41 Payable from General Obligation Bonds 42 Priority 1 $ 31,300 43(1589)Highway 92 Realignment Near Youngsville, 44 Construction, Right of Way, and Utilities 45 (Lafayette) 46 Payable from General Obligation Bonds 47 Priority 1 $ 295,000 Page 100 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/MW4ZWOLLE1 2(1590)Installation of 6" Waterline and Water Well, Planning 3 and Construction ($25,000 Local Match) 4 (Sabine) 5 Payable from General Obligation Bonds 6 Priority 1 $ 21,400 50/N71NORTH LAFOURCHE CONSERVATION LEVEE 7 8 AND DRAINAGE DISTRICT 9(1591)80 Arpent Canal Dredging, Caldwell Plantation to 10 Laurel Valley, Planning and Construction 11 (Lafourche) 12 Payable from General Obligation Bonds 13 Priority 1 $ 10,000 50/NA2LAFAYETTE AIRPORT COMMISSION14 15(1592)Construction of Cargo Facilities, Planning and 16 Construction 17 (Lafayette) 18 Payable from General Obligation Bonds 19 Priority 1 $ 1,158,300 50/NB3MCKINLEY HIGH SCHOOL ALUMNI ASSOCIATION20 21(1593)Old McKinley High Community Center on Thomas 22 Delpit Drive in the City of Baton Rouge, Kitchen and 23 Building Renovations, Repairs and Upgrades Including 24 Elevator Repair, Planning and Construction 25 (East Baton Rouge) 26 Payable from General Obligation Bonds 27 Priority 1 $ 100,000 50/NBMBLACK RIVER LAKE COMMISSION28 29(1594)Black River Lake Drainage Structure Installation, 30 Studies, Permits, Planning and Construction 31 (Concordia) 32 Payable from General Obligation Bonds 33 Priority 1 $ 255,000 50/NBTDISTRICT 2 COMMUNITY ENHANCEMENT 34 35 CORPORATION 36(1595)New Orleans East Walking and Bike Trail, Planning 37 and Construction 38 (Orleans) 39 Payable from General Obligation Bonds 40 Priority 1 $ 23,700 50/NCNSOUTH TOLEDO BEND WATERWORK S DISTRICT41 42(1596)Water Distribution System Improvements Including 43 Water Meters 44 (Sabine) 45 Payable from General Obligation Bonds 46 Priority 1 $ 8,800 Page 101 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/NCYRECONCILE NEW ORLEANS, INC.1 2(1597)Reconcile New Orleans, Renovation and Expansion 3 Project, Central City New Orleans, Planning and 4 Construction 5 (Orleans) 6 Payable from General Obligation Bonds 7 Priority 1 $ 55,000 50/NFQALGIERS DEVELOPMENT CORPORATION, INC.8 9(1598)Westbank Recreation Center - Federal City 10 (Orleans) 11 Payable from General Obligation Bonds 12 Priority 1 $ 178,000 50/NFSSHREVEPORT - RUSTON METHODIST CAMP13 14(1599)Caney Conference Center Remodel Project, Planning 15 and Construction 16 (Webster) 17 Payable from General Obligation Bonds 18 Priority 1 $ 2,000 1950/NG6LOUISIANA BLACK HISTORY HALL OF FAME 20(274) Museum and Cultural Center, Land Acquisition, 21 Planning ans Construction ($100,000 Cash 22 and/or In-Kind Match) 23 East Baton Rouge) 24 Payable from General Obligation Bonds 25 Priority 2 $ 500,000 26 Priority 5 $ 400,000 27 Total $ 900,000 50/NGEWEST VERNON WATERWORK S DISTRICT28 29(1600)Expansion of Water Distribution System and Booster 30 Station West Vernon Waterworks District, Planning 31 and Construction 32 (Vernon) 33 Payable from General Obligation Bonds 34 Priority 1 $ 32,500 50/NGFFAMILY CENTER OF LIFE, INC.35 36(1601)Family Center of Hope Community Center in New 37 Orleans, Planning and Construction ($600,000 Local 38 Match) 39 (Orleans) 40 Payable from General Obligation Bonds 41 Priority 1 $ 89,900 Page 102 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/NHLBOGALUSA COMMUNITY MEDICAL CENTER 1 2 FOUNDATION 3(1602)Capital Improvements at Washington St. Tammany 4 Regional Medical Center 5 (St. Tammany, Washington) 6 Payable from General Obligation Bonds 7 Priority 1 $ 32,300 50/NHSPLEASANT HILL-CROSSROADS WATER SYSTEMS, INC.8 9(1603)Pleasant Hill/Crossroads Water System, Repairs and 10 Extension, Planning and Construction 11 (Winn) 12 Payable from General Obligation Bonds 13 Priority 1 $ 4,100 50/NIKLOUISIANA 4-H FOUNDATION14 15(1604)Louisiana 4-H Foundation Youth Educational 16 Development Center, Camp Windy Wood Property, 17 Including Multipurpose Educational Building, 18 Planning, Construction and Acquisition 19 (Grant) 20 Payable from General Obligation Bonds 21 Priority 1 $ 25,500 50/NILYMCA OF GREATER NEW ORLEANS22 23(1433)Belle Chasse YMCA, Phase II, 24 Planning and Construction 25 (Plaquemines) 26 Payable from General Obligation Bonds 27 Priority 1 $ 700,000 28 Priority 5 $ 300,000 29 Total $ 1,000,000 50/NJ8NORTH LOUISIANA CRIMINALISTICS LAB30 31(1605)Replacement of Shreveport Facility, Planning and 32 Construction 33 (Caddo) 34 Payable from General Obligation Bonds 35 Priority 1 $ 1,974,100 50/NJ9DRYADES YMCA36 37(1606)Technical Training Center, Planning and Construction 38 (Orleans) 39 Payable from General Obligation Bonds 40 Priority 1 $ 139,500 41 Priority 2 $ 990,000 42 Priority 5 $ 7,759,500 43 Total $ 8,889,000 Page 103 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/NLRHORSESHOE ROAD WATER SYSTEM, INC.1 2(1607)Horseshoe Water System, Planning and Construction 3 (Webster) 4 Payable from General Obligation Bonds 5 Priority 1 $ 15,900 50/NQYWESTON WATER SYSTEM, INC.6 7(1608)Water Mains Extensions with Connections, Booster 8 Station and Emergency Power Improvements, Planning 9 and Construction 10 (Jackson) 11 Payable from General Obligation Bonds 12 Priority 1 $ 13,500 50/NSRJUNIOR LEAGUE OF NEW ORLEANS, INCORP ORATED13 14(1609)Renovate Annex Building and Re-Purpose Space, 15 Including Installation of Handicap Accessibility Ramp 16 and Bathroom Upgrades, Planning and Construction 17 (Orleans) 18 Payable from General Obligation Bonds 19 Priority 1 $ 5,000 20(1610)Renovate Thrift Shop and Annex, Including Parking 21 Lot, Planning and Construction 22 (Orleans) 23 Payable from General Obligation Bonds 24 Priority 1 $ 2,700 25(1611)Renovate Headquarters Building, Including HVAC 26 System, Planning and Construction 27 (Orleans) 28 Payable from General Obligation Bonds 29 Priority 1 $ 8,300 50/NT2MERCY ENDEAVORS30 31(1612)Irish Channel St. Andrew Street Elderly Resource Center, 32 New Facility, Land Acquisition, Including Installation and 33 Acquisition of Building Equipment and Furnishings, 34 Planning and Construction 35 (Orleans) 36 Payable from General Obligation Bonds 37 Priority 1 $ 299,800 50/NTIJACKSON TOURISM ENHANCEMENT38 39(1633)Feliciana Veterans Memorial, Planning and Construction 40 (East Feliciana) 41 Payable from the balance of Series 94A (08T-02)$ 600 Page 104 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/NTJCADEVILLE WATER DISTRICT1 2(1613)Site No. 4 Water System Renovations and 3 Improvements, Planning and Construction (50% Local 4 Match) 5 (Ouachita) 6 Payable from General Obligation Bonds 7 Priority 1 $ 3,800 50/NTQEAST FELICIANA EMERG ENCY COMMUNICATIONS DISTRICT8 9(1614)Emergency Communications Center, Planning and 10 Construction 11 (East Feliciana) 12 Payable from General Obligation Bonds 13 Priority 1 $ 70,100 50/NTTHOMER MEMORIAL HOSP ITAL14 15(1615)Bone Density Machine, Acquisition and Installation 16 (Claiborne) 17 Payable from General Obligation Bonds 18 Priority 1 $ 16,100 50/NUR9TH WARD FIELD OF DREAMS19 20(296) 9th Ward Field of Dreams Football and 21 Track Stadium, 22 Planning and Construction 23 (Orleans) 24 Payable from General Obligation Bonds 25 Priority 2 $ 750,000 26 Priority 5 $ 3,415,000 27 Total $ 4,165,000 50/NV5SWLA CENTER FOR HEALTH SERVICES28 29(1623)SWLA Center for Health Services - Healing Center, 30 Planning and Construction 31 (Calcasieu) 32 Payable from General Obligation Bonds 33 Priority 1 $ 85,000 50/NV6EAST CARROLL PARISH HOSPITAL34 35(1616)East Carroll Parish Hospital Capital Improvement, 36 Emergency Repairs, Planning and Construction 37 (East Carroll) 38 Payable from General Obligation Bonds 39 Priority 1 $ 3,400 50/NVWOUR LADY OF THE LAKE CHILDREN'S HOSPITAL40 41(1618)Our Lady of the Lake Children's Hospital, Acquisition, 42 Planning and Construction 43 (East Baton Rouge) 44 Payable from General Obligation Bonds 45 Priority 1 $ 3,007,700 46 Priority 5 $11,000,000 47 Total $14,007,700 Page 105 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/NWKNATIONAL HURRICANE MUSEUM AND 1 2 SCIENCE CENTER, INC. 3(1619)National Hurricane Museum and Science Center, 4 Planning and Construction 5 (Calcasieu) 6 Payable from General Obligation Bonds 7 Priority 1 $ 4,000 50/NWWTHRIVE FOUNDATION8 9(1620)New Facility, Planning and Construction 10 (East Baton Rouge) 11 Payable from General Obligation Bonds 12 Priority 1 $ 299,800 50/NXCLIVINGSTON PARISH SHERIFF'S OFFICE13 14(1637)Livingston/Ascension Parish Outpost on the Diversion, 15 Planning and Construction 16 (Livingston) 17 Payable from