Louisiana 2017 2nd Special Session

Louisiana House Bill HB12 Latest Draft

Bill / Introduced Version

                            HLS 172ES-17	ORIGINAL
2017 Second Extraordinary Session
HOUSE BILL NO. 12
BY REPRESENTATIVE JONES
CAPITAL OUTLAY:  Provides for the comprehensive Capital Outlay budget (Item #3)
1	AN ACT
2To provide with respect to the capital outlay budget and the capital outlay program for state
3 government, state institutions, and other public entities; to provide for the
4 designation of projects and improvements; to provide for the financing thereof
5 making appropriations from certain sources; and to provide for related matters.
6Be it enacted by the Legislature of Louisiana:
7 Section 1.  The following sums or so much thereof as may be necessary are hereby
8appropriated out of any monies in the state treasury from the sources specified, from federal
9funds and self-generated revenues belonging to the state of Louisiana and/or collected by
10boards, commissions, departments, and agencies thereof, all for making capital outlay and
11for the purposes and in the amounts specified herein for the Fiscal Year commencing July
121, 2017, and ending June 30, 2018, subject to the conditions thereafter provided:
13 A project with funding payable from General Obligation Bonds Priority 1 indicates
14that the funding for the project includes the reauthorization of funding which was previously
15on a line of credit granted by the State Bond Commission in Fiscal Year 2016-2017.  As
16used in this Section, the term "general obligation bonds" means state general obligation
17bonds or other evidences of indebtedness payable from the Bond Security and Redemption
18Fund.  The amount set forth in this Section opposite each project, or so much thereof as may
19be necessary, is hereby appropriated and payable from the proceeds available from the sale
20of general obligation bonds, unless a different source of funding is indicated.  Where such
21a different source of funding is indicated, the corresponding amount set forth, or so much
Page 1 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1thereof as may be necessary, is hereby appropriated and payable from the source of funding
2indicated; provided, however, amounts appropriated and payable from federal funds may be
3encumbered or expended only to the extent such amounts shall have been committed or
4received.  Pursuant to the provisions of R.S. 39:82, funds for planning, acquisition,
5construction, and major repair projects appropriated by this Act may be retained until
6completion of the project, even if no bona fide liability exists on the last day of the fiscal
7year. 
8 This Act shall constitute the comprehensive state capital outlay budget for the 2017-
92018 Fiscal Year.  Projects set forth which are payable from the proceeds available from the
10sale of general obligation bonds shall have the priorities as indicated.  The Request for Line
11of Credit form used by the attorney general and Bond Counsel in evaluating Louisiana
12Constitutional, Internal Revenue Code, and applicable income tax regulations shall be filed
13with the commissioner of administration, State Bond Commission, and state attorney
14general.  No general obligation bonds shall be sold, nor cash lines of credit granted to fund
15any lower priority project prior to the sale of general obligation bonds or the granting of cash
16lines of credit to fund all higher priority projects (the "general rule"), except as hereinafter
17provided.  This prohibition against funding a lower priority project shall not apply upon a
18showing of an impossibility or impracticality either to proceed with all unfunded higher
19priority projects or to proceed with the funding of such projects or any part thereof through
20the issuance of general obligation bonds for any reason.  Such showing shall be stated in
21reasonable detail in a certificate or certificates signed by the state agency responsible for
22administering the funding, and filed with the commissioner of administration and the State
23Bond Commission (hereinafter referred to as "the Commission").  Upon a determination by
24the Commission that proceeding with such a project or the funding thereof through the
25issuance of general obligation bonds is impractical or impossible, the Commission may then
26proceed with the sale of general obligation bonds or the granting of cash lines of credit
27without regard to the priority of the unfunded projects determined to be impossible or
28impractical. 
29 Upon recommendation by the state agency responsible for administering the funding,
30if it is determined at any time that proceeding with the project or with the funding thereof
Page 2 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1is no longer impossible or impractical, the State Bond Commission may rescind the
2certificate of impossibility or impracticality and may proceed with the project or with the
3issuance of general obligation bonds or the granting of cash lines of credit to fund the
4project.  Alternatively, the Interim Emergency Board (hereinafter referred to as "the Board"),
5upon reviewing certificates as described above and determining that proceeding with such
6project or the funding thereof through the issuance of general obligation bonds is impossible
7or impractical, may designate a lower priority for such project.  The Board's determination
8and lower priority designation shall be submitted to the members of the legislature for their
9approval in accordance with the provisions of Chapter 3-B of Subtitle I of Title 39 of the
10Louisiana Revised Statutes of 1950.  In accordance with the provisions of Chapter 3-B of
11Subtitle I of Title 39 of the Louisiana Revised Statutes of 1950, whenever at the written
12request of the appropriate legislators and agency, the Board determines that an adjustment
13to a project description originally set forth in such capital budget adopted by the legislature
14for a current fiscal year is necessary to correct a mistake in a project description, clarify a
15description, change the scope of a description, or make any other adjustment the Board
16deems necessary to implement the purpose of the project, such adjustment shall become
17effective only upon the approval by majority vote of the elected members of each house of
18the legislature in the manner provided for in Chapter 3-B of Subtitle I of Title 39 of the
19Louisiana Revised Statutes of 1950. 
20 If such approval is granted, notification by the chair or secretary of the Board of the
21results of the balloting shall be transmitted to the State Bond Commission, which may then
22proceed with the sale of general obligation bonds or the granting of cash lines of credit for
23each change approved upon request of the commissioner of administration in accordance
24with the general rule. 
25 With respect to Priorities 1 through 5, a lower priority project may be moved to a
26higher priority only upon a showing of an emergency or other cause not reasonably
27anticipated by the legislature, which shall be stated in reasonable detail in a certificate signed
28by the head of the appropriate department, political subdivision, or agency and filed with the
29commissioner of administration and the Board.  Upon a determination by the Board that such
30project should be moved to a higher priority because of an emergency or other cause not
Page 3 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1reasonably anticipated by the legislature, the Board shall designate a higher priority to the
2project.  The matter then shall be submitted to and be subject to the same approval by the
3members of the legislature in the manner previously indicated in this Section.  If such
4approval is granted, notification by the chair or secretary of the board of the change of
5priority shall be transmitted to the State Bond Commission, which then upon request of the
6commissioner of administration, may proceed with the sale of general obligation bonds or
7the granting of cash lines of credit in accordance with the general rule.  As to projects within
8a priority, the State Bond Commission acting on requests submitted by the commissioner of
9administration shall determine when such project, or phases thereof, shall be funded.  In
10making such determination, the State Bond Commission shall consider the amount of
11proceeds of general obligation bonds to be made available in light of money and capital
12market conditions; the expenditure requirements of the project; the time required for
13architectural plans and drawings, public bidding, and site acquisition and preparation;
14availability of receipt of federal monies; litigation affecting the undertaking or completion
15of a project; federal tax laws and regulations regarding the sale of municipal bonds; and
16other items of a similar nature bearing upon the possibility or the necessity to commence a
17project or any particular phase thereof. 
18 Any other provision of this Act to the contrary notwithstanding, projects described
19in Priority 5 of this Act shall not be moved to a higher priority except upon one of the
20following conditions: (1) Funding is necessary to complete or additionally fund a project
21located elsewhere in the Capital Outlay Act.  Determination of such condition shall be made
22by the head of the appropriate department or agency by means of a certificate to that effect
23filed with the Interim Emergency Board, who shall, by mail ballot, request approval of such
24change and if approved by a majority of each house of the legislature it shall be funded, or
25(2) unless required by an emergency or other cause not reasonably anticipated by the
26legislature, to be in accordance with procedures set forth in this Section.  However, the State
27Bond Commission may authorize a non-cash line of credit for any project in Priority 5 which
28represents that portion of construction contracts which were let during a previous fiscal year,
29or construction contracts which will be let during the current fiscal year, but which will not
30require cash expenditures during the year.  Such non-cash lines of credit, when combined
Page 4 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1with previously sold bonds or with higher priority bonds or lines of credit, or with funds
2appropriated from other sources, will provide sufficient appropriated funds to award
3equipment or construction contracts.  Contracts shall not be awarded without approval of the
4division of administration.
5 Upon approval by the State Bond Commission, and subject to compliance with its
6policies and procedures and the procedures set forth herein, a line of credit providing for the
7use of funds in anticipation of the sale of general obligation bonds may be granted to the
8appropriate administering agency or department from the Comprehensive Capital Outlay
9Escrow Account, or if there is not a sufficient amount available in such account, from other
10available state cash in the state treasury, for capital improvement projects for which bond
11proceeds are appropriated by a current capital budget, prior to the actual issuance of bonds
12for such projects, unless the attorney general advises that an impediment exists to the valid
13issuance of the bonds on the date such line of credit is granted. 
14 All bonds that are to be repaid, in whole or in part, by revenues generated by the
15project shall be designated as "Reimbursement Bonds".  The State Bond Commission shall
16enter into such agreements as are necessary to provide that the agency or subdivision, whose
17project is reimbursable, shall pay the bond debt costs into the Bond Security and Redemption
18Fund.  Such costs may be paid annually or at the end of the term of the bonds issued as
19determined by the State Bond Commission. 
20 Priority 1 general obligation bond funding shall be limited to: 
21 (1)  Projects and amounts which were previously authorized by Act 16 of the 2016
22Second Extraordinary Session of the Legislature; and which were granted cash lines of credit
23by the State Bond Commission.  The bonds to fund these projects were not sold in Fiscal
24Year 2016-2017.
25 (2)  The reauthorization of the portion of the outstanding Fiscal Year 2016-2017
26Priority 5 Non-Cash Lines of Credit for projects which will require cash expenditures in
27Fiscal Year 2017-2018 and therefore must be converted to Cash Lines of Credit in Fiscal
28Year 2017-2018.
29 (3)  Commitments made in the Higher Education Desegregation Settlement
30Agreement. 
Page 5 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1 Priority 2 general obligation bond projects are for the completion of plans and
2specifications, land acquisition, site preparation, or for construction which will begin during
3the fiscal year.  It is presently anticipated that the listed projects will require the sale of
4bonds or extension of lines of credit during the fiscal year after adoption of this Act. 
5 Priority 3 general obligation bond projects are for the preparation of plans and
6specifications, land acquisition, site preparation, or for construction and shall be limited to
7funding for the portion of construction contracts which will not require cash expenditures
8during the fiscal year.  The projects in this category shall be considered future year projects
9in the state's five-year capital outlay plan.  It is presently anticipated that the listed projects
10will not require the sale of bonds or extension of lines of credit during the fiscal year. 
11 Priority 4 general obligation bond projects are for the preparation of plans and
12specifications, land acquisition, site preparation, or for construction and shall be limited to
13funding for the portion of construction contracts which will not require cash expenditures
14during the fiscal year.  The projects in this category shall be considered future year projects
15in the state's five-year capital outlay plan.  It is presently anticipated that the listed projects
16will not require the sale of bonds or extension of lines of credit during the fiscal year. 
17 Priority 5 general obligation bond funding shall be limited to funding for the portion
18of construction contracts which will not require cash expenditures during the fiscal year. 
19These funds, when combined with previously sold bonds or with higher priority bonds on
20lines of credit, or with funds appropriated from other sources, will provide sufficient
21appropriated funds to award contracts.  Non-cash lines of credit shall be required prior to the
22award of these contracts.
23 In accordance with the cash management plan adopted pursuant to R.S. 48:251(D)
24and the provisions of Act 161 of the 1998 First Extraordinary Session, the Department of
25Transportation and Development is authorized to enter into contracts or agreements for
26projects approved pursuant to the Highway Priority Program, Airport Construction and
27Development Priority Program, Port Construction and Development Priority Program, and
28Statewide Flood Control Program for projects bid and awarded, authorized, or commenced
29during the fiscal year which do not require cash expenditures for the full contract or
30agreement amount.
Page 6 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
EXECUTIVE DEPARTMENT1
01/107DIVISION OF ADMINISTRATION2
3(1277)Local Government Assistance Program
4 (Statewide)
5 Payable from General Obligation Bonds
6	Priority 1	$ 8,614,200
7(1278)Community Water Enrichment Program
8 (Statewide)
9 Payable from General Obligation Bonds
10	Priority 1	$13,693,600
11	Priority 5	$ 5,000,000
12 Total	$18,693,600
13Provided, however, that all recipients comply with the applicable Department of Natural
14Resources rules and regulations, if any, regarding master meter installation.
15(1330)Louisiana Cancer Research Center in New Orleans, 
16 Planning and Construction
17 (Orleans)
18 Payable from General Obligation Bonds
19	Priority 1	$ 5,170,100
20	Priority 2	$ 3,000,000
21 Total	$ 8,170,100
22(1343)State Office Buildings Major Repairs, Equipment 
23 Replacement, and Renovations, Planning and Construction
24 (Statewide)
25 Payable from General Obligation Bonds
26	Priority 1	$ 1,610,700
27(1345)Exterior Waterproofing at the State Capitol Building, 
28 Planning and Construction
29 (East Baton Rouge)
30 Payable from General Obligation Bonds
31	Priority 1	$ 3,996,400
32	Priority 2	$ 5,300,000
33 Total	$ 9,296,400
34(1346)Repair, Restoration and Replacement for Hurricanes 
35 Katrina, Rita, Gustav and Ike, Planning, Construction, 
36 Renovation, and Acquisition 
37 (Statewide)
38 Payable from General Obligation Bonds
39	Priority 1	$100,039,000
40(1347)Outpatient Clinics in Rapides Parish, Planning and 
41 Construction
42 (Rapides)
43 Payable from General Obligation Bonds
44	Priority 1	$10,349,300
45	Priority 5	$ 121,700
46 Total	$10,471,000
Page 7 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(1348)Major Repairs for State Buildings Based on Statewide 
2 Condition Assessment, and Infrastructure, Planning and 
3 Construction 
4 (Statewide)
5 Payable from General Obligation Bonds
6	Priority 1	$40,961,000
7	Priority 2	$20,000,000
8 Total	$60,961,000
9(1349)Statewide Roofing, Waterproofing, and Related Repairs 
10 and Equipment Replacement Program 
11 (Statewide)
12 Payable from General Obligation Bonds
13	Priority 1	$ 1,650,100
14(1350)Mold Remediation and Indoor Air Quality, Planning 
15 and Construction 
16 (Statewide)
17 Payable from General Obligation Bonds
18	Priority 1	$ 200,000
19	Priority 5	$ 250,000
20 Total	$ 450,000
21(1352)Land Acquisition for Mitigation 
22 (Richland)
23 Payable from General Obligation Bonds
24	Priority 1	$ 10,000
25(1353)Statewide Roofing Asset Management Program 
26 and Waterproofing, Related Repairs and Equipment 
27 Replacement Program 
28 (Statewide)
29 Payable from General Obligation Bonds
30	Priority 1	$ 8,500,000
31	Priority 2	$ 5,000,000
32	Priority 5	$ 6,500,000
33 Payable from Fees and Self Generated Revenues $ 250,000
34 Total	$20,250,000
35(1354)Americans With Disabilities Act Implementation for 
36 State Facilities, Planning and Construction 
37 (Statewide)
38 Payable from General Obligation Bonds
39	Priority 1	$ 1,894,900
40	Priority 5	$ 2,500,000
41 Total	$ 4,394,900
42(1358)Louisiana Property Assistance Agency Relocation 
43 of Facility, Planning and Construction
44 (East Baton Rouge)
45 Payable from Interagency Transfers	$ 243,000
46 Payable from Fees and Self Generated Revenues $ 757,000
47 Total	$ 1,000,000
48(1634)Shreveport State Office Building Mechanical and 
49 Electrical Renovations
50 (Caddo)
51 Payable from the balance of Series 94A (08T-02)$ 316
Page 8 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
01/109COASTAL PROTECTION AND RESTORATION AUTHORITY1
2(199) Coastal Protection Projects, Planning and Construction
3 (Statewide)
4 Payable from Interagency Transfers	$ 250,000
5 Payable from Coastal Protection and Restoration Fund $224,377,888
6 Payable from Federal Funds	$55,250,000
7 Total	$279,877,888
8(201) Westbank Hurricane Protection Project, Planning, 
9 Construction, Right of Way and Utilities 
10 ($199,000,000 Federal Match and $52,800,000 
11 Local Match)
12 (Jefferson, Orleans, Plaquemines, St. Charles)
13 Payable from General Obligation Bonds
14	Priority 1	$ 597,600
15(204) Morganza to Gulf of Mexico Flood Control Feasibility 
16 Study, Planning, Design, Right of Way and Construction 
17 of Levees, Floodgates and Other Flood Control Systems 
18 ($100,000,000 Local Match)
19 (Ascension, Assumption, Iberia, Iberville, Lafourche, 
20 Pointe Coupee, St. Martin, St. Mary, Terrebonne, 
21 West Baton Rouge)
22 Payable from General Obligation Bonds
23	Priority 1	$20,000,000
24	Priority 5	$34,300,000
25 Total	$54,300,000
26(213) Lafitte Area Tidal Protection, Planning and Construction
27 (Jefferson)
28 Payable from General Obligation Bonds
29	Priority 1	$ 2,402,900
30	Priority 5	$11,000,000
31 Total	$13,402,900
01/112DEPARTMENT OF MILITARY AFFAIRS32
33(412) Statewide Backlog of Maintenance and Repair (BMAR), 
34 Phase 3, and Statewide Infrastructure Rehabilitation, Phase 3
35 (Statewide)
36 Payable from General Obligation Bonds
37	Priority 1	$ 3,602,300
38	Priority 5	$ 2,960,000
39 Payable from Federal Funds	$ 4,000,000
40 Total	$10,562,300
41(461) Camp Minden, Infrastructure, Rehabilitation, Phase 2, 
42 Planning and Construction
43 (Webster)
44 Payable from General Obligation Bonds
45	Priority 1	$ 1,740,000
46 Payable from Federal Funds	$ 963,000
47 Total	$ 2,703,000
48(1035)Readiness Center Replacement, Franklinton, LA, 
49 Planning and Construction
50 (Washington)
51 Payable from General Obligation Bonds
52	Priority 1	$ 214,200
Page 9 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(1090)State Emergency Warehouse at Camp Villere, 
2 Planning and Construction
3 (St. Tammany)
4 Payable from General Obligation Bonds
5	Priority 1	$ 3,290,000
01/124LOUISIANA STADIUM AND EXP OSITION DISTRICT6
7(1385)Bayou Segnette Sports Complex Improvements, 
8 Including Hall B Expansion, Planning and Construction
9 (Jefferson)
10 Payable from General Obligation Bonds
11	Priority 1	$ 2,897,900
12(1386)Improvements to TPC Louisiana, Planning and 
13 Construction 
14 (Jefferson)
15 Payable from General Obligation Bonds
16	Priority 1	$ 3,549,100
17(1387)Zephyr Field Improvements
18 (Jefferson)
19 Payable from General Obligation Bonds
20	Priority 2	$ 363,500
21	Priority 5	$ 3,000,000
22 Total	$ 3,363,500
23(1388)Improvements to the Superdome 
24 (Orleans)
25 Payable from General Obligation Bonds
26	Priority 1	$ 5,172,400
27(1390)Bayou Segnette Recreation Complex, Land Acquisition, 
28 Planning and Construction 
29 (Jefferson)
30 Payable from General Obligation Bonds
31	Priority 1	$ 7,367,100
32	Priority 5	$18,100,000
33 Total	$25,467,100
DEPARTMENT OF VETERANS AFFAIRS34
03/130DEPARTMENT OF VETERANS AFFAIRS35
36(440) Veterans Cemetery in Jennings, LA
37 (Jefferson Davis)
38 Priority 2	$ 1,000,000
39 Payable from Federal Funds via Interagency Transfers $ 6,486,250
40 Total	$ 7,486,250
41(462) Southeast LA Veterans Cemetery Expansion, Columbarium
42 (St. Tammany)
43 Payable from General Obligation Bonds
44	Priority 2	$ 175,000
45 Payable from Federal Funds via Interagency Transfers $ 1,521,886
46 Total	$ 1,696,886
Page 10 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
03/132NORTHEAST LOUISIANA WAR VETERANS HOME1
2(1112)New Generator, Planning and Construction
3 (Ouachita)
4 Payable from Federal Funds via Interagency Transfers $ 850,000
5(1119)Replacement of Walk-in Coolers and Freezer
6 (Ouachita)
7 Payable from Federal Funds via Interagency Transfers $ 75,000
8(1123)Replacement and Expanded Capacity of Existing 
9 Cooling Tower 
10 (Ouachita)
11 Payable from Federal Funds via Interagency Transfers $ 257,900
12(1450)Exterior and Interior Door Replacements
13 (Ouachita)
14 Payable from General Obligation Bonds
15	Priority 1	$ 8,000
16
17Pending submittal and approval of capital outlay budget request pursuant to the
18provisions of R.S. 39:112
03/134SOUTHWEST LOUISIANA WAR VETERANS HOME19
20(937) Walk-in-the-Park Alzheimers "Reflections" Unit Expansion 
21 (Jefferson Davis)
22 Payable from Federal Funds via Interagency Transfers $ 354,000
23 Payable from Fees and Self Generated Revenues $ 246,000
24 Total	$ 600,000
25(1005)HVAC Attic and Hallway Unit Replacement
26 (Jefferson Davis)
27 Payable from Federal Funds via Interagency Transfers $ 508,234
28 Payable from Fees and Self Generated Revenues $ 353,179
29 Total	$ 861,413
03/136SOUTHEAST LOUISIANA WAR VETERANS HOME30
31(424) Southeast LA Veterans Home Facility Preservation
32 (St. John the Baptist)
33 Payable from Fees and Self Generated Revenues $ 168,791
ELECTED OFFICIALS34
04/139SECRETARY OF STATE35
36(1052)Louisiana State Exhibit Museum - Regional Archives 
37 and Office Facility, Planning and Construction
38 (Caddo)
39 Payable from General Obligation Bonds
40	Priority 1	$ 2,362,600
Page 11 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
DEPARTMENT OF ECONOMIC DEVELOP MENT1
05/252OFFICE OF BUSINESS DEVELOPMENT2
3(1161)Economic Development Award Program for Infrastructure 
4 Assistance 
5 (Statewide)
6 Payable from General Obligation Bonds
7	Priority 1	$ 8,857,700
8	Priority 2	$ 3,000,000
9	Priority 5	$ 7,000,000
10 Total	$18,857,700
11(1403)Capital Improvements Projects to Meet Economic 
12 Development Commitments, Planning, Construction, 
13 and Equipment
14 (Statewide)
15 Payable from General Obligation Bonds
16	Priority 1	$ 72,055
17(1404)Water Conference and Education Center, Planning, 
18 Engineering, Design and Construction
19 (East Baton Rouge)
20 Payable from General Obligation Bonds
21	Priority 1	$13,400,000
DEPARTMENT OF CULTURE, RECREATION AND TOURISM22
06/263OFFICE OF STATE MUSEUM23
24(429) Construction of Civil Rights Museum, Planning
25 and Construction
26 (Orleans)
27 Payable from General Obligation Bonds
28	Priority 5	$ 765,000
29(430) Old U. S. Mint Museum Exhibit
30 (Orleans)
31 Payable from General Obligation Bonds
32	Priority 1	$ 215,000
33(1030)Presbytere Exterior Restoration and Repair, Planning 
34 and Construction
35 (Orleans)
36 Payable from General Obligation Bonds
37	Priority 1	$ 322,700
38	Priority 2	$ 1,920,000
39 Total	$ 2,242,700
40(1031)Cabildo Exterior Restoration and Repair, Planning 
41 and Construction
42 (Orleans)
43 Payable from General Obligation Bonds
44	Priority 1	$ 150,900
45	Priority 2	$ 2,360,000
46 Total	$ 2,510,900
Page 12 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
06/264OFFICE OF STATE PARKS1
2(613) Preventive Maintenance/Major Repairs and Improvements
3 (Statewide)
4 Payable from General Obligation Bonds
5	Priority 1	$ 3,986,800
6	Priority 5	$ 3,427,800
7 Total	$ 7,414,600
8(616) Bayou Segnette State Park, Land Acquisition, 
9 Additional Cabins, Planning and Construction
10 (Jefferson)
11 Payable from General Obligation Bonds
12	Priority 1	$ 1,603,300
13	Priority 5	$ 9,565,000
14 Total	$11,168,300
15(617) Poverty Point Reservoir State Park Group Camp, 
16 Conference Center, Site Amenities, Acquisition, 
17 Planning and Construction
18 (Richland)
19 Payable from General Obligation Bonds
20	Priority 1	$ 2,142,800
21	Priority 5	$ 6,678,000
22 Total	$ 8,820,800
23(618) Tunica Hills State Preservation Area, Acquisition, 
24 Planning and Construction
25 (West Feliciana)
26 Payable from General Obligation Bonds
27	Priority 1	$ 161,200
28	Priority 5	$10,242,100
29 Total	$10,403,300
30(642) Chemin-a-Haut State Park Acquisition, Planning and 
31 Construction of New Group Camp, Vacation Cabins, 
32 Visitor Center and Restrooms
33 (Morehouse)
34 Payable from General Obligation Bonds
35	Priority 1	$ 1,100
36(643) Fort Pike State Historic Site, Planning and Construction
37 (Orleans)
38 Payable from General Obligation Bonds
39	Priority 5	$ 117,900
06/267OFFICE OF TOURISM40
41(459) I-10 Vinton Welcome Center
42 (Calcasieu)
43 Payable from General Obligation Bonds
44	Priority 1	$ 934,800
06/A20NEW ORLEANS CITY P ARK45
46(1457)City Park Maintenance Complex Improvements,
47 Planning and Construction
48 (Orleans)
49 Payable from General Obligation Bonds
50	Priority 5	$ 2,525,300
Page 13 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
DEPARTMENT OF TRANSPORTATION AND DEVELOP MENT1
07/270ADMINISTRATION2
3(719) Highway Program (Up to $4,000,000 for Secretary's 
4 Emergency Fund)
5 (Statewide)
6 Payable from General Obligation Bonds
7	Priority 1	$147,324,300
8	Priority 5	$70,000,000
9 Payable from Transportation Trust Fund - Regular $87,196,874
10 Payable from Transportation Trust Fund - Federal $612,761,670
11 Payable from the balance of General Obligation Bonds
12 previously allocated under the authority of Act 27 of 2006 for
13 Department of Transportation and Development,
14 Administration, LA 118 Bridge, Planning and Construction
15 (Sabine); and Act 20 of 2009 for Department of
16 Transportation and Development, Administration, US 167
17 Corridor Study (Evangeline, St. Landry)	$ 74,141
18 Total	$917,356,985
19Provided, however, that the Department of Transportation and Development is authorized
20to implement or commence projects approved in this program for Fiscal Year 2017-2018
21identified for phased funding pursuant to the cash management plan established pursuant to
22R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing
23unspent cash balances appropriated in prior years’ programs, which funds when combined
24with current appropriations will provide sufficient appropriated funds to award contracts.
25(723) Secretary's Emergency Fund for Bridge Damages, 
26 Other Reimbursements, Local Matching Dollars, 
27 Federal Funds, and Opportunity Grants Subject to 
28 the Provisions of R.S. 48:232
29 (Statewide)
30 Payable from Interagency Transfers	$15,000,000
31 Payable from Fees and Self Generated Revenues $25,000,000
32 Payable from Transportation Trust Fund - Federal
33 Receipts	$25,000,000
34 Payable from Federal Funds	$ 2,500,000
35 Total	$67,500,000
36(769) LA 42 (US 61 to LA 44) Widening 
37 (Ascension)
38 Payable from General Obligation Bonds
39	Priority 1	$23,783,900
40(773) Harding Boulevard Improvements and Southern 
41 University Information Center 
42 (East Baton Rouge)
43 Payable from General Obligation Bonds
44	Priority 1	$ 825,000
45	Priority 2	$ 1,175,000
46 Total	$ 2,000,000
47(776) Highway 397 in Calcasieu Parish, North and South 
48 Turning Lanes 
49 (Calcasieu)
50 Payable from General Obligation Bonds
51 Priority 5	$ 2,000,000
Page 14 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(784) Pecue Lane/I-10 Interchange, Planning, Design, 
2 Rights of Way, Utilities and Construction 
3 (East Baton Rouge)
4 Payable from General Obligation Bonds
5	Priority 1	$13,000,000
6	Priority 5	$38,500,000
7 Total	$51,500,000
8(807) Hooper Road Extension and Widening, Environmental, 
9 Planning, Engineering, Right of Way, Utilities and 
10 Construction 
11 (East Baton Rouge, Livingston)
12 Payable from General Obligation Bonds
13	Priority 1	$ 1,591,400
14	Priority 5	$ 4,200,000
15 Total	$ 5,791,400
16(814) Evaluation of Regional Freeway System Expansion 
17 (East Baton Rouge, West Baton Rouge)
18 Payable from General Obligation Bonds
19	Priority 1	$ 540,000
20	Priority 5	$ 2,500,000
21 Total	$ 3,040,000
22(913) Widening of Highway 447 and I-12 Overpass 
23 Improvements, Environmental Phase Commencement, 
24 Planning and Construction 
25 (Livingston)
26 Payable from General Obligation Bonds
27	Priority 1	$ 290,000
28	Priority 5	$ 1,000,000
29 Total	$ 1,290,000
30(939) Essen Lane Widening, I-10 to Perkins Road, Planning, 
31 Utilities, Right of Way and Construction 
32 (East Baton Rouge)
33 Payable from General Obligation Bonds
34	Priority 1	$ 6,382,300
35	Priority 2	$ 1,200,000
36 Total	$ 7,582,300
37(944) LA 38 and Avenue F Railroad Safety Improvements, 
38 Planning and Construction 
39 (Tangipahoa)
40 Payable from General Obligation Bonds
41	Priority 1	$ 500,000
42(948) LA 22 Improvements (LA 16 to Diversion Canal), 
43 Including the Overlay of LA 22 from Head of Island 
44 to Chinquapin Bridge, Planning and Construction 
45 (Livingston)
46 Payable from General Obligation Bonds
47	Priority 1	$ 4,300
48	Priority 2	$ 3,400,000
49 Total	$ 3,404,300
Page 15 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(953) Hooper Road Widening and Sewer Improvements 
2 (Blackwater Bayou to Sullivan Road) Planning, 
3 Engineering, Utilities and Construction 
4 (East Baton Rouge)
5 Payable from General Obligation Bonds
6	Priority 1	$ 2,690,000
7	Priority 5	$ 9,575,000
8 Total	$12,265,000
9(962) Juban Road (LA 1026) Widening (I-12 to US 190)
10 (Livingston)
11 Payable from General Obligation Bonds
12	Priority 1	$16,269,200
13(968) LA 44 Widening, I-10 to LA 22, Planning, Utilities, 
14 Right of Way and Construction
15 (Ascension)
16 Payable from General Obligation Bonds
17	Priority 1	$ 1,500,000
18	Priority 5	$ 9,500,000
19 Total	$11,000,000
20(971) LA 930 Reconstruction
21 (Ascension)
22 Payable from General Obligation Bonds
23	Priority 1	$ 6,260,100
24	Priority 2	$ 1,300,000
25 Total	$ 7,560,100
26Provided, however, that this appropriation is contingent upon Ascension Parish agreeing to
27accept ownership of LA 930 upon completion of construction.
