Massachusetts 2023-2024 Regular Session

Massachusetts Senate Bill S2967 Latest Draft

Bill / Introduced Version

                             
SENATE  .  .  .  .  . .  .  .  .  .  .  .  .  .  .  No. 2967 
 
The Commonwealth of Massachusetts 
 
_______________
 
In the One Hundred and Ninety-Third General Court 
(2023- 2024)
 
_______________ 
 
 
SENATE, October 21, 2024 
 Report of the committee of conference on the disagreeing votes of the two branches with 
reference to the House amendment to the Senate Bill upgrading the grid and protecting 
ratepayers (Senate, No. 2838) (amended by the House by striking out all after the enacting clause 
and inserting in place thereof the text of House document numbered 4884),-- reports, a “Bill 
promoting a clean energy grid, advancing equity and protecting ratepayers” (Senate, No. 2967). 
 
For the Committee: 
Michael J. Barrett Jeffrey N. Roy 
Cynthia Stone Creem Richard M. Haggerty 
   1 of 139 
SENATE  .  .  .  .  .  .  .  .  .  .  .  .  .  .  No. 2967 
 
 
The Commonwealth of Massachusetts 
 
_______________
 
In the One Hundred and Ninety-Third General Court 
(2023- 2024)
 
_______________
 
 
An Act promoting a clean energy grid, advancing equity and protecting ratepayers. 
 
 Be it enacted by the Senate and House of Representatives in General Court assembled, and by the authority 
of the same, as follows:
 
