Maryland 2025 Regular Session

Maryland Senate Bill SB716 Compare Versions

Only one version of the bill is available at this time.
OldNewDifferences
11
22
33 EXPLANATION: CAPITALS INDICATE MAT TER ADDED TO EXISTIN G LAW.
44 [Brackets] indicate matter deleted from existing law.
55 *sb0716*
66
77 SENATE BILL 716
88 C5, M5 5lr1388
99
1010 By: Senators Brooks, McKay, Rosapepe, and West
1111 Introduced and read first time: January 27, 2025
1212 Assigned to: Education, Energy, and the Environment
1313
1414 A BILL ENTITLED
1515
1616 AN ACT concerning 1
1717
1818 Public Utilities – Nuclear Energy – Renewable Energy Portfolio Standard and 2
1919 Procurement 3
2020 (Decarbonization Infrastructure Solutions Act of 2025) 4
2121
2222 FOR the purpose of altering the renewable energy portfolio standard; including nuclear 5
2323 energy generated by certain nuclear energy reactors as a Tier 1 renewable source; 6
2424 establishing a certified nuclear renewable energy credit for use in meeting certain 7
2525 renewable energy portfolio standard requirements; establishing a procurement 8
2626 process for the Public Service Commission to evaluate and approve an application 9
2727 for nuclear energy generation projects; requiring the Governor’s Office of Small, 10
2828 Minority, and Women Business Affairs, in consultation with the Office of the 11
2929 Attorney General, to provide certain assistance to potential applicants and minority 12
3030 investors and, in consultation with the Office of the Attorney General and a certain 13
3131 applicant, establish a certain plan; requiring the Commission to approve orders to 14
3232 facilitate the financing of nuclear energy generation projects under certain 15
3333 circumstances; requiring each electric company to procure a certain volume of 16
3434 nuclear energy from a certain escrow account; requiring a certain nuclear energy 17
3535 generation project to sell certain energy, capacity, and ancillary services into certain 18
3636 markets and distribute the proceeds in a certain manner; and generally relating to 19
3737 the renewable energy portfolio standard and nuclear energy. 20
3838
3939 BY repealing and reenacting, without amendments, 21
4040 Article – Public Utilities 22
4141 Section 7–701(a) 23
4242 Annotated Code of Maryland 24
4343 (2020 Replacement Volume and 2024 Supplement) 25
4444
4545 BY adding to 26
4646 Article – Public Utilities 27 2 SENATE BILL 716
4747
4848
4949 Section 7–701(e–2) and (s)(14), 7–703(b)(26) through (35) and (g), and 7–709.2; and 1
5050 7–1201 through 7–1211 to be under the new subtitle “Subtitle 12. Nuclear 2
5151 Energy Procurement” 3
5252 Annotated Code of Maryland 4
5353 (2020 Replacement Volume and 2024 Supplement) 5
5454
5555 BY repealing and reenacting, with amendments, 6
5656 Article – Public Utilities 7
5757 Section 7–701(s)(12) and (13), 7–703(b)(21) through (25), and 7–704(a) 8
5858 Annotated Code of Maryland 9
5959 (2020 Replacement Volume and 2024 Supplement) 10
6060
6161 SECTION 1. BE IT ENACTED BY THE GENERAL ASSEMBLY OF MARYLAND, 11
6262 That the Laws of Maryland read as follows: 12
6363
6464 Article – Public Utilities 13
6565
6666 7–701. 14
6767
6868 (a) In this subtitle the following words have the meanings indicated. 15
6969
7070 (E–2) “NUCLEAR ENERGY REACTOR” OR “REACTOR” MEANS A DEVICE THAT 16
7171 IS: 17
7272
7373 (1) DESIGNED OR USED TO PRODUCE ELECTRICA L OR HEAT ENERGY 18
7474 BY SUSTAINING NUCLEAR FISSION IN A SELF–SUPPORTING CHAIN REACTION ; 19
7575
7676 (2) LICENSED FOR COMMERC IAL USE BY THE NUCLEAR REGULATORY 20
7777 COMMISSION; AND 21
7878
7979 (3) LOCATED AT A NUCLEAR ENERGY GENERATING FA CILITY 22
8080 CONNECTED WITH THE E LECTRIC DISTRIBUTION SYSTEM SERVING THE STATE. 23
8181
8282 (s) “Tier 1 renewable source” means one or more of the following types of energy 24
8383 sources: 25
8484
8585 (12) thermal energy from a thermal biomass system; [and] 26
8686
8787 (13) raw or treated wastewater used as a heat source or sink for a heating 27
8888 or cooling system; AND 28
8989
9090 (14) NUCLEAR ENERGY FROM A NUCLEAR ENERGY REACTOR, 29
9191 INCLUDING SMALL MODU LAR REACTORS . 30
9292
9393 7–703. 31
9494 SENATE BILL 716 3
9595
9696
9797 (b) Except as provided in subsections (e) and (f) of this section, the renewable 1
9898 energy portfolio standard shall be as follows: 2
9999
100100 (21) in 2026: 3
101101
102102 (i) [38%] 42% from Tier 1 renewable sources, including: 4
103103
104104 1. at least 8% derived from solar energy; 5
105105
106106 2. an amount set by the Commission under § 7–704.2(a) of 6
107107 this subtitle derived from offshore wind energy, including at least 400 megawatts of Round 7
108108 2 offshore wind projects; [and] 8
109109
110110 3. at least 0.5% derived from post–2022 geothermal systems; 9
111111 and 10
112112
113113 4. AT LEAST 4% DERIVED FROM NUCLEAR ENERGY; AND 11
114114
115115 (ii) 2.5% from Tier 2 renewable sources; and 12
116116
117117 (22) in 2027: 13
118118
119119 (i) [41.5%] 49.5% from Tier 1 renewable sources, including: 14
120120
121121 1. at least 9.5% derived from solar energy; 15
122122
123123 2. an amount set by the Commission under § 7–704.2(a) of 16
124124 this subtitle derived from offshore wind energy, including at least 400 megawatts of Round 17
