Maryland 2025 Regular Session

Maryland House Bill HB1225 Latest Draft

Bill / Introduced Version Filed 02/07/2025

                             
 
EXPLANATION: CAPITALS INDICATE MAT TER ADDED TO EXISTIN G LAW. 
        [Brackets] indicate matter deleted from existing law. 
          *hb1225*  
  
HOUSE BILL 1225 
C5   	5lr1815 
    	CF SB 908 
By: Delegates Qi, Charkoudian, and Fraser–Hidalgo 
Introduced and read first time: February 7, 2025 
Assigned to: Economic Matters 
 
A BILL ENTITLED 
 
AN ACT concerning 1 
 
Public Utilities – Electric Distribution System Plans – Establishment 2 
(Affordable Grid Act) 3 
 
FOR the purpose of requiring the Public Service Commission to adopt regulations or issue 4 
orders on or before a certain date that require electric companies to, every 3 years, 5 
develop an electric system distribution plan to be approved by the Commission and 6 
provide the Commission with annual progress reports; requiring the Commission to 7 
adopt regulations or issue orders adopting certain metrics to monitor and assess 8 
electric distribution system plans; requiring an electric company to provide certain 9 
public comment opportunities; requiring the Commission to adopt regulations or 10 
issue orders adopting a certain information–sharing framework; and generally 11 
relating to electric distribution in the State. 12 
 
BY repealing and reenacting, with amendments, 13 
 Article – Public Utilities 14 
Section 7–804 15 
 Annotated Code of Maryland 16 
 (2020 Replacement Volume and 2024 Supplement) 17 
 
 SECTION 1. BE IT ENACTED BY THE GENERAL ASSEMBLY OF MARYLAND, 18 
That the Laws of Maryland read as follows: 19 
 
Article – Public Utilities 20 
 
7–804. 21 
 
 (A) (1) IN THIS SECTION THE F OLLOWING WORDS HAVE THE MEANINGS 22 
INDICATED. 23 
  2 	HOUSE BILL 1225  
 
 
 (2) (I) “AUTOMATE D ELECTRIC VEHICLE L OAD MANAGEMENT ” 1 
MEANS THE UTILIZATIO N OF A POWER CONTROL SYST EM, AS DEFINED IN UL 3141, 2 
TO LIMIT OR CONTROL CURRENT OR POWER TO STAY WITHIN SAFE , DEFINED LIMITS 3 
THAT ARE CALCULATED IN ACCORD ANCE WITH NATIONAL ELECTRICAL CODE 4 
625.42 AND 750.30.  5 
 
 (II) “AUTOMATED ELECTRIC VE HICLE LOAD MANAGEMEN T” 6 
INCLUDES:  7 
 
 1. A SINGLE DEVICE USED TO CONTROL THE ELECTRIC 8 
VEHICLE CHARGING LOA D; AND  9 
 
 2. MULTIPLE DEVICES OPE RATING TOGETHER AS A 10 
SYSTEM TO CONTROL THE ELECTRIC VEHICLE CHA RGING LOAD. 11 
 
 (3) “DISTRIBUTED ENERGY RESOURCE” HAS THE MEANING STATED 12 
IN § 7–1001 OF THIS TITLE. 13 
 
 (4) (I) “FLEXIBLE INTERCONNECT ION” MEANS A METHOD FOR 14 
CONNECTING DISTRIBUTED ENERGY RESOURCES TO THE ELECTRIC DISTRIBUTIO N 15 
SYSTEM IN A MANNER THAT IS ADA PTABLE TO CHANGING C ONDITIONS AND 16 
OPTIMIZES THE USE OF EXISTING ELECTRIC DISTRIBUTIO N SYSTEM 17 
INFRASTRUCTURE . 18 
 
 (II) “FLEXIBLE INTERCONNECT ION” INCLUDES THE USE OF AN 19 
AGREEMENT BETWEEN TH E CUSTOMER AND AN ELECTRIC COMPANY TO IMPLEMENT 20 
THE USE OF A POWER C ONTROL SYSTEM , AS DEFINED IN UL 3141, TO PREVENT A 21 
CONSTRAINED PART OF THE ELECTRIC DISTRIBUTIO N SYSTEM FROM EXCEEDIN G 22 
EXISTING CAPACITY . 23 
 
 (5) “HOSTING CAPACITY ” MEANS THE AMOUNT OF AGGREGATE 24 
GENERATION THAT CAN BE ACCOMMODATED ON AN ELECTRIC DISTR IBUTION 25 
SYSTEM OR AREA , OR A COMPONENT OF AN ELECTRIC DISTRIBUT ION SYSTEM, 26 
WITHOUT REQUIRING IN FRASTRUCTURE UPGRADE S. 27 
 
