1 | 1 | | |
---|
2 | 2 | | |
---|
3 | 3 | | EXPLANATION: CAPITALS INDICATE MAT TER ADDED TO EXISTIN G LAW. |
---|
4 | 4 | | [Brackets] indicate matter deleted from existing law. |
---|
5 | 5 | | *hb0579* |
---|
6 | 6 | | |
---|
7 | 7 | | HOUSE BILL 579 |
---|
8 | 8 | | C5 4lr4581 |
---|
9 | 9 | | CF SB 474 |
---|
10 | 10 | | By: The Speaker (By Request – Administration) and Delegates Allen, Amprey, |
---|
11 | 11 | | Anderton, Bagnall, Bhandari, Boyce, Buckel, Conaway, Crutchfield, |
---|
12 | 12 | | Edelson, Fennell, Grossman, Guyton, Harris, Henson, Hill, Hornberger, |
---|
13 | 13 | | Jackson, A. Johnson, S. Johnson, D. Jones, Kaiser, Kaufman, J. Long, Love, |
---|
14 | 14 | | McCaskill, Miller, Munoz, Pasteur, Patterson, Phillips, Pippy, Pruski, |
---|
15 | 15 | | Reilly, Roberson, Roberts, Rogers, Rose, Ruff, Simmons, Simpson, Spiegel, |
---|
16 | 16 | | Taveras, Taylor, Toles, Tomlinson, Turner, Valderrama, Watson, Williams, |
---|
17 | 17 | | and Wu |
---|
18 | 18 | | Introduced and read first time: January 24, 2024 |
---|
19 | 19 | | Assigned to: Economic Matters |
---|
20 | 20 | | |
---|
21 | 21 | | A BILL ENTITLED |
---|
22 | 22 | | |
---|
23 | 23 | | AN ACT concerning 1 |
---|
24 | 24 | | |
---|
25 | 25 | | Certificate of Public Convenience and Necessity and Related Approvals – 2 |
---|
26 | 26 | | Definition of Generating Station 3 |
---|
27 | 27 | | (Critical Infrastructure Streamlining Act of 2024) 4 |
---|
28 | 28 | | |
---|
29 | 29 | | FOR the purpose of altering and establishing the definition of “generating station” for the 5 |
---|
30 | 30 | | purpose of exempting the construction of certain generating facilities used to produce 6 |
---|
31 | 31 | | electricity for the purpose of onsite emergency backup and certain test and 7 |
---|
32 | 32 | | maintenance operations from the requirement to obtain a certificate of public 8 |
---|
33 | 33 | | convenience and necessity or certain other related approvals under certain 9 |
---|
34 | 34 | | circumstances; and generally relating to generating stations. 10 |
---|
35 | 35 | | |
---|
36 | 36 | | BY repealing and reenacting, without amendments, 11 |
---|
37 | 37 | | Article – Public Utilities 12 |
---|
38 | 38 | | Section 7–207(a)(1) 13 |
---|
39 | 39 | | Annotated Code of Maryland 14 |
---|
40 | 40 | | (2020 Replacement Volume and 2023 Supplement) 15 |
---|
41 | 41 | | |
---|
42 | 42 | | BY repealing and reenacting, with amendments, 16 |
---|
43 | 43 | | Article – Public Utilities 17 |
---|
44 | 44 | | Section 7–207(a)(4), 7–207.1(a), 7–207.2(a), and 7–208(a) 18 |
---|
45 | 45 | | Annotated Code of Maryland 19 |
---|
46 | 46 | | (2020 Replacement Volume and 2023 Supplement) 20 |
---|
47 | 47 | | 2 HOUSE BILL 579 |
---|
48 | 48 | | |
---|
49 | 49 | | |
---|
50 | 50 | | SECTION 1. BE IT ENACTED BY THE GENERAL ASSEMBLY OF MARYLAND, 1 |
---|
51 | 51 | | That the Laws of Maryland read as follows: 2 |
---|
52 | 52 | | |
---|
53 | 53 | | Article – Public Utilities 3 |
---|
54 | 54 | | |
---|
55 | 55 | | 7–207. 4 |
---|
56 | 56 | | |
---|