 
 SECTION 1. Section 30 of chapter 7C of the General Laws, as appearing in the 2022 1 
Official Edition, is hereby amended by striking out, in line 4, the words “the energy consumption 2 
of” and inserting in place thereof the following words:- the: (i) energy consumption of; (ii) 3 
energy efficiency of; and (iii) greenhouse gas emissions directly attributable to. 4 
 SECTION 2. Said section 30 of said chapter 7C, as so appearing, is hereby further 5 
amended by striking out, in lines 10 and 11, the words “energy conservation maintenance and 6 
operating procedures” and inserting in place thereof the following words:- maintenance and 7 
operating procedures for energy conservation, energy efficiency and greenhouse gas emissions 8 
reductions. 9 
 SECTION 3. Said section 30 of said chapter 7C, as so appearing, is hereby further 10 
amended by striking out, in line 13, the words “energy efficiency standards” and inserting in 11 
place thereof the following words:- standards for energy efficiency and greenhouse gas 12 
emissions reductions. 13  2 of 139 
 SECTION 4. Said chapter 7C is hereby further amended by adding the following 14 
section:- 15 
 Section 73.  (a) As used in this section, the following words shall have the following 16 
meanings unless the context clearly requires otherwise:- 17 
 “Division”, the division of capital asset management and maintenance. 18 
 “Environmental product declaration” or “EPD”, an independently verified and registered 19 
declaration that provides a life cycle assessment of a product’s global warming potential and 20 
facilitates a comparison of environmental impacts between products fulfilling the same function; 21 
provided, however, that such declaration shall be a Type III or higher as defined by the 22 
International Organization for Standardization (ISO), 14025:2006, or substantially similar life 23 
cycle assessment and comparative methodologies that have uniform standards in data collection 24 
and scientific integrity, and any pertinent product category rule developed in conformance with 25 
ISO 14025:2006. 26 
 “Global warming potential”, a numeric value that measures the total contribution to 27 
global warming from the emission of greenhouse gasses or the elimination of greenhouse gas 28 
sinks. 29 
 “Life cycle assessment” or “LCA”, an assessment used to calculate the environmental 30 
primary and secondary impacts of a product, service or process over the lifetime of such product, 31 
service or process. 32 
 “Low-embodied carbon material”, material used in building and transportation 33 
construction that has been verified by the division to embody carbon emissions that are 34  3 of 139 
sufficiently low, based on a threshold set by the division, as compared to the embodied carbon 35 
emissions of a conventional material fulfilling the same function. 36 
 (b) There shall be within the division, but not subject to the control of the division, an 37 
embodied carbon intergovernmental coordinating council. The council shall consist of: the 38 
commissioner of capital asset management and maintenance or a designee, who shall serve as 39 
co-chair; the climate chief or equivalent climate official within the office of the governor or a 40 
designee, who shall serve as co-	chair; the secretary of energy and environmental affairs or a 41 
designee; the secretary of  transportation or a designee; the secretary of housing and livable 42 
communities or a designee; the secretary of administration and finance or a designee; the 43 
secretary of economic development or a designee; the chief executive officer of the 44 
Massachusetts Port Authority or a designee; the general manager of the Massachusetts Bay 45 
Transportation Authority or a designee; the chief executive officer of the Massachusetts clean 46 
energy technology center or a designee; the chair of the board of building regulations and 47 
standards or a designee; the chairs of the joint committee on telecommunications, utilities and 48 
energy or their designees and the house and senate minority leaders or their designees, who shall 49 
serve as nonvoting members with respect to any spending matters; and 5 persons who shall be 50 
appointed by the governor, 1 of whom shall be a representative of the building trades, 1 of whom 51 
shall be a general contractor, 1 of whom shall be a licensed architect with expertise in using low-52 
embodied carbon materials of construction, 1 of whom shall be a structural engineer who shall be 53 
a licensed professional engineer with expertise in using low-embodied carbon materials of 54 
construction, and 1 of whom shall be the executive director of a regional planning agency. The 55 
council shall not be a public body as defined in section 18 of chapter 30A; provided, however, 56  4 of 139 
that the council shall hold a public meeting not less than quarterly while the council is 57 
developing the plan pursuant to subsection (f). 58 
 (c) The council shall prepare an embodied carbon reduction plan, which shall include, but 59 
shall not be limited to, strategies to measure, monitor and reduce embodied carbon. The plan 60 
shall: (i) with respect to major building and transportation projects of executive offices, 61 
departments, divisions, centers, agencies and authorities of state and municipal governments, 62 
include, but not be limited to, steps to encourage and, where appropriate, recommend requiring: 63 
(a) environmental product declarations for construction materials commonly used in such 64 
projects; and (b) the use of low-embodied carbon materials, with particular attention to cement 65 
and concrete mixtures, steel, glass, asphalt and asphalt mixtures and wood, in such projects; (ii) 66 
review progress in research, development and commercialization of low-embodied carbon 67 
technologies and materials in the government, private and nonprofit sectors within and outside of 68 
the commonwealth; (iii) make recommendations for establishing a process to set, on or before 69 
January 1, 2026, maximum global warming potential values for products likely to be used in 70 
such building and transportation projects including, but not limited to, cement and concrete 71 
mixtures, steel, glass, asphalt and asphalt mixtures and wood; (iv) develop recommended 72 
procedures for the use of: (a) EPDs in state government contracting and procurement; and (b) 73 
low-embodied carbon materials in the commonwealth, where available and at reasonable cost, 74 
including conditions under which waivers may be obtained; (v) examine current laws, 75 
regulations, policies and guidelines that affect the use of EPDs and low-embodied carbon 76 
materials in the private and nonprofit sectors and recommend laws, regulations, policies or 77 
guidelines to increase the use of EPDs and low-embodied carbon materials; and (vi) consider 78 
interactions between embodied carbon and operational carbon to ensure policy recommendations 79  5 of 139 
to reduce embodied carbon will also contribute to the reduction of operational carbon. The 80 
council shall consider: (i) the best approaches to integrate the reduction of embodied carbon into 81 
the state building code, including the stretch and specialized stretch energy code pursuant to 82 
section 96 of chapter 143 and the state building code; and (ii) best practices to incentivize and 83 
enhance the reuse of building materials and decrease building demolition. 84 
 (d)  The council shall meet regularly and seek data, input and advice related to EPDs and 85 
low-embodied carbon materials from stakeholders, which shall include, but not be limited to, 86 
companies, contractors and subcontractors involved in construction, architecture, engineering, 87 
design and procurement and organizations and associations of such companies, contractors and 88 
subcontractors, academic and nonprofit institutions with relevant missions and activities, labor 89 
organizations involved in construction and transportation, organizations focused on 90 
environmental, energy and climate policy and perspectives and groups representing consumers, 91 
including, but not limited to, low income consumers. The council shall hold not less than 3 92 
public hearings in geographically diverse areas of the commonwealth prior to finalizing the plan. 93 
 (e) The division and the executive office of energy and environmental affairs shall 94 
provide administrative support to the council. 95 
 (f) The council shall update the plan and submit the updated plan and a progress report at 96 
least every 2 years to the senate and house committees on ways and means, the joint committee 97 
on state administration and regulatory oversight and the joint committee on telecommunications, 98 
utilities and energy and shall cause the plan and the report to be publicly available on the website 99 
of each cabinet official, executive office, department, division, center, agency and authority 100 
represented on the council. 101  6 of 139 
 SECTION 5. Chapter 21A of the General Laws is hereby amended by adding the 102 
following 3 sections:- 103 
 Section 29. There shall be an office of environmental justice and equity within the 104 
executive office of energy and environmental affairs, which shall be administered by an 105 
undersecretary of environmental justice and equity who shall be appointed and may be removed 106 
by the secretary of energy and environmental affairs. The office shall be responsible for 107 
implementing environmental justice principles, as defined in section 62 of chapter 30, in the 108 
operation of each office and agency under the executive office. The office shall develop 109 
standards and guidelines governing the potential use and applicability of: (i) community benefit 110 
plans and agreements; and (ii) cumulative impact analyses in developing energy infrastructure 111 
with input from representatives of utilities, the renewable energy industry, local government, 112 
environmental justice community organizations, environmental sectors and other representatives 113 
as deemed appropriate by the office.  114 
 Section 30. The executive office of energy and environmental affairs shall establish and 115 
periodically update a methodology for determining the suitability of sites for clean energy 116 
generation facilities, clean energy storage facilities and clean transmission and distribution 117 
infrastructure facilities in newly established public rights of way. The methodology shall include 118 
multiple geospatial screening criteria to evaluate sites for: (i) development potential; (ii) climate 119 
change resilience; (iii) carbon storage and sequestration; (iv) biodiversity; and (v) social and 120 
environmental benefits and burdens. The executive office shall require facility development 121 
project proponents to avoid or minimize or, if impacts cannot be avoided or minimized, mitigate 122 
siting impacts and environmental and land use concerns. The executive office shall develop and 123 
periodically update guidance to inform state, regional and local regulations, ordinances, by-laws 124  7 of 139 
and permitting processes on ways to avoid, minimize or mitigate impacts on the environment and 125 
people to the greatest extent practicable.                                    126 
 Section 31. (a) For the purposes of this section, the following words shall have the 127 
following meanings unless the context clearly requires otherwise:-  128 
 “Charger”, a device having at least 1 charging port and connector for charging electric 129 
vehicles; provided, however, that “charger” shall also mean electric vehicle supply equipment.  130 
 “Charging network provider”, the entity that operates the digital communication network 131 
that remotely manages the chargers, which may include charging station operators and 132 
manufacturer chargers.  133 
 “Charging station”, a charger or group of chargers and the area in the immediate vicinity 134 
of such charger or group of chargers, which may include, at the discretion of the regulating 135 
entity, supporting equipment, parking areas adjacent to the chargers and lanes for vehicle ingress 136 
and egress; provided, however, that a charging station may comprise only part of the property on 137 
which it is located.  138 
 “Charging station operator”, an entity that owns or provides the chargers and the 139 
supporting equipment and facilities at charging stations and is responsible for the operation and 140 
maintenance of the chargers and the supporting equipment and facilities; provided, however, that 141 
such operator may delegate responsibility for certain aspects of the charging station operation 142 
and maintenance to subcontractors.  143 
 “Connector” or “Plug”, a device that attaches an electric vehicle to a charging port to 144 
transfer electricity. 145  8 of 139 
 “Direct current fast charger”, a charger that enables rapid charging by delivering direct-146 
current, or DC current, electricity directly to an electric vehicle’s battery. 147 
 “Electric vehicle”, a battery electric vehicle that is either a zero-emission vehicle or a 148 
plug-in hybrid electric vehicle equipped with an on-	board electrical energy storage device that 149 
can be recharged from an external source of electricity and has the capability to run on another 150 
fuel; provided, however, that “electric vehicle” shall not include a golf cart, electric bicycle or 151 
other micromobility device.  152 
 “Electric vehicle charging services”, the transfer of electric energy from an electric 153 
vehicle charging station to a battery or other storage device in an electric vehicle and related 154 
billing services, networking and operation and maintenance.  155 
 “Electric vehicle supply equipment”, a device, including at least 1 charging port and 156 
connector, for charging electric vehicles; provided, however, that the term “electric vehicle 157 
supply equipment” shall also mean a charger.  158 
 “Level 1”, a galvanically-connected electric vehicle supply equipment with a single-159 
phase input voltage nominally 120 volts alternating current and maximum output current of not 160 
more than 16 amperes alternating current.  161 
 “Level 2”, a galvanically-connected electric vehicle supply equipment with a single-162 
phase input voltage range from 208 volts to 240 volts alternating current and maximum output 163 
current of not more than 80 amperes alternating current.  164 
 “National Electric Vehicle Infrastructure Formula Program”, the federal program 165 
established pursuant to the Infrastructure Investment and Jobs Act, Public Law 117-	58, pursuant 166  9 of 139 
to which the Federal Highway Administration provides funding to the states to facilitate the 167 
strategic, nationwide deployment of electric vehicle infrastructure and the related establishment 168 
of an interconnected, interstate network that is designed to facilitate data collection, access and 169 
reliability in association with the increased use of electric vehicles and electric vehicle 170 
infrastructure.  171 
 “Public electric vehicle charging station”, an electric vehicle charging station located at a   172 
 publicly- available parking space.  173 
 “Publicly-available parking space”, a parking space that has been designated by a 174 
property owner or lessee to be available to and accessible by the public and may include on-175 
street parking spaces and parking spaces in surface lots or parking garages; provided, however, 176 
that “publicly-available parking space” shall not include a parking space that is part of or 177 
associated with residential real property containing not more than 4 dwelling units or that is 178 
reserved for the exclusive use of an individual driver or vehicle or for a group of drivers or 179 
vehicles, including employees, tenants, visitors, residents of a common interest development and 180 
residents of an adjacent building.  181 
 “Publicly-funded and available charging station”, a public electric vehicle charging 182 
station that has received, or expects to receive, a grant, loan or other incentive from a federal or 183 
state government source or by a charge on ratepayers and is located at a publicly available 184 
parking space.   185 
 (b) The executive office of energy and environmental affairs shall promulgate regulations 186 
to: (i) monitor the utilization or frequency of use of chargers and charging stations; (ii) monitor 187 
the reliability and availability of chargers and charging stations, including, but not limited to, 188  10 of 139 
whether reliability varies by the income of municipalities or neighborhoods or by regions of the 189 
commonwealth; and (iii) require, with respect to publicly-funded and available charging stations 190 
installed on or after April 1, 2025, charging network providers and charging station operators to 191 
share, free of charge, certain data fields, including, but not limited to, data fields providing real-192 
time information about location, availability and price by port, with third-	party software 193 
developers via application programming interfaces; provided, however, that any such data 194 
sharing may be conditioned on measures to protect sensitive or confidential business 195 
information. The executive office of energy and environmental affairs may designate any of its 196 
agencies to promulgate such regulations.  197 
 (c) In promulgating regulations under this section, the executive office or its designated 198 
agency may apply different requirements to publicly-	funded and available charging stations or 199 
other charging stations.  200 
 (d) Regulations promulgated under this section may vary by technology type, power 201 
levels, number of chargers per site, site ownership and according to whether chargers: (i) are 202 
networked; (ii) are public; (iii) are publicly-funded and available charging stations; (iv) are level 203 
1, level 2 or direct current fast chargers; or (v) are all-inclusive mobile solar charging stations. 204 
Such regulations may apply to charging stations other than publicly-	funded and available 205 
charging stations but shall not apply to chargers or charging stations installed at a residential real 206 
property containing not more than 4 dwelling units. The executive office or its designated agency 207 
may, in its discretion, set such standards as it deems necessary for data formats that comply with 208 
electric vehicle charging industry best practices and standards.  209  11 of 139 
 (e) With respect to any regulations that may be promulgated pertaining to reliability, the 210 
executive office or its designated agency shall develop definitions of “uptime” and “exempted 211 
downtime” through a public process and in such a manner to promote, as much as is practicable, 212 
consistency with other jurisdictions and the National Electric Vehicle Infrastructure Formula 213 
Program requirements; provided, however, that the office or designated agency may: (i) set 214 
standards for uptime; (ii) consider which events, if any, may count as exempted downtime; and 215 
(iii) take into account the quality and condition of software and hardware.  216 
 SECTION 6.  Section 1 of chapter 23J of the General Laws, as appearing in the 2022 217 
Official Edition, is hereby amended by striking out the definitions of “Clean energy” and “Clean 218 
energy research” and inserting in place thereof the following 2 definitions:- 219 
 “Clean energy”, advanced and applied technologies that significantly reduce or eliminate 220 
the use of energy from non-	renewable sources including, but not limited to: (i) energy efficiency; 221 
(ii) demand response; (iii) energy conservation; (iv) carbon dioxide removal; (v) embodied 222 
carbon reduction; or (vi) technologies powered, in whole or in part, by the sun, wind, water, 223 
geothermal energy, including networked geothermal and deep geothermal energy, hydrogen 224 
produced by non- fossil fuel sources and methods, alcohol, fuel cells, fusion energy, nuclear 225 
fission or any other renewable, nondepletable or recyclable fuel; provided, however, that “clean 226 
energy” shall include an alternative energy generating source as defined in clauses (i) to (vi), 227 
inclusive, of subsection (a) of section 11F½ of chapter 25A.  228 
 “Clean energy research”, advanced and applied research in new clean energy 229 
technologies including: (i) solar photovoltaic; (ii) solar thermal; (iii) wind power; (iv) geothermal 230 
energy, including networked geothermal and deep geothermal energy; (v) wave and tidal energy; 231  12 of 139 
(vi) advanced hydropower; (vii) energy transmission and distribution; (viii) energy storage; (ix) 232 
renewable biofuels, including ethanol, biodiesel and advanced biofuels; (x) renewable, 233 
biodegradable chemicals; (xi) advanced thermal-to-energy conversion; (xii) fusion energy; (xiii) 234 
hydrogen produced by non-	fossil fuel sources and methods; (xiv) carbon capture and 235 
sequestration; (xv) carbon dioxide removal; (xvi) energy monitoring; (xvii) green building 236 
materials and embodied carbon reduction; (xviii) energy efficiency; (xix) energy-	efficient 237 
lighting; (xx) gasification and conversion of gas to liquid fuels; (xxi) industrial energy 238 
efficiency; (xxii) demand-side management; (xxiii) fuel cells; and (xxiv) nuclear fission; 239 
provided, however, that “clean energy research” shall not include advanced and applied research 240 
in coal, oil or natural gas. 241 
 SECTION 7. Section 2 of said chapter 23J is hereby amended by inserting after the word 242 
“ventures”, in line 23, as so appearing, the following words:- , which may include carbon 243 
sequestration and the development of other clean energy sources. 244 
 SECTION 8. Chapter 25 of the General Laws is hereby amended by striking out section 245 
12N, as so appearing, and inserting in place thereof the following section:- 246 
 Section 12N. There is hereby established within the department, and under the general 247 
supervision and control of the commission, a facility siting division, which shall be under the 248 
charge of a director appointed by the commission. The facility siting division, hereinafter 249 
referred to as the division, shall perform such functions as the commission deems necessary for 250 
the administration, implementation and enforcement of sections 69G to 69W, inclusive, of 251 
chapter 164 imposed upon the department and the energy facilities siting board by said sections. 252  13 of 139 
 The division shall maintain a real-	time, online, clean energy infrastructure dashboard. 253 
The division shall, in cooperation with the executive office of energy and environmental affairs 254 
and its affiliated departments and offices, create, maintain and update the dashboard by 255 
collecting, facilitating the collection and reporting of comprehensive data and information related 256 
to: (i) accelerating the responsible deployment of clean energy infrastructure through siting and 257 
permitting reform in a manner consistent with applicable legal requirements, including, but not 258 
limited to, the greenhouse gas emissions limits and sublimits set under chapter 21N; (ii) 259 
facilitating community input into the siting and permitting of clean energy infrastructure; and 260 
(iii) ensuring that the benefits of clean energy deployment are shared equitably among all 261 
residents of the commonwealth. The dashboard shall, at a minimum, report for the most recent 262 
reporting period and in the aggregate the number of applications filed, decided or pending 263 
information, including, but not limited to: (i) the number of applications deemed incomplete and 264 
the number of applications constructively approved; (ii) the average duration of application 265 
review; and (iii) average staffing levels delineated by job classification. The dashboard shall 266 
make use of bar charts, line charts and other visual representations to facilitate public 267 
understanding of both recent performance and long-	term and cumulative trends and outcomes of 268 
clean energy deployment. The division shall convene a stakeholder process to develop and 269 
inform the design and content of the dashboard; provided, however, that comprehensive data and 270 
information shall be made publicly available in a machine-readable format. 271 
 SECTION 9. The first paragraph of section 12Q of said chapter 25, as so appearing, is 272 
hereby amended by striking out the second sentence and inserting in place thereof the following 273 
sentence:- The department shall credit to the fund: (i) appropriations or other money authorized 274 
or transferred by the general court and specifically designated to be credited to the fund; (ii) a 275  14 of 139 
portion of assessments, as determined by the department, collected pursuant to section 18; (iii) a 276 
portion of application fees, as determined by the department, collected pursuant to section 69J1/2 277 
of chapter 164; and (iv) income derived from the investment of amounts credited to the fund. 278 
 SECTION 10. Said chapter 25 is hereby further amended by inserting after section 12R 279 
the following 2 sections:-  280 
 Section 12S. There shall be a Department of Public Utilities and Energy Facilities Siting 281 
Board Intervenor Support Fund. The department shall credit to the fund: (i) appropriations or 282 
other money authorized or transferred by the general court and specifically designated to be 283 
credited to the fund; (ii) a portion of assessments, as determined by the department, collected 284 
pursuant to section 18; (iii) a portion of application fees, as determined by the department, 285 
collected pursuant to sections 69J1/2, 69T, 69U, 69V and 69W of chapter 164; (iv) any non-286 
ratepayer funded sources obtained through gifts, grants, contributions and bequests of funds from 287 
any department, agency or subdivision of federal, state or municipal government or any 288 
individual, foundation, corporation, association or public authority; and (v) income derived from 289 
the investment of amounts credited to the fund. All amounts credited to the fund shall be held in 290 
trust and shall be expended solely, without further appropriation, for the purposes set forth in 291 
section 149 of chapter 164, consistent with the requirements set forth in said section 149 of said 292 
chapter 164 and any regulations promulgated thereunder. Any unexpended balance in the fund at 293 
the close of a fiscal year shall remain in the fund and shall not revert and shall be available for 294 
expenditure in subsequent fiscal years. 295 
 Section 12T. There shall be a division of public participation within the department and 296 
under the general supervision and control of the commission, which shall be under the charge of 297  15 of 139 
a director appointed by the commission. The division of public participation, hereinafter referred 298 
to as the division, shall perform such functions as the commission may determine and shall be 299 
responsible for assisting individuals, local governments, community organizations and other 300 
entities before the department or the energy facilities siting board. With respect to matters before 301 
the department, the division shall assist such parties with navigating filing requirements, 302 
opportunities to provide comment and intervene and facilitating dialogue among parties to 303 
proceedings. With respect to siting and permitting matters under the jurisdiction of the energy 304 
facilities siting board, the division shall assist individuals, local governments, community 305 
organizations, project applicants and other entities with navigating pre-filing consultation and 306 
engagement requirements, clarifying filing requirements, identifying opportunities to intervene 307 
and facilitating dialogue among stakeholders involved in the permitting process and shall assist 308 
with coordinating with other state, regional and local officials, including the office of 309 
environmental justice and equity established by section 29 of chapter 21A, involved in the 310 
prefiling consultation process, pre-filing engagement process and the permitting process 311 
generally. The director and staff of the division shall not participate as adjudicatory staff, nor 312 
have any input or communication with adjudicatory or decisional staff, in matters before the 313 
department or in reviewing applications submitted to the energy facilities siting board, nor shall 314 
they serve as legal counsel to or otherwise represent any party before the department or the 315 
energy facilities siting board. The director shall be responsible for making final determinations 316 
with respect to intervenor funding support requests made pursuant to section 149 of chapter 164 317 
and administering all aspects of the intervenor support grant program established pursuant to said 318 
section 149 of said chapter 164. The department, in consultation with the energy facilities siting 319  16 of 139 
board, shall promulgate regulations to implement this section, including for the function and 320 
participation of the division of public participation and ex parte prohibitions, as appropriate.  321 
 SECTION 11. Section 18 of said chapter 25, as appearing in the 2022 Official Edition, is 322 
hereby amended by inserting after the third paragraph the following 2 paragraphs:-  323 
 The commission may make an assessment against each electric company under the 324 
jurisdictional control of the department, based upon the intrastate operating revenues subject to 325 
the jurisdiction of the department of each such company derived from sales within the 326 
commonwealth of electric service, as shown in the annual report of each such company to the 327 
department. The assessments shall be made at a rate of not more than 0.1 per cent of such 328 
intrastate operating revenues, as shall be determined and certified annually by the commission as 329 
sufficient to reimburse the commonwealth for: (i) funds appropriated by the general court for the 330 
operation and general administration of the energy facilities siting board, exclusive of the cost of 331 
fringe benefits established by the comptroller pursuant to section 5D of chapter 29, including 332 
group life and health insurance, retirement benefits, paid vacations, holidays and sick leave; and 333 
(ii) funds for a clean energy infrastructure dashboard, as required to be maintained by the facility 334 
siting division pursuant to section 12N. The funds may be used by the energy facilities siting 335 
board to compensate consultants in hearings on petitions filed by companies subject to 336 
assessment under this section. Assessments made under this section may be credited to the 337 
normal operating cost of each company. Each company shall pay the amount assessed against it 338 
not later than 30 days after the date of the notice of assessment from the department. The 339 
department shall collect such assessments and credit a portion of said assessments to the 340 
Department of Public Utilities Energy Facilities Siting Board Trust Fund established under 341 
section 12Q and the Department of Public Utilities and Energy Facilities Siting Board Intervenor 342  17 of 139 
Support Fund established under section 12S. Any funds unexpended in any fiscal year for the 343 
purposes for which such assessments were made shall be credited against the assessment to be 344 
made in the following fiscal year and the assessment in the following fiscal year shall be reduced 345 
by any such unexpended amount. 346 
 For the purpose of providing the department with funds to be used to provide support to 347 
intervenors in the department or energy facilities siting board proceedings consistent with section 348 
149 of chapter 164, the commission may make a separate assessment proportionally against each 349 
electric and gas company under the jurisdictional control of the department, based upon the 350 
intrastate operating revenues subject to the jurisdiction of the department of each of such 351 
companies derived from sales within the commonwealth of electric and gas service, as shown in 352 
the annual report of each of such companies to the department. Such assessments shall be made 353 
at a rate as shall be determined and certified annually by the commission as sufficient to produce 354 
an annual amount of not more than $3,500,000. The amount of the assessment may be increased 355 
by the commission annually by a rate not to exceed the most recent annual consumer price index 356 
as calculated for the northeast region for all urban consumers. Assessments made under this 357 
section may be credited to the normal operating cost of each company. Each company shall pay 358 
the amount assessed against it not later than 30 days after the date of the notice of assessment 359 
from the department. Such assessments shall be collected by the department and credited to the 360 
Department of Public Utilities and Energy Facilities Siting Board Intervenor Support Fund 361 
established by section 12S. Funds unexpended in any fiscal year and remaining in the fund shall 362 
be credited against the assessment to be made in the following fiscal year and the assessment in 363 
the following fiscal year shall be reduced by any such unexpended amount. 364  18 of 139 
 SECTION 12. Section 22 of said chapter 25 is hereby amended by striking out, in line 6, 365 
as so appearing, the words “the manufacturing industry” and inserting in place thereof the 366 
following words:- low and moderate income interests. 367 
 SECTION 13. Said section 22 of said chapter 25 is hereby further amended by inserting 368 
after the word “labor”, in line 7, as so appearing, the following words:- , as recommended by the 369 
president of the Massachusetts AFL-CIO. 370 
 SECTION 14. Said section 22 of said chapter 25 is hereby further amended by striking 371 
out, in lines 11 and 12, as so appearing, the words “employing fewer than 10 persons”. 372 
 SECTION 15. Said section 22 of said chapter 25 is hereby further amended by striking 373 
out, in lines 24 and 25, as so appearing, the words “energy efficiency businesses” and inserting 374 
in place thereof the following words:- the Massachusetts clean energy center established 375 
pursuant to section 2 of chapter 23J. 376 
 SECTION 16. Said section 22 of said chapter 25 is hereby further amended by striking 377 
out subsection (b), as so appearing, and inserting in place thereof the following subsection:-  378 
 (b) The council shall, as part of the approval process by the department, seek to: (i) 379 
maximize net economic benefits through energy efficiency, demand management and beneficial 380 
electrification resources; and (ii) achieve energy, capacity, climate and environmental goals 381 
through a sustained and integrated statewide energy efficiency and decarbonization effort.  382 
 The council shall: (i) review and approve plans and budgets; (ii) work with program 383 
administrators in preparing energy resource assessments; (iii) determine the economic, system 384 
reliability, climate and air quality benefits of energy efficiency, demand management and 385  19 of 139 
beneficial electrification resources; (iv) conduct and recommend relevant research; and (v) 386 
recommend long- term energy efficiency, demand management and beneficial electrification 387 
goals consistent with meeting greenhouse gas emissions limits and sublimits imposed by law or 388 
regulation and with mitigating ratepayer impacts. Approval of energy efficiency, demand 389 
management and beneficial electrification plans and budgets shall require a 2/3 vote. The council 390 
shall, as part of its review of plans, examine opportunities to offer joint programs; provided, 391 
however, that any costs for such joint programs shall be allocated equitably among the efficiency 392 
programs. 393 
 SECTION 17. Section 2 of chapter 25A of the General Laws, as so appearing, is hereby 394 
amended by striking out the second paragraph and inserting in place thereof the following 395 
paragraph:- 396 
 There shall be within the department 4 divisions: (i) a division of energy efficiency, 397 
which shall work with the department of public utilities regarding energy efficiency programs; 398 
(ii) a division of renewable and alternative energy development, which shall oversee and 399 
coordinate activities that seek to maximize the installation of renewable and alternative energy 400 
generating sources that will provide benefits to ratepayers, advance the production and use of 401 
biofuels and other alternative fuels as the division may define by regulation and administer the 402 
renewable portfolio standard and the alternative portfolio standard; (iii) a division of green 403 
communities, which shall serve as the principal point of contact for local governments and other 404 
governmental bodies concerning all matters under the jurisdiction of the department of energy 405 
resources, with the exception of matters involving the siting and permitting of small clean energy 406 
infrastructure facilities; and (iv) a division of clean energy siting and permitting, which shall 407 
establish standard conditions, criteria and requirements for the siting and permitting of small 408  20 of 139 
clean energy infrastructure facilities by local governments and provide technical support and 409 
assistance to local governments, small clean energy infrastructure facility project proponents and 410 
other stakeholders impacted by the siting and permitting of small clean energy infrastructure 411 
facilities at the local government level. Each division shall be headed by a director appointed by 412 
the commissioner and who shall be a person of skill and experience in the field of energy 413 
efficiency, renewable energy or alternative energy, energy regulation or policy and land use and 414 
planning, respectively. The directors shall be the executive and administrative heads of their 415 
respective divisions and shall be responsible for administering and enforcing the law relative to 416 
their division and to each administrative unit thereof under the supervision, direction and control 417 
of the commissioner. The directors shall serve at the pleasure of the commissioner, shall receive 418 
such salary as may be determined by law and shall devote full time during regular business hours 419 
to the duties of the office. In the case of an absence or vacancy in the office of a director, or in 420 
the case of disability as determined by the commissioner, the commissioner may designate an 421 
acting director to serve as director until the vacancy is filled or the absence or disability ceases. 422 
The acting director shall have all the powers and duties of the director and shall have similar 423 
qualifications as the director. 424 
 SECTION 18. Section 6 of said chapter 25A, as so appearing, is hereby amended by 425 
striking out, in line 56, the word “and”. 426 
 SECTION 19. Said section 6 of said chapter 25A, as so appearing, is hereby further 427 
amended by striking out, in line 63, the words “chapter 21N” and inserting in place thereof the 428 
following words:- chapter 21N; and  429  21 of 139 
 (15) develop and promulgate, regulations, criteria, guidelines and standard conditions, 430 
criteria and requirements that establish parameters for the siting, zoning, review and permitting 431 
of small clean energy infrastructure facilities by local government pursuant to section 21. 432 
 SECTION 20. Section 11F of said chapter 25A, as so appearing, is hereby amended by 433 
striking out, in lines 44 and 45 and line 84, the words “or (9) geothermal energy”, each time they 434 
appear, and inserting in place thereof, in each instance, the following words:- (9) geothermal 435 
energy; or (10) fusion energy. 436 
 SECTION 21. Said section 11F of said chapter 25A, as so appearing, is hereby further 437 
amended by striking out, in line 116, the words “or (10) geothermal energy” and inserting in 438 
place thereof the following words:- (10) geothermal energy; or (11) fusion energy. 439 
 SECTION 22. Section 11F1/2 of said chapter 25A, as so appearing, is hereby amended 440 
by striking out, in line 18, the words “naturally occurring”. 441 
 SECTION 23. Said chapter 25A is hereby further amended by adding the following 442 
section:-  443 
 Section 21. (a) As used in this section, the following words shall have the following 444 