 (6) “LOAD FLEXIBILITY” MEANS A CHANGE IN TH E AMOUNT OR 28 
TIMING OF ENERGY USE TO SUPPOR T ELECTRIC DISTRIBUTIO N SYSTEM NEEDS. 29 
 
 (7) “NON–WIRES SOLUTION ” MEANS ANY ELECTRICAL SYSTEM 30 
INVESTMENT, PROGRAM, RATE, OR SERVICE THAT IS INTENDED TO DEFER OR 31 
REMOVE THE NEED TO C ONSTRUCT NEW OR UPGR ADE EXISTING COMPONENTS OF A 32 
DISTRIBUTION OR TRAN SMISSION SYSTEM . 33 
   	HOUSE BILL 1225 	3 
 
 
 (8) “UL 3141” MEANS THE ELECTRICAL STANDARDS P UBLISHED BY 1 
UL SOLUTIONS THAT DEFINES REQUIREMENTS FOR MAT ERIAL CONSTRUCTION , 2 
PERFORMANCE , TESTING, AND INSTALLATION TO PROMOTE THE SAFETY AND 3 
RELIABILITY OF POWER CONTROL SYS TEMS. 4 
 
 (9) “VIRTUAL POWER PLANT ” MEANS A NETWORK OF MULTIPLE, 5 
DECENTRALIZED , DISTRIBUTED ENERGY R ESOURCES INTEGRATED TO BALANC E 6 
ENERGY SUPPLY AND DEMAND ON A LARG E SCALE. 7 
 
 [(a)] (B) On or before December 31, 2025, the Commission shall adopt 8 
regulations or issue orders to: 9 
 
 (1) implement specific policies for electric system planning; 10 
 
 (2) require consideration of investment in, or procurement of, cost–effective 11 
demand–side methods and technology to improve reliability and efficiency, including 12 
virtual power plants; [and] 13 
 
 (3) implement specific policies for improvements in order to promote the 14 
State’s policy goals under § 7–802 of this subtitle AND TO ACHIEVE THE STATE’S 15 
TARGETS FOR THE EXPANSION OF: 16 
 
 (I) SOLAR ENERGY ; 17 
 
 (II) BUILDING ELECTRIFICA TION; 18 
 
 (III) ELECTRIC VEHICLES ; 19 
 
 (IV) ENERGY STORAGE CAPACITY ; AND  20 
 
 (V) REDUCTION OF GREENHO USE GAS EMISSIONS; 21 
 
 (4) REQUIRE EACH ELECTRI C COMPANY, EVERY 3 YEARS, TO SUBMIT 22 
TO THE COMMISSION FOR APPROV AL AN ELECTRIC DISTRIBUTION SYSTEM PLAN 23 
THAT: 24 
 
 (I) INCLUDES THE INFORMATION REQU IRED IN SUBSECTION 25 
(D) OF THIS SECTION; AND  26 
 
 (II) COMPLIES WITH THE REQUIREMENTS OF SUBSECTION (E) 27 
OF THIS SECTION; 28 
 
 (5) ADOPT AND UPDATE AS NEEDED METRICS TO BE USED TO 29 
MONITOR AN ELECTRIC COMPANY’S PROGRESS TOWARD IM PLEMENTING ITS 30  4 	HOUSE BILL 1225  
 
 
ELECTRIC DISTRIBUTION SYSTEM PLAN , INCLUDING METRICS ASSESSING TH E 1 
FOLLOWING CATEGORIES : 2 
 
 (I) SYSTEM RELIABILITY ; 3 
 
 (II) INTEGRATION OF DISTR IBUTED ENERGY RESOUR CES, 4 
INCLUDING SPECIFIC M ETRICS RELATED TO SO LAR ENERGY, ENERGY STORAGE , 5 
AND ELECTRIC VEHICLE S; 6 
 
 (III) ELECTRIC DISTRIBUTIO N SYSTEM MANAGEMENT , 7 
INCLUDING SPECIFIC M ETRICS RELATED TO : 8 
 
 1. AGGREGATE PEAK LOAD ; 9 
 
 2. PEAK LOAD REDUCTION PROGRAMS; 10 
 
 3. TIME–OF–USE AND DYNAMIC PRIC ING PROGRAMS ; 11 
 
 4. ELECTRIC VEHICLE CHA RGING PROGRAMS ; AND 12 
 
 5. HOSTING CAPACITY STA TUS AND EXPANSION ; 13 
 
 (IV) USE OF NON –WIRES SOLUTIONS AND NONCAPITAL 14 
INVESTMENTS AND THE RELATIONSHIP BETWEEN USING THESE SOLUTION S AND 15 
INVESTMENTS AND THE LONG–TERM SYSTEM CAPACITY; 16 
 