57 | 57 | | (a) (1) In this section the following words have the meanings indicated. 5 |
---|
58 | 58 | | |
---|
59 | 59 | | (4) “Generating station” does not include: 6 |
---|
60 | 60 | | |
---|
61 | 61 | | (i) a generating unit or facility that: 7 |
---|
62 | 62 | | |
---|
63 | 63 | | 1. is used for the production of electricity; 8 |
---|
64 | 64 | | |
---|
65 | 65 | | 2. has the capacity to produce not more than 2 megawatts of 9 |
---|
66 | 66 | | alternating current; and 10 |
---|
67 | 67 | | |
---|
68 | 68 | | 3. is installed with equipment that prevents the flow of 11 |
---|
69 | 69 | | electricity to the electric grid during time periods when the electric grid is out of service; 12 |
---|
70 | 70 | | [or] 13 |
---|
71 | 71 | | |
---|
72 | 72 | | (ii) a combination of two or more generating units or facilities that: 14 |
---|
73 | 73 | | |
---|
74 | 74 | | 1. are used for the production of electricity from a solar 15 |
---|
75 | 75 | | photovoltaic system or an eligible customer–generator that is subject to the provisions of § 16 |
---|
76 | 76 | | 7–306 of this title; 17 |
---|
77 | 77 | | |
---|
78 | 78 | | 2. are located on the same property or adjacent properties; 18 |
---|
79 | 79 | | |
---|
80 | 80 | | 3. have the capacity to produce, wh en calculated 19 |
---|
81 | 81 | | cumulatively for all generating units or facilities on the property or adjacent property, more 20 |
---|
82 | 82 | | than 2 megawatts but not more than 14 megawatts of alternating current; and 21 |
---|
83 | 83 | | |
---|
84 | 84 | | 4. for each individual generating unit or facility: 22 |
---|
85 | 85 | | |
---|
86 | 86 | | A. has the capacity to produce not more than 2 megawatts of 23 |
---|
87 | 87 | | alternating current; 24 |
---|
88 | 88 | | |
---|
89 | 89 | | B. is separately metered by the electric company; and 25 |
---|
90 | 90 | | |
---|
91 | 91 | | C. does not export electricity for sale on the wholesale market 26 |
---|
92 | 92 | | under an agreement with PJM Interconnection, LLC; 27 |
---|
93 | 93 | | |
---|
94 | 94 | | (III) A GENERATING UNIT OR FACILITY THAT: 28 |
---|
95 | 95 | | HOUSE BILL 579 3 |
---|
96 | 96 | | |
---|
97 | 97 | | |
---|
98 | 98 | | 1. IS USED FOR THE PROD UCTION OF ELECTRICIT Y FOR 1 |
---|
99 | 99 | | THE PURPOSE OF : 2 |
---|
100 | 100 | | |
---|
101 | 101 | | A. ONSITE EMERGENCY BAC KUP AT A FACILITY WH EN 3 |
---|
102 | 102 | | SERVICE FROM THE ELE CTRIC COMPANY IS INT ERRUPTED; AND 4 |
---|
103 | 103 | | |
---|
104 | 104 | | B. TEST AND MAINTENANCE OPERATIONS NECESSARY 5 |
---|
105 | 105 | | TO ENSURE FUNCTIONAL ITY OF THE GENERATIN G UNIT OR FACILITY I N THE EVENT 6 |
---|
106 | 106 | | OF A SERVICE INTERRU PTION FROM THE ELECT RIC COMPANY ; 7 |
---|
107 | 107 | | |
---|
108 | 108 | | 2. IS INSTALLED WITH EQ UIPMENT THAT PREVENT S THE 8 |
---|
109 | 109 | | FLOW OF ELECTRICITY TO THE ELECTRI C GRID; AND 9 |
---|
110 | 110 | | |
---|
111 | 111 | | 3. IS SUBJECT TO A PERM IT TO CONSTRUCT ISSU ED BY 10 |
---|
112 | 112 | | THE DEPARTMENT OF THE ENVIRONMENT ; OR 11 |
---|
113 | 113 | | |
