New Mexico 2025 Regular Session

New Mexico Senate Bill SB425 Compare Versions

OldNewDifferences
1-SFC/SB 425
2-Page 1
1+underscored material = new
2+[bracketed material] = delete
33 1
44 2
55 3
66 4
77 5
88 6
99 7
1010 8
1111 9
1212 10
1313 11
1414 12
1515 13
1616 14
1717 15
1818 16
1919 17
2020 18
2121 19
2222 20
2323 21
2424 22
2525 23
2626 24
2727 25
28+SENATE BILL 425
29+57
30+TH LEGISLATURE
31+-
32+
33+STATE
34+
35+OF
36+
37+NEW
38+
39+MEXICO
40+
41+-
42+ FIRST SESSION
43+,
44+
45+2025
46+INTRODUCED BY
47+Benny Shendo, Jr.
2848 AN ACT
2949 RELATING TO CAPITAL EXPENDITURES; REAUTHORIZING OR
3050 REAPPROPRIATING BALANCES, EXPANDING OR CHANGING PURPOSES,
3151 EXTENDING EXPENDITURE PERIODS, CHANGING AGENCIES AND
3252 ESTABLISHING CONDITIONS FOR THE REVERSION OR TRANSFER OF
3353 UNEXPENDED BALANCES OF APPROPRIATIONS MADE BY THE LEGISLATURE
3454 IN PRIOR YEARS; DECLARING AN EMERGENCY.
3555 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF NEW MEXICO:
36-SECTION 1. SEVERANCE TAX BONDS--REVERSION OF
37-PROCEEDS.--
56+SECTION 1. SEVERANCE TAX BONDS--REVERSION OF PROCEEDS.--
3857 A. Except as otherwise provided in another section
3958 of this act:
4059 (1) the unexpended balance from the proceeds
4160 of severance tax bonds issued for a project that has been
4261 reauthorized in this act shall revert to the severance tax
4362 bonding fund:
44-(a) at the end of the expenditure
45-period as set forth in this act, if the expenditure period is
46-changed in this act; or
47-(b) if the expenditure period is not
48-changed in this act, pursuant to the time frame set forth in
49-the law that originally authorized the severance tax bonds or
50-the time frame set forth in any law that has previously
51-reauthorized the expenditure of the proceeds, whichever is SFC/SB 425
52-Page 2
63+.230191.1 underscored material = new
64+[bracketed material] = delete
5365 1
5466 2
5567 3
5668 4
5769 5
5870 6
5971 7
6072 8
6173 9
6274 10
6375 11
6476 12
6577 13
6678 14
6779 15
6880 16
6981 17
7082 18
7183 19
7284 20
7385 21
7486 22
7587 23
7688 24
7789 25
90+(a) at the end of the expenditure period
91+as set forth in this act, if the expenditure period is changed
92+in this act; or
93+(b) if the expenditure period is not
94+changed in this act, pursuant to the time frame set forth in
95+the law that originally authorized the severance tax bonds or
96+the time frame set forth in any law that has previously
97+reauthorized the expenditure of the proceeds, whichever is
7898 later; and
7999 (2) all remaining balances from the proceeds
80100 of severance tax bonds issued for a project that has been
81101 reauthorized in this act shall revert to the severance tax
82102 bonding fund three months after the reversion date for the
83103 unexpended balances.
84104 B. For the purpose of this section, "unexpended
85105 balance" means the remainder of an appropriation after
86106 reserving for unpaid costs and expenses covered by binding
87107 written obligations to third parties.
88108 SECTION 2. GENERAL FUND AND OTHER FUND APPROPRIATIONS--
89109 REVERSIONS.--
90110 A. Except as otherwise provided in another section
91111 of this act:
92-(1) the unexpended balance of an
93-appropriation from the general fund or other state fund that
94-has been changed in this act shall revert:
95-(a) at the end of the expenditure
96-period as set forth in this act, if the expenditure period is
97-changed in this act; or
98-(b) if the expenditure period is not
99-changed in this act, pursuant to the time frame set forth in
100-the law in which the original appropriation was made or the
101-time frame set forth in any law that has previously changed
102-the appropriation, whichever is later; and SFC/SB 425
103-Page 3
112+(1) the unexpended balance of an appropriation
113+from the general fund or other state fund that has been changed
114+in this act shall revert:
115+.230191.1
116+- 2 - underscored material = new
117+[bracketed material] = delete
104118 1
105119 2
106120 3
107121 4
108122 5
109123 6
110124 7
111125 8
112126 9
113127 10
114128 11
115129 12
116130 13
117131 14
118132 15
119133 16
120134 17
121135 18
122136 19
123137 20
124138 21
125139 22
126140 23
127141 24
128142 25
129-(2) all remaining balances of an
130-appropriation from the general fund or other state fund that
131-has been changed in this act shall revert three months after
132-the reversion date for the unexpended balance.
143+(a) at the end of the expenditure period
144+as set forth in this act, if the expenditure period is changed
145+in this act; or
146+(b) if the expenditure period is not
147+changed in this act, pursuant to the time frame set forth in
148+the law in which the original appropriation was made or the
149+time frame set forth in any law that has previously changed the
150+appropriation, whichever is later; and
151+(2) all remaining balances of an appropriation
152+from the general fund or other state fund that has been changed
153+in this act shall revert three months after the reversion date
154+for the unexpended balance.
133155 B. Except as provided in Subsection C of this
134-section, the balance of an appropriation made from the
135-general fund or other state fund shall revert pursuant to
136-Subsection A of this section to the originating fund.
156+section, the balance of an appropriation made from the general
157+fund or other state fund shall revert pursuant to Subsection A
158+of this section to the originating fund.
137159 C. The balance of an appropriation made from the
138160 general fund or other state fund to the Indian affairs
139-department or the aging and long-term services department for
140-a project located on lands of an Indian nation, tribe or
141-pueblo shall revert pursuant to Subsection A of this section
142-to the tribal infrastructure project fund.
161+department or the aging and long-term services department for a
162+project located on lands of an Indian nation, tribe or pueblo
163+shall revert pursuant to Subsection A of this section to the
164+tribal infrastructure project fund.