 (V) ADVANCEMENT OF STATE POLICY GOALS AND TARGETS 17 
IDENTIFIED IN ITEM (3) OF THIS SUBSECTION AND ANY OTHER APPLIC ABLE STATE 18 
GOALS AND TARGETS EF FECTIVE AT THE TIME OF THE PLANNING CYCL E; 19 
 
 (VI) FUTURE ELECTRIC SYSTEM CAPABILITY, INCLUDING: 20 
 
 1. ENERGY STORAGE FLEXI BILITY; 21 
 
 2. FLEXIBLE INTERCONNECTIONS ; AND  22 
 
 3. LOCAL DEMAND RESPONS E; AND 23 
 
 (VII) AN ELECTRIC COMPANY ’S PARTICIPATION IN , AND 24 
FACILITATION OF , AN EFFECTIVE INFORMATIO N EXCHANGE PROCESS AS 25 
DESCRIBED IN ITEM (7) OF THIS SUBSECTION ;  26 
   	HOUSE BILL 1225 	5 
 
 
 (6) REQUIRE EACH GAS COM PANY THAT OPERATES WITHIN ANY 1 
PORTION OF AN ELECTRIC COMPANY ’S SERVICE AREA TO PARTICIPATE IN THE 2 
ELECTRIC COMPANY ’S ELECTRIC DISTRIBUTION SYSTEM PLANNING PROCESS TO 3 
THE EXTENT NE CESSARY FOR THE ELECTRIC COM PANY TO DEVELOP AND MAINTAIN 4 
AN ELECTRIC DISTRIBUTION SYSTEM PLAN THAT MEETS THE REQUIREMENTS OF 5 
THIS SECTION; AND 6 
 
 (7) (I) ADOPT AN INFORMATION SHARIN G FRAMEWORK FOR THE 7 
BROAD EXCHANGE OF DA TA BETWEEN ELECTRIC COMPANIES, GAS COMPANIES , 8 
ELECTRICITY SUPPLIER S, AND THE PUBLIC THAT MEETS THE REQUI REMENTS OF 9 
SUBSECTION (G) OF THIS SECTION; AND  10 
 
 (II) REQUIRE ALL ELECTRIC COMPANIES AND GAS COMPANIES 11 
TO PARTICIPATE IN EX CHANGING DATA AS DESCRIBE D IN ITEM (I) OF THIS ITEM. 12 
 
 [(b)] (C) The regulations adopted and orders issued under [subsection (a) of] this 13 
section shall: 14 
 
 (1) [be developed with] ATTEMPT TO ENSURE UNIFORMITY IN 15 
ELECTRIC DISTRIBUTION SYSTEM PLANNING WHILE GIVIN G DUE consideration 16 
[given] to the inherent differences, individual circumstances, and available resources 17 
among investor–owned electric companies, electric cooperatives, and municipal electric 18 
utilities; and 19 
 
 (2) if determined necessary by the Commission, establish separate 20 
requirements for investor–owned electric companies, electric cooperatives, and municipal 21 
electric utilities. 22 
 
 (D) (1) AN ELECTRIC DISTRIBUT ION SYSTEM PLAN SUBMITTED TO THE 23 
COMMISSION IN ACCORDA NCE WITH THIS SECTIO N SHALL INCLUDE : 24 
 
 (I) A DISTRIBUTED E NERGY RESOURCE FORECAST , AS 25 
SPECIFIED UNDER PARAGRAPH (2) OF THIS SUBSECTION , AND A LOAD FORECAST , 26 
AS SPECIFIED UNDER PARAGRAPH (3) OF THIS SUBSECTION , FOR AT LEAST THREE 27 
PLANNING HORIZONS , INCLUDING: 28 
 
 1. A SHORT–TERM FORECAST OF 1 TO 3 YEARS FROM THE 29 
DATE OF PLAN SUBMISSION ; 30 
 
 2. A MID–TERM FORECAST OF 4 TO 6 YEARS FROM THE 31 
DATE OF PLAN SUBMISSION ; AND 32 
 
 3. A LONG–TERM FORECAST OF 7 TO 10 OR MORE YEARS 33 
FROM THE DATE OF PLAN SUBMISSION ; 34  6 	HOUSE BILL 1225  
 
 
 
 (II) AT LEAST T WO FORECAST SCENARIO AN ALYSES 1 
REFLECTING POSSIBLE FUTURE OUTCOMES TO SERVE AS A REFERE NCE IN THE 2 
DEVELOPMENT AND EVAL UATION OF THE ELECTRIC DISTRIBUTION PLAN , 3 
INCLUDING: 4 
 