---|
114 | 114 | | (IV) A COMBINATION OF TWO OR MORE GENERATING U NITS OR 12 |
---|
115 | 115 | | FACILITIES THAT SATI SFY ITEM (III) OF THIS PARAGRAPH . 13 |
---|
116 | 116 | | |
---|
117 | 117 | | 7–207.1. 14 |
---|
118 | 118 | | |
---|
119 | 119 | | (a) In this section, “generating station” does not include: 15 |
---|
120 | 120 | | |
---|
121 | 121 | | (1) a generating unit or facility that: 16 |
---|
122 | 122 | | |
---|
123 | 123 | | (i) is used for the production of electricity; 17 |
---|
124 | 124 | | |
---|
125 | 125 | | (ii) has the capacity to produce not more than 2 megawatts of 18 |
---|
126 | 126 | | alternating current; and 19 |
---|
127 | 127 | | |
---|
128 | 128 | | (iii) is installed with equipment that prevents the flow of electricity 20 |
---|
129 | 129 | | to the electric grid during time periods when the electric grid is out of service; [or] 21 |
---|
130 | 130 | | |
---|
131 | 131 | | (2) a combination of two or more generating units or facilities that: 22 |
---|
132 | 132 | | |
---|
133 | 133 | | (i) are used for the production of electricity from a solar photovoltaic 23 |
---|
134 | 134 | | system or an eligible customer–generator that is subject to the provisions of § 7–306 of this 24 |
---|
135 | 135 | | title; 25 |
---|
136 | 136 | | |
---|
137 | 137 | | (ii) are located on the same property or adjacent properties; 26 |
---|
138 | 138 | | |
---|
139 | 139 | | (iii) have the capacity to produce, when calculated cumulatively for 27 |
---|
140 | 140 | | all generating units or facilities on the property or adjacent property, more than 2 28 |
---|
141 | 141 | | megawatts but not more than 14 megawatts of alternating current; and 29 |
---|
142 | 142 | | 4 HOUSE BILL 579 |
---|
143 | 143 | | |
---|
144 | 144 | | |
---|
145 | 145 | | (iv) for each individual generating unit or facility: 1 |
---|
146 | 146 | | |
---|
147 | 147 | | 1. has the capacity to produce not more than 2 megawatts of 2 |
---|
148 | 148 | | alternating current; 3 |
---|
149 | 149 | | |
---|
150 | 150 | | 2. is separately metered by the electric company; and 4 |
---|
151 | 151 | | |
---|
152 | 152 | | 3. does not export electricity for sale on the wholesale market 5 |
---|
153 | 153 | | under an agreement with PJM Interconnection, LLC; 6 |
---|
154 | 154 | | |
---|
155 | 155 | | (3) A GENERATING UNIT OR FACILITY THAT: 7 |
---|
156 | 156 | | |
---|
157 | 157 | | (I) IS USED FOR THE PROD UCTION OF ELECTRICIT Y FOR THE 8 |
---|
158 | 158 | | PURPOSE OF: 9 |
---|
159 | 159 | | |
---|
160 | 160 | | 1. ONSITE EMERGENCY BAC KUP AT A FACILITY WHEN 10 |
---|
161 | 161 | | SERVICE FROM THE ELE CTRIC COMPANY IS INT ERRUPTED; AND 11 |
---|
162 | 162 | | |
---|
163 | 163 | | 2. TEST AND MAINTENANCE OPERATIONS NECESSARY 12 |
---|
164 | 164 | | TO ENSURE FUNCTIONAL ITY OF THE GENERATIN G UNIT OR FACILITY I N THE EVENT 13 |
---|
165 | 165 | | OF A SERVICE INTERRU PTION FROM THE ELECT RIC COMPANY ; 14 |
---|
166 | 166 | | |
---|
167 | 167 | | (II) IS INSTALLED WITH EQ UIPMENT THAT PREVENT S THE FLOW 15 |
---|