General Obligation Bonds 18 Priority 2 $ 200,000 50/NYNOPELOUSAS HEIGHTS19 20(1636)Opelousas Heights Proposed Subdivision, Planning 21 and Construction 22 (St. Landry) 23 Payable from General Obligation Bonds 24 Priority 2 $ 500,000 25 Priority 5 $ 715,000 26 Total $ 1,215,000 50/NYOTWELFTH DISTRICT NUMBER 3 BAP TIST ASSOCIATION27 28(1639)Multipurpose Center, Planning and Major Renovation 29 (Sabine) 30 Payable from General Obligation Bonds 31 Priority 2 $ 182,000 50/S39POINTE COUPEE PARISH SCHOOL BOARD32 33(1621)Pointe Coupee Parish School Board Central Office 34 Relocation, Renovation and Rebuilding Due to 35 Flooding Caused By Hurricane Gustav 36 (Pointe Coupee) 37 Payable from General Obligation Bonds 38 Priority 1 $ 69,700 39 Section 1.B. The projects in this Section did not submit a capital outlay request 40for Fiscal Year 2017-2018 by November 1, 2016 in compliance with the provisions of R.S. 4139:101(A). Therefore, because the projects in this Section are not in compliance with the 42provisions of Act 419 of the 2016 Regular Session of the Legislature, the appropriations for 43the projects in this Section require separate statutory change to existing law in order to be Page 106 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1eligible for cash and non-cash lines of credit and therefore, the proposed appropriations for 2these projects are pending that effective statutory change. DEPARTMENT OF VETERANS AFFAIRS3 03/130DEPARTMENT OF VETERANS AFFAIRS4 5( )Northeast Louisiana State Cemetery, 6 Planning and Construction 7 (Richland) 8 Payable from General Obligation Bonds 9 Priority 5 $ 347,000 DEPARTMENT OF CULTURE, RECREATION AND TOURISM10 06/264OFFICE OF STATE PARKS11 12( )Poverty Point Reservoir State Park, 13 Acquisition, Planning and Construction, 14 Supplemental Funding 15 (Richland) 16 Payable from General Obligation Bonds 17 Priority 1 $ 2,000 DEPARTMENT OF TRANSPORTATION AND DEVELOP MENT18 07/270ADMINISTRATION19 20( )Verot School Road, Construction 21 (Lafayette) 22 Payable from General Obligation Bonds 23 Priority 5 $ 1,000,000 24( )LA Highway 616 (Caldwell Road to LA Highway 143), 25 Planning and Construction 26 (Ouachita) 27 Payable from General Obligation Bonds 28 Priority 5 $ 1,200,000 29( )LA 143 to US 165 Connector, Planning, Engineering, 30 Right of Way, Utilities and Construction 31 (Ouachita) 32 Payable from General Obligation Bonds 33 Priority 5 $33,200,000 34( )La. Hwy 167 Corridor Improvements, 35 Planning and Construction 36 (St. Landry, Evangeline) 37 Payable from General Obligation Bonds 38 Priority 2 $ 9,500,000 Page 107 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1 DEPARTMENT OF EDUCATION 2 19/601LSU BATON ROUG E3 4( )Stephenson Veterinary Hospital, Planning 5 and Construction 6 (East Baton Rouge) 7 Payable from General Obligation Bonds 8 Priority 5 $ 5,000,000 9 Payable from Fees and Self Generated Revenues$ 5,000,000 10 Total $10,000,000 19/629UNIVERSITY OF LOUISIANA - MONROE11 12( )Stubbs Hall Reroofing, Planning and Construction 13 (Ouachita) 14 Payable from General Obligation Bonds 15 Priority 1 $ 5,400 16 Priority 2 $ 9,600 17 Total $ 15,000 19/631NORTHWESTERN STATE UNIVERSITY18 19( )Multi-Purpose Assembly Center, Planning 20 and Construction 21 (Natchitoches) 22 Payable from General Obligation Bonds 23 Priority 5 $ 295,800 19/644BOSSIER COMMUNITY COLLEG E24 25( )Land Acquisition, Planning and Construction 26 (Bossier) 27 Payable from General Obligation Bonds 28 Priority 1 $ 300,000 29 Priority 2 $ 1,000,000 30 Priority 5 $ 2,600,000 31 Total $ 3,900,000 32 PORTS AND LEVEE DISTRICTS 36/P26LAKE CHARLES HARBOR AND TERMINAL DISTRICT33 34( )Dredging of Berth 8 at City Docks, 35 Planning and Construction 36 ($1,000,000 Local Match) 37 (Calcasieu) 38 Payable from General Obligation Bonds 39 Priority 1 $ 250,000 MISCELLANEOUS NON-STATE40 4150/J15CONCORDIA PARISH 42( )Concordia Parish Public Health Center 43 Renovation, Planning and Construction 44 (Concordia) 45 Payable from General Obligation Bonds 46 Priority 5 $ 92,600 Page 108 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/J18EAST CARROLL PARISH1 2( )East Carroll Parish Road Improvements 3 (East Carroll) 4 Payable from General Obligation Bonds 5 Priority 1 $ 15,000 50/J40RICHLAND PARISH6 7( )Sapa Drive Improvements, 8 Planning and Construction 9 (Richland) 10 Payable from General Obligation Bonds 11 Priority 2 $ 8,000 50/J54TENSAS PARISH12 13( )Tensas Parish Port/Port Priority Site Plan, 14 Planning and Construction 15 (Tensas) 16 Payable from General Obligation Bonds 17 Priority 1 $ 4,700 18 Priority 5 $ 500,000 19 Total $ 504,700 50/M06AMITE20 21( )City Police Station Repairs, Planning and Construction 22 (Tangipahoa) 23 Payable from General Obligation Bonds 24 Priority 2 $ 200,000 25 Priority 5 $ 700,000 26 Total $ 900,000 50/M19BASTROP27 28( )Municipal Center Lighting/Ceiling Tile 29 (Morehouse) 30 Payable from General Obligation Bonds 31 Priority 5 $ 312,000 32( )Central Fire Station, Replace Driveway City 33 Hall, Roof Construction, Planning and Construction 34 (Morehouse) 35 Payable from General Obligation Bonds 36 Priority 5 $ 250,000 37( )Pool Pump Houses/Comfort Stations Roof, Planning 38 and Construction 39 (Morehouse) 40 Payable from General Obligation Bonds 41 Priority 5 $ 125,000 50/M31BREAUX BRIDGE42 43( )New Pavilion at Carl Williams Memorial 44 Park, Planning and Construction 45 (St. Martin) 46 Payable from General Obligation Bonds 47 Priority 2 $ 50,000 Page 109 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1( )Renovations at Veterans Memorial Park, 2 Planning and Construction 3 (St. Martin) 4 Payable from General Obligation Bonds 5 Priority 2 $ 50,000 650/M95FRANKLINTON 7( )Right Turn Lane Entrance to Recreational 8 Facility, Planning and Construction 9 (Washington) 10 Payable from General Obligation Bonds 11 Priority 2 $ 20,000 50/MA9GRAND COTEAU12 13( )Police and Utility Departments Roof, 14 Air Conditioning Unit for Town Hall, 15 Handheld Meter Reader, Abandon 16 and Plug Water Well 17 (St. Landry) 18 Payable from General Obligation Bond 19 Priority 2 $ 60,000 20( )Fire Truck and Fire Stations Upgrades 21 (St. Landry) 22 Payable from General Obligation Bond 23 Priority 2 $ 10,000 50/ML3NEW ORLEANS24 25( )Construction of Opelousas Street Extension from Behrman 26 Avenue to Obannon Street and Construction of Patterson 27 Drive Extension from Hendee Street to Obannon Street, 28 Planning and Construction 29 (Orleans) 30 Payable from General Obligation Bonds 31 Priority 2 $ 250,000 32 Priority 5 $ 1,500,000 33 Total $ 1,750,000 34( )Donsereaux/Harrison Playground Renovations, 35 Planning and Construction 36 (Orleans) 37 Payable from General Obligation Bonds 38 Priority 5 $ 100,000 39( )Holiday Drive Roadway Construction 40 (Gen. MacArthur to Behrman) 41 (Orleans) 42 Payable from General Obligation Bonds 43 Priority 2 $ 98,200 44( )Joe Bartholomew Golf Course Storm Shelter/ 45 Restroom Portico Units, Planning, Acquisition, 46 Installation, and Construction 47 (Orleans) 48 Payable from General Obligation Bonds 49 Priority 2 $ 300,000 Page 110 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/MM4OIL CITY1 2( )Highway 538 Water Line Extension, 3 Planning and Construction 4 (Caddo) 5 Payable from General Obligation Bonds 6 Priority 5 $ 105,000 50/MU7WALKER7 8( )Industrial Park Road Extension, 9 Planning and Construction 10 (Livingston) 11 Payable from General Obligation Bonds 12 Priority 1 $ 250,000 50/MV2WEST MONROE13 14( )Rehabilitation of Montgomery Street from 15 LA 34 to I-20, Roadway, Water and Sewer 16 (Ouachita) 17 Payable from General Obligation Bonds 18 Priority 5 $ 500,000 19( )Creation of a Hurricane/Disaster Shelter by 20 Expanding the West Ouachita Senior Center, 21 Planning and Construction 22 (Ouachita) 23 Payable from General Obligation Bonds 24 Priority 2 $ 300,000 50/N13CHENNAULT INDUSTRIAL AIR P ARK AUTHORITY25 26( )New Aviation Hanger and Ground 27 Support Equipment Facility, 28 Planning and Construction 29 ($1,000,000 Local Match) 30 (Calcasieu) 31 Payable from General Obligation Bonds 32 Priority 1 $ 260,000 33( )New Air Cargo Facility, 34 Planning and Construction 35 ($1,100,000 Local Match) 36 (Calcasieu) 37 Payable from General Obligation Bonds 38 Priority 1 $ 350,000 39 Priority 5 $ 2,750,000 40 Total $ 3,100,000 50/NFCJOHN K. KELLY GRAND BAYOU RESERVOIR41 42( )Grand Bayou Resort Sea Wall and Sewer System 43 Repairs, Planning and Construction 44 (Red River) 45 Payable from General Obligation Bonds 46 Priority 2 $ 135,000 Page 111 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/NJ7BLOOD