ENROLLED ACT No. 465 2023 Regular Session HOUSE BILL NO. 2 BY REPRESENTATIVE BISHOP 1 AN ACT 2 To provide with respect to the capital outlay budget and the capital outlay program for state 3 government, state institutions, and other public entities; to provide for the 4 designation of projects and improvements; to provide for the financing thereof 5 making appropriations from certain sources; and to provide for related matters. 6 Be it enacted by the Legislature of Louisiana: 7 Section 1. The following sums or so much thereof as may be necessary are 8 hereby appropriated out of any monies in the state treasury from the sources specified, from 9 federal funds and self-generated revenues belonging to the state of Louisiana and/or 10 collected by boards, commissions, departments, and agencies thereof, all for making capital 11 outlay and for the purposes and in the amounts specified herein for the Fiscal Year 12 commencing July 1, 2023, and ending June 30, 2024, subject to the conditions thereafter 13 provided: 14 A project with funding payable from General Obligation Bonds Priority 1 15 indicates that the funding for the project includes the reauthorization of funding which was 16 previously granted as a line of credit by the State Bond Commission in Fiscal Year 2022- 17 2023. As used in this Section, the term "general obligation bonds" means state general 18 obligation bonds or other evidences of indebtedness payable from the Bond Security and 19 Redemption Fund. The amount set forth in this Section opposite each project, or so much 20 thereof as may be necessary, is hereby appropriated and payable from the source of funding 21 indicated; provided, however, amounts appropriated and payable from federal funds may be 22 encumbered or expended only to the extent such amounts shall have been committed or 23 received. Pursuant to the provisions of R.S. 39:82, funds for planning, acquisition, Page 1 of 161 HB NO. 2 ENROLLED 1 construction, and major repair projects appropriated by this Act may be retained until 2 completion of the project, even if no bona fide liability exists on the last day of the fiscal 3 year. 4 This Act shall constitute the comprehensive state capital outlay budget for the 5 2023-2024 Fiscal Year. Projects set forth which are payable from the proceeds available 6 from the sale of general obligation bonds shall have the priorities as indicated. The Request 7 for Line of Credit form used by the attorney general and Bond Counsel in evaluating 8 Louisiana Constitutional, Internal Revenue Code, and applicable income tax regulations 9 shall be filed with the commissioner of administration, State Bond Commission, and state 10 attorney general. No general obligation bond cash lines of credit shall be granted to fund any 11 lower priority project prior to the granting of general obligation bond cash lines of credit to 12 fund all higher priority projects (the "general rule"), except as hereinafter provided. This 13 prohibition against funding a lower priority project shall not apply upon a showing of an 14 impossibility or impracticality either to proceed with all unfunded higher priority projects 15 or to proceed with the funding of such projects or any part thereof through the issuance of 16 general obligation bonds for any reason. Such showing shall be stated in reasonable detail 17 in a certificate or certificates signed by the state agency responsible for administering the 18 funding, and filed with the commissioner of administration and the State Bond Commission 19 (hereinafter referred to as "the Commission"). Upon a determination by the Commission 20 that proceeding with such a project or the funding thereof through the issuance of general 21 obligation bonds is impractical or impossible, the Commission may then proceed with the 22 sale of general obligation bonds or the granting of cash lines of credit without regard to the 23 priority of the unfunded projects determined to be impossible or impractical. 24 Upon recommendation by the state agency responsible for administering the 25 funding, if it is determined at any time that proceeding with the project or with the funding 26 thereof is no longer impossible or impractical, the State Bond Commission may rescind the 27 certificate of impossibility or impracticality and may proceed with the project or with the 28 issuance of general obligation bonds or the granting of cash lines of credit to fund the 29 project. Alternatively, the Interim Emergency Board (hereinafter referred to as "the Board"), 30 upon reviewing certificates as described above and determining that proceeding with such 31 projects or the funding thereof through the issuance of general obligation bonds is Page 2 of 161 HB NO. 2 ENROLLED 1 impossible or impractical, may designate a lower priority for such projects. The Board's 2 determination and lower priority designation shall be submitted to the members of the 3 legislature for their approval in accordance with the provisions of Chapter 3-B of Subtitle 4 I of Title 39 of the Louisiana Revised Statutes of 1950. In accordance with the provisions 5 of Chapter 3-B of Subtitle I of Title 39 of the Louisiana Revised Statutes of 1950, whenever 6 at the written request of the appropriate legislators and agency, the Board determines that 7 an adjustment to a project description originally set forth in such capital budget adopted by 8 the legislature for a current fiscal year is necessary to correct a mistake in a project 9 description, clarify a description, change the scope of a description, or make any other 10 adjustment the Board deems necessary to implement the purpose of the project, such 11 adjustment shall become effective only upon the approval by majority vote of the elected 12 members of each house of the legislature in the manner provided for in Chapter 3-B of 13 Subtitle I of Title 39 of the Louisiana Revised Statutes of 1950. 14 If such approval is granted, notification by the chair or secretary of the Board of 15 the results of the balloting shall be transmitted to the State Bond Commission, which may 16 then proceed with the sale of general obligation bonds or the granting of cash lines of credit 17 for each change approved upon request of the commissioner of administration in accordance 18 with the general rule. 19 With respect to Priorities 1 through 5, a lower priority project may be moved to 20 a higher priority only upon a showing of an emergency or other cause not reasonably 21 anticipated by the legislature, which shall be stated in reasonable detail in a certificate signed 22 by the head of the appropriate department, political subdivision, or agency and filed with the 23 commissioner of administration and the Board. Upon a determination by the Board that such 24 project should be moved to a higher priority because of an emergency or other cause not 25 reasonably anticipated by the legislature, the Board shall designate a higher priority to the 26 project. The matter then shall be submitted to and be subject to the same approval by the 27 members of the legislature in the manner previously indicated in this Section. If such 28 approval is granted, notification by the chair or secretary of the Board of the change of 29 priority shall be transmitted to the State Bond Commission, which then upon request of the 30 commissioner of administration, may proceed with the sale of general obligation bonds or 31 the granting of cash lines of credit in accordance with the general rule. As to projects within Page 3 of 161 HB NO. 2 ENROLLED 1 a priority, the State Bond Commission acting on requests submitted by the commissioner of 2 administration shall determine when such project, or phases thereof, shall be funded. In 3 making such determination, the State Bond Commission shall consider the amount of 4 proceeds of general obligation bonds to be made available in light of money and capital 5 market conditions; the expenditure requirements of the project; the time required for 6 architectural plans and drawings, public bidding, and site acquisition and preparation; 7 availability of receipt of federal monies; litigation affecting the undertaking or completion 8 of a project; federal tax laws and regulations regarding the sale of municipal bonds; and 9 other items of a similar nature bearing upon the possibility or the necessity to commence a 10 project or any particular phase thereof. 11 Any other provision of this Act to the contrary notwithstanding, projects 12 described in Priority 5 of this Act shall not be moved to a higher priority except upon one 13 of the following conditions: (1) Funding is necessary to complete or additionally fund a 14 project located elsewhere in the Capital Outlay Act. Determination of such condition shall 15 be made by the head of the appropriate department or agency by means of a certificate to 16 that effect filed with the Interim Emergency Board, who shall, by mail ballot, request 17 approval of such change and if approved by a majority of each house of the legislature it 18 shall be funded, or (2) unless required by an emergency or other cause not reasonably 19 anticipated by the legislature, to be in accordance with procedures set forth in this Section. 20 However, the State Bond Commission may authorize a non-cash line of credit for any 21 project in Priority 5 which represents that portion of construction contracts which were let 22 during a previous fiscal year, or construction contracts which will be let during the current 23 fiscal year, but which will not require cash expenditures during the year. Such non-cash 24 lines of credit, when combined with previously sold bonds or with higher priority bonds or 25 lines of credit, or with funds appropriated from other sources, will provide sufficient 26 appropriated funds to award equipment or construction contracts. Contracts shall not be 27 awarded without approval of the division of administration. 28 Upon approval by the State Bond Commission, and subject to compliance with 29 its policies and procedures and the procedures set forth herein, a line of credit providing for 30 the use of funds in anticipation of the sale of general obligation bonds may be granted to the 31 appropriate administering agency or department from the Comprehensive Capital Outlay Page 4 of 161 HB NO. 2 ENROLLED 1 Escrow Account, or if there is not a sufficient amount available in such account, from other 2 available state cash in the state treasury, for capital improvement projects for which bond 3 proceeds are appropriated by a current capital budget, prior to the actual issuance of bonds 4 for such projects, unless the attorney general advises that an impediment exists to the valid 5 issuance of the bonds on the date such line of credit is granted. 6 All bonds that are to be repaid, in whole or in part, by revenues generated by the 7 project shall be designated as "Reimbursement Bonds.” The State Bond Commission shall 8 enter into such agreements as are necessary to provide that the agency or subdivision, whose 9 project is reimbursable, shall pay the bond debt costs into the Bond Security and Redemption 10 Fund. Such costs may be paid annually or at the end of the term of the bonds issued as 11 determined by the State Bond Commission. 12 Priority 1 general obligation bond funding shall be limited to: 13 (1) Projects and amounts which were previously authorized by Act 117 of the 14 2022 Regular Session of the Legislature; and which were granted cash lines of credit by the 15 State Bond Commission. The bonds to fund these projects were not sold in Fiscal Year 16 2022-2023. 17 (2) The reauthorization of the portion of the outstanding Fiscal Year 2022-2023 18 Priority 5 Non-Cash Lines of Credit for projects which will require cash expenditures in 19 Fiscal Year 2023-2024 and therefore must be converted to Cash Lines of Credit in Fiscal 20 Year 2023-2024. 21 (3) Commitments made in the Higher Education Desegregation Settlement 22 Agreement. 23 Priority 2 general obligation bond projects are for the completion of plans and 24 specifications, land acquisition, site preparation, or for construction which will begin during 25 the fiscal year. It is presently anticipated that the listed projects will require the sale of 26 bonds or extension of lines of credit during the fiscal year after adoption of this Act. 27 Priority 3 general obligation bond projects are for the preparation of plans and 28 specifications, land acquisition, site preparation, or for construction and shall be limited to 29 funding for the portion of construction contracts which will not require cash expenditures 30 during the fiscal year. The projects in this category shall be considered future year projects Page 5 of 161 HB NO. 2 ENROLLED 1 in the state's five-year capital outlay plan. It is presently anticipated that the listed projects 2 will not require the sale of bonds or extension of lines of credit during the fiscal year. 3 Priority 4 general obligation bond projects are for the preparation of plans and 4 specifications, land acquisition, site preparation, or for construction and shall be limited to 5 funding for the portion of construction contracts which will not require cash expenditures 6 during the fiscal year. The projects in this category shall be considered future year projects 7 in the state's five-year capital outlay plan. It is presently anticipated that the listed projects 8 will not require the sale of bonds or extension of lines of credit during the fiscal year. 9 Priority 5 general obligation bond funding shall be limited to funding for the 10 portion of construction contracts which will not require cash expenditures during the fiscal 11 year. These funds, when combined with previously sold bonds or with higher priority bonds 12 on lines of credit, or with funds appropriated from other sources, will provide sufficient 13 appropriated funds to award contracts. Non-cash lines of credit shall be required prior to the 14 award of these contracts. 15 In accordance with the cash management plan adopted pursuant to R.S. 16 48:251(D) and the provisions of Act 161 of the 1998 First Extraordinary Session, the 17 Department of Transportation and Development is authorized to enter into contracts or 18 agreements for projects approved pursuant to the Highway Priority Program, Airport 19 Construction and Development Priority Program, Port Construction and Development 20 Priority Program, and Statewide Flood Control Program for projects bid and awarded, 21 authorized, or commenced during the fiscal year which do not require cash expenditures for 22 the full contract or agreement amount. 23 EXECUTIVE DEPARTMENT 24 01/107DIVISION OF ADMINISTRATION 25 (103) Exterior Waterproofing at State Capitol Building, 26 Planning and Construction 27 (East Baton Rouge) 28 Payable from General Obligation Bonds 29 Priority 5 $115,500,000 30 Payable from State General Fund (Direct) Non-Recurring 31 Revenues $ 7,000,000 32 Total $122,500,000 Page 6 of 161 HB NO. 2 ENROLLED 1 (310) State Office Buildings Major Repairs, Equipment 2 Replacement, and Renovations, Planning and 3 Construction 4 (Statewide) 5 Payable from General Obligation Bonds 6 Priority 1 $ 2,386,538 7 Priority 5 $12,110,000 8 Payable from State General Fund (Direct) Non-Recurring 9 Revenues $ 2,500,000 10 Total $16,996,538 11 (925) Pentagon Barracks Repair/Restore/Replace Equipment, 12 Planning and Construction 13 (East Baton Rouge) 14 Payable from General Obligation Bonds 15 Priority 5 $ 6,000,000 16 Payable from State General Fund (Direct) Non-Recurring 17 Revenues $ 1,000,000 18 Total $ 7,000,000 19 (926) Exterior Waterproofing and Repairs, Chief Justice 20 Pascal F. Calogero, Jr. Courthouse, Planning and 21 Construction 22 (Orleans) 23 Payable from General Obligation Bonds 24 Priority 1 $10,000,000 25 Payable from State General Fund (Direct) Non-Recurring 26 Revenues $ 1,000,000 27 Total $11,000,000 28 (1542)State Capitol Repair/Replace East Plaza Deck/Roof, 29 Planning and Construction 30 (East Baton Rouge) 31 Payable from General Obligation Bonds 32 Priority 5 $27,500,000 33 Payable from State General Fund (Direct) Non-Recurring 34 Revenues $ 700,000 35 Total $28,200,000 36 (1543)Pentagon Barracks Repair Brick Walls/Mitigate Rising 37 Damp, Planning and Construction 38 (East Baton Rouge) 39 Payable from General Obligation Bonds 40 Priority 5 $27,900,000 41 Payable from State General Fund (Direct) Non-Recurring 42 Revenues $ 1,500,000 43 Total $29,400,000 44 (1580)Louisiana Governor's Mansion Renovations, 45 Additions, Planning, and Construction 46 (East Baton Rouge) 47 Payable from General Obligation Bonds 48 Priority 5 $ 1,000,000 Page 7 of 161 HB NO. 2 ENROLLED 1 (1710)Community Water Enrichment Program 2 (Statewide) 3 Payable from General Obligation Bonds 4 Priority 5 $11,000,000 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 4,000,000 7 Payable from the balance of State General Funds (Direct) 8 previously allocated under the authority of Act 2 of 2020 9 for New Orleans, Algiers Playgrounds and Parks, 10 Renovation of Restrooms, Lighting, Fencing, and 11 Playground Equipment (Orleans), Act 117 of 2022 for 12 New Orleans, Algiers Playgrounds and Parks, Renovation 13 of Restrooms, Lighting, Fencing, and Playground 14 Equipment (Orleans), Act 29 of 2018 for Rosepine, 15 Rehabilitation of Elevated Water Tank, Planning and 16 Construction (Vernon), Act 20 of 2019 for St. 17 Francisville, Burnet Road Bridge Replacement, Planning 18 and Construction (West Feliciana), Act 20 of 2019 for 19 Westlake, New Water Well, Planning and Construction 20 (Calcasieu), Act 27 of 2006 for Magnaville Louisiana, 21 USA, Inc., Multipurpose Evacuation Shelter/Community 22 Center in Simmesport, Acquisitions, Utilities, Planning 23 and Construction (Avoyelles), Act 2 of 2020 for 24 Cajundome, Cajundome Boiler Replacement (Lafayette), 25 Act 26 of 2005 for Catahoula Council on Aging, Inc., 26 Catahoula Council on Aging, Inc., 27 Planning and Construction (Catahoula) $ 450,809 28 Total $15,450,809 29 (1711)Local Government Assistance Program 30 (Statewide) 31 Payable from General Obligation Bonds 32 Priority 5 $10,000,000 33 Payable from State General Fund (Direct) Non-Recurring 34 Revenues $ 5,000,000 35 Payable from the balance of State General Funds (Direct) 36 previously allocated under the authority of Act 29 of 2018 37 for Pointe Coupee Port, Harbor and Terminal District, 38 Pointe Coupee Parish Port Capital Improvements, 39 Planning and Construction (Pointe Coupee), Act 29 of 40 2018 for East Carroll Parish, Industrial Site Development 41 and Road Improvements (For Economic Development 42 Purposes, Including but not limited to an Ethanol Plant), 43 Planning and Construction (East Carroll), Act 20 of 2009 44 for Jefferson Parish, Jefferson Community Health Center 45 Expansion to the Existing Marrero Facility in Order to 46 Implement a Dental Program, Planning and Construction 47 (Jefferson), Act 29 of 2018 for St Helena Parish, Eddy 48 Road Improvements, Planning and Construction (St. 49 Helena), Act 485 of 2021 for St. Tammany Parish, LA 22 50 Extension and Improvements, LA 22 Roundabout, 51 Design, Engineering, Planning and Construction (St. 52 Tammany), Act 29 of 2018 for Hornbeck, Emergency 53 Connection with West Vernon Waterworks District and 54 Inline Booster Station, Planning and Construction 55 (Vernon) $ 344,952 56 Payable from the balance of general obligation bond 57 proceeds previously allocated under the authority of Act 58 20 of 2019 for Berwick, Sewerage Collection System 59 Along Old Spanish Trail and LA 182, Planning and 60 Construction 61 (St. Mary) $ 108,986 62 Total $15,453,938 Page 8 of 161 HB NO. 2 ENROLLED 1 (1712)Americans with Disabilities Act Implementation for 2 State Facilities, Planning and Construction 3 (Statewide) 4 Payable from State General Fund (Direct) Non-Recurring 5 Revenues $ 500,000 6 Payable from Interest Earnings $ 900,000 7 Total $ 1,400,000 8 (1713)Statewide Roofing Asset Management Program and 9 Waterproofing, Related Repairs and Equipment 10 Replacement Program 11 (Statewide) 12 Payable from State General Fund (Direct) Non-Recurring 13 Revenues $ 2,500,000 14 Payable from Interagency Transfers $ 5,000,000 15 Payable from Fees and Self-Generated Revenues $ 3,000,000 16 Total $10,500,000 17 (1714)Repair, Restoration and Replacement for Declared 18 Disasters, Planning, Construction, Renovation, and 19 Acquisition 20 (Statewide) 21 Payable from General Obligation Bonds 22 Priority 1 $55,285,237 23 Priority 5 $65,000,000 24 Payable from Federal Funds via Interagency Transfers $20,000,000 25 Total $140,285,237 26 (1715)Outstanding Percent for Arts Projects 27 (Statewide) 28 Payable from General Obligation Bonds 29 Priority 1 $ 2,058,097 30 Priority 2 $ 250,000 31 Priority 5 $ 4,000,000 32 Payable from Interagency Transfers $ 3,000,000 33 Payable from Fees and Self-Generated Revenues $ 3,000,000 34 Total $12,308,097 35 (1716)Mold Remediation and Indoor Air Quality, Planning 36 and Construction 37 (Statewide) 38 Payable from General Obligation Bonds 39 Priority 2 $ 500,000 40 (1717)Major Repairs, Equipment Replacement and 41 Renovations for State Buildings to Address Deferred 42 Maintenance Backlog and Infrastructure, Planning and 43 Construction 44 (Statewide) 45 Payable from General Obligation Bonds 46 Priority 1 $ 5,555,169 47 Payable from Interagency Transfers $15,000,000 48 Payable from State General Fund (Direct) Non-Recurring 49 Revenues $ 7,308,229 50 Payable from Fees and Self-Generated Revenues $ 2,000,000 51 Payable from the balance of State General Funds (Direct) 52 previously allocated under the authority of Act 20 of 2019 53 for Office of Juvenile Justice, HVAC System 54 Replacement at Columbia, Planning and Construction 55 (Ouachita), Act 23 of 2002 for Hammond Development 56 Center, Replacement of Underground High Temperature Page 9 of 161 HB NO. 2 ENROLLED 1 Hot Water System, Planning and Construction 2 (Tangipahoa), Act 2 of 2020 for Southern University 3 Baton Rouge, Southern University Laboratory School 4 Addition and Upgrades, Planning and Construction 5 (East Baton Rouge) $ 87,219 6 Payable from the balance of Interest Earnings previously 7 allocated under the authority of Act 53 of 2012 for 8 McNeese State University, Alpha Hall Renovations 9 Planning and Construction 10 (Calcasieu) $ 423 11 Payable from the balance of general obligation bond 12 proceeds previously allocated under the authority of 13 Act 29 of 2018 for Southern University Baton Rouge, 14 T.T. Allain Hall, Americans with Disabilities Act 15 Compliance and Upgrades, Planning and Construction 16 (East Baton Rouge), Act 29 of 2018 for Southern 17 University Baton Rouge, F.G. Clark Activity Center, 18 Americans with Disabilities Act Compliance and 19 Upgrades, Planning and Construction (East Baton 20 Rouge), Act 2 of 2020 for Louisiana School for Math, 21 Science, and the Arts, New Dormitory Building, 22 Planning and Construction 23 (Natchitoches) $ 2,691,477 24 Payable from Special Appropriations from FACS $ 156,093 25 Total $32,798,610 26 01/109COASTAL PROTECTION AND RESTORATION AUTHORITY 27 (271) Larose to Golden Meadow Hurricane Protection 28 Project, Planning and Construction 29 (Lafourche) 30 Payable from General Obligation Bonds 31 Priority 5 $ 20,000,000 32 Payable from State General Fund (Direct) Non-Recurring 33 Revenues $ 1,000,000 34 Total $ 21,000,000 35 (320) Coastal Protection Projects, Planning and Construction 36 (Statewide) 37 Payable from General Obligation Bonds 38 Priority 1 $ 1,720,000 39 Priority 5 $ 213,000,000 40 Payable from State General Fund (Direct) Non-Recurring 41 Revenues $ 107,417,778 42 Payable from Interagency Transfers $ 500,000 43 Payable from Federal Funds $ 140,703,531 44 Payable from Natural Resources Restoration Trust Fund$ 444,000,000 45 Payable from Coastal Protection and Restoration Fund $ 157,401,878 46 Total $1,064,743,187 47 Provided, however that $220,000 of the P1 appropriation, and $4,500,000 of the Priority 5 48 appropriation from General Obligation Bonds be used for the South Slidell – Fritchie Coastal 49 Resilience, Planning and Construction project in St. Tammany Parish. 50 Provided, however that $4,500,000 of the Priority 5 appropriation from General Obligation 51 Bonds be used for the Military Road Flood Risk Reduction, Planning and Construction 52 project in St. Tammany Parish. 53 Provided, however that $1,500,000 of the Priority 1 appropriation, and $3,000,000 of the 54 Priority 5 appropriation from General Obligation Bonds be used for the Eden Isle Roadway 55 Infrastructure Flood Resilience, Planning and Construction project in St. Tammany Parish. Page 10 of 161 HB NO. 2 ENROLLED 1 Provided, however that $10,000,000 of the Priority 5 appropriation from General Obligation 2 Bonds shall be used for the Bayou Lafourche Freshwater District for the Construction of the 3 Pumping Capacity Improvements, Phase I project. 4 Provided, however that $2,000,000 of the State General Fund (Direct) Non-Recurring 5 Revenues appropriation be used for the Atchafalaya Basin Program Master Plan project. 6 Provided, however that $2,000,000 of the State General Fund (Direct) Non-Recurring 7 Revenues appropriation be used for the Vermilion Bay Shoreline Protection project. 8 Provided, however that $300,000 of the State General Fund (Direct) Non-Recurring 9 Revenues appropriation be used for the Atchafalaya National Estuarine Research Reserve 10 Designation project. 11 Provided, however that $1,000,000 of the State General Fund (Direct) Non-Recurring 12 Revenues appropriation shall be used to fund the commercial off bottom oyster farming 13 initiative to be administered by the Coastal Protection and Restoration Authority in 14 conjunction with the Department of Wildlife and Fisheries. 15 (890) Union Diversion Project, Planning and Construction 16 (Ascension, Livingston, St. James, St. John the Baptist) 17 Payable from General Obligation Bonds 18 Priority 1 $ 2,350,000 19 Priority 5 $ 20,000,000 20 Total $ 22,350,000 21 (1298)Morganza to Gulf of Mexico Flood Control Feasibility 22 Study, Planning, Design, Right-of-Way and 23 Construction of Levees, Floodgates and Other Flood 24 Control Systems ($100,000,000 Local Match) 25 (Ascension, Assumption, Iberia, Iberville, Lafourche, Pointe 26 Coupee, St. Martin, St. Mary, Terrebonne, West Baton Rouge) 27 Payable from General Obligation Bonds 28 Priority 1 $ 7,500,000 29 Priority 5 $ 79,500,000 30 Total $ 87,000,000 31 (1300)Atchafalaya Basin Protection and Enhancement 32 (Federal Match and Local/Sponsor Match) 33 (Assumption, Avoyelles, Iberia, Iberville, Pointe Coupee, 34 St. Landry, St. Martin, St. Mary) 35 Payable from General Obligation Bonds 36 Priority 5 $ 8,000,000 37 01/112DEPARTMENT OF MILITARY AFFAIRS 38 (28) Renovate-Upgrade Cadet Barracks Buildings 18, 21, 39 22, 23, and 24, Youth Challenge Program (YCP), 40 Carville, Louisiana 41 (Iberville) 42 Payable from General Obligation Bonds 43 Priority 1 $ 400,000 44 Payable from State General Fund (Direct) Non-Recurring 45 Revenues $ 1,000,000 46 Total $ 1,400,000 Page 11 of 161 HB NO. 2 ENROLLED 1 (444) Louisiana National Guard Readiness Center 2 Replacement, Lafayette LA, Planning and Construction 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 1 $ 7,392,220 6 Priority 2 $ 1,400,000 7 Total $ 8,792,220 8 (645) Gillis W. Long Center, Water, Fire, and Sewage Line 9 Upgrades, Carville, Louisiana 10 (Iberville) 11 Payable from General Obligation Bonds 12 Priority 1 $ 3,504,172 13 Payable from State General Fund (Direct) Non-Recurring 14 Revenues $ 3,514,200 15 Payable from Federal Funds $ 434,300 16 Total $ 7,452,672 17 (656) Thibodaux Readiness Center Modernization 18 (Lafourche) 19 Payable from State General Fund (Direct) Non-Recurring 20 Revenues $ 59,000 21 Payable from Federal Funds $ 177,000 22 Total $ 236,000 23 (849) Camp Beauregard Road Network Rehabilitation 24 (Rapides) 25 Payable from General Obligation Bonds 26 Priority 1 $ 1,550,000 27 (918) Renovation Cadet Barracks Buildings 605, 606, 608, 28 Youth Challenge Program, Camp Beauregard, 29 Pineville, Louisiana 30 (Rapides) 31 Payable from General Obligation Bonds 32 Priority 5 $ 900,000 33 Payable from State General Fund (Direct) Non-Recurring 34 Revenues $ 1,040,000 35 Total $ 1,940,000 36 (1270)Louisiana National Guard Readiness Center Complex, 37 Abbeville LA, Planning and Construction 38 (Vermilion) 39 Payable from General Obligation Bonds 40 Priority 1 $ 5,666,600 41 (1331)Renovate-Upgrade Cadet Barracks Building 131, 132, 42 and 133, Youth Challenge Program, Camp Minden, 43 Minden, Louisiana 44 (Webster) 45 Payable from General Obligation Bonds 46 Priority 5 $ 700,000 47 Payable from State General Fund (Direct) Non-Recurring 48 Revenues $ 1,150,000 49 Total $ 1,850,000 50 (1332)Renovation Building 129, Cadre Operations, Youth 51 Challenge Program, Camp Minden 52 (Webster) 53 Payable from State General Fund (Direct) Non-Recurring 54 Revenues $ 250,000 Page 12 of 161 HB NO. 2 ENROLLED 1 (1475)Statewide Backlog of Maintenance and Repair 2 (BMAR), Phase 3, and Statewide Infrastructure 3 Rehabilitation, Phase 3 4 (Statewide) 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 4,000,000 7 Payable from Federal Funds $ 19,000,000 8 Total $ 23,000,000 9 (1691)Renovation Classroom Building 118, Youth Challenge 10 Program, Camp Minden 11 (Webster) 12 Payable from State General Fund (Direct) Non-Recurring 13 Revenues $ 1,350,000 14 01/124LOUISIANA STADIUM AND EXP OSITION DISTRICT 15 (813) Zephyr Field Improvements, Planning and Construction 16 (Jefferson) 17 Payable from General Obligation Bonds 18 Priority 5 $ 10,000,000 19 (1223)Bayou Segnette Recreation Complex, Land 20 Acquisition, Planning and Construction 21 (Jefferson) 22 Payable from General Obligation Bonds 23 Priority 1 $ 25,402,961 24 Priority 2 $ 17,000,000 25 Total $ 42,402,961 26 DEPARTMENT OF VETERANS AFFAIRS 27 03/130DEPARTMENT OF VETERANS AFFAIRS 28 (168) Northeast Louisiana Veterans Cemetery Addition of 29 1,000 In-ground Burial Crypts and Other Improvements 30 (Richland) 31 Payable from Federal Funds via Interagency Transfers$ 1,331,000 32 (786) Southeast Louisiana Veterans Cemetery Addition of 33 2,800 In-ground Burial Crypts and Other Improvements 34 (St. Tammany) 35 Payable from Federal Funds via Interagency Transfers$ 1,500,000 36 03/134SOUTHWEST LOUISIANA WAR VETERANS HOME 37 (1418)Reconstruct Communal Shower Rooms and 38 Isolation Shower Rooms/Bathrooms, 39 Planning and Construction 40 (Jefferson Davis) 41 Payable from General Obligation Bonds 42 Priority 5 $ 2,350,000 43 03/136SOUTHEAST LOUISIANA WAR VETERANS HOME 44 (593) Pond Restoration, Planning and Construction 45 (St. John the Baptist) 46 Payable from Federal Funds via Interagency Transfers$ 1,140,000 Page 13 of 161 HB NO. 2 ENROLLED 1 ELECTED OFFICIALS 2 04/139SECRETARY OF STATE 3 (802) Old Governor's Mansion Repairs and Renovation 4 (East Baton Rouge) 5 Payable from General Obligation Bonds 6 Priority 1 $ 300,000 7 Payable from State General Fund (Direct) Non-Recurring 8 Revenues $ 1,000,000 9 Total $ 1,300,000 10 (954) Old State Capitol Exterior Repairs, Planning and 11 Construction 12 (East Baton Rouge) 13 Payable from General Obligation Bonds 14 Priority 1 $ 3,000,000 15 Priority 5 $ 4,400,000 16 Payable from State General Fund (Direct) Non-Recurring 17 Revenues $ 1,000,000 18 Total $ 8,400,000 19 DEPARTMENT OF ECONOMIC DEVELOP MENT 20 05/252OFFICE OF BUSINESS DEVELOPMENT 21 (352) Economic Development Award Program for 22 Infrastructure Assistance 23 (Statewide) 24 Payable from General Obligation Bonds 25 Priority 5 $ 5,000,000 26 Payable from Interagency Transfers $ 10,000,000 27 Total $ 15,000,000 28 (353) NIRC BSL-3 Lab and Animal Housing, Planning and 29 Construction 30 (Iberia) 31 Payable from General Obligation Bonds 32 Priority 1 $ 10,600,000 33 Priority 5 $ 10,000,000 34 Total $ 20,600,000 35 (1169)NIRC Iberia BioInnovation Accelerator GMP CDMO 36 Planning and Construction 37 (Iberia) 38 Payable from General Obligation Bonds 39 Priority 1 $ 14,400,000 40 Priority 5 $ 39,000,000 41 Total $ 53,400,000 42 DEPARTMENT OF CULTURE, RECREATION AND TOURISM 43 06/263OFFICE OF STATE MUSEUM 44 (755) Construction of Civil Rights Museum, Planning and 45 Construction 46 (Orleans) 47 Payable from General Obligation Bonds 48 Priority 1 $ 2,760,174 Page 14 of 161 HB NO. 2 ENROLLED 1 06/264OFFICE OF STATE PARKS 2 (255) Poverty Point State Historic Site - Land Acquisition, 3 Design, Museum/Interpretive Center and Expansion 4 (West Carroll) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,494,713 7 Priority 5 $ 10,500,000 8 Total $ 11,994,713 9 (461) Bogue Chitto State Park - Mountain Bike Trail Design, 10 Construction, Acquisition and Other Development 11 (Washington) 12 Payable from General Obligation Bonds 13 Priority 1 $ 938,762 14 (1078)Tunica Hills State Preservation Area, Construction, 15 Development and Acquisition 16 (West Feliciana) 17 Payable from General Obligation Bonds 18 Priority 5 $ 20,000,000 19 Payable from Interagency Transfers $ 1,000,000 20 Total $ 21,000,000 21 (1291)Preventive Maintenance/Major Repairs and 22 Improvements 23 (Statewide) 24 Payable from General Obligation Bonds 25 Priority 1 $ 574,825 26 Priority 5 $ 2,000,000 27 Payable from State General Fund (Direct) Non-Recurring 28 Revenues $ 3,000,000 29 Payable from Interagency Transfers $ 20,000,000 30 Payable from Federal Funds via Interagency Transfers$ 20,000,000 31 Total $ 45,574,825 32 (1490)Bogue Chitto State Park Emergency Erosion, Planning, 33 Design, Construction and Other Development 34 (Washington) 35 Payable from General Obligation Bonds 36 Priority 1 $ 1,409,597 37 Priority 5 $ 840,000 38 Total $ 2,249,597 39 (1491)Bayou Segnette State Park, Land Acquisition, 40 Additional Cabins, Planning and Construction 41 (Jefferson) 42 Payable from General Obligation Bonds 43 Priority 1 $ 432,875 44 06/A20NEW ORLEANS CITY P ARK 45 (1355)Repairs to Historic Structures, Planning and 46 Construction 47 (Orleans) 48 Payable from General Obligation Bonds 49 Priority 1 $ 1,089,307 50 Priority 5 $ 1,000,000 51 Total $ 2,089,307 Page 15 of 161 HB NO. 2 ENROLLED 1 06/A98LOUISIANA NAVAL WAR MEMORIAL COMMISSION 2 (1371)Hull Repair & Reinforcement, Superstructure Repair, 3 Interior Restoration, & Painting of USS KIDD DD-661, 4 Docking Cradle Repairs & Upgrade, Planning, 5 Transport, Construction 6 (East Baton Rouge) 7 Payable from General Obligation Bonds 8 Priority 1 $ 1,600,000 9 Priority 5 $ 6,750,000 10 Payable from State General Fund (Direct) $ 2,000,000 11 Total $ 10,350,000 12 DEPARTMENT OF TRANSPORTATION AND DEVELOP MENT 13 07/270ADMINISTRATION 14 (24) Overlay of U.S. 167 for 9.32 Miles, from Turkey Creek 15 North of I-49, Planning and Construction 16 (Evangeline) 17 Payable from General Obligation Bonds 18 Priority 1 $ 633,519 19 (25) LA 91: Bayou Plaquemine Brule Bridge Replacement, 20 Planning and Construction 21 (Acadia) 22 Payable from General Obligation Bonds 23 Priority 1 $ 1,000,000 24 Priority 5 $ 5,200,000 25 Total $ 6,200,000 26 (39) Beaver Creek, LA Highway 106, Planning and 27 Construction 28 (Evangeline) 29 Payable from General Obligation Bonds 30 Priority 1 $ 7,200,000 31 Priority 5 $ 6,000,000 32 Payable from State General Fund (Direct) Non-Recurring 33 Revenues $ 1,000,000 34 Total $ 14,200,000 35 (40) St. Landry, LA 106, Planning and Construction 36 (Evangeline) 37 Payable from General Obligation Bonds 38 Priority 1 $ 5,400,000 39 Priority 5 $ 7,500,000 40 Total $ 12,900,000 41 (44) Highway 397 in Calcasieu Parish, North and South 42 Turning Lanes 43 (Calcasieu) 44 Payable from General Obligation Bonds 45 Priority 1 $ 2,000,000 46 Priority 2 $ 600,000 47 Total $ 2,600,000 48 (128) LA 22: North Hoover Road - Dunson Road 49 (Tangipahoa) 50 Payable from General Obligation Bonds 51 Priority 5 $ 12,600,000 Page 16 of 161 HB NO. 2 ENROLLED 1 (133) LA 44 Widening, I-10 to LA 22, Planning, Utilities, 2 Right-of-Way and Construction 3 (Ascension) 4 Payable from General Obligation Bonds 5 Priority 1 $ 9,600,086 6 Priority 5 $ 9,000,000 7 Total $ 18,600,086 8 (135) LA 173 (Ford Street) Overlay, 1.32 Miles, 9 Planning and Construction 10 (Caddo) 11 Payable from the Capital Outlay Savings Fund $ 750,000 12 (239) US 190 (Vine Street) Reconstruction 13 (St. Landry) 14 Payable from General Obligation Bonds 15 Priority 1 $ 200,000 16 Priority 5 $ 19,200,000 17 Total $ 19,400,000 18 (240) Jimmie Davis Bridge Rehabilitation and Lighting, or 19 Design, Engineering, Planning and Construction 20 (Bossier) 21 Payable from General Obligation Bonds 22 Priority 1 $ 3,260,334 23 Priority 5 $ 15,000,000 24 Total $ 18,260,334 25 (248) LA 100: LA 97 - LA 91, Planning and Construction 26 (Acadia) 27 Payable from General Obligation Bonds 28 Priority 5 $ 7,400,000 29 Payable from State General Fund (Direct) Non-Recurring 30 Revenues $ 100,000 31 Total $ 7,500,000 32 (341) LA 70: Sunshine Bridge - LA 22 33 (Ascension, St. James) 34 Payable from General Obligation Bonds 35 Priority 5 $ 17,000,000 36 (342) Pecue Lane/I-10 Interchange and I-10, Planning, 37 Design, Rights-of-Way, Utilities and Construction 38 (East Baton Rouge) 39 Payable from General Obligation Bonds 40 Priority 1 $ 14,000,000 41 (360) LA 1 Improvements, Phase 2, Planning, Engineering, 42 Right-of-Way, Utilities and Construction 43 (Lafourche) 44 Payable from General Obligation Bonds 45 Priority 1 $ 9,985,898 46 Priority 5 $ 82,000,000 47 Total $ 91,985,898 48 (367) Roundabout at Intersection of LA 3125 and LA 3274 49 (St. James) 50 Payable from General Obligation Bonds 51 Priority 1 $ 2,355,572 Page 17 of 161 HB NO. 2 ENROLLED 1 (374) Secretary’s Emergency Fund for Bridge Damages, 2 Other Reimbursements, Local Matching Dollars, 3 Federal Funds, and Opportunity Grants Subject to the 4 Provisions of R.S. 48:232 5 (Statewide) 6 Payable from Transportation Trust Fund - Federal 7 Receipts $ 25,000,000 8 Payable from Federal Funds $ 2,500,000 9 Payable from Interagency Transfers $ 10,000,000 10 Payable from Fees and Self-Generated Revenues $ 30,000,000 11 Total $ 67,500,000 12 (445) Louisiana Highway 64 and Louisiana Highway 1019 13 Roundabout, Planning and Construction 14 (Livingston) 15 Payable from General Obligation Bonds 16 Priority 1 $ 175,000 17 (455) LA 3277: LA 757 - LA 104, Planning and Construction 18 (Evangeline) 19 Payable from General Obligation Bonds 20 Priority 5 $ 6,900,000 21 (456) LA 621 Realignment at LA 73, Planning and 22 Construction 23 (Ascension) 24 Payable from General Obligation Bonds 25 Priority 1 $ 3,949,375 26 Priority 5 $ 5,100,000 27 Total $ 9,049,375 28 (457) Claiborne Corridor Rehabilitation 29 (Orleans) 30 Payable from General Obligation Bonds 31 Priority 5 $ 20,000,000 32 (459) LA 429/I-10 Interchange, Planning and Construction 33 (Ascension) 34 Payable from General Obligation Bonds 35 Priority 5 $ 5,000,000 36 (548) LA 28 Widening (LA 3128 - LA 116) 37 (Rapides) 38 Payable from General Obligation Bonds 39 Priority 1 $ 2,700,000 40 Priority 5 $ 31,600,000 41 Total $ 34,300,000 42 (650) City of Gonzales - GO Program LA Highway 30 43 Corridor, Planning and Construction 44 (Ascension) 45 Payable from General Obligation Bonds 46 Priority 1 $ 8,320,100 47 (651) Improvements on LA 3038, Including Patching, 48 Repairing and Overlaying of the Highway, Planning 49 and Construction 50 (Ascension) 51 Payable from General Obligation Bonds 52 Priority 1 $ 47,139 Page 18 of 161 HB NO. 2 ENROLLED 1 (652) New Mississippi River Bridge 2 (Ascension, East Baton Rouge, Iberville, St. James, 3 West Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,486,228 6 Priority 5 $ 3,000,000 7 Total $ 4,486,228 8 (653) Turn Lanes on US 71 for Emergency Vehicle Staging 9 Area, Planning, Engineering, Right-of-Way, Utilities 10 and Construction 11 (Rapides) 12 Payable from General Obligation Bonds 13 Priority 1 $ 200,295 14 (660) LA 13 (Crowley to Vermilion Parish Line) 15 (Acadia) 16 Payable from General Obligation Bonds 17 Priority 1 $ 1,200,000 18 Priority 5 $ 5,500,000 19 Total $ 6,700,000 20 (687) Highway Program (Up to $4,000,000 for Secretary's 21 Emergency Fund) 22 (Statewide) 23 Payable from General Obligation Bonds 24 Priority 1 $ 30,000,000 25 Priority 5 $ 115,750,000 26 Payable from State General Fund (Direct) 27 Non-Recurring Revenues $ 107,412,778 28 Payable from State General Fund (Direct) $ 25,000,000 29 Payable from Transportation Trust Fund - Construction 30 Subfund $ 190,300,000 31 Payable from Transportation Trust Fund - Regular $ 367,000,000 32 Payable from Transportation Trust Fund - Federal 33 Receipts $ 959,550,550 34 Total $1,795,013,328 35 Provided, however, that the Department of Transportation and Development is authorized 36 to implement or commence projects approved in this program for Fiscal Year 2023-2024 37 identified for phased funding pursuant to the cash management plan established pursuant to 38 R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing 39 unspent cash balances appropriated in prior years' programs, which funds when combined 40 with current appropriations will provide sufficient appropriated funds to award contracts. 