Maryland 2025 Regular Session

Maryland Senate Bill SB908 Compare Versions

Only one version of the bill is available at this time.
OldNewDifferences
11
22
33 EXPLANATION: CAPITALS INDICATE MAT TER ADDED TO EXISTIN G LAW.
44 [Brackets] indicate matter deleted from existing law.
55 *sb0908*
66
77 SENATE BILL 908
88 C5 5lr1816
99 SB 1083/24 – EEE CF 5lr1815
1010 By: Senator Hester
1111 Introduced and read first time: January 28, 2025
1212 Assigned to: Education, Energy, and the Environment
1313
1414 A BILL ENTITLED
1515
1616 AN ACT concerning 1
1717
1818 Public Utilities – Electric Distribution System Plans – Establishment 2
1919 (Affordable Grid Act) 3
2020
2121 FOR the purpose of requiring the Public Service Commission to adopt regulations or issue 4
2222 orders on or before a certain date that require electric companies to, every 3 years, 5
2323 develop an electric system distribution plan to be approved by the Commission and 6
2424 provide the Commission with annual progress reports; requiring the Commission to 7
2525 adopt regulations or issue orders adopting certain metrics to monitor and assess 8
2626 electric distribution system plans; requiring an electric company to provide certain 9
2727 public comment opportunities; requiring the Commission to adopt regulations or 10
2828 issue orders adopting a certain information–sharing framework; and generally 11
2929 relating to electric distribution in the State. 12
3030
3131 BY repealing and reenacting, with amendments, 13
3232 Article – Public Utilities 14
3333 Section 7–804 15
3434 Annotated Code of Maryland 16
3535 (2020 Replacement Volume and 2024 Supplement) 17
3636
3737 SECTION 1. BE IT ENACTED BY THE GENERAL ASSEMBLY OF MARYLAND, 18
3838 That the Laws of Maryland read as follows: 19
3939
4040 Article – Public Utilities 20
4141
4242 7–804. 21
4343
4444 (A) (1) IN THIS SECTION THE F OLLOWING WORDS HAVE THE MEANINGS 22
4545 INDICATED. 23
4646 2 SENATE BILL 908
4747
4848
4949 (2) (I) “AUTOMATED ELEC TRIC VEHICLE LOAD MA NAGEMENT” 1
5050 MEANS THE UTILIZATIO N OF A POWER CONTROL SYSTEM, AS DEFINED IN UL 3141, 2
5151 TO LIMIT OR CONTROL CURRENT OR POWER TO STAY WITHIN SAFE , DEFINED LIMITS 3
5252 THAT ARE CALCULATED IN ACCORDANCE WITH NATIONAL ELECTRICAL CODE 4
5353 625.42 AND 750.30. 5
5454
5555 (II) “AUTOMATED ELECTRIC VE HICLE LOAD MANAGEMEN T” 6
5656 INCLUDES: 7
5757
5858 1. A SINGLE DEVICE USED TO CONTROL THE ELECT RIC 8
5959 VEHICLE CHARGING LOA D; AND 9
6060
6161 2. MULTIPLE DEVICES OPE RATING TOGETHER AS A 10
6262 SYSTEM TO CONTROL TH E ELECTRIC VEHICLE C HARGING LOAD . 11
6363
6464 (3) “DISTRIBUTED ENERGY RE SOURCE” HAS THE MEANING STAT ED 12
6565 IN § 7–1001 OF THIS TITLE. 13
6666
6767 (4) (I) “FLEXIBLE INTERCONNECT ION” MEANS A METHOD FOR 14
6868 CONNECTING DISTRIBUT ED ENERGY RESOURCES TO THE ELECTRIC DIST RIBUTION 15
6969 SYSTEM IN A MANNER T HAT IS ADAPTABLE TO CHANGING CONDITIONS AND 16
7070 OPTIMIZES THE USE OF EXISTING ELECTRIC DI STRIBUTION SYSTEM 17
7171 INFRASTRUCTURE . 18
7272
7373 (II) “FLEXIBLE INTERCONNECT ION” INCLUDES THE USE OF AN 19
7474 AGREEMENT BETWEEN TH E CUSTOMER AND AN EL ECTRIC COMPANY TO IM PLEMENT 20
