New Jersey 2024-2025 Regular Session

New Jersey Senate Bill S223 Compare Versions

OldNewDifferences
1-[Second Reprint] SENATE, No. 223 STATE OF NEW JERSEY 221st LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2024 SESSION
1+[First Reprint] SENATE, No. 223 STATE OF NEW JERSEY 221st LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2024 SESSION
22
3-[Second Reprint]
3+[First Reprint]
44
55 SENATE, No. 223
66
77
88
99 STATE OF NEW JERSEY
1010
1111 221st LEGISLATURE
1212
1313
1414
1515 PRE-FILED FOR INTRODUCTION IN THE 2024 SESSION
1616
1717
1818
19- Sponsored by: Senator BOB SMITH District 17 (Middlesex and Somerset) Senator LINDA R. GREENSTEIN District 14 (Mercer and Middlesex) SYNOPSIS Directs BPU to establish certain standards concerning electric public utility use of customer energy usage data. CURRENT VERSION OF TEXT As amended by the Senate on March 24, 2025.
19+ Sponsored by: Senator BOB SMITH District 17 (Middlesex and Somerset) Senator LINDA R. GREENSTEIN District 14 (Mercer and Middlesex) SYNOPSIS Directs BPU to establish certain standards concerning electric public utility use of customer energy usage data. CURRENT VERSION OF TEXT As amended by the Senate on October 28, 2024.
2020
2121
2222
2323 Sponsored by:
2424
2525 Senator BOB SMITH
2626
2727 District 17 (Middlesex and Somerset)
2828
2929 Senator LINDA R. GREENSTEIN
3030
3131 District 14 (Mercer and Middlesex)
3232
3333
3434
3535
3636
3737
3838
3939
4040
4141 SYNOPSIS
4242
4343 Directs BPU to establish certain standards concerning electric public utility use of customer energy usage data.
4444
4545
4646
4747 CURRENT VERSION OF TEXT
4848
49- As amended by the Senate on March 24, 2025.
49+ As amended by the Senate on October 28, 2024.
5050
5151
5252
53- An Act concerning customer energy usage data privacy and supplementing Title 48 of the Revised Statutes. Be It Enacted by the Senate and General Assembly of the State of New Jersey: 1. As used in P.L. , c. (C. ) (pending before the Legislature as this bill): "Advanced metering infrastructure" or "AMI" means an integrated system of smart meters, communications networks, and data management systems that enables two-way communication between an electric public utility and customers that can be processed in real-time. "Anonymized data" means a data set containing individual sets of information where all identifiable characteristics and information including, but not limited to, name, address, or account number, are removed so that one cannot reasonably re-identify any individual customer within the data set. "Authorized third party" means a third party to which an electric public utility has disclosed a customer's CEUD with the customer's informed consent. "Board" means the New Jersey Board of Public Utilities or any successor agency. "Customer" means a person or entity, or their authorized agent, who is an end-user of electricity distributed by an electric public utility in this State and whose CEUD is collected through AMI. "Customer energy usage data" or "CEUD" means any data concerning a customer's electricity usage that is generated by advanced metering infrastructure and collected by an electric public utility, which includes, but is not limited to, kilowatts, kilowatt/hours, or any other data that the meter collects, such as voltage, current, rate, or billing cycle. "Data portability" means a feature that allows a customer 1or authorized third party1 to obtain 1[their] the customer's1 CEUD in a customer-accessible local file, in a standardized, electronic, machine-readable format. "Disclosure" means the sale, sharing, offering, or theft by any means of a customer's CEUD to or by a third party. "Electric public utility" means a public utility, as that term is defined in R.S.48:2-13, that transmits and distributes electricity to end users within this State and that uses AMI to collect CEUD. "Informed consent" means the authorization provided by a customer who has received sufficient information from the electric public utility to ensure the customer has full knowledge and understanding of how and to whom the customer's CEUD is disclosed to third parties. "Interval usage" means the granular, incremental power quality and energy usage data measured in watts. "Plan" means the data access plan required pursuant to section 3 of P.L. , c. (C. ) (pending before the Legislature as this bill). "Third party" means any entity or person that is not the electric public utility that initially collected a customer's CEUD through AMI. 2. A customer shall have full ownership and complete control of the customer's CEUD. An electric public utility shall disclose a customer's CEUD only to an authorized third party 2that is licensed by the board pursuant to section 29 of P.L.1999, c.23 (C.48:3-78), or that demonstrates to the board that its cybersecurity and information security systems are at least as effective as those of entities that are licensed by the board pursuant to