41 Provided, however, that the Department of Transportation and Development shall use 42 $107,412,778 of the appropriation from State General Fund (Direct) Non-Recurring for 43 financial cost overruns in the Highway Priority Program, and out of the appropriations from 44 Transportation Trust Fund - Regular, $75,000,000 for State match to the Federal Highway 45 Administration Formula Program, $195,000,000 for ARPA project financial cost overruns 46 $30,000,000 to meet Federal match obligations pursuant to competitive Federal grants, and 47 $20,000,000 for State match pursuant to August Redistribution Funding provided through 48 the Federal Highway Administration. 49 Provided, however, $25,000,000 of the State General Fund (Direct) appropriation shall be 50 used by the Department of Transportation and Development for the Road Transfer Program. 51 Provided, however that the Department of Transportation and Development shall use 52 $2,150,000 of the appropriation from the Transportation Trust Fund - Construction Subfund 53 for the purchase or procurement of movable equipment dedicated for use in Highway 54 District 03. Page 19 of 161 HB NO. 2 ENROLLED 1 (690) Hooper Road Extension and Widening, Environmental, 2 Planning, Engineering, Right-of-Way, Utilities and 3 Construction 4 (East Baton Rouge, Livingston) 5 Payable from General Obligation Bonds 6 Priority 1 $ 8,197,249 7 (744) Florida Avenue Bridge, Planning and Construction 8 (Orleans) 9 Payable from General Obligation Bonds 10 Priority 5 $ 7,200,000 11 (745) LA 964 (Groom Road - US 61) Highway Lighting 12 (East Baton Rouge) 13 Payable from General Obligation Bonds 14 Priority 1 $ 1,400,000 15 Priority 5 $ 1,000,000 16 Total $ 2,400,000 17 (794) LA 117 Widening (LA 8 - LA 118) 18 (Natchitoches, Vernon) 19 Payable from General Obligation Bonds 20 Priority 1 $ 5,952,055 21 Priority 5 $ 30,000,000 22 Total $ 35,952,055 23 (856) Essen Lane Widening, I-10 to Perkins Road, Planning, 24 Utilities, Right-of-Way and Construction 25 (East Baton Rouge) 26 Payable from General Obligation Bonds 27 Priority 1 $ 481,358 28 (857) Widening of Highway 447 and I-12 Overpass 29 Improvements, Environmental Phase Commencement, 30 Planning and Construction 31 (Livingston) 32 Payable from General Obligation Bonds 33 Priority 1 $ 1,719,800 34 Priority 5 $ 26,000,000 35 Total $ 27,719,800 36 (858) Earhart/Causeway Interchange, Planning, Engineering, 37 Right-of-Way, Utilities and Construction 38 (Jefferson) 39 Payable from General Obligation Bonds 40 Priority 1 $ 4,755,588 41 Priority 5 $ 44,500,000 42 Total $ 49,255,588 43 (868) LA 353: LA 94 to Cypress Island Hwy 44 (Lafayette, St. Martin) 45 Payable from General Obligation Bonds 46 Priority 5 $ 1,400,000 47 (872) New Orleans International Airport Landside Access 48 Improvements 49 (Jefferson) 50 Payable from General Obligation Bonds 51 Priority 1 $ 8,300,000 52 Priority 5 $ 7,700,000 53 Total $ 16,000,000 Page 20 of 161 HB NO. 2 ENROLLED 1 (951) LA 699: LA 35 - LA 343, Planning and Construction 2 (Vermilion) 3 Payable from General Obligation Bonds 4 Priority 5 $ 7,870,000 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 200,000 7 Total $ 8,070,000 8 (979) Roundabout on LA 447 and LA 1025, Planning and 9 Construction 10 (Livingston) 11 Payable from General Obligation Bonds 12 Priority 1 $ 500,000 13 Priority 5 $ 2,000,000 14 Total $ 2,500,000 15 (992) Roundabout at LA 3211 and Yokley Road 16 (St. Mary) 17 Payable from General Obligation Bonds 18 Priority 1 $ 3,500,000 19 (998) I-610 and I-10 Fence Removal, Replacement, and 20 Repairs, due to Hurricane Ida Damage, Planning and 21 Construction 22 (Orleans) 23 Payable from General Obligation Bonds 24 Priority 1 $ 600,000 25 (1061)Peters Road Bridge and Extension, Planning and 26 Construction 27 (Jefferson, Plaquemines) 28 Payable from General Obligation Bonds 29 Priority 1 $ 17,542,954 30 Priority 5 $ 7,000,000 31 Total $ 24,542,954 32 (1062)Highway 30 Roundabout West of LA 44, Planning and 33 Construction 34 (Ascension) 35 Payable from General Obligation Bonds 36 Priority 1 $ 2,000,000 37 Priority 5 $ 2,500,000 38 Total $ 4,500,000 39 (1069)LA 29 Improvements (LA 13 - LA 758) 40 (Evangeline, St. Landry) 41 Payable from General Obligation Bonds 42 Priority 1 $ 5,120,000 43 Priority 5 $ 1,600,000 44 Total $ 6,720,000 45 (1070)LA 758: US 190 - LA 29, Planning and Construction 46 (Evangeline, St. Landry) 47 Payable from General Obligation Bonds 48 Priority 5 $ 4,400,000 49 (1106)Hooper Road Widening and Sewer Improvements 50 (Blackwater Bayou to Sullivan Road) Planning, 51 Engineering, Utilities and Construction 52 (East Baton Rouge) 53 Payable from General Obligation Bonds 54 Priority 1 $ 12,265,000 Page 21 of 161 HB NO. 2 ENROLLED 1 (1159)Relocate Hickory Avenue (LA Hwy. 48-11th Street) 2 (Mounes) (LA Hwy. 3154) Construction, Right of 3 Way, and Utilities 4 (Jefferson) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,000,000 7 Priority 5 $ 1,000,000 8 Total $ 2,000,000 9 (1175)I-49 South from Lafayette to Westbank Expressway, 10 Planning, Engineering, Right-of-Way, Utilities and 11 Construction 12 (Iberia, Jefferson, Lafayette, Lafourche, St. Charles, 13 St. Martin, St. Mary, Terrebonne) 14 Payable from General Obligation Bonds 15 Priority 1 $ 1,830,089 16 Priority 5 $ 188,000,000 17 Payable from Megaproject Leverage Fund $ 100,000,000 18 Total $ 289,830,089 19 (1187)Non-Federal Aid Eligible Highway Program 20 (Statewide) 21 Payable from State Highway Improvement Fund $ 33,400,000 22 (1271)Intersection Improvements (Roundabouts), Planning 23 and Construction 24 (Lafayette) 25 Payable from General Obligation Bonds 26 Priority 1 $ 5,000,000 27 Priority 5 $ 5,000,000 28 Total $ 10,000,000 29 (1279)LA 3227 - LA 157 Intersection Realignment, Planning 30 and Construction 31 (Bossier) 32 Payable from General Obligation Bonds 33 Priority 1 $ 1,500,000 34 (1311)Loyola/I-10 Interchange Improvements, Feasibility 35 Study, Interchange Modification Report, Environmental 36 Assessment, Engineering, Right-of-Ways, Utilities and 37 Construction 38 (Jefferson, Orleans) 39 Payable from General Obligation Bonds 40 Priority 1 $ 2,974,700 41 (1364)LA 95: LA 98 - Beginning of PCCP in Church Point, 42 Planning and Construction 43 (Acadia) 44 Payable from General Obligation Bonds 45 Priority 5 $ 5,800,000 46 Payable from State General Fund (Direct) Non-Recurring 47 Revenues $ 100,000 48 Total $ 5,900,000 Page 22 of 161 HB NO. 2 ENROLLED 1 (1369)I-10 Calcasieu River Bridge, Environmental, Planning, 2 Engineering, Right-of-Way, Utilities, Demolition and 3 Construction 4 (Calcasieu) 5 Payable from General Obligation Bonds 6 Priority 1 $ 20,000,000 7 Priority 5 $ 80,000,000 8 Payable from Megaproject Leverage Fund $ 100,000,000 9 Total $ 200,000,000 10 (1470)LA 3034 Improvements 11 (East Baton Rouge) 12 Payable from General Obligation Bonds 13 Priority 1 $ 15,379,082 14 Priority 5 $ 20,000,000 15 Total $ 35,379,082 16 (1471)LA 42 (US 61 to LA 44) Widening, including a 17 Roundabout at Joe Sevario Road, Planning and 18 Construction 19 (Ascension) 20 Payable from General Obligation Bonds 21 Priority 1 $ 227,773 22 (1485)LA 335: LA 35 - LA 14, Planning and Construction 23 (Vermilion) 24 Payable from General Obligation Bonds 25 Priority 5 $ 16,100,000 26 Payable from State General Fund (Direct) Non-Recurring 27 Revenues $ 1,000,000 28 Total $ 17,100,000 29 (1486)LA 31: LA 182 - 0.15 Mi N of N LA 96 30 (Iberia, St. Martin) 31 Payable from General Obligation Bonds 32 Priority 5 $ 9,600,000 33 (1572)LA 92 - 1 (US 90 - LA 182), Planning and Construction 34 (St. Martin) 35 Payable from General Obligation Bonds 36 Priority 5 $ 4,600,000 37 (1631)US 190 Widening: LA 25 - US 190 Bus 38 (St. Tammany) 39 Payable from General Obligation Bonds 40 Priority 1 $ 2,000,000 41 Priority 5 $ 3,100,000 42 Total $ 5,100,000 43 (1696)Interchange Improvements in Lafayette Parish, 44 Planning and Construction 45 (Lafayette) 46 Payable from General Obligation Bonds 47 Priority 5 $ 10,000,000 Page 23 of 161 HB NO. 2 ENROLLED 1 (1753)LA 22 Extension and Improvements, LA 22 2 Roundabout, Design, Engineering, Planning and 3 Construction 4 (St. Tammany) 5 Payable from General Obligation Bonds 6 Priority 1 $ 646,062 7 Priority 2 $ 200,000 8 Priority 5 $ 3,240,000 9 Total $ 4,086,062 10 (1782)LA 409 (Liberty Road): LA 64 - East Feliciana Parish 11 Line Planning and Construction 12 (East Baton Rouge) 13 Payable from General Obligation Bonds 14 Priority 2 $ 2,000,000 15 Priority 5 $ 14,000,000 16 Total $ 16,000,000 17 (1794)Roundabout at LA 3233 and I-49 Northbound Service 18 Road, Planning and Construction 19 (St. Landry) 20 Payable from General Obligation Bonds 21 Priority 5 $ 9,600,000 22 Payable from State General Fund (Direct) $ 1,000,000 23 Total $ 10,600,000 24 Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 25 39:112. 26 (1851)LA 755: LA 368 - LA 91, Planning and Construction 27 (Acadia) 28 Payable from General Obligation Bonds 29 Priority 5 $ 5,576,000 30 Payable from State General Fund (Direct) Non-Recurring 31 Revenues $ 100,000 32 Total $ 5,676,000 33 (1853)LA 1100: LA 98 - LA 95, Planning and Construction 34 (Acadia) 35 Payable from General Obligation Bonds 36 Priority 5 $ 3,150,000 37 Payable from State General Fund (Direct) Non-Recurring 38 Revenues $ 100,000 39 Total $ 3,250,000 40 (1854)LA 343 (Bosco Hwy) LA 98 - LA 356, 41 Planning and Construction 42 (St. Landry) 43 Payable from General Obligation Bonds 44 Priority 5 $ 6,985,000 45 Payable from State General Fund (Direct) Non-Recurring 46 Revenues $ 100,000 47 Total $ 7,085,000 48 (1857)US 90: Lafayette Regional Airport - Assumption 49 Parish Line, Planning and Construction 50 (Iberia, Lafayette, St. Martin, St. Mary) 51 Payable from General Obligation Bonds 52 Priority 5 $ 40,000,000 53 Payable from the Capital Outlay Savings Fund $ 10,000,000 54 Total $ 50,000,000 Page 24 of 161 HB NO. 2 ENROLLED 1 (1862)LA 3211: Yokley Road to LA 182, 2 Planning and Construction 3 (St. Mary) 4 Payable from General Obligation Bonds 5 Priority 5 $ 5,000,000 6 (1855)LA 347: LA 678 - 0.6 Mile North of LA 355, 7 Planning and Construction 8 (St. Martin) 9 Payable from the Capital Outlay Savings Fund $ 585,000 10 ( )LA 347: LA 355 to LA 686 (Bushville Highway 11 from Cecilia Bridge Highway to Canal Street) 12 Planning and Construction 13 (St. Martin) 14 Payable from General Obligation Bonds 15 Priority 5 $ 4,250,000 16 Payable from State General Fund (Direct) Non-Recurring 17 Revenues $ 1,000,000 18 Total $ 5,250,000 19 Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 20 39:112. 21 ( )Livingston Roundabout at Corner of LA 16 and 22 LA 42, Planning and Construction 23 (Livingston) 24 Payable from General Obligation Bonds 25 Priority 5 $ 3,600,000 26 Payable from State General Fund (Direct) Non-Recurring 27 Revenues $ 750,000 28 Total $ 4,350,000 29 Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 30 39:112. 31 07/274PUBLIC IMPROVEMENTS 32 (22) Short Line Railroad Upgrades 33 (Statewide) 34 Payable from General Obligation Bonds 35 Priority 1 $ 12,000,000 36 Priority 5 $ 3,000,000 37 Total $ 15,000,000 38 (126) Port Construction and Development Priority Program 39 (Statewide) 40 Payable from Transportation Trust Fund - Regular $ 39,400,000 41 Payable from State General Fund (Direct) $ 25,000,000 42 Total $ 64,400,000 43 (236) Comite River Diversion Canal Planning, Right-of-Way, 44 Utilities and Construction 45 (Ascension, East Baton Rouge, Livingston) 46 Payable from General Obligation Bonds 47 Priority 1 $ 1,008,665 Page 25 of 161 HB NO. 2 ENROLLED 1 (237) Bayou Dechene Reservoir, Planning, Land Acquisition 2 and Construction 3 (Caldwell) 4 Payable from General Obligation Bonds 5 Priority 1 $ 13,353,232 6 Priority 5 $ 11,000,000 7 Total $ 24,353,232 8 (238) Houma Navigational Canal Deepening Project, 9 Planning, Design, Construction, Rights-of-Ways, 10 Relocations and Utilities 11 (Terrebonne) 12 Payable from General Obligation Bonds 13 Priority 1 $ 17,236,052 14 Priority 5 $ 23,500,000 15 Total $ 40,736,052 16 (375) Statewide Flood Control Program 17 (Statewide) 18 Payable from Transportation Trust Fund - Regular $ 20,000,000 19 (443) Acadiana Gulf of Mexico Access Channel (AGMAC), 20 Port of Iberia, Planning, Design, Construction, Rights- 21 of-Way, Relocations and Utilities 22 (Iberia, Vermilion) 23 Payable from General Obligation Bonds 24 Priority 1 $ 35,029,300 25 Priority 5 $ 5,000,000 26 Total $ 40,029,300 27 (646) Turkey Creek Lake Repairs, Planning and Construction 28 (Franklin) 29 Payable from General Obligation Bonds 30 Priority 1 $ 1,500,000 31 Priority 5 $ 3,686,560 32 Total $ 5,186,560 33 (647) Ouachita River Bank Stabilization and Levee Repair 34 (Caldwell, Ouachita) 35 Payable from General Obligation Bonds 36 Priority 1 $ 5,135,000 37 Priority 5 $ 14,650,000 38 Total $ 19,785,000 39 (648) Mississippi River Levee Raising, Arkansas to Old 40 River, Planning and Construction 41 (Avoyelles, Concordia, East Carroll, Madison, Pointe 42 Coupee, Tensas) 43 Payable from General Obligation Bonds 44 Priority 1 $ 9,897,522 45 Priority 5 $ 31,000,000 46 Total $ 40,897,522 47 (854) Mississippi River Deepening, Phase 3, Planning, 48 Design, Construction, Rights-of-Way, Relocations and 49 Utilities 50 (Ascension, East Baton Rouge, Jefferson, Orleans, 51 Plaquemines, St. Bernard, St. Charles, St. James, 52 St. John the Baptist, West Baton Rouge) 53 Payable from General Obligation Bonds 54 Priority 1 $ 42,500,000 55 Priority 5 $ 28,000,000 56 Total $ 70,500,000 Page 26 of 161 HB NO. 2 ENROLLED 1 (1058)J. Bennett Johnston (Red River) Deepening 2 (Avoyelles, Bossier, Caddo, Grant, Natchitoches, 3 Rapides, Red River) 4 Payable from General Obligation Bonds 5 Priority 1 $ 500,000 6 Priority 5 $ 1,000,000 7 Total $ 1,500,000 8 (1059)Bundick Lake Level Control Structure, Planning and 9 Construction 10 (Beauregard) 11 Payable from General Obligation Bonds 12 Priority 1 $ 2,980,000 13 (1269)New Orleans Rail Gateway Finalize EIS to Complete 14 Study 15 (Jefferson, Orleans) 16 Payable from General Obligation Bonds 17 Priority 1 $ 1,983,811 18 (1467)Rehabilitation and Repair of State-Maintained 19 Reservoirs and Dams 20 (Statewide) 21 Payable from General Obligation Bonds 22 Priority 1 $ 3,912,702 23 Priority 5 $ 4,500,000 24 Total $ 8,412,702 25 (1669)West of Atchafalaya Basin Feasibility Study 26 (Statewide) 27 Payable from General Obligation Bonds 28 Priority 5 $ 750,000 29 07/276ENGINEERING AND OPERATIONS 30 (980) Motor Vessel and Equipment Drydocking, Repairs, 31 Various Locations Statewide 32 (Statewide) 33 Payable from Transportation Trust Fund - Regular $ 1,500,000 34 (1268)New Cameron Ferry 35 (Cameron) 36 Payable from General Obligation Bonds 37 Priority 1 $ 21,568,016 38 (1665)Facilities Program Major Repairs, Renovations, 39 Additions, New Facilities, Equipment Replacement at 40 Various DOTD Sites, Planning and Construction 41 (Statewide) 42 Payable from Transportation Trust Fund - Regular $ 4,000,000 43 07/277AVIATION IMPROVEMENTS 44 (1188)State Aviation and Airport Improvement Program 45 (Statewide) 46 Payable from Transportation Trust Fund - Regular $ 10,674,794 47 Payable from Federal Funds $ 2,000,000 48 Payable from State General Fund (Direct) $ 17,300,000 49 Total $ 29,974,794 Page 27 of 161 HB NO. 2 ENROLLED 1 DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS 2 08/400DEPARTMENT OF CORRECTIONS 3 (1505)HVAC Installation, Offender Housing, Planning and 4 Construction 5 (Statewide) 6 Payable from General Obligation Bonds 7 Priority 1 $ 550,000 8 08/402LOUISIANA STATE PENITENTIARY 9 (1472)Main Prison Shower and Cellblock Plumbing Upgrade, 10 Planning and Construction 11 (West Feliciana) 12 Payable from General Obligation Bonds 13 Priority 1 $ 250,000 14 Priority 5 $ 1,356,000 15 Total $ 1,606,000 16 (1473)Electrical Distribution System Upgrade, Planning and 17 Construction 18 (West Feliciana) 19 Payable from General Obligation Bonds 20 Priority 1 $ 364,410 21 Priority 5 $ 4,194,000 22 Total $ 4,558,410 23 08/403OFFICE OF JUVENILE JUSTICE 24 (84) Community Based Program, Juvenile Justice 25 Improvements, Planning, Construction, Renovation, 26 Acquisition, and Equipment 27 (Statewide) 28 Payable from General Obligation Bonds 29 Priority 1 $ 13,909,667 30 Priority 5 $ 58,500,000 31 Payable from Interagency Transfers $ 10,000,000 32 Payable from State General Fund (Direct) Non-Recurring 33 Revenues $ 4,500,000 34 Total $ 86,909,667 35 (701) Swanson Center for Youth at Columbia - Emergency 36 Power Upgrades, Planning and Construction 37 (Ouachita) 38 Payable from Interagency Transfers $ 870,000 39 (910) Bridge City Center for Youth - Replace Campus Storm 40 Drain System, Planning and Construction 41 (Jefferson) 42 Payable from Interagency Transfers $ 337,400 43 (1407)Bridge City Center for Youth - New Recreational 44 Pavilion, Planning and Construction 45 (Jefferson) 46 Payable from Interagency Transfers $ 682,000 Page 28 of 161 HB NO. 2 ENROLLED 1 (1527)Acadiana Center for Youth - Renovation to Create 2 Behavioral Intervention Rooms 3 (Avoyelles) 4 Payable from General Obligation Bonds 5 Priority 2 $ 400,000 6 Payable from Interagency Transfers $ 1,100,000 7 Total $ 1,500,000 8 08/406LOUISIANA CORRECTIONAL INSTITUTE F OR WOMEN 9 (1462)Rebuild and/or Replace Facility Due to Damage from 10 2016 Flood Event 11 (Iberville) 12 Payable from General Obligation Bonds 13 Priority 1 $ 36,600,000 14 Priority 5 $ 19,400,000 15 Total $ 56,000,000 16 08/416RAYBURN CORRECTIONAL CENTER 17 (1260)Security Perimeter Fence, Planning and Construction 18 (Washington) 19 Payable from General Obligation Bonds 20 Priority 1 $ 250,000 21 Priority 5 $ 1,845,000 22 Total $ 2,095,000 23 08/418PUBLIC SAFETY OFFICE OF MANAGEMENT AND FINANCE 24 (1568)OMF/OMV Headquarters Office Renovation Project, 25 Planning and Construction 26 (East Baton Rouge) 27 Payable from General Obligation Bonds 28 Priority 2 $ 616,000 29 08/419OFFICE OF STATE POLICE 30 (1756)JESTC Training Facility Improvements, Planning and 31 Construction 32 (East Baton Rouge) 33 Payable from General Obligation Bonds 34 Priority 5 $ 3,750,000 35 Payable from Interagency Transfers $ 3,000,000 36 Payable from Federal Funds via Interagency Transfers$ 1,000,000 37 Total $ 7,750,000 38 (1758)New Louisiana State Police Troop L Facility, Planning 39 and Construction 40 (St. Tammany) 41 Payable from General Obligation Bonds 42 Priority 2 $ 3,000,000 43 Priority 5 $ 27,000,000 44 Total $ 30,000,000 45 LOUISIANA DEPARTMENT OF HEALTH 46 09/320OFFICE OF AGING AND ADULT SERVICES 47 (71) Replace Roof and Storm Drains on all Patient 48 Buildings, Planning and Construction 49 (East Feliciana) 50 Payable from General Obligation Bonds 51 Priority 1 $ 71,547 Page 29 of 161 HB NO. 2 ENROLLED 1 (72) Repair and Upgrade to Sewer System, Planning and 2 Construction 3 (East Feliciana) 4 Payable from General Obligation Bonds 5 Priority 1 $ 447,593 6 Priority 5 $ 6,170,000 7 Total $ 6,617,593 8 (1788)Renovations of Multiple Buildings at Villa Feliciana 9 Medical Complex, Planning and Construction 10 (East Feliciana) 11 Payable from Interagency Transfers $ 8,000,000 12 09/330OFFICE OF BEHAVIORAL HEALTH 13 (75) Central Louisiana State Hospital Relocation to 14 Pinecrest, Planning and Construction 15 (Rapides) 16 Payable from General Obligation Bonds 17 Priority 1 $ 3,040,953 18 (906) Center Building and Fire Alarm System Renovation 19 and Restoration, East Louisiana State Hospital, 20 Planning and Construction 21 (East Feliciana) 22 Payable from General Obligation Bonds 23 Priority 1 $ 323,183 24 Priority 5 $ 5,000,000 25 Total $ 5,323,183 26 (1320)Fire Alarm System Replacement for Ten Buildings, 27 Planning and Construction 28 (East Feliciana) 29 Payable from General Obligation Bonds 30 Priority 5 $ 2,453,200 31 09/340OFFICE FOR CITIZENS WITH DEVELOP MENTAL DISABILITIES 32 (507) Plant Generator, Planning and Construction 33 (Rapides) 34 Payable from Interagency Transfers $ 1,000,000 35 (1123)Global Infrastructure Improvements, Planning and 36 Construction 37 (Rapides) 38 Payable from Interagency Transfers $ 1,500,000 39 DEPARTMENT OF WILDLIFE AND FISHERIES 40 16/512OFFICE OF THE SECRETARY 41 (109) Wildlife and Fisheries Enforcement Training Academy 42 and Emergency Facility (Complex) 43 (East Baton Rouge) 44 Payable from General Obligation Bonds 45 Priority 1 $ 2,250,000 Page 30 of 161 HB NO. 2 ENROLLED 1 16/513OFFICE OF WILDLIFE 2 (519) Hammond Headquarters, Planning and Construction 3 (Tangipahoa) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,500,000 6 (520) Region 5/Lake Charles Office 7 (Calcasieu) 8 Payable from General Obligation Bonds 9 Priority 5 $ 3,000,000 10 (1341)Woodworth Central Office Complex and Pineville 11 Office/Region 3, Planning and Construction 12 (Rapides) 13 Payable from General Obligation Bonds 14 Priority 5 $ 6,300,000 15 DEPARTMENT OF EDUCATION 16 19/601LSU BATON ROUG E 17 (17) Science - Strategic Capital Plan Repairs and Upgrades - 18 Food Science Renovation, New Science Building, 19 Infrastructure and Utilities, Planning and Construction 20 (East Baton Rouge) 21 Payable from General Obligation Bonds 22 Priority 1 $ 5,000,000 23 Priority 5 $ 89,175,000 24 Total $ 94,175,000 25 Provided, however, that the $475,000 of the Priority 5 appropriation shall be used to fund 26 the construction or addition of a Vivarium on the Louisiana State University – Shreveport 27 campus. 28 (437) Military and Security Sciences Renovations, 29 Planning and Construction 30 (East Baton Rouge) 31 Payable from General Obligation Bonds 32 Priority 1 $ 4,500,000 33 Priority 5 $ 17,500,000 34 Total $ 22,000,000 35 (438) Veterinary Medicine Facilities Repairs/Addition 36 (East Baton Rouge) 37 Payable from General Obligation Bonds 38 Priority 1 $ 14,500,000 39 Priority 5 $ 3,500,000 40 Total $ 18,000,000 41 (1049)Strategic Capital Plan - Deferred Maintenance for 42 Infrastructure, Renovations, and Streets 43 (East Baton Rouge) 44 Payable from General Obligation Bonds 45 Priority 1 $ 7,346,176 46 Priority 5 $ 31,700,000 47 Total $ 39,046,176 Page 31 of 161 HB NO. 2 ENROLLED 1 (1258)Louisiana State University Library 2 (East Baton Rouge) 3 Payable from General Obligation Bonds 4 Priority 1 $ 3,254,349 5 Priority 5 $ 149,500,000 6 Total $ 152,754,349 7 19/602LSU ALEXANDRIA 8 (422) Student Success Center, Planning and Construction 9 (Rapides) 10 Payable from General Obligation Bonds 11 Priority 1 $ 8,000,000 12 Priority 5 $ 7,900,000 13 Total $ 15,900,000 14 (1795)Downtown Health Services Center, Planning 15 and Construction 16 (Rapides) 17 Payable from General Obligation Bonds 18 Priority 2 $ 100,000 19 Priority 5 $ 29,185,000 20 Payable from Interagency Transfers $ 8,000,000 21 Payable from State General Fund (Direct) Non-Recurring 22 Revenues $ 2,900,000 23 Total $ 40,185,000 24 19/603UNIVERSITY OF NEW ORLEANS 25 (451) Hotel, Restaurant and Tourism Program Relocation 26 Buildout to North Central Plant Building - Phase 1, 27 Planning and Construction 28 (Orleans) 29 Payable from General Obligation Bonds 30 Priority 5 $ 5,800,000 31 Payable from State General Fund (Direct) Non-Recurring 32 Revenues $ 650,000 33 Total $ 6,450,000 34 (861) New Track & Field Stadium, 35 Planning and Construction 36 (Orleans) 37 Payable from General Obligation Bonds 38 Priority 5 $ 13,000,000 39 (1477)Miscellaneous Roof Replacements, Planning 40 and Construction 41 (Orleans) 42 Payable from General Obligation Bonds 43 Priority 5 $ 4,800,000 44 Payable from State General Fund (Direct) Non-Recurring 45 Revenues $ 550,000 46 Total $ 5,350,000 47 19/604NLSU HEALTH SCIENCES CENTER - NEW ORLEANS 48 (3) LSUHSC-NO Campus Stormwater Infrastructure 49 Upgrades, Planning and Construction 50 (Orleans) 51 Payable from General Obligation Bonds 52 Priority 5 $ 3,000,000 Page 32 of 161 HB NO. 2 ENROLLED 1 (626) Health Science Center Facility Renovations – Dental 2 School 3 Simulation Facility, Planning and Construction 4 (Orleans) 5 Payable from General Obligation Bonds 6 Priority 5 $ 40,000,000 7 Payable from Fees and Self-Generated Revenues $ 4,000,000 8 Payable from State General Fund (Direct) $ 4,000,000 9 Total $ 48,000,000 10 (832) LSUHSC-NO Medical Education Building Laboratory 11 Renovation, Phase 1, Planning and Construction 12 (Orleans) 13 Payable from General Obligation Bonds 14 Priority 1 $ 10,000,000 15 Priority 5 $ 65,000,000 16 Total $ 75,000,000 17 (1034)Center for Advanced Learning and Simulation 18 Infrastructure and Equipment, Planning and 19 Construction 20 (Orleans) 21 Payable from General Obligation Bonds 22 Priority 5 $ 2,800,000 23 Payable from State General Fund (Direct) $ 2,800,000 24 Total $ 5,600,000 25 19/604SLSU HEALTH SCIENCES CENTER - SHREVEP ORT 26 (212) Center for Medical Education and Wellness, Planning 27 and Construction 28 (Caddo) 29 Payable from General Obligation Bonds 30 Priority 1 $ 26,000,000 31 (423) Comprehensive Emergency Water Supply 32 Improvements, Planning and Construction 33 (Caddo) 34 Payable from General Obligation Bonds 35 Priority 1 $ 6,110,650 36 Priority 5 $ 1,391,000 37 Total $ 7,501,650 38 (1035)Gross Anatomy Lab Expansion and Modernization, 39 Planning and Construction 40 (Caddo) 41 Payable from General Obligation Bonds 42 Priority 1 $ 2,120,052 43 Priority 2 $ 875,000 44 Total $ 2,995,052 45 (1449)Stonewall Animal Research and Training Facility, 46 Planning and Construction 47 (DeSoto) 48 Payable from General Obligation Bonds 49 Priority 1 $ 5,000,000 50 (1718)Capital Improvement Projects, Design and Engineering 51 (Caddo) 52 Payable from General Obligation Bonds 53 Priority 1 $ 2,007,423 Page 33 of 161 HB NO. 2 ENROLLED 1 (1719)Medical School B-Building HVAC Replacement, 2 Planning and Construction 3 (Caddo) 4 Payable from General Obligation Bonds 5 Priority 1 $ 2,322,408 6 19/605LSU EUNICE 7 (1) STEAM Innovation Center, Phase 1, 8 Planning and Construction 9 (Acadia) 10 Payable from General Obligation Bonds 11 Priority 5 $ 27,900,000 12 Payable from the Capital Outlay Savings Fund $ 1,000,000 13 Total $ 28,900,000 14 (2) Athletic Complex Facility, Planning and Construction 15 (Acadia) 16 Payable from General Obligation Bonds 17 Priority 1 $ 6,000,000 18 Priority 5 $ 7,750,000 19 Payable from Fees and Self-Generated Revenues $ 1,000,000 20 Total $ 14,750,000 21 (1720)Manuel Hall Exterior Wall and Roof Repair, Planning 22 and Construction 23 (Acadia) 24 Payable from General Obligation Bonds 25 Priority 1 $ 2,624,749 26 19/606LSU SHREVEPORT 27 (1448)Building Exterior Walls and Bridge Repair, Planning 28 and Construction 29 (Caddo) 30 Payable from General Obligation Bonds 31 Priority 1 $ 3,094,021 32 19/607LSU AGRICULTURAL CENTER 33 (213) John M. Parker Agricultural Center & Livestock Show 34 Barn Renovations and Repairs 35 (East Baton Rouge) 36 Payable from General Obligation Bonds 37 Priority 1 $ 2,500,000 38 Priority 5 $ 20,500,000 39 Total $ 23,000,000 40 (625) Animal and Food Science Facilities Renovations and 41 Modernizations, Phase II, Planning and Construction 42 (East Baton Rouge) 43 Payable from General Obligation Bonds 44 Priority 1 $ 346,950 45 Priority 5 $ 29,403,500 46 Total $ 29,750,450 47 (628) Burden Wetlands and Trail Improvements, Planning 48 and Construction 49 (East Baton Rouge) 50 Payable from Fees and Self-Generated Revenues $ 10,000,000 Page 34 of 161 HB NO. 2 ENROLLED 1 (833) Renewable and Natural Resources Building Repairs, 2 Planning and Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 1 $ 2,297,035 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 4,000,000 8 Total $ 6,297,035 9 (1036)Food Innovation Center, Planning and Construction 10 (East Baton Rouge) 11 Payable from General Obligation Bonds 12 Priority 5 $ 4,000,000 13 Payable from Fees and Self-Generated Revenues $ 500,000 14 Payable from State General Fund (Direct) Non-Recurring 15 Revenues $ 1,000,000 16 Total $ 5,500,000 17 (1060)Dean Lee Tornado Damage Building Repairs and 18 Reconstruction 19 (Rapides) 20 Payable from General Obligation Bonds 21 Priority 1 $ 1,499,630 22 Priority 2 $ 1,700,000 23 Total $ 3,199,630 24 (1858)AgCenter and Veterinary Medicine Innovation Center, 25 Planning and Construction 26 (East Baton Rouge) 27 Payable from General Obligation Bonds 28 Priority 2 $ 4,000,000 29 Priority 5 $ 54,000,000 30 Total $ 58,000,000 31 19/612BATON ROUGE COMMUNITY COLLEG E 32 (1547)Allied Health Facility and Other Campus Development, 33 with Equipment, Planning and Construction 34 (East Baton Rouge) 35 Payable from General Obligation Bonds 36 Priority 1 $ 13,500,000 37 Priority 5 $ 39,500,000 38 Total $ 53,000,000 39 (1783)Campus Development, Planning and Construction 40 (Pointe Coupee) 41 Payable from General Obligation Bonds 42 Priority 5 $ 6,000,000 43 Payable from State General Fund (Direct) $ 1,000,000 44 Total $ 7,000,000 45 19/614SOUTHERN UNIVERSITY LAW CENTER 46 (18) Renovations and Addition to Existing Law Library, 47 Planning and Construction 48 (East Baton Rouge) 49 Payable from General Obligation Bonds 50 Priority 1 $ 5,614,030 51 Priority 5 $ 5,750,000 52 Total $ 11,364,030 Page 35 of 161 HB NO. 2 ENROLLED 1 (1759)Career Learning Center, Planning and Construction 2 (East Baton Rouge) 3 Payable from General Obligation Bonds 4 Priority 5 $ 15,500,000 5 (1861)Law Clinic Annex, Planning and Construction 6 (East Baton Rouge) 7 Payable from Fees and Self Generated 8 Revenues $ 1,600,000 9 Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 10 39:112. 