 1. AT LEAST ONE SCENARI O REFLECTING THE 5 
INVESTMENTS REQUIRED TO MEET THE STATE’S EXISTING CLEAN ENE RGY AND 6 
GREENHOUSE GAS EMISSIONS REDUCTION GOALS ; AND 7 
 
 2. AT LEAST ONE SCENARI O REFLECTING A DEMAND FOR 8 
ELECTRICITY BEYOND T HE INCREASED LOAD ANTICIPATED IN RESPONSE TO THE 9 
STATE TARGETS SPECIFIED IN SUBSECTION (B)(3) OF THIS SECTION;  10 
 
 (III) FOR EACH FORECAST SC ENARIO INCLUDED IN A PLAN IN 11 
ACCORDANCE WITH ITEM (II) OF THIS PARAGRAPH , AT LEAST ONE PORTFOL IO OF 12 
INVESTMENTS AND PROG RAMS THAT REFLECT HO W THE ELECTRIC COMPANY 13 
COULD MEET RELIABILI TY NEEDS AND FORECAST DEMAND WHILE MINIMIZING 14 
CAPITAL INFRASTRUCTU RE INVESTMENT TO THE GREATEST EXTENT POSS IBLE; 15 
 
 (IV) AN ANALYSIS OF THE H OSTING CAPACITY FOR DISTRIBUTED 16 
ENERGY RESOURCE S, INCLUDING: 17 
 
 1. SOLAR PHOTOVOLTAICS ; 18 
 
 2. ENERGY STORAGE ; 19 
 
 3. ELECTRIC VEHICLES ; AND 20 
 
 4. DEMAND RESPONSE AND CONTROLLABLE LOADS ; 21 
 
 (V) AN ANALYSIS OF THE LOAD–SERVING CAPACITY FOR 22 
DISTRIBUTED ENERGY R ESOURCES, INCLUDING: 23 
 
 1. ENERGY STORAGE ; 24 
 
 2. ELECTRIC VEHICLES ; 25 
 
 3. BUILDING ELECTRIFICA TION; AND 26 
 
 4. DEMAND RESPONSE AND CONTROLLABLE LOADS ; 27 
   	HOUSE BILL 1225 	7 
 
 
 (VI) AN ANALYSIS OF LOCATIONS WITHIN THE ELECTRIC 1 
COMPANY’S SERVICE AREA WHERE THE EXPANSION OF DIS TRIBUTED ENERGY 2 
RESOURCES WILL PROVI DE THE GREATEST VALU E TOWARD MEETING DEMAND OR 3 
PROVIDING NECESSARY ELECTRIC DISTRIBUTIO N SYSTEM SERVICES; 4 
 
 (VII) AN ANALYSIS OF EXIST ING CONSTRAINTS ON T HE ABILITY 5 
OF THE ELECTRIC COMPANY’S ELECTRIC DISTRIBUTION SYSTEM TO: 6 
 
 1. EXPAND DISTRIBUTED E NERGY RESOURCES ; 7 
 
 2. MEET ANTICIPATED LOAD REQ UIREMENTS; AND 8 
 
 3. ACHIEVE THE STATE’S CLEAN ENERGY AND 9 
GREENHOUSE GAS EMISSIONS REDUCTION GOALS ; 10 
 
 (VIII) AN A NALYSIS APPLYING THE STATE UNIFIED  11 
BENEFIT–COST ANALYSIS FRAMEWORK TO POSSIBLE SOLUTIONS FOR ADDRESSING 12 
THE CONSTRAINTS IDENTIFIED IN ITEM (VII) OF THIS PARAGRAPH , INCLUDING  13 
NON–WIRES SOLUTIONS ; 14 
 
 (IX) A LIST OF THE POSSIBLE SOLUTIONS IDENTIFIED IN ITEM 15 
(VIII) OF THIS PARAGRAPH THAT HAVE BEEN SELECTED BY THE ELEC TRIC COMPANY 16 
TO BE IMPLEMENTED AND THE FACTORS THAT CONTRIBUTED TO EACH DECISION ; 17 
 
 (X) A DESCRIPTION OF PLA NS FOR THE INCORPORATIO N OF 18 
INNOVATIONS AND TECH NOLOGIES TO INCREASE THE RELIABILITY AND RESILIENCE 19 
OF, AND THE ABILITY TO EXPAND , MANAGE, AND MODERNIZE , THE ELECTRIC 20 
DISTRIBUTION SYSTEM, INCLUDING: 21 
 