section 29 of P.L.1999, c.23 (C.48:3-78)2 , except as provided in subsection a. of section 4 of P.L. , c. (C. ) (pending before the Legislature as this bill). An electric public utility shall use CEUD only to provide electric public utility service in the ordinary course of business and according to law. 3. a. Within 90 calendar days of the effective date of P.L. , c. (C. ) (pending before the Legislature as this bill), the board shall establish Statewide standardized privacy requirements that each electric public utility shall be required to adopt as part of the data access plan required by subsection b. of this section. The standardized privacy requirements shall include 2[provisions]2 : (1) 2provisions2 committing the electric public utility to protect CEUD from unauthorized disclosure or destruction by using reasonable security procedures and practices; (2) 2provisions2 requiring each electric public utility, in the event of an unauthorized disclosure of CEUD, to notify all customers, the board, and, if appropriate, law enforcement of the event; and (3) any other CEUD privacy and transparency requirements the board deems appropriate. b. Within 90 calendar days of the issuance of the Statewide standardized privacy requirements established by subsection a. of this section, the board shall require each electric public utility to file with the board, in a form and manner to be determined by the board, a data access plan. 2The board may also require an authorized third party to submit a data access plan to the board.2 The plan shall require each electric public utility 2or authorized third party, as applicable2 to address CEUD disclosure, access, and privacy, and billing reconciliation procedures. Each plan shall require an electric public utility 2or authorized third party, as applicable2 to develop practices and procedures that shall 2[ensure]2 : (1) 2ensure2 customers 1and their authorized third parties1 have real-time or near real-time access to their ongoing and historical CEUD, made available on a digital platform no later than 24 hours after the CEUD was collected by the AMI, in a form that allows for data portability; (2) 2ensure2 customers are provided with sufficient information, including, but not limited to, the names of third parties and the intended use of CEUD by third parties, to provide informed consent in writing authorizing a third party to receive the customer's CEUD, except that the customer shall have the ability 1to1 deny consent and to revoke informed consent at any time; (3) 2ensure that2 an electric public utility contractually requires authorized third parties that have access to CEUD to abide by the provisions of this section; (4) 2ensure2 the use of CEUD shall assist the State in achieving the clean energy goals provided in the Energy Master Plan; (5) 2ensure2 the use of CEUD improves the reliability of electricity distribution by increasing system and customer transparency, improving efficiency of distribution system planning, and accelerating outage recovery; (6) 2ensure2 an electric public utility collects five-minute interval usage data that shall be made available to the customer pursuant to paragraph (1) of this subsection; (7) 2ensure that2 AMI and CEUD shall improve the efficiency of rates charged to customers, including rate design and billing accuracy; and (8) 2include2 any other information the board deems appropriate. c. The board shall have 30 calendar days to review and approve a plan submitted by an electric public utility 2or authorized third party, as applicable2. A plan shall be deemed approved by the board if the board fails to approve or reject a plan within 30 calendar days of the date of submission. 2d. An electric public utility or authorized third party that submits a data access plan pursuant to this section may include an existing energy data usage consent waiver in the plan. If the board finds that the existing energy data usage consent waiver satisfies the requirements of P.L. , c. (C. ) (pending before the Legislature as this bill), the third party to which the consent waiver applies shall be deemed to satisfy the requirement to obtain informed, written consent pursuant to paragraph (2) of subsection b. of this section, and shall not be required to obtain additional written consent.2 4. a. The provisions of P.L. , c. (C. ) (pending before the Legislature as this bill) shall not preclude an electric public utility from: (1) using CEUD for analysis, reporting, or program management if it is anonymized data; or (2) disclosing CEUD as required or permitted under State or federal law or by an order of the board. b. The provisions of P.L. , c. (C. ) (pending before the Legislature as this bill) shall not apply if a customer chooses to disclose the customer's CEUD to a third party that is not subject to the provisions of P.L. , c. (C. ) (pending before the Legislature as this bill). 5. This act shall take effect immediately.