meanings unless the context clearly requires otherwise:- 445 
 “Anaerobic digestion facility”, a facility that: (i) generates electricity from a biogas 446 
produced by the accelerated biodegradation of organic materials under controlled anaerobic 447 
conditions; and (ii) has been determined by the department, in coordination with the department 448 
of environmental protection, to qualify under department of energy resources regulations as a 449 
Class I renewable energy generating source under section 11F. 450  22 of 139 
 “Local government”, a municipality or regional agency, including, but not limited to, the 451 
Cape Cod commission, established by chapter 716 of the acts of 1989, and the Martha’s 452 
Vineyard Commission, established by chapter 831 of the acts of 1977, that has permitting 453 
authority over small clean energy infrastructure facilities. 454 
 “Small clean energy generation facility”, energy generation infrastructure with a 455 
nameplate capacity of less than 25 megawatts that is an anaerobic digestion facility, solar facility 456 
or wind facility, including any ancillary structure that is an integral part of the operation of the 457 
small clean energy generation facility or, following a rulemaking by the department in 458 
consultation with the energy facilities siting board in which the facility type is added to the 459 
regulatory definition of a small clean energy generation facility, any other type of generation 460 
facility that produces no greenhouse gas emissions or other pollutant emissions known to have 461 
negative health impacts; provided, however, that the nameplate capacity for solar facilities shall 462 
be calculated in direct current.  463 
 “Small clean energy infrastructure facility”, a small clean energy generation facility, 464 
small clean energy storage facility or small clean transmission and distribution infrastructure 465 
facility. 466 
 “Small clean energy storage facility”, an energy storage system as defined in section 1 of 467 
chapter 164 with a rated capacity of less than 100 megawatt hours, including any ancillary 468 
structure that is an integral part of the operation of the small clean energy storage facility. 469 
 “Small clean transmission and distribution infrastructure facility”, electric transmission 470 
and distribution infrastructure and related ancillary infrastructure, including: (i) electric 471 
transmission line reconductoring or rebuilding projects; (ii) new or substantially altered electric 472  23 of 139 
transmission lines located in an existing transmission corridor that are not more than 10 miles 473 
long, including any ancillary structure that is an integral part of the operation of the transmission 474 
line; (iii) new or substantially altered electric transmission lines located in a new transmission 475 
corridor that are not more than 1 mile long, including any ancillary structure that is an integral 476 
part of the operation of the transmission line; (iv) any other electric transmission infrastructure, 477 
including standalone transmission substations and upgrades and any ancillary structure that is an 478 
integral part of the operation of the transmission line and that does not require zoning 479 
exemptions; and (v) electric distribution-	level projects that meet a certain threshold, as 480 
determined by the department; provided, however, that the “small clean transmission and 481 
distribution infrastructure facility” shall be: (A) designed, fully or in part, to directly interconnect 482 
or otherwise facilitate the interconnection of clean energy infrastructure to the electric grid; (B) 483 
designed to ensure electric grid reliability and stability; or (C) designed to help facilitate the 484 
electrification of the building and transportation sectors; and provided further, that a “small clean 485 
transmission and distribution infrastructure facility” shall not include new transmission and 486 
distribution infrastructure facilities that solely interconnect new or existing generation powered 487 
by fossil fuels to the electric grid on or after January 1, 2026. 488 
 “Solar facility”, a ground mounted facility that uses sunlight to generate electricity. 489 
 “Wind facility”, an onshore or offshore facility that uses wind to generate electricity. 490 
 (b) The department shall establish standards, requirements and procedures governing the 491 
siting and permitting of small clean energy infrastructure facilities by local governments that 492 
shall include: (i) uniform sets of public health, safety, environmental and other standards, 493 
including zoning criteria, that local governments shall require for the issuance of permits for 494  24 of 139 
small clean energy infrastructure facilities; (ii) a common standard application for small clean 495 
energy infrastructure facility project applicants submitting a permit application to local 496 
governments; (iii) uniform pre-filing requirements for small clean energy infrastructure facilities, 497 
which shall include specific requirements for public meetings and other forms of outreach that 498 
must occur in advance of an applicant submitting an application; (iv) standards for applying site 499 
suitability guidance developed by the executive office of energy and environmental affairs 500 
pursuant to section 30 of chapter 21A to evaluate the social and environmental impacts of 501 
proposed small clean energy generation facilities, small clean energy storage facilities and small 502 
clean transmission and distribution infrastructure facilities in new rights of way, which shall 503 
include a mitigation hierarchy to be applied during the permitting process to avoid or minimize 504 
or, if impacts cannot be avoided or minimized, mitigate negative impacts of siting on the 505 
environment, people and the commonwealth’s goals and objectives for climate mitigation, 506 
resilience, biodiversity and protection of natural and working lands, to the extent practicable; (v) 507 
common conditions and requirements for a single permit consolidating all necessary local 508 
approvals to be issued for different types of small clean energy infrastructure facilities in the 509 
event that constructive approval is triggered through the non-	issuance of a final decision by a 510 
local government pursuant to subsection (d); (vi) guidance for procedures and potential 511 
extensions of time should an applicant fail to respond to a request for information within a 512 
specified timeframe or proposes a significant revision to a proposed project; provided, however, 513 
that the department shall solicit public input in the development of such guidance; and (vii) 514 
responsible parties subject to enforcement actions, including in the event of sale of small clean 515 
energy infrastructure facilities after permitting. The department may promulgate rules and 516 
regulations allowing local governments to set fees for compensatory environmental mitigation 517  25 of 139 
for the restoration, establishment, enhancement or preservation of comparable environmental 518 
resources through funds paid to the local government or to a non-	profit entity to be used at the 519 
election of an applicant to satisfy the standard of mitigation to the maximum extent practicable. 520 
Local governments acting in accordance with the standards established by the department for 521 
small clean energy generation facilities and small clean energy storage facilities pursuant to this 522 
subsection shall be considered to have acted consistent with the limitations on solar facility and 523 
small clean energy storage facility zoning under section 3 of chapter 40A. The department shall 524 
establish a transition or concurrency period for the effective date of any standards that it 525 
establishes. 526 
 (c) The proponent of a small clean energy infrastructure facility may submit a 527 
consolidated small clean energy infrastructure facility permit application seeking a single permit 528 
consolidating all necessary local permits and approvals. To initiate the permitting of a small 529 
clean energy infrastructure facility, an applicant may elect to submit an application, with 530 
supporting information in the form developed by the department pursuant to subsection (b), for 531 
the local government to conduct a consolidated review pursuant to the criteria and standards set 532 
forth in subsection (b) and using the process set forth in subsection (d). Local governments shall 533 
determine whether such consolidated small clean energy infrastructure facility permit application 534 
is complete not later than 30 days of receipt. If an application is deemed incomplete, the 535 
applicant shall have 30 days, and any additional time as determined by the local government, to 536 
cure any deficiencies before the application is rejected. In the event of a rejection of the 537 
application, the local government shall provide a detailed reasoning for the rejection. 538 
 (d)(1) Local governments shall issue a single, final decision on a consolidated small clean 539 
energy infrastructure facility permit application submitted pursuant to subsection (c), including 540  26 of 139 
all decisions necessary for a project to proceed with construction within 12 months of the receipt 541 
of a complete permit application; provided, however, that the permit shall not include any state 542 
permits that may be required to proceed with construction and operation of said facility. All local 543 
government authorities, boards, commissions, offices or other entities that may be required to 544 
issue a decision on 1 or more permits in response to the application for the small clean energy 545 
infrastructure facility may conduct reviews separately and concurrently. Such permits shall 546 
adhere to any requirements established by the department pursuant to subsection (b). 547 
 (2) If a final decision is not issued within 12 months of the receipt of a complete permit 548 
application, a constructive approval permit shall be issued by the local government that includes 549 
the common conditions and requirements established by the department for the type of small 550 
clean energy infrastructure facility under review. 551 
 (e) Individual decisions of local government authorities, boards, commissions, offices or 552 
other entities that would otherwise be required to issue 1 or more permits to the small clean 553 
energy infrastructure facility may not be appealed or reviewed independently. The only decision 554 
of a local government that is subject to further review is the single, final decision issued by the 555 
local government that includes all individual decisions necessary for a project to proceed with 556 
construction, exclusive of any state permits that may be required, which shall be reviewable by a 557 
de novo adjudication of the permit application by the director of the energy facilities siting 558 
division of the department of public utilities, as provided in subsection (f). 559 
 (f) Within 30 days of the single, final decision on a consolidated permit application by a 560 
local government described in subsections (d) and (e), project proponents and other individuals 561 
or entities substantially and specifically affected by a proposed small clean energy infrastructure 562  27 of 139 
facility may file a petition to request in writing a de novo adjudication of the permit application 563 
by the director of the facilities siting division pursuant to section 69W of chapter 164 following 564 
permit issuance, including constructive approval permits issued pursuant to subsection (d), or 565 
denials by a local government. 566 
 (g) If a local government lacks the resources, capacity or staffing to review a small clean 567 
energy infrastructure facility permit application within 12 months, it may, not later than 60 days 568 
after receipt of such application or at any time thereafter with the consent of the applicant, 569 
request in writing a de novo adjudication of such application by the director pursuant to section 570 
69W of chapter 164. 571 
 (h) The department shall promulgate regulations to implement this section in consultation 572 
with the Massachusetts Municipal Association, Inc., the department of public utilities, the 573 
department of environmental protection, the department of fish and game, the department of 574 
conservation and recreation, the department of agricultural resources, an office within the 575 
executive office of energy and environmental affairs designated by the secretary of energy and 576 
environmental affairs for review of compliance with the Massachusetts environmental policy act, 577 
the office of environmental justice and equity, the executive office of health and human services, 578 
the executive office of housing and livable communities and the executive office of public safety 579 
and security. 580 
 (i) Nothing in subsections (c) to (g), inclusive, shall apply to a comprehensive permit 581 
pursuant to sections 20 to 23, inclusive, of chapter 40B. For the purpose of this section, the 582 
procedures and standards for filing and review of an application for a comprehensive permit that 583  28 of 139 
includes a small clean energy infrastructure facility shall be in accordance with said sections 20 584 
to 23, inclusive, of said chapter 40B. 585 
 (j) The department of energy resources shall, on a quarterly basis, determine whether 586 
more than 50 per cent of applications for small clean energy infrastructure facilities processed in 587 
the preceding 24- month period throughout the commonwealth have been constructively 588 
approved. If more than 50 per cent of applications have been so approved, the department of 589 
energy resources, the department of public utilities and the office of environmental justice and 590 
equity shall, within 6 months of the conclusion of the 24-	month period, analyze and report on the 591 
cause of the high rate of constructive approvals by local governments and make 592 
recommendations to local governments, the general court and the governor on how to reduce the 593 
number of constructive approvals and increase the number of decisions reached by means other 594 
than constructive approval. 595 
 (k) A consolidated small clean energy infrastructure permit application submitted 596 
pursuant to this section shall include the following certification and disclosure requirements: 597 
 (i) documentation reflecting the applicant’s demonstrated commitment to workforce or 598 
economic development within the commonwealth; 599 
 (ii) a statement of intent concerning efforts that the applicant and its contractors and 600 
subcontractors will make to promote workforce or economic development through the project; 601 
 (iii) documentation reflecting the applicant’s demonstrated commitment to expand 602 
workforce diversity, equity and inclusion in its past projects within the commonwealth; 603  29 of 139 
 (iv) documentation as to whether the applicant and its contractors and subcontractors 604 
participate in a state or federally certified apprenticeship program and the number of apprentices 605 
the apprenticeship program has trained to completion for each of the last 5 years; 606 
 (v) a statement of intent concerning how or if the applicant and its contractors and 607 
subcontractors intend to utilize apprentices on the project, including whether each of its 608 
contractors and subcontractors on the project participates in a state or federally certified 609 
apprenticeship program; 610 
 (vi) documentation relative to the applicant and its contractors and subcontractors 611 
regarding their history of compliance with chapters 149, 151, 151A, 151B and 152, 29 U.S.C. 612 
section 201, et seq. and applicable federal anti-discrimination laws; 613 
 (vii) documentation that the applicant and its contractors and subcontractors are currently, 614 
and will remain, in compliance with chapters 149, 151, 151A, 151B, and 152, 29 U.S.C. section 615 
201, et seq. and applicable federal anti-discrimination laws for the duration of the project; 616 
 (viii) detailed plans for assuring labor harmony during all phases of the construction, 617 
reconstruction, renovation, development and operation of the project, including documentation 618 
of the applicant’s history with picketing, work stoppages, boycotts or other economic actions 619 
against the applicant and a description or plan of how the applicant intends to prevent or address 620 
such actions; 621 
 (ix) documentation relative to whether the applicant and its contractors have been found 622 
in violation of state or federal safety regulations in the previous 10 years. 623  30 of 139 
 (l) The department may require a wage bond or other comparable form of insurance in an 624 
amount to be set by the department to ensure compliance with law, certifications or department 625 
obligations. 626 
 (m) The department shall notify applicants that an applicant shall be disqualified from the 627 
project if the applicant has been debarred by the federal government or commonwealth for the 628 
entire term of the debarment. 629 
 (n) An applicant shall, in a timely manner, provide documentation and certifications as 630 
required by law or otherwise directed by the department. Incomplete or inaccurate information 631 
may be grounds for disqualification, dismissal or other action deemed appropriate by the 632 
department. 633 
 (o) The department shall give added weight to applicants that demonstrate compliance 634 
with the provisions of sections 26 to 27F, inclusive, of chapter 149, and have a history of 635 
participation with state or federally certified apprenticeship programs. 636 
 SECTION 24. Section 2 of chapter 25B of the General Laws, as appearing in the 2022 637 
Official Edition, is hereby amended by inserting after the definition of “Compensation” the 638 
following 2 definitions:-  639 
 “Connector” or “Plug”, a device that attaches an electric vehicle to a charging port to 640 
transfer electricity. 641 
 “Direct current fast charger”, a charger that enables rapid charging by delivering direct-642 
current, or DC current, electricity directly to an electric vehicle battery.  643  31 of 139 
 SECTION 25. Said section 2 of said chapter 25B, as so appearing, is hereby further 644 
amended by striking out the definition of “Electric vehicle supply equipment” and inserting in 645 
place thereof the following definition:- 646 
 “Electric vehicle supply equipment” or “EVSE”, a device, including at least 1 charging 647 
port and connector, for charging electric vehicles; provided, however, that “electric vehicle 648 
supply equipment” shall also mean a charger. 649 
 SECTION 26. Said section 2 of said chapter 25B, as so appearing, is hereby further 650 
amended by inserting after the definition of “Faucet” the following definition:-  651 
 "Flexible demand”, the capability to schedule, shift or curtail the electrical demand of a 652 
load-serving entity’s customer through direct action by the customer or through action by a third 653 
party, the load- serving entity or a grid balancing authority, with the customer’s consent. 654 
 SECTION 27. Said section 2 of said chapter 25B, as so appearing, is hereby further 655 
amended by inserting after the definition of “Lamp” the following 2 definitions:- 656 
 “Level 1”, a galvanically-connected electric vehicle supply equipment with a single-657 
phase input voltage nominally 120 volts alternating current and maximum output current of not 658 
more than 16 amperes alternating current.  659 
 “Level 2”, a galvanically-connected electric vehicle supply equipment with a single-660 
phase input voltage range from 208 volts to 240 volts alternating current, and maximum output 661 
current of not more than 80 amperes alternating current. 662 
 SECTION 28. Said section 2 of said chapter 25B, as so appearing, is hereby further 663 
amended by inserting after the definition of “Plumbing fixture” the following definition:- 664  32 of 139 
 “Port”, a system or connecting outlet on a charger that provides power to charge an 665 
electric vehicle; provided, however, that a port may be equipped with multiple connectors but 666 
use only 1 connector at a time to provide such power. 667 
 SECTION 29. Section 5 of said chapter 25B, as so appearing, is hereby amended by 668 
striking out the first and second paragraphs and inserting in place thereof the following 669 
paragraph:-  670 
 The commissioner may, by regulation, update energy efficiency standards for the types of 671 
new products set forth in clauses (f) to (y), inclusive, of section 3. Any revision of such 672 
efficiency standards shall be based upon the determination of the commissioner; provided, 673 
however, that a revision of said efficiency standards for electric vehicle supply equipment may 674 
allow the use of equipment that consumes additional kilowatts per hour. Any standard revised 675 
pursuant to this section which conflicts with a corresponding standard in the state plumbing code 676 
shall take precedence over the standard in said state plumbing code. Any standard revised 677 
pursuant to this section shall not take effect for at least 1 year after its adoption.  678 
 SECTION 30. Said section 5 of said chapter 25B, as so appearing, is hereby further 679 
amended by striking out clause (20) and inserting in place thereof the following clause:-  680 
 (20) Electric vehicle supply equipment included in the scope of the ENERGY STAR 681 
Program Requirements Product Specification for Electric Vehicle Supply Equipment, Version 682 
1.2 (Rev. June 2023), shall meet the qualification criteria of that specification. 683 
 SECTION 31.  Said section 5 of said chapter 25B, as so appearing, is hereby further 684 
amended by striking out, in line 198, the words “, electric vehicle supply equipment”. 685  33 of 139 
 SECTION 32. Said section 5 of said chapter 25B, as so appearing, is hereby further 686 
amended by adding the following paragraph:-  687 
 The commissioner may adopt and update regulations for the standards for any appliances 688 
to facilitate the deployment of flexible demand technologies. The regulations may include 689 
labeling provisions to promote the use of appliances with flexible demand capabilities. The 690 
flexible demand appliance standards shall be based on feasible and attainable efficiencies or 691 
feasible improvements that will enable appliance operations to be scheduled, shifted or curtailed 692 
to reduce emissions of greenhouse gases associated with electricity generation.  693 
 SECTION 33. The second paragraph of section 62A of chapter 30 of the General Laws, 694 
as so appearing, is hereby amended by striking out the last sentence and inserting in place thereof 695 
the following sentence:- This section and sections 62B to 62L, inclusive, shall not apply to the 696 
energy facilities siting board established under section 69H of chapter 164 or to any proponent or 697 
owner of a large clean energy infrastructure facility, as defined in section 69G of said chapter 698 
164, or small clean energy infrastructure facility, as defined in section 21 of chapter 25A, in 699 
relation to an application for a consolidated permit or petition for a de novo adjudication filed 700 
under sections 69T to 69W, inclusive, of said chapter 164. 701 
 SECTION 34. Chapter 30B of the General Laws is hereby amended by striking out 702 
section 23, as so appearing, and inserting in place thereof the following section:-  703 
 Section 23. Notwithstanding section 39M of chapter 30 or any other general or special 704 
law to the contrary, a governmental body may, pursuant to this chapter, procure electric vehicles, 705 
including electric school buses, and the installation of electric vehicle supply equipment as 706 
defined in section 2 of chapter 25B for such electric vehicles. Electric vehicles and the 707  34 of 139 
installation of related electric vehicle supply equipment may be procured separately or in a single 708 
procurement. For the purposes of this section, electric vehicles shall be considered supplies and 709 
electric vehicle supply equipment and its installation shall be considered services; provided, 710 
however, that if electric vehicles and electric vehicle supply equipment and its installation are 711 
procured in a single procurement both shall be considered supplies.  712 
 A contract under this section shall only be awarded to a bidder who: (i) possesses the 713 
skill, ability and integrity necessary for the faithful performance of the work; (ii) certifies that it 714 
is able to furnish labor that can work in harmony with all other elements of labor employed or to 715 
be employed in the work; (iii) certifies that all employees to be employed at the worksite will 716 
have successfully completed a course in construction safety and health approved by the United 717 
States Occupational Safety and Health Administration that is not less than 10 hours in duration at 718 
the time the employee begins work and  furnish documentation of successful completion of such 719 
course with the first certified payroll report for each employee; and (iv) obtains within 10 days of 720 
the notification of contract award the security by bond required under section 29 of chapter 149.  721 
For the purposes of this section, “security by bond” shall mean the bond of a surety company 722 
qualified to do business under the laws of the commonwealth and satisfactory to the awarding 723 
authority; provided, however, that if there is more than 1 surety company, the surety companies 724 
shall be jointly and severally liable. Sections 26 to 27D, inclusive, of said chapter 149 shall apply 725 
to any contract entered into under this section. 726 
 SECTION 35. Section 23 of said chapter 30B is hereby repealed 727 
 SECTION 36. Section 1A of chapter 40A of the General Laws, as so appearing, is hereby 728 
amended by inserting after the definition of “Permit granting authority” the following definition:- 729  35 of 139 
 “Public service corporation”, (i) a corporation or other entity duly qualified to conduct 730 
business in the commonwealth that owns or operates or proposes to own or operate assets or 731 
facilities to provide electricity, gas, telecommunications, cable, water or other similar services of 732 
public need or convenience to the public directly or indirectly, including, but not limited to, an 733 
entity that owns or operates or proposes to own or operate electricity generation, storage, 734 
transmission or distribution facilities, or natural gas facilities including pipelines, and 735 
manufacturing and storage facilities; (ii) any transportation company that owns or operates or 736 
proposes to own or operate railways and related common carrier facilities; (iii) any 737 
communications company, including a wireless communications company or cable company that 738 
owns or operates or proposes to own or operate communications or cable facilities; and (iv) any 739 
water company that owns or operates or proposes to own or operate facilities necessary for its 740 
operations. 741 
 SECTION 37. Section 3 of said chapter 40A, as so appearing, is hereby amended by 742 
striking out, in lines 64 to 65, 74 and 82, the words “department of public utilities” and inserting 743 
in place thereof, in each instance, the following words:- energy facilities siting board. 744 
 SECTION 38. Section 5 of chapter 40C of the General Laws, as so appearing, is hereby 745 
amended by inserting after the word “districts”, in line 20, the following words:- ; the words 746 
“solar energy system” shall mean a device or structural design feature, a substantial purpose of 747 
which is to provide for the collection, storage and distribution of solar energy for space heating 748 
or cooling, electricity generation or water heating. 749 
 SECTION 39. The first paragraph of section 7 of said chapter 40C, as so appearing, is 750 
hereby amended by striking out the third sentence and inserting in place thereof the following 751  36 of 139 
sentence:- Notwithstanding any general or special law to the contrary, the commission shall give 752 
substantial weight to the threat posed by climate change and to the commonwealth’s obligation 753 
to meet statewide greenhouse gas emission limits and sublimits established under chapter 21N 754 
when ruling on applications for certificates of appropriateness for solar energy systems. 755 
 SECTION 40. Subsection (cc) of section 6 of chapter 62 of the General Laws, as so 756 
appearing, is hereby amended by striking out, in lines 1489 and 1490, the words “employ, in the 757 
aggregate with other tenants at the offshore wind facility, not less than 200” and inserting in 758 
place thereof the following words:- employ not less than 50. 759 
 SECTION 41. Section 38MM of chapter 63 of the General Laws, as so appearing, is 760 
hereby amended by striking out, in lines 48 to 50, inclusive, the words “employ, in the aggregate 761 
with other tenants at the offshore wind facility, not less than 200” and inserting in place thereof 762 
the following words:- employ not less than 50.   763 
 SECTION 42. Chapter 98 of the General Laws is hereby amended by adding the 764 
following section:-  765 
 Section 59. (a) For the purposes of this section, the following words shall have the 766 
following meanings unless the context clearly requires otherwise:-  767 
 “Charger”, a device having at least 1 charging port and connector for charging electric 768 
vehicles; provided, however, that “charger” shall also mean electric vehicle supply equipment.  769 
 “Charging network provider”, the entity that operates the digital communication network 770 
that remotely manages the chargers which may include charging station operators and 771 
manufacture chargers.  772  37 of 139 
 “Charging station”, a charger or group of chargers and the area in the immediate vicinity 773 
of such charger or group of chargers, which may include, at the discretion of the regulating 774 
entity, supporting equipment, parking areas adjacent to the chargers and lanes for vehicle ingress 775 
and egress; provided, however, that a charging station may comprise only part of the property on 776 
which it is located.  777 
 “Charging station operator”, an entity that owns or provides the chargers and the 778 
supporting equipment and facilities at charging stations and is responsible for the operation and 779 
maintenance of the chargers and the supporting equipment and facilities; provided, however, that 780 
such operator may delegate responsibility for certain aspects of the charging station operation 781 
and maintenance to subcontractors.  782 
 “Connector” or “Plug”, a device that attaches an electric vehicle to a charging port to 783 
transfer electricity. 784 
 “Direct current fast charger”, a charger that enables rapid charging by delivering direct-785 
current, or DC current, electricity directly to an electric vehicle’s battery.  786 
 “Electric vehicle”, a battery electric vehicle that is either a zero-emission vehicle or a 787 
plug-in hybrid electric vehicle equipped with an on-	board electrical energy storage device that 788 
can be recharged from an external source of electricity and has the capability to run on another 789 
fuel; provided, however, that “electric vehicle” shall not include a golf cart, electric bicycle or 790 
other micromobility device.  791 
 “Electric vehicle charging services”, the transfer of electric energy from an electric 792 
vehicle charging station to a battery or other storage device in an electric vehicle and related 793 
billing services, networking and operation and maintenance.  794  38 of 139 
 “Electric vehicle supply equipment”, a device, including at least 1 charging port and 795 
connector, for charging electric vehicles; provided, however, that “electric vehicle supply 796 
equipment” shall also mean a charger.  797 
 “Level 1”, a galvanically-connected electric vehicle supply equipment with a single-798 
phase input voltage nominally 120 volts AC, or alternating current, and maximum output current 799 
of not more than 16 amperes AC.  800 
 “Level 2”, a galvanically-connected electric vehicle supply equipment with a single-801 
phase input voltage range from 208 volts to 240 volts AC, or alternating current, and maximum 802 
output current of not more than 80 amperes AC.  803 
 “Public electric vehicle charging station”, an electric vehicle charging station located at a 804 
publicly- available parking space.  805 
 “Publicly-available parking space”, a parking space that has been designated by a 806 
property owner or lessee to be available to and accessible by the public and may include on-807 
street parking spaces and parking spaces in surface lots or parking garages; provided, however, 808 
that “publicly-available parking space” shall not include a parking space that is part of or 809 
associated with residential real property containing not more than 4 dwelling units or that is 810 
reserved for the exclusive use of an individual driver or vehicle or for a group of drivers or 811 
vehicles, including employees, tenants, visitors, residents of a common interest development and 812 
residents of an adjacent building.  813 
 “Publicly-funded and available charging station”, a public electric vehicle charging 814 
station that has received, or expects to receive, a grant, loan or other incentive from a federal or 815  39 of 139 
state government source or through a charge on ratepayers and is located at a publicly available 816 
parking space.  817 
 (b) The division of standards shall promulgate regulations to: (i) inventory the number 818 
and location of charging stations; and (ii) ensure the accuracy of pricing and volumes of 819 
electricity purchased at public electric vehicle charging stations; provided, however, that, with 820 
respect to such public charging stations, such regulations shall include setting minimum 821 
requirements for the communication and display of pricing information; provided further, that 822 
the division of standards shall not prevent a charging station from operating due to an omission 823 
or inability by the division to test, inspect, seal or inventory the charging station or otherwise 824 
administer and enforce such regulations or, in the case of a public electric vehicle charging 825 
station, due to an omission or inability to ensure the accuracy of pricing and volumes of 826 
electricity purchased at, and information communicated by, such charging station.  827 
 (c) Any regulations promulgated pursuant to this section may vary by technology type, 828 
power levels, number of chargers per site, site ownership and according to whether charging 829 
stations and chargers: (i) are networked; (ii) are level 1, level 2 or direct current fast chargers; 830 
and (iii) are all-inclusive mobile solar charging stations. Such regulations shall not apply to 831 
chargers or charging stations installed at a residential real property containing not more than 4 832 
dwelling units. The division may set standards for data formats that comply with electric vehicle 833 
charging industry best practices and standards, as determined by the division.  834 
 (d) Annually, not later than May 1, the division shall submit a report and accompanying 835 
data with respect to the inventory required under subsections (b) and (c) and other findings made 836 
and activities undertaken pursuant to said subsections (b) and (c) to the joint committee on ways 837  40 of 139 
and means, the joint committee on telecommunications, utilities and energy, the secretary of 838 
energy and environmental affairs and the secretary of administration and finance.  839 
 (e) In promulgating regulations under this section, the division may apply different 840 
requirements to publicly-	funded and available electric vehicle chargers and other charging 841 
stations. 842 
 SECTION 43. Section 95 of chapter 143 of the General Laws, as so appearing, is hereby 843 
amended by inserting after the word “conservation”, in line 6, the following words:- , energy 844 
efficiency, reductions in greenhouse gas emissions, reductions in embodied carbon. 845 
 SECTION 44. Said section 95 of said chapter 143, as so appearing, is hereby further 846 
amended by inserting after the word “buildings”, in line 21, the following words:- ; provided 847 
however, that, notwithstanding any general or special law or regulation to the contrary,  the 848 
board may vary such standards, regulations and requirements and prefer the treatment of certain 849 
types of classes of materials, products and methods of construction, in order to advance 850 
reductions in greenhouse gas emissions needed to meet the statewide greenhouse gas emissions 851 
limits and sublimits established pursuant to chapter 21N; and provided further, that any such 852 
variation in standards, regulations and requirements and any such preferential treatment shall not 853 
affect the health, safety and security of the occupants or users of buildings. 854 
 SECTION 45. Said chapter 143 is hereby further amended by adding the following 855 
section:- 856 
 Section 101. Notwithstanding any provision of the state building code, specialized code 857 
or any other general or special law to the contrary, refrigerants identified as an alternative for use 858 
in accordance with 42 U.S.C. 7671k shall be acceptable for use in the commonwealth. 859  41 of 139 
 SECTION 46. Section 1 of chapter 164 of the General Laws, as so appearing, is hereby 860 
amended by inserting before the definition of “Aggregator” the following definition:- 861 
 “Advanced metering infrastructure”, a meter and network communications technology 862 
that measures, records and transmits electricity usage by the end user at a minimum of hourly 863 
intervals and is capable of providing data to the end user and authorized third parties in real time 864 
or near real time. 865 
 SECTION 47. Said section 1 of said chapter 164, as so appearing, is hereby further 866 
amended by striking out the definition of “Gas company” and inserting in place thereof the 867 
following definition:-  868 
 “Gas company”, a corporation originally organized for the purpose of making and selling 869 
or distributing and selling, gas within the commonwealth, even though subsequently authorized 870 
to make or sell electricity. A gas company may make, sell or distribute utility-scale non-emitting 871 
thermal energy, including networked geothermal and deep geothermal energy. 872 
 SECTION 48. Section 1F of said chapter 164, as so appearing, is hereby amended by 873 
striking out paragraph (4) and inserting in place thereof the following paragraph:-  874 
 (4)(i) The department shall require that distribution companies provide discounted rates 875 
for low income customers and eligible moderate income customers comparable to the low 876 
income discount rate in effect prior to March 1, 1998. Such discounts shall be in addition to any 877 
reduction in rates that becomes effective pursuant to subsection (b) of section 1B on March 1, 878 
1998. and to any subsequent rate reductions provided by a distribution company pursuant to said 879 
subsection. The cost of such discounts shall be included in the rates charged to all other 880 
customers of a distribution company upon approval by the department. Each distribution 881  42 of 139 
company shall guarantee payment to the generation supplier for all power sold to low income 882 
and eligible moderate income customers at the discounted rates. Eligibility for the discount rates 883 
provided for in this section shall be established upon verification of a low income customer’s 884 
receipt of any means-tested public benefit or verification of eligibility for the low income home 885 
energy assistance program, or its successor program, for which eligibility does not exceed 200 886 
per cent of the federal poverty level based on a household’s gross income and by criteria 887 
determined by the department for verification of an eligible moderate income customer. Such 888 
public benefits may include, but shall not be limited to including, assistance that provides cash, 889 
housing, food or medical care including, but not limited to, transitional assistance for needy 890 
families, supplemental security income, emergency assistance to elders, disabled and children, 891 