125125 2 offshore wind projects; [and] 18
126126
127127 3. at least 0.75% derived from post–2022 geothermal 19
128128 systems; and 20
129129
130130 4. AT LEAST 8% DERIVED FROM NUCLEAR ENERGY ; AND 21
131131
132132 (ii) 2.5% from Tier 2 renewable sources; and 22
133133
134134 (23) in 2028: 23
135135
136136 (i) [43%] 55% from Tier 1 renewable sources, including: 24
137137
138138 1. at least 11% derived from solar energy; 25
139139
140140 2. an amount set by the Commission under § 7–704.2(a) of 26
141141 this subtitle derived from offshore wind energy, including at least 800 megawatts of Round 27
142142 2 offshore wind projects; [and] 28 4 SENATE BILL 716
143143
144144
145145
146146 3. at least 1% derived from post–2022 geothermal systems; 1
147147 and 2
148148
149149 4. AT LEAST 12% DERIVED FROM NUCLEAR ENERGY; 3
150150 AND 4
151151
152152 (ii) 2.5% from Tier 2 renewable sources; and 5
153153
154154 (24) in 2029: 6
155155
156156 (i) [49.5%] 65.5% from Tier 1 renewable sources, including: 7
157157
158158 1. at least 12.5% derived from solar energy; 8
159159
160160 2. an amount set by the Commission under § 7–704.2(a) of 9
161161 this subtitle derived from offshore wind energy, including at least 800 megawatts of Round 10
162162 2 offshore wind projects; [and] 11
163163
164164 3. at least 1% derived from post–2022 geothermal systems; 12
165165 and 13
166166
167167 4. AT LEAST 16% DERIVED FROM NUC LEAR ENERGY ; 14
168168 AND 15
169169
170170 (ii) 2.5% from Tier 2 renewable sources; [and] 16
171171
172172 (25) in 2030 [and later]: 17
173173
174174 (i) [50%] 70% from Tier 1 renewable sources, including: 18
175175
176176 1. at least 14.5% derived from solar energy; 19
177177
178178 2. an amount set by the Commission under § 7–704.2(a) of 20
179179 this subtitle derived from offshore wind energy, including at least 1,200 megawatts of 21
180180 Round 2 offshore wind projects; [and] 22
181181
182182 3. at least 1% derived from post–2022 geothermal systems; 23
183183 and 24
184184
185185 4. AT LEAST 20% DERIVED FROM NUCLEAR ENERGY; 25
186186 AND 26
187187
188188 (ii) 2.5% from Tier 2 renewable sources; 27
189189
190190 (26) IN 2031: 28 SENATE BILL 716 5
191191
192192
193193
194194 (I) 73% FROM TIER 1 RENEWABLE SOURCES , INCLUDING: 1
195195
196196 1. AT LEAST 14.5% DERIVED FROM SOLAR E NERGY; 2
197197
198198 2. AN AMOUNT SET BY THE COMMISSION UNDER § 3
199199 7–704.2(A) OF THIS SUBTITLE DER IVED FROM OFFSHORE W IND ENERGY, INCLUDING 4
200200 AT LEAST 1,200 MEGAWATTS OF ROUND 2 OFFSHORE WIND PROJEC TS; 5
201201
202202 3. AT LEAST 1% DERIVED FROM POST –2022 6
203203 GEOTHERMAL SYSTEMS ; AND 7
204204
205205 4. AT LEAST 23% DERIVED FROM NUCLEAR ENERGY; 8
206206 AND 9
207207
208208 (II) 2.5% FROM TIER 2 RENEWABLE SOURCES; 10
209209
210210 (27) IN 2032: 11
211211
212212 (I) 76% FROM TIER 1 RENEWABLE SOURCES , INCLUDING: 12
213213
214214 1. AT LEAST 14.5% DERIVED FROM SOLAR E NERGY; 13
215215
216216 2. AN AMOUNT SET BY THE COMMISSION UNDER § 14
217217 7–704.2(A) OF THIS SUBTITLE DER IVED FROM OFFSHORE W IND ENERGY, INCLUDING 15
218218 AT LEAST 1,200 MEGAWATTS OF ROUND 2 OFFSHORE WIND PROJEC TS; 16
219219
220220 3. AT LEAST 1% DERIVED FROM POST –2022 17
221221 GEOTHERMAL SYSTEMS ; AND 18
222222
223223 4. AT LEAST 26% DERIVED FROM NUCLEAR ENERGY; 19
224224 AND 20
225225
226226 (II) 2.5% FROM TIER 2 RENEWABLE SOURCES ; 21
227227
228228 (28) IN 2033: 22
229229
230230 (I) 79% FROM TIER 1 RENEWABLE SOURCES , INCLUDING: 23
231231
232232 1. AT LEAST 14.5% DERIVED FROM SOLAR E NERGY; 24
233233 6 SENATE BILL 716
234234
235235
236236 2. AN AMOUNT SET BY THE COMMISSION UNDER § 1
237237 7–704.2(A) OF THIS SUBTITLE DER IVED FROM OFFSHORE WIND ENERGY , INCLUDING 2
238238 AT LEAST 1,200 MEGAWATTS OF ROUND 2 OFFSHORE WIND PROJEC TS; 3
239239
240240 3. AT LEAST 1% DERIVED FROM POST –2022 4
241241 GEOTHERMAL SYSTEMS ; AND 5
242242
243243 4. AT LEAST 29% DERIVED FROM NUCLEAR ENERGY; 6
244244 AND 7
245245
246246 (II) 2.5% FROM TIER 2 RENEWABLE SOURCES; 8
247247
248248 (29) IN 2034: 9
249249
250250 (I) 82% FROM TIER 1 RENEWABLE SOURCES , INCLUDING: 10
251251
252252 1. AT LEAST 14.5% DERIVED FROM SOLAR E NERGY; 11
253253
254254 2. AN AMOUNT SET BY THE COMMISSION UNDER § 12
255255 7–704.2(A) OF THIS SUBTITLE DER IVED FROM OFFSHORE W IND ENERGY, INCLUDING 13
256256 AT LEAST 1,200 MEGAWATTS OF ROUND 2 OFFSHORE WIND PROJEC TS; 14
257257
258258 3. AT LEAST 1% DERIVED FROM POST –2022 15
259259 GEOTHERMAL SYSTEMS ; AND 16
260260
261261 4. AT LEAST 32% DERIVED FROM NUCLEAR ENERGY; 17
262262 AND 18
263263
264264 (II) 2.5% FROM TIER 2 RENEWABLE SOURCES ; 19
265265
266266 (30) IN 2035: 20
267267
268268 (I) 85% FROM TIER 1 RENEWABLE SOURCES , INCLUDING: 21
269269
270270 1. AT LEAST 14.5% DERIVED FROM SOLAR E NERGY; 22
271271
272272 2. AN AMOUNT SET BY THE COMMISSION UNDER § 23
273273 7–704.2(A) OF THIS SUBTITLE DER IVED FROM OFFSHORE W IND ENERGY, INCLUDING 24
274274 AT LEAST 1,200 MEGAWATTS OF ROUND 2 OFFSHORE WIND PROJEC TS; 25
275275
276276 3. AT LEAST 1% DERIVED FROM POST –2022 26
277277 GEOTHERMAL SYSTEMS ; AND 27
278278 SENATE BILL 716 7
279279
280280
281281 4. AT LEAST 35% DERIVED FROM NUCLEAR ENERGY; 1
282282 AND 2
283283
284284 (II) 2.5% FROM TIER 2 RENEWABLE SOURCES ; 3