7575 THE USE OF A POWER C ONTROL SYSTEM , AS DEFINED IN UL 3141, TO PREVENT A 21
7676 CONSTRAINED PART OF THE ELECTRIC DISTRIB UTION SYSTEM FROM EX CEEDING 22
7777 EXISTING CAPACITY . 23
7878
7979 (5) “HOSTING CAPACITY ” MEANS THE AMOUNT OF AGGREGATE 24
8080 GENERATION THAT CAN BE ACCOMMODATED ON A N ELECTRIC DISTRIBUT ION 25
8181 SYSTEM OR AREA , OR A COMPONENT OF AN ELECTRIC DISTRIBUTIO N SYSTEM, 26
8282 WITHOUT REQUIRING IN FRASTRUCTURE UPGRADE S. 27
8383
8484 (6) “LOAD FLEXIBILITY ” MEANS A CHANGE IN TH E AMOUNT OR 28
8585 TIMING OF ENERGY USE TO SUPPORT ELECTRIC DISTRIBUTION SYSTEM NEEDS. 29
8686
8787 (7) “NON–WIRES SOLUTION ” MEANS A NY ELECTRICAL SYSTEM 30
8888 INVESTMENT, PROGRAM, RATE, OR SERVICE THAT IS I NTENDED TO DEFER OR 31
8989 REMOVE THE NEED TO C ONSTRUCT NEW OR UPGR ADE EXISTING COMPONE NTS OF A 32
9090 DISTRIBUTION OR TRAN SMISSION SYSTEM . 33
9191 SENATE BILL 908 3
9292
9393
9494 (8) “UL 3141” MEANS THE ELECTRICAL STANDARDS PUBLISHED BY 1
9595 UL SOLUTIONS THAT DEFINE S REQUIREMENTS FOR M ATERIAL CONSTRUCTION , 2
9696 PERFORMANCE , TESTING, AND INSTALLATION TO PROMOTE THE SAFETY A ND 3
9797 RELIABILITY OF POWER CONTROL SYSTEMS . 4
9898
9999 (9) “VIRTUAL POWER PLANT ” MEANS A NETWORK OF M ULTIPLE, 5
100100 DECENTRALIZED , DISTRIBUTED ENE RGY RESOURCES INTEGR ATED TO BALANCE 6
101101 ENERGY SUPPLY AND DE MAND ON A LARGE SCAL E. 7
102102
103103 [(a)] (B) On or before December 31, 2025, the Commission shall adopt 8
104104 regulations or issue orders to: 9
105105
106106 (1) implement specific policies for electric system planning; 10
107107
108108 (2) require consideration of investment in, or procurement of, cost–effective 11
109109 demand–side methods and technology to improve reliability and efficiency, including 12
110110 virtual power plants; [and] 13
111111
112112 (3) implement specific policies for improvements in order to promote the 14
113113 State’s policy goals under § 7–802 of this subtitle AND TO ACHIEVE THE STATE’S 15
114114 TARGETS FOR THE EXPA NSION OF: 16
115115
116116 (I) SOLAR ENERGY ; 17
117117
118118 (II) BUILDING ELECTRIFICA TION; 18
119119
120120 (III) ELECTRIC VEHICLES ; 19
121121
122122 (IV) ENERGY STORAGE CAPAC ITY; AND 20
123123
124124 (V) REDUCTION OF GREENHO USE GAS EMISSIONS ; 21
125125
126126 (4) REQUIRE EACH ELECTRI C COMPANY, EVERY 3 YEARS, TO SUBMIT 22
127127 TO THE COMMISSION FOR APPROV AL AN ELECTRIC DISTR IBUTION SYSTEM PLAN 23
128128 THAT: 24
129129
130130 (I) INCLUDES THE INFORMA TION REQUIRED IN SUB SECTION 25
131131 (D) OF THIS SECTION; AND 26
132132
133133 (II) COMPLIES WITH THE RE QUIREMENTS OF SUBSEC TION (E) 27
134134 OF THIS SECTION; 28
135135
136136 (5) ADOPT AND UPDATE AS NEEDED METRICS TO BE USED TO 29
137137 MONITOR AN ELECTRIC COMPANY’S PROGRESS TOWARD IM PLEMENTING ITS 30 4 SENATE BILL 908
138138
139139
140140 ELECTRIC DISTRIBUTIO N SYSTEM PLAN , INCLUDING METRICS AS SESSING THE 1
141141 FOLLOWING CATEGORIES : 2
142142
143143 (I) SYSTEM RELIABILITY ; 3
144144
145145 (II) INTEGRATION OF DISTR IBUTED ENERGY RESOUR CES, 4
146146 INCLUDING SPECIFIC M ETRICS RELATED TO SO LAR ENERGY , ENERGY STORAGE , 5
147147 AND ELECTRIC VEHICLE S; 6
148148
149149 (III) ELECTRIC DISTRIBUTIO N SYSTEM MANAGEMENT , 7