11 19/616SOUTHERN UNIVERSITY - BATON ROUG E 12 (19) Ravine, Bluff and Riverbank Stabilization Project, 13 Planning and Construction 14 (East Baton Rouge) 15 Payable from General Obligation Bonds 16 Priority 1 $ 1,000,000 17 Priority 5 $ 31,000,600 18 Total $ 32,000,600 19 (441) New STEM Science Complex, Planning and 20 Construction 21 (East Baton Rouge) 22 Payable from General Obligation Bonds 23 Priority 1 $ 14,699,943 24 Priority 5 $ 51,800,000 25 Total $ 66,499,943 26 (442) School of Business/Professional Accountancy, Planning 27 and Construction 28 (East Baton Rouge) 29 Payable from General Obligation Bonds 30 Priority 1 $ 2,250,000 31 Priority 5 $ 42,250,000 32 Total $ 44,500,000 33 (1789)J. K. Haynes Hall School of Nursing Renovation and 34 Addition, Planning and Construction 35 (East Baton Rouge) 36 Payable from General Obligation Bonds 37 Priority 2 $ 1,100,000 38 Priority 5 $ 10,300,000 39 Payable from Fees and Self-Generated Revenues $ 18,000,000 40 Total $ 29,400,000 41 (859) Replace Chilled Water Lines, Planning and 42 Construction 43 (East Baton Rouge) 44 Payable from General Obligation Bonds 45 Priority 2 $ 2,000,000 46 Priority 5 $ 28,000,000 47 Payable from State General Fund (Direct) $ 1,000,000 48 Total $ 31,000,000 Page 36 of 161 HB NO. 2 ENROLLED 1 (1265)Stewart Hall - Wall Mount HVAC Units 1st, 2nd and 2 3rd Floors, Planning and Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,729,068 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 1,000,000 8 Total $ 2,729,068 9 (1724)A.O. Williams Hall Renovations, 10 Planning and Construction 11 (East Baton Rouge) 12 Payable from General Obligation Bonds 13 Priority 1 $ 2,715,575 14 (1760)New Southern University Laboratory School Complex, 15 Planning and Construction 16 (East Baton Rouge) 17 Payable from General Obligation Bonds 18 Priority 2 $ 2,000,000 19 Priority 5 $ 53,000,000 20 Payable from State General Fund (Direct) $ 1,800,000 21 Total $ 56,800,000 22 (1784)Global Innovation and Welcome Center, Phase II, 23 Planning and Construction 24 (East Baton Rouge) 25 Payable from Interagency Transfers $ 3,000,000 26 Payable from Fees and Self-Generated Revenues $ 3,000,000 27 Total $ 6,000,000 28 (1785)Center for Innovation, Entrepreneurship and 29 Community Engagement, Planning and Construction 30 (East Baton Rouge) 31 Payable from Fees and Self-Generated Revenues $ 15,000,000 32 19/617SOUTHERN UNIVERSITY- NEW ORLEANS 33 (23) ADA Compliant Restrooms and Public 34 Accommodations in the Cafeteria, University Center, 35 Health & Physical Education, Library and 36 Administration Building, Planning and Construction 37 (Orleans) 38 Payable from General Obligation Bonds 39 Priority 1 $ 1,000,000 40 Priority 2 $ 2,650,000 41 Total $ 3,650,000 42 (1468)Campus Exterior Lighting Upgrades, Planning and 43 Construction 44 (Orleans) 45 Payable from General Obligation Bonds 46 Priority 1 $ 1,000,000 47 (1469)University Cafeteria, Planning and Construction 48 (Orleans) 49 Payable from General Obligation Bonds 50 Priority 1 $ 100,000 51 Priority 5 $ 9,900,000 52 Total $ 10,000,000 Page 37 of 161 HB NO. 2 ENROLLED 1 (1761)General Classroom Building, Planning and 2 Construction 3 (Orleans) 4 Payable from General Obligation Bonds 5 Priority 5 $ 15,000,000 6 (1786)Nursing and Allied Health Building, Planning and 7 Construction 8 (Orleans) 9 Payable from Fees and Self-Generated Revenues $ 20,000,000 10 19/618SOUTHERN UNIVERSITY - SHREVEP ORT 11 (488) Domestic Water Loop, Hot Water Loop and Drainage 12 Improvements, Planning and Construction 13 (Caddo) 14 Payable from General Obligation Bonds 15 Priority 2 $ 520,000 16 Priority 5 $ 7,480,000 17 Total $ 8,000,000 18 (836) Louis Collier Hall Science Building Renovation, 19 Planning and Construction 20 (Caddo) 21 Payable from General Obligation Bonds 22 Priority 1 $ 654,083 23 Priority 5 $ 15,950,000 24 Total $ 16,604,083 25 (1256)Gym Complex, Planning and Construction 26 (Caddo) 27 Payable from General Obligation Bonds 28 Priority 5 $ 8,700,000 29 (1259)New Workforce Training and Technology Center, 30 Planning and Construction 31 (Caddo) 32 Payable from General Obligation Bonds 33 Priority 1 $ 1,675,947 34 Priority 5 $ 17,500,000 35 Total $ 19,175,947 36 (1787)HVAC Renovations, Planning and Construction 37 (Caddo) 38 Payable from Fees and Self-Generated Revenues $ 10,000,000 39 19/619SOUTHERN UNIVERSITY AGRICULTURAL RESEARCH AND 40 EXTENSION CENTER 41 (1246)Disaster Relief Mega Shelter, Planning and 42 Construction 43 (East Baton Rouge) 44 Payable from General Obligation Bonds 45 Priority 1 $ 1,144,942 46 Priority 5 $ 9,200,000 47 Payable from Federal Funds via Interagency Transfers$ 18,000,000 48 Total $ 28,344,942 49 (1762)High Tech Meat Processing Facility Expansion, 50 Planning and Construction 51 (East Baton Rouge) 52 Payable from Federal Funds via Interagency Transfers$ 3,500,000 Page 38 of 161 HB NO. 2 ENROLLED 1 19/621NICHOLLS STATE UNIVERSITY 2 (227) Coastal Center Facility, Planning and Construction 3 (Lafourche) 4 Payable from General Obligation Bonds 5 Priority 1 $ 10,905,088 6 (229) New Nursing Building, Planning and Construction 7 (Lafourche) 8 Payable from General Obligation Bonds 9 Priority 1 $ 19,999,897 10 Priority 5 $ 7,500,000 11 Total $ 27,499,897 12 (1460)Fieldhouse, Planning and Construction 13 (Lafourche) 14 Payable from General Obligation Bonds 15 Priority 5 $ 2,100,000 16 Payable from State General Fund (Direct) Non-Recurring 17 Revenues $ 1,500,000 18 Total $ 3,600,000 19 (1816)Women's Student Athlete Performance Center, 20 Planning and Construction 21 (Lafourche) 22 Payable from General Obligation Bonds 23 Priority 5 $ 3,700,000 24 Payable from State General Fund (Direct) Non-Recurring 25 Revenues $ 4,300,000 26 Total $ 8,000,000 27 (1856)Drainage Improvements and Raising Level of Street, 28 Planning and Construction 29 (Lafourche) 30 Payable from the Capital Outlay Savings Fund $ 2,000,000 31 (1860)Welcome Center-Alumni House, Planning and 32 Construction 33 (Lafourche) 34 Payable from State General Fund (Direct) Non-Recurring 35 Revenues $ 290,000 36 19/623GRAMBLING STATE UNIVERSITY 37 (713) Campus Utility Infrastructure Assessment Emergency 38 Repair/Replacement, Planning and Construction 39 (Lincoln) 40 Payable from General Obligation Bonds 41 Priority 1 $ 2,999,963 42 Priority 5 $ 5,000,000 43 Total $ 7,999,963 44 (901) Reroof, Waterproof, Envelope Repairs for Various 45 Buildings, Planning and Construction 46 (Lincoln) 47 Payable from General Obligation Bonds 48 Priority 1 $ 1,000,000 49 Priority 5 $ 7,500,000 50 Total $ 8,500,000 Page 39 of 161 HB NO. 2 ENROLLED 1 (1313)Criminal Justice Building Renovation 2 (Lincoln) 3 Payable from General Obligation Bonds 4 Priority 1 $ 799,968 5 Priority 5 $ 10,500,000 6 Total $ 11,299,968 7 (1781)Computer Science and Cyber Security Building, 8 Planning, Construction, and Equipment 9 (Lincoln) 10 Payable from General Obligation Bonds 11 Priority 2 $ 800,000 12 Priority 5 $ 41,000,000 13 Total $ 41,800,000 14 19/625LOUISIANA TECH UNIVERSITY 15 (243) Renovation of George T. Madison Hall, Planning and 16 Construction 17 (Lincoln) 18 Payable from General Obligation Bonds 19 Priority 1 $ 2,399,937 20 Priority 2 $ 600,000 21 Priority 5 $ 35,000,000 22 Total $ 37,999,937 23 (244) Agriculture and Forestry Wood Products Education and 24 Research Center, Planning and Construction 25 (Lincoln) 26 Payable from General Obligation Bonds 27 Priority 1 $ 999,937 28 Priority 5 $ 9,000,000 29 Total $ 9,999,937 30 (1065)Athletic Academic Center, Planning and Construction 31 (Lincoln) 32 Payable from General Obligation Bonds 33 Priority 1 $ 5,499,937 34 Priority 5 $ 2,000,000 35 Payable from Fees and Self-Generated 36 Revenues $ 4,000,000 37 Total $ 11,499,937 38 (1066)Central Steam Generator - Switch Gear, Planning and 39 Construction 40 (Lincoln) 41 Payable from General Obligation Bonds 42 Priority 1 $ 599,972 43 Priority 5 $ 2,900,000 44 Total $ 3,499,972 45 (1823)Carson-Taylor Hall Renovation, 46 Planning and Construction 47 (Lincoln) 48 Payable from General Obligation Bonds 49 Priority 5 $ 26,000,000 50 Payable from State General Fund (Direct) Non-Recurring 51 Revenues $ 1,000,000 52 Total $ 27,000,000 Page 40 of 161 HB NO. 2 ENROLLED 1 19/627MCNEESE STATE UNIVERSITY 2 (228) Contraband Bayou Erosion Retaining Wall, Phase II, 3 Planning and Construction 4 (Calcasieu) 5 Payable from General Obligation Bonds 6 Priority 1 $ 728,313 7 (436) Shearman Fine Arts Building Renovation and Addition, 8 Planning and Construction 9 (Calcasieu) 10 Payable from General Obligation Bonds 11 Priority 1 $ 3,024,937 12 Priority 5 $ 4,700,000 13 Total $ 7,724,937 14 (847) Burton Business Center Exterior Mitigation, 15 Planning and Construction 16 (Calcasieu) 17 Payable from General Obligation Bonds 18 Priority 5 $ 7,000,000 19 Payable from State General Fund (Direct) $ 1,500,000 20 Total $ 8,500,000 21 (1461)McNeese Disaster Recovery, Planning and 22 Construction 23 (Calcasieu) 24 Payable from General Obligation Bonds 25 Priority 1 $ 9,931,163 26 ( ) Locker Room/Weight Room Renovations, 27 Planning and Construction 28 (Calcasieu) 29 Payable from State General Fund (Direct) Non-Recurring 30 Revenues $ 1,500,000 31 Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 32 39:112. 33 19/629UNIVERSITY OF LOUISIANA - MONROE 34 (42) School of Construction Practice Lab Building, 35 Planning and Construction 36 (Ouachita) 37 Payable from General Obligation Bonds 38 Priority 5 $ 5,000,000 39 (863) Health Science Complex Renovation, Sugar Hall and 40 Caldwell Hall, Planning and Construction 41 (Ouachita) 42 Payable from General Obligation Bonds 43 Priority 1 $ 16,322,729 44 Priority 5 $ 14,000,000 45 Total $ 30,322,729 46 (1074)Human Development and Well-Being Multi-Purpose 47 Center, Planning and Construction 48 (Ouachita) 49 Payable from General Obligation Bonds 50 Priority 2 $ 1,500,000 51 Priority 5 $ 57,100,000 52 Total $ 58,600,000 Page 41 of 161 HB NO. 2 ENROLLED 1 19/631NORTHWESTERN STATE UNIVERSITY 2 (440) Health Performance Center, Planning and Construction 3 (Natchitoches) 4 Payable from General Obligation Bonds 5 Priority 1 $ 5,000,000 6 Payable from Fees and Self-Generated Revenues $ 2,000,000 7 Total $ 7,000,000 8 (869) Renovation of Nursing Education Center at Warrington 9 Place (Shreveport Campus), Planning and Construction 10 (Caddo) 11 Payable from General Obligation Bonds 12 Priority 2 $ 1,335,000 13 Priority 5 $ 12,100,000 14 Total $ 13,435,000 15 (1264)Replacement of John S. Kyser Hall, Planning and 16 Construction 17 (Natchitoches) 18 Payable from General Obligation Bonds 19 Priority 1 $ 35,530,969 20 Priority 5 $ 8,195,000 21 Payable from Fees and Self-Generated Revenues $ 1,000,000 22 Total $ 44,725,969 23 19/634SOUTHEASTERN LOUISIANA UNIVERSITY 24 (424) D. Vickers Hall Renovation and Addition, Planning and 25 Construction 26 (Tangipahoa) 27 Payable from General Obligation Bonds 28 Priority 1 $ 20,038,373 29 Priority 5 $ 12,100,000 30 Total $ 32,138,373 31 (1037)Academic Athletic Training and Ancillary Athletic 32 Facility, Planning and Construction 33 (Tangipahoa) 34 Payable from General Obligation Bonds 35 Priority 1 $ 782,460 36 Priority 5 $ 12,500,000 37 Total $ 13,282,460 38 (1038)Nursing and Health Science Building, Planning and 39 Construction 40 (Tangipahoa) 41 Payable from General Obligation Bonds 42 Priority 1 $ 600,000 43 Priority 5 $ 31,300,000 44 Total $ 31,900,000 45 (1243)Baton Rouge Nursing Center Renovation, Planning and 46 Construction 47 (East Baton Rouge, Tangipahoa) 48 Payable from General Obligation Bonds 49 Priority 1 $ 685,435 50 Priority 5 $ 9,220,000 51 Total $ 9,905,435 Page 42 of 161 HB NO. 2 ENROLLED 1 19/640UNIVERSITY OF LOUISIANA - LAFAYETTE 2 (464) DeClouet Hall Renovation, Planning and Construction 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 1 $ 500,000 6 Priority 5 $ 5,500,000 7 Total $ 6,000,000 8 (668) Foster Hall Renovation, Planning and Construction 9 (Lafayette) 10 Payable from General Obligation Bonds 11 Priority 1 $ 444,173 12 Priority 5 $ 4,000,000 13 Total $ 4,444,173 14 (669) Madison Hall Renovation, Planning and Construction 15 (Lafayette) 16 Payable from General Obligation Bonds 17 Priority 1 $ 8,000,000 18 Priority 5 $ 14,000,000 19 Total $ 22,000,000 20 (670) Engineering Classroom Building, Planning and 21 Construction 22 (Lafayette) 23 Payable from General Obligation Bonds 24 Priority 1 $ 7,084,465 25 Priority 5 $ 47,866,573 26 Total $ 54,951,038 27 (877) Kinesiology, Hospitality Management, and Athletic 28 Administration Complex, Engineering, Stabilization, 29 Equipment, Planning and Construction 30 (Lafayette) 31 Payable from General Obligation Bonds 32 Priority 1 $ 15,000,000 33 Priority 5 $ 22,000,000 34 Total $ 37,000,000 35 (1079)Health Care Education and Training Facility and 36 UL/LSU Health Science Education Collaboration 37 Building, Planning, and Construction 38 (Lafayette) 39 Payable from General Obligation Bonds 40 Priority 1 $ 13,249,968 41 Priority 5 $ 62,500,000 42 Total $ 75,749,968 43 (1817)Sciences Lab/Classroom Building, 44 Planning and Construction 45 (Lafayette) 46 Payable from General Obligation Bonds 47 Priority 5 $ 47,750,000 48 Payable from the Capital Outlay Savings Fund $ 1,250,000 49 Total $ 49,000,000 Page 43 of 161 HB NO. 2 ENROLLED 1 (1818)Billeaud Hall Renovation, 2 Planning and Construction 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 5 $ 29,500,000 6 Payable from the Capital Outlay Savings Fund $ 500,000 7 Total $ 30,000,000 8 (1819)Montgomery Hall Renovation, 9 Planning and Construction 10 (Lafayette) 11 Payable from General Obligation Bonds 12 Priority 5 $ 21,500,000 13 Payable from the Capital Outlay Savings Fund $ 500,000 14 Total $ 22,000,000 15 (1820)Learning Lab, Planning and Construction 16 (Lafayette) 17 Payable from General Obligation Bonds 18 Priority 5 $ 42,000,000 19 Payable from the Capital Outlay Savings Fund $ 2,000,000 20 Total $ 44,000,000 21 (1821)Property Acquisition 22 (Lafayette) 23 Payable from the Capital Outlay Savings Fund $ 2,000,000 24 (1863) Performing Arts Center Complex, Planning 25 and Construction 26 (Lafayette) 27 Payable from General Obligation Bonds 28 Priority 5 $ 74,000,000 29 Payable from State General Fund (Direct) $ 1,000,000 30 Total $ 75,000,000 31 19/646RIVER PARISHES COMMUNITY COLLEG E 32 (1132)Donaldsonville Renovation Project, Planning and 33 Construction 34 (Ascension) 35 Payable from General Obligation Bonds 36 Priority 1 $ 1,100,000 37 19/647LOUISIANA DELTA COMMUNITY COLLEG E 38 (231) Campus Expansion for Louisiana Delta Community 39 College, Winnsboro, Planning and Construction 40 (Franklin) 41 Payable from General Obligation Bonds 42 Priority 1 $ 4,139,820 43 (232) Campus Development for Louisiana Delta Community 44 College Bastrop, Planning and Construction 45 (Morehouse) 46 Payable from General Obligation Bonds 47 Priority 1 $ 4,500,000 48 Priority 5 $ 12,000,000 49 Total $ 16,500,000 Page 44 of 161 HB NO. 2 ENROLLED 1 (1052)Campus Development for Louisiana Delta Community 2 College, Planning and Construction 3 (Union) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,000,000 6 Priority 5 $ 16,500,000 7 Total $ 17,500,000 8 19/649LOUISIANA COMMUNITY AND TECHNICAL COLLEG E SYSTEM 9 (517) Resurface Campus Parking, Planning and Construction 10 (Calcasieu) 11 Payable from General Obligation Bonds 12 Priority 1 $ 149,963 13 Priority 5 $ 2,500,000 14 Total $ 2,649,963 15 (1548)Maritime/Petroleum Workforce Training Academy, 16 Planning and Construction 17 (Terrebonne) 18 Payable from General Obligation Bonds 19 Priority 5 $ 9,334,817 20 (1859)Central Louisiana Technical Community College - 21 Campus Development Rod Brady Campus, 22 Planning and Construction 23 (LaSalle) 24 Payable from General Obligation Bonds 25 Priority 5 $ 9,000,000 26 Payable from the Capital Outlay Savings Fund $ 1,000,000 27 Total $ 10,000,000 28 19/671BOARD OF REGENTS 29 (412) Land Acquisition for Post Secondary Educational 30 Institutions 31 (Statewide) 32 Payable from General Obligation Bonds 33 Priority 1 $ 501,913 34 (413) Major Repairs and Deferred Maintenance of Buildings 35 and Facilities, Planning and Construction 36 (Statewide) 37 Payable from General Obligation Bonds 38 Priority 5 $ 10,000,000 39 Payable from State General Fund (Direct) Non-Recurring 40 Revenues $ 26,300,000 41 Payable from Fees and Self-Generated Revenues $ 10,000,000 42 Payable from Federal Funds via Interagency Transfers$ 10,000,000 43 Total $ 56,300,000 44 Provided, however that $1,300,000 of the State General Fund (Direct) Non-Recurring 45 Revenues appropriation shall be for the Roof Replacement on LSU Biological and 46 Agricultural Engineering Ag Metals Building located on the Baton Rouge campus of 47 Louisiana State University. 48 (1229)System-Wide Telecommunications Wiring and 49 Equipment, Planning and Construction 50 (Statewide) 51 Payable from General Obligation Bonds 52 Priority 1 $ 1,995,822 Page 45 of 161 HB NO. 2 ENROLLED 1 19/673NEW ORLEANS CENTER F OR THE CREATIVE ARTS 2 (1390)Building Acquisition for Academic Studio Program, 3 Planning and Construction 4 (Orleans) 5 Payable from General Obligation Bonds 6 Priority 5 $ 8,000,000 7 Payable from State General Fund (Direct) Non-Recurring 8 Revenues $ 100,000 9 Total $ 8,100,000 10 19/674LOUISIANA UNIVERSITIES MARINE CONSORTIUM 11 (870) Houma Marine Campus Phase 2, Planning and 12 Construction 13 (Terrebonne) 14 Payable from General Obligation Bonds 15 Priority 1 $ 11,488,262 16 (1073)Research Vessel (R/V Pelican) Replacement 17 (Terrebonne) 18 Payable from General Obligation Bonds 19 Priority 1 $ 10,890,000 20 Priority 5 $ 31,000,000 21 Total $ 41,890,000 22 (1725)LUMCON Houma Marine Campus, Planning and 23 Construction 24 (Terrebonne) 25 Payable from General Obligation Bonds 26 Priority 1 $ 3,839,806 27 Priority 5 $ 8,600,000 28 Total $ 12,439,806 29 19/712LOUISIANA TECHNICAL COLLEG E-SULLIVAN CAMPUS 30 (719) New Diesel Automotive Building, Northshore 31 Technical Community College - Sullivan Campus, 32 Planning and Construction 33 (Washington) 34 Payable from General Obligation Bonds 35 Priority 1 $ 3,000,000 36 Priority 5 $ 7,140,000 37 Total $ 10,140,000 38 19/731FLETCHER TECHNICAL COMMUNITY COLLEG E 39 (313) Precision Agriculture Training Facility, Planning and 40 Construction 41 (Terrebonne) 42 Payable from General Obligation Bonds 43 Priority 1 $ 11,000,000 44 Priority 5 $ 9,300,000 45 Total $ 20,300,000 46 19/772NORTHWEST LA TECHNICAL COMMUNITY COLLEG E 47 MANSFIELD 48 (1133)Campus Nursing Lab and Student Center, 49 Planning and Construction 50 (DeSoto) 51 Payable from State General Fund (Direct) Non-Recurring 52 Revenues $ 3,500,000 Page 46 of 161 HB NO. 2 ENROLLED 1 19/788NORTHSHORE TECHNICAL COMMUNITY 2 COLLEGE 3 (1340)New Hammond Area Campus, Planning and 4 Construction 5 (Tangipahoa) 6 Payable from General Obligation Bonds 7 Priority 2 $ 3,000,000 8 Priority 5 $ 37,675,000 9 Total $ 40,675,000 10 (1763)Livingston Campus Expansion, Planning and 11 Construction 12 (Livingston) 13 Payable from General Obligation Bonds 14 Priority 5 $ 9,000,000 15 Payable from State General Fund (Direct) Non-Recurring 16 Revenues $ 1,000,000 17 Total $ 10,000,000 18 JUDICIAL EXPENSES 19 23/949LOUISIANA JUDICIARY 20 (1050)Land Acquisition, Planning, and Construction of New 21 Courthouse for the Louisiana Court of Appeal, Third 22 Circuit 23 (Calcasieu) 24 Payable from General Obligation Bonds 25 Priority 1 $ 268,700 26 LEVEE DISTRICTS AND PORTS 27 36/L03LAFOURCHE BASIN LEVEE DISTRICT 28 (389) West Bank and Vicinity Western Tie-In, 29 Planning and Construction 30 (St. James) 31 Payable from General Obligation Bonds 32 Priority 2 $ 3,100,000 33 Priority 5 $ 37,200,000 34 Total $ 40,300,000 35 36/L13PONTCHARTRAIN LEVEE DISTRICT 36 (170) Lake Pontchartrain West Shore Hurricane Protection 37 Project 38 (Ascension, St. Charles, St. James, St. John the Baptist) 39 Payable from General Obligation Bonds 40 Priority 1 $ 8,251,715 41 Priority 5 $ 4,000,000 42 Total $ 12,251,715 43 (394) Amite River Diversion Canal Weir, Planning and 44 Construction 45 (Ascension, Livingston, St. James) 46 Payable from General Obligation Bonds 47 Priority 2 $ 5,000,000 Page 47 of 161 HB NO. 2 ENROLLED 1 ( )LA 22 Gapping Project, Planning and Construction 2 (Ascension, Livingston, St. James) 3 Payable from General Obligation Bonds 4 Priority 5 $ 5,800,000 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 1,000,000 7 Total $ 6,800,000 8 36/L15SQUIRREL RUN LEVEE DRAINAG E DISTRICT 9 (1406)Maintenance of Levee and FEMA Certification 10 (Iberia) 11 Payable from General Obligation Bonds 12 Priority 1 $ 250,000 13 Priority 5 $ 200,000 14 Total $ 450,000 15 36/L16SOUTH LAFOURCHE LEVEE DISTRICT 16 (1324)Larose to Golden Meadow Hurricane Protection 17 System, Planning and Construction 18 (Lafourche) 19 Payable from General Obligation Bonds 20 Priority 5 $ 10,200,000 21 36/L25GRAND ISLE INDEPENDENT LEVEE DISTRICT 22 (812) Grand Isle Back Levee Flood Protection, Planning and 23 Construction 24 (Jefferson) 25 Payable from General Obligation Bonds 26 Priority 1 $ 1,500,000 27 (1640)Breakwater Protection, Planning and Construction 28 (Jefferson) 29 Payable from General Obligation Bonds 30 Priority 1 $ 2,734,160 31 36/L26NATCHITOCHES LEVEE AND DRAINAG E DISTRICT 32 (1592)Lower Cane River Area Flow Control Structure and 33 Levee Surface Restorations, Planning and Construction 34 (Natchitoches) 35 Payable from General Obligation Bonds 36 Priority 1 $ 125,087 37 36/L34LAKEFRONT MANAG EMENT AUTHORITY 38 (585) Planning, Designing and Constructing Public Use 39 Pavilions Inclusive of Benches and Tables along 5.2 40 Miles of Public Parks and Green Space along New 41 Orleans Lakeshore Drive 42 (Orleans) 43 Payable from General Obligation Bonds 44 Priority 5 $ 168,750 45 (994) Seabrook Public Boat Launch Rehabilitation, Planning 46 and Construction 47 (Orleans) 48 Payable from General Obligation Bonds 49 Priority 1 $ 100,000 50 Priority 5 $ 1,780,000 51 Total $ 1,880,000 Page 48 of 161 HB NO. 2 ENROLLED 1 36/L36LAFITTE AREA INDEPENDENT LEVEE DISTRICT 2 (404) Lower Lafitte (Orange Street) Basin, Planning and 3 Construction 4 (Jefferson) 5 Payable from General Obligation Bonds 6 Priority 1 $ 8,500,000 7 Priority 5 $ 8,492,500 8 Total $ 16,992,500 9 (1219)Goose Bayou/The Pen Levee Basin, Planning and 10 Construction 11 (Jefferson) 12 Payable from General Obligation Bonds 13 Priority 1 $ 3,000,000 14 Priority 5 $ 12,066,000 15 Total $ 15,066,000 16 36/P05WEST CALCASIEU PORT 17 (742) New Property Along Gulf Intracoastal Waterway, 18 Planning and Construction 19 (Calcasieu) 20 Payable from General Obligation Bonds 21 Priority 5 $ 2,000,000 22 36/P10GREATER LAFOURCHE PORT COMMISSION 23 (203) Port Fourchon to Belle Pass Channel Deepening 24 Project, Planning and Construction 25 (Lafourche) 26 Payable from General Obligation Bonds 27 Priority 5 $ 20,000,000 28 Payable from State General Fund (Direct) $ 5,000,000 29 Total $ 25,000,000 30 (617) South Lafourche Leonard Miller Jr. Airport 31 Terminal Building, Planning and Construction 32 (Lafourche) 33 Payable from General Obligation Bonds 34 Priority 5 $ 2,500,000 35 (1649)Fourchon Bridge and Connector Road, Planning and 36 Construction 37 (Lafourche) 38 Payable from General Obligation Bonds 39 Priority 1 $ 500,000 40 Priority 5 $ 4,910,000 41 Total $ 5,410,000 42 36/P12LAKE PROVIDENCE PORT COMMISSION 43 (392) Third Lane Addition, Planning and Construction 44 (East Carroll) 45 Payable from General Obligation Bonds 46 Priority 2 $ 100,000 47 Priority 5 $ 1,800,000 48 Total $ 1,900,000 Page 49 of 161 HB NO. 2 ENROLLED 1 36/P15MORGAN CITY HARBOR & TERMINAL DISTRICT 2 (1310)Dock Expansion - Bulkheading, State Drydock 3 Repair, and Related Dredging, Planning and 4 Construction 5 (St. Mary) 6 Payable from State General Fund (Direct) $ 10,500,000 7 (1570)Warehouse Infrastructure Improvements (Fire 8 Suppression System), Planning and Construction 9 (St. Mary) 10 Payable from Capital Outlay Savings Fund $ 500,000 11 36/P16PORT OF IBERIA 12 (406) Road Repair, Replacement and Improvements, 13 Planning and Construction 14 (Iberia) 15 Payable from General Obligation Bonds 16 Priority 2 $ 3,600,000 17 Priority 5 $ 5,000,000 18 Total $ 8,600,000 19 36/P17PORT OF NEW ORLEANS 20 (324) St. Claude Bridge Rehabilitation, 21 Planning and Construction 22 (Orleans) 23 Payable from General Obligation Bonds 24 Priority 5 $ 23,500,000 25 (1348)St. Bernard Transportation Corridor, Planning and 26 Construction 27 (St. Bernard) 28 Payable from General Obligation Bonds 29 Priority 1 $ 2,000,000 30 Priority 5 $ 48,000,000 31 Total $ 50,000,000 32 36/P21PORT OF SOUTH LOUISIANA 33 (112) Globalplex Road Improvements and Drainage Between 34 Globalplex Buildings 71 and 76, Planning and 35 Construction 36 (St. John the Baptist) 37 Payable from General Obligation Bonds 38 Priority 1 $ 500,000 39 (523) Globalplex Dock Access Bridge and Equipment 40 Replacement/Repair, Planning and Construction 41 (St. John the Baptist) 42 Payable from General Obligation Bonds 43 Priority 1 $ 10,800,750 44 (524) Globalplex Roadway Improvements at Parking Area 45 Near Building 2, Planning and Construction 46 (St. John the Baptist) 47 Payable from General Obligation Bonds 48 Priority 1 $ 2,940,000 Page 50 of 161 HB NO. 2 ENROLLED 1 (1346)Globalplex Terminal Building #71 and Other 2 Globalplex Terminal Building Upgrades, Planning and 3 Construction 4 (St. John the Baptist) 5 Payable from General Obligation Bonds 6 Priority 1 $ 567,361 7 Priority 5 $ 1,000,000 8 Total $ 1,567,361 9 (1555)Globalplex Roadway Improvements: Parking Area 10 Near Building 60, Planning and Construction 11 (St. John the Baptist) 12 Payable from General Obligation Bonds 13 Priority 1 $ 1,290,000 14 36/P23TERREBONNE PORT COMMISSION 15 (87) Slip Dredging, Houma Navigation Canal Dredging, 16 Planning and Construction 17 (Terrebonne) 18 Payable from General Obligation Bonds 19 Priority 1 $ 5,061,923 20 (1792)Maritime Manufacturing Facility, Planning and 21 Construction 22 (Terrebonne) 23 Payable from General Obligation Bonds 24 Priority 1 $ 4,000,000 25 Priority 5 $ 40,000,000 26 Total $ 44,000,000 27 36/P26PORT OF LAKE CHARLES 28 (618) Two Mobile Harbor Cranes for BT-1, Planning and 29 Construction 30 (Calcasieu) 31 Payable from General Obligation Bonds 32 Priority 1 $ 2,836,539 33 (873) Berths 4, 5, & 6 Wharf and Shed Reconstruction at City 34 Docks, Planning and Construction 35 (Calcasieu) 36 Payable from General Obligation Bonds 37 Priority 1 $ 28,000,000 38 Priority 5 $ 68,400,000 39 Total $ 96,400,000 40 (987) Lake Charles Harbor and Terminal District Industrial 41 Canal Storage Facility, Planning and Construction 42 (Calcasieu) 43 Payable from General Obligation Bonds 44 Priority 2 $ 550,000 45 Priority 5 $ 4,500,000 46 Total $ 5,050,000 Page 51 of 161 HB NO. 2 ENROLLED 1 36/P34WEST ST. MARY PARISH PORT 2 (920) Warehouse Facilities and Related Infrastructure 3 Improvements (Baldwin Campus), Planning and 4 Construction 5 (St. Mary) 6 Payable from General Obligation Bonds 7 Priority 1 $ 2,000,000 8 36/P35MERMENTAU RIVER HARBOR AND TERMINAL DISTRICT 9 (934) Land Acquisition for New Slip Construction 10 (Acadia) 11 Payable from General Obligation Bonds 12 Priority 5 $ 295,000 13 (1141)Slip Improvements, Planning and Construction 14 (Acadia) 15 Payable from General Obligation Bonds 16 Priority 1 $ 925,000 17 36/P36CENTRAL LOUISIANA REG IONAL PORT 18 (948) CLRP High Water Hardstand and Access Road, 19 Construction and Planning 20 (Rapides) 21 Payable from General Obligation Bonds 22 Priority 1 $ 1,975,000 23 36/P40GRAND ISLE PORT COMMISSION 24 (183) Pier and Bulkhead Project, Planning and Construction 25 (Jefferson) 26 Payable from State General Fund (Direct) $ 1,000,000 27 (598) Improvements to the Grand Isle Port Facility, 28 Planning and Construction 29 (Jefferson) 30 Payable from the Capital Outlay Savings Fund $ 800,000 31 36/P41JEFFERSON PARISH ECONOMIC DEVELOPMENT AND PORT 32 DISTRICT 33 (287) Avondale Marine Facility Improvements, Planning and 34 Construction 35 (Jefferson) 36 Payable from General Obligation Bonds 37 Priority 1 $ 1,500,000 38 (1105)Restore Rail Connection and Crossing to Avondale 39 Marine, Planning and Construction 40 (Jefferson) 41 Payable from General Obligation Bonds 42 Priority 1 $ 1,100,000 43 Priority 5 $ 2,700,000 44 Total $ 3,800,000 Page 52 of 161 HB NO. 2 ENROLLED 1 36/P43COLUMBIA PORT COMMISSION 2 (572) Railroad Spur, Planning and Construction 3 (Caldwell) 4 Payable from General Obligation Bonds 5 Priority 1 $ 117,846 6 Priority 5 $ 1,841,000 7 Total $ 1,958,846 8 36/P44AVOYELLES PORT COMMISSION 9 (1726)Liquid Fertilizer Tank Terminal Expansion, Planning 10 and Construction 11 (Avoyelles) 12 Payable from General Obligation Bonds 13 Priority 1 $ 150,000 14 Priority 5 $ 600,000 15 Total $ 750,000 16 MISCELLANEOUS NON-STATE 17 50/J01ACADIA PARISH 18 (526) Remove and Replace the Vie Terre Beau Bridge, 19 Planning and Construction 20 (Acadia) 21 Payable from General Obligation Bonds 22 Priority 5 $ 1,715,000 23 Payable from State General Fund (Direct) Non-Recurring 24 Revenues $ 200,000 25 Total $ 1,915,000 26 (725) Improvements to the Acadia Parish Courthouse Building 27 (Window Replacement), Planning and Construction 28 (Acadia) 29 Payable from State General Fund (Direct) Non-Recurring 30 Revenues $ 842,000 31 (933) Ye Olde Country Road and Muskrat Road 32 Improvements, Planning and Construction 33 (Acadia) 34 Payable from General Obligation Bonds 35 Priority 5 $ 1,370,000 36 Payable from State General Fund (Direct) Non-Recurring 37 Revenues $ 150,000 38 Total $ 1,520,000 39 (935) Rice Arena Improvements, Planning and Construction 40 (Acadia) 41 Payable from State General Fund (Direct) Non-Recurring 42 Revenues $ 495,000 43 (1345)Old Spanish Trail Roadway Improvements to Provide 44 for Freight Traffic Bypass of Dangerous Railroad 45 Crossing, Planning and Construction 46 (Acadia) 47 Payable from General Obligation Bonds 48 Priority 1 $ 745,000 Page 53 of 161 HB NO. 2 ENROLLED 1 50/J02ALLEN PARISH 2 (343) Bridge Improvements, Planning and Construction 3 (Allen) 4 Payable from General Obligation Bonds 5 Priority 5 $ 3,050,000 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 250,000 8 Total $ 3,300,000 9 (545) Road Rehabilitation, Planning and Construction 10 (Allen) 11 Payable from General Obligation Bonds 12 Priority 5 $ 1,550,000 13 Payable from State General Fund (Direct) Non-Recurring 14 Revenues $ 250,000 15 Total $ 1,800,000 16 50/J03ASCENSION PARISH 17 (151) Donaldsonville Courthouse Restoration, Planning 18 and Construction 19 (Ascension) 20 Payable from State General Fund (Direct) Non-Recurring 21 Revenues $ 225,000 22 (401) Early Childhood Education Project, 23 Planning and Construction 24 (Ascension) 25 Payable from General Obligation Bonds 26 Priority 5 $ 2,700,000 27 Payable from State General Fund (Direct) Non-Recurring 28 Revenues $ 300,000 29 Total $ 3,000,000 30 (566) St. Amant Community Health and Wellness 31 Center, Planning and Construction 32 (Ascension) 33 Payable from General Obligation Bonds 34 Priority 5 $ 4,600,000 35 Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 36 39:112. 37 (764) Energy Transition Parkway, 38 Planning and Construction 39 (Ascension) 40 Payable from General Obligation Bonds 41 Priority 5 $ 2,400,000 42 Payable from State General Fund (Direct) $ 4,000,000 43 Total $ 6,400,000 44 (783) Parish Utilities of Ascension Water Plant Feed 45 Tank, Planning and Construction 46 (Ascension) 47 Payable from General Obligation Bonds 48 Priority 5 $ 520,000 49 Payable from State General Fund (Direct) Non-Recurring 50 Revenues $ 500,000 51 Total $ 1,020,000 Page 54 of 161 HB NO. 2 ENROLLED 1 (970) 4-Lane LA 30 from I-10 to LA 73, 2 Planning and Construction 3 (Ascension) 4 Payable from State General Fund (Direct) $ 5,000,000 5 (988) Parish Utilities of Ascension Water Plant 6 Clarifiers, Planning and Construction 7 (Ascension) 8 Payable from General Obligation Bonds 9 Priority 5 $ 1,240,000 10 (1595)Donaldsonville National Guard Armory Health and 11 Wellness Center, Planning and Construction 12 (Ascension) 13 Payable from State General Fund (Direct) Non-Recurring 14 Revenues $ 850,000 15 ( )LA 3127 Connector from Hwy 70 to LA 1, 16 Planning and Construction 17 (Ascension) 18 Payable from General Obligation Bonds 19 Priority 5 $ 7,000,000 20 Payable from State General Fund (Direct) Non-Recurring 21 Revenues $ 1,000,000 22 Total $ 8,000,000 23 Pending submittal and approval of the capital outlay budget request pursuant to the 24 provisions of R.S. 39:112. 25 50/J04ASSUMPTION PARISH 26 (619) Assumption Parish Pumps and Drainage, Planning and 27 Construction 28 (Assumption) 29 Payable from General Obligation Bonds 30 Priority 1 $ 500,000 31 (1024)Plattenville Drainage Improvements, Planning and 32 Construction 33 (Assumption) 34 Payable from General Obligation Bonds 35 Priority 1 $ 1,800,000 36 (1706)Shell Beach Boat Launch, Planning 37 and Construction 38 (Assumption) 39 Payable from State General Fund (Direct) Non-Recurring 40 Revenues $ 500,000 41 (1736)Lee Drive Repaving, Planning and Construction 42 (Assumption) 43 Payable from General Obligation Bonds 44 Priority 1 $ 300,000 45 Priority 5 $ 1,428,000 46 Total $ 1,728,000 Page 55 of 161 HB NO. 2 ENROLLED 1 50/J05AVOYELLES PARISH 2 (1164)Parishwide Roadway Improvements, Planning 3 and Construction 4 (Avoyelles) 5 Payable from General Obligation Bonds 6 Priority 2 $ 1,000,000 7 Priority 5 $ 1,000,000 8 Total $ 2,000,000 9 (1385)Parish Recreation and Education Complex, 10 Planning and Construction 11 (Avoyelles) 12 Payable from State General Fund (Direct) Non-Recurring 13 Revenues $ 3,000,000 14 50/J06BEAUREGARD PARISH 15 (54) Lumus Road Improvements, Planning 16 and Construction 17 (Beauregard) 18 Payable from State General Fund (Direct) Non-Recurring 19 Revenues $ 360,000 20 (60) Longview Road Improvements, Beauregard Parish 21 Police Jury, Planning and Construction 22 (Beauregard) 23 Payable from General Obligation Bonds 24 Priority 5 $ 360,000 25 (576) Stamps Road Improvements, Planning 26 and Construction 27 (Beauregard) 28 Payable from State General Fund (Direct) Non-Recurring 29 Revenues $ 360,000 30 (1063)Graybow Road Improvements, Planning 31 and Construction 32 (Beauregard) 33 Payable from State General Fund (Direct) Non-Recurring 34 Revenues $ 360,000 35 (1233)Camp Edgewood Road Improvements - Beauregard 36 Parish Police Jury 37 (Beauregard) 38 Payable from General Obligation Bonds 39 Priority 1 $ 750,000 40 (1497)Cranberry Road Improvements, 41 Planning and Construction 42 (Beauregard) 43 Payable from State General Fund (Direct) Non-Recurring 44 Revenues $ 260,000 45 (1504)North Smokey Cove Road Improvements, 46 Planning and Construction 47 (Beauregard) 48 Payable from State General Fund (Direct) Non-Recurring 49 Revenues $ 360,000 Page 56 of 161 HB NO. 2 ENROLLED 1 50/J08BOSSIER PARISH 2 (750) Improvements to Highway 157, LA Highway 3227 3 to US Highway 80, Planning and Construction 4 (Bossier) 5 Payable from General Obligation Bonds 6 Priority 5 $ 10,200,000 7 50/J10CALCASIEU PARISH 8 (55) Calcasieu Police Jury Gravity Sewer Trunk Mains & 9 Pumping Station South Ward 3 and South Ward 4, 10 Planning and Construction 11 (Calcasieu) 12 Payable from General Obligation Bonds 13 Priority 1 $ 2,000,000 14 Priority 5 $ 12,000,000 15 Total $ 14,000,000 16 50/J11CALDWELL PARISH 17 (365) Swim Lake Road, Planning and Reconstruction 18 (Caldwell) 19 Payable from General Obligation Bonds 20 Priority 1 $ 450,000 21 (563) Wiles Road and Kountry Korner Road, Planning and 22 Reconstruction 23 (Caldwell) 24 Payable from General Obligation Bonds 25 Priority 1 $ 500,000 26 50/J12CAMERON PARISH 27 (402) Shoreline Stabilization, Planning and Construction 28 (Cameron) 29 Payable from General Obligation Bonds 30 Priority 5 $ 2,000,000 31 Payable from State General Fund (Direct) Non-Recurring 32 Revenues $ 450,000 33 Total $ 2,450,000 34 (1216)North Cameron Emergency Operations Center, 35 Planning and Construction 36 (Cameron) 37 Payable from the Capital Outlay Savings Fund $ 1,975,000 38 (1425)Marshall Street Pumps, Planning and Construction 39 (Cameron) 40 Payable from State General Fund (Direct) Non-Recurring 41 Revenues $ 200,000 42 50/J13CATAHOULA PARISH 43 (1211)Catahoula Parish Hospital Service District #1, 44 Roof Replacement, Planning and Construction 45 (Catahoula) 46 Payable from State General Fund (Direct) Non-Recurring 47 Revenues $ 500,000 Page 57 of 161 HB NO. 2 ENROLLED 1 50/J15CONCORDIA PARISH 2 (1239)Roadway Reconstruction, Doty Road, 3 Planning and Construction 4 (Concordia) 5 Payable from General Obligation Bonds 6 Priority 2 $ 200,000 7 Priority 5 $ 1,600,000 8 Total $ 1,800,000 9 50/J16DESOTO PARISH 10 (38) DeSoto Parish Police Jury- Five Year Capital 11 Road Plan, Planning and Construction 12 (Desoto) 13 Payable from General Obligation Bonds 14 Priority 5 $ 37,000,000 15 Payable from State General Fund (Direct) $ 1,600,000 16 Total $ 38,600,000 17 50/J17EAST BATON ROUG E PARISH 18 (490) East Baton Rouge Parish Flood Risk Reduction Project- 19 Expand, Repair, and Modify Drainage System 20 throughout East Baton Rouge Parish 21 (East Baton Rouge) 22 Payable from General Obligation Bonds 23 Priority 1 $ 12,951,787 24 Priority 5 $ 22,000,000 25 Total $ 34,951,787 26 50/J18EAST CARROLL PARISH 27 (411) Spillway Structure Repairs for Lake Providence Lake 28 and Cleaning of Outfall Canal from the Lake 29 Downstream, Planning and Construction 30 (East Carroll) 31 Payable from General Obligation Bonds 32 Priority 1 $ 100,000 33 Priority 5 $ 300,000 34 Total $ 400,000 35 50/J20EVANGELINE PARISH 36 (714) Courthouse Improvements and Refurbishment, Planning, 37 Construction, Equipment, and Parking 38 (Evangeline) 39 Payable from State General Fund (Direct) $ 1,150,000 40 50/J21FRANKLIN PARISH 41 (292) Erosion Control and Bank Stabilization at Big Creek 42 Bridge and Looney Canal, Planning and Construction 43 (Franklin) 44 Payable from General Obligation Bonds 45 Priority 5 $ 600,000 46 (612) Franklin Parish Activity Center, Planning and 47 Construction 48 (Franklin) 49 Payable from General Obligation Bonds 50 Priority 1 $ 1,935,000 Page 58 of 161 HB NO. 2 ENROLLED 1 (697) Riley Road Improvements, Planning and Construction 2 (Franklin) 3 Payable from General Obligation Bonds 4 Priority 1 $ 1,000,000 5 (1224)Franklin Medical Center Improvements, 6 Planning and Construction 7 (Franklin) 8 Payable from State General Fund (Direct) Non-Recurring 9 Revenues $ 2,000,000 10 (1317)Dr. Rogers Road Improvements, Planning and 11 Construction 12 (Franklin) 13 Payable from General Obligation Bonds 14 Priority 1 $ 600,000 15 (1321)LD Knox Road Reconstruction, Planning and 16 Construction 17 (Franklin) 18 Payable from General Obligation Bonds 19 Priority 5 $ 1,555,000 20 50/J23IBERIA PARISH 21 (415) Courthouse Elevators, Planning and Construction 22 (Iberia) 23 Payable from General Obligation Bonds 24 Priority 1 $ 171,900 25 (532) Iberia Parish Courthouse Elevator No. 2, 26 Planning and Construction 27 (Iberia) 28 Payable from the Capital Outlay Savings Fund $ 130,000 29 (666) Evacuation Center at Acadiana Fairgrounds, Planning 30 and Construction 31 (Iberia) 32 Payable from General Obligation Bonds 33 Priority 1 $ 8,000,000 34 (667) LaSalle Street and Hanger Road Extensions, Planning 35 and Construction 36 (Iberia) 37 Payable from General Obligation Bonds 38 Priority 1 $ 400,000 39 (735) Animal Control Shelter Improvements/Additions, 40 Planning and Construction 41 (Iberia) 42 Payable from the Capital Outlay Savings Fund $ 1,000,000 43 (875) Parish Jail Improvements, Planning and Construction 44 (Iberia) 45 Payable from General Obligation Bonds 46 Priority 1 $ 840,000 Page 59 of 161 HB NO. 2 ENROLLED 1 50/J24IBERVILLE PARISH 2 (691) Manchac Roadway Improvements 3 (Iberville) 4 Payable from General Obligation Bonds 5 Priority 1 $ 2,400,000 6 50/J25JACKSON PARISH 7 (1740)Lakeshore Drive Rehabilitation and Improvements, 8 Planning and Construction 9 (Jackson) 10 Payable from General Obligation Bonds 11 Priority 1 $ 1,989,000 12 50/J26JEFFERSON PARISH 13 (8) Bucktown Harbor Wave Attenuation Jetty, Planning 14 and Construction 15 (Jefferson) 16 Payable from General Obligation