53+ An Act concerning customer energy usage data privacy and supplementing Title 48 of the Revised Statutes. Be It Enacted by the Senate and General Assembly of the State of New Jersey: 1. As used in P.L. , c. (C. ) (pending before the Legislature as this bill): "Advanced metering infrastructure" or "AMI" means an integrated system of smart meters, communications networks, and data management systems that enables two-way communication between an electric public utility and customers that can be processed in real-time. "Anonymized data" means a data set containing individual sets of information where all identifiable characteristics and information including, but not limited to, name, address, or account number, are removed so that one cannot reasonably re-identify any individual customer within the data set. "Authorized third party" means a third party to which an electric public utility has disclosed a customer's CEUD with the customer's informed consent. "Board" means the New Jersey Board of Public Utilities or any successor agency. "Customer" means a person or entity, or their authorized agent, who is an end-user of electricity distributed by an electric public utility in this State and whose CEUD is collected through AMI. "Customer energy usage data" or "CEUD" means any data concerning a customer's electricity usage that is generated by advanced metering infrastructure and collected by an electric public utility, which includes, but is not limited to, kilowatts, kilowatt/hours, or any other data that the meter collects, such as voltage, current, rate, or billing cycle. "Data portability" means a feature that allows a customer 1or authorized third party1 to obtain 1[their] the customer's1 CEUD in a customer-accessible local file, in a standardized, electronic, machine-readable format. "Disclosure" means the sale, sharing, offering, or theft by any means of a customer's CEUD to or by a third party. "Electric public utility" means a public utility, as that term is defined in R.S.48:2-13, that transmits and distributes electricity to end users within this State and that uses AMI to collect CEUD. "Informed consent" means the authorization provided by a customer who has received sufficient information from the electric public utility to ensure the customer has full knowledge and understanding of how and to whom the customer's CEUD is disclosed to third parties. "Interval usage" means the granular, incremental power quality and energy usage data measured in watts. "Plan" means the data access plan required pursuant to section 3 of P.L. , c. (C. ) (pending before the Legislature as this bill). "Third party" means any entity or person that is not the electric public utility that initially collected a customer's CEUD through AMI. 2. A customer shall have full ownership and complete control of the customer's CEUD. An electric public utility shall disclose a customer's CEUD only to an authorized third party, except as provided in subsection a. of section 4 of P.L. , c. (C. ) (pending before the Legislature as this bill). An electric public utility shall use CEUD only to provide electric public utility service in the ordinary course of business and according to law. 3. a. Within 90 calendar days of the effective date of P.L. , c. (C. ) (pending before the Legislature as this bill), the board shall establish Statewide standardized privacy requirements that each electric public utility shall be required to adopt as part of the data access plan required by subsection b. of this section. The standardized privacy requirements shall include provisions: (1) committing the electric public utility to protect CEUD from unauthorized disclosure or destruction by using reasonable security procedures and practices; (2) requiring each electric public utility, in the event of an unauthorized disclosure of CEUD, to notify all customers, the board, and, if appropriate, law enforcement of the event; and (3) any other CEUD privacy and transparency requirements the board deems appropriate. b. Within 90 calendar days of the issuance of the Statewide standardized privacy requirements established by subsection a. of this section, the board shall require each electric public utility to file with the board, in a form and manner to be determined by the board, a data access plan. The plan shall require each electric public utility to address CEUD disclosure, access, and privacy, and billing reconciliation procedures. Each plan shall require an electric public utility to develop practices and procedures that shall ensure: (1) customers 1and their