food stamps, public housing, federally-	subsidized or state-subsidized housing, the low income 892 
home energy assistance program, veterans’ benefits and similar benefits. The department of 893 
energy resources shall make available to distribution companies the eligibility guidelines for said 894 
public benefit programs. Each distribution company shall conduct substantial outreach efforts to 895 
make the low income or moderate income discount available to eligible customers and shall 896 
report to the department of energy resources, at least annually, as to its outreach activities and 897 
results. Outreach may include establishing an automated program of matching customer accounts 898 
with: (A) lists of recipients of said means-tested public benefit programs and, based on the 899 
results of said matching program, to presumptively offer a low income discount rate to eligible 900 
customers so identified; and (B) criteria established by the department for verification of a 901 
moderate income customer to presumptively offer a moderate income discount rate to eligible 902 
customers so identified; provided, however, that the distribution company, within 60 days of said 903 
presumptive enrollment, informs any such low income customer or eligible moderate income 904  43 of 139 
customer of said presumptive enrollment and all rights and obligations of a customer under said 905 
program, including the right to withdraw from said program without penalty.  906 
 In a program year in which maximum eligibility for the low income home energy 907 
assistance program, or its successor program, exceeds 200 per cent of the federal poverty level, a 908 
household that is income eligible for the low income home energy assistance program shall be 909 
eligible for the low income discount rates required by this subparagraph.  910 
 (ii) A residential customer eligible for low income or moderate income discount rates 911 
shall receive the service on demand. Each distribution company shall periodically notify all 912 
customers of the availability and method of obtaining low income or moderate income discount 913 
rates. An existing residential customer eligible for a low income or moderate income discount on 914 
the date of the start of retail access who orders service for the first time from a distribution 915 
company shall be offered basic service by that distribution company.  916 
 The department shall promulgate rules and regulations requiring utility companies 917 
organized pursuant to this chapter to produce information, in the form of a mailing, webpage or 918 
other approved method of distribution, to their consumers, to inform them of available rebates, 919 
discounts, credits and other cost-saving mechanisms that can help them lower their monthly 920 
utility bills and send out such information semi-annually, unless otherwise provided by this 921 
chapter.  922 
 (iii) There shall be no charge to any residential customer for initiating or terminating low 923 
income or moderate income discount rates, default service or standard offer service when said 924 
initiation or termination request is made after a regular meter reading has occurred and the 925 
customer is in receipt of the results of said reading. A distribution company may impose a 926  44 of 139 
reasonable charge, as set by the department through regulation, for initiating or terminating low 927 
income or moderate income discount rates, default service or standard offer service when a 928 
customer does not make such an initiation or termination request upon the receipt of said results 929 
and prior to the receipt of the next regularly scheduled meter reading. For purposes of this 930 
subsection, there shall be a regular meter reading conducted of every residential account not less 931 
often than once every 2 months. Notwithstanding the foregoing, there shall be no charge when 932 
the initiation or termination is involuntary on the part of the customer. 933 
 SECTION 49. Section 30 of said chapter 164, as appearing in the 2022 Official Edition, 934 
is hereby amended by adding the following paragraph:- 935 
 Notwithstanding any general or special law to the contrary, in deciding whether to 936 
exercise its authority pursuant to this section, the department shall consider whether a request to   937 
authorize gas distribution service is reasonable and in the public interest; provided, however, that 938 
in determining reasonableness and the public interest, the department shall consider factors 939 
including, but not limited to: (i) the commonwealth’s interest in complying with the greenhouse 940 
gas emissions limits and sublimits established pursuant to chapter 21N, including the statewide 941 
emissions limit set for 2050; (ii) the commonwealth’s interest in avoiding the stranding of assets 942 
and the likelihood of costs being borne by ratepayers; and (iii) whether an alternative to gas 943 
service is available and likely to provide substantially similar service, which shall include 944 
consideration of cost. 945 
 SECTION 50. Section 69G of said chapter 164, as so appearing, is hereby amended by 946 
striking out, in line 1, the words “sixty-	nine H to sixty- nine R” and inserting in place thereof the 947 
following words:- 69H to 69W. 948  45 of 139 
 SECTION 51. Said section 69G of said chapter 164, as so appearing, is hereby further 949 
amended by striking out the definition of “Applicant” and inserting in place thereof the following 950 
2 definitions:-  951 
 “Anaerobic digestion facility”, a facility that: (i) generates electricity from a biogas 952 
produced by the accelerated biodegradation of organic materials under controlled anaerobic 953 
conditions; and (ii) has been determined by the department of energy resources, in coordination 954 
with the department of environmental protection, to qualify under the department of energy 955 
resources regulations as a Class I renewable energy generating source under section 11F of 956 
chapter 25A. 957 
 “Applicant”, a person or group of persons who submits to the department or board a 958 
long-range plan, a petition to construct a facility, a petition for a consolidated permit for a large 959 
clean energy infrastructure facility or small clean energy infrastructure facility, a petition for a 960 
certificate of environmental impact and public need, a notice of intent to construct an oil facility 961 
or any application, petition or matter referred by the chair of the department to the board 962 
pursuant to section 69H. 963 
 SECTION 52. Said section 69G of said chapter 164, as so appearing, is hereby further 964 
amended by inserting after the definition of “Certificate” the following definition:- 965 
 “Consolidated permit”, a permit issued by the board to a large clean energy 966 
infrastructure facility or a small clean energy infrastructure facility that includes all municipal, 967 
regional and state permits that the large or small clean energy infrastructure facility would 968 
otherwise need to obtain individually, with the exception of certain federal permits that are 969 
delegated to specific state agencies as determined by the board. 970  46 of 139 
 SECTION 53. Said section 69G of said chapter 164, as so appearing, is hereby further 971 
amended by striking out the definition of “Department” and inserting in place thereof the 972 
following 3 definitions:- 973 
 “Cumulative impact analysis”, a written report produced by the applicant assessing 974 
impacts and burdens, including but not limited to any existing environmental burden and  public 975 
health consequences impacting a specific geographical area in which a facility, large clean 976 
energy infrastructure facility or small clean energy infrastructure facility is proposed from any 977 
prior or current private, industrial, commercial, state or municipal operation or project ; 978 
provided, that if the analysis indicates that such a geographical area is subject to an existing 979 
unfair or inequitable environmental burden or related health consequence, the analysis shall 980 
identify any: (i) environmental and public health impact from the proposed project that would 981 
likely result in a disproportionate adverse effect on such geographical area; (ii) potential impact 982 
or consequence from the proposed project that would increase or reduce the effects of climate 983 
change on such geographical area; and (iii) proposed potential remedial actions to address any 984 
disproportionate adverse impacts to the environment, public health and climate resilience of such 985 
geographical area that may be attributable to the proposed project. Said cumulative impact 986 
analysis shall be developed in accordance with guidance established by the office of 987 
environmental justice and equity established pursuant to section 29 of chapter 21A and 988 
regulations promulgated by the board. 989 
 “Department”, the department of public utilities. 990 
 “Director”, the director of the facilities siting division appointed pursuant to section 12N 991 
of chapter 25, who shall serve as the director of the board; provided, however, that the director 992  47 of 139 
may issue decisions on de novo adjudications of local permit applications pursuant to section 993 
69W of chapter 164. 994 
 SECTION 54. Said section 69G of said chapter 164, as so appearing, is hereby further 995 
amended by inserting after the word “capacity”, in line 46, the following words:- ; provided, 996 
however, that “facility” shall not include a large clean energy infrastructure facility or small 997 
clean energy infrastructure facility.  998 
 SECTION 55. Said section 69G of said chapter 164, as so appearing, is hereby further 999 
amended by striking out, in line 48, the words “and liquified natural gas” and inserting in place 1000 
thereof the following words:- liquified natural gas, renewable natural gas and hydrogen. 1001 
 SECTION 56. Said section 69G of said chapter 164, as so appearing, is hereby further 1002 
amended by striking out, in line 61, the figure “100” and inserting in place thereof the following 1003 
figure:- 25. 1004 
 SECTION 57. Said section 69G of said chapter 164, as so appearing, is hereby further 1005 
amended by inserting after the definition of “Generating facility” the following 4 definitions:-  1006 
 “Large clean energy generation facility”, energy generation infrastructure with a 1007 
nameplate capacity of not less than 25 megawatts that is an anaerobic digestion facility, solar 1008 
facility or wind facility, including any ancillary structure that is an integral part of the operation 1009 
of the large clean energy generation facility, or, following a rulemaking by the board in 1010 
consultation with the department of energy resources that includes the facility within the 1011 
regulatory definition of a large clean energy generation facility, any other type of generation 1012 
facility that does not emit greenhouse gas; provided, however, that the nameplate capacity for 1013 
solar facilities shall be calculated in direct current. 1014  48 of 139 
 “Large clean energy infrastructure facility”, a large clean energy generation facility, large 1015 
clean energy storage facility or large clean transmission and distribution infrastructure facility.  1016 
 “Large clean energy storage facility”, an energy storage system as defined under section 1017 
1 with a rated capacity of not less than 100 megawatt hours, including any ancillary structure that 1018 
is an integral part of the operation of the large clean energy storage facility.  1019 
 “Large clean transmission and distribution infrastructure facility”, electric transmission 1020 
and distribution infrastructure and related ancillary infrastructure that is: (i) a new electric 1021 
transmission line having a design rating of not less than 69 kilovolts and that is not less than 1 1022 
mile in length on a new transmission corridor, including any ancillary structure that is an integral 1023 
part of the operation of the transmission line; (ii) a new electric transmission line having a design 1024 
rating of not less than 115 kilovolts that is not less than 10 miles in length on an existing 1025 
transmission corridor except reconductored or rebuilt transmission lines at the same voltage, 1026 
including any ancillary structure that is an integral part of the operation of the transmission line; 1027 
(iii) any other new electric transmission infrastructure requiring zoning exemptions, including 1028 
standalone transmission substations and upgrades and any ancillary structure that is an integral 1029 
part of the operation of the transmission line; and (iv) facilities needed to interconnect offshore 1030 
wind to the grid; provided, however, that the large clean transmission and distribution facility is: 1031 
(A) designed, fully or in part, to directly interconnect or otherwise facilitate the interconnection 1032 
of clean energy infrastructure to the electric grid; (B) approved by the regional transmission 1033 
operator in relation to interconnecting clean energy infrastructure; (C) proposed to ensure electric 1034 
grid reliability and stability; or (D) will help facilitate the electrification of the building and 1035 
transportation sectors; provided further, that a “large clean transmission and distribution 1036 
infrastructure facility” shall not include new transmission and distribution infrastructure that 1037  49 of 139 
solely interconnects new and existing energy generation powered by fossil fuels on or after 1038 
January 1, 2026. 1039 
 SECTION 58. Said section 69G of said chapter 164, as so appearing, is hereby further 1040 
amended by striking out the definition of “Significant portion of his income” and inserting in 1041 
place thereof the following 6 definitions:- 1042 
 “Significant portion of their income”, 10 per cent of gross personal income for a calendar 1043 
year; provided, however, that it shall mean 50 per cent of gross personal income for a calendar 1044 
year if the recipient is over 60 years of age and is receiving such portion pursuant to retirement, 1045 
pension or similar arrangement. Income includes retirement benefits, consultants’ fees and stock 1046 
dividends. Income shall not be received directly or indirectly from permit holders or applicants 1047 
for a permit where it is derived from mutual fund payments or from other diversified investments 1048 
over which the recipient does not know the identity of the primary sources of income. 1049 
 “Small clean energy generation facility”, as defined in section 21 of chapter 25A. 1050 
 “Small clean energy infrastructure facility”, as defined in section 21 of chapter 25A.  1051 
 “Small clean energy storage facility”, as defined in section 21 of chapter 25A. 1052 
 “Small clean transmission and distribution infrastructure facility”, as defined in section 1053 
21 of chapter 25A. 1054 
 “Solar facility”, a ground mounted facility that uses sunlight to generate electricity. 1055 
 SECTION 59. Said section 69G of said chapter 164, as so appearing, is hereby further 1056 
amended by adding the following definition:-  1057  50 of 139 
 “Wind facility”, an onshore or offshore facility that uses wind to generate electricity. 1058 
 SECTION 60. Section 69H of said chapter 164, as amended by section 292 of chapter 7 1059 
of the acts of 2023, is hereby further amended by striking out the first 3 paragraphs and inserting 1060 
in place thereof the following 4 paragraphs:-  1061 
 There shall be an energy facilities siting board within the department, but not under the 1062 
supervision or control of the department. The board shall implement the provisions contained in 1063 
sections 69H to 69Q, inclusive, and sections 69S to 69W, inclusive, to: (i) provide a reliable, 1064 
resilient and clean supply of energy consistent with the commonwealth’s climate change and 1065 
greenhouse gas reduction policies and requirements; (ii) ensure that large clean energy 1066 
infrastructure facilities, small clean energy infrastructure facilities, facilities and oil facilities 1067 
avoid or minimize or, if impacts cannot be avoided or minimized, mitigate environmental 1068 
impacts and negative health impacts to the extent practicable; (iii) ensure that large clean energy 1069 
infrastructure facilities, small clean energy infrastructure facilities, facilities and oil facilities are, 1070 
to the extent practicable, in compliance with energy, environmental, land use, labor, economic 1071 
justice, environmental justice and equity and public health and safety policies of the 1072 
commonwealth, its subdivisions and its municipalities; and (iv) ensure large clean energy 1073 
infrastructure facilities, small clean energy infrastructure facilities, facilities and oil facilities are 1074 
constructed in a manner that avoids or minimizes costs. The board shall review: (A) the need for, 1075 
cost of and environmental and public health impacts of transmission lines, natural gas pipelines, 1076 
facilities for the manufacture and storage of gas, oil facilities, large clean transmission and 1077 
distribution infrastructure facilities and small clean transmission and distribution infrastructure 1078 
facilities; and (B) the environmental and public health impacts of generating facilities, large 1079  51 of 139 
clean energy generation facilities, small clean energy generation facilities, large clean energy 1080 
storage facilities and small clean energy storage facilities.   1081 
 Any determination made by the board shall describe the environmental and public health 1082 
impacts, if any, of the large clean energy infrastructure facility, small clean energy infrastructure 1083 
facility, facility or oil facility and shall include findings, including, but not be limited to, findings 1084 
that: (i) efforts have been made to avoid or minimize or, if impacts cannot be avoided or 1085 
minimized, mitigate environmental impacts; (ii) due consideration has been given to the findings 1086 
and recommendations of local governments; (iii) in the case of large clean transmission and 1087 
distribution infrastructure facilities, small clean transmission and distribution infrastructure 1088 
facilities and natural gas pipelines, due consideration has been given to advanced conductors, 1089 
advanced transmission technologies, grid enhancement technologies, non-	wires or non- pipeline 1090 
alternatives, the repair or retirement of pipelines and other alternatives in an effort to avoid or 1091 
minimize expenditures; (iv) in the case of large clean transmission and distribution infrastructure 1092 
facilities and small clean transmission and distribution infrastructure facilities, the infrastructure 1093 
or project will increase the capacity of the system to interconnect large electricity customers, 1094 
electric vehicle supply equipment, clean energy generation, clean energy storage or other clean 1095 
energy generation sources that qualify under any clean energy standard regulation established by 1096 
the department of environmental protection pursuant to subsection (d) of section 3 of chapter 1097 
21N or will facilitate the electrification of the building and transportation sectors; and (v) due 1098 
consideration has been given to any cumulative burdens on host communities and efforts that 1099 
must be taken to avoid or minimize or, if impacts cannot be avoided or minimized, efforts to 1100 
mitigate such burdens. In considering and issuing a decision, the board shall also consider 1101 
reasonably foreseeable climate change impacts, including additional greenhouse gas or other 1102  52 of 139 
pollutant emissions known to have negative health impacts, predicted sea level rise, flooding and 1103 
any other disproportionate adverse effects on a specific geographical area. Such reviews shall be 1104 
conducted consistent with section 69J 1/4 for generating facilities, section 69T for large clean 1105 
energy infrastructure facilities, sections 69U to 69W, inclusive, for small clean energy 1106 
infrastructure facilities and section 69J for all other types of facilities.  1107 
 The board shall be composed of: the secretary of energy and environmental affairs or a 1108 
designee, who shall serve as chair; the secretary of economic development or a designee; the 1109 
commissioner of environmental protection or a designee; the commissioner of energy resources 1110 
or a designee; the chair of the department of public utilities or a designee; the commissioner of 1111 
fish and game or a designee; the commissioner of public health or a designee; and 4 public 1112 
members to be appointed by the governor for a term coterminous with that of the governor, 1 of 1113 
whom shall be a representative of the Massachusetts Association of Regional Planning Agencies, 1114 
1 of whom shall be a representative of the Massachusetts Municipal Association, Inc. with 1115 
expertise in municipal permitting matters, 1 of whom shall be experienced in environmental 1116 
justice issues or indigenous sovereignty and 1 of whom shall be experienced in labor issues; 1117 
provided, however, that the public members shall not have received, within the 2 years 1118 
immediately preceding appointment, a significant portion of their income directly or indirectly 1119 
from the developer of an energy facility or an electric, gas or oil company. The public members 1120 
shall serve on a part-time basis, receive $100 per diem of board service and be reimbursed by the 1121 
commonwealth for all reasonable expenses actually and necessarily incurred in the performance 1122 
of official board duties. Upon the resignation of any public member, a successor shall be 1123 
appointed in a like manner for the unexpired portion of the term. Appointees shall serve for not 1124 
more than 2 consecutive full terms.  1125  53 of 139 
 In the event of the absence, recusal or disqualification of the chair, the commissioner of 1126 
energy resources shall appoint an acting chair from the remaining members of the board. The 1127 
board shall meet at such time and place as the chair may designate or upon the request of 3 1128 
members. The board shall render a final decision on an application by a majority vote of the 1129 
members in attendance at a meeting and 5 members shall constitute a quorum.  1130 
 SECTION 61. The fifth paragraph of said section 69H of said chapter 164, as appearing 1131 
in the 2022 Official Edition, is hereby amended by striking out clause (1) and inserting in place 1132 
thereof the following clause:- 1133 
 (1) To adopt and publish rules and regulations consistent with the purposes of sections 1134 
69H to 69S, inclusive, and to amend the same from time to time, including, but not limited to, 1135 
rules and regulations for the conduct of the board’s public hearings under sections 69H 1/2, 69J, 1136 
69J 1/4, 69M and 69T to 69W, inclusive. 1137 
 SECTION 62. Said section 69H of said chapter 164, as so appearing, is hereby further 1138 
amended by adding the following 2 paragraphs:- 1139 
 In consultation with the office of environmental justice and equity and the Massachusetts 1140 
environmental policy act office, the board shall promulgate regulations for cumulative impact 1141 
analysis as part of its review of facilities, large clean energy infrastructure facilities and small 1142 
clean energy infrastructure facilities; provided, however, that such regulations shall be informed 1143 
by the cumulative impact analysis standards and guidelines issued pursuant to section 29 of 1144 
chapter 21A. 1145 
 The board and any proponent or owner of a large clean energy infrastructure facility or 1146 
small clean energy infrastructure facility shall not be subject to any provisions of sections 61 to 1147  54 of 139 
62L, inclusive, of chapter 30 in relation to an application or petition for a comprehensive permit 1148 
or de novo adjudication filed under sections 69T to 69W, inclusive. This section shall apply to 1149 
any state agency issuing, in relation to an application or petition under said sections 69T to 69V, 1150 
inclusive, a federal permit that is delegated to that agency and determined by the board to be 1151 
excluded from the definition of consolidated permit in section 69G. 1152 
 SECTION 63. The third paragraph of section 69I of said chapter 164, as so appearing, is 1153 
hereby amended by striking out the last sentence and inserting in place thereof the following 1154 
sentence:- Neither the board nor any other person shall, in taking any action pursuant to sections 1155 
69J to 69J1/4, inclusive, or sections 69T to 69W, inclusive, be subject to sections 61 to 62H, 1156 
inclusive, of chapter 30.  1157 
 SECTION 64. Section 69J of said chapter 164, as so appearing, is hereby amended by 1158 
inserting after the word “facility”, in lines 1 and 2, the following words:- that is not a large clean 1159 
energy infrastructure facility or small clean energy infrastructure facility. 1160 
 SECTION 65. Said section 69J of said chapter 164, as so appearing, is hereby further 1161 
amended by striking out the second to fourth paragraphs, inclusive, and inserting in place thereof 1162 
the following paragraph:- 1163 
 A petition to construct a facility shall include, in such form and detail as the board shall 1164 
from time to time prescribe: (i) a description of the facility, site and surrounding areas; (ii) an 1165 
analysis of the need for the facility, either within or outside, or both within and outside the 1166 
commonwealth, including a description of the energy benefits of the facility; (iii) a description of 1167 
the alternatives to the facility, such as other methods of transmitting or storing energy, other site 1168 
locations, other sources of electrical power or gas or a reduction of requirements through load 1169  55 of 139 
management; (iv) a description of the environmental impacts of the facility, including both 1170 
environmental benefits and burdens, that includes a description of efforts to avoid, minimize and 1171 
mitigate burdens and efforts to enhance benefits, such as shared use, recreational paths or access 1172 
to nature; (v) evidence that all pre-	filing consultation and community engagement requirements 1173 
established by the board have been satisfied and, if not, the applicant shall demonstrate good 1174 
cause for a waiver of the requirements that could not be satisfied by the applicant; and (vi) a 1175 
cumulative impact analysis. The board may issue and revise filing guidelines after public notice 1176 
and a period for comment. Said filing guidelines shall require the applicant to provide minimum 1177 
data for review related to climate change impact, land use impact, water resource impact, air 1178 
quality impact, fire and other public safety risks, solid waste impact, radiation impact, noise 1179 
impact and other public health impacts as determined by the board. 1180 
 SECTION 66. Said section 69J of said chapter 164, as so appearing, is hereby further 1181 
amended by striking out the last paragraph and inserting in place thereof the following 1182 
paragraph:- 1183 
 This section shall not apply to petitions submitted under sections 69U to 69W, inclusive, 1184 
or petitions to construct a generating facility or a large clean energy infrastructure facility, which 1185 
shall be subject to sections 69J1/4 and 69T, respectively 1186 
 SECTION 67. Section 69J1/4 of said chapter 164, as so appearing, is hereby amended by 1187 
inserting after the word “facility”, in line 2, the following words:- that is not a large clean energy 1188 
infrastructure facility or small clean energy infrastructure facility. 1189  56 of 139 
 SECTION 68. Said section 69J1/4 of said chapter 164, as so appearing, is hereby further 1190 
amended by striking out the third paragraph and inserting in place thereof the following 1191 
paragraph:- 1192 
 A petition to construct a generating facility shall include, in such form and detail as the 1193 
board shall from time to time prescribe, the following information: (i) a description of the 1194 
proposed generating facility, including any ancillary structures and related facilities, including a 1195 
description of the energy benefits of the generating facility; (ii) a description of the 1196 
environmental and public health impacts of the facility, including both environmental and public 1197 
health benefits and burdens, that includes efforts to avoid or minimize or, if impacts cannot be 1198 
avoided or minimized, to mitigate the burdens and enhance the benefits, as well as costs 1199 
associated with the mitigation, control or reduction of such environmental and public health 1200 
impacts; (iii) a description of the project development and site selection process used in choosing 1201 
the design and location of the proposed generating facility; (iv) either: (a) evidence that the 1202 
expected emissions from the facility meet the technology performance standard in effect at the 1203 
time of filing; or (b) a description of the environmental impacts, costs and reliability of other 1204 
fossil fuel generating technologies and an explanation of why the proposed technology was 1205 
chosen; (v) evidence that all prefiling consultation and community engagement requirements 1206 
established by the board have been satisfied and, if not, the applicant shall demonstrate good 1207 
cause for a waiver of the requirements that could not be satisfied by the applicant; (vi) a 1208 
cumulative impact analysis; and (vii) any other information necessary to demonstrate that the 1209 
generating facility meets the requirements for approval specified in this section. 1210 
 SECTION 69. Said chapter 164 is hereby further amended by striking out section 69J1/2, 1211 
as so appearing, and inserting in place thereof the following section:-  1212  57 of 139 
 Section 69J1/2. Notwithstanding any general or special law to the contrary, the 1213 
department may charge a fee as specified by its regulations for each application to construct a 1214 
facility that generates electricity, a large clean energy generation facility, a small clean energy 1215 
generation facility, a large clean energy storage facility, a small clean energy storage facility, a 1216 
non-utility owned large clean transmission and distribution infrastructure facility or a small clean 1217 
transmission and distribution infrastructure facility. If the application to construct any such 1218 
facility is accompanied by an application to construct 1 additional facility that does not generate 1219 
electricity, the department may charge a fee as specified by its regulations for the combined 1220 
application. If an application to construct a facility that generates electricity is accompanied by 1221 
applications to construct 2 additional facilities that do not generate electricity, the department 1222 
may charge a fee as specified by its regulations for the combined application. If an application to 1223 
construct a facility that does not generate electricity is filed separately, the department may 1224 
charge a fee as specified by its regulations for each such application; provided, however, that, the 1225 
department may charge a lower fee for applications to construct facilities that do not generate 1226 
electricity and that are below a size to be determined by the department. Said fees shall be 1227 
payable upon issuance of the notice of adjudication and public hearing.  1228 
 The department may retain said fees for the purpose of reviewing applications to 1229 
construct or consolidated permit applications for large clean energy infrastructure facilities, small 1230 
clean energy infrastructure facilities or other facilities subject to this section and for the purpose 1231 
of creating a clean energy infrastructure dashboard established under section 12N of chapter 25. 1232 
 Any remaining balance of fees at the end of a fiscal year shall not revert to the General 1233 
Fund but shall remain available to the department during the following fiscal year for the 1234 
purposes of this section or section 12S of chapter 25.   1235  58 of 139 
 The department shall issue an annual report summarizing the data and information 1236 
required by this section, including, but not limited to: (i) the number of applications filed for 1237 
facilities, large clean energy infrastructure facilities and small clean energy infrastructure 1238 
facilities, decided and pending; (ii) the average duration of review; and (iii) the average staffing 1239 
levels; provided, however, that the annual report shall make use of bar charts, line charts and 1240 
other visual representations in order to facilitate public understanding of events of the immediate 1241 
preceding year and of long-	term and cumulative trends and outcomes. The board shall file the 1242 
report with the clerks of the house of representatives and the senate, the house and senate 1243 
committees on ways and means and the joint committee on telecommunications, utilities and 1244 
energy not later than January 31.  1245 
 Nothing contained in this section shall be interpreted as changing the statutory mandates 1246 
of the department or board or the type of facilities that may be constructed by applicants that are 1247 
not utilities. Nothing contained in this section shall be interpreted as changing the regulations or 1248 
body of precedent of the department or board or interpreted as changing the rights of intervenors 1249 
before the department or board.  1250 
 SECTION 70. Section 69O of said chapter 164, as so appearing, is hereby amended by 1251 
striking out, in lines 7 and 8, the words “sixty-	one to sixty- two H, inclusive, of chapter thirty” 1252 
and inserting in place thereof the following words:- 61 to 62L, inclusive, of chapter 30. 1253 
 SECTION 71. Said chapter 164 is hereby further amended by striking out section 69P, as 1254 
so appearing, and inserting in place thereof the following section:- 1255 
 Section 69P. Any party in interest aggrieved by a final decision of the board or the 1256 
director shall have a right to judicial review in the manner provided by section 5 of chapter 25. 1257  59 of 139 
The scope of such judicial review shall be limited to whether the decision of the board or the 1258 
director: (i) is in conformity with the Constitution of the Commonwealth and the United states 1259 
Constitution; (ii) was made in accordance with the procedures established in section 69H to 69O, 1260 
inclusive, and section 69T to 69W, inclusive, and the rules and regulations of the board with 1261 
respect to such provisions; (iii) was supported by substantial evidence of record in the board’s 1262 
proceedings; or (iv) was arbitrary, capricious or an abuse of the board’s discretion under said 1263 
section 69H to 69O, inclusive, and said section 69T to 69W, inclusive. 1264 
 SECTION 72. Said chapter 164 is hereby further amended by striking out section 69R, as 1265 
so appearing, and inserting in place thereof the following section:- 1266 
 Section 69R. An electric or gas company, generation company or wholesale generation 1267 
company may petition the board for the right to exercise the power of eminent domain with 1268 
respect to a facility, large clean transmission and distribution infrastructure facility or small clean 1269 
transmission and distribution infrastructure facility, specified and contained in a petition or 1270 
application submitted in accordance with sections 69J, 69T or 69U, or a bulk power supply 1271 
substation if such company is unable to reach an agreement with the owners of land for the 1272 
acquisition of any necessary estate or interest in land. The applicant shall forward, at the time of 1273 
filing such petition, a copy thereof to each city, town and property owner affected. 1274 
 The company shall file with such petition or have annexed thereto: (i) a statement of the 1275 
use for which such land is to be taken; (ii) a description of land to be taken sufficient for the 1276 
identification thereof; (iii) a statement of the estate or interest in the land to be taken for such 1277 
use; (iv) a plan showing the land to be taken; (v) a statement of the sum of money established by 1278  60 of 139 
such utility to be just compensation for the land to be taken; and (vi) such additional maps and 1279 
information as the board requires. 1280 
 The board, after such notice as it may direct, shall hold at least 1 public hearing in the 1281 
community in which the land to be taken is located. For facilities involving takings in several 1282 
communities, the hearing shall be held in communities in proximity to the land to be taken, as 1283 
determined by the board. The board may thereafter authorize the company to take by eminent 1284 
domain under chapter 79 such lands necessary for the construction of the facility as are required 1285 
in the public interest, convenience and necessity. The board shall transmit a certified copy of its 1286 
order to the company and to the clerk of each affected municipality. 1287 
 If the board dismisses the petition at any stage in the proceedings, no further action shall 1288 
be taken thereon and the company may file a new petition not less than 1 year after the date of 1289 
such dismissal. 1290 
 Following a taking under this section, the electric or gas company may forthwith proceed 1291 
to utilize such land. If the electric or gas company shall not utilize the lands so taken for the 1292 
purpose or purposes authorized in the department’s order within such time as the board shall 1293 
determine, its rights under such taking shall cease and terminate. 1294 
 No land, rights of way or other easements therein in any public way, public park, 1295 
reservation or other land subject to Article 97 of the Amendments to the Constitution of the 1296 
Commonwealth shall be taken by eminent domain under this section except in accordance with 1297 
said Article 97. 1298  61 of 139 
 This section shall not be construed as abrogating the board’s jurisdiction described in 1299 
section 72 in respect to transmission lines or the board’s jurisdiction described in sections 75B to 1300 
75G, inclusive, in respect to natural gas transmission lines. 1301 
 SECTION 73. The second paragraph of section 69S of said chapter 164, as so appearing, 1302 
is hereby amended by striking out the first sentence and inserting in place thereof the following 1303 
sentence:- The board, after such notice as it may direct, shall hold at least 1 public hearing in the 1304 
city or town in which the greater portion of said land in question is located. 1305 
 SECTION 74. Said chapter 164 is hereby further amended by inserting after section 69S 1306 
the following 4 sections:-  1307 
 Section 69T. (a) The energy facilities siting board may issue consolidated permits for 1308 
large clean energy infrastructure facilities. No applicant shall commence construction of a large 1309 
clean energy infrastructure facility at a site unless an application for a consolidated permit for 1310 
such facility pursuant to this section has been approved by the board and no state agency shall 1311 
issue a construction permit for any such facility unless the petition to construct such facility has 1312 
been approved by the board. For the purposes of this section, construction shall not include 1313 
contractual obligations to purchase facilities or equipment.  1314 
 (b) The board shall establish the following criteria governing the siting and permitting of 1315 
large clean energy infrastructure facilities: (i) a uniform set of baseline health, safety, 1316 
environmental and other standards that apply to the issuance of a consolidated permit; (ii) a 1317 
common standard application to be used when submitting an application to the board; (iii) pre-1318 
filing requirements commensurate with the scope and scale of the proposed large clean energy 1319 
infrastructure facility, which shall include specific requirements for pre-filing consultations with 1320  62 of 139 
permitting agencies and the Massachusetts environmental policy act office, public meetings and 1321 
other forms of outreach that must occur in advance of an applicant submitting an application; (iv) 1322 
standards for applying site suitability criteria developed by the executive office of energy and 1323 
environmental affairs pursuant to section 30 of chapter 21A to evaluate the social and 1324 
environmental impacts of proposed large clean energy infrastructure project sites and which shall 1325 
