GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2025 H 1 HOUSE BILL 295 Short Title: Req. DOT to Install Prop. Corner Markers. (Public) Sponsors: Representatives Gillespie, B. Jones, Tyson, and Iler (Primary Sponsors). For a complete list of sponsors, refer to the North Carolina General Assembly web site. Referred to: Transportation, if favorable, Rules, Calendar, and Operations of the House March 6, 2025 *H295 -v-1* A BILL TO BE ENTITLED 1 AN ACT TO REQUIRE THE NORTH CAROLINA DEPARTMENT OF TRANSPORT ATION 2 TO INSTALL PROPERTY CORNER MARKERS ALONG CERTAIN PROPERTY 3 ACQUISITIONS AFTER PROJECT COMPLETION. 4 The General Assembly of North Carolina enacts: 5 SECTION 1. G.S. 136-19.4A reads as rewritten: 6 "§ 136-19.4A. Required surveying information in certain acquisition plans.plans; 7 installation of property-related corner markers. 8 (a) Surveying Information Required. – The Department of Transportation shall include 9 in any plan prepared for the purpose of acquiring right-of-way, a permanent easement, or both, 10 that depicts property lines, right-of-way lines, or permanent easements, a set of drawings that 11 clearly identify design alignments, baseline control points, found property-related corner 12 markers, and new right-of-way and permanent easement corner markers. Plans subject to the 13 requirements of this section shall document the localized coordinates for each major control point 14 along the design alignments. The coordinates and associated localization metadata shall be based 15 upon, and tied to, the North Carolina State Plane Coordinate system and shall be clearly identified 16 within the plans. All property corner markers found found, identified, and surveyed shall be 17 clearly identified within the plans in accordance with general surveying standards and 18 procedures. Each property corner marker shall be accurately tied to the design alignment or the 19 North Carolina State Plane Coordinate system, by either a system of bearings and distances or 20 by station and offset. For the purposes of this section, the phrase "new right-of-way and 21 permanent easement corner markers" must include all property boundary intersections along 22 right-of-way or permanent easements acquired by the Department. 23 (b) Installation of New Right-of-Way and Permanent Easement Corner Markers. – The 24 Department of Transportation shall survey and install new right-of-way and permanent easement 25 corner markers utilizing metal stakes, or materials of comparable permanence, along 26 right-of-way or permanent easements acquired by the Department, as described in subsection (a) 27 of this section, in accordance with general surveying standards and procedures after the 28 completion of a project for which right-of-way or permanent easements were acquired." 29 SECTION 2. This act is effective when it becomes law and applies to Department 30 of Transportation projects initiated on or after that date that require right-of-way or permanent 31 easement acquisition. 32