150150 INCLUDING SPECIFIC METR ICS RELATED TO: 8
151151
152152 1. AGGREGATE PEAK LOAD ; 9
153153
154154 2. PEAK LOAD REDUCTION PROGRAMS; 10
155155
156156 3. TIME–OF–USE AND DYNAMIC PRIC ING PROGRAMS ; 11
157157
158158 4. ELECTRIC VEHICLE CHA RGING PROGRAMS ; AND 12
159159
160160 5. HOSTING CAPACITY STA TUS AND EXPANSION ; 13
161161
162162 (IV) USE OF NON –WIRES SOLUTIONS AND NONCAPITAL 14
163163 INVESTMENTS AND THE RELATIONSHIP BETWEEN USING THESE SOLUTION S AND 15
164164 INVESTMENTS AND THE LONG–TERM SYSTEM CAPACITY ; 16
165165
166166 (V) ADVANCEMENT OF STATE POLICY GOALS AN D TARGETS 17
167167 IDENTIFIED IN ITEM (3) OF THIS SUBSECTION A ND ANY OTHER APPLICABLE STATE 18
168168 GOALS AND TARGETS EF FECTIVE AT THE TIME OF THE PLANNING CYCL E; 19
169169
170170 (VI) FUTURE ELECTRIC SYST EM CAPABILITY, INCLUDING: 20
171171
172172 1. ENERGY STORAGE FLEXI BILITY; 21
173173
174174 2. FLEXIBLE INTERCONNEC TIONS; AND 22
175175
176176 3. LOCAL DEMAND RESPONS E; AND 23
177177
178178 (VII) AN ELECTRIC COMPANY ’S PARTICIPATION IN , AND 24
179179 FACILITATION OF , AN EFFECTIVE INFORMA TION EXCHANGE PROCES S AS 25
180180 DESCRIBED IN ITEM (7) OF THIS SUBSECTION ; 26
181181 SENATE BILL 908 5
182182
183183
184184 (6) REQUIRE EACH GAS COM PANY THAT OPERATES W ITHIN ANY 1
185185 PORTION OF AN ELECTR IC COMPANY’S SERVICE AREA TO PARTICIPAT E IN THE 2
186186 ELECTRIC COMPANY ’S ELECTRIC DISTRIBUT ION SYSTEM PLANNING PROCESS TO 3
187187 THE EXTENT NECESSARY FOR THE ELECTRIC COM PANY TO DEVELOP AND MAINTAIN 4
188188 AN ELECTRIC DISTRIBU TION SYSTEM PLAN THA T MEETS THE REQUIREM ENTS OF 5
189189 THIS SECTION; AND 6
190190
191191 (7) (I) ADOPT AN INFORMATION SHARING FRAMEWORK FO R THE 7
192192 BROAD EXCHANGE OF DA TA BETWEEN ELECTRIC COMPANIES, GAS COMPANIES , 8
193193 ELECTRICITY SUPPLIER S, AND THE PUBLIC THAT MEETS THE REQUIREMEN TS OF 9
194194 SUBSECTION (G) OF THIS SECTION; AND 10
195195
196196 (II) REQUIRE ALL ELECTRIC COMPANIES AND GAS CO MPANIES 11
197197 TO PARTICIPATE IN EX CHANGING DATA AS DES CRIBED IN ITEM (I) OF THIS ITEM. 12
198198
199199 [(b)] (C) The regulations adopted and orders issued under [subsection (a) of] this 13
200200 section shall: 14
201201
202202 (1) [be developed with] ATTEMPT TO ENSURE UN IFORMITY IN 15
203203 ELECTRIC DISTRIBUTIO N SYSTEM PLANNING WH ILE GIVING DUE consideration 16
204204 [given] to the inherent differences, individual circumstances, and available resources 17
205205 among investor–owned electric companies, electric cooperatives, and municipal electric 18
206206 utilities; and 19
207207
208208 (2) if determined necessary by the Commission, establish separate 20
209209 requirements for investor–owned electric companies, electric cooperatives, and municipal 21
210210 electric utilities. 22
211211
212212 (D) (1) AN ELECTRIC DISTRIBUT ION SYSTEM PL AN SUBMITTED TO THE 23
213213 COMMISSION IN ACCORDA NCE WITH THIS SECTIO N SHALL INCLUDE : 24
214214
215215 (I) A DISTRIBUTED ENERGY RESOURCE FORECAST , AS 25
216216 SPECIFIED UNDER PARA GRAPH (2) OF THIS SUBSECTION , AND A LOAD FORECAST , 26
217217 AS SPECIFIED UNDER P ARAGRAPH (3) OF THIS SUBSECTION , FOR AT LEAST THREE 27