28(1008)LA 64 Capacity Improvements (LA 1019 to LA 16) 
29 Planning and Construction
30 (Livingston)
31 Payable from General Obligation Bonds
32	Priority 1	$ 1,000,000
33	Priority 5	$ 8,650,000
34 Total	$ 9,650,000
35(1009)LA 1 Improvements, Phase 2, Planning, Engineering, 
36 Right of Way, Utilities and Construction 
37 (Lafourche)
38 Payable from General Obligation Bonds
39	Priority 1	$ 5,000,000
40	Priority 5	$75,000,000
41 Total	$80,000,000
42(1010)Loyola/I-10 Interchange Improvements, Feasibility 
43 Study, Interchange Modification Report, Environmental 
44 Assessment, Engineering, Right of Ways, Utilities and 
45 Construction
46 (Jefferson, Orleans)
47 Payable from General Obligation Bonds
48	Priority 1	$ 3,117,800
49	Priority 5	$ 2,315,000
50 Total	$ 5,432,800
Page 16 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(1014)Jimmie Davis Bridge Rehabilitation and Lighting, 
2 or Design, Engineering, Planning and Construction 
3 (Bossier, Caddo)
4 Payable from General Obligation Bonds
5	Priority 1	$ 9,336,500
6(1084)Non-Federal Aid Eligible Highway Program 
7 (Statewide)
8 Payable from State Highway Improvement Fund $41,400,000
9(1092)LA 89 Box Culvert Planning and Construction
10 (Lafayette)
11 Payable from General Obligation Bonds
12	Priority 2	$ 255,000
13(1101)LA 3034 Improvements 
14 (East Baton Rouge)
15 Payable from General Obligation Bonds
16	Priority 1	$ 3,987,800
17	Priority 5	$14,000,000
18 Total	$17,987,800
19(1102)Peters Road Bridge and Extension, Planning and 
20 Construction 
21 (Plaquemines)
22 Payable from General Obligation Bonds
23	Priority 1	$ 4,000,000
24(1118)City of Gonzales - GO Program LA Highway 30 
25 Corridor, Planning and Construction 
26 (Ascension)
27 Payable from General Obligation Bonds
28	Priority 1	$ 1,440,000
29(1159)Improvements on LA 3038, Including Patching, 
30 Repairing and Overlaying of the Highway, Planning 
31 and Construction 
32 (Ascension)
33 Payable from General Obligation Bonds
34	Priority 1	$ 800,000
35(1189)State Streets, Algiers, Planning and Construction 
36 (Jefferson, Orleans)
37 Payable from General Obligation Bonds
38	Priority 1	$ 2,347,400
07/274PUBLIC IMPROVEMENTS39
40(286) Comite River Diversion Canal Planning, Right of Way, 
41 Utilities and Construction
42 (Ascension, East Baton Rouge, Livingston)
43 Payable from General Obligation Bonds
44	Priority 1	$15,000,000
45	Priority 5	$72,000,000
46 Total	$87,000,000
Page 17 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(287) Mississippi River Levee Raising, Arkansas to Old River, 
2 Planning and Construction
3 (Avoyelles, Concordia, East Carroll, Madison, 
4 Pointe Coupee, Tensas)
5 Payable from General Obligation Bonds
6	Priority 1	$ 500,000
7(351) Bayou Dechene Reservoir, Planning, Land Acquisition 
8 and Construction 
9 (Caldwell)
10 Payable from General Obligation Bonds
11	Priority 1	$ 6,433,800
12	Priority 5	$ 2,000,000
13 Total	$ 8,433,800
14(360) Water Resources Management Program, Studies, 
15 Planning and Construction 
16 (Statewide)
17 Payable from General Obligation Bonds
18	Priority 5	$ 1,000,000
19Provided, however, that the Department of Transportation and Development prepare and
20maintain a Water Resources Management Master Plan along with an annual Program of
21projects to support implementation of the Master Plan. The Department of Transportation
22and Development shall adopt the necessary rules for proper management of the Master Plan
23and Program, with the intended rules subject to the approval of the Joint Legislative
24Committee on the Budget prior to adoption. The Master Plan and Program, and any revisions
25thereto, are subject to approval of the Joint Legislative Committee on the Budget.
26(362) Port Construction and Development Priority Program
27 (Statewide)
28 Payable from Transportation Trust Fund - Regular $39,400,000
29Provided, however, that the Department of Transportation and Development is authorized
30to implement or commence projects approved in this program for Fiscal Year 2017-2018
31identified for phased funding pursuant to the cash management plan established pursuant to
32R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing
33unspent cash balances appropriated in prior years’ programs, which funds when combined
34with current appropriations will provide sufficient appropriated funds to award contracts.
35(483) Mississippi River Deepening, Phase 3, Planning, Design, 
36 Construction, Rights-of-Way, Relocations and Utilities 
37 (Federal Match $154,500,000) 
38 (Ascension, East Baton Rouge, Jefferson, Orleans,
39 Plaquemines, St. Bernard, St. Charles, St. James, 
40 St. John the Baptist, West Baton Rouge)
41 Payable from General Obligation Bonds
42	Priority 1	$ 400,000
43(484) Houma Navigational Canal Deepening Project, Planning, 
44 Design, Construction, Rights-of-Ways, Relocations and 
45 Utilities (Federal Match $191,000,000) 
46 (Terrebonne)
47 Payable from General Obligation Bonds
48	Priority 1	$ 498,600
Page 18 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(485) Acadiana Gulf of Mexico Access Channel (AGMAC), 
2 Port of Iberia, Planning, Design, Construction, 
3 Rights-of-Way, Relocations and Utilities (Federal 
4 Match $100,000,000)
5 (Iberia, Vermilion)
6 Payable from General Obligation Bonds
7	Priority 1	$ 3,500,000
8	Priority 5	$ 5,000,000
9 Total	$ 8,500,000
10(1086)Statewide Flood Control Program
11 (Statewide)
12 Payable from Transportation Trust Fund - Regular $ 9,900,000
13 Payable from the balance of General Obligation Bonds
14 previously allocated under the authority of Act 24 of 2003 for
15 Department of Transportation and Development, Public
16 Improvements, Allen Parish Reservoir, Land Acquisition,
17 Planning, Right of Way, Utilities, Equipment and
18 Construction (Allen); and Act 24 of 2003 for Department of
19 Transportation and Development, Public Improvements,
20 Alexandria to Gulf of Mexico Flood Study (Rapides); and
21 Act 24 of 2013 for Department of Transportation and
22 Development, Public Improvements, Boat Launch
23 Rehabilitation (LA Hwy 42 at Amite River), Planning and
24 Construction (Ascension)	$ 22,323
25 Total	$ 9,922,323
26Provided, however, that the Department of Transportation and Development is authorized
27to implement or commence projects approved in this program for Fiscal Year 2017-2018
28identified for phased funding pursuant to the cash management plan established pursuant to
29R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing
30unspent cash balances appropriated in prior years’ programs, which funds when combined
31with current appropriations will provide sufficient appropriated funds to award contracts.
07/276ENGINEERING AND OPERATIONS32
33(1087)Motor Vessel and Equipment Drydocking, Repairs,
34 Various Locations
35 (Statewide)
36 Payable from Transportation Trust Fund - Regular $ 1,500,000
37(1088)Facilities Program Major Repairs, Renovations,
38 Additions, New Facilities, Equipment Replacement at
39 Various DOTD Sites, Planning and Construction
40 (Statewide)
41 Payable from Transportation Trust Fund - Regular $ 2,000,000
07/277AVIATION IMPROVEMENTS42
43(1085)State Aviation and Airport Improvement Program
44 (Statewide)
45 Payable from Transportation Trust Fund - Regular $28,268,784
Page 19 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS1
08/402LOUISIANA STATE PENITENTIARY2
3(1044)Emergency Water Filter System Replacement, 
4 Planning and Construction
5 (West Feliciana)
6 Payable from General Obligation Bonds
7	Priority 1	$ 1,400
8	Priority 5	$ 618,600
9 Total	$ 620,000
10(1050)Electrical Distribution System Upgrade, Planning 
11 and Construction
12 (West Feliciana)
13 Payable from General Obligation Bonds
14	Priority 1	$ 68,500
15	Priority 5	$ 4,535,500
16 Total	$ 4,604,000
17(1120)Main Prison Shower and Cellblock Plumbing Upgrade,
18 Planning and Construction
19 (West Feliciana)
20 Payable from General Obligation Bonds
21	Priority 1	$ 43,400
22	Priority 5	$ 1,607,600
23 Total	$ 1,651,000
08/403OFFICE OF JUVENILE JUSTICE24
25(786) HVAC System Replacement at Columbia, Planning and
26 Construction
27 (Ouachita)
28 Payable from General Obligation Bonds
29	Priority 1	$ 180,000
30	Priority 2	$ 25,000
31 Total	$ 205,000
32(958) Community Based Program, Juvenile Justice
33 Improvements, Planning, Construction, Renovation,
34 Acquisition, and Equipment
35 (Statewide)
36 Payable from General Obligation Bonds
37	Priority 1	$ 2,396,700
38(1202)Bridge City Center for Youth, Sewer System Renovation,
39 Planning and Construction
40 (Jefferson)
41 Payable from General Obligation Bonds
42	Priority 1	$ 235,000
43(1203)Major Repairs and Equipment Replacement, Planning and
44 Construction
45 (Statewide)
46 Payable from General Obligation Bonds
47	Priority 1	$ 13,200
Page 20 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
08/416RAYBURN CORRECTIONAL CENTER1
2(1051)Security Perimeter Fence, Planning and Construction
3 (Washington)
4 Payable from General Obligation Bonds
5	Priority 1	$ 61,900
6	Priority 5	$ 2,033,100
7 Total	$ 2,095,000
08/419OFFICE OF STATE POLICE8
9(842) Crime Lab Expansion, Planning and Construction
10 (East Baton Rouge)
11 Payable from General Obligation Bonds
12	Priority 1	$ 36,000
13(880) Renovate Training Academy, Planning and Construction
14 (East Baton Rouge)
15 Payable from General Obligation Bonds
16	Priority 5	$16,175,000
LOUISIANA DEPARTMENT OF HEALTH17
09/320OFFICE OF AGING AND ADULT SERVICES18
19(823) Repair and Upgrade to Sewer System, Planning and
20 Construction
21 (East Feliciana)
22 Payable from General Obligation Bonds
23	Priority 1	$ 265,000
24	Priority 5	$ 4,535,000
25 Total	$ 4,800,000
26(825) Water Tower Repairs and Improvements, Planning and
27 Construction
28 (East Feliciana)
29 Payable from General Obligation Bonds
30	Priority 1	$ 120,300
31	Priority 2	$ 340,000
32 Total	$ 460,300
09/330OFFICE OF BEHAVIORAL HEALTH33
34(709) Central Louisiana State Hospital Relocation to Pinecrest,
35 Planning and Construction
36 (Rapides)
37 Payable from General Obligation Bonds
38	Priority 1	$ 800,500
39	Priority 5	$28,013,200
40 Total	$28,813,700
41(736) Center Building and Fire Alarm System Renovation and
42 Restoration, East Louisiana State Hospital, Planning and
43 Construction
44 (East Feliciana)
45 Payable from General Obligation Bonds
46	Priority 1	$ 66,700
47	Priority 5	$ 7,600,000
48 Total	$ 7,666,700
Page 21 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(737) Fire Alarm System Replacement for Ten Buildings,
2 Planning and Construction
3 (East Feliciana)
4 Payable from General Obligation Bonds
5	Priority 1	$ 95,600
6	Priority 5	$ 7,200,000
7 Total	$ 7,295,600
DEPARTMENT OF NATURAL RESOURCES8
11/431OFFICE OF THE SECRETARY9
10(1381)Atchafalaya Basin Protection and Enhancement (Federal
11 Match and Local/Sponsor Match)
12 (Assumption, Avoyelles, Iberia, Iberville, Pointe Coupee,
13 St. Landry, St. Martin, St. Mary)
14 Payable from General Obligation Bonds
15	Priority 1	$ 8,642,900
DEPARTMENT OF WILDLIFE AND FISHERIES16
16/512OFFICE OF THE SECRETARY17
18(195) Wildlife and Fisheries Enforcement Training Academy
19 and Emergency Facility Complex, Planning and
20 Construction
21 (East Baton Rouge)
22 Payable from Federal Funds via Interagency Transfers $ 1,630,836
23 Payable from Conservation Fund	$ 1,401,929
24 Total	$ 3,032,765
16/513OFFICE OF WILDLIFE25
26(972) Woodworth Central Office Complex 
27 (Rapides)
28 Payable from General Obligation Bonds
29	Priority 1	$ 288,900
30	Priority 5	$13,800,000
31 Total	$14,088,900
32(973) Region 5/Lake Charles Office, Planning and Construction
33 (Calcasieu)
34 Payable from General Obligation Bonds
35	Priority 1	$ 734,400
36	Priority 5	$10,660,600
37 Total	$11,395,000
38(975) Monroe Headquarters, District 2, Planning and
39 Construction
40 (Ouachita)
41 Payable from General Obligation Bonds
42	Priority 1	$ 130,500
43(977) Wildlife Land Acquisition 
44 (Statewide)
45 Payable from Rockefeller Wildlife Refuge Trust
46 and Protection Fund	$ 2,000,000
Page 22 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(1107)Rockefeller Refuge Office Replacement 
2 (Cameron)
3 Payable from Rockefeller Wildlife Refuge and Game
4 Preserve Fund	$ 2,694,400
5(1622)Replace Two Water Control Structures at Pointe Aux
6 Chenes Unit at Pointe Aux Chenes Wildlife Management
7 Area
8 (Terrebonne)
9 Payable from Rockefeller Wildlife Refuge Trust
10 and Protection Fund	$ 1,440,000
11Provided, however, that this appropriation is in lieu of funds appropriated in Act 26 of 2015
12for Department of Wildlife and Fisheries, Office of Wildlife, Replace Two Water Control
13Structures at Pointe Aux Chenes Unit and Pointe Aux Chenes Wildlife Management Area
16/514OFFICE OF FISHERIES14
15(951) Science Center and Educational Complex 
16 (Calcasieu)
17 Payable from Federal Funds via Interagency Transfers $ 8,000,000
18(954) Elmer's Island Access Enhancement 
19 (Jefferson)
20 Payable from Federal Funds via Interagency Transfers $ 5,000,000
21(1048)16-Bay Boatshed LDWF Headquarters District #7
22 (East Baton Rouge)
23 Payable from Conservation Fund	$ 321,840
DEPARTMENT OF EDUCATION24
19/600LSU BOARD OF SUPERVISORS25
26(37) Major Repairs and Deferred Maintenance of Buildings
27 and Facilities, Planning and Construction
28 (Acadia, Caddo, East Baton Rouge, Orleans, Rapides)
29 Payable from General Obligation Bonds
30	Priority 1	$ 5,000,000
19/601LSU BATON ROUG E31
32(20) H. P. Long Field House Renovation, Planning
33 and Construction
34 (East Baton Rouge)
35 Payable from General Obligation Bonds
36	Priority 2	$ 1,800,000
37(21) Renovate Old Engineering Shops for Art Department,
38 Planning and Construction
39 (East Baton Rouge)
40 Payable from General Obligation Bonds
41	Priority 1	$ 1,922,300
42	Priority 5	$11,937,700
43 Total	$13,860,000
Page 23 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(22) Patrick F. Taylor Hall Renovations and Expansion,
2 Planning and Construction
3 (East Baton Rouge)
4 Payable from General Obligation Bonds
5	Priority 1	$ 9,800,000
6(38) Highland Hall Renovation, Planning and Construction
7 (East Baton Rouge)
8 Payable from Revenue Bonds	$12,350,000
9Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue
10Bonds appropriated in Act 16 of the 2016 Second Extraordinary Session to LSU Baton
11Rouge for Highland Hall Renovation, Planning and Construction
12(39) New Residence Hall, Planning and Construction
13 (East Baton Rouge)
14 Payable from Revenue Bonds	$80,450,000
15Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue
16Bonds appropriated in Act 16 of the 2016 Second Extraordinary Session to LSU Baton
17Rouge for New Residence Hall, Planning and Construction
18(40) Greenhouse Relocation, Planning and Construction
19 (East Baton Rouge)
20 Payable from Revenue Bonds	$14,550,000
21Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue
22Bonds appropriated in Act 16 of the 2016 Second Extraordinary Session to LSU Baton
23Rouge for Greenhouse Relocation, Planning and Construction
24(41) Enclose Corporation Canal, Planning and Construction
25 (East Baton Rouge)
26 Payable from Revenue Bonds	$13,750,000
27Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue
28Bonds appropriated in Act 16 of the 2016 Second Extraordinary Session to LSU Baton
29Rouge for Enclose Corporation Canal, Planning and Construction
30(42) Evangeline Residence Hall Renovation, Planning and
31 Construction
32 (East Baton Rouge)
33 Payable from Revenue Bonds	$18,650,000
34Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue
35Bonds appropriated in Act 16 of the 2016 Second Extraordinary Session to LSU Baton
36Rouge for Evangeline Residence Hall, Planning and Construction
37(43) Family Housing Complex, Planning and Construction
38 (East Baton Rouge)
39 Payable from Revenue Bonds	$50,235,000
40Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue
41Bonds appropriated in Act 16 of the 2016 Second Extraordinary Session to LSU Baton
42Rouge for Family Housing Complex, Planning and Construction
Page 24 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(44) Student Health Center Renovation and Addition, Planning
2 and Construction
3 (East Baton Rouge)
4 Payable from Revenue Bonds	$23,890,000
5Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue
6Bonds appropriated in Act 16 of the 2016 Second Extraordinary Session to LSU Baton
7Rouge for Student Health Center Renovation and Addition, Planning and Construction
8(45) Louise Garig Hall Renovation, Planning and Construction
9 (East Baton Rouge)
10 Payable from Revenue Bonds	$ 5,100,000
11Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue
12Bonds appropriated in Act 16 of the 2016 Second Extraordinary Session to LSU Baton
13Rouge for Louise Garig Hall Renovation, Planning and Construction
14(46) New Residence Hall 2, Planning and Construction
15 (East Baton Rouge)
16 Payable from Revenue Bonds	$47,650,000
17Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue
18Bonds appropriated in Act 16 of the 2016 Second Extraordinary Session to LSU Baton
19Rouge for New Residence Hall 2, Planning and Construction
20(47) French House Renovation, Acquisition, Planning and
21 Construction
22 (East Baton Rouge)
23 Payable from General Obligation Bonds
24	Priority 1	$ 208,000
25(48) Nicholson Gateway: Infrastructure Improvements,
26 Planning and Construction
27 (East Baton Rouge)
28 Payable from General Obligation Bonds
29	Priority 1	$ 676,700
30(1402)LSU Memorial Tower Renovations
31 (East Baton Rouge)
32 Payable from General Obligation Bonds
33	Priority 5	$ 4,000,000
34	Payable from Fees and Self Generated Revenues$ 4,000,000
35	Total	$ 8,000,000
19/602LSU ALEXANDRIA36
37(19) Infrastructure Improvements, Construction
38 (Rapides)
39 Payable from General Obligation Bonds
40	Priority 5	$ 6,090,700
41(50) Drainage Outfall Improvements, Planning and Construction
42 (Rapides)
43 Payable from General Obligation Bonds
44	Priority 1	$ 55,400
45(1626)Network and Telephone Cabling Infrastructure, Planning and
46 Construction
47 (Rapides)
48 Payable from the balance of Series 94A (08T-02)$ 100
Page 25 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
19/603UNIVERSITY OF NEW ORLEANS1
2(1291)Library Fourth Floor Completion Information Resource
3 Center
4 (Orleans)
5 Payable from General Obligation Bonds
6	Priority 1	$ 1,327,800
7(1292)Science Building Mechanical Renovations, Planning and
8 Construction
9 (Orleans)
10 Payable from General Obligation Bonds
11	Priority 1	$ 1,013,200
19/604NLSU HEALTH SCIENCES CENTER -  NEW ORLEANS12
13(1) Interim Hospital Repurposing, Construction
14 (Orleans)
15 Payable from General Obligation Bonds
16	Priority 5	$34,500,000
17(5) Land Acquisition 
18 (Orleans)
19 Payable from Fees and Self Generated Revenues $ 6,500,000
20(16) Human Development Center, Planning and Construction
21 (Orleans)
22 Payable from General Obligation Bonds
23	Priority 1	$ 353,900
24(17) Health Science Center Facility Renovations - Dental
25 School Simulation Facility
26 (Orleans)
27 Payable from General Obligation Bonds
28	Priority 1	$ 806,300
19/604SLSU HEALTH SCIENCES CENTER - SHREVEP ORT29
30(9) Medical School B-Building HVAC Replacement
31 (Caddo)
32 Payable from General Obligation Bonds
33	Priority 2	$ 500,000
34	Priority 5	$ 4,600,000
35 Total	$ 5,100,000
36(62) Boiler Replacement, Planning and Construction
37 (Caddo)
38 Payable from General Obligation Bonds
39	Priority 1	$ 5,211,100
40(63) Patient Care HVAC Replacement, Planning and
41 Construction
42 (Caddo)
43 Payable from General Obligation Bonds
44	Priority 1	$ 1,873,400
Page 26 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(64) Capital Improvement Projects, Design and Engineering
2 (Caddo)
3 Payable from General Obligation Bonds
4	Priority 1	$ 3,748,300
5	Priority 5	$ 1,067,400
6 Total	$ 4,815,700
7(65) Inpatient Critical Care Renovation, Planning and
8 Construction
9 (Caddo)
10 Payable from General Obligation Bonds
11	Priority 1	$ 143,900
12	Priority 5	$ 3,428,200
13 Total	$ 3,572,100
14(66) High Voltage Electrical Distribution System Upgrade,
15 Planning and Construction
16 (Caddo)
17 Payable from General Obligation Bonds
18	Priority 1	$ 13,700
19/607LSU AGRICULTURAL CENTER19
20(11) Animal and Food Science Facilities Renovations and
21 Modernizations, Phase II, Planning and Construction
22 (East Baton Rouge)
23 Payable from General Obligation Bonds
24	Priority 1	$ 823,500
25	Priority 5	$ 168,500
26 Total	$ 992,000
19/609PENNINGTON BIOMEDICAL RESEARCH CENTER27
28(69) Pennington Biomedical Clinical Research Building,
29 Imaging Center and High Tech Research Instrumentation
30 Equipment 
31 (East Baton Rouge)
32 Payable from General Obligation Bonds
33	Priority 1	$ 1,000,000
19/610LSU HEALTH CARE SERVICES DIVISION34
35(52) Replacement of Air Handlers and Chillers, WO Moss,
36 Planning and Construction 
37 (Calcasieu)
38 Payable from General Obligation Bonds
39	Priority 1	$ 44,000
40(54) Emergency Room Expansion, University Medical Center,
41 Planning and Construction 
42 (Lafayette)
43 Payable from General Obligation Bonds
44	Priority 1	$ 548,200
45(55) Air Handling Unit Replacement, Chabert, Planning and
46 Construction
47 (Terrebonne)
48 Payable from General Obligation Bonds
49	Priority 5	$ 38,000
Page 27 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(56) New Emergency Generator and Chillers, UMC, Planning
2 and Construction 
3 (Lafayette)
4 Payable from General Obligation Bonds
5	Priority 1	$ 10,000
6(135) Air Handler Replacement, Planning and Construction 
7 (Lafayette)
8 Payable from General Obligation Bonds
9	Priority 1	$ 47,500
10(1627)Refurbish Elevators, UMC, Planning and Construction
11 (Lafayette)
12 Payable from the balance Series 94A (08T-02) $ 100
13(1628)University Medical Center in Baton Rouge
14 (East Baton Rouge)
15 Payable from the balance Series 94A (08T-02) $ 100
19/615SOUTHERN UNIVERSITY BOARD OF16
17 SUPERVISORS
18(250) Major Repairs and Deferred Maintenance of Buildings
19 and Facilities, Including HVAC, Planning and
20 Construction
21 (Caddo, East Baton Rouge, Orleans)
22 Payable from General Obligation Bonds
23	Priority 1	$ 3,000,000
24 State General Fund (Direct)	$ 1,000,000
25 Total	$ 4,000,000
26Provided that the State General Fund (Direct) appropriation shall be used for HVAC at
27Southern University.
19/616SOUTHERN UNIVERSITY - BATON ROUG E28
29(1172)A.W. Mumford, Americans with Disabilities Act
30 Compliance and Upgrades, Planning and Construction
31 (East Baton Rouge)
32 Payable from General Obligation Bonds
33	Priority 1	$ 7,900,000
34(1174)Repair of Sloughing Off of Ravine, Planning and
35 Construction
36 (East Baton Rouge)
37 Payable from General Obligation Bonds
38	Priority 1	$ 6,900
39	Priority 5	$ 1,000,600
40 Total	$ 1,007,500
41(1176)T.T. Allain Hall, Americans with Disabilities Act
42 Compliance Upgrades, Planning and Construction
43 (East Baton Rouge)
44 Payable from General Obligation Bonds
45	Priority 1	$ 1,010,000
Page 28 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(1186)F.G. Clark Activity Center, Americans with Disabilities
2 Act Compliance and Upgrades, Planning and
3 Construction
4 (East Baton Rouge)
5 Payable from General Obligation Bonds
6	Priority 1	$ 7,450,000
7(1192)Southern University Laboratory School Addition and
8 Upgrades, Planning and Construction
9 (East Baton Rouge)
10 Payable from General Obligation Bonds
11	Priority 1	$ 54,100
12	Priority 5	$ 6,600,000
13 Total	$ 6,654,100
19/618SOUTHERN UNIVERSITY - SHREVEP ORT14
15(136) Workforce Training and Technology Center, Planning
16 and Construction
17 (Caddo)
18 Payable from General Obligation Bonds
19	Priority 2	$ 200,000
20	Priority 5	$ 476,000
21 Total	$ 676,000
22(138) Renovations of Allen Building, Planning and 
23 Construction
24 (Caddo)
25 Payable from General Obligation Bonds
26	Priority 1	$ 3,433,800
27(142) New Classroom Building, Southern University - 
28 Shreveport, Planning and Construction
29 (Caddo)
30 Payable from General Obligation Bonds
31	Priority 1	$ 641,900
19/620UNIVERSITY OF LOUISIANA SYSTEM 32
33 BOARD OF SUPERVISORS
34(1392)Major Repairs and Deferred Maintenance of 
35 Buildings and Facilities, Including HVAC, 
36 Planning and Construction
37 (Calcasieu, Lafayette, Lafourche, Lincoln, 
38 Natchitoches, Orleans, Ouachita, Tangipahoa)
39 Payable from General Obligation Bonds
40	Priority 1	$ 3,000,000
41 State General Fund (Direct)	$ 500,000
42 Total	$ 3,500,000
43Provided that the State General Fund (Direct) appropriation shall be used for HVAC at
44Grambling State University.
19/621NICHOLLS STATE UNIVERSITY45
46(29) Athletic Facilities - Didier Field, Renovation, 
47 Planning and Construction
48 (Lafourche)
49 Payable from General Obligation Bonds
50	Priority 1	$ 497,000
Page 29 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(1317)Talbot Hall Renovation and Roof Replacement, 
2 Planning and Construction
3 (Lafourche)
4 Payable from General Obligation Bonds
5	Priority 1	$ 512,600
6(1473)Fieldhouse, Planning and Construction
7 (Lafourche)
8 Payable from General Obligation Bonds
9	Priority 2	$ 1,850,000
10	Priority 5	$ 2,000,000
11 Total	$ 3,850,000
19/623GRAMBLING STATE UNIVERSITY12
13(198) Campus Utility Infrastructure Assessment, 
14 Planning and Emergency Repairs and/or 
15 Replacement, Planning and Construction
16 (Lincoln)
17 Payable from General Obligation Bonds
18	Priority 1	$ 123,400
19(239) Library Replacement, Planning and Construction
20 (Lincoln)
21 Payable from General Obligation Bonds
22	Priority 1	$ 893,300
23	Priority 5	$24,106,700
24 Total	$25,000,000
19/625LOUISIANA TECH UNIVERSITY25
26(181) Louisiana Tech Research Park, Real Estate 
27 Acquisition, Planning and Construction
28 (Lincoln)
29 Payable from General Obligation Bonds
30	Priority 1	$ 59,000
31(182) Integrated Engineering and Science Building 
32 (Lincoln)
33 Payable from General Obligation Bonds
34	Priority 1	$ 5,181,200
35	Priority 5	$24,069,600
36 Payable from Fees and Self Generated Revenues $ 6,300,000
37 Total	$35,550,800
38(1320)Business Building Replacement and Addition, Planning
39 and Construction
40 (Lincoln)
41 Payable from General Obligation Bonds
42	Priority 1	$ 1,499,800
19/627MCNEESE STATE UNIVERSITY43
44(33) Contraband Bayou Erosion Retaining Wall Phase II,
45 Planning and Construction
46 (Calcasieu)
47 Payable from General Obligation Bonds
48	Priority 1	$ 2,031,900
49	Priority 5	$ 3,622,000
50 Total	$ 5,653,900
Page 30 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(34) Health/Human Performance Education Complex,
2 Planning and Construction
3 (Calcasieu)
4 Payable from General Obligation Bonds
5	Priority 1	$24,860,600
6(58) Shearman Fine Arts Building Renovation and Addition,
7 Planning and Construction
8 (Calcasieu)
9 Payable from General Obligation Bonds
10	Priority 1	$ 1,025,000
11(1321)ADA Upgrades Campus-Wide, Planning and
12 Construction
13 (Calcasieu)
14 Payable from General Obligation Bonds
15	Priority 1	$ 2,910,100
19/629UNIVERSITY OF LOUISIANA - MONROE16
17(1322)Sandel Hall Renovation, Planning and Construction
18 (Ouachita)
19 Payable from General Obligation Bonds
20	Priority 1	$ 1,178,200
19/631NORTHWESTERN STATE UNIVERSITY21
22(158) South Jefferson Street Extension
23 (Natchitoches)
24 Payable from General Obligation Bonds
25	Priority 5	$ 59,000
19/634SOUTHEASTERN LOUISIANA UNIVERSITY26
27(143) Computer Science and Technology Facility
28 Improvements and Expansion, Planning and Construction
29 (Tangipahoa)
30 Payable from General Obligation Bonds
31	Priority 1	$10,247,000
19/640UNIVERSITY OF LOUISIANA - LAFAYETTE32
33(205) Fletcher Hall Exterior Repairs, Planning and Construction
34 (Lafayette)
35 Payable from General Obligation Bonds
36	Priority 1	$ 187,700
37	Priority 5	$ 186,300
38 Total	$ 374,000
19/649LOUISIANA COMMUNITY AND TECHNICAL 39
40 COLLEGE SYSTEM
41(270) Major Repairs and Deferred Maintenance of Buildings
42 and Facilities, Planning and Construction
43 (Statewide)
44 Payable from General Obligation Bonds
45	Priority 1	$ 3,000,000
Page 31 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(1293)Automotive Training Facility, Planning and Construction
2 (East Baton Rouge)
3 Payable from General Obligation Bonds
4	Priority 1	$ 5,711,700
19/655LOUISIANA SPECIAL EDUCATION CENTER5
6(1300)Global Infrastructure Improvements 
7 (Rapides)
8 Payable from Interagency Transfers	$ 1,200,000
19/657LOUISIANA SCHOOL F OR MATH, SCIENCE AND THE ARTS9
10(1294)New Dormitory Building, Planning and Construction
11 (Natchitoches)
12 Payable from General Obligation Bonds
13	Priority 1	$ 2,964,000
14	Priority 5	$23,360,100
15 Total	$26,324,100
16(1295)HVAC Issues in Caddo Hall, Planning and Construction
17 (Natchitoches)
18 Payable from General Obligation Bonds
19	Priority 1	$ 1,500
20(1296)Stair Railings - Addressing Code Violations, Planning
21 and Construction
22 (Natchitoches)
23 Payable from General Obligation Bonds
24	Priority 1	$ 3,800
19/671BOARD OF REGENTS25
26(1366)System-Wide Telecommunications Wiring and
27 Equipment, Planning and Construction
28 (Statewide)
29 Payable from General Obligation Bonds
30	Priority 1	$ 3,315,800
31(1367)Land Acquisition for Post Secondary
32 Educational Institutions
33 (Statewide)
34 Payable from General Obligation Bonds
35	Priority 1	$ 2,000,000
36	Priority 2	$ 1,000,000
37	Priority 5	$ 2,000,000
38 Total	$ 5,000,000
39Provided that $2,500,000 of this appropriation shall be used for the acquisition of the former
40Our Lady of Lourdes Hospital facility.
