14 | 14 | | A BILL ENTITLED |
---|
15 | 15 | | |
---|
16 | 16 | | AN ACT concerning 1 |
---|
17 | 17 | | |
---|
18 | 18 | | Abundant Affordable Clean Energy – Procurement and Development 2 |
---|
19 | 19 | | (AACE Act) 3 |
---|
20 | 20 | | |
---|
21 | 21 | | FOR the purpose of requiring each electric company in the State to submit to the Public 4 |
---|
22 | 22 | | Service Commission by certain dates plans for the construction or procurement of 5 |
---|
23 | 23 | | distribution–connected energy storage devices and to construct or procure the 6 |
---|
24 | 24 | | devices in accordance with the plan; providing for the creation of zero–emission 7 |
---|
25 | 25 | | credits by beneficial nuclear facilities; requiring the Commission to pursue certain 8 |
---|
26 | 26 | | coordinated approaches to offshore wind energy transmission development; altering 9 |
---|
27 | 27 | | the requirements for a certain transmission system analysis and the scope of certain 10 |
---|
28 | 28 | | transmission proposals that the Commission may evaluate; repealing a certain draft 11 |
---|
29 | 29 | | solicitation requirement; requiring that certain alternative compliance fees be paid 12 |
---|
30 | 30 | | into a certain escrow account rather than into the Maryland Strategic Energy 13 |
---|
31 | 31 | | Investment Fund; requiring that renewable energy credits be procured in a certain 14 |
---|
32 | 32 | | order; establishing the Utility–Scale SREC–II Program and the Small Solar 15 |
---|
33 | 33 | | Facilities Incentive Program for the creation of SREC–II credits; establishing certain 16 |
---|
34 | 34 | | processes and requirements for the procurement of certain front–of–the–meter 17 |
---|
35 | 35 | | transmission energy storage devices and certain credits from certain solar, 18 |
---|
36 | 36 | | hydroelectric, and land–based wind energy generating systems; requiring the 19 |
---|
37 | 37 | | Commission to establish and the Maryland Energy Administration to supervise a 20 |
---|
38 | 38 | | certain escrow account; authorizing certain units of State government to issue 21 |
---|
39 | 39 | | certain competitive sealed bids for projects that are higher than the amount 22 |
---|
40 | 40 | | authorized for small procurements; authorizing the Chief Procurement Officer to 23 |
---|
41 | 41 | | approve certain procurement contracts; altering the distribution of sales and use tax 24 |
---|
42 | 42 | | revenue attributable to certain data centers; altering the distribution of franchise 25 |
---|
43 | 43 | | tax revenue attributable to certain data centers; and generally relating to the 26 |
---|
44 | 44 | | procurement and development of clean energy resources. 27 |
---|
45 | 45 | | |
---|
46 | 46 | | BY repealing and reenacting, with amendments, 28 |
---|
47 | 47 | | Article – Public Utilities 29 2 HOUSE BILL 398 |
---|
48 | 48 | | |
---|
49 | 49 | | |
---|
50 | 50 | | Section 7–207(b)(1), 7–216(a), 7–704.3(a), (b), and (e)(2), 7–704.4(e), 7–705(b), and 1 |
---|
51 | 51 | | 7–709(b) 2 |
---|
52 | 52 | | Annotated Code of Maryland 3 |
---|
53 | 53 | | (2020 Replacement Volume and 2024 Supplement) 4 |
---|
54 | 54 | | |
---|
55 | 55 | | BY adding to 5 |
---|
56 | 56 | | Article – Public Utilities 6 |
---|
57 | 57 | | Section 7–216.2; 7–231 through 7–235 to be under the new part “Part III. 7 |
---|
58 | 58 | | Zero–Emission Credits”; 7–701(m–1), 7–709.2, and 7–709.3; and 7–1201 8 |
---|
59 | 59 | | through 7–1221 to be under the new subtitle “Subtitle 12. Energy 9 |
---|
60 | 60 | | Procurement” 10 |
---|
61 | 61 | | Annotated Code of Maryland 11 |
---|
62 | 62 | | (2020 Replacement Volume and 2024 Supplement) 12 |
---|
63 | 63 | | |
---|
64 | 64 | | BY repealing and reenacting, without amendments, 13 |
---|
65 | 65 | | Article – Public Utilities 14 |
---|
66 | 66 | | Section 7–701(a) and (m), 7–704.3(c), 7–704.4(d), 7–709(a), and 7–709.1(a) 15 |
---|
67 | 67 | | Annotated Code of Maryland 16 |
---|
68 | 68 | | (2020 Replacement Volume and 2024 Supplement) 17 |
---|
69 | 69 | | |
---|
70 | 70 | | BY repealing and reenacting, with amendments, 18 |
---|
71 | 71 | | Article – State Finance and Procurement 19 |
---|
72 | 72 | | Section 13–102(a) 20 |
---|
73 | 73 | | Annotated Code of Maryland 21 |
---|
74 | 74 | | (2021 Replacement Volume and 2024 Supplement) 22 |
---|
75 | 75 | | |
---|
76 | 76 | | BY adding to 23 |
---|
77 | 77 | | Article – State Finance and Procurement 24 |
---|
78 | 78 | | Section 13–117 25 |
---|
79 | 79 | | Annotated Code of Maryland 26 |
---|
80 | 80 | | (2021 Replacement Volume and 2024 Supplement) 27 |
---|
81 | 81 | | |
---|
82 | 82 | | BY repealing and reenacting, without amendments, 28 |
---|
83 | 83 | | Article – State Government 29 |
---|
84 | 84 | | Section 9–20B–05(a) 30 |
---|
85 | 85 | | Annotated Code of Maryland 31 |
---|
86 | 86 | | (2021 Replacement Volume and 2024 Supplement) 32 |
---|
87 | 87 | | |
---|
88 | 88 | | BY repealing and reenacting, with amendments, 33 |
---|
89 | 89 | | Article – State Government 34 |
---|
90 | 90 | | Section 9–20B–05(e) and (i–1) 35 |
---|
91 | 91 | | Annotated Code of Maryland 36 |
---|
92 | 92 | | (2021 Replacement Volume and 2024 Supplement) 37 |
---|
93 | 93 | | |
---|
94 | 94 | | BY repealing 38 |
---|
95 | 95 | | Article – State Government 39 |
---|
96 | 96 | | Section 9–20B–05(g–1) and (i) 40 HOUSE BILL 398 3 |
---|
97 | 97 | | |
---|
98 | 98 | | |
---|
99 | 99 | | Annotated Code of Maryland 1 |
---|
100 | 100 | | (2021 Replacement Volume and 2024 Supplement) 2 |
---|
101 | 101 | | |
---|
102 | 102 | | BY repealing and reenacting, with amendments, 3 |
---|
103 | 103 | | Article – Tax – General 4 |
---|
104 | 104 | | Section 2–1201 and 2–1303 5 |
---|
105 | 105 | | Annotated Code of Maryland 6 |
---|
106 | 106 | | (2022 Replacement Volume and 2024 Supplement) 7 |
---|
107 | 107 | | |
---|
108 | 108 | | BY adding to 8 |
---|
109 | 109 | | Article – Tax – General 9 |
---|
110 | 110 | | Section 2–1302.5 10 |
---|
111 | 111 | | Annotated Code of Maryland 11 |
---|
112 | 112 | | (2022 Replacement Volume and 2024 Supplement) 12 |
---|
113 | 113 | | |
---|
114 | 114 | | BY repealing and reenacting, without amendments, 13 |
---|
115 | 115 | | Article – Tax – General 14 |
---|
116 | 116 | | Section 11–239(a)(1), (2), and (5) 15 |
---|
117 | 117 | | Annotated Code of Maryland 16 |
---|
118 | 118 | | (2022 Replacement Volume and 2024 Supplement) 17 |
---|
119 | 119 | | |
---|
120 | 120 | | SECTION 1. BE IT ENACTED BY THE GENERAL ASSEMBLY OF MARYLAND, 18 |
---|
121 | 121 | | That the Laws of Maryland read as follows: 19 |
---|
122 | 122 | | |
---|
123 | 123 | | Article – Public Utilities 20 |
---|
124 | 124 | | |
---|
125 | 125 | | 7–207. 21 |
---|
126 | 126 | | |
---|
127 | 127 | | (b) (1) (i) Unless a certificate of public convenience and necessity for the 22 |
---|
128 | 128 | | construction is first obtained from the Commission, a person may not begin construction in 23 |
---|
129 | 129 | | the State of: 24 |
---|
130 | 130 | | |
---|
131 | 131 | | 1. a generating station; or 25 |
---|
132 | 132 | | |
---|
133 | 133 | | 2. a qualified generator lead line. 26 |
---|
134 | 134 | | |
---|
135 | 135 | | (ii) If a person obtains Commission approval for construction under 27 |
---|
136 | 136 | | § 7–207.1 of this subtitle OR SUBTITLE 12, PART II OF THIS TITLE, the Commission shall 28 |
---|
137 | 137 | | exempt a person from the requirement to obtain a certificate of public convenience and 29 |
---|
138 | 138 | | necessity under this section. 30 |
---|
139 | 139 | | |
---|
140 | 140 | | (iii) Notwithstanding subparagraph (i) of this paragraph, a person 31 |
---|
141 | 141 | | may not apply to obtain a certificate of public convenience and necessity for construction of 32 |
---|
142 | 142 | | a qualified generator lead line unless: 33 |
---|
143 | 143 | | |
---|
144 | 144 | | 1. at least 90 days before the filing of an application for a 34 |
---|
145 | 145 | | certificate of public convenience and necessity, the person had in good faith offered the 35 4 HOUSE BILL 398 |
---|
146 | 146 | | |
---|
147 | 147 | | |
---|
148 | 148 | | electric company that owns that portion of the electric grid in Maryland to which the 1 |
---|
149 | 149 | | qualified generator lead line would interconnect a full and fair opportunity for the electric 2 |
---|
150 | 150 | | company to construct the qualified generator lead line; and 3 |
---|
151 | 151 | | |
---|
152 | 152 | | 2. at any time at least 10 days before the filing of an 4 |
---|
153 | 153 | | application for a certificate of public convenience and necessity, the electric company: 5 |
---|
154 | 154 | | |
---|
155 | 155 | | A. did not accept from the person a proposal or a negotiated 6 |
---|
156 | 156 | | version of the proposal under which the electric company would construct the qualified 7 |
---|
157 | 157 | | generator lead line; or 8 |
---|
158 | 158 | | |
---|
159 | 159 | | B. stated in writing that the electric company did not intend 9 |
---|
160 | 160 | | to construct the qualified generator lead line. 10 |
---|
161 | 161 | | |
---|
162 | 162 | | 7–216. 11 |
---|
163 | 163 | | |
---|
164 | 164 | | (a) (1) In this section the following words have the meanings indicated. 12 |
---|
165 | 165 | | |
---|
166 | 166 | | (2) (i) “Energy storage device” means a resource capable of absorbing 13 |
---|
167 | 167 | | electrical energy, storing it for a period of time, and delivering the energy for use at a later 14 |
---|
168 | 168 | | time as needed, regardless of where the resource is located on the electric [distribution] 15 |
---|
169 | 169 | | system. 16 |
---|
170 | 170 | | |
---|
171 | 171 | | (ii) “Energy storage device” includes all types of electric storage 17 |
---|
172 | 172 | | technologies, regardless of their size, storage medium, or operational purpose, including: 18 |
---|
173 | 173 | | |
---|
174 | 174 | | 1. thermal storage; 19 |
---|
175 | 175 | | |
---|
176 | 176 | | 2. electrochemical storage; 20 |
---|
177 | 177 | | |
---|
178 | 178 | | 3. [virtual power plants ] THERMO–MECHANICAL 21 |
---|
179 | 179 | | STORAGE; and 22 |
---|
180 | 180 | | |
---|
181 | 181 | | 4. hydrogen–based storage. 23 |
---|
182 | 182 | | |
---|
183 | 183 | | (3) “Investor–owned electric company” means an electric company that is 24 |
---|
184 | 184 | | not a municipal electric utility or an electric cooperative. 25 |
---|
185 | 185 | | |
---|
186 | 186 | | 7–216.2. 26 |
---|
187 | 187 | | |
---|
188 | 188 | | (A) IN THIS SECTION , “ENERGY STORAGE DEVIC E” HAS THE MEANING 27 |
---|
189 | 189 | | STATED IN § 7–216 OF THIS SUBTITLE. 28 |
---|
190 | 190 | | |
---|
191 | 191 | | (B) (1) THE GENERAL ASSEMBLY FINDS AND DE CLARES THAT THE 29 |
---|
192 | 192 | | STATE HAS A GOAL OF R EACHING 150 MEGAWATTS OF DISTRIB UTION–CONNECTED 30 |
---|
193 | 193 | | ENERGY STORAGE DEVIC ES. 31 HOUSE BILL 398 5 |
---|
194 | 194 | | |
---|
195 | 195 | | |
---|
196 | 196 | | |
---|
197 | 197 | | (2) ON OR BEFORE JULY 1, 2025, AND ON OR BEFORE JULY 1, 2026, 1 |
---|
198 | 198 | | THE COMMISSION SHALL NOTI FY EACH ELECTRIC COM PANY OF ITS PROPORTI ON OF 2 |
---|
199 | 199 | | THE GOAL ESTABLISHED UNDER THIS SUBSECTIO N, BASED ON THE ELECTRIC 3 |
---|
200 | 200 | | COMPANY’S SERVICE LOAD. 4 |
---|
201 | 201 | | |
---|
202 | 202 | | (C) (1) ON OR BEFORE NOVEMBER 1, 2025, AND ON OR BEFORE 5 |
---|
203 | 203 | | NOVEMBER 1, 2026, THE COMMISSION SHALL REQU IRE EACH ELECTRIC CO MPANY 6 |
---|
204 | 204 | | TO DEVELOP AND IMPLE MENT A PLAN TO ACHIEVE THE PROPORTION OF 7 |
---|
205 | 205 | | DISTRIBUTION–CONNECTED ENERGY STO RAGE DEVICES NECESSARY TO REACH THE 8 |
---|
206 | 206 | | ELECTRIC COMPANY ’S APPORTIONMENT OF T HE GOAL STATED IN SU BSECTION (B) 9 |
---|
207 | 207 | | OF THIS SECTION. 10 |
---|
208 | 208 | | |
---|
209 | 209 | | (2) ON OR BEFORE MARCH 1, 2026, FOR PLANS SUBMITTED BY 11 |
---|
210 | 210 | | NOVEMBER 1, 2025, AND ON OR BEFORE MARCH 1, 2027, FOR PLANS SUBMITTED BY 12 |
---|
211 | 211 | | NOVEMBER 1, 2026, THE COMMISSION SHALL : 13 |
---|
212 | 212 | | |
---|
213 | 213 | | (I) EVALUATE EACH PLAN ; 14 |
---|
214 | 214 | | |
---|
215 | 215 | | (II) ACCEPT PUBLIC COMMENTS ON E ACH PLAN; AND 15 |
---|
216 | 216 | | |
---|
217 | 217 | | (III) ISSUE AN ORDER FOR EAC H PLAN THAT EITHER : 16 |
---|
218 | 218 | | |
---|
219 | 219 | | 1. APPROVES THE PLAN ; OR 17 |
---|
220 | 220 | | |
---|
221 | 221 | | 2. APPROVES THE PLAN WI TH MODIFICATIONS THA T 18 |
---|
222 | 222 | | THE COMMISSION CONSIDERS NECESSARY. 19 |
---|
223 | 223 | | |
---|
224 | 224 | | (3) THE ENERGY STORAGE DEVICES CONSTRUCTED OR PROCURED 20 |
---|
225 | 225 | | UNDER EACH PLAN SHAL L INCLUDE A COMBINAT ION OF DEVICES OWNED BY THE 21 |
---|
226 | 226 | | ELECTRIC COMPANY AND DEVICES OWNED BY A T HIRD PARTY, WITH NOT MORE 22 |
---|
227 | 227 | | THAN 30% OF THE DEVICES BEING OWNED BY A THI RD PARTY. 23 |
---|