CENTER PROPERTIES, INC.1 2( )Lake Charles Facility Flood Wall and 3 Retractable Flood Gates Project 4 (Calcasieu) 5 Payable from General Obligation Bonds 6 Priority 5 $ 1,600,000 50/NM1RAPIDES WATER WORK S DISTRICT NO. 37 8( )Color Removal from Well No. 2 and Well No. 7 9 at LA Army National Guard, Camp Beauregard, 10 Pineville, LA, Planning and Construction 11 (Rapides) 12 Payable from General Obligation Bonds 13 Priority 1 $ 50,000 50/NMHSOUTHWEST OUACHITA WATER WORK S, INC.14 15( )Water Distribution System Renovations, 16 Planning and Construction 17 (Ouachita) 18 Payable from General Obligation Bonds 19 Priority 5 $ 300,000 50/NTTHOMER MEMORIAL HOSP ITAL20 21( )Hospital Roof Repair, 22 Planning and Construction 23 (Claiborne) 24 Payable from General Obligation Bonds 25 Priority 1 $ 25,000 26 Priority 2 $ 126,100 27 Total $ 151,100 28( )Upper Parking Lot Expansion, 29 Planning and Construction 30 (Claiborne) 31 Payable from General Obligation Bonds 32 Priority 1 $ 110,000 33( )Backup Generator, Acquisition, Planning 34 and Construction 35 (Claiborne) 36 Payable from General Obligation Bonds 37 Priority 2 $ 100,000 50/NQEFREED MEN, INC.38 39( )Housing Renovations, Planning and Construction 40 (Ouachita) 41 Payable from General Obligation Bonds 42 Priority 1 $ 45,000 Page 112 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 50/NRVMADISON VOLUNTARY COUNCIL ON AG ING1 2( )Expansion and Improvements to Activities 3 Building, Planning and Construction 4 (Madison) 5 Payable from General Obligation Bonds 6 Priority 5 $ 220,000 50/NVTINDIAN VILLAGE WATER SYSTEM7 8( )Connection to Robinson Chapel Water System 9 and Associated Improvements, 10 Planning and Construction 11 (Jackson) 12 Payable from General Obligation Bonds 13 Priority 2 $ 97,800 50/NXBMONTEREY RURAL WATER SYSTEM14 15( )Emergency Water Ground Storage Tank Replacement, 16 Planning and Construction 17 (Concordia) 18 Payable from General Obligation Bonds 19 Priority 5 $ 210,000 20 Section 2. The expenditure of funds appropriated in this Act, except appropriations 21made to nonprofit economic development corporations, shall be in conformity to all existing 22statutes relative to public bidding, contractual review, and R.S. 39:101 through 128 and any 23other statutes affecting the capital outlay program for state government, state institutions, 24and political entities. No contract shall be awarded for any project prior to the granting of 25a line of credit or the sale of bonds by the State Bond Commission, determination by the 26state treasurer that cash funding is available in the Comprehensive Capital Outlay Escrow 27Account for the project, or delivery of revenue bonds whose issuance is authorized in 28Section 1 of this Act. 29 Section 3. Payment for projects specified in this Act must be made by warrant 30submitted to the division of administration, Department of Transportation and Development, 31the state treasurer or other administering agency as provided in Section 8, whichever is 32appropriate, only to the extent of funds required for immediate payment. Copies of invoices 33or other supporting documentation shall be submitted with warrants. In the event that any 34equipment included in this Act, is procured pursuant to the provisions of the State Lease- 35Purchase Act, R.S. 39:1761 et seq., the amounts included in this Act for each such piece of 36equipment shall not be appropriated. The provisions of R.S. 39:1771 which require 37equipment to be leased under the State Lease-Purchase Act to be included in the executive Page 113 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1budget and approved by the legislature through inclusion in the General Appropriation Act 2shall be considered waived upon the inclusion of such equipment in this Act. Projects 3contained in this Act may, at the direction of the division of administration and with the 4approval of the State Bond Commission, alternatively be funded through financing programs 5heretofore or hereafter provided by a public trust and public corporation duly organized 6pursuant to R.S. 9:2341 et seq., having for its beneficiary the state and the Louisiana Local 7Government Environmental Facilities and Community Development Authority, pursuant to 8R.S. 33:4548.1 et seq. 9 Section 4. If at any time during the Fiscal Year 2017-2018, the governor should find, 10or the Joint Legislative Committee on the Budget or the commissioner of administration 11should report to the governor, that the receipts of the treasury are falling short or appear 12likely to fall short of the revenue estimates for the fiscal year and that a cash deficit is likely 13to be incurred, the governor shall take such steps as deemed necessary to prevent the 14occurrence of a cash deficit. In the event that a capital outlay project funded in this Act falls 15under an agency which is abolished or for which funds are not appropriated in the 2017-2018 16General Appropriation Act, then the funds appropriated in this Act for such capital outlay 17projects shall not be expended unless deemed necessary by the governor to protect life or 18property. In the event that legislation is enacted which transfers facilities or programs for 19which projects are funded in this Act, on behalf of one agency, institution, department, or 20management board to another agency, institution, department, or management board, then 21the projects in this Act shall be deemed transferred also. 22 Section 5. All monies appropriated by this Act and any applicable funds of a prior 23capital outlay budget act adopted by the legislature shall be deposited by the state treasurer 24in the Comprehensive Capital Outlay Escrow Account, established by this Section, in the 25state treasury. In accordance with R.S. 36:764, no later than sixty days following the end 26of each quarter, the state treasurer shall report to the Joint Legislative Committee on the 27Budget and the commissioner of administration, all funds contained in the Miscellaneous 28Fund of the Comprehensive Capital Outlay Escrow Account. Notwithstanding any 29provisions contained herein or other law to the contrary, any original issue premium or 30accrued interest proceeds received pursuant to the sale of general obligation bonds shall Page 114 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1remain on deposit to the credit of the Bond Security and Redemption Fund until such time 2as they may be utilized in accordance with U.S. Department of the Treasury Regulations 3promulgated pursuant to the Internal Revenue Code of 1986. All such monies shall be 4administered according to the particular act pertaining to the fiscal year in which such 5monies were appropriated. If it is determined by the director of the office of facility 6planning and control, division of administration, that the funds appropriated by this Act or 7any prior capital outlay budget act are not sufficient to complete the projects contained in 8any capital outlay budget act, through unavoidable deficiencies in appropriation, including 9administrative and legal requirements, the commissioner of administration, subject to 10approval of the Joint Legislative Committee on the Budget, may direct the use of interest 11earned from the investment of general obligation bond or note proceeds in the 12Comprehensive Capital Outlay Escrow Account, not to exceed an aggregate of five million 13dollars in any one fiscal year, for the purpose of completing the projects contained in any 14capital outlay budget act and such money shall be deemed appropriated in specific amounts 15necessary for such purpose. All appropriations in this Act which are made as additions to 16funds for previously authorized projects shall be included, for accounting purposes, in the 17account of the previously authorized projects. If it is determined by the director of the office 18of facility planning and control, division of administration, that it is cost effective and 19practical to combine individual appropriations, the commissioner of administration, subject 20to the approval of the Joint Legislative Committee on the Budget, may direct that two or 21more appropriations or parts thereof may be combined into a single project for accounting 22and audit purposes. The commissioner of administration may direct that funding in the 23various statewide and/or multiple parish projects for improvements for state facilities may 24be transferred to any project, in this Act or any previous Capital Outlay Act, which require 25supplemental funding for improvements for state facilities which qualify for funding through 26the various statewide and/or multiple parish projects for improvements for state facilities. 