19/673NEW ORLEANS CENTER FOR THE CREATIVE41
42 ARTS
43(1177)Replace HVAC System, Planning and Construction
44 (Orleans)
45 Payable from General Obligation Bonds
46	Priority 1	$ 120,900
Page 32 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
19/752SOWELA TECHNICAL COMMUNITY COLLEG E - 1
2 MORGAN SMITH CAMPUS
3(1369)New Construction or Renovations to Morgan Smith
4 Campus, Planning and Construction
5 (Jefferson Davis)
6 Payable from General Obligation Bonds
7	Priority 1	$ 6,146,800
LEVEE DISTRICTS AND PORTS8
36/L10ORLEANS LEVEE DISTRICT9
10(466) Southeast Louisiana Flood Protection Authority - East for
11 Bayou St. John, Maintenance and Improvements,
12 Perimeter Elevation, Hydrology Study, Planning and
13 Construction
14 (Orleans)
15 Payable from General Obligation Bonds
16	Priority 5	$ 4,600
17(559) New Police Complex - Elysian Fields,
18 Planning and Construction
19 (Orleans)
20 Payable from General Obligation Bonds
21	Priority 5	$ 1,000,000
36/L13PONTCHARTRAIN LEVEE DISTRICT22
23(465) Lake Pontchartrain West Shore Hurricane 
24 Protection Project 
25 (St. Charles, St. James, St. John the Baptist)
26 Payable from General Obligation Bonds
27	Priority 2	$ 2,330,000
28	Priority 5	$ 8,500,000
29 Total	$10,830,000
36/L16SOUTH LAFOURCHE LEVEE DISTRICT30
31(224) Larose to Golden Meadow Hurricane Protection System,
32 Planning and Construction
33 (Lafourche)
34 Payable from General Obligation Bonds
35	Priority 1	$ 2,033,900
36	Priority 5	$12,000,000
37 Total	$14,033,900
36/L25GRAND ISLE INDEPENDENT LEVEE DISTRICT38
39(1029)Breakwater Protection, Planning and Construction 
40 (Jefferson)
41 Payable from General Obligation Bonds
42	Priority 1	$ 416,300
43	Priority 5	$ 678,700
44 Total	$ 1,095,000
Page 33 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
36/L36LAFITTE AREA INDEPENDENT LEVEE DISTRICT1
2(1374)Lower Lafitte Orange Street Basin,
3 Planning and Construction
4 (Jefferson)
5 Payable from General Obligation Bonds
6	Priority 2	$ 2,500,000
7	Priority 5	$14,500,000
8 Total	$17,000,000
36/L37IBERIA PARISH LEVEE HURRICANE 9
10 AND CONSERVATION DISTRICT
11(777) Planning, Permitting, Engineering and Right of Way
12 Acquisitions for the Iberia Hurricane Protection Master
13 Plan
14 (Iberia)
15 Payable from General Obligation Bonds
16	Priority 1	$ 4,300
17	Priority 2	$ 300,000
18	Total	$ 304,300
36/P03GREATER BATON ROUG E PORT COMMISSION19
20(1106)Inland Rivers Marine Terminal Dock and Access
21 Roadway Construction Project, Planning and
22 Construction
23 (West Baton Rouge)
24 Payable from General Obligation Bonds
25	Priority 1	$ 6,567,800
26	Priority 5	$15,652,600
27 Total	$22,220,400
36/P05WEST CALCASIEU PORT28
29(474) New Bulkhead along Gulf Intracoastal Waterway - West
30 Calcasieu Port
31 (Calcasieu)
32 Payable from General Obligation Bonds
33	Priority 1	$ 200,000
36/P10GREATER LAFOURCHE PORT COMMISSION34
35(645) Minor Cheramie Road Paving, Planning
36 and Construction
37 (Lafourche)
38 Payable from General Obligation Bonds
39	Priority 1	$ 500,000
40	Priority 5	$ 2,400,000
41 Total	$ 2,900,000
36/P15MORGAN CITY HARBOR AND TERMINAL DISTRICT42
43(404) Governmental Operations and Emergency Center,
44 Planning and Construction 
45 (St. Mary)
46 Payable from General Obligation Bonds
47	Priority 1	$ 33,900
Page 34 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
36/P17PORT OF NEW ORLEANS1
2(236) Milan Upland Yard Improvements 
3 (Orleans)
4 Payable from General Obligation Bonds
5	Priority 1	$ 3,000,000
6	Priority 2	$ 372,700
7	Priority 5	$ 7,777,300
8 Total	$11,150,000
9(237) Cruise Ship Terminal, Planning and Construction
10 (Orleans)
11 Payable from General Obligation Bonds
12	Priority 1	$ 197,200
13	Priority 5	$ 6,690,000
14 Total	$ 6,887,200
36/P20ST. BERNARD PORT, HARBOR AND 15
16 TERMINAL DISTRICT
17(396) Rehabilitation of Chalmette Slip, 
18 Planning and Construction
19 (St. Bernard)
20 Payable from General Obligation Bonds
21	Priority 2	$ 100,000
22	Priority 5	$ 200,000
23 Total	$ 300,000
36/P21PORT OF SOUTH LOUISIANA24
25(340) Administration Building, also known as the Business
26 Development Center
27 (St. John the Baptist)
28 Payable from General Obligation Bonds
29	Priority 1	$ 1,500,000
30	Priority 5	$ 2,629,550
31 Total	$ 4,129,550
32(341) Globalplex Terminal Building #71 and Other Globalplex
33 Terminal Building Upgrades, Planning and Construction
34 (St. John the Baptist)
35 Payable from General Obligation Bonds
36	Priority 1	$ 2,840,000
37(342) Globalplex Dock Access Bridge and 
38 Equipment Replacement/Repair
39 (St. John the Baptist)
40 Payable from General Obligation Bonds
41	Priority 2	$ 975,000
42	Priority 5	$ 7,705,000
43 Total	$ 8,680,000
44(344) Warehouse and Property Acquisition and
45 Improvements, Planning and Construction
46 (St. John the Baptist)
47 Payable from General Obligation Bonds
48	Priority 1	$ 90,000
Page 35 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(348) Globalplex Rail Siding 
2 ($5,577,932 Local/Federal/Other Match)
3 (St. John the Baptist)
4 Payable from General Obligation Bonds
5	Priority 1	$ 346,700
6	Priority 5	$ 2,516,800
7 Total	$ 2,863,500
36/P23TERREBONNE PORT COMMISSION8
9(160) Maintenance Dredging of Houma Navigation
10 Canal by U.S. Corps of Engineers
11 (Terrebonne)
12 Payable from General Obligation Bonds
13	Priority 2	$ 500,000
14	Priority 5	$ 1,500,000
15 Total	$ 2,000,000
16(161) Slip Dredging, Houma Navigation Canal Dredging 
17 and Improvements for Terrebonne Port Commission
18 Government Multi-Use Complex, Planning 
19 and Construction
20 (Terrebonne)
21 Payable from General Obligation Bonds
22	Priority 1	$ 990,700
23	Priority 5	$ 3,770,300
24 Total	$ 4,761,000
36/P41JEFFERSON PARISH ECONOMIC DEVELOP MENT 25
26 AND PORT DISTRICT
27(112) New Access Road in the Churchill Technology
28 and Business Park for Delgado Community
29 College's Advanced Manufacturing and River
30 City Campus, Planning and Construction
31 (Jefferson)
32 Payable from General Obligation Bonds
33	Priority 2	$ 1,548,648
34	Priority 5	$ 2,382,535
35 Total	$ 3,931,183
36(1435)Jefferson Parish Business Park: Science and Technology
37 Academy and Conference Center  
38 (Jefferson)
39 Payable from General Obligation Bonds
40	Priority 1	$ 1,821,200
41	Priority 2	$ 5,503,800
42 Total	$ 7,325,000
36/P43COLUMBIA PORT COMMISSION43
44(197) Railroad Spur, Planning and Construction
45 (Caldwell)
46 Payable from General Obligation Bonds
47	Priority 1	$ 155,000
48	Priority 5	$ 1,841,000
49 Total	$ 1,996,000
Page 36 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
MISCELLANEOUS NON-STATE1
250/J04ASSUMPTION PARISH
3(1210)Parishwide Fire Hydrant Installation,
4 Planning and Construction
5 (Avoyelles)
6 Payable from General Obligation Bonds
7	Priority 2	$ 756,000
50/J05AVOYELLES PARISH8
9(1056)Parishwide Roadway Improvements, Planning and
10 Construction
11 (Avoyelles)
12 Payable from General Obligation Bonds
13	Priority 1	$ 745,000
50/J08BOSSIER PARISH14
15(279) Acceleration Lane on US 71, Planning and Construction
16 (Bossier)
17 Payable from General Obligation Bonds
18	Priority 1	$ 150,000
19(283) Extension of Crouch Road to Swan
20 Lake Road/Reconstruction of Swan Lake 
21 Road To I-220, Planning and Construction
22 (Local Match Required)
23 (Bossier)
24 Payable from General Obligation Bonds
25	Priority 1	$ 101,300
26	Priority 5	$ 124,200
27 Total	$ 225,500
28(284) Sewerage District No. 1 of the Parish of Bossier, Planning
29 and Construction ($28,000,000 Local Match)
30 (Bossier)
31 Payable from General Obligation Bonds
32	Priority 1	$ 354,200
33	Priority 5	$ 255,000
34 Total	$ 609,200
50/J10CALCASIEU PARISH35
36(403) Gravity Sewer Trunk Mains and Pumping Stations South
37 Ward 3 and South Ward 4, Planning and Construction
38 (Calcasieu)
39 Payable from General Obligation Bonds
40	Priority 1	$ 2,081,900
41	Priority 5	$ 9,300,000
42 Total	$11,381,900
50/J11CALDWELL PARISH43
44(1138)Wiles Road and Kountry Korner Road Reconstruction,
45 Planning and Construction 
46 (Caldwell)
47 Payable from General Obligation Bonds
48	Priority 5	$ 433,400
Page 37 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(1153)Recreation Facilities Construction, Reconstruction,
2 Planning and Construction 
3 (Caldwell)
4 Payable from General Obligation Bonds
5	Priority 1	$ 37,000
50/J15CONCORDIA PARISH6
7(879) Concordia Parish Courthouse District Courtroom Security
8 and Safety Renovations
9 (Concordia)
10 Payable from General Obligation Bonds
11	Priority 1	$ 315,000
50/J16DESOTO PARISH12
13(934) DeSoto Sports Complex, Planning and Construction
14 (DeSoto)
15 Payable from General Obligation Bonds
16	Priority 5	$ 50,000
50/J21FRANKLIN PARISH17
18(288) Franklin Parish Activity Center, Planning and
19 Construction ($250,000 Local Match)
20 (Franklin)
21 Payable from General Obligation Bonds
22	Priority 1	$ 67,700
23	Priority 5	$ 1,360,000
24 Total	$ 1,427,700
25(1065)Bayou Macon Cut-Off No. 1 Drainage Structure
26 Improvements, Planning and Construction
27 (Franklin)
28 Payable from General Obligation Bonds
29	Priority 1	$ 415,000
50/J22GRANT PARISH30
31(447) Southern Grant Sewerage System Improvements, Study,
32 Design, Planning and Construction
33 (Grant)
34 Payable from General Obligation Bonds
35	Priority 1	$ 1,325,100
36	Priority 2	$ 1,597,100
37 Total	$ 2,922,200
38(558) Regional Economic Development Building,
39 Rehabilitation, Planning and Construction
40 (Grant)
41 Payable from General Obligation Bonds
42	Priority 1	$ 28,900
Page 38 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/J23IBERIA PARISH1
2(774) Robert B. Green Veterans Memorial Building Renovation,
3 Upgrade and Expansion Project for Robert B. Green
4 American Legion Post 533 and Perry Thompson VFW Post
5 12065, Planning and Construction
6 (Iberia)
7 Payable from General Obligation Bonds
8	Priority 1	$ 200,000
9	Priority 2	$ 50,000
10 Total	$ 250,000
11(1431)Iberia Parish Highway 90 West
12 Drainage Improvements
13 (Iberia)
14 Payable from General Obligation Bonds
15	Priority 5	$ 200,000
50/J25JACKSON PARISH16
17(481) Jackson Parish Riding Arena and Livestock Pavilion,
18 Planning and Construction
19 (Jackson)
20 Payable from General Obligation Bonds
21	Priority 1	$ 276,800
22	Priority 2	$ 500,000
23	Priority 5	$ 917,600
24 Total	$ 1,694,400
50/J26JEFFERSON PARISH25
26(71) 11
th
 Street Roadway Replacement and Upgrade
27 of Subsurface Drainage System between Queens
28 Blvd. and Manhattan Blvd., Planning and Construction
29 (Jefferson)
30 Payable From General Obligation Bonds
31	Priority 2	$ 1,400,000
32	Priority 5	$ 7,850,000
33 Total	$ 9,250,000
34(72) Airline Drive (US 61) at 17th Street Canal 
35 Drainage Crossing Railroad Bridge Replacement,
36 Planning and Construction
37 (Jefferson)
38 Payable from General Obligation Bonds
39	Priority 5	$ 1,990,000
40(73) Ames Boulevard Widening from Two Lanes to Three Lanes
41 between Barataria Boulevard and Bayou Boeuf Drive (2.0
42 miles) with Installation of Subsurface Drainage 
43 (Jefferson)
44 Payable from General Obligation Bonds
45	Priority 1	$ 338,700
46	Priority 5	$ 3,576,300
47 Total	$ 3,915,000
Page 39 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(76) Avondale Booster Club and Playground Upgrades,
2 Planning and Construction
3 (Jefferson)
4 Payable from General Obligation Bonds
5	Priority 1	$ 758,300
6(78) Bike Path Along Leo Kerner Parkway (Barataria Blvd. to
7 Parc des Familles Entrance), Planning and Construction
8 (Jefferson)
9 Payable from General Obligation Bonds
10	Priority 1	$ 43,800
11(79) Bonnabel Canal Rehabilitation and Bank Stabilization
12 (Veterans Boulevard to West Esplanade), Planning and
13 Construction
14 (Jefferson)
15 Payable from General Obligation Bonds
16	Priority 1	$ 1,508,500
17	Priority 5	$ 370,800
18 Total	$ 1,879,300
19(81) Brown Avenue Canal Improvements Between the
20 Westbank Expressway and Harold Street, Planning and
21 Construction
22 (Jefferson)
23 Payable from General Obligation Bonds
24	Priority 1	$ 400,000
25	Priority 5	$ 600,000
26 Total	$ 1,000,000
27( 82 )Brown Avenue Roadway Reconstruction between
28 the Westbank Expressway and 36th Street, Planning
29 and Construction
30 (Jefferson)
31 Payable from General Obligation Bonds
32	Priority 5	$ 1,000,000
33(97) Gretna Government Complex Parking Lot, Planning and
34 Construction
35 (Jefferson)
36 Payable from General Obligation Bonds
37	Priority 1	$ 111,600
38	Priority 5	$ 328,400
39 Total	$ 440,000
40(100) Kennedy Heights Playground Improvements, Planning
41 and Construction
42 (Jefferson)
43 Payable from General Obligation Bonds
44	Priority 5	$ 65,000
45(101) Lafreniere Park Marsh Island Restoration, Planning and
46 Construction
47 (Jefferson)
48 Payable from General Obligation Bonds
49	Priority 5	$ 1,125,000
Page 40 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(106) Latigue Street Roadway Improvements, Planning and
2 Construction
3 (Jefferson)
4 Payable from General Obligation Bonds
5	Priority 5	$ 70,000
6(111) Multi-Purpose Recreational and Achievement Center 
7 (Jefferson)
8 Payable from General Obligation Bonds
9	Priority 1	$ 436,400
10(113) Parc des Familles, Construction of Utilities, Restrooms,
11 Pavilions and Roadways in Raw Undeveloped Wooded
12 Area in Order to Initiate Construction of Regional Park,
13 Planning and Construction
14 (Jefferson)
15 Payable from General Obligation Bonds
16	Priority 5	$ 743,300
17(114) Parish Line Drainage Pump Station Capacity Increase,
18 Planning and Construction
19 (Jefferson)
20 Payable from General Obligation Bonds
21	Priority 1	$ 3,350,000
22	Priority 5	$ 1,600,000
23 Total	$ 4,950,000
24(116) Riverside Senior Center, Planning and Construction
25 (Jefferson)
26 Payable from General Obligation Bonds
27	Priority 1	$ 61,900
28	Priority 5	$ 1,455,000
29 Total	$ 1,516,900
30(121) South Kenner Road Rehabilitation from Live Oak
31 Boulevard to River Road, Planning and Construction
32 (Jefferson)
33 Payable from General Obligation Bonds
34	Priority 1	$ 2,478,700
35	Priority 5	$ 4,794,400
36 Total	$ 7,273,100
37(122) Terry Parkway Drainage Between Carol Sue Drive and
38 Industry Canal ($500,000 Local Match) 
39 (Jefferson)
40 Payable from General Obligation Bonds
41	Priority 1	$ 3,000,000
42(123) Upper Kraak Ditch Subsurface Drainage Improvement
43 (Upper Kraak Drainage Pump Station to Earhart
44 Expressway), Planning and Construction
45 (Jefferson)
46 Payable from General Obligation Bonds
47	Priority 1	$ 207,400
48(124) Waggaman Playground Improvements, Planning and
49 Construction
50 (Jefferson)
51 Payable from General Obligation Bonds
52	Priority 5	$ 50,000
Page 41 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(126) Waggaman Subsurface Drainage Improvements, Planning
2 and Construction
3 (Jefferson)
4 Payable from General Obligation Bonds
5	Priority 1	$ 54,700
6(127) Walkertown Bus Terminal, Planning and Construction
7 (Jefferson)
8 Payable from General Obligation Bonds
9	Priority 5	$ 95,000
10(128) Woodland West Drainage Improvements,
11 Planning and Construction
12 (Jefferson)
13 Payable from General Obligation Bonds
14	Priority 2	$ 225,000
15	Priority 5	$ 1,875,000
16 Total	$ 2,100,000
17(130) Woodmere Community Center, Real Estate Acquisition,
18 Planning and Construction ($15,000 Local Match)
19 (Jefferson)
20 Payable from General Obligation Bonds
21	Priority 1	$ 341,400
22	Priority 5	$ 191,800
23 Total	$ 533,200
50/J27JEFFERSON DAVIS PARISH24
25(1245)Acquisition and Renovation of Existing Building and site
26 for Regional Consolidated Jail Facility, Acquisition,
27 Planning and Construction
28 (Jefferson Davis)
29 Payable from General Obligation Bonds
30	Priority 1	$ 9,727,600
50/J28LAFAYETTE PARISH31
32(262) Governmental Complex, Jail Physical Plant Upgrade,
33 Planning and Construction ($4,980,000 Non-State Match)
34 (Lafayette)
35 Payable from General Obligation Bonds
36	Priority 1	$ 1,401,500
37	Priority 5	$ 100,000
38 Total	$ 1,501,500
39(263) Parish Governmental Complex - Parish Courthouse,
40 Planning and Construction
41 (Lafayette)
42 Payable from General Obligation Bonds
43	Priority 1	$ 8,600
44	Priority 2	$ 1,000,000
45	Priority 5	$ 6,000,000
46 Total	$ 7,008,600
47(264) Kaliste Saloom Widening
48 (Lafayette)
49 Payable from General Obligation Bonds
50	Priority 1	$ 190,500
51	Priority 5	$10,633,300
52 Total	$10,823,800
Page 42 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/J29LAFOURCHE PARISH1
2(1145)South Lafourche Airport Corridor Project
3 (Lafourche)
4 Payable from General Obligation Bonds
5	Priority 1	$ 341,400
6	Priority 5	$ 122,000
7 Total	$ 463,400
8(1173)Kraemer Water Line Improvements
9 (Lafourche)
10 Payable from General Obligation Bonds
11	Priority 2	$ 100,000
50/J34MOREHOUSE PARISH12
13(477) Public Works Center,
14 Planning and Construction
15 (Morehouse)
16	Priority 5	$ 325,000
50/J35NATCHITOCHES P ARISH17
18(597) Hard Surfacing of Coco Bed Road, Phase 1, Planning and Construction
19 (Natchitoches)
20 Payable from General Obligation Bonds
21	Priority 1	$ 280,000
22(599) Resurfacing of Fish Hatchery Road 
23 (Natchitoches)
24 Payable from General Obligation Bonds
25	Priority 5	$ 125,000
26(660) Courthouse Security Improvements, 
27 Planning and Construction
28 (Natchitoches)
29 Payable from General Obligation Bonds
30	Priority 1	$ 480,000
31(671) Resurfacing of Roads in Payne Subdivision, 
32 Planning and Construction
33 (Natchitoches)
34 Payable from General Obligation Bonds
35	Priority 1	$ 200,000
36	Priority 5	$ 300,000
37 Total	$ 500,000
38(869) Resurfacing of Blanchard Road, 
39 Planning and Construction
40 (Natchitoches)
41 Payable from General Obligation Bonds
42	Priority 5	$ 280,000
43(870) Old River Bridge, Planning and Construction
44 (Natchitoches)
45 Payable from General Obligation Bonds
46	Priority 5	$ 610,000
Page 43 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/J37OUACHITA PARISH1
2(561) Steep Bayou Sewer - Phase 2,
3 Planning and Construction
4 (Ouachita)
5 Payable from General Obligation Bonds
6	Priority 2	$ 500,000
7(606) Hannah's Run Control Structure, 
8 Planning and Construction
9 (Ouachita)
10 Payable from General Obligation Bonds
11	Priority 1	$ 500,000
50/J38PLAQUEMINES PARISH12
13(184) Belle Chasse Parks, Planning and Construction
14 (Plaquemines)
15 Payable from General Obligation Bonds
16	Priority 5	$ 120,000
17(185) Empire Bridge Lighting, Planning and 
18 Construction
19 (Plaquemines)
20 Payable from General Obligation Bonds
21	Priority 1	$ 100,000
22	Priority 5	$ 200,000
23 Total	$ 300,000
50/J40RAPIDES PARISH24
25(1279)Renovation of Elevators at Rapides Parish Courthouse
26 (Rapides)
27 Payable from General Obligation Bonds
28	Priority 2	$ 375,000
50/J42RICHLAND PARISH29
30(952) Richland Parish Courthouse Renovations 
31 (Richland)
32 Payable from General Obligation Bonds
33	Priority 1	$ 27,600
34	Priority 5	$ 2,400
35 Total	$ 30,000
50/J43SABINE PARISH36
37(60) Water Treatment and Supply System Study
38 (Sabine)
39 Payable from General Obligation Bonds
40	Priority 1	$ 197,700
41(61) Plainview Road Rehabilitation, Planning and
42 Construction
43 (Sabine)
44 Payable from General Obligation Bonds
45	Priority 1	$ 30,700
46	Priority 5	$ 4,305,600
47 Total	$ 4,336,300
Page 44 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/J45ST. CHARLES PARISH1
2(1442)West Bank Hurricane Protection Levee
3 (St. Charles)
4 Payable from General Obligation Bonds
5	Priority 2	$ 43,200
50/J47ST. JAMES PARISH6
7(268) St. James Parish Land Acquisition,
8 Planning and Construction
9 (St. James)
10 Payable from General Obligation Bonds
11	Priority 5	$ 5,000,000
12(923) Blind River Freshwater Diversion
13 (St. James)
14 Payable from General Obligation Bonds
15	Priority 5	$ 350,000
50/J48ST. JOHN THE BAPTIST PARISH16
17(1332)East Bank Courthouse, Planning and Construction
18 (St. John the Baptist)
19 Payable from General Obligation Bonds
20	Priority 1	$ 30,000
21	Priority 2	$ 45,000
22 Total	$ 75,000
50/J49ST. LANDRY PARISH23
24(1213)Hurricane Evacuations and Homeland Security
25 Coordination and Related Renovations, Planning and
26 Construction
27 (St. Landry)
28 Payable from General Obligation Bonds
29	Priority 1	$ 86,300
30(1223)Harry Guilbeau Road Economic Development District,
31 Infrastructure Improvements, Planning, Engineering,
32 Utilities, and Construction
33 (St. Landry)
34 Payable from General Obligation Bonds
35	Priority 1	$ 186,300
50/J50ST. MARTIN PARISH36
37(670) I-10 Frontage Road, LA 328 to LA 347
38 (St. Martin)
39 Payable from General Obligation Bonds
40	Priority 5	$ 750,000
41(673) Road Improvements on Four-Mile Bayou Road 
42 (St. Martin)
43 Payable from General Obligation Bonds
44	Priority 1	$ 645,000
Page 45 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/J51ST. MARY PARISH1
2(370) Reconstruction of Chitimacha Trail Road from LA 328 to
3 LA 670 for St. Mary Parish Government Within Existing
4 Rights-of-Way
5 (St. Mary)
6 Payable from General Obligation Bonds
7	Priority 1	$ 760,000
8(371) Reconstruction of Flattown Road from Chitimacha Trail
9 to Ralph Darden Memorial Parkway for St. Mary Parish
10 Government Within Existing Rights-of-Way
11 (St. Mary)
12 Payable from General Obligation Bonds
13	Priority 1	$ 450,000
14(372) Reconstruction of Charenton Beach Road from
15 LA Hwy 87 to the West Atchafalaya Basin
16 Protection Levee, Planning and Construction
17 (St. Mary)
18 Payable from General Obligation Bonds
19	Priority 5	$ 500,000
20(375) Infrastructure Improvements at the Charenton Canal 
21 Industrial Park 
22 (St. Mary)
23 Payable from General Obligation Bonds
24	Priority 1	$ 421,800
25	Priority 5	$ 27,000
26 Total	$ 448,800
27(376) Installation of Culverts and Associated Infrastructure in
28 Middle Road Drainage Canal - Bayou Vista LA for Sub-
29 Gravity Drainage District #1 of St. Mary Parish Gravity
30 Drainage District #2
31 (St. Mary)
32 Payable from General Obligation Bonds
33	Priority 1	$ 2,800
34(382) Reconstruction of Martin Luther King Road
35 in Charenton for St. Mary Parish Government
36 within Existing Right of Way
37 (St. Mary)
38 Payable from General Obligation Bonds
39	Priority 5	$ 750,000
40(442) Recreation and Infrastructure Improvements 
41 at Centerville Park, Planning and Construction
42 (St. Mary)
43 Payable from General Obligation Bonds
44	Priority 1	$ 1,500
45(443) Plantation Pump Station Replacement for Sub-Gravity
46 Drainage District #1 of St. Mary Parish Gravity Drainage
47 District #2, Planning and Construction
48 (St. Mary)
49 Payable from General Obligation Bonds
50	Priority 1	$ 95,500
Page 46 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(445) St. Mary Parish Sewage District #5 Sewer Lift Station
2 Improvements
3 (St. Mary)
4 Payable from General Obligation Bonds
5	Priority 1	$ 95,000
50/J52ST. TAMMANY PARISH6
7(406) University Square Learning Center Facilities, 
8 Planning and Construction
9 (St. Tammany)
10 Payable from General Obligation Bonds
11	Priority 1	$ 210,000
12	Priority 2	$ 500,000
13	Priority 5	$11,740,000
14 Total	$12,450,000
15(407) Safe Haven Campus for Behavioral and Mental
16 Health, Planning and Construction
17 (St. Tammany)
18 Payable from General Obligation Bonds
19	Priority 2	$ 500,000
20	Priority 5	$ 2,220,000
21 Total	$ 2,720,000
22(408) South Slidell Levee Protection Rehabilitation (USACE 533d
23 Report for Levees West and East of I-10) Planning and
24 Construction
25 (St. Tammany)
26 Payable from General Obligation Bonds
27	Priority 5	$ 9,585,200
28(409) St. Tammany Parish Fishing Pier, Planning and
29 Construction
30 (St. Tammany)
31 Payable from General Obligation Bonds
32	Priority 1	$ 390,000
50/J53TANGIPAHOA PARISH33
34(759) Wardline Road, Widening and Improvements
35 (Tangipahoa)
36 Payable from General Obligation Bonds
37	Priority 1	$ 53,900
38(760) South Airport Road - North Hoover Road Improvements
39 (Tangipahoa)
40 Payable from General Obligation Bonds
41	Priority 1	$ 131,700
50/J55TERREBONNE PARISH42
43(1083)Bayou LaCarpe Watershed Project, Location C, Design
44 and Construction
45 (Terrebonne)
46 Payable from General Obligation Bonds
47	Priority 5	$ 750,000
Page 47 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(1270)South Louisiana Wetland Discovery Center - 
2 Phase 2 - Bayou Country Institute, 
3 Planning and Construction
4 (Terrebonne)
5 Payable from General Obligation Bonds
6	Priority 1	$ 250,000
7	Priority 5	$ 740,000
8 Total	$ 990,000
50/J58VERNON PARISH9
10(997) Visitor Center, Planning and Construction
11 (Vernon)
12 Payable from General Obligation Bonds
13	Priority 5	$ 350,000
14(999) Creation of Vernon Lake Cultural Center, Recreation 
15 and Tourism Park, Planning and Construction
16 (Vernon)
17 Payable from General Obligation Bonds
18	Priority 5	$ 260,000
19(1003)Pickering School Parking Lot, Planning and 
20 Construction
21 (Vernon)
22 Payable from General Obligation Bonds
23	Priority 1	$ 90,000
24(1004)Catfish Hut Road and Bridge Repair and/or 
25 Replacement, Planning and Construction
26 (Vernon)
27 Payable from General Obligation Bonds
28	Priority 1	$ 325,000
29(1043)Vernon/Fort Polk Thoroughfare Electrical Power 
30 Extension, and Utilities Including Generators
31 (Vernon)
32 Payable from General Obligation Bonds
33	Priority 5	$ 480,000
34(1163)Vernon/Fort Polk Thoroughfare Plan, Planning 
35 and Construction
36 (Vernon)
37 Payable from General Obligation Bonds
38	Priority 1	$ 1,712,100
39	Priority 5	$ 7,461,500
40 Total	$ 9,173,600
50/J59WASHINGTON PARISH41
42(1232)Animal Shelter Construction and Furnishings
43 (Washington)
44 Payable from General Obligation Bonds
45	Priority 1	$ 80,000
Page 48 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/J61WEST BATON ROUG E PARISH1
2(653) Sid Richardson Road Extension, Planning and 
3 Construction
4 (West Baton Rouge)
5 Payable from General Obligation Bonds
6	Priority 1	$ 150,000
50/J62WEST CARROLL P ARISH7
8(265) West Carroll Parish Courthouse Renovations, 
9 Planning and Construction
10 (West Carroll)
11 Payable from General Obligation Bonds
12	Priority 1	$ 300,000
50/J63WEST FELICIANA PARISH13
14(554) Port of West Feliciana Parish, Planning 
15 and Construction
16 (West Feliciana)
17 Payable from General Obligation Bonds
18	Priority 2	$ 160,000
19	Priority 5	$ 1,440,000
20 Total	$ 1,600,000
50/J64WINN PARISH21
22(1265)Roadway Reconstruction, Planning and Construction
23 (Winn)
24 Payable from General Obligation Bonds
25	Priority 2	$ 200,000
26	Priority 5	$ 295,000
27 Total	$ 495,000
50/M01ABBEVILLE28
29(1023)City of Abbeville Flood Damage Reduction &
30 Drainage Improvement Projects, Planning and Construction
31 (Vermilion)
32 Payable from General Obligation Bonds
33	Priority 5	$ 375,000
50/M05ALEXANDRIA34
35(1162)Sugarhouse Road/Eddie Williams Boulevard to 
36 LA Highway 1, Phase I and II, Planning and 
37 Construction ($5,000,000 Local Match)
38 (Rapides)
39 Payable from General Obligation Bonds
40	Priority 2	$ 3,810,000
41	Priority 5	$ 7,620,000
42 Total	$11,430,000
Page 49 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/M06AMITE1
2(232) Town of Amite City Water Improvement Project, 
3 Planning and Construction
4 (Tangipahoa)
5 Payable from General Obligation Bonds
6	Priority 1	$ 69,000
7	Priority 5	$ 600,000
8 Total	$ 669,000
50/M07ANACOCO9
10(303) Anacoco Street Rehabilitation - Liles Road and 
11 East Road, Planning and Construction
12 (Vernon)
13 Payable from General Obligation Bonds
14	Priority 5	$ 110,000
50/M19BASTROP15
16(912) Bastrop City Hall - Roof Construction and Green 
17 Lighting, Planning and Construction
18 (Morehouse)
19 Payable from General Obligation Bonds
20	Priority 1	$ 20,000
50/M27BOGALUSA21
22(1018)Drainage, Paving and Water System Improvements, 
23 Planning and Construction 
24 (Washington)
25 Payable from General Obligation Bonds
26	Priority 1	$ 8,100
27(1019)Emergency Sewer Collection System Evaluation 