Bonds 17 Priority 1 $ 464,000 18 (13) Riverside Senior Center, Planning and Construction 19 (Jefferson) 20 Payable from General Obligation Bonds 21 Priority 1 $ 948,000 22 Priority 5 $ 1,455,000 23 Total $ 2,403,000 24 (218) Bainbridge Canal Closure from Veterans Boulevard to 25 Terminal Drive, Planning and Construction 26 (Jefferson) 27 Payable from General Obligation Bonds 28 Priority 1 $ 930,000 29 Priority 5 $ 13,800,000 30 Total $ 14,730,000 31 (221) East Bank Backup Generators West: Sewer Lift 32 Station Backup Generators (Camp Plauche, 33 Transcontinental at West Metairie, and 34 Transcontinental at Vineland) 35 (Jefferson) 36 Payable from General Obligation Bonds 37 Priority 5 $ 2,000,000 38 Payable from State General Fund (Direct) $ 3,300,000 39 Total $ 5,300,000 40 (426) Bonnabel Canal Bank Stabilization (West Side) - 41 Veterans Blvd. to West Esplanade, Planning and 42 Construction 43 (Jefferson) 44 Payable from General Obligation Bonds 45 Priority 1 $ 100,000 46 Priority 5 $ 8,500,000 47 Total $ 8,600,000 48 (428) Canal #13 Concrete Lining (Loyola Drive to Butler Canal) 49 (Jefferson) 50 Payable from General Obligation Bonds 51 Priority 1 $ 250,000 52 Priority 5 $ 3,750,000 53 Total $ 4,000,000 Page 60 of 161 HB NO. 2 ENROLLED 1 (431) Preservation and Restoration of Historic Structures for 2 Hope Haven/Madonna Manor Campus, Planning and 3 Construction 4 (Jefferson) 5 Payable from General Obligation Bonds 6 Priority 1 $ 7,277,147 7 Payable from State General Fund (Direct) Non-Recurring 8 Revenues $ 500,000 9 Total $ 7,777,147 10 (538) Barataria Blvd. (LA 45) Drainage Improvements 11 (Merlin Lane to Pritchard Road), Planning 12 and Construction 13 (Jefferson) 14 Payable from General Obligation Bonds 15 Priority 5 $ 6,500,000 16 Payable from State General Fund (Direct) Non-Recurring 17 Revenues $ 1,000,000 18 Total $ 7,500,000 19 (629) 4th Street Shared-Use Path (Barataria Blvd. to Gretna 20 City Limits), Planning and Construction 21 (Jefferson) 22 Payable from General Obligation Bonds 23 Priority 1 $ 1,225,000 24 Priority 5 $ 3,146,600 25 Total $ 4,371,600 26 (632) Hickory Avenue (LA 3154) Rehabilitation (River Road 27 to 10th Street), Planning and Construction 28 (Jefferson) 29 Payable from General Obligation Bonds 30 Priority 1 $ 600,000 31 Priority 5 $ 6,270,000 32 Total $ 6,870,000 33 (633) Jefferson Park Sport Field Renovation, Planning and 34 Construction 35 (Jefferson) 36 Payable from General Obligation Bonds 37 Priority 5 $ 6,840,000 38 (636) Woodlake Estates Drainage Improvements, Planning and 39 Construction 40 (Jefferson) 41 Payable from General Obligation Bonds 42 Priority 1 $ 500,000 43 Priority 5 $ 4,650,000 44 Total $ 5,150,000 45 (637) Woodmere Playground Improvements, Planning and 46 Construction 47 (Jefferson) 48 Payable from General Obligation Bonds 49 Priority 1 $ 2,084,163 Page 61 of 161 HB NO. 2 ENROLLED 1 (837) 11th Street Roadway Replacement and Upgrade of 2 Subsurface Drainage System between Queens and 3 Manhattan Boulevard, Planning and Construction 4 (Jefferson) 5 Payable from General Obligation Bonds 6 Priority 1 $ 369,192 7 Priority 5 $ 9,175,000 8 Total $ 9,544,192 9 (838) Bucktown Harbor Boardwalk and Kayak Launch, 10 Planning and Construction 11 (Jefferson) 12 Payable from General Obligation Bonds 13 Priority 1 $ 1,575,000 14 (1790)Gretna Government Complex Parking Lot, Planning 15 and Construction 16 (Jefferson) 17 Payable from General Obligation Bonds 18 Priority 1 $ 428,000 19 Priority 5 $ 10,171,600 20 Payable from the Capital Outlay Savings Fund $ 1,000,000 21 Total $ 11,599,600 22 (843) Sewer Lift Station Backup Generators - North, 23 Planning and Construction 24 (Jefferson) 25 Payable from General Obligation Bonds 26 Priority 1 $ 575,000 27 (1041)East Bank Backup Generators East: Sewer Lift Station 28 Backup Generators (Clearview at W. Napoleon, Cleary 29 at W. Napoleon, Houma at W. Napoleon and Galleria 30 Sewer Station), Planning and Construction 31 (Jefferson) 32 Payable from General Obligation Bonds 33 Priority 5 $ 1,750,000 34 (1044)New Access Road in the Churchill Technology and 35 Business Park for Delgado's Advanced Manufacturing 36 and River City Campus, Planning and Construction 37 (Jefferson) 38 Payable from General Obligation Bonds 39 Priority 1 $ 200,000 40 Priority 5 $ 1,350,000 41 Total $ 1,550,000 42 (1046)West Esplanade Pump Station, Planning and 43 Construction 44 (Jefferson) 45 Payable from General Obligation Bonds 46 Priority 1 $ 3,500,000 47 Priority 2 $ 1,000,000 48 Priority 5 $ 3,700,000 49 Total $ 8,200,000 Page 62 of 161 HB NO. 2 ENROLLED 1 (1247)Airline Drive (US 61) at 17th Street Canal Drainage 2 Crossing and Railroad Bridge Replacement 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 15,991,250 6 Priority 5 $ 11,090,000 7 Total $ 27,081,250 8 (1248)Brown Avenue Canal Improvements between the 9 Westbank Expressway and Harold Street, Planning and 10 Construction 11 (Jefferson) 12 Payable from General Obligation Bonds 13 Priority 1 $ 2,205,920 14 Priority 5 $ 1,000,000 15 Total $ 3,205,920 16 (1254)Woodland West Drainage Improvements, Planning and 17 Construction 18 (Jefferson) 19 Payable from General Obligation Bonds 20 Priority 1 $ 799,116 21 Priority 5 $ 1,000,000 22 Total $ 1,799,116 23 (1255)Shrewsbury Road at Jefferson Highway Culvert 24 Replacement, Planning and Construction 25 (Jefferson) 26 Payable from General Obligation Bonds 27 Priority 1 $ 450,000 28 (1459)Woodmere Youth Center, Planning and Construction 29 (Jefferson) 30 Payable from General Obligation Bonds 31 Priority 1 $ 99,862 32 (1798)Vietnamese American Cultural and Service Center, 33 Planning and Construction 34 (Jefferson) 35 Payable from General Obligation Bonds 36 Priority 5 $ 3,550,000 37 Payable from State General Fund (Direct) Non-Recurring 38 Revenues $ 1,005,000 39 Total $ 4,555,000 40 Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 41 39:112. 42 50/J27JEFFERSON DAVIS PARISH 43 (990) Farm Supply Road Paving, 44 Planning and Construction 45 (Jefferson Davis) 46 Payable from State General Fund (Direct) Non-Recurring 47 Revenues $ 650,000 Page 63 of 161 HB NO. 2 ENROLLED 1 50/J28LAFAYETTE PARISH 2 (20) Parish Government Complex, Jail, New Design, 3 Planning, and Construction 4 (Lafayette) 5 Payable from General Obligation Bonds 6 Priority 5 $ 35,000,000 7 Payable from the Capital Outlay Savings Fund $ 8,750,000 8 Payable from State General Fund (Direct) $ 8,750,000 9 Total $ 52,500,000 10 (21) Ingress and Egress Interchange Improvements, 11 Planning and Construction 12 (Lafayette) 13 Payable from General Obligation Bonds 14 Priority 5 $ 10,000,000 15 Payable from State General Fund (Direct) $ 1,000,000 16 Total $ 11,000,000 17 (233) State Interchange Improvements, Planning 18 and Construction 19 (Lafayette) 20 Payable from General Obligation Bonds 21 Priority 5 $ 11,325,000 22 Payable from the Capital Outlay Savings Fund $ 500,000 23 Payable from State General Fund (Direct) $ 5,000,000 24 Total $ 16,825,000 25 (234) Isaac Verot Coulee - Main Channel Hardening, 26 Planning and Construction 27 (Lafayette) 28 Payable from General Obligation Bonds 29 Priority 5 $ 11,000,000 30 Payable from the Capital Outlay Savings Fund $ 1,000,000 31 Total $ 12,000,000 32 (235) E Broussard Roundabout, Planning and Construction 33 (Lafayette) 34 Payable from General Obligation Bonds 35 Priority 5 $ 2,000,000 36 Payable from State General Fund (Direct) $ 1,000,000 37 Total $ 3,000,000 38 (502) Milton Volunteer Fire Department, 39 Planning and Construction 40 (Lafayette) 41 Payable from the Capital Outlay Savings Fund $ 250,000 42 (643) Rue Du Belier Widening, Planning and Construction 43 (Lafayette) 44 Payable from General Obligation Bonds 45 Priority 5 $ 7,000,000 46 Payable from State General Fund (Direct) $ 1,000,000 47 Total $ 8,000,000 48 (820) Kaliste Saloom Widening 49 (Lafayette) 50 Payable from General Obligation Bonds 51 Priority 1 $ 53,461 Page 64 of 161 HB NO. 2 ENROLLED 1 (851) Verot School Road, State Hwy. 339 Widening, 2 Planning and Construction 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 5 $ 60,500,000 6 Payable from State General Fund (Direct) $ 2,500,000 7 Total $ 63,000,000 8 (852) Parish Government Complex, Parish Courthouse, 9 Planning and Construction 10 (Lafayette) 11 Payable from General Obligation Bonds 12 Priority 1 $ 6,054,757 13 (1026)University Avenue Corridor Improvements, Planning, 14 Construction and Acquisition 15 (Lafayette) 16 Payable from General Obligation Bonds 17 Priority 1 $ 13,000,000 18 (1054)Bayou Vermilion Flood Control, Planning and 19 Construction 20 (Lafayette) 21 Payable from General Obligation Bonds 22 Priority 1 $ 13,000,000 23 Priority 5 $ 22,000,000 24 Total $ 35,000,000 25 (1055)Interchange Improvements on Louisiana 26 Highways, Planning and Construction 27 (Lafayette) 28 Payable from General Obligation Bonds 29 Priority 5 $ 12,500,000 30 (1056)Lake Farm to Verot School Road Extension, 31 Planning and Construction 32 (Lafayette) 33 Payable from General Obligation Bonds 34 Priority 5 $ 2,500,000 35 Payable from State General Fund (Direct) Non-Recurring 36 Revenues $ 500,000 37 Total $ 3,000,000 38 (1057)Cue Road Extension, Planning and Construction 39 (Lafayette) 40 Payable from General Obligation Bonds 41 Priority 5 $ 3,500,000 42 Payable from State General Fund (Direct) Non-Recurring 43 Revenues $ 500,000 44 Total $ 4,000,000 45 (1267)Parish Road Overlay, Planning and Construction 46 (Lafayette) 47 Payable from General Obligation Bonds 48 Priority 5 $ 7,000,000 49 Payable from State General Fund (Direct) $ 1,000,000 50 Total $ 8,000,000 Page 65 of 161 HB NO. 2 ENROLLED 1 (1463)Heymann Park Improvements Project, Planning and 2 Construction 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,955,000 6 50/J29LAFOURCHE PARISH 7 (762) Butch Hill Pump Station Replacement, Planning and 8 Construction 9 (Lafourche) 10 Payable from General Obligation Bonds 11 Priority 1 $ 646,000 12 Priority 2 $ 3,854,000 13 Priority 5 $ 3,100,000 14 Total $ 7,600,000 15 (969) Kraemer Water Line Improvements, 16 Planning and Construction 17 (Lafourche) 18 Payable from General Obligation Bonds 19 Priority 2 $ 500,000 20 Priority 5 $ 1,500,000 21 Total $ 2,000,000 22 (1176)South Lafourche Airport Corridor Project 23 (Lafourche) 24 Payable from General Obligation Bonds 25 Priority 1 $ 2,789,545 26 Priority 5 $ 4,598,137 27 Total $ 7,387,682 28 (1562)Hero's Park Recreation Center and Head Start 29 in Thibodaux, Planning and Construction 30 (Lafourche) 31 Payable from General Obligation Bonds 32 Priority 2 $ 500,000 33 Priority 5 $ 4,500,000 34 Total $ 5,000,000 35 50/J31LINCOLN PARISH 36 (379) Bridge Replacements on Mitchell and Shady Grove 37 Roads, Planning and Construction 38 (Lincoln) 39 Payable from General Obligation Bonds 40 Priority 1 $ 380,000 41 50/J32LIVINGSTON PARISH 42 (120) Cook Road Extension Economic Development Corridor 43 (Pete's Highway Frontage Road) 44 (Livingston) 45 Payable from General Obligation Bonds 46 Priority 1 $ 3,018,975 47 (1561)Juban Road North Extension between US 190 (Florida 48 Blvd.) and LA 1026 (Lockhart Road), Planning and 49 Construction 50 (Livingston) 51 Payable from General Obligation Bonds 52 Priority 1 $ 3,000,000 53 Priority 5 $ 3,005,000 54 Total $ 6,005,000 Page 66 of 161 HB NO. 2 ENROLLED 1 50/J34MOREHOUSE PARISH 2 (291) Public Works Center, Planning and Construction 3 (Morehouse) 4 Payable from General Obligation Bonds 5 Priority 1 $ 301,750 6 (1127)Grabault Road, Higginbotham Road, and 7 Horseshoe Lake Road Rehabilitation, 8 Planning and Construction 9 (Morehouse) 10 Payable from State General Fund (Direct) Non-Recurring 11 Revenues $ 820,000 12 50/J35NATCHITOCHES P ARISH 13 (821) Courthouse Security Improvements, Planning and 14 Construction 15 (Natchitoches) 16 Payable from General Obligation Bonds 17 Priority 1 $ 2,192,545 18 50/J37OUACHITA PARISH 19 (325) Indian Creek Control Structure, Frenchman's Bend 20 Subdivision, Planning, Construction and Right-of-Way 21 Acquisition 22 (Ouachita) 23 Payable from the Capital Outlay Savings Fund $ 450,000 24 (336) Force Main Replacement for Lift Station N, 25 Planning, Right-of-Way, and Construction 26 (Ouachita) 27 Payable from General Obligation Bonds 28 Priority 5 $ 1,000,000 29 Payable from State General Fund (Direct) Non-Recurring 30 Revenues $ 600,000 31 Total $ 1,600,000 32 (728) Steep Bayou Sewer - Phase 3, Planning, Construction 33 and Right-of-Way Acquisition 34 (Ouachita) 35 Payable from General Obligation Bonds 36 Priority 1 $ 1,854,137 37 Priority 5 $ 2,080,000 38 Total $ 3,934,137 39 (729) Tedeton Road Bridge Replacement, 40 Planning and Construction 41 (Ouachita) 42 Payable from State General Fund (Direct) Non-Recurring 43 Revenues $ 150,000 44 (738) Elkins Road Improvements, Planning, 45 Right-of-Way, and Construction 46 (Ouachita) 47 Payable from General Obligation Bonds 48 Priority 2 $ 550,000 49 Priority 5 $ 1,500,000 50 Total $ 2,050,000 Page 67 of 161 HB NO. 2 ENROLLED 1 (739) Highland Road Improvements, Planning, 2 Right-of-Way, and Construction 3 (Ouachita) 4 Payable from General Obligation Bonds 5 Priority 5 $ 1,040,000 6 (937) Cheniere Lake Area 1 Improvements, Planning and 7 Construction 8 (Ouachita) 9 Payable from General Obligation Bonds 10 Priority 1 $ 1,080,000 11 (1153)Black Bayou Lake Control Structure & Canal 12 to Bayou DeSiard, Planning, Right-of-Way and 13 Construction 14 (Ouachita) 15 Payable from the Capital Outlay Savings Fund $ 150,000 16 (1349)Bayou Mouchoir Drainage Improvements 17 (Ouachita) 18 Payable from General Obligation Bonds 19 Priority 1 $ 477,500 20 (1360)Fontana Road Improvements, Planning, 21 Right-of-Way, and Construction 22 (Ouachita) 23 Payable from General Obligation Bonds 24 Priority 2 $ 250,000 25 Priority 5 $ 3,000,000 26 Total $ 3,250,000 27 (1732)Hannah's Run Control Structure, Planning and 28 Construction 29 (Ouachita) 30 Payable from General Obligation Bonds 31 Priority 1 $ 187,385 32 Priority 5 $ 200,000 33 Total $ 387,385 34 50/J38PLAQUEMINES PARISH 35 (245) Empire Bridge Lighting, Planning and Construction 36 (Plaquemines) 37 Payable from General Obligation Bonds 38 Priority 1 $ 197,000 39 (454) Plaquemines Parish Public Safety Answering Point 40 (PSAP), Planning and Construction 41 (Plaquemines) 42 Payable from General Obligation Bonds 43 Priority 5 $ 2,000,000 44 (1068)Barriere Road Four-Lane Widening, 45 Planning and Construction 46 (Plaquemines) 47 Payable from General Obligation Bonds 48 Priority 5 $ 8,000,000 Page 68 of 161 HB NO. 2 ENROLLED 1 50/J39POINTE COUPEE PARISH 2 (154) Ventress Road Drainage Outfall Project, 3 Planning and Construction 4 (Pointe Coupee) 5 Payable from the Capital Outlay Savings Fund $ 300,000 6 (204) Courthouse Restoration - Phase 2, Planning and 7 Construction 8 (Pointe Coupee) 9 Payable from General Obligation Bonds 10 Priority 1 $ 2,988,750 11 Payable from State General Fund (Direct) Non-Recurring 12 Revenues $ 3,600,000 13 Total $ 6,588,750 14 (351) False River Ecosystem Restoration Project, Including 15 Bulkhead Replacement, Planning and Construction 16 (Pointe Coupee) 17 Payable from General Obligation Bonds 18 Priority 1 $ 2,400,000 19 Priority 5 $ 5,600,000 20 Total $ 8,000,000 21 (752) Portage Canal Drainage Project, Planning and 22 Construction 23 (Pointe Coupee) 24 Payable from General Obligation Bonds 25 Priority 1 $ 2,000,000 26 (753) Watershed Drainage Improvements Bayou Grosse Tete, 27 Bayou Cholpe, Bayou Choctaw, False River Outfall 28 Channel, and Johnson Bayou, Planning and 29 Construction 30 (Pointe Coupee) 31 Payable from General Obligation Bonds 32 Priority 1 $ 2,000,000 33 Payable from State General Fund (Direct) Non-Recurring 34 Revenues $ 3,000,000 35 Total $ 5,000,000 36 (1600)Multi-Use Sewer Extension Project, Planning 37 and Construction 38 (Pointe Coupee) 39 Payable from State General Fund (Direct) Non-Recurring 40 Revenues $ 380,000 41 50/J40RAPIDES PARISH 42 (528) Gunter Road/Barron Chapel Road Street 43 Improvements, Planning and Construction 44 (Rapides) 45 Payable from General Obligation Bonds 46 Priority 1 $ 1,450,000 47 (938) Philadelphia Road Street Improvements, Planning and 48 Construction 49 (Rapides) 50 Payable from General Obligation Bonds 51 Priority 1 $ 500,000 52 Priority 5 $ 2,950,000 53 Total $ 3,450,000 Page 69 of 161 HB NO. 2 ENROLLED 1 (1799)New Fire Station at LSU Alexandria Serving 2 Rapides Parish – Fire District 18, Planning 3 and Construction 4 (Rapides) 5 Payable from General Obligation Bonds 6 Priority 5 $ 1,300,000 7 Payable from the Capital Outlay Savings Fund $ 100,000 8 Total $ 1,400,000 9 Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 10 39:112. 11 50/J43SABINE PARISH 12 (211) Plainview Road Rehabilitation, Planning and 13 Construction 14 (Sabine) 15 Payable from General Obligation Bonds 16 Priority 1 $ 1,837,720 17 50/J44ST. BERNARD PARISH 18 (923) St. Bernard Parish Jail Renovations, Planning and 19 Construction 20 (St. Bernard) 21 Payable from General Obligation Bonds 22 Priority 1 $ 3,000,000 23 Priority 5 $ 5,000,000 24 Total $ 8,000,000 25 (1134)St. Bernard Parish SOD Building on LA 47, 26 Planning and Construction 27 (St. Bernard) 28 Payable from General Obligation Bonds 29 Priority 5 $ 2,000,000 30 Payable from State General Fund (Direct) Non-Recurring 31 Revenues $ 500,000 32 Total $ 2,500,000 33 50/J45ST. CHARLES PARISH 34 (311) Des Allemans Bulkhead - Phase 1, Planning and 35 Construction 36 (St. Charles) 37 Payable from General Obligation Bonds 38 Priority 1 $ 150,000 39 Priority 5 $ 2,622,500 40 Total $ 2,772,500 41 (388) Fairfield and Oakland Pump Station Discharge 42 Improvements, Planning and Construction 43 (St. Charles) 44 Payable from General Obligation Bonds 45 Priority 1 $ 825,000 46 (565) Paul Fredrick Street and Kinler Street Demolition and 47 Reconstruction 48 (St. Charles) 49 Payable from General Obligation Bonds 50 Priority 1 $ 3,000,000 Page 70 of 161 HB NO. 2 ENROLLED 1 (1698)Fifth Street Drainage Improvements, Planning and 2 Construction 3 (St. Charles) 4 Payable from General Obligation Bonds 5 Priority 1 $ 429,750 6 Priority 5 $ 450,000 7 Total $ 879,750 8 50/J46ST. HELENA PARISH 9 (1545)Audubon Library, Planning and Construction 10 (St. Helena) 11 Payable from General Obligation Bonds 12 Priority 1 $ 1,163,600 13 50/J47ST. JAMES PARISH 14 (282) Storm Damage Repair to Dock on Blind River, 15 Planning and Construction 16 (St. James) 17 Payable from State General Fund (Direct) Non-Recurring 18 Revenues $ 1,000,000 19 (1099)West Shore Risk Reduction Connector Levee 20 (St. James) 21 Payable from General Obligation Bonds 22 Priority 1 $ 3,650,000 23 Priority 5 $ 10,200,000 24 Total $ 13,850,000 25 (1100)LA 3127 Widening (LA 20 to LA 3213), Planning and 26 Construction 27 (St. James) 28 Payable from General Obligation Bonds 29 Priority 1 $ 1,190,393 30 Priority 5 $ 7,400,000 31 Total $ 8,590,393 32 (1744)Parishwide Road Rehabilitation, Planning 33 and Construction 34 (St. James) 35 Payable from General Obligation Bonds 36 Priority 5 $ 1,000,000 37 Payable from State General Fund (Direct) Non-Recurring 38 Revenues $ 1,230,000 39 Total $ 2,230,000 40 50/J48ST. JOHN THE BAPTIST PARISH 41 (104) Edgard Land Acquisition Construction and Equipment 42 of a New Courthouse, Planning and Construction 43 (St. John the Baptist) 44 Payable from General Obligation Bonds 45 Priority 2 $ 500,000 46 Priority 5 $ 10,500,000 47 Total $ 11,000,000 Page 71 of 161 HB NO. 2 ENROLLED 1 50/J49ST. LANDRY PARISH 2 (98) Parish Wide Road Program, Planning and Construction 3 (St. Landry) 4 Payable from General Obligation Bonds 5 Priority 5 $ 5,000,000 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 1,000,000 8 Total $ 6,000,000 9 (199) Parish Wide Drainage Project, Planning and 10 Construction 11 (St. Landry) 12 Payable from General Obligation Bonds 13 Priority 1 $ 1,000,000 14 (1645)Courthouse Renovations, Planning and Construction 15 (St. Landry) 16 Payable from General Obligation Bonds 17 Priority 1 $ 320,000 18 Payable from State General Fund (Direct) Non-Recurring 19 Revenues $ 680,000 20 Total $ 1,000,000 21 50/J50ST. MARTIN PARISH 22 (253) Road Improvements on Four-Mile Bayou Road 23 (St. Martin) 24 Payable from General Obligation Bonds 25 Priority 1 $ 78,233 26 Priority 5 $ 500,000 27 Total $ 578,233 28 (254) Expansion and Renovation of Central Office 29 Complex, Planning and Construction 30 (St. Martin) 31 Payable from the Capital Outlay Savings Fund $ 1,000,000 32 Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 33 39:112. 34 (922) I-10 Frontage Road, LA 328 to LA 347, 35 Planning and Construction 36 (St. Martin) 37 Payable from General Obligation Bonds 38 Priority 5 $ 1,000,000 39 Payable from the Capital Outlay Savings Fund $ 2,000,000 40 Total $ 3,000,000 41 (1077)Joe Daigre Canal Drainage Improvements, Planning 42 and Construction 43 (St. Martin) 44 Payable from General Obligation Bonds 45 Priority 1 $ 711,858 46 Priority 5 $ 550,000 47 Total $ 1,261,858 Page 72 of 161 HB NO. 2 ENROLLED 1 (1285)Spanish Trail Industrial Park Access Road, Planning 2 and Construction 3 (St. Martin) 4 Payable from General Obligation Bonds 5 Priority 1 $ 4,100,000 6 50/J51ST. MARY PARISH 7 (270) Roof Replacement at Fairview Treatment 8 Center, Bayou Vista, Planning and Construction 9 (St. Mary) 10 Payable from the Capital Outlay Savings Fund $ 175,000 11 (472) Facility and Infrastructure Improvements 12 at Kemper Williams Park Near Patterson, 13 Planning and Construction 14 (St. Mary) 15 Payable from State General Fund (Direct) Non-Recurring 16 Revenues $ 266,400 17 (888) Patch, Mill and Asphalt Overlay of Lake Palourde 18 Road from LA Hwy. 182 to Lakeview Drive, 19 Amelia, LA, for St. Mary Parish Government 20 Within Existing Rights-of-Way, Planning and 21 Construction 22 (St. Mary) 23 Payable from the Capital Outlay Savings Fund $ 1,150,000 24 (903) Walking/Bike Path and Associated Improvements 25 Along Duhon Blvd. in Amelia, for St. Mary Parish 26 Government in Existing Rights-of-Way, Planning 27 and Construction 28 (St. Mary) 29 Payable from the Capital Outlay Savings Fund $ 55,000 30 (1189)Emergency Power and Facility Improvements at the 31 Office of Homeland Security and Emergency 32 Preparedness Warehouse, Planning and Construction 33 (St. Mary) 34 Payable from the Capital Outlay Savings Fund $ 235,000 35 (1481)Infrastructure Improvements and Construction of a 36 Welding Training Center Facility at the Charenton 37 Canal Industrial Park 38 (St. Mary) 39 Payable from General Obligation Bonds 40 Priority 5 $ 527,000 41 (1482)Reconstruction of Martin Luther King Roadway in 42 Charenton for St. Mary Parish Government, within 43 Existing Right-of-Way, Planning and Construction 44 (St. Mary) 45 Payable from General Obligation Bonds 46 Priority 1 $ 407,020 47 (1500)Emergency Power Improvements at St. Mary Parish 48 Courthouse, Planning and Construction 49 (St. Mary) 50 Payable from General Obligation Bonds 51 Priority 1 $ 250,000 Page 73 of 161 HB NO. 2 ENROLLED 1 (1501)New Central Fire Station for St. Mary Parish Fire 2 Protection District No. 11 in the Four Corners 3 Community, Planning and Construction 4 (St. Mary) 5 Payable from the Capital Outlay Savings Fund $ 1,000,000 6 (1571)Emergency Power Systems for Multiple All-Electric 7 Drainage Pump Stations for Amelia Community for 8 St. Mary Parish Government, Planning and Construction 9 (St. Mary) 10 Payable from the Capital Outlay Savings Fund $ 400,000 11 50/J52ST. TAMMANY PARISH 12 (354) LA 1077 Widening, Design, Right of Way, Planning 13 and Construction 14 (St. Tammany) 15 Payable from General Obligation Bonds 16 Priority 1 $ 2,020,000 17 Priority 5 $ 18,000,000 18 Total $ 20,020,000 19 (355) Sharp Road Improvements and Sidewalk, Planning and 20 Construction 21 (St. Tammany) 22 Payable from General Obligation Bonds 23 Priority 1 $ 612,500 24 Priority 5 $ 5,512,500 25 Total $ 6,125,000 26 (357) Emerald Forrest Boulevard to LA 59, Design, Planning 27 and Construction 28 (St. Tammany) 29 Payable from General Obligation Bonds 30 Priority 1 $ 1,300,000 31 Priority 5 $ 11,700,000 32 Total $ 13,000,000 33 (552) Ben Thomas - Stone Road to Powell Drive, Design, 34 Planning, and Construction 35 (St. Tammany) 36 Payable from General Obligation Bonds 37 Priority 1 $ 1,500,000 38 Priority 5 $ 2,200,000 39 Total $ 3,700,000 40 (553) South Slidell Levee Protection Rehabilitation: (USACE 41 533d Report or Planning, Land Acquisition, and 42 Construction of Levees West and East of Interstate 10) 43 (St. Tammany) 44 Payable from General Obligation Bonds 45 Priority 1 $ 1,000,000 46 Priority 5 $ 8,858,000 47 Total $ 9,858,000 48 (756) University Square Learning Center Facilities, Planning 49 and Construction 50 (St. Tammany) 51 Payable from General Obligation Bonds 52 Priority 1 $ 1,208,740 53 Priority 5 $ 9,630,000 54 Total $ 10,838,740 Page 74 of 161 HB NO. 2 ENROLLED 1 (963) Hwy. 11 Regional Water Consolidation Design, 2 Planning and Construction 3 (St. Tammany) 4 Payable from General Obligation Bonds 5 Priority 5 $ 20,000,000 6 (964) Fabourg Coquille Water Quality Improvements, 7 Planning and Construction 8 (St. Tammany) 9 Payable from General Obligation Bonds 10 Priority 5 $ 6,050,000 11 Payable from State General Fund (Direct) Non-Recurring 12 Revenues $ 550,000 13 Total $ 6,600,000 14 (965) East St. Tammany Regional Sewer Consolidation Design, 15 Planning and Construction 16 (St. Tammany) 17 Payable from General Obligation Bonds 18 Priority 5 $ 30,000,000 19 (966) Water Well and Storage Site Emergency 20 Generators, Planning and Construction 21 (St. Tammany) 22 Payable from State General Fund (Direct) Non-Recurring 23 Revenues $ 800,000 24 (1171)Safe Haven Campus for Behavioral and Mental Health, 25 Planning, Construction and Renovation for Triage 26 (St. Tammany) 27 Payable from General Obligation Bonds 28 Priority 1 $ 3,154,543 29 Priority 5 $ 8,350,000 30 Total $ 11,504,543 31 (1582)Harrison Avenue Widening, Planning and Construction 32 (St. Tammany) 33 Payable from General Obligation Bonds 34 Priority 1 $ 1,300,000 35 Priority 5 $ 12,000,000 36 Total $ 13,300,000 37 (359) Safe Haven Behavioral Health Campus Roads, 38 Design, Planning and Construction 39 (St. Tammany) 40 Payable from General Obligation Bonds 41 Priority 5 $ 2,250,000 42 (1584)Highway 11 - Opportunity Zone, Sewer & Water 43 Improvements, Planning and Construction 44 (St. Tammany) 45 Payable from General Obligation Bonds 46 Priority 5 $ 28,000,000 Page 75 of 161 HB NO. 2 ENROLLED 1 50/J53TANGIPAHOA PARISH 2 (300) North Hoover Road Improvements Phase 2, Planning 3 and Construction 4 (Tangipahoa) 5 Payable from General Obligation Bonds 6 Priority 1 $ 2,000,000 7 Priority 5 $ 725,000 8 Payable from State General Fund (Direct) Non-Recurring 9 Revenues $ 1,725,000 10 Total $ 4,450,000 11 (474) South Airport Road, North Hoover Road 12 Improvements, Planning and Construction 13 (Tangipahoa) 14 Payable from General Obligation Bonds 15 Priority 1 $ 4,430,785 16 50/J54TENSAS PARISH 17 (43) Lide Road Improvements, Planning and Construction 18 (Tensas) 19 Payable from General Obligation Bonds 20 Priority 1 $ 776,277 21 (458) Tensas Parish/Port Priority Site Plan, Planning and 22 Construction 23 (Tensas) 24 Payable from General Obligation Bonds 25 Priority 1 $ 214,800 26 Payable from the Capital Outlay Savings Fund $ 600,000 27 Total $ 814,800 28 (975) Recreation Facility, Planning and Construction 29 (Tensas) 30 Payable from General Obligation Bonds 31 Priority 1 $ 230,000 32 Priority 5 $ 5,048,000 33 Total $ 5,278,000 34 50/J55TERREBONNE PARISH 35 (184) Bayou LaCarpe Watershed Project, Location C, Design 36 and Construction 37 (Terrebonne) 38 Payable from General Obligation Bonds 39 Priority 1 $ 1,675,000 40 Priority 5 $ 4,000,000 41 Total $ 5,675,000 42 (185) Valhi Extension (Savanne to LA 311), Planning and 43 Construction 44 (Terrebonne) 45 Payable from General Obligation Bonds 46 Priority 1 $ 2,000,000 47 Priority 5 $ 30,000,000 48 Total $ 32,000,000 Page 76 of 161 HB NO. 2 ENROLLED 1 (340) South Louisiana Wetland Discovery Center - Phase 2 - 2 Bayou Country Institute, Planning and Construction 3 (Terrebonne) 4 Payable from General Obligation Bonds 5 Priority 1 $ 473,615 6 (363) Replacement of D-18 Pump Station Falgout Canal, 7 Theriot, La., Planning and Construction 8 (Terrebonne) 9 Payable from General Obligation Bonds 10 Priority 1 $ 1,075,000 11 Priority 5 $ 1,050,000 12 Total $ 2,125,000 13 (562) Westside/Alma Street Drainage, Planning and 14 Construction 15 (Terrebonne) 16 Payable from General Obligation Bonds 17 Priority 1 $ 783,850 18 (599) Bayou Terrebonne Miter Gate, Twin Span 19 Location, Planning and Construction 20 (Terrebonne) 21 Payable from State General Fund (Direct) $ 500,000 22 (1007)Company Canal Miter Gate in Bourg, 23 Planing and Construction 24 (Terrebonne) 25 Payable from State General Fund (Direct) $ 500,000 26 (1180)Terrebonne Sports Complex, Planning and 27 Construction 28 (Terrebonne) 29 Payable from General Obligation Bonds 30 Priority 1 $ 1,939,000 31 Payable from State General Fund (Direct) Non-Recurring 32 Revenues $ 2,000,000 33 Total $ 3,939,000 34 (1590)Replacement of Brady Road Bridge, Planning and 35 Construction 36 (Terrebonne) 37 Payable from General Obligation Bonds 38 Priority 1 $ 800,000 39 Priority 5 $ 5,085,000 40 Total $ 5,885,000 41 (1632)Terrebonne Basin Watershed (HNC at Bayou 42 Grand Caillou) Pump Station, Phase 1 and 2, 43 Planning and Construction 44 (Terrebonne) 45 Payable from General Obligation Bonds 46 Priority 2 $ 3,000,000 47 (1850)Hollywood/Valhi Roundabout, Planning 48 and Construction 49 (Terrebonne) 50 Payable from State General Fund (Direct) Non-Recurring 51 Revenues $ 1,900,000 52 Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 53 39:112. Page 77 of 161 HB NO. 2 ENROLLED 1 ( )Andolsek Park, Planning and Construction 2 (Terrebonne) 3 Payable from State General Fund (Direct) $ 1,000,000 4 Pending submittal and approval of the capital outlay budget request pursuant to the 5 provisions of R.S. 39:112. 6 50/J57VERMILION PARISH 7 (797) Bridge Repairs and Improvements, 8 Planning and Construction 9 (Vermilion) 10 Payable from State General Fund (Direct) Non-Recurring 11 Revenues $ 500,000 12 (1591)Parishwide Road Improvements, Planning 13 and Construction 14 (Vermilion) 15 Payable from State General Fund (Direct) Non-Recurring 16 Revenues $ 800,000 17 50/J58VERNON PARISH 18 (468) Vernon/Fort Polk Thoroughfare Electrical Power 19 Extension, and Utilities Including Generators 20 (Vernon) 21 Payable from General Obligation Bonds 22 Priority 1 $ 468,000 23 (556) East Hawthorne Road Improvements, 24 Planning and Construction 25 (Vernon) 26 Payable from the Capital Outlay Savings Fund $ 1,980,000 27 (1379)Tom Beckom Road Improvements, 28 Planning and Construction 29 (Vernon) 30 Payable from General Obligation Bonds 31 Priority 5 $ 900,000 32 (1585)Bailey Road Improvements, Planning and Construction 33 (Vernon) 34 Payable from General Obligation Bonds 35 Priority 5 $ 3,888,000 36 (1587)Lake Vernon Road and Spillway Road Improvements, 37 Planning and Construction 38 (Vernon) 39 Payable from General Obligation Bonds 40 Priority 5 $ 2,580,000 41 50/J59WASHINGTON PARISH 42 (801) Pearl River Navigational Canal, Planning, 43 Construction, and Acquisition 44 (Washington) 45 Payable from General Obligation Bonds 46 Priority 1 $ 500,000 Page 78 of 161 HB NO. 2 ENROLLED 1 (1004)Washington Parish Jail Renovations Including HVAC, 2 Security and ADA, Planning and Construction 3 (Washington) 4 Payable from General Obligation Bonds 5 Priority 1 $ 968,500 6 (1629)Washington Parish Courthouse Renovation and HVAC, 7 Planning and Construction 8 (Washington) 9 Payable from General Obligation Bonds 10 Priority 1 $ 386,500 11 50/J63WEST FELICIANA PARISH 12 (247) West Feliciana Port Infrastructure, Planning, 13 Engineering, and Construction 14 (West Feliciana) 15 Payable from General Obligation Bonds 16 Priority 1 $ 736,563 17 Priority 5 $ 2,140,000 18 Total $ 2,876,563 19 50/J64WINN PARISH 20 (160) Roadway Reconstruction, L. Sullivan Road, 21 Planning and Construction 22 (Winn) 23 Payable from State General Fund (Direct) Non-Recurring 24 Revenues $ 675,000 25 (378) Roadway Reconstruction, Eugene Garrett Road, 26 Planning and Construction 27 (Winn) 28 Payable from General Obligation Bonds 29 Priority 1 $ 385,000 30 (779) Roadway Reconstruction, Brownville Road, Planning 31 and Construction 32 (Winn) 33 Payable from General Obligation Bonds 34 Priority 1 $ 335,000 35 (1192)Roadway Reconstruction, Frank White Road, Planning 36 and Construction 37 (Winn) 38 Payable from General Obligation Bonds 39 Priority 1 $ 460,000 40 (1396)Roadway Reconstruction, Williams Loop, Cole, Oak 41 Ridge and Pine Ridge Roadways, Planning and 42 Construction 43 (Winn) 44 Payable from General Obligation Bonds 45 Priority 1 $ 652,500 46 (1607)Roadway Reconstruction, Aunt Marie's Road, 47 Planning and Construction 48 (Winn) 49 Payable from State General Fund (Direct) Non-Recurring 50 Revenues $ 445,000 Page 79 of 161 HB NO. 2 ENROLLED 1 50/M05ALEXANDRIA 2 (767) City-Wide Roadway/Neighborhood Drainage 3 Improvements Program, Planning and Construction 4 (Rapides) 5 Payable from General Obligation Bonds 6 Priority 5 $ 6,000,000 7 (974) Foisy Street Gateway Reconstruction, Monroe to 8 Jackson, Planning and Construction 9 (Rapides) 10 Payable from General Obligation Bonds 11 Priority 5 $ 2,500,000 12 (1386)Sugarhouse Road/Eddie Williams Boulevard to LA 13 Highway 1, Phase I and II, Planning and Construction 14 ($5,000,000 Local Match) 15 (Rapides) 16 Payable from General Obligation Bonds 17 Priority 1 $ 2,972,100 18 Priority 5 $ 4,620,000 19 Total $ 7,592,100 20 50/M06AMITE 21 (1739)Amite Governmental Complex, Planning and 22 Construction 23 (Tangipahoa) 24 Payable from General Obligation Bonds 25 Priority 1 $ 310,000 26 Priority 5 $ 2,600,000 27 Total $ 2,910,000 28 50/M07ANACOCO 29 (883) North Water Plant Tank Replacement, 30 Planning and Construction 31 (Vernon) 32 Payable from State General Fund (Direct) Non-Recurring 33 Revenues $ 480,000 34 (1157)Street Rehabilitation - Port Arthur Ave. 35 Planning and Construction 36 (Vernon) 37 Payable from State General Fund (Direct) Non-Recurring 38 Revenues $ 360,000 39 (1230)Street Rehabilitation - Ross Road, Lula Street, and 40 Loop Drive, Planning and Construction 41 (Vernon) 42 Payable from General Obligation Bonds 43 Priority 1 $ 240,000 44 50/M10ARNAUDVILLE 45 (1822)Water System - Automated Meter Reading System, 46 Planning and Construction 47 (St. Landry) 48 Payable from the Capital Outlay Savings Fund $ 395,000 49 Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 50 39:112. Page 80 of 161 HB NO. 2 ENROLLED 1 50/M14BAKER 2 (417) Drainage Improvements and Upgrades, Planning and 3 Construction 4 (East Baton Rouge) 5 Payable from General Obligation Bonds 6 Priority 5 $ 2,600,000 7 (620) Sidewalk Construction for Underdeveloped Streets and 8 Culverts, Planning and Construction 9 (East Baton Rouge) 10 Payable from General Obligation Bonds 11 Priority 5 $ 1,875,000 12 (1236)Energy and Power - Upgrade Gas Pipes: 13 PVC and Steel to Polyethylene, Planning 14 and Construction 15 (East Baton Rouge) 16 Payable from State General Fund (Direct) Non-Recurring 17 Revenues $ 500,000 18 50/M15BALDWIN 19 (334) Basketball Court, Planning and Construction 20 (St. Mary) 21 Payable from State General Fund (Direct) $ 160,000 22 (864) Wastewater System Repair and Improvements, 23 Planning and Construction 24 (St. Mary) 25 Payable from General Obligation Bonds 26 Priority 5 $ 1,000,000 27 (1766)Potable Water System Improvements, Planning and 28 Construction 29 (St. Mary) 30 Payable from General Obligation Bonds 31 Priority 1 $ 156,822 32 Priority 5 $ 700,000 33 Payable from State General Fund (Direct) Non-Recurring 34 Revenues $ 700,000 35 Total $ 1,556,822 36 50/M17BASILE 37 (792) Street Improvements, Planning and Construction 38 (Evangeline) 39 Payable from State General Fund (Direct) Non-Recurring 40 Revenues $ 125,000 41 50/M19BASTROP 42 (1436)City Hall - Roof Replacement, Planning and 43 Construction 44 (Morehouse) 45 Payable from General Obligation Bonds 46 Priority 1 $ 347,150 Page 81 of 161 HB NO. 2 ENROLLED 1 50/M20BATON ROUGE 2 (73) Old Hammond Hwy. (LA 426) Roadway Improvements 3 from Blvd. De Province to Millerville Road, Planning 4 and Construction 5 (East Baton Rouge) 6 Payable from General Obligation Bonds 7 Priority 1 $ 450,000 8 Priority 5 $ 9,250,000 9 Total $ 9,700,000 10 (74) Pride Fire District No. 8 - Indian Mound Station, 11 Planning and Construction 12 (East Baton Rouge) 13 Payable from State General Fund (Direct) Non-Recurring 14 Revenues $ 250,000 15 (491) Chaneyville Fire District No. 7 Reames Road Fire 16 Station, Planning and Construction 17 (East Baton Rouge) 18 Payable from General Obligation Bonds 19 Priority 5 $ 300,000 20 (1518)Hooper Road Widening and Sewer Improvements 21 (Blackwater Bayou to Sullivan Road) Planning, 22 Engineering, Utilities and Construction 23 (East Baton Rouge) 24 Payable from General Obligation Bonds 25 Priority 5 $ 9,500,000 26 (1519)Old Hammond Highway (LA 426) Roadway 27 Improvements from Millerville Road to 28 O'Neal Lane, Planning and Construction 29 (East Baton Rouge) 30 Payable from General Obligation Bonds 31 Priority 5 $ 11,000,000 32 (1831)Raising Cane's River Center, Planning 33 Design and Renovation 34 (East Baton Rouge) 35 Payable from General Obligation Bonds 36 Priority 5 $ 8,000,000 37 Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 38 39:112. 