 1. AUTOMATED ELECTRIC V	EHICLE LOAD 22 
MANAGEMENT ; 23 
 
 2. FLEXIBLE INTERCONNEC TION; 24 
 
 3. CLEAN MICROGRIDS ; 25 
 
 4. LOAD FLEXIBILITY ; 26 
 
 5. ENERGY EFFICIENCY ; AND 27 
 
 6. VIRTUAL POWER PLANTS ; 28 
  8 	HOUSE BILL 1225  
 
 
 (XI) A DESCRIPTION OF HOW THE ELECTRIC COMPANY IS 1 
COORDINAT ING ELECTRIC DISTRIBUTION SYSTEM INVESTMENTS WITH ELECTRIC 2 
TRANSMISSION SYSTEM PLANNING IN THE PJM REGION IN A MANNER T HAT IS MOST 3 
COST–EFFECTIVE TO RATEPAY ERS; 4 
 
 (XII) A DESCRIPTION OF PLANS AND ACTIONS TAKEN TO 5 
MINIMIZE THE COST TO RATEPAYERS T HROUGH THE EFFECTIVE USE OF FEDERAL, 6 
STATE, AND LOCAL RESOURCES AND INCENTIVES ; 7 
 
 (XIII) A DESCRIPTION OF ANY OTHER ACTIONS TAKEN TO 8 
MINIMIZE THE COST TO RATEPAYERS ; 9 
 
 (XIV) A DESCRIPTION OF EFFORTS TO COORDINATE WITH GAS 10 
COMPANIES TO IDENTIFY LOCATIONS FOR GAS DE CARBONIZATION AND FACILITATE 11 
ELECTRIFICATION TO M EET THE STATE’S CLIMATE GOALS , INCLUDING: 12 
 
 1. A DESCRIPTION OF EFFORTS TO COLLABORA TE WITH 13 
ANY GAS COMPANY WHOSE TERRITORY OVER LAPS WITH THAT OF THE ELECTRIC 14 
COMPANY TO MODEL EACH COMPANY’S RESIDENTIAL AND COMM ERCIAL  15 
BUILDING–RELATED LOAD FORECAS TS WITH THE PURPOSE OF ENSURING THAT 16 
HEATING DEMAND IS NO T DOUBLE–COUNTED ACROSS SYSTE MS; AND 17 
 
 2. A DESCRIPTION OF HOW T	HE ELECTRIC 18 
DISTRIBUTION PLAN AC COUNTS FOR: 19 
 
 A. ANY GAS COMPANY EFFICIENCY; AND  20 
 
 B. ANY ELECTRIFICATION PROG RAMS OR NON–PIPELINE 21 
ALTERNATIVES THAT IM PACT ELECTRICITY DEM AND; 22 
 
 (XV) A DESCRIPTION OF HOW THE ELECTRIC COMPANY PLANS TO 23 
MANAGE ITS DISTRIBUTED ENER GY RESOURCE HOSTING CAPACITY IN A WAY THAT 24 
INCLUDES: 25 
 
 1. ESTABLISHING THE MINIMUM AMOUNT OF RESERVE 26 
CAPACITY FOR EACH FEEDER CIRC UIT, AS DETERMINED BY A C IRCUIT–SPECIFIC 27 
ANALYSIS, TO MAXIMIZE THE CAPA CITY AVAILABLE FOR ACTIVE DISTRIBUTED 28 
ENERGY RESOURCE DEVE LOPMENT; 29 
 
 2. DEVELOPING HOSTING CAPACITY MAP S THAT 30 
FACILITATE DISTRIBUT ED ENERGY RESOURCE P LANNING, INCLUDING: 31 
   	HOUSE BILL 1225 	9 
 
 
 A. IDENTIFYING AREAS WH ERE INTERCONNECTION 1 
COSTS WILL BE HIGHER OR LOWER THAN AVERAGE; 2 
 
 B. LISTING OTHER UPCOMI NG PROJECTS FOR SPEC IFIC 3 
CIRCUITS; AND 4 
 
 C. EXISTING FEEDER LOAD AND CAPACITY; AND  5 
 
 3. REVISING THE HOSTING CAPACITY ANALYSIS AND 6 
HOSTING CAPACITY MAP S FREQUENTLY ENOUGH TO REFLECT THE ACTUA L 7 
DEVELOPMENT OF DISTR IBUTED ENERGY RESOUR CES ON CIRCUITS; 8 
 
 (XVI) A DESCRIPTION OF HOW THE ELECTRIC DISTRIBUTION 9 
SYSTEM PLAN ACCOUNTS FOR AND CONTRIBUTES TO ACHIEVING THE STATE’S 10 
CLEAN ENERGY AND CLI MATE GOALS, INCLUDING THE GOALS AND TARGET S 11 
IDENTIFIED IN SUBSECTION (B)(3) OF THIS SECTION; 12 
 
 (XVII) AN ANALYSIS APPLYING EACH OF THE METRICS ADOPTED 13 
BY THE COMMISSION UNDER SUBSECTION (B)(5) OF THIS SECTION; AND 14 
 