28 and Repairs, Planning and Construction
29 (Washington)
30 Payable from General Obligation Bonds
31	Priority 1	$ 38,300
50/M29BOSSIER CITY32
33(152) Louisiana Technology Research Institute
34 (Bossier)
35 Payable from General Obligation Bonds
36	Priority 1	$ 124,000
37	Priority 5	$ 1,329,700
38 Total	$ 1,453,700
50/M31BREAUX BRIDGE39
40(549) Breaux Bridge Sewer System Improvements,
41 Planning and Construction
42 (St. Martin)
43 Payable from General Obligation Bonds
44	Priority 5	$ 250,000
Page 50 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/M39CARENCRO1
2(166) Wastewater and City Infrastructure Flood Damages, 
3 Planning and Construction 
4 (Lafayette)
5 Payable from General Obligation Bonds
6	Priority 1	$ 5,386,400
7(168) Gaston Coulee Cleaning, Planning and 
8 Improvements
9 (Lafayette)
10 Payable from General Obligation Bonds
11	Priority 1	$ 37,600
50/M43CHENEYVILLE12
13(557) After School Education Center, Planning and 
14 Construction
15 (Rapides)
16 Payable from General Obligation Bonds
17	Priority 5	$ 510,000
50/M44CHOUDRANT18
19(1194)Village of Choudrant Town Hall 
20 (Lincoln)
21 Payable from General Obligation Bonds
22	Priority 1	$ 13,500
23	Priority 5	$ 6,500
24 Total	$ 20,000
50/M45CHURCH POINT25
26(547) Church Point Sewer System Improvements,
27 Planning and Construction
28 (Acadia)
29 Payable from General Obligation Bonds
30	Priority 5	$ 300,000
50/M59CULLEN31
32(989) Potable Water and Distribution System Improvements, 
33 Planning and Construction
34 (Webster)
35 Payable from General Obligation Bonds
36	Priority 5	$ 80,000
50/M60DELCAMBRE37
38(1006)Water Distribution and Storage System Improvements, 
39 Planning and Construction
40 (Vermilion)
41 Payable from General Obligation Bonds
42	Priority 1	$ 5,700
43	Priority 5	$ 216,500
44 Total	$ 222,200
Page 51 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/M61DELHI1
2(1160)Richland Parish Recreational and Learning Center, 
3 Planning and Construction
4 (Richland)
5 Payable from General Obligation Bonds
6	Priority 1	$ 1,400
7	Priority 5	$ 302,300
8 Total	$ 303,700
50/M65DERIDDER9
10(324) Education and Job Training Center, Planning and 
11 Construction
12 (Beauregard)
13 Payable from General Obligation Bonds
14	Priority 5	$ 205,000
15(325) Community Recreational Building and Shelter, 
16 Planning and Construction and/or Acquisition and 
17 Rehabilitation of the Existing Facility ($1,500,000 
18 Local Match)
19 (Beauregard)
20 Payable from General Obligation Bonds
21	Priority 5	$ 2,063,100
50/M70DOYLINE22
23(698) Village of Doyline Wastewater Treatment Facility 
24 Upgrades 
25 (Webster)
26 Payable from General Obligation Bonds
27	Priority 1	$ 45,000
28	Priority 5	$ 370,000
29 Total	$ 415,000
50/M74DUSON30
31(441) Duson Sewer System and Street Infrastructure 
32 Improvements, 
33 Planning and Construction
34 (Acadia)
35 Payable from General Obligation Bonds
36	Priority 1	$ 505,000
50/M80ERATH37
38(366) Wastewater Treatment Plant Improvement, 
39 Planning and Construction
40 (Vermilion)
41 Payable from General Obligation Bonds
42	Priority 1	$ 15,600
43(1013)Public Works Facility, Planning and Construction
44 (Vermilion)
45 Payable from General Obligation Bonds
46	Priority 1	$ 7,000
47	Priority 5	$ 40,000
48 Total	$ 47,000
Page 52 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/M85FARMERVILLE1
2(159) Highway 33 South Pump Station and Force
3 Main in Farmerville, Planning and Construction
4 (Union)
5 Payable from General Obligation Bonds
6	Priority 2	$ 550,000
50/M89FLORIEN7
8(911) Village of Florien Town Hall, Planning and 
9 Construction
10 (Sabine)
11 Payable from General Obligation Bonds
12	Priority 1	$ 425,000
50/M90FOLSOM13
14(580) Recreational Park and Trails,
15 Planning and Construction
16 (St. Tammany)
17 Payable from General Obligation Bonds
18	Priority 5	$ 200,000
19(826) Sewer Treatment and Potable Water
20 System Upgrades, Planning and Construction
21 (St. Tammany)
22 Payable from General Obligation Bonds
23	Priority 5	$ 200,000
50/M93FOREST HILL24
25(581) Renovation of Community Facilities, Planning and 
26 Construction ($375,000 Local Match)
27 (Rapides)
28 Payable from General Obligation Bonds
29	Priority 1	$ 39,900
30	Priority 5	$ 523,700
31 Total	$ 563,600
50/M94FRANKLIN32
33(151) Cayce Street Repair, Planning and Construction
34 St. Mary)
35 Payable from General Obligation Bonds
36	Priority 2	$ 150,000
37	Priority 5	$ 2,500,000
38 Total	$2,650,000 
39(1021)Renovation of Old Crowell Elementary Building, 
40 Planning and Construction
41 (St. Mary)
42 Payable from General Obligation Bonds
43	Priority 1	$ 223,800
44	Priority 2	$ 300,000
45	Priority 5	$ 1,065,300
46 Total	$ 1,589,100
Page 53 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/MA3GOLDEN MEADOW1
2(229) Median Turning Lane near Town Hall 
3 (Lafourche)
4 Payable from General Obligation Bonds
5	Priority 1	$ 103,600
6	Priority 5	$ 16,400
7 Total	$ 120,000
8(230) Upgrade to North Sewerage Treatment Plant, 
9 Planning and Construction
10 (Lafourche)
11 Payable from General Obligation Bonds
12	Priority 1	$ 15,200
13	Priority 5	$ 159,800
14 Total	$ 175,000
50/MA6GRAMBLING15
16(1260)Wastewater System Expansion
17 (Lincoln)
18 Payable from General Obligation Bonds
19	Priority 1	$ 5,000
20	Priority 5	$ 190,000
21 Total	$ 195,000
50/MB1GRAND ISLE22
23(852) Historic Recreation Center/Community Center, 
24 Planning and Construction
25 (Jefferson)
26 Payable from General Obligation Bonds
27	Priority 1	$ 17,000
28	Priority 5	$ 824,600
29 Total	$ 841,600
50/MB5GRETNA30
31(925) Hancock Street Canal Improvements (Kepler Street - 
32 Virgil Street), Planning and Construction
33 (Jefferson)
34 Payable from General Obligation Bonds
35	Priority 1	$ 240,300
36	Priority 5	$ 608,700
37 Total	$ 849,000
38(926) Cultural Center for the Arts, Planning and 
39 Construction ($300,000 Local Match, $500,000 
40 Parish Match)
41 (Jefferson)
42 Payable from General Obligation Bonds
43	Priority 1	$ 202,700
Page 54 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(927) Downtown Drainage Improvements, Planning 
2 and Construction
3 (Jefferson)
4 Payable from General Obligation Bonds
5	Priority 1	$1,300,,000
6	Priority 5	$ 1,515,000
7 Total	$ 2,815,000
8(928) City Hall Exterior and Interior Renovation, 
9 Planning and Construction
10 (Jefferson)
11 Payable from General Obligation Bonds
12	Priority 1	$ 60,600
13	Priority 5	$ 2,960,900
14 Total	$ 3,021,500
15(929) Mel Ott Exterior Lighting and Improvements
16 (Jefferson)
17 Payable from General Obligation Bonds
18	Priority 1	$ 23,800
50/MB9HAMMOND19
20(517) Air Traffic Control Tower Elevator, Planning 
21 and Construction 
22 (Tangipahoa)
23 Payable from General Obligation Bonds
24	Priority 5	$ 140,000
25(1032)Gateway to Hammond, Phase I, Planning and 
26 Construction
27 (Tangipahoa)
28 Payable from General Obligation Bonds
29	Priority 1	$ 600,000
50/MC6HENDERSON30
31(546) Henderson Municipal Complex,
32 Planning and Construction
33 (St. Martin)
34 Payable from General Obligation Bonds
35	Priority 1	$ 185,000
36	Priority 5	$ 65,000
37 Total	$ 250,000
50/MD1HORNBECK38
39(469) Improvements to the Compressed Natural Gas 
40 System, Acquisition, Planning and Construction
41 (Vernon)
42 Payable from General Obligation Bonds
43	Priority 1	$ 412,000
Page 55 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(610) Emergency Connection with West Vernon 
2 Waterworks District and Inline Booster Station, 
3 Planning and Construction
4 (Vernon)
5 Payable from General Obligation Bonds
6	Priority 1	$ 75,900
7	Priority 5	$ 95,700
8 Total	$ 171,600
50/ME1JEAN LAFITTE9
10(431) Lafitte Wetlands Museum Addition,
11 Planning and Construction
12 (Jefferson)
13 Payable from General Obligation Bonds
14	Priority 2	$ 700,000
50/ME2JEANERETTE15
16(910) Sewer Treatment Facility Upgrade, Planning and 
17 Construction ($912,500 Federal and/or Local Match)
18 (Iberia)
19 Payable from General Obligation Bonds
20	Priority 1	$ 171,500
21	Priority 5	$ 138,000
22 Total	$ 309,500
50/ME6JONESVILLE23
24(985) Renovations to National Guard Armory Building
25 (Catahoula)
26 Payable from General Obligation Bonds
27	Priority 1	$ 34,300
28	Priority 5	$ 285,700
29 Total	$ 320,000
30(1183)Pumping Station Upgrade, Planning and Construction
31 (Catahoula)
32 Payable from General Obligation Bonds
33	Priority 5	$ 55,000
50/ME8KAPLAN34
35(502) City of Kaplan Street Improvements, Reconstruction
36 and Drainage Improvements Project, 
37 Planning and Construction
38 (Vermilion)
39 Payable from General Obligation Bonds
40	Priority 2	$ 500,000
50/MF4KILLIAN41
42(1336)Killian Police and Fire Joint Operation Building, 
43 Planning and Construction
44 (Livingston)
45 Payable from General Obligation Bonds
46	Priority 1	$ 250,000
Page 56 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/MF9LAKE CHARLES1
2(254) Infrastructure Improvements for Economic Development,
3 Planning and Construction ($2,000,000 Local Match)
4 (Calcasieu)
5 Payable from General Obligation Bonds
6	Priority 5	$ 2,250,000
7(259) Lakefront Development 
8 (Calcasieu)
9 Payable from General Obligation Bonds
10	Priority 5	$ 200,000
11(260) Wastewater Treatment Plant, Plant B/C Force Main
12 Segment No. 2, Planning and Construction ($4,195,000
13 Local Match)
14 (Calcasieu)
15 Payable from General Obligation Bonds
16	Priority 1	$ 2,499,800
17	Priority 5	$ 5,530,000
18 Total	$ 8,029,800
50/MG3LEESVILLE19
20(242) Water System Rehabilitation Including 
21 Generators, Planning and Construction
22 (Vernon)
23 Payable from General Obligation Bonds
24	Priority 5	$ 375,000
25(243) Acquisition of East Central Water System
26 (Vernon)
27 Payable from General Obligation Bonds
28	Priority 1	$ 235,000
29(401) Street Rehabilitation and Extension
30 (Vernon)
31 Payable from General Obligation Bonds
32	Priority 1	$ 755,000
50/MG4LEONVILLE33
34(657) Leonville Boat Launch Facility Improvements
35 Phase II, Planning and Construction
36 (St. Landry)
37 Payable from General Obligation Bonds
38	Priority 2	$ 150,000
50/MG8LIVONIA39
40(196) Sewer Infrastructure Expansion and Improvements
41 (Pointe Coupee)
42 Payable from General Obligation Bonds
43	Priority 1	$ 1,500
Page 57 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/MG9LOCKPORT1
2(862) Lockport Street Improvements, Planning and 
3 Construction
4 (Lafourche)
5 Payable from General Obligation Bonds
6	Priority 1	$ 990,000
50/MH9MANGHAM7
8(410) Mangham Recreation Complex 
9 (Richland)
10 Payable from General Obligation Bonds
11	Priority 1	$ 48,400
12	Priority 5	$ 1,520,000
13 Total	$ 1,568,400
50/MI1MANSFIELD14
15(1143)Wastewater Collection System Improvements, 
16 Planning and Construction
17 (DeSoto)
18 Payable from General Obligation Bonds
19	Priority 5	$ 50,000
50/MI4MARINGOUIN20
21(299) Governmental/Multi-Purpose Facility, 
22 Planning and Construction 
23 (Iberville)
24 Payable from General Obligation Bonds
25	Priority 1	$ 11,900
26	Priority 5	$ 300,000
27 Total	$ 311,900
2850/MI8MAURICE
29(1036)New Village Hall for the Village of Maurice,
30 Planning and Construction
31 (Vermilion)
32 Payable from General Obligation Bonds
33	Priority 5	$ 720,000
50/MJ1MELVILLE34
35(1407)Police Department Renovation, Planning
36 and Construction
37 (St. Landry)
38 Payable from General Obligation Bonds
39	Priority 2	$ 205,000
50/MJ5MINDEN40
41(479) Potable Water Ground Storage Tank, Planning 
42 and Construction
43 (Webster)
44 Payable from General Obligation Bonds
45	Priority 1	$ 145,100
46	Priority 5	$ 686,300
47 Total	$ 831,400
Page 58 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/MJ6MONROE1
2(1286)I-20 Interchange Improvement and Kansas Garrett 
3 Connector, Kansas Lane Connector, Planning and 
4 Construction ($1,000,000 Local and $6,000,000 
5 Federal Match)
6 (Ouachita)
7 Payable from General Obligation Bonds
8	Priority 1	$ 6,369,900
9	Priority 5	$25,600,000
10 Total	$31,969,900
11(1289)Downtown Development District Facilities and 
12 Infrastructure for River Front, Design and Construction 
13 (Ouachita)
14 Payable from General Obligation Bonds
15	Priority 2	$ 150,000
16	Priority 5	$ 100,000
17 Total	$ 250,000
50/MK2MORGAN CITY18
19(1305)Water Plant Improvements, Planning and Construction
20 (St. Mary)
21 Payable from General Obligation Bonds
22	Priority 5	$ 50,000
23(1308)Lake End Parkway Cabins, Planning and Construction
24 (St. Mary)
25 Payable from General Obligation Bonds
26	Priority 1	$ 9,700
50/MK9NATCHITOCHES27
28(1079)Blanchard Road Development, Planning and Construction
29 (Natchitoches)
30 Payable from General Obligation Bonds
31	Priority 5	$ 200,000
32(1080)South Natchitoches Drainage Improvements, including
33 Adjacent Roadwork, Planning and Construction
34 (Natchitoches)
35 Payable from General Obligation Bonds
36	Priority 1	$ 39,000
37	Priority 5	$ 6,000
38 Total	$ 45,000
39(1081)Highland Park Road Bridge, Environmental, 
40 Planning and Construction
41 (Natchitoches)
42 Payable from General Obligation Bonds
43	Priority 5	$ 250,000
50/ML1NEW IBERIA44
45(402) Bayou Teche Museum Expansion and George Rodrigue
46 Park
47 (Iberia)
48 Payable from General Obligation Bonds
49	Priority 2	$ 750,000
Page 59 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(552) Sewer System Improvements,
2 Planning and Construction
3 (Iberia)
4 Payable from General Obligation Bonds
5	Priority 5	$ 250,000
50/ML3NEW ORLEANS6
7(520) Landside Roadways - Louis Armstrong International
8 North Terminal Project, Planning and Construction
9 (Orleans)
10 Payable from General Obligation Bonds
11	Priority 2	$ 2,000,000
12	Priority 5	$ 2,300,000
13 Total	$ 4,300,000
14(523) Fourth District Police Station, Planning and Construction
15 (Orleans)
16 Payable from General Obligation Bonds
17	Priority 1	$ 300,000
18(525) Canal Street East-Bank Ferry Terminal,
19 Planning and Construction
20 (Orleans)
21 Payable from General Obligation Bonds
22	Priority 2	$ 600,000
23	Priority 5	$ 1,000,000
24 Total	$ 1,600,000
25(527) West Bank Park Improvements and George W.
26 Carver Playground Renovations, Including New 
27 Soccer and Recreational Facilities, and Skateboard 
28 Park Planning and Construction
29 (Orleans)
30 Payable from General Obligation Bonds
31	Priority 1	$ 910,900
32	Priority 5	$12,775,400
33 Total	$13,686,300
34Provided, however, that $450,000 of the Priority 1 appropriation and $200,000 of the
35Priority 1 appropriation shall be used to fund the George W. Carver Playground Renovations
36project and the Skateboard Park at the West Bank Park project, respectively.
37(529) New Consolidated Westbank Fire Station, 
38 Planning and Construction
39 (Orleans)
40 Payable from General Obligation Bonds
41	Priority 1	$ 375,000
42(531) Milne Boys Home, Planning and Construction
43 (Orleans)
44 Payable from General Obligation Bonds
45	Priority 1	$ 90,000
46	Priority 2	$ 390,000
47	Priority 5	$ 3,300,000
48 Total	$ 3,780,000
49Provided that the issuance of a line of credit for all or a portion of the funds in Priority 2 or
50Priority 5 shall be subject to the submission of a duly adopted resolution of the City Council
51of New Orleans in support of the Gentilly Development District, which resolution shall be
Page 60 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1submitted to the commissioner of administration, the State Bond Commission, and the
2attorney general.
3(532) West Bank Ferry Terminal Renovations,
4 Planning and Construction
5 (Orleans)
6 Payable from General Obligation Bonds
7	Priority 2	$ 300,000
8	Priority 5	$ 300,000
9 Total	$ 600,000
10(533) Norman Playground Basketball Gym, and 
11 Park Enhancements, Planning and Construction
12 (Orleans)
13 Payable from General Obligation Bonds
14	Priority 1	$ 82,400
15	Priority 5	$ 2,700
16 Total	$ 85,100
17(1113)Historic Algiers Courthouse Renovation, 
18 Planning and Construction
19 (Orleans)
20 Payable from General Obligation Bonds
21	Priority 1	$ 125,000
22(1135)Algiers Playgrounds and Parks, Renovation of Restrooms,
23 Lighting, Fencing, and Playground Equipment
24 (Orleans)
25 Payable from General Obligation Bonds
26	Priority 1	$ 225,900
27	Priority 5	$ 49,100
28 Total	$ 275,000
29(1247)Eastern New Orleans Hospital, Equipment, Acquisition,
30 Installation, Planning and Construction
31 (Orleans)
32 Payable from General Obligation Bonds
33	Priority 1	$ 2,613,000
50/ML4NEW ROADS34
35(1446)Industrial Park Development Project, Planning
36 and Construction
37 (Pointe Coupee)
38 Payable from General Obligation Bonds
39	Priority 5	$ 1,000,000
50/MM3OBERLIN40
41(399) Lift Station Pump and Control Replacement
42 (Allen)
43 Payable from General Obligation Bonds
44	Priority 2	$ 150,000
Page 61 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/MM4OIL CITY1
2(846) Water Distribution System Improvements,
3 Planning and Construction
4 (Caddo)
5 Payable from General Obligation Bonds
6	Priority 5	$ 335,000
7(847) Water Treatment Plant Improvements, Planning and
8 Construction
9 (Caddo)
10 Payable from General Obligation Bonds
11	Priority 1	$ 1,970,000
12	Priority 5	$ 500,000
13 Total	$ 2,470,000
14
50/MM5OLLA15
16(1264)Downtown Area Sidewalk, Ramps, Curbing, and Fencing
17 Enhancements 
18 (LaSalle)
19 Payable from General Obligation Bonds
20	Priority 1	$ 16,200
21	Priority 5	$ 240,000
22 Total	$ 256,200
50/MM6OPELOUSAS23
24(1378)Opelousas Infrastructure Renovation Program, Planning
25 and Construction
26 (St. Landry)
27 Payable from General Obligation Bonds
28	Priority 5	$ 200,000
50/MM8PARKS29
30(708) Municipal Complex, Village Hall, Acquisition, Planning,
31 Construction and Renovation
32 (St. Martin)
33 Payable from General Obligation Bonds
34	Priority 1	$ 185,000
35	Priority 5	$ 680,000
36 Total	$ 865,000
50/MM9PATTERSON37
38(68) Replacement of Water and Gas Meters in Patterson,
39 Planning and Construction
40 (St. Mary)
41 Payable from General Obligation Bonds
42	Priority 5	$ 460,000
Page 62 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/MN5PLAIN DEALING1
2(768) Wastewater Treatment Plant Improvement, Planning and
3 Construction
4 (Bossier)
5 Payable from General Obligation Bonds
6	Priority 1	$ 13,600
7	Priority 5	$ 277,900
8 Total	$ 291,500
50/MN8PLEASANT HILL9
10(1011)Rehabilitate Two Elevated Water Tanks and Rehabilitate
11 Water Well, Planning and Construction
12 (Sabine)
13 Payable from General Obligation Bonds
14	Priority 1	$ 150,000
50/MO1PONCHATOULA15
16(1324)Downtown Parking Lot, Acquisition, Planning and
17 Construction
18 (Tangipahoa)
19 Payable from General Obligation Bonds
20	Priority 1	$ 257,800
50/MO7QUITMAN21
22(986) Wastewater Treatment Plant, Planning and Construction
23 (Jackson)
24 Payable from General Obligation Bonds
25	Priority 2	$ 230,000
50/MO8RAYNE26
27(512) Martin Luther King Community Center Improvements,
28 Planning and Construction
29 (Acadia)
30 Payable from General Obligation Bonds
31	Priority 5	$ 315,000
50/MO9RAYVILLE32
33(984) Water Service Facilities for Economic Development,
34 Planning and Construction 
35 (Richland)
36 Payable from General Obligation Bonds
37	Priority 1	$ 672,200
38	Priority 5	$ 8,022,300
39 Total	$ 8,694,500
40(1105)Wastewater Transport and Treatment Facilities for Economic
41 Development
42 (Richland)
43 Payable from General Obligation Bonds
44	Priority 1	$ 765,400
Page 63 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/MP5RINGGOLD1
2(905) Town Hall/Civic Center Renovations, and Remodeling,
3 Planning and Construction
4 (Bienville)
5 Payable from General Obligation Bonds
6	Priority 1	$ 45,000
7	Priority 2	$ 705,000
8 Total	$ 750,000
50/MP8ROSEDALE9
10(1319)New Fire Station, Planning and Construction
11 (Iberville)
12 Payable from General Obligation Bonds
13	Priority 2	$ 435,000
50/MP9ROSELAND14
15(1158)Community Center, Planning and 
16 Construction
17 (Tangipahoa)
18 Payable from General Obligation Bonds
19	Priority 2	$ 100,000
20	Priority 5	$ 600,000
21 Total	$ 700,000
50/MQ1ROSEPINE22
23(837) Rosepine Wastewater Treatment Plant Improvement,
24 Planning and Construction
25 (Vernon)
26 Payable from General Obligation Bonds
27	Priority 5	$ 1,610,000
50/MQ3ST. FRANCISVILLE28
29(369) Burnet Road Bridge Replacement, Planning and
30 Construction 
31 (West Feliciana)
32 Payable from General Obligation Bonds
33	Priority 1	$ 494,300
50/MQ8SCOTT34
35(446) Apollo Road Extension (Rue Du Belie and
36 Dulles Drive Intersection to Old Spanish Trail
37 and Apollo Road Intersection), Planning and 
38 Construction and Acquisition 
39 (Lafayette)
40 Payable from General Obligation Bonds
41	Priority 2	$ 2,000,000
42	Priority 5	$12,990,000
43 Total	$14,990,000
Page 64 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/MR1SHREVEPORT1
2(1426)C.C. Antoine Museum and Arts Center, Planning and
3 Construction ($64,000 Local Match)
4 (Caddo)
5 Payable from General Obligation Bonds
6	Priority 1	$ 400,000
50/MR2SIBLEY7
8(906) Wastewater Treatment Facilities Improvements, Planning
9 and Construction
10 (Webster)
11 Payable from General Obligation Bonds
12	Priority 1	$ 303,800
50/MS4SPRINGFIELD13
14(434) Water System Planning and Construction 
15 (Livingston)
16 Payable from General Obligation Bonds
17	Priority 1	$ 731,900
18	Priority 2	$ 971,000
19 Total	$ 1,702,900
50/MS5SPRINGHILL20
21(365) Recreational Complex
22 (Webster)
23 Payable from General Obligation Bonds
24	Priority 1	$ 500,000
25	Priority 5	$ 2,975,000
26 Total	$ 3,475,000
27(1195)Wastewater Collection System Improvements, Planning
28 and Construction
29 (Webster)
30 Payable from General Obligation Bonds
31	Priority 5	$ 70,000
50/MS7STERLINGTON32
33(1208)Wastewater Treatment Improvements - Headworks
34 Structure, Planning and Construction
35 (Ouachita)
36 Payable from General Obligation Bonds
37	Priority 1	$ 12,500
38	Priority 5	$ 147,500
39 Total	$ 160,000
50/MS9SULPHUR40
41(222) Upgrade Regional Sewerage Pumping Stations (Arizona
42 and Highway 108), Planning and Construction
43 (Calcasieu)
44 Payable from General Obligation Bonds
45	Priority 1	$ 700,000
46	Priority 5	$ 2,000,000
47 Total	$ 2,700,000
Page 65 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/MT3TALLULAH1
2(974) Emergency Water Production, Transmission and
3 Treatment, Acquisition, Planning and Construction
4 (Madison)
5 Payable from General Obligation Bonds
6	Priority 5	$ 500,000
50/MT4TANGIPAHOA7
8(1327)Community Center, Planning and Construction
9 (Tangipahoa)
10 Payable from General Obligation Bonds
11	Priority 5	$ 621,000
50/MT6TICKFAW12
13(715) Tickfaw Police Station,
14 Planning and Construction
15 (Tangipahoa)
16 Payable from General Obligation Bonds
17	Priority 5	$ 250,000
50/MU2VIDALIA18
19(806) Development of a Slackwater Port on the Mississippi
20 River, Planning and Construction
21 (Concordia)
22 Payable from General Obligation Bonds
23	Priority 1	$ 8,908,400
24	Priority 5	$ 4,250,000
25 Total	$13,158,400
50/MU4VILLE PLATTE26
27(1047)Ville Platte Evangeline Recreational
28 Park, Planning and Construction, Infrastructure
29 and Improvements
30 (Evangeline)
31 Payable from General Obligation Bonds
32	Priority 2	$ 1,500,000
50/MU6VIVIAN33
34(947) Water and Wastewater System Improvements and
35 Extension, Planning and Construction
36 (Caddo)
37 Payable from General Obligation Bonds
38	Priority 1	$ 60,500
39	Priority 5	$ 872,100
40 Total	$ 932,600
50/MV3WESTLAKE41
42(593) Police and Emergency Response Facility, Planning and
43 Construction
44 (Calcasieu)
45 Payable from General Obligation Bonds
46	Priority 1	$ 1,000,000
Page 66 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(659) Golf Course Development, Planning and Development
2 ($5,000,000 Local/Other Match Consisting of Cash
3 and/or In-Kind, with First Year not to Exceed $200,000)
4 (Calcasieu)
5 Payable from General Obligation Bonds
6	Priority 5	$ 2,110,000
7(914) New Water Well, Planning and Construction
8 (Calcasieu)
9 Payable from General Obligation Bonds
10	Priority 1	$ 550,000
50/MV4WESTWEGO11
12(572) The WHARF, Planning, Construction, 
13 and Site Preparation
14 (Jefferson)
15 Payable from General Obligation Bonds
16	Priority 1	$ 200,000
17	Priority 5	$ 7,200,000
18 Total	$ 7,400,000
19(594) Park Land and Improvements, Including Improvements
20 to Existing Parks and Land Acquisition, Planning and
21 Construction
22 (Jefferson)
23 Payable from General Obligation Bonds
24	Priority 1	$ 1,402,200
25	Priority 2	$ 723,500
26 Total	$ 2,125,700
27(650) Sala Avenue Street and Infrastructure Improvements 
28 (Jefferson)
29 Payable from General Obligation Bonds
30	Priority 1	$ 400,000
31	Priority 5	$ 600,000
32 Total	$ 1,000,000
33(658) Riverboat Landing Phase IV, Planning and Construction
34 ($200,000 Local Match)
35 (Jefferson)
36 Payable from General Obligation Bonds
37	Priority 1	$ 143,100
38(676) Drainage Improvements, Phase I
39 (Jefferson)
40 Payable from General Obligation Bonds
41	Priority 1	$ 47,300
42	Priority 5	$ 26,700
43 Total	$ 74,000
44(706) Street Improvements, including the Placement of Fire
45 Hydrants, Planning and Construction
46 (Jefferson)
47 Payable from General Obligation Bonds
48	Priority 1	$ 500,000
49	Priority 5	$ 500,000
50 Total	$ 1,000,000
Page 67 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(710) Emergency Preparedness Building, Planning and
2 Construction
3 (Jefferson)
4 Payable from General Obligation Bonds
5	Priority 1	$ 1,105,000
6	Priority 5	$ 600,000
7 Total	$ 1,705,000
8(717) Farmers/Fisheries Market, Planning and Construction
9 (Jefferson)
10 Payable from General Obligation Bonds
11	Priority 5	$ 66,600
12(725) Water Tower, Line and Improvements 
13 (Jefferson)
14 Payable from General Obligation Bonds
15	Priority 1	$ 450,000
16(733) Water Plant Improvements, Planning and Construction
17 (Jefferson)
18 Payable from General Obligation Bonds
19	Priority 1	$ 2,883,200
20(775) Performing Arts Center/Community Center Renovations,
21 Planning, Construction and Equipment
22 (Jefferson)
23 Payable from General Obligation Bonds
24	Priority 5	$ 1,000,000
25 Payable from the balance of Series 94A (08T-02)$ 400
26 Total	$ 1,000,400
27(1061)Fire Station, Planning and Construction
28 (Jefferson)
29 Payable from General Obligation Bonds
30	Priority 1	$ 4,100,000
31	Priority 5	$ 300,000
32 Total	$ 4,400,000
50/MV7WINNFIELD33
34(1171)Port DeLuce Reservoir, Planning and Construction 
35 (Winn)
36 Payable from General Obligation Bonds
37	Priority 1	$ 496,200
38	Priority 5	$ 3,800
39 Total	$ 500,000
50/MV8WINNSBORO40
41(1033)Winnsboro Farmer's Market, Planning and Construction 
42 (Franklin)
43 Payable from General Obligation Bonds
44	Priority 1	$ 203,800
Page 68 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/MW2YOUNGSVILLE1
2(541) Infrastructure Improvements for the Youngsville Sports
3 Complex, Planning and Construction
4 (Lafayette)
5 Payable from General Obligation Bonds
6	Priority 1	$ 112,800
7	Priority 5	$ 150,000
8 Total	$ 262,800
50/MW3ZACHARY9
10(275) Water System Improvements, Planning and Construction 
11 (East Baton Rouge)
12 Payable from General Obligation Bonds
13	Priority 1	$ 1,300,000
14	Priority 2	$ 250,000
15	Priority 5	$ 330,000
16 Total	$ 1,880,000
50/MW8CENTRAL17
18(859) Administration Building
19 (East Baton Rouge)
20 Payable from General Obligation Bonds
21	Priority 1	$ 61,800
22	Priority 5	$ 399,500
23 Total	$ 461,300
50/N02TULANE UNIVERSITY24
25(436) Tulane River and Coastal Center, Planning and
26 Construction
27 (Orleans)
28 Payable from General Obligation Bonds
29	Priority 1	$ 1,500,000
30	Priority 2	$ 1,000,000
31 Total	$ 2,500,000
50/N03THE AUDUBON INSTITUTE, INC.32
33(967) Audubon 2020 Exhibits
34 (Orleans)
35 Payable from General Obligation Bonds
36	Priority 1	$ 4,711,100
37	Priority 2	$ 5,000,000
38	Priority 5	$42,000,000
39 Total	$51,711,100
40Provided that the Priority 2 appropriation shall be used for the Audubon Aquarium in
41Downtown New Orleans.