143165 D. For the purpose of this section, "unexpended
144166 balance" means the remainder of an appropriation after
145167 reserving for unpaid costs and expenses covered by binding
146-written obligations to third parties.
147-SECTION 3. PASEO DEL VOLCAN IMPROVEMENT--EXTEND TIME--
148-SEVERANCE TAX BONDS.--The time of expenditure for the
149-department of transportation project in Subsection 1 of
150-Section 33 of Chapter 138 of Laws 2021 to acquire rights of
151-way and to plan, design and construct improvements to paseo
152-del Volcan in Bernalillo and Sandoval counties is extended
153-through fiscal year 2027. SFC/SB 425
154-Page 4
168+.230191.1
169+- 3 - underscored material = new
170+[bracketed material] = delete
155171 1
156172 2
157173 3
158174 4
159175 5
160176 6
161177 7
162178 8
163179 9
164180 10
165181 11
166182 12
167183 13
168184 14
169185 15
170186 16
171187 17
172188 18
173189 19
174190 20
175191 21
176192 22
177193 23
178194 24
179195 25
180-SECTION 4. ALBUQUERQUE MESA DEL SOL EAST PLAT LIFT
181-STATION CONSTRUCTION--CHANGE TO ALBUQUERQUE-BERNALILLO COUNTY
182-WATER UTILITY AUTHORITY MESA DEL SOL EAST PLAT LIFT STATION
183-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The
184-unexpended balance of the appropriation to the department of
185-environment in Subsection 4 of Section 22 of Chapter 53 of
186-Laws 2022 to plan, design and construct a lift station on the
187-east plat of the Mesa del Sol economic development hub in
188-Bernalillo county shall not be expended for the original
189-purpose but is changed to plan, design and construct a lift
190-station for the Albuquerque-Bernalillo county water utility
191-authority on the east plat of the Mesa del Sol economic
192-development hub in Bernalillo county. The time of
193-expenditure is extended through fiscal year 2027.
194-SECTION 5. ARENAL ROAD SOUTHWEST IMPROVEMENT--EXTEND
195-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
196-department of transportation project in Subsection 4 of
197-Section 33 of Chapter 138 of Laws 2021 to plan, design,
198-construct and rehabilitate any county-maintained road and
199-associated infrastructure, including Arenal road from Coors
200-boulevard west to the end of county maintenance and the
201-intersection of Rio Bravo boulevard and Second street
202-extending north and east, in county commission district 2 in
203-Bernalillo county is extended through fiscal year 2027.
204-SECTION 6. ARMIJO ROAD SOUTHWEST ROAD AND DRAINAGE SFC/SB 425
205-Page 5
196+written obligations to third parties.
197+SECTION 3. LAS VEGAS EIGHTH STREET WATER LINE EXTENSION--
198+CHANGE TO PURCHASE VEHICLES AND EQUIPMENT--CHANGE AGENCY--
199+EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of
200+the appropriation to the department of environment in
201+Subsection 91 of Section 22 of Chapter 53 of Laws 2022 to plan,
202+design and construct a water line along Eighth street north of
203+Mills avenue in Las Vegas in San Miguel county shall not be
204+expended for the original purpose but is appropriated to the
205+local government division to purchase and equip vehicles and
206+equipment for the utilities department in Las Vegas. The time
207+of expenditure is extended through fiscal year 2027.
208+SECTION 4. LAS VEGAS VETERANS OF FOREIGN WARS BUILDING
209+RENOVATION--CHANGE TO IMPROVE VETERANS PARK--GENERAL FUND.--The
210+unexpended balance of the appropriation to the local government
211+division in Subsection 450 of Section 28 of Chapter 66 of Laws
212+2024 to plan, design, construct and renovate the Las Vegas
213+veterans of foreign wars building, including heating,
214+ventilation and air conditioning systems, and to purchase and
215+install equipment, including commemorative bricks, in Las Vegas
216+in San Miguel county shall not be expended for the original
217+purpose but is changed to plan, design, construct, renovate,
218+furnish and equip improvements to Veterans park in Las Vegas in
219+San Miguel county.
220+SECTION 5. SAN MIGUEL COUNTY PASSENGER VAN PURCHASE--
221+.230191.1
222+- 4 - underscored material = new
223+[bracketed material] = delete
206224 1
207225 2
208226 3
209227 4
210228 5
211229 6
212230 7
213231 8
214232 9
215233 10
216234 11
217235 12
218236 13
219237 14
220238 15
221239 16
222240 17
223241 18
224242 19
225243 20
226244 21
227245 22
228246 23
229247 24
230248 25
231-IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of
232-expenditure for the department of transportation project
233-originally authorized in Subsection 4 of Section 40 of
234-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
235-Chapter 203, Section 52 to plan, design and construct road
236-and drainage improvements to Armijo road SW in the
237-South Valley area of Bernalillo county is extended through
238-fiscal year 2027.
239-SECTION 7. ATRISCO VISTA BOULEVARD NORTHWEST
240-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
241-expenditure for the department of transportation project in
242-Subsection 5 of Section 33 of Chapter 138 of Laws 2021 to
243-acquire rights of way and to plan, design and improve
244-Atrisco Vista boulevard from Double Eagle airport to paseo
245-del Norte boulevard NW in Bernalillo county is extended
246-through fiscal year 2027.
247-SECTION 8. BERNALILLO COUNTY DISTRICT 2 TRAFFIC CALMING
248-INSTALLATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
249-expenditure for the department of transportation project in
250-Subsection 7 of Section 33 of Chapter 138 of Laws 2021 to
251-plan, design, construct and install traffic calming devices,
252-including speed humps, in county commission district 2 in
253-Bernalillo county is extended through fiscal year 2027.