285285
286286 (31) IN 2036: 4
287287
288288 (I) 88% FROM TIER 1 RENEWABLE SOURCES , INCLUDING: 5
289289
290290 1. AT LEAST 14.5% DERIVED FROM SOLAR E NERGY; 6
291291
292292 2. AN AMOUNT SET BY THE COMMISSION UNDER § 7
293293 7–704.2(A) OF THIS SUBTITLE DER IVED FROM OFFSHORE W IND ENERGY, INCLUDING 8
294294 AT LEAST 1,200 MEGAWATTS OF ROUND 2 OFFSHORE WIND PROJEC TS; 9
295295
296296 3. AT LEAST 1% DERIVED FROM POST –2022 10
297297 GEOTHERMAL SYSTEMS ; AND 11
298298
299299 4. AT LEAST 38% DERIVED FROM NUCLEAR ENERGY; 12
300300 AND 13
301301
302302 (II) 2.5% FROM TIER 2 RENEWABLE SOURCES ; 14
303303
304304 (32) IN 2037: 15
305305
306306 (I) 91% FROM TIER 1 RENEWABLE SOURCES , INCLUDING: 16
307307
308308 1. AT LEAST 14.5% DERIVED FROM SOLAR E NERGY; 17
309309
310310 2. AN AMOUNT SET BY THE COMMISSION UNDER § 18
311311 7–704.2(A) OF THIS SUBTITLE DER IVED FROM OFFSHORE W IND ENERGY, INCLUDING 19
312312 AT LEAST 1,200 MEGAWATTS OF ROUND 2 OFFSHORE WIND PROJEC TS; 20
313313
314314 3. AT LEAST 1% DERIVED FROM POST –2022 21
315315 GEOTHERMAL SYSTEMS ; AND 22
316316
317317 4. AT LEAST 41% DERIVED FROM NUCLEAR ENERGY ; 23
318318 AND 24
319319
320320 (II) 2.5% FROM TIER 2 RENEWABLE SOURCES ; 25
321321
322322 (33) IN 2038: 26
323323 8 SENATE BILL 716
324324
325325
326326 (I) 94% FROM TIER 1 RENEWABLE SOURCES , INCLUDING: 1
327327
328328 1. AT LEAST 14.5% DERIVED FROM SOLAR E NERGY; 2
329329
330330 2. AN AMOUNT SET BY THE COMMISSION UNDER § 3
331331 7–704.2(A) OF THIS SUBTITLE DER IVED FROM OFFSHORE WIND ENERGY , INCLUDING 4
332332 AT LEAST 1,200 MEGAWATTS OF ROUND 2 OFFSHORE WIND PROJEC TS; 5
333333
334334 3. AT LEAST 1% DERIVED FROM POST –2022 6
335335 GEOTHERMAL SYSTEMS ; AND 7
336336
337337 4. AT LEAST 44% DERIVED FROM NUCLEAR ENERGY; 8
338338 AND 9
339339
340340 (II) 2.5% FROM TIER 2 RENEWABLE SOURCE S; 10
341341
342342 (34) IN 2039: 11
343343
344344 (I) 97% FROM TIER 1 RENEWABLE SOURCES , INCLUDING: 12
345345
346346 1. AT LEAST 14.5% DERIVED FROM SOLAR E NERGY; 13
347347
348348 2. AN AMOUNT SET BY THE COMMISSION UNDER § 14
349349 7–704.2(A) OF THIS SUBTITLE DER IVED FROM OFFSHORE W IND ENERGY, INCLUDING 15
350350 AT LEAST 1,200 MEGAWATTS OF ROUND 2 OFFSHORE WIND PROJEC TS; 16
351351
352352 3. AT LEAST 1% DERIVED FROM POST –2022 17
353353 GEOTHERMAL SYSTEMS ; AND 18
354354
355355 4. AT LEAST 47% DERIVED FROM NUCLEAR ENERGY; 19
356356 AND 20
357357
358358 (II) 2.5% FROM TIER 2 RENEWABLE SOURCES ; AND 21
359359
360360 (35) SUBJECT TO SUBSECTIO N (G) OF THIS SECTION , IN 2040 AND 22
361361 LATER, 100% FROM TIER 1 RENEWABLE SOURCES , INCLUDING: 23
362362
363363 (I) AT LEAST 14.5% DERIVED FROM SOLAR E NERGY; 24
364364
365365 (II) AN AMOUNT SET BY THE COMMISSION UNDER § 7–704.2(A) 25
366366 OF THIS SUBTITLE DER IVED FROM OFFSHOR E WIND ENERGY , INCLUDING AT LEAST 26
367367 1,200 MEGAWATTS OF ROUND 2 OFFSHORE WIND PROJEC TS; 27
368368 SENATE BILL 716 9
369369
370370
371371 (III) AT LEAST 1% DERIVED FROM POST –2022 GEOTHERMAL 1
372372 SYSTEMS; AND 2
373373
374374 (IV) AT LEAST 50% DERIVED FROM NUCLEAR ENERGY . 3
375375
376376 (G) TO ENSURE THE DEVELOP MENT AND INCREASING USE OF CLEAN 4
377377 ENERGY TECHNOLOGIES OTHER THAN NUCLEAR E NERGY, STARTING IN 2040, THE 5
378378 COMMISSION MAY INCREMENTALLY REDUCE THE PERCENTAGE REQUIREMENT OF 6
379379 THE RENEWABLE PORTFO LIO STANDARD FOR ENE RGY DERIVED FROM NUC LEAR 7
380380 ENERGY. 8
381381
382382 7–704. 9
383383
384384 (a) (1) (I) Energy from a Tier 1 renewable source: 10
385385
386386 [(i)] 1. EXCEPT AS PROVIDED I N SUBPARAGRAPH (II) OF THIS 11
387387 PARAGRAPH , is eligible for inclusion in meeting the renewable energy portfolio standard 12
388388 regardless of when the generating system or facility was placed in service; and 13
389389
390390 [(ii)] 2. may be applied to the percentage requirements of the 14
391391 standard for either Tier 1 renewable sources or Tier 2 renewable sources. 15
392392
393393 (II) ENERGY FROM A NUCLEAR ENERGY REACTOR PLACED IN 16
394394 SERVICE AT A NUCLEAR ENERGY GENERATING FACILITY ON OR BEFORE OCTOBER 17
395395 1, 2025, IS NOT ELIGIBLE FOR INCLUSION IN MEETING THE RENEWABLE ENERGY 18
396396 PORTFOLIO STANDARD . 19
397397
398398 (2) (i) Energy from a Tier 1 renewable source under § 7–701(s)(1), (5), 20
399399 (9), (10), [or (11)] (11), OR (14) of this subtitle is eligible for inclusion in meeting the 21
400400 renewable energy portfolio standard only if the source is connected with the electric 22
401401 distribution [grid] SYSTEM serving Maryland. 23
402402
403403 (ii) Energy from a Tier 1 renewable source under § 7–701(s)(13) of 24
404404 this subtitle is eligible for inclusion in meeting the renewable energy portfolio standard 25
405405 only if the source: 26
406406
407407 1. is connected with the electric distribution [grid] SYSTEM 27
408408 serving Maryland; or 28
409409
410410 2. processes wastewater from Maryland residents. 29
411411
412412 (iii) If the owner of a solar generating system in this State chooses to 30
413413 sell solar renewable energy credits from that system, the owner must first offer the credits 31
414414 for sale to an electricity supplier or electric company that shall apply them toward 32
415415 compliance with the renewable energy portfolio standard under § 7–703 of this subtitle. 33 10 SENATE BILL 716