50/N05NEW ORLEANS EXHIBITION HALL AUTHORITY42
43(920) Property Development Project
44 (Orleans)
45 Payable from General Obligation Bonds
46	Priority 5	$25,000,000
Page 69 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/N12LOUISIANA CHILDREN'S MUSEUM1
2(1049)Early Learning Village, Planning, Design, Construction
3 and Equipment
4 (Orleans)
5 Payable from General Obligation Bonds
6	Priority 1	$15,851,700
7	Priority 5	$11,471,300
8 Total	$27,323,000
50/N18IBERIA PARISH AIRPORT AUTHORITY9
10(1111)Rehabilitation of Hangar #88 and Associated Parking Lot,
11 Planning and Construction
12 (Iberia)
13 Payable from General Obligation Bonds
14	Priority 1	$ 500,000
15	Priority 2	$ 1,000,000
16 Total	$ 1,500,000
50/N25WYES TV NEW ORLEANS17
18(1046)WYES Katrina Rebuilding/Equipment Project 
19 (Orleans)
20 Payable from General Obligation Bonds
21	Priority 1	$ 2,504,600
50/N33ENGLAND ECONOMIC AND INDUSTRIAL 22
23 DEVELOPMENT DISTRICT
24(536) New Town Industrial Park Infrastructures Westside
25 of Airfield, Acquisition, Planning and Construction
26 (Rapides)
27 Payable from General Obligation Bonds
28	Priority 1	$ 1,000,000
29	Priority 2	$ 1,300,000
30	Priority 5	$ 8,510,000
31 Total	$10,810,000
32(537) Warehouse/Distribution Complex, Planning and
33 Construction
34 (Rapides)
35 Payable from General Obligation Bonds
36	Priority 5	$ 200,000
50/N34ODYSSEY HOUSE LOUISIANA, INC.37
38(652) Odyssey House Louisiana Renovation Project, Planning
39 and Construction
40 (Orleans)
41 Payable from General Obligation Bonds
42	Priority 1	$ 2,022,700
43	Priority 5	$ 3,877,300
44 Total	$ 5,900,000
Page 70 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/N41BATON ROUGE METRO AIRPORT1
2(516) Airport Aviation Business Park, Planning and
3 Construction
4 (East Baton Rouge)
5 Payable from General Obligation Bonds
6	Priority 1	$ 700,000
7	Priority 5	$ 500,000
8 Total	$ 1,200,000
950/N71NORTH LAFOURCHE CONSERVATION LEVEE
10 AND DRAINAGE DISTRICT
11(979) Bayou Blue - Hollywood Flood Protection
12 Project, Planning and Construction
13 (Lafourche)
14 Payable from General Obligation Bonds
15	Priority 2	$ 500,000
16	Priority 5	$ 1,145,000
17 Total	$ 1,645,000
50/N74THE NATIONAL WORLD WAR II MUSEUM, INC.18
19(364) Capital Expansion Project, including Parking Structure,
20 Skybridge, Andrew Higgins Plaza, Train Station
21 Experience and Canopy, Planning and Construction
22 (Orleans)
23 Payable from General Obligation Bonds
24	Priority 1	$ 6,260,000
25	Priority 5	$13,900,000
26 Total	$20,160,000
50/N98KINGSLEY HOUSE, INC.27
28(832) Kingsley House Acquisition, Renovations, New
29 Construction and Major Repairs
30 (Orleans)
31 Payable from General Obligation Bonds
32	Priority 1	$ 171,700
33	Priority 5	$ 100
34 Total	$ 171,800
50/NA2LAFAYETTE AIRPORT COMMISSION35
36(895) Construction of a New Passenger Facility Terminal at
37 Lafayette Regional Airport, Planning and Construction
38 (Lafayette)
39 Payable from General Obligation Bonds
40	Priority 1	$ 1,300,000
41	Priority 2	$ 2,000,000
42	Priority 5	$10,200,000
43 Total	$13,500,000
Page 71 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/NAJEFFORTS OF GRACE, INC.1
2(932) Ashe Too, Planning and Construction 
3 (Orleans)
4 Payable from General Obligation Bonds
5	Priority 1	$ 11,700
6	Priority 5	$ 3,300
7 Total	$ 15,000
50/NBBTHE LIGHTHOUSE FOR THE BLIND 8
9 IN NEW ORLEANS, INCORP ORATED
10(1315)Economic Development Project, Planning and 
11 Construction
12 (Orleans)
13 Payable from General Obligation Bonds
14	Priority 1	$ 4,205,100
15
50/NBCCAPITOL CITY FAMILY HEALTH CENTER16
17(663) Federally Qualified Health Centers, Acquisitions, 
18 Planning and Construction
19 (Ascension, East Baton Rouge)
20 Payable from General Obligation Bonds
21	Priority 1	$ 35,000
22	Priority 5	$ 100,000
23 Total	$ 135,000
50/NBKYMCA OF THE CAPITAL AREA24
25(70) Capital Area YMCA - Long Farms, Acquisition, 
26 Planning and Construction
27 (East Baton Rouge)
28 Payable from General Obligation Bonds
29	Priority 5	$ 100,000
50/NC2BATON ROUGE RECREATION AND PARKS COMMISSION30
31(694) Children's Museum, Planning and Construction 
32 ($5,000,000 Local Match)
33 (East Baton Rouge)
34 Payable from General Obligation Bonds
35	Priority 1	$ 174,700
36	Priority 5	$ 145,000
37 Total	$ 319,700
38(695) Anna T. Jordan Site and Facility Improvements 
39 (Non-State Match Required)
40 (East Baton Rouge)
41 Payable from General Obligation Bonds
42	Priority 1	$ 93,100
43	Priority 5	$ 150,000
44 Total	$ 243,100
Page 72 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(696) Central Community Sports Park, Planning and 
2 Construction
3 (East Baton Rouge)
4 Payable from General Obligation Bonds
5	Priority 1	$ 16,600
6	Priority 5	$ 255,000
7 Total	$ 271,600
50/NCCARCHDIOCESE OF NEW ORLEANS8
9(1028)Preservation and Restoration of Historic Structures for
10 Hope Haven/Madonna Manor Campus, Planning and
11 Construction
12 (Jefferson)
13 Payable from General Obligation Bonds
14	Priority 1	$ 1,000,000
15	Priority 5	$ 4,000,000
16 Total	$ 5,000,000
50/NCJWATERWORK S DISTRICT 14 CALCASIEU PARISH17
18(221) Replacement of Old Starks Water System Lines and
19 Plugging of Old Wells, Planning and Construction
20 (Calcasieu)
21 Payable from General Obligation Bonds
22	Priority 5	$ 50,000
50/NDNOPPORTUNITIES INDUSTRIALIZ ATION 23
24 CENTER INCORPORATED OF OUACHITA
25(582) New Education Building, Planning and Construction
26 (Ouachita)
27 Payable from General Obligation Bonds
28	Priority 1	$ 100,000
29	Priority 2	$ 50,000
30	Priority 5	$ 255,000
31 Total	$ 405,000
50/NGALINCOLN PARISH FIRE PROTECTION DISTRICT #132
33(1313)Renovations to Existing Facility and Additional
34 Buildings, Acquisition, Planning and Construction
35 (Lincoln)
36 Payable from General Obligation Bonds
37	Priority 5	$ 120,000
50/NGQTHE STRAND THEATRE OF SHREVEPORT 38
39 CORPORATION
40(460) Repair and Renovation to the Strand Theatre of 
41 Shreveport
42 (Caddo)
43 Payable from General Obligation Bonds
44	Priority 1	$ 26,600
45	Priority 5	$ 984,000
46 Total	$ 1,010,600
Page 73 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/NGYLINCOLN PARISH SHERIFF'S OFFICE1
2(1007)Safety Town, Planning and Construction
3 (Lincoln)
4 Payable from General Obligation Bonds
5	Priority 2	$ 323,750
50/NJ7BLOOD CENTER PROPERTIES, INC.6
7(1199)Generator, Auxiliary Tank, and Transfer Switch Project
8 for Blood Center Properties in Lake Charles, Planning
9 and Construction
10 (Calcasieu)
11 Payable from General Obligation Bonds
12	Priority 2	$ 60,000
50/NJ9DRYADES YMCA13
14(1026)Major Repairs and Deferred Maintenance to Dryades
15 YMCA Building and Facilities, Planning
16 and Construction
17 (Orleans)
18 Payable from General Obligation Bonds
19	Priority 2	$ 500,000
50/NJPWATERWORK S DISTRICT #1 DESOTO PARISH20
21(1325)Water System Improvements and Extension, 
22 Planning and Construction ($1,977,300 Local Match)
23 (DeSoto)
24 Payable from General Obligation Bonds
25	Priority 1	$ 5,000
26	Priority 5	$ 290,000
27 Total	$ 295,000
50/NJZGRAVITY DRAINAGE DISTRICT #8 CALCASIEU28
29(397) Belfield Ditch Drainage Improvement Project, Planning
30 and Construction
31 (Calcasieu)
32 Payable from General Obligation Bonds
33	Priority 1	$ 910,000
50/NLMFOUNDATION FOR SCIENCE AND 34
35 MATHEMATICS EDUCATION
36(983) Model for a 21st Century Workforce
37 Development Urban High School - 
38 New Orleans Science and Mathematics
39 High School
40 (Orleans)
41 Payable from General Obligation Bonds
42	Priority 5	$ 3,000,000
Page 74 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/NM3NATCHITOCHES VOLUNTEER COUNCIL 1
2 ON AGING, INC.
3(1246)Reconstruction and Renovations to Natchitoches Parish
4 Council on Aging Office and Activities Building,
5 Planning and Construction
6 (Natchitoches)
7 Payable from General Obligation Bonds
8	Priority 1	$ 4,000
50/NMBWATERWORK S DISTRICT #1 OF WARD #1 9
10 OF CALCASIEU PARISH
11(891) Topsy Road Waterline Improvements (Welcome Road to
12 Parish Road), Planning and Construction
13 (Calcasieu)
14 Payable from General Obligation Bonds
15	Priority 1	$ 225,000
50/NMDBELMONT WATERWORK S, INC.16
17(1204)Water System Improvements, Planning and Construction 
18 (Sabine)
19 Payable from General Obligation Bonds
20	Priority 1	$ 499,700
21	Priority 5	$ 875,700
22 Total	$ 1,375,400
50/NMGLIVINGSTON ASSOCIATION FOR RETARDED 23
24 CHILDREN, INC.
25(1215)New Facility for Livingston Association for Retarded
26 Children, Inc. Planning and Construction
27 (Livingston)
28 Payable from General Obligation Bonds
29	Priority 1	$ 530,000
50/NMLCITY OF GRETNA POLICE DEPARTMENT30
31(584) Gretna Police Department, Construction of Armory,
32 Elevation/Flood Proofing/Wind Retrofit, Planning and
33 Construction
34 (Jefferson)
35 Payable from General Obligation Bonds
36	Priority 1	$ 3,106,400
50/NNLHUNGARIAN SETTLEMENT HISTORICAL 37
38 SOCIETY, INC.
39(993) Hungarian Settlement Historical Museum, Planning and
40 Construction
41 (Livingston)
42 Payable from General Obligation Bonds
43	Priority 1	$ 172,000
44	Priority 5	$ 360,200
45 Total	$ 532,200
Page 75 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/NNRWASHINGTON PARISH RECREATION 1
2 DISTRICT #1
3(388) Multi-Purpose Recreation Facility, Land
4 Acquisition, Master Planning, Design, and
5 Construction
6 (Washington)
7 Payable from General Obligation Bonds
8	Priority 2	$ 246,000
9	Priority 5	$ 100,000
10 Total	$ 346,000
11(918) Right Turn Lane Entrance into Recreation
12 Facility, Planning and Construction
13 (Washington)
14 Payable from General Obligation Bonds
15	Priority 2	$ 204,000
50/NNWBEAUREGARD PARISH WATERWORK S 16
17 DISTRICT #3
18(322) Longacre Road Water Plant Improvements, Planning and
19 Construction
20 (Beauregard)
21 Payable from General Obligation Bonds
22	Priority 5	$ 50,000
50/NP1ACADIANA CRIMINALITIES LAB23
24(534) New Crime Laboratory, Planning, Design, Construction 
25 and Equipment
26 (Iberia)
27 Payable from General Obligation Bonds
28	Priority 2	$ 2,000,000
29	Priority 5	$ 2,000,000
30 Total	$ 4,000,000
50/NP3BAYOU LAFOURCHE FRESH WATER DISTRICT31
32(991) Donaldsonville Flood Control, Planning and Construction
33 (Ascension, Assumption, Lafourche, Terrebonne)
34 Payable from General Obligation Bonds
35	Priority 1	$ 765,000
50/NPDIBERIA ECONOMIC DEVELOP MENT AUTHORITY36
37(711) Progress Point Business Park and Airport Gateway, Land
38 Acquisition, Planning and Construction
39 (Iberia)
40 Payable from General Obligation Bonds
41	Priority 1	$ 2,352,200
50/NQVBEAUREGARD WATERWORK S DISTRICT #642
43(323) Water System Improvements, Planning and Construction
44 (Beauregard)
45 Payable from General Obligation Bonds
46	Priority 1	$ 78,500
47	Priority 5	$ 1,505,000
48 Total	$ 1,583,500
Page 76 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/NQWCALCASIEU WATERWORK S DISTRICT #101
2(246) New Water System, Planning and Construction
3 (Calcasieu)
4 Payable from General Obligation Bonds
5	Priority 5	$ 750,000
50/NQYWESTON WATER SYSTEM, INC.6
7(1266)Water Distribution System Expansion - 
8 Caney Lake Extension 
9 (Jackson)
10 Payable from General Obligation Bonds
11	Priority 1	$ 278,800
50/NRDSOUTH BEAUREG ARD PARISH RECREATION 12
13 DISTRICT #2
14(1133)Multi-Purpose Recreation Facility, Planning 
15 and Construction
16 (Beauregard)
17 Payable from General Obligation Bonds
18	Priority 1	$ 93,000
50/NRHDIXIE BUSINESS CENTER19
20(896) Demco Drive Improvements, Planning,
21 Acquisition, Demolition and Construction
22 (Livingston)
23 Payable from General Obligation Bonds
24	Priority 2	$ 325,000
50/NRONATCHITOCHES COMMUNICATIONS DISTRICT25
26(413) Natchitoches Parish Emergency Communications 
27 District, Planning and Construction
28 (Natchitoches)
29 Payable from General Obligation Bonds
30	Priority 1	$ 2,800,000
50/NSESABINE PARISH WATER DISTRICT #131
32(1275)New Production Water Well, Planning and Construction
33 (Sabine)
34 Payable from General Obligation Bonds
35	Priority 1	$ 23,600
36	Priority 5	$ 6,700
37 Total	$ 30,300
50/NSMNATCHITOCHES VETERANS MEMORIAL 38
39 PARK COMMISSION
40(1375)Natchitoches Veterans and Memorial Park, 
41 Planning and Construction
42 (Natchitoches)
43 Payable from General Obligation Bonds
44	Priority 1	$ 26,600
Page 77 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/NSPEDEN HOUSE1
2(1064)New Facility, Acquisition, Planning and Construction
3 (Orleans)
4 Payable from General Obligation Bonds
5	Priority 1	$ 11,700
6	Priority 5	$ 500,100
7 Total	$ 511,800
50/NSXMOREHOUSE PARISH SHERIFF8
9(1206)Operations Center Relocation, Site Development, 
10 Renovations and Improvements, Planning and 
11 Construction ($130,000 Local Match)
12 (Morehouse)
13 Payable from General Obligation Bonds
14	Priority 1	$ 273,300
15	Priority 5	$ 14,400
16 Total	$ 287,700
50/NTBCALCASIEU WATERWORK S DISTRICT 12 WARD 317
18(730) Waterworks District 12, Ward 3 - Water System 
19 Improvements, Planning and Construction
20 (Calcasieu)
21 Payable from General Obligation Bonds
22	Priority 1	$ 1,734,000
50/NTGTERREBONNE PARISH RECREATION 23
24 DISTRICTS 2 AND 3
25(488) Terrebonne Sports Complex, Phase I, Infrastructure
26 Improvements, Acquisition, Planning and Construction
27 (Terrebonne)
28 Payable from General Obligation Bonds
29	Priority 1	$ 677,700
30	Priority 5	$ 1,984,000
31 Total	$ 2,661,700
50/NTKTHE UNION LINCOLN REG IONAL WATER 32
33 SUPPLY INITIATIVE
34(1175)Development of Alternative Water Supply from Lake
35 D'Arbonne for Lincoln and Union Parishes
36 (Lincoln, Union)
37 Payable from General Obligation Bonds
38	Priority 1	$ 1,710,000
39	Priority 5	$ 2,400,000
40 Total	$ 4,110,000
50/NTLGIRL SCOUTS LOUISIANA EAST41
42(575) Emergency Repairs to Lake Valve and
43 Spillway at Girl Scout Camp Whispering Pines
44 (Tangipahoa)
45 Payable from General Obligation Bonds
46	Priority 2	$ 100,000
47	Priority 5	$ 850,000
48 Total	$ 950,000
Page 78 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/NUJHAMMOND AREA RECREATION DISTRICT 11
2(933) Parking Lot for Hammond Area Recreation District No.
3 1, Planning and Construction
4 (Tangipahoa)
5 Payable from General Obligation Bonds
6	Priority 1	$ 80,500
7	Priority 5	$ 100,500
8 Total	$ 181,000
50/NUOHOUSTON RIVER WATERWORK S DISTRICT 119
10(247) Elevated Water Tank and Associated Piping, Planning
11 and Construction
12 (Calcasieu)
13 Payable from General Obligation Bonds
14	Priority 1	$ 605,000
50/NUVMONROE DOWNTOWN ECONOMIC 15
16 DEVELOPMENT DISTRICT
17(887) Monroe Riverwalk, Planning and Construction
18 (Ouachita)
19 Payable from General Obligation Bonds
20	Priority 1	$ 113,500
21	Priority 5	$ 76,200
22 Total	$ 189,700
50/NUWTERREBONNE PARISH RECREATION DISTRICT #1123
24(367) Mechanicville Gym - Multi-Purpose Building, Planning
25 and Construction
26 (Terrebonne)
27 Payable from General Obligation Bonds
28	Priority 1	$ 231,700
29	Priority 5	$ 16,500
30 Total	$ 248,200
50/NVZBORDELONVILLE VOLUNTEER F IRE DEPARTMENT31
32(535) Roof Repairs to Fire Department Building, Planning and
33 Construction
34 (Avoyelles)
35 Payable from General Obligation Bonds
36	Priority 1	$ 105,000
50/NWBLOUISIANA LAKES CONSERVANCY37
38(605) Louisiana Lakes Conservancy, Planning and Construction
39 (East Baton Rouge)
40 Payable from General Obligation Bonds
41	Priority 5	$ 50,000
Page 79 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/NWMNORTH DELTA REG IONAL PLANNING AND1
2 ECONOMIC DEVELOP MENT DISTRICT, INC.
3(1256)North Delta Innovation Technology and
4 Disaster Recovery Center
5 (Ouachita)
6 Payable from General Obligation Bonds
7	Priority 5	$ 950,000
50/NWQCHENIER PLAIN COASTAL RESTORATION 8
9 AND PROTECTION AUTHORITY
10(1309)Boston Canal/Vermilion Bay Bank Stabilization
11 (Vermilion)
12 Payable from General Obligation Bonds
13	Priority 1	$ 65,000
14	Priority 2	$ 500,000
15	Priority 5	$ 250,000
16 Total	$ 815,000
17
50/NWRLOUISIANA SWAMP BASE, INC.18
19(302) Camp Atchafalaya Swamp Base, Planning, Design and
20 Construction
21 (St. Martin)
22 Payable from General Obligation Bonds
23	Priority 5	$ 1,780,000
50/NWSLAFAYETTE CENTRAL P ARK, INC.24
25(317) Lafayette Central Park Improvements 
26 (Lafayette)
27 Payable from General Obligation Bonds
28	Priority 5	$ 2,000,000
50/NXAOUR LADY OF THE LAKE REGIONAL 29
30 MEDICAL CENTER
31(779) Our Lady of the Lake Regional Medical Center, Mid-City
32 Neighborhood Clinic and Urgent Care Center, Planning
33 and Construction
34 (East Baton Rouge)
35 Payable from General Obligation Bonds
36	Priority 1	$ 1,500,000
37	Priority 2	$ 1,000,000
38	Priority 5	$10,000,000
39 Total	$12,500,000
4050/NXBGLOBAL FOUNDATION FOR BETTER EDUCATION,
41 HEALTH, AND ENVIRONMENT, INC.
42(604) Urgent Care Facility, Planning and Construction
43 (East Baton Rouge)
44 Payable from General Obligation Bonds
45	Priority 2	$ 50,000
Page 80 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/NXEOCHSNER HEALTH SYSTEM1
2(57) Ochsner Transplant Center of Excellence,
3 Planning and Construction
4 (Jefferson)
5 Payable from General Obligation Bonds
6	Priority 1	$ 2,500,000
7	Priority 5	$12,500,000
8 Total	$15,000,000
50/NXNLOUISIANA CHILDREN'S MEDICAL CENTER HEALTH9
10(1284)Children's Hospital New Orleans Behavioral Health
11 Hospital, Planning and Construction
12 (Orleans)
13 Payable from General Obligation Bonds
14	Priority 2	$ 2,000,000
15	Priority 5	$11,000,000
16 Total	$13,000,000
50/NYIKENNER DISCOVERY HEALTH SCIENCES17
18 ACADEMY HIGH SCHOOL
19(1401)Installation of Temporary, Modular Space for
20 Kenner Discovery Health Sciences Academy
21 High School, Planning and Construction
22 (Jefferson)
23 Payable from General Obligation Bonds
24	Priority 2	$ 350,000
50/S10CALCASIEU PARISH SCHOOL BOARD25
26(1034)Renovations to Lake Charles Boston Stadium, Planning
27 and Construction
28 (Calcasieu)
29 Payable from General Obligation Bonds
30	Priority 1	$ 177,000
31	Priority 5	$ 823,000
32 Total	$ 1,000,000
50/S18EAST CARROLL PARISH SCHOOL BOARD33
34(352) Administration Building, Acquisition and Renovation,
35 Planning and Construction
36 (East Carroll)
37 Payable from General Obligation Bonds
38	Priority 5	$ 280,000
50/S63WEST FELICIANA PARISH SCHOOL BOARD39
40(343) Julius Freyhan Cultural/Conference Center, Planning and
41 Construction
42 (West Feliciana)
43 Payable from General Obligation Bonds
44	Priority 1	$ 101,000
45	Priority 5	$ 2,999,000
46 Total	$ 3,100,000
Page 81 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1 Section 1.A.  The projects in this Section did not submit a capital outlay request for
2Fiscal Year 2017-2018 by November 1, 2016, in compliance with the provisions of Act 419
3of the 2016 Regular Session of the Legislature and therefore these projects are not eligible
4for cash or non-cash lines of credit for Fiscal Year 2017-2018.  The appropriations made in
5this Section are intended to provide funding to satisfy commitments  made against general
6obligation bond cash lines of credit granted for appropriations in Act 16 of the 2016 Second
7Extraordinary Session of the Louisiana Legislature.  However, because the projects in this
8Section are not in compliance with the provisions of Act 419 of the 2016 Regular Session
9of the Legislature, the appropriations for the projects in this Section require separate
10statutory change to existing law in order to be eligible for cash and non-cash lines of credit
11and therefore, the proposed appropriations for these projects are pending that effective
12statutory change.