168 | 168 | | OF ELECTRICITY TO TH E ELECTRIC GRID ; AND 16 |
---|
169 | 169 | | |
---|
170 | 170 | | (III) IS SUBJECT TO A PERM IT TO CONSTRUCT ISS UED BY THE 17 |
---|
171 | 171 | | DEPARTMENT OF THE ENVIRONMENT ; OR 18 |
---|
172 | 172 | | |
---|
173 | 173 | | (4) A COMBINATION OF TWO OR MORE GENERATING U NITS OR 19 |
---|
174 | 174 | | FACILITIES THAT SATI SFY ITEM (3) OF THIS SUBSECTION . 20 |
---|
175 | 175 | | |
---|
176 | 176 | | 7–207.2. 21 |
---|
177 | 177 | | |
---|
178 | 178 | | (a) In this section, “generating station” does not include: 22 |
---|
179 | 179 | | |
---|
180 | 180 | | (1) a generating unit or facility that: 23 |
---|
181 | 181 | | |
---|
182 | 182 | | (i) is used for the production of electricity; 24 |
---|
183 | 183 | | |
---|
184 | 184 | | (ii) has the capacity to produce not more than 2 megawatts of 25 |
---|
185 | 185 | | alternating current; and 26 |
---|
186 | 186 | | |
---|
187 | 187 | | (iii) is installed with equipment that prevents the flow of electricity 27 |
---|
188 | 188 | | to the electric grid during time periods when the electric grid is out of service; [or] 28 |
---|
189 | 189 | | HOUSE BILL 579 5 |
---|
190 | 190 | | |
---|
191 | 191 | | |
---|
192 | 192 | | (2) a combination of two or more generating units or facilities that: 1 |
---|
193 | 193 | | |
---|
194 | 194 | | (i) are used for the production of electricity from a solar photovoltaic 2 |
---|
195 | 195 | | system or an eligible customer–generator that is subject to the provisions of § 7–306 of this 3 |
---|
196 | 196 | | title; 4 |
---|
197 | 197 | | |
---|
198 | 198 | | (ii) are located on the same property or adjacent properties; 5 |
---|
199 | 199 | | |
---|
200 | 200 | | (iii) have the capacity to produce, when calculated cumulatively for 6 |
---|
201 | 201 | | all generating units or facilities on the property or adjacent property, more than 2 7 |
---|
202 | 202 | | megawatts but not more than 14 megawatts of alternating current; and 8 |
---|
203 | 203 | | |
---|
204 | 204 | | (iv) for each individual generating unit or facility: 9 |
---|
205 | 205 | | |
---|
206 | 206 | | 1. has the capacity to produce not more than 2 megawatts of 10 |
---|
207 | 207 | | alternating current; 11 |
---|
208 | 208 | | |
---|
209 | 209 | | 2. is separately metered by the electric company; and 12 |
---|
210 | 210 | | |
---|
211 | 211 | | 3. does not export electricity for sale on the wholesale market 13 |
---|
212 | 212 | | under an agreement with PJM Interconnection, LLC; 14 |
---|
213 | 213 | | |
---|
214 | 214 | | (3) A GENERATING UNIT OR FACILITY THAT: 15 |
---|
215 | 215 | | |
---|
216 | 216 | | (I) IS USED FOR THE PROD UCTION OF ELECTRICIT Y FOR THE 16 |
---|
217 | 217 | | PURPOSE OF: 17 |
---|
218 | 218 | | |
---|
219 | 219 | | 1. ONSITE EMERGENCY BAC KUP AT A FACILITY WHEN 18 |
---|
220 | 220 | | SERVICE FROM THE ELE CTRIC COMPANY IS INT ERRUPTED; AND 19 |
---|
221 | 221 | | |
---|
222 | 222 | | 2. TEST AND MAINTENANCE OPERATIONS NECESSARY 20 |
---|
223 | 223 | | TO ENSURE FUNCTIONAL ITY OF THE GENERATIN G UNIT OR FACILITY I N THE EVENT 21 |