27The office of facility planning and control, division of administration is authorized to receive 28settlements and vendor rebates not in excess of $50,000 unless approved by the Joint 29Legislative Committee on the Budget, and to add those receipts to the funding for projects 30in this Act or any previous Capital Outlay Act for which project funds are received. The Page 115 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1office of facility planning and control, division of administration is authorized to receive 2insurance payments and are hereby authorized to immediately repair facilities that suffer 3insurance losses without those projects being included in the Act and shall report to the Joint 4Legislative Committee on the Budget any expenditures from insurance funds received 5pursuant to this section. A portion, as determined by the commissioner of administration and 6not to exceed one percent (1%), of the funding for projects which qualify for the Percent for 7Art Program, may be transferred from the qualifying project budgets, to the Department of 8Culture, Recreation and Tourism for costs of acquiring art and administering the program. 9For all Percent for Art Program projects in this or any previous capital outlay, up to ten 10percent (10%) of the aforementioned one percent (1%) may be used for the costs of 11administering the projects. 12 Section 6. Prior to March 1, 2018, the commissioner of administration shall submit 13to the Joint Legislative Committee on Capital Outlay a list of projects that are completed and 14the cash balances remaining in each project. 15 Section 7. The commissioner of administration, with the approval of the Joint 16Legislative Committee on the Budget, is authorized to supplement or substitute the 17appropriations specified in this or previous capital outlay acts with any federal or other funds 18which are or may become available and such funds shall be deemed appropriated in specific 19amounts necessary for the purposes of this Act. Any funds received by the State Bond 20Commission as a result of a prepayment of reimbursement contracts as authorized by law 21and the policy and procedure for reimbursement contracts of the Department of Treasury, 22office of State Bond Commission, shall be deposited as set forth in such policy and 23procedure and shall be deemed available and appropriated in specific amounts necessary for 24the purposes of this Act pursuant to the procedure set forth in this section. 25 Section 8. All of the funds herein appropriated, except for appropriations made to 26the Department of Military Affairs, the Legislature, the Louisiana Stadium and Exposition 27District, the Department of Economic Development, the Coastal Protection and Restoration 28Authority, the Division of Administration for Supplemental State Funds for Local 29Government Assistance Program, the Division of Administration for the Community Water 30Enrichment Program or the Department of Transportation and Development, shall be Page 116 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1considered as having been appropriated directly to the Office of Facility Planning and 2Control, Division of Administration, and all projects herein authorized and funded shall be 3subject to the provisions of R.S. 39:101 through 128. All of the funds appropriated in the 4Capital Outlay Act under the name of non-state entities shall be administered by the Office 5of Facility Planning and Control, Division of Administration, under cooperative endeavor 6agreements. All cooperative endeavor agreements for non-state entities shall be prepared 7by the Office of Facility Planning and Control and the Commissioner of Administration is 8hereby authorized and directed to effectuate any necessary transfer of funds from the 9Department of Justice to the Office of Facility Planning and Control in order to accomplish 10this purpose. However, all cooperative endeavor agreements between the Department of 11Transportation and Development and non-state entities entered into prior to the passage of 12this Act shall continue to be administered by the Department of Transportation and 13Development. Cooperative endeavor agreements entered into pursuant to this Act, and 14approved by the Commissioner of Administration or his designee, or the Secretary of the 15Department of Transportation and Development for projects appropriated to or administered 16by the Department of Transportation and Development, shall not be required to be submitted 17to the Division of Administration, Office of Contractual Review. For all projects in the 18Capital Outlay Act or a previous Capital Outlay Act which are appropriated to the Office of 19Facility Planning and Control, Division of Administration, including those administered by 20cooperative endeavor agreements, up to six percent of each line-item may be used for costs 21of administering the projects. For all projects in Capital Outlay Act or a previous Capital 22Outlay Act appropriated to the Department of Transportation and Development, up to six 23percent of each line-item may be used for costs of administering the projects, or for field 24engineering/construction supervision. Line-item general obligation bond projects 25appropriated to the Department of Transportation and Development in the Capital Outlay 26Act or a previous Capital Outlay Act shall be authorized to draw Transportation Trust Funds 27from the Highway Program appropriation, for supplemental funding on overruns in excess 28of the original estimated project cost as determined by the Department of Transportation and 29Development, provided however that said projects are in the state or federal highway system 30and in the priority program, and the overrun is less than $50,000. Any such overrun of Page 117 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1$50,000 or more must be approved by the Joint Legislative Committee on the Budget. 2Furthermore, all ports, levee districts and other non-state entities must have a fully executed 3cooperative endeavor agreement, from the Office of Facility Planning and Control, 4Department of Transportation and Development, or the State Treasurer, whichever is 5appropriate, before entering into any contracts which obligate state funding and must follow 6all laws pertaining to public bidding. If a port, levee district or other non-state entity enters 7into a contract prior to receipt of funding, or prior to execution of a cooperative endeavor 8agreement, then payments under such contracts are prohibited from capital outlay 9appropriations, and are the sole responsibility of the port, levee district, or other non-state 10entity. Notwithstanding the provisions of this Act, the Capital Outlay Act, or any previous 11capital outlay act, contracts may be entered into for the Atchafalaya Basin Protection and 12Enhancement Kemper Williams project in St. Mary Parish prior to a cooperative endeavor 13agreement being entered into with the state. Notwithstanding anything contained in this Act, 14the Capital Outlay Act, or any previous capital outlay act to the contrary or any other 15provision of law, contracts may be entered into for the Youngsville Sports Complex project 16in Lafayette Parish, prior to receipt of funding and prior to execution of the cooperative 17endeavor agreement and the state is authorized to financially participate in obligations 18created by such contracts. Notwithstanding the provisions of R.S. 39:112(E)(2), the project 19for Independence, Independence Area Community Pavilion, Planning and Construction, 20shall be exempt from all local match requirements. Notwithstanding anything contained in 21this Act or the Capital Outlay Act to the contrary or any other provision of law, the scope 22of the appropriations made in the Capital Outlay Act or any other Capital Outlay Act for the 23St. Mary Parish Plantation Pump Station Replacement project shall be deemed to include 24repair, equipment, rehabilitation and infrastructure improvements at the existing Plantation 25Pump Station. Notwithstanding anything contained in this Act or the Capital Outlay Act to 26the contrary or any other provision of law, the scope of the appropriations made in this or 27any other Capital Outlay Act for the Louisiana 4-H Foundation, Youth Education 28Development Camp Windy Wood project, shall be deemed to include planning, construction, 29and acquisition. Notwithstanding anything contained in this Act or the Capital Outlay Act 30to the contrary or any other provision of law, the scope of the appropriations made in the Page 118 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1Capital Outlay Act or any other Capital Outlay Act for the Youngsville Parkway Road 2project shall be deemed to include waterline improvements and roadway lighting. 