ELECTED OFFICIALS13
04/160DEPARTMENT OF AGRICULTURE AND FORESTRY14
15(1451)Louisiana Animal Disease Diagnostic Laboratory,
16 Planning and Construction
17 (Statewide)
18 Payable from General Obligation Bonds
19	Priority 1	$ 9,600
DEPARTMENT OF CULTURE, RECREATION, AND TOURISM20
06/A20NEW ORLEANS CITY P ARK21
22(1458)City Park Golf Complex Improvements, Planning and
23 Construction
24 (Orleans)
25 Payable from General Obligation Bonds
26	Priority 1	$ 919,300
27(1459)Splash Park, Planning and Construction
28 (Orleans)
29 Payable from General Obligation Bonds
30	Priority 1	$ 189,000
06/A98LOUISIANA NAVAL WAR MEMORIAL COMMISSION31
32(1447)HVAC Replacement and Repair, Planning
33 and Construction
34 (East Baton Rouge)
35 Payable from General Obligation Bonds
36	Priority 2	$ 139,000
Page 82 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
DEPARTMENT OF TRANSPORTATION AND DEVELOP MENT1
07/270ADMINISTRATION2
3(1640)Highway 91 Overlay within the City Limits
4 of Eunice
5 (Acadia, St. Landry)
6 Payable from General Obligation Bonds
7	Priority 2	$ 500,000
8	Priority 5	$ 1,200,000
9 Total	$ 1,700,000
DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS10
08/407WINN CORRECTIONAL CENTER11
12(1462)Sanitation Code Violations, Planning and Construction
13 (Winn)
14 Payable from General Obligation Bonds
15	Priority 1	$ 3,400
08/409DIXON CORRECTIONAL INSTITUTE16
17(1624)Emergency Generators, Planning and Construction
18 (East Feliciana)
19 Payable from the balance of Series 94A (08T-02)$ 562
LOUISIANA DEPARTMENT OF HEALTH20
09/320OFFICE OF AGING AND ADULT SERVICES21
22(1464)Replace Roof and Storm Drains on all Patient
23 Buildings, Planning and Construction
24 (East Feliciana)
25 Payable from General Obligation Bonds
26	Priority 1	$ 606,800
27(1625 )Replace Fire Alarm and Sprinkler System, 
28 Planning and Construction
29 (East Feliciana)
30 Payable from the balance of Series 94A (08T-02) $ 188
09/330OFFICE OF BEHAVIORAL HEALTH31
32(1465)New South Louisiana Human Services Authority
33 Administrative Building, Land Acquisition, Planning
34 and Construction
35 (Terrebonne)
36 Payable from General Obligation Bonds
37	Priority 1	$ 985,000
09/340OFFICE FOR CITIZENS WITH DEVELOP MENTAL 38
39 DISABILITIES
40(1466)Replace Rooftop Air Conditioning Units on Residential
41 Homes, Planning and Construction
42 (Tangipahoa)
43 Payable from General Obligation Bonds
44	Priority 1	$ 143,700
Page 83 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
LOUISIANA WORK FORCE COMMISSION1
14/474OFFICE OF WORKFORCE DEVELOPMENT2
3(1467)Renovations to Louisiana Workforce Commission's
4 Administrative Headquarters, Planning and
5 Construction
6 (East Baton Rouge)
7 Payable from General Obligation Bonds
8	Priority 1	$ 32,100
DEPARTMENT OF EDUCATION9
19/612BATON ROUGE COMMUNITY COLLEG E10
11(1468)Office of Motor Vehicle Building and Campus
12 Renovation, Demolition and Improvements, Planning
13 and Construction
14 (East Baton Rouge)
15 Payable from General Obligation Bonds
16	Priority 1	$ 53,100
19/616SOUTHERN UNIVERSITY BATON ROUG E17
18(1469)Fire Detection and Alarm System Upgrades, Planning
19 and Construction
20 (East Baton Rouge)
21 Payable from General Obligation Bonds
22	Priority 1	$ 29,600
23(1470)Major Repairs to F.G. Clark Activity Center
24 (East Baton Rouge)
25 Payable from General Obligation Bonds
26	Priority 1	$ 163,100
27(1471)A.O. Williams Hall Renovations
28 (East Baton Rouge)
29 Payable from General Obligation Bonds
30	Priority 1	$ 160,400
31(1629 )Provide Localized Boilers and Replace Chilled Water Loop
32 (East Baton Rouge)
33 Payable from the balance of Series 94A (08T-02)$ 400
19/621NICHOLLS STATE UNIVERSITY34
35(1472)Renovation of Athletic Training and Meeting Facility,
36 Planning and Construction
37 (Lafourche)
38 Payable from General Obligation Bonds
39	Priority 1	$ 254,600
40(1473)Fieldhouse, Planning and Construction
41 (Lafourche)
42 Payable from General Obligation Bonds
43	Priority 1	$ 84,700
Page 84 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
19/625LOUISIANA TECH UNIVERSITY1
2(1474)Water Distribution System Repairs and Improvements
3 (Lincoln)
4 Payable from General Obligation Bonds
5	Priority 1	$ 31,400
6(1475)Visual Arts Building Renovation for Business, Planning
7 and Construction
8 (Lincoln)
9 Payable from General Obligation Bonds
10	Priority 1	$ 53,000
19/627MCNEESE STATE UNIVERSITY11
12(1476)Alpha Hall Renovations, Planning and Construction
13 (Calcasieu)
14 Payable from General Obligation Bonds
15	Priority 1	$ 531,700
16(1477)Frazar Memorial Library Renovation and Repairs,
17 Planning and Construction
18 (Calcasieu)
19 Payable from General Obligation Bonds
20	Priority 1	$ 420,000
21(1478)Campus-Wide Elevator Repairs, Planning and
22 Construction
23 (Calcasieu)
24 Payable from General Obligation Bonds
25	Priority 1	$ 3,150
19/631NORTHWESTERN STATE UNIVERSITY26
27(1479)Williamson Hall Renovation for Engineering
28 Technology, Planning and Construction
29 (Natchitoches)
30 Payable from General Obligation Bonds
31	Priority 1	$ 45,000
19/644BOSSIER COMMUNITY COLLEG E32
33(1480)Parking Lot, Planning and Construction
34 (Bossier)
35 Payable from General Obligation Bonds
36	Priority 1	$ 2,000
19/657LOUISIANA SCHOOL F OR MATH, SCIENCE 37
38 AND THE ARTS
39(1481)Renovation, Expansion and Replacement of Annex
40 Building, Existing Auditorium and Cafeteria Areas,
41 Planning and Construction
42 (Natchitoches)
43 Payable from General Obligation Bonds
44	Priority 1	$ 112,700
Page 85 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
19/731L.E. FLETCHER TECHNICAL COMMUNITY COLLEG E1
2(1482)Integrated Petroleum Technologies Program (IPT) Lab
3 and Classroom Building, Planning and Construction
4 (Terrebonne)
5 Payable from General Obligation Bonds
6	Priority 1	$ 32,700
7(1483)Diesel Marine, Welding and Transportation Building
8 for Fletcher Technical Community College
9 (Terrebonne)
10 Payable from General Obligation Bonds
11	Priority 1	$ 52,700
19/741SOUTH LOUISIANA COMMUNITY COLLEG E - 12
13 LAFAYETTE CAMPUS
14(1484)HVAC Replacement, Planning and Construction
15 (Lafayette)
16 Payable from General Obligation Bonds
17	Priority 1	$ 46,700
JUDICIAL EXPENSES18
23/949LOUISIANA JUDICIARY19
20(1485)Land Acquisition, Planning, and Construction of New
21 Courthouse for the Louisiana Court of Appeal, Third
22 Circuit
23 (Calcasieu)
24 Payable from General Obligation Bonds
25	Priority 1	$ 268,700
LEVEE DISTRICTS AND PORTS26
36/L13PONTCHARTRAIN LEVEE DISTRICT27
28
29(131) East St. Charles Urban Flood Control Project
30 (St. Charles)
31 Payable from General Obligation Bonds
32	Priority 2	$ 1,500,000
33	Priority 5	$ 500,000
34 Total	$ 2,000,000
36/L35ST. MARY LEVEE DISTRICT35
36(1486)Franklin Canal Levee and Floodgate Project, Planning
37 and Construction
38 (St. Mary)
39 Payable from General Obligation Bonds
40	Priority 1	$ 630,000
36/P05WEST CALCASIEU PORT41
42(1487)Land Acquisition and Rehabilitation of Existing
43 Bulkhead, Planning and Construction ($1,305,000
44 Local Match)
45 (Calcasieu)
46 Payable from General Obligation Bonds
47	Priority 1	$ 73,900
Page 86 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
36/P12LAKE PROVIDENCE PORT COMMISSION1
2(1488)Railroad Rehabilitation, Planning and Construction
3 (East Carroll)
4 Payable from General Obligation Bonds
5	Priority 1	$ 112,200
36/P14MADISON PARISH PORT, HARBOR AND 6
7 TERMINAL DISTRICT
8(1489)Railroad Rehabilitation/ Improvement and New Rail
9 Spur for Avondale Facility, and Improvements
10 Required for Levee Raising Including Raise Rail, Road
11 and Utilities ($221,000 Local Match)
12 (Madison)
13 Payable from General Obligation Bonds
14	Priority 1	$ 130,000
15(1490)Improvements to Madison Parish Port former Northrop
16 Grumman Shipbuilding Expansion
17 (Madison)
18 Payable from General Obligation Bonds
19	Priority 1	$ 15,000
36/P26LAKE CHARLES HARBOR AND TERMINAL 20
21 DISTRICT
22(1491)New Administration Building, Planning and
23 Construction ($1,500,000 Local Match)
24 (Calcasieu)
25 Payable from General Obligation Bonds
26	Priority 1	$ 119,200
36/P40GRAND ISLE PORT COMMISSION27
28(1492)Port Access Road and New Commercial Boat Slip
29 Facility
30 (Jefferson)
31 Payable from General Obligation Bonds
32	Priority 1	$ 27,800
36/P49POINTE COUPEE PORT, HARBOR AND 33
34 TERMINAL DISTRICT
35(1494)Pointe Coupee Parish Port Capital Improvements,
36 Planning and Construction
37 (Pointe Coupee)
38 Payable from General Obligation Bonds
39	Priority 1	$ 11,800
MISCELLANEOUS NON-STATE40
50/J03ASCENSION PARISH41
42(1495)Lamar Dixon Expo Center Recreational Complex,
43 Planning and Construction
44 (Ascension)
45 Payable from General Obligation Bonds
46	Priority 1	$ 300,000
Page 87 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(1496)Lamar Dixon Development, Purchase and Land
2 Acquisition
3 (Ascension)
4 Payable from General Obligation Bonds
5	Priority 1	$ 1,600
50/J06BEAUREGARD PARISH6
7(1497)Crosby, Butler and Pleasant Hill Roads
8 (Beauregard)
9 Payable from General Obligation Bonds
10	Priority 1	$ 12,000
50/J07BIENVILLE PARISH11
12(1498)Courthouse Improvements in Arcadia, Planning and
13 Construction ($115,000 Non-State Match)
14 (Bienville)
15 Payable from General Obligation Bonds
16	Priority 1	$ 40,000
50/J18EAST CARROLL PARISH17
18(1499)Industrial Site Development and Road Improvements
19 (For Economic Development Purposes, Including but
20 not Limited to an Ethanol Plant), Planning and
21 Construction
22 (East Carroll)
23 Payable from General Obligation Bonds
24	Priority 1	$ 42,500
25(1500)Courthouse and Jail Renovations
26 (East Carroll)
27 Payable from General Obligation Bonds
28	Priority 1	$ 55,200
50/J21FRANKLIN PARISH29
30(1501)Courthouse Renovations, Planning and Construction
31 (Franklin)
32 Payable from General Obligation Bonds
33	Priority 1	$ 43,200
34(1502)Parish Road Improvements
35 (Franklin)
36 Payable from General Obligation Bonds
37	Priority 1	$ 31,500
50/J23IBERIA PARISH38
39(1503)Wastewater System Improvements for the Acadiana
40 Regional Airport ($667,000 Non-State Match)
41 (Iberia)
42 Payable from General Obligation Bonds
43	Priority 1	$ 409,600
Page 88 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(1504)Five Lane Road Extension from Highway 675 to
2 Highway 3212, Planning and Construction
3 (Iberia)
4 Payable from General Obligation Bonds
5	Priority 1	$ 2,660,000
50/J26JEFFERSON PARISH6
7(1505)Martin Luther King Playground Improvements,
8 Planning and Construction
9 (Jefferson)
10 Payable from General Obligation Bonds
11	Priority 1	$ 2,000
12(1506)Livingston Place (Metairie Road to Loumor Avenue)
13 (Jefferson)
14 Payable from General Obligation Bonds
15	Priority 1	$ 17,700
16(1507)Upper Kraak Ditch Drainage Pump Station Pump
17 Replacement and Generator Installation
18 (Jefferson)
19 Payable from General Obligation Bonds
20	Priority 1	$ 150,850
50/J29LAFOURCHE PARISH21
22(1508)Company Canal Pump Station, Planning and
23 Construction ($283,236 Cash and/or In-Kind Match)
24 (Lafourche)
25 Payable from General Obligation Bonds
26	Priority 1	$ 30,000
50/J30LASALLE PARISH27
28(1509)Pine Hill Road Improvements, Planning and
29 Construction
30 (LaSalle)
31 Payable from General Obligation Bonds
32	Priority 1	$ 16,200
50/J32LIVINGSTON PARISH33
34(1510)Livingston Parish Regional Airport, Planning and
35 Construction ($900,000 Federal Funds)
36 (Livingston)
37 Payable from General Obligation Bonds
38	Priority 1	$ 39,500
39	Priority 2	$ 600,000
40	Priority 5	$ 1,000,000
41 Total	$ 1,639,500
42(1511)Cook Road Extension Economic Development Corridor
43 (Pete's Highway Frontage Road)
44 (Livingston)
45 Payable from General Obligation Bonds
46	Priority 1	$ 1,551,900
47	Priority 5	$ 3,000,000
48 Total	$ 4,551,900
Page 89 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(1512)District 9 Fire Station, Planning and Construction
2 (Livingston)
3 Payable from General Obligation Bonds
4	Priority 1	$ 100,000
5(1513)Livingston Parish Animal Shelter
6 (Livingston)
7 Payable from General Obligation Bonds
8	Priority 1	$ 5,200
50/J33MADISON PARISH9
10(1514)Charles Brown Road (Tendal Road) Repairs, Planning
11 and Construction
12 (Madison)
13 Payable from General Obligation Bonds
14	Priority 1	$ 189,100
50/J34MOREHOUSE PARISH15
16(1515)Carl Road Improvements, Construction
17 (Morehouse)
18 Payable from General Obligation Bonds
19	Priority 1	$ 1,500
50/J37OUACHITA PARISH20
21(1440)River Styx, Pump Station and Force Main
22 Replacement, Planning and Construction
23 (Ouachita)
24 Payable from General Obligation Bonds
25	Priority 5	$ 1,485,000
50/J39POINTE COUPEE PARISH26
27(1516)False River Ecosystem Restoration Project, Planning
28 and Construction
29 (Pointe Coupee)
30 Payable from General Obligation Bonds
31	Priority 1	$ 688,900
32	Priority 5	$ 2,189,300
33 Total	$ 2,878,200
34(1517)Regional Fence Line Monitoring, Planning and
35 Equipment
36 (Pointe Coupee)
37 Payable from General Obligation Bonds
38	Priority 1	$ 21,600
39(1518)Emergency Communications Equipment
40 (Pointe Coupee)
41 Payable from General Obligation Bonds
42	Priority 1	$ 6,100
Page 90 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/J46ST. HELENA PARISH1
2(1093)Audubon Library, Planning and Construction
3 (St. Helena)
4 Payable from General Obligation Bonds
5	Priority 1	$ 300,000
6	Priority 5	$ 1,140,000
7 Total	$ 1,440,000
8(1519)Emergency ADA and Life Safety Renovations to the
9 Court House, Planning and Construction ($2,680,000
10 Federal Funds)
11 (St. Helena)
12 Payable from General Obligation Bonds
13	Priority 1	$ 4,100
14(1520)Eddy Road Improvements, Planning and Construction
15 (St. Helena)
16 Payable from General Obligation Bonds
17	Priority 1	$ 5,000
50/J53TANGIPAHOA PARISH18
19(1521)Courthouse and Courthouse Annex Renovations and
20 Expansions, Planning and Construction ($500,000
21 Local Match)
22 (Tangipahoa)
23 Payable from General Obligation Bonds
24	Priority 1	$ 12,700
25(1522)Tangipahoa Parish Multipurpose Livestock and
26 Agricultural Facility, Planning and Construction,
27 Supplemental Funding
28 (Tangipahoa)
29 Payable from General Obligation Bonds
30	Priority 1	$ 36,000
50/J55TERREBONNE PARISH31
32(1068)Renovate the LePetit Terrebonne Theater
33 Building, Planning and Construction
34 (Terrebonne)
35 Payable from General Obligation Bonds
36	Priority 1	$ 350,000
37	Priority 5	$ 350,000
38 Total	$ 700,000
39(1523)Terrebonne Parish Animal Shelter Facility, Planning,
40 Construction, and Equipment
41 (Terrebonne)
42 Payable from General Obligation Bonds
43	Priority 1	$ 33,900
44(1524)Thompson Road Extension, Land Acquisition, Planning
45 and Construction ($2,000,000 Local Match)
46 (Terrebonne)
47 Payable from General Obligation Bonds
48	Priority 1	$ 2,707,000
Page 91 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(1525)Terrebonne Parish Emergency Operations Center,
2 Planning and Construction
3 (Terrebonne)
4 Payable from General Obligation Bonds
5	Priority 1	$ 2,122,900
50/J58VERNON PARISH6
7(1526)Plainview Road Improvements, Planning and
8 Construction
9 (Vernon)
10 Payable from General Obligation Bonds
11	Priority 1	$ 82,900
12(1527)Lift Station and Force Main for Vernon Parish Jail
13 (Vernon)
14 Payable from General Obligation Bonds
15	Priority 1	$ 32,000
50/J60WEBSTER PARISH16
17(1528)Courthouse HVAC Renovations, Planning and
18 Construction
19 (Webster)
20 Payable from General Obligation Bonds
21	Priority 1	$ 205,600
50/J64WINN PARISH22
23(1529)Beulah Road Reconstruction, Planning and
24 Construction
25 (Winn)
26 Payable from General Obligation Bonds
27	Priority 1	$ 12,000
28(1530)Parish-Wide Roadway Projects
29 (Winn)
30 Payable from General Obligation Bonds
31	Priority 1	$ 11,600
50/M02ABITA SPRINGS32
33(1531)Water Lines and Sewer Lines, Extensions and
34 Upgrades, Planning and Construction (Cash and/or In-
35 Kind Match Required)
36 (St. Tammany)
37 Payable from General Obligation Bonds
38	Priority 1	$ 4,800
50/M10ARNAUDVILLE39
40(1532)Multipurpose Aquatic Recreational Facility
41 (St. Landry)
42 Payable from General Obligation Bonds
43	Priority 1	$ 5,000
Page 92 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/M14BAKER1
2(1533)Baker Fire Training Facility, Planning and Construction
3 (East Baton Rouge)
4 Payable from General Obligation Bonds
5	Priority 1	$ 170,000
50/M20BATON ROUGE6
7(1534)Drainage Improvements in Old Goodwood Area,
8 Planning and Construction
9 (East Baton Rouge)
10 Payable from General Obligation Bonds
11	Priority 1	$ 5,000
50/M22BENTON12
13(1535)Town of Benton Wastewater Collection System
14 Improvements, Planning and Construction
15 (Bossier)
16 Payable from General Obligation Bonds
17	Priority 1	$ 10,100
50/M24BERWICK18
19(1536)Sewerage Collection System Along Old Spanish Trail
20 and LA 182, Planning and Construction
21 (St. Mary)
22 Payable from General Obligation Bonds
23	Priority 1	$ 1,394,200
50/M25BIENVILLE24
25(1537)Village of Bienville, Water System Improvements
26 (Bienville)
27 Payable from General Obligation Bonds
28	Priority 1	$ 2,000
50/M32BROUSSARD29
30(1037)Rehabilitate LA Hwy 182 from US 90 to LA Hwy 89,
31 Planning and Construction
32 (Lafayette)
33 Payable from General Obligation Bonds
34	Priority 1	$ 245,000
35(1039)Three-Lane LA 182 in the City of Broussard, 
36 Planning and Construction ($750,000 Match)
37 (Lafayette)
38 Payable from General Obligation Bonds
39	Priority 5	$ 2,240,000
40(1538)Reconstruct South Bernard Road From LA Hwy 182 to
41 US Hwy 90, Planning and Construction
42 (Lafayette)
43 Payable from General Obligation Bonds
44	Priority 1	$ 995,000
45	Priority 5	$ 4,000,000
46 Total	$ 4,995,000
Page 93 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/M52COLUMBIA1
2(1539)Water Well, Planning and Construction
3 (Caldwell)
4 Payable from General Obligation Bonds
5	Priority 1	$ 6,500
50/M54COTTON VALLEY6
7(1638)Sewerage System Improvements, Planning
8 and Construction
9 (Webster)
10 Payable from General Obligation Bonds
11	Priority 1	$ 1,260,000
50/M58CROWLEY12
13(1540)North Avenue O Drainage Improvements, Planning and
14 Construction
15 (Acadia)
16 Payable from General Obligation Bonds
17	Priority 1	$ 35,000
50/M64DEQUINCY18
19(1541)Buxton Creek Emergency Drainage Improvements,
20 Planning and Construction
21 (Calcasieu)
22 Payable from General Obligation Bonds
23	Priority 1	$ 690,000
50/M68DONALDSONVILLE24
25(1542)Riverfront Development, Planning and Construction
26 (Ascension)
27 Payable from General Obligation Bonds
28	Priority 1	$ 196,100
50/M87FERRIDAY29
30(1543)Downtown Revitalization, Planning and Construction
31 ($253,750 In-Kind Local Match)
32 (Concordia)
33 Payable from General Obligation Bonds
34	Priority 1	$ 12,400
50/MB2GRAYSON35
36(1544)Streets and Drainage Improvements
37 (Caldwell)
38 Payable from General Obligation Bonds
39	Priority 1	$ 11,200
50/MB5GRETNA40
41(1545)McDonoghville Fire Station, Planning and Construction
42 (Jefferson)
43 Payable from General Obligation Bonds
44	Priority 1	$ 73,700
Page 94 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(1546)Lion's Club Conversion to Gretna Senior Center,
2 Planning and Construction
3 (Jefferson)
4 Payable from General Obligation Bonds
5	Priority 1	$ 91,700
50/MB9HAMMOND6
7(1630 )Pine Hill Sewer System Improvements and Municipal Tie-
8 In, Planning and Construction
9 (Tangipahoa)
10 Payable from the balance of Series 94A (08T-02)$ 100
50/MC1HARAHAN11
12(1547)Magnolia Boulevard Drainage - West Magnolia to
13 Jefferson Highway, Planning and Construction
14 (Jefferson)
15 Payable from General Obligation Bonds
16	Priority 1	$ 16,500
50/MC3HAUGHTON17
18(1548)Additional Water Supply Wells, Planning and
19 Construction
20 (Bossier)
21 Payable from General Obligation Bonds
22	Priority 1	$ 4,100
50/MC9HOMER23
24(1549)Town of Homer, Town Hall Renovations, Planning and
25 Construction
26 (Claiborne)
27 Payable from General Obligation Bonds
28	Priority 1	$ 7,700
50/MD1HORNBECK29
30(1550)Emergency Connection with Sabine Parish Water
31 Works District 1, Planning and Construction
32 (Sabine)
33 Payable from General Obligation Bonds
34	Priority 1	$ 18,600
35(1551)Rehabilitation of Elevated Water Tank, Planning and
36 Construction
37 (Vernon)
38 Payable from General Obligation Bonds
39	Priority 1	$ 3,600
50/MD5INDEPENDENCE40
41(1552)Independence Area Community Pavilion, Planning and
42 Construction
43 (Tangipahoa)
44 Payable from General Obligation Bonds
45	Priority 1	$ 1,000
Page 95 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/ME1JEAN LAFITTE1
2(1553)Lafitte Seafood Pavilion, Planning and Construction
3 (Jefferson)
4 Payable from General Obligation Bonds
5	Priority 1	$ 61,800
50/MF1KENNER6
7(1554)Lake Trail Drainage Improvement, Planning and
8 Construction
9 (Jefferson)
10 Payable from General Obligation Bonds
11	Priority 1	$ 367,300
50/MF2KENTWOOD12
13(1555)Recreational Facility Property Acquisition, Planning,
14 Site Preparation, Master Recreation Plan and
15 Construction
16 (Tangipahoa)
17 Payable from General Obligation Bonds
18	Priority 1	$ 200,000
19	Priority 5	$ 300,000
20 Total	$ 500,000
50/MF9LAKE CHARLES21
22(1556)Riverside Park Improvements, Planning and
23 Construction
24 (Calcasieu)
25 Payable from General Obligation Bonds
26	Priority 1	$ 261,700
50/MG3LEESVILLE27
28(1557)University Parkway Sewer System and Wastewater
29 Treatment Facilities Enhancements, Planning and
30 Construction
31 (Vernon)
32 Payable from General Obligation Bonds
33	Priority 1	$ 19,300
50/MG7LIVINGSTON34
35(1558)Water Tower and Well, Acquisition, Planning and
36 Construction
37 (Livingston)
38 Payable from General Obligation Bonds
39	Priority 1	$ 500,000
50/MG8LIVONIA40
41(1631)Purchase and Installation of Law Enforcement Surveillance
42 System, Planning and Construction
43 (Pointe Coupee)
44 Payable from the balance of Series 94A (08T-02)$ 500
Page 96 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/MH3LOREAUVILLE1
2(1559)Loreauville Wastewater Treatment Plant Improvements
3 and Demolition Project, Planning and Construction
4 (Iberia)
5 Payable from General Obligation Bonds
6	Priority 1	$ 10,200
7	Priority 5	$ 840,000
8 Total	$ 850,200
50/MH8MANDEVILLE9
10(1560)Water Tower, Construction
11 (St. Tammany)
12 Payable from General Obligation Bonds
13	Priority 1	$ 325,300
50/MI6MARKSVILLE14
15(1561)Mary Bethune Community Center, previously known as
16 D.A. Jordan Community Center, for the City of
17 Marksville, Planning and Construction
18 (Avoyelles)
19 Payable from General Obligation Bonds
20	Priority 1	$ 59,900
50/MJ3MER ROUGE21
22(1562)Boutz Lane Renovations
23 (Morehouse)
24 Payable from General Obligation Bonds
25	Priority 1	$ 15,000
50/MJ4MERRYVILLE26
27(1563)Sewerage Pump Station and Aeration System
28 Improvements, Planning and Construction
29 (Beauregard)
30 Payable from General Obligation Bonds
31	Priority 1	$ 24,300
50/MJ6MONROE32
33(1564)Monroe Regional Airport Terminal, Planning and
34 Construction ($40,500,000 Federal and/or Local Match)
35 (Ouachita)
36 Payable from General Obligation Bonds
37	Priority 1	$ 696,100
38
50/ML1NEW IBERIA39
40(1565)Armenco Branch Canal Drainage Improvements (Non-
41 State Match Required)
42 (Iberia)
43 Payable from General Obligation Bonds
44	Priority 1	$ 74,500
Page 97 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/ML2NEW LLANO1
2(1566)Raymond Street Rehabilitation
3 (Vernon)
4 Payable from General Obligation Bonds
5	Priority 1	$ 23,600
6(1567)Expansion of Wastewater System South to Fort Polk
7 Entrance Road ($750,000 Local Match) Real Estate
8 Acquisition, and/or Street Lighting Improvements,
9 Planning and Construction
10 (Vernon)
11 Payable from General Obligation Bonds
12	Priority 1	$ 171,800
13(1568)Water System Improvements, Construction ($800,000
14 Local Match)
15 (Vernon)
16 Payable from General Obligation Bonds
17	Priority 1	$ 643,300
18(1569)Street Improvements, Planning and Construction
19 (Vernon)
20 Payable from General Obligation Bonds
21	Priority 1	$ 14,800
50/ML3NEW ORLEANS22
23(1570)Rosenwald Community Center, Planning and
24 Construction
25 (Orleans)
26 Payable from General Obligation Bonds
27	Priority 1	$ 889,800
50/MO1PONCHATOULA28
29(1571)Consolidated Law Enforcement Complex, Acquisition,
30 Planning and Construction
31 (Tangipahoa)
32 Payable from General Obligation Bonds
33	Priority 1	$ 12,000
34	Priority 2	$ 250,000
35 Total	$ 262,000
50/MQ1ROSEPINE36
37(1572)Water System Improvements, Town of Rosepine,
38 Planning and Construction
39 (Vernon)
40 Payable from General Obligation Bonds
41	Priority 1	$ 1,000
42(1573)Rehabilitation of Elevated Water Tank, Planning and
43 Construction
44 (Vernon)
45 Payable from General Obligation Bonds
46	Priority 1	$ 235,400
Page 98 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(1574)Improvements to Sewer Collection System
2 (Vernon)
3 Payable from General Obligation Bonds
4	Priority 1	$ 150,900
50/MQ4ST. JOSEPH5
6(1575)Repairs and Upgrades to Water System, Planning and
7 Construction
8 (Tensas)
9 Payable from General Obligation Bonds
10	Priority 1	$ 7,458,800
11(1576)Proposed City Hall/Convention Center, Planning and
12 Construction
13 (Tensas)
14 Payable from General Obligation Bonds
15	Priority 1	$ 15,000
50/MQ5ST. MARTINVILLE16
17(1577)Sewer and Water Updates, Planning and Construction
18 (St. Martin)
19 Payable from General Obligation Bonds
20	Priority 1	$ 19,500
21	Priority 5	$ 50,000
22 Total	$ 69,500
23(1578)Sewer Lift Station Improvements
24 (St. Martin)
25 Payable from General Obligation Bonds
26	Priority 1	$ 30,900
50/MQ8SCOTT27
28(1579)Water and Sewer Line Installation along Apollo Road
29 Extension, Planning and Construction
30 (Lafayette)
31 Payable from General Obligation Bonds
32	Priority 1	$ 358,900
50/MR1SHREVEPORT33
34(1580)C.C. Antoine Park, Planning and Construction
35 (Caddo)
36 Payable from General Obligation Bonds
37	Priority 1	$ 277,300
38	Priority 2	$ 200,000
39	Priority 5	$ 822,700
40 Total	$ 1,300,000
50/MR2SIBLEY41
42(1581)Town of Sibley, Water Tank Rehabilitations, Planning
43 and Construction
44 (Webster)
45 Payable from General Obligation Bonds
46	Priority 1	$ 6,100
Page 99 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/MR7SIMSBORO1
2(1582)Water Well and Water Main
3 (Lincoln)
4 Payable from General Obligation Bonds
5	Priority 1	$ 28,000
50/MT3TALLULAH6
7(1583)Improvements to Sewer System, Planning and
8 Construction
9 (Madison)
10 Payable from General Obligation Bonds
11	Priority 1	$ 13,600
12(1584)Sewer Treatment Plant Improvements City of Tallulah
13 (Madison)
14 Payable from General Obligation Bonds
15	Priority 1	$ 92,600
50/MT5THIBODAUX16
17(1585)LA Hwy 20 (N. Canal Blvd.) Widening, Planning and
18 Construction
19 (Lafourche)
20 Payable from General Obligation Bonds
21	Priority 1	$ 30,900
50/MU5VINTON22
23(1586)Water Treatment Plant Improvements, Including
24 Rehabilitation of Elevated Water Storage Tank, Site
25 and Electrical Improvements, Planning and
26 Construction
27 (Calcasieu)
28 Payable from General Obligation Bonds
29	Priority 1	$ 26,800
30(1587)Reconstruction of Big Woods Road, Planning and
31 Construction
32 (Calcasieu)
33 Payable from General Obligation Bonds
34	Priority 1	$ 70,300
50/MW2YOUNGSVILLE35
36(1588)Youngsville Parkway Road Project, Including
37 Waterline Improvements, Roadway Lighting, and Other
38 Infrastructure Improvements, Planning and
39 Construction
40 (Lafayette)
41 Payable from General Obligation Bonds
42	Priority 1	$ 31,300
43(1589)Highway 92 Realignment Near Youngsville,
44 Construction, Right of Way, and Utilities
45 (Lafayette)
46 Payable from General Obligation Bonds
47	Priority 1	$ 295,000
Page 100 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/MW4ZWOLLE1
2(1590)Installation of 6" Waterline and Water Well, Planning
3 and Construction ($25,000 Local Match)
4 (Sabine)
5 Payable from General Obligation Bonds
6	Priority 1	$ 21,400
50/N71NORTH LAFOURCHE CONSERVATION LEVEE 7
8 AND DRAINAGE DISTRICT
9(1591)80 Arpent Canal Dredging, Caldwell Plantation to
10 Laurel Valley, Planning and Construction