228 | 228 | | |
---|
229 | 229 | | (4) (I) THE ENERGY STORAGE DE VICES THAT ARE CONST RUCTED 24 |
---|
230 | 230 | | OR PROCURED UNDER A PLAN SUBMITTED BY NOVEMBER 1, 2025, SHALL BE 25 |
---|
231 | 231 | | OPERATIONAL BY AUGUST 1, 2027. 26 |
---|
232 | 232 | | |
---|
233 | 233 | | (II) THE ENERGY STORAGE DE VICES THAT ARE CONSTRU CTED 27 |
---|
234 | 234 | | OR PROCURED UNDER A PLAN SUBMITTED BY NOVEMBER 1, 2026, SHALL BE 28 |
---|
235 | 235 | | OPERATIONAL BY AUGUST 1, 2028. 29 |
---|
236 | 236 | | |
---|
237 | 237 | | (III) THE COMMISSION MAY EXTEND A DEADLINE UNDER THI S 30 |
---|
238 | 238 | | PARAGRAPH FOR GOOD C AUSE. 31 6 HOUSE BILL 398 |
---|
239 | 239 | | |
---|
240 | 240 | | |
---|
241 | 241 | | |
---|
242 | 242 | | (D) THE COMMISSION SHALL REQU IRE EACH PLAN TO DEMONSTRATE THAT 1 |
---|
243 | 243 | | THE CONSTRUCTION OR PROCUREMENT OF EACH ENERGY STORAGE DEVIC E: 2 |
---|
244 | 244 | | |
---|
245 | 245 | | (1) IS BENEFICIAL IN TERMS OF COST, INCLUDING A DEMONSTRATION 3 |
---|
246 | 246 | | OF ANY: 4 |
---|
247 | 247 | | |
---|
248 | 248 | | (I) AVOIDED OR DELAYED T RANSMISSION, DISTRIBUTION, AND 5 |
---|
249 | 249 | | GENERATION COSTS ; AND 6 |
---|
250 | 250 | | |
---|
251 | 251 | | (II) AVOIDED EMISSIONS; AND 7 |
---|
252 | 252 | | |
---|
253 | 253 | | (2) CAN BE COMPLETED WITHIN 18 MONTHS AFTER THE PLAN IS 8 |
---|
254 | 254 | | APPROVED. 9 |
---|
255 | 255 | | |
---|
256 | 256 | | (E) (1) A DEVELOPER OF A THIRD–PARTY–OWNED ENERGY STORAGE 10 |
---|
257 | 257 | | DEVICE CONSTRUCTED IN ACCORDANCE WITH T HIS SECTION SHALL EN SURE THAT 11 |
---|
258 | 258 | | WORKERS ARE PAID NOT LESS THAN THE PREVAILING WAGE RATE DETERMINED 12 |
---|
259 | 259 | | UNDER TITLE 17, SUBTITLE 2 OF THE STATE FINANCE AND PROCUREMENT 13 |
---|
260 | 260 | | ARTICLE. 14 |
---|
261 | 261 | | |
---|
262 | 262 | | (2) AN ENERGY STORAGE DEVIC E CONSTRUCTED AND OWNE D BY AN 15 |
---|
263 | 263 | | ELECTRIC COMPANY SHALL BE CONSTRUCTED BY: 16 |
---|
264 | 264 | | |
---|
265 | 265 | | (I) EMPLOYEES OF THE ELECTRIC COMPANY ; OR 17 |
---|
266 | 266 | | |
---|
267 | 267 | | (II) CONTRACTORS THAT SHA LL ENSURE THAT WORKE RS 18 |
---|
268 | 268 | | CONSTRUCTING THE ENE RGY STORAGE DEVICE A RE PAID NOT LESS THAN THE 19 |
---|
269 | 269 | | PREVAILING WAGE RATE DETERMINED UNDER TITLE 17, SUBTITLE 2 OF THE STATE 20 |
---|
270 | 270 | | FINANCE AND PROCUREMENT ARTICLE. 21 |
---|
271 | 271 | | |
---|
272 | 272 | | (3) AN ELECTRIC COMPANY S HALL PROVIDE ITS EMPLOYEE 22 |
---|
273 | 273 | | BARGAINING UNIT AN O PPORTUNITY TO PROVID E MAINTENANCE AND OP ERATIONS 23 |
---|
274 | 274 | | FOR ANY ENERGY STORA GE DEVICE OWNED BY T HE ELECTRIC COMPANY . 24 |
---|
275 | 275 | | |
---|
276 | 276 | | (4) (I) SUBJECT TO SUBPARAGRA PH (II) OF THIS PARAGRAPH , AN 25 |
---|
277 | 277 | | ELECTRIC COMPANY MAY CONTRACT ANY WORK UN DER THIS SECTION NOT 26 |
---|
278 | 278 | | CONDUCTED BY THE COM PANY’S EMPLOYEE BARGAININ G UNIT TO A QUALIFIE D 27 |
---|
279 | 279 | | CONTRACTOR . 28 |
---|
280 | 280 | | |
---|
281 | 281 | | (II) AN ELECTRIC COMPANY S HALL REQUIRE A CONTR ACTOR 29 |
---|
282 | 282 | | OR SUBCONTRACT OR ON A PROJECT UNDER T HIS SECTION TO: 30 |
---|
283 | 283 | | HOUSE BILL 398 7 |
---|
284 | 284 | | |
---|
285 | 285 | | |
---|
286 | 286 | | 1. PAY THE AREA PREVAIL ING WAGE RATE DETERM INED 1 |
---|
287 | 287 | | BY THE COMMISSIONER OF LABOR AND INDUSTRY, INCLUDING WAGES AND FRINGE 2 |
---|
288 | 288 | | BENEFITS; AND 3 |
---|
289 | 289 | | |
---|
290 | 290 | | 2. OFFER HEALTH CARE AN D RETIREMENT BENEFIT S TO 4 |
---|
291 | 291 | | THE EMPLOYEES WORKIN G ON THE PROJECT . 5 |
---|
292 | 292 | | |
---|
293 | 293 | | 7–229. RESERVED. 6 |
---|
294 | 294 | | |
---|
295 | 295 | | 7–230. RESERVED. 7 |
---|
296 | 296 | | |
---|
297 | 297 | | PART III. ZERO–EMISSION CREDITS. 8 |
---|
298 | 298 | | |
---|
299 | 299 | | 7–231. 9 |
---|
300 | 300 | | |
---|
301 | 301 | | (A) IN THIS PART THE FOLL OWING WORDS HAVE THE MEANINGS 10 |
---|
302 | 302 | | INDICATED. 11 |
---|
303 | 303 | | |
---|
304 | 304 | | (B) “BENEFICIAL NUCLEAR FA CILITY” MEANS A NUCLEAR REAC TOR THAT 12 |
---|
305 | 305 | | IS LOCATED IN AND PR OVIDES ENVIRONMENTAL BENEFITS TO THE STATE. 13 |
---|
306 | 306 | | |
---|
307 | 307 | | (C) “ZERO–EMISSION CREDIT ” OR “ZEC” MEANS A PAYMENT EQUAL TO THE 14 |
---|
308 | 308 | | GENERATION ATTRIBUTE S OF 1 MEGAWATT –HOUR OF ELECTRICITY THAT IS 15 |
---|
309 | 309 | | DERIVED FROM A BENEF ICIAL NUCLEAR FACILI TY. 16 |
---|
310 | 310 | | |
---|
311 | 311 | | 7–232. 17 |
---|
312 | 312 | | |
---|
313 | 313 | | (A) SUBJECT TO SUBSECTION (B) OF THIS SECTION, A BENEFICIAL NUCLEAR 18 |
---|
314 | 314 | | FACILITY MAY SUBMIT AN APPLICATIO N TO THE COMMISSION TO RECEIVE 19 |
---|
315 | 315 | | ZERO–EMISSION CREDITS . 20 |
---|
316 | 316 | | |
---|
317 | 317 | | (B) (1) A BENEFICIAL NUCLEAR F ACILITY MAY NOT RECE IVE 21 |
---|
318 | 318 | | ZERO–EMISSION CREDITS DUR ING ANY PERIOD IN WH ICH THE FACILITY RECEIVES 22 |
---|
319 | 319 | | ZERO–EMISSION NUCLEAR POW ER PRODUCTION TAX CREDI TS UNDER § 13105 OF 23 |
---|
320 | 320 | | THE INFLATION REDUCTION ACT OF 2022. 24 |
---|
321 | 321 | | |
---|
322 | 322 | | (2) THE COMMISSION MAY NOT OF FER ZERO–EMISSION CREDITS 25 |
---|
323 | 323 | | AFTER 2055. 26 |
---|
324 | 324 | | |
---|
325 | 325 | | (3) TO BE ELIGIBLE TO REC EIVE A ZERO –EMISSION CREDIT , A 27 |
---|
326 | 326 | | BENEFICIAL NUCLEAR F ACILITY MUST MAINTAIN A NEUTRAL POSITION IN ANY 28 |
---|
327 | 327 | | LABOR ORGANIZING THA T TAKES PLACE AT THE FACIL ITY. 29 |
---|
328 | 328 | | 8 HOUSE BILL 398 |
---|
329 | 329 | | |
---|
330 | 330 | | |
---|
331 | 331 | | 7–233. 1 |
---|
332 | 332 | | |
---|
333 | 333 | | (A) AFTER NOTICE AND AN OPPORTUNITY FOR A HE ARING, THE 2 |
---|
334 | 334 | | COMMISSION SHALL APPR OVE OR DENY AN APPLI CATION SUBMITTED UNDER § 3 |
---|
335 | 335 | | 7–232 OF THIS SUBTITLE WITHIN 9 MONTHS AFTER THE APPLICATIO N IS FILED. 4 |
---|
336 | 336 | | |
---|
337 | 337 | | (B) THE COMMISSION MAY APPROVE AN APPLICATI ON: 5 |
---|
338 | 338 | | |
---|
339 | 339 | | (1) IN WHOLE OR IN PART ; AND 6 |
---|
340 | 340 | | |
---|
341 | 341 | | (2) SUBJECT TO ANY LIMITATIONS AND QUAL IFICATIONS THAT THE 7 |
---|
342 | 342 | | COMMISSION CONSIDERS NECESSARY AND IN THE PUBLIC IN TEREST. 8 |
---|
343 | 343 | | |
---|
344 | 344 | | 7–234. 9 |
---|
345 | 345 | | |
---|
346 | 346 | | (A) SUBJECT TO SUBSECTION (B) OF THIS SECTION , THE PRICE FOR A 10 |
---|
347 | 347 | | ZERO–EMISSION CREDIT SHALL BE EQUAL TO [$15/MWH – 80% X (GROSS 11 |
---|
348 | 348 | | RECEIPTS – $25/MWH)]. 12 |
---|
349 | 349 | | |
---|
350 | 350 | | (B) THE $15/MWH AND $25/MWH CALCULATIONS SHALL BE ADJUSTED FOR 13 |
---|
351 | 351 | | INFLATION. 14 |
---|
352 | 352 | | |
---|
353 | 353 | | 7–235. 15 |
---|
354 | 354 | | |
---|
355 | 355 | | (A) THE COMMISSION SHALL ADOP T REGULATIONS TO IMP LEMENT THIS 16 |
---|
356 | 356 | | PART NOT LATER THAN 365 DAYS BEFORE THE EXPIRATION OF TH E AVAILABILITY 17 |
---|
357 | 357 | | OF ZERO–EMISSION NUCLEAR POW ER PRODUCTION TAX CR EDITS UNDER § 13105 OF 18 |
---|
358 | 358 | | THE INFLATION REDUCTION ACT OF 2022. 19 |
---|
359 | 359 | | |
---|
360 | 360 | | (B) THE REGULATIONS SHALL : 20 |
---|
361 | 361 | | |
---|
362 | 362 | | (1) INCLUDE DATA SUBMISSION REQU IREMENTS NECESSARY T O 21 |
---|
363 | 363 | | EVALUATE A BENEFICIAL NUCLEAR FACILITY’S PROJECTED ENVIRONMEN TAL 22 |
---|
364 | 364 | | BENEFITS AND ANNUAL GROSS RECEIPTS ; AND 23 |
---|
365 | 365 | | |
---|
366 | 366 | | (2) PROVIDE FOR THE RECA PTURE OF THE ALLOCAT ION OF ANY 24 |
---|
367 | 367 | | ZERO–EMISSION CREDIT WITHIN THE PR EVIOUS 3 YEARS TO A BENEFICIAL NUCLEAR 25 |
---|
368 | 368 | | FACILITY THAT PERMANENTLY TER MINATES OPERATIONS , EXCEPT IN THE CASE O F 26 |
---|
369 | 369 | | FORCE MAJEURE. 27 |
---|
370 | 370 | | |
---|
371 | 371 | | 7–701. 28 |
---|
372 | 372 | | |
---|
373 | 373 | | (a) In this subtitle the following words have the meanings indicated. 29 |
---|
374 | 374 | | HOUSE BILL 398 9 |
---|
375 | 375 | | |
---|
376 | 376 | | |
---|
377 | 377 | | (m) “Renewable energy credit” or “credit” means a credit equal to the generation 1 |
---|
378 | 378 | | attributes of 1 megawatt–hour of electricity that is derived from a Tier 1 renewable source 2 |
---|
379 | 379 | | or a Tier 2 renewable source that is located: 3 |
---|
380 | 380 | | |
---|
381 | 381 | | (1) in the PJM region; 4 |
---|
382 | 382 | | |
---|
383 | 383 | | (2) outside the area described in item (1) of this subsection but in a control 5 |
---|
384 | 384 | | area that is adjacent to the PJM region, if the electricity is delivered into the PJM region; 6 |
---|
385 | 385 | | or 7 |
---|
386 | 386 | | |
---|
387 | 387 | | (3) on the outer continental shelf of the Atlantic Ocean in an area that: 8 |
---|
388 | 388 | | |
---|
389 | 389 | | (i) the United States Department of the Interior designates for 9 |
---|
390 | 390 | | leasing after coordination and consultation with the State in accordance with § 388(a) of 10 |
---|
391 | 391 | | the Energy Policy Act of 2005; and 11 |
---|
392 | 392 | | |
---|
393 | 393 | | (ii) is between 10 and 80 miles off the coast of the State. 12 |
---|
394 | 394 | | |
---|
395 | 395 | | (M–1) “RENEWABLE ENERGY CRED IT–II” OR “REC–II” MEANS A 13 |
---|
396 | 396 | | RENEWABLE ENERGY C REDIT THAT IS DERIVE D FROM AN ENERGY GENERATING 14 |
---|
397 | 397 | | SYSTEM PROCURED IN ACCORDANCE WITH SUBTITLE 12 OF THIS TITLE. 15 |
---|
398 | 398 | | |
---|
399 | 399 | | 7–704.3. 16 |
---|
400 | 400 | | |
---|
401 | 401 | | (a) (1) The General Assembly finds and declares that it is: 17 |
---|
402 | 402 | | |
---|
403 | 403 | | (I) in the public interest to upgrade and expand the transmission 18 |
---|
404 | 404 | | system to accommodate the buildout of at least 8,500 megawatts of offshore wind energy 19 |
---|
405 | 405 | | from qualified offshore wind projects serving the State by 2031; AND 20 |
---|
406 | 406 | | |
---|
407 | 407 | | (II) THE PUBLIC POLICY OF THE STATE TO ENGAGE IN 21 |
---|
408 | 408 | | COORDINATED TRANSMIS SION PLANNING TO SUP PORT OFFSHORE WIND ENERGY ON 22 |
---|
409 | 409 | | A MULTISTATE, REGIONAL, OR INTER–REGIONAL BASIS . 23 |
---|
410 | 410 | | |
---|
411 | 411 | | (2) TO FURTHER THE PUBLIC POLICY STATED IN PARAGRAPH (1)(II) 24 |
---|
412 | 412 | | OF THIS SUBSECTION , THE COMMISSION SHALL PURSUE ONE OF THE FOLLOWING 25 |
---|
413 | 413 | | COORDINATED APPROACH ES TO THE TRANSMISSION OF ENER GY DERIVED FROM 26 |
---|
414 | 414 | | OFFSHORE WIND : 27 |
---|
415 | 415 | | |
---|
416 | 416 | | (I) PJM INTERCONNECTION ’S LONG–TERM TRANSMISSION 28 |
---|
417 | 417 | | PLANNING PROCESS ; OR 29 |
---|
418 | 418 | | |
---|
419 | 419 | | (II) AN ALTERNATIVE VOLUN TARY AGREEMENT . 30 |
---|
420 | 420 | | 10 HOUSE BILL 398 |
---|
421 | 421 | | |
---|
422 | 422 | | |
---|
423 | 423 | | (b) (1) To meet the goals established under § 7–703 of this subtitle and 1 |
---|
424 | 424 | | subsection (a) of this section, the Commission, in consultation with the Maryland Energy 2 |
---|
425 | 425 | | Administration, shall request that PJM Interconnection conduct an analysis of 3 |
---|
426 | 426 | | transmission system upgrade and expansion options that take into consideration both 4 |
---|
427 | 427 | | onshore and offshore infrastructure. 5 |
---|
428 | 428 | | |
---|
429 | 429 | | (2) The Commission: 6 |
---|
430 | 430 | | |
---|
431 | 431 | | (i) shall consult with other states served by PJM Interconnection to 7 |
---|
432 | 432 | | evaluate regional transmission cooperation that could help achieve the State’s renewable 8 |
---|
433 | 433 | | energy and offshore wind energy goals with greater efficiency; 9 |
---|
434 | 434 | | |
---|
435 | 435 | | (ii) shall work with PJM Interconnection to ensure that the analysis 10 |
---|
436 | 436 | | requested under paragraph (1) of this subsection includes an analysis of solutions that: 11 |
---|
437 | 437 | | |
---|
438 | 438 | | 1. use an open–access collector transmission system to allow 12 |
---|
439 | 439 | | for the interconnection of multiple qualified offshore wind projects at a single [substation] 13 |
---|
440 | 440 | | OR AT MULTIPLE SUBSTATIONS LOCATED IN OR NEAR THE DELMARVA PENINSULA; 14 |
---|
441 | 441 | | |
---|
442 | 442 | | 2. TO THE EXTENT POSSIBLE, USE UPGRADES TO 15 |
---|
443 | 443 | | EXISTING TRANSMISSIO N SYSTEMS BEFORE CON SIDERING NEW TRANSMISSION 16 |
---|
444 | 444 | | SYSTEM ELEMENTS, INCLUDING USING UPGRADES TO THE EXIS TING 138 KILOVOLTS 17 |
---|
445 | 445 | | AND 230 KILOVOLTS TRANSMISSION ELEMENT S IN THE DELMARVA PENINSULA TO 18 |
---|
446 | 446 | | HIGHER VOLTAGE LEVEL S; 19 |
---|
447 | 447 | | |
---|
448 | 448 | | 3. SUPPORT 8,500 MEGAWATTS OF OFFSHORE WIND 20 |
---|
449 | 449 | | ENERGY GENERATION TO SERVE THE STATE’S LOAD EITHER THROUG H INTRASTATE 21 |
---|