include a mitigation hierarchy to be applied during the permitting process to avoid or minimize 1326 
or, if impacts cannot be avoided or minimized, mitigate impacts of siting on the environment, 1327 
people and goals and objectives of the commonwealth for climate mitigation, carbon storage and 1328 
sequestration, resilience, biodiversity and protection of natural and working lands to the extent 1329 
practicable; (v) standards for applying the cumulative impacts analysis standards and guidelines 1330 
developed by the office of environmental justice and equity pursuant to section 29 of chapter 1331 
21A; (vi) standard permit conditions and requirements for a single permit consolidating all 1332 
necessary local, regional and state approvals to be issued to different types of large clean energy 1333 
infrastructure facilities in the event that constructive approval is triggered through the non-1334 
issuance of a permit by the board pursuant to subsection (i); and (vii) entities responsible for 1335 
compliance and enforcement of permit conditions, including in the event of sale of large clean 1336 
energy infrastructure facilities after permitting.   1337 
 (c) An application for a consolidated permit for a large clean transmission and 1338 
distribution infrastructure facility shall include, in such form and detail as the board shall from 1339 
time to time prescribe: (i) a description of the large clean transmission and distribution 1340 
infrastructure facility, site and surrounding areas; (ii) an analysis of the need for the large clean 1341 
transmission and distribution infrastructure facility, either within or outside or both within and 1342 
outside the commonwealth, including a description of energy benefits; (iii) a description of the 1343  63 of 139 
alternatives to the large clean transmission and distribution infrastructure facility, including 1344 
siting and project alternatives to avoid or minimize or, if impacts cannot be avoided or 1345 
minimized, mitigate impacts; (iv) a description of the environmental impacts of the large clean 1346 
transmission and distribution infrastructure facility, including both environmental burdens and 1347 
benefits such as shared use, recreational paths or access to nature; (v) evidence that all pre-filing 1348 
consultation and community engagement requirements established by the board have been 1349 
satisfied and, if not, a demonstration of good cause for a waiver of the requirements that could 1350 
not be satisfied by the applicant; and (vi) a cumulative impact analysis. The board may issue and 1351 
revise filing guidelines after public notice and a period for comment.   1352 
 (d) An application for a consolidated permit for a large clean energy generation facility or 1353 
large clean energy storage facility shall include, in such form and detail as the board shall from 1354 
time to time prescribe: (i) a description of the large clean energy generation facility’s or large 1355 
clean energy storage facility’s site and surrounding areas, including any ancillary structures and 1356 
related facilities and a description of the energy benefits of the large clean energy generation 1357 
facility or large clean energy storage facility; (ii) a description of the environmental impacts of 1358 
the large clean energy generation facility or large clean energy storage facility, including both 1359 
environmental benefits and burdens; (iii) a description of the project site selection process and 1360 
alternatives analysis used in choosing the location of the proposed large clean energy generation 1361 
facility or large clean energy storage facility to avoid or minimize or, if impacts cannot be 1362 
avoided or minimized, mitigate impacts; (iv) evidence that all pre-filing consultation and 1363 
community requirements established by the board have been satisfied and, if not, a 1364 
demonstration of good cause for a waiver of the requirements that could not be satisfied by the 1365  64 of 139 
applicant; and (v) a cumulative impact analysis. The board may issue and revise filing guidelines 1366 
after public notice and a period for comment.   1367 
 (e) Review by the board of the application shall be an adjudicatory proceeding under 1368 
chapter 30A. The authority of the board to conduct the adjudicatory proceeding under this 1369 
section may be delegated in whole or in part to the employees of the department. Pursuant to the 1370 
rules of the board, such employees shall report back to the board with recommended decisions 1371 
for final action thereon.   1372 
 (f) The board shall determine whether a large clean energy infrastructure facility permit 1373 
application is complete within 30 days of receipt of the application. If an application is deemed 1374 
not complete, the applicant shall have 30 days to cure any deficiencies identified by the board 1375 
before the application is rejected. The board may provide extensions of time to cure deficiencies 1376 
if the applicant can demonstrate extenuating circumstances.   1377 
 (g) The board shall conduct a public hearing in at least 1 of the affected cities or towns in 1378 
which a large clean energy infrastructure facility would be located.   1379 
 (h) Following a determination by the board that an application for a large clean energy 1380 
infrastructure facility is complete, all municipal, regional and state agencies, authorities, boards, 1381 
commissions, offices or other entities that would otherwise be required to issue at least 1 permit 1382 
to the facility shall be deemed to be substantially and specifically affected by the proceeding and 1383 
upon notification to the board shall have intervenor status in the proceeding to review the 1384 
facility’s application. All municipal, regional and state agencies, authorities, boards, 1385 
commissions, offices or other entities that would otherwise be required to issue at least 1 permit 1386 
to the facility shall be afforded an opportunity to submit statements of recommended permit 1387  65 of 139 
conditions to the board relative to the respective permits that each agency, authority, board, 1388 
commission, office or other entity would otherwise be responsible for issuing.   1389 
 (i) The board shall establish timeframes for reviewing different types of large clean 1390 
energy infrastructure facilities based on the complexity of the facility, the need for an exemption 1391 
from local zoning requirements and community impacts, but in no instance shall the board take 1392 
more than 15 months from the determination of application completeness to render a final 1393 
decision on an application. The board shall have the authority to approve, approve with 1394 
conditions or reject a consolidated permit application. If no final decision is issued within the 1395 
deadline established by the board for the type of large clean energy infrastructure facility, the 1396 
board shall issue a permit granting approval to construct that includes the common conditions 1397 
and requirements established by the board through regulations for the type of large clean energy 1398 
infrastructure facility under review, which shall be deemed a final decision of the board. A 1399 
consolidated permit, if issued, shall be in the form of a composite of all individual permits, 1400 
approvals or authorizations that would otherwise be necessary for the construction and operation 1401 
of the large clean energy infrastructure facility and that portion of the consolidated permit that 1402 
relates to subject matters within the jurisdiction of a municipal, regional or state agency, 1403 
authority, board, commission, office or other entity shall be enforced by said agency, authority, 1404 
board, commission, office or other entity under other applicable laws of the commonwealth as if 1405 
the consolidated permit had been directly granted by said agency, authority, board, commission, 1406 
office or other entity.  1407 
 Section 69U. (a) Upon request by an applicant and upon a showing of good cause, the 1408 
board may issue a consolidated permit for a small clean transmission and distribution 1409 
infrastructure facility that is not automatically subject to the jurisdiction of the board pursuant to 1410  66 of 139 
section 69G, if the applicant petitions the board to be granted a consolidated permit for such 1411 
facility. The board shall review such petition in accordance with subsections (b) and (c). The 1412 
board may issue such consolidated permit upon finding that the small clean transmission and 1413 
distribution infrastructure facility will serve the public convenience and is consistent with the 1414 
public interest. Upon application for a consolidated permit under this section, no applicant shall 1415 
commence construction of a small clean transmission and distribution infrastructure facility at a 1416 
site unless a consolidated permit for construction of that small clean transmission and 1417 
distribution infrastructure facility pursuant to this section has been approved by the board. For 1418 
purposes of this section, “construction” shall not include contractual obligations to purchase such 1419 
facilities or equipment.    1420 
 (b) The board shall establish the same criteria governing the siting and permitting of 1421 
small clean transmission and distribution infrastructure facilities eligible to submit an application 1422 
under this section as it is required to establish for large clean energy infrastructure facilities 1423 
pursuant to subsection (b) of section 69T. An application for a consolidated permit for a small 1424 
clean transmission and distribution infrastructure facility shall include the same elements as 1425 
required for large clean transmission and distribution infrastructure facilities under subsection (c) 1426 
of said section 69T. Subject to subsection (c), subsections (d) to (i), inclusive, of said section 69T 1427 
shall apply to the process followed by the board regarding the issuance of a consolidated permit 1428 
to any small clean transmission and distribution infrastructure facility under this section.  1429 
 (c) The board shall establish timeframes and procedures for reviewing different types of 1430 
small clean transmission and distribution infrastructure facilities based on the complexity of the 1431 
facility and the need for an exemption from local zoning requirements, but in no instance shall 1432 
the board take more than 12 months from the determination of application completeness to 1433  67 of 139 
render a final decision on an application. The board shall have the authority to approve, approve 1434 
with conditions or reject a permit application. If no final decision is issued within the deadline 1435 
for the type of small clean transmission and distribution infrastructure facility established by the 1436 
board, the board shall issue a permit granting approval to construct that adopts the common 1437 
conditions and requirements established by the board in regulation for the type of small clean 1438 
transmission and distribution infrastructure facility under review, which shall be deemed a final 1439 
decision of the board. A consolidated permit, if issued, shall be in the form of a composite of all 1440 
individual permits, approvals or authorizations that would otherwise be necessary for the 1441 
construction and operation of the small clean transmission and distribution infrastructure facility 1442 
and the portion of the consolidated permit that relates to subject matters within the jurisdiction of 1443 
a municipal, regional or state agency, authority, board, commission, office or other entity shall 1444 
be enforced by said agency, authority, board, commission, office or other entity under the other 1445 
applicable laws of the commonwealth as if the consolidated permit had been directly granted by 1446 
said agency, authority, board, commission, office or other entity.  1447 
 Section 69V. (a) The board may issue a consolidated permit for a small clean energy 1448 
generation facility or a small clean energy storage facility. An owner or proponent of a small 1449 
clean energy generation facility or a small clean energy storage facility may submit an 1450 
application to the board to be granted a consolidated permit that shall include all state permits 1451 
necessary to construct the small clean energy generation facility or small clean energy storage 1452 
facility. All local government permits and approvals for a small clean energy generation facility 1453 
or a small clean energy storage facility shall be issued separately pursuant to section 21 of 1454 
chapter 25A.  1455  68 of 139 
 (b) The board shall establish the same criteria governing the siting and permitting of 1456 
small clean energy generation facilities and small clean energy storage facilities eligible to 1457 
submit an application under this section as it is required to establish for large clean energy 1458 
infrastructure facilities pursuant to subsection (b) of section 69T. An application for a 1459 
consolidated permit for a small clean energy generation facility or small clean energy storage 1460 
facility eligible to submit an application under this section shall include the same elements as 1461 
required for a large clean energy generation facility and a large clean energy storage facility 1462 
under subsection (d) of said section 69T. Subsections (e) to (g), inclusive, of said section 69T 1463 
shall apply to the issuance of a consolidated permit to any small clean energy generation facility 1464 
or small clean energy storage facility under this section.  1465 
 (c) The board shall not take more than 12 months from the determination of application 1466 
completeness to render a final decision on an application. The board may approve, approve with 1467 
conditions or reject a permit application. If no final decision is issued within the deadline for the 1468 
type of small clean energy generation facility or small clean energy storage facility established 1469 
by the board, the board shall issue a permit granting approval to construct that adopts the 1470 
common conditions and requirements established by the board in regulation for the type of small 1471 
clean energy generation facility or small clean energy storage facility under review, which shall 1472 
be deemed a final decision of the board. A consolidated permit shall be in the form of a 1473 
composite of all individual permits, approvals or authorizations that would otherwise be 1474 
necessary for the construction and operation of the small clean energy generation facility or 1475 
small clean energy storage facility and that portion of the consolidated permit that relates to 1476 
subject matters within the jurisdiction of a municipal, regional or state agency, authority, board, 1477 
commission, office or other entity shall be enforced by said agency, authority, board, 1478  69 of 139 
commission, office or other entity under the other applicable laws of the commonwealth as if the 1479 
consolidated permit had been directly granted by said agency, authority, board, commission, 1480 
office or other entity.  1481 
 Section 69W. (a) An owner or proponent of a small clean energy infrastructure facility 1482 
that has received a final decision on, or a constructive approval of, a consolidated permit 1483 
application from a local government, as defined in section 21 of chapter 25A, or other parties 1484 
substantially and specifically affected by the decision of the local government may submit a 1485 
request for a de novo adjudication of the local permit application by the director. Subject to 1486 
subsection (g) of said section 21 of said chapter 25A, a local government may also submit a 1487 
request for a de novo adjudication if their resources, capacity and staffing do not allow for 1488 
review of a small clean energy infrastructure facility’s permit application within the required 1489 
maximum 12-month timeframe for local government review established in said section 21 of 1490 
said chapter 25A. Review by the director of the request for de novo adjudication shall be deemed 1491 
an adjudicatory proceeding under chapter 30A.  1492 
 (b) A request for a de novo adjudication by an owner or proponent of a small clean 1493 
energy infrastructure facility or other party substantially and specifically affected by a final 1494 
decision of a local government shall be filed within 30 days of such decision.   1495 
 (c) Upon determination that at least 1 party seeking a de novo adjudication is 1496 
substantially and specifically affected, the director of the board shall review the request and the 1497 
local government’s final decision for consistency with the regulations adopting statewide 1498 
permitting standards for such facilities established by the department of energy resources 1499 
pursuant to section 21 of chapter 25A. The director shall render a decision on the request within 1500  70 of 139 
6 months of receipt of the application and such decision shall be final. If the local government’s 1501 
decision is found to be inconsistent with the regulatory standards established by the department 1502 
of energy resources, the director may issue a final decision that supersedes the local 1503 
government’s prior decision and imposes new local permit conditions that are consistent with the 1504 
laws of the commonwealth.   1505 
 (d) The board shall establish regulations governing the process the director shall follow to 1506 
conduct the review of requests for de novo adjudication under this section.  1507 
 SECTION 75. Said chapter 164 is hereby further amended by striking out sections 72 and 1508 
72A, as appearing in the 2022 Official Edition, and inserting in place thereof the following 2 1509 
sections:- 1510 
 Section 72. An electric company, distribution company, generation company, 1511 
transmission company or any other entity providing or seeking to provide transmission service 1512 
may petition the energy facilities siting board for authority to construct and use, or to continue to 1513 
use as constructed or with altered construction, a line for the transmission of electricity for 1514 
distribution in some definite area or for supplying electricity to itself, another electric company 1515 
or a municipal lighting plant for distribution and sale or to a railroad, street railway or electric 1516 
railroad for the purpose of operating it and shall represent that such line will or does serve the 1517 
public convenience and is consistent with the public interest. The company or other entity 1518 
providing or seeking to provide transmission service shall forward at the time of filing such 1519 
petition a copy thereof to each municipality within such area. The company or other entity shall 1520 
file with such petition a general description of such transmission line and a map or plan showing 1521 
the municipalities through which the line will or does pass and its general location. The company 1522  71 of 139 
or other entity shall also furnish an estimate showing in reasonable detail the cost of the line and 1523 
such additional maps and information as the energy facilities siting board requires. The energy 1524 
facilities siting board, after notice and a public hearing in at least 1 of the municipalities affected, 1525 
may determine that said line is necessary for the purpose alleged, will serve the public 1526 
convenience and is consistent with the public interest. If the electric company, distribution 1527 
company, generation company or transmission company or any other entity providing or seeking 1528 
to provide transmission service shall file with the energy facilities siting board a map or plan of 1529 
the transmission line showing the municipalities through which it will or does pass, the public 1530 
ways, railroads, railways, navigable streams and tide waters in the municipality named in said 1531 
petition that it will cross and the extent to which it will be located upon private land or upon, 1532 
under or along public ways and places, the energy facilities siting board, after such notice as it 1533 
may direct, shall hold a public hearing in at least 1 of the municipalities through which the line 1534 
passes or is intended to pass. The energy facilities siting board may by order authorize an electric 1535 
company, distribution company, generation company, transmission company or any other entity 1536 
to take by eminent domain under chapter 79 such lands or such rights of way or widening thereof 1537 
or other easements therein necessary for the construction and use or continued use as constructed 1538 
or with altered construction of such line along the route prescribed in the order of the energy 1539 
facilities siting board. The energy facilities siting board shall transmit a certified copy of its order 1540 
to the company and the clerk of each affected municipality. The company or other entity may at 1541 
any time before such hearing modify the whole or a part of the route of said line, either of its 1542 
own motion or at the insistence of the energy facilities siting board or otherwise and, in such 1543 
case, shall file with the energy facilities siting board maps, plans and estimates as aforesaid 1544 
showing such changes. If the energy facilities siting board dismisses the petition at any stage in 1545  72 of 139 
said proceedings, no further action shall be taken thereon and the company may file a new 1546 
petition not less than 1 year after the date of such dismissal. When a taking under this section is 1547 
effected, the company may forthwith, except as hereinafter provided, proceed to erect, maintain 1548 
and operate thereon said line. If the company or other entity does not enter upon and construct 1549 
such line upon the land so taken within 1 year thereafter, its right under such taking shall cease 1550 
and terminate. No lands or rights of way or other easements therein shall be taken by eminent 1551 
domain under the provisions of this section in any public way, public place, park or reservation 1552 
or within the location of any railroad, electric railroad or street railway company except with the 1553 
consent of such company and on such terms and conditions as it may impose or except as 1554 
otherwise provided in this chapter and no electricity shall be transmitted over any land, right of 1555 
way or other easement taken by eminent domain as herein provided until the electric company, 1556 
distribution company, generation company, transmission company or any other entity shall have 1557 
acquired from the select board, city council or such other authority having jurisdiction all 1558 
necessary rights in the public ways or public places in the municipality or municipalities, or in 1559 
any park or reservation, through which the line will or does pass. No land, rights of way or other 1560 
easements therein in any public way, public park, reservation or other land subject to Article 97 1561 
of the Amendments to the Constitution of the Commonwealth shall be taken by eminent domain 1562 
under this section except in accordance with said Article 97. No entity shall be authorized under 1563 
this section or section 69R or section 24 of chapter 164A to take by eminent domain any lands or 1564 
rights of way or other easements therein held by an electric company or transmission company to 1565 
support an existing or proposed transmission line without the consent of the electric company or 1566 
transmission company. 1567  73 of 139 
 No electric company, distribution company, generation company, transmission company 1568 
or any other entity providing or seeking to provide transmission services shall be required to 1569 
petition the energy facilities siting board under this section unless it is seeking authorization to 1570 
take lands, rights of way or other easements under chapter 79. 1571 
 Section 72A. The energy facilities siting board may, upon petition, authorize an electric 1572 
company to enter upon lands of any person or corporation for the purpose of making a survey 1573 
preliminary to eminent domain proceedings. The energy facilities siting board shall give notice 1574 
of the authorization granted, by registered mail, to the landowners involved not less than 5 days 1575 
prior to any entry by such electric company. The company entering upon any such lands shall be 1576 
subject to liability for any damages occasioned thereby to be recovered under chapter 79. 1577 
 SECTION 76. Said chapter 164 is hereby further amended by striking out section 75C, as 1578 
so appearing, and inserting in place thereof the following section:- 1579 
 Section 75C. A natural gas pipeline company may petition the energy facilities siting 1580 
board for the right to exercise the power of eminent domain under chapter 79. Such company 1581 
shall file with the petition a general description of the pipeline and a map or plan thereof 1582 
showing the rights of way, easements and other interests in land or other property proposed to be 1583 
taken for such use, the towns through which the pipeline will pass, the public ways, railroads, 1584 
railways, navigable streams and tide waters in the towns named in the petition that it will cross 1585 
and the extent to which it will be located upon private land and upon, under or along public 1586 
ways, lands and places. Upon the filing of such petition, the energy facilities siting board, after 1587 
such notice as it may direct, shall provide notice to each municipality through which the pipeline 1588 
is intended to pass and hold a public hearing in at least 1 of the towns through which the pipeline 1589  74 of 139 
is intended to pass and may, by order, authorize the company to take by eminent domain under 1590 
said chapter 79 such lands or such rights of way, easements or other interests in land or other 1591 
property necessary for the construction, operation, maintenance, alteration and removal of the 1592 
pipeline, compressor stations, appliances, appurtenances and other equipment along the route 1593 
described in the order of the energy facilities siting board. The energy facilities siting board shall 1594 
transmit a certified copy of its order to the company and the town clerk of each affected town. At 1595 
any time before such hearing, the company may modify the whole or a part of the route of the 1596 
pipeline, either of its own motion or at the insistence of the energy facilities siting board or 1597 
otherwise and, in such case, shall file with the energy facilities siting board maps, plans and 1598 
estimates showing such changes. If the energy facilities siting board dismisses the petition at any 1599 
stage in the proceedings, no further action shall be taken thereon and the company may file a 1600 
new petition not sooner than 1 year after the date of such dismissal. 1601 
 When a taking under this section is effected, the company may forthwith, except as 1602 
hereinafter provided, proceed to construct, install, maintain and operate thereon such pipeline. If 1603 
the company shall not enter upon and construct such line upon the land so taken within 1 year 1604 
thereafter, its right under such taking shall cease and terminate. No lands or rights of way or 1605 
easements therein shall be taken by eminent domain under the provisions of this section in any 1606 
public way, public place, park or reservation or within the location of any railroad, electric 1607 
railroad or street railway company, except that such pipeline may be constructed under any 1608 
public way or any way dedicated to the public use; provided, however, that the rights granted 1609 
hereunder shall not affect the right or remedy to recover damages for an injury caused to persons 1610 
or property by the acts of such company; provided further, that such company shall put all such 1611 
streets, lanes and highways in as good repair as they were when opened by such company and 1612  75 of 139 
the method of such construction and the plans and specifications therefor have been approved 1613 
either generally or in any particular instance by the energy facilities siting board or, in the case of 1614 
state highways, by the department of highways. A natural gas pipeline company may construct 1615 
such lines under, over or across the location on private land of any railroad, electric railroad or 1616 
street railway corporation subject to section 73. Rights of way, buildings, structures or lands to 1617 
be used in the construction of such pipelines over or upon the lands referred to therein shall be 1618 
governed by section 34A of chapter 132. 1619 
 SECTION 77. The first paragraph of section 92 of said chapter 164, as so appearing, is 1620 
hereby amended by adding the following 2 sentences:- Notwithstanding any general or special 1621 
law to the contrary, in determining whether to issue an order directing a corporation to supply a 1622 
petitioner with gas service, the department shall consider: (i) whether the grant of the petition is 1623 
in the public interest, including the public interest in reducing greenhouse gas emissions and 1624 
complying with the limits and sublimits established pursuant to chapter 21N; and (ii) whether, in 1625 
the totality of the circumstances, the petitioner can secure adequate substitutes for gas-fired 1626 
services for space heating, water heating and cooking appliances which, in the case of space 1627 
heating, may include thermal energy that provides heating or cooling without combustion. The 1628 
department may, in order to advance the public interest in reducing greenhouse gas emissions 1629 
and complying with the limits and sublimits established pursuant to said chapter 21N, order 1630 
actions that may vary the uniformity of the availability of natural gas service. 1631 
 SECTION 78. Subsection (c) of section 92B of said chapter 164, as so appearing, is 1632 
hereby amended by striking out clauses (ii) and (iii) and inserting in place thereof the following 3 1633 
clauses:- 1634  76 of 139 
 (ii) consider and include a summary of all proposed and related investments, alternatives 1635 
to these investments and alternative approaches to financing these investments that have been 1636 
reviewed, are under consideration or have been approved by the department previously; 1637 
 (iii) solicit input, such as planning scenarios and modeling, from the Grid Modernization 1638 
Advisory Council established in section 92C, respond to information and document requests 1639 
from said council and conduct technical conferences and not less than 2 stakeholder meetings to 1640 
inform the public, appropriate state and federal agencies and companies engaged in the 1641 
development and installation of distributed generation, energy storage, vehicle electrification 1642 
systems and building electrification systems; and 1643 
 (iv) prepare and file a climate vulnerability and resilience plan at least once every 5 years 1644 
based on best available data, which shall include, but not be limited to, the following: 1645 
 (A) an evaluation of the climate science and projected sea level rise, extreme 1646 
temperature, precipitation, humidity and storms and other climate-related risks for the service 1647 
territory; 1648 
 (B) an evaluation and risk assessment of potential impacts of climate change on existing 1649 
operation, planning and physical assets; 1650 
 (C) identification, prioritization and cost-benefit analysis of adaptation options to 1651 
increase asset and system-wide resilience over time; 1652 
 (D) a community engagement plan with targeted engagement for environmental justice 1653 
populations in the service territory; and 1654  77 of 139 
 (E) an implementation timeline for making changes in line with the findings of the study 1655 
such as modifying design and construction standards, modifying operations and planning 1656 
processes and relocating or upgrading existing infrastructure to ensure reliability and resilience 1657 
of the grid. 1658 
 SECTION 79. Said chapter 164 is hereby further amended by inserting after section 1659 
116B, the following section:- 1660 
 Section 116C. (a) Distribution companies deploying advanced metering infrastructure in 1661 
their territories shall jointly establish a centralized data repository to allow customers and third 1662 
parties, including competitive suppliers, access to advanced metering data, including billing, 1663 
interval usage and load data, in near-real time for all customer classes. The centralized data 1664 
repository shall be developed in a cost-effective manner as approved by the department. 1665 
 (b) A supplier or other third party shall be entitled to access detailed advanced metering 1666 
infrastructure customer data from the centralized data repository, subject to appropriate customer 1667 
approval and protections. Advanced metering infrastructure data may include, but shall not be 1668 
limited to, customer billing period usage data, peak demand, supplier information and relevant 1669 
account information. 1670 
 (c) Electric customers may opt out of inclusion in the implementation of advanced 1671 
metering infrastructure with notice to the distribution company. Upon receiving such notice, the 1672 
distribution company shall remove the customer from the implementation plan, notify the 1673 
department of the customer’s decision to opt out of such implementation plan in a manner 1674 
determined by the department and charge such a customer any reasonable and necessary fees for 1675 
delivering non- advanced metering service. 1676  78 of 139 
 (d) Distribution companies shall implement accelerated switching permitting a residential 1677 
or small commercial electric customer to change suppliers within 3 business days. Customers 1678 
moving within a distribution company’s territory shall be permitted to transfer their supplier 1679 
directly to their new service location without being required to switch to an interim rate provided 1680 
by the distribution company or other supplier. Customers establishing electric service shall be 1681 
permitted to take service from their supplier on the first day of service. Customers shall not be 1682 
required to take basic service from a distribution company prior to selecting and switching to a 1683 
supplier. Notwithstanding the requirements of this subsection, a distribution company shall not 1684 
implement accelerated switching until the advanced metering infrastructure, approved by the 1685 
department in calendar year 2022 as part of a company’s grid modernization plan, is fully 1686 
deployed. 1687 
 (e) Distribution companies shall be entitled to recovery of prudent and necessary 1688 
expenses for the implementation of advanced metering data repositories. The department may 1689 
implement penalties for failure of distribution companies to meet implementation goals. 1690 
 SECTION 80. Section 141 of said chapter 164, as appearing in the 2022 Official Edition, 1691 
is hereby amended by striking out the last sentence and inserting in place thereof the following 1692 
sentence:- Where the scale of on-site generation would have an impact on affordability for low 1693 
income or eligible moderate income customers, a fully compensating adjustment shall be made 1694 
to the low income or moderate income rate discount. 1695 
 SECTION 81. Said chapter 164 is hereby further amended by striking out section 145, as 1696 
so appearing, and inserting in place thereof the following section:- 1697  79 of 139 
 Section 145. (a) For the purposes of this section, the following words shall have the 1698 
following meanings unless the context clearly requires otherwise,:- 1699 
 “Customer”, a retail natural gas customer. 1700 
 “Eligible infrastructure measure”, a replacement, retirement or an improvement of 1701 
existing infrastructure of a gas company that: (i) is made on or after January 1, 2015; (ii) is 1702 
designed to improve public safety or infrastructure reliability; (iii) does not increase the revenue 1703 
of a gas company by connecting an improvement for a principal purpose of serving new 1704 
customers; (iv) reduces, or has the potential to reduce, lost and unaccounted for natural gas 1705 
through a reduction in natural gas system leaks; (v) is not included in the current rate base of the 1706 
gas company as determined in the gas company's most recent rate proceeding; (vi) may include 1707 
use of advanced leak repair technology approved by the department to repair an existing leak-1708 
prone gas pipe to extend the useful life of the such gas pipe by no less than 10 years; and (vii) 1709 
may include replacing gas infrastructure with utility-scale non-emitting renewable thermal 1710 
energy infrastructure. 1711 
 “Non-emitting renewable thermal infrastructure”, utility-scale distribution infrastructure 1712 
that supplies heating or cooling from energy sources that do not emit greenhouse gas emissions 1713 
as defined in section 1 of chapter 21N; provided, however, that such infrastructure may include, 1714 
but shall not be limited to including, infrastructure for networked geothermal and deep 1715 
geothermal energy. 1716 
 “Plan”, a detailed compilation of eligible infrastructure measures that a gas company files 1717 
pursuant to subsection (b). 1718  80 of 139 
 “Project”, an eligible infrastructure measure proposed by a gas company in a plan filed 1719 
under this section. 1720 
 (b) A gas company shall file with the department a plan to address aging or leaking 1721 
natural gas infrastructure within the commonwealth and the leak rate on the gas company's 1722 
natural gas infrastructure in the interest of public safety and reducing lost and unaccounted for 1723 
natural gas through a reduction in natural gas system leaks. Each company's gas infrastructure 1724 
plan shall include interim targets for the department's review. The department shall review these 1725 
interim targets to ensure each gas company is meeting the appropriate pace to reduce the leak 1726 
rate in a safe and timely manner and comply with the limits and sublimits established pursuant to 1727 
chapter 21N of the general laws. The interim targets shall be for periods of not more than 6 years 1728 
or at the conclusion of 2 complete 3-	year walking survey cycles conducted by the gas company. 1729 
The gas companies shall incorporate these interim targets into timelines for removing all leak-1730 
prone infrastructure filed pursuant to subsection (c) and may update them based on overall 1731 
progress. The department may levy a penalty against any gas company that fails to meet its 1732 
interim target in an amount up to and including the equivalent of 2.5 per cent of such gas 1733 
company's transmission and distribution service revenues for the previous calendar year. 1734 
 (c) Any plan filed with the department shall include, but not be limited to: (i) eligible 1735 
infrastructure measures concerning mains, services, meter sets and other ancillary facilities 1736 
composed of non- cathodically protected steel, cast iron and wrought iron, prioritized to 1737 
implement the federal gas distribution pipeline integrity management plan annually submitted to 1738 
the department and consistent with subpart P of 49 C.F.R. part 192; (ii) an anticipated timeline 1739 
for the completion of each project; (iii) the estimated cost of each project; (iv) rate change 1740 
requests; (v) a description of customer costs and benefits under the plan, including the costs of 1741  81 of 139 
potential stranded assets and the benefits of avoiding financial exposure to such assets; (vi) the 1742 
relocations, where practical, of a meter located inside of a structure to the outside of said 1743 
structure for the purpose of improving public safety; and (vii) any other information the 1744 
department considers necessary to evaluate the plan. 1745 
 As part of each plan filed under this section, a gas company shall include a timeline for 1746 
removing or remediating all leak-	prone infrastructure on an accelerated basis specifying an 1747 
annual pace and program end date with a target end date of: (i) not more than 20 years from the 1748 
filing of a gas company's initial plan; or (ii) a reasonable target end date considering the 1749 
allowable recovery cap established pursuant to subsection (f). The department shall not approve 1750 