 (XVIII) A COMPILATION OF ANY OFFICIAL COMMENT S 15 
RECEIVED THROUGHOUT THE DRAFTING AND REVIEW PROCESS ACCOMPANIED BY : 16 
 
 1. A DESCRIPTION OF WHERE THE COMMENT IS 17 
INCORPORATED IN THE ELECTRIC DIST RIBUTION SYSTEM PLAN ; OR 18 
 
 2. A JUSTIFICATION FOR NOT INCORPORATIN G THE 19 
COMMENT IN THE ELECTRIC DIST RIBUTION SYSTEM PLAN . 20 
 
 (2) (I) THE DISTRIBUTED ENERGY R ESOURCE FORECAST 21 
INCLUDED IN AN ELECTRIC DISTR IBUTION SYSTEM PLAN UNDER PARAGRAPH (1)(I) 22 
OF THIS SUBSECTION SHALL INCLUDE A FORE CAST FOR, AT A MINIMUM: 23 
 
 1. SOLAR PHOTOVOLTAICS ; 24 
 
 2. ENERGY STORAGE ; 25 
 
 3. ELECTRIC VEHICLES ; 26 
 
 4. BUILDING ELECTRIFICA TION; AND 27 
 
 5. DEMAND RESPONSE AND CONTROLLA BLE LOADS. 28 
  10 	HOUSE BILL 1225  
 
 
 (II) THE DISTRIBUTED ENERGY RE SOURCE FORECAST SHALL 1 
REFLECT THE ABILITY OF EACH RESOURCE FOR ECAST TO PROVIDE ELECTRIC 2 
DISTRIBUTION SYSTEM SERVICES, INCLUDING: 3 
 
 1. BIDIRECTIONAL ELECTR IC VEHICLE CHARGING ; AND  4 
 
 2. AGGREGATION OF DISTR	IBUTED ENERGY 5 
RESOURCES. 6 
 
 (III) THE DISTRIBUTED ENERGY R ESOURCE FORECAST SHA LL 7 
PREDICT DISTRIBUTED ENERGY RESOURCE AND ELECTRIFICATION ADOP TION AND 8 
RELATED IMPACTS , BOTH TEMPORALLY AND GEOGRAPHICALLY . 9 
 
 (3) (I) THE LOAD FORECAST INCLUDED IN AN ELECT RIC 10 
DISTRIBUTION SYSTEM PLAN SUBMITTED UNDER PARAGRAPH (1)(I) OF THIS 11 
SUBSECTION SHALL REFLECT EXPECTED CHANGES IN ELECTRICITY DEMAND 12 
WITHIN THE ELECTRIC DISTRIBUTION SYSTEM FOR: 13 
 
 1. THE 8,760 HOURLY LOAD VARIATIO N; 14 
 
 2. LOAD PATTERNS AT THE FEEDER; 15 
 
 3. THE ANTICIPATED AMOUNT A ND GEOGRAPHIC 16 
LOCATION OF EXPANSIO N OF DISTRIBUTED ENERG Y RESOURCES; AND 17 
 
 4. THE LOAD–MODIFYING CHARACTERISTICS FOR THE 18 
DISTRIBUTED ENERGY R ESOURCES FORECAST UN DER PARAGRAPH (1)(I) OF THIS 19 
SUBSECTION. 20 
 
 (II) THE LOAD FORECAST SHA LL TAKE INTO CONSIDERAT ION 21 
AND INCLUDE A DESCRIPTIO N OF THE EXPECTED RA TE OF DEVELOPMENT AN D 22 
ADOPTION OF THE DISTRIBUTED ENER GY RESOURCES FORECAST UNDER 23 
PARAGRAPH (1)(I) OF THIS SUBSECTION . 24 
 
 (4) IF AN ELECTRIC COMPAN Y DOES NOT HAVE THE 	FULL 25 
FORECASTING CAPABILI TY REQUIRED TO MEET THE FORECAST REPORTING 26 
REQUIREMENTS OF THE FORECASTS REQUIR ED UNDER PARAGRAPH (1)(I) OF THIS 27 
SUBSECTION, THE ELECTRIC COMPANY , IN ITS FIRST PLANNIN G CYCLE, MAY 28 
INSTEAD SUBMIT A ROADMAP OF ACTIONS TO BRIDGE TH E GAP BETWEEN CURREN T 29 
FORECAST PROCESSES A ND NECESSARY IMPROVEMEN TS, INCLUDING A TIMELINE 30 
FOR MEETING THE FORECAST REPORTING REQUIREMEN TS. 31 
   	HOUSE BILL 1225 	11 
 