450 | 450 | | TRANSMISSION UPGRADE S OR INTERSTATE TRAN SMISSION UPGRADES BE TWEEN 22 |
---|
451 | 451 | | THE STATE AND DELAWARE; 23 |
---|
452 | 452 | | |
---|
453 | 453 | | [2.] 4. avoid a significant outage, or single contingency, of any 24 |
---|
454 | 454 | | part of the transmission system; 25 |
---|
455 | 455 | | |
---|
456 | 456 | | [3.] 5. reduce permitting risks, impacts on communities, and 26 |
---|
457 | 457 | | unnecessary high costs; 27 |
---|
458 | 458 | | |
---|
459 | 459 | | [4. leverage existing infrastructure; 28 |
---|
460 | 460 | | |
---|
461 | 461 | | 5.] 6. offer benefits that address additional grid challenges; and 29 |
---|
462 | 462 | | |
---|
463 | 463 | | [6.] 7. address any other issues that the Commission identifies; 30 |
---|
464 | 464 | | [and] 31 |
---|
465 | 465 | | |
---|
466 | 466 | | (iii) SHALL ENSURE THE COMPLETIO N OF A COST–BENEFIT 32 |
---|
467 | 467 | | ANALYSIS OF VARIOUS APPROACHE S FOR UPGRADING AND EXPAND ING THE 33 HOUSE BILL 398 11 |
---|
468 | 468 | | |
---|
469 | 469 | | |
---|
470 | 470 | | TRANSMISSION SYSTEM TO MEET THE STATE’S OFFSHORE WIND ENERGY TARGETS 1 |
---|
471 | 471 | | AND ENERGY NEEDS , INCLUDING: 2 |
---|
472 | 472 | | |
---|
473 | 473 | | 1. AN ANALYSIS OF THE FOLLOWING THREE SCENARIOS: 3 |
---|
474 | 474 | | |
---|
475 | 475 | | A. INTERCONNECTING OFFS HORE WIND FACILITIES TO 4 |
---|
476 | 476 | | THE PJM INTERCONNECTION SYSTEM ON A RADIAL B ASIS, BASED ON STUDY 5 |
---|
477 | 477 | | ESTIMATES OF PAST RADIAL INTER CONNECTION COSTS AND FUTURE PROJECTED 6 |
---|
478 | 478 | | RADIAL INTERCONNECTI ON COSTS; 7 |
---|
479 | 479 | | |
---|
480 | 480 | | B. A COORDINATED TRANSMIS SION SOLUTION THAT 8 |
---|
481 | 481 | | CONNECTS ENERGY DERIVED FROM OFFSHORE WIN D DIRECTLY TO MAJOR LO AD 9 |
---|
482 | 482 | | CENTERS IN THE STATE; AND 10 |
---|
483 | 483 | | |
---|
484 | 484 | | C. A COORDINATED TRANSM ISSION SOLUTION THAT 11 |
---|
485 | 485 | | DOES NOT CONNECT ENERGY DERIV ED FROM OFFSHORE WIN D DIRECTLY TO MAJOR 12 |
---|
486 | 486 | | LOAD CENTERS IN THE STATE; AND 13 |
---|
487 | 487 | | |
---|
488 | 488 | | 2. AN ECONOMIC ANALYSIS THAT CONSIDERS, OVER THE 14 |
---|
489 | 489 | | EXPECTED LIFE OF EAC H FACILITY: 15 |
---|
490 | 490 | | |
---|
491 | 491 | | A. THE COSTS OF ANY TRA NSMISSION CONSTRUCTION 16 |
---|
492 | 492 | | OR UPGRADES THAT ARE AVOIDED BY ANY NEW OFFSHORE WIN D ENERGY 17 |
---|
493 | 493 | | GENERATION AND TRANSMISSION DEV ELOPMENT; 18 |
---|
494 | 494 | | |
---|
495 | 495 | | B. ANY PRODUCTION COST SAVINGS THAT RESULT FROM 19 |
---|
496 | 496 | | MEETING THE STATE’S OFFSHORE WIND ENERGY TARGETS; 20 |
---|
497 | 497 | | |
---|
498 | 498 | | C. ANY REDUCTION IN TRA NSMISSION LOSSES ; 21 |
---|
499 | 499 | | |
---|
500 | 500 | | D. CHANGES IN TOTAL PJM INTERCONNECTION 22 |
---|
501 | 501 | | MARKET COSTS ; 23 |
---|
502 | 502 | | |
---|
503 | 503 | | E. ENVIRONMENTAL BENEFI TS; 24 |
---|
504 | 504 | | |
---|
505 | 505 | | F. RELIABILITY BENEFITS ; AND 25 |
---|
506 | 506 | | |
---|
507 | 507 | | G. ANY OTHER BENEFITS O R COSTS IDENTIFIED BY THE 26 |
---|
508 | 508 | | COMMISSION; AND 27 |
---|
509 | 509 | | |
---|
510 | 510 | | (IV) may consult with owners of transmission facilities in the State to 28 |
---|
511 | 511 | | gather relevant technical information. 29 |
---|
512 | 512 | | 12 HOUSE BILL 398 |
---|
513 | 513 | | |
---|
514 | 514 | | |
---|
515 | 515 | | (3) The Commission may enter into any necessary agreements with PJM 1 |
---|
516 | 516 | | Interconnection for transmission planning to: 2 |
---|
517 | 517 | | |
---|
518 | 518 | | (i) initiate PJM Interconnection’s analysis; or 3 |
---|
519 | 519 | | |
---|
520 | 520 | | (ii) assist with the solicitation of proposals for offshore wind 4 |
---|
521 | 521 | | transmission projects. 5 |
---|
522 | 522 | | |
---|
523 | 523 | | (4) On or before July 1, 2024, the Commission shall submit a status update 6 |
---|
524 | 524 | | on the analysis requested under paragraph (1) of this subsection to the General Assembly, 7 |
---|
525 | 525 | | in accordance with § 2–1257 of the State Government Article. 8 |
---|
526 | 526 | | |
---|
527 | 527 | | (c) (1) On or before July 1, 2025, the Commission shall issue, or request that 9 |
---|
528 | 528 | | PJM Interconnection issue, one or more competitive solicitations for proposals for open 10 |
---|
529 | 529 | | access offshore wind transmission facilities and complementary onshore transmission 11 |
---|
530 | 530 | | upgrades and expansions. 12 |
---|
531 | 531 | | |
---|
532 | 532 | | (2) The Commission may issue, or request that PJM Interconnection issue, 13 |
---|
533 | 533 | | further solicitations for proposals after this date if determined necessary by the 14 |
---|
534 | 534 | | Commission. 15 |
---|
535 | 535 | | |
---|
536 | 536 | | (e) (2) The Commission may evaluate, or request that PJM Interconnection 16 |
---|
537 | 537 | | assist with the evaluation of, proposals that include: 17 |
---|
538 | 538 | | |
---|
539 | 539 | | (i) upgrading the existing transmission grid AND DEPLOYING 18 |
---|
540 | 540 | | ADVANCED TRANSMISSIO N TECHNOLOGIES ; 19 |
---|
541 | 541 | | |
---|
542 | 542 | | (ii) extending the existing transmission grid onshore and offshore to 20 |
---|
543 | 543 | | be closer to offshore wind energy locations; 21 |
---|
544 | 544 | | |
---|
545 | 545 | | (iii) interconnecting between offshore substations; 22 |
---|
546 | 546 | | |
---|
547 | 547 | | (iv) adding energy storage; and 23 |
---|
548 | 548 | | |
---|
549 | 549 | | (v) the use of HVDC converter technology to support potential 24 |
---|
550 | 550 | | weaknesses in the transmission grid. 25 |
---|
551 | 551 | | |
---|
552 | 552 | | 7–704.4. 26 |
---|
553 | 553 | | |
---|
554 | 554 | | (d) (1) The State shall: 27 |
---|
555 | 555 | | |
---|
556 | 556 | | (i) issue a draft solicitation for procurement of offshore wind energy 28 |
---|
557 | 557 | | for public comment and review on or before June 1, 2024; 29 |
---|
558 | 558 | | |
---|
559 | 559 | | (ii) issue a procurement for offshore wind energy on or before July 30 |
---|
560 | 560 | | 31, 2024; 31 |
---|
561 | 561 | | HOUSE BILL 398 13 |
---|
562 | 562 | | |
---|
563 | 563 | | |
---|
564 | 564 | | (iii) provide a procurement submission process window of not less 1 |
---|
565 | 565 | | than 180 days; and 2 |
---|
566 | 566 | | |
---|
567 | 567 | | (iv) award contracts in a timely manner. 3 |
---|
568 | 568 | | |
---|
569 | 569 | | (2) (i) Subject to subparagraph (ii) of this paragraph, on or before 4 |
---|
570 | 570 | | September 1, 2025, the State may enter into a contract or contracts for the procurement 5 |
---|
571 | 571 | | issued under paragraph (1) of this subsection. 6 |
---|
572 | 572 | | |
---|
573 | 573 | | (ii) The State may modify the date established in subparagraph (i) 7 |
---|
574 | 574 | | of this paragraph if an unforeseen circumstance adversely affects the procurement 8 |
---|
575 | 575 | | submission process. 9 |
---|
576 | 576 | | |
---|
577 | 577 | | (e) (1) In addition to the solicitation and procurement issued under subsection 10 |
---|
578 | 578 | | (d) of this section, the State[: 11 |
---|
579 | 579 | | |
---|
580 | 580 | | (i) shall issue a draft solicitation for procurement of offshore wind 12 |
---|
581 | 581 | | energy for public comment and review on or before September 1, 2025; and 13 |
---|
582 | 582 | | |
---|
583 | 583 | | (ii)] shall issue a procurement for offshore wind energy on or before 14 |
---|
584 | 584 | | December 31, 2025. 15 |
---|
585 | 585 | | |
---|
586 | 586 | | (2) Subject to paragraph (3) of this subsection and in addition to any 16 |
---|
587 | 587 | | contract entered into under subsection (d) of this section, on or before March 31, 2027, the 17 |
---|
588 | 588 | | State may enter into a contract or contracts for the procurement issued under paragraph 18 |
---|
589 | 589 | | (1) of this subsection. 19 |
---|
590 | 590 | | |
---|
591 | 591 | | (3) The State may modify the date established in paragraph (2) of this 20 |
---|
592 | 592 | | subsection if an unforeseen circumstance adversely affects the procurement submission 21 |
---|
593 | 593 | | process. 22 |
---|
594 | 594 | | |
---|
595 | 595 | | 7–705. 23 |
---|
596 | 596 | | |
---|
597 | 597 | | (b) (1) This subsection does not apply to a shortfall from the required Tier 1 24 |
---|
598 | 598 | | renewable sources that is to be derived from post–2022 geothermal systems. 25 |
---|
599 | 599 | | |
---|
600 | 600 | | (2) [If] BEGINNING OCTOBER 1, 2025, IF an electricity supplier fails to 26 |
---|
601 | 601 | | comply with the renewable energy portfolio standard for the applicable year, the electricity 27 |
---|
602 | 602 | | supplier shall pay into the [Maryland Strategic Energy Investment Fund established under 28 |
---|
603 | 603 | | § 9–20B–05 of the State Government Article] ESCROW ACCOUNT ESTAB LISHED UNDER 29 |
---|
604 | 604 | | PARAGRAPH (4) OF THIS SUBSECTION : 30 |
---|
605 | 605 | | |
---|
606 | 606 | | (i) except as provided in item (ii) of this paragraph, a compliance fee 31 |
---|
607 | 607 | | of: 32 |
---|
608 | 608 | | 14 HOUSE BILL 398 |
---|
609 | 609 | | |
---|
610 | 610 | | |
---|
611 | 611 | | 1. the following amounts for each kilowatt–hour of shortfall 1 |
---|
612 | 612 | | from required Tier 1 renewable sources other than the shortfall from the required Tier 1 2 |
---|
613 | 613 | | renewable sources that is to be derived from solar energy: 3 |
---|
614 | 614 | | |
---|
615 | 615 | | A. 4 cents through 2016; 4 |
---|
616 | 616 | | |
---|
617 | 617 | | B. 3.75 cents in 2017 and 2018; 5 |
---|
618 | 618 | | |
---|
619 | 619 | | C. 3 cents in 2019 through 2023; 6 |
---|
620 | 620 | | |
---|
621 | 621 | | D. 2.75 cents in 2024; 7 |
---|
622 | 622 | | |
---|
623 | 623 | | E. 2.5 cents in 2025; 8 |
---|
624 | 624 | | |
---|
625 | 625 | | F. 2.475 cents in 2026; 9 |
---|
626 | 626 | | |
---|
627 | 627 | | G. 2.45 cents in 2027; 10 |
---|
628 | 628 | | |
---|
629 | 629 | | H. 2.25 cents in 2028 and 2029; and 11 |
---|
630 | 630 | | |
---|
631 | 631 | | I. 2.235 cents in 2030 and later; 12 |
---|
632 | 632 | | |
---|
633 | 633 | | 2. the following amounts for each kilowatt–hour of shortfall 13 |
---|
634 | 634 | | from required Tier 1 renewable sources that is to be derived from solar energy: 14 |
---|
635 | 635 | | |
---|
636 | 636 | | A. 45 cents in 2008; 15 |
---|
637 | 637 | | |
---|
638 | 638 | | B. 40 cents in 2009 through 2014; 16 |
---|
639 | 639 | | |
---|
640 | 640 | | C. 35 cents in 2015 and 2016; 17 |
---|
641 | 641 | | |
---|
642 | 642 | | D. 19.5 cents in 2017; 18 |
---|
643 | 643 | | |
---|
644 | 644 | | E. 17.5 cents in 2018; 19 |
---|
645 | 645 | | |
---|
646 | 646 | | F. 10 cents in 2019; 20 |
---|
647 | 647 | | |
---|
648 | 648 | | G. 10 cents in 2020; 21 |
---|
649 | 649 | | |
---|
650 | 650 | | H. 8 cents in 2021; 22 |
---|
651 | 651 | | |
---|
652 | 652 | | I. 6 cents in 2022; 23 |
---|
653 | 653 | | |
---|
654 | 654 | | J. 6 cents in 2023; 24 |
---|
655 | 655 | | |
---|
656 | 656 | | K. 6 cents in 2024; 25 |
---|
657 | 657 | | HOUSE BILL 398 15 |
---|
658 | 658 | | |
---|
659 | 659 | | |
---|
660 | 660 | | L. 5.5 cents in 2025; 1 |
---|
661 | 661 | | |
---|
662 | 662 | | M. 4.5 cents in 2026; 2 |
---|
663 | 663 | | |
---|
664 | 664 | | N. 3.5 cents in 2027; 3 |
---|
665 | 665 | | |
---|
666 | 666 | | O. 3.25 cents in 2028; 4 |
---|
667 | 667 | | |
---|
668 | 668 | | P. 2.5 cents in 2029; and 5 |
---|
669 | 669 | | |
---|
670 | 670 | | Q. 2.25 cents in 2030 and later; and 6 |
---|
671 | 671 | | |
---|
672 | 672 | | 3. 1.5 cents for each kilowatt–hour of shortfall from required 7 |
---|
673 | 673 | | Tier 2 renewable sources; or 8 |
---|
674 | 674 | | |
---|
675 | 675 | | (ii) for industrial process load: 9 |
---|
676 | 676 | | |
---|
677 | 677 | | 1. for each kilowatt–hour of shortfall from required Tier 1 10 |
---|
678 | 678 | | renewable sources, a compliance fee of: 11 |
---|
679 | 679 | | |
---|
680 | 680 | | A. 0.8 cents in 2006, 2007, and 2008; 12 |
---|
681 | 681 | | |
---|
682 | 682 | | B. 0.5 cents in 2009 and 2010; 13 |
---|
683 | 683 | | |
---|
684 | 684 | | C. 0.4 cents in 2011 and 2012; 14 |
---|
685 | 685 | | |
---|
686 | 686 | | D. 0.3 cents in 2013 and 2014; 15 |
---|
687 | 687 | | |
---|
688 | 688 | | E. 0.25 cents in 2015 and 2016; and 16 |
---|
689 | 689 | | |
---|
690 | 690 | | F. except as provided in paragraph (3) of this subsection, 0.2 17 |
---|
691 | 691 | | cents in 2017 and later; and 18 |
---|
692 | 692 | | |
---|
693 | 693 | | 2. nothing for any shortfall from required Tier 2 renewable 19 |
---|
694 | 694 | | sources. 20 |
---|
695 | 695 | | |
---|
696 | 696 | | (3) For industrial process load, the compliance fee for each kilowatt–hour 21 |
---|
697 | 697 | | of shortfall from required Tier 1 renewable sources is nothing for the year following any 22 |
---|