39 50/M24BERWICK 40 (1478)Water Meter Replacement, Planning and Construction 41 (St. Mary) 42 Payable from the Capital Outlay Savings Fund $ 585,000 43 50/M27BOGALUSA 44 (479) Community Center and Emergency Shelter, Planning 45 and Construction 46 (Washington) 47 Payable from General Obligation Bonds 48 Priority 1 $ 500,000 49 Priority 5 $ 10,500,000 50 Total $ 11,000,000 Page 82 of 161 HB NO. 2 ENROLLED 1 (480) Emergency Sewer System Evaluation and 2 Repairs, Planning and Construction 3 (Washington) 4 Payable from General Obligation Bonds 5 Priority 2 $ 4,450,000 6 Payable from the Capital Outlay Savings Fund $ 500,000 7 Total $ 4,950,000 8 (894) City Hall Renovations 9 (Washington) 10 Payable from General Obligation Bonds 11 Priority 1 $ 210,000 12 (1447)Davenport Avenue Bridge, Servitude Street Emergency 13 Replacement and Repair, Planning and Construction 14 (Washington) 15 Payable from General Obligation Bonds 16 Priority 5 $ 565,000 17 50/M28BONITA 18 (773) Municipal Complex, Planning and Construction 19 (Morehouse) 20 Payable from General Obligation Bonds 21 Priority 1 $ 400,000 22 Priority 5 $ 1,850,000 23 Total $ 2,250,000 24 50/M31BREAUX BRIDGE 25 (1021)Water Treatment Plant Improvements, Planning and 26 Construction 27 (St. Martin) 28 Payable from General Obligation Bonds 29 Priority 1 $ 35,500 30 50/M32BROUSSARD 31 (584) Water System Groundwater Storage Tank, 32 Planning and Construction 33 (Lafayette) 34 Payable from General Obligation Bonds 35 Priority 2 $ 45,000 36 Priority 5 $ 405,000 37 Total $ 450,000 38 (817) Reconstruct South Bernard Road from LA Hwy 182 to 39 US Hwy 90, Planning and Construction 40 (Lafayette) 41 Payable from General Obligation Bonds 42 Priority 1 $ 4,430,490 43 (1126)Marteau Road Water Well, Planning and Construction 44 (Lafayette) 45 Payable from General Obligation Bonds 46 Priority 2 $ 376,000 47 Priority 5 $ 3,350,000 48 Total $ 3,726,000 Page 83 of 161 HB NO. 2 ENROLLED 1 (1514)Highway 89 Improvements, Planning and Construction 2 (Lafayette) 3 Payable from General Obligation Bonds 4 Priority 1 $ 4,842,500 5 (1674)Lake Talon Road Sewer Improvements, 6 Planning and Construction 7 (Lafayette) 8 Payable from General Obligation Bonds 9 Priority 2 $ 1,315,000 10 (1746)Highway 90 Service Road, Planning 11 and Construction 12 (Lafayette) 13 Payable from State General Fund (Direct) Non-Recurring 14 Revenues $ 810,000 15 Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 16 39:112. 17 (1747)Albertson Parkway Water Well and Ground 18 Storage Tank, Planning and Construction 19 (Lafayette) 20 Priority 2 $ 234,000 21 Priority 5 $ 2,106,000 22 Total $ 2,340,000 23 Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 24 39:112. 25 50/M38CANKTON 26 (46) Street and Drainage Improvements, Planning 27 and Construction 28 (St. Landry) 29 Payable from State General Fund (Direct) Non-Recurring 30 Revenues $ 90,000 31 50/M39CARENCRO 32 (414) I-49 to Gloria Switch Coulee Project, Planning and 33 Construction 34 (Lafayette) 35 Payable from General Obligation Bonds 36 Priority 1 $ 419,972 37 (1231)Arceneaux Road Drainage Improvements and Utility 38 Relocations, Planning and Construction 39 (Lafayette) 40 Payable from General Obligation Bonds 41 Priority 1 $ 175,815 42 (1232)Wastewater and City Infrastructure Flood Damages, 43 Planning and Construction 44 (Lafayette) 45 Payable from General Obligation Bonds 46 Priority 1 $ 2,252,600 Page 84 of 161 HB NO. 2 ENROLLED 1 50/M44CHOUDRANT 2 (1200)New Town Hall, Planning and Construction 3 (Lincoln) 4 Payable from General Obligation Bonds 5 Priority 1 $ 150,000 6 Priority 5 $ 1,096,586 7 Total $ 1,246,586 8 50/M45CHURCH POINT 9 (1023)Sewer System Improvements, Planning and 10 Construction 11 (Acadia) 12 Payable from General Obligation Bonds 13 Priority 1 $ 54,341 14 (1071)Street and Drainage Improvements, Planning 15 and Construction 16 (Acadia) 17 Payable from General Obligation Bonds 18 Priority 5 $ 548,000 19 Payable from State General Fund (Direct) Non-Recurring 20 Revenues $ 100,000 21 Total $ 648,000 22 50/M49CLINTON 23 (1370)Sewer Treatment Pond Repairs, Planning 24 and Construction 25 (East Feliciana) 26 Payable from the Capital Outlay Savings Fund $ 25,000 27 50/M50COLFAX 28 (765) Street Improvements, Planning and Construction 29 (Grant) 30 Payable from General Obligation Bonds 31 Priority 1 $ 762,000 32 Priority 5 $ 1,250,000 33 Total $ 2,012,000 34 50/M54COTTON VALLEY 35 (486) Sewerage System Improvements, Planning and 36 Construction 37 (Webster) 38 Payable from General Obligation Bonds 39 Priority 1 $ 1,189,000 40 50/M57COVINGTON 41 (123) Covington Menetre Boat Launch, 42 Planning and Construction 43 (St. Tammany) 44 Payable from State General Fund (Direct) Non-Recurring 45 Revenues $ 697,500 Page 85 of 161 HB NO. 2 ENROLLED 1 (335) Covington Wastewater Treatment Plant, Planning and 2 Construction 3 (St. Tammany) 4 Payable from General Obligation Bonds 5 Priority 1 $ 83,250 6 (1579)Downtown Historic District Overlays, Planning and 7 Construction 8 (St. Tammany) 9 Payable from General Obligation Bonds 10 Priority 1 $ 80,000 11 Priority 5 $ 640,000 12 Payable from State General Fund (Direct) Non-Recurring 13 Revenues $ 720,000 14 Total $ 1,440,000 15 (1675)Ozone Sewer Repairs, Planning and Construction 16 (St. Tammany) 17 Payable from State General Fund (Direct) Non-Recurring 18 Revenues $ 3,000,000 19 50/M58CROWLEY 20 (724) Renovation and Repairs to Rice Festival Building, 21 Including the Repair or Replacement of the Roof, 22 Planning and Construction 23 (Acadia) 24 Payable from General Obligation Bonds 25 Priority 1 $ 230,000 26 (1553)Installation of Comminutor for the City of Crowley 27 Main Sewerage Pump Station, Planning and 28 Construction 29 (Acadia) 30 Payable from General Obligation Bonds 31 Priority 1 $ 386,775 32 (1554)Pavilion, Planning and Construction 33 (Acadia) 34 Payable from State General Fund (Direct) Non-Recurring 35 Revenues $ 1,640,000 36 50/M61DELHI 37 (942) Sapa Drive Extension, Planning and Construction 38 (Richland) 39 Payable from General Obligation Bonds 40 Priority 1 $ 943,300 41 Priority 5 $ 1,056,700 42 Total $ 2,000,000 43 50/M62DELTA 44 (614) Street Improvements, Planning and Construction 45 (Madison) 46 Payable from the Capital Outlay Savings Fund $ 860,000 Page 86 of 161 HB NO. 2 ENROLLED 1 50/M63DENHAM SPRINGS 2 (579) Cook Road Extension (DEMCO Road) / Rushing 3 Road Connector, Planning and Construction 4 (Livingston) 5 Payable from General Obligation Bonds 6 Priority 2 $ 450,000 7 Priority 5 $ 7,800,000 8 Total $ 8,250,000 9 (1441)Home Depot Road Improvements (LA 3003 - LA 3002), 10 Planning and Construction 11 (Livingston) 12 Payable from General Obligation Bonds 13 Priority 2 $ 400,000 14 Priority 5 $ 2,770,000 15 Total $ 3,170,000 16 50/M64DEQUINCY 17 (481) Sanitary Sewer Lift Station Improvements, 18 Planning and Construction 19 (Calcasieu) 20 Payable from State General Fund (Direct) Non-Recurring 21 Revenues $ 900,000 22 (1308)Street Rehabilitation, Planning and Construction 23 (Calcasieu) 24 Payable from State General Fund (Direct) Non-Recurring 25 Revenues $ 510,000 26 (1476)DeQuincy Industrial Airpark T-Hangars and Taxi Lane, 27 Planning and Construction 28 (Calcasieu) 29 Payable from General Obligation Bonds 30 Priority 5 $ 1,755,010 31 50/M65DERIDDER 32 (265) Education and Job Training Center, Planning and 33 Construction 34 (Beauregard) 35 Payable from General Obligation Bonds 36 Priority 1 $ 1,203,462 37 Priority 5 $ 2,500,000 38 Total $ 3,703,462 39 (897) Street Rehabilitation, Planning and Construction 40 (Beauregard) 41 Payable from the Capital Outlay Savings Fund $ 750,000 42 (1027)Ellis Road and Branch Street Drainage Improvements, 43 Planning and Construction 44 (Beauregard) 45 Payable from General Obligation Bonds 46 Priority 1 $ 150,000 47 (1156)DeRidder Disposal Facility, Planning and Construction 48 (Beauregard) 49 Payable from the Capital Outlay Savings Fund $ 750,000 Page 87 of 161 HB NO. 2 ENROLLED 1 50/M68DONALDSONVILLE 2 (370) Natural Gas System Infrastructure Improvement Phase 3 III, Planning and Construction 4 (Ascension) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,100,000 7 (1389)Natural Gas System Infrastructure Improvements, 8 Phase II, Planning and Construction 9 (Ascension) 10 Payable from General Obligation Bonds 11 Priority 1 $ 242,987 12 (1598)Lala Regira Field Renovations, Planning and 13 Construction 14 (Ascension) 15 Payable from General Obligation Bonds 16 Priority 1 $ 300,000 17 Payable from the Capital Outlay Savings Fund $ 1,000,000 18 Total $ 1,300,000 19 50/M70DOYLINE 20 (1727)Village of Doyline Wastewater Treatment Facility 21 Upgrades 22 (Webster) 23 Payable from General Obligation Bonds 24 Priority 1 $ 13,000 25 50/M74DUSON 26 (914) LA Highway 95 Roundabout, Planning and 27 Construction 28 (Acadia) 29 Payable from General Obligation Bonds 30 Priority 1 $ 2,601,934 31 50/M83EUNICE 32 (1767)Library Renovations, Planning and Construction 33 (St. Landry) 34 Payable from State General Fund (Direct) Non-Recurring 35 Revenues $ 350,000 36 50/M84EVERGREEN 37 (1525)Evergreen Water System Improvements 38 (Avoyelles) 39 Payable from General Obligation Bonds 40 Priority 1 $ 897,470 41 50/M85FARMERVILLE 42 (1195)Lake D'Arbonne Mega Ramp, Planning and 43 Construction 44 (Union) 45 Payable from General Obligation Bonds 46 Priority 5 $ 4,185,000 47 Payable from the Capital Outlay Savings Fund $ 2,000,000 48 Total $ 6,185,000 Page 88 of 161 HB NO. 2 ENROLLED 1 50/M87FERRIDAY 2 (201) Water Renovations, Planning and Construction 3 (Concordia) 4 Payable from General Obligation Bonds 5 Priority 1 $ 298,987 6 Priority 5 $ 3,000,000 7 Total $ 3,298,987 8 (202) Town of Ferriday Auditorium, Planning and 9 Construction 10 (Concordia) 11 Payable from General Obligation Bonds 12 Priority 1 $ 700,000 13 Priority 5 $ 18,800,000 14 Total $ 19,500,000 15 50/M89FLORIEN 16 (1309)Village of Florien Town Hall, Planning and 17 Construction 18 (Sabine) 19 Payable from General Obligation Bonds 20 Priority 1 $ 385,505 21 50/M91FORDOCHE 22 (1604)Water Storage Improvements, Planning and 23 Construction 24 (Pointe Coupee) 25 Payable from General Obligation Bonds 26 Priority 1 $ 755,000 27 Priority 5 $ 780,000 28 Total $ 1,535,000 29 (1605)Water Distribution System Improvements, Planning 30 and Construction 31 (Pointe Coupee) 32 Payable from General Obligation Bonds 33 Priority 1 $ 623,170 34 Priority 5 $ 2,935,000 35 Total $ 3,558,170 36 50/M94FRANKLIN 37 (121) Renovation of Old Crowell Elementary Building, 38 Planning and Construction 39 (St. Mary) 40 Payable from General Obligation Bonds 41 Priority 1 $ 20,374 42 Priority 5 $ 321,000 43 Total $ 341,374 44 (1565)Cayce Street Repairs, Planning and Construction 45 (St. Mary) 46 Payable from General Obligation Bonds 47 Priority 1 $ 2,309,235 Page 89 of 161 HB NO. 2 ENROLLED 1 (1699)Water Treatment Facility, Booster Pump Station, and 2 Distribution System Improvements, Planning and 3 Construction 4 (St. Mary) 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 2,400,000 7 50/M99GILBERT 8 (1566)Municipal Building, Planning and Construction 9 (Franklin) 10 Payable from State General Fund (Direct) Non-Recurring 11 Revenues $ 450,000 12 50/MA3GOLDEN MEADOW 13 (162) Replacement of Sewer Lift Station behind 14 Williams Road, Planning and Construction 15 (Lafourche) 16 Payable from State General Fund (Direct) Non-Recurring 17 Revenues $ 207,000 18 (163) Armand/Alcide Area Drainage, Planning 19 and Construction 20 (Lafourche) 21 Payable from State General Fund (Direct) Non-Recurring 22 Revenues $ 610,000 23 (1399)Upgrade to North Sewerage Treatment Plant, Planning 24 and Construction 25 (Lafourche) 26 Payable from General Obligation Bonds 27 Priority 1 $ 163,940 28 50/MA5GONZALES 29 (1372)Connector Road for City of Gonzales Hospital District, 30 Construction and Planning 31 (Ascension) 32 Payable from General Obligation Bonds 33 Priority 1 $ 1,200,000 34 Priority 5 $ 2,705,000 35 Total $ 3,905,000 36 (1653)Veteran's Ave. to Commerce Ave. Connector Road, 37 Planning and Construction 38 (Ascension) 39 Payable from General Obligation Bonds 40 Priority 1 $ 30,942 41 50/MA6GRAMBLING 42 (384) Community Center Expansion, Planning and 43 Construction 44 (Lincoln) 45 Payable from General Obligation Bonds 46 Priority 1 $ 300,000 Page 90 of 161 HB NO. 2 ENROLLED 1 (580) Wastewater System Expansion, Planning and 2 Construction 3 (Lincoln) 4 Payable from General Obligation Bonds 5 Priority 5 $ 2,000,000 6 (581) Water Distribution System Replacement, 7 Planning and Construction 8 (Lincoln) 9 Payable from General Obligation Bonds 10 Priority 5 $ 1,000,000 11 Payable from State General Fund (Direct) Non-Recurring 12 Revenues $ 600,000 13 Total $ 1,600,000 14 50/MA7GRAMERCY 15 (533) Major Drainage Canals, Planning 16 and Construction 17 (St. James) 18 Payable from State General Fund (Direct) Non-Recurring 19 Revenues $ 360,000 20 50/MB1GRAND ISLE 21 (1793)Historic Recreation Center/Community Center, 22 Planning and Construction 23 (Jefferson) 24 Payable from General Obligation Bonds 25 Priority 1 $ 17,000 26 50/MB5GRETNA 27 (800) City Hall Exterior and Interior Renovation 28 (Jefferson) 29 Payable from General Obligation Bonds 30 Priority 1 $ 1,300,000 31 Priority 5 $ 1,500,000 32 Total $ 2,800,000 33 (1419)Downtown Drainage Improvements, 34 Planning and Construction 35 (Jefferson) 36 Payable from General Obligation Bonds 37 Priority 5 $ 1,000,000 38 50/MB6GROSSE TETE 39 (1617)LA Hwy 77 Realignment Improvements Multi-Phased, 40 Acquisition, Planning, and Construction 41 (Iberville) 42 Payable from State General Fund (Direct) Non-Recurring 43 Revenues $ 1,137,750 44 50/MB9HAMMOND 45 (1442)Roadside Drainage Improvements, Planning and 46 Construction 47 (Tangipahoa) 48 Payable from General Obligation Bonds 49 Priority 1 $ 225,000 Page 91 of 161 HB NO. 2 ENROLLED 1 50/MC1HARAHAN 2 (1663)Emergency Sewer Collection and Treatment System 3 Overhaul, Planning and Construction 4 (Jefferson) 5 Payable from General Obligation Bonds 6 Priority 5 $ 1,000,000 7 Payable from State General Fund (Direct) Non-Recurring 8 Revenues $ 3,500,000 9 Total $ 4,500,000 10 Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 11 39:112. 12 50/MC4HAYNESVILLE 13 (466) Water Distribution System Improvements, 14 Planning and Construction 15 (Claiborne) 16 Payable from General Obligation Bonds 17 Priority 5 $ 855,000 18 (467) Town of Haynesville Street Improvements, Planning 19 and Construction 20 (Claiborne) 21 Payable from General Obligation Bonds 22 Priority 1 $ 50,000 23 Priority 5 $ 300,000 24 Total $ 350,000 25 50/MC6HENDERSON 26 (1287)Sewer System Improvements, 27 Planning and Construction 28 (St. Martin) 29 Payable from General Obligation Bonds 30 Priority 5 $ 3,000,000 31 50/MC9HOMER 32 (100) Street Improvement Project, Planning and Construction 33 (Claiborne) 34 Payable from General Obligation Bonds 35 Priority 1 $ 600,000 36 (101) Town Hall Renovations, Planning and Construction 37 (Claiborne) 38 Payable from General Obligation Bonds 39 Priority 1 $ 818,904 40 50/MD1HORNBECK 41 (622) West Side Water System Expansion, Planning and 42 Construction 43 (Sabine, Vernon) 44 Payable from General Obligation Bonds 45 Priority 1 $ 105,465 Page 92 of 161 HB NO. 2 ENROLLED 1 (1102)Water Plant Expansion, Planning and Construction 2 (Vernon) 3 Payable from the Capital Outlay Savings Fund $ 750,000 4 50/MD4IDA 5 (1655)Water System Improvements, Water Wells, Tanks, and 6 Booster Stations Construction, Planning and 7 Construction 8 (Caddo) 9 Payable from General Obligation Bonds 10 Priority 1 $ 42,435 11 50/MD6IOTA 12 (1344)Street Improvements, Planning and Construction 13 (Acadia) 14 Payable from State General Fund (Direct) Non-Recurring 15 Revenues $ 225,000 16 50/MD8JACKSON 17 (939) New Roofs for Four Town of Jackson Buildings, 18 Planning and Construction 19 (East Feliciana) 20 Payable from General Obligation Bonds 21 Priority 5 $ 300,000 22 50/ME1JEAN LAFITTE 23 (607) Lafitte Wetlands Museum Addition, including Exhibits, 24 Planning and Construction 25 (Jefferson) 26 Payable from General Obligation Bonds 27 Priority 1 $ 823,981 28 Payable from the Capital Outlay Savings Fund $ 800,000 29 Payable from State General Fund (Direct) Non-Recurring 30 Revenues $ 750,000 31 Total $ 2,373,981 32 (1016)Manila Village, Planning and Construction 33 (Jefferson) 34 Payable from State General Fund (Direct) Non-Recurring 35 Revenues $ 1,260,000 36 (1642)Amphitheater Stage, Planning 37 and Construction 38 (Jefferson) 39 Payable from General Obligation Bonds 40 Priority 5 $ 400,000 41 Payable from State General Fund (Direct) 42 Non-Recurring Revenues $ 400,000 43 Total $ 800,000 44 50/ME2JEANERETTE 45 (337) Sewer System Improvements, Planning and 46 Construction 47 (Iberia) 48 Payable from General Obligation Bonds 49 Priority 5 $ 3,320,000 50 Payable from State General Fund (Direct) Non-Recurring 51 Revenues $ 1,000,000 52 Total $ 4,320,000 Page 93 of 161 HB NO. 2 ENROLLED 1 (740) City Hall Renovations, Planning and Construction 2 (Iberia) 3 Payable from General Obligation Bonds 4 Priority 5 $ 370,000 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 750,000 7 Total $ 1,120,000 8 (1161)Water System Improvements, Planning and 9 Construction 10 (Iberia) 11 Payable from General Obligation Bonds 12 Priority 5 $ 575,000 13 Payable from State General Fund (Direct) Non-Recurring 14 Revenues $ 1,000,000 15 Total $ 1,575,000 16 50/ME8KAPLAN 17 (1483)Street and Drainage Improvements, 18 Planning and Construction 19 (Vermilion) 20 Payable from State General Fund (Direct) Non-Recurring 21 Revenues $ 315,000 22 50/MF1KENNER 23 (307) Roosevelt Boulevard Improvements, Planning 24 and Construction 25 (Jefferson) 26 Payable from State General Fund (Direct) Non-Recurring 27 Revenues $ 1,650,000 28 (703) Pump to the River Pump Station Phase I, Planning and 29 Construction 30 (Jefferson) 31 Payable from General Obligation Bonds 32 Priority 1 $ 1,000,000 33 Priority 5 $ 9,050,000 34 Total $ 10,050,000 35 (913) Lincoln Manor Drainage Phase 2, Planning and 36 Construction 37 (Jefferson) 38 Payable from General Obligation Bonds 39 Priority 1 $ 500,000 40 (949) Loyola Drive Roadway Striping 41 (Jefferson) 42 Payable from State General Fund (Direct) $ 84,000 43 (1117)Lincoln Manor Subdivision Drainage Improvement, 44 including 30 th Street Roadway and Drainage 45 Improvements from Loyola Drive to Ohio Street, 46 Planning and Construction 47 (Jefferson) 48 Payable from General Obligation Bonds 49 Priority 1 $ 155,000 Page 94 of 161 HB NO. 2 ENROLLED 1 (1530)Kenner Fire Department Facility Replacement - 2 New Fire Station, Planning and Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 5 $ 2,000,000 6 50/MF8LAKE ARTHUR 7 (1666)Wastewater Treatment Facility Improvements, 8 Planning and Construction 9 (Jefferson Davis) 10 Payable from General Obligation Bonds 11 Priority 5 $ 1,050,000 12 Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 13 39:112. 14 (1667)Wastewater Collection System Improvements, 15 Planning and Construction 16 (Jefferson Davis) 17 Payable from General Obligation Bonds 18 Priority 5 $ 990,000 19 Payable from State General Fund (Direct) Non-Recurring 20 Revenues $ 100,000 21 Total $ 1,090,000 22 Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 23 39:112. 24 (1668)Water System Improvements, Planning and Construction 25 (Jefferson Davis) 26 Payable from General Obligation Bonds 27 Priority 5 $ 990,000 28 Payable from State General Fund (Direct) Non-Recurring 29 Revenues $ 100,000 30 Total $ 1,090,000 31 Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 32 39:112. 33 50/MF9LAKE CHARLES 34 (275) Lakefront Development 35 (Calcasieu) 36 Payable from General Obligation Bonds 37 Priority 1 $ 1,955,000 38 (477) Enterprise Boulevard Extension, Planning and 39 Construction 40 (Calcasieu) 41 Payable from General Obligation Bonds 42 Priority 1 $ 3,500,000 43 (1093)Relocation of Public Works Campus, Planning and 44 Construction 45 (Calcasieu) 46 Payable from General Obligation Bonds 47 Priority 1 $ 5,000,000 48 Priority 5 $ 4,000,000 49 Total $ 9,000,000 Page 95 of 161 HB NO. 2 ENROLLED 1 (1094)Sallier Street Rehabilitation, Planning and Construction 2 (Calcasieu) 3 Payable from General Obligation Bonds 4 Priority 2 $ 2,000,000 5 Priority 5 $ 3,000,000 6 Total $ 5,000,000 7 50/MG3LEESVILLE 8 (266) City of Leesville, Sanitary Sewer Extension for Fort 9 Polk Entrance Road, Planning and Construction 10 (Vernon) 11 Payable from General Obligation Bonds 12 Priority 1 $ 2,395,701 13 Priority 5 $ 4,000,000 14 Total $ 6,395,701 15 (884) Street Rehabilitation and Extension, Planning and 16 Construction 17 (Vernon) 18 Payable from General Obligation Bonds 19 Priority 1 $ 80,319 20 Priority 5 $ 250,000 21 Payable from the Capital Outlay Savings Fund $ 500,000 22 Total $ 830,319 23 (1515)Fort Polk Entrance Road Fire Substation, 24 Planning and Construction 25 (Vernon) 26 Payable from General Obligation Bonds 27 Priority 2 $ 108,000 28 Priority 5 $ 972,000 29 Total $ 1,080,000 30 50/MG4LEONVILLE 31 (308) Street and Drainage Improvements, Planning 32 and Construction 33 (St. Landry) 34 Payable from State General Fund (Direct) Non-Recurring 35 Revenues $ 300,000 36 50/MG8LIVONIA 37 (1104)Water Well, Planning and Construction 38 (Pointe Coupee) 39 Payable from General Obligation Bonds 40 Priority 2 $ 600,000 41 Priority 5 $ 1,035,000 42 Total $ 1,635,000 43 50/MH1LOGANSPORT 44 (257) Recreational Improvements, Planning and Construction 45 (DeSoto) 46 Payable from General Obligation Bonds 47 Priority 1 $ 150,000 48 Priority 5 $ 1,150,000 49 Total $ 1,300,000 Page 96 of 161 HB NO. 2 ENROLLED 1 50/MH3LOREAUVILLE 2 (718) New Village Hall, Planning and Construction 3 (Iberia) 4 Payable from State General Fund (Direct) $ 1,200,000 5 50/MH8MANDEVILLE 6 (760) Police Department Building, 7 Planning and Construction 8 (St. Tammany) 9 Payable from State General Fund (Direct) Non-Recurring 10 Revenues $ 2,000,000 11 50/MH9MANGHAM 12 (1319)Mangham Recreation Complex, Planning and 13 Construction 14 (Richland) 15 Payable from General Obligation Bonds 16 Priority 1 $ 767,411 17 50/MI3MANY 18 (676) Water Treatment Plant Improvements, Acquisition, 19 Planning and Construction 20 (Sabine) 21 Payable from General Obligation Bonds 22 Priority 5 $ 1,500,000 23 50/MI8MAURICE 24 (705) New Village Hall, Planning and Construction 25 (Vermilion) 26 Payable from General Obligation Bonds 27 Priority 1 $ 365,000 28 Priority 5 $ 1,000,000 29 Total $ 1,365,000 30 50/MJ4MERRYVILLE 31 (715) Sewer System Improvements, 32 Planning and Construction 33 (Beauregard) 34 Payable from the Capital Outlay Savings Fund $ 990,000 35 50/MJ5MINDEN 36 (604) Potable Water Ground Storage Tank, Planning and 37 Construction 38 (Webster) 39 Payable from General Obligation Bonds 40 Priority 1 $ 645,100 41 Priority 5 $ 2,800,000 42 Total $ 3,445,100 Page 97 of 161 HB NO. 2 ENROLLED 1 50/MJ6MONROE 2 (216) I-20 Interchange Improvement and Kansas Garrett 3 Connector, Kansas Lane Connector, Planning and 4 Construction ($1,000,000 Local and $6,000,000 Federal 5 Match) 6 (Ouachita) 7 Payable from General Obligation Bonds 8 Priority 1 $ 26,794,872 9 Priority 5 $ 11,600,000 10 Total $ 38,394,872 11 (217) Georgia Street Pump Station, Including Generator and 12 Auxiliary Pumps, Planning, Engineering, Right-of- 13 Way, Utilities and Construction 14 (Ouachita) 15 Payable from General Obligation Bonds 16 Priority 1 $ 2,000,000 17 (621) Booker T. Washington Stormwater System Evaluation 18 and Upgrades, Planning and Construction 19 (Ouachita) 20 Payable from General Obligation Bonds 21 Priority 5 $ 5,040,000 22 Payable from State General Fund (Direct) Non-Recurring 23 Revenues $ 1,000,000 24 Total $ 6,040,000 25 (627) Youngs Bayou Enhancement of Channel Capacity, 26 Planning and Construction 27 (Ouachita) 28 Payable from General Obligation Bonds 29 Priority 1 $ 500,000 30 Priority 5 $ 10,900,000 31 Total $ 11,400,000 32 (834) US Highway 165 South; US Highway 165 Business 33 Route Connector Phase I, Planning and Construction 34 (Ouachita) 35 Payable from General Obligation Bonds 36 Priority 2 $ 2,550,000 37 (835) I-20 South Frontage Road Drainage Improvements, 38 Planning, Design, Rights-of-Ways, Utilities, and 39 Construction 40 (Ouachita) 41 Payable from General Obligation Bonds 42 Priority 5 $ 5,000,000 43 (1039)Calypso Street Pump Station Rehabilitation, Planning, 44 Engineering, Design, Right-of-Way, Utilities, and 45 Construction 46 (Ouachita) 47 Payable from General Obligation Bonds 48 Priority 1 $ 30,000 49 Priority 5 $ 1,770,000 50 Total $ 1,800,000 Page 98 of 161 HB NO. 2 ENROLLED 1 (1245)River Pump Station Water Treatment Plant, Planning 2 and Construction 3 (Ouachita) 4 Payable from General Obligation Bonds 5 Priority 1 $ 300,000 6 50/MK4MORSE 7 (321) Wastewater Treatment Facility, Planning 8 and Construction 9 (Acadia) 10 Payable from General Obligation Bonds 11 Priority 5 $ 1,350,000 12 Payable from State General Fund (Direct) Non-Recurring 13 Revenues $ 150,000 14 Total $ 1,500,000 15 (723) Water Tower Improvements, Planning and 16 Construction 17 (Acadia) 18 Payable from General Obligation Bonds 19 Priority 1 $ 55,703 20 50/MK8NATCHEZ 21 (395) Municipal Complex, Planning and Construction 22 (Natchitoches) 23 Payable from State General Fund (Direct) Non-Recurring 24 Revenues $ 250,000 25 50/MK9NATCHITOCHES 26 (117) Natchitoches Fire Station - University Parkway 27 (LA Hwy 6), Planning and Construction 28 (Natchitoches) 29 Payable from State General Fund (Direct) $ 1,800,000 30 (531) Second Street and Touline Street Concrete Pavement 31 and Replacement, Planning and Construction 32 (Natchitoches) 33 Payable from General Obligation Bonds 34 Priority 5 $ 2,000,000 35 Payable from State General Fund (Direct) $ 200,000 36 Total $ 2,200,000 37 (1147)Texas Street Corridor Improvements, Planning and 38 Construction 39 (Natchitoches) 40 Payable from State General Fund (Direct) Non-Recurring 41 Revenues $ 435,000 42 50/ML1NEW IBERIA 43 (251) Frontage Road Improvements, 44 Planning and Construction 45 (Iberia) 46 Payable from General Obligation Bonds 47 Priority 5 $ 1,000,000 48 (252) Ann Street Park, Planning and Construction 49 (Iberia) 50 Payable from General Obligation Bonds 51 Priority 1 $ 300,000 Page 99 of 161 HB NO. 2 ENROLLED 1 (664) City Park and West End Community Centers 2 Improvements, Planning and Construction 3 (Iberia) 4 Payable from General Obligation Bonds 5 Priority 1 $ 577,317 6 (1028)Bayou Teche Museum Expansion and George Rodrigue 7 Park 8 (Iberia) 9 Payable from General Obligation Bonds 10 Priority 1 $ 1,354,112 11 (1489)Pepperplex Improvements, Planning and Construction 12 (Iberia) 13 Payable from the Capital Outlay Savings Fund $ 1,500,000 14 50/ML3NEW ORLEANS 15 (78) West Bank Ferry Terminal Renovations, Planning and 16 Construction 17 (Orleans) 18 Payable from General Obligation Bonds 19 Priority 1 $ 300,000 20 Priority 5 $ 300,000 21 Total $ 600,000 22 (79) Richard Lee Playground, Planning and Construction 23 (Orleans) 24 Payable from General Obligation Bonds 25 Priority 1 $ 500,000 26 Priority 5 $ 2,700,000 27 Total $ 3,200,000 28 (289) West Bank Park Improvements Including New Soccer 29 and Recreational Facilities, Planning and Construction 30 (Orleans) 31 Payable from General Obligation Bonds 32 Priority 1 $ 3,180,413 33 Priority 5 $ 11,225,400 34 Payable from State General Fund (Direct) $ 2,000,000 35 Total $ 16,405,813 36 Provided, however, that $1,750,000 of the Priority 1 appropriation shall be used to fund the 37 George W. Carver Playground Renovations project, and $200,000 of the Priority 1 38 appropriation shall be used to fund the Skateboard Park at the West Bank Park project. 39 (1107)New Sewerage and Water Board Power Plant, Planning 40 and Construction 41 (Orleans) 42 Payable from General Obligation Bonds 43 Priority 1 $ 42,700,000 44 Priority 5 $ 29,000,000 45 Payable from State General Fund (Direct) $ 5,000,000 46 Total $ 76,700,000 47 (1108)Old New Orleans VA Building Rehabilitation 48 (Orleans) 49 Payable from General Obligation Bonds 50 Priority 1 $ 1,981,250 51 Priority 5 $ 8,000,000 52 Total $ 9,981,250 Page 100 of 161 HB NO. 2 ENROLLED 1 (1452)Monticello Canal Culverts at Airline Highway 2 (Orleans) 3 Payable from General Obligation Bonds 4 Priority 1 $ 750,000 5 Priority 5 $ 8,250,000 6 Total $ 9,000,000 7 (1522)Lower Ninth Ward Green Infrastructure Project, 8 Planning and Construction 9 (Orleans) 10 Payable from General Obligation Bonds 11 Priority 1 $ 2,900,000 12 (1523)Dryades Kitchen Incubator, Planning and Construction 13 (Orleans) 14 Payable from General Obligation Bonds 15 Priority 5 $ 350,000 16 Payable from State General Fund (Direct) Non-Recurring 17 Revenues $ 350,000 18 Total $ 700,000 19 50/ML4NEW ROADS 20 (623) Industrial Park Development Project, Including 21 Underground Electrical System Upgrades, Planning 22 and Construction 23 (Pointe Coupee) 24 Payable from General Obligation Bonds 25 Priority 1 $ 988,000 26 50/ML8NORWOOD 27 (1301)Sewer Collection and Treatment System 28 Improvements, Planning and Construction 29 (East Feliciana) 30 Payable from General Obligation Bonds 31 Priority 5 $ 1,080,000 32 50/MM2OAKDALE 33 (418) Oakdale City Hall Renovations, Roof, and 34 Reconstruction 35 (Allen) 36 Payable from General Obligation Bonds 37 Priority 1 $ 35,000 38 50/MM5OLLA 39 (985) Roadway Reconstruction, Church Street, 40 Planning and Construction 41 (LaSalle) 42 Payable from State General Fund (Direct) Non-Recurring 43 Revenues $ 300,000 44 50/MM6OPELOUSAS 45 (1237)Water Meter Replacement and Upgrades, Planning and 46 Construction 47 (St. Landry) 48 Payable from General Obligation Bonds 49 Priority 1 $ 1,014,305 50 Priority 2 $ 500,000 51 Total $ 1,514,305 Page 101 of 161 HB NO. 2 ENROLLED 1 (1510)Opelousas Street and Drainage Improvements 2 (St. Landry) 3 Payable from General Obligation Bonds 4 Priority 1 $ 2,250,000 5 Priority 5 $ 1,000,000 6 Total $ 3,250,000 7 (1511)Bridge Replacements and Upgrades, 8 Planning and Construction 9 (St. Landry) 10 Payable from State General Fund (Direct) Non-Recurring 11 Revenues $ 2,100,000 12 50/MM8PARKS 13 (1560)Parks Water System Improvements, Planning and 14 Construction 15 (St. Martin) 16 Payable from State General Fund (Direct) Non-Recurring 17 Revenues $ 500,000 18 50/MM9PATTERSON 19 (1409)Replacement of Water and Gas Meters in Patterson, 20 Planning and Construction 21 (St. Mary) 22 Payable from General Obligation Bonds 23 Priority 1 $ 451,000 24 (1440)Water Plant Improvements, Planning and Construction 25 (St. Mary) 26 Payable from State General Fund (Direct) Non-Recurring 27 Revenues $ 5,000,000 28 (1774)Rehabilitation of Nine Sewer Lift Stations, Planning 29 and Construction 30 (St. Mary) 31 Payable from State General Fund (Direct) Non-Recurring 32 Revenues $ 2,395,000 33 50/MN3PINEVILLE 34 (1557)Consolidated Municipal and Court Complex, Planning 35 and Construction 36 (Rapides) 37 Payable from General Obligation Bonds 38 Priority 5 $ 11,090,000 39 Payable from State General Fund (Direct) $ 1,000,000 40 Total $ 12,090,000 41 (1558)Cedar Lake Pump Station Reconstruction, Design, 42 Planning and Construction 43 (Rapides) 44 Payable from General Obligation Bonds 45 Priority 5 $ 585,000 46 Payable from the Capital Outlay Savings Fund $ 1,500,000 47 Total $ 2,085,000 Page 102 of 161 HB NO. 2 ENROLLED 1 50/MO1PONCHATOULA 2 (1751)Fire Station Complex US 51 - Veterans Avenue, Land 3 Acquisition, Planning and Construction 4 (Tangipahoa) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,075,000 7 Priority 5 $ 800,000 8 Total $ 1,875,000 9 50/MO2PORT ALLEN 10 (1648)Street and Drainage Improvements, Planning and 11 Construction 12 (West Baton Rouge) 13 Payable from General Obligation Bonds 14 Priority 1 $ 80,000 15 Priority 5 $ 3,520,000 16 Total $ 3,600,000 17 50/MO6PROVENCAL 18 (1701)New Water Well and Emergency Water Connection, 19 Planning and Construction 20 (Natchitoches) 21 Payable from General Obligation Bonds 22 Priority 5 $ 600,000 23 Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 24 39:112. 25 50/MO8RAYNE 26 (825) Martin Luther King Community Center Improvements, 27 Planning and Construction 28 (Acadia) 29 Payable from General Obligation Bonds 30 Priority 1 $ 39,402 31 50/MO9RAYVILLE 32 (495) Wastewater Transport and Treatment Facilities for 33 Economic Development 34 (Richland) 35 Payable from General Obligation Bonds 36 Priority 1 $ 675,887 37 Priority 5 $ 2,851,000 38 Total $ 3,526,887 39 Provided, however, that this appropriation is used for the extension of sewer lines south 40 along Highway 425. 41 (569) Municipal Complex, Planning and Construction 42 (Richland) 43 Payable from General Obligation Bonds 44 Priority 2 $ 500,000 45 Priority 5 $ 5,000,000 46 Payable from State General Fund (Direct) Non-Recurring 47 Revenues $ 500,000 48 Total $ 5,500,000 Page 103 of 161 HB NO. 2 ENROLLED 1 (586) Water Service Facilities for Economic Development, 2 Planning and Construction 3 (Richland) 4 Payable from General Obligation Bonds 5 Priority 1 $ 894,570 6 Priority 5 $ 7,522,300 7 Total $ 8,416,870 8 50/MP3RICHWOOD 9 (1768)Municipal Complex, Planning and Construction 10 (Ouachita) 11 Payable from General Obligation Bonds 12 Priority 1 $ 150,000 13 Priority 5 $ 3,400,000 14 Total $ 3,550,000 15 50/MP8ROSEDALE 16 (1238)New Rosedale Fire Station, Planning and Construction 17 (Iberville) 18 Payable from General Obligation Bonds 19 Priority 1 $ 338,521 20 50/MQ2RUSTON 21 (156) New Road from Highway 150 to I-20 South Frontage 22 Road, Planning and Construction 23 (Lincoln) 24 Payable from General Obligation Bonds 25 Priority 1 $ 815,718 26 Priority 5 $ 1,000,000 27 Total $ 1,815,718 28 (1393)East Kentucky/Cedar Creek Road Intersection 29 Improvements, Planning and Construction 30 (Lincoln) 31 Payable from General Obligation Bonds 32 Priority 1 $ 1,260,000 33 50/MQ3ST. FRANCISVILLE 34 (1092)Emergency Erosion Repairs, Planning and Construction 35 (West Feliciana) 36 Payable from General Obligation Bonds 37 Priority 1 $ 50,000 38 Priority 5 $ 3,204,000 39 Payable from State General Fund (Direct) Non-Recurring 40 Revenues $ 1,000,000 41 Total $ 4,254,000 42 (1708)Commerce Street Improvements and Utilities Relocation, 43 Planning and Construction 44 (West Feliciana) 45 Payable from General Obligation Bonds 46 Priority 5 $ 900,000 Page 104 of 161 HB NO. 2 ENROLLED 1 50/MQ4ST. JOSEPH 2 (1772)St. Joseph's Community House, Planning and 3 Construction 4 (Tensas) 5 Payable from General Obligation Bonds 6 Priority 5 $ 690,000 7 50/MQ5ST. MARTINVILLE 8 (823) Water Drainage Project, Planning and Construction 9 (St. Martin) 10 Payable from General Obligation Bonds 11 Priority 1 $ 200,000 12 (1639)Main Street Enhancement Project, Planning and 13 Construction 14 (St. Martin) 15 Payable from General Obligation Bonds 16 Priority 5 $ 1,450,000 17 Payable from the Capital Outlay Savings Fund $ 135,000 18 Total $ 1,585,000 19 (1848)Electrical System Improvements, Planning 20 and Construction 21 (St. Martin) 22 Payable from the Capital Outlay Savings Fund $ 800,000 23 Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 24 39:112. 