a timeline as part of a plan unless the allowable recovery cap established pursuant to subsection 1751 
(f) provides the gas company with a reasonable opportunity to recover the costs associated with 1752 
removing or remediating all leak-	prone infrastructure on the accelerated basis set forth under the 1753 
timeline utilizing the cost recovery mechanism established pursuant to this section. After filing 1754 
the initial plan, a gas company shall, at 5-	year intervals, provide the department with a summary 1755 
of its progress to date, a summary of work to be completed during the next 5 years and any 1756 
similar information the department may require. The department may require a gas company to 1757 
file an updated long-	term timeline as part of a plan if it alters the cap established pursuant to 1758 
subsection (f). 1759 
 (d) If a gas company files a plan on or before October 31 for the subsequent construction 1760 
year, the department shall review the plan within 6 months. The plan shall be effective as of the 1761 
date of filing, pending department review. The department may modify a plan prior to approval 1762 
at the request of a gas company or make other modifications to a plan as a condition of approval. 1763 
The department shall consider the costs and benefits of the plan including, but not limited to, 1764  82 of 139 
impacts on ratepayers, reductions of lost and unaccounted for natural gas through a reduction in 1765 
natural gas system leaks and improvements to public safety, and reducing greenhouse gas 1766 
emissions in compliance with the limits and sublimits established in chapter 21N. The 1767 
department shall give priority to plans narrowly tailored to addressing leak-prone infrastructure 1768 
most immediately in need of remediation. 1769 
 (e) If a plan is in compliance with this section and the department determines the plan 1770 
operates in a balanced manner to reasonably accelerate eligible infrastructure measures and 1771 
provide benefits, the department shall issue preliminary acceptance of the plan in whole or in 1772 
part. A gas company shall then be permitted to begin recovery of the estimated costs of projects 1773 
included in the plan beginning on May 1 of the year following the initial filing and collect any 1774 
revenue requirement, including depreciation, property taxes and return associated with the plan. 1775 
 (f) On or before May 1 of each year, a gas company shall file final project documentation 1776 
for projects completed in the prior year to demonstrate substantial compliance with the plan 1777 
approved pursuant to subsection (e) and that project costs were reasonably and prudently 1778 
incurred. The department shall investigate project costs within 6 months of submission and shall 1779 
approve and reconcile the authorized rate factor, if necessary, upon a determination that the costs 1780 
were reasonable and prudent. Annual changes in the revenue requirement eligible for recovery 1781 
shall not exceed (i) 1.5 per cent of the gas company's most recent calendar year total firm 1782 
revenues, including gas revenues attributable to sales and transportation customers, or (ii) an 1783 
amount determined by the department that is greater than 1.5 per cent of the gas company's most 1784 
recent calendar year total firm revenues, including gas revenues attributable to sales and 1785 
transportation customers. Any revenue requirement approved by the department in excess of 1786 
such cap may be deferred for recovery in the following year. 1787  83 of 139 
 (g) All rate change requests made to the department pursuant to an approved plan, shall 1788 
be filed annually on a fully reconciling basis, subject to final determination by the department 1789 
pursuant to subsection (f). The rate change included in a plan pursuant to section (c), reviewed 1790 
pursuant to subsection (d) and taking effect each May 1 pursuant to subsection (e) shall be 1791 
subject to investigation by the department pursuant to subsection (f) to determine whether the gas 1792 
company has over collected or under collected its requested rate adjustment with such over 1793 
collection or under collection reconciled annually. If the department determines that any of the 1794 
costs were not reasonably or prudently incurred, the department shall disallow the costs and 1795 
direct the gas company to refund the full value of the costs charged to customers with the 1796 
appropriate carrying charges on the over-collected amounts. If the department determines that 1797 
any of the costs were not in compliance with the approved plan, the department shall disallow 1798 
the costs from the cost recovery mechanism established under this section and shall direct the gas 1799 
company to refund the full value of the costs charged to customers with the appropriate carrying 1800 
charges on the over collected amounts. 1801 
 (h) The department may promulgate rules and regulations under this section. The 1802 
department may discontinue a plan and require a gas company to refund any costs charged to 1803 
customers due to failure to substantially comply with a plan or failure to reasonably and 1804 
prudently manage project costs. 1805 
 SECTION 82. Said chapter 164 is hereby further amended by adding the following 3 1806 
sections:- 1807 
 Section 149. (a) For the purposes of this section, the following words shall have the 1808 
following meanings unless the context clearly requires otherwise,:- 1809  84 of 139 
 “Director”, the director of the division of public participation.  1810 
 “Division of public participation”, established in section 12T of chapter 25. 1811 
 “Fund”, the Department of Public Utilities and Energy Facilities Siting Board Intervenor 1812 
Support Fund established in section 12S of chapter 25. 1813 
 “Governmental body”, a city, town, district, regional school district, county or agency, 1814 
board, commission, authority, department or instrumentality of a city, town, district, regional 1815 
school district or county. 1816 
 “Grantee”, an organization, entity, governmental body, federally recognized tribe, state-1817 
acknowledged tribe or state-recognized tribe that has received a grant award under this section. 1818 
 “Office of environmental justice and equity”, established in section 29 of chapter 21A. 1819 
 “Prospective grantee”, an organization, entity, governmental body, federally recognized 1820 
tribe, state-acknowledged tribe or state-recognized tribe that has applied or plans to apply for a 1821 
grant under this section. 1822 
 (b) The department may make available as grants funds deposited into the fund to parties 1823 
that have been granted intervenor status by the department or the board pursuant to clause (4) of 1824 
the second sentence of the first paragraph of section 10 of chapter 30A and corresponding 1825 
department and board regulations, and that are: (i) organizations and entities that advocate on 1826 
behalf of a relevant subset of residential customers defined geographically or based on specific 1827 
shared interests; (ii) organizations and entities that advocate on behalf of low income or 1828 
moderate income residential populations, residents of historically marginalized or overburdened 1829 
and underserved communities; or (iii) governmental bodies, including regional planning 1830  85 of 139 
agencies, federally recognized tribes, state-	acknowledged tribes or state-recognized tribes. Any 1831 
grants awarded pursuant to this section may be used only in proceedings before the department 1832 
or the board, and not for any judicial appeal of such agencies’ final decisions. 1833 
 (c) The director, in consultation with the office of environmental justice and equity, shall 1834 
establish criteria to determine whether, and to what extent, a prospective grantee shall be eligible 1835 
to receive a grant award pursuant to this section. Such criteria shall include, but shall not be 1836 
limited to, whether the prospective grantee: (i) lacks the financial resources that would enable it 1837 
to intervene and participate in a department or board proceeding absent a grant award pursuant to 1838 
this section; and (ii) previously intervened in department or board proceedings prior to the 1839 
establishment of the intervenor support grant program pursuant to this section; provided, 1840 
however, that a municipality with a population of less than 7,500 that is a prospective grantee for 1841 
a proceeding pertaining to a facility, large clean energy infrastructure facility or small clean 1842 
energy infrastructure facility, as those terms are defined in section 69G, within its boundaries 1843 
shall not be required to meet the criteria pursuant to this paragraph to receive a grant award. 1844 
 (d) A prospective grantee seeking funding under this section shall submit a grant 1845 
application in a form and manner developed by the director demonstrating that the prospective 1846 
grantee meets the criteria established by the director in accordance with subsection (c). Such 1847 
grant application shall include: (i) a statement outlining the prospective grantee’s anticipated 1848 
participation in the department or board proceeding, to the extent it is known at the time of grant 1849 
application; (ii) a detailed estimate of costs and fees of anticipated attorneys, consultants and 1850 
experts, including community experts, and all other costs related to the preparation for, and 1851 
intervention and participation in, the department or board proceeding; and (iii) background 1852 
information on the attorneys, consultants and experts, including community experts, that the 1853  86 of 139 
prospective grantee plans to retain if awarded grant funding. The director may, at their 1854 
discretion, make conditional grant awards to grant applicants that have not yet been granted 1855 
intervenor status by the department or board; provided, however, that no grant shall be awarded 1856 
until such intervenor status is granted. 1857 
 (e) A grant awarded pursuant to this section shall not exceed $150,000 for any single 1858 
department or board proceeding. The director shall, in the director’s sole discretion, determine 1859 
the amount of financial support being granted, considering the demonstrated needs of the 1860 
intervenor and the complexity of the proceeding. The director may, in the director’s sole 1861 
discretion: (i) upon the petition of a prospective grantee, award a grant exceeding $150,000 only 1862 
upon a demonstration of good cause, including the complexity of the proceeding in which the 1863 
grantee is intervening; and (ii) upon the petition of a prospective grantee, provide grant funding 1864 
in addition to the funding initially requested under section (c) upon a showing that new, novel or 1865 
complex issues have arisen in the proceeding since the time the grant application was submitted 1866 
pursuant said subsection (c). The director shall consider the potential for intervenors to share 1867 
costs through collaborative efforts with other parties to a proceeding as part of determining the 1868 
amount of funding awarded to any prospective grantee and such intervenors shall be expected to 1869 
reduce duplicative costs to the extent possible in instances where the position or positions of 1870 
multiple intervenors align. 1871 
 (f) The aggregate grant funding for any individual department or board proceeding shall 1872 
not exceed $500,000; provided, however, that where the aggregate amount of funding being 1873 
requested exceeds $500,000, funding shall be allocated to prospective grantees based on their 1874 
relative financial hardship. The director may, at the director’s discretion and upon a 1875  87 of 139 
determination of good cause, provide funding exceeding $500,000 for any individual department 1876 
or board proceeding. 1877 
 (g) Ten per cent of grant funds awarded to a grantee, or a greater percentage as 1878 
determined by the director at the director’s sole discretion, may be expended on non-	legal, non-1879 
expert and non-consultant administrative costs directly attributable to the intervention and 1880 
participation in a proceeding before the department or board. All remaining grant funds may be 1881 
expended to retain qualified legal counsel, experts and consultants to assist in proceedings before 1882 
the department or board; provided, however, that such funds may be used to retain qualified 1883 
community experts, which shall include residential ratepayers and residents with lived 1884 
experience that can inform such proceedings. Such funding may be expended for administrative, 1885 
legal, consultant and expert costs associated with an intervention petition submitted pursuant to 1886 
clause (4) of the first paragraph of section 10 of chapter 30A or section 10A of said chapter 30A 1887 
and any department or board regulations, if applicable. 1888 
 (h) All grant payments to grantees shall be made from the fund. Such grant payments 1889 
shall be made only for reasonable costs incurred and upon submission of a grant payment request 1890 
by the grantee. Such grant payment requests shall be in a form and manner as prescribed by the 1891 
director and grant payments shall be made within 30 days of receipt of such grant payment 1892 
requests by the director to the grantee or to the entity designated by the grantee to receive grant 1893 
payments. The director, at the director’s discretion or as provided for in regulations promulgated 1894 
pursuant to this section, may provide grant payments before such costs are incurred by the 1895 
grantee upon a showing of financial hardship by the grantee. Within 30 days of the completion of 1896 
any proceeding in which a grantee has received an award from the fund, each grantee shall 1897 
submit a report that: (i) identifies the use of the funds during the proceeding; (ii) the substantial 1898  88 of 139 
contribution provided by its participation; and (iii) a demonstration that its participation and the 1899 
use of the funding did not cause a delay in the proceeding.  1900 
 (i) All decisions pertaining to the issuance of financial support shall be made solely by 1901 
the director. The director shall have sole discretion to deny funding to a prospective grantee that 1902 
demonstrates a pattern of repeatedly delaying or obstructing, or attempting to repeatedly delay or 1903 
obstruct, proceedings or otherwise misuses or has misused funds. The director shall have full 1904 
discretion as to whether to approve or deny a request for intervenor funding. Applicants shall 1905 
have no legal right or privilege to funding and shall not be entitled to any further review if denied 1906 
by the director. 1907 
 (j) In the department’s annual report required pursuant to section 2 of chapter 25, the 1908 
director shall include a report describing all activities of the fund, including, but not limited to: 1909 
(i) amounts credited to the fund, amounts expended from the fund and any unexpended balance; 1910 
(ii) a summary of the intervenor support grant fund application process; (iii) the number of grant 1911 
applications received, the number and amount of awards granted, and the number of grant 1912 
applications rejected; (iv) the number of intervenors who participated in proceedings with and 1913 
without support from the fund; (v) an itemization of costs incurred by and payments made to 1914 
grantees; (vi) an evaluation of the impact and contribution of grantees in department and board 1915 
proceedings; (vii) a summary of education and outreach activities conducted by the division of 1916 
public participation related to the intervenor support grant program; and (viii) any recommended 1917 
changes to the program. 1918 
 (k) The director shall develop: (i) accessible, multi-	lingual and easily comprehensible 1919 
web-based educational materials, including forms and templates, to educate prospective grantees 1920  89 of 139 
and the public on the intervenor support grant program; and (ii) a robust virtual and in-	person 1921 
outreach program to educate prospective grantees and the public about the intervenor support 1922 
grant program. 1923 
 (l) The department, in consultation with the board, shall promulgate regulations to 1924 
implement this section. 1925 
 Section 150. (a) For the purposes of this section, the following words shall have the 1926 
following meanings unless the context clearly requires otherwise:- 1927 
 “Advanced conductors”, any hardware technology that can conduct electricity across 1928 
transmission and distribution lines and demonstrate enhanced performance over traditional 1929 
conductor products. 1930 
 “Advanced power flow control”, any hardware or software technologies used to push or 1931 
pull electric power in a manner that balances overloaded lines and underutilized corridors within 1932 
the distribution or transmission system. 1933 
 “Advanced reconductoring”, the application of advanced conductors to increase the 1934 
capacity and efficiency of the existing electric grid. 1935 
 “Advanced transmission technology”, a technology that increases the capacity, 1936 
efficiency, or reliability of an existing or new transmission facility, including: high-temperature 1937 
lines, including superconducting cables; underground cables; advanced conductor technology 1938 
including advanced composite conductors, high-	temperature low-sag conductors, and fiber optic 1939 
temperature sensing conductors; high-	capacity ceramic electric wire, connectors, and insulators;  1940  90 of 139 
 optimized transmission line configurations, including multiple phased transmission lines; 1941 
modular equipment; wireless power transmission; ultra-high voltage lines; high-	voltage DC 1942 
technology; flexible alternating current transmission systems; energy storage devices, including 1943 
pumped hydro, compressed air, superconducting magnetic energy storage, flywheels, and 1944 
batteries; controllable load; distributed generation, including photovoltaic fuel cells, and 1945 
microturbines; enhanced power device monitoring; direct system state sensors; fiber optic 1946 
technologies; power electronics and related software, including real time monitoring and 1947 
analytical software; mobile transformers and mobile substations; and any other technologies the 1948 
Federal Energy Regulatory Commission considers appropriate.  1949 
 “Dynamic line rating”, any hardware or software technology used to appropriately update 1950 
the calculated thermal limits of existing distribution or transmission lines based on real-	time and 1951 
forecasted weather conditions. 1952 
 “Grid-enhancing technology”, any hardware or software technology that enables 1953 
enhanced or more efficient performance from the electric distribution or transmission system, 1954 
including, but not limited to, dynamic line rating, advanced power flow control technology, 1955 
topology optimization and energy storage when used as a distribution or transmission resource. 1956 
 “Topology optimization”, any hardware or software technology that identifies 1957 
reconfigurations of the distribution or transmission grid and can enable the routing of power 1958 
flows around congested or overloaded distribution or transmission elements. 1959 
 (b) To the extent authorized by federal law, for base rate proceedings and other 1960 
proceedings in which a distribution or transmission company proposes capital improvements or 1961 
additions to the distribution or transmission system, the distribution or transmission company 1962  91 of 139 
shall conduct a cost-effectiveness and timetable analysis of multiple strategies, including, but not 1963 
limited to, the deployment of advanced transmission technologies, advanced conductors, grid-1964 
enhancing technologies, or energy storage used as a distribution or transmission resource. Where 1965 
advanced transmission technologies, advanced conductors, grid-	enhancing technologies, or 1966 
energy storage used as a distribution or transmission resource, whether in combination with or 1967 
instead of capital investments, offer a more cost-effective strategy for achieving distribution or 1968 
transmission goals, including, but not limited to, distributed energy resource interconnection, 1969 
grid reliability and enhanced cyber and physical security, the department, to the extent permitted 1970 
under federal law, may approve the deployment of advanced transmission technologies, 1971 
advanced conductors, grid-	enhancing technologies or energy storage used as a distribution or 1972 
transmission resource. 1973 
 (c) As part of a base rate filing or other filing in which a distribution or transmission 1974 
company proposes capital improvements or additions to the distribution or transmission system, 1975 
the distribution or transmission company may propose a performance incentive mechanism that 1976 
provides a financial incentive for the cost-effective deployment of advanced transmission 1977 
technologies, advanced reconductoring, grid-	enhancing technologies or energy storage used as a 1978 
distribution or transmission resource. 1979 
 (d) Once every 5 years, not later than September 1 of the fifth year, each distribution 1980 
company and, to the extent permitted by federal law and in a format determined by the 1981 
department, each transmission company shall make a compliance filing with the department and 1982 
provide a separate report to both ISO-NE and the joint committee on telecommunications, 1983 
utilities and energy on the deployment of advanced transmission technologies, advanced 1984  92 of 139 
conductors, grid- enhancing technologies or energy storage used as a distribution or transmission 1985 
resource. 1986 
 Section 151. (a) For the purposes of this section, “meter socket adapter” shall mean an 1987 
electronic device that is installed between a residential electric meter and the meter socket, for 1988 
the purpose of facilitating the deployment of customer-owned or customer-leased technology. 1989 
 (b) An electric company shall authorize the installation and operation of a meter socket 1990 
adapter, whether the meter socket is owned by a residential customer or by a third-party, if the 1991 
meter socket adapter: 1992 
 (i) is qualified to be connected to the supply side of the service disconnect pursuant to the 1993 
applicable provisions of the National Electric Code; 1994 
 (ii) is approved or listed by a nationally recognized testing laboratory and is rated 1995 
appropriately for the meter socket into which it is intended to be installed; 1996 
 (iii) is certified to meet all applicable standards, as determined by a nationally recognized 1997 
testing laboratory approved by the department; and 1998 
 (iv) does not prevent access to the sealed meter socket compartment or the pull section of 1999 
the service section of the electric meter or switchboard, as applicable. 2000 
 (c) A manufacturer of a meter socket adapter, a third-party, a residential customer or an 2001 
electric company shall all be allowed to install, maintain or service a meter socket adapter or 2002 
associated equipment.  2003 
 (d) An electric company shall approve or disapprove a request for approval of a specific 2004 
model of meter socket adapter for installation in its service area not later than 60 days after a 2005  93 of 139 
manufacturer, a third-party or a residential customer submits a request for approval of the 2006 
specific model of meter socket adapter. An electric company shall provide public notice of all 2007 
decisions approving a meter socket adapter, including by posting the information on the 2008 
company’s website. Should an electric company disapprove a specific model of meter socket 2009 
adapter, the electric company shall provide an explanation to the requesting vendor providing the 2010 
reasons the application was denied. 2011 
 (e) The department may adopt rules and regulations as necessary to implement the 2012 
provisions of this section. 2013 
 SECTION 83. Chapter 166 of the General Laws is hereby amended by striking out 2014 
section 28, as appearing in the 2022 Official Edition, and inserting in place thereof the following 2015 
section:- 2016 
 Section 28. A company subject to this chapter, except a telegraph or telephone company, 2017 
desiring to construct a line for the transmission of electricity that will, of necessity, pass through 2018 
at least 1 city or town to connect the proposed termini of such line, whose petition for the 2019 
location necessary for such line has been refused or has not been granted within 3 months after 2020 
the filing thereof by the city council or the select board of the town through which the company 2021 
intends to construct such line, may apply to the energy facilities siting board for such location. 2022 
The energy facilities siting board shall hold a public hearing thereon after notice to the city 2023 
council or select board refusing or neglecting to grant such location and to all persons owning 2024 
real estate abutting upon any way in the city or town where such location is sought, as such 2025 
ownership is determined by the last assessment for taxation. The energy facilities siting board 2026 
shall, if requested by the city council or select board, hold the hearing in the city or town where 2027  94 of 139 
the location is sought. If it appears at the hearing that the company has already been granted, and 2028 
has accepted, a location for such line in 2 cities or in 2 towns or in a city and town adjoining the 2029 
city or town refusing or neglecting to grant a location or if it appears at the hearing that the 2030 
company has already been granted, and has accepted, locations for such line in a majority of the 2031 
cities or towns through which such line will pass and if the energy facilities siting board deems 2032 
the location necessary for public convenience and in the public interest, the board may by order 2033 
grant a location for such line in the city or town with respect to which the application is made 2034 
and shall have and exercise the powers and authority conferred by section 22 upon the city 2035 
council or select board and in addition to the provisions of law governing such company may 2036 
impose such other terms, limitations and restrictions as it deems the public interest may require. 2037 
The energy facilities siting board shall cause an attested copy of its order, with the certificate of 2038 
its clerk endorsed thereon that the order was adopted after due notice and a public hearing, to be 2039 
forwarded to the city or town clerk, who shall record the same and furnish attested copies 2040 
thereof. The company in whose favor the order is made shall pay for such record and attested 2041 
copies the fees provided by clauses 31 and 32, respectively, of section 34 of chapter 262. 2042 
 SECTION 84. Section 6 of chapter 183A of the General Laws, as so appearing, is hereby 2043 
amended by striking out, in lines 37 to 42, inclusive, the words “any energy conservation device 2044 
installed in a unit, not already separately metered for water and utilities, including but not limited 2045 
to the installation of separate water meters, low-flow toilets and showerheads, faucet aerators, 2046 
windows and storm windows; provided, however, that a unit owner required to install such 2047 
energy conservation” and inserting in place thereof the following words:- a device installed 2048 
pursuant to an action taken by a corporation, trust or association pursuant to section 10; 2049 
provided, however, that a unit owner required to install such. 2050  95 of 139 
 SECTION 85. Subsection (b) of section 10 of said chapter 183A, as so appearing, is 2051 
hereby amended by striking out clause (6) and inserting in place thereof the following clause:- 2052 
 (6) to require reasonable measures to facilitate energy savings, energy efficiency and 2053 
greenhouse gas emissions reductions and, in furtherance of such measures, to cause the 2054 
installation of devices that result in energy savings, energy efficiency and greenhouse gas 2055 
emissions reductions in all units not already separately metered for water and utilities; provided, 2056 
however, that such measures and devices shall not include solar energy systems, the installation 2057 
of which shall be governed by section 18; provided further, that electric vehicle supply 2058 
equipment as defined in section 2 of chapter 25B shall only be required in the  common areas 2059 
and facilities in the condominium; provided further, that such devices may include, but shall not 2060 
be limited to including, separate meters for each unit to monitor the use of water, electricity and 2061 
other utilities for the unit to which it is attached, low-flow toilets and showerheads, faucet 2062 
aerators, windows and storm windows; provided further,  that such devices and, in the case of 2063 
electric vehicle supply equipment installed in common areas and facilities, such supply 2064 
equipment shall not be considered improvements for the purposes of said section 18 if the board 2065 
of trustees of the organization of unit owners or, if there is no board of trustees, the entity 2066 
performing its duties, receives the approval of the majority of unit owners in attendance at a 2067 
meeting for which notice was duly given and which was held for the purpose of voting on the 2068 
installation of such devices and supply equipment; provided further, that the cost of installation 2069 
of such devices and, in the case of supply equipment installed in common areas and facilities, of 2070 
such supply equipment shall be an expense of the organization of unit owners, which may be 2071 
assessed to the individual unit owners as a special assessment, the amount of which, if such 2072 
device was installed in each individual unit or in substantially all of the units in the 2073  96 of 139 
condominium, may be attributable to each unit owner in the amount of the cost of the item 2074 
installed. The organization of unit owners may assess to each unit owner their proportionate 2075 
share of the costs for water, electricity and other utilities as measured by the meter attached to 2076 
the unit. In the event of a conflict between this clause and the master deed, trust or by-	laws of a 2077 
condominium under of this chapter, this clause shall control; provided further, that nothing 2078 
herein shall be construed to conflict with the state sanitary code, the state building code, the 2079 
stretch energy code or any municipal opt-in specialized energy code; provided further, that 2080 
notwithstanding any rights to use common areas reserved for individual unit owners, if the 2081 
governing board of the organization of unit owners determines to install electric vehicle supply 2082 
equipment in a common area for the use of all members of the organization, the organization 2083 
shall develop appropriate terms of use of the supply equipment; and provided further, that the 2084 
expenses incurred in and proceeds accruing from the exercise of the rights and powers under this 2085 
clause shall be common expenses and common profits. 2086 
 SECTION 86. Said chapter 183A is hereby further amended by inserting after section 10 2087 
the following section:-  2088 
 Section 10A. (a) As used in this section, the following words shall have the following 2089 
meanings unless the context clearly requires otherwise:-  2090 
 “Association”, a condominium association, homeowners’ association, community 2091 
association, cooperative, trust or other nongovernmental entity with covenants, by-	laws and 2092 
administrative provisions with which the compliance of a homeowner or unit owner is required. 2093 
 “Dedicated parking space”, a parking space located within an owner’s separate interest or 2094 
a parking space in a common area but subject to exclusive use rights of an owner including, but  2095  97 of 139 
 not limited to, a deeded parking space, a garage space, a carport or a parking space 2096 
specifically designated for use by a particular owner.  2097 
 “Historic district commission”, a commission or other body responsible for administering 2098 
the rules and regulations of an historic district established by a community pursuant to any 2099 
general or special law.  2100 
 “Municipal governing body”, the legislative body of a city or town.  2101 
 “Neighborhood conservation district”, a district established by a municipal governing 2102 
body as part of the local zoning code or by-laws for the express purpose of protecting the 2103 
architectural character of a neighborhood.  2104 
 “Owner”, a person or group of persons who owns a separate lot, unit or interest, along 2105 
with an undivided interest or membership interest in the common area of the entire project 2106 
including, but not limited to, a condominium, planned unit development and parcel subject to a 2107 
homeowners’ association.  2108 
 “Reasonable restrictions”, restrictions that do not significantly: (i) increase the cost of 2109 
electric vehicle supply equipment as defined in section 2 of chapter 25B or the installation 2110 
thereof; or (ii) significantly decrease its efficiency or specified performance or effectively 2111 
prohibit the installation.  2112 
 “Separate interest”, a separate lot, unit or interest to which an owner has exclusive rights 2113 
of ownership. 2114 
 (b) Notwithstanding chapters 21, 40C and 183A or any other general or special law to the 2115 
contrary, a historic district commission, commission or board of a neighborhood conservation 2116  98 of 139 
district or manager or organization of unit owners of an association shall not prohibit or 2117 
unreasonably restrict an owner from installing electric vehicle supply equipment, as defined in 2118 
section 2 of chapter 25B, on or in an area subject to the owner’s separate interest or in an area to 2119 
which the owner has exclusive use. Nothing in this section shall prohibit a historic district 2120 
commission, a commission or board of a neighborhood conservation district or a manager or 2121 
organization of unit owners of an association from setting reasonable restrictions; provided, 2122 
however, that in setting such restrictions, the commission, board, manager or organization shall 2123 
give substantial weight to threats posed by climate change and the commonwealth’s obligation to 2124 
meet the statewide greenhouse gas emission limits and sublimits established under chapter 21N. 2125 
 (c) Electric vehicle supply equipment shall: (i) be installed at the owner’s expense; (ii) be 2126 
installed by a licensed contractor or electrician; and (iii) conform to all applicable health and 2127 
safety standards and requirements imposed by national, state and local authorities and all other 2128 
applicable zoning, land use or other ordinances and land use permits.  2129 
 (d) A historic district commission, a commission or board of a neighborhood 2130 
conservation district or a manager or organization of unit owners of an association may require 2131 
an owner to submit an application before installing electric vehicle supply equipment. If the 2132 
commission, board, manager or organization requires such an application and also requires an 2133 
application for approval of an architectural modification to the property, the application to install 2134 
electric vehicle supply equipment shall be processed and approved by the commission, board, 2135 
manager or organization in the same manner as an application for approval of an architectural 2136 
modification to the property and such application shall not be willfully avoided or delayed; 2137 
provided, further, that if the commission, board, manager or organization requires such an 2138 
application and does not require an application for approval of an architectural modification to 2139  99 of 139 
the property, the application to install electric vehicle supply equipment shall not be willfully 2140 
avoided or delayed; provided further, that the commission, board, manager or organization shall 2141 
approve the application if the owner complies with this section and the architectural standards, if 2142 
any, of the association, historic district or neighborhood conservation district. The approval or 2143 
denial of an application shall be in writing and if an application is not denied in writing within 60 2144 
days after the date of receipt thereof, the application shall be deemed approved unless the delay 2145 
is the result of a reasonable request for additional information. The association, historic district 2146 
or neighborhood conservation district shall not assess or charge the owner any fees for the 2147 
placement of any electric vehicle supply equipment above any reasonable fees for processing the 2148 
application if any fees exist for all applications for approval of architectural modifications. 2149 
 (e) The owner and each successive owner of the separate interest or with exclusive rights 2150 
to the area where the electric vehicle supply equipment is installed shall be responsible for: (i) 2151 
disclosing to prospective buyers the existence of such supply equipment, its owner and the 2152 
related responsibilities of the owner pursuant to this section; (ii) disclosing to prospective buyers 2153 
whether such supply equipment is removable and whether the owner intends to remove the 2154 
supply equipment in order to install it elsewhere; (iii) the costs of the maintenance, repair and 2155 
replacement of such supply equipment until such equipment has been removed and the common 2156 
area is restored after removal; (iv) the costs of any damage to such supply equipment, common 2157 
area, exclusive common area or separate interest resulting from the installation, maintenance, 2158 
repair, removal or replacement of such equipment; (v) the cost of electricity associated with the 2159 
electric vehicle supply equipment; provided, however, that the owner shall connect such supply 2160 
equipment to the owner’s own electric utility account unless the licensed contractor performing 2161 
the installation deems that to be impossible; provided further that if the connection is deemed 2162  100 of 139 
impossible, the association, historic district commission or neighborhood conservation district 2163 
shall allow the owner to connect such supply equipment to the common electricity account but 2164 
may require equitable reimbursement by the owner to the association, historic district 2165 
commission or neighborhood conservation district for electricity costs; and (vi) removing the 2166 
electric vehicle supply equipment at the owner’s expense if reasonably necessary for the repair, 2167 
maintenance or replacement of any property of the association, historic district commission, 2168 
neighborhood conservation district or separate interest.  2169 
 (f) A historic district commission, a commission or board of a neighborhood conservation 2170 
district or a manager or organization of unit owners of an association may install electric vehicle 2171 
supply equipment in a common area reserved for the use of all members or residents of the 2172 
association or district; provided, however, that the commission, board, manager or organization 2173 
shall develop appropriate terms of use for such supply equipment.  2174 
 (g) The executive office of housing and livable communities may promulgate regulations 2175 
as necessary to implement this section.  2176 
 SECTION 87. Section 3A of chapter 185 of the General Laws, as appearing in the 2022 2177 
Official Edition, is hereby amended by striking out, in lines 35 to 37, inclusive, the words 2178 
“involves either 25 or more dwelling units or the construction or alteration of 25,000 square feet 2179 
or more of gross floor area or both” and inserting in place thereof the following words:- 2180 
involves: (i) not less than 25 dwelling units; (ii) the construction or alteration of not less than 2181 
25,000 square feet of gross floor area; (iii) the construction or alteration of a Class I renewable 2182 
energy generating source as defined in subsection (c) of section 11F of chapter 25A; or (iv) the 2183 
construction or alteration of an energy storage system as defined in section 1 of chapter 164. 2184  101 of 139 
 SECTION 88. Said section 3A of said chapter 185 is hereby further amended by striking 2185 
out the words “involves: (i) not less than 25 dwelling units; (ii) the construction or alteration of 2186 