254-SECTION 9. BERNALILLO COUNTY FAMILY SERVICES FACILITY
255-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of SFC/SB 425
256-Page 6
257-1
258-2
259-3
260-4
261-5
262-6
263-7
264-8
265-9
266-10
267-11
268-12
269-13
270-14
271-15
272-16
273-17
274-18
275-19
276-20
277-21
278-22
279-23
280-24
281-25
282-expenditure for the local government division project
283-originally authorized in Subsection 4 of Section 29 of
284-Chapter 138 of Laws 2021 and reauthorized in Laws 2023,
285-Chapter 203, Section 9 to plan, design, construct, renovate,
286-furnish, equip and landscape a family services facility in
287-the South Valley area of Bernalillo county is extended
288-through fiscal year 2027.
289-SECTION 10. BERNALILLO COUNTY MEAL DELIVERY EQUIPMENT
290-PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
291-expenditure for the local government division project
292-originally authorized in Subsection 68 of Section 29 of
293-Chapter 138 of Laws 2021 and reauthorized in Laws 2023,
294-Chapter 203, Section 13 to purchase and install equipment,
295-including information technology and related equipment and
296-infrastructure, cooking equipment, white goods, appliances
297-and storage equipment, for a homebound and special needs meal
298-delivery program in Bernalillo county is extended through
299-fiscal year 2027.
300-SECTION 11. BERNALILLO COUNTY MOUNTAINVIEW NEIGHBORHOOD
301-DRAINAGE IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The
302-time of expenditure for the department of transportation
303-project in Subsection 8 of Section 33 of Chapter 138 of
304-Laws 2021 to plan, design, construct and improve drainage in
305-cooperation with the Albuquerque metropolitan arroyo flood
306-control authority in the Mountainview neighborhood in county SFC/SB 425
307-Page 7
308-1
309-2
310-3
311-4
312-5
313-6
314-7
315-8
316-9
317-10
318-11
319-12
320-13
321-14
322-15
323-16
324-17
325-18
326-19
327-20
328-21
329-22
330-23
331-24
332-25
333-commission district 2 in Bernalillo county is extended
334-through fiscal year 2027.
335-SECTION 12. BERNALILLO COUNTY SOUTHWEST MESA FIRE
336-STATION CONSTRUCTION--CHANGE TO NORTH VALLEY FIRE STATION
337-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The
338-unexpended balance of the appropriation to the local
339-government division in Subsection 14 of Section 29 of
340-Chapter 138 of Laws 2021 to acquire land and to plan, design,
341-construct, equip and furnish phase 1 of a new fire station
342-for the southwest mesa in Bernalillo county shall not be
343-expended for the original purpose but is changed to plan,
344-design, construct, equip and furnish a fire station in the
345-north valley in Bernalillo county. The time of expenditure
346-is extended through fiscal year 2027.
347-SECTION 13. BERNALILLO COUNTY SOUTHERN AREA STREET
348-LIGHT CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The
349-time of expenditure for the department of transportation
350-project in Subsection 6 of Section 33 of Chapter 138 of
351-Laws 2021 to plan, design, construct, improve, replace,
352-purchase, retrofit and install street lights and related
353-equipment in county commission district 2
354- in Bernalillo
355-county is extended through fiscal year 2027.
356-SECTION 14. BERNALILLO COUNTY VETERANS TRANSITIONAL
357-HOUSING FURNITURE AND EQUIPMENT PURCHASE--EXTEND TIME--
358-GENERAL FUND.--The time of expenditure for the local SFC/SB 425
359-Page 8
360-1
361-2
362-3
363-4
364-5
365-6
366-7
367-8
368-9
369-10
370-11
371-12
372-13
373-14
374-15
375-16
376-17
377-18
378-19
379-20
380-21
381-22
382-23
383-24
384-25
385-government division project in Subsection 155 of Section 28
386-of Chapter 199 of Laws 2023 to purchase and install
387-furnishings and equipment for transitional housing at the
388-veterans integration centers in Albuquerque in Bernalillo
389-county is extended through fiscal year 2027.
390-SECTION 15. ESCARPMENT ROAD IMPROVEMENT--EXTEND TIME--
391-GENERAL FUND.--The time of expenditure for the department of
392-transportation project originally authorized in Subsection 10
393-of Section 40 of Chapter 277 of Laws 2019 and reauthorized in
394-Laws 2023, Chapter 203, Section 21 to plan, design and
395-construct paving and other improvements on Escarpment road on
396-the southwest mesa in Bernalillo county is extended through
397-fiscal year 2027.
398-SECTION 16. ALBUQUERQUE PLAYING FIELD IMPROVEMENT--
399-CHANGE TO EXPO NEW MEXICO PLAYING FIELD AND SPORTS ARENA
400-IMPROVEMENT--CHANGE AGENCY--EXTEND TIME--SEVERANCE TAX
401-BONDS.--Fifty-four percent of the unexpended balance of
402- the
403-appropriation to the local government division originally
404-authorized in Subsection 73 of Section 30 of Chapter 53 of
405-Laws 2022 and reauthorized in Laws 2023, Chapter 203,
406-Section 43 to purchase, equip, install and make improvements
407-to playing fields, including artificial turf, throughout
408-Albuquerque in Bernalillo county shall not be expended for
409-the original or reauthorized purpose but is appropriated to
410-the state fair commission to purchase, equip, install and SFC/SB 425
411-Page 9
412-1
413-2
414-3
415-4
416-5
417-6
418-7
419-8
420-9
421-10
422-11
423-12
424-13
425-14
426-15
427-16
428-17
429-18
430-19
431-20
432-21
433-22
434-23
435-24
436-25
437-make improvements to playing fields and sports arenas,
438-including artificial turf, for Expo New Mexico in
439-Bernalillo county. The time of expenditure is extended
440-through fiscal year 2027.
441-SECTION 17. NEW MEXICO HIGHWAY 333 AND TABLAZON ROAD
442-INTERSECTION IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The
443-time of expenditure for the department of transportation
444-project originally authorized in Subsection 15 of Section 40
445-of Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
446-Chapter 203, Section 24 to acquire rights of way for and to
447-plan, design and construct improvements at the intersection
448-of Tablazon road and New Mexico highway 333, including
449-realignment and road extension, in Bernalillo county is
249+EXPAND PURPOSE--EXTEND TIME--GENERAL FUND.--The local
250+government division project in Subsection 388 of Section 28 of
251+Chapter 199 of Laws 2023 to purchase and equip passenger vans
252+for after-school and summer programs in Las Vegas in San Miguel
253+county may include purchasing and equipping buses. The time of
254+expenditure is extended through fiscal year 2027.