218218 PLANNING HORIZONS , INCLUDING: 28
219219
220220 1. A SHORT–TERM FORECAST OF 1 TO 3 YEARS FROM THE 29
221221 DATE OF PLAN SUBMISS ION; 30
222222
223223 2. A MID–TERM FORECAST OF 4 TO 6 YEARS FROM THE 31
224224 DATE OF PLAN SUBMISS ION; AND 32
225225
226226 3. A LONG–TERM FORECAST OF 7 TO 10 OR MORE YEARS 33
227227 FROM THE DATE OF PLA N SUBMISSION; 34 6 SENATE BILL 908
228228
229229
230230
231231 (II) AT LEAST TWO FORECAS T SCENARIO ANALYSES 1
232232 REFLECTING POSSIBLE FUTURE OUTCOMES TO S ERVE AS A REFERENCE IN THE 2
233233 DEVELOPMENT AND EVAL UATION OF THE ELECTR IC DISTRIBUTION PLAN , 3
234234 INCLUDING: 4
235235
236236 1. AT LEAST ONE SCENAR IO REFLECTING THE 5
237237 INVESTMENTS REQUIRED TO MEET THE STATE’S EXISTING CLEAN ENE RGY AND 6
238238 GREENHOUSE GAS EMISS IONS REDUCTION GOALS ; AND 7
239239
240240 2. AT LEAST ONE SCENARI O REFLECTING A DEMAN D FOR 8
241241 ELECTRICITY BEYOND T HE INCREASED LOAD AN TICIPATED IN RESPONS E TO THE 9
242242 STATE TARGETS SPECIFIE D IN SUBSECTION (B)(3) OF THIS SECTION; 10
243243
244244 (III) FOR EACH FORECAST SC ENARIO INCLUDED IN A PLAN IN 11
245245 ACCORDANCE WITH ITEM (II) OF THIS PARAGRAPH , AT LEAST ONE PORTFOL IO OF 12
246246 INVESTMENTS AND PROG RAMS THAT REFLECT HO W THE ELECTRIC COMPA NY 13
247247 COULD MEET RELIABILITY NEEDS AND FORECAST D EMAND WHILE MINIMIZI NG 14
248248 CAPITAL INFRASTRUCTU RE INVESTMENT TO THE GREATEST EXTENT POSS IBLE; 15
249249
250250 (IV) AN ANALYSIS OF THE H OSTING CAPACITY FOR DISTRIBUTED 16
251251 ENERGY RESOURCES , INCLUDING: 17
252252
253253 1. SOLAR PHOTOVOLTAICS ; 18
254254
255255 2. ENERGY STORAGE ; 19
256256
257257 3. ELECTRIC VEHICLES ; AND 20
258258
259259 4. DEMAND RESPONSE AND CONTROLLABLE LOADS ; 21
260260
261261 (V) AN ANALYSIS OF THE L OAD–SERVING CAPACITY FOR 22
262262 DISTRIBUTED ENERGY R ESOURCES, INCLUDING: 23
263263
264264 1. ENERGY STORAGE ; 24
265265
266266 2. ELECTRIC VEHICLES ; 25
267267
268268 3. BUILDING ELECTRIFICA TION; AND 26
269269
270270 4. DEMAND RESPONSE AND CONTROLLABLE LOADS ; 27
271271 SENATE BILL 908 7
272272
273273
274274 (VI) AN ANALYSIS OF LOCAT IONS WITHIN THE ELEC TRIC 1
275275 COMPANY’S SERVICE AREA WHERE THE EXPANSION OF DIS TRIBUTED ENERGY 2
276276 RESOURCES WILL PROVI DE THE GREATEST VALU E TOWARD MEETING DE MAND OR 3
277277 PROVIDING NECESSARY ELECTRIC DISTRIBUTIO N SYSTEM SERVICES ; 4
278278
279279 (VII) AN ANALYSIS OF EXIST ING CONSTRAINTS ON T HE ABILITY 5
280280 OF THE ELECTRIC COMP ANY’S ELECTRIC DISTRIBUT ION SYSTEM TO: 6
281281
282282 1. EXPAND DISTRIBUTED E NERGY RESOURCES ; 7
283283
284284 2. MEET ANTICIPATED LOAD REQUIREMENTS ; AND 8
285285
286286 3. ACHIEVE THE STATE’S CLEAN ENERGY AND 9
287287 GREENHOUSE GAS EMISS IONS REDUCTION GOALS ; 10
288288
289289 (VIII) AN ANALYSIS APPLYING THE STATE UNIFIED 11
290290 BENEFIT–COST ANALYSIS FRAMEWORK TO POSSIBLE SOLUTIONS F OR ADDRESSING 12
291291 THE CONSTRAINTS IDEN TIFIED IN ITEM (VII) OF THIS PARAGRAPH , INCLUDING 13
292292 NON–WIRES SOLUTIONS ; 14
293293
294294 (IX) A LIST OF THE POSSIB LE SOLUTIONS IDENTIF IED IN ITEM 15
295295 (VIII) OF THIS PARAGRAPH TH AT HAVE BEEN SELECTE D BY THE ELECTRIC CO MPANY 16
296296 TO BE IMPLEMENTED AN D THE FACTORS THAT C ONTRIBUTED TO E ACH DECISION; 17