698 | 698 | | year during which, after final calculations, the net rate impact per megawatt–hour from 23 |
---|
699 | 699 | | Round 1 offshore wind projects exceeded $1.65 in 2012 dollars. 24 |
---|
700 | 700 | | |
---|
701 | 701 | | (4) (I) SUBJECT TO ANY ESCROW ACCOUNT RESERVE 25 |
---|
702 | 702 | | REQUIREMENT THE COMMISSION ESTABLISHES, THE COMPLIANCE FEES PAID INTO 26 |
---|
703 | 703 | | THE ESCROW ACCOUNT E STABLISHED IN ACCORD ANCE WITH THIS SUBSE CTION 27 |
---|
704 | 704 | | SHALL BE DISTRIBUTED TO ELECTRIC COMPANIE S TO BE REFUNDED OR CREDITED 28 |
---|
705 | 705 | | TO EACH DISTRIBUTION CUSTOMER BASED ON TH E CUSTOMER’S CONSUMPTION OF 29 16 HOUSE BILL 398 |
---|
706 | 706 | | |
---|
707 | 707 | | |
---|
708 | 708 | | ELECTRICITY SUPPLY THAT IS SUBJECT TO THE RENEWABLE ENERGY PORTFOLIO 1 |
---|
709 | 709 | | STANDARD. 2 |
---|
710 | 710 | | |
---|
711 | 711 | | (II) THE PROCESS UNDER SUBPARAGRAPH (I) OF THIS 3 |
---|
712 | 712 | | PARAGRAPH RELATED TO THE REFUN DING OR CREDITING OF AMOUNTS TO 4 |
---|
713 | 713 | | DISTRIBUTION CUSTOME RS SHALL BE DIRECTED AN D OVERSEEN BY THE 5 |
---|
714 | 714 | | COMMISSION. 6 |
---|
715 | 715 | | |
---|
716 | 716 | | (5) THE COMMISSION SHALL ADOP T REGULATIONS TO IMP LEMENT 7 |
---|
717 | 717 | | THIS SUBSECTION , INCLUDING: 8 |
---|
718 | 718 | | |
---|
719 | 719 | | (I) THE ESTABLISHMENT OF AN ESCROW ACCOUNT TO BE 9 |
---|
720 | 720 | | UNDER, SUBJECT TO PARAGRAPH (4)(II) OF THIS SUBSECTION , THE SUPERVISION OF 10 |
---|
721 | 721 | | THE MARYLAND ENERGY ADMINISTRATION ; AND 11 |
---|
722 | 722 | | |
---|
723 | 723 | | (II) DEFINING RULES TO FA CILITATE AND ENSURE THE SECURE 12 |
---|
724 | 724 | | AND TRANSPARENT TRAN SFER OF COMPLIANCE FEE PAYMENTS TO ELECTRIC 13 |
---|
725 | 725 | | COMPANIES TO BE DIST RIBUTED BACK TO DIST RIBUTION CUSTOMERS . 14 |
---|
726 | 726 | | |
---|
727 | 727 | | 7–709. 15 |
---|
728 | 728 | | |
---|
729 | 729 | | (a) An electricity supplier may use accumulated renewable energy credits to meet 16 |
---|
730 | 730 | | the renewable energy portfolio standard, including credits created by a renewable on–site 17 |
---|
731 | 731 | | generator. 18 |
---|
732 | 732 | | |
---|
733 | 733 | | (b) (1) (I) IN THIS SUBSECTION TH E FOLLOWING WORDS HA VE THE 19 |
---|
734 | 734 | | MEANINGS INDICATED. 20 |
---|
735 | 735 | | |
---|
736 | 736 | | (II) “CERTIFIED SREC” HAS THE MEANING STAT ED IN § 21 |
---|
737 | 737 | | 7–709.1 OF THIS SUBTITLE . 22 |
---|
738 | 738 | | |
---|
739 | 739 | | (III) “SREC–II” HAS THE MEANING STAT ED IN § 7–709.2 OF THIS 23 |
---|
740 | 740 | | SUBTITLE. 24 |
---|
741 | 741 | | |
---|
742 | 742 | | (2) A renewable energy credit may be sold or otherwise transferred. 25 |
---|
743 | 743 | | |
---|
744 | 744 | | (3) AN ELECTRICITY SUPPLIER THAT PROCURE S RENEWABLE 26 |
---|
745 | 745 | | ENERGY CREDITS TO MEET THE RENEWABL E ENERGY PORTFOLIO S TANDARD SHALL 27 |
---|
746 | 746 | | PROCURE CREDITS TO M EET THE STANDARD IN THE FOLLOWING ORDER : 28 |
---|
747 | 747 | | |
---|
748 | 748 | | (I) FIRST, ORECS, REC–IIS, AND SREC–IIS; 29 |
---|
749 | 749 | | |
---|
750 | 750 | | (II) SECOND, CERTIFIED SRECS; AND 30 |
---|
751 | 751 | | HOUSE BILL 398 17 |
---|
752 | 752 | | |
---|
753 | 753 | | |
---|
754 | 754 | | (III) THIRD, RENEWABLE ENERGY CREDITS OTHER THAN 1 |
---|
755 | 755 | | ORECS, REC–IIS, SREC–IIS, AND CERTIFIED SRECS. 2 |
---|
756 | 756 | | |
---|
757 | 757 | | 7–709.1. 3 |
---|
758 | 758 | | |
---|
759 | 759 | | (a) (1) In this section the following words have the meanings indicated. 4 |
---|
760 | 760 | | |
---|
761 | 761 | | (2) “Brownfield” has the meaning stated in § 7–207 of this title. 5 |
---|
762 | 762 | | |
---|
763 | 763 | | (3) “Certified SREC” means a solar renewable energy credit generated by 6 |
---|
764 | 764 | | a certified system. 7 |
---|
765 | 765 | | |
---|
766 | 766 | | (4) “Certified system” means a solar energy generating system certified by 8 |
---|
767 | 767 | | the Commission under the Program to generate certified SRECs with the compliance value 9 |
---|
768 | 768 | | specified in subsection (c) of this section. 10 |
---|
769 | 769 | | |
---|
770 | 770 | | (5) “Program” means the Small Solar Energy Generating System Incentive 11 |
---|
771 | 771 | | Program. 12 |
---|
772 | 772 | | |
---|
773 | 773 | | 7–709.2. 13 |
---|
774 | 774 | | |
---|
775 | 775 | | (A) (1) IN THIS SECTION THE F OLLOWING WORDS HAVE THE MEANINGS 14 |
---|
776 | 776 | | INDICATED. 15 |
---|
777 | 777 | | |
---|
778 | 778 | | (2) “PROGRAM” MEANS THE UTILITY–SCALE SREC–II PROGRAM. 16 |
---|
779 | 779 | | |
---|
780 | 780 | | (3) “QUALIFYING SMALL SYST EM” HAS THE MEANING STAT ED IN 17 |
---|
781 | 781 | | § 7–709.3 OF THIS SUBTITLE. 18 |
---|
782 | 782 | | |
---|
783 | 783 | | (4) “QUALIFYING SYSTEM ” MEANS A UTILITY –SCALE SOLAR ENERGY 19 |
---|
784 | 784 | | GENERATING SYSTEM CE RTIFIED TO GENERATE SREC–IIS. 20 |
---|
785 | 785 | | |
---|
786 | 786 | | (5) “SREC–II” MEANS A SOLAR RENEWABLE ENER GY CREDIT EQUAL 21 |
---|
787 | 787 | | TO THE GENERATION AT TRIBUTES OF 1 MEGAWATT –HOUR OF ELECTRICITY THAT IS 22 |
---|
788 | 788 | | DERIVED FROM A QUALI FYING SYSTEM OR A QU ALIFYING SMALL SYSTE M. 23 |
---|
789 | 789 | | |
---|
790 | 790 | | (6) “UTILITY–SCALE SOLAR ENERGY GENERATI NG SYSTEM” MEANS A 24 |
---|
791 | 791 | | SOLAR PHOTOVOLTAIC S YSTEM THAT HAS A GENERATIN G CAPACITY THAT EXCE EDS 25 |
---|
792 | 792 | | 5 MEGAWATTS , AS MEASURED BY THE A LTERNATING CURRENT R ATING OF THE 26 |
---|
793 | 793 | | SYSTEM’S INVERTER. 27 |
---|
794 | 794 | | |
---|
795 | 795 | | (B) THERE IS A UTILITY–SCALE SREC–II PROGRAM IN THE COMMISSION. 28 |
---|
796 | 796 | | 18 HOUSE BILL 398 |
---|
797 | 797 | | |
---|
798 | 798 | | |
---|
799 | 799 | | (C) THE PROGRAM SHALL PROVIDE INCENTIVES FOR THE D EVELOPMENT 1 |
---|
800 | 800 | | OF AT LEAST 3,000 MEGAWATTS OF NEW UTILITY –SCALE SOLAR GENERATI ON BY 2 |
---|
801 | 801 | | 2035. 3 |
---|
802 | 802 | | |
---|
803 | 803 | | (D) (1) UNDER THE PROGRAM, A QUALIFYING SYSTEM SHALL GENERATE 4 |
---|
804 | 804 | | SREC–IIS. 5 |
---|
805 | 805 | | |
---|
806 | 806 | | (2) A QUALIFYING SYSTEM THAT GENERATES SREC–IIS UNDER THE 6 |
---|
807 | 807 | | PROGRAM MAY NOT SIMULTANEOUS LY RECEIVE REC–IIS, RECS, OR ANY OTHER 7 |
---|
808 | 808 | | EQUIVALENT CERTIFICATES. 8 |
---|
809 | 809 | | |
---|
810 | 810 | | (3) EXCEPT AS OTHERWISE PROVIDED IN THIS SECTION , THE 9 |
---|
811 | 811 | | PROVISIONS OF THIS S UBTITLE RELATING TO RENEWABLE ENERGY CRE DITS SHALL 10 |
---|
812 | 812 | | APPLY TO SREC–IIS GENERATED UNDER THE PROGRAM. 11 |
---|
813 | 813 | | |
---|
814 | 814 | | (4) AN SREC–II GENERATED UNDER THE PROGRAM MAY BE 12 |
---|
815 | 815 | | APPLIED ONLY TOWARD MEETING THE R ENEWABLE ENERGY PORT FOLIO STANDARD 13 |
---|
816 | 816 | | BEGINNING WITH THE Y EAR IN WHICH THE SREC–II IS GENERATED. 14 |
---|
817 | 817 | | |
---|
818 | 818 | | (E) THE COMMISSION SHALL ADOP T REGULATIONS TO IMPLEMENT THIS 15 |
---|
819 | 819 | | SECTION, INCLUDING REGULATION S TO ESTABLISH REQUI REMENTS FOR 16 |
---|
820 | 820 | | CERTIFICATION AS A Q UALIFYING SYSTEM UND ER THE PROGRAM. 17 |
---|
821 | 821 | | |
---|
822 | 822 | | 7–709.3. 18 |
---|
823 | 823 | | |
---|
824 | 824 | | (A) (1) IN THIS SECTION THE F OLLOWING WORDS HAVE THE MEANINGS 19 |
---|
825 | 825 | | INDICATED. 20 |
---|
826 | 826 | | |
---|
827 | 827 | | (2) “ADMINISTRATIVELY DETE RMINED INCENTIVE” MEANS THE 21 |
---|
828 | 828 | | MONETARY VALUE OF AN SREC–II GENERATED BY A QUALIFYING SMALL SYSTEM 22 |
---|
829 | 829 | | UNDER THE PROGRAM. 23 |
---|
830 | 830 | | |
---|
831 | 831 | | (3) “CAPACITY BLOCK ” MEANS THE MAXIMUM AMOUNT OF 24 |
---|
832 | 832 | | GENERATING CAPACITY , MEASURED IN MEGAWATTS , THAT THE COMMISSION 25 |
---|
833 | 833 | | DETERMINES CAN BE ALLOTTED TO A SPECIFIC MARKET SEGM ENT FOR A GIVEN 26 |
---|
834 | 834 | | INCENTIVE YEAR . 27 |
---|
835 | 835 | | |
---|
836 | 836 | | (4) “COMMUNITY SOLAR ENERG Y GENERATING SYSTEM ” HAS THE 28 |
---|
837 | 837 | | MEANING STATED IN § 7–306.2 OF THIS TITLE. 29 |
---|
838 | 838 | | |
---|
839 | 839 | | (5) “ELIGIBLE CUSTOMER –GENERATOR ” HAS THE MEANING STAT ED 30 |
---|
840 | 840 | | IN § 7–306 OF THIS TITLE. 31 |
---|
841 | 841 | | HOUSE BILL 398 19 |
---|
842 | 842 | | |
---|
843 | 843 | | |
---|
844 | 844 | | (6) “MARKET SEGMENT ” MEANS THE GROUP CLASSIFICA TION FOR 1 |
---|
845 | 845 | | THE TYPE OF SMALL SOLAR ENERGY GENERAT ING SYSTEM S ELIGIBLE FOR 2 |
---|
846 | 846 | | CERTIFICATION UNDER THE PROGRAM. 3 |
---|
847 | 847 | | |
---|
848 | 848 | | (7) “NET METERED SOLAR ENERGY GENERATING SYSTEM” MEANS A 4 |
---|
849 | 849 | | SMALL SOLAR ENERGY GENERATING SYSTEM US ED BY AN ELIGIBLE 5 |
---|
850 | 850 | | CUSTOMER–GENERATOR FOR NET ME TERING IN ACCORDANCE WITH § 7–306 OF 6 |
---|
851 | 851 | | THIS TITLE. 7 |
---|
852 | 852 | | |
---|
853 | 853 | | (8) “PROGRAM” MEANS THE SMALL SOLAR FACILITIES INCENTIVE 8 |
---|
854 | 854 | | PROGRAM. 9 |
---|
855 | 855 | | |
---|
856 | 856 | | (9) “PROJECT OFF–TAKER” MEANS THE END USER O F SREC–IIS 10 |
---|
857 | 857 | | THAT ARE GENERATED BY A QUALI FYING SMALL SYSTEM. 11 |
---|
858 | 858 | | |
---|
859 | 859 | | (10) “QUALIFYING SMALL SYST EM” MEANS A SMALL SOLAR ENERGY 12 |
---|
860 | 860 | | GENERATING SYSTEM CERTIFIED TO GENERAT E SREC–IIS UNDER THE PROGRAM. 13 |
---|
861 | 861 | | |
---|
862 | 862 | | (11) “SMALL SOLAR ENERGY GENERATI NG SYSTEM ” MEANS A 14 |
---|
863 | 863 | | PHOTOVOLTAIC SYSTEM THAT HAS A GENERATING CAPACITY OF 5 MEGAWATTS OR 15 |
---|
864 | 864 | | LESS, AS MEASURED BY THE A LTERNATING CURRENT R ATING OF THE SYSTEM ’S 16 |
---|
865 | 865 | | INVERTER. 17 |
---|
866 | 866 | | |
---|
867 | 867 | | (12) “SREC–II” HAS THE MEANING STAT ED IN § 7–709.2 OF THIS 18 |
---|
868 | 868 | | SUBTITLE. 19 |
---|
869 | 869 | | |
---|
870 | 870 | | (B) (1) THERE IS A SMALL SOLAR FACILITIES INCENTIVE PROGRAM. 20 |
---|
871 | 871 | | |
---|
872 | 872 | | (2) THE COMMISSION SHALL ADMI NISTER THE PROGRAM. 21 |
---|
873 | 873 | | |
---|
874 | 874 | | (C) THE PROGRAM SHALL PROVIDE INCENTIVES FOR THE D EVELOPMENT 22 |
---|
875 | 875 | | OF, BY 2035, AT LEAST 3,000 MEGAWATTS OF NEW SOL AR ENERGY GENERATION BY 23 |
---|
876 | 876 | | OWNERS OF SMALL SOLAR ENERGY GENERATING SYSTEMS T HAT ARE: 24 |
---|
877 | 877 | | |
---|
878 | 878 | | (1) COMMUNI TY SOLAR ENERGY GENE RATING SYSTEMS ; OR 25 |
---|
879 | 879 | | |
---|
880 | 880 | | (2) NET METERED SOLAR EN ERGY GENERATING SYST EMS. 26 |
---|
881 | 881 | | |
---|
882 | 882 | | (D) (1) THE COMMISSION SHALL ESTA BLISH ELIGIBILITY CR ITERIA AND 27 |
---|
883 | 883 | | AN APPLICATION PROCE SS BY WHICH AN OWNER OF A SMALL SOLAR ENERGY 28 |
---|
884 | 884 | | GENERATING SYSTEM MAY APPLY TO BECOME A QUALIFYING SMALL SYSTEM AND 29 |
---|
885 | 885 | | GENERATE SREC–IIS UNDER THE PROGRAM. 30 |
---|
886 | 886 | | 20 HOUSE BILL 398 |
---|
887 | 887 | | |
---|
888 | 888 | | |
---|
889 | 889 | | (2) IN ADDITION TO ANY REQUIREMENTS ESTABLISHED BY THE 1 |
---|
890 | 890 | | COMMISSION UNDER PARA GRAPH (1) OF THIS SUBSECTION , TO BE ELIGIBLE UNDER 2 |
---|
891 | 891 | | THE PROGRAM, A SMALL SOLAR ENERGY GENERATING SYSTEM SHALL : 3 |
---|
892 | 892 | | |
---|
893 | 893 | | (I) BE LOCATED IN THE STATE; 4 |
---|
894 | 894 | | |
---|
895 | 895 | | (II) BE ELIGIBLE FOR INCL USION IN MEETING THE RENEWABLE 5 |
---|
896 | 896 | | ENERGY PORTFOLIO STA NDARD; 6 |
---|
897 | 897 | | |
---|
898 | 898 | | (III) HAVE A GENERATING CA PACITY OF 5 MEGAWATTS OR LESS , 7 |
---|
899 | 899 | | AS MEASURED BY THE A LTERNATING CURRENT RATING OF THE SYSTEM ’S INVERTER; 8 |
---|
900 | 900 | | |
---|
901 | 901 | | (IV) BE PLACED IN SERVICE ON OR AFTER JULY 1, 2027; AND 9 |
---|
902 | 902 | | |
---|
903 | 903 | | (V) BE BENEFICIAL TO THE ELECTRIC DISTRIBUTION SYSTEM IN 10 |
---|
904 | 904 | | THE STATE. 11 |
---|
905 | 905 | | |
---|
906 | 906 | | (E) ON OR BEFORE JANUARY 1, 2028, THE PROGRAM SHALL BEGIN 12 |
---|
907 | 907 | | ACCEPTING APPLICATIO NS FROM QUALIFYING SMALL SYS TEMS TO FULFILL 13 |
---|
908 | 908 | | CAPACITY WITHIN A CA PACITY BLOCK ON A FI RST–COME, FIRST–SERVED BASIS. 14 |
---|
909 | 909 | | |
---|
910 | 910 | | (F) (1) ON OR BEFORE JANUARY 1, 2027, AND EVERY 3 YEARS 15 |
---|
911 | 911 | | THEREAFTER , THE COMMISSION SHALL ESTABLISH AN ADMINISTRATIVELY 16 |
---|
912 | 912 | | DETERMINED INCENTIVE AND ANNUAL CAPACITY BLOCK FOR EACH OF THE 17 |
---|
913 | 913 | | FOLLOWING MARKET SEG MENTS UNDER THE PROGRAM: 18 |
---|
914 | 914 | | |
---|
915 | 915 | | (I) BEHIND–THE–METER RESIDENTIAL ; 19 |
---|
916 | 916 | | |
---|
917 | 917 | | (II) BEHIND–THE–METER NONRESIDENTIAL ; 20 |
---|
918 | 918 | | |
---|
919 | 919 | | (III) AGGREGATED NET METER ING; AND 21 |
---|
920 | 920 | | |
---|
921 | 921 | | (IV) COMMUNITY SOLAR . 22 |
---|
922 | 922 | | |
---|
923 | 923 | | (2) AT ANY TIME A FTER PROVIDING PUBLIC NOTICE THE 23 |
---|