authorized third parties1 have real-time or near real-time access to their ongoing and historical CEUD, made available on a digital platform no later than 24 hours after the CEUD was collected by the AMI, in a form that allows for data portability; (2) customers are provided with sufficient information, including, but not limited to, the names of third parties and the intended use of CEUD by third parties, to provide informed consent in writing authorizing a third party to receive the customer's CEUD, except that the customer shall have the ability 1to1 deny consent and to revoke informed consent at any time; (3) an electric public utility contractually requires authorized third parties that have access to CEUD to abide by the provisions of this section; (4) the use of CEUD shall assist the State in achieving the clean energy goals provided in the Energy Master Plan; (5) the use of CEUD improves the reliability of electricity distribution by increasing system and customer transparency, improving efficiency of distribution system planning, and accelerating outage recovery; (6) an electric public utility collects five-minute interval usage data that shall be made available to the customer pursuant to paragraph (1) of this subsection; (7) AMI and CEUD shall improve the efficiency of rates charged to customers, including rate design and billing accuracy; and (8) any other information the board deems appropriate. c. The board shall have 30 calendar days to review and approve a plan submitted by an electric public utility. A plan shall be deemed approved by the board if the board fails to approve or reject a plan within 30 calendar days of the date of submission. 4. a. The provisions of P.L. , c. (C. ) (pending before the Legislature as this bill) shall not preclude an electric public utility from: (1) using CEUD for analysis, reporting, or program management if it is anonymized data; or (2) disclosing CEUD as required or permitted under State or federal law or by an order of the board. b. The provisions of P.L. , c. (C. ) (pending before the Legislature as this bill) shall not apply if a customer chooses to disclose the customer's CEUD to a third party that is not subject to the provisions of P.L. , c. (C. ) (pending before the Legislature as this bill). 5. This act shall take effect immediately.
5454
5555 An Act concerning customer energy usage data privacy and supplementing Title 48 of the Revised Statutes.
5656
5757
5858
5959 Be It Enacted by the Senate and General Assembly of the State of New Jersey:
6060
6161
6262
6363 1. As used in P.L. , c. (C. ) (pending before the Legislature as this bill):
6464
6565 "Advanced metering infrastructure" or "AMI" means an integrated system of smart meters, communications networks, and data management systems that enables two-way communication between an electric public utility and customers that can be processed in real-time.
6666
6767 "Anonymized data" means a data set containing individual sets of information where all identifiable characteristics and information including, but not limited to, name, address, or account number, are removed so that one cannot reasonably re-identify any individual customer within the data set.
6868
6969 "Authorized third party" means a third party to which an electric public utility has disclosed a customer's CEUD with the customer's informed consent.
7070
7171 "Board" means the New Jersey Board of Public Utilities or any successor agency.
7272
7373 "Customer" means a person or entity, or their authorized agent, who is an end-user of electricity distributed by an electric public utility in this State and whose CEUD is collected through AMI.
7474
7575 "Customer energy usage data" or "CEUD" means any data concerning a customer's electricity usage that is generated by advanced metering infrastructure and collected by an electric public utility, which includes, but is not limited to, kilowatts, kilowatt/hours, or any other data that the meter collects, such as voltage, current, rate, or billing cycle.
7676
7777 "Data portability" means a feature that allows a customer 1or authorized third party1 to obtain 1[their] the customer's1 CEUD in a customer-accessible local file, in a standardized, electronic, machine-readable format.
7878
7979 "Disclosure" means the sale, sharing, offering, or theft by any means of a customer's CEUD to or by a third party.
8080
8181 "Electric public utility" means a public utility, as that term is defined in R.S.48:2-13, that transmits and distributes electricity to end users within this State and that uses AMI to collect CEUD.