297297
298298 (X) A DESCRIPTION OF PLA NS FOR THE INCORPORA TION OF 18
299299 INNOVATIONS AND TECH NOLOGIES TO INCREASE THE RELIABILITY AND RESILIENCE 19
300300 OF, AND THE ABILITY TO E XPAND, MANAGE, AND MODERNIZE , THE ELECTRIC 20
301301 DISTRIBUTION SYSTEM , INCLUDING: 21
302302
303303 1. AUTOMAT ED ELECTRIC VEHICLE LOAD 22
304304 MANAGEMENT ; 23
305305
306306 2. FLEXIBLE INTERCONNEC TION; 24
307307
308308 3. CLEAN MICROGRIDS ; 25
309309
310310 4. LOAD FLEXIBILITY ; 26
311311
312312 5. ENERGY EFFICIENCY ; AND 27
313313
314314 6. VIRTUAL POWER PLANTS ; 28
315315 8 SENATE BILL 908
316316
317317
318318 (XI) A DESCRIPTION OF HOW THE ELECTRIC COMPANY IS 1
319319 COORDINATING ELECTRIC DISTRIBUTIO N SYSTEM INVESTMENTS WITH ELECTRIC 2
320320 TRANSMISSION SYSTEM PLANNING IN THE PJM REGION IN A MANNER T HAT IS MOST 3
321321 COST–EFFECTIVE TO RATEPAY ERS; 4
322322
323323 (XII) A DESCRIPTION OF PLA NS AND ACTIONS TAKEN TO 5
324324 MINIMIZE THE COST TO RATEPAYERS THROUGH T HE EFFECTIVE USE OF FEDE RAL, 6
325325 STATE, AND LOCAL RESOURCES AND INCENTIVES ; 7
326326
327327 (XIII) A DESCRIPTION OF ANY OTHER ACTIONS TAKEN TO 8
328328 MINIMIZE THE COST TO RATEPAYERS ; 9
329329
330330 (XIV) A DESCRIPTION OF EFF ORTS TO COORDINATE W ITH GAS 10
331331 COMPANIES TO IDENTIF Y LOCATIONS FOR GAS DECARBONIZATION AND FA CILITATE 11
332332 ELECTRIFICATION TO M EET THE STATE’S CLIMATE GOALS , INCLUDING: 12
333333
334334 1. A DESCRIPTION OF EFF ORTS TO COLLABORATE WITH 13
335335 ANY GAS COMPANY WHOS E TERRITORY OVERLAPS WITH THAT OF THE ELE CTRIC 14
336336 COMPANY TO MODEL EAC H COMPANY ’S RESIDENTIAL A ND COMMERCIAL 15
337337 BUILDING–RELATED LOAD FORECAS TS WITH THE PURPOSE OF ENSURING THAT 16
338338 HEATING DEMAND IS NO T DOUBLE–COUNTED ACROSS SYSTE MS; AND 17
339339
340340 2. A DESCRIPTION OF HOW THE ELECTRIC 18
341341 DISTRIBUTION PLAN AC COUNTS FOR: 19
342342
343343 A. ANY GAS COMPANY EFFI CIENCY; AND 20
344344
345345 B. ANY ELECTRIFICATION PROGRAMS OR NON –PIPELINE 21
346346 ALTERNATIVES THAT IM PACT ELECTRICITY DEM AND; 22
347347
348348 (XV) A DESCRIPTION OF HOW THE ELECTRIC COMPANY PLANS TO 23
349349 MANAGE ITS DISTRIBUT ED ENERGY RESOURCE H OSTING CAPACITY IN A WAY THAT 24
350350 INCLUDES: 25
351351
352352 1. ESTABLISHING THE MINIMUM AMOUNT O F RESERVE 26
353353 CAPACITY FOR EACH FE EDER CIRCUIT, AS DETERMINED BY A C IRCUIT–SPECIFIC 27
354354 ANALYSIS, TO MAXIMIZE THE CAPA CITY AVAILABLE FOR A CTIVE DISTRIBUTED 28
355355 ENERGY RESOURCE DEVE LOPMENT; 29
356356
357357 2. DEVELOPING HOSTING C APACITY MAPS THAT 30
358358 FACILITATE DISTRIBUTED ENERGY RES OURCE PLANNING , INCLUDING: 31
359359 SENATE BILL 908 9
360360
361361
362362 A. IDENTIFYING AREAS WH ERE INTERCONNECTION 1
363363 COSTS WILL BE HIGHER OR LOWER THAN AVERAG E; 2
364364
365365 B. LISTING OTHER UPCOMI NG PROJECTS FOR SPEC IFIC 3
366366 CIRCUITS; AND 4
367367
368368 C. EXISTING FEEDER LOAD AND CAPACITY; AND 5
369369
370370 3. REVISING THE HOSTING CAPACITY ANALYSIS AN D 6
371371 HOSTING CAPACITY MAP S FREQUENTLY ENOUGH TO REFLECT THE ACTUA L 7
372372 DEVELOPMENT OF DISTR IBUTED ENERGY RESOUR CES ON CIRCUITS; 8
373373