924 | 924 | | COMMISSION MAY ADJUST THE ADMIN ISTRATIVELY DETERMIN ED INCENTIVE AND 24 |
---|
925 | 925 | | ANNUAL CAPACITY BLOCKS IF THE COMMISSION DETERMINES AN ADJUSTMENT IS 25 |
---|
926 | 926 | | NECESSARY. 26 |
---|
927 | 927 | | |
---|
928 | 928 | | (3) THE ADMINISTRATIVELY DETERMINED INCENTIVE FOR A 27 |
---|
929 | 929 | | QUALIFIED SMALL SYST EM SHALL BE FIXED FO R 15 YEARS AT THE AMOUNT OF THE 28 |
---|
930 | 930 | | ADMINISTRATIVELY DET ERMINED INCENTIVE TH AT WAS ESTABLISHED I N THE YEAR 29 HOUSE BILL 398 21 |
---|
931 | 931 | | |
---|
932 | 932 | | |
---|
933 | 933 | | IN WHICH THE QUALIFY ING SMALL SYSTEM WAS CONSTRUCTED OR RECEI VED 1 |
---|
934 | 934 | | CERTIFICATION AS A Q UALIFYING SMALL SYST EM, WHICHEVER IS LATER . 2 |
---|
935 | 935 | | |
---|
936 | 936 | | (4) (I) IN ESTABLISHING AN ADMINISTRATIVELY DET ERMINED 3 |
---|
937 | 937 | | INCENTIVE AND ANNUAL CAPACITY BLOCKS UNDER PARAGRAPH (1) OF THIS 4 |
---|
938 | 938 | | SUBSECTION, THE COMMISSION SHALL BALA NCE THE NEED FOR CON TINUED 5 |
---|
939 | 939 | | MARKET DEVELOPMENT F OR EACH MARKET SEGME NT WHILE LIMITING THE 6 |
---|
940 | 940 | | PROJECTED NET RATE IMPACT FOR ALL CUSTOMERS TO 5% OF THE TOTAL 7 |
---|
941 | 941 | | ELECTRICITY BILL OVE R THE DURATION OF TH E PROGRAM. 8 |
---|
942 | 942 | | |
---|
943 | 943 | | (II) THE NET RATE IMPACT C ALCULATIONS SHALL TA KE INTO 9 |
---|
944 | 944 | | ACCOUNT ANY COSTS AN D BENEFITS ATTRIBUTA BLE TO THE PROGRAM AS 10 |
---|
945 | 945 | | DETERMINED BY THE COMMISSION, INCLUDING: 11 |
---|
946 | 946 | | |
---|
947 | 947 | | 1. ENERGY GENERATED ; 12 |
---|
948 | 948 | | |
---|
949 | 949 | | 2. THE CAPACITY OF QUALIFYING SMALL SYS TEMS IN 13 |
---|
950 | 950 | | THE PROGRAM; AND 14 |
---|
951 | 951 | | |
---|
952 | 952 | | 3. THE TRANSMISSION AND DISTRIBUTION OF THE 15 |
---|
953 | 953 | | ENERGY THROUGH THE TRANSMISSION AND DIS TRIBUTION SYSTEMS. 16 |
---|
954 | 954 | | |
---|
955 | 955 | | (G) IN DETERMINING THE AD MINISTRATIVELY DETERMINED INCENTIVE 17 |
---|
956 | 956 | | FOR EACH MARKET SEGM ENT UNDER SUBSECTION (F)(1) OF THIS SECTION , THE 18 |
---|
957 | 957 | | COMMISSION SHALL : 19 |
---|
958 | 958 | | |
---|
959 | 959 | | (1) FOR EACH MARKET SEGM ENT, CONSIDER PRICE DIFFE RENTIALS 20 |
---|
960 | 960 | | BASED ON THE FOLLOWI NG CRITERIA: 21 |
---|
961 | 961 | | |
---|
962 | 962 | | (I) PROJECT SIZE; 22 |
---|
963 | 963 | | |
---|
964 | 964 | | (II) PROJECT OFF–TAKER TYPE; 23 |
---|
965 | 965 | | |
---|
966 | 966 | | (III) PROJECT LOCATION ; AND 24 |
---|
967 | 967 | | |
---|
968 | 968 | | (IV) ELECTRIC COMPANY SER VICE TERRITORY ; 25 |
---|
969 | 969 | | |
---|
970 | 970 | | (2) ESTABLISH MONETARY V ALUES THAT ENCOURAGE MARKET 26 |
---|
971 | 971 | | DEVELOPMENT WHILE BA LANCING RATEPAYER IN TERESTS; AND 27 |
---|
972 | 972 | | |
---|
973 | 973 | | (3) STRIVE TO ACHIEVE MA RKET DIVERSITY , INCLUDING 28 |
---|
974 | 974 | | GEOGRAPHIC DIVERS ITY AND PROJECT OFF –TAKER DIVERSITY . 29 |
---|
975 | 975 | | 22 HOUSE BILL 398 |
---|
976 | 976 | | |
---|
977 | 977 | | |
---|
978 | 978 | | (H) IN ESTABLISHING THE CAPACITY BLOCK FOR EACH MARKET SEGM ENT 1 |
---|
979 | 979 | | UNDER SUBSECTION (F)(1) OF THIS SECTION, THE COMMISSION SHALL : 2 |
---|
980 | 980 | | |
---|
981 | 981 | | (1) ENABLE MEANINGFUL AN D CONTINUED MARKET G ROWTH FOR 3 |
---|
982 | 982 | | EACH MARKET SEGMENT ; 4 |
---|
983 | 983 | | |
---|
984 | 984 | | (2) CONSIDER THE VALUE OF REDU CING ELECTRICITY DEMAND AND 5 |
---|
985 | 985 | | THE COST OF INSTALLING GENERATIN G CAPACITY ON THE TRANSMISSION AND 6 |
---|
986 | 986 | | DISTRIBUTION SYSTEMS; AND 7 |
---|
987 | 987 | | |
---|
988 | 988 | | (3) FOR THE BEHIND –THE–METER RESIDENTIAL MA RKET SEGMENT , 8 |
---|
989 | 989 | | ENSURE THAT THE NEXT CAPACITY BLOCK IS ESTABLISHED AS SOON AS 9 |
---|
990 | 990 | | REASONABLY POSSIBLE AFTER THE CURRENT CAPACITY BLOCK HAS BEEN FULLY 10 |
---|
991 | 991 | | RESERVED. 11 |
---|
992 | 992 | | |
---|
993 | 993 | | (I) (1) A QUALIFYING SMALL SYS TEM THAT GENERATES SREC–IIS 12 |
---|
994 | 994 | | UNDER THIS PROGRAM MAY NOT SIMUL TANEOUSLY RECEIVE REC–IIS, RECS, OR 13 |
---|
995 | 995 | | ANY OTHER EQUIVALENT CREDITS. 14 |
---|
996 | 996 | | |
---|
997 | 997 | | (2) EXCEPT AS OTHERWISE P ROVIDED IN SECTION , THE PROVISIONS 15 |
---|
998 | 998 | | OF THIS SUBTITLE REL ATING TO RENEWABLE E NERGY CREDITS SHALL APPLY TO 16 |
---|
999 | 999 | | SREC–IIS GENERATED UNDER TH E PROGRAM. 17 |
---|
1000 | 1000 | | |
---|
1001 | 1001 | | (3) AN SREC–II GENERATED UNDER THE PROGRAM MAY BE 18 |
---|
1002 | 1002 | | APPLIED ONLY TOWARD MEETING THE R ENEWABL E ENERGY PORTFOLIO S TANDARD 19 |
---|
1003 | 1003 | | BEGINNING WITH THE Y EAR IN WHICH THE SREC–II IS GENERATED. 20 |
---|
1004 | 1004 | | |
---|
1005 | 1005 | | SUBTITLE 12. ENERGY PROCUREMENT . 21 |
---|
1006 | 1006 | | |
---|
1007 | 1007 | | PART I. DEFINITIONS; GENERAL PROVISIONS. 22 |
---|
1008 | 1008 | | |
---|
1009 | 1009 | | 7–1201. 23 |
---|
1010 | 1010 | | |
---|
1011 | 1011 | | (A) IN THIS SUBTITLE THE FOLLOWING WORDS HAVE THE MEANINGS 24 |
---|
1012 | 1012 | | INDICATED. 25 |
---|
1013 | 1013 | | |
---|
1014 | 1014 | | (B) “EFFECTIVE NAMEPLATE C APACITY” MEANS THE AMOUNT OF ENERGY 26 |
---|
1015 | 1015 | | AN ENERGY STORAGE DE VICE CAN DELIVER CON TINUOUSLY TO THE ELE CTRIC 27 |
---|
1016 | 1016 | | DISTRIBUTION SYSTEM OVER A 4–HOUR PERIOD . 28 |
---|
1017 | 1017 | | |
---|
1018 | 1018 | | (C) “ENERGY STORAGE DEVICE ” HAS THE MEANING STAT ED IN § 7–216 OF 29 |
---|
1019 | 1019 | | THIS TITLE. 30 |
---|
1020 | 1020 | | HOUSE BILL 398 23 |
---|
1021 | 1021 | | |
---|
1022 | 1022 | | |
---|
1023 | 1023 | | (D) “REC–II” HAS THE MEANING STAT ED IN § 7–701 OF THIS TITLE. 1 |
---|
1024 | 1024 | | |
---|
1025 | 1025 | | (E) “REC–II PAYMENT” MEANS THE MONETARY V ALUE OF A REC–II 2 |
---|
1026 | 1026 | | GENERATED AND SOLD B Y AN ENERGY GENERATING SY STEM AWARDED A CONTRACT 3 |
---|
1027 | 1027 | | IN ACCORDANCE WITH T HIS SUBTITLE. 4 |
---|
1028 | 1028 | | |
---|
1029 | 1029 | | 7–1202. 5 |
---|
1030 | 1030 | | |
---|
1031 | 1031 | | (A) AN APPLICATION FOR A PROPOSED PROJECT UND ER THIS SUBTITLE IS 6 |
---|
1032 | 1032 | | SUBJECT TO A COMMUNI TY BENEFIT AGREEMENT . 7 |
---|
1033 | 1033 | | |
---|
1034 | 1034 | | (B) A COMMUNITY BENEFIT AG REEMENT SHALL : 8 |
---|
1035 | 1035 | | |
---|
1036 | 1036 | | (1) PROMOTE INCREASED OP PORTUNITIES FOR LOCA L BUSINESSES 9 |
---|
1037 | 1037 | | AND SMALL, MINORITY, WOMEN–OWNED, AND VETERAN –OWNED BUSINESSES IN THE 10 |
---|
1038 | 1038 | | CLEAN ENERGY INDUSTR Y; 11 |
---|
1039 | 1039 | | |
---|
1040 | 1040 | | (2) ENSURE THE TIMELY , SAFE, AND EFFICIENT COMPLE TION OF THE 12 |
---|
1041 | 1041 | | PROJECT BY: 13 |
---|
1042 | 1042 | | |
---|
1043 | 1043 | | (I) FACILITATING A STEAD Y SUPPLY OF HIGHLY S KILLED 14 |
---|
1044 | 1044 | | CRAFT WORKERS WHO SH ALL BE PAID NOT LESS THAN THE PREVAILING WAGE RATE 15 |
---|
1045 | 1045 | | DETERMINED BY THE COMMISSIONER OF LABOR AND INDUSTRY UNDER TITLE 17, 16 |
---|
1046 | 1046 | | SUBTITLE 2 OF THE STATE FINANCE AND PROCUREMENT ARTICLE; AND 17 |
---|
1047 | 1047 | | |
---|
1048 | 1048 | | (II) GUARANTEEING THAT TH E CONSTRUCTION WORK 18 |
---|
1049 | 1049 | | PERFORMED IN CONNECT ION WITH THE PROJECT WILL BE SUBJECT TO A N 19 |
---|
1050 | 1050 | | AGREEMENT THAT : 20 |
---|
1051 | 1051 | | |
---|
1052 | 1052 | | 1. ESTABLISHES THE TERMS AND CONDITIONS OF 21 |
---|
1053 | 1053 | | EMPLOYMENT AT THE CO NSTRUCTION SITE OF T HE PROJECT OR A PORT ION OF THE 22 |
---|
1054 | 1054 | | PROJECT; 23 |
---|
1055 | 1055 | | |
---|
1056 | 1056 | | 2. GUARANTEES AGAINST S TRIKES, LOCKOUTS, AND 24 |
---|
1057 | 1057 | | SIMILAR DISRUPTIONS ; 25 |
---|
1058 | 1058 | | |
---|
1059 | 1059 | | 3. ENSURES THAT ALL WOR K ON THE PROJECT FUL LY 26 |
---|
1060 | 1060 | | CONFORMS TO ALL RELEVANT STATE AND FEDERAL LAW S, RULES, AND 27 |
---|
1061 | 1061 | | REGULATIONS , INCLUDING ALL REQUIR ED TRAINING FOR EMPL OYEES; 28 |
---|
1062 | 1062 | | |
---|
1063 | 1063 | | 4. CREATES MUTUALLY BIN DING PROCEDURES FOR 29 |
---|
1064 | 1064 | | RESOLVING LABOR DISP UTES ARISING DURING THE TERM OF THE PROJ ECT; 30 |
---|
1065 | 1065 | | 24 HOUSE BILL 398 |
---|
1066 | 1066 | | |
---|
1067 | 1067 | | |
---|
1068 | 1068 | | 5. SETS FORTH OTHER MEC HANISMS FO R 1 |
---|
1069 | 1069 | | LABOR–MANAGEMENT COOPERATI ON ON MATTERS OF MUT UAL INTEREST AND 2 |
---|
1070 | 1070 | | CONCERN, INCLUDING PRODUCTIVI TY, QUALITY OF WORK , SAFETY, AND HEALTH ; 3 |
---|
1071 | 1071 | | AND 4 |
---|
1072 | 1072 | | |
---|
1073 | 1073 | | 6. BINDS ALL CONTRACTOR S AND SUBCONTRACTORS TO 5 |
---|
1074 | 1074 | | THE TERMS OF THE AGR EEMENT THROUGH THE I NCLUSION OF APPROPRI ATE 6 |
---|
1075 | 1075 | | PROVISIONS IN ALL RE LEVANT SOLICITATION AND CONTRACT DOCUMEN TS; 7 |
---|
1076 | 1076 | | |
---|
1077 | 1077 | | (3) PROMOTE SAFE COMPLET ION OF THE PROJECT B Y ENSURING 8 |
---|
1078 | 1078 | | THAT AT LEAST 80% OF THE CRAFT WORKERS ON THE PROJECT HAVE COMPLETED 9 |
---|
1079 | 1079 | | AN OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION 10–HOUR COURSE ; 10 |
---|
1080 | 1080 | | |
---|
1081 | 1081 | | (4) PROMOTE CAREER TRAIN ING OPPORTUNITIES IN THE 11 |
---|
1082 | 1082 | | MANUFACTURING , MAINTENANCE , AND CONSTRUCTION IND USTRIES FOR LOCAL 12 |
---|
1083 | 1083 | | RESIDENTS, VETERANS, WOMEN, MINORITIES, AND FORMERLY INCARCE RATED 13 |
---|
1084 | 1084 | | INDIVIDUALS; 14 |
---|
1085 | 1085 | | |
---|
1086 | 1086 | | (5) INCLUDE PROVISIONS F OR LOCAL HIRING AND THE HIRING O F 15 |
---|
1087 | 1087 | | HISTORICALLY DISADVA NTAGED GROUPS ; 16 |
---|
1088 | 1088 | | |
---|
1089 | 1089 | | (6) USE LOCALLY , SUSTAINABLY, AND DOMESTICALLY 17 |
---|
1090 | 1090 | | MANUFACTURED CONSTRU CTION MATERIALS AND COMPONENTS TO THE EX TENT 18 |
---|
1091 | 1091 | | PRACTICABLE ; 19 |
---|
1092 | 1092 | | |
---|
1093 | 1093 | | (7) REQUIRE THE USE OF S KILLED LOCAL LABOR , PARTICULARLY 20 |
---|
1094 | 1094 | | WITH REGARD TO THE C ONSTRUCTION AND MANUFACTURING CO MPONENTS OF THE 21 |
---|
1095 | 1095 | | PROJECT, USING METHODS INCLUD ING OUTREACH , HIRING, OR REFERRAL 22 |
---|
1096 | 1096 | | METHODS THAT ARE AFF ILIATED WITH REGISTE RED APPRENTICESHIP P ROGRAMS 23 |
---|
1097 | 1097 | | UNDER TITLE 11, SUBTITLE 4 OF THE LABOR AND EMPLOYMENT ARTICLE; AND 24 |
---|
1098 | 1098 | | |
---|
1099 | 1099 | | (8) AUTHORIZE THE MARYLAND DEPARTMENT OF LABOR AND THE 25 |
---|
1100 | 1100 | | COMMISSION TO CONSIDE R, REVIEW, AND ENFORCE A STORAG E DEVELOPER OR 26 |
---|
1101 | 1101 | | ENERGY DEVELOPER ’S COMPLIANCE WITH AN Y COMMUNITY BENEFIT AGREEMENT . 27 |
---|
1102 | 1102 | | |
---|
1103 | 1103 | | 7–1203. 28 |
---|
1104 | 1104 | | |
---|
1105 | 1105 | | THE COMMISSION MAY CONTRA CT FOR THE SERVICES OF INDEPENDENT 29 |
---|
1106 | 1106 | | CONSULTANTS AND EXPERTS TO IMPLEMENT AND EXECUT E ANY PART OF THIS 30 |
---|
1107 | 1107 | | SUBTITLE. 31 |
---|
1108 | 1108 | | |
---|
1109 | 1109 | | 7–1204. RESERVED. 32 |
---|
1110 | 1110 | | HOUSE BILL 398 25 |
---|
1111 | 1111 | | |
---|
1112 | 1112 | | |
---|
1113 | 1113 | | 7–1205. RESERVED. 1 |
---|
1114 | 1114 | | |
---|
1115 | 1115 | | PART II. TRANSMISSION ENERGY STORAGE DEVICES. 2 |
---|
1116 | 1116 | | |
---|
1117 | 1117 | | 7–1206. 3 |
---|
1118 | 1118 | | |
---|
1119 | 1119 | | (A) THE GENERAL ASSEMBLY FINDS AND DE CLARES THAT THE STATE HAS 4 |
---|
1120 | 1120 | | A GOAL OF REACHING 1,600 MEGAWATTS OF FRONT –OF–THE–METER TRANSMISSION 5 |
---|
1121 | 1121 | | ENERGY STORAGE DEVIC ES. 6 |
---|
1122 | 1122 | | |
---|
1123 | 1123 | | (B) THE COMMISSION SHALL , BY REGULATION OR ORD ER, ESTABLISH A 7 |
---|
1124 | 1124 | | COMPETITIVE PROCESS FOR THE PROCUREMENT OF PROJECTS FOR THE 8 |
---|
1125 | 1125 | | CONSTRUCTION AND DEP LOYMENT OF FRONT–OF–THE–METER TRANSMISSION 9 |
---|
1126 | 1126 | | ENERGY STORAGE DEVIC ES. 10 |
---|
1127 | 1127 | | |
---|
1128 | 1128 | | (C) (1) (I) ON OR BEFORE JANUARY 1, 2026, THE COMMISSION SHALL 11 |
---|
1129 | 1129 | | ISSUE A PROCUREMENT SOLICITATION FOR APP LICATIONS FOR PROJEC TS FOR THE 12 |
---|
1130 | 1130 | | CONSTRUCTION AND DEP LOYMENT OF FRONT –OF–THE–METER TRANSMISSION 13 |
---|
1131 | 1131 | | ENERGY STORAGE DEVIC ES. 14 |
---|
1132 | 1132 | | |
---|
1133 | 1133 | | (II) THE PROCUREMENT SOLICITATION SHALL B E FOR A 15 |
---|
1134 | 1134 | | MAXIMUM OF 800 MEGAWATTS OF CUMULAT IVE ENERGY STORAGE C APACITY, AS 16 |
---|
1135 | 1135 | | MEASURED IN EFFECTIV E NAMEPLATE CAPACITY . 17 |
---|
1136 | 1136 | | |
---|
1137 | 1137 | | (2) ON OR BEFORE OCTOBER 1, 2026, THE COMMISSION SHALL ISSU E 18 |
---|
1138 | 1138 | | A DECISION ON WHETHER TO APPROV E ONE OR MORE PROPOSALS IN AC CORDANCE 19 |
---|
1139 | 1139 | | WITH § 7–1208(B) OF THIS SUBTITLE. 20 |
---|
1140 | 1140 | | |
---|
1141 | 1141 | | (3) (I) EXCEPT AS PROVIDED IN SUBPARAGRAPH (II) OF THIS 21 |
---|
1142 | 1142 | | PARAGRAPH , THE TRANSMISSION ENE RGY STORAGE DEVICES PROCURED IN 22 |
