Maryland 2025 Regular Session

Maryland House Bill HB1111 Compare Versions

OldNewDifferences
11
22
33 EXPLANATION: CAPITALS INDICATE MAT TER ADDED TO EXISTIN G LAW.
44 [Brackets] indicate matter deleted from existing law.
5- Underlining indicates amendments to bill.
6- Strike out indicates matter stricken from the bill by amendment or deleted from the law by
7-amendment.
85 *hb1111*
96
107 HOUSE BILL 1111
118 C5, M5, Q1 5lr3018
129
1310 By: Delegate Fraser–Hidalgo
1411 Introduced and read first time: February 5, 2025
1512 Assigned to: Economic Matters
16-Committee Report: Favorable with amendments
17-House action: Adopted
18-Read second time: March 7, 2025
1913
20-CHAPTER ______
14+A BILL ENTITLED
2115
2216 AN ACT concerning 1
2317
2418 Public Utilities – Solar Energy Generating Systems – Floating Systems and 2
25-Systems Located on or Over Water Retention Ponds, Quarries, or Brownfields 3
19+Systems Located on Brownfields 3
2620
27-FOR the purpose of providing that certain floating solar energy generating systems located 4
28-on or over certain water retention ponds or quarries are eligible for the Small Solar 5
29-Energy Generating System Incentive Program; exempting certain floating solar 6
30-energy generating systems and solar energy generating systems located on 7
31-brownfields from a certain property tax authorizing the Mayor and City Council of 8
32-Baltimore City or the governing body of a county or municipal corporation to grant, 9
33-by law, a certain property tax credit against the county or municipal corporation 10
34-property tax imposed on certain nonresidential solar energy generating systems; and 11
35-generally relating to solar energy generating systems. 12
21+FOR the purpose of providing that certain floating solar energy generating systems are 4
22+eligible for the Small Solar Energy Generating System Incentive Program ; 5
23+exempting certain floating solar energy generating systems and solar energy 6
24+generating systems located on brownfields from a certain property tax; and generally 7
25+relating to solar energy generating systems. 8
3626
37-BY repealing and reenacting, without amendments, 13
38- Article – Public Utilities 14
39-Section 7–709.1(a) 15
40- Annotated Code of Maryland 16
41- (2020 Replacement Volume and 2024 Supplement) 17
27+BY repealing and reenacting, without amendments, 9
28+ Article – Public Utilities 10
29+Section 7–709.1(a) 11
30+ Annotated Code of Maryland 12
31+ (2020 Replacement Volume and 2024 Supplement) 13
4232
43-BY repealing and reenacting, with amendments, 18
44- Article – Public Utilities 19
45-Section 7–709.1(d) and (e) 20
46- Annotated Code of Maryland 21
47- (2020 Replacement Volume and 2024 Supplement) 22
48- 2 HOUSE BILL 1111
33+BY repealing and reenacting, with amendments, 14
34+ Article – Public Utilities 15
35+Section 7–709.1(d) and (e) 16
36+ Annotated Code of Maryland 17
37+ (2020 Replacement Volume and 2024 Supplement) 18
38+
39+BY repealing and reenacting, with amendments, 19
40+ Article – Tax – Property 20
41+Section 7–249 21
42+ Annotated Code of Maryland 22
43+ (2019 Replacement Volume and 2024 Supplement) 23
44+
45+ SECTION 1. BE IT ENACTED BY THE GENERAL ASSEMBLY OF MARYLAND, 24
46+That the Laws of Maryland read as follows: 25
47+
48+Article – Public Utilities 26 2 HOUSE BILL 1111
4949
5050
51-BY repealing and reenacting, with amendments, adding to 1
52- Article – Tax – Property 2
53-Section 7–249 9–275 3
54- Annotated Code of Maryland 4
55- (2019 Replacement Volume and 2024 Supplement) 5
5651
57- SECTION 1. BE IT ENACTED BY THE GENERAL ASSEMBLY OF MARYLAND, 6
58-That the Laws of Maryland read as follows: 7
52+7–709.1. 1
5953
60-Article – Public Utilities 8
54+ (a) (1) In this section the following words have the meanings indicated. 2
6155
62-7–709.1. 9
56+ (2) “Brownfield” has the meaning stated in § 7–207 of this title. 3
6357
64- (a) (1) In this section the following words have the meanings indicated. 10
58+ (3) “Certified SREC” means a solar renewable energy credit generated by 4
59+a certified system. 5
6560
66- (2) “Brownfield” has the meaning stated in § 7–207 of this title. 11