255+SECTION 6. MOUNTAINAIR PUBLIC SCHOOL DISTRICT ACCESSIBLE
256+ACTIVITY BUS PURCHASE--CHANGE TO PURCHASE AN ACTIVITY BUS--
257+EXTEND TIME--GENERAL FUND.--The public education department
258+project in Subsection 211 of Section 16 of Chapter 199 of Laws
259+2023 to purchase and equip an activity bus with wheelchair lift
260+capabilities for the Mountainair public school district in
261+Torrance county shall not be expended for the original purpose
262+but is changed to purchase and equip an activity bus for the
263+Mountainair public school district. The time of expenditure is
450264 extended through fiscal year 2027.
451-SECTION 18. ALBUQUERQUE MESA DEL SOL LIFT STATION AND
452-INFRASTRUCTURE CONSTRUCTION--CHANGE TO ALBUQUERQUE-BERNALILLO
453-COUNTY WATER UTILITY AUTHORITY MESA DEL SOL LIFT STATION
454-CONSTRUCTION--CHANGE AGENCY--EXTEND TIME--GENERAL FUND.--The
455-unexpended balance of the apropriation to the local
456-government division in Subsection 71 of Section 28 of
457-Chapter 199 of Laws 2023 to plan, design and construct the
458-Mesa del Sol lift station and infrastructure for fire
459-stations, police stations and schools in Albuquerque in
460-Bernalillo county shall not be expended for the original
461-purpose but is appropriated to the department of environment SFC/SB 425
462-Page 10
463-1
464-2
465-3
466-4
467-5
468-6
469-7
470-8
471-9
472-10
473-11
474-12
475-13
476-14
477-15
478-16
479-17
480-18
481-19
482-20
483-21
484-22
485-23
486-24
487-25
488-to plan, design and construct the Mesa del Sol lift station
489-and infrastructure for fire stations, police stations and
490-schools for the Albuquerque-Bernalillo county water utility
491-authority in Bernalillo county. The time of expenditure is
492-extended through fiscal year 2027.
493-SECTION 19. ALBUQUERQUE MESA DEL SOL NORTH PLAT LIFT
494-STATION CONSTRUCTION--CHANGE TO ALBUQUERQUE-BERNALILLO COUNTY
495-WATER UTILITY AUTHORITY MESA DEL SOL NORTH PLAT LIFT STATION
496-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The
497-unexpended balance of the appropriation to the department of
498-environment in Subsection 5 of Section 22 of Chapter 53 of
499-Laws 2022 to plan, design and construct a lift station in the
500-north plat of the Mesa del Sol economic development hub in
501-Bernalillo county shall not be expended for the original
502-purpose but is changed to plan, design and construct a lift
503-station for the Albuquerque-Bernalillo county water utility
504-authority on the north plat of the Mesa del Sol economic
505-development hub in Bernalillo county. The time of
506-expenditure is extended through fiscal year 2027.
507-SECTION 20. TWELFTH STREET NORTHWEST AND SAWMILL ROAD
508-NORTHWEST IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The
509-time of expenditure for the department of transportation
510-project in Subsection 14 of Section 33 of Chapter 138 of
511-Laws 2021 to acquire rights of way and to plan, design,
512-construct, equip and install traffic calming devices and SFC/SB 425
513-Page 11
514-1
515-2
516-3
517-4
518-5
519-6
520-7
521-8
522-9
523-10
524-11
525-12
526-13
527-14
528-15
529-16
530-17
531-18
532-19
533-20
534-21
535-22
536-23
537-24
538-25
539-pedestrian safety improvements on Twelfth street NW and
540-Sawmill road NW in Albuquerque in Bernalillo county is
541-extended through fiscal year 2027.
542-SECTION 21. SECOND STREET NORTHWEST IMPROVEMENT--EXTEND
543-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
544-department of transportation project in Subsection 2 of
545-Section 33 of Chapter 138 of Laws 2021 to acquire rights of
546-way and to plan, design, construct and improve
547-Second street NW from Osuna road to Los Ranchos road,
548-including accessibility compliance, in Bernalillo county is
549-extended through fiscal year 2027.
550-SECTION 22. ALBUQUERQUE ANDERSON-ABRUZZO INTERNATIONAL
551-BALLOON MUSEUM EXHIBITION CONSTRUCTION--EXTEND TIME--
552-SEVERANCE TAX BONDS.--The time of expenditure for the local
553-government division project in Subsection 21 of Section 29 of
554-Chapter 138 of Laws 2021 to plan, design, construct,
555-purchase, furnish, equip and install exhibitions, including
556-the balloon fiesta exhibition and an outdoor youth
557-exhibition, at the Anderson-Abruzzo Albuquerque international
558-balloon museum in Albuquerque in Bernalillo county is
559-extended through fiscal year 2027.
560-SECTION 23. ALBUQUERQUE NORTH FOURTH ARTS CENTER
561-RENOVATION--CHANGE TO ARTS CENTER CONSTRUCTION--EXTEND TIME--
562-SEVERANCE TAX BONDS.--The unexpended balance of the
563-appropriation to the local government division in SFC/SB 425
564-Page 12
565-1
566-2
567-3
568-4
569-5
570-6
571-7
572-8
573-9
574-10
575-11
576-12
577-13
578-14
579-15
580-16
581-17
582-18
583-19
584-20
585-21
586-22
587-23
588-24
589-25
590-Subsection 74 of Section 29 of Chapter 138 of Laws 2021 to
591-plan, design and construct safety and security renovations,
592-including accessibility compliance improvements, at the north
593-Fourth arts center in Albuquerque in Bernalillo county shall
594-not be expended for the original purpose but is changed to
595-plan, design, construct, equip and furnish an arts center in
596-Albuquerque. The time of expenditure is extended through
597-fiscal year 2027.
