2022 Regular Session ENROLLED SENATE BILL NO. 280 BY SENATOR BERNARD 1 AN ACT 2 To amend and reenact R.S. 38:21, 22, 23, 26(C), 27, and 28(B), and to enact R.S. 38:28(C) 3 and (D), relative to DOTD and the inspection, regulation, and supervision of all 4 present or future dams within the state; to provide for additional requirements for the 5 engineer; to provide for certain penalties; and to provide for related matters. 6 Be it enacted by the Legislature of Louisiana: 7 Section 1. R.S. 38:21, 22, 23, 26(C), 27, and 28(B) are hereby amended and 8 reenacted and R.S. 38:28(C) and (D) are hereby enacted to read as follows: 9 §21. Intent 10 It is the responsibility of the state to provide a means for the inspection, 11 regulation, and supervision of all present or future dams within the state and the 12 operation and maintenance of those as specified in this Chapter, both federal and 13 nonfederal but excluding the Toledo Bend Dam, and the locks and dams on the 14 Red River, Ouachita River, Black River, Mississippi River, and tributaries 15 under the jurisdiction of the United States Army Corps of Engineers, in order 16 to prevent and correct potential hazards to downstream life and property in the event 17 of failure of any dam. 18 §22. Definitions 19 For the purposes of this When used in this Chapter, the following words, 20 terms and phrases, shall have the following meaning: 21 (1) a dam "Dam" is any artificial barrier, including appurtenant works, which 22 does or will impound or divert water or any other liquid substance and which (1) is 23 has or will be have a dam height of twenty-five feet or more in height from the bed 24 of the watercourse measured at the downstream toe of the barrier or from the lowest 25 elevation of the outside limit of the barrier, if it is not across a stream channel or 26 watercourse, to the maximum water storage elevation or (2) has or will have an 27 impounding capacity at a maximum water liquid storage elevation capacity of fifty ACT No. 687 Page 1 of 5 Coding: Words which are struck through are deletions from existing law; words in boldface type and underscored are additions. SB NO. 280 ENROLLED 1 acre-feet or more. This definition does not include any dam or barrier that is not or 2 will not be in excess of six feet in height, regardless of storage capacity or which has 3 or will have a storage capacity of maximum water storage elevation capacity not in 4 excess of fifteen acre-feet, regardless of height. 5 (2) "Dam height" means the difference in elevation of the bed of the 6 watercourse measured at the downstream toe of the barrier or from the lowest 7 elevation of the outside limit of the barrier, if it is not across a stream channel 8 or watercourse, to the lowest point on the crest of the dam excluding any 9 spillways or controlled openings. 10 (3) "Modification" means enlargements or changes that may affect the 11 safety of the dam, including but not limited to adding significant amounts of 12 material to, or removing material from the cross-section of a dam; changing the 13 dimensions or elevations of spillways; correcting damages associated with 14 significant seepage through or under the dam; building a roadway or placing 15 utilities on or in any part of the dam or altering the operational features of a 16 dam excluding activities associated with routine maintenance. 17 §23. Permit or consent required 18 A. All dams, as herein above described in R.S. 38:22, both federal and 19 nonfederal but excluding the Toledo Bend Dam, and the locks and dams on the 20 Red River, Ouachita River, Black River, Mississippi River and tributaries 21 under the jurisdiction of the United States Army Corp of Engineers, shall be 22 under the jurisdiction of the state acting through the chief engineer of the Department 23 of Transportation and Development, office of engineering. The chief engineer, or his 24 authorized representative, shall have supervision and overview of the construction, 25 modification, operation, and maintenance of the dams to the extent required to 26 protect life and property and to provide for the safety and welfare of the public. No 27 person, partnership, association, corporation, agency, or political subdivision shall 28 construct any such dam or make, construct, or permit to be made or constructed any 29 change in modification of the dam without first obtaining the written consent or 30 permit of the chief engineer. No permit is required for routine maintenance. Page 2 of 5 Coding: Words which are struck through are deletions from existing law; words in boldface type and underscored are additions. SB NO. 280 ENROLLED 1 B. All designs for new dams or for modifications or removal of existing 2 dams under the jurisdiction of the state shall be designed by a professional 3 engineer registered in Louisiana and shall be in compliance with all rules and 4 regulations promulgated under the provisions of the Administrative Procedure 5 Act. The