416416
417417
418418
419419 (3) Energy from a Tier 1 renewable source under § 7–701(s)(8) of this 1
420420 subtitle is eligible for inclusion in meeting the renewable energy portfolio standard if it is 2
421421 generated at a dam that existed as of January 1, 2004, even if a system or facility that is 3
422422 capable of generating electricity did not exist on that date. 4
423423
424424 (4) Energy from a Tier 2 renewable source under § 7–701(t) of this subtitle 5
425425 is eligible for inclusion in meeting the renewable energy portfolio standard if it is generated 6
426426 at a system or facility that existed and was operational as of January 1, 2004, even if the 7
427427 facility or system was not capable of generating electricity on that date. 8
428428
429429 7–709.2. 9
430430
431431 (A) (1) IN THIS SECTIO N THE FOLLOWING WORD S HAVE THE MEANINGS 10
432432 INDICATED. 11
433433
434434 (2) “CERTIFIED NREC” MEANS A NUCLEAR RENE WABLE ENERGY 12
435435 CREDIT GENERATED BY A CERTIFIED REACTOR. 13
436436
437437 (3) “CERTIFIED REACTOR” MEANS A NUCLEAR ENERGY REACTOR 14
438438 CERTIFIED BY THE COMMISSION UNDER THE PROGRAM TO GENERATE CERTIFIED 15
439439 NRECS WITH THE COMPLIANC E VALUE SPECIFIED IN SUBSECTION (C) OF THIS 16
440440 SECTION. 17
441441
442442 (4) “PROGRAM” MEANS THE NUCLEAR ENERGY REACTOR 18
443443 INCENTIVE PROGRAM. 19
444444
445445 (B) THE COMMISSION SHALL ESTA BLISH A NUCLEAR ENERGY REACTOR 20
446446 INCENTIVE PROGRAM. 21
447447
448448 (C) (1) UNDER THE PROGRAM, A CERTIFIED REACTOR SHALL GENERATE 22
449449 CERTIFIED NRECS. 23
450450
451451 (2) EXCEPT AS PROVIDED IN PARAGRAPH (3) OF THIS SUBSECTION , 24
452452 THE PROVISIONS OF TH IS SUBTITLE RELATING TO RENEWABLE ENERGY CREDITS 25
453453 SHALL APPLY TO CERTI FIED NRECS. 26
454454
455455 (3) (I) A CERTIFIED NREC SHALL HAVE A COMPLIA NCE VALUE 27
456456 ESTABLISHED BY THE COMMISSION UNDER SUBP ARAGRAPH (II) OF THIS 28
457457 PARAGRAPH FOR ELECTRICITY SUPP LIERS TO PUT TOWARD MEETING THE 29
458458 RENEWABLE ENERGY POR TFOLIO STANDARD FOR ENERGY DERIVED FROM NUCLEAR 30
459459 ENERGY UNDER § 7–703 OF THIS SUBTITLE. 31
460460 SENATE BILL 716 11
461461
462462
463463 (II) 1. ON OR BEFORE JUNE 1 EACH YEAR, THE COMMISSION 1
464464 SHALL ESTABLISH A COMPLIANCE VALUE FOR CERTIFIED NRECS FOR THE NEXT 2
465465 FISCAL YEAR THAT ENSURES COMPETI TIVENESS OF ALL TECH NOLOGIES USED TO 3
466466 MEET THE RENEWABLE E NERGY PORTFOLIO STAN DARD. 4
467467
468468 2. THE COMMISSION MAY NOT ES TABLISH A 5
469469 COMPLIANCE VALUE THA T RESULTS IN CERTIFIED NREC VALUES THAT ARE LESS 6
470470 THAN $50 PER MEGAWATT –HOUR OR GREATER THAN $75 PER MEGAWATT –HOUR. 7
471471
472472 3. FOR FISCAL YEAR 2027 THE COMMISSION SHALL 8
473473 ESTABLISH A COMPLIAN CE VALUE THAT RESULT S IN A CERTIFIED NREC VALUE OF 9
474474 $65 PER MEGAWATT –HOUR. 10
475475
476476 (D) TO BE ELIGIBLE FOR CE RTIFICATION UNDER TH E PROGRAM, A 11
477477 NUCLEAR ENERGY REACTOR SHALL: 12
478478
479479 (1) BE LOCATED IN THE STATE; 13
480480
481481 (2) BE ELIGIBLE FOR INCLUSI ON IN MEETING THE RE NEWABLE 14
482482 ENERGY PORTFOLIO STA NDARD; 15
483483
484484 (3) HAVE THE GENERATING CAPACITY REQUIRED BY THE 16
485485 COMMISSION; AND 17
486486
487487 (4) BE PLACED IN SERVICE AFTER OCTOBER 1, 2025. 18
488488
489489 (E) THE COMMISSION, AT THE TIME OF CERTI FYING A NUCLEAR ENERGY 19
490490 REACTOR AS A TIER 1 RENEWABLE SOURCE , SHALL CERTIFY THE REACTOR AS 20
491491 ELIGIBLE TO GENERATE CERTIFIED NRECS IN ACCORDANCE WITH SUBSECTION (C) 21
492492 OF THIS SECTION IF T HE APPLICANT SUBMITS WITH ITS APPLICATION FOR 22
493493 CERTIFICATION AS A TIER 1 RENEWABLE SOURCE : 23
494494
495495 (1) A FORM REQUESTING TO BE CERTIFIED TO RECE IVE CERTIFIED 24
496496 NRECS WITH THE VALUE SPE CIFIED IN SUBSECTION (C) OF THIS SECTION; AND 25
497497
498498 (2) ANY OTHER INFORMATIO N REQUIRED BY THE COMMISSION. 26
499499
500500 (F) AN ELECTRICITY SUPPLI ER MAY APPLY THE CER TIFIED NRECS 27
501501 GENERATED IN ACCORDANCE WITH THIS SECTION TOWARD THE R ENEWABLE 28
502502 ENERGY PORTFOLIO STANDARD. 29
503503
504504 SUBTITLE 12. NUCLEAR ENERGY PROCUREMENT . 30
505505 12 SENATE BILL 716
506506
507507
508508 7–1201. 1
509509
510510 (A) AFTER THE EFFECTIVE D ATE OF COMMISSION REGULATION S 2
511511 IMPLEMENTING THIS SU BTITLE, A PERSON MAY SUBMIT AN APPLICATION TO TH E 3
512512 COMMISSION FOR APPROV AL OF A PROPOSED NUC LEAR ENERGY GENERATI ON 4
513513 PROJECT. 5
514514
515515 (B) (1) ON RECEIPT OF AN APPL ICATION FOR APPROVAL OF A PROPOSED 6
516516 NUCLEAR ENERGY GENER ATION PROJECT , THE COMMISSION SHALL : 7
517517
518518 (I) OPEN AN APPLICATION PERIOD DURING WHICH OTHER 8
519519 INTERESTED PERSONS MAY SUB MIT APPLICATIONS FOR APPROVAL OF A PROPOS ED 9
520520 NUCLEAR ENERGY GENER ATION PROJECT ; AND 10
521521
522522 (II) PROVIDE NOTICE THAT THE COMMISSION IS ACCEPTI NG 11
523523 APPLICATIONS FOR APP ROVAL OF PROPOSED NU CLEAR ENERGY GENERAT ION 12
524524 PROJECTS. 13
525525
526526 (2) THE COMMISSION SHALL SET THE CLOSIN G DATE FOR THE 14
527527 APPLICATION PERIOD T O BE NOT SOONER THAN 90 DAYS AFTER THE NOTIC E 15
528528 PROVIDED UNDER PARAG RAPH (1) OF THIS SUBSECTION . 16
529529
530530 (C) THE COMMISSION SHALL PROV IDE AT LEAST TWO ADD ITIONAL 17
