1 | 1 | | |
---|
2 | 2 | | |
---|
3 | 3 | | EXPLANATION: CAPITALS INDICATE MAT TER ADDED TO EXISTIN G LAW. |
---|
4 | 4 | | [Brackets] indicate matter deleted from existing law. |
---|
5 | 5 | | *sb0753* |
---|
6 | 6 | | |
---|
7 | 7 | | SENATE BILL 753 |
---|
8 | 8 | | C5 5lr2100 |
---|
9 | 9 | | |
---|
10 | 10 | | By: Senator Kramer |
---|
11 | 11 | | Introduced and read first time: January 27, 2025 |
---|
12 | 12 | | Assigned to: Education, Energy, and the Environment |
---|
13 | 13 | | |
---|
14 | 14 | | A BILL ENTITLED |
---|
15 | 15 | | |
---|
16 | 16 | | AN ACT concerning 1 |
---|
17 | 17 | | |
---|
18 | 18 | | Offshore Wind Turbines and Accessory Installations – Aircraft Detection 2 |
---|
19 | 19 | | Lighting Systems 3 |
---|
20 | 20 | | |
---|
21 | 21 | | FOR the purpose of requiring that any wind turbine and accessory installation associated 4 |
---|
22 | 22 | | with a qualified offshore wind project or an offshore wind transmission project be 5 |
---|
23 | 23 | | installed with a certain aircraft detection lighting system; and generally relating to 6 |
---|
24 | 24 | | offshore wind turbines and accessory installations. 7 |
---|
25 | 25 | | |
---|
26 | 26 | | BY adding to 8 |
---|
27 | 27 | | Article – Public Utilities 9 |
---|
28 | 28 | | Section 7–218 10 |
---|
29 | 29 | | Annotated Code of Maryland 11 |
---|
30 | 30 | | (2020 Replacement Volume and 2024 Supplement) 12 |
---|
31 | 31 | | |
---|
32 | 32 | | SECTION 1. BE IT ENACTED BY THE GENERAL ASSEMBLY OF MARYLAND, 13 |
---|
33 | 33 | | That the Laws of Maryland read as follows: 14 |
---|
34 | 34 | | |
---|
35 | 35 | | Article – Public Utilities 15 |
---|
36 | 36 | | |
---|
37 | 37 | | 7–218. 16 |
---|
38 | 38 | | |
---|
39 | 39 | | (A) (1) IN THIS SECTION THE F OLLOWING WORDS HAVE THE MEANINGS 17 |
---|
40 | 40 | | INDICATED. 18 |
---|
41 | 41 | | |
---|
42 | 42 | | (2) “AIRCRAFT DETECTION LI GHTING SYSTEM ” MEANS A 19 |
---|
43 | 43 | | SENSOR–BASED SYSTEM DESIGNE D TO: 20 |
---|
44 | 44 | | |
---|
45 | 45 | | (I) DETECT AN AIRCRAFT A PPROACHING AN OBSTRU CTION OR 21 |
---|
46 | 46 | | GROUP OF OBSTRUCTION S; AND 22 |
---|
47 | 47 | | 2 SENATE BILL 753 |
---|
48 | 48 | | |
---|
49 | 49 | | |
---|
50 | 50 | | (II) AUTOMATICALLY ACTIVA TE OBSTRUCTION LIGHT S UNTIL 1 |
---|
51 | 51 | | THE AIRCRAFT HAS DEPARTE D THE AREA. 2 |
---|
52 | 52 | | |
---|
53 | 53 | | (3) “OFFSHORE WIND TRANSMI SSION PROJECT ” HAS THE MEANING 3 |
---|
54 | 54 | | STATED IN § 7–701 OF THIS TITLE. 4 |
---|
55 | 55 | | |
---|
56 | 56 | | (4) “QUALIFIED OFFSHORE WI ND PROJECT ” HAS THE MEANING 5 |
---|
57 | 57 | | STATED IN § 7–701 OF THIS TITLE. 6 |
---|
58 | 58 | | |
---|
59 | 59 | | (B) BEGINNING OCTOBER 1, 2025, ANY WIND TURBINE AND ACCESSORY 7 |
---|
60 | 60 | | INSTALLATION CONSTRUCTED IN CONNE CTION WITH A QUALIFI ED OFFSHORE WIND 8 |
---|
61 | 61 | | PROJECT OR AN OFFSHORE WIND TRANSM ISSION PROJECT SHALL INCLUDE THE 9 |
---|
62 | 62 | | INSTALLATION OF AN AIRCRAFT DETECTIO N LIGHTING SYSTEM AP PROVED BY THE 10 |
---|
63 | 63 | | FEDERAL AVIATION ADMINISTRATION . 11 |
---|
64 | 64 | | |
---|
65 | 65 | | (C) A PERSON THAT OWNS OR OPERATES A QUALIFIED OFFSHORE WIND 12 |
---|
66 | 66 | | PROJECT OR AN OFFSHORE WIND TRANSM ISSION PROJECT CONSTRUCTED BEFORE 13 |
---|
67 | 67 | | OCTOBER 1, 2025, THAT IS NOT EQUIPPED WITH AN AIRCRAFT DET ECTION 14 |
---|
68 | 68 | | LIGHTING SYSTEM APPR OVED BY THE FEDERAL AVIATION ADMINISTRATION 15 |
---|
69 | 69 | | SHALL: 16 |
---|
70 | 70 | | |
---|
71 | 71 | | (1) ON OR BEFORE DECEMBER 1, 2025, SUBMIT AN APPLICATIO N TO 17 |
---|
72 | 72 | | THE FEDERAL AVIATION ADMINISTRATION FOR AP PROVAL TO INSTALL ON EACH 18 |
---|
73 | 73 | | WIND TURBINE AND ANY ACCESSORY INSTAL LATION ASSOCIATED WITH THE 19 |
---|
74 | 74 | | PROJECT AN AIRCRAFT DETECTIO N LIGHTING SYSTEM ; AND 20 |
---|
75 | 75 | | |
---|
76 | 76 | | (2) COMMENCE INSTALLATIO N OF THE AIRCRAFT DE TECTION 21 |
---|
77 | 77 | | LIGHTING SYSTEM ON EACH WIND TURBINE AND ANY ACCESSORY INSTALLATI ON 22 |
---|
78 | 78 | | ASSOCIATED WITH THE PROJECT WITHIN 3 MONTHS AFTER THE FEDERAL AVIATION 23 |
---|
79 | 79 | | ADMINISTRATION APPROV ES AND CERTIFIES THE SYSTEM. 24 |
---|
80 | 80 | | |
---|
81 | 81 | | (D) THE COMMISSION SHALL ADOPT REGULATI ONS TO CARRY OUT THIS 25 |
---|
82 | 82 | | SECTION. 26 |
---|
83 | 83 | | |
---|
84 | 84 | | SECTION 2. AND BE IT FURTHER ENACTED, That this Act shall take effect 27 |
---|
85 | 85 | | October 1, 2025. 28 |
---|