25 50/MQ8SCOTT 26 (941) Roundabout at LA 93 and Renaud Drive, 27 Planning, Construction, and Land Acquisition 28 (Lafayette) 29 Payable from General Obligation Bonds 30 Priority 5 $ 2,897,000 31 Payable from State General Fund (Direct) $ 580,000 32 Total $ 3,477,000 33 (1353)LA 93 Roadway Improvements- I-10 Ramp to Renaud 34 Drive, Planning, Construction, and Land Acquisition 35 (Lafayette) 36 Payable from General Obligation Bonds 37 Priority 1 $ 1,000,000 38 Priority 5 $ 2,495,000 39 Total $ 3,495,000 40 (1559)Eraste Landry Road Extension, Planning and 41 Construction 42 (Lafayette) 43 Payable from General Obligation Bonds 44 Priority 1 $ 1,175,000 45 Priority 5 $ 7,832,000 46 Total $ 9,007,000 Page 105 of 161 HB NO. 2 ENROLLED 1 (1773)Water and Sewer Line Installation along Apollo Road 2 Extension, Planning and Construction 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 1 $ 2,513,750 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 355,250 8 Total $ 2,869,000 9 50/MR1SHREVEPORT 10 (166) University Park Subdivision Improvements, 11 Planning and Construction 12 (Caddo) 13 Payable from General Obligation Bonds 14 Priority 5 $ 7,625,000 15 Payable from State General Fund (Direct) Non-Recurring 16 Revenues $ 750,000 17 Total $ 8,375,000 18 (249) Shreveport Healthcare and Development Corridor, 19 Planning and Construction 20 (Caddo) 21 Payable from General Obligation Bonds 22 Priority 5 $ 40,000,000 23 Payable from the Capital Outlay Savings Fund $ 1,000,000 24 Total $ 41,000,000 25 (661) Greenwood Road Extension, (Greenwood Industrial 26 Park Road - Asphalt Road), Planning and Construction 27 (Caddo) 28 Payable from General Obligation Bonds 29 Priority 1 $ 120,000 30 Priority 5 $ 2,000,000 31 Total $ 2,120,000 32 (662) C.C. Antoine Museum and Arts Center, Planning and 33 Construction ($64,000 Local Match) 34 (Caddo) 35 Payable from General Obligation Bonds 36 Priority 1 $ 425,000 37 Priority 5 $ 100,000 38 Total $ 525,000 39 (1072)C.C. Antoine Park, Planning and Construction 40 (Caddo) 41 Payable from General Obligation Bonds 42 Priority 1 $ 1,892,810 43 Priority 5 $ 350,000 44 Total $ 2,242,810 45 (1281)Valencia Park Spray Park, Planning and Construction 46 (Caddo) 47 Payable from General Obligation Bonds 48 Priority 1 $ 75,000 49 (1487)District 3 Road Rehabilitation, Planning 50 and Construction 51 (Caddo) 52 Payable from State General Fund (Direct) Non-Recurring 53 Revenues $ 310,000 Page 106 of 161 HB NO. 2 ENROLLED 1 (1613)Bayou Pierre Drainage and Recreation, 2 Planning and Construction 3 (Caddo) 4 Payable from General Obligation Bonds 5 Priority 5 $ 7,500,000 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 750,000 8 Total $ 8,250,000 9 (1809)Amtrak Platform and Facility, Planning 10 and Construction 11 (Caddo) 12 Payable from General Obligation Bonds 13 Priority 5 $ 10,000,000 14 Payable from the Capital Outlay Savings Fund $ 1,250,000 15 Total $ 11,250,000 16 Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 17 39:112. 18 (1810)State Fairgrounds Access Improvements, 19 Planning and Construction 20 (Caddo) 21 Payable from General Obligation Bonds 22 Priority 5 $ 2,100,000 23 Payable from State General Fund (Direct) Non-Recurring 24 Revenues $ 240,000 25 Total $ 2,340,000 26 Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 27 39:112. 28 50/MR2SIBLEY 29 (982) Street Improvements, Planning and 30 Construction 31 (Webster) 32 Payable from State General Fund (Direct) Non-Recurring 33 Revenues $ 900,000 34 50/MR6SIMPSON 35 (1029)Rehabilitation of Various Roads, Planning and 36 Construction 37 (Vernon) 38 Payable from General Obligation Bonds 39 Priority 1 $ 35,000 40 50/MR8SLAUGHTER 41 (1610)Water System Improvements, 42 Planning and Construction 43 (East Feliciana) 44 Payable from General Obligation Bonds 45 Priority 5 $ 1,000,000 46 Payable from State General Fund (Direct) Non-Recurring 47 Revenues $ 1,000,000 48 Total $ 2,000,000 Page 107 of 161 HB NO. 2 ENROLLED 1 50/MR9SLIDELL 2 (1622)Sewer Lift Station Upgrades at Grafton Dr. (PS 312), 3 Breckenridge (PS 252), and LaQuinta/Cracker Barrel 4 (PS 202), Planning and Construction 5 (St. Tammany) 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 550,000 8 50/MS4SPRINGFIELD 9 (58) Water System Improvements and Upgrades, Planning 10 and Construction 11 (Livingston) 12 Payable from General Obligation Bonds 13 Priority 2 $ 141,000 14 Priority 5 $ 1,547,400 15 Payable from State General Fund (Direct) Non-Recurring 16 Revenues $ 250,000 17 Total $ 1,938,400 18 (1688)Roadway Rehabilitation, Planning and 19 Construction 20 (Livingston) 21 Payable from State General Fund (Direct) Non-Recurring 22 Revenues $ 655,000 23 50/MS5SPRINGHILL 24 (674) Wastewater Treatment Plant Rehabilitation, 25 Planning and Construction 26 (Webster) 27 Payable from General Obligation Bonds 28 Priority 5 $ 1,200,000 29 Payable from State General Fund (Direct) Non-Recurring 30 Revenues $ 1,200,000 31 Total $ 2,400,000 32 (881) Water System Improvements - Phase 3, 33 Planning and Construction 34 (Webster) 35 Payable from General Obligation Bonds 36 Priority 5 $ 5,700,000 37 Payable from State General Fund (Direct) $ 1,200,000 38 Total $ 6,900,000 39 50/MS9SULPHUR 40 (80) Maplewood Drive Rehabilitation 41 (Calcasieu) 42 Payable from General Obligation Bonds 43 Priority 1 $ 7,155,323 44 Priority 5 $ 5,137,500 45 Total $ 12,292,823 46 (1182)Installation of Water Meters, 47 Planning and Construction 48 (Calcasieu) 49 Payable from General Obligation Bonds 50 Priority 2 $ 1,000,000 51 Priority 5 $ 14,000,000 52 Total $ 15,000,000 Page 108 of 161 HB NO. 2 ENROLLED 1 (1524)Maplewood Pump Station, Planning and Construction 2 (Calcasieu) 3 Payable from General Obligation Bonds 4 Priority 5 $ 1,075,000 5 50/MT1SUN 6 (1638)Roof Replacement of Town Hall Building 7 (St. Tammany) 8 Payable from General Obligation Bonds 9 Priority 1 $ 200,000 10 50/MT2SUNSET 11 (97) Sunset Police and Fire Emergency Facility, Planning 12 and Construction 13 (St. Landry) 14 Payable from General Obligation Bonds 15 Priority 5 $ 400,000 16 (1832)Sewer Plant Upgrade, Planning and Construction 17 (St. Landry) 18 Payable from State General Fund (Direct) Non-Recurring 19 Revenues $ 1,400,000 20 Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 21 39:112. 22 50/MT3TALLULAH 23 (983) Emergency Water Production, Transmission and 24 Treatment, Acquisition, Planning and Construction 25 (Madison) 26 Payable from General Obligation Bonds 27 Priority 1 $ 366,045 28 Payable from State General Fund (Direct) Non-Recurring 29 Revenues $ 100,000 30 Total $ 466,045 31 50/MT5THIBODAUX 32 (90) LA 648/Acadia Road Intersection Improvements Project, 33 Planning and Construction 34 (Lafourche) 35 Payable from General Obligation Bonds 36 Priority 5 $ 3,000,000 37 Payable from the Capital Outlay Savings Fund $ 250,000 38 Total $ 3,250,000 39 (301) Replacement of Canal Boulevard Bridges and 40 Construction of Menard Pedestrian Bike Trail, Planning 41 and Construction 42 (Lafourche) 43 Payable from General Obligation Bonds 44 Priority 1 $ 4,650,000 45 Priority 5 $ 1,750,000 46 Total $ 6,400,000 Page 109 of 161 HB NO. 2 ENROLLED 1 50/MT8TURKEY CREEK 2 ( )Elevated Water Tank at Leisure Lane and 3 Connecting Water Main, Planning and 4 Construction 5 (Evangeline) 6 Payable from General Obligation Bonds 7 Priority 5 $ 2,125,000 8 Pending submittal and approval of the capital outlay budget request pursuant to the 9 provisions of R.S. 39:112. 10 50/MU2VIDALIA 11 (1282)Development of a Slackwater Port on the Mississippi 12 River, Planning and Construction 13 (Concordia) 14 Payable from General Obligation Bonds 15 Priority 1 $ 4,229,044 16 (1596)Utility System Upgrade, Planning, Acquisition, 17 Construction and Equipment 18 (Concordia) 19 Payable from General Obligation Bonds 20 Priority 1 $ 9,995,000 21 Priority 5 $ 7,000,000 22 Total $ 16,955,000 23 50/MU4VILLE PLATTE 24 (49) New Fire Station, Planning and Construction 25 (Evangeline) 26 Payable from General Obligation Bonds 27 Priority 5 $ 2,320,000 28 Payable from State General Fund (Direct) Non-Recurring 29 Revenues $ 500,000 30 Total $ 2,820,000 31 (1013)Infrastructure Improvements, Planning and 32 Construction 33 (Evangeline) 34 Payable from General Obligation Bonds 35 Priority 1 $ 186,413 36 (1731)Ville Platte Evangeline Recreational District 37 (Evangeline) 38 Payable from General Obligation Bonds 39 Priority 1 $ 855,000 40 Priority 5 $ 885,000 41 Total $ 1,740,000 42 50/MU5VINTON 43 (1575)Wastewater Treatment Plant Improvements, 44 Planning and Construction 45 (Calcasieu) 46 Payable from the Capital Outlay Savings Fund $ 900,000 Page 110 of 161 HB NO. 2 ENROLLED 1 50/MU6VIVIAN 2 (1288)Water and Wastewater System Improvements and 3 Extension, Planning and Construction 4 (Caddo) 5 Payable from General Obligation Bonds 6 Priority 1 $ 240,164 7 50/MU8WASHINGTON 8 (570) Water and Gas Meter Upgrade/Replacement, 9 Planning and Construction 10 (St. Landry) 11 Payable from State General Fund (Direct) Non-Recurring 12 Revenues $ 500,000 13 50/MV1WELSH 14 (678) Frontage Road Extension, Planning and Construction 15 (Jefferson Davis) 16 Payable from General Obligation Bonds 17 Priority 1 $ 500,000 18 Priority 5 $ 1,645,000 19 Total $ 2,145,000 20 50/MV2WEST MONROE 21 (501) North 3 rd Street Improvements, Planning 22 and Construction 23 (Ouachita) 24 Payable from State General Fund (Direct) Non-Recurring 25 Revenues $ 480,000 26 (911) Cotton Street Improvements and Sidewalks, 27 Planning and Construction 28 (Ouachita) 29 Payable from General Obligation Bonds 30 Priority 5 $ 1,350,000 31 (1681)Mid-City Drainage Improvements, Planning and 32 Construction 33 (Ouachita) 34 Payable from General Obligation Bonds 35 Priority 1 $ 1,000,000 36 Priority 5 $ 4,000,000 37 Total $ 5,000,000 38 (1682)Sunshine Heights Drainage Improvements, Planning 39 and Construction 40 (Ouachita) 41 Payable from General Obligation Bonds 42 Priority 1 $ 1,375,000 43 (1685)West Monroe Greenway, Planning and 44 Construction 45 (Ouachita) 46 Payable from General Obligation Bonds 47 Priority 5 $ 1,315,000 Page 111 of 161 HB NO. 2 ENROLLED 1 (1686)New Drago Street Sanitary Sewer Lift Station, Planning 2 and Construction 3 (Ouachita) 4 Payable from General Obligation Bonds 5 Priority 5 $ 1,213,614 6 50/MV3WESTLAKE 7 (885) Compressed Natural Gas Fueling Station, Planning and 8 Construction 9 (Calcasieu) 10 Payable from General Obligation Bonds 11 Priority 1 $ 470,000 12 Priority 5 $ 1,600,000 13 Total $ 2,070,000 14 50/MV4WESTWEGO 15 (92) The WHARF, Planning, Construction, and Site 16 Preparation 17 (Jefferson) 18 Payable from General Obligation Bonds 19 Priority 1 $ 6,601,859 20 (302) Park Land and Improvements, Including Improvements 21 to Existing Parks and Land Acquisition, Planning and 22 Construction 23 (Jefferson) 24 Payable from General Obligation Bonds 25 Priority 1 $ 498,305 26 Priority 5 $ 1,000,000 27 Total $ 1,498,305 28 (303) Riverboat Landing Phase III, Planning 29 and Construction 30 (Jefferson) 31 Payable from General Obligation Bonds 32 Priority 5 $ 1,205,000 33 (504) Water Tower, Line and Improvements, Water Meter 34 Replacement, Planning and Construction 35 (Jefferson) 36 Payable from General Obligation Bonds 37 Priority 1 $ 47,568 38 Priority 5 $ 1,000,000 39 Total $ 1,047,568 40 (505) Emergency Preparedness Building, Planning and 41 Construction 42 (Jefferson) 43 Payable from General Obligation Bonds 44 Priority 1 $ 83,851 45 Payable from State General Fund (Direct) Non-Recurring 46 Revenues $ 465,000 47 Total $ 548,851 48 (916) Farmer Fisheries Market, Planning and Construction 49 (Jefferson) 50 Payable from State General Fund (Direct) Non-Recurring 51 Revenues $ 270,000 Page 112 of 161 HB NO. 2 ENROLLED 1 (1120)Fire Station, Planning and Construction 2 (Jefferson) 3 Payable from General Obligation Bonds 4 Priority 1 $ 436,400 5 (1121)Sala Avenue Street and Infrastructure Improvements 6 (Jefferson) 7 Payable from General Obligation Bonds 8 Priority 1 $ 1,058,300 9 (1775)Wastewater Treatment Plant Improvements, Planning 10 and Construction 11 (Jefferson) 12 Payable from General Obligation Bonds 13 Priority 5 $ 4,503,500 14 Payable from State General Fund (Direct) Non-Recurring 15 Revenues $ 400,000 16 Total $ 4,903,500 17 50/MV5WHITE CASTLE 18 (196) Water System Improvements, Planning 19 and Construction 20 (Iberville) 21 Payable from State General Fund (Direct) Non-Recurring 22 Revenues $ 250,000 23 (1186)Training & Learning Center, 24 Planning and Construction 25 (Iberville) 26 Payable from General Obligation Bonds 27 Priority 5 $ 1,000,000 28 Payable from State General Fund (Direct) Non-Recurring 29 Revenues $ 500,000 30 Total $ 1,500,000 31 50/MV6WILSON 32 (1702)Sanitary Sewer System Improvements, Planning and 33 Construction 34 (East Feliciana) 35 Payable from General Obligation Bonds 36 Priority 2 $ 792,000 37 (1703)Community Youth Center Renovation, 38 Planning and Construction 39 (East Feliciana) 40 Payable from General Obligation Bonds 41 Priority 5 $ 210,000 42 50/MV7WINNFIELD 43 (1620)South Winnfield Drainage Improvements - Phase 1, 44 Planning and Construction 45 (Winn) 46 Payable from General Obligation Bonds 47 Priority 1 $ 75,000 48 Priority 5 $ 600,000 49 Total $ 675,000 Page 113 of 161 HB NO. 2 ENROLLED 1 50/MV8WINNSBORO 2 (1154)Winnsboro Industrial Park - Franklin Rubber Plant 3 Grinding Line Rebuild, Planning and Construction 4 (Franklin) 5 Payable from State General Fund (Direct) $ 2,225,000 6 (1388)Winnsboro LED Marquee Sign, 7 Planning and Construction 8 (Franklin) 9 Payable from State General Fund (Direct) Non-Recurring 10 Revenues $ 50,000 11 50/MW2YOUNGSVILLE 12 (37) Chemin Metairie Parkway Widening, Planning and 13 Construction 14 (Lafayette) 15 Payable from General Obligation Bonds 16 Priority 5 $ 3,880,000 17 Payable from State General Fund (Direct) Non-Recurring 18 Revenues $ 600,000 19 Total $ 4,480,000 20 (45) New Fire Station, Planning and Construction 21 (Lafayette) 22 Payable from General Obligation Bonds 23 Priority 5 $ 3,250,000 24 Payable from State General Fund (Direct) Non-Recurring 25 Revenues $ 500,000 26 Total $ 3,750,000 27 (658) Highway 89 Improvements, Planning and Construction 28 (Lafayette) 29 Payable from General Obligation Bonds 30 Priority 1 $ 8,955,000 31 Priority 5 $ 13,590,000 32 Total $ 22,545,000 33 (659) Highway 92 Improvements, Planning and Construction 34 (Lafayette) 35 Payable from General Obligation Bonds 36 Priority 1 $ 880,000 37 Priority 5 $ 4,525,000 38 Total $ 5,405,000 39 (866) Fortune Road Extension, Planning and Construction 40 (Lafayette) 41 Payable from General Obligation Bonds 42 Priority 1 $ 3,885,000 43 (867) Wastewater System Improvements, Planning 44 and Construction 45 (Lafayette) 46 Payable from General Obligation Bonds 47 Priority 5 $ 4,500,000 48 Payable from State General Fund (Direct) Non-Recurring 49 Revenues $ 500,000 50 Total $ 5,000,000 Page 114 of 161 HB NO. 2 ENROLLED 1 (1202)Highway 92/Prescott Boulevard Roundabout, 2 Design, Planning, and Construction 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 5 $ 2,614,000 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 500,000 8 Total $ 3,114,000 9 (1277)Langlinais Road Extension, Planning and Construction 10 (Lafayette) 11 Payable from General Obligation Bonds 12 Priority 5 $ 5,580,000 13 Payable from State General Fund (Direct) Non-Recurring 14 Revenues $ 860,000 15 Total $ 6,440,000 16 50/MW6ST. GABRIEL 17 (609) City Council Chambers - New Construction 18 (Iberville) 19 Payable from General Obligation Bonds 20 Priority 1 $ 1,440,000 21 (1733)City Council Chambers Phase 2, Planning and 22 Construction 23 (Iberville) 24 Payable from General Obligation Bonds 25 Priority 1 $ 2,000,000 26 Priority 5 $ 700,000 27 Total $ 2,700,000 28 50/MW8CENTRAL 29 (1206)Administration Building 30 (East Baton Rouge) 31 Payable from General Obligation Bonds 32 Priority 1 $ 16,943 33 Payable from State General Fund (Direct) $ 3,000,000 34 Total $ 3,016,943 35 50/N02TULANE 36 (1162)Clean Room Facility for Science and Engineering 37 Research and Development, Planning and Construction 38 (Orleans) 39 Payable from State General Fund (Direct) $ 3,000,000 40 (1009)Central Community School System Multi-Use Activity 41 Center, Recreational Facility, Planning and Construction 42 (East Baton Rouge) 43 Payable from General Obligation Bonds 44 Priority 1 $ 1,200,000 45 Priority 5 $ 9,800,000 46 Total $ 11,000,000 Page 115 of 161 HB NO. 2 ENROLLED 1 50/N03AUDUBON NATURE INSTITUTE, INC. 2 (1397)Audubon Facility Renovations and Improvements: 3 Audubon Zoo, Planning and Construction 4 (Orleans) 5 Payable from General Obligation Bonds 6 Priority 1 $ 9,500,000 7 Priority 5 $ 9,500,000 8 Total $ 19,000,000 9 50/N05NEW ORLEANS EXHIBITION HALL AUTHORITY 10 (190) Property Development Project 11 (Orleans) 12 Payable from General Obligation Bonds 13 Priority 1 $ 500,000 14 Priority 5 $ 25,000,000 15 Total $ 25,500,000 16 50/N06STATE FAIR OF LOUISIANA 17 (293) Hirsch Memorial Coliseum and Louisiana State 18 Fairgrounds Improvements Project 19 (Caddo) 20 Payable from General Obligation Bonds 21 Priority 1 $ 273,295 22 Priority 5 $ 3,280,000 23 Total $ 3,553,295 24 50/N13CHENNAULT INTERNATIONAL AIRP ORT AUTHORITY 25 (1791)Firewater Pumphouse #3 and Infrastructure, Planning 26 and Construction 27 (Calcasieu) 28 Payable from General Obligation Bonds 29 Priority 5 $ 6,000,000 30 Payable from State General Fund (Direct) $ 1,000,000 31 Total $ 7,000,000 32 50/N17NEW ORLEANS CAREER CENTER 33 (1741)Expanding High Wage, High Demand Career and 34 Technical Training, Planning and Construction 35 (Orleans) 36 Payable from General Obligation Bonds 37 Priority 1 $ 1,000,000 38 Priority 5 $ 2,000,000 39 Total $ 3,000,000 40 50/N18IBERIA PARISH AIRPORT AUTHORITY 41 (242) Rehabilitation of Hangar #88 and Associated 42 Parking Lot, Planning and Construction 43 (Iberia) 44 Payable from General Obligation Bonds 45 Priority 5 $ 900,000 46 Payable from State General Fund (Direct) Non-Recurring 47 Revenues $ 500,000 48 Total $ 1,400,000 49 Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 50 39:112. Page 116 of 161 HB NO. 2 ENROLLED 1 (274) Acadiana Regional Airport Improvements, Planning 2 and Construction 3 (Iberia) 4 Payable from General Obligation Bonds 5 Priority 1 $ 3,150,000 6 Priority 2 $ 3,000,000 7 Priority 5 $ 34,000,000 8 Payable from State General Fund (Direct) Non-Recurring 9 Revenues $ 1,000,000 10 Total $ 41,150,000 11 50/N19PAUL S. MORTON SCHOLARSHIP FOUNDATION 12 (616) Paul S. Morton Scholarship Foundation Greater Works 13 Family Life Center, Planning and Construction 14 (Orleans) 15 Payable from General Obligation Bonds 16 Priority 5 $ 6,200,000 17 Payable from State General Fund (Direct) $ 1,000,000 18 Total $ 7,200,000 19 50/N33ENGLAND ECONOMIC & INDUSTRIAL DEVELOP MENT 20 DISTRICT 21 (116) High Bay Aircraft Maintenance Hangar, Planning and 22 Construction 23 (Rapides) 24 Payable from General Obligation Bonds 25 Priority 1 $ 1,713,915 26 Priority 5 $ 15,425,000 27 Payable from the Capital Outlay Savings Fund $ 1,500,000 28 Total $ 18,638,915 29 (1797)Regional Warehouse and Distribution 30 Complex, Planning and Construction 31 (Rapides) 32 Payable from General Obligation Bonds 33 Priority 5 $ 7,200,000 34 Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 35 39:112. 36 50/N34ODYSSEY HOUSE LOUISIANA, INC. 37 (928) Odyssey House Louisiana Gambling Treatment Center, 38 Planning and Construction 39 (Orleans) 40 Payable from General Obligation Bonds 41 Priority 5 $ 5,000,000 42 (1546)Odyssey House Louisiana Renovation Project, Planning 43 and Construction 44 (Orleans) 45 Payable from General Obligation Bonds 46 Priority 1 $ 6,614,300 Page 117 of 161 HB NO. 2 ENROLLED 1 50/N36WALKER COMMUNITY RESOURCE AND RECREATION 2 CENTER 3 (1693)Walker Community Resource and Recreation Center, 4 Planning and Construction 5 (Lafayette) 6 Payable from General Obligation Bonds 7 Priority 5 $ 750,000 8 Payable from State General Fund (Direct) Non-Recurring 9 Revenues $ 250,000 10 Total $ 1,000,000 11 50/N40LAFAYETTE ECONOMIC DEVELOP MENT AUTHORITY 12 (771) Lafayette Innovation Center, Planning and Construction 13 (Lafayette) 14 Payable from General Obligation Bonds 15 Priority 1 $ 5,497,881 16 50/N41BATON ROUGE METROPOLITAN AIRPORT 17 (1335)Airport Aviation Business Park, Planning and 18 Construction 19 (East Baton Rouge) 20 Payable from General Obligation Bonds 21 Priority 1 $ 2,661,361 22 Priority 5 $ 4,750,000 23 Total $ 7,411,361 24 ( )Wildlife Hazard Mitigation, Planning, 25 Environmental, Design, and Phases I and II, 26 Planning and Construction 27 (East Baton Rouge) 28 Payable from General Obligation Bonds 29 Priority 5 $ 1,313,000 30 Payable from State General Fund (Direct) Non-Recurring 31 Revenues $ 1,000,000 32 Total $ 2,313,000 33 Pending submittal and approval of the capital outlay budget request pursuant to the 34 provisions of R.S. 39:112. 35 50/N47ST. MARTIN ECONOMIC DEVELOP MENT 36 AUTHORITY 37 (1769)North Business Park, Planning and Construction 38 (St. Martin) 39 Payable from General Obligation Bonds 40 Priority 5 $ 2,100,000 41 50/N52LAFAYETTE PARISH SHERIFF’S OFFICE 42 (449) Crime Scene and Evidence Storage, Planning and 43 Construction 44 (Lafayette) 45 Payable from General Obligation Bonds 46 Priority 1 $ 2,485,000 47 Payable from State General Fund (Direct) Non-Recurring 48 Revenues $ 350,000 49 Total $ 2,835,000 Page 118 of 161 HB NO. 2 ENROLLED 1 (450) Fitness Center, Planning and Construction 2 (Lafayette) 3 Payable from General Obligation Bonds 4 Priority 1 $ 2,010,000 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 220,000 7 Total $ 2,230,000 8 (860) Range Upgrades, Planning and Construction 9 (Lafayette) 10 Payable from General Obligation Bonds 11 Priority 1 $ 2,565,000 12 Payable from State General Fund (Direct) Non-Recurring 13 Revenues $ 300,000 14 Total $ 2,865,000 15 (1673)Law Enforcement Center, Planning 16 and Construction 17 (Lafayette) 18 Payable from General Obligation Bonds 19 Priority 5 $ 46,500,000 20 Payable from the Capital Outlay Savings Fund $ 7,800,000 21 Total $ 54,300,000 22 Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 23 39:112. 24 50/N53ORLEANS PARISH COMMUNICATIONS DISTRICT 25 (534) Orleans Parish Communications District Expansion 26 Project, Planning and Construction 27 (Orleans) 28 Payable from General Obligation Bonds 29 Priority 5 $ 33,600,000 30 Payable from State General Fund (Direct) Non-Recurring 31 Revenues $ 5,000,000 32 Total $ 38,600,000 33 50/N70REGIONAL TRANSIT AUTHORITY 34 (808) Chalmette-Lower Algiers Vehicle Ferry 35 Replacement Study, Planning and Construction 36 (Orleans) 37 Payable from the Capital Outlay Savings Fund $ 500,000 38 (1635)Replacement of Two Maintenance Barges 39 Located at Lower Algiers Maintenance Facility, 40 Planning and Construction 41 (Orleans) 42 Payable from General Obligation Bonds 43 Priority 5 $ 10,000,000 44 50/N71NORTH LAFOURCHE CONSERVATION, LEVEE 45 AND DRAINAGE DISTRICT 46 (766) Raceland Prairie Levee Improvements, Planning and 47 Construction 48 (Lafourche) 49 Payable from General Obligation Bonds 50 Priority 1 $ 3,975,000 Page 119 of 161 HB NO. 2 ENROLLED 1 50/N72RIVER ROAD AFRICAN AMERICAN MUSEUM 2 (568) River Road African American Museum, 3 Planning and Construction 4 (Ascension) 5 Payable from General Obligation Bonds 6 Priority 5 $ 1,000,000 7 50/N74NATIONAL WORLD WAR II MUSEUM, INC. 8 (506) Eight Projects Under FP&C Management Plus 9 Liberation Pavilion: Bricks and Mortar, Exhibit 10 Fabrication, Media Production, Planning and 11 Construction 12 (Orleans) 13 Payable from General Obligation Bonds 14 Priority 1 $ 12,500,000 15 Priority 2 $ 6,500,000 16 Priority 5 $ 12,300,000 17 Payable from State General Fund (Direct) 18 Non-Recurring Revenues $ 3,000,000 19 Total $ 34,300,000 20 50/N79TANGIPAHOA PARISH FIRE DISTRICT 1 21 (1351)Bruce Cutrer Regional Fire Training Facility of 22 Tangipahoa Parish, Planning and Construction 23 (Tangipahoa) 24 Payable from General Obligation Bonds 25 Priority 1 $ 225,000 26 Priority 5 $ 2,000,000 27 Total $ 2,225,000 28 50/N90NORTH OF CROWLEY WATER CORP ORATION 29 (1812)Water System Improvements, Planning 30 and Construction 31 (Acadia) 32 Payable from the Capital Outlay Savings Fund $ 810,000 33 Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 34 39:112. 35 50/NA2LAFAYETTE AIRPORT COMMISSION 36 (610) Construction of a New Passenger Facility Terminal and 37 Associated Infrastructure at Lafayette Regional Airport 38 (Lafayette) 39 Payable from General Obligation Bonds 40 Priority 1 $ 673,815 41 50/NAAPOINTE COUPEE COUNCIL ON AGING 42 (1290)Senior Center, Planning and Construction 43 (Pointe Coupee) 44 Payable from General Obligation Bonds 45 Priority 1 $ 395,400 46 Priority 5 $ 1,920,000 47 Total $ 2,315,400 Page 120 of 161 HB NO. 2 ENROLLED 1 50/NADMU ZETA FOUNDATION, INC. 2 (1738)Expansion Project, Planning and Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 1 $ 179,765 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 50,000 8 Total $ 229,765 9 50/NAJEFFORTS OF GRACE, INC. 10 (1770)Ashe Too, Planning and Construction 11 (Orleans) 12 Payable from General Obligation Bonds 13 Priority 1 $ 1,000,000 14 50/NAZHOSPICE OF ACADIANA FOUNDATION, INC. 15 (1730)Calcutta House, Planning and Construction 16 (Lafayette) 17 Payable from General Obligation Bonds 18 Priority 1 $ 249,795 19 Priority 5 $ 600,000 20 Payable from State General Fund (Direct) Non-Recurring 21 Revenues $ 250,000 22 Total $ 1,099,795 23 50/NB1CENTER FOR INNOVATIVE TRAINING OF YOUTH 24 (815) STEM NOLA's Innovation Hub, Planning 25 and Construction 26 (Orleans) 27 Payable from General Obligation Bonds 28 Priority 5 $ 8,600,000 29 Payable from the Capital Outlay Savings Fund $ 2,000,000 30 Total $ 10,600,000 31 50/NBCCAPITOL CITY FAMILY HEALTH CENTER, INC. 32 (1734)Care South Medical and Dental Expansion, Planning 33 and Construction 34 (East Baton Rouge) 35 Payable from General Obligation Bonds 36 Priority 1 $ 704,765 37 Priority 5 $ 550,000 38 Total $ 1,254,765 39 50/NBFCOMMUNITY RECEIVING HOME, INC. 40 (409) Renaissance Home for Youth, New Administrative 41 Building, Renovation of Existing Administrative 42 Building, Roads and Parking Areas, Planning and 43 Construction 44 (Rapides) 45 Payable from General Obligation Bonds 46 Priority 1 $ 395,920 Page 121 of 161 HB NO. 2 ENROLLED 1 (1350)Rapides Parish Juvenile Justice Complex, Planning and 2 Construction 3 (Rapides) 4 Payable from General Obligation Bonds 5 Priority 2 $ 1,300,000 6 Priority 5 $ 25,300,000 7 Payable from the Capital Outlay Savings Fund $ 1,000,000 8 Total $ 27,600,000 9 50/NBJJONESVILLE FIRE DISTRICT 10 (115) New Fire Station at U.S. Hwy. 84 and 3rd Street, 11 Planning and Construction 12 (Catahoula) 13 Payable from General Obligation Bonds 14 Priority 5 $ 800,000 15 50/NBVCAPITAL AREA GROUND WATER 16 CONSERVATION DISTRICT 17 (558) Water Monitoring System, Planning and Construction 18 (Ascension, East Baton Rouge, East Feliciana, Pointe 19 Coupee, West Baton Rouge, West Feliciana) 20 Payable from General Obligation Bonds 21 Priority 1 $ 1,000,000 22 Priority 5 $ 1,800,000 23 Total $ 2,800,000 24 50/NC2BATON ROUGE RECREATION AND PARKS 25 COMMISSION 26 (398) Baker Youth Tournament Ball Fields, Planning and 27 Construction 28 (East Baton Rouge) 29 Payable from General Obligation Bonds 30 Priority 1 $ 65,000 31 (803) Cadillac Street Park Site Improvements, Planning and 32 Construction 33 (East Baton Rouge) 34 Payable from General Obligation Bonds 35 Priority 1 $ 71,625 36 (1212)Central Community Sports Park, Planning and 37 Construction 38 (East Baton Rouge) 39 Payable from General Obligation Bonds 40 Priority 1 $ 26,671 41 (1420)J.S. Clark Golf Course Renovation in Greenwood 42 Community Park, Planning and Construction 43 (East Baton Rouge) 44 Payable from General Obligation Bonds 45 Priority 1 $ 50,000 46 Priority 5 $ 800,000 47 Total $ 850,000 Page 122 of 161 HB NO. 2 ENROLLED 1 (1429)The Inspiration Center - Howell Community Park, 2 Planning and Construction 3 (East Baton Rouge) 4 Payable from State General Fund (Direct) Non-Recurring 5 Revenues $ 5,000,000 6 (1689)Baton Rouge Gallery Contemporary Art Center 7 at City Park, Planning and Construction 8 (East Baton Rouge) 9 Payable from General Obligation Bonds 10 Priority 5 $ 5,000,000 11 Payable from State General Fund (Direct) Non-Recurring 12 Revenues $ 250,000 13 Total $ 5,250,000 14 50/NCFTECHE ACTION BOARD, INC. 15 (416) Construction and Completion of New Health 16 Center Facility for Teche Action Clinic at 17 Gramercy in Gramercy, LA, 18 Planning and Construction 19 (St. James) 20 Payable from General Obligation Bonds 21 Priority 5 $ 3,700,000 22 Payable from State General Fund (Direct) Non-Recurring 23 Revenues $ 500,000 24 Total $ 4,200,000 25 50/NC3ST. TAMMANY PARISH SHERIFF'S OFFICE 26 (230) St. Tammany Parish Sheriff's Training Facility, 27 Planning and Construction 28 (St. Tammany) 29 Payable from State General Fund (Direct) $ 2,000,000 30 50/NCGASSUMPTION PARISH RECREATION 31 DISTRICT 2 32 (717) Emergency Use Pavilion at Veterans Park, 33 Planning and Construction 34 (Assumption) 35 Payable from State General Fund (Direct) Non-Recurring 36 Revenues $ 270,000 37 50/NCMFIFTH WARD RECREATION DISTRICT OF 38 ST. HELENA PARISH 39 (828) Recreation District Baseball Fields, Planning and 40 Construction 41 (St. Helena) 42 Payable from General Obligation Bonds 43 Priority 1 $ 950,417 44 50/NCNSOUTH TOLEDO BEND WATERWORK S DISTRICT 45 (1294)Vaco Road, Prospect Road, and Firesheets Lane, 46 Planning and Construction 47 (Sabine) 48 Payable from General Obligation Bonds 49 Priority 1 $ 25,000 50 Priority 5 $ 200,000 51 Total $ 225,000 Page 123 of 161 HB NO. 2 ENROLLED 1 50/ND5LAFOURCHE PARISH WATER DISTRICT 2 (1002)Kraemer Water Line Upgrades, Planning and 3 Construction 4 (Lafourche) 5 Payable from General Obligation Bonds 6 Priority 1 $ 100,000 7 Priority 5 $ 1,500,000 8 Payable from State General Fund (Direct) Non-Recurring 9 Revenues $ 600,000 10 Total $ 2,200,000 11 50/ND8BOSSIER PARISH SHERIFF 12 (1339)Criminal Operations Building, Planning 13 and Construction 14 (Bossier) 15 Payable from General Obligation Bonds 16 Priority 5 $ 10,000,000 17 Payable from State General Fund (Direct) Non-Recurring 18 Revenues $ 1,000,000 19 Total $ 11,000,000 20 50/ND9NORTHEAST LOUISIANA CHILDREN'S MUSEUM 21 (1151)Northeast Louisiana Children's Museum Relocation, 22 Planning and Construction 23 (Ouachita) 24 Payable from General Obligation Bonds 25 Priority 1 $ 1,000,000 26 Priority 5 $ 9,000,000 27 Payable from State General Fund (Direct) Non-Recurring 28 Revenues $ 1,000,000 29 Total $ 11,000,000 30 50/NDNOPPORTUNITIES INDUSTRIALIZ ATION CENTER 31 INCORPORATED OF OUACHITA 32 (403) New Education Building, Planning and Construction 33 (Ouachita) 34 Payable from General Obligation Bonds 35 Priority 1 $ 386,775 36 Priority 5 $ 1,845,000 37 Total $ 2,231,775 38 50/NDQTANGIPAHOA AFRICAN AMERICAN HERITAG E 39 MUSEUM AND VETERANS' ARCHIVES 40 (421) Tangipahoa African American Heritage Museum Roof 41 Replacement, Planning and Construction 42 (Tangipahoa) 43 Payable from General Obligation Bonds 44 Priority 5 $ 540,000 45 50/NDXNEW ORLEANS COUNCIL ON AG ING, INC. 46 (494) New Orleans Council on Aging Office and Senior 47 Community Center, Planning, Purchase, and 48 Renovation of a Building and/or Acquire Land and 49 Construct a New Building 50 (Orleans) 51 Payable from General Obligation Bonds 52 Priority 1 $ 4,998,358 Page 124 of 161 HB NO. 2 ENROLLED 1 50/NDYJEFFERSON DAVIS WATER AND SEWER DISTRICT 2 COMMISSION #1 3 (1014)Water System Improvements, Planning 4 and Construction 5 (Jefferson Davis) 6 Payable from General Obligation Bonds 7 Priority 5 $ 5,200,000 8 Payable from State General Fund (Direct) Non-Recurring 9 Revenues $ 750,000 10 Total $ 5,950,000 11 50/NEEBIOMEDICAL RESEARCH AND INNOVATION P ARK 12 (1517)Biomedical Research and Innovation Park Building, 13 Planning and Construction 14 (Ouachita) 15 Payable from General Obligation Bonds 16 Priority 1 $ 8,600,000 17 Priority 5 $ 14,900,000 18 Total $ 23,500,000 19 50/NERST. HELENA PARISH HOSPITAL SERVICE 20 DISTRICT NO. 1 21 (1225)Hospital Renovation, Expansion, and Equipment 22 Replacement, Planning and Construction 23 (St. Helena) 24 Payable from General Obligation Bonds 25 Priority 1 $ 4,181,045 26 50/NEVHOSPITAL SERVICE DISTRICT 1 TERREBONNE 27 PARISH 28 (1184)Emergency Power System Replacement and 29 Upgrade, Planning and Construction 30 (Terrebonne) 31 Payable from General Obligation Bonds 32 Priority 5 $ 15,800,000 33 Payable from State General Fund (Direct) Non-Recurring 34 Revenues $ 1,500,000 35 Total $ 17,300,000 36 Pending submittal and approval of the capital outlay budget request pursuant to the 37 provisions of R.S. 39:112. 