374374 (XVI) A DESCRIPTION OF HOW THE ELECTRIC DISTRIB UTION 9
375375 SYSTEM PLAN ACCOUNTS FOR AND CO NTRIBUTES TO ACHIEVI NG THE STATE’S 10
376376 CLEAN ENERGY AND CLI MATE GOALS , INCLUDING THE GOALS AND TARGETS 11
377377 IDENTIFIED IN SUBSEC TION (B)(3) OF THIS SECTION; 12
378378
379379 (XVII) AN ANALYSIS APPLYING EACH OF THE METRICS ADOPTED 13
380380 BY THE COMMISSION UNDER SUBS ECTION (B)(5) OF THIS SECTION; AND 14
381381
382382 (XVIII) A COMPILATION OF ANY OFFICIAL COMMENTS 15
383383 RECEIVED THROUGHOUT THE DRAFTING AND REV IEW PROCESS ACCOMPAN IED BY: 16
384384
385385 1. A DESCRIPTION OF WHE RE THE COMMENT IS 17
386386 INCORPORATED IN THE ELECTRIC DISTRIBUTIO N SYSTEM PLAN; OR 18
387387
388388 2. A JUSTIFICATION FOR NOT INCORP ORATING THE 19
389389 COMMENT IN THE ELECT RIC DISTRIBUTION SYS TEM PLAN. 20
390390
391391 (2) (I) THE DISTRIBUTED ENERG Y RESOURCE FORECAST 21
392392 INCLUDED IN AN ELECT RIC DISTRIBUTION SYS TEM PLAN UNDER PARAG RAPH (1)(I) 22
393393 OF THIS SUBSECTION S HALL INCLUDE A FOREC AST FOR, AT A MINIMUM: 23
394394
395395 1. SOLAR PHOTOVOLTAICS ; 24
396396
397397 2. ENERGY STORAGE ; 25
398398
399399 3. ELECTRIC VEHICLES ; 26
400400
401401 4. BUILDING ELECTRIFICA TION; AND 27
402402
403403 5. DEMAND RESPONSE AND CONTROLLABLE LOADS . 28
404404 10 SENATE BILL 908
405405
406406
407407 (II) THE DISTRIBUTED ENERG Y RESOURCE FORECAST SHALL 1
408408 REFLECT THE ABILITY OF EACH RESOURCE FOR ECAST TO PROVIDE ELE CTRIC 2
409409 DISTRIBUTION SYSTEM SERVICES, INCLUDING: 3
410410
411411 1. BIDIRECTIONAL ELECTR IC VEHICLE CHARGING ; AND 4
412412
413413 2. AGGREGATION OF DISTR IBUTED ENERGY 5
414414 RESOURCES. 6
415415
416416 (III) THE DISTRIBUTED ENERG Y RESOURCE FORECAST SHALL 7
417417 PREDICT DISTRIBUTED ENERG Y RESOURCE AND ELECT RIFICATION ADOPTION AND 8
418418 RELATED IMPACTS , BOTH TEMPORALLY AND GEOGRAPHICALLY . 9
419419
420420 (3) (I) THE LOAD FORECAST INC LUDED IN AN ELECTRIC 10
421421 DISTRIBUTION SYSTEM PLAN SUBMITTED UNDER PARAGRAPH (1)(I) OF THIS 11
422422 SUBSECTION SHALL REF LECT EXPECTED CHANGE S IN ELECTRICITY DEM AND 12
423423 WITHIN THE ELECTRIC DISTRIBUTION SYSTEM FOR: 13
424424
425425 1. THE 8,760 HOURLY LOAD VARIATIO N; 14
426426
427427 2. LOAD PATTERNS AT THE FEEDER; 15
428428
429429 3. THE ANTICIPATED AMOU NT AND GEOGRAPHIC 16
430430 LOCATION OF EXPANSIO N OF DISTRIBUTED ENE RGY RESOURCES; AND 17
431431
432432 4. THE LOAD–MODIFYING CHARACTERI STICS FOR THE 18
433433 DISTRIBUTED ENERGY R ESOURCES FORECAST UN DER PARAGRAPH (1)(I) OF THIS 19
434434 SUBSECTION. 20
435435
436436 (II) THE LOAD FORECAST SHA LL TAKE INTO CONSIDE RATION 21
437437 AND INCLUDE A DESCRI PTION OF THE EXPECTE D RATE OF DEVELOPMENT AND 22
438438 ADOPTION OF THE DIST RIBUTED ENERGY RESOU RCES FORECAST UNDER 23
439439 PARAGRAPH (1)(I) OF THIS SUBSECTION . 24
440440
441441 (4) IF AN ELECTRIC COMPAN Y DOES NOT HAVE THE FULL 25
442442 FORECASTING CAPABILI TY REQUIRED TO MEET THE FORECAST REPORTI NG 26
443443 REQUIREMENTS OF THE FORECASTS REQUIRED UNDER PA RAGRAPH (1)(I) OF THIS 27
444444 SUBSECTION, THE ELECTRIC COMPANY , IN ITS FIRST PLANNIN G CYCLE, MAY 28
445445 INSTEAD SUBMIT A ROA DMAP OF ACTIONS TO B RIDGE THE GAP BETWEE N CURRENT 29