not less than 25,000 square feet of gross floor area; (iii) the construction or alteration of a Class I 2187 
renewable energy generating source as defined in subsection (c) of section 11F of chapter 25A; 2188 
or (iv) the construction or alteration of an energy storage system defined in section 1 of chapter 2189 
164”, inserted by section 87, and inserting in place thereof the following words:- involves either 2190 
25 or more dwelling units or the construction or alteration of 25,000 square feet or more of gross 2191 
floor area or both. 2192 
 SECTION 89. The first paragraph of section 2 of chapter 465 of the acts of 1956 is 2193 
hereby amended by inserting after the first sentence, the following sentence:- In discharging its 2194 
responsibilities and exercising its powers under this chapter, the Authority shall, with respect to 2195 
itself and the entities with which it contracts or does business, and in a manner consistent with 2196 
any federal law relating to aeronautics or any regulations promulgated or standards established 2197 
pursuant thereto, promote commerce, economic prosperity, safety, security, environmental 2198 
protection and resilience, reductions in greenhouse gas emissions, and environmental justice 2199 
principles as defined in section 62 of chapter 30 of the General Laws.  2200 
 SECTION 90. Section 3 of said chapter 465, as most recently amended by section 2 of 2201 
chapter 660 of the acts of 1977, is hereby further amended by striking out subsection (g) and 2202 
inserting in place thereof the following subsection:-  2203 
 (g) To extend, enlarge, improve, rehabilitate, lease as lessor or lessee, maintain, repair, 2204 
and operate the projects under its control, and to establish rules and regulations for the use of any 2205 
such project; provided, that the Authority shall, with respect to itself and the entities with which 2206  102 of 139 
it contracts or does business, and in a manner consistent with any federal law relating to 2207 
aeronautics or to any regulations promulgated or standards established pursuant thereto, 2208 
undertake such activities, and promulgate such rules and regulations, in such a manner as to 2209 
promote commerce, economic prosperity, safety, security, environmental protection and 2210 
resilience, reductions in greenhouse gas emissions, and environmental justice principles as 2211 
defined in section 62 of chapter 30 of the General Laws; provided, further, that no such rules or 2212 
regulations shall conflict with the rules and regulations of any state or federal regulatory body 2213 
having jurisdiction over the operation of aircraft; and provided, further, that in the enforcement 2214 
of such rules and regulations the police appointed or employed by the Authority under section 23 2215 
shall have within the boundaries of all projects all the powers of police officers and constables of 2216 
the towns of the commonwealth except the power of serving and executing civil process;  2217 
 SECTION 91. Section 6 of chapter 665 of the acts of 1956 is hereby amended by striking 2218 
out the words “state department of public utilities” and inserting in place thereof the following 2219 
words:- energy facilities siting board. 2220 
 SECTION 92. Section 3 of chapter 470 of the acts of 1973 is hereby amended by 2221 
inserting after the definition of “Public place”, inserted by section 3 of chapter 845 of the acts of 2222 
1975, the following definition:- 2223 
 “Solar energy system”, a device or structural design feature, a substantial purpose of 2224 
which is to provide for the collection, storage and distribution of solar energy for space heating 2225 
or cooling, electricity generation or water heating. 2226 
 SECTION 93. Clause (a) of the first paragraph of section 10 of said chapter 470 is hereby 2227 
amended by adding the following words:- ; provided, however, that the commission shall give 2228  103 of 139 
substantial weight to the threat posed by climate change and to the commonwealth’s obligation 2229 
to meet statewide greenhouse gas emission limits and sublimits established under chapter 21N of 2230 
the General Laws when ruling on applications for certificates of appropriateness for solar energy 2231 
systems. 2232 
 SECTION 94. The first paragraph of section 83B of chapter 169 of the acts of 2008, as 2233 
most recently amended by section 60 of chapter 179 of the acts of 2022, is hereby further 2234 
amended by striking out the words “83C and 83D” and inserting in place thereof the following 2235 
words:- 83C, 83D and 83E. 2236 
 SECTION 95. Said first paragraph of said section 83B of said chapter 169, as so 2237 
amended, is hereby further amended by inserting after the definition of “Distribution company” 2238 
the following 2 definitions:- 2239 
 “Energy services”, operation of infrastructure that increases the deliverability or 2240 
reliability of clean energy generation or reduces the cost of clean energy generation. Such 2241 
infrastructure shall include, but not be limited to, transmission, energy storage systems, as 2242 
defined in section 1 of chapter 164 of the General Laws, and demand response technologies. 2243 
 “Environmental attributes”, all present and future attributes under any and all 2244 
international, federal, regional, state or other law or market, including, but not limited to, all 2245 
credits or certificates that are associated, either now or by future action, with clean energy 2246 
generation, including, but not limited to, those attributes authorized and created by programs 2247 
developed under subsection (c) section 3 of chapter 21N of the General Laws, and section 11F 2248 
and section 17 of chapter 25A of the General Laws. 2249  104 of 139 
 SECTION 96. Said first paragraph of said section 83B of said chapter 169, as so 2250 
amended, is hereby further amended by striking out the definitions "Long-	duration energy 2251 
storage system” and “Long-term contract” and inserting in place thereof the following 2 2252 
definitions:- 2253 
 “Long- duration energy storage system”, an energy storage system, as defined in section 1 2254 
of chapter 164 of the General Laws, that is capable of dispatching energy at its full rated capacity 2255 
for a period greater than 10 hours and less than or equal to 24 hours.  2256 
 “Long- term contract”, a contract for a period of 15 to 30 years for offshore wind energy 2257 
generation pursuant to section 83C or for clean energy generation pursuant to section 83D, or a 2258 
contract for a period of up to 30 years for energy storage systems pursuant to section 83E; 2259 
provided, however, that a contract for offshore wind energy generation pursuant to said section 2260 
83C may include terms and conditions for renewable energy credits associated with the offshore 2261 
wind energy generation that exceed the term of generation under the contract. 2262 
 SECTION 97. Said first paragraph of said section 83B of said chapter 169, as so 2263 
amended, is hereby further amended by striking out the definition of “Mid-	duration energy 2264 
storage system” and inserting in place thereof the following 2 definitions:- 2265 
 “Mid-duration energy storage system”, an energy storage system, as defined in section 1 2266 
of chapter 164 of the General Laws, that is capable of dispatching energy at its full rated capacity 2267 
for a period equal to or greater than 4 hours and up to 10 hours. 2268 
 “Multi- day energy storage system,” an energy storage system, as defined in section 1 of 2269 
chapter 164 of the General Laws, that is capable of dispatching electricity at its full rated 2270 
capacity for greater than 24 hours. 2271  105 of 139 
 SECTION 98. Said chapter 169, as amended by chapter 188 of the acts of 2016, is hereby 2272 
further amended by inserting after section 83D the following section:-  2273 
 Section 83E. (a) In order to provide a cost-effective mechanism for facilitating the 2274 
financing of beneficial, reliable energy storage systems, as defined in section 1 of chapter 164 of 2275 
the General Laws, on a long-	term basis, taking into account the factors outlined in this section, 2276 
every distribution company shall, in coordination with the department of energy resources, 2277 
jointly and competitively solicit proposals for energy storage systems and, provided that 2278 
reasonable proposals have been received, shall enter into cost-effective long-term contracts equal 2279 
to, in the aggregate, approximately 5,000 megawatts of energy storage systems not later than 2280 
July 31, 2030, of which 3,500 megawatts shall be mid-	duration energy storage, 750 megawatts 2281 
shall be long- duration energy storage and, if commercially available at a reasonable cost, 750 2282 
megawatts shall be multi-	day energy storage; provided, however, that existing energy storage 2283 
systems shall be eligible to participate in any procurement issued under this section.  2284 
 (b) The timetable and method for solicitation of long-	term contracts shall be proposed by 2285 
the department of energy resources in coordination with the distribution companies using a 2286 
competitive bidding process and shall be subject to review and approval by the department of 2287 
public utilities. The department of energy resources shall consult with the distribution companies 2288 
and the office of the attorney general regarding the choice of solicitation methods. A solicitation 2289 
may be coordinated and issued jointly with other New England states or entities designated by 2290 
those states. The distribution companies, in coordination with the department of energy 2291 
resources, may conduct 1 or more competitive solicitations through a staggered procurement 2292 
schedule developed by the department of energy resources. The schedule shall ensure that the 2293 
distribution companies enter into cost-effective long-term contracts for energy storage systems 2294  106 of 139 
equal to approximately 5,000 megawatts not later than July 31, 2030, of which: (i) approximately 2295 
1,500 megawatts of mid-	duration storage shall be procured by July 31, 2025, and shall be for 2296 
environmental attributes only; (ii) approximately 1,000 megawatts of mid-	duration storage shall 2297 
be procured by July 31, 2026; (iii) approximately 1,000 megawatts of mid-	duration storage shall 2298 
be procured by July 31, 2027; and (iv) all remaining energy storage systems capacity shall be 2299 
procured by July 31, 2030. Each procurement shall consider inclusion of environmental 2300 
attributes, energy services or a combination of both; provided, however, that the procurement of 2301 
1,500 megawatts of mid-	duration storage by July 31, 2025 shall be for environmental attributes 2302 
only. The distribution companies may fulfill their obligations for this procurement by filing 2303 
contracts with the department of public utilities that were entered into as a result of a solicitation 2304 
issued under section 17 of chapter 25A of the General Laws. The department of public utilities 2305 
shall approve, approve in part, or reject any contracts filed by the electric distribution companies 2306 
for compliance under this section not later than 6 months from the filing date of said contracts. 2307 
Proposals received pursuant to a solicitation pursuant to this section shall be subject to review by 2308 
the department of energy resources and the executive office of economic development in 2309 
consultation with the independent evaluator. The electric distribution companies shall offer 2310 
technical advice. If the department of energy resources, in consultation with the independent 2311 
evaluator, determines that reasonable proposals were not received pursuant to a solicitation, the 2312 
department may terminate the solicitation and may require additional solicitations to fulfill the 2313 
requirements of this section.  2314 
 (c) The department of energy resources may give preference to proposals for 2315 
environmental attributes or energy services from energy storage systems that provide additional 2316 
benefits or value to the electric power grid or communities, including, but not limited to: (i) 2317  107 of 139 
supporting grid resiliency and transmission needs in specific geographic locations; (ii) providing 2318 
economic opportunities or public health benefits to environmental justice or disadvantaged 2319 
communities; or (iii) creating economic opportunities in transitioning fossil fuel communities. 2320 
The department shall give preference to proposals that demonstrate compliance with the 2321 
provisions of sections 26 to 27F, inclusive, of chapter 149 of the General Laws, and have a 2322 
history of participation with state or federally certified apprenticeship programs. 2323 
 (d) In developing proposed long-	term contracts, the distribution companies shall consider 2324 
long-term contracts for energy services, for environmental attributes and for a combination of 2325 
both energy services and environmental attributes. A distribution company may decline to pursue 2326 
a contract if the contract’s terms and conditions would require the contract obligation to place an 2327 
unreasonable burden on the distribution company’s balance sheet after consultation with the 2328 
department of energy resources; provided, however, that the distribution company shall take all 2329 
reasonable actions to structure the contracts, pricing or administration of the products purchased 2330 
under this section to prevent or mitigate an impact on the balance sheet or income statement of 2331 
the distribution company or its parent company, subject to the approval of the department of 2332 
public utilities; and provided further, that mitigation shall not increase costs to ratepayers. If a 2333 
distribution company deems all contracts to be unreasonable, the distribution company shall 2334 
consult with the department of energy resources and, not later than 20 days of the date of its 2335 
decision, submit a filing to the department of public utilities. The filing shall include, in the form 2336 
and detail prescribed by the department of public utilities, documentation supporting the 2337 
distribution company’s decision to decline the contract. Following a distribution company’s 2338 
filing, and not later than 4 months of the date of filing, the department of public utilities shall 2339 
approve or reject the distribution company’s decision and may order the distribution company to 2340  108 of 139 
reconsider any contract. The department of public utilities shall take into consideration the 2341 
department of energy resources’ recommendations on the distribution company’s decision. The 2342 
department of energy resources may require additional solicitations to fulfill the requirements of 2343 
this section.  2344 
 (e) The department of public utilities shall promulgate regulations consistent with this 2345 
section. The regulations shall: (i) allow developers or owners of energy storage systems to 2346 
submit proposals for long-	term contracts; (ii) require that contracts executed by the distribution 2347 
companies under such proposals are filed with, and approved by, the department of public 2348 
utilities before they become effective; (iii) provide for an annual remuneration for the contracting 2349 
distribution company equal to 2.25 per cent of the annual payments under the contract to 2350 
compensate the company for accepting the financial obligation of the long-	term contract; 2351 
provided, however, that such provision shall be acted upon by the department of public utilities 2352 
at the time of contract approval; (iv) require associated transmission costs to be incorporated into 2353 
a proposal; provided, however, that to the extent there are regional or project-specific 2354 
transmission costs included in a bid, the department of public utilities may, if it finds such 2355 
recovery to be in the public interest, authorize or require the relevant parties to seek recovery of 2356 
such transmission costs from other states or from benefitted entities or populations in other states 2357 
through federal transmission rates, consistent with policies and tariffs of the Federal Energy 2358 
Regulatory Commission; and (v) require that the energy storage systems used by a developer or 2359 
owner under the proposal meet the following criteria: (A) are cost effective to electric ratepayers 2360 
in the commonwealth over the term of the contract taking into consideration costs and benefits to 2361 
the ratepayers, including economic and environmental benefits and the equitable allocation of 2362 
costs to, and the equitable sharing of costs with other states and populations within other states 2363  109 of 139 
that may benefit from energy storage systems procured by the commonwealth; (B) if applicable, 2364 
adequately demonstrate project viability in a commercially reasonable timeframe; (C) include 2365 
benefits to environmental justice populations and low income ratepayers in the commonwealth; 2366 
and (D) include opportunities for diversity, equity and inclusion, including, at a minimum, a 2367 
workforce diversity plan and supplier diversity program plan.  2368 
 (f) A proposed long-	term contract shall be subject to the review and approval of the 2369 
department of public utilities and shall be apportioned among the distribution companies. As part 2370 
of its approval process, the department of public utilities shall consider recommendations by the 2371 
attorney general, which shall be submitted to the department not later than 45 days following the 2372 
filing of a proposed long-	term contract with the department. The department of public utilities 2373 
shall take into consideration: (i) the department of energy resources’ recommendations on the 2374 
costs and benefits to ratepayers, the equitable allocation and sharing of costs to and with other 2375 
states and populations within other states that may benefit from energy storage systems procured 2376 
by the commonwealth; and (ii) the requirements of chapter 298 of the acts of 2008 and of the 2377 
statewide greenhouse gas emissions limits under chapter 21N of the General Laws. The 2378 
department of public utilities shall consider the costs and benefits of the proposed long-	term 2379 
contract and shall approve a proposed long-term contract if the department finds that the 2380 
proposed contract is in the public interest and is a cost-effective mechanism for procuring 2381 
beneficial, reliable energy storage systems on a long-term basis, taking into account the factors 2382 
outlined in this section. A distribution company shall be entitled to cost recovery of payments 2383 
made under a long-	term contract approved under this section.  2384 
 (g) The department of energy resources and the attorney general shall jointly select, and 2385 
the department of energy resources shall contract with, an independent evaluator to monitor and 2386  110 of 139 
report on the solicitation and bid selection process in order to assist the department of energy 2387 
resources in determining whether a proposal received pursuant to subsection (b) is reasonable 2388 
and to assist the department of public utilities in its consideration of long-	term contracts filed for 2389 
approval. To ensure an open, fair and transparent solicitation and bid selection process is not 2390 
unduly influenced by an affiliated company, the independent evaluator shall: (i) issue a report to 2391 
the department of public utilities analyzing the timetable and method of solicitation and the 2392 
solicitation process implemented by the distribution companies and the department of energy 2393 
resources under subsection (b) and include recommendations, if any, for improving the process; 2394 
and (ii) upon the opening of an investigation by the department of public utilities into a proposed 2395 
long-term contract for a winning bid proposal, file a report with the department of public utilities 2396 
summarizing and analyzing the solicitation and the bid selection process and providing its 2397 
independent assessment of whether all bids were evaluated in a fair and non-	discriminatory 2398 
manner. The independent evaluator shall have access to all information and data related to the 2399 
competitive solicitation and bid selection process necessary to fulfill the purposes of this 2400 
subsection but shall ensure all proprietary information remains confidential. The department of 2401 
public utilities shall consider the findings of the independent evaluator and may adopt 2402 
recommendations made by the independent evaluator as a condition for approval. If the 2403 
independent evaluator concludes in the findings that the solicitation and bid selection of a long-2404 
term contract was not fair and objective and that the process was substantially prejudiced as a 2405 
result, the department of public utilities shall reject the contract.  2406 
 (h) The distribution companies shall each enter into a contract with the winning bidders 2407 
for their apportioned share of the long-	term contract costs. The apportioned share shall be 2408  111 of 139 
calculated and based upon the total energy demand from all distribution customers in each 2409 
service territory of the distribution companies.  2410 
 (i) An electric distribution company may elect to use or retain environmental attributes to 2411 
meet any applicable annual portfolio standard requirements, including section 11F of chapter 2412 
25A of the General Laws, and other clean energy compliance standards as applicable. If the 2413 
environmental attributes are not so used, such companies shall sell such purchased 2414 
environmental attributes attributed to any applicable portfolio standard eligible resources to 2415 
minimize the costs to ratepayers under the contract. The department of energy resources shall 2416 
conduct periodic reviews to determine the impact on the environmental attributes markets of the 2417 
disposition of environmental attributes under this section and may issue reports recommending 2418 
legislative changes if it determines that actions are being taken that will adversely affect the 2419 
environmental attributes markets.  2420 
 (j) If a distribution company sells the environmental attributes as described in this 2421 
section, the distribution company shall net the cost of payments made to projects under the long-2422 
term contracts against the net proceeds obtained from the sale of environmental attributes and the 2423 
difference shall be credited or charged to all distribution customers through a uniform, fully 2424 
reconciling annual factor in distribution rates, subject to review and approval of the department 2425 
of public utilities.  2426 
 (k) A long- term contract procured under this section for energy storage systems shall 2427 
utilize an appropriate tracking system to ensure a unit specific accounting of the delivery of 2428 
environmental attributes, to enable the department of environmental protection, in consultation 2429 
with the department of energy resources, to accurately measure progress in achieving the 2430  112 of 139 
commonwealth’s goals under chapter 298 of the acts of 2008 and the statewide greenhouse gas 2431 
emissions limits under chapter 21N of the General Laws.  2432 
 (l) The department of energy resources and the department of public utilities may jointly 2433 
develop requirements for a bond or other security to ensure performance with requirements 2434 
under this section. 2435 
 (m) The department of energy resources may promulgate regulations necessary to 2436 
implement this section.  2437 
 (n) If this section is subjected to a legal challenge, the department of public utilities may 2438 
suspend the applicability of the challenged provision during the pendency of the action until a 2439 
final resolution, including any appeals, is obtained and shall issue an order and take other actions 2440 
as are necessary to ensure that the provisions not subject to the challenge are implemented 2441 
expeditiously to achieve the public purposes of this section. 2442 
 SECTION 99. Chapter 149 of the acts of 2014 is hereby amended by striking out section 2443 
3. 2444 
 SECTION 100. Subsection (a) of section 81 of chapter 179 of the acts of 2022 is hereby 2445 
amended by striking out the figure “11” and inserting in place thereof the following figure:- 13. 2446 
 SECTION 101. Said subsection (a) of said section 81 of said chapter 179 is hereby 2447 
further amended by inserting after the words “commissioner of public utilities or designee” the 2448 
following words:- ; the executive director of the Massachusetts clean energy technology center 2449 
or designee; the commissioner of the division of standards or designee.  2450  113 of 139 
 SECTION 102. The second paragraph of said subsection (a) of said section 81 of said 2451 
chapter 179 is hereby amended by striking out the words “and (ix)” and inserting in place thereof 2452 
the following words:- (ix) estimates of the number of zero-emission medium and heavy duty 2453 
vehicle charging stations required to meet the commonwealth’s emissions limits and sublimits 2454 
pursuant to said chapter 21N; (x) a discussion of costs, permitting processes and estimated 2455 
timelines for installing charging stations for medium and heavy duty vehicles; and (xi). 2456 
 SECTION 103. Said section 81 of said chapter 179 is hereby further amended by striking 2457 
out subsection (d) and inserting in place thereof the following subsection:- 2458 
 (d)(1) The council shall issue an initial assessment to the senate and house committees on 2459 
ways and means and the joint committee on telecommunications, utilities and energy not later 2460 
than 12 months after the effective date of this act and shall reconsider and revise its assessment 2461 
at least once every 2 years. The council shall make its assessments publicly available on the 2462 
website of each secretariat with a member serving on the council.  2463 
 (2) Each assessment submitted pursuant to this section shall forecast electric vehicle 2464 
charging demand throughout the commonwealth for the next 10 years and the impacts of such 2465 
demand on the electric distribution grid, identifying areas of the grid that may require 2466 
modification due to such impacts. In conducting such forecasts, the council shall consult with 2467 
key stakeholders, including, but not limited to, electric distribution companies, convenience store 2468 
and restaurant retailers and other small businesses, electric vehicle supply equipment companies, 2469 
electric vehicle original equipment manufacturers and fleet operators. Each forecast shall 2470 
consider current traffic patterns and expected adoption of light, medium and heavy-	duty electric 2471 
vehicles over various time periods.  2472  114 of 139 
 (3) Not later than 6 months after the completion of each assessment, the council, in 2473 
coordination with the department of energy resources, the Massachusetts Department of 2474 
Transportation and said key stakeholders, shall identify optimal sites along or near 2475 
commonwealth highways and major roadways in each electric distribution company service 2476 
territory that may be suitable to host electric vehicle fast charging hubs and fleet depots. 2477 
Identification of such priority sites for electric vehicle fast charging stations and fleet depots 2478 
shall include, but not be limited to, consideration of the following: (i) convenience, accessibility 2479 
and safety for drivers and passengers; (ii) ease of access for both consumer and commercial 2480 
electric vehicles; (iii) cost-	effective and efficient use of existing electric company infrastructure 2481 
and rights-of-way; (iv) land use feasibility; (v) potential ability to qualify for public funds, 2482 
including, but not limited to, funds made available under the federal Infrastructure Investment 2483 
and Jobs Act of 2021, Public Law No. 117-	58; and (vi) impact on environmental justice 2484 
communities and low and moderate income neighborhoods.  2485 
 (4) Not later than 12 months after the completion of each assessment, each electric 2486 
distribution company shall develop a plan for building the additional distribution infrastructure 2487 
investments necessary on its system to satisfy, at a minimum, the 10-year charging demand 2488 
projected in each such assessment, including, but not limited to, in the areas identified in such 2489 
assessment as potentially requiring a grid upgrade and at the sites identified as potential hosts of 2490 
fast charging hubs and fleet depots. Such additional distribution infrastructure investments shall 2491 
be designed to accommodate any additional projected future needs for the area identified by the 2492 
electric distribution company and shall be inclusive of, but not limited to, increased demand 2493 
associated with heating and cooling electrification and hosting capacity for distributed energy 2494 
resources. Each such additional distribution infrastructure investment shall be: (i) consistent with 2495  115 of 139 
the requirements and criteria set forth in section 92B of chapter 164 of the General Laws; (ii) 2496 
treated as small clean transmission and distribution infrastructure facilities as defined in chapter 2497 
25A of the General Laws; and (iii) subject to the statutes, regulations and processes attendant to 2498 
said chapter 25A.  2499 
 (5) Not later than 12 months after the completion of each assessment, each electric 2500 
distribution company may submit to the department of public utilities an application to increase 2501 
its base electric distribution rates to account for the additional distribution infrastructure included 2502 
in the plan pursuant to paragraph (4). Such application shall be approved by the department of 2503 
public utilities not later than 3 months after submission so long as the requested increase is 2504 
consistent with the department's accounting practices and incremental costs are not otherwise 2505 
accounted for in the electric distribution company's existing rates. The department's review of 2506 
such application shall not be construed as a prudence review. The electric distribution company's 2507 
application shall be deemed approved if the department does not act within 3 months.                                                                                  2508 
 (6) The department of public utilities shall conduct a prudence review of the additional 2509 
distribution infrastructure investments planned pursuant to paragraph (4) during the next general 2510 
rate case of the electric distribution company or in reviewing the electric distribution company's 2511 
electric-sector modernization plan submitted pursuant to section 92B of chapter 164 of the 2512 
General Laws, at the department's discretion. Each electric distribution company shall be entitled 2513 
to full cost recovery of all such infrastructure investments deemed prudent. To demonstrate 2514 
prudence, the electric distribution company shall clearly outline how it evaluated advanced 2515 
transmission technologies, other infrastructure investments and alternatives other than 2516 
infrastructure investments to satisfy projected demand. The electric distribution company shall 2517 
also demonstrate that the proposed infrastructure investments were cost effective compared with 2518  116 of 139 
the alternatives, provide net benefits for customers and meet the criteria enumerated in clauses (i) 2519 
to (vi), inclusive, of subsection (a) of said section 92B of said chapter 164. If the department 2520 
finds that such investments were imprudent, it may, at its discretion, order customers to be 2521 
credited for any increase in base distribution rates made pursuant to paragraph (5) with interest, 2522 
as appropriate. 2523 
 SECTION 104. Said section 81 of said chapter 179, as amended by section 165 of 2524 
chapter 77 of the acts of 2023, is hereby further amended by adding the following subsection:- 2525 
 (f) The council shall be responsible for providing leadership and direction for the 2526 
deployment of electric vehicle charging infrastructure and electric vehicle chargers and shall 2527 
strive to ensure a network of convenient, affordable, reliable and equitable electric vehicle 2528 
chargers in the commonwealth. Responsibilities of the council shall include, but not be limited 2529 
to: (i) achieving the objectives and serving the purposes enumerated in this section; (ii) 2530 
monitoring the preparedness, staffing level, staff training and overall effectiveness of public and 2531 
private initiatives, activities, programs, agencies, offices and divisions involved in siting, 2532 
permitting, financing, installing, inspecting, maintaining or protecting consumer interactions 2533 
with electric vehicle chargers in the commonwealth; (iii) facilitating intergovernmental 2534 
coordination and effectiveness with respect to achieving the objectives and serving the purposes 2535 
enumerated in this section; (iv) achieving timely compliance with, and implementation and 2536 
administration of, standards, requirements and regulations promulgated by the National Electric 2537 
Vehicle Infrastructure Formula Program established pursuant to the Infrastructure Investment 2538 
and Jobs Act of 2021, Public Law No. 117-	58; and (v) ensuring wayfinding signage on highways 2539 
and on streets adjacent to charging locations with information on such locations.  2540  117 of 139 
 Not later than July 31, 2025, or as part of the next periodic assessment compiled pursuant 2541 
to subsection (d), whichever occurs later, and every 2 years thereafter, the council shall report on 2542 
its efforts to lead and direct such deployment and its results to the senate and house committees 2543 
on ways and means and the joint committee on telecommunications, utilities and energy. The 2544 
council shall make such reports publicly available on the website of each secretariat with a 2545 
member serving on the council. 2546 
 SECTION 105. Said chapter 179 is hereby further amended by striking out section 82 2547 
and inserting in place thereof the following section:- 2548 
 Section 82. The department of energy resources may coordinate with 1 or more New 2549 
England states to consider competitive solicitations for long-	term clean energy generation, 2550 
including nuclear power generation that is located in the ISO-NE control area and commenced 2551 
commercial operation before January 1, 2011, associated environmental attributes, transmission 2552 
or capacity for the benefit of residents of the commonwealth and the region. If the department of 2553 
energy resources, in consultation with the electric distribution companies and the office of the 2554 
attorney general, determines not later than December 31, 2025 that a project would satisfy all of 2555 
the benefits listed below, the electric distribution companies shall enter into cost-	effective long-2556 
term contracts. In its determination, the department of energy resources shall determine if any 2557 
proposals: (i) provide cost-effective clean energy generation to electric ratepayers in the 2558 
commonwealth and the region over the term of the contract; (ii) provide the benefits of clean 2559 
energy and associated transmission towards meeting the commonwealth’s decarbonization goals; 2560 
(iii) where possible, avoid, minimize or mitigate, to the maximum extent practicable, 2561 
environmental impacts and impacts to low income populations; or (iv) reduce ratepayer costs in 2562 
winter months and improve energy security during winter months. For the purposes of this 2563  118 of 139 
section, a long- term contract shall be a contract with a term of 10 to 20 years. Eligible clean 2564 
energy generation must contribute to achieving compliance with limits and sublimits established 2565 
pursuant to sections 3 and 3A of chapter 21N of the General Laws. Associated transmission costs 2566 
must be incorporated into a proposal. All proposed contracts shall be subject to the review and 2567 
approval of the department of public utilities. The department of public utilities shall consider 2568 
both potential costs and benefits of such contracts and shall only approve a contract upon a 2569 
finding that it is cost-	effective, taking into account the factors provided in this section. 2570 
 SECTION 106. Notwithstanding any general or special law, rule, regulation or order to 2571 
the contrary, the department of public utilities shall investigate expanding access to net crediting 2572 
solutions for net metering facilities and solar facilities eligible to receive bill credits under any 2573 
programs established pursuant to section 11 of chapter 75 of the acts of 2016. Such net crediting 2574 
solutions may facilitate the allocation of credits between owners of facilities and customers, 2575 
including any payment mechanism that requires an electric distribution company, at the request 2576 
of a host customer or eligible facility to: (i) include the monthly subscription charge of a host 2577 
customer or eligible facility on the customer’s bills; and (ii) remit payment for those charges to 2578 
the host customer or eligible facility. The department shall consider whether an electric 2579 
distribution company may require a fee for a host customer or eligible facility that uses net 2580 
crediting. 2581 
 SECTION 107. Notwithstanding any general or special law, rule or regulation to the 2582 
contrary, the department of public utilities, in consultation with the department of energy 2583 
resources, shall: (i) amend any applicable rules, regulations and tariffs to permit the transfer of 2584 
credits from an alternative on-bill credit generation unit, as defined by regulations of the 2585 
department of energy resources, to customers of any electric distribution company located in the 2586  119 of 139 
commonwealth; and (ii) require the electric distribution companies to implement consolidated 2587 
billing on Alternative On-Bill Credit (AOBC) Low Income Community Shared Solar (LICSS) 2588 
generation units. In implementing said consolidated billing, the electric distribution companies 2589 
shall apply the net value of the bill credit directly to customer’s accounts and remit the developer 2590 
or owner portion of the payment directly to the developer or owner. The net value of the bill 2591 
credits the electric distribution companies would apply to customer accounts may be calculated 2592 
in a manner determined by the department.  2593 
 SECTION 108. There shall be a special legislative commission to recommend to the 2594 
general court extended producer responsibility policies for the commonwealth. The commission 2595 
shall include: the commissioner of environmental protection or a designee, who shall serve as 2596 
chair; the secretary of economic development or a designee; the commissioner of public health or 2597 
a designee; 1 person to be appointed by the attorney general, who shall have expertise in 2598 
consumer protection; 1 person to be appointed by the senate chair of the joint committee on 2599 
environment and natural resources; 1 person to be appointed by the senate chair of the joint 2600 
committee on telecommunications, utilities and energy; 1 person to be appointed by the minority 2601 
leader of the senate; 1 person to be appointed by the house chair of the joint committee on 2602 
environment and natural resources; 1 person to be appointed by the house chair of the joint 2603 
committee on telecommunications, utilities and energy; 1 person to be appointed by the minority 2604 
leader of the house of representatives; 1 person to be appointed by the Massachusetts Association 2605 
of Regional Planning Agencies; and 10 additional persons to be appointed by the chair, 1 of 2606 
whom shall represent an organization representing product or packaging producers, 1 of whom 2607 
shall represent retailers, 1 of whom shall represent waste haulers and material recovery facility 2608 
operators, 1 of whom shall represent municipal officials or employees, 1 of whom shall represent 2609  120 of 139 
a statewide or regional environmental protection organization, 3 of whom shall represent 2610 
environmental justice organizations, 1 of whom shall represent a statewide recycling advocacy 2611 