3Notwithstanding anything contained in this Act or the Capital Outlay Act to the contrary, or 4any other provision of law, the scope of the appropriations made in the Capital Outlay Act 5or any other Capital Outlay Act for the City of New Orleans, Eastern New Orleans Hospital 6and Medical Office Building, Real Estate Acquisition, Planning, Design, Construction, 7Renovation and Equipment project, the City of New Orleans may make such capital outlay 8funds available to the Parish Hospital Service District of the Parish of Orleans District "A" 9in furtherance of the District's planning, design, acquisition, development, renovation, 10construction, equipment and operation of a hospital and medical office building in Eastern 11New Orleans. Notwithstanding anything contained in this Act or the Capital Outlay Act, or 12in any cooperative endeavor agreement between the Office of Facility Planning and Control 13and the City of New Orleans or the Hospital Service District to the contrary, the Hospital 14Service District may mortgage or otherwise encumber any and all land, real estate property, 15including buildings and equipment, and appurtenances acquired, in whole or part, with state 16capital outlay funds provided that bond counsel to the state opines that such mortgage shall 17not affect the tax-exempt status of the bonds to be issued by the state for the project. 18Notwithstanding anything in this Act or the Capital Outlay Act to the contrary, contracts 19may be entered into for the City of New Orleans, Eastern New Orleans Hospital and Medical 20Office Building, Real Estate Acquisition, Planning, Design, Construction, Renovation and 21Equipment project prior to receipt of funding and prior to execution of the cooperative 22endeavor agreement. Notwithstanding anything contained in this Act or the Capital Outlay 23Act to the contrary or any other provision of law, the scope of the appropriations made in 24the Capital Outlay Act or any other Capital Outlay Act for the Jefferson Parish Bonnabel 25Canal Rehabilitation and Bank Stabilization (Veterans Boulevard to West Esplanade), 26Planning and Construction project shall be deemed to include steel sheet pile bulkhead, 27and/or bank excavation and reshaping, bridge replacement, property acquisition, demolition 28and improvements needed to stabilize the canal bank along the Bonnabel Drainage Canal in 29order to address canal bank failures between Veterans Boulevard and West Esplanade 30Avenue. Notwithstanding anything contained in this Act or the Capital Outlay Act to the Page 119 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1contrary or any other provision of law, the scope of the appropriations made in this or any 2other Capital Outlay Act for the New Orleans West Bank Park Improvements, New Soccer 3and Recreational Facilities, and Skateboard Park project and the Norman Playground 4Basketball Gym, Planning and Construction project shall be deemed to include the George 5W. Carver Playground, Renovations and Upgrades project for the West Bank Park project 6and park enhancements for a walking track, basketball, football and baseball fields and a 7concession stand for the Norman Playground project. Notwithstanding anything contained 8in this Act or the Capital Outlay Act to the contrary or any other provision of law, the Parks 9Municipal Complex, Planning and Construction project shall include the purchase, 10construction or renovation of a new facility in St. Martin Parish. Notwithstanding anything 11contained in this Act or the Capital Outlay Act to the contrary or any other provision of law, 12The Vernon/Fort Polk Thoroughfare Electrical Power Extension project shall include 13Utilities Including Generators. Notwithstanding anything contained in this Act or the 14Capital Outlay Act to the contrary or any other provision of law, the Parish Road 15Improvements Project for Franklin Parish is exempt from the contract limit set forth in R.S. 1638:2212. Notwithstanding anything contained in this Act or the Capital Outlay Act to the 17contrary or any other Act or provision of law, the appropriations made for the Executive 18Department for facilities which promote economic development included in the Repair, 19Restoration, and Replacement for Hurricanes Katrina and Rita project, and the Department 20of Economic Development projects are for public purposes pursuant to the provisions of 21Article VII, Section 14 of the Constitution of Louisiana primarily for economic 22development, including the generation of tax revenues, creation of jobs, promotion of 23tourism, and creation of facilities for charitable, cultural, artistic, educational, social, civic, 24research, service, economic development activities, or provide facilities for professional golf 25events, pursuant to the terms of cooperative endeavor agreements, including leases and all 26expenditures of these appropriations and may be exempted, by the Commissioner of 27Administration, from all statutes relative to public bidding, contractual review and the 28provisions of R.S. 33:9029.2(D) and in lieu thereof be allowed to use alternative competitive 29contracting arrangements where the appropriate administering entity submits documentation 30to the Commissioner of Administration substantiating that it is in the best interest of the Page 120 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1citizens of the state, due to economic and/or operational benefits, and the necessity to 2complete the projects in a timely manner; and, the appropriate administering entity shall 3have the authority to directly appoint the design professional from a list of a minimum of 4three design firms or joint ventures with the appropriate specialized facility design 5experience submitted to and acceptable to the Commissioner of Administration and shall be 6exempt from other state requirements for selection of designers, and may include 7expenditures for computers, fixtures, furniture, and other equipment as such is deemed to 8be capital outlay in nature, and unless the Commissioner of Administration is advised by 9bond counsel to the State that such may violate federal tax law, may be used to reimburse 10any expenditure made prior to the granting of a line of credit or the sale of bonds by the State 11Bond Commission, determination by the State Treasurer that cash funding has been 12deposited in the Comprehensive Capital Outlay Escrow Account for the project or the 13execution of a cooperative endeavor agreement from the Office of Facility Planning and 14Control, and may be used to acquire land or real property, the title to which is held in the 15name of an entity exempt from taxation under the provisions of 26 U.S.C. 501(c)(3). 16Notwithstanding anything contained in this Act or the Capital Outlay Act to the contrary or 17any other provision of law, all of the funds herein appropriated to the Department of 18Economic Development in connection with the Capital Improvements Project to Meet 19Economic Development Commitments for which the Department of Economic Development 20utilizes a cooperative endeavor agreement to further economic development as permitted 21under Article VII, Section 14 of the Louisiana Constitution, including the generation of tax 22revenues and creation of jobs, shall be considered as having been appropriated to the 23Department of Economic Development, may be used to reimburse any expenditure made 24prior to the granting of a line of credit and made prior to the execution of a cooperative 25endeavor agreement and shall be administered solely by the Department of Economic 26Development pursuant to, in compliance with, and on the terms contained in such 27cooperative endeavor agreements. Notwithstanding any provision of law to the contrary, the 28Commissioner of Administration is hereby authorized to take such actions as are necessary, 29including using such funds as may be available including those appropriated and available 30under this Act or the Capital Outlay Act for professional sports facilities through the Page 121 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1Louisiana Stadium and Exposition District and that are otherwise available, executing on 2behalf of the State such documents as are necessary in order to terminate the ground lease 3between the State and the PGA and thereby acquiring all leasehold improvements for the 4State, extending the management agreement between the State and the PGA, and extending 5the sponsorship and presence of the Zurich Classic in the Greater New Orleans area. 6Notwithstanding anything contained in this Act, or the Capital Outlay Act, or any other 7capital outlay act, contracts may be entered into for the Port of South Louisiana, Globalplex 8Rail Siding; Globalplex Terminal Building #71 Upgrade, Planning and Construction and/or 9Administration Building (also known as the Business Development Center) projects prior 10to receipt of funding and prior to execution of a cooperative endeavor agreement. 