531531 APPLICATION PERIODS BEFORE JANUARY 1, 2031. 18
532532
533533 (D) THE COMMISSION MAY PROVID E ADDITIONAL APPLICA TION PERIODS 19
534534 THAT MEET THE REQUIR EMENTS OF THIS SECTI ON. 20
535535
536536 7–1202. 21
537537
538538 UNLESS EXTENDED BY MU TUAL CONSENT OF THE PARTIES, THE COMMISSION 22
539539 SHALL APPROVE , CONDITIONALLY APPROV E, OR DENY AN APPLICATI ON SUBMITTED 23
540540 UNDER § 7–1201 OF THIS SUBTITLE WITHIN 1 YEAR AFTER THE CLOSE OF THE 24
541541 APPLICATION PERIOD . 25
542542
543543 7–1203. 26
544544
545545 AN APPLICATION SUBMITTED FOR A NUCL EAR ENERGY GENERATIO N 27
546546 PROJECT UNDER § 7–1201 OF THIS SUBTITLE SHALL INCLUDE : 28
547547
548548 (1) A DETAILED DESCRIPTI ON AND FINANCIAL ANALYSIS O F THE 29
549549 PROJECT; 30
550550 SENATE BILL 716 13
551551
552552
553553 (2) THE PROPOSED METHOD OF FINANCING THE PRO JECT; 1
554554
555555 (3) A COST–BENEFIT ANALYSIS OF THE ECONOMIC , ENVIRONMENTAL , 2
556556 AND HEALTH BENEFITS THAT THE PROJECT IS ANTICIPATED TO PROVI DE TO THE 3
557557 STATE; 4
558558
559559 (4) A PROPOSED LONG –TERM PRICING SCHEDULE FOR THE PROJECT 5
560560 THAT SHALL SPECIFY A PRICE FOR THE GENERA TION ATTRIBUTES ; 6
561561
562562 (5) A DECOMMISSIONING AN D WASTE STORAGE PLAN FOR THE 7
563563 PROJECT, INCLUDING PROVISIONS FOR DECOMMISSIONING OR WASTE STORAGE AS 8
564564 REQUIRED BY THE U.S. NUCLEAR REGULATORY COMMISSION; 9
565565
566566 (6) A COMMITMENT TO ABIDE BY THE REQUIRE MENTS SET FORTH IN 10
567567 § 7–1206 OF THIS SUBTITLE; 11
568568
569569 (7) A DESCRIPTION OF THE APPLICANT’S PLAN FOR ENGAGING SMALL 12
570570 BUSINESSES, AS DEFINED IN § 14–501 OF THE STATE FINANCE AND PROCUREMENT 13
571571 ARTICLE; 14
572572
573573 (8) IF APPLICABLE, THE STATEMENT SPECIF IED IN § 7–1204(C)(2) OF 15
574574 THIS SUBTITLE; AND 16
575575
576576 (9) ANY OTHER INFORMATIO N THE COMMISSION REQUIRES . 17
577577
578578 7–1204. 18
579579
580580 (A) THE COMMISSION SHALL USE THE FOLLOWING CRITER IA TO EVALUATE 19
581581 AND COMPARE APPLICATIONS FOR NUCLEAR ENERGY GENERATION PROJECTS 20
582582 SUBMITTED DURING AN APPLICATION PERIOD UNDER § 7–1201 OF THIS SUBTITLE: 21
583583
584584 (1) THE LOWEST COST IMPA CT ON RATEPAYERS OF THE PRICE SET 22
585585 UNDER A PROPOSED PRI CING SCHEDULE ; 23
586586
587587 (2) POTENTIAL REDUCTIONS IN TRANSMISSION CONG ESTION PRICES 24
588588 WITHIN THE STATE; 25
589589
590590 (3) POTENTIAL CHANGES IN CAPACITY PRICES WITH IN THE STATE; 26
591591
592592 (4) POTENTIAL REDUCTIONS IN LOCATIONAL MARGIN AL PRICING; 27
593593 14 SENATE BILL 716
594594
595595
596596 (5) POTENTIAL LONG –TERM CHANGES IN CAPA CITY PRICES WITHIN 1
597597 THE STATE FROM THE PROJEC T AS IT COMPARES TO CONVENTIONAL ENERGY 2
598598 SOURCES; 3
599599
600600 (6) THE EXTENT TO WHICH THE COST–BENEFIT ANALYSIS SUB MITTED 4
601601 UNDER § 7–1203 OF THIS SUBTITLE DEM ONSTRATES POSITIVE N ET ECONOMIC , 5
602602 ENVIRONMENTAL , AND HEALTH BENEFITS TO THE STATE; 6
603603
604604 (7) THE EXTENT TO WHICH AN APPLICANT ’S PLAN FOR ENGAGING 7
605605 SMALL BUSINESSES MEE TS THE GOALS SPECIFI ED IN TITLE 14, SUBTITLE 5 OF THE 8
606606 STATE FINANCE AND PROCUREMENT ARTICLE; 9
607607
608608 (8) THE EXTENT TO WHICH AN APPLICANT’S PLAN PROVIDES FOR THE 10
609609 USE OF SKILLED LABOR , PARTICULARLY WITH RE GARD TO THE CONSTRUC TION AND 11
610610 MANUFACT URING COMPONENTS OF THE PROJECT , THROUGH OUTREACH , HIRING, 12
611611 OR REFERRAL SYSTEMS THAT ARE AFFILIATED WITH REGISTERED APPR ENTICESHIP 13
612612 PROGRAMS UNDER TITLE 11, SUBTITLE 4 OF THE LABOR AND EMPLOYMENT 14
613613 ARTICLE; 15
614614
615615 (9) THE EXTENT TO WHICH AN APPLICANT’S PLAN PROVID ES FOR THE 16
616616 USE OF AN AGREEMENT DESIGNED TO ENSURE T HE USE OF SKILLED LA BOR AND TO 17
617617 PROMOTE THE PROMPT , EFFICIENT, AND SAFE COMPLETION OF THE PROJECT , 18
618618 PARTICULARLY WITH RE GARD TO THE CONSTRUC TION, MANUFACTURING , AND 19
619619 MAINTENANCE OF THE P ROJECT; 20
620620
621621 (10) THE EXTENT TO WHICH AN APP LICANT’S PLAN PROVIDES FOR 21
622622 COMPENSATION TO ITS EMPLOYEES AND SUBCON TRACTORS CONSISTENT WITH 22
623623 WAGES OUTLINED UNDER TITLE 17, SUBTITLE 2 OF THE STATE FINANCE AND 23
624624 PROCUREMENT ARTICLE; 24
625625
626626 (11) SITING AND PROJECT F EASIBILITY; 25
627627
628628 (12) THE EXTE NT TO WHICH THE PROJ ECT WOULD REQUIRE 26
629629 TRANSMISSION OR DIST RIBUTION INFRASTRUCT URE IMPROVEMENTS IN THE 27
630630 STATE; AND 28
631631
632632 (13) ANY OTHER CRITERIA T HAT THE COMMISSION DETERMINES ARE 29
633633 APPROPRIATE . 30
634634
635635 (B) IN EVALUATING AND COM PARING AN APPLICA TION FOR A NUCLEAR 31
636636 ENERGY GENERATION PROJECT UNDER SUBSECTION (A) OF THIS SECTION , THE 32
637637 COMMISSION MAY CONTRA CT FOR THE SERVICES OF INDEPENDENT CONSU LTANTS 33
638638 AND EXPERTS. 34 SENATE BILL 716 15
639639
640640
641641
642642 (C) (1) IN THIS PARAGRAPH , “MINORITY” MEANS AN INDIVIDUAL WHO IS 1
643643 A MEMBER OF ANY OF T HE GROUPS LISTED IN § 14–301(K)(1)(I) OF THE STATE 2
644644 FINANCE AND PROCUREMENT ARTICLE. 3
645645
646646 (2) IF AN APPLICANT IS SE EKING INVESTORS IN A PROPOSED 4
647647 NUCLEAR ENERGY GENER ATION PROJECT , THE APPLICANT SHALL TAKE THE 5
648648 FOLLOWING STEPS BEFO RE THE COMMISSION MAY APPROV E THE PROPOSED 6
649649 PROJECT: 7