61+ (4) “Certified system” means a solar energy generating system certified by 6
62+the Commission under the Program to generate certified SRECs with the compliance value 7
63+specified in subsection (c) of this section. 8
6764
68- (3) “Certified SREC” means a solar renewable energy credit generated by 12
69-a certified system. 13
65+ (5) “Program” means the Small Solar Energy Generating System Incentive 9
66+Program. 10
7067
71- (4) “Certified system” means a solar energy generating system certified by 14
72-the Commission under the Program to generate certified SRECs with the compliance value 15
73-specified in subsection (c) of this section. 16
68+ (d) To be eligible for certification under the Program, a solar energy generating 11
69+system shall: 12
7470
75- (5) “Program” means the Small Solar Energy Generating System Incentive 17
76-Program. 18
71+ (1) be located in the State; 13
7772
78- (d) To be eligible for certification under the Program, a solar energy generating 19
79-system shall: 20
73+ (2) be eligible for inclusion in meeting the renewable energy portfolio 14
74+standard; 15
8075
81- (1) be located in the State; 21
76+ (3) have a generating capacity of 5 megawatts or less, as measured by the 16
77+alternating current rating of the system’s inverter; 17
8278
83- (2) be eligible for inclusion in meeting the renewable energy portfolio 22
84-standard; 23
79+ (4) be placed in service between July 1, 2024, and January 1, 2028, 18
80+inclusive; and 19
8581
86- (3) have a generating capacity of 5 megawatts or less, as measured by the 24
87-alternating current rating of the system’s inverter; 25
82+ (5) be one of the following types of systems: 20
8883
89- (4) be placed in service between July 1, 2024, and January 1, 2028, 26
90-inclusive; and 27
84+ (i) a system with a generating capacity of 20 kilowatts or less, as 21
85+measured by the alternating current rating of the system’s inverter; 22
9186
92- (5) be one of the following types of systems: 28
87+ (ii) a system with a generating capacity of 2 megawatts or less, as 23
88+measured by the alternating current rating of the system’s inverter, if the system is used 24
89+for aggregate net metering; or 25
9390
94- (i) a system with a generating capacity of 20 kilowatts or less, as 29
95-measured by the alternating current rating of the system’s inverter; 30
96- HOUSE BILL 1111 3
91+ (iii) a system with a generating capacity of between 20 kilowatts and 26
92+5 megawatts, as measured by the alternating current rating of the system’s inverter, if the 27
93+system is: 28
94+
95+ 1. located on a rooftop, a parking canopy, or a brownfield; OR 29
96+
97+ 2. A FLOATING SYSTEM. 30 HOUSE BILL 1111 3
9798
9899
99- (ii) a system with a generating capacity of 2 megawatts or less, as 1
100-measured by the alternating current rating of the system’s inverter, if the system is used 2
101-for aggregate net metering; or 3
102100
103- (iii) a system with a generating capacity of between 20 kilowatts and 4
104-5 megawatts, as measured by the alternating current rating of the system’s inverter, if the 5
105-system is LOCATED ON OR OVER : 6
101+ (e) Except as provided in subsection (f) of this section, the Commission, at the 1
102+time of certifying a solar energy generating system as a Tier 1 renewable source, shall 2
103+certify the system as eligible to generate certified SRECs in accordance with subsection (c) 3
104+of this section if the applicant submits with its application for certification as a Tier 1 4
105+renewable source: 5
106106
107- 1. located on a rooftop,; 7
107+ (1) a form requesting to be certified to receive certified SRECs with the 6
108+value specified in subsection (c) of this section; 7
108109
109- 2. a parking canopy, or; 8
110+ (2) a copy of the interconnection agreement between the applicant and the 8
111+applicant’s electric company indicating that the size of the system is eligible; 9
110112
111- 3. a brownfield; OR 9
113+ (3) if seeking certification as a system located on or over a roof, parking lot, 10
114+[or] parking structure, OR NONNAVIGABLE BODY OF WA TER, a copy of the final approval 11
115+of the local building permit; 12
112116
113- 2. A FLOATING SYSTEM 10