38 50/NEYORLEANS PARISH HOSPITAL SERVICE 39 DISTRICT A 40 (819) Parish Hospital Service District for the Parish of 41 Orleans - District A- Obstetrics Service Line Expansion 42 Level 2 Unit, Planning and Construction 43 (Orleans) 44 Payable from General Obligation Bonds 45 Priority 1 $ 3,200,000 46 Payable from the Capital Outlay Savings Fund $ 1,000,000 47 Total $ 4,200,000 Page 125 of 161 HB NO. 2 ENROLLED 1 50/NF6ST. MARTIN PARISH SHERIFF'S OFFICE 2 (1660)Regional Law Enforcement Training Academy, 3 Planning and Construction 4 (St. Martin) 5 Payable from General Obligation Bonds 6 Priority 5 $ 900,000 7 Payable from the Capital Outlay Savings Fund $ 1,500,000 8 Total $ 2,400,000 9 50/NF8CENTRAL LOUISIANA DETENTION CENTER 10 AUTHORITY 11 (862) Central Louisiana Juvenile Detention Center, Planning 12 and Construction 13 (Grant) 14 Payable from General Obligation Bonds 15 Priority 1 $ 2,000,000 16 Priority 5 $ 8,700,000 17 Payable from State General Fund (Direct) Non-Recurring 18 Revenues $ 1,000,000 19 Total $ 11,700,000 20 50/NFECAJUNDOME 21 (369) Cajundome and Convention Center Indoor Air Quality 22 Improvements, Planning and Construction 23 (Lafayette) 24 Payable from General Obligation Bonds 25 Priority 1 $ 6,364,182 26 (772) Cajundome Arena, 2 New Elevators Replacements, 27 Planning and Construction 28 (Lafayette) 29 Payable from State General Fund (Direct) Non-Recurring 30 Revenues $ 900,000 31 50/NFIRAPIDES PARISH FIRE DISTRICT 2 32 (527) Replace Station No. 1 on Ransbottom, Planning 33 and Construction 34 (Rapides) 35 Payable from State General Fund (Direct) Non-Recurring 36 Revenues $ 500,000 37 50/NFXTHE O.W. DILLON TRAINING AND COMMUNITY 38 DEVELOPMENT CENTER, INC. 39 (1435)The O.W. Dillon Training and Community 40 Development Center Building, Planning and 41 Construction 42 (Tangipahoa) 43 Payable from General Obligation Bonds 44 Priority 1 $ 1,500,000 45 Priority 5 $ 4,500,000 46 Total $ 6,000,000 Page 126 of 161 HB NO. 2 ENROLLED 1 50NFZOUR LADY OF LOURDES REGIONAL MEDICAL CENTER 2 (82) Our Lady of Lourdes Regional Medical Center, 3 Planning and Construction 4 (Lafayette) 5 Payable from General Obligation Bonds 6 Priority 5 $ 13,000,000 7 Payable from the Capital Outlay Savings Fund $ 3,000,000 8 Total $ 16,000,000 9 50/NG6THE LOUISIANA BLACK HISTORY HALL OF FAME 10 (209) Museum and Cultural Center, Planning and 11 Construction 12 (East Baton Rouge) 13 Payable from General Obligation Bonds 14 Priority 1 $ 2,089,802 15 50/NGALINCOLN PARISH FIRE PROTECTION DISTRICT #1 16 (186) Renovations to Existing Facility and Additional 17 Buildings, Acquisition, Planning and Construction 18 (Lincoln) 19 Payable from General Obligation Bonds 20 Priority 1 $ 120,000 21 Priority 5 $ 765,000 22 Total $ 885,000 23 50/NGGYWCA GREATER NEW ORLEANS 24 (1018)Construction Project, Planning and Construction 25 (Orleans) 26 Payable from General Obligation Bonds 27 Priority 5 $ 700,000 28 50/NGMNEW ORLEANS AF RICAN AMERICAN 29 MUSEUM OF ART, CULTURE AND HISTORY 30 (1676)New Orleans African American Museum of Art, 31 Culture and History: Renovation and New Construction 32 (Orleans) 33 Payable from General Obligation Bonds 34 Priority 1 $ 374,765 35 Priority 5 $ 4,000,000 36 Total $ 4,374,765 37 50/NGNLOUISIANA CHAMBER OF COMMERCE 38 FOUNDATION, INC. 39 (1405)Louisiana Chamber of Commerce's Business 40 Innovation Center, Planning and Construction 41 (Calcasieu) 42 Payable from General Obligation Bonds 43 Priority 1 $ 1,645,000 Page 127 of 161 HB NO. 2 ENROLLED 1 50/NGQTHE STRAND THEATRE OF SHREVEPORT 2 CORPORATION 3 (1318)Repair and Renovation to the Strand Theatre of 4 Shreveport 5 (Caddo) 6 Payable from General Obligation Bonds 7 Priority 1 $ 71,694 8 Priority 5 $ 984,000 9 Total $ 1,055,694 10 50/NH7CEMETERY MAINTENANCE Z ACHARY 11 (1771)Public Cemetery Maintenance, Planning and 12 Construction 13 (East Baton Rouge) 14 Payable from General Obligation Bonds 15 Priority 5 $ 3,750,000 16 50/NHEST. JAMES PARISH HOSPITAL 17 (1008)West Bank Health Clinic, Planning and Construction 18 (St. James) 19 Payable from General Obligation Bonds 20 Priority 1 $ 1,790,795 21 Priority 5 $ 1,500,000 22 Total $ 3,290,795 23 50/NHGLAFAYETTE CENTRE DEVELOP MENT DISTRICT 24 (1677)Downtown Lafayette Public Infrastructure 25 Improvements and Upgrades, Planning and 26 Construction 27 (Lafayette) 28 Payable from General Obligation Bonds 29 Priority 1 $ 500,000 30 50/NHQSHREVEPORT FOUNDATION 31 (588) Greater Shreveport Chamber of Commerce Exterior 32 Window Replacements, Planning and Construction 33 (Caddo) 34 Payable from State General Fund (Direct) Non-Recurring 35 Revenues $ 350,000 36 (1417)Greater Shreveport Chamber of Commerce Elevator 37 Replacement, Planning and Construction 38 (Caddo) 39 Payable from State General Fund (Direct) Non-Recurring 40 Revenues $ 200,000 41 50/NHUSOUTH GRANT WATER CORP ORATION 42 (181) Water Production System Improvements, 43 East Well #2, Planning and Construction 44 (Grant) 45 Payable from General Obligation Bonds 46 Priority 5 $ 390,000 47 Payable from the Capital Outlay Savings Fund $ 390,000 48 Total $ 780,000 Page 128 of 161 HB NO. 2 ENROLLED 1 50/NI6ST. LANDRY ECONOMIC DEVELOP MENT DISTRICT 2 (1412)Wastewater Collection System Improvements - 3 Central St. Landry Economic Development District, 4 Planning and Construction 5 (St. Landry) 6 Payable from State General Fund (Direct) $ 1,700,000 7 50/NI7HOSPITAL SERVICE DISTRICT 1 IBERIA PARISH DBA 8 IBERIA MEDICAL CENTER 9 (542) Addition of Medical, Surgical, and Psychiatric 10 Inpatient Rooms, Planning, Construction, and 11 Equipment 12 (Iberia) 13 Payable from General Obligation Bonds 14 Priority 5 $ 7,175,000 15 Payable from State General Fund (Direct) Non-Recurring 16 Revenues $ 1,500,000 17 Total $ 8,675,000 18 50/NI9ASCENSION-ST. JAMES AIRPORT AND 19 TRANSPORTATION AUTHORITY 20 (798) Drinking Water, Fire Suppression, and ADA 21 Compliance - Louisiana Regional Airport, Gonzales, 22 LA, Planning and Construction 23 (Ascension) 24 Payable from General Obligation Bonds 25 Priority 1 $ 190,000 26 (1416)Commercial Hangar Complex - Louisiana Regional 27 Airport, Gonzales, LA, Planning and Construction 28 (Ascension) 29 Payable from General Obligation Bonds 30 Priority 1 $ 500,000 31 Priority 5 $ 500,000 32 Payable from State General Fund (Direct) Non-Recurring 33 Revenues $ 500,000 34 Total $ 1,500,000 35 50/NIWLIONS CLUB OF ALEXANDRIA 36 (1306)Pool Replacement, Planning and Construction 37 (Vernon) 38 Payable from State General Fund (Direct) Non-Recurring 39 Revenues $ 400,000 40 50/NJ9DRYADES YMCA 41 (1235)Technical Training Center, 42 Planning and Construction 43 (Orleans) 44 Payable from General Obligation Bonds 45 Priority 5 $ 5,000,000 46 50/NJACECILIA WATER CORP ORATION 47 (1654)Water System Improvements, Planning and 48 Construction 49 (St. Martin) 50 Payable from General Obligation Bonds 51 Priority 1 $ 495,000 Page 129 of 161 HB NO. 2 ENROLLED 1 50/NJLBASTION COMMUNITY OF RESILIENCE 2 (1526)Veterans Wellness Facility in New Orleans, Planning 3 and Construction 4 (Orleans) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,900,000 7 50/NJSASCENSION PARISH TOURIST COMMISSION 8 (59) Ascension Parish Visitor Center, Planning 9 and Construction 10 (Ascension) 11 Payable from the Capital Outlay Savings Fund $ 810,000 12 50/NJTCARE/HELP OF SULPHUR, INC. 13 (540) New Assistance Facility, Planning 14 and Construction 15 (Calcasieu) 16 Payable from State General Fund (Direct) Non-Recurring 17 Revenues $ 800,000 18 50/NKJSOUTH VERNON PARISH WATERWORK S DISTRICT 1 19 (1363)Water System Improvements, 20 Planning and Construction 21 (Vernon) 22 Payable from State General Fund (Direct) Non-Recurring 23 Revenues $ 320,000 24 50/NKMTIGER ATHLETIC FOUNDATION 25 (7) Pete Maravich Assembly Center "PMAC" 26 Enhancement Project, Planning and Construction 27 (East Baton Rouge) 28 Payable from General Obligation Bonds 29 Priority 5 $ 50,000,000 30 Payable from Fees and Self-Generated Revenues $ 50,000,000 31 Payable from the Capital Outlay Savings Fund $ 1,000,000 32 Total $ 101,000,000 33 50/NKQTHIBODAUX REG IONAL HEALTH SYSTEM 34 (1084)Emergency Power System Replacement and 35 Upgrade, Planning and Construction 36 (Lafourche) 37 Payable from General Obligation Bonds 38 Priority 5 $ 15,800,000 39 Payable from State General Fund (Direct) Non-Recurring 40 Revenues $ 3,500,000 41 Total $ 19,300,000 42 50/NL1BEAUREGARD PARISH WATER WORK S DISTRICT #2 43 (114) Booster Station Upgrades, Planning and Construction 44 (Beauregard) 45 Payable from General Obligation Bonds 46 Priority 2 $ 120,000 47 Priority 5 $ 1,080,000 48 Total $ 1,200,000 Page 130 of 161 HB NO. 2 ENROLLED 1 50/NL5ACADIANA CENTER F OR THE ARTS 2 (818) Louisiana Music Museum, Planning 3 and Construction 4 (Lafayette) 5 Payable from General Obligation Bonds 6 Priority 2 $ 1,000,000 7 50/NLDUNION MUSEUM 8 (976) Union Museum of History and Art Renovations, 9 Planning and Construction 10 (Union) 11 Payable from the Capital Outlay Savings Fund $ 500,000 12 50/NLMFOUNDATION FOR SCIENCE AND MATHEMATICS 13 EDUCATION, INC. 14 (48) A Model for a 21st Century Workforce Development 15 Urban High School - New Orleans Science and 16 Mathematics High School 17 (Orleans) 18 Payable from General Obligation Bonds 19 Priority 1 $ 814,846 20 Priority 5 $ 1,000,000 21 Total $ 1,814,846 22 50/NLOOUR LADY OF THE ANGELS HOSPITAL 23 (382) Medical Office Building, Planning and Construction 24 (Washington) 25 Payable from General Obligation Bonds 26 Priority 5 $ 4,400,000 27 Payable from State General Fund (Direct) Non-Recurring 28 Revenues $ 3,000,000 29 Total $ 7,400,000 30 50/NLSTRUE FRIENDS SOCIETY OF LAFAYETTE 31 (1208)Maison Creole de Freetown African 32 American History Museum, Planning 33 and Construction 34 (Lafayette) 35 Payable from State General Fund (Direct) Non-Recurring 36 Revenues $ 325,000 37 50/NMDBELMONT WATERWORK S, INC. 38 (57) Water System Improvements, Planning and 39 Construction 40 (Sabine) 41 Payable from General Obligation Bonds 42 Priority 1 $ 150,882 43 50/NNKPIERRE PART BELL RIVER MUSEUM 44 (539) Pierre Part Bell River Museum, 45 Planning and Construction 46 (Assumption) 47 Payable from General Obligation Bonds 48 Priority 5 $ 2,000,000 49 Payable from State General Fund (Direct) $ 1,350,000 50 Total $ 3,350,000 Page 131 of 161 HB NO. 2 ENROLLED 1 50/NP1ACADIANA CRIMINALISTICS LABORATORY 2 DISTRICT 3 (327) New Crime Laboratory, Planning, Design, 4 Construction, and Equipment 5 (Iberia) 6 Payable from General Obligation Bonds 7 Priority 1 $ 18,486,399 8 Priority 5 $ 4,500,000 9 Payable from State General Fund (Direct) Non-Recurring 10 Revenues $ 1,000,000 11 Total $ 23,986,399 12 50/NP2EAST DESOTO WATER SYSTEM, INC. 13 (1194)Emergency Power Systems, Planning 14 and Construction 15 (DeSoto) 16 Payable from State General Fund (Direct) Non-Recurring 17 Revenues $ 360,000 18 50/NP3BAYOU LAFOURCHE FRESH WATER DISTRICT 19 (611) Donaldsonville Flood Control, Planning and 20 Construction 21 (Ascension, Assumption, Lafourche, Terrebonne) 22 Payable from General Obligation Bonds 23 Priority 1 $ 753,000 24 50/NPBFRIENDS OF CROWVILLE 25 (385) Community Center Improvement, 26 Planning and Construction 27 (Franklin) 28 Payable from State General Fund (Direct) Non-Recurring 29 Revenues $ 860,000 30 50/NPDIBERIA ECONOMIC DEVELOP MENT AUTHORITY 31 (465) Progress Point Business Park and Airport Gateway, 32 Land Acquisition, Planning and Construction 33 (Iberia) 34 Payable from General Obligation Bonds 35 Priority 1 $ 1,337,444 36 50/NQ2GRAVITY DRAINAGE DISTRICT 6 37 CALCASIEU PARISH 38 (886) Buxton Creek Drainage Improvements, Planning and 39 Construction 40 (Calcasieu) 41 Payable from General Obligation Bonds 42 Priority 1 $ 4,100,000 43 Priority 5 $ 2,000,000 44 Total $ 6,100,000 Page 132 of 161 HB NO. 2 ENROLLED 1 50/NQGLAFAYETTE METROP OLITAN EXPRESSWAY 2 COMMISSION 3 (1400)Lafayette Loop Project, Planning and Construction 4 (Lafayette) 5 Payable from General Obligation Bonds 6 Priority 1 $ 4,000,000 7 Priority 5 $ 2,500,000 8 Total $ 6,500,000 9 50/NQNLSU REAL ESTATE AND FACILITIES 10 FOUNDATION 11 (141) University Lakes Restoration Project to Address Flood 12 Control, Environmental, Safety, Health and Other 13 Issues (Matching Funds) 14 (East Baton Rouge) 15 Payable from General Obligation Bonds 16 Priority 1 $ 26,000,000 17 Priority 5 $ 14,000,000 18 Total $ 40,000,000 19 Notwithstanding any other provision of law to the contrary, the appropriation for the LSU 20 Real Estate and Facilities Foundation, University Lakes Restoration Project to Address 21 Flood Control, Environmental, Safety, Health and Other Issues is conditioned upon the 22 contracts for the project containing a provision that any sinker cypress or other natural 23 resource recovered from the lakes is public property, and shall be sold at public auction with 24 the proceeds of the sale to be used for the project. 25 50/NQRLEONA TATE 26 (804) Tate Etienne Provost Center, St. Claude Avenue 27 Planning, Acquisition and Construction 28 (Orleans) 29 Payable from General Obligation Bonds 30 Priority 5 $ 500,000 31 50/NQSKORAN POST 388 AMERICAN LEGION 32 (824) Bossier City Veteran Memorial Concrete 33 Pad Expansion by Women Veterans 34 of the Ark-La-Tex, Planning and Construction 35 (Bossier) 36 Payable from State General Fund (Direct) Non-Recurring 37 Revenues $ 4,000 38 (1656)Koran American Legion Post Construction 39 and Renovation, Planning and Construction 40 (Bossier) 41 Payable from State General Fund (Direct) Non-Recurring 42 Revenues $ 112,000 43 50/NQUBEAUREGARD PARISH WATERWORK S DISTRICT #5 44 (891) New Water Well and Repair to Ground Storage 45 Tanks, Planning and Construction 46 (Beauregard) 47 Payable from State General Fund (Direct) Non-Recurring 48 Revenues $ 960,000 Page 133 of 161 HB NO. 2 ENROLLED 1 50/NQVBEAUREGARD WATERWORK S DISTRICT #6 2 (470) Water System Improvements, Planning and 3 Construction 4 (Beauregard) 5 Payable from General Obligation Bonds 6 Priority 1 $ 116,125 7 Priority 5 $ 1,000,000 8 Total $ 1,116,125 9 50/NRPFIRST GRACE UNITED METHODIST 10 (591) Hagar's House Major Renovations, 11 Planning and Construction 12 (Orleans) 13 Payable from State General Fund (Direct) Non-Recurring 14 Revenues $ 115,000 15 50/NRUEAST BATON ROUG E COUNCIL ON AGING 16 (578) Lotus Village at the Lakes Senior Community, 17 Planning, Development and Construction 18 (East Baton Rouge) 19 Payable from General Obligation Bonds 20 Priority 1 $ 7,184,000 21 (1814)Lotus Village Phase II, Acquisition, Planning, 22 Rehabilitation, and Construction 23 (East Baton Rouge) 24 Payable from General Obligation Bonds 25 Priority 5 $ 1,000,000 26 Payable from State General Fund (Direct) Non-Recurring 27 Revenues $ 500,000 28 Total $ 1,500,000 29 Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 30 39:112. 31 50/NSPEDEN HOUSE 32 (806) New Orleans Emergency Shelter, Planning and 33 Construction 34 (Orleans) 35 Payable from General Obligation Bonds 36 Priority 1 $ 850,000 37 50/NSSLOUISIANA EMERG ENCY MEDICAL UNIT 38 (1705)Louisiana Emergency Medical Unit, 39 Planning and Construction 40 (Lafayette) 41 Payable from State General Fund (Direct) $ 700,000 42 50/NSTDOWNTOWN DEVELOP MENT DISTRICT 43 NEW ORLEANS 44 (1218)Harmony Circle, Planning and Construction 45 (Orleans) 46 Payable from General Obligation Bonds 47 Priority 5 $ 4,000,000 48 Payable from State General Fund (Direct) Non-Recurring 49 Revenues $ 500,000 50 Total $ 4,500,000 Page 134 of 161 HB NO. 2 ENROLLED 1 50/NSXMOREHOUSE PARISH SHERIFF 2 (711) Sewer Treatment Facility Improvements for 3 Collinston Detention Center, Planning and Construction 4 (Morehouse) 5 Payable from Capital Outlay Savings Fund $ 500,000 6 50/NT5FRIENDS OF CHENNAULT AVIATION AND MILITARY 7 MUSEUM 8 (261) Chennault Aviation and Military 9 Museum Preservation, Restoration, 10 Fire Suppression, Planning, and Construction 11 (Ouachita) 12 Payable from State General Fund (Direct) Non-Recurring 13 Revenues $ 315,000 14 (1443)Chennault Aviation and Military 15 Museum Floor Preservation Project, 16 Planning and Construction 17 (Ouachita) 18 Payable from State General Fund (Direct) Non-Recurring 19 Revenues $ 115,000 20 50/NT7CITIZENS MEDICAL CENTER 21 (1053)Expansion of Emergency Department, ICU, 22 and Imaging, Planning, Design, and Construction 23 (Caldwell) 24 Payable from General Obligation Bonds 25 Priority 5 $ 8,000,000 26 Payable from State General Fund (Direct) Non-Recurring 27 Revenues $ 2,000,000 28 Total $ 10,000,000 29 50/NTAEAST CARROLL PARISH SHERRIFF'S OFFICE 30 (1723)Training and Recreation Center, Planning and 31 Construction 32 (East Carroll) 33 Payable from General Obligation Bonds 34 Priority 5 $ 3,000,000 35 Payable from Capital Outlay Savings Fund $ 1,000,000 36 Total $ 4,000,000 37 50/NTKTHE UNION LINCOLN REG IONAL WATER SUPPLY 38 INITIATIVE 39 (1735)Development of Alternative Water Supply from Lake 40 D'Arbonne for Lincoln and Union Parishes 41 (Lincoln, Union) 42 Payable from General Obligation Bonds 43 Priority 1 $ 1,397,200 44 Priority 5 $ 2,400,000 45 Total $ 3,797,200 46 50/NU2LA ENDOWMENT F OR THE HUMANITIES 47 (47) Critical Repairs and Restoration of Historic 48 Turners Hall, Planning and Construction 49 (Orleans) 50 Payable from State General Fund (Direct) Non-Recurring 51 Revenues $ 730,000 Page 135 of 161 HB NO. 2 ENROLLED 1 50/NU99TH WARD STADIUM, INC. 2 (874) Multi-Sport Venue in Eastern New Orleans and Lower 3 Ninth Ward, Planning and Construction 4 (Orleans) 5 Payable from General Obligation Bonds 6 Priority 1 $ 3,449,765 7 50/NUQLOUISIANA HIBERNIAN CHARITY 8 (1658)Four Acre Irish Heritage Park in the Lakeview 9 Neighborhood, Planning and Construction 10 (Orleans) 11 Payable from General Obligation Bonds 12 Priority 1 $ 250,000 13 50/NUTCATHOLIC CHARITIES OF ACADIANA 14 (1678)Disaster Response Center of Acadiana, 15 Planning and Construction 16 (Lafayette) 17 Payable from the Capital Outlay Savings Fund $ 917,000 18 (1679)St. Joseph Diner and FoodNet Program for 19 Acadiana, Planning and Construction 20 (Lafayette) 21 Payable from General Obligation Bonds 22 Priority 2 $ 2,510,000 23 Payable from the Capital Outlay Savings Fund $ 1,000,000 24 Total $ 3,510,000 25 Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 26 39:112. 27 (1680)Emergency Housing of Acadiana for Disaster 28 Volunteers, Planning and Construction 29 (Lafayette) 30 Payable from the Capital Outlay Savings Fund $ 365,000 31 50/NVYWASHINGTON PARISH HOSPITAL SERVICE 32 DISTRICT NO. 1 33 (1742)Emergency Upgrades including Power Generation 34 System Upgrade, Mechanical Systems, and Roofing, 35 Planning and Construction 36 (Washington) 37 Payable from General Obligation Bonds 38 Priority 1 $ 2,200,000 39 Priority 5 $ 3,100,000 40 Total $ 5,300,000 41 50/NWGCHILDREN'S ADVOCACY NETWORK , INC. 42 (1796)Children's Advocacy Network Campus, 43 Planning and Construction 44 (Rapides) 45 Payable from General Obligation Bonds 46 Priority 5 $ 2,000,000 47 Payable from Capital Outlay Savings Fund $ 500,000 48 Total $ 2,500,000 49 Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 50 39:112. Page 136 of 161 HB NO. 2 ENROLLED 1 50/NWOAIRPORT DISTRICT 1 OF CALCASIEU PARISH 2 (1314)Airport Entrance and Access Road Improvements and 3 Marquee, Planning and Construction 4 (Calcasieu) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,000,000 7 50/NWRLOUISIANA SWAMP BASE, INC. 8 (460) Camp Atchafalaya Swamp Base, Planning, Design, and 9 Construction 10 (St. Martin) 11 Payable from General Obligation Bonds 12 Priority 1 $ 645,000 13 Priority 5 $ 8,850,000 14 Total $ 9,495,000 15 50/NWSLAFAYETTE CENTRAL P ARK, INC. 16 (1283)Lafayette Central Park Improvements, Planning and 17 Construction 18 (Lafayette) 19 Payable from General Obligation Bonds 20 Priority 1 $ 7,834,500 21 Priority 5 $ 1,000,000 22 Total $ 8,834,500 23 50/NXCLIVINGSTON PARISH SHERIFF'S OFFICE 24 (408) Livingston Parish Emergency Response and Evacuation 25 Center, Planning and Construction 26 (Livingston) 27 Payable from General Obligation Bonds 28 Priority 1 $ 11,000,000 29 Priority 5 $ 33,920,000 30 Total $ 44,920,000 31 50/NXIHEBERT WATER SYSTEM, INC. 32 (493) Water System Improvements, Planning and 33 Construction 34 (Caldwell) 35 Payable from General Obligation Bonds 36 Priority 1 $ 213,583 37 Priority 5 $ 1,000,000 38 Payable from State General Fund (Direct) Non-Recurring 39 Revenues $ 1,000,000 40 Total $ 2,213,583 41 50/NXSBATON ROUGE GENERAL MEDICAL CENTER 42 (1662)Secure Backup Power Generators 43 for Baton Rouge General Hospital, 44 Planning and Construction 45 (East Baton Rouge) 46 Payable from the Capital Outlay Savings Fund $ 4,500,000 47 Payable from State General Fund (Direct) Non-Recurring 48 Revenues $ 4,500,000 49 Total $ 9,000,000 Page 137 of 161 HB NO. 2 ENROLLED 1 50/NXYCONCORDIA PARISH HOSPITAL SERVICE 2 DISTRICT #1 3 (113) Construction of Turn Lane on U.S. 84/425 4 (Concordia) 5 Payable from General Obligation Bonds 6 Priority 1 $ 225,000 7 Payable from State General Fund (Direct) Non-Recurring 8 Revenues $ 100,000 9 Total $ 325,000 10 50/NYJALLEN PARISH HOSPITAL 11 (1646)New Hospital Equipment, Planning and 12 Construction 13 (Allen) 14 Payable from State General Fund (Direct) Non-Recurring 15 Revenues $ 1,000,000 16 50/NYNOPELOUSAS HEIGHTS, INC. 17 (624) Opelousas Heights Proposed Subdivision, Planning and 18 Construction 19 (St. Landry) 20 Payable from General Obligation Bonds 21 Priority 1 $ 1,184,790 22 50/NYPSECOND HARVEST F OOD BANK OF GREATER 23 NEW ORLEANS AND ACADIANA 24 (368) Roof Replacement and HVAC Installation, Planning 25 and Construction 26 (Jefferson) 27 Payable from General Obligation Bonds 28 Priority 1 $ 1,006,031 29 50/NYQYMCA OF NORTHWEST LOUISIANA 30 (447) Youth Sports Construction, Planning 31 and Construction 32 (Bossier, Caddo) 33 Payable from State General Fund (Direct) Non-Recurring 34 Revenues $ 2,000,000 35 Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 36 39:112. 37 50/NYSHOLY ROSARY REDEVELOP MENT 38 (175) Holy Rosary Institute, Planning, Construction, and 39 Restoration 40 (Lafayette) 41 Payable from General Obligation Bonds 42 Priority 1 $ 4,422,825 43 Priority 5 $ 3,200,000 44 Payable from State General Fund (Direct) $ 1,000,000 45 Total $ 8,622,825 Page 138 of 161 HB NO. 2 ENROLLED 1 50/NYVNOTRE DAME HEALTH SYSTEM 2 (1437)Wynhoven Health Care Expansion, including St. 3 Andrew's Village, Planning and Construction 4 (Jefferson) 5 Payable from General Obligation Bonds 6 Priority 1 $ 3,561,859 7 Priority 5 $ 1,999,750 8 Total $ 5,561,609 9 50/NZ3BEAUREGARD MEMORIAL HOSP ITAL 10 (1183)Emergency Department Addition and Renovation 11 and Women's Center Renovation, Planning and 12 Construction 13 (Beauregard) 14 Payable from General Obligation Bonds 15 Priority 5 $ 4,900,000 16 50/NZ7ASSOCIATION FOR THE LIBERTY THEATRE 17 (1664)Liberty Theatre Restoration and Preservation Project, 18 HVAC Replacement and Mold Remediation, 19 Planning and Construction 20 (St. Landry) 21 Payable from State General Fund (Direct) Non-Recurring 22 Revenues $ 680,000 23 50/NZBLIVINGSTON PARISH AIRPORT DISTRICT 24 (348) Livingston Executive Airport, Planning and 25 Construction 26 (Livingston) 27 Payable from General Obligation Bonds 28 Priority 1 $ 1,646,233 29 Priority 5 $ 5,000,000 30 Payable from State General Fund (Direct) 31 Non-Recurring Revenues $ 1,000,000 32 Total $ 7,646,233 33 50/NZDHOSPITAL SERVICE DISTRICT NO. 1, 34 PARISH OF ST. MARY 35 (127) Franklin Foundation Hospital Wellness Center 36 (St. Mary) 37 Payable from General Obligation Bonds 38 Priority 1 $ 2,000,000 39 50/NZKTHE ROBERT A. BOGAN BATON ROUGE FIRE MUSEUM 40 (208) Museum Restoration, Planning and Construction 41 (East Baton Rouge) 42 Payable from General Obligation Bonds 43 Priority 5 $ 3,165,000 44 50/NZXWEST CALCASIEU CAMERON HOSP ITAL 45 (1401)West Calcasieu Cameron Hospital Medical Office 46 Building, Planning and Construction 47 (Calcasieu) 48 Payable from General Obligation Bonds 49 Priority 1 $ 1,328,000 50 Priority 5 $ 3,022,000 51 Total $ 4,350,000 Page 139 of 161 HB NO. 2 ENROLLED 1 50/NZWYWCA OF GREATER BATON ROUG E 2 (543) Early Childhood Education Project, 3 Planning and Construction 4 (East Baton Rouge) 5 Payable from General Obligation Bonds 6 Priority 5 $ 5,000,000 7 50/S10CALCASIEU PARISH SCHOOL BOARD 8 (1728)Renovations to Lake Charles Boston Stadium, Planning 9 and Construction 10 (Calcasieu) 11 Payable from General Obligation Bonds 12 Priority 1 $ 167,000 13 Priority 5 $ 823,000 14 Total $ 990,000 15 50/S32LIVINGSTON PARISH SCHOOL BOARD 16 (1445)Widening and Turn Lane Construction for LA Hwy 16 17 as Part of the New Southside Elementary and Jr. High 18 Schools 19 (Livingston) 20 Payable from General Obligation Bonds 21 Priority 1 $ 543,297 22 50/S39POINTE COUPEE PARISH SCHOOL BOARD 23 (1737)Pointe Coupee Parish School Board Office Relocation, 24 to be Located at 8777 Morganza Highway, Formerly 25 Labarre Elementary School Site, Due to Flooding 26 Caused by Hurricane Gustav, Planning and 27 Construction 28 (Pointe Coupee) 29 Payable from General Obligation Bonds 30 Priority 1 $ 2,468,060 31 Priority 5 $ 1,900,000 32 Total $ 4,368,060 33 50/S63WEST FELICIANA PARISH SCHOOL BOARD 34 (657) Julius Freyhan Cultural/Conference Center, Planning 35 and Construction 36 (West Feliciana) 37 Payable from General Obligation Bonds 38 Priority 1 $ 1,497,000 39 50/S67CENTRAL COMMUNITY SCHOOL SYSTEM 40 (603) Central City Community Sports Complex Infrastructure, 41 and School Board Administration Building and Meeting 42 Room, Planning and Construction 43 (East Baton Rouge) 44 Payable from General Obligation Bonds 45 Priority 5 $ 2,000,000 46 Payable from State General Fund (Direct) Non-Recurring 47 Revenues $ 400,000 48 Total $ 2,400,000 Page 140 of 161 HB NO. 2 ENROLLED 1 Section 1.(A) Appropriated Debt Projects. The projects listed in this section are 2 to be funded through the sale bonds and secured by or payable from state appropriation. 3 08/419OFFICE OF STATE POLICE 4 (743) Crime Laboratory, Planning and Construction 5 (East Baton Rouge) 6 Payable from Interagency Transfer $ 10,000,000 7 Payable from Revenue Bonds $ 130,000,000 8 Total $ 140,000,000 9 Notwithstanding anything contained in this Capital Outlay Act, or any previous 10 Capital Outlay Act to the contrary, or any other provision of law, the Office of State Police 11 may finance the design, construction, furnishing and equipping of facilities through the 12 issuance of revenue bonds by the Louisiana Public Facilities Authority to be secured by and 13 payable from State appropriations. The issuance of such revenue bonds shall require the 14 approval of the State Bond Commission. 15 01/107DIVISION OF ADMINISTRATION 16 (541) Northwest Louisiana State Office Building Renovations, 17 Phase II, Planning and Construction 18 (Caddo) 19 Payable from Revenue Bonds $75,000,000 20 Notwithstanding anything contained in this Capital Outlay Act, or any previous 21 Capital Outlay Act to the contrary, or any other provision of law, the Division of 22 Administration may finance the design, construction, furnishing and equipping of facilities 23 through the issuance of revenue bonds by the Office Facilities Corporation to be secured by 24 and payable from State appropriations. The issuance of such revenue bonds shall require the 25 approval of the State Bond Commission. 26 Section 2.(A) The expenditure of funds appropriated in this Act shall be in 27 conformity to all existing statutes relative to public bidding, contractual review, and R.S. 28 39:101 through 128 and any other statutes affecting the capital outlay program for state 29 government, state institutions, and political entities. 30 (B) Notwithstanding the provisions of R.S. 39:101, 102, and 112(C), projects 31 included in Section 1 of this Act which did not submit a capital outlay application by 32 November 1, 2022, in compliance with the provisions of R.S. 39:101 and 102 and which 33 have not received late approval as required by R.S. 39:112(C) are hereby deemed to have 34 until June 15, 2023, to submit a capital outlay budget request application pursuant to R.S. 35 39:101(A), and if the application is submitted by that date, the project is deemed to have Page 141 of 161 HB NO. 2 ENROLLED 1 complied with the late approval requirements of R.S. 39:112(C). Additionally, the capital 2 outlay budget requests together with supporting information and documents for these 3 projects shall constitute the feasibility study required by Article VII, Section 11(C) of the 4 Constitution of Louisiana. 5 Section 3. Payment for projects specified in this Act must be made by warrant 6 submitted to the division of administration, Department of Transportation and Development, 7 the state treasurer or other administering agency as provided in Section 8, whichever is 8 appropriate, only to the extent of funds required for immediate payment. Copies of invoices 9 or other supporting documentation shall be submitted with warrants. In the event that any 10 equipment included in this Act, is procured pursuant to the provisions of the State Lease- 11 Purchase Act, R.S. 39:1761 et seq., the amounts included in this Act for each such piece of 12 equipment shall not be appropriated. The provisions of R.S. 39:1771 which require 13 equipment to be leased under the State Lease-Purchase Act to be included in the executive 14 budget and approved by the legislature through inclusion in the General Appropriation Act 15 shall be considered waived upon the inclusion of such equipment in this Act. Projects 16 contained in this Act may, at the direction of the division of administration and with the 17 approval of the State Bond Commission, alternatively be funded through financing programs 18 heretofore or hereafter provided by a public trust and public corporation duly organized 19 pursuant to R.S. 9:2341 et seq., having for its beneficiary the state and the Louisiana Local 20 Government Environmental Facilities and Community Development Authority, pursuant to 21 R.S. 33:4548.1 et seq. 22 Section 4. If at any time during the Fiscal Year 2023-2024, the governor should 23 find, or the Joint Legislative Committee on the Budget or the commissioner of 24 administration should report to the governor, that the receipts of the treasury are falling short 25 or appear likely to fall short of the revenue estimates for the fiscal year and that a cash 26 deficit is likely to be incurred, the governor shall take such steps as deemed necessary to 27 prevent the occurrence of a cash deficit. In the event that a capital outlay project funded in 28 this Act falls under an agency which is abolished or for which funds are not appropriated in 29 the 2023-2024 General Appropriation Act, then the funds appropriated in this Act for such 30 capital outlay projects shall not be expended unless deemed necessary by the governor to 31 protect life or property. In the event that legislation is enacted which transfers facilities or Page 142 of 161 HB NO. 2 ENROLLED 1 programs for which projects are funded in this Act, on behalf of one agency, institution, 2 department, or management board to another agency, institution, department, or management 3 board, then the projects in this Act shall be deemed transferred also. 4 Section 5. All monies appropriated by this Act and any applicable funds of a prior 5 capital outlay budget act adopted by the legislature shall be deposited by the state treasurer 6 in the Comprehensive Capital Outlay Escrow Account, established by this Section, in the 7 state treasury. In accordance with R.S. 36:764, no later than sixty days following the end of 8 each quarter, the state treasurer shall report to the Joint Legislative Committee on the Budget 9 and the commissioner of administration, all funds contained in the Miscellaneous Fund of 10 the Comprehensive Capital Outlay Escrow Account. Notwithstanding any provisions 11 contained herein or other law to the contrary, any original issue premium or accrued interest 12 proceeds received pursuant to the sale of general obligation bonds shall remain on deposit 13 to the credit of the Bond Security and Redemption Fund until such time as they may be 14 utilized in accordance with U.S. Department of the Treasury Regulations promulgated 15 pursuant to the Internal Revenue Code of 1986. All such monies shall be administered 16 according to the particular act pertaining to the fiscal year in which such monies were 17 appropriated. If it is determined by the director of the office of facility planning and control, 18 division of administration, that the funds appropriated by this Act or any prior capital outlay 19 budget Act are not sufficient to complete the projects contained in any capital outlay budget 20 Act, through unavoidable deficiencies in appropriation, including administrative and legal 21 requirements, the commissioner of administration, subject to approval of the Joint 22 Legislative Committee on the Budget, may direct the use of interest earned from the 23 investment of general obligation bond or note proceeds in the Comprehensive Capital Outlay 24 Escrow Account, not to exceed an aggregate of five million dollars in any one fiscal year, 25 for the purpose of completing the projects contained in any capital outlay budget Act and 26 such money shall be deemed appropriated in specific amounts necessary for such purpose. 27 All appropriations in this Act which are made as additions to funds for previously authorized 28 projects shall be included, for accounting purposes, in the account of the previously 29 authorized projects. If it is determined by the director of the office of facility planning and 30 control, division of administration, that it is cost effective and practical to combine 31 individual appropriations, the commissioner of administration, subject to the approval of the Page 143 of 161 HB NO. 2 ENROLLED 1 Joint Legislative Committee on the Budget, may direct that two or more appropriations or 2 parts thereof may be combined into a single project for accounting and audit purposes. The 3 commissioner of administration may direct that funding in the various statewide and/or 4 multiple parish projects for improvements for state facilities may be transferred to any 5 project, in this Act or any previous Capital Outlay Act, which require supplemental funding 6 for improvements for state facilities which qualify for funding through the various statewide 7 and/or multiple parish projects for improvements for state facilities. The office of facility 8 planning and control, division of administration is authorized to receive settlements and 9 vendor rebates and to add a portion or all of these receipts to the existing project funds 10 relating to the settlement and/or vendor rebates and appropriated in this Act or any previous 11 Capital Outlay Act including those previously appropriated funds that become unavailable. 12 Approval of the Joint Legislative Committee on the Budget will be obtained if the settlement 13 and/or vendor rebates will be added to any projects in this Act or any previous Capital 14 Outlay Act which are unrelated to the project from which the settlement and/or vendor 15 rebates were received. The office of facility planning and control, division of administration 16 is authorized to receive insurance payments and are hereby authorized to immediately repair 17 facilities that suffer insurance losses without those projects being included in the Act and 18 shall report to the Joint Legislative Committee on the Budget any expenditures from 19 insurance funds received pursuant to this section. A portion, as determined by the 20 commissioner of administration and not to exceed one percent (1%), of the funding for 21 projects which qualify for the Percent for Art Program and not to exceed $450,000 for an 22 individual, qualifying project, may be transferred from the qualifying project budgets, to the 23 Department of Culture, Recreation and Tourism for costs of acquiring art and administering 24 the program. For all Percent for Art Program projects in this or any previous capital outlay, 25 up to ten percent (10%) of the aforementioned one percent (1%) may be used for the costs 26 of administering the projects. 27 Section 6. No later than February 1, 2024, agencies administering capital outlay 28 projects will submit reports identifying completed projects and cash balances to the Joint 29 Legislative Committee on Capital Outlay pursuant to the reporting requirements of R.S. 30 39:105 and R.S. 39:116. Page 144 of 161 HB NO. 2 ENROLLED 1 Section 7. The commissioner of administration, with the approval of the Joint 2 Legislative Committee on the Budget, is authorized to supplement or substitute the 3 appropriations specified in this or previous capital outlay acts with any federal or other funds 4 which are or may become available and such funds shall be deemed appropriated in specific 5 amounts necessary for the purposes of this Act. Any funds received by the State Bond 6 Commission as a result of a prepayment of reimbursement contracts as authorized by law 7 and the policy and procedure for reimbursement contracts of the Department of Treasury, 8 office of State Bond Commission, shall be deposited as set forth in such policy and 9 procedure and shall be deemed available and appropriated in specific amounts necessary for 10 the purposes of this Act pursuant to the procedure set forth in this section. 11 Section 8.(A) All projects herein authorized and funded shall be subject to the 12 provisions of R.S. 39:101 through 128. With the exception of appropriations made to the 13 Department of Military Affairs, the Legislature, the Louisiana Stadium and Exposition 14 District, the Department of Economic Development, the Coastal Protection and Restoration 15 Authority, the Division of Administration for Supplemental State Funds for Local 16 Government Assistance Program, the Division of Administration for the Community Water 17 Enrichment Program or the Department of Transportation and Development, all funds herein 18 appropriated shall be considered as having been appropriated directly to the Office of 19 Facility Planning and Control, Division of Administration. All cooperative endeavor 20 agreements for non-state entities shall be prepared by the appropriate administering agency 21 and submitted to the office of State Procurement for review and approval. As part of its 22 review, the office of State Procurement shall consult with bond counsel to the State relative 23 to any federal tax issues. 24 (1) Notwithstanding anything contained in this act to the contrary or any other 25 provision of law, the appropriations made for the Louisiana Stadium and Exposition District 26 shall be appropriated directly to the Louisiana Stadium and Exposition District, and are 27 public purposes pursuant to the provisions of Article VII, Section 14 of the Constitution of 28 Louisiana primarily for economic development, including the generation of tax revenue, 29 creation of jobs, and the generation of tourism, and may be used to reimburse any 30 expenditure made prior to the granting of a line of credit or the sale of bonds by the State Page 145 of 161 HB NO. 2 ENROLLED 1 Bond Commission, determination by the State Treasurer that cash funding has been 2 deposited in the Comprehensive Capital Outlay Escrow Account for the project. 3 (2) Further, with respect to appropriations to the Louisiana Stadium and 4 Exposition District for the TPC Louisiana, Planning and Construction project, the Louisiana 5 Stadium and Exposition District shall be permitted to use alternative competitive 6 procurement and delivery methods for the award of any contracts to be funded through such 7 appropriation. 8 (3) The Louisiana Stadium and Exposition District shall have the authority to 9 directly appoint a design professional from a list of a minimum of three architectural firms 10 or joint ventures with professional sports facility design experience acceptable to the 11 Commissioner of Administration and shall be exempt from other state requirements for 12 selection of designers. The design professional fee shall be in accordance with state 13 guidelines administered by the Office of Facility Planning and Control, Division of 14 Administration. 15 (B)(1)(a) Funds appropriated in the Capital Outlay Act under the name of non- 16 state entities shall be administered by the Office of Facility Planning and Control, Division 17 of Administration under cooperative endeavor agreements; however, projects involving state 18 or federal highways may be administered by the Department of Transportation and 19 Development, if appropriate. Except as provided in Section 8(A), cooperative endeavor 20 agreements entered into pursuant to appropriations in this Act shall not be required to be 21 submitted to the Division of Administration, Office of State Procurement. 22 (b) Further, for all projects in the Capital Outlay Act or a previous Capital Outlay 23 Act which are appropriated to the Office of Facility Planning and Control, Division of 24 Administration, including those administered by cooperative endeavor agreements, up to six 25 percent of each line-item may be used for costs of administering the projects. 26 (c) For all projects in Capital Outlay Act or a previous Capital Outlay Act 27 appropriated to the Department of Transportation and Development, up to six percent of 28 each line-item may be used for costs of administering the projects, or for field 29 engineering/construction supervision. 30 (2) Notwithstanding anything in this Act, or a previous Capital Outlay Act, the 31 Office of Facility Planning and Control may enter into a cooperative endeavor agreement Page 146 of 161 HB NO. 2 ENROLLED 1 with the Archdiocese of New Orleans and Jefferson Parish for the Preservation and 2 Restoration of Historic Structure for Hope Haven/Madonna Manor Campus, Planning and 3 Construction project. 4 (C) Line-item general obligation bond projects appropriated to the Department 5 of Transportation and Development in the Capital Outlay Act or a previous Capital Outlay 6 Act shall be authorized to draw Transportation Trust Funds from the Highway Program 7 appropriation, for supplemental funding on overruns in excess of the original estimated 8 project cost as determined by the Department of Transportation and Development, provided 9 however that said projects are in the state or federal highway system and in the priority 10 program, and the overrun is less than $50,000. Any such overrun of $50,000 or more must 11 be approved by the Joint Legislative Committee on the Budget. 