11Notwithstanding anything in this Act, the Capital Outlay Act, any previous capital outlay act, 12or other provision of law to the contrary, the scope of the appropriation for the Port of South 13Louisiana Globalplex Terminal Building #71 Upgrade project shall be deemed to also 14include similar upgrades for other Globalplex Terminal Buildings. Notwithstanding 15anything in this Act, any previous capital outlay act, or other provision of law to the 16contrary, monies appropriated herein for the Port of South Louisiana Globalplex Terminal 17Building #71 and Other Globalplex Terminal Building Upgrades, Planning and Construction 18may be expended for design fees related to the conveyor system and ancillary equipment that 19exceed the customary ten percent limitation on design fee costs. Notwithstanding anything 20in this Act or the Capital Outlay Act to the contrary or any other provision of law, contracts 21may be entered into for the Greater Baton Rouge Port Commission Inland Rivers Marine 22Terminal Dock and Access Roadway Construction Project, Planning and Construction 23Project prior to receipt of funding and prior to the execution of a cooperative endeavor 24agreement. Notwithstanding anything in this Act to the contrary or any other provision of 25law, monies appropriated herein for the Juban Road (LA1026) Widening (I-12 to US 190) 26project may be expended for the installation of sewer lines along the roadway and pursuant 27to a cooperative endeavor agreement between the Department of Transportation and 28Development and Livingston Parish, funds may be provided to Livingston Parish for that 29purpose. Notwithstanding anything contained in this act to the contrary or any other 30provision of law, the appropriations made for the Louisiana Stadium and Exposition District Page 122 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1shall be appropriated directly to the Louisiana Stadium and Exposition District, and are 2public purposes pursuant to the provisions of Article VII, Section 14 of the Constitution of 3Louisiana primarily for economic development, including the generation of tax revenue, 4creation of jobs, and the generation of tourism, and may be used to reimburse any 5expenditure made prior to the granting of a line of credit or the sale of bonds by the State 6Bond Commission, determination by the State Treasurer that cash funding has been 7deposited in the Comprehensive Capital Outlay Escrow Account for the project. The 8Louisiana Stadium and Exposition District may apply up to $10,000,000 to reimburse the 9New Orleans Pelicans NBA, LLC for costs incurred in constructing a new training facility 10as contemplated by the Amended and Restated Arena Use Agreement dated July, 1 2015; 11but, otherwise, contracts for projects funded through this appropriation shall be awarded 12utilizing the public bid and contractual review process set forth in Chapter 10 of Title 38 and 13Chapter 17 of Title 39 of the Louisiana Revised Statutes of 1950, except with respect to time 14requirements, or, in order to encourage competition for the projects funded through this 15appropriation and to complete the projects in a timely manner, the Louisiana Stadium and 16Exposition District shall have the authority to select a general contractor through an RFP 17process whereby general contractors will bid general conditions and contractor's fee based 18on the direct construction budget. The alternative time requirements shall be approved by 19the Commissioner of Administration before the awarding of any such contracts. Further, 20with respect to appropriations to the Louisiana Stadium and Exposition District for the TPC 21Louisiana, Planning and Construction project, the Louisiana Stadium and Exposition District 22shall be permitted to use alternative competitive procurement and delivery methods for the 23award of any contracts to be funded through such appropriation. The Louisiana Stadium and 24Exposition District shall have the authority to directly appoint the design professional from 25a list of a minimum of three architectural firms or joint ventures with professional sports 26facility design experience acceptable to the Commissioner of Administration and shall be 27exempt from other state requirements for selection of designers. The design professional fee 28shall be in accordance with state guidelines administered by the Office of Facility Planning 29and Control, Division of Administration. Eligible expenses for Economic Development 30Award Program funds may include documented project expenses beginning on the date of Page 123 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1LEDC Board approval of the project and may be reimbursed upon execution of the 2cooperative endeavor agreement for the project. The new University Medical Center in New 3Orleans project in Orleans Parish shall be exempt from the state's requirements for selection 4of designers and the Commissioner of Administration shall have the authority to approve a 5design professional selection process. The design professional fee shall be in accordance 6with state guidelines administered by the Office of Facility Planning and Control, Division 7of Administration. The Division of Administration, Office of Facility Planning and Control, 8with approval of the Commissioner of Administration and the Joint Legislative Committee 9on the Budget, is authorized to use alternative delivery strategies in implementing hurricane 10damage repairs to Southern University at New Orleans, Hazardous Material Abatement 11Projects, the City Park Golf Complex Improvements project, the Health/Human Performance 12Education Complex, and the Patrick Taylor Hall Renovation and Expansion project. In 13addition, with the approval of the Commissioner of Administration and the Joint Legislative 14Committee on the Budget, an alternative delivery strategy may be used in the 15implementation of the Louisiana Children's Museum, Early Learning Village project. Due 16to the State's current investment in TPC Louisiana and the financial support it provides to 17the PGA TOUR event currently played at said facility, the funding of the City Park Golf 18Complex Improvements project described above is conditioned upon said PGA TOUR event 19not being played at New Orleans City Park Golf Complex without the prior agreement of the 20Commissioner of Administration and the Chairman of the Jefferson Parish Council. 21Notwithstanding the foregoing, the City Park Golf Complex may host any other golf 22tournament or event, including but not limited to any other PGA-affiliated or sponsored 23tournament or event. For all projects administered by the Office of Facility Planning and 24Control and payable from proceeds of self-generated revenues, funds shall be remitted to the 25Office of Facility Planning and Control for deposit in the state treasury at such time as may 26be deemed necessary by the Office of Facility Planning and Control in order to cover the 27amount of contracts or other project expenses. The State Treasurer shall refund to the 28appropriate source any surplus self-generated funds, advanced insurance funds received by 29the Office of Facility Planning and Control as Interagency Transfer from Office of Risk 30Management associated with hurricane damage recovery, and interest earned on these funds, Page 124 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1provided the Treasurer's Office is notified, when these funds are deposited in the state 2treasury, that the user agency or Office of Risk Management intends to request a refund of 3this interest. Any revenue bonds appropriated in Section 1 of the Capital Outlay Act shall 4not be secured by the full faith and credit of the state. Notwithstanding anything in this Act 5or the Capital Outlay Act