446446 FORECAST PROCESSES A ND NECESSARY IMPROVE MENTS, INCLUDING A TIMELINE 30
447447 FOR MEETING THE FORECAST REP ORTING REQUIREMENTS . 31
448448 SENATE BILL 908 11
449449
450450
451451 (E) BEFORE SUBMITTING AN ELECTRIC DISTRIBUTIO N SYSTEM PLAN TO 1
452452 THE COMMISSION UNDER THIS SECTION, AN ELECTRIC COMPANY SHALL PROVIDE 2
453453 SPECIFIC OPPORTUNITI ES FOR PUBLIC AND ST AKEHOLDER PARTICIPAT ION 3
454454 THROUGHOUT THE DRAFTING PROCESS , INCLUDING: 4
455455
456456 (1) THREE PUBLIC STATUS MEETINGS THAT ARE OP EN TO PUBLIC 5
457457 AND STAKEHOLDER PART ICIPATION, SPREAD OUT OVER THE COURSE OF THE 6
458458 DRAFTING PROCESS , DISCUSSING: 7
459459
460460 (I) PLAN, SCENARIO, FORECAST, AND TECHNOLOGY ADOPT ION 8
461461 ASSUMPTIONS ; 9
462462
463463 (II) IDENTIFIED SYSTEM CO NSTRAINTS AND NEEDS ; AND 10
464464
465465 (III) THE PROGRESS ON THE DRAFT PLAN , INCLUDING 11
466466 PROPOSED SOLUTIONS A CCOMPANIED BY A COST –BENEFIT ANALYSIS AND ANY 12
467467 ADDITIONAL CRITERIA USED TO SELECT THE S OLUTION; 13
468468
469469 (2) THE OPPORTUNITY FOR STAKEHOLD ERS AND THE PUBLIC T O 14
470470 PROVIDE WRITTEN FEED BACK ON THE CURRENT DRAFT PLAN FOR THE 30 DAYS 15
471471 FOLLOWING EACH PUBLI C MEETING; AND 16
472472
473473 (3) WITHIN 30 DAYS FOLLOWING A COM MENT PERIOD UNDER IT EM (2) 17
474474 OF THIS SUBSECTION , PROVIDING A RESPONSE TO ALL COMMENTS SUBM ITTED 18
475475 DURING THE COMMENT PE RIOD, INCLUDING: 19
476476
477477 (I) A DESCRIPTION OF WHE RE THE COMMENT IS 20
478478 INCORPORATED IN THE ELECTRIC DISTRIBUTIO N SYSTEM PLAN; OR 21
479479
480480 (II) A JUSTIFICATION FOR NOT INCORPORATING TH E COMMENT 22
481481 IN THE ELECTRIC DIST RIBUTION SYSTEM PLAN . 23
482482
483483 (F) (1) THE COMMISSION SHALL REVI EW EACH ELECTRIC COM PANY’S 24
484484 ELECTRIC DISTRIBUTIO N SYSTEM PLAN SUBMIT TED FOR APPROVAL . 25
485485
486486 (2) THE COMMISSION MAY NOT AP PROVE AN ELECTRIC 26
487487 DISTRIBUTION SYSTEM PLAN UNLESS THE COMMISSION FINDS THAT : 27
488488
489489 (I) THE ELECTRIC COMPANY SATISFIED ALL OF THE PUBLIC 28
490490 AND STAKEHOLDER ENGA GEMENT REQUIREMENTS SPECIFIED IN SUBSECT ION (E) 29
491491 OF THIS SECTION; 30
492492 12 SENATE BILL 908
493493
494494
495495 (II) THE PROJECTED DISTRI BUTION ACTIVITIES AN D 1
496496 CORRESPONDING BUDGET S AFFORDABLY AND STR ATEGICALLY BENEFIT O R 2
497497 ADVANCE THE POLICY G OALS AND TARGETS SPE CIFIED IN SUBSECTION (B)(3) OF 3
498498 THIS SECTION; 4
499499
500500 (III) THE PLAN WILL COST –EFFECTIVELY ADVANCE APPLICABLE 5
501501 STATE POLICY TO THE GREATE ST EXTENT POSSIBLE ; 6
502502
503503 (IV) THE PLAN HAS ADEQUAT ELY INCORPORATED NON –WIRES 7
504504 SOLUTIONS AND OTHER NONCAPITAL INVESTMEN TS; AND 8
505505
506506 (V) THE PLAN: 9
507507
508508 1. INCORPORATES STAKEHO LDER AND PUBLIC 10
509509 COMMENTS RECEIVED DU RING THE DRAFTING PR OCESS; OR 11
510510
511511 2. PROVIDES A SUFFICIEN T, EVIDENCE–BASED 12
512512 JUSTIFICATION FOR WH Y THE ELECTRIC COMPA NY DID NOT INCORPORA TE INTO 13
513513 THE PLAN STAKEHOLDER OR PUBLIC COMMENTS R ECEIVED DURING THE D RAFTING 14
514514 PROCESS. 15
515515
516516 (3) THE COMMISSION MAY REJECT AN ELECTRIC DISTRIBU TION 16