12 (D) All ports, levee districts and other non-state entities must follow the 13 provisions of R.S. 39:122. 14 (E) Pursuant to R.S. 39:122(B)(2), funds to be reimbursed by the state which a 15 non-state entity attempts to obligate prior to the receipt of funding shall not be eligible for 16 reimbursement or payment by the state; however, 17 (1) Notwithstanding anything in this Act or any previous Capital Outlay Acts to 18 the contrary, contracts may be entered into for the Lafayette Economic Development 19 Authority, Lafayette Innovation Center (Lafayette) prior to the receipt of funding and the 20 State is authorized to financially participate in obligations created by such contracts. 21 (2) Notwithstanding anything in this Act or the capital outlay act to the contrary, 22 contracts may be entered into for the City of Broussard, Lake Talon Road Sewer 23 Improvements, Planning and Construction project prior to receipt of funding and the State 24 is authorized to financially participate in obligations created by such contracts. 25 (3) Notwithstanding anything contained in this Act or any other provision of law, 26 Lafayette Parish is authorized to execute contracts for the Bayou Vermilion Flood Control 27 project prior to execution of a cooperative endeavor agreement, the granting of a line of 28 credit or the sale of bonds. The appropriation for this project may be used to pay any 29 obligation incurred or to reimburse any expenditure made pursuant to such contracts unless 30 the Commissioner of Administration is advised by bond counsel to the state that such may Page 147 of 161 HB NO. 2 ENROLLED 1 violate federal tax law. The office of facility planning and control shall consult with bond 2 counsel to the State relative to any federal tax issues. 3 (4) Notwithstanding anything contained in this Act or any other provision of law, 4 Lafayette Parish is authorized to execute contracts for the Parish Government Complex, 5 Parish Courthouse project prior to execution of a cooperative endeavor agreement, the 6 granting of a line of credit, or the sale of bonds. The appropriation for this project may be 7 used to pay any obligation incurred or to reimburse any expenditure made pursuant to such 8 contracts unless the Commissioner of Administration is advised by bond counsel to the state 9 that such may violate federal tax law. The office of facility planning and control shall consult 10 with bond counsel to the State relative to any federal tax issues. 11 (F) Pursuant to R.S. 39:112(E)(2), non-state entity projects shall require a match 12 for each appropriation in this act; however, 13 (1) Notwithstanding anything contained in this Act, any prior Capital Outlay 14 Acts, any other provision of law, or the provisions of R.S. 39:112(E)(2), the projects for the 15 City of Opelousas for the Water Meter Replacement and Upgrades and for the Bridge 16 Replacement and Upgrades shall be exempt for all match requirements. 17 (G) Notwithstanding anything contained in this Act or the Capital Outlay Act to 18 the contrary or any other Act or provision of law, the appropriations made for the Executive 19 Department for facilities which promote economic development included in the Repair, 20 Restoration, and Replacement for Declared Disasters, Planning, Construction, Renovation, 21 and Acquisition project, and the Department of Economic Development projects are for 22 public purposes pursuant to the provisions of Article VII, Section 14 of the Constitution of 23 Louisiana primarily for economic development, including the generation of tax revenues, 24 creation of jobs, promotion of tourism, and creation of facilities for charitable, cultural, 25 artistic, educational, social, civic, research, service, economic development activities, or 26 provide facilities for professional golf events, pursuant to the terms of cooperative endeavor 27 agreements, including leases and all expenditures of these appropriations and may be 28 exempted, by the Commissioner of Administration, from all statutes relative to public 29 bidding, contractual review and the provisions of R.S. 33:9029.2(D) and in lieu thereof be 30 allowed to use alternative competitive contracting arrangements where the appropriate 31 administering entity submits documentation to the Commissioner of Administration Page 148 of 161 HB NO. 2 ENROLLED 1 substantiating that it is in the best interest of the citizens of the state, due to economic and/or 2 operational benefits, and the necessity to complete the projects in a timely manner; and, the 3 appropriate administering entity shall have the authority to directly appoint the design 4 professional from a list of a minimum of three design firms or joint ventures with the 5 appropriate specialized facility design experience submitted to and acceptable to the 6 Commissioner of Administration and shall be exempt from other state requirements for 7 selection of designers, and may include expenditures for computers, fixtures, furniture, and 8 other equipment as such is deemed to be capital outlay in nature, and unless the 9 Commissioner of Administration is advised by bond counsel to the State that such may 10 violate federal tax law, may be used to reimburse any expenditure made prior to the granting 11 of a line of credit or the sale of bonds by the State Bond Commission, determination by the 12 State Treasurer that cash funding has been deposited in the Comprehensive Capital Outlay 13 Escrow Account for the project or the execution of a cooperative endeavor agreement from 14 the Office of Facility Planning and Control, and may be used to acquire land or real property, 15 the title to which is held in the name of an entity exempt from taxation under the provisions 16 of 26 U.S.C. 501(c)(3). 17 (H) Notwithstanding any other provision of this Act or the Capital Outlay Act or 18 any other provision of law to the contrary, all of the funds herein appropriated to the 19 Department of Economic Development in connection with projects or programs for which 20 the Department of Economic Development utilizes a cooperative endeavor agreement to 21 further economic development as permitted under Article VII, Section 14 of the Louisiana 22 Constitution, including the generation of tax revenues and creation of jobs, shall be 23 considered as having been appropriated to the Department of Economic Development, may 24 be used to reimburse any expenditure made prior to the granting of a line of credit and made 25 prior to the execution of a cooperative endeavor agreement and shall be administered solely 26 by the Department of Economic Development pursuant to, in compliance with, and on the 27 terms contained in such cooperative endeavor agreements without compliance with any other 28 law, including, but not limited to, the provisions of R.S. 39:101 through 128. Additionally, 29 all expenditures of these appropriations may be exempted by the Commissioner of 30 Administration, from all statutes relative to public bidding, contractual review and the 31 provisions of R.S. 33:9029.2(D). Page 149 of 161 HB NO. 2 ENROLLED 1 (I)(1) Notwithstanding any other provision of this Act or the Capital Outlay Act 2 or any other provision of law to the contrary, funds appropriated for the Economic 3 Development Award Program project for the Office of Business Development are to be used 4 solely for capital and infrastructure improvements subject to verification by the Division of 5 Administration, Office of Facility Planning and Control. 6 (2) Eligible expenses for Economic Development Award Program funds may 7 include documented project expenses beginning on the date of LEDC Board approval of the 8 project and may be reimbursed upon execution of the cooperative endeavor agreement for 9 the project. 10 (J)(1) Due to the state's current investment in TPC Louisiana and the financial 11 support it provides to the PGA TOUR event currently played at said facility, said PGA 12 TOUR event shall not be played at New Orleans City Park Golf Complex without the prior 13 agreement of the Commissioner of Administration and the Chairman of the Jefferson Parish 14 Council. 15 (2) Notwithstanding the foregoing, the City Park Golf Complex may host any 16 other golf tournament or event, including but not limited to any other PGA-affiliated or 17 sponsored tournament or event. 18 (K)(1) For all projects administered by the Office of Facility Planning and 19 Control and payable from proceeds of self-generated revenues, funds shall be remitted to the 20 Office of Facility Planning and Control for deposit in the state treasury at such time as may 21 be deemed necessary by the Office of Facility Planning and Control in order to cover the 22 amount of contracts or other project expenses. 23 (2) Notwithstanding any provisions contained herein or any other law to the 24 contrary, for projects with other means of financing provided to the administering agency 25 by interagency transfer, the authority to draw these funds shall remain with the user agency. 26 (3) Any revenue bonds appropriated in Section 1 or Section 1.(A) of the Capital 27 Outlay Act shall not be secured by the full faith and credit of the state. 28 (4) The State Treasurer shall refund to the appropriate source any surplus self- 29 generated funds, advanced insurance funds received by the Office of Facility Planning and 30 Control as Interagency Transfer from Office of Risk Management associated with hurricane 31 damage recovery, and interest earned on these funds, provided the Treasurer's Office is Page 150 of 161 HB NO. 2 ENROLLED 1 notified, when these funds are deposited in the state treasury, that the user agency or Office 2 of Risk Management intends to request a refund of this interest. 3 (L) Notwithstanding any provisions contained in this Act, the Capital Outlay Act, 4 or any other provision of law to the contrary, any funds expended by the parish of St. Mary 5 for the purpose of securing a federal grant, for the Infrastructure Improvements and 6 Construction of a Welding Training Center Facility at the Charenton Canal Industrial Park, 7 shall be eligible for reimbursement from any cash line of credit approved for the project. 8 (M) Notwithstanding anything contained in this Act to the contrary or any other 9 provision of law, the resolution adopted by the Joint Legislative Committee on the Budget 10 (the committee) on March 19, 2019 approving State of Louisiana Grant Anticipation 11 Revenue Bonds, in one or more series, not exceeding $650,000,000, and approving the 12 related projects and providing for other matters in connection therewith, contains the 13 following approvals: 14 (1) The first series of bonds in the original principal amount of not exceeding 15 $185,000,000 in order to fund the following projects in the following estimated amounts: 16 Barksdale Project ($61,600,000) and portions of the Loyola Project ($77,600,000) and the 17 I-10 Project ($30,601,000) with the understanding that the Department has the ability to 18 manage the actual application of bond proceeds in order to appropriately fund the Projects 19 and meet expenditure requirements of the Internal Revenue Service. 20 (2) The second series of bonds for the express purpose of granting the required 21 contracts in the principal amount of approximately $142,000,000 in order to fund the 22 following projects in the following estimated amounts: the balance of the Barksdale Project 23 ($16,518,000), the balance of the Loyola Project ($87,500,000), portions of the I-10 Project 24 ($37,982,000) and the Belle Chasse Project ($12,500,000) with the understanding that the 25 Department has the ability to manage the actual application of Bond proceeds in order to 26 appropriately fund the Projects and meet expenditure requirements of the Internal Revenue 27 Service provided, however, the Department of Transportation and Development seeks 28 approval from the Committee for the issuance of the second series of bonds and all 29 subsequent series of bonds. 30 (N) Notwithstanding anything contained in this Act to the contrary or any other 31 provision of law, the Research Vessel (R/V) Pelican Replacement is deemed to be a capital Page 151 of 161 HB NO. 2 ENROLLED 1 asset and the appropriation to Louisiana Universities Marine Consortium (LUMCON) to 2 replace the R/V Pelican is for a public purpose and has a significant economic impact 3 providing a variety of oceanographic research missions. Further, LUMCON shall be 4 permitted to use an alternative delivery method to award contracts for design of the proposed 5 replacement vessel. LUMCON shall have the authority to select the design professional from 6 a list of a minimum of two engineering firms or joint ventures with ship design experience 7 acceptable to the Commissioner of Administration and the selection shall be exempt from 8 other state requirements for the selection of designers. The design professional fee shall be 9 in accordance with state guidelines administered by the Office of Facility Planning and 10 Control, Division of Administration. LUMCON shall further be permitted to use an 11 alternative delivery method to award contracts for the construction of the proposed 12 replacement vessel. LUMCON shall have the authority to select the contractor from a list 13 of a minimum of three highly qualified ship builders/shipyards with relevant vessel 14 construction experience acceptable to the Commissioner of Administration and the selection 15 shall be exempt from other state requirements for the selection of contractors. The 16 construction contract shall be administered by the Office of Facility Planning and Control, 17 Division of Administration in accordance with state guidelines. 18 (O) Notwithstanding anything contained in this Act to the contrary or any other 19 provision of law, the appropriations for Major Repairs for Higher Education Facilities – 20 Infrastructure, and Buildings Based on Statewide Condition Assessment, Planning and 21 Construction, in Act 7 of 2008 identifying specific projects for higher education is deemed 22 to be complete, and any remaining residual funds are hereby authorized to be combined and 23 accumulated to accomplish additional major repair projects within the higher education 24 systems, as deemed necessary and approved by the Board of Regents and Facility Planning 25 and Control. At the completion of the program, Facility Planning and Control shall submit 26 a report to the Joint Legislative Committee on the Budget concerning the use of the 27 remaining residual funds. 28 (P) Notwithstanding anything contained in this Act or any other provision of law, 29 LSU Real Estate and Facilities Foundation (LRFF) is authorized to execute contracts for the 30 University Lakes Restoration Project to Address Flood Control, Environmental, Safety, 31 Health and Other Issues project prior to execution of a cooperative endeavor agreement, the Page 152 of 161 HB NO. 2 ENROLLED 1 granting of a line of credit or the sale of bonds. The appropriation for this project may be 2 used to pay any obligation incurred or to reimburse any expenditure made pursuant to such 3 contracts unless the Commissioner of Administration is advised by bond counsel to the state 4 that such may violate federal tax law, after execution of a cooperative endeavor agreement. 5 The Office of Facility Planning and Control shall consult with bond counsel to the State 6 relative to any federal tax issues. Further, LRFF may use alternative competitive contracting 7 arrangements with the prior approval of the Commissioner of Administration. 8 (Q) Notwithstanding anything contained in this Act to the contrary or any other 9 provision of law, the USS KIDD DD-661, a World War II era Fletcher class destroyer and 10 National Historic Landmark, is deemed to be a capital asset and the appropriation to the 11 Louisiana Naval War Memorial Commission for Hull Repair & Reinforcement, 12 Superstructure Repair, Interior Restoration & Painting and Docking Cradle Repairs & 13 Upgrade is for a public purpose and will allow the vessel to continue to serve the citizens of 14 Louisiana as a proven highly successful tourist attraction, educational institution, military 15 memorial, patriotic ceremonial platform and documentary/theatrical film set. Further, the 16 USS KIDD DD-661 the only surviving Fletcher class destroyer in her original WW2 17 configuration and the restoration project requires special consideration in the selection of a 18 restoration contractor and in the location and complete identification of the repairs to be 19 performed. Therefore, the Louisiana Naval War Memorial Commission, through the Office 20 of Culture, Recreation & Tourism, shall be permitted to use an alternative delivery method 21 to award construction contract(s) for the proposed repairs and renovations to the USS KIDD 22 and its cradle. The Louisiana Naval War Memorial Commission, through the Office of 23 Culture, Recreation & Tourism, shall have the authority to select the contractor(s) from a list 24 of a minimum of three highly qualified ship builders/shipyards with relevant restoration 25 experience acceptable to the Commissioner of Administration and the selection shall be 26 exempt from other state requirements for the selection of contractors. The construction 27 contract(s) shall be administered by the Office of Facility Planning and Control, Division 28 of Administration in accordance with state guidelines and all restoration and repairs shall 29 adhere to the U.S. Department of Interiors’ Standards for Historic Ship Preservation 30 Projects. Page 153 of 161 HB NO. 2 ENROLLED 1 (R) Pursuant to R.S. 39:102, each capital outlay budget request submitted as 2 required by R.S. 39:101 shall include a detailed project description and justification for each 3 new project requested; however, 4 (1) Notwithstanding anything contained in this Act or the Capital Outlay Act to 5 the contrary or any other provision of law, the scope of the appropriations made in this or 6 any other Capital Outlay Act for the New Orleans West Bank Park Improvements, New 7 Soccer and Recreational Facilities project shall be deemed to include the George W. Carver 8 Playground, Renovations and Upgrades project for the West Bank Park project. 9 (2) Notwithstanding anything contained in this Act or the Capital Outlay Act to 10 the contrary or any other provision of law, the scope of the appropriations made in this or 11 any other Capital Outlay Act for the Pointe Coupee Parish School Board Office Relocation, 12 Due to Flooding Caused by Hurricane Gustav, Planning and Construction project shall be 13 deemed to include that the School Board Office is to be Located at 8777 Morganza 14 Highway. 15 (3) Notwithstanding anything in this Act, any previous capital outlay act, or other 16 provision of law to the contrary, the scope of the appropriation for the Port of South 17 Louisiana Globalplex Terminal Building #71 Upgrade project shall be deemed to also 18 include similar upgrades for other Globalplex Terminal Buildings and a Heavy Load 19 Capacity Foundation or Floor. 20 (4) Notwithstanding anything in this Act, any previous capital outlay act, or other 21 provision of law to the contrary, monies appropriated herein for the Port of South Louisiana 22 Globalplex Terminal Building #71 and Other Globalplex Terminal Building Upgrades, 23 Planning and Construction may be expended for design fees related to the conveyor system 24 and ancillary equipment that exceed the customary ten percent limitation on design fee costs. 25 (5) Notwithstanding anything in this Act, any previous capital outlay act, or other 26 provision of law to the contrary, the scope of the appropriation for the Port of South 27 Louisiana Globalplex Dock Access Bridge and Equipment Replacement/Repair project shall 28 be deemed to also include an Access Road. 29 (6) Notwithstanding anything in this Act, any previous capital outlay act, or other 30 provision of law to the contrary, the scope of the appropriation for the Port of South 31 Louisiana Globalplex Rail Siding project shall be deemed to also include a Rail Spur. Page 154 of 161 HB NO. 2 ENROLLED 1 (7) Notwithstanding anything contained in this Act or the Capital Outlay Act to 2 the contrary or any other provision of law, the scope of the appropriations made in this or 3 any other Capital Outlay Act for the Pontchartrain Levee District Lake Pontchartrain West 4 Shore Hurricane Protection, Planning and Construction project shall be deemed to include 5 Ascension Parish. 6 (8) Notwithstanding anything contained in this Act or the Capital Act to the 7 contrary or any other provision of law, the scope of the appropriation made in this or any 8 other Capital Outlay Act for the Statewide Roofing Asset Management Program and 9 Waterproofing, Related Repairs and Equipment Replacement Program project shall be 10 deemed to include Peltier Hall at Nicholls State University. 11 (9) Notwithstanding anything contained in this Act or the Capital Act to the 12 contrary or any other provision of law, the scope of the appropriation made in this or any 13 other Capital Outlay Act for the Longview Road Improvements, Beauregard Parish Police 14 Jury project shall be deemed to include Longville Road Improvements for the Beauregard 15 Parish Police Jury. 16 (10) Notwithstanding anything contained in this Act to the contrary or any other 17 provision of law, the capital outlay request with an appropriation for the Water Treatment 18 Facility, Booster Pump Station, and Distribution System Improvements project for the City 19 of Franklin shall be deemed to be submitted timely and is otherwise compliant with the 20 provisions of R.S. 39:101 and R.S. 39:102 as the project was originally submitted on time, 21 by August 31, 2022, for the Water Sector Program and such request together with supporting 22 information and documents shall constitute the feasibility study required by Article VI, 23 Section 11(C) of the Constitution of Louisiana. 24 (11) Notwithstanding anything contained in this Act to the contrary or any other 25 provision of law, the capital outlay request with an appropriation for the Sewer 26 Rehabilitation project for the City of Morgan City shall be deemed to be submitted timely 27 and is otherwise compliant with the provisions of R.S. 39:101 and R.S. 39:102 as the project 28 was originally submitted on time, by August 31, 2022, for the Water Sector Program and 29 such request together with supporting information and documents shall constitute the 30 feasibility study required by Article VI, Section 11(C) of the Constitution of Louisiana. Page 155 of 161 HB NO. 2 ENROLLED 1 (12) Notwithstanding anything contained in this Act to the contrary or any other 2 provision of law, the capital outlay request with an appropriation for the Rehabilitation of 3 Nine Sewer Lift Stations project for the City of Patterson shall be deemed to be submitted 4 timely and is otherwise compliant with the provisions of R.S. 39:101 and R.S. 39:102 as the 5 project was originally submitted on time, by August 31, 2022, for the Water Sector Program 6 and such request together with supporting information and documents shall constitute the 7 feasibility study required by Article VI, Section 11(C) of the Constitution of Louisiana. 8 (13) Notwithstanding anything contained in this Act to the contrary or any other 9 provision of law, the capital outlay request with an appropriation for the Wastewater 10 Treatment Plant Improvements project for the City of Westwego shall be deemed to be 11 submitted timely and is otherwise compliant with the provisions of R.S. 39:101 and R.S. 12 39:102 as the project was originally submitted on time, by August 31, 2022, for the Water 13 Sector Program and such request together with supporting information and documents shall 14 constitute the feasibility study required by Article VI, Section 11(C) of the Constitution of 15 Louisiana. 16 (14) Notwithstanding anything contained in this Act to the contrary or any other 17 provision of law, the capital outlay request with an appropriation for the Water Distribution 18 System Improvements project for the City of Westwego shall be deemed to be submitted 19 timely and is otherwise compliant with the provisions of R.S. 39:101 and R.S. 39:102 as the 20 project was originally submitted on time, by August 31, 2022, for the Water Sector Program 21 and such request together with supporting information and documents shall constitute the 22 feasibility study required by Article VI, Section 11(C) of the Constitution of Louisiana. 23 (15) Notwithstanding anything contained in this Act or the Capital Act to the 24 contrary or any other provision of law, the scope of the appropriation made in this or any 25 other Capital Outlay Act for the JESTC Training Facility Improvements project shall be 26 deemed to include facilities at JESTC to accommodate a less than lethal training program 27 utilizing mobile virtual training. 28 (16) Notwithstanding anything contained in this Act, any previous capital outlay 29 act to the contrary, or any other provision of law, the scope of the appropriations made in 30 this or any other capital outlay act for the Industrial Park Development project for New 31 Roads shall be deemed to include underground electrical system upgrades. Page 156 of 161 HB NO. 2 ENROLLED 1 (17) Notwithstanding anything contained in this Act, any previous capital outlay 2 act to the contrary, or any other provision of law, the scope of the appropriations made in 3 this or any other capital outlay act for the Lincoln Manner Subdivision Drainage project for 4 Kenner shall be deemed to include 30 th Street Roadway and Drainage Improvements from 5 Loyola Drive to Ohio Street. 6 (18) Notwithstanding anything contained in this Act or the Capital Outlay Act 7 to the contrary or any other provision of law, the scope of the appropriations made in this 8 or any other Capital Outlay Act for the Tensas Parish Recreational Facility project shall be 9 deemed to include Recreational Facilities at Newellton, St. Joseph, and Waterproof. 10 (S) Notwithstanding anything contained in this Act to the contrary or any other 11 provision of law, all non-state projects that include water systems in the scope of work shall 12 also be required to include a rate study as part of the project. 13 (T) Notwithstanding anything contained in this Act or any other provision of law, 14 the appropriations included herein identified as "Payable from State General Fund (Direct) 15 Non-Recurring Revenues" are appropriated for the purpose of making supplemental capital 16 outlay appropriations for Fiscal Year 2022-2023. 17 (U) Notwithstanding anything contained in this Act to the contrary or any other 18 provision of the law, the appropriations included herein identified as "Payable from Interest 19 Earnings" are appropriated for the purpose of making supplemental capital outlay 20 appropriations for Fiscal Year 2022-2023. 21 (V) Notwithstanding anything contained in this Act to the contrary or any other 22 provision of law, any water/sewer project that submitted by August 31, 2022 for the Water 23 Sector Program shall be deemed to be submitted timely provided a capital outlay request is 24 submitted and is otherwise compliant with the provisions of R.S. 39:101 and R.S. 39:102. 25 Such request together with supporting information and documents shall constitute the 26 feasibility study required by Article VI, Section 11(C) of the Constitution of Louisiana. 27 (W) Notwithstanding anything contained in this Act or any other provision of 28 law, the Port of New Orleans is authorized to execute contracts for the Louisiana 29 International Terminal Roadway and Rail Improvements, Planning and Construction and the 30 Louisiana International Terminal, Drainage, Site Preparation and Mitigation, Planning and 31 Construction prior to execution of a cooperative endeavor agreement, the granting of a line Page 157 of 161 HB NO. 2 ENROLLED 1 of credit, or the sale of bonds. The appropriation for this project may be used to pay any 2 obligation incurred or to reimburse any expenditure made pursuant to such contracts unless 3 the commissioner of administration is advised by bond counsel to the state that such may 4 violate federal tax law. The office of facility planning and control shall consult with bond 5 counsel to the state relative to any federal tax issues. 6 (X) Notwithstanding anything contained in this Act or any other provision of 7 law, the Board of Commissioners for the Port of New Orleans is authorized to execute 8 contracts for the Louisiana International Terminal Roadway and Rail Improvements, 9 Planning and Construction and the Louisiana International Terminal, Drainage, Site 10 Preparation and Mitigation, Planning and Construction project prior to execution of a 11 cooperative endeavor agreement, the granting of a line of credit, or the sale of bonds. The 12 appropriation for this project may be used to pay any obligation incurred or to reimburse any 13 expenditure made pursuant to such contracts unless the commissioner of administration is 14 advised by bond counsel to the state that such may violate federal tax law. The office of 15 facility planning and control shall consult with bond counsel to the state relative to any 16 federal tax issues. 17 Section 9. Notwithstanding any provisions contained herein or any other law to 18 the contrary, the provisions of Chapter 16 of Subtitle III of Title 39 of the Louisiana Revised 19 Statutes of 1950 as amended, shall not apply to architectural and engineering contracts, 20 administered by the office of facility planning and control, division of administration 21 pursuant to this or any other capital outlay act. 22 Section 10. All funds appropriated herein to agencies administering capital outlay 23 projects, on behalf of non-state entities, by cooperative endeavor agreements pursuant to this 24 Act shall be expended within two (2) years from the date of the issuance of the bonds. 25 Agencies administering capital outlay projects pursuant to a cooperative endeavor agreement 26 shall notify the non-state entity of the date the bonds are issued within three (3) months from 27 the issuance thereof. If the funds appropriated herein and administered under cooperative 28 endeavor agreements pursuant to this Act are not totally expended within two (2) years from 29 the issuance of the bonds, the administering agency can close the project and recommend 30 that the reallocation of any unexpended proceeds to any project contained in this Act or any 31 previous Capital Outlay Acts. Page 158 of 161 HB NO. 2 ENROLLED 1 Section 11. Notwithstanding any provisions contained herein or law to the 2 contrary, the proceeds of revenue bonds to be utilized to fund certain projects authorized in 3 Section 1. and Section 1.(A) hereof may, in accordance with Article VII, Section 9 of the 4 Louisiana Constitution of 1974, be deposited in special accounts held outside the state 5 treasury in accordance with the provisions of any bond resolution, indenture, reimbursement 6 contract, or other bond or financing covenant which provides for the pledge of such funds 7 in connection with the issuance of revenue bonds. For all projects administered by the office 8 of facility planning and control, division of administration, authorized in Section 1. And 9 Section 1.(A) hereof which are payable from the proceeds of revenue bonds, only the office 10 of facility planning and control, division of administration, will be authorized to requisition 11 funds from the special accounts described immediately above, at such time or times as may 12 be deemed necessary by the office of facility planning and control, division of 13 administration, in order to cover contract amounts or other project expenses. 14 Section 12. The governor shall have the power to veto any line-item in this Act. 15 Section 13. Except as otherwise provided herein, no funds shall be expended on 16 any highway projects on highways within the state highway system as established in R.S. 17 48:191 under the jurisdiction of the Department of Transportation and Development unless 18 and until such project is in the Highway Program, R.S. 48:228 through 232, approved by the 19 Joint Legislative Committee on Transportation, Highways and Public Works. Pursuant to 20 R.S. 49:214.6.2(B), no integrated coastal protection construction project shall be undertaken 21 with funds included in this bill except those included in an annual plan finally approved by 22 the legislature in accordance with the provisions of R.S. 49:214.5.3. No funds appropriated 23 to the Coastal Protection and Restoration Authority in this Act as a contribution for a project 24 cost-share or otherwise, for the national economic development and national ecosystem 25 restoration components of the Southwest Coastal Louisiana Study shall be used or provided 26 for the expropriation of property or use of eminent domain, except where such funds are to 27 be used to obtain property voluntarily offered for project purposes, where at least seventy- 28 five percent of the owners have voluntarily offered the property, or where the record or 29 apparent owners have voluntarily offered the property but do not have clear title. 30 Section 14. The word "statewide" used in place of the specific parish designation 31 for projects contained in this Act indicates that the project or program is applicable to all Page 159 of 161 HB NO. 2 ENROLLED 1 sixty- four parishes in the state. The description of any project in this Act shall be deemed 2 to include planning, design, master planning, studies, permits, surveys, testing, construction, 3 land and/or building/improvement acquisition, reconstruction, renovation, repair, right-of- 4 way and utilities, site and other improvements, miscellaneous/contingencies, lease hold 5 improvements ultimately owned by the state or a political subdivision of the state, equipment 6 and other acquisitions, and any other component of the project if such are included or 7 indicated in the capital outlay request for such projects required by R. S. 39:101 subject to 8 the provisions of Title 39 of the Louisiana Revised Statutes of 1950. For new construction 9 or renovation projects, equipment or other acquisitions, which can reasonably be considered 10 necessary for the facility to be functional, may be deemed to be included in the project, even 11 if such equipment or other acquisitions are not included or indicated in the project name or 12 the capital outlay request. When local or federal match is referenced in a project title, but 13 only a portion of the state appropriation is granted a line of credit or otherwise funded, then 14 the amount of local or federal match, required to be made available, may be prorated relative 15 to the amount of state appropriation made available through lines of credit. 16 Section 15. The provisions, items, and projects contained in this Act are severable 17 and if any provision, item, or project contained herein, or the application of any such 18 provision, item, or project, is held invalid, such invalidity shall not affect other provisions, 19 items, projects, or applications of the Act which can be given effect without the invalid 20 provision, project, item, or application. 21 Section 16. Notwithstanding any other provisions of law to the contrary, the state 22 shall not grant cash lines of credit, or authorize or issue general obligation bonds in a 23 principal amount in excess of $1,451,887,938 for Fiscal Year 2023-2024. 24 Section 17. Notwithstanding any contrary provision of this Act or any contrary 25 provision of law, no funds appropriated by this Act shall be released or provided to any 26 recipient of an appropriation made in this Act if, when, and for as long as, the recipient fails 27 or refuses to comply with the provisions of R.S. 24:513. No recipient shall be considered to 28 fail or refuse to comply with the provisions of R.S. 24:513 pursuant to this Section during 29 any extension of time granted by the legislative auditor to the recipient to comply. Page 160 of 161 HB NO. 2 ENROLLED 1 Section 18. This Act shall become effective upon signature by the governor or, 2 if not signed by the governor, upon expiration of the time for bills to become law without 3 signature by the governor, as provided in Article III, Section 18 of the Constitution of 4 Louisiana. If vetoed by the governor and subsequently approved by the legislature, this Act 5 shall become effective on the day following such approval. SPEAKER OF THE HOUSE OF REPRESENTATIVES PRESIDENT OF THE SENATE GOVERNOR OF THE STATE OF LOUISIANA APPROVED: Page 161 of 161