11 (Lafourche)
12 Payable from General Obligation Bonds
13	Priority 1	$ 10,000
50/NA2LAFAYETTE AIRPORT COMMISSION14
15(1592)Construction of Cargo Facilities, Planning and
16 Construction
17 (Lafayette)
18 Payable from General Obligation Bonds
19	Priority 1	$ 1,158,300
50/NB3MCKINLEY HIGH SCHOOL ALUMNI ASSOCIATION20
21(1593)Old McKinley High Community Center on Thomas
22 Delpit Drive in the City of Baton Rouge, Kitchen and
23 Building Renovations, Repairs and Upgrades Including
24 Elevator Repair, Planning and Construction
25 (East Baton Rouge)
26 Payable from General Obligation Bonds
27	Priority 1	$ 100,000
50/NBMBLACK RIVER LAKE COMMISSION28
29(1594)Black River Lake Drainage Structure Installation,
30 Studies, Permits, Planning and Construction
31 (Concordia)
32 Payable from General Obligation Bonds
33	Priority 1	$ 255,000
50/NBTDISTRICT 2 COMMUNITY ENHANCEMENT 34
35 CORPORATION
36(1595)New Orleans East Walking and Bike Trail, Planning
37 and Construction
38 (Orleans)
39 Payable from General Obligation Bonds
40	Priority 1	$ 23,700
50/NCNSOUTH TOLEDO BEND WATERWORK S DISTRICT41
42(1596)Water Distribution System Improvements Including
43 Water Meters
44 (Sabine)
45 Payable from General Obligation Bonds
46	Priority 1	$ 8,800
Page 101 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/NCYRECONCILE NEW ORLEANS, INC.1
2(1597)Reconcile New Orleans, Renovation and Expansion
3 Project, Central City New Orleans, Planning and
4 Construction
5 (Orleans)
6 Payable from General Obligation Bonds
7	Priority 1	$ 55,000
50/NFQALGIERS DEVELOPMENT CORPORATION, INC.8
9(1598)Westbank Recreation Center - Federal City
10 (Orleans)
11 Payable from General Obligation Bonds
12	Priority 1	$ 178,000
50/NFSSHREVEPORT - RUSTON METHODIST CAMP13
14(1599)Caney Conference Center Remodel Project, Planning
15 and Construction
16 (Webster)
17 Payable from General Obligation Bonds
18	Priority 1	$ 2,000
1950/NG6LOUISIANA BLACK HISTORY HALL OF FAME
20(274) Museum and Cultural Center, Land Acquisition,
21 Planning ans Construction ($100,000 Cash
22 and/or In-Kind Match)
23 East Baton Rouge)
24 Payable from General Obligation Bonds
25	Priority 2	$ 500,000
26	Priority 5	$ 400,000
27 Total	$ 900,000
50/NGEWEST VERNON WATERWORK S DISTRICT28
29(1600)Expansion of Water Distribution System and Booster
30 Station West Vernon Waterworks District, Planning
31 and Construction
32 (Vernon)
33 Payable from General Obligation Bonds
34	Priority 1	$ 32,500
50/NGFFAMILY CENTER OF LIFE, INC.35
36(1601)Family Center of Hope Community Center in New
37 Orleans, Planning and Construction ($600,000 Local
38 Match)
39 (Orleans)
40 Payable from General Obligation Bonds
41	Priority 1	$ 89,900
Page 102 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/NHLBOGALUSA COMMUNITY MEDICAL CENTER 1
2 FOUNDATION
3(1602)Capital Improvements at Washington St. Tammany
4 Regional Medical Center
5 (St. Tammany, Washington)
6 Payable from General Obligation Bonds
7	Priority 1	$ 32,300
50/NHSPLEASANT HILL-CROSSROADS WATER SYSTEMS, INC.8
9(1603)Pleasant Hill/Crossroads Water System, Repairs and
10 Extension, Planning and Construction
11 (Winn)
12 Payable from General Obligation Bonds
13	Priority 1	$ 4,100
50/NIKLOUISIANA 4-H FOUNDATION14
15(1604)Louisiana 4-H Foundation Youth Educational
16 Development Center, Camp Windy Wood Property,
17 Including Multipurpose Educational Building,
18 Planning, Construction and Acquisition
19 (Grant)
20 Payable from General Obligation Bonds
21	Priority 1	$ 25,500
50/NILYMCA OF GREATER NEW ORLEANS22
23(1433)Belle Chasse YMCA, Phase II,
24 Planning and Construction
25 (Plaquemines)
26 Payable from General Obligation Bonds
27	Priority 1	$ 700,000
28	Priority 5	$ 300,000
29 Total	$ 1,000,000
50/NJ8NORTH LOUISIANA CRIMINALISTICS LAB30
31(1605)Replacement of Shreveport Facility, Planning and
32 Construction
33 (Caddo)
34 Payable from General Obligation Bonds
35	Priority 1	$ 1,974,100
50/NJ9DRYADES YMCA36
37(1606)Technical Training Center, Planning and Construction
38 (Orleans)
39 Payable from General Obligation Bonds
40	Priority 1	$ 139,500
41	Priority 2	$ 990,000
42	Priority 5	$ 7,759,500
43 Total	$ 8,889,000
Page 103 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/NLRHORSESHOE ROAD WATER SYSTEM, INC.1
2(1607)Horseshoe Water System, Planning and Construction
3 (Webster)
4 Payable from General Obligation Bonds
5	Priority 1	$ 15,900
50/NQYWESTON WATER SYSTEM, INC.6
7(1608)Water Mains Extensions with Connections, Booster
8 Station and Emergency Power Improvements, Planning
9 and Construction
10 (Jackson)
11 Payable from General Obligation Bonds
12	Priority 1	$ 13,500
50/NSRJUNIOR LEAGUE OF NEW ORLEANS, INCORP ORATED13
14(1609)Renovate Annex Building and Re-Purpose Space,
15 Including Installation of Handicap Accessibility Ramp
16 and Bathroom Upgrades, Planning and Construction
17 (Orleans)
18 Payable from General Obligation Bonds
19	Priority 1	$ 5,000
20(1610)Renovate Thrift Shop and Annex, Including Parking
21 Lot, Planning and Construction
22 (Orleans)
23 Payable from General Obligation Bonds
24	Priority 1	$ 2,700
25(1611)Renovate Headquarters Building, Including HVAC
26 System, Planning and Construction
27 (Orleans)
28 Payable from General Obligation Bonds
29	Priority 1	$ 8,300
50/NT2MERCY ENDEAVORS30
31(1612)Irish Channel St. Andrew Street Elderly Resource Center,
32 New Facility, Land Acquisition, Including Installation and
33 Acquisition of Building Equipment and Furnishings,
34 Planning and Construction
35 (Orleans)
36 Payable from General Obligation Bonds
37	Priority 1	$ 299,800
50/NTIJACKSON TOURISM ENHANCEMENT38
39(1633)Feliciana Veterans Memorial, Planning and Construction
40 (East Feliciana)
41 Payable from the balance of Series 94A (08T-02)$ 600
Page 104 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/NTJCADEVILLE WATER DISTRICT1
2(1613)Site No. 4 Water System Renovations and
3 Improvements, Planning and Construction (50% Local
4 Match)
5 (Ouachita)
6 Payable from General Obligation Bonds
7	Priority 1	$ 3,800
50/NTQEAST FELICIANA EMERG ENCY COMMUNICATIONS DISTRICT8
9(1614)Emergency Communications Center, Planning and
10 Construction
11 (East Feliciana)
12 Payable from General Obligation Bonds
13	Priority 1	$ 70,100
50/NTTHOMER MEMORIAL HOSP ITAL14
15(1615)Bone Density Machine, Acquisition and Installation
16 (Claiborne)
17 Payable from General Obligation Bonds
18	Priority 1	$ 16,100
50/NUR9TH WARD FIELD OF DREAMS19
20(296) 9th Ward Field of Dreams Football and
21 Track Stadium,
22 Planning and Construction
23 (Orleans)
24 Payable from General Obligation Bonds
25	Priority 2	$ 750,000
26	Priority 5	$ 3,415,000
27 Total	$ 4,165,000
50/NV5SWLA CENTER FOR HEALTH SERVICES28
29(1623)SWLA Center for Health Services - Healing Center,
30 Planning and Construction
31 (Calcasieu)
32 Payable from General Obligation Bonds
33	Priority 1	$ 85,000
50/NV6EAST CARROLL PARISH HOSPITAL34
35(1616)East Carroll Parish Hospital Capital Improvement,
36 Emergency Repairs, Planning and Construction
37 (East Carroll)
38 Payable from General Obligation Bonds
39	Priority 1	$ 3,400
50/NVWOUR LADY OF THE LAKE CHILDREN'S HOSPITAL40
41(1618)Our Lady of the Lake Children's Hospital, Acquisition,
42 Planning and Construction
43 (East Baton Rouge)
44 Payable from General Obligation Bonds
45	Priority 1	$ 3,007,700
46	Priority 5	$11,000,000
47 Total	$14,007,700
Page 105 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/NWKNATIONAL HURRICANE MUSEUM AND 1
2 SCIENCE CENTER, INC.
3(1619)National Hurricane Museum and Science Center,
4 Planning and Construction
5 (Calcasieu)
6 Payable from General Obligation Bonds
7	Priority 1	$ 4,000
50/NWWTHRIVE FOUNDATION8
9(1620)New Facility, Planning and Construction
10 (East Baton Rouge)
11 Payable from General Obligation Bonds
12	Priority 1	$ 299,800
50/NXCLIVINGSTON PARISH SHERIFF'S OFFICE13
14(1637)Livingston/Ascension Parish Outpost on the Diversion,
15 Planning and Construction
16 (Livingston)
17 Payable from General Obligation Bonds
18	Priority 2	$ 200,000
50/NYNOPELOUSAS HEIGHTS19
20(1636)Opelousas Heights Proposed Subdivision, Planning
21 and Construction
22 (St. Landry)
23 Payable from General Obligation Bonds
24	Priority 2	$ 500,000
25	Priority 5	$ 715,000
26 Total	$ 1,215,000
50/NYOTWELFTH DISTRICT NUMBER 3 BAP TIST ASSOCIATION27
28(1639)Multipurpose Center, Planning and Major Renovation
29 (Sabine)
30 Payable from General Obligation Bonds
31	Priority 2	$ 182,000
50/S39POINTE COUPEE PARISH SCHOOL BOARD32
33(1621)Pointe Coupee Parish School Board Central Office
34 Relocation, Renovation and Rebuilding Due to
35 Flooding Caused By Hurricane Gustav
36 (Pointe Coupee)
37 Payable from General Obligation Bonds
38	Priority 1	$ 69,700
39 Section 1.B.  The projects in this Section did not submit a capital outlay request
40for Fiscal Year 2017-2018 by November 1, 2016 in compliance with the provisions of R.S.
4139:101(A).  Therefore, because the projects in this Section are not in compliance with the
42provisions of Act 419 of the 2016 Regular Session of the Legislature, the appropriations for
43the projects in this Section require separate statutory change to existing law in order to be
Page 106 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1eligible for cash and non-cash lines of credit and therefore, the proposed appropriations for
2these projects are pending that effective statutory change.
DEPARTMENT OF VETERANS AFFAIRS3
03/130DEPARTMENT OF VETERANS AFFAIRS4
5(    )Northeast Louisiana State Cemetery,
6 Planning and Construction
7 (Richland)
8 Payable from General Obligation Bonds
9	Priority 5	$ 347,000
DEPARTMENT OF CULTURE, RECREATION AND TOURISM10
06/264OFFICE OF STATE PARKS11
12(    )Poverty Point Reservoir State Park, 
13 Acquisition, Planning and Construction,
14 Supplemental Funding
15 (Richland)
16 Payable from General Obligation Bonds
17	Priority 1	$ 2,000
DEPARTMENT OF TRANSPORTATION AND DEVELOP MENT18
07/270ADMINISTRATION19
20(    )Verot School Road, Construction
21 (Lafayette)
22 Payable from General Obligation Bonds
23	Priority 5	$ 1,000,000
24(    )LA Highway 616 (Caldwell Road to LA Highway 143),
25 Planning and Construction
26 (Ouachita)
27 Payable from General Obligation Bonds
28	Priority 5	$ 1,200,000
29(    )LA 143 to US 165 Connector, Planning, Engineering,
30 Right of Way, Utilities and Construction
31 (Ouachita)
32 Payable from General Obligation Bonds
33	Priority 5	$33,200,000
34(    )La. Hwy 167 Corridor Improvements,
35 Planning and Construction
36 (St. Landry, Evangeline)
37 Payable from General Obligation Bonds
38	Priority 2	$ 9,500,000
Page 107 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1	DEPARTMENT OF EDUCATION
2
19/601LSU BATON ROUG E3
4(    )Stephenson Veterinary Hospital, Planning
5 and Construction
6 (East Baton Rouge)
7 Payable from General Obligation Bonds
8	Priority 5	$ 5,000,000
9	Payable from Fees and Self Generated Revenues$ 5,000,000
10 Total	$10,000,000
19/629UNIVERSITY OF LOUISIANA - MONROE11
12(    )Stubbs Hall Reroofing, Planning and Construction
13 (Ouachita)
14 Payable from General Obligation Bonds
15	Priority 1	$ 5,400
16	Priority 2	$ 9,600
17 Total	$ 15,000
19/631NORTHWESTERN STATE UNIVERSITY18
19(    )Multi-Purpose Assembly Center, Planning
20 and Construction
21 (Natchitoches)
22 Payable from General Obligation Bonds
23	Priority 5	$ 295,800
19/644BOSSIER COMMUNITY COLLEG E24
25(    )Land Acquisition, Planning and Construction
26 (Bossier)
27 Payable from General Obligation Bonds
28	Priority 1	$ 300,000
29	Priority 2	$ 1,000,000
30	Priority 5	$ 2,600,000
31 Total	$ 3,900,000
32	PORTS AND LEVEE DISTRICTS
36/P26LAKE CHARLES HARBOR AND TERMINAL DISTRICT33
34(    )Dredging of Berth 8 at City Docks, 
35 Planning and Construction 
36 ($1,000,000 Local Match)
37 (Calcasieu)
38 Payable from General Obligation Bonds
39	Priority 1	$ 250,000
MISCELLANEOUS NON-STATE40
4150/J15CONCORDIA PARISH
42(    )Concordia Parish Public Health Center 
43 Renovation, Planning and Construction
44 (Concordia)
45 Payable from General Obligation Bonds
46	Priority 5	$ 92,600
Page 108 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/J18EAST CARROLL PARISH1
2(    )East Carroll Parish Road Improvements
3 (East Carroll)
4 Payable from General Obligation Bonds
5	Priority 1	$ 15,000
50/J40RICHLAND PARISH6
7(    )Sapa Drive Improvements,
8 Planning and Construction
9 (Richland)
10 Payable from General Obligation Bonds
11	Priority 2	$ 8,000
50/J54TENSAS PARISH12
13(    )Tensas Parish Port/Port Priority Site Plan,
14 Planning and Construction
15 (Tensas)
16 Payable from General Obligation Bonds
17	Priority 1	$ 4,700
18	Priority 5	$ 500,000
19 Total	$ 504,700
50/M06AMITE20
21(    )City Police Station Repairs, Planning and Construction
22 (Tangipahoa)
23 Payable from General Obligation Bonds
24	Priority 2	$ 200,000
25	Priority 5	$ 700,000
26 Total	$ 900,000
50/M19BASTROP27
28(    )Municipal Center Lighting/Ceiling Tile
29 (Morehouse)
30 Payable from General Obligation Bonds
31	Priority 5	$ 312,000
32(    )Central Fire Station, Replace Driveway City 
33 Hall, Roof Construction, Planning and Construction
34 (Morehouse)
35 Payable from General Obligation Bonds
36	Priority 5	$ 250,000
37(    )Pool Pump Houses/Comfort Stations Roof, Planning
38 and Construction
39 (Morehouse)
40 Payable from General Obligation Bonds
41	Priority 5	$ 125,000
50/M31BREAUX BRIDGE42
43(    )New Pavilion at Carl Williams Memorial
44 Park, Planning and Construction
45 (St. Martin)
46 Payable from General Obligation Bonds
47	Priority 2	$ 50,000
Page 109 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1(    )Renovations at Veterans Memorial Park,
2 Planning and Construction
3 (St. Martin)
4 Payable from General Obligation Bonds
5	Priority 2	$ 50,000
650/M95FRANKLINTON
7(    )Right Turn Lane Entrance to Recreational
8 Facility, Planning and Construction
9 (Washington)
10 Payable from General Obligation Bonds
11	Priority 2	$ 20,000
50/MA9GRAND COTEAU12
13(    )Police and Utility Departments Roof,
14 Air Conditioning Unit for Town Hall,
15 Handheld Meter Reader, Abandon
16 and Plug Water Well
17 (St. Landry)
18 Payable from General Obligation Bond
19	Priority 2	$ 60,000
20(    )Fire Truck and Fire Stations Upgrades
21 (St. Landry)
22 Payable from General Obligation Bond
23	Priority 2	$ 10,000
50/ML3NEW ORLEANS24
25(    )Construction of Opelousas Street Extension from Behrman
26 Avenue to Obannon Street and Construction of Patterson
27 Drive Extension from Hendee Street to Obannon Street,
28 Planning and Construction 
29 (Orleans)
30 Payable from General Obligation Bonds
31	Priority 2	$ 250,000
32	Priority 5	$ 1,500,000
33 Total	$ 1,750,000
34(    )Donsereaux/Harrison Playground Renovations,
35 Planning and Construction
36 (Orleans)
37 Payable from General Obligation Bonds
38	Priority 5	$ 100,000
39(    )Holiday Drive Roadway Construction
40 (Gen. MacArthur to Behrman)
41 (Orleans)
42 Payable from General Obligation Bonds
43	Priority 2	$ 98,200
44(    )Joe Bartholomew Golf Course Storm Shelter/
45 Restroom Portico Units, Planning, Acquisition, 
46 Installation,  and Construction
47 (Orleans)
48 Payable from General Obligation Bonds
49	Priority 2	$ 300,000
Page 110 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/MM4OIL CITY1
2(    )Highway 538 Water Line Extension,
3 Planning and Construction
4 (Caddo)
5 Payable from General Obligation Bonds
6	Priority 5	$ 105,000
50/MU7WALKER7
8(    )Industrial Park Road Extension,
9 Planning and Construction
10 (Livingston)
11 Payable from General Obligation Bonds
12	Priority 1	$ 250,000
50/MV2WEST MONROE13
14(    )Rehabilitation of Montgomery Street from
15 LA 34 to I-20, Roadway, Water and Sewer
16 (Ouachita)
17 Payable from General Obligation Bonds
18	Priority 5	$ 500,000
19(    )Creation of a Hurricane/Disaster Shelter by
20 Expanding the West Ouachita Senior Center,
21 Planning and Construction
22 (Ouachita)
23 Payable from General Obligation Bonds
24	Priority 2	$ 300,000
50/N13CHENNAULT INDUSTRIAL AIR P ARK AUTHORITY25
26(    )New Aviation Hanger and Ground
27 Support Equipment Facility,
28 Planning and Construction
29 ($1,000,000 Local Match)
30 (Calcasieu)
31 Payable from General Obligation Bonds
32	Priority 1	$ 260,000
33(    )New Air Cargo Facility,
34 Planning and Construction
35 ($1,100,000 Local Match)
36 (Calcasieu)
37 Payable from General Obligation Bonds
38	Priority 1	$ 350,000
39	Priority 5	$ 2,750,000
40 Total	$ 3,100,000
50/NFCJOHN K. KELLY GRAND BAYOU RESERVOIR41
42(    )Grand Bayou Resort Sea Wall and Sewer System
43 Repairs, Planning and Construction
44 (Red River)
45 Payable from General Obligation Bonds
46	Priority 2	$ 135,000
Page 111 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/NJ7BLOOD CENTER PROPERTIES, INC.1
2(    )Lake Charles Facility Flood Wall and
3 Retractable Flood Gates Project
4 (Calcasieu)
5 Payable from General Obligation Bonds
6	Priority 5	$ 1,600,000
50/NM1RAPIDES WATER WORK S DISTRICT NO. 37
8(    )Color Removal from Well No. 2 and Well No. 7
9 at LA Army National Guard, Camp Beauregard,
10 Pineville, LA, Planning and Construction
11 (Rapides)
12 Payable from General Obligation Bonds
13	Priority 1	$ 50,000
50/NMHSOUTHWEST OUACHITA WATER WORK S, INC.14
15(    )Water Distribution System Renovations, 
16 Planning and Construction
17 (Ouachita)
18 Payable from General Obligation Bonds
19	Priority 5	$ 300,000
50/NTTHOMER MEMORIAL HOSP ITAL20
21(    )Hospital Roof Repair,
22 Planning and Construction
23 (Claiborne)
24 Payable from General Obligation Bonds
25	Priority 1	$ 25,000
26	Priority 2	$ 126,100
27 Total	$ 151,100
28(    )Upper Parking Lot Expansion,
29 Planning and Construction
30 (Claiborne)
31 Payable from General Obligation Bonds
32	Priority 1	$ 110,000
33(    )Backup Generator, Acquisition, Planning
34 and Construction
35 (Claiborne)
36 Payable from General Obligation Bonds
37	Priority 2	$ 100,000
50/NQEFREED MEN, INC.38
39(    )Housing Renovations, Planning and Construction
40 (Ouachita)
41 Payable from General Obligation Bonds
42	Priority 1	$ 45,000
Page 112 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
50/NRVMADISON VOLUNTARY COUNCIL ON AG ING1
2(    )Expansion and Improvements to Activities
3 Building, Planning and Construction
4 (Madison)
5 Payable from General Obligation Bonds
6	Priority 5	$ 220,000
50/NVTINDIAN VILLAGE WATER SYSTEM7
8(    )Connection to Robinson Chapel Water System 
9 and Associated Improvements, 
10 Planning and Construction
11 (Jackson)
12 Payable from General Obligation Bonds
13	Priority 2	$ 97,800
50/NXBMONTEREY RURAL WATER SYSTEM14
15(    )Emergency Water Ground Storage Tank Replacement,
16 Planning and Construction
17 (Concordia)
18 Payable from General Obligation Bonds
19	Priority 5	$ 210,000
20 Section 2.  The expenditure of funds appropriated in this Act, except appropriations
21made to nonprofit economic development corporations, shall be in conformity to all existing
22statutes relative to public bidding, contractual review, and R.S. 39:101 through 128 and any
23other statutes affecting the capital outlay program for state government, state institutions,
24and political entities.  No contract shall be awarded for any project prior to the granting of
25a line of credit or the sale of bonds by the State Bond Commission, determination by the
26state treasurer that cash funding is available in the Comprehensive Capital Outlay Escrow
27Account for the project, or delivery of revenue bonds whose issuance is authorized in
28Section 1 of this Act. 
29 Section 3.  Payment for projects specified in this Act must be made by warrant
30submitted to the division of administration, Department of Transportation and Development,
31the state treasurer or other administering agency as provided in Section 8, whichever is
32appropriate, only to the extent of funds required for immediate payment. Copies of invoices
33or other supporting documentation shall be submitted with warrants.  In the event that any
34equipment included in this Act, is procured pursuant to the provisions of the State Lease-
35Purchase Act, R.S. 39:1761 et seq., the amounts included in this Act for each such piece of
36equipment shall not be appropriated.  The provisions of R.S. 39:1771 which require
37equipment to be leased under the State Lease-Purchase Act to be included in the executive
Page 113 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1budget and approved by the legislature through inclusion in the General Appropriation Act
2shall be considered waived upon the inclusion of such equipment in this Act.  Projects
3contained in this Act may, at the direction of the division of administration and with the
4approval of the State Bond Commission, alternatively be funded through financing programs
5heretofore or hereafter provided by a public trust and public corporation duly organized
6pursuant to R.S. 9:2341 et seq., having for its beneficiary the state and the Louisiana Local
7Government Environmental Facilities and Community Development Authority, pursuant to
8R.S. 33:4548.1 et seq. 
9 Section 4.  If at any time during the Fiscal Year 2017-2018, the governor should find,
10or the Joint Legislative Committee on the Budget or the commissioner of administration
11should report to the governor, that the receipts of the treasury are falling short or appear
12likely to fall short of the revenue estimates for the fiscal year and that a cash deficit is likely
13to be incurred, the governor shall take such steps as deemed necessary to prevent the
14occurrence of a cash deficit.  In the event that a capital outlay project funded in this Act falls
15under an agency which is abolished or for which funds are not appropriated in the 2017-2018
16General Appropriation Act, then the funds appropriated in this Act for such capital outlay
17projects shall not be expended unless deemed necessary by the governor to protect life or
18property.  In the event that legislation is enacted which transfers facilities or programs for
19which projects are funded in this Act, on behalf of one agency, institution, department, or
20management board to another agency, institution, department, or management board, then
21the projects in this Act shall be deemed transferred also.
22 Section 5.  All monies appropriated by this Act and any applicable funds of a prior
23capital outlay budget act adopted by the legislature shall be deposited by the state treasurer
24in the Comprehensive Capital Outlay Escrow Account, established by this Section, in the
25state treasury.  In accordance with R.S. 36:764, no later than sixty days following the end
26of each quarter, the state treasurer shall report to the Joint Legislative Committee on the
27Budget and the commissioner of administration, all funds contained in the Miscellaneous
28Fund of the Comprehensive Capital Outlay Escrow Account.  Notwithstanding any
29provisions contained herein or other law to the contrary, any original issue premium or
30accrued interest proceeds received pursuant to the sale of general obligation bonds shall
Page 114 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1remain on deposit to the credit of the Bond Security and Redemption Fund until such time
2as they may be utilized in accordance with U.S. Department of the Treasury Regulations
3promulgated pursuant to the Internal Revenue Code of 1986.  All such monies shall be
4administered according to the particular act pertaining to the fiscal year in which such
5monies were appropriated.  If it is determined by the director of the office of facility
6planning and control, division of administration, that the funds appropriated by this Act or
7any prior capital outlay budget act are not sufficient to complete the projects contained in
8any capital outlay budget act, through unavoidable deficiencies in appropriation, including
9administrative and legal requirements, the commissioner of administration, subject to
10approval of the Joint Legislative Committee on the Budget, may direct the use of interest
11earned from the investment of general obligation bond or note proceeds in the
12Comprehensive Capital Outlay Escrow Account, not to exceed an aggregate of five million
13dollars in any one fiscal year, for the purpose of completing the projects contained in any
14capital outlay budget act and such money shall be deemed appropriated in specific amounts
15necessary for such purpose.  All appropriations in this Act which are made as additions to
16funds for previously authorized projects shall be included, for accounting purposes, in the
17account of the previously authorized projects.  If it is determined by the director of the office
18of facility planning and control, division of administration, that it is cost effective and
19practical to combine individual appropriations, the commissioner of administration, subject
20to the approval of the Joint Legislative Committee on the Budget, may direct that two or
21more appropriations or parts thereof may be combined into a single project for accounting
22and audit purposes.  The commissioner of administration may direct that funding in the
23various statewide and/or multiple parish projects for improvements for state facilities may
24be transferred to any project, in this Act or any previous Capital Outlay Act, which require
25supplemental funding for improvements for state facilities which qualify for funding through
26the various statewide and/or multiple parish projects for improvements for state facilities. 
27The office of facility planning and control, division of administration is authorized to receive
28settlements and vendor rebates not in excess of $50,000 unless approved by the Joint
29Legislative Committee on the Budget, and to add those receipts to the funding for projects
30in this Act or any previous Capital Outlay Act for which project funds are received.  The
Page 115 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1office of facility planning and control, division of administration is authorized to receive
2insurance payments and are hereby authorized to immediately repair facilities that suffer
3insurance losses without those projects being included in the Act and shall report to the Joint
4Legislative Committee on the Budget any expenditures from insurance funds received
5pursuant to this section.  A portion, as determined by the commissioner of administration and
6not to exceed one percent (1%), of the funding for projects which qualify for the Percent for
7Art Program, may be transferred from the qualifying project budgets, to the Department of
8Culture, Recreation and Tourism for costs of acquiring art and administering the program. 
9For all Percent for Art Program projects in this or any previous capital outlay, up to ten
10percent (10%) of the aforementioned one percent (1%) may be used for the costs of
11administering the projects.
12 Section 6.  Prior to March 1, 2018, the commissioner of administration shall submit
13to the Joint Legislative Committee on Capital Outlay a list of projects that are completed and
14the cash balances remaining in each project. 
15 Section 7.  The commissioner of administration, with the approval of the Joint
16Legislative Committee on the Budget, is authorized to supplement or substitute the
17appropriations specified in this or previous capital outlay acts with any federal or other funds
18which are or may become available and such funds shall be deemed appropriated in specific
19amounts necessary for the purposes of this Act.  Any funds received by the State Bond
20Commission as a result of a prepayment of reimbursement contracts as authorized by law
21and the policy and procedure for reimbursement contracts of the Department of Treasury,
22office of State Bond Commission, shall be deposited as set forth in such policy and
23procedure and shall be deemed available and appropriated in specific amounts necessary for
24the purposes of this Act pursuant to the procedure set forth in this section.