 
 (E) BEFORE SUBMITTING AN ELECTRIC DISTRIBUTION SYSTEM PLAN TO 1 
THE COMMISSION UNDER THIS SECTION , AN ELECTRIC COMPANY S HALL PROVIDE 2 
SPECIFIC OPPORTUNITI ES FOR PUBLIC AND ST AKEHOLDER PARTICIPAT ION 3 
THROUGHOUT THE DRAFT ING PROCESS, INCLUDING: 4 
 
 (1) THREE PUBLIC STATUS MEETING S THAT ARE OPEN TO PUBLIC 5 
AND STAKEHOLDER PART ICIPATION, SPREAD OUT OVER THE COURSE OF THE 6 
DRAFTING PROCESS , DISCUSSING: 7 
 
 (I) PLAN, SCENARIO, FORECAST, AND TECHNOLOGY ADOPT ION 8 
ASSUMPTIONS ; 9 
 
 (II) IDENTIFIED SYSTEM CO NSTRAINTS AND NEEDS ; AND 10 
 
 (III) THE PROGRESS ON THE DRAFT PLAN , INCLUDING 11 
PROPOSED SOLUTIONS A CCOMPANIED BY A COST –BENEFIT ANALYSIS AND ANY 12 
ADDITIONAL CRITERIA USED TO SELECT THE S OLUTION; 13 
 
 (2) THE OPPORTUNITY FOR STAKEHOLDERS AND THE PUBLIC TO 14 
PROVIDE WRITTEN FEED BACK ON THE CURRENT DRAFT PLAN FOR THE 30 DAYS 15 
FOLLOWING EACH PUBLI C MEETING; AND 16 
 
 (3) WITHIN 30 DAYS FOLLOWING A COM MENT PERIOD UNDER IT EM (2) 17 
OF THIS SUBSECTION, PROVIDING A RESPONSE TO ALL CO MMENTS SUBMITTED 18 
DURING THE COMMENT P ERIOD, INCLUDING: 19 
 
 (I) A DESCRIPTION OF WHERE THE COMMENT IS 20 
INCORPORATED IN THE ELECTRIC DISTRIBUTION SYSTEM PLAN; OR  21 
 
 (II) A JUSTIFICATION FOR NOT INCORPORAT ING THE COMMENT 22 
IN THE ELECTRIC DIST RIBUTION SYSTEM PLAN .  23 
 
 (F) (1) THE COMMISSION SHALL REVI EW EACH ELECTRIC COM PANY’S 24 
ELECTRIC DISTRIBUTION SYSTEM PLAN SUBMITTED FOR APPROVAL .  25 
 
 (2) THE COMMISSION MAY NOT APPROVE A N ELECTRIC 26 
DISTRIBUTION SYSTEM PLAN UNLESS THE COMMISSION FINDS THAT : 27 
 
 (I) THE ELECTRIC COMPANY SATISFIED ALL OF THE PUBLIC 28 
AND STAKEHOLDER ENGA GEMENT REQUIREMENTS SPECIFIED IN SUBSECTION (E) 29 
OF THIS SECTION; 30 
  12 	HOUSE BILL 1225  
 
 
 (II) THE PROJECTED DISTRI BUTION ACTIVITIES AN D 1 
CORRESPONDING BUDGET S AFFORDABLY AND STR ATEGICALLY BENEFIT O R 2 
ADVANCE THE POLICY GOALS AND TARGETS SPECIFIED IN SUBSECTION (B)(3) OF 3 
THIS SECTION;  4 
 
 (III) THE PLAN WILL C OST–EFFECTIVELY ADVANCE APPLICABLE 5 
STATE POLICY TO THE G REATEST EXTENT POSSI BLE;  6 
 
 (IV) THE PLAN HAS ADEQUAT ELY INCORPORATED NON –WIRES 7 
SOLUTIONS AND OTHER NONCAPITAL INV ESTMENTS; AND 8 
 
 (V) THE PLAN:  9 
 
 1. INCORPORATES STAKEHO LDER AND PUBLIC 10 
COMMENTS RECEIVED DURING THE DRAFTING PROCESS ; OR  11 
 
 2. PROVIDES A SUFFICIEN T, EVIDENCE–BASED 12 
JUSTIFICATION FOR WH Y THE ELECTRIC COMPA NY DID NOT INCORPORA TE INTO 13 
THE PLAN STAKEHOLDER OR PUBLIC COMMENTS RECEIVED DURING THE DRAFTING 14 
PROCESS. 15 
 
 (3) THE COMMISSION MAY REJECT AN ELECTRIC DISTRIBUTION 16 
PLAN SUBMITTED UNDER THIS SECTION IF THE COMMISSION FINDS THAT THE PLAN 17 
FAILS TO: 18 
 