---|
1143 | 1143 | | ACCORDANCE WITH THIS SUBSECTION SHALL BE OPERATIONAL WITHIN 18 MONTHS 23 |
---|
1144 | 1144 | | AFTER A PROJECT IS S ELECTED BY THE COMMISSION. 24 |
---|
1145 | 1145 | | |
---|
1146 | 1146 | | (II) THE COMMISSION MAY EXTEND THE OPERATING DEADLI NE 25 |
---|
1147 | 1147 | | UNDER SUBPARAGRAPH (I) OF THIS PARAGRAPH FO R GOOD CAUSE SHOWN . 26 |
---|
1148 | 1148 | | |
---|
1149 | 1149 | | (D) (1) ON OR BEFORE JANUARY 1, 2027, THE COMMISSION SHALL ISSU E 27 |
---|
1150 | 1150 | | A SECOND PROCUREMENT SOLICITA TION FOR THE PROCUREMENT OF P ROJECTS 28 |
---|
1151 | 1151 | | FOR THE CONSTRUCTION AND DEPLOYMENT OF FRONT–OF–THE–METER 29 |
---|
1152 | 1152 | | TRANSMISSION ENERGY STORAGE DEVIC ES. 30 |
---|
1153 | 1153 | | 26 HOUSE BILL 398 |
---|
1154 | 1154 | | |
---|
1155 | 1155 | | |
---|
1156 | 1156 | | (2) THE PROCUREMENT SOLIC ITATION SHALL BE FOR A MAXIMUM OF 1 |
---|
1157 | 1157 | | 800 MEGAWATTS OF CUMULAT IVE ENERGY STORAGE CAPACITY, AS MEASURED IN 2 |
---|
1158 | 1158 | | EFFECTIVE NAMEPLATE CAPACITY. 3 |
---|
1159 | 1159 | | |
---|
1160 | 1160 | | (3) ON OR BEFORE OCTOBER 1, 2027, THE COMMISSION SHALL ISSU E 4 |
---|
1161 | 1161 | | A DECISION ON WHETHER TO APPROVE ONE OR MORE PROPOSAL S IN ACCORDANCE 5 |
---|
1162 | 1162 | | WITH § 7–1208(B) OF THIS SUBTITLE. 6 |
---|
1163 | 1163 | | |
---|
1164 | 1164 | | (4) (I) EXCEPT AS PROVIDED IN SUBPARAGRAPH (II) OF THIS 7 |
---|
1165 | 1165 | | PARAGRAPH , THE TRANSMISSION ENE RGY STORAGE DEVICES PROCURED IN 8 |
---|
1166 | 1166 | | ACCORDANCE WITH THIS SUBSECTION SHALL BE OPERATIONAL WITHIN 18 MONTHS 9 |
---|
1167 | 1167 | | AFTER A PROJECT IS S ELECTED BY THE COMMISSION. 10 |
---|
1168 | 1168 | | |
---|
1169 | 1169 | | (II) THE COMMISSION MAY EXTEND THE OPERATING DEADLINE 11 |
---|
1170 | 1170 | | UNDER SUBPARAGRAPH (I) OF THIS PARAGRAPH FO R GOOD CAUSE SHOWN . 12 |
---|
1171 | 1171 | | |
---|
1172 | 1172 | | 7–1207. 13 |
---|
1173 | 1173 | | |
---|
1174 | 1174 | | (A) THE COMMISSION SHALL INCL UDE SPECIFICATIONS IN A 14 |
---|
1175 | 1175 | | PROCUREMENT SOLICITATION ISSUED UNDER § 7–1206 OF THIS SUBTITLE THAT 15 |
---|
1176 | 1176 | | REQUIRE EACH PROPOSAL TO: 16 |
---|
1177 | 1177 | | |
---|
1178 | 1178 | | (1) INCLUDE A PROPOSED P RICING SCHEDULE FOR THE 17 |
---|
1179 | 1179 | | TRANSMISSION ENERGY STORAGE DEVICE PROJECT; 18 |
---|
1180 | 1180 | | |
---|
1181 | 1181 | | (2) INCLUDE A COST –BENEFIT ANALYSIS OF THE PROJECT AND THE 19 |
---|
1182 | 1182 | | PROPOSED PRICING SCH EDULE, INCLUDING AN ANALYSI S OF: 20 |
---|
1183 | 1183 | | |
---|
1184 | 1184 | | (I) THE LOCATIONAL VALUE , DURATION, AND TIME TO 21 |
---|
1185 | 1185 | | DEPLOYMENT OF THE EN ERGY STORAGE DEVICES ; 22 |
---|
1186 | 1186 | | |
---|
1187 | 1187 | | (II) AVOIDED OR DELAYED T RANSMISSION, GENERATION , AND 23 |
---|
1188 | 1188 | | DISTRIBUTION COSTS; 24 |
---|
1189 | 1189 | | |
---|
1190 | 1190 | | (III) AVOIDED EMISSIONS IN THE SHORT TERM AND P ROJECTED 25 |
---|
1191 | 1191 | | AVOIDED EMISSIONS IN THE LONG TERM , MEASURED USING THE S OCIAL COST OF 26 |
---|
1192 | 1192 | | CARBON, AS DETERMINED BY THE U.S. ENVIRONMENTAL PROTECTION AGENCY AS 27 |
---|
1193 | 1193 | | OF JANUARY 1, 2025; 28 |
---|
1194 | 1194 | | |
---|
1195 | 1195 | | (IV) THE VALUE OF THE RAPID DEPLOYMENT OF ENERGY 29 |
---|
1196 | 1196 | | STORAGE DEVICES ; AND 30 |
---|
1197 | 1197 | | |
---|
1198 | 1198 | | (V) ANY OTHER AVOIDED CO STS; 31 HOUSE BILL 398 27 |
---|
1199 | 1199 | | |
---|
1200 | 1200 | | |
---|
1201 | 1201 | | |
---|
1202 | 1202 | | (3) ENSURE THAT THE OWNER OR OPERATOR OF THE PROJECT HAS 1 |
---|
1203 | 1203 | | THE CAPABILITY TO EXPORT ELECTRICIT Y FOR SALE ON THE WH OLESALE MARKET 2 |
---|
1204 | 1204 | | AND BID INTO THE PJM CAPACITY MARKET UNDER AN AGREEMENT W ITH PJM 3 |
---|
1205 | 1205 | | INTERCONNECTION ; 4 |
---|
1206 | 1206 | | |
---|
1207 | 1207 | | (4) ENSURE THAT THE ENER GY STORAGE DEVICES CAN DELIVER 5 |
---|
1208 | 1208 | | THEIR EFFECTIVE NAME PLATE CAPACITY ; 6 |
---|
1209 | 1209 | | |
---|
1210 | 1210 | | (5) INCORPORATE A COMMUN ITY BENEFIT AGREEMEN T; 7 |
---|
1211 | 1211 | | |
---|
1212 | 1212 | | (6) ATTEST IN WRITING TH AT ALL CONTRACTORS A ND 8 |
---|
1213 | 1213 | | SUBCONTRACTORS W ORKING ON THE PROJEC T HAVE BEEN IN COMPL IANCE WITH 9 |
---|
1214 | 1214 | | FEDERAL AND STATE WAGE AND HOUR L AWS FOR THE IMMEDIAT ELY PRECEDING 3 10 |
---|
1215 | 1215 | | YEARS OR THE DURATIO N OF THE CONTRACTOR ’S OR SUBCONTRACTOR ’S BUSINESS 11 |
---|
1216 | 1216 | | OPERATION, WHICHEVER IS LONGER ; AND 12 |
---|
1217 | 1217 | | |
---|
1218 | 1218 | | (7) ENSURE A COMPETITIVE BIDDING PROCESS BY RED ACTING 13 |
---|
1219 | 1219 | | PROPRIETARY INFORMAT ION PROVIDED TO THE COMMISSION. 14 |
---|
1220 | 1220 | | |
---|
1221 | 1221 | | (B) FRONT–OF–THE–METER TRANSMISSION E NERGY STORAGE DEVICE S 15 |
---|
1222 | 1222 | | PAIRED WITH TIER 1 OR TIER 2 RENEWABLE SOURCES , AS DEFINED UNDER § 7–701 16 |
---|
1223 | 1223 | | OF THIS TITLE, MAY BE INCLUDED IN A PROPOSAL IN RESPON SE TO A PROCUREMENT 17 |
---|
1224 | 1224 | | SOLICITATION UNDER § 7–1206 OF THIS SUBTITLE. 18 |
---|
1225 | 1225 | | |
---|
1226 | 1226 | | 7–1208. 19 |
---|
1227 | 1227 | | |
---|
1228 | 1228 | | (A) IN SELECTING A PROPOS AL FOR A FRONT–OF–THE–METER 20 |
---|
1229 | 1229 | | TRANSMISSION ENERGY STORAGE DEVIC E PROJECT, THE COMMISSION: 21 |
---|
1230 | 1230 | | |
---|
1231 | 1231 | | (1) SHALL SPECIFY THE PR ICING SCHEDULE , WHICH SHALL BE A 22 |
---|
1232 | 1232 | | MONTHLY FIXED PRICE REPRESEN TING THE VALUE OF TH E FRONT–OF–THE–METER 23 |
---|
1233 | 1233 | | TRANSMISSION ENERGY STORAGE DEVICE BEYOND THE PAYMENT S RECEIVED FROM 24 |
---|
1234 | 1234 | | PJM WHOLESALE MARKETS; 25 |
---|
1235 | 1235 | | |
---|
1236 | 1236 | | (2) SHALL SPECIFY THAT F OR CONTINUED RE CEIPT OF PAYMENT 26 |
---|
1237 | 1237 | | UNDER ITEM (1) OF THIS SUBSECTION , AN APPLICANT SHALL DEMONSTRATE , TO 27 |
---|
1238 | 1238 | | THE SATISFACTION OF THE COMMISSION, THAT THE APPLICANT ’S ENERGY STORAGE 28 |
---|
1239 | 1239 | | DEVICE IS AVAILABLE AND PARTICIPATING IN THE PJM ENERGY AND CAPACITY 29 |
---|
1240 | 1240 | | MARKET AT NOT LESS THAN THE CLASS AVERAGE AVAILABILITY RATE ESTABLISHED 30 |
---|
1241 | 1241 | | BY PJM INTERCONNECTION FOR C OMPARABLE DEVICES ; 31 |
---|
1242 | 1242 | | 28 HOUSE BILL 398 |
---|
1243 | 1243 | | |
---|
1244 | 1244 | | |
---|
1245 | 1245 | | (3) SHALL INCORPORATE PENALTIE S FOR NONPERFORMANCE IN THE 1 |
---|
1246 | 1246 | | CONTRACT, INCLUDING WITHHOLDIN G OF PAYMENT , FOR ENERGY STORAGE 2 |
---|
1247 | 1247 | | DEVICES THAT FAIL TO MEET AVAILABILITY METRICS ; 3 |
---|
1248 | 1248 | | |
---|
1249 | 1249 | | (4) MAY TERMINATE ENERGY STORAGE DEVICES FROM THE PROGRAM 4 |
---|
1250 | 1250 | | IF DEVICE PERFORMANCE DOES NOT IMPROVE AFTER APPROP RIATE NOTICE AND 5 |
---|
1251 | 1251 | | OPPORTUNITY TO CURE ; AND 6 |
---|
1252 | 1252 | | |
---|
1253 | 1253 | | (5) MAY CONSIDER OTHER N ONPRICE FACTORS SUCH AS: 7 |
---|
1254 | 1254 | | |
---|
1255 | 1255 | | (I) PROJECT MATURITY DATES; 8 |
---|
1256 | 1256 | | |
---|
1257 | 1257 | | (II) SITE CONTROL; AND 9 |
---|
1258 | 1258 | | |
---|
1259 | 1259 | | (III) ANY OTHER RELEVANT N ONPRICE FACTORS AS 10 |
---|
1260 | 1260 | | DETERMINED BY THE COMMISSION. 11 |
---|
1261 | 1261 | | |
---|
1262 | 1262 | | (B) THE COMMISSION SHALL : 12 |
---|
1263 | 1263 | | |
---|
1264 | 1264 | | (1) AFTER GIVING PUBLIC NOTICE, HOLD ONE OR MORE PUBLIC 13 |
---|
1265 | 1265 | | HEARINGS TO RECEIVE PUBLIC COMMENT AND EVALUATE THE PROPOSA LS; AND 14 |
---|
1266 | 1266 | | |
---|
1267 | 1267 | | (2) SUBJECT TO SUBSECTIO N (C) OF THIS SECTION , ISSUE ONE OR 15 |
---|
1268 | 1268 | | MORE ORDERS TO SELECT A PROPOSAL OR PROPOSALS FOR DEVELO PMENT. 16 |
---|
1269 | 1269 | | |
---|
1270 | 1270 | | (C) IF THE COMMISSION FINDS THAT NONE OF THE PROPOSAL S 17 |
---|
1271 | 1271 | | ADEQUATELY SUPPORT T HE GOALS ESTABLISHED UNDER THIS SUBTITLE THE 18 |
---|
1272 | 1272 | | COMMISSION MAY END TH E SOLICITATION PROCE SS WITHOUT SELECTING A 19 |
---|
1273 | 1273 | | PROPOSAL. 20 |
---|
1274 | 1274 | | |
---|
1275 | 1275 | | 7–1209. 21 |
---|
1276 | 1276 | | |
---|
1277 | 1277 | | (A) FOR ANY PROPOSAL SELE CTED UNDER THIS PART , THE COMMISSION 22 |
---|
1278 | 1278 | | MAY ADOPT CONDITIONS FOR THE CONSTRUCTION AND OPERATION OF FACILIT IES 23 |
---|
1279 | 1279 | | INCLUDED IN THE PROPOSAL. 24 |
---|
1280 | 1280 | | |
---|
1281 | 1281 | | (B) AN ORDER SELECTING A PROPOSAL UNDER § 7–1208 OF THIS SUBTITLE 25 |
---|
1282 | 1282 | | BESTOWS THE SAME RIG HTS TO THE SELECTED PROPOSAL THAT A GENE RATING 26 |
---|
1283 | 1283 | | SYSTEM WOULD OTHERWI SE BE GRANTED THROUG H A CERTIFICATE OF PUB LIC 27 |
---|
1284 | 1284 | | CONVENIENCE AND NECE SSITY UNDER § 7–207 OF THIS TITLE IF THE SELECTED 28 |
---|
1285 | 1285 | | PROPOSAL IS REVIEWED UNDER AN ALTERNATIVE PROCESS AS DETERMINE D BY THE 29 |
---|
1286 | 1286 | | COMMISSION. 30 |
---|
1287 | 1287 | | HOUSE BILL 398 29 |
---|
1288 | 1288 | | |
---|
1289 | 1289 | | |
---|
1290 | 1290 | | 7–1210. 1 |
---|
1291 | 1291 | | |
---|
1292 | 1292 | | ANY TRANSMISSION ENERGY STORAGE DEVICE BUILT IN ACCORDANCE WITH 2 |
---|
1293 | 1293 | | THIS SUBTITLE SHALL COUNT TOWARD T HE ENERGY STORAGE DE VICE 3 |
---|
1294 | 1294 | | DEPLOYMENT GOALS UNDER § 7–216.2 OF THIS TITLE. 4 |
---|
1295 | 1295 | | |
---|
1296 | 1296 | | 7–1211. 5 |
---|
1297 | 1297 | | |
---|
1298 | 1298 | | ON OR BEFORE DECEMBER 31, 2026, THE COMMISSION SHALL REPO RT, IN 6 |
---|
1299 | 1299 | | ACCORDANCE WITH § 2–1257 OF THE STATE GOVERNMENT ARTICLE, TO THE 7 |
---|
1300 | 1300 | | GENERAL ASSEMBLY ON THE EFFEC TIVENESS OF THE PROCUREMENT PROCESS 8 |
---|
1301 | 1301 | | ESTABLISHED UNDER TH IS PART. 9 |
---|
1302 | 1302 | | |
---|
1303 | 1303 | | 7–1212. RESERVED. 10 |
---|
1304 | 1304 | | |
---|
1305 | 1305 | | 7–1213. RESERVED. 11 |
---|
1306 | 1306 | | |
---|
1307 | 1307 | | PART III. RENEWABLE ENERGY CREDITS. 12 |
---|
1308 | 1308 | | |
---|
1309 | 1309 | | 7–1214. 13 |
---|
1310 | 1310 | | |
---|
1311 | 1311 | | (A) IN THIS PART THE FOLL OWING WORDS HAVE THE MEANINGS 14 |
---|
1312 | 1312 | | INDICATED. 15 |
---|
1313 | 1313 | | |
---|
1314 | 1314 | | (B) “BROWNFIELD” HAS THE MEANING STAT ED IN § 7–207 OF THIS TITLE. 16 |
---|
1315 | 1315 | | |
---|
1316 | 1316 | | (C) “QUALIFYING SYSTEM ” HAS THE MEANING STAT ED IN § 7–709.2 OF THIS 17 |
---|
1317 | 1317 | | TITLE. 18 |
---|
1318 | 1318 | | |
---|
1319 | 1319 | | (D) “REC ESCROW ADMINISTRATOR ” MEANS THE ENTITY CHO SEN, IN 19 |
---|
1320 | 1320 | | ACCORDANCE WITH § 7–1219 OF THIS SUBTITLE , TO SUPERVISE THE ESC ROW 20 |
---|
1321 | 1321 | | ACCOUNT CREATED UNDE R THIS SUBTITLE TO E NSURE THE SECURE AND 21 |
---|
1322 | 1322 | | TRANSPARENT TRANSFER OF REVENUES , SREC–IIS, AND REC–IIS AMONG 22 |
---|
1323 | 1323 | | QUALIFYING SYSTEMS , WIND SYSTEMS , SMALL HYDROELECTRIC SYSTEMS, AND 23 |
---|
1324 | 1324 | | ELECTRIC COMPANIES . 24 |
---|
1325 | 1325 | | |
---|
1326 | 1326 | | (E) “RENEWABLE ENERGY CRED IT” HAS THE MEANING STAT ED IN § 7–701 25 |
---|
1327 | 1327 | | OF THIS TITLE. 26 |
---|
1328 | 1328 | | |
---|
1329 | 1329 | | (F) “SMALL HYDROELECTRIC S YSTEM” HAS THE MEANING STAT ED IN § 27 |
---|
1330 | 1330 | | 7–701(S)(8) OF THIS TITLE. 28 |
---|
1331 | 1331 | | 30 HOUSE BILL 398 |
---|
1332 | 1332 | | |
---|
1333 | 1333 | | |
---|
1334 | 1334 | | (G) “SOLAR ENERGY GENERATI NG SYSTEM” HAS THE MEANING STAT ED IN § 1 |
---|
1335 | 1335 | | 7–709.2 OF THIS TITLE. 2 |
---|
1336 | 1336 | | |
---|
1337 | 1337 | | (H) “SREC–II” HAS THE MEANING STAT ED IN § 7–709.2 OF THIS TITLE. 3 |
---|
1338 | 1338 | | |
---|
1339 | 1339 | | (I) “SREC–II PAYMENT” MEANS THE MONETARY V ALUE OF AN SREC–II 4 |
---|
1340 | 1340 | | GENERATED AND SOLD B Y A SOLAR ENERGY GENERAT ING SYSTEM AWARDED A 5 |
---|
1341 | 1341 | | CONTRACT IN ACCORDAN CE WITH THIS SUBTITLE. 6 |
---|
1342 | 1342 | | |
---|
1343 | 1343 | | (J) “WIND SYSTEM” MEANS A LAND –BASED WIND ENERGY GE NERATING 7 |
---|
1344 | 1344 | | SYSTEM. 8 |
---|
1345 | 1345 | | |
---|
1346 | 1346 | | 7–1215. 9 |
---|
1347 | 1347 | | |
---|
1348 | 1348 | | (A) THROUGH REGULATION OR ORDER , THE COMMISSION SHALL 10 |
---|
1349 | 1349 | | ESTABLISH A COMPETITIVE PROCESS FOR THE PROCUREMENT OF: 11 |
---|
1350 | 1350 | | |
---|
1351 | 1351 | | (1) SREC–IIS FROM QUALIFYING SY STEMS; AND 12 |
---|
1352 | 1352 | | |
---|
1353 | 1353 | | (2) REC–IIS FROM SMALL HYDROEL ECTRIC SYSTEMS AND W IND 13 |
---|
1354 | 1354 | | SYSTEMS. 14 |
---|
1355 | 1355 | | |
---|
1356 | 1356 | | (B) THE COMPETITIVE PROCESS E STABLISHED UNDER THIS PART SHALL 15 |
---|
1357 | 1357 | | REQUIRE THAT : 16 |
---|
1358 | 1358 | | |
---|
1359 | 1359 | | (1) BIDS FROM QUALIFYING SYSTEMS, SMALL HYDROELECTRIC 17 |
---|
1360 | 1360 | | SYSTEMS, AND WIND SYSTEMS SHALL BE ONLY FOR TH E PROCUREMENT OF 18 |
---|