598-SECTION 24. ALBUQUERQUE FILM AND MEDIA TRAINING CENTER
599-IMPROVEMENT--CHANGE TO ARTS CENTER CONSTRUCTION--EXTEND
600-TIME--SEVERANCE TAX BONDS.--The unexpended balance of the
601-appropriation to the local government division in
602-Subsection 63 of Section 30 of Chapter 53 of Laws 2022 to
603-purchase and install equipment and to plan, design and
604-construct related improvements for an incubator and training
605-center for film, digital media, theater and studio arts
606-workers in Albuquerque in Bernalillo county shall not be
607-expended for the original purpose but is changed to plan,
608-design, construct, equip and furnish an arts center in
609-Albuquerque in Bernalillo county. The time of expenditure is
610-extended through fiscal year 2027.
611-SECTION 25. ALBUQUERQUE ASIAN AND PACIFIC ISLANDER
612-COMMUNITY CENTER CONSTRUCTION--EXTEND TIME--GENERAL
613-FUND.--The time of expenditure for the local government
614-division project originally authorized in Subsection 31 of SFC/SB 425
615-Page 13
616-1
617-2
618-3
619-4
620-5
621-6
622-7
623-8
624-9
625-10
626-11
627-12
628-13
629-14
630-15
631-16
632-17
633-18
634-19
635-20
636-21
637-22
638-23
639-24
640-25
641-Section 34 of Chapter 277 of Laws 2019 and reauthorized in
642-Laws 2020, Chapter 82, Section 12 and reauthorized again in
643-Laws 2023, Chapter 203, Section 38 to plan, design and
644-construct a city-owned community center inclusive of the
645-cultural needs of the Asian and Pacific Islander population
646-in Albuquerque in Bernalillo county is extended through
647-fiscal year 2027.
648-SECTION 26. ALBUQUERQUE CANDELARIA NATURE PRESERVE
649-RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
650-expenditure for the local government division project in
651-Subsection 28 of Section 29 of Chapter 138 of Laws 2021 to
652-plan, design, construct and renovate the Candelaria nature
653-preserve in Albuquerque in Bernalillo county is extended
654-through fiscal year 2027.
655-SECTION 27. ALBUQUERQUE COMMUNITY KITCHEN
656-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
657-expenditure for the local government division project in
658-Subsection 33 of Section 29 of Chapter 138 of Laws 2021 to
659-plan, design, construct, renovate and equip a building as a
660-restaurant incubator and community kitchen in the Barelas
661-metropolitan redevelopment area in Albuquerque in
662-Bernalillo county is extended through fiscal year 2027.
663-SECTION 28. ALBUQUERQUE DANIEL WEBSTER PARK
664-RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
665-expenditure for the local government division project in SFC/SB 425
666-Page 14
667-1
668-2
669-3
670-4
671-5
672-6
673-7
674-8
675-9
676-10
677-11
678-12
679-13
680-14
681-15
682-16
683-17
684-18
685-19
686-20
687-21
688-22
689-23
690-24
691-25
692-Subsection 35 of Section 29 of Chapter 138 of Laws 2021 to
693-plan, design, construct and renovate Daniel Webster park,
694-including accessibility and infrastructure improvements, in
695-Albuquerque in Bernalillo county is extended through fiscal
696-year 2027.
697-SECTION 29. ALBUQUERQUE INTERNATIONAL DISTRICT
698-METROPOLITAN REDEVELOPMENT AREA DEVELOPMENT--CHANGE TO DENTAL
699-HEALTH SERVICES PROGRAM EQUIPMENT PURCHASE--GENERAL FUND.--Up
700-to one million four hundred eighty-five thousand dollars
701-($1,485,000) of the unexpended balance of the appropriation
702-to the local government division in Subsection 74 of
703-Section 28 of Chapter 199 of Laws 2023 to acquire land and
704-property for and to plan, design, construct, equip and
705-improve the central/highland/upper Nob Hill metropolitan
706-development area, including infrastructure and facilities, in
707-Albuquerque in Bernalillo county shall not be expended for
708-the original purpose but is changed to purchase equipment
709-and to equip a dental health services program providing
710-health services to the unhoused, including medical
711-equipment, furnishings and fixtures, in Albuquerque in
712-Bernalillo county.
713-SECTION 30. ALBUQUERQUE DISPLACED PERSONS
714-TRANSPORTATION SERVICES VEHICLE PURCHASE--EXTEND TIME--
715-GENERAL FUND.--The time of expenditure for the local
716-government division project in Subsection 56 of Section 28 of SFC/SB 425
717-Page 15
718-1
719-2
720-3
721-4
722-5
723-6
724-7
725-8
726-9
727-10
728-11
729-12
730-13
731-14
732-15
733-16
734-17
735-18
736-19
737-20
738-21
739-22
740-23
741-24
742-25
743-Chapter 199 of Laws 2023 to purchase equipment and vehicles
744-to provide transportation and meal services to displaced
745-persons and families experiencing homelessness in the
746-international district in Albuquerque in Bernalillo county is
747-extended through fiscal year 2027.
748-SECTION 31. ALBUQUERQUE EMERGENCY FOOD DISTRIBUTION
749-EQUIPMENT PURCHASE--EXTEND TIME--GENERAL FUND.--The time of
750-expenditure for the local government division project in
751-Subsection 60 of Section 28 of Chapter 199 of Laws 2023 to
752-purchase and equip tractors, trailers, forklifts, forklift
753-batteries and pallet jacks and racking for emergency food
754-storage and distribution for Albuquerque in Bernalillo county
755-is extended through fiscal year 2027.
756-SECTION 32. ALBUQUERQUE EMERGENCY FOOD DISTRIBUTION
757-PROGRAM VEHICLE PURCHASE--EXTEND TIME--SEVERANCE TAX
758-BONDS.--The time of expenditure for the local government
759-division project in Subsection 42 of Section 29 of
760-Chapter 138 of Laws 2021 and reauthorized in Laws 2023,
761-Chapter 203, Section 33 to purchase vehicles and equipment
762-for use by a food bank emergency food distribution program in
763-Albuquerque in Bernalillo county is extended through fiscal
764-year 2027.