 (I) COST–EFFECTIVELY ADVANCE EACH APPLICABLE STATE 19 
POLICY TO THE GREATE ST EXTENT POSSIBLE ; OR  20 
 
 (II) PRIORITIZE PASSING ON THE LOWEST CO	ST TO 21 
RATEPAYER S WHILE ENSURING FUTURE ELECTRIC DISTRIBUTIO N SYSTEM 22 
CAPACITY AND RELIABI LITY. 23 
 
 (G) (1) THE INFORMATION SHARING FRAMEWORK ADOPTED UNDER 24 
SUBSECTION (D) OF THIS SECTION SHAL L ENSURE ACCURACY IN ELECTRIC 25 
DISTRIBUTION SYSTEM FORECASTING AND ASSE SSING ELECTRIC DISTRIBUTIO N 26 
SYSTEM CAPACITY .  27 
 
 (2) THE INFORMATION SHARING FRAMEWORK SHALL: 28 
 
 (I) INCLUDE SECURE METHO DS OF COMMUNICATING : 29 
 
 1. FOR GAS COMPANIES, THE GEOGRAPHIC POSIT ION OF 30 
GAS SERVICES, MAINS, AND RELATED DISTRIBUTION EQUIPMENT ALONG WITH ANY 31   	HOUSE BILL 1225 	13 
 
 
INFORMATION REGARDIN G THE AGE, MATERIAL, DIAMETER, AND CONDITION OF 1 
PIPES; AND 2 
 
 2. FOR ELECTRIC COMPANIES, THE GEOGRAPHIC 3 
POSITION OF ALL FEED ERS, SUBSTATIONS, AND RELATED EQUIPMEN T, INCLUDING 4 
THE AGE AND CONDITIO N OF THE EQUIPMENT ; AND 5 
 
 (II) ADHERE TO ALL INDUSTRY –RECOMMENDED 6 
CYBERSECURITY GUIDEL INES. 7 
 
 (H) THE COMMISSION MAY STAGGE R THE REVIEW AND APP ROVAL OF 8 
DIFFERENT ELECTRIC D ISTRIBUTION SYSTEM PLANS TO BE COMPLETE D IN 9 
DIFFERENT YEARS , PROVIDED EACH ELECTR IC COMPANY ’S ELECTRIC 10 
DISTRIBUTION SYSTEM PLAN IS REVIEWED AT LEAST ONCE EVERY 3 YEARS. 11 
 
 (I) (1) ON OR BEFORE DECEMBER 1, 2026, AND EACH DECEMBER 1 12 
THEREAFTER , THE COMMISSION SHALL REQU IRE EACH ELECTRIC COMPANY T O 13 
PROVIDE THE COMMISSION WITH A PROGRESS REPORT ON THE ELECTR IC 14 
COMPANY’S PROGRESS TOWARDS I MPLEMENTING THE COMPANY’S APPROVED 15 
ELECTRIC DISTRIBUTION SYSTEM PLAN. 16 
 
 (2) A PROGRESS REPORT SUBMITTED UNDER PARA GRAPH (1) OF 17 
THIS SUBSECTION SHALL INCLUDE : 18 
 
 (I) A DESCRIPTION OF ALL ONGOING ELECTRIC DISTRIBUTIO N 19 
SYSTEM–RELATED PROJECTS OR PROCESSE S AND ANY PLANNED OR UPCOMING 20 
ELECTRIC DISTRIBUTIO N SYSTEM–RELATED PROJECTS; 21 
 
 (II) AN ANALYSIS DOCUMENT ING THE DECISION –MAKING 22 
PROCESS FOR SELEC TED ELECTRIC DISTRIBUTIO N SYSTEM–RELATED PROJECTS 23 
AND DESCRIBING ANY R EJECTED ALTERNATIVES ;  24 
 
 (III) A DESCRIPTION OF HOW EACH ONGOING AND UPC OMING 25 
ELECTRIC DISTRIBUTIO N SYSTEM–RELATED PROJECT CONTRIBUTES TO MEETING 26 
APPLICABLE STATE POLICY AND THE POLICY GOALS AND TARGETS SP ECIFIED IN 27 
SUBSECTION (B)(3) OF THIS SECTION; AND 28 
 
 (IV) AN ANALYSIS OF THE ELECTRIC COMPANY ’S PROGRESS 29 
TOWARD IMPLEMENTING ITS ELECTRIC DISTRIB UTION SYSTEM PLAN US ING EACH 30 
OF THE METRICS ADOPT ED BY THE COMMISSION UNDER SUBSECTION (B)(5) OF THIS 31 
SECTION. 32 
 
 SECTION 2. AND BE IT FURTHER ENACTED, That this Act shall take effect 33 
October 1, 2025. 34