25 Section 8.  All of the funds herein appropriated, except for appropriations made to
26the Department of Military Affairs, the Legislature, the Louisiana Stadium and Exposition
27District, the Department of Economic Development, the Coastal Protection and Restoration
28Authority, the Division of Administration for Supplemental State Funds for Local
29Government Assistance Program, the Division of Administration for the Community Water
30Enrichment Program or the Department of Transportation and Development, shall be
Page 116 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1considered as having been appropriated directly to the Office of Facility Planning and
2Control, Division of Administration, and all projects herein authorized and funded shall be
3subject to the provisions of R.S. 39:101 through 128.  All of the funds appropriated in the
4Capital Outlay Act under the name of non-state entities shall be administered by the Office
5of Facility Planning and Control, Division of Administration, under cooperative endeavor
6agreements.  All cooperative endeavor agreements for non-state entities shall be prepared
7by the Office of Facility Planning and Control and the Commissioner of Administration is
8hereby authorized and directed to effectuate any necessary transfer of funds from the
9Department of Justice to the Office of Facility Planning and Control in order to accomplish
10this purpose.  However, all cooperative endeavor agreements between the Department of
11Transportation and Development and non-state entities entered into prior to the passage of
12this Act shall continue to be administered by the Department of Transportation and
13Development.  Cooperative endeavor agreements entered into pursuant to this Act, and
14approved by the Commissioner of Administration or his designee, or the Secretary of the
15Department of Transportation and Development for projects appropriated to or administered
16by the Department of Transportation and Development, shall not be required to be submitted
17to the Division of Administration, Office of Contractual Review.  For all projects in the
18Capital Outlay Act or a previous Capital Outlay Act which are appropriated to the Office of
19Facility Planning and Control, Division of Administration, including those administered by
20cooperative endeavor agreements, up to six percent of each line-item may be used for costs
21of administering the projects.  For all projects in Capital Outlay Act or a previous Capital
22Outlay Act appropriated to the Department of Transportation and Development, up to six
23percent of each line-item may be used for costs of administering the projects, or for field
24engineering/construction supervision.  Line-item general obligation bond projects
25appropriated to the Department of Transportation and Development in the Capital Outlay
26Act or a previous Capital Outlay Act shall be authorized to draw Transportation Trust Funds
27from the Highway Program appropriation, for supplemental funding on overruns in excess
28of the original estimated project cost as determined by the Department of Transportation and
29Development, provided however that said projects are in the state or federal highway system
30and in the priority program, and the overrun is less than $50,000.  Any such overrun of
Page 117 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1$50,000 or more must be approved by the Joint Legislative Committee on the Budget. 
2Furthermore, all ports, levee districts and other non-state entities must have a fully executed
3cooperative endeavor agreement, from the Office of Facility Planning and Control,
4Department of Transportation and Development, or the State Treasurer, whichever is
5appropriate, before entering into any contracts which obligate state funding and must follow
6all laws pertaining to public bidding.  If a port, levee district or other non-state entity enters
7into a contract prior to receipt of funding, or prior to execution of a cooperative endeavor
8agreement, then payments under such contracts are prohibited from capital outlay
9appropriations, and are the sole responsibility of the port, levee district, or other non-state
10entity.  Notwithstanding the provisions of this Act, the Capital Outlay Act, or any previous
11capital outlay act, contracts may be entered into for the Atchafalaya Basin Protection and
12Enhancement Kemper Williams project in St. Mary Parish prior to a cooperative endeavor
13agreement being entered into with the state. Notwithstanding anything contained in this Act,
14the Capital Outlay Act, or any previous capital outlay act to the contrary or any other
15provision of law, contracts may be entered into for the Youngsville Sports Complex project
16in Lafayette Parish, prior to receipt of funding and prior to execution of the cooperative
17endeavor agreement and the state is authorized to financially participate in obligations
18created by such contracts.  Notwithstanding the provisions of R.S. 39:112(E)(2), the project
19for Independence, Independence Area Community Pavilion, Planning and Construction,
20shall be exempt from all local match requirements. Notwithstanding anything contained in
21this  Act or the Capital Outlay Act to the contrary or any other provision of law, the scope
22of the appropriations made in the Capital Outlay Act or any other Capital Outlay Act for the
23St. Mary Parish Plantation Pump Station Replacement project shall be deemed to include
24repair, equipment, rehabilitation and infrastructure improvements at the existing Plantation
25Pump Station.  Notwithstanding anything contained in this Act or the Capital Outlay Act to
26the contrary or any other provision of law, the scope of the appropriations made in this or
27any other Capital Outlay Act for the Louisiana 4-H Foundation, Youth Education
28Development Camp Windy Wood project, shall be deemed to include planning, construction,
29and acquisition.  Notwithstanding anything contained in this Act or the Capital Outlay Act
30to the contrary or any other provision of law, the scope of the appropriations made in the
Page 118 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1Capital Outlay Act or any other Capital Outlay Act for the Youngsville Parkway Road
2project shall be deemed to include waterline improvements and roadway lighting.
3Notwithstanding anything contained in this Act or the Capital Outlay Act to the contrary, or
4any other provision of law, the scope of the appropriations made in the Capital Outlay Act
5or any other Capital Outlay Act for the City of New Orleans, Eastern New Orleans Hospital
6and Medical Office Building, Real Estate Acquisition, Planning, Design, Construction,
7Renovation and Equipment project, the City of New Orleans  may make such capital outlay
8funds available to the Parish Hospital Service District of the Parish of Orleans District "A"
9in furtherance of the District's planning, design, acquisition, development, renovation,
10construction, equipment and operation of a hospital and medical office building in Eastern
11New Orleans. Notwithstanding anything contained in this Act or the Capital Outlay Act, or
12in any cooperative endeavor agreement between the Office of Facility Planning and Control
13and the City of New Orleans or the Hospital Service District to the contrary, the Hospital
14Service District may mortgage or otherwise encumber any and all land, real estate property,
15including buildings and equipment, and appurtenances acquired, in whole or part, with state
16capital outlay funds provided that bond counsel to the state opines that such mortgage shall
17not affect the tax-exempt status of the bonds to be issued by the state for the project.
18Notwithstanding anything in this Act or the Capital Outlay Act to the contrary, contracts
19may be entered into for the City of New Orleans, Eastern New Orleans Hospital and Medical
20Office Building, Real Estate Acquisition, Planning, Design, Construction, Renovation and
21Equipment project prior to receipt of funding and prior to execution of the cooperative
22endeavor agreement.  Notwithstanding anything contained in this Act or the Capital Outlay
23Act to the contrary or any other provision of law, the scope of the appropriations made in 
24the Capital Outlay Act or any other Capital Outlay Act for the Jefferson Parish Bonnabel
25Canal Rehabilitation and Bank Stabilization (Veterans Boulevard to West Esplanade),
26Planning and Construction project shall be deemed to include steel sheet pile bulkhead,
27and/or bank excavation and reshaping, bridge replacement, property acquisition, demolition
28and improvements needed to stabilize the canal bank along the Bonnabel Drainage Canal in
29order to address canal bank failures between Veterans Boulevard and West Esplanade
30Avenue.  Notwithstanding anything contained in this Act or the Capital Outlay Act to the
Page 119 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1contrary or any other provision of law, the scope of the appropriations made in this or any
2other Capital Outlay Act for the New Orleans West Bank Park Improvements, New Soccer
3and Recreational Facilities, and Skateboard Park project and the Norman Playground
4Basketball Gym, Planning and Construction project shall be deemed to include the George
5W. Carver Playground, Renovations and Upgrades project for the West Bank Park project
6and  park enhancements for a walking track, basketball, football and baseball fields and a
7concession stand for the Norman Playground project.  Notwithstanding anything contained
8in this Act or the Capital Outlay Act to the contrary or any other provision of law, the Parks
9Municipal Complex, Planning and Construction project shall include the purchase,
10construction or renovation of a new facility in St. Martin Parish.  Notwithstanding anything
11contained in this Act or the Capital Outlay Act to the contrary or any other provision of law,
12The Vernon/Fort Polk Thoroughfare Electrical Power Extension project shall include
13Utilities Including Generators.  Notwithstanding anything contained in this Act or the
14Capital Outlay Act to the contrary or any other provision of law, the Parish Road
15Improvements Project for Franklin Parish is exempt from the contract limit set forth in R.S.
1638:2212.  Notwithstanding anything contained in this Act or the Capital Outlay Act to the
17contrary or any other Act or provision of law, the appropriations made for the Executive
18Department for facilities which promote economic development included in the Repair,
19Restoration, and Replacement for Hurricanes Katrina and Rita project, and the Department
20of Economic Development projects are for public purposes pursuant to the provisions of
21Article VII, Section 14 of the Constitution of Louisiana primarily for economic
22development, including the generation of tax revenues, creation of jobs, promotion of
23tourism, and creation of facilities for charitable, cultural, artistic, educational, social, civic,
24research, service, economic development activities, or provide facilities for professional golf
25events, pursuant to the terms of cooperative endeavor agreements, including leases and all
26expenditures of these appropriations and may be exempted, by the Commissioner of
27Administration, from all statutes relative to public bidding, contractual review and the
28provisions of R.S. 33:9029.2(D) and in lieu thereof be allowed to use alternative competitive
29contracting arrangements where the appropriate administering entity submits documentation
30to the Commissioner of Administration substantiating that it is in the best interest of the
Page 120 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1citizens of the state, due to economic and/or operational benefits, and the necessity to
2complete the projects in a timely manner; and, the appropriate administering entity shall
3have the authority to directly appoint the design professional from a list of a minimum of
4three design firms or joint ventures with the appropriate specialized facility design
5experience submitted to and acceptable to the Commissioner of Administration and shall be
6exempt from other state requirements for selection of designers, and may include
7expenditures for computers, fixtures, furniture, and other equipment as such is deemed to
8be capital outlay in nature, and unless the Commissioner of Administration is advised by
9bond counsel to the State that such may violate federal tax law, may be used to reimburse
10any expenditure made prior to the granting of a line of credit or the sale of bonds by the State
11Bond Commission, determination by the State Treasurer that cash funding has been
12deposited in the Comprehensive Capital Outlay Escrow Account for the project or the
13execution of a cooperative endeavor agreement from the Office of Facility Planning and
14Control, and may be used to acquire land or real property, the title to which is held in the
15name of an entity exempt from taxation under the provisions of 26 U.S.C. 501(c)(3). 
16Notwithstanding anything contained in this Act or the Capital Outlay Act to the contrary or
17any other provision of law, all of the funds herein appropriated to the Department of
18Economic Development in connection with the Capital Improvements Project to Meet
19Economic Development Commitments for which the Department of Economic Development
20utilizes a cooperative endeavor agreement to further economic development as permitted
21under Article VII, Section 14 of the Louisiana Constitution, including the generation of tax
22revenues and creation of jobs, shall be considered as having been appropriated to the
23Department of Economic Development, may be used to reimburse any expenditure made
24prior to the granting of a line of credit and made prior to the execution of a cooperative
25endeavor agreement and shall be administered solely by the Department of Economic
26Development pursuant to, in compliance with, and on the terms contained in such
27cooperative endeavor agreements. Notwithstanding any provision of law to the contrary, the
28Commissioner of Administration is hereby authorized to take such actions as are necessary,
29including using such funds as may be available including those appropriated and available
30under this Act or the Capital Outlay Act for professional sports facilities through the
Page 121 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1Louisiana Stadium and Exposition District and that are otherwise available, executing on
2behalf of the State such documents as are necessary in order to terminate the ground lease
3between the State and the PGA and thereby acquiring all leasehold improvements for the
4State, extending the management agreement between the State and the PGA, and extending
5the sponsorship and presence of the Zurich Classic in the Greater New Orleans area. 
6Notwithstanding anything contained in this Act, or the Capital Outlay Act, or any other
7capital outlay act, contracts may be entered into for the Port of South Louisiana, Globalplex
8Rail Siding; Globalplex Terminal Building #71 Upgrade, Planning and Construction and/or
9Administration Building (also known as the Business Development Center) projects prior
10to receipt of funding and prior to execution of a cooperative endeavor agreement. 
11Notwithstanding anything in this Act, the Capital Outlay Act, any previous capital outlay act,
12or other provision of law to the contrary, the scope of the appropriation for the Port of South
13Louisiana Globalplex Terminal Building #71 Upgrade project shall be deemed to also
14include similar upgrades for other Globalplex Terminal Buildings.  Notwithstanding
15anything in this Act, any previous capital outlay act, or other provision of law to the
16contrary, monies appropriated herein for the Port of South Louisiana Globalplex Terminal
17Building #71 and Other Globalplex Terminal Building Upgrades, Planning and Construction
18may be expended for design fees related to the conveyor system and ancillary equipment that
19exceed the customary ten percent limitation on design fee costs.  Notwithstanding anything
20in this Act or the Capital Outlay Act to the contrary or any other provision of law, contracts
21may be entered into for the Greater Baton Rouge Port Commission Inland Rivers Marine
22Terminal Dock and Access Roadway Construction Project, Planning and Construction
23Project prior to receipt of funding and prior to the execution of a cooperative endeavor
24agreement. Notwithstanding anything in this Act to the contrary or any other provision of
25law, monies appropriated herein for the Juban Road (LA1026) Widening (I-12 to US 190)
26project may be expended for the installation of sewer lines along the roadway and pursuant
27to a cooperative endeavor agreement between the Department of Transportation and
28Development and Livingston Parish, funds may be provided to Livingston Parish for that
29purpose. Notwithstanding anything contained in this act to the contrary or any other
30provision of law, the appropriations made for the Louisiana Stadium and Exposition District
Page 122 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1shall be appropriated directly to the Louisiana Stadium and Exposition District, and are
2public purposes pursuant to the provisions of Article VII, Section 14 of the Constitution of
3Louisiana primarily for economic development, including the generation of tax revenue,
4creation of jobs, and the generation of tourism, and may be used to reimburse any
5expenditure made prior to the granting of a line of credit or the sale of bonds by the State
6Bond Commission, determination by the State Treasurer that cash funding has been
7deposited in the Comprehensive Capital Outlay Escrow Account for the project. The
8Louisiana Stadium and Exposition District may apply up to $10,000,000 to reimburse the
9New Orleans Pelicans NBA, LLC for costs incurred in constructing a new training facility
10as contemplated by the Amended and Restated Arena Use Agreement dated July, 1 2015;
11but, otherwise, contracts for projects funded through this appropriation shall be awarded
12utilizing the public bid and contractual review process set forth in Chapter 10 of Title 38 and
13Chapter 17 of Title 39 of the Louisiana Revised Statutes of 1950, except with respect to time
14requirements, or, in order to encourage competition for the projects funded through this
15appropriation and to complete the projects in a timely manner, the Louisiana Stadium and
16Exposition District shall have the authority to select a general contractor through an RFP
17process whereby general contractors will bid general conditions and contractor's fee based
18on the direct construction budget.  The alternative time requirements shall be approved by
19the Commissioner of Administration before the awarding of any such contracts.  Further,
20with respect to appropriations to the Louisiana Stadium and Exposition District for the TPC
21Louisiana, Planning and Construction project, the Louisiana Stadium and Exposition District
22shall be permitted to use alternative competitive procurement and delivery methods for the
23award of any contracts to be funded through such appropriation.  The Louisiana Stadium and
24Exposition District shall have the authority to directly appoint the design professional from
25a list of a minimum of three architectural firms or joint ventures with professional sports
26facility design experience acceptable to the Commissioner of Administration and shall be
27exempt from other state requirements for selection of designers.  The design professional fee
28shall be in accordance with state guidelines administered by the Office of Facility Planning
29and Control, Division of Administration.  Eligible expenses for Economic Development
30Award Program funds may include documented project expenses beginning on the date of
Page 123 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1LEDC Board approval of the project and may be reimbursed upon execution of the
2cooperative endeavor agreement for the project.  The new University Medical Center in New
3Orleans project in Orleans Parish shall be exempt from the state's requirements for selection
4of designers and the Commissioner of Administration shall have the authority to approve a
5design professional selection process.  The design professional fee shall be in accordance
6with state guidelines administered by the Office of Facility Planning and Control, Division
7of Administration.  The Division of Administration, Office of Facility Planning and Control,
8with approval of the Commissioner of Administration and the Joint Legislative Committee
9on the Budget, is authorized to use alternative delivery strategies in implementing hurricane
10damage repairs to Southern University at New Orleans, Hazardous Material Abatement
11Projects, the City Park Golf Complex Improvements project, the Health/Human Performance
12Education Complex, and the Patrick Taylor Hall Renovation and Expansion project.  In
13addition, with the approval of the Commissioner of Administration and the Joint Legislative
14Committee on the Budget, an alternative delivery strategy may be used in the
15implementation of the Louisiana Children's Museum, Early Learning Village project.  Due
16to the State's current investment in TPC Louisiana and the financial support it provides to
17the PGA TOUR event currently played at said facility, the funding of the City Park Golf
18Complex Improvements project described above is conditioned upon said PGA TOUR event
19not being played at New Orleans City Park Golf Complex without the prior agreement of the
20Commissioner of Administration and the Chairman of the Jefferson Parish Council.
21Notwithstanding the foregoing, the City Park Golf Complex may host any other golf
22tournament or event, including but not limited to any other PGA-affiliated or sponsored
23tournament or event.  For all projects administered by the Office of Facility Planning and
24Control and payable from proceeds of self-generated revenues, funds shall be remitted to the
25Office of Facility Planning and Control for deposit in the state treasury at such time as may
26be deemed necessary by the Office of Facility Planning and Control in order to cover the
27amount of contracts or other project expenses. The State Treasurer shall refund to the
28appropriate source any surplus self-generated funds, advanced insurance funds received by
29the Office of Facility Planning and Control as Interagency Transfer from Office of Risk
30Management associated with hurricane damage recovery, and interest earned on these funds,
Page 124 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1provided the Treasurer's Office is notified, when these funds are deposited in the state
2treasury, that the user agency or Office of Risk Management intends to request a refund of
3this interest.  Any revenue bonds appropriated in Section 1 of the Capital Outlay Act shall
4not be secured by the full faith and credit of the state. Notwithstanding anything in this Act
5or the Capital Outlay Act to the contrary or any other provision of law, contracts may be
6entered into for the Mississippi River Levee Raising, Arkansas to Old River project prior to
7receipt of funding, and the State is authorized to financially participate in obligations created
8by such contracts.  Notwithstanding anything in this Act or the Capital Outlay Act to the
9contrary or any other provision of law, contracts may be entered into for the Old McKinley
10High School Community Center on Thomas Delpit Drive in the City of Baton Rouge,
11Kitchen and Building Renovations, Repairs and Upgrades Including Elevator Repair Project
12prior to receipt of funding and prior to the execution of a cooperative endeavor agreement,
13and unless the Commissioner of Administration is advised by bond counsel to the state that
14such may violate federal tax law, the appropriation may be used to reimburse any
15expenditure made prior to the granting of a line of credit or the sale of bonds by the State
16Bond Commission.  Notwithstanding anything in this Act or the Capital Outlay Act to the
17contrary or any other provision of law, contracts may be entered into for the Tulane
18University Tulane River and Coastal Center Project prior to receipt of funding and prior to
19the execution of a cooperative endeavor agreement, and the project is exempted from all
20statutes relative to public bidding and state procurement and in lieu thereof shall be subject
21to federal government qualifications and regulations approved by the Economic
22Development Authority.  Notwithstanding anything in this Act or the Capital Outlay Act to
23the contrary or any other provision of law, contracts may be entered into for the Outpatient
24Clinics in Rapides Parish, Planning and Construction project for the Division of
25Administration prior to the execution of a cooperative endeavor agreement.  Notwithstanding
26any other provision of this Act or the Capital Outlay Act or any other provision of law to the
27contrary, funds appropriated for the Economic Development Award Program  project for the
28Office of Business Development are to be used solely for capital and infrastructure
29improvements subject to verification by the Division of Administration, Office of Facility
30Planning and Control.  Notwithstanding any other provision of this Act or the Capital Outlay
Page 125 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1Act or any other provision of law to the contrary,  all of the funds herein appropriated to the
2Department of Economic Development in connection with projects or programs for which
3the Department of Economic Development utilizes a cooperative endeavor agreement to
4further economic development as permitted under Article VII, Section 14 of the Louisiana
5Constitution, including the generation of tax revenues and creation of jobs, shall be
6considered as having been appropriated to the Department of Economic Development, may
7be used to reimburse any expenditure made prior to the granting of a line of credit and made
8prior to the execution of a cooperative endeavor agreement and shall be administered solely
9by the Department of Economic Development pursuant to, in compliance with, and on the
10terms contained in such cooperative endeavor agreements without compliance with any other
11law, including, but not limited to, the provisions of R.S. 39:101 through 128. Additionally,
12all expenditures of these appropriations may be exempted by the Commissioner of
13Administration, from all statutes relative to public bidding, contractual review and the
14provisions of R.S. 33:9029.2(D). Notwithstanding anything contained in this Act, the Capital
15Outlay Act, or any other provision of law to the contrary, the letting of a contract for
16construction of the "Louisiana Construction Center", funded wholly by the Louisiana
17Licensing Board for Contractors, shall be exempt from all statutes relative to public bidding
18and contractual review. Notwithstanding anything contained in this Act or the Capital Outlay
19Act or any other provision of law to the contrary, contracts may be entered into for the City
20of Gretna’s Lion’s Club Conversion to Senior Center project prior to receipt of funding and
21prior to execution of a cooperative endeavor agreement and the project is exempted from all
22statutes relative to public bidding and contractual review. Notwithstanding anything
23contained in this Act, the Capital Outlay Act, or any other provision of law to the contrary,
24the scope of the appropriation for the Department of Transportation and Development, LA
2522 Improvements (LA 16 to Diversion Canal), Planning and Construction (Livingston) is
26deemed to also include the overlay of LA 22 from Head of Island to Chinquapin Bridge. 
27Notwithstanding anything contained in this Act, the Capital Outlay Act, or any other
28provision of law to the contrary, the Department of Transportation and Development shall
29use $2,500,000 of general obligation bond funding appropriated for Department of
30Transportation and Development, Administration, Highway Program (Up to $4,000,000 for
Page 126 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1Secretary's Emergency Fund) in Act 25 of the 2014 Regular Session of the Legislature for
2the Louisiana Highway 92 Overlay, Preservation and Construction (Lafayette) project.
3Notwithstanding anything contained in the Act or a previous Capital Outlay Act, any
4provision of law, or in any cooperative endeavor agreement between the Office of Facility
5Planning and Control and Westwego, the scope of the appropriations in this or any previous
6Capital Outlay Act for Westwego, The WHARF project shall be deemed to include site
7preparation.  Notwithstanding anything contained in the Act or the Capital Outlay Act to the
8contrary or any other provision of law, the Slip Dredging and Improvements for the
9Terrebonne Port Commission Government Multi-Use Complex, Planning and Construction
10project shall be deemed to include Houma Navigation Canal Dredging. Notwithstanding
11anything contained in this Act or a previous Capital Outlay Act, any provision of law, or in
12any cooperative endeavor agreement between the Office of Facility Planning and Control
13and the Pontchartrain Levee District, the scope of the appropriations in this or any previous
14Capital Outlay Act for the Pontchartrain Levee District, East St. Charles Urban Flood
15Control project shall be deemed to include planning, design, and construction of the East St.
16Charles Urban Flood Control project, including the Almedia, St. Rose, and Airport Pump
17Stations located in the eastern end of the East Bank of St. Charles Parish.  Notwithstanding
18anything contained in this Act, the Capital Outlay Act, or any other provision of law to the
19contrary, $50,000 of the appropriation for Department of Natural Resources, Office of the
20Secretary, Atchafalaya Basin Protection and Enhancement (Federal Match and
21Local/Sponsor Match)(Assumption, Avoyelles, Iberia, Iberville, Pointe Coupee, St. Landry,
22St. Martin, St. Mary) will be used to fund House Concurrent Resolution No. 168 of 2011. 
23Notwithstanding anything contained in this Act or the Capital Outlay Act to the contrary,
24any other provisions of law, or the provisions of R.S. 39:112(E)(2), the project for Eden
25House, New Facility, Acquisition, Planning and Construction, shall be exempt from all local
26match requirements.  Notwithstanding anything contained in this Act, the Capital Outlay
27Act, any other provision of law, or the provisions of R.S. 39:112(E)(2) to the contrary, the
28project for Lockport Street Improvements, Planning and Construction, shall be exempt from
29all local match requirements.  Notwithstanding anything contained in this Act, the Capital
30Outlay Act, or any other Capital Outlay Act, the scope of the appropriation for the
Page 127 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1Department of Transportation and Development, Jimmie Davis Bridge Rehabilitation and
2Lighting, Planning and Construction project in Bossier and Caddo parishes, shall be deemed
3to include the planning, design and construction of a new bridge.  Notwithstanding any
4provisions contained herein or any other law to the contrary, for projects with other means
5of financing provided to the administering agency by interagency transfer, the authority to
6draw these funds shall remain with the user agency.
7 Section 9.  Notwithstanding any provisions contained herein or any other law to the
8contrary, the provisions of Chapter 16 of Subtitle III of Title 39 of the Louisiana Revised
9Statutes of 1950 as amended, shall not apply to architectural and engineering contracts,
10administered by the office of facility planning and control, division of administration
11pursuant to this or any other capital outlay act.
12 Section 10.  All funds appropriated herein to the office of facility planning and
13control, division of administration, on behalf of non-state entities, and administered by
14cooperative endeavor agreements pursuant to this Act shall be expended within two (2) years
15from the date of the issuance of the bonds.  The office of facility planning and control,
16division of administration, agrees that it will notify the non-state entity of the date the bonds
17are issued within three (3) months from the issuance thereof.  The non-state entity
18understands and agrees that if the funds appropriated herein and administered under
19cooperative endeavor agreements pursuant to this Act are not totally expended within two
20(2) years from the issuance of the bonds, the office of facility planning and control, division
21of administration, can close the project and recommend that the legislature reallocate any
22unexpended proceeds to other projects.
23 Section 11.  Notwithstanding any provisions contained herein or law to the contrary,
24the proceeds of revenue bonds to be utilized to fund certain projects authorized in Section
251 hereof may, in accordance with Article VII, Section 9 of the Louisiana Constitution of
261974, be deposited in special accounts held outside the state treasury in accordance with the
27provisions of any bond resolution, indenture, reimbursement contract, or other bond or
28financing covenant which provides for the pledge of such funds in connection with the
29issuance of revenue bonds.  For all projects administered by the office of facility planning
30and control, division of administration, authorized in Section 1 hereof which are payable
Page 128 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1from the proceeds of revenue bonds, only the office of facility planning and control, division
2of administration, will be authorized to requisition funds from the special accounts described
3immediately above, at such time or times as may be deemed necessary by the office of
4facility planning and control, division of administration, in order to cover contract amounts
5or other project expenses. 
6 Section 12.  The governor shall have the power to veto any line-item in this Act.
7 Section 13.  Except as otherwise provided herein, no funds shall be expended on any
8highway projects on highways within the state highway system as established in R.S. 48:191
9under the jurisdiction of the Department of Transportation and Development unless and until
10such project is in the Highway Program, R.S. 48:228 through 232, approved by the Joint
11Legislative Committee on Transportation, Highways and Public Works.  Pursuant to R.S.
1249:214.6.2(B), no integrated coastal protection construction project shall be undertaken with
13funds included in this bill except those included in an annual plan finally approved by the
14legislature in accordance with the provisions of R.S. 49:214.5.3.  No funds appropriated to
15the Coastal Protection and Restoration Authority in this Act as a contribution for a project
16cost-share or otherwise, for the national economic development and national ecosystem
17restoration components of the Southwest Coastal Louisiana Study shall be used or provided
18for the expropriation of property or use of eminent domain, except where such funds are to
19be used to obtain property voluntarily offered for project purposes, where at least seventy-
20five percent of the owners have voluntarily offered the property, or where the record or
21apparent owners have voluntarily offered the property but do not have clear title.
22 Section 14.  The word "statewide" used in place of the specific parish designation for
23projects contained in this Act indicates that the project or program is applicable to all sixty-
24four parishes in the state.  The description of any project in this Act shall be deemed to
25include planning, design, master planning, studies, permits, surveys, testing, construction,
26land and/or building/improvement acquisition, reconstruction, renovation, repair, right of
27way and utilities, site and other improvements, miscellaneous/contingencies, lease hold
28improvements ultimately owned by the state or a political subdivision of the state, equipment
29and other acquisitions, and any other component of the project if such are included or
30indicated in the capital outlay request for such projects required by R. S. 39:101 subject to
Page 129 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
1the provisions of Title 39 of the Louisiana Revised Statutes.  For new construction or
2renovation projects, equipment or other acquisitions, which can reasonably be considered
3necessary for the facility to be functional, may be deemed to be included in the project, even
4if such equipment or other acquisitions are not included or indicated in the project name or
5the capital outlay request.  When local or federal match is referenced in a project title, but
6only a portion of the state appropriation is granted a line of credit or otherwise funded, then
7the amount of local or federal match, required to be made available, may be prorated relative
8to the amount of state appropriation made available through lines of credit. 
9 Section 15.  The provisions, items, and projects contained in this Act are severable
10and if any provision, item, or project contained herein, or the application of any such
11provision, item, or project, is held invalid, such invalidity shall not affect other provisions,
12items, projects, or applications of the Act which can be given effect without the invalid
13provision, project, item, or application. 
14 Section 16.  Notwithstanding any other provisions of law to the contrary, the state
15shall not grant cash lines of credit, or authorize or issue general obligation bonds in a
16principal amount in excess of $1,140,750,000 for Fiscal Year 2017-2018. 
17 Section 17.  Notwithstanding any contrary provision of this Act or any contrary
18provision of law, no funds appropriated by this Act shall be released or provided to any
19recipient of an appropriation made in this Act if, when, and for as long as, the recipient fails
20or refuses to comply with the provisions of R.S. 24:513.  No recipient shall be considered
21to fail or refuse to comply with the provisions of R.S. 24:513 pursuant to this Section during
22any extension of time granted by the legislative auditor to the recipient to comply.  The
23legislative auditor is authorized to grant an extension of time to comply with the provisions
24of R.S. 24:513 for recipient entities of an appropriation contained in this Act.
25 Section 18.  This Act shall become effective upon signature by the governor or, if not
26signed by the governor, upon expiration of the time for bills to become law without signature
27by the governor, as provided in Article III, Section 18 of the Constitution of Louisiana.  If
28vetoed by the governor and subsequently approved by the legislature, this Act shall become
29effective on the day following such approval.
Page 130 of 131 HLS 172ES-17	ORIGINAL
HB NO. 12
DIGEST
The digest printed below was prepared by House Legislative Services.  It constitutes no part
of the legislative instrument.  The keyword, one-liner, abstract, and digest do not constitute
part of the law or proof or indicia of legislative intent.  [R.S. 1:13(B) and 24:177(E)]
HB 12 Original 2017 Second Extraordinary Session	Jones
Provides for the capital outlay budget and program for FY 2017-2018; provides for the
funding of the capital outlays from the specified sources of monies in the specified amounts
as follows:
State General Fund (Direct)	$ 1,500,000
Federal Funds	$ 62,713,000
Transportation Trust Fund (TTF) - Federal $ 637,761,670
Transportation Trust Fund (TTF) - Regular $ 168,265,658
Interagency Transfers	$ 41,377,106
Misc. Statutory Dedications	$ 273,636,057
Fees and Self-Generated Revenues $ 48,574,970
Revenue Bonds	$ 266,625,000
TOTAL CASH PORTION	$1,500,453,461
Authorizes the funding of certain capital outlay projects from the sale of general obligation
bonds for the projects delineated as follows:
Priority 1	$ 939,915,655
Priority 2	$ 131,125,398
Priority 5	$1,298,115,485
TOTAL GENERAL OBLIGATIONS BONDS	$2,369,156,538
BONDS NRP/RBP	$ 99,830
GRAND TOTAL ALL MEANS OF FINANCING $3,869,709,829
Page 131 of 131