8282
8383 "Informed consent" means the authorization provided by a customer who has received sufficient information from the electric public utility to ensure the customer has full knowledge and understanding of how and to whom the customer's CEUD is disclosed to third parties.
8484
8585 "Interval usage" means the granular, incremental power quality and energy usage data measured in watts.
8686
8787 "Plan" means the data access plan required pursuant to section 3 of P.L. , c. (C. ) (pending before the Legislature as this bill).
8888
8989 "Third party" means any entity or person that is not the electric public utility that initially collected a customer's CEUD through AMI.
9090
9191
9292
93- 2. A customer shall have full ownership and complete control of the customer's CEUD. An electric public utility shall disclose a customer's CEUD only to an authorized third party 2that is licensed by the board pursuant to section 29 of P.L.1999, c.23 (C.48:3-78), or that demonstrates to the board that its cybersecurity and information security systems are at least as effective as those of entities that are licensed by the board pursuant to section 29 of P.L.1999, c.23 (C.48:3-78)2 , except as provided in subsection a. of section 4 of P.L. , c. (C. ) (pending before the Legislature as this bill). An electric public utility shall use CEUD only to provide electric public utility service in the ordinary course of business and according to law.
93+ 2. A customer shall have full ownership and complete control of the customer's CEUD. An electric public utility shall disclose a customer's CEUD only to an authorized third party, except as provided in subsection a. of section 4 of P.L. , c. (C. ) (pending before the Legislature as this bill). An electric public utility shall use CEUD only to provide electric public utility service in the ordinary course of business and according to law.
9494
9595
9696
97- 3. a. Within 90 calendar days of the effective date of P.L. , c. (C. ) (pending before the Legislature as this bill), the board shall establish Statewide standardized privacy requirements that each electric public utility shall be required to adopt as part of the data access plan required by subsection b. of this section. The standardized privacy requirements shall include 2[provisions]2 :
97+ 3. a. Within 90 calendar days of the effective date of P.L. , c. (C. ) (pending before the Legislature as this bill), the board shall establish Statewide standardized privacy requirements that each electric public utility shall be required to adopt as part of the data access plan required by subsection b. of this section. The standardized privacy requirements shall include provisions:
9898
99- (1) 2provisions2 committing the electric public utility to protect CEUD from unauthorized disclosure or destruction by using reasonable security procedures and practices;
99+ (1) committing the electric public utility to protect CEUD from unauthorized disclosure or destruction by using reasonable security procedures and practices;
100100
101- (2) 2provisions2 requiring each electric public utility, in the event of an unauthorized disclosure of CEUD, to notify all customers, the board, and, if appropriate, law enforcement of the event; and
101+ (2) requiring each electric public utility, in the event of an unauthorized disclosure of CEUD, to notify all customers, the board, and, if appropriate, law enforcement of the event; and
102102
103103 (3) any other CEUD privacy and transparency requirements the board deems appropriate.