650650
651651 (I) MAKE SERIOUS , GOOD–FAITH EFFORTS TO SOL ICIT AND 8
652652 INTERVIEW A REASONAB LE NUMBER OF MINORIT Y INVESTORS; 9
653653
654654 (II) AS PART OF THE APPLI CATION, SUBMIT A STATEMENT T O 10
655655 THE COMMISSION THAT LISTS THE NAMES AND ADDRES SES OF ALL MINORITY 11
656656 INVESTORS INTERVIEWE D AND WHETHER OR NOT ANY O F THOSE INVESTORS HA VE 12
657657 PURCHASED AN EQUITY SHARE IN THE ENTITY SUBMITTING THE APPLI CATION; 13
658658
659659 (III) SIGN A MEMORANDUM OF UNDERSTANDING WITH T HE 14
660660 COMMISSION THAT REQUI RES THE APPLICANT TO AGAIN MAKE SERIOUS , 15
661661 GOOD–FAITH EFFORTS TO SOL ICIT AND INTERVIEW A R EASONABLE NUMBER OF 16
662662 MINORITY INVESTORS I N ANY FUTURE ATTEMPT S TO RAISE VENTURE C APITAL OR 17
663663 ATTRACT NEW INVESTOR S TO THE PROJECT ; 18
664664
665665 (IV) SIGN A MEMORANDUM OF UNDERSTANDING WITH T HE 19
666666 COMMISSION THAT REQUI RES THE APPLICANT TO USE BEST EFF ORTS AND 20
667667 EFFECTIVE OUTREACH T O OBTAIN , AS A GOAL , CONTRACTORS AND 21
668668 SUBCONTRACTORS FOR T HE PROJECT THAT ARE MINORITY BUSINESS 22
669669 ENTERPRISES , TO THE EXTENT PRACTI CABLE, AS SUPPORTED BY A DI SPARITY 23
670670 STUDY; AND 24
671671
672672 (V) SIGN A MEMORANDUM OF UNDERSTANDING WITH T HE 25
673673 COMMISSION AND SKILLE D LABOR ORGANIZATION S THAT REQUIRES THE 26
674674 APPLICANT TO FOLLOW THE PORTIONS OF THE APPLICANT’S PLAN THAT RELATE T O 27
675675 THE CRITERIA SET FOR TH IN SUBSECTION (A)(8) AND (9) OF THIS SECTION. 28
676676
677677 (3) THE GOVERNOR’S OFFICE OF SMALL, MINORITY, AND WOMEN 29
678678 BUSINESS AFFAIRS, IN CONSULTATION WITH THE OFFICE OF THE ATTORNEY 30
679679 GENERAL, SHALL PROVIDE ASSIST ANCE TO ALL POTENTIA L APPLICANTS AND 31
680680 POTENTIAL MINORITY I NVESTORS TO SATISFY THE REQUIREMENTS UND ER 32
681681 PARAGRAPH (2)(I) AND (III) OF THIS SUBSECTION . 33
682682
683683 7–1205. 34 16 SENATE BILL 716
684684
685685
686686
687687 (A) THE COMMISSION MAY NOT AP PROVE AN APPLICA TION FOR A NUCLEAR 1
688688 ENERGY GENERATION PR OJECT SUBMITTED UNDER § 7–1201 OF THIS SUBTITLE 2
689689 UNLESS: 3
690690
691691 (1) THE PROJECT IS CONNE CTED TO THE ELECTRIC DISTRIBUTION 4
692692 SYSTEM SERVING THE STATE; 5
693693
694694 (2) OVER THE DURATION OF THE PROPOSED LONG –TERM PRICING 6
695695 SCHEDULE, THE PROJECTED NET RA TE IMPACT FOR AN AVE RAGE RESIDENTIAL 7
696696 CUSTOMER, BASED ON ANNUAL CONS UMPTION OF 12,000 KILOWATT–HOURS AND 8
697697 COMBINED WITH THE PR OJECTED NET RATE IMP ACT OF OTHER NUCLEAR ENERGY 9
698698 GENERATION PROJECTS , DOES NOT EXCEED AN AMO UNT DETERMINED BY TH E 10
699699 COMMISSION; 11
700700
701701 (3) OVER THE DURATION OF THE PROPOSED LONG –TERM PRICING 12
702702 SCHEDULE, THE PROJECTED NET RA TE IMPACT FOR ALL NO NRESIDENTIAL 13
703703 CUSTOMERS , CONSIDERED AS A BLEN DED AVERAGE AND COMB INED WITH THE 14
704704 PROJECTED NET R ATE IMPACT OF OTHER NUCLEAR ENERGY GENER ATION 15
705705 PROJECTS, DOES NOT EXCEED A PE RCENTAGE DETERMINED BY THE COMMISSION 16
706706 OF NONRESIDENTIAL CU STOMERS’ TOTAL ANNUAL ELECTRI C BILLS; AND 17
707707
708708 (4) THE PRICE SPECIFIED IN THE PROPOSED LONG –TERM PRICING 18
709709 SCHEDULE DOES NOT E XCEED AN AMOUNT DETE RMINED BY THE COMMISSION. 19
710710
711711 (B) WHEN CALCULATING THE PROJECTED NET AVERAG E RATE IMPACTS 20
712712 FOR NUCLEAR ENERGY G ENERATION PROJECTS U NDER THIS SECTION , THE 21
713713 COMMISSION SHALL APPL Y THE SAME NET LONG –TERM COST PER 22
714714 MEGAWATT –HOUR TO RESIDENTIAL AND NONRESIDENTIAL C USTOMERS. 23
715715
716716 7–1206. 24
717717
718718 (A) AN APPLICATION FOR A NUCLEAR ENERGY GENER ATION PROJECT 25
719719 SUBMITTED UNDER § 7–1207 OF THIS SUBTITLE IS SUBJECT TO A COMM UNITY 26
720720 BENEFIT AGREEMENT . 27
721721
722722 (B) A COMMUNITY BENEFIT AG REEMENT SHALL : 28
723723
724724 (1) BE APPLICABLE TO THE DEVELOPMENT OF A NUCLEAR ENERGY 29
725725 GENERATION PROJECT ; 30
726726 SENATE BILL 716 17
727727
728728
729729 (2) PROMOTE INCREASED OP PORTUNITIES FOR LOCA L BUSINESSES 1
730730 AND SMALL, MINORITY, WOMEN–OWNED, AND VETERAN –OWNED BUSINESSES IN THE 2
731731 CLEAN ENERGY INDUSTR Y; 3
732732
733733 (3) ENSURE THE TIMELY , SAFE, AND EFFICIENT C OMPLETION OF THE 4
734734 PROJECT BY: 5
735735
736736 (I) FACILITATING A STEAD Y SUPPLY OF HIGHLY S KILLED 6
737737 CRAFT WORKERS WHO SH ALL BE PAID NOT LESS THAN THE PREVAILING WAGE RATE 7
738738 DETERMINED BY THE COMMISSIONER OF LABOR AND INDUSTRY UNDER TITLE 17, 8
739739 SUBTITLE 2 OF THE STATE FINANCE AND PROCUREMENT ARTICLE; AND 9
740740
741741 (II) GUARANTEEING THAT TH E CONSTRUCTION WORK 10
742742 PERFORMED IN CONNECT ION WITH THE PROJECT WILL BE SUBJECT TO A N 11
743743 AGREEMENT THAT : 12
744744
745745 1. IS WITH ONE OR MORE LABOR ORGANIZATIONS ; AND 13
746746
747747 2. ESTABLISHES, IN ACCORDANCE WITH T HIS SECTION, 14
748748 THE TERMS AND CONDIT IONS OF EMPLOYMENT A T THE CONSTRUCTION S ITE OF THE 15
749749 PROJECT OR A PORTION OF THE PROJECT ; 16
750750
751751 (4) PROMOTE SAFE COMPLET ION OF THE PROJECT B Y ENSURING 17
752752 THAT AT LEAST 80% OF THE CRAFT WORKERS ON THE PROJECT HAVE COMPLETED 18
753753 AN OCCUPATION AL SAFETY AND HEALTH ADMINISTRATION 10–HOUR OR 30–HOUR 19
754754 COURSE; 20
755755
756756 (5) PROMOTE CAREER TRAIN ING OPPORTUNITIES IN THE 21