765-SECTION 33. ALBUQUERQUE FIRE RESCUE EMERGENCY MEDICAL
766-RESPONSE EQUIPMENT PURCHASE--EXTEND TIME--GENERAL FUND.--The
767-time of expenditure for the local government division project SFC/SB 425
768-Page 16
769-1
770-2
771-3
772-4
773-5
774-6
775-7
776-8
777-9
778-10
779-11
780-12
781-13
782-14
783-15
784-16
785-17
786-18
787-19
788-20
789-21
790-22
791-23
792-24
793-25
794-in Subsection 65 of Section 28 of Chapter 199 of Laws 2023 to
795-purchase and equip emergency medical response equipment,
796-including chest compression system devices, gurneys and
797-extrication equipment, in Albuquerque in Bernalillo county is
798-extended through fiscal year 2027.
799-SECTION 34. ALBUQUERQUE FIRE RESCUE VEHICLE PURCHASE--
800-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
801-for the local government division project originally
802-authorized in Subsection 50 of Section 29 of Chapter 138 of
803-Laws 2021 and reauthorized in Laws 2023, Chapter 203,
804-Section 34 to purchase and equip fire department vehicles for
805-Albuquerque in Bernalillo county is extended through fiscal
806-year 2027.
807-SECTION 35. ALBUQUERQUE FOOD BUSINESS INCUBATOR
808-CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of
809-expenditure for the local government division project
810-originally authorized in Subsection 63 of Section 34 of
811-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
812-Chapter 203, Section 36 to acquire land for and to plan,
813-design, construct, furnish, equip and install equipment for a
814-commercial kitchen and food business incubator in Albuquerque
815-in Bernalillo county is extended through fiscal year 2027.
816-SECTION 36. ALBUQUERQUE GENOCIDE AND INTOLERANCE MUSEUM
817-RENOVATION--EXTEND TIME--GENERAL FUND.--The time of
818-expenditure for the local government division originally SFC/SB 425
819-Page 17
820-1
821-2
822-3
823-4
824-5
825-6
826-7
827-8
828-9
829-10
830-11
831-12
832-13
833-14
834-15
835-16
836-17
837-18
838-19
839-20
840-21
841-22
842-23
843-24
844-25
845-authorized in Subsection 66 of Section 34 of Chapter 277 of
846-Laws 2019 and reauthorized in Laws 2023, Chapter 203,
847-Section 37 to plan, design, construct and renovate a facility
848-for the Holocaust and Intolerance museum in Albuquerque in
849-Bernalillo county is extended through fiscal year 2027.
850-SECTION 37. ALBUQUERQUE SURGICAL CENTER CONSTRUCTION--
851-CHANGE TO HEALTH CARE DATA SYSTEMS INFORMATION TECHNOLOGY
852-PURCHASE--GENERAL FUND.--Two hundred fifty thousand dollars
853-($250,000) of the unexpended balance of the appropriation to
854-the local government division originally authorized in
855-Subsection 106 of Section 28 of Chapter 199 of Laws 2023 and
856-reauthorized in Laws 2024, Chapter 65, Section 30 to plan,
857-design, construct, acquire, furnish and equip a surgical
858-center for a clinically integrated health care network in
859-Albuquerque in Bernalillo county shall not be expended for
860-the original or reauthorized purpose but is changed to
861-purchase, equip, furnish and install information technology
862-for health care data systems in Albuquerque in
863-Bernalillo county.
864-SECTION 38. ALBUQUERQUE LADDER TRUCK PURCHASE--EXTEND
865-TIME--GENERAL FUND.--The time of expenditure for the local
866-government division project in Subsection 80 of Section 28 of
867-Chapter 199 of Laws 2023 to purchase, equip and replace
868-ladder trucks for Albuquerque fire rescue station 7 in
869-Albuquerque in Bernalillo county is extended through fiscal SFC/SB 425
870-Page 18
871-1
872-2
873-3
874-4
875-5
876-6
877-7
878-8
879-9
880-10
881-11
882-12
883-13
884-14
885-15
886-16
887-17
888-18
889-19
890-20
891-21
892-22
893-23
894-24
895-25
896-year 2027.
897-SECTION 39. ALBUQUERQUE LOMAS TRAMWAY LIBRARY
898-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
899-expenditure for the local government division project in
900-Subsection 63 of Section 29 of Chapter 138 of Laws 2021 to
901-plan, design, construct, replace, equip and install
902-improvements to the roof and the heating, ventilation and air
903-conditioning systems at the Lomas Tramway library in
904-Albuquerque in Bernalillo county is extended through fiscal
905-year 2027.
906-SECTION 40. ALBUQUERQUE GEORGE J. MALOOF MEMORIAL AIR
907-PARK IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time
908-of expenditure for the local government division project in
909-Subsection 65 of Section 29 of Chapter 138 of Laws 2021 to
910-plan, design and construct improvements at the
911-George J. Maloof memorial air park in Albuquerque in
912-Bernalillo county is extended through fiscal year 2027.
913-SECTION 41. ALBUQUERQUE MEDIAN LANDSCAPING
914-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
915-expenditure for the department of transportation project in
916-Subsection 17 of Section 33 of Chapter 138 of Laws 2021 to
917-plan, design, construct and improve median landscaping along
918-streets in city council district 3
919- in Albuquerque in
920-Bernalillo county is extended through fiscal year 2027.
921-SECTION 42. ALBUQUERQUE MOBILE HOMELESS FACILITY AND SFC/SB 425
922-Page 19
923-1
924-2
925-3
926-4
927-5
928-6
929-7
930-8
931-9
932-10
933-11
934-12
935-13
936-14
937-15
938-16
939-17
940-18
941-19
942-20
943-21
944-22
945-23
946-24
947-25
948-VEHICLE PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time
949-of expenditure for the local government division project in
950-Subsection 70 of Section 29 of Chapter 138 of Laws 2021 to
951-purchase and equip mobile facilities and vehicles, including
952-shower units and soup kitchens, for the homeless community in
953-the international district and surrounding areas in
954-Albuquerque in Bernalillo county is extended through fiscal
955-year 2027.