engineer providing professional services shall notify the owner in 6 writing of the owner's obligation to obtain a permit or written consent of the 7 chief engineer before the start of construction of a new dam or modification or 8 removal of an existing dam. 9 * * * 10 §26. Violations; orders of chief engineer; remedial measures; emergency situations; 11 designated operation and maintenance 12 * * * 13 C. The commission or political subdivision under whose authority the 14 following dams are established, is hereby authorized to transfer the maintenance and 15 operation thereof to the Department of Transportation and Development, office of 16 engineering, and the Department of Transportation and Development, office of 17 engineering, is hereby authorized and directed to operate and maintain the dam, 18 water-control structures, gates, spillway, and related appurtenances to the extent that 19 it deems necessary to ensure that the manmade impoundment structure and the 20 attendant water-control devices are functioning to design capabilities. 21 (1) Bundick Creek in Beauregard Parish 22 (2) Kepler Creek Dam in Bienville Parish 23 (3) Ivan Lake Dam in Bossier Parish 24 (4) Lake Bistineau Dam in Bossier Parish 25 (5) Black Lake Dam in Caddo Parish 26 (6) Lake Claiborne Dam in Claiborne Parish 27 (7) Smithport Dam in DeSoto Parish 28 (8) Chicot Lake Dam in Evangeline Parish 29 (9) Turkey Creek Dam in Franklin Parish 30 (10) Iatt Lake Dam in Grant Parish Page 3 of 5 Coding: Words which are struck through are deletions from existing law; words in boldface type and underscored are additions. SB NO. 280 ENROLLED 1 (11) Nantachie Lake Dam in Grant Parish 2 (12) Caney Lake Dam in Jackson Parish 3 (13) Allen-Chivery Dam in Natchitoches Parish 4 (14) Saline Lake Dam in Natchitoches Parish 5 (15) Bayou Cocodrie in Rapides Parish 6 (16) John K. Kelly Grand Bayou in Red River Parish 7 (17) Bayou Darbonne Dam and Reservoir in Union Parish 8 (18) Lower Anacoco Dam in Vernon Parish 9 (19) Vernon Lake Dam in Vernon Parish 10 (20) Black Lake Bayou Reservoir in Natchitoches Parish 11 (21) Nantachie Lake Dam No. 2 in Grant Parish 12 * * * 13 §27. Damage claims 14 No action may be brought against the state of Louisiana, its agencies, or its 15 agents and employees for the recovery of damages caused by the partial or total 16 failure of any dam or through the operation of any dam on the basis that such 17 defendant or defendants is liable to the claimant because of the approval of the dam, 18 or the approval of plans for flood handling during the period of construction, 19 modification, removal, or the issuance or enforcement of orders relative to 20 maintenance, repair, modification, removal, or operation of the dam, or the control 21 and regulation of the dam, or the measures taken to protect against failure of the dam 22 during an emergency. 23 §28. Penalties 24 A. * * * 25 B. Whoever violates any of the provisions of this Section shall be guilty of 26 a misdemeanor and shall be fined not more than five hundred dollars or be 27 imprisoned for not more than six months, or both. Any engineer providing 28 professional services who designs a new dam or a modification or removal of an 29 existing dam without notifying the owner in writing of the owner's obligation 30 to obtain a permit or written consent of the chief engineer prior to the start of Page 4 of 5 Coding: Words which are struck through are deletions from existing law; words in boldface type and underscored are additions. SB NO. 280 ENROLLED 1 construction shall be reported to the Louisiana Professional Engineering and 2 Land Surveying Board (LAPELS). 3 C. Upon request of the Department of Transportation and Development, 4 the state police may issue a citation to any person who is in violation of 5 Subsection A of this Section. Every person who is convicted of a violation of 6 Subsection A of this Section shall be guilty of a misdemeanor and shall be fined 7 not more than five hundred dollars or be imprisoned for not more than six 8 months, or both. 9 D. Every fine imposed pursuant to the provisions of this Section shall be 10 collected by the court and forwarded to the state treasurer for deposit in the 11 Transportation Trust Fund to defray the costs of the Louisiana Dam Safety 12 Program. 13 Section 2. This Act shall become effective upon signature by the governor or, if not 14 signed by the governor, upon expiration of the time for bills to become law without signature 15 by the governor, as provided by Article III, Section 18 of the Constitution of Louisiana. If 16 vetoed by the governor and subsequently approved by the legislature, this Act shall become 17 effective on the day following such approval. PRESIDENT OF THE SENATE SPEAKER OF THE HOUSE OF REPRESENTATIVES GOVERNOR OF THE STATE OF LOUISIANA APPROVED: Page 5 of 5 Coding: Words which are struck through are deletions from existing law; words in boldface type and underscored are additions.