757757 MANUFACTURING , MAINTENANCE , AND CONSTRUCTION IND USTRIES FOR LOCAL 22
758758 RESIDENTS, VETERANS, WOMEN, AND MINORITIES ; 23
759759
760760 (6) PROVIDE FOR BEST EFF ORTS AND EFFECTIVE OUTREA CH TO 24
761761 OBTAIN, AS A GOAL, THE USE OF A WORKFOR CE INCLUDING MINORIT IES, TO THE 25
762762 EXTENT PRACTICABLE ; 26
763763
764764 (7) REFLECT A 21ST–CENTURY LABOR –MANAGEMENT APPROACH BY 27
765765 DEVELOPERS AND SUPPL IERS BASED ON COOPER ATION, HARMONY, AND 28
766766 PARTNERSHIP THAT PR OACTIVELY SEEKS TO E NSURE THAT WORKERS C AN FREELY 29
767767 CHOOSE TO BOTH ORGAN IZE AND COLLECTIVELY BARGAIN; 30
768768
769769 (8) PROVIDE PLANS TO USE DOMESTIC IRON , STEEL, AND 31
770770 MANUFACTURED GOODS T O THE GREATEST EXTEN T PRACTICABLE BY DIS CLOSING 32
771771 CONTRACTED SUPPLIERS ; 33 18 SENATE BILL 716
772772
773773
774774
775775 (9) USE LOCALLY AND DOME STICALLY MANUFACTURE D 1
776776 CONSTRUCTION MATERIA LS AND COMPONENTS ; 2
777777
778778 (10) MAXIMIZE THE USE OF SKILLED LOCAL LABOR , PARTICULARLY 3
779779 WITH REGARD TO THE C ONSTRUCTION AND MANU FACTURING COMPONENTS OF THE 4
780780 PROJECT, USING METHODS INCLUD ING OUTREACH , HIRING, OR REFERRAL 5
781781 METHODS THAT ARE AFF ILIATED WITH REGISTE RED APPRENTICESHIP P ROGRAMS 6
782782 UNDER TITLE 11, SUBTITLE 4 OF THE LABOR AND EMPLOYMENT ARTICLE; 7
783783
784784 (11) GUARANTEE AGAINST ST RIKES, LOCKOUTS, AND SIMILAR 8
785785 DISRUPTIONS; 9
786786
787787 (12) ENSURE THAT ALL WORK ON THE PROJECT FULLY CONF ORMS TO 10
788788 ALL RELEVANT STATE AND FEDERAL LAW S, RULES, AND REGULATIONS ; 11
789789
790790 (13) CREATE MUTUALLY BIND ING PROCEDURES FOR R ESOLVING 12
791791 LABOR DISPUTES ARISI NG DURING THE TERM O F THE PROJECT; 13
792792
793793 (14) SET FORTH OTHER MECH ANISMS FOR LABOR –MANAGEMENT 14
794794 COOPERATION ON MATTE RS OF MUTUAL INTERES T AND CONCERN , INCLUDING 15
795795 PRODUCTIVITY , QUALITY OF WORK , SAFETY, AND HEALTH; AND 16
796796
797797 (15) BIND ALL CONTRACTORS AND SUBCONTRACTORS T O THE TERMS 17
798798 OF THE AGREEMENT THR OUGH THE INCLUSION O F APPROPRIATE PROVIS IONS IN 18
799799 ALL RELEVANT SOLICITATION AND CONTRACT DOCUMEN TS. 19
800800
801801 7–1207. 20
802802
803803 (A) AN ORDER THE COMMISSION ISSUES APP ROVING AN APPLICATION FOR 21
804804 A NUCLEAR ENERGY GENER ATION PROJECT SUBMITTED UNDER § 7–1201 OF THIS 22
805805 SUBTITLE SHALL: 23
806806
807807 (1) SPECIFY THE LONG –TERM PRICING SCHEDUL E; 24
808808
809809 (2) SPECIFY THE DURATION OF THE LONG–TERM PRICING SCHEDUL E, 25
810810 NOT TO EXCEED 30 YEARS; 26
811811
812812 (3) PROVIDE THAT : 27
813813
814814 (I) A PAYMENT MAY NOT BE MADE UNDER A LONG –TERM 28
815815 PRICING SCHEDULE UNT IL ELECTRICITY SUPPL Y IS GENERATED BY TH E PROJECT; 29
816816 AND 30 SENATE BILL 716 19
817817
818818
819819
820820 (II) RATEPAYERS AND THE STATE SHALL BE HELD H ARMLESS 1
821821 FOR ANY COST OVERRUN S ASSOCIATED WITH TH E PROJECT; AND 2
822822
823823 (4) REQUIRE THAT ANY DEB T INSTRUMENT ISSUED IN CONNECTION 3
824824 WITH THE PROJECT INC LUDE LANGUAGE SPECIF YING THAT THE DEBT I NSTRUMENT 4
825825 DOES NOT ESTABLISH A DEBT, OBLIGATION, OR LIABILITY OF THE STATE. 5
826826
827827 (B) AN ORDER APPROVING A NUCLEAR ENERGY GENER ATION PROJECT 6
828828 VESTS THE OWNER OF T HE PROJECT WITH THE RIGHT TO RECEIVE PAY MENTS 7
829829 ACCORDING TO THE TER MS IN THE ORDER . 8
830830
831831 (C) ON OR BEFORE MARCH 1 EACH YEAR, THE COMMISSION SHALL REPO RT 9
832832 TO THE GOVERNOR AND , IN ACCORDANCE WITH § 2–1257 OF THE STATE 10
833833 GOVERNMENT ARTICLE, TO THE SENATE COMMITTEE ON EDUCATION, ENERGY, 11
834834 AND THE ENVIRONMENT AND THE HOUSE ECONOMIC MATTERS COMMITTEE ON : 12
835835
836836 (1) APPLICANT COMPLIANCE WITH THE MINORITY BU SINESS 13
837837 ENTERPRISE PARTICIPATION GOALS UNDER § 7–1204(C) OF THIS SUBTITLE; AND 14
838838
839839 (2) WITH RESPECT TO THE COMMUNITY BENEFIT AG REEMENT UNDER 15
840840 § 7–1206 OF THIS SUBTITLE: 16
841841
842842 (I) THE AVAILABILITY AND USE OF OPPORTUNITIES FOR LOCAL 17
843843 BUSINESSES AND SMALL , MINORITY, WOMEN–OWNED, AND VETERAN –OWNED 18
844844 BUSINESSES; 19
845845
846846 (II) THE SUCCESS OF EFFOR TS TO PROMOTE CAREER TRAINING 20
847847 OPPORTUNITIES IN THE MANUFACTURING , MAINTENANCE , AND CONSTRUCTION 21
848848 INDUSTRIES FOR LOCAL RESIDENTS, VETERANS, WOMEN, AND MINORITIES ; AND 22
849849
850850 (III) COMPLIANCE WITH THE MINORITY WORKFORCE G OAL 23
851851 UNDER § 7–1206(B) OF THIS SUBTITLE. 24
852852
853853 7–1208. 25
854854
855855 (A) (1) SUBJECT TO SUBSECTION (B) OF THIS SECTION , IF THE 26
856856 COMMISSION APPROVES P ROPOSALS THAT DEMONS TRATE, BASED ON THE 27
857857 CRITERIA SPECIFIED I N § 7–1203 OF THIS SUBTITLE , POSITIVE NET ECO NOMIC, 28
858858 ENVIRONMENTAL , AND HEALTH BENEFITS TO THE STATE, THE COMMISSION SHALL 29
859859 APPROVE ORDERS TO FA CILITATE THE FINANCI NG OF NUCLEAR ENERGY 30
860860 GENERATION PROJECTS . 31
861861 20 SENATE BILL 716
862862
863863
864864 (2) WHEN CALCULATING THE NET BENEFITS TO THE STATE UNDER 1
865865 PARAGRAPH (1) OF THIS SUBSECTION , THE COMMISSION MAY CONTRA CT FOR THE 2
866866 SERVICES OF INDEPEND ENT CONSULTANTS AND EXPERTS. 3
867867
868868 (B) THE COMMISSION MAY NOT AP PROVE AN ORDER TO FA CILITATE THE 4
869869 FINANCING OF A NUCLE AR ENERGY GENERATION PROJECT UNLESS THE P ROJECT IS 5