104104
105- b. Within 90 calendar days of the issuance of the Statewide standardized privacy requirements established by subsection a. of this section, the board shall require each electric public utility to file with the board, in a form and manner to be determined by the board, a data access plan. 2The board may also require an authorized third party to submit a data access plan to the board.2 The plan shall require each electric public utility 2or authorized third party, as applicable2 to address CEUD disclosure, access, and privacy, and billing reconciliation procedures. Each plan shall require an electric public utility 2or authorized third party, as applicable2 to develop practices and procedures that shall 2[ensure]2 :
105+ b. Within 90 calendar days of the issuance of the Statewide standardized privacy requirements established by subsection a. of this section, the board shall require each electric public utility to file with the board, in a form and manner to be determined by the board, a data access plan. The plan shall require each electric public utility to address CEUD disclosure, access, and privacy, and billing reconciliation procedures. Each plan shall require an electric public utility to develop practices and procedures that shall ensure:
106106
107- (1) 2ensure2 customers 1and their authorized third parties1 have real-time or near real-time access to their ongoing and historical CEUD, made available on a digital platform no later than 24 hours after the CEUD was collected by the AMI, in a form that allows for data portability;
107+ (1) customers 1and their authorized third parties1 have real-time or near real-time access to their ongoing and historical CEUD, made available on a digital platform no later than 24 hours after the CEUD was collected by the AMI, in a form that allows for data portability;
108108
109- (2) 2ensure2 customers are provided with sufficient information, including, but not limited to, the names of third parties and the intended use of CEUD by third parties, to provide informed consent in writing authorizing a third party to receive the customer's CEUD, except that the customer shall have the ability 1to1 deny consent and to revoke informed consent at any time;
109+ (2) customers are provided with sufficient information, including, but not limited to, the names of third parties and the intended use of CEUD by third parties, to provide informed consent in writing authorizing a third party to receive the customer's CEUD, except that the customer shall have the ability 1to1 deny consent and to revoke informed consent at any time;
110110
111- (3) 2ensure that2 an electric public utility contractually requires authorized third parties that have access to CEUD to abide by the provisions of this section;
111+ (3) an electric public utility contractually requires authorized third parties that have access to CEUD to abide by the provisions of this section;
112112
113- (4) 2ensure2 the use of CEUD shall assist the State in achieving the clean energy goals provided in the Energy Master Plan;
113+ (4) the use of CEUD shall assist the State in achieving the clean energy goals provided in the Energy Master Plan;
114114
115- (5) 2ensure2 the use of CEUD improves the reliability of electricity distribution by increasing system and customer transparency, improving efficiency of distribution system planning, and accelerating outage recovery;
115+ (5) the use of CEUD improves the reliability of electricity distribution by increasing system and customer transparency, improving efficiency of distribution system planning, and accelerating outage recovery;
116116
117- (6) 2ensure2 an electric public utility collects five-minute interval usage data that shall be made available to the customer pursuant to paragraph (1) of this subsection;
117+ (6) an electric public utility collects five-minute interval usage data that shall be made available to the customer pursuant to paragraph (1) of this subsection;
118118
119- (7) 2ensure that2 AMI and CEUD shall improve the efficiency of rates charged to customers, including rate design and billing accuracy; and
119+ (7) AMI and CEUD shall improve the efficiency of rates charged to customers, including rate design and billing accuracy; and
120120
121- (8) 2include2 any other information the board deems appropriate.
121+ (8) any other information the board deems appropriate.
122122
123- c. The board shall have 30 calendar days to review and approve a plan submitted by an electric public utility 2or authorized third party, as applicable2. A plan shall be deemed approved by the board if the board fails to approve or reject a plan within 30 calendar days of the date of submission.
123+ c. The board shall have 30 calendar days to review and approve a plan submitted by an electric public utility. A plan shall be deemed approved by the board if the board fails to approve or reject a plan within 30 calendar days of the date of submission.
124124
125- 2d. An electric public utility or authorized third party that submits a data access plan pursuant to this section may include an existing energy data usage consent waiver in the plan. If the board finds that the existing energy data usage consent waiver satisfies the requirements of P.L. , c. (C. ) (pending before the Legislature as this bill), the third party to which the consent waiver applies shall be deemed to satisfy the requirement to obtain informed, written consent pursuant to paragraph (2) of subsection b. of this section, and shall not be required to obtain additional written consent.2
125+
126126
127127 4. a. The provisions of P.L. , c. (C. ) (pending before the Legislature as this bill) shall not preclude an electric public utility from:
128128
129129 (1) using CEUD for analysis, reporting, or program management if it is anonymized data; or
130130
131131 (2) disclosing CEUD as required or permitted under State or federal law or by an order of the board.
132132
133133 b. The provisions of P.L. , c. (C. ) (pending before the Legislature as this bill) shall not apply if a customer chooses to disclose the customer's CEUD to a third party that is not subject to the provisions of P.L. , c. (C. ) (pending before the Legislature as this bill).
134134
135135
136136
137137 5. This act shall take effect immediately.