---|
224 | 224 | | OF A SERVICE INTERRUPTION FRO M THE ELECTRIC COMPA NY; 22 |
---|
225 | 225 | | |
---|
226 | 226 | | (II) IS INSTALLED WITH EQ UIPMENT THAT PREVENT S THE FLOW 23 |
---|
227 | 227 | | OF ELECTRICITY TO TH E ELECTRIC GRID ; AND 24 |
---|
228 | 228 | | |
---|
229 | 229 | | (III) IS SUBJECT TO A PERM IT TO CONSTRUCT ISSU ED BY THE 25 |
---|
230 | 230 | | DEPARTMENT OF THE ENVIRONMENT ; OR 26 |
---|
231 | 231 | | |
---|
232 | 232 | | (4) A COMBINATION OF TWO O R MORE GENERATING UN ITS OR 27 |
---|
233 | 233 | | FACILITIES THAT SATI SFY ITEM (3) OF THIS SUBSECTION . 28 |
---|
234 | 234 | | |
---|
235 | 235 | | 7–208. 29 |
---|
236 | 236 | | 6 HOUSE BILL 579 |
---|
237 | 237 | | |
---|
238 | 238 | | |
---|
239 | 239 | | (a) (1) In this section the following words have the meanings indicated. 1 |
---|
240 | 240 | | |
---|
241 | 241 | | (2) “Construction” has the meaning stated in § 7–207 of this subtitle. 2 |
---|
242 | 242 | | |
---|
243 | 243 | | (3) “GENERATING STATION ” DOES NOT INCLUDE : 3 |
---|
244 | 244 | | |
---|
245 | 245 | | (I) A GENERATING UNIT OR FACILITY THAT: 4 |
---|
246 | 246 | | |
---|
247 | 247 | | 1. IS USED FOR THE PROD UCTION OF ELECTRICIT Y FOR 5 |
---|
248 | 248 | | THE PURPOSE OF : 6 |
---|
249 | 249 | | |
---|
250 | 250 | | A. ONSITE EMERGENCY BAC KUP AT A FACILITY WH EN 7 |
---|
251 | 251 | | SERVICE FROM THE ELE CTRIC COMPANY IS INT ERRUPTED; AND 8 |
---|
252 | 252 | | |
---|
253 | 253 | | B. TEST AND MAINTENANCE OPERATIONS NECESSARY 9 |
---|
254 | 254 | | TO ENSURE FUNCTIONAL ITY OF THE GENERATIN G UNIT OR FACILITY I N THE EVENT 10 |
---|
255 | 255 | | OF AN INTERRUPTION O F SERVICE FROM THE E LECTRIC COMPANY ; 11 |
---|
256 | 256 | | |
---|
257 | 257 | | 2. IS INSTALLED WITH EQ UIPMENT THAT PREVENT S THE 12 |
---|
258 | 258 | | FLOW OF ELECTRICITY TO THE E LECTRIC GRID; AND 13 |
---|
259 | 259 | | |
---|
260 | 260 | | 3. IS SUBJECT TO A PERM IT TO CONSTRUCT ISSU ED BY 14 |
---|
261 | 261 | | THE DEPARTMENT OF THE ENVIRONMENT ; OR 15 |
---|
262 | 262 | | |
---|
263 | 263 | | (II) A COMBINATION OF TWO OR MORE GENERATING U NITS OR 16 |
---|
264 | 264 | | FACILITIES THAT SATI SFY ITEM (I) OF THIS PARAGRAPH . 17 |
---|
265 | 265 | | |
---|
266 | 266 | | [(3)] (4) “Qualified offshore wind project” has the meaning stated in § 18 |
---|
267 | 267 | | 7–701 of this title. 19 |
---|
268 | 268 | | |
---|
269 | 269 | | [(4)] (5) “Qualified submerged renewable energy line” means: 20 |
---|
270 | 270 | | |
---|
271 | 271 | | (i) a line carrying electricity supply and connecting a qualified 21 |
---|
272 | 272 | | offshore wind project to the transmission system; and 22 |
---|
273 | 273 | | |
---|
274 | 274 | | (ii) a line in which the portions of the line crossing any submerged 23 |
---|
275 | 275 | | lands or any part of a beach erosion control district are buried or submerged. 24 |
---|
276 | 276 | | |
---|
277 | 277 | | SECTION 2. AND BE IT FURTHER ENACTED, That this Act shall take effect July 25 |
---|
278 | 278 | | 1, 2024. 26 |
---|