870870 SUBJECT TO A COMMUNI TY BENEFIT AGREEMEN T UNDER § 7–1206 OF THIS 6
871871 SUBTITLE. 7
872872
873873 7–1209. 8
874874
875875 (A) THE FINDINGS AND EVID ENCE RELIED ON BY TH E GENERAL ASSEMBLY 9
876876 FOR THE CONTINUATION OF THE MINORITY BUSINESS ENTERPRISE PROGRAM 10
877877 UNDER TITLE 14, SUBTITLE 3 OF THE STATE FINANCE AND PROCUREMENT 11
878878 ARTICLE ARE INCORPORATED IN THIS SECTION. 12
879879
880880 (B) TO THE EXTENT PRACTIC ABLE AND AUTHORIZED BY THE UNITED 13
881881 STATES CONSTITUTION, AN APPLICANT APPROVED FOR A NUCLEAR ENERGY 14
882882 GENERATION PROJECT UNDER § 7–1208 OF THIS SUBTITLE SHALL COMPLY WITH 15
883883 THE STATE’S MINORITY BUSINESS ENTERPRISE PROGRAM. 16
884884
885885 (C) (1) WITHIN 6 MONTHS AFTER THE ISS UANCE OF AN ORDER TH AT 17
886886 APPROVES A NUCLEAR E NERGY GENERATION PRO JECT AND INCLUDES A 18
887887 LONG–TERM PRICING COMPONE NT, THE GOVERNOR’S OFFICE OF SMALL, 19
888888 MINORITY, AND WOMEN BUSINESS AFFAIRS, IN CONSULTATION WITH THE OFFICE 20
889889 OF THE ATTORNEY GENERAL AND THE APPRO VED APPLICANT , SHALL ESTABLISH A 21
890890 CLEAR PLAN FOR SETTI NG REASONABLE AND AP PROPRIATE MINORITY B USINESS 22
891891 ENTERPRISE PARTICIPA TION GOALS AND PROCE DURES FOR EACH PHASE OF THE 23
892892 NUCLEAR ENERGY GENER ATION PROJECT . 24
893893
894894 (2) TO THE EXTENT PRACTIC ABLE, THE GOALS AND PROCED URES SET 25
895895 IN ACCORDANCE WITH P ARAGRAPH (1) OF THIS SUBSECTION S HALL BE BASED ON 26
896896 THE REQUIREMENTS OF TITLE 14, SUBTITLE 3 OF THE STATE FINANCE AND 27
897897 PROCUREMENT ARTICLE AND THE REGUL ATIONS IMPLEMENTING THAT SUBTITLE. 28
898898
899899 (3) EVERY 6 MONTHS FOLLOWING THE ISSUANCE OF AN ORDER THAT 29
900900 APPROVES A NUCLEAR E NERGY GENERATION PRO JECT AND INCLUDES A 30
901901 LONG–TERM PRICING COMPONE NT, THE APPROVED APPLICANT SHALL SUBM IT A 31
902902 REPORT ON THE PROGRESS MADE TO ESTABLISH AND IMPLEM ENT MINORITY 32
903903 BUSINESS ENTERPRISE GOALS AND PROCEDURES TO THE COMMISSION. 33
904904
905905 7–1210. 34
906906 SENATE BILL 716 21
907907
908908
909909 (A) THE COMMISSION SHALL ADOPT REGULATIONS TH AT: 1
910910
911911 (1) ESTABLISH THE NUCLEA R ENERGY LONG –TERM PRICING 2
912912 PURCHASE OBLIGATION SUFFICIENTLY IN ADVA NCE TO ALLOW AN ELEC TRIC 3
913913 COMPANY TO REFLECT NUCLEAR E NERGY LONG –TERM PRICING COSTS A S A 4
914914 NONBYPASSABLE SURCHA RGE PAID BY ALL DIST RIBUTION CUSTOMERS O F THE 5
915915 ELECTRIC COMPANY ; 6
916916
917917 (2) ESTABLISH A NONBYPAS SABLE SURCHARGE THAT ALLOWS AN 7
918918 ELECTRIC COMPANY TO RECOVER ALL COSTS AS SOCIATED WITH THE PURCHASE OF 8
919919 NUCLEAR ENERGY FROM ALL DISTRIBUTION CUS TOMERS OF THE ELECTR IC 9
920920 COMPANY; 10
921921
922922 (3) ESTABLISH AN ESCROW ACCOUNT THAT IS UNDE R COMMISSION 11
923923 SUPERVISION; AND 12
924924
925925 (4) DEFINE RULES THAT FA CILITATE AND ENSURE THE SECURE AND 13
926926 TRANSPARENT TRANSFER OF REVENU ES AND LONG –TERM PRICING PAYMENT S 14
927927 AMONG PARTIES . 15
928928
929929 (B) (1) EACH ELECTRIC COMPANY SHALL PROCURE FROM T HE ESCROW 16
930930 ACCOUNT ESTABLISHED BY REGULATION UNDER THIS SECTION A VOLUM E OF 17
931931 NUCLEAR ENERGY EQUAL TO THE ELECTRIC COMP ANY’S RESPECTIVE PERCENT AGE 18
932932 OF RETAIL ELECTRIC SALES EACH Y EAR. 19
933933
934934 (2) (I) SUBJECT TO ANY ESCROW ACCOUNT RESERVE 20
935935 REQUIREMENT THE COMMISSION ESTABLISHE S, IF THERE IS INSUFFIC IENT 21
936936 NUCLEAR ENERGY AVAIL ABLE TO SATISFY THE ELECTRIC COMPANIES ’ NUCLEAR 22
937937 ENERGY OBLIGATION , THE OVERPAYMENT SHAL L BE DISTRIBUTED TO ELECTRIC 23
938938 COMPANIES TO BE REFU NDED OR CREDITED TO EACH DISTRIBUTION CU STOMER 24
939939 BASED ON THE CUSTOME R’S CONSUMPTION OF ELE CTRICITY SUPPLY THAT IS 25
940940 SUBJECT TO THE RENEWABLE ENERGY PORTFOLIO STA NDARD. 26
941941
942942 (II) SUBJECT TO ANY ESCROW ACCOUNT RESERVE 27
943943 REQUIREMENT THE COMMISSION ESTABLISHE S, THE CALCULATION OF A N 28
944944 ELECTRIC COMPANY ’S NUCLEAR ENERGY PUR CHASE OBLIGATION SHA LL BE BASED 29
945945 ON FINAL ELECTRICITY SALES DATA AS REPORT ED BY PJM INTERCONNECTION , 30
946946 LLC, AND MEASURED AT THE CUSTOMER METER . 31
947947
948948 (3) FOR EACH LONG–TERM PRICING SCHEDUL E FOR WHICH A 32
949949 NUCLEAR ENERGY GENER ATION PROJECT RECEIV ES PAYMENT , THE PROJECT 33
950950 SHALL: 34
951951 22 SENATE BILL 716
952952
953953
954954 (I) SELL ALL ENERGY , CAPACITY, AND ANCILLARY SERVIC ES 1
955955 ASSOCIATED WITH THE CREATION OF THE LONG –TERM PRICING INTO TH E MARKETS 2
956956 OPERATED BY PJM INTERCONNECTION , LLC; AND 3
957957
958958 (II) DISTRIBUTE THE PROCE EDS RECEIVED FROM TH E SALES 4
959959 UNDER ITEM (I) OF THIS PARAGRAPH TO ELECTRIC COMPANIES T O BE REFUNDED 5
960960 OR CREDITED TO EACH DISTRIBUTION CUSTOME R BASED ON THE CUSTO MER’S 6
961961 CONSUMPTION OF ELECT RICITY SUPPLY THAT IS SUBJECT TO THE CL EAN ENERGY 7
962962 PORTFOLIO STANDARD . 8
963963
964964 (C) A DEBT, AN OBLIGATION , OR A LIABILITY OF A NUCLEAR ENERGY 9
965965 GENERATION PROJECT O R OF AN OWNER OR OPE RATOR OF A NUCLEAR E NERGY 10
966966 GENERATION PROJECT M AY NOT BE CONSIDERED A DEBT, AN OBLIGATION , OR A 11
967967 LIABILITY OF THE STATE. 12
968968
969969 7–1211. 13
970970
971971 ON OR BEFORE JANUARY 1, 2026, THE COMMISSION SHALL ADOP T 14