1361 | 1361 | | SREC–IIS AND REC–IIS; AND 19 |
---|
1362 | 1362 | | |
---|
1363 | 1363 | | (2) BIDS SUBMITTED FOR THE PROCUREMENT OF SREC–IIS OR 20 |
---|
1364 | 1364 | | REC–IIS SHALL INCLUDE A N SREC–II OR REC–II PRICING SCHEDULE THA T 21 |
---|
1365 | 1365 | | SPECIFIES A PRICE FOR THE GENERATION ATTRIBUTE S OF THE ORIGINATING 22 |
---|
1366 | 1366 | | ENERGY GENERATING SY STEM, INCLUDING ENERGY , CAPACITY, ANCILLARY 23 |
---|
1367 | 1367 | | SERVICES, AND ENVIRONMENTAL AT TRIBUTES. 24 |
---|
1368 | 1368 | | |
---|
1369 | 1369 | | 7–1216. 25 |
---|
1370 | 1370 | | |
---|
1371 | 1371 | | AN ORDER THE COMMISSION ISSUES APP ROVING A PROPOSED 26 |
---|
1372 | 1372 | | PROCUREMENT UNDER THIS PART SHAL L: 27 |
---|
1373 | 1373 | | |
---|
1374 | 1374 | | (1) SPECIFY THE SREC–II OR REC–II PRICING SCHEDULE ; 28 |
---|
1375 | 1375 | | HOUSE BILL 398 31 |
---|
1376 | 1376 | | |
---|
1377 | 1377 | | |
---|
1378 | 1378 | | (2) SPECIFY THE DURATION OF THE SREC–II OR REC–II PRICING 1 |
---|
1379 | 1379 | | SCHEDULE, NOT TO EXCEED 30 YEARS; 2 |
---|
1380 | 1380 | | |
---|
1381 | 1381 | | (3) SPECIFY THE NUMBER O F SREC–IIS OR REC–IIS THAT MAY BE 3 |
---|
1382 | 1382 | | PURCHASED EACH YEAR FROM THE QUALIFYING SYSTE M, SMALL HYDROELECTRIC 4 |
---|
1383 | 1383 | | SYSTEM, OR WIND SYSTEM ; 5 |
---|
1384 | 1384 | | |
---|
1385 | 1385 | | (4) PROVIDE THAT : 6 |
---|
1386 | 1386 | | |
---|
1387 | 1387 | | (I) A PAYMENT MAY NOT BE MADE FOR AN SREC–II OR 7 |
---|
1388 | 1388 | | REC–II UNTIL ELECTRICITY SU PPLY IS GENERATED UNDER THE PROCUREMEN T; 8 |
---|
1389 | 1389 | | AND 9 |
---|
1390 | 1390 | | |
---|
1391 | 1391 | | (II) RATEPAYERS , PURCHASERS OF SREC–IIS AND REC–IIS, 10 |
---|
1392 | 1392 | | AND THE STATE SHALL BE HELD H ARMLESS FOR ANY COST OVERRUNS ASSOCIATED 11 |
---|
1393 | 1393 | | WITH THE QUALIFYING SYSTEM , SMALL HYDROELECTRIC SYSTEM, OR WIND SYSTEM; 12 |
---|
1394 | 1394 | | |
---|
1395 | 1395 | | (5) REQUIRE THAT ANY DEB T INSTRUMENT ISSUED IN CONNECTION 13 |
---|
1396 | 1396 | | WITH THE QUALIFYING SYSTEM , SMALL HYDROELECTRIC SYSTEM, OR WIND SYSTEM 14 |
---|
1397 | 1397 | | INCLUDE LANGUAGE SPE CIFYING THAT THE DEB T INSTRUMENT DOES NO T 15 |
---|
1398 | 1398 | | ESTABLISH A DEBT , AN OBLIGATION, OR A LIABILITY OF THE STATE; AND 16 |
---|
1399 | 1399 | | |
---|
1400 | 1400 | | (6) REQUIRE THAT THE OWNER OR OPERATOR OF A QUALIFYING 17 |
---|
1401 | 1401 | | SYSTEM, SMALL HYDROELECTRIC SYSTEM, OR WIND SYSTEM EXECU TE AND COMPLY 18 |
---|
1402 | 1402 | | WITH A COMMUNITY BEN EFIT AGREEMENT UNDER § 7–1202 OF THIS SUBTITLE. 19 |
---|
1403 | 1403 | | |
---|
1404 | 1404 | | 7–1217. 20 |
---|
1405 | 1405 | | |
---|
1406 | 1406 | | TO BE ELIGIBLE TO PAR TICIPATE IN THE COMPETITIVE PROCUREMENT 21 |
---|
1407 | 1407 | | PROCESS UNDER THIS PART, A QUALIFYING SYSTEM , SMALL HYDROELECTRIC 22 |
---|
1408 | 1408 | | SYSTEM, OR WIND SYSTEM SHALL : 23 |
---|
1409 | 1409 | | |
---|
1410 | 1410 | | (1) BE LOCATED IN THE STATE OR OTHERWISE DE MONSTRATE AN 24 |
---|
1411 | 1411 | | ABILITY TO ADDRESS T HE RESOURCE ADEQUACY NEEDS OF THE STATE; 25 |
---|
1412 | 1412 | | |
---|
1413 | 1413 | | (2) BE ELIGIBLE FOR INCLUSI ON IN MEETING THE RENEW ABLE 26 |
---|
1414 | 1414 | | ENERGY PORTFOLIO STA NDARD UNDER § 7–703(B) OF THIS TITLE; AND 27 |
---|
1415 | 1415 | | |
---|
1416 | 1416 | | (3) FOR SMALL HYDROELECT RIC SYSTEMS: 28 |
---|
1417 | 1417 | | |
---|
1418 | 1418 | | (I) HAVE A GENERATING CA PACITY OF LESS THAN 30 29 |
---|
1419 | 1419 | | MEGAWATTS ; AND 30 |
---|
1420 | 1420 | | 32 HOUSE BILL 398 |
---|
1421 | 1421 | | |
---|
1422 | 1422 | | |
---|
1423 | 1423 | | (II) BE LICENSED O R EXEMPT FROM LICENSIN G BY THE 1 |
---|
1424 | 1424 | | FEDERAL ENERGY REGULATORY COMMISSION. 2 |
---|
1425 | 1425 | | |
---|
1426 | 1426 | | 7–1218. 3 |
---|
1427 | 1427 | | |
---|
1428 | 1428 | | UNLESS EXTENDED BY MU TUAL CONSENT OF THE PARTIES, THE COMMISSION 4 |
---|
1429 | 1429 | | SHALL APPROVE , CONDITIONALLY APPROV E, OR DENY A PROCUREMENT UNDER 5 |
---|
1430 | 1430 | | THIS PART WITHIN 180 DAYS AFTER THE CLOSE OF A SOLICITATION PE RIOD. 6 |
---|
1431 | 1431 | | |
---|
1432 | 1432 | | 7–1219. 7 |
---|
1433 | 1433 | | |
---|
1434 | 1434 | | (A) FOR THE PROCUREMENT P ROCESS ESTABLISHED U NDER THIS PART , BY 8 |
---|
1435 | 1435 | | REGULATION OR ORDER , THE COMMISSION SHALL : 9 |
---|
1436 | 1436 | | |
---|
1437 | 1437 | | (1) ESTABLISH AN SREC–II AND REC–II PURCHASER ’S OBLIGATION 10 |
---|
1438 | 1438 | | FOR SREC–II AND REC–II PURCHASERS TO PURCHA SE SREC–IIS AND REC–IIS 11 |
---|
1439 | 1439 | | FOR EACH YEAR : 12 |
---|
1440 | 1440 | | |
---|
1441 | 1441 | | (I) ON A FORWARD –LOOKING BASIS; AND 13 |
---|
1442 | 1442 | | |
---|
1443 | 1443 | | (II) AT LEAST 1 YEAR BEFORE THE YEAR IN WHICH TH AT 14 |
---|
1444 | 1444 | | SREC–II AND REC–II PURCHASE OBLIGAT ION BECOMES EFFECTIVE TO ALLOW AN 15 |
---|
1445 | 1445 | | ELECTRIC COMPANY TO REFLECT SREC–II AND REC–II COSTS AS A 16 |
---|
1446 | 1446 | | NONBYPASSABLE SURCHA RGE PAID BY ALL DIST RIBUTION CUSTOMERS O F THE 17 |
---|
1447 | 1447 | | ELECTRIC COMPANY ; 18 |
---|
1448 | 1448 | | |
---|
1449 | 1449 | | (2) ESTABLISH A NONBYPAS SABLE SURCHARGE THAT ALLOWS AN 19 |
---|
1450 | 1450 | | ELECTRIC COMPANY TO RECOVER ALL COSTS ASSO CIATED WITH THE PURC HASE OF 20 |
---|
1451 | 1451 | | SREC–IIS AND REC–IIS FROM ALL DISTRIBUT ION CUSTOMERS OF THE ELECTRIC 21 |
---|
1452 | 1452 | | COMPANY; 22 |
---|
1453 | 1453 | | |
---|
1454 | 1454 | | (3) ESTABLISH AN ESCROW ACCOUNT THAT IS UNDER THE 23 |
---|
1455 | 1455 | | SUPERVISION OF THE REC ESCROW ADMINISTRATOR ; AND 24 |
---|
1456 | 1456 | | |
---|
1457 | 1457 | | (4) DIRECT THE ELECTRIC COMPANIES, IN CONSULTATION WITH THE 25 |
---|
1458 | 1458 | | COMMISSION, TO JOINTLY SELECT A REC ESCROW ADMINISTRATOR . 26 |
---|
1459 | 1459 | | |
---|
1460 | 1460 | | (B) (1) EACH ELECTRIC COMPANY SHALL PROCURE FROM T HE ESCROW 27 |
---|
1461 | 1461 | | ACCOUNT ESTABLISHED BY REGULATION OR ORDER UNDER THIS SECTION T HE 28 |
---|
1462 | 1462 | | NUMBER OF SREC–IIS AND REC–IIS REQUIRED TO SATISFY THE SREC–II AND 29 |
---|
1463 | 1463 | | REC–II PURCHASER ’S OBLIGATIONS. 30 |
---|
1464 | 1464 | | HOUSE BILL 398 33 |
---|
1465 | 1465 | | |
---|
1466 | 1466 | | |
---|
1467 | 1467 | | (2) SUBJECT TO ANY ESCROW ACCOUNT RESERVE REQU IREMENT THE 1 |
---|
1468 | 1468 | | COMMISSION ESTABLISHE S: 2 |
---|
1469 | 1469 | | |
---|
1470 | 1470 | | (I) IF THERE ARE INSUFFICIENT SREC–IIS OR REC–IIS 3 |
---|
1471 | 1471 | | AVAILABLE TO SATISFY THE ELECTRI C COMPANIES ’ SREC–II AND REC–II 4 |
---|
1472 | 1472 | | PURCHASER ’S OBLIGATION , THE OVERPAYMENT SHAL L BE DISTRIBUTED TO 5 |
---|
1473 | 1473 | | ELECTRIC COMPANIES T O BE REFUNDED OR CRE DITED TO EACH DISTRI BUTION 6 |
---|
1474 | 1474 | | CUSTOMER BASED ON TH E CUSTOMER ’S CONSUMPTION OF ELE CTRICITY SUPPLY 7 |
---|
1475 | 1475 | | THAT IS SUBJECT TO T HE RENEWABLE ENERGY PORTFOLIO STA NDARD; AND 8 |
---|
1476 | 1476 | | |
---|
1477 | 1477 | | (II) THE CALCULATION OF A N ELECTRIC COMPANY ’S SREC–II 9 |
---|
1478 | 1478 | | AND REC–II PURCHASE OBLIGATION SHALL BE BASED ON FI NAL ELECTRICITY 10 |
---|
1479 | 1479 | | SALES DATA AS REPORT ED BY PJM INTERCONNECTION AS MEASURED AT THE 11 |
---|
1480 | 1480 | | CUSTOMER’S METER. 12 |
---|
1481 | 1481 | | |
---|
1482 | 1482 | | (3) FOR EACH SREC–II AND REC–II FOR WHICH A QUALIFYING 13 |
---|
1483 | 1483 | | SYSTEM, SMALL HYDROELECTRIC SYSTEM, OR WIND SYSTEM RECEIVES PAYMENT , 14 |
---|
1484 | 1484 | | THE QUALIFYING SYSTEM , SMALL HYDROELECTRIC SYSTEM, OR WIND SYSTEM 15 |
---|
1485 | 1485 | | SHALL: 16 |
---|
1486 | 1486 | | |
---|
1487 | 1487 | | (I) SELL ALL ENERGY , CAPACITY, AND ANCILLARY SERVIC ES 17 |
---|
1488 | 1488 | | ASSOCIATED WITH THE CREATION OF THE SREC–IIS OR REC–IIS INTO THE 18 |
---|
1489 | 1489 | | MARKETS OPERATED BY PJM INTERCONNECTION ; AND 19 |
---|
1490 | 1490 | | |
---|
1491 | 1491 | | (II) DISTRIBUTE THE PROCE EDS RECEIVED FROM TH E SALES 20 |
---|
1492 | 1492 | | UNDER ITEM (I) OF THIS PARAGRAPH TO ELECTRIC COMPANIES T O BE REFUNDED 21 |
---|
1493 | 1493 | | OR CREDITED TO EACH DISTRIBUTION CUSTOMER BASED ON THE CUSTOMER ’S 22 |
---|
1494 | 1494 | | CONSUMPTION OF ELECT RICITY SUPPLY THAT I S SUBJECT TO THE RENEWABLE 23 |
---|
1495 | 1495 | | ENERGY PORTFOLIO STA NDARD. 24 |
---|
1496 | 1496 | | |
---|
1497 | 1497 | | 7–1220. 25 |
---|
1498 | 1498 | | |
---|
1499 | 1499 | | BY REGULATION OR ORDE R, THE COMMISSION SHALL SPEC IFY THE 26 |
---|
1500 | 1500 | | TRANSFER AND EXPIRAT ION OF SREC–IIS AND REC–IIS CREATED BY QUALIFYING 27 |
---|
1501 | 1501 | | SYSTEMS, SMALL HYDROELECTRIC SYSTEMS, OR WIND SYSTEMS IN E XCESS OF THE 28 |
---|
1502 | 1502 | | ESTABLISHED SREC–II OR REC–II PRICING SCHEDULE . 29 |
---|
1503 | 1503 | | |
---|
1504 | 1504 | | 7–1221. 30 |
---|
1505 | 1505 | | |
---|
1506 | 1506 | | A DEBT, AN OBLIGATION, OR A LIABILITY OF A QUALI FYING SYSTEM, SMALL 31 |
---|
1507 | 1507 | | HYDROELECTRIC SYSTEM , OR WIND SYSTEM OR OF AN OWNER OR OPERATOR OF A 32 |
---|
1508 | 1508 | | QUALIFYING SYSTEM , SMALL HYDROELECTRIC SYSTEM, OR WIND SYSTEM MAY N OT 33 |
---|
1509 | 1509 | | BE CONSIDERED A DEBT , AN OBLIGATION, OR A LIABILITY OF THE STATE. 34 34 HOUSE BILL 398 |
---|
1510 | 1510 | | |
---|
1511 | 1511 | | |
---|
1512 | 1512 | | |
---|
1513 | 1513 | | Article – State Finance and Procurement 1 |
---|
1514 | 1514 | | |
---|
1515 | 1515 | | 13–102. 2 |
---|
1516 | 1516 | | |
---|
1517 | 1517 | | (a) The following procurement methods are authorized at the procurement 3 |
---|
1518 | 1518 | | officer’s discretion, where applicable: 4 |
---|
1519 | 1519 | | |
---|
1520 | 1520 | | (1) competitive sealed bids under § 13–103 of this subtitle; 5 |
---|
1521 | 1521 | | |
---|
1522 | 1522 | | (2) competitive sealed proposals under § 13–104 or § 13–105 of this 6 |
---|
1523 | 1523 | | subtitle; 7 |
---|
1524 | 1524 | | |
---|
1525 | 1525 | | (3) noncompetitive negotiation under § 13–106 of this subtitle; 8 |
---|
1526 | 1526 | | |
---|
1527 | 1527 | | (4) sole source procurement under § 13–107 of this subtitle; 9 |
---|
1528 | 1528 | | |
---|
1529 | 1529 | | (5) emergency or expedited procurement under § 13–108 of this subtitle; 10 |
---|
1530 | 1530 | | |
---|
1531 | 1531 | | (6) small procurement under § 13–109 of this subtitle; 11 |
---|
1532 | 1532 | | |
---|
1533 | 1533 | | (7) an intergovernmental cooperative purchasing agreement under § 12 |
---|
1534 | 1534 | | 13–110 of this subtitle; 13 |
---|
1535 | 1535 | | |
---|
1536 | 1536 | | (8) auction bids under § 13–111 of this subtitle; 14 |
---|
1537 | 1537 | | |
---|
1538 | 1538 | | (9) architectural, engineering, and land surveying services qualification 15 |
---|
1539 | 1539 | | based selection under § 13–112 of this subtitle; 16 |
---|
1540 | 1540 | | |
---|
1541 | 1541 | | (10) master contracting under § 13–113 of this subtitle; [or] 17 |
---|
1542 | 1542 | | |
---|
1543 | 1543 | | (11) pay–for–success contracting under § 13–112.1 of this subtitle; OR 18 |
---|
1544 | 1544 | | |
---|
1545 | 1545 | | (12) LEGISLATIVE FAST –TRACK PROCUREMENTS UNDER § 13–117 OF 19 |
---|
1546 | 1546 | | THIS SUBTITLE. 20 |
---|
1547 | 1547 | | |
---|
1548 | 1548 | | 13–117. 21 |
---|
1549 | 1549 | | |
---|
1550 | 1550 | | (A) IT IS THE INTENT OF T HE GENERAL ASSEMBLY TO: 22 |
---|
1551 | 1551 | | |
---|
1552 | 1552 | | (1) RECOGNIZE THE NEED F OR STATE AGENCIES TO BE RESPONSIVE 23 |
---|
1553 | 1553 | | TO THE REQUESTS AND LEGISLATIVE DIRECTIV ES OF THE GENERAL ASSEMBLY; 24 |
---|
1554 | 1554 | | |
---|
1555 | 1555 | | (2) REDUCE THE TIME IT T AKES FOR STATE AGENCIES TO PRO CURE 25 |
---|
1556 | 1556 | | CONSULTANTS TO ASSIS T WITH LEGISLATIVE M ANDATES THAT HAVE DEADLINES 26 |
---|
1557 | 1557 | | SPECIFIED IN LAW; AND 27 HOUSE BILL 398 35 |
---|
1558 | 1558 | | |
---|
1559 | 1559 | | |
---|
1560 | 1560 | | |
---|
1561 | 1561 | | (3) BE TIMELY IN ADDRESS ING CLIMATE CHANGE , ENVIRONMENTAL , 1 |
---|
1562 | 1562 | | ENERGY, AND GREENHOUSE GAS E MISSIONS RELATED ISS UES. 2 |
---|
1563 | 1563 | | |
---|
1564 | 1564 | | (B) THIS SECTION APPLIES ONLY TO THE PROCUREMENT OF CONSU LTANTS 3 |
---|
1565 | 1565 | | THAT: 4 |
---|
1566 | 1566 | | |
---|
1567 | 1567 | | (1) ARE LEGISLATIVE LY MANDATED WITH SPECIF IC TIME FRAMES 5 |
---|
1568 | 1568 | | ESTABLISHED IN LAW ; AND 6 |
---|
1569 | 1569 | | |
---|
1570 | 1570 | | (2) WILL ADDRESS ISSUES RELAT ED ONLY TO CLIMATE CHANGE , 7 |
---|
1571 | 1571 | | ENVIRONMENTAL , ENERGY, AND GREENHOUSE GAS E MISSIONS. 8 |
---|
1572 | 1572 | | |
---|
1573 | 1573 | | (C) THE FOLLOWING UNITS ARE AUTHORIZED TO IS SUE COMPETITIVE 9 |
---|
1574 | 1574 | | SEALED BIDS HIGHER T HAN THEIR DESIGNATED SMALL PROCUREMENT 10 |
---|
1575 | 1575 | | DELEGATION AUTHORITI ES: 11 |
---|
1576 | 1576 | | |
---|
1577 | 1577 | | (1) THE PUBLIC SERVICE COMMISSION; 12 |
---|
1578 | 1578 | | |
---|