117+ (4) if seeking certification as a system located on a brownfield, 13
118+documentation demonstrating that the system is located on a brownfield; 14
114119
115- 4. A WATER RETENTION PO ND OR QUARRY CURRENT LY 11
116-OR PREVIOUSLY DESIGN ATED FOR INDUSTRIAL USE. 12
120+ (5) if seeking certification based on aggregated net metering, a copy of the 15
121+aggregated net energy metering rider submitted with the interconnection agreement; and 16
117122
118- (e) Except as provided in subsection (f) of this section, the Commission, at the 13
119-time of certifying a solar energy generating system as a Tier 1 renewable source, shall 14
120-certify the system as eligible to generate certified SRECs in accordance with subsection (c) 15
121-of this section if the applicant submits with its application for certification as a Tier 1 16
122-renewable source: 17
123+ (6) any other information required by the Commission. 17
123124
124- (1) a form requesting to be certified to receive certified SRECs with the 18
125-value specified in subsection (c) of this section; 19
125+Article – Tax – Property 18
126126
127- (2) a copy of the interconnection agreement between the applicant and the 20
128-applicant’s electric company indicating that the size of the system is eligible; 21
127+7–249. 19
129128
130- (3) if seeking certification as a system located on or over a roof, parking lot, 22
131-[or] parking structure, OR NONNAVIGABLE BODY OF WA TER AN AREA SPECIFIED 23
132-UNDER SUBSECTION (D)(5)(III) OF THIS SECTION , a copy of the final approval of the 24
133-local building permit; 25
129+ (a) This section applies only to nonresidential solar energy generating systems 20
130+that are approved by the Public Service Commission under § 7–207 or § 7–207.1 of the 21
131+Public Utilities Article on or after July 1, 2024. 22
134132
135- (4) if seeking certification as a system located on a brownfield, 26
136-documentation demonstrating that the system is located on a brownfield; 27
133+ (b) Nonresidential solar energy generating systems that are constructed on the 23
134+rooftops of buildings [or on], parking facility canopies, OR BROWNFIELDS , OR THAT ARE 24
135+FLOATING SYSTEMS , are not subject to valuation or to property tax. 25
137136
138- (5) if seeking certification based on aggregated net metering, a copy of the 28
139-aggregated net energy metering rider submitted with the interconnection agreement; and 29
140-
141- (6) any other information required by the Commission. 30
142-
143-Article – Tax – Property 31
144- 4 HOUSE BILL 1111
145-
146-
147-9–275. 1
148-
149- (A) THE MAYOR AND CITY COUNCIL OF BALTIMORE CITY OR THE 2
150-GOVERNING BODY OF A COUNTY OR MUNICIPAL CORPORATION MAY GRAN T, BY LAW, 3
151-A TAX CREDIT AGAINST THE COUNTY OR MUNICI PAL CORPORATION PROP ERTY TAX 4
152-IMPOSED ON A NONRESI DENTIAL SOLAR ENERGY GENERATING SYSTEM 5
153-CONSTRUCTED ON A BRO WNFIELD OR A WATER R ETENTION POND OR QUA RRY 6
154-CURRENTLY OR PREVIOU SLY DESIGNATED FOR I NDUSTRIAL USE . 7
155-
156- (B) THE MAYOR AND CITY COUNCIL OF BALTIMORE CITY OR THE 8
157-GOVERNING BODY OF A COUNTY OR MUNICIPAL CORPORATION MAY PROV IDE, BY 9
158-LAW, FOR: 10
159-
160- (1) THE AMOUNT AND DURAT ION OF THE TAX CREDI T UNDER THIS 11
161-SECTION; 12
162-
163- (2) ADDITIONAL ELIGIBILI TY CRITERIA FOR THE TAX CREDIT UNDER 13
164-THIS SECTION; AND 14
165-
166- (3) ANY OTHER PROVISION NECESSARY TO CARRY O UT THIS SECTION. 15
167-
168-7–249. 16
169-
170- (a) This section applies only to nonresidential solar energy generating systems 17
171-that are approved by the Public Service Commission under § 7–207 or § 7–207.1 of the 18
172-Public Utilities Article on or after July 1, 2024. 19
173-
174- (b) Nonresidential solar energy generating systems that are constructed on the 20
175-rooftops of buildings [or on], parking facility canopies, OR BROWNFIELDS , OR THAT ARE 21
176-FLOATING SYSTEMS , are not subject to valuation or to property tax. 22
177-
178- SECTION 2. AND BE IT FURTHER ENACTED, That this Act shall take effect July 23
179-1, 2025. 24
180-
181-
137+ SECTION 2. AND BE IT FURTHER ENACTED, That this Act shall take effect July 26
138+1, 2025. 27
182139
183140