956-SECTION 43. ALBUQUERQUE NEW MEXICO VETERANS' MEMORIAL
957-PARK RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time
958-of expenditure for the local government division project in
959-Subsection 77 of Section 29 of Chapter 138 of Laws 2021 to
960-plan, design, construct, renovate and equip a New Mexico
961-veterans' memorial park in Albuquerque in Bernalillo county
962-is extended through fiscal year 2027.
963-SECTION 44. ALBUQUERQUE NORTHWEST MESA FIRE STATION
964-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
965-expenditure for the local government division project
966-originally authorized in Subsection 49 of Section 29 of
967-Chapter 138 of Laws 2021 and reauthorized in Laws 2023,
968-Chapter 203, Section 35 to plan, design and construct a fire
969-station on the northwest mesa in Albuquerque in
970-Bernalillo county is extended through fiscal year 2027.
971-SECTION 45. ALBUQUERQUE PERFORMING AND VISUAL ARTS
972-EDUCATION CENTER CONSTRUCTION--EXTEND TIME--SEVERANCE TAX SFC/SB 425
973-Page 20
974-1
975-2
976-3
977-4
978-5
979-6
980-7
981-8
982-9
983-10
984-11
985-12
986-13
987-14
988-15
989-16
990-17
991-18
992-19
993-20
994-21
995-22
996-23
997-24
998-25
999-BONDS.--The time of expenditure for the local government
1000-division project in Subsection 80 of Section 29 of
1001-Chapter 138 of Laws 2021 to plan, design, construct and
1002-renovate buildings and grounds, including site preparation
1003-and the purchase and installation of fencing, infrastructure
1004-and related equipment, at a public performing, visual arts
1005-and education center in Albuquerque in Bernalillo county is
1006-extended through fiscal year 2027.
1007-SECTION 46. ALBUQUERQUE DOMESTIC VIOLENCE COUNSELING
1008-OFFICE ACQUISITION--CHANGE TO ALBUQUERQUE POLICE DEPARTMENT
1009-FAMILY ADVOCACY CENTER RENOVATION--EXTEND TIME--GENERAL
1010-FUND.--The unexpended balance of the appropriation to the
1011-local government division in Subsection 57 of Section 28 of
1012-Chapter 199 of Laws 2023 to acquire property, including a
1013-building in which domestic violence counselors can work with
1014-victims, in Albuquerque in Bernalillo county shall not be
1015-expended for the original purpose but is changed to plan,
1016-design, construct, renovate, equip and furnish the police
1017-department family advocacy center in Albuquerque. The time
1018-of expenditure is extended through fiscal year 2027.
1019-SECTION 47. ALBUQUERQUE ROUTE 66 SIGNAGE CONSTRUCTION--
1020-CHANGE TO ROUTE 66 CENTRAL AVENUE SIGNAGE AND LIGHTING
1021-IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The unexpended
1022-balance of the appropriation to the local government division
1023-originally authorized in Subsection 107 of Section 34 of SFC/SB 425
1024-Page 21
1025-1
1026-2
1027-3
1028-4
1029-5
1030-6
1031-7
1032-8
1033-9
1034-10
1035-11
1036-12
1037-13
1038-14
1039-15
1040-16
1041-17
1042-18
1043-19
1044-20
1045-21
1046-22
1047-23
1048-24
1049-25
1050-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
1051-Chapter 203, Section 39 to plan, design, construct and
1052-install route 66 signage at the Central avenue and
1053-Lomas boulevard intersection area in Albuquerque in
1054-Bernalillo county shall not be expended for the original
1055-purpose but is changed to plan, design, construct and install
1056-route 66 signage and lighting along Central avenue in
1057-Albuquerque in Bernalillo county. The time of expenditure is
1058-extended through fiscal year 2027.
1059-SECTION 48. BERNALILLO COUNTY SOUTH VALLEY LIBRARY
1060-FURNITURE PURCHASE--CHANGE TO ALBUQUERQUE SOUTH VALLEY
1061-LIBRARY FURNITURE PURCHASE--EXTEND TIME--GENERAL FUND.--The
1062-unexpended balance of the appropriation to the local
1063-government division in Subsection 24 of Section 28 of
1064-Chapter 199 of Laws 2023 to purchase and replace furniture at
1065-the South Valley library in Bernalillo county shall not be
1066-expended for the original purpose but is changed to purchase
1067-and replace furniture at the South Valley library in
1068-Albuquerque in Bernalillo county. The time of expenditure is
1069-extended through fiscal year 2027.
1070-SECTION 49. ALBUQUERQUE SAN ANTONIO DRIVE MEDIAN STUDY
1071-PLAN--CHANGE TO MEDIAN IMPROVEMENT--GENERAL FUND.--The
1072-unexpended balance of the appropriation to the local
1073-government division in Subsection 166 of Section 28 of
1074-Chapter 66 of Laws 2024 for a feasibility study to convert SFC/SB 425
1075-Page 22
1076-1
1077-2
1078-3
1079-4
1080-5
1081-6
1082-7
1083-8
1084-9
1085-10
1086-11
1087-12
1088-13
1089-14
1090-15
1091-16
1092-17
1093-18
1094-19
1095-20
1096-21
1097-22
1098-23
1099-24
1100-25
1101-medians along San Antonio drive into linear parks or
1102-greenways in Albuquerque in Bernalillo county shall not be
1103-expended for the original purpose but is changed to plan,
1104-design, construct, renovate and improve medians along
1105-San Antonio drive in Albuquerque.
1106-SECTION 50. ALBUQUERQUE SAWMILL OLD TOWN PEDESTRIAN
1107-STREETS IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The
1108-time of expenditure for the local government division project
1109-in Subsection 93 of Section 29 of Chapter 138 of Laws 2021 to
1110-plan, design, construct and improve pedestrian streets,
1111-including utility relocation, lighting and signage, in the
1112-Sawmill and Old Town areas of Albuquerque in
1113-Bernalillo county is extended through fiscal year 2027.