517517 PLAN SUBMITTED UNDER TH IS SECTION IF THE COMMISSION FINDS THAT THE PLAN 17
518518 FAILS TO: 18
519519
520520 (I) COST–EFFECTIVELY ADVANCE EACH APPLICABLE STATE 19
521521 POLICY TO THE GREATE ST EXTENT POSSIBLE ; OR 20
522522
523523 (II) PRIORITIZE PASSING O N THE LOWEST COST TO 21
524524 RATEPAYERS WHILE ENS URING FU TURE ELECTRIC DISTRI BUTION SYSTEM 22
525525 CAPACITY AND RELIABI LITY. 23
526526
527527 (G) (1) THE INFORMATION SHARI NG FRAMEWORK ADOPTED UNDER 24
528528 SUBSECTION (D) OF THIS SECTION SHAL L ENSURE ACCURACY IN ELECTRIC 25
529529 DISTRIBUTION SYSTEM FORECASTING AND ASSE SSING ELECTRIC DISTR IBUTION 26
530530 SYSTEM CAPACITY. 27
531531
532532 (2) THE INFORMATION SHARI NG FRAMEWORK SHALL : 28
533533
534534 (I) INCLUDE SECURE METHO DS OF COMMUNICATING : 29
535535
536536 1. FOR GAS COMPANIES , THE GEOGRAPHIC POSIT ION OF 30
537537 GAS SERVICES, MAINS, AND RELATED DISTRIBU TION EQUIPMENT ALONG WITH ANY 31 SENATE BILL 908 13
538538
539539
540540 INFORMATION REGARDIN G THE AGE, MATERIAL, DIAMETER, AND CONDITION OF 1
541541 PIPES; AND 2
542542
543543 2. FOR ELECTRIC COMPANI ES, THE GEOGRAPHIC 3
544544 POSITION OF ALL FEED ERS, SUBSTATIONS, AND RELATED EQUIPMEN T, INCLUDING 4
545545 THE AGE AND CONDITIO N OF THE EQUIPMENT ; AND 5
546546
547547 (II) ADHERE TO ALL INDUSTRY–RECOMMENDED 6
548548 CYBERSECURITY GUIDEL INES. 7
549549
550550 (H) THE COMMISSION MAY STAGGE R THE REVIEW AND APP ROVAL OF 8
551551 DIFFERENT ELECTRIC D ISTRIBUTION SYSTEM P LANS TO BE COMPLETED IN 9
552552 DIFFERENT YEARS , PROVIDED EACH ELECTR IC COMPANY ’S ELECTRIC 10
553553 DISTRIBUTION SYSTEM PLAN IS REVIEWED AT LEAST ONCE EVERY 3 YEARS. 11
554554
555555 (I) (1) ON OR BEFORE DECEMBER 1, 2026, AND EACH DECEMBER 1 12
556556 THEREAFTER , THE COMMISSION SHALL REQU IRE EACH ELECTRIC CO MPANY TO 13
557557 PROVIDE THE COMMISSION WITH A PRO GRESS REPORT ON THE ELECTRIC 14
558558 COMPANY’S PROGRESS TOWARDS IMPLEMENTING THE COM PANY’S APPROVED 15
559559 ELECTRIC DISTRIBUTIO N SYSTEM PLAN. 16
560560
561561 (2) A PROGRESS REPORT SUBM ITTED UNDER PARAGRAP H (1) OF 17
562562 THIS SUBSECTION SHAL L INCLUDE: 18
563563
564564 (I) A DESCRIPTION OF ALL ONGOING ELECTRIC DIS TRIBUTION 19
565565 SYSTEM–RELATED PROJECTS OR PROCESSES AND ANY PLANNED OR U PCOMING 20
566566 ELECTRIC DISTRIBUTIO N SYSTEM–RELATED PROJECTS ; 21
567567
568568 (II) AN ANALYSIS DOCUMENT ING THE DECISION –MAKING 22
569569 PROCESS FOR SELECTED ELECTRIC DISTRIBUTIO N SYSTEM–RELATED PROJECTS 23
570570 AND DESCRIBING ANY R EJECTED ALTERNATIVES ; 24
571571
572572 (III) A DESCRIPTION OF HOW EACH ON GOING AND UPCOMING 25
573573 ELECTRIC DISTRIBUTIO N SYSTEM–RELATED PROJECT CONT RIBUTES TO MEETING 26
574574 APPLICABLE STATE POLICY AND THE POLICY GOALS AND TAR GETS SPECIFIED IN 27
575575 SUBSECTION (B)(3) OF THIS SECTION; AND 28
576576
577577 (IV) AN ANALYSIS OF THE E LECTRIC COMPANY’S PROGRESS 29
578578 TOWARD IMPLEMENTING ITS ELECTRIC DISTRIB UTION SYSTEM PLAN US ING EACH 30
579579 OF THE METRICS ADOPT ED BY THE COMMISSION UNDER SUBS ECTION (B)(5) OF THIS 31
580580 SECTION. 32
581581
582582 SECTION 2. AND BE IT FURTHER ENACTED, That this Act shall take effect 33
583583 October 1, 2025. 34 14 SENATE BILL 908
584584
585585
586586