to the contrary or any other provision of law, contracts may be 6entered into for the Mississippi River Levee Raising, Arkansas to Old River project prior to 7receipt of funding, and the State is authorized to financially participate in obligations created 8by such contracts. Notwithstanding anything in this Act or the Capital Outlay Act to the 9contrary or any other provision of law, contracts may be entered into for the Old McKinley 10High School Community Center on Thomas Delpit Drive in the City of Baton Rouge, 11Kitchen and Building Renovations, Repairs and Upgrades Including Elevator Repair Project 12prior to receipt of funding and prior to the execution of a cooperative endeavor agreement, 13and unless the Commissioner of Administration is advised by bond counsel to the state that 14such may violate federal tax law, the appropriation may be used to reimburse any 15expenditure made prior to the granting of a line of credit or the sale of bonds by the State 16Bond Commission. Notwithstanding anything in this Act or the Capital Outlay Act to the 17contrary or any other provision of law, contracts may be entered into for the Tulane 18University Tulane River and Coastal Center Project prior to receipt of funding and prior to 19the execution of a cooperative endeavor agreement, and the project is exempted from all 20statutes relative to public bidding and state procurement and in lieu thereof shall be subject 21to federal government qualifications and regulations approved by the Economic 22Development Authority. Notwithstanding anything in this Act or the Capital Outlay Act to 23the contrary or any other provision of law, contracts may be entered into for the Outpatient 24Clinics in Rapides Parish, Planning and Construction project for the Division of 25Administration prior to the execution of a cooperative endeavor agreement. Notwithstanding 26any other provision of this Act or the Capital Outlay Act or any other provision of law to the 27contrary, funds appropriated for the Economic Development Award Program project for the 28Office of Business Development are to be used solely for capital and infrastructure 29improvements subject to verification by the Division of Administration, Office of Facility 30Planning and Control. Notwithstanding any other provision of this Act or the Capital Outlay Page 125 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1Act or any other provision of law to the contrary, all of the funds herein appropriated to the 2Department of Economic Development in connection with projects or programs for which 3the Department of Economic Development utilizes a cooperative endeavor agreement to 4further economic development as permitted under Article VII, Section 14 of the Louisiana 5Constitution, including the generation of tax revenues and creation of jobs, shall be 6considered as having been appropriated to the Department of Economic Development, may 7be used to reimburse any expenditure made prior to the granting of a line of credit and made 8prior to the execution of a cooperative endeavor agreement and shall be administered solely 9by the Department of Economic Development pursuant to, in compliance with, and on the 10terms contained in such cooperative endeavor agreements without compliance with any other 11law, including, but not limited to, the provisions of R.S. 39:101 through 128. Additionally, 12all expenditures of these appropriations may be exempted by the Commissioner of 13Administration, from all statutes relative to public bidding, contractual review and the 14provisions of R.S. 33:9029.2(D). Notwithstanding anything contained in this Act, the Capital 15Outlay Act, or any other provision of law to the contrary, the letting of a contract for 16construction of the "Louisiana Construction Center", funded wholly by the Louisiana 17Licensing Board for Contractors, shall be exempt from all statutes relative to public bidding 18and contractual review. Notwithstanding anything contained in this Act or the Capital Outlay 19Act or any other provision of law to the contrary, contracts may be entered into for the City 20of Gretna’s Lion’s Club Conversion to Senior Center project prior to receipt of funding and 21prior to execution of a cooperative endeavor agreement and the project is exempted from all 22statutes relative to public bidding and contractual review. Notwithstanding anything 23contained in this Act, the Capital Outlay Act, or any other provision of law to the contrary, 24the scope of the appropriation for the Department of Transportation and Development, LA 2522 Improvements (LA 16 to Diversion Canal), Planning and Construction (Livingston) is 26deemed to also include the overlay of LA 22 from Head of Island to Chinquapin Bridge. 27Notwithstanding anything contained in this Act, the Capital Outlay Act, or any other 28provision of law to the contrary, the Department of Transportation and Development shall 29use $2,500,000 of general obligation bond funding appropriated for Department of 30Transportation and Development, Administration, Highway Program (Up to $4,000,000 for Page 126 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1Secretary's Emergency Fund) in Act 25 of the 2014 Regular Session of the Legislature for 2the Louisiana Highway 92 Overlay, Preservation and Construction (Lafayette) project. 3Notwithstanding anything contained in the Act or a previous Capital Outlay Act, any 4provision of law, or in any cooperative endeavor agreement between the Office of Facility 5Planning and Control and Westwego, the scope of the appropriations in this or any previous 6Capital Outlay Act for Westwego, The WHARF project shall be deemed to include site 7preparation. Notwithstanding anything contained in the Act or the Capital Outlay Act to the 8contrary or any other provision of law, the Slip Dredging and Improvements for the 9Terrebonne Port Commission Government Multi-Use Complex, Planning and Construction 10project shall be deemed to include Houma Navigation Canal Dredging. Notwithstanding 11anything contained in this Act or a previous Capital Outlay Act, any provision of law, or in 12any cooperative endeavor agreement between the Office of Facility Planning and Control 13and the Pontchartrain Levee District, the scope of the appropriations in this or any previous 14Capital Outlay Act for the Pontchartrain Levee District, East St. Charles Urban Flood 15Control project shall be deemed to include planning, design, and construction of the East St. 16Charles Urban Flood Control project, including the Almedia, St. Rose, and Airport Pump 17Stations located in the eastern end of the East Bank of St. Charles Parish. Notwithstanding 18anything contained in this Act, the Capital Outlay Act, or any other provision of law to the 19contrary, $50,000 of the appropriation for Department of Natural Resources, Office of the 20Secretary, Atchafalaya Basin Protection and Enhancement (Federal Match and 21Local/Sponsor Match)(Assumption, Avoyelles, Iberia, Iberville, Pointe Coupee, St. Landry, 22St. Martin, St. Mary) will be used to fund House Concurrent Resolution No. 168 of 2011. 23Notwithstanding anything contained in this Act or the Capital Outlay Act to the contrary, 24any other provisions of law, or the provisions of R.S. 39:112(E)(2), the project for Eden 25House, New Facility, Acquisition, Planning and Construction, shall be exempt from all local 26match requirements. Notwithstanding anything contained in this Act, the Capital Outlay 27Act, any other provision of law, or the provisions of R.S. 39:112(E)(2) to the contrary, the 28project for Lockport Street Improvements, Planning and Construction, shall be exempt from 29all local match requirements. Notwithstanding anything contained in this Act, the Capital 30Outlay Act, or any other Capital Outlay Act, the scope of the appropriation for the Page 127 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1Department of Transportation and Development, Jimmie Davis Bridge Rehabilitation and 2Lighting, Planning and Construction project in Bossier and Caddo parishes, shall be deemed 3to include the planning, design and construction of a new bridge. Notwithstanding any 4provisions contained herein or any other law to the contrary, for projects with other means 5of financing provided to the administering agency by interagency transfer, the authority to 6draw these funds shall remain with the user agency. 