organization and 1 of whom shall represent an environmental health and public health 2612 
organization. The chair shall consider geographic diversity in making appointments to the 2613 
commission. The chair may select a third-party facilitator for the commission.  2614 
 The extended producer responsibility policy recommendations shall include, but not be 2615 
limited to: (i) recommendations on specific extended producer responsibility approaches and 2616 
other strategies for product and packaging categories including, but not limited to, paint, 2617 
mattresses, electronics, lithium-	ion batteries, plastics and other packaging; (ii) a proposed 2618 
structure for each product and packaging category including collection, processing and financial 2619 
responsibility; (iii) information on cost impacts of residential curbside collection or transfer 2620 
station operations, on-	site processing costs for each readily recyclable material type, 2621 
management costs of non-readily recyclable materials and other cost factors; (iv) methods for 2622 
incentivizing product and packaging production, including material reduction, reuse and lifecycle 2623 
extensions; and (v) impacts on waste generation and waste stream contamination reduction. The 2624 
commission shall host not less than 4 public meetings and solicit public comment regarding 2625 
extended producer responsibility. Not later than January 15, 2026, the commission shall issue 2626 
initial recommendations and related findings to the senate and house committees on ways and 2627 
means, the joint committee on environment and natural resources, the joint committee on 2628 
telecommunications, utilities and energy and the clerks of the senate and house of 2629 
representatives. The department of environmental protection shall publish said recommendations 2630 
and related findings on its website. 2631  121 of 139 
 SECTION 109. There shall be a special commission to study the impacts on the fossil 2632 
fuel workforce caused by public and private efforts to reduce greenhouse gas emissions and 2633 
transition from fossil fuels to clean energy. The commission shall seek to measure and monitor 2634 
the impact on fossil fuel workers and industries and examine ways to increase access to 2635 
employment, training and workforce opportunities in clean energy industries and related fields. 2636 
The commission shall consist of: the secretary of labor and workforce development or a 2637 
designee, who shall serve as co-	chair; the commissioner of energy resources or a designee, who 2638 
shall serve as co-chair; the secretary of economic development or a designee; the director of 2639 
environmental justice and equity or a designee; the executive director of the Massachusetts clean 2640 
energy technology center or a designee; 8 members to be appointed by the governor, 1 of whom 2641 
shall be a representative of employers in the gas utility sector, 1 of whom shall be a 2642 
representative of employers in the electric power generation sector, 1 of whom shall be a 2643 
representative of employers in the renewable electricity sector, 1 of whom shall be a 2644 
representative of employers in the energy efficiency sector, 1 of whom shall be a representative 2645 
of employers in the clean transportation sector, 1 of whom shall be a representative of employers 2646 
in the clean heating sector and 2 of whom shall work in or be affiliated with a higher education 2647 
university with educational expertise in labor policy and the fossil fuel or clean energy workforce 2648 
and 5 of whom shall be recommended by the president of the Massachusetts AFL-CIO, 1 of 2649 
whom shall be a representative of employees in the gas utility sector, 1 of whom shall be a 2650 
representative of employees in the electric power generation sector, 2 of whom shall be 2651 
representatives of employees in the clean energy sector and 1 of whom shall be a representative 2652 
of employees in the transportation sector; the president of the Massachusetts Building Trades; 2653  122 of 139 
and 2 representatives of environmental justice communities appointed by the director of 2654 
environmental justice and equity. 2655 
 The work of the commission shall include, but not be limited to, identifying workers 2656 
currently employed in the energy sector by industry, trade and job classification, including an 2657 
analysis of wage and benefit packages and current licensing, certification and training 2658 
requirements. The commission shall recommend education and training programs to enhance re-2659 
employment opportunities within the energy sector and services to support dislocated workers 2660 
displaced from jobs within the energy sector as a result of public or private efforts to reduce 2661 
greenhouse gas emissions or transition from fossil fuels to clean energy and advancements in 2662 
clean energy technology. The commission shall, not later than December 31, 2025, issue a 2663 
report, including any plans and recommendations, to the clerks of the senate and house of 2664 
representatives. 2665 
 SECTION 110. The initial regulations required to be promulgated by the executive office 2666 
of energy and environmental affairs or its designated agency under section 31 of chapter 21A of 2667 
the General Laws and the initial regulations required to be promulgated by the division of 2668 
standards in the office of consumer affairs and business regulation under section 59 of chapter 98 2669 
of the General Laws shall be completed not later than February 1, 2026 and shall apply to 2670 
chargers installed on or after June 1, 2026. 2671 
 SECTION 111. The Massachusetts clean energy technology center shall conduct and 2672 
publish a study of prospects and opportunities for carbon dioxide removal innovation and 2673 
operations within the commonwealth or in waters not more than 50 nautical miles off the 2674 
commonwealth. Methods of carbon dioxide removal shall include, but not be limited to: (i) 2675  123 of 139 
sequestration and storage involving terrestrial mineralization or enhanced rock weathering; (ii) 2676 
sequestration and storage involving biochar, woody waste, agricultural waste or other waste 2677 
products; (iii) ocean-based solutions including electro-	chemical alkalinity enhancement, marine 2678 
permaculture, deep-ocean sequestration and storage of biomass and coastal enhanced 2679 
weathering; (iv) construction materials and products, the production of which directly contributes 2680 
to the sequestration and storage of carbon dioxide or other greenhouse gases, including mass 2681 
timber; and (v) direct air capture paired with either durable geologic sequestration and storage or 2682 
durable sequestration and storage in the built environment including in concrete. 2683 
 The study shall include, but not be limited to: (i) cost considerations, including ranges of 2684 
likely prices per ton of carbon dioxide removed; (ii) the scale potential of various potential 2685 
carbon dioxide removal processes; (iii) the likely duration of various potential carbon dioxide 2686 
removal operations; (iv) projected start times of various activities and operations; (v) the 2687 
conservation efficiency of various activities and operations in terms of their use of water, land 2688 
and energy resources with explicit consideration of projects with low water, land and energy 2689 
requirements and of projects that exclusively employ renewable energy; (vi) the number of 2690 
potential jobs within the commonwealth, including research and development jobs, that are likely 2691 
to be created by various activities and operations; (vii) the potential of various activities and 2692 
operations to involve purchases of equipment and supplies from businesses located in the 2693 
commonwealth; (viii) the potential of various activities and operations to generate significant 2694 
agricultural, ecological or ecosystem co-benefits, harms or effects of ocean acidification on the 2695 
marine environment, habitats and species, including shellfish, lobsters and other commercially-2696 
important fisheries in the waters of the commonwealth; (ix) the extent to which various activities 2697 
and operations may generate economic benefit to 1 or more disadvantaged communities; (x) 2698  124 of 139 
methods of measuring, reporting and verifying carbon dioxide removal technologies; and (xi) 2699 
recommended next steps, if any, for legislative or executive branch action.  2700 
 The center shall publish a draft study for comment not later than December 31, 2025 and 2701 
a final study not later than April 30, 2026. 2702 
 SECTION 112. Notwithstanding any general or special law to the contrary and subject to 2703 
availability of sufficient proceeds, the department of energy resources shall expend amounts 2704 
from the RGGI Auction Trust Fund established in section 35II of chapter 10 of the General Laws 2705 
to fund the green communities program established in section 10 of chapter 25A of the General 2706 
Laws and the Electric Vehicle Adoption Incentive Trust Fund established in section 19 of said 2707 
chapter 25A through June 30, 2027. Payments made from the fund shall be prioritized by 2708 
directing initial payments to the green communities program and the Electric Vehicle Adoption 2709 
Incentive Trust Fund; provided, however, that not less than $27,000,000 shall be available for the 2710 
Electric Vehicle Adoption Incentive Trust Fund each fiscal year. 2711 
 SECTION 113. Notwithstanding any general or special law to the contrary and not later 2712 
than July 31, 2025, the executive office of housing and livable communities, in consultation with 2713 
the executive office of energy and environmental affairs, shall promulgate regulations to 2714 
implement a cradle-to-grave life cycle assessment in accordance with International Organization 2715 
for Standardization ISO 14040 and ISO 14044 of state-funded housing projects. The assessment 2716 
shall encompass the full life cycle including, but not limited to: (i) resource extraction through 2717 
demolition and disposal; and (ii) on-	site construction, operations, maintenance and replacement 2718 
and material-and product-embodied acquisition, processing and transportation energy. 2719  125 of 139 
 SECTION 114. Notwithstanding any general or special law to the contrary, the 2720 
department of energy resources, in consultation with the department of public utilities and the 2721 
Massachusetts clean energy technology center, shall issue technical guidance on how a 2722 
municipality or group of municipalities with an approved municipal load aggregation plan 2723 
authorized pursuant to section 134 of chapter 164 of the General Laws or with approved 2724 
aggregations authorized pursuant to section 137 of said chapter 164, may enter into a long-	term 2725 
contract to purchase electricity from an offshore wind developer. The guidance shall be publicly 2726 
posted on the department’s website not later than June 1, 2025.  2727 
 SECTION 115. The embodied carbon intergovernmental coordinating council shall 2728 
submit the initial embodied carbon reduction plan under section 73 of chapter 7C of the General 2729 
Laws to the clerks of the senate and house of representatives not later than July 31, 2025. 2730 
 SECTION 116. (a) Notwithstanding any general or special law to the contrary, the 2731 
department of energy resources shall conduct a review to determine the effectiveness of the 2732 
commonwealth’s existing solicitations and procurements required by sections 83 to 83E, 2733 
inclusive, of chapter 169 of the acts of 2008 and shall make recommendations regarding the 2734 
future procurement of clean energy resources for the purposes of ensuring compliance with 2735 
statewide greenhouse gas emissions limits and sublimits under chapter 21N of the General Laws.  2736 
 (b) The department’s recommendations shall include a review of: (i) prior clean energy 2737 
solicitations; (ii) best practices and models utilized by other states to procure clean energy; (iii) 2738 
best practices and models utilized by other states and the federal government to ensure high labor 2739 
standards in clean energy; (iv) with respect to sections 83C, 83D, and 83E of chapter 169 of the 2740 
acts of 2008, the optimal length of long-	term contracts as defined in section 83B of said chapter 2741  126 of 139 
169; (v) the use of energy services in future solicitations and procurements, which shall include 2742 
operation of advanced transmission infrastructure, including transmission, energy storage 2743 
systems as defined in section 1 of chapter 164 of the General Laws and demand response 2744 
technologies, that increases the deliverability or reliability of clean energy generation or reduces 2745 
the cost of clean energy generation; (vi) authorization of surplus interconnection service as an 2746 
available transmission option in future solicitations and procurements required by said section 2747 
83C of said chapter 169; and (vii) strategies to minimize total carbon emissions generated by 2748 
vessels during both the construction phase and the operation and maintenance phase of a project 2749 
and any legislative recommendations needed to amend or replace existing statutory authority. 2750 
 (c) The department’s review of best practices and models for labor standards shall 2751 
include an investigation of reporting requirements for future solicitations and procurements 2752 
pursuant to section 83C of chapter 169 of the acts of 2008 regarding information relative to 2753 
compliance with chapters 149, 151, 151A, 151B and 152 of the General Laws, 29 U.S.C. section 2754 
201, et seq. and applicable federal anti-discrimination laws by offshore wind developers as 2755 
defined in said section 83B of said chapter 169, their contractors and subcontractors, 2756 
documentation of such parties’ history with picketing, work stoppages, boycotts or other 2757 
economic actions and documentation relative to whether such parties have been found in 2758 
violation of any state or federal safety regulations in the previous 10 years. The review shall 2759 
further include information regarding the use of state or federally certified apprenticeship 2760 
programs and the use of prevailing or union wages on clean energy projects.    2761 
 (d) The department shall consult with the clean energy industry, the office of the attorney 2762 
general, the Massachusetts clean energy technology center, environmental justice organizations, 2763 
labor organizations representing workers in the offshore wind industry and other impacted 2764  127 of 139 
stakeholders as part of this review process. Such review and recommendations shall be submitted 2765 
to the joint committee on telecommunications, utilities and energy not later than July 1, 2025. 2766 
 SECTION 117. The executive office of energy and environmental affairs shall conduct a 2767 
study on the feasibility of the electric vehicle only sales mandate that becomes effective in 2035. 2768 
The study shall include, but not be limited to, an examination of a realistic timeline to implement 2769 
the mandate, the infrastructure needed to implement the mandate, including ample charging 2770 
stations throughout the commonwealth and where and how enough electricity will be needed and 2771 
generated into the power grid to sustain such a mandate by 2035. The study shall also seek input 2772 
on the impacts of the mandate from relevant industries including, but not limited to, the 2773 
automobile industry, auto sales industry, auto repair industry, transportation industry, shipping 2774 
and construction industries and travel and tourism. The executive office shall collect information 2775 
on the feasibility of installing and providing access to charging stations in rural, suburban and 2776 
urban areas. The executive office shall also collect and study information on the costs associated 2777 
with the repair and general maintenance of electric vehicles compared to gas-fueled vehicles.  2778 
 The executive office shall report its findings to the joint committee on 2779 
telecommunications, utilities and energy, the chairs of the house and senate committees on 2780 
global warming and climate change and the chairs of the house and senate committees on ways 2781 
and means not later July 31, 2025.  2782 
 SECTION 118. (a) Notwithstanding any general or special law to the contrary, an energy 2783 
storage system as defined in section 1 of chapter 164 of the General Laws that is not less than 2784 
100 megawatt hours and has received a comprehensive exemption from local zoning by-	laws 2785 
pursuant to section 3 of chapter 40A of the General Laws or pursuant to section 6 of chapter 665 2786  128 of 139 
of the acts of 1956 may petition the energy facilities siting board to obtain a certificate of 2787 
environmental impact and public interest if the petition is filed prior to the date when regulations 2788 
are promulgated pursuant to section 132.  2789 
 (b) The energy facilities siting board shall consider a petition pursuant to subsection (a) if 2790 
the applicant is prevented from building the energy storage system because: (i) the applicant is 2791 
unable to meet standards imposed by a state or local agency with reasonable and commercially 2792 
available equipment; (ii) the processing or granting by a state or local agency of any approval, 2793 
consent, permit or certificate has been unduly delayed for any reason; (iii) the applicant believes 2794 
there are inconsistencies among resource use permits issued by such state or local agencies; (iv) 2795 
the applicant believes that a nonregulatory issue or condition has been raised or imposed by such 2796 
state or local agencies, including, but not limited to, aesthetics and recreation; (v) the generating 2797 
facility cannot be constructed due to any disapprovals, conditions or denials by a state or local 2798 
agency or body, except with respect to any lands or interests therein, excluding public ways, 2799 
owned or managed by any state agency or local government; or (vi) the facility cannot be 2800 
constructed because of delays caused by the appeal of any approval, consent, permit or 2801 
certificate.  2802 
 (c) The energy facilities siting board shall, upon petition, consider an application for a 2803 
certificate of environmental impact and public interest if it finds that any state or local agency 2804 
has imposed a burdensome condition or limitation on any license or permit. An energy storage 2805 
system, with respect to which a certificate is issued by the energy facilities siting board, shall 2806 
thereafter be constructed, maintained and operated in conformity with such certificate and any 2807 
terms and conditions contained therein.   2808  129 of 139 
 (d) Notwithstanding any general or special law to the contrary, such certificate may be so 2809 
issued; provided, however, that when so issued no state agency or local government shall require 2810 
any approval, consent, permit, certificate or condition for the construction, operation or 2811 
maintenance of the energy storage system with respect to which the certificate is issued and no 2812 
state agency or local government shall impose or enforce any law, ordinance, by-	law, rule or 2813 
regulation nor take any action nor fail to take any action that would delay or prevent the 2814 
construction, operation or maintenance of such energy storage system except as required by 2815 
federal law; and provided further, that the energy facilities siting board shall not issue a 2816 
certificate, the effect of which would be to grant or modify a permit, approval or authorization, 2817 
which, if so granted or modified by the appropriate state or local agency, would be invalid 2818 
because of a conflict with applicable federal water or air standards or requirements. A certificate, 2819 
if issued, shall be in the form of a composite of all individual permits, approvals or 2820 
authorizations that would otherwise be necessary for the construction and operation of the energy 2821 
storage system and that portion of the certificate that relates to subject matters within the 2822 
jurisdiction of a state or local agency shall be enforced by said agency under the other applicable 2823 
laws of the commonwealth as if it had been directly granted by the said agency.  2824 
 (e) Energy storage systems that have not petitioned the department of public utilities for a 2825 
comprehensive exemption from local zoning by-	laws pursuant to section 3 of chapter 40A of the 2826 
General Laws prior to July 1, 2026, shall not be eligible to petition the energy facilities siting 2827 
board to obtain a certificate of environmental impact and public interest under this section.  2828 
 (f) Notwithstanding any general or special law to the contrary, large clean energy storage 2829 
facilities that have: (i) submitted a petition under section 72 of chapter 164 of the General Laws; 2830 
(ii) submitted a petition under section 3 of chapter 40A of the General Laws; or (iii) requested 2831  130 of 139 
local permits or a grant of location prior to the date when regulations are promulgated pursuant 2832 
to section 132 shall not be required to submit an application or petition to the energy facility 2833 
siting board pursuant to section 69T of chapter 164 of the General Laws.  2834 
 SECTION 119. (a) For purposes of this section, the following words shall have the 2835 
following meanings unless the context clearly requires otherwise:-  2836 
 “Approval”, except as otherwise provided in subsection (b), any permit, certificate, order, 2837 
excluding enforcement orders, license, certification, determination, exemption, variance, waiver, 2838 
building permit or other approval or determination of rights from any municipal, regional or state 2839 
governmental entity, including any agency, department, commission or other instrumentality of 2840 
the municipal, regional or state governmental entity, concerning the use or development of real 2841 
property, including certificates, licenses, certifications, determinations, exemptions, variances, 2842 
waivers, building permits or other approvals or determination of rights issued or made under 2843 
chapter 21 of the General Laws or chapter 21A of the General Laws; provided, however 2844 
“approval” shall not mean any permit, certificate, order, excluding enforcement orders, license, 2845 
certification, determination, exemption, variance, waiver, building permit or other approval or 2846 
determination of rights issued or made under section 16 of chapter 21D of the General Laws, 2847 
sections 61 to 62H, inclusive, of chapter 30 of the General Laws, chapters 30A, 40 and 40A to 2848 
40C, inclusive, of the General Laws, chapters 40R, 41 and 43D of the General Laws, section 21 2849 
of chapter 81 of the General Laws, chapters 91, 131, 131A and 143 of the General Laws, 2850 
sections 4 and 5 of chapter 249 of the General Laws or chapter 258 of the General Laws or 2851 
chapter 665 of the acts of 1956 or any local by-	law or ordinance.  2852  131 of 139 
 “Clean energy infrastructure project”, a project involving the construction, 2853 
reconstruction, conversion, relocation or enlargement of any renewable energy generating 2854 
source, as defined in subsection (c) of section 11F of chapter 25A of the General Laws, any 2855 
energy storage system, as defined in section 1 of chapter 164 of the General Laws, any 2856 
transmission facility or distribution facility, as defined in said section 1 of said chapter 164, or 2857 
related infrastructure, including substations and any other project that may be so designated as a 2858 
clean energy infrastructure project by the department of energy resources.  2859 
 (b)(1) Notwithstanding any general or special law to the contrary, any approval granted 2860 
for a clean energy generation or storage project that was in effect from October 22, 2020, to 2861 
August 1, 2024, inclusive, shall be extended to August 1, 2029.  2862 
 (2) A clean energy infrastructure project shall be governed by the applicable provisions 2863 
of any state, regional or local statute, regulation, ordinance or by-	law, if any, in effect at the time 2864 
of the initial approval granted for such project, unless the owner or petitioner of such project 2865 
elects to waive this section.    2866 
 (3) Nothing in this section shall extend or purport to extend: (i) a permit or approval 2867 
issued by the government of the United States or an agency or instrumentality of the government 2868 
of the United States or to a permit or approval of which the duration of effect or the date or terms 2869 
of its expiration are specified or determined by or under law or regulation of the federal 2870 
government or any of its agencies or instrumentalities; or (ii) a permit, license, privilege or 2871 
approval issued by the division of fisheries and wildlife under chapter 131 of the General Laws 2872 
for hunting, fishing or aquaculture.  2873  132 of 139 
 (4) If an owner or petitioner sells or otherwise transfers a property or project to receive 2874 
approval for an extension, the new owner or petitioner shall agree to assume all commitments 2875 
made by the original owner or petitioner under the terms of the approval, otherwise the approval 2876 
shall not be extended under this section.  2877 
 SECTION 120. The department of public utilities shall commission a management study 2878 
to assess: (i) the likely workload of the energy facilities siting board based on the new 2879 
requirements of this act and the commonwealth’s clean energy and climate plans; (ii) the 2880 
workforce qualifications needed to implement this act; (iii) the cost associated with the hiring 2881 
and retention of qualified professionals and consultants to successfully complete that work 2882 
required pursuant to this act; and (iv) the design, population and maintenance of a real-time, 2883 
online clean energy infrastructure dashboard, as required to be maintained by the facility siting 2884 
division pursuant to section 12N of chapter 25 of the General Laws. The funding and staffing 2885 
resource requirements identified in the management study shall be reported to the joint 2886 
committee on ways and means, the joint committee on telecommunications, utilities and energy, 2887 
the secretary of energy and environmental affairs and the secretary of administration and finance 2888 
not later than August 1, 2025. The secretary of energy and environmental affairs and the 2889 
secretary of administration and finance shall within 60 days of their receipt of the study provide 2890 
recommendations to the senate and house committees on ways and means and the joint 2891 
committee on telecommunications, utilities and energy on options to implement any proposed 2892 
recommendations of the study. 2893 
 SECTION 121. (a) The department of public utilities, in coordination with the 2894 
department of energy resources, shall conduct an independent investigation that examines the use 2895 
of advanced conductors, grid-	enhancing technologies and other advanced transmission 2896  133 of 139 
technologies to enhance the performance of the commonwealth’s transmission system in 2897 
applications that are subject to federal jurisdiction. Such advanced conductors, grid-	enhancing 2898 
technologies and other advanced transmission technologies may include, but shall not be limited 2899 
to, reconductoring of transmission and distribution lines and the use of dynamic line ratings, 2900 
advanced power flow control and topology optimization software.   2901 
 (b) In conducting its investigation, the department shall: (i) review industry trends for the 2902 
implementation and use of advanced conductors, grid-	enhancing technologies, and other 2903 
advanced transmission technologies and determine which technologies are cost-effective and in 2904 
the public interest and under what conditions those technologies could be utilized for 2905 
transmission and distribution infrastructure within the state; and (ii) for any technologies 2906 
determined to be cost effective and in the public interest, identify any jurisdictional and cost-2907 
sharing issues related to requiring a transmission and distribution utility to implement such 2908 
advanced transmission technologies. The investigation shall consider the costs of such 2909 
technologies and consider their benefits including, but not limited to: (A) access to lower cost 2910 
and zero carbon electricity; (B) acceleration of distributed energy resource interconnection; (C) 2911 
reduced generator curtailment or congestion; (D) reduced environmental impacts; (E) 2912 
maximization of the value of planned investments; (F) improved resilience; and (G) improved 2913 
outage coordination and mitigation.  2914 
 (c) The department of public utilities shall submit is report to the joint committee on 2915 
telecommunications, utilities and energy not later than September 1, 2025.   2916 
 SECTION 122. The department of environmental protection, in consultation with the 2917 
board of fire prevention and regulations and the department of energy resources, shall issue 2918  134 of 139 
guidance on the public health, safety and environmental impacts of electric battery storage and 2919 
electric vehicle chargers not more than 6 months after the effective date of this act.  2920 
 SECTION 123. (a) Notwithstanding 225 CMR 15.07(2) or any general or special law, 2921 
rule or regulation to the contrary, the RPS Class II Waste Energy Minimum Standard in the year 2922 
2026 and all subsequent compliance years shall be equal to 3.7 per cent of total annual electrical 2923 
energy sales.  2924 
 (b) Notwithstanding 225 CMR 15.08(4)(a)(2) or any general or special law, rule or 2925 
regulation to the contrary, the alternative compliance payment rate for the RPS Class II Waste 2926 
Energy Minimum Standard in the year 2026 and all subsequent compliance years shall be equal 2927 
to the alternative compliance payment rate for the RPS Class II Renewable Energy Minimum 2928 
Standard set pursuant to 225 CMR 15.08(3)(a)(2).  2929 
 SECTION 124. The department of energy resources shall convene a stakeholder working 2930 
group to develop recommendations for regulatory and legislative changes that may be necessary 2931 
to encourage the construction and operation of solar power generating canopies. The 2932 
recommendations shall be designed to contribute to the state’s greenhouse gas emission limits 2933 
and sublimits established pursuant to chapter 21N of the General Laws and facilitate the 2934 
development and deployment of solar canopies in a cost-effective manner. The working group 2935 
shall be convened not later than March 30, 2025. The working group shall consist of the 2936 
commissioner of energy resources or a designee, who shall serve as chair, and the following 2937 
members to be appointed by the secretary of energy and environmental affairs: a representative 2938 
of the commercial real estate sector; a representative of the residential real estate sector; a 2939 
representative of the organized labor industry; a representative of the solar energy industry; a 2940  135 of 139 
representative of an environmental group concerned with energy; a representative of the 2941 
construction industry; a representative of an electric utility or organization representing electric 2942 
utilities; a representative of local government; a person with expertise in energy siting; and a 2943 
person with expertise in solar energy and energy efficiency. The working group shall submit its 2944 
report to the joint committee on telecommunications, utilities and energy, the senate and house 2945 
committees on global warming and climate change and the clerks of the senate and house of 2946 
representatives not later than June 31, 2025. 2947 
 SECTION 125. The secretary of energy and environmental affairs shall review existing 2948 
flood risk mapping resources and assess the need for and feasibility of creating additional flood 2949 
risk mapping resources to identify areas vulnerable to current and future flooding across the 2950 
commonwealth. 2951 
 The secretary shall develop recommendations, including any legislation or funding 2952 
necessary, to support any additional required flood risk mapping resources and shall submit its 2953 
recommendations to the joint committee on environment and natural resources, the climate chief, 2954 
the house and senate committees on ways and means and the clerks of the senate and house of 2955 
representatives not later than 6 months after the effective date of this act. The recommendations 2956 
shall also be made available to the public on the website of the executive office of energy and 2957 
environmental affairs. 2958 
 SECTION 126. Orders restricting coastal wetlands recorded pursuant to section 105 of 2959 
chapter 130 of the General Laws prior to July 1, 2024, and orders restricting inland wetlands 2960 
recorded pursuant to section 40A of chapter 131 of the General Laws prior to July 1, 2024, shall 2961 
permit or allow ecological restoration projects as defined in 310 CMR 10.04; provided, however, 2962  136 of 139 
that such ecological restoration project is permitted by the department of environmental 2963 
protection or local issuing authority pursuant to section 40 of said chapter 131 and applicable 2964 
regulations. 2965 
 SECTION 127. Subsection (a) of section 116C of chapter 164 of the General Laws shall 2966 
be implemented not later than 1 year after the effective date of this act.  2967 
 SECTION 128. All distribution companies operating within the commonwealth shall 2968 
submit a plan for the implementation of advanced metering data access protocols pursuant to 2969 
section 116C of chapter 164 of the General Laws to the department of public utilities for 2970 
approval not later than 1 year after the effective date of this act. 2971 
 SECTION 129. The office of environmental justice and equity established pursuant to 2972 
section 29 of chapter 21A of the General Laws shall establish standards and guidelines for 2973 
community benefit plans and agreements as required by said section 29 of said chapter 21A not 2974 
later than March 1, 2026, and shall issue the cumulative impacts analysis guidance pursuant to 2975 
said section 29 of said chapter 21A before the energy facilities siting board regulations are 2976 
promulgated pursuant to section 133. 2977 
 SECTION 130. The executive office of energy and environmental affairs shall coordinate 2978 
and convene a stakeholder process with the agencies and offices under its jurisdiction and any 2979 
other relevant local, regional and state agencies with a permitting role in energy related 2980 
infrastructure to establish the methodology for determining the suitability of sites and associated 2981 
guidance required by section 30 of chapter 21A of the General Laws not later than March 1, 2982 
2026. 2983  137 of 139 
 SECTION 131. The department of energy resources shall promulgate regulations to 2984 
implement section 21 of chapter 25A of the General Laws not later than March 1, 2026. 2985 
 SECTION 132. The energy facilities siting board shall promulgate regulations to 2986 
implement the changes to sections 69G to 69J1/4, inclusive, sections 69O and 69P, sections 69R 2987 
and 69S and sections 69T to 69W, inclusive, of chapter 164 of the General Laws not later than 2988 
March 1, 2026. Such regulations shall apply to all jurisdictional projects submitted to the energy 2989 
facilities siting board on and after July 1, 2026. In promulgating said regulations, the board shall 2990 
consult with the department of public utilities, the department of energy resources, the 2991 
department of environmental protection, the department of fish and game, the department of 2992 
conservation and recreation, the department of agricultural resources, the Massachusetts 2993 
environmental policy act office, the Massachusetts Department of Transportation, the executive 2994 
office of public safety and security and all other agencies, authorities and departments whose 2995 
approval, order, order of conditions, permit, license, certificate or permission in any form is 2996 
required prior to or for construction of a facility, small clean energy infrastructure facility or 2997 
large clean energy infrastructure facility. 2998 
 SECTION 133. The department of public utilities and the energy facilities siting board, in 2999 
consultation with the office of environmental justice and equity established by section 29 of 3000 
chapter 21A of the General Laws and the office of the attorney general, shall promulgate 3001 
regulations to implement section 149 of chapter 164 of the General Laws not later than March 1, 3002 
2026.  3003 
 SECTION 134. Not later than July 31, 2025, the department of public utilities shall open 3004 
a proceeding to facilitate right-of-way or pole-mounted electric vehicle supply equipment 3005  138 of 139 
throughout the commonwealth and shall require certain parties as it may identify, including, but 3006 
not limited to, electric distribution companies as defined in section 1 of chapter 164 of the 3007 
General Laws, to submit plans to facilitate the deployment of such equipment. Not later than 3008 
December 31, 2025, electric distribution companies and such other parties as the department may 3009 
identify shall file plans with the department for establishing such equipment throughout the 3010 
commonwealth. Such plans may: (i) include schedules and calendar dates for deploying the 3011 
equipment, making chargers operational and meeting other requirements as set by the 3012 
department; (ii) promote partnerships between companies and municipalities or other 3013 
governmental entities; (iii) ensure accessibility and affordability for rural communities and low 3014 
and moderate income populations, including renters; (iv) favor chargers at Level 2 and higher 3015 
capacity; (v) promote the use of poles owned by, or under the control of, electric distribution 3016 
companies; (vi) review potential funding mechanisms and sources including, but not limited to, 3017 
off-peak charging rate structures; (vii) review potential funding mechanisms, sources and 3018 
liability provisions for ensuring routine maintenance and a state of good repair; and (viii) require 3019 
annual reporting and tabulations including, but not limited to: (A) the number of equipment 3020 
installations completed, identified by specific location; (B) pricing and consumer costs; (C) the 3021 
number of supply equipment outages, identified by specific location, together with estimates of 3022 
downtime; and (D) identification of software and hardware malfunctions or characteristics or 3023 
labor or parts shortages that may have contributed to excessive equipment outages or downtimes; 3024 
provided, however, that such annual reporting and tabulations may be coordinated with, or 3025 
delegated to, the division of standards. Not later than July 31, 2026, the department shall 3026 
approve, approve with conditions or reject such plans; provided, however, that nothing in this 3027  139 of 139 
section shall conflict with or delay pole-mounted electric vehicle supply equipment installations 3028 
that are underway before a relevant departmental approval. 3029 
 SECTION 135. The department of public utilities shall promulgate regulations to 3030 
implement section 48 including, but not limited to, the establishment of a moderate income 3031 
discount eligibility rate following an investigation thereof. 3032 
 SECTION 136. Not later than June 1, 2029, the director of public participation 3033 
established in section 12T of chapter 25 of the General Laws shall complete a review of the 3034 
intervenor support grant program established in section 149 of chapter 164 of the General Laws 3035 
and provide an opportunity for public comment to determine whether the program and 3036 
corresponding regulations should be amended. 3037 
 SECTION 137. Sections 12 to 15, inclusive, shall take effect on January 1, 2028. 3038 
 SECTION 138. Section 35 shall take effect on June 30, 2029. 3039 
 SECTION 139. Sections 64 to 68, inclusive, 70 to 76, inclusive, 83, 87, 91, 118 and 119, 3040 
129 and 132 and section 149 of chapter 164 of the General Laws shall take effect on March 1, 3041 
2026. 3042 