1579 | 1579 | | (2) THE OFFICE OF PEOPLE’S COUNSEL; 13 |
---|
1580 | 1580 | | |
---|
1581 | 1581 | | (3) THE MARYLAND ENERGY ADMINISTRATIO N; 14 |
---|
1582 | 1582 | | |
---|
1583 | 1583 | | (4) THE DEPARTMENT OF THE ENVIRONMENT ; AND 15 |
---|
1584 | 1584 | | |
---|
1585 | 1585 | | (5) THE DEPARTMENT OF NATURAL RESOURCES. 16 |
---|
1586 | 1586 | | |
---|
1587 | 1587 | | (D) BEFORE AWARDING A PRO CUREMENT CONTRACT UN DER THIS SECTION , 17 |
---|
1588 | 1588 | | THE PROCUREMENT OFFI CER SHALL OBTAIN THE APPROVAL OF : 18 |
---|
1589 | 1589 | | |
---|
1590 | 1590 | | (1) THE HEAD OF THE UNIT ; AND 19 |
---|
1591 | 1591 | | |
---|
1592 | 1592 | | (2) THE CHIEF PROCUREMENT OFFICER, OR THEIR DESIGNEE . 20 |
---|
1593 | 1593 | | |
---|
1594 | 1594 | | (E) (1) THE CHIEF PROCUREMENT OFFICER, OR THEIR DESIGNEE , 21 |
---|
1595 | 1595 | | SHALL APPROVE A PROCUREMENT CONTRA CT SUBMITTED UNDER THIS SECTION IF 22 |
---|
1596 | 1596 | | IT COMPLIES WITH THE REQUIREMENTS OF THIS SECTION. 23 |
---|
1597 | 1597 | | |
---|
1598 | 1598 | | (2) IF THE CHIEF PROCUREMENT OFFICER, OR THEIR DESIGNEE , 24 |
---|
1599 | 1599 | | DOES NOT APPROVE A PROCUREMENT CONTRA CT SUBMITTED UNDER THIS SECTION 25 |
---|
1600 | 1600 | | WITHIN 5 BUSINESS DAYS AFTER RECEIVING THE CONTRACT, THE CONTRACT SHALL 26 |
---|
1601 | 1601 | | BE CONSIDERED APPROV ED. 27 |
---|
1602 | 1602 | | 36 HOUSE BILL 398 |
---|
1603 | 1603 | | |
---|
1604 | 1604 | | |
---|
1605 | 1605 | | Article – State Government 1 |
---|
1606 | 1606 | | |
---|
1607 | 1607 | | 9–20B–05. 2 |
---|
1608 | 1608 | | |
---|
1609 | 1609 | | (a) There is a Maryland Strategic Energy Investment Fund. 3 |
---|
1610 | 1610 | | |
---|
1611 | 1611 | | (e) The Fund consists of: 4 |
---|
1612 | 1612 | | |
---|
1613 | 1613 | | (1) all of the proceeds from the sale of allowances under § 2–1002(g) of the 5 |
---|
1614 | 1614 | | Environment Article; 6 |
---|
1615 | 1615 | | |
---|
1616 | 1616 | | (2) money appropriated in the State budget to the Program; 7 |
---|
1617 | 1617 | | |
---|
1618 | 1618 | | (3) repayments and prepayments of principal and interest on loans made 8 |
---|
1619 | 1619 | | from the Fund; 9 |
---|
1620 | 1620 | | |
---|
1621 | 1621 | | (4) interest and investment earnings on the Fund; 10 |
---|
1622 | 1622 | | |
---|
1623 | 1623 | | (5) compliance fees paid under [§ 7–705] § 7–705(B–1) of the Public 11 |
---|
1624 | 1624 | | Utilities Article; 12 |
---|
1625 | 1625 | | |
---|
1626 | 1626 | | (6) money received from any public or private source for the benefit of the 13 |
---|
1627 | 1627 | | Fund; 14 |
---|
1628 | 1628 | | |
---|
1629 | 1629 | | (7) money transferred from the Public Service Commission under § 15 |
---|
1630 | 1630 | | 7–207.2(c)(3) of the Public Utilities Article; and 16 |
---|
1631 | 1631 | | |
---|
1632 | 1632 | | (8) money distributed under § 2–614.1 of the Tax – General Article. 17 |
---|
1633 | 1633 | | |
---|
1634 | 1634 | | [(g–1) Proceeds received by the Fund from compliance fees under § 7–705(b)(2)(i)2 of 18 |
---|
1635 | 1635 | | the Public Utilities Article shall be allocated as follows: 19 |
---|
1636 | 1636 | | |
---|
1637 | 1637 | | (1) beginning in fiscal year 2025, at least 20% of the proceeds shall be used 20 |
---|
1638 | 1638 | | to provide grants to support the installation of new solar energy generating systems under 21 |
---|
1639 | 1639 | | the Customer–Sited Solar Program; 22 |
---|
1640 | 1640 | | |
---|
1641 | 1641 | | (2) up to 10% of the proceeds shall be credited to an administrative expense 23 |
---|
1642 | 1642 | | account for costs related to the administration of the Fund; 24 |
---|
1643 | 1643 | | |
---|
1644 | 1644 | | (3) proceeds collected but unused from a previous year shall be used before 25 |
---|
1645 | 1645 | | proceeds allocated for the current year; and 26 |
---|
1646 | 1646 | | |
---|
1647 | 1647 | | (4) the Administration shall reallocate to other authorized uses any 27 |
---|
1648 | 1648 | | proceeds that are not used within 3 fiscal years after collection.] 28 |
---|
1649 | 1649 | | |
---|
1650 | 1650 | | [(i) (1) Except as provided in paragraph (2) of this subsection, compliance fees 29 |
---|
1651 | 1651 | | paid under § 7–705(b) of the Public Utilities Article may be used only to make loans and 30 HOUSE BILL 398 37 |
---|
1652 | 1652 | | |
---|
1653 | 1653 | | |
---|
1654 | 1654 | | grants to support the creation of new Tier 1 renewable energy sources in the State that are 1 |
---|
1655 | 1655 | | owned by or directly benefit: 2 |
---|
1656 | 1656 | | |
---|
1657 | 1657 | | (i) low– to moderate–income communities located in a census tract 3 |
---|
1658 | 1658 | | with an average median income at or below 80% of the average median income for the State; 4 |
---|
1659 | 1659 | | or 5 |
---|
1660 | 1660 | | |
---|
1661 | 1661 | | (ii) overburdened or underserved communities, as defined in § 1–701 6 |
---|
1662 | 1662 | | of the Environment Article. 7 |
---|
1663 | 1663 | | |
---|
1664 | 1664 | | (2) Compliance fees paid under § 7–705(b)(2)(i)2 of the Public Utilities 8 |
---|
1665 | 1665 | | Article shall be accounted for separately within the Fund and may be used only to make 9 |
---|
1666 | 1666 | | loans and grants to support the creation of new solar energy sources in the State that are 10 |
---|
1667 | 1667 | | owned by or directly benefit: 11 |
---|
1668 | 1668 | | |
---|
1669 | 1669 | | (i) low– to moderate–income communities located in a census tract 12 |
---|
1670 | 1670 | | with an average median income at or below 80% of the average median income for the State; 13 |
---|
1671 | 1671 | | |
---|
1672 | 1672 | | (ii) overburdened or underserved communities, as defined in § 1–701 14 |
---|
1673 | 1673 | | of the Environment Article; or 15 |
---|
1674 | 1674 | | |
---|
1675 | 1675 | | (iii) households with low to moderate income, as defined in § 9–2016 16 |
---|
1676 | 1676 | | of this title.] 17 |
---|
1677 | 1677 | | |
---|
1678 | 1678 | | [(i–1)] (I) (1) (i) In this subsection the following words have the meanings 18 |
---|
1679 | 1679 | | indicated. 19 |
---|
1680 | 1680 | | |
---|
1681 | 1681 | | (ii) “Area median income” has the meaning stated in § 4–1801 of the 20 |
---|
1682 | 1682 | | Housing and Community Development Article. 21 |
---|
1683 | 1683 | | |
---|
1684 | 1684 | | (iii) “Low and moderate income” means having an annual household 22 |
---|
1685 | 1685 | | income that is at or below 120% of the area median income. 23 |
---|
1686 | 1686 | | |
---|
1687 | 1687 | | (2) Compliance fees paid under § 7–705(b–1) of the Public Utilities Article 24 |
---|
1688 | 1688 | | shall be accounted for separately within the Fund and may be used only to make loans and 25 |
---|
1689 | 1689 | | grants to promote increased opportunities for the growth and development of small, 26 |
---|
1690 | 1690 | | minority, women–owned, and veteran–owned businesses in the State that install 27 |
---|
1691 | 1691 | | geothermal systems in the State. 28 |
---|
1692 | 1692 | | |
---|
1693 | 1693 | | Article – Tax – General 29 |
---|
1694 | 1694 | | |
---|
1695 | 1695 | | 2–1201. 30 |
---|
1696 | 1696 | | |
---|
1697 | 1697 | | (A) IN THIS SECTION , “QUALIFIED DATA CENTE R” HAS THE MEANING 31 |
---|
1698 | 1698 | | STATED IN § 11–239 OF THIS ARTICLE. 32 |
---|
1699 | 1699 | | 38 HOUSE BILL 398 |
---|
1700 | 1700 | | |
---|
1701 | 1701 | | |
---|
1702 | 1702 | | (B) The Comptroller shall pay refunds relating to the public service company 1 |
---|
1703 | 1703 | | franchise tax from the General Fund of the State. 2 |
---|
1704 | 1704 | | |
---|
1705 | 1705 | | (C) THE COMPTROLLER SHALL DIS TRIBUTE 75% OF THE FRANCHISE TAX 3 |
---|
1706 | 1706 | | REVENUE FROM PUBLIC SERVICE COMPANIES IMPOSED UNDER § 8–402.1 OF THIS 4 |
---|
1707 | 1707 | | ARTICLE, THAT IS ATTRIBUTABLE TO THE KILOWATT –HOURS OF ELECTRICITY 5 |
---|
1708 | 1708 | | DELIVERED TO QUALIFI ED DATA CENTERS THAT ARE OPERATIONAL ON O R AFTER 6 |
---|
1709 | 1709 | | JANUARY 1, 2026, TO THE ESCROW ACCOUN T ESTABLISHED BY THE PUBLIC 7 |
---|
1710 | 1710 | | SERVICE COMMISSION UNDER § 7–705 OF THE PUBLIC UTILITIES ARTICLE. 8 |
---|
1711 | 1711 | | |
---|
1712 | 1712 | | 2–1302.5. 9 |
---|
1713 | 1713 | | |
---|
1714 | 1714 | | (A) IN THIS SECTION , “QUALIFIED DATA CENTE R” HAS THE MEANING 10 |
---|
1715 | 1715 | | STATED IN § 11–239 OF THIS ARTICLE. 11 |
---|
1716 | 1716 | | |
---|
1717 | 1717 | | (B) THE COMPTROLLER SHALL DIS TRIBUTE 75% OF THE SALES AND USE 12 |
---|
1718 | 1718 | | TAX REVENUES ATTRIBU TABLE TO THE SALE OF ELECTRICITY DELIVERED TO 13 |
---|
1719 | 1719 | | QUALIFIED DATA CENTE RS THAT ARE OPERATIO NAL ON OR AFTER JANUARY 1, 2026, 14 |
---|
1720 | 1720 | | TO THE ESCROW ACCOUN T ESTABLISHED BY THE PUBLIC SERVICE COMMISSION 15 |
---|
1721 | 1721 | | UNDER § 7–705 OF THE PUBLIC UTILITIES ARTICLE. 16 |
---|
1722 | 1722 | | |
---|
1723 | 1723 | | 2–1303. 17 |
---|
1724 | 1724 | | |
---|
1725 | 1725 | | After making the distributions required under §§ 2–1301 through [2–1302.4] 18 |
---|
1726 | 1726 | | 2–1302.5 of this subtitle, the Comptroller shall pay: 19 |
---|
1727 | 1727 | | |
---|
1728 | 1728 | | (1) revenues from the hotel surcharge into the Dorchester County 20 |
---|
1729 | 1729 | | Economic Development Fund established under § 10–130 of the Economic Development 21 |
---|
1730 | 1730 | | Article; 22 |
---|
1731 | 1731 | | |
---|
1732 | 1732 | | (2) to the Blueprint for Maryland’s Future Fund established under § 5–206 23 |
---|
1733 | 1733 | | of the Education Article, the following percentage of the remaining sales and use tax 24 |
---|
1734 | 1734 | | revenues: 25 |
---|
1735 | 1735 | | |
---|
1736 | 1736 | | (i) for fiscal year 2023, 9.2%; 26 |
---|
1737 | 1737 | | |
---|
1738 | 1738 | | (ii) for fiscal year 2024, 11.0%; 27 |
---|
1739 | 1739 | | |
---|
1740 | 1740 | | (iii) for fiscal year 2025, 11.3%; 28 |
---|
1741 | 1741 | | |
---|
1742 | 1742 | | (iv) for fiscal year 2026, 11.7%; and 29 |
---|
1743 | 1743 | | |
---|
1744 | 1744 | | (v) for fiscal year 2027 and each fiscal year thereafter, 12.1%; and 30 |
---|
1745 | 1745 | | HOUSE BILL 398 39 |
---|
1746 | 1746 | | |
---|
1747 | 1747 | | |
---|
1748 | 1748 | | (3) the remaining sales and use tax revenue into the General Fund of the 1 |
---|
1749 | 1749 | | State. 2 |
---|
1750 | 1750 | | |
---|
1751 | 1751 | | 11–239. 3 |
---|
1752 | 1752 | | |
---|
1753 | 1753 | | (a) (1) In this section the following words have the meanings indicated. 4 |
---|
1754 | 1754 | | |
---|
1755 | 1755 | | (2) “Data center” means a building or group of buildings used to house 5 |
---|
1756 | 1756 | | computer systems, computer storage equipment, and associated infrastructure that 6 |
---|
1757 | 1757 | | businesses or other organizations use to organize, process, store, and disseminate large 7 |
---|
1758 | 1758 | | amounts of data. 8 |
---|
1759 | 1759 | | |
---|
1760 | 1760 | | (5) (i) “Qualified data center” means a data center located in the State 9 |
---|
1761 | 1761 | | in which an individual or a corporation, within 3 years after submitting an application for 10 |
---|
1762 | 1762 | | the sales and use tax exemption under this section, has: 11 |
---|
1763 | 1763 | | |
---|
1764 | 1764 | | 1. for a data center located within a Tier I area, invested at 12 |
---|
1765 | 1765 | | least $2,000,000 in qualified data center personal property and created at least five 13 |
---|
1766 | 1766 | | qualified positions; or 14 |
---|
1767 | 1767 | | |
---|
1768 | 1768 | | 2. for a data center located in any other area of the State, 15 |
---|
1769 | 1769 | | invested at least $5,000,000 in qualified data center personal property and created at least 16 |
---|
1770 | 1770 | | five qualified positions. 17 |
---|
1771 | 1771 | | |
---|
1772 | 1772 | | (ii) “Qualified data center” includes: 18 |
---|
1773 | 1773 | | |
---|
1774 | 1774 | | 1. a data center that is a co–located or hosting data center 19 |
---|
1775 | 1775 | | where equipment, space, and bandwidth are available to lease to multiple customers; and 20 |
---|
1776 | 1776 | | |
---|
1777 | 1777 | | 2. an enterprise data center owned and operated by the 21 |
---|
1778 | 1778 | | company it supports. 22 |
---|
1779 | 1779 | | |
---|
1780 | 1780 | | SECTION 2. AND BE IT FURTHER ENACTED, That the General Assembly 23 |
---|
1781 | 1781 | | supports the extension or renewal of the Federal Nuclear Regulatory Commission license 24 |
---|
1782 | 1782 | | for the Calvert Cliffs Nuclear Power Plant’s nuclear reactors in the years 2034 and 2036. 25 |
---|
1783 | 1783 | | |
---|
1784 | 1784 | | SECTION 3. AND BE IT FURTHER ENACTED, That a presently existing obligation 26 |
---|
1785 | 1785 | | or contract right may not be impaired in any way by this Act. 27 |
---|
1786 | 1786 | | |
---|
1787 | 1787 | | SECTION 4. AND BE IT FURTHER ENACTED, That this Act shall take effect June 28 |
---|
1788 | 1788 | | 1, 2025. 29 |
---|