7 Section 9. Notwithstanding any provisions contained herein or any other law to the 8contrary, the provisions of Chapter 16 of Subtitle III of Title 39 of the Louisiana Revised 9Statutes of 1950 as amended, shall not apply to architectural and engineering contracts, 10administered by the office of facility planning and control, division of administration 11pursuant to this or any other capital outlay act. 12 Section 10. All funds appropriated herein to the office of facility planning and 13control, division of administration, on behalf of non-state entities, and administered by 14cooperative endeavor agreements pursuant to this Act shall be expended within two (2) years 15from the date of the issuance of the bonds. The office of facility planning and control, 16division of administration, agrees that it will notify the non-state entity of the date the bonds 17are issued within three (3) months from the issuance thereof. The non-state entity 18understands and agrees that if the funds appropriated herein and administered under 19cooperative endeavor agreements pursuant to this Act are not totally expended within two 20(2) years from the issuance of the bonds, the office of facility planning and control, division 21of administration, can close the project and recommend that the legislature reallocate any 22unexpended proceeds to other projects. 23 Section 11. Notwithstanding any provisions contained herein or law to the contrary, 24the proceeds of revenue bonds to be utilized to fund certain projects authorized in Section 251 hereof may, in accordance with Article VII, Section 9 of the Louisiana Constitution of 261974, be deposited in special accounts held outside the state treasury in accordance with the 27provisions of any bond resolution, indenture, reimbursement contract, or other bond or 28financing covenant which provides for the pledge of such funds in connection with the 29issuance of revenue bonds. For all projects administered by the office of facility planning 30and control, division of administration, authorized in Section 1 hereof which are payable Page 128 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1from the proceeds of revenue bonds, only the office of facility planning and control, division 2of administration, will be authorized to requisition funds from the special accounts described 3immediately above, at such time or times as may be deemed necessary by the office of 4facility planning and control, division of administration, in order to cover contract amounts 5or other project expenses. 6 Section 12. The governor shall have the power to veto any line-item in this Act. 7 Section 13. Except as otherwise provided herein, no funds shall be expended on any 8highway projects on highways within the state highway system as established in R.S. 48:191 9under the jurisdiction of the Department of Transportation and Development unless and until 10such project is in the Highway Program, R.S. 48:228 through 232, approved by the Joint 11Legislative Committee on Transportation, Highways and Public Works. Pursuant to R.S. 1249:214.6.2(B), no integrated coastal protection construction project shall be undertaken with 13funds included in this bill except those included in an annual plan finally approved by the 14legislature in accordance with the provisions of R.S. 49:214.5.3. No funds appropriated to 15the Coastal Protection and Restoration Authority in this Act as a contribution for a project 16cost-share or otherwise, for the national economic development and national ecosystem 17restoration components of the Southwest Coastal Louisiana Study shall be used or provided 18for the expropriation of property or use of eminent domain, except where such funds are to 19be used to obtain property voluntarily offered for project purposes, where at least seventy- 20five percent of the owners have voluntarily offered the property, or where the record or 21apparent owners have voluntarily offered the property but do not have clear title. 22 Section 14. The word "statewide" used in place of the specific parish designation for 23projects contained in this Act indicates that the project or program is applicable to all sixty- 24four parishes in the state. The description of any project in this Act shall be deemed to 25include planning, design, master planning, studies, permits, surveys, testing, construction, 26land and/or building/improvement acquisition, reconstruction, renovation, repair, right of 27way and utilities, site and other improvements, miscellaneous/contingencies, lease hold 28improvements ultimately owned by the state or a political subdivision of the state, equipment 29and other acquisitions, and any other component of the project if such are included or 30indicated in the capital outlay request for such projects required by R. S. 39:101 subject to Page 129 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 1the provisions of Title 39 of the Louisiana Revised Statutes. For new construction or 2renovation projects, equipment or other acquisitions, which can reasonably be considered 3necessary for the facility to be functional, may be deemed to be included in the project, even 4if such equipment or other acquisitions are not included or indicated in the project name or 5the capital outlay request. When local or federal match is referenced in a project title, but 6only a portion of the state appropriation is granted a line of credit or otherwise funded, then 7the amount of local or federal match, required to be made available, may be prorated relative 8to the amount of state appropriation made available through lines of credit. 9 Section 15. The provisions, items, and projects contained in this Act are severable 10and if any provision, item, or project contained herein, or the application of any such 11provision, item, or project, is held invalid, such invalidity shall not affect other provisions, 12items, projects, or applications of the Act which can be given effect without the invalid 13provision, project, item, or application. 14 Section 16. Notwithstanding any other provisions of law to the contrary, the state 15shall not grant cash lines of credit, or authorize or issue general obligation bonds in a 16principal amount in excess of $1,140,750,000 for Fiscal Year 2017-2018. 17 Section 17. Notwithstanding any contrary provision of this Act or any contrary 18provision of law, no funds appropriated by this Act shall be released or provided to any 19recipient of an appropriation made in this Act if, when, and for as long as, the recipient fails 20or refuses to comply with the provisions of R.S. 24:513. No recipient shall be considered 21to fail or refuse to comply with the provisions of R.S. 24:513 pursuant to this Section during 22any extension of time granted by the legislative auditor to the recipient to comply. The 23legislative auditor is authorized to grant an extension of time to comply with the provisions 24of R.S. 24:513 for recipient entities of an appropriation contained in this Act. 25 Section 18. This Act shall become effective upon signature by the governor or, if not 26signed by the governor, upon expiration of the time for bills to become law without signature 27by the governor, as provided in Article III, Section 18 of the Constitution of Louisiana. If 28vetoed by the governor and subsequently approved by the legislature, this Act shall become 29effective on the day following such approval. Page 130 of 131 HLS 172ES-17 ORIGINAL HB NO. 12 DIGEST The digest printed below was prepared by House Legislative Services. It constitutes no part of the legislative instrument. The keyword, one-liner, abstract, and digest do not constitute part of the law or proof or indicia of legislative intent. [R.S. 1:13(B) and 24:177(E)] HB 12 Original 2017 Second Extraordinary Session Jones Provides for the capital outlay budget and program for FY 2017-2018; provides for the funding of the capital outlays from the specified sources of monies in the specified amounts as follows: State General Fund (Direct) $ 1,500,000 Federal Funds $ 62,713,000 Transportation Trust Fund (TTF) - Federal $ 637,761,670 Transportation Trust Fund (TTF) - Regular $ 168,265,658 Interagency Transfers $ 41,377,106 Misc. Statutory Dedications $ 273,636,057 Fees and Self-Generated Revenues $ 48,574,970 Revenue Bonds $ 266,625,000 TOTAL CASH PORTION $1,500,453,461 Authorizes the funding of certain capital outlay projects from the sale of general obligation bonds for the projects delineated as follows: Priority 1 $ 939,915,655 Priority 2 $ 131,125,398 Priority 5 $1,298,115,485 TOTAL GENERAL OBLIGATIONS BONDS $2,369,156,538 BONDS NRP/RBP $ 99,830 GRAND TOTAL ALL MEANS OF FINANCING $3,869,709,829 Page 131 of 131