1114-SECTION 51. ALBUQUERQUE SAWMILL COMMUNITY LAND TRUST
1115-PLAZA RENOVATION--CHANGE TO SAWMILL RAIL TRAIL CONSTRUCTION--
1116-EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of
1117-the appropriation to the local government division in
1118-Subsection 123 of Section 30 of Chapter 53 of Laws 2022 to
1119-plan, design, construct and renovate the plaza on the Sawmill
1120-community land trust in Albuquerque in Bernalillo county
1121-shall not be expended for the original purpose but is changed
1122-to plan, design, construct, furnish and equip the Sawmill
1123-rail trail. The time of expenditure is extended through
1124-fiscal year 2027.
1125-SECTION 52. ALBUQUERQUE SOUTHWEST MESA STREET LIGHTS SFC/SB 425
1126-Page 23
1127-1
1128-2
1129-3
1130-4
1131-5
1132-6
1133-7
1134-8
1135-9
1136-10
1137-11
1138-12
1139-13
1140-14
1141-15
1142-16
1143-17
1144-18
1145-19
1146-20
1147-21
1148-22
1149-23
1150-24
1151-25
1152-CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of
1153-expenditure for the department of transportation project
1154-originally authorized in Subsection 23 of Section 40 of
1155-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
1156-Chapter 203, Section 41 to plan, design, construct, equip and
1157-install street lights for the southwest mesa area in
1158-Albuquerque in Bernalillo county is extended through fiscal
1159-year 2027.
1160-SECTION 53. ALBUQUERQUE STREET LIGHT INSTALLATION--
1161-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
1162-for the department of transportation project in Subsection 16
1163-of Section 33 of Chapter 138 of Laws 2021 to plan, design,
1164-construct and install street lights for city council district
1165-3 in Albuquerque in Bernalillo county is extended through
1166-fiscal year 2027.
1167-SECTION 54. ALBUQUERQUE SUICIDE MEMORIAL CONSTRUCTION--
1168-CHANGE TO SUICIDE PREVENTION INFORMATION PORTAL
1169-CONSTRUCTION--GENERAL FUND.--The unexpended balance of the
1170-appropriation to the local government division in
1171-Subsection 126 of Section 28 of Chapter 199 of Laws 2023 to
1172-plan, design and construct a memorial for victims of suicide
1173-in Albuquerque in Bernalillo county shall not be expended for
1174-the original purpose but is changed to plan, design and
1175-construct suicide prevention information portals citywide,
1176-including in city parks, in Albuquerque in Bernalillo county. SFC/SB 425
1177-Page 24
1178-1
1179-2
1180-3
1181-4
1182-5
1183-6
1184-7
1185-8
1186-9
1187-10
1188-11
1189-12
1190-13
1191-14
1192-15
1193-16
1194-17
1195-18
1196-19
1197-20
1198-21
1199-22
1200-23
1201-24
1202-25
1203-SECTION 55. ALBUQUERQUE TONY HILLERMAN LIBRARY SECURITY
1204-SYSTEM INSTALLATION--EXTEND TIME--GENERAL FUND.--The time of
1205-expenditure for the local government division project in
1206-Subsection 131 of Section 28 of Chapter 199 of Laws 2023 to
1207-purchase and install security systems, including fire and
1208-burglary systems and cameras, at the Tony Hillerman library
1209-in Albuquerque in Bernalillo county is extended through
1210-fiscal year 2027.
1211-SECTION 56. ALBUQUERQUE TRUMBULL PARK RENOVATION--
1212-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
1213-for the local government division project in Subsection 103
1214-of Section 29 of Chapter 138 of Laws 2021 to plan, design,
1215-construct and replace playground equipment at Trumbull park
1216-in Albuquerque in Bernalillo county is extended through
1217-fiscal year 2027.
1218-SECTION 57. ALBUQUERQUE TURF PLAYING FIELDS
1219-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
1220-expenditure for the local government division project
1221-originally authorized in Subsection 24 of Section 29 of
1222-Chapter 138 of Laws 2021 and reauthorized in Laws 2023,
1223-Chapter 203, Section 42 to purchase, equip, install and make
1224-improvements to playing fields, including artificial turf,
1225-throughout Albuquerque in Bernalillo county is extended
1226-through fiscal year 2027.
1227-SECTION 58. ALBUQUERQUE VISITOR CENTER IMPROVEMENT-- SFC/SB 425
1228-Page 25
1229-1
1230-2
1231-3
1232-4
1233-5
1234-6
1235-7
1236-8
1237-9
1238-10
1239-11
1240-12
1241-13
1242-14
1243-15
1244-16
1245-17
1246-18
1247-19
1248-20
1249-21
1250-22
1251-23
1252-24
1253-25
1254-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
1255-for the local government division project in Subsection 90 of
1256-Section 29 of Chapter 138 of Laws 2021 to plan, design,
1257-construct, improve, equip and furnish a visitor center and
1258-multi-use trail along west Central avenue in Albuquerque in
1259-Bernalillo county is extended through fiscal year 2027.
1260-SECTION 59. WEST MESA BASEBALL FACILITY IMPROVEMENT--
1261-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
1262-for the local government division project in Subsection 119
1263-of Section 29 of Chapter 138 of Laws 2021 to plan, design,
1264-construct, install, purchase and equip improvements,
1265-including concessions, office, bathrooms, plumbing,
1266-electrical, security systems, overhead shade, fencing
1267-repairs, wind and glare screens and turf, and to comply with
1268-accessibility requirements and with the guidelines of the
1269-federal centers for disease control and prevention at fields
1270-used by the West Mesa little league in Albuquerque in
1271-Bernalillo county is extended through fiscal year 2027.
1272-SECTION 60. ALBUQUERQUE WESTSIDE ANIMAL SHELTER
1273-RENOVATION--EXTEND TIME--GENERAL FUND.--The time of
1274-expenditure for the local government division project in
1275-Subsection 141 of Section 28 of Chapter 199 of Laws 2023 to
1276-plan, design, construct, improve and expand the Westside
1277-animal shelter, including kennels, associated support
1278-facilities, offices, public areas and a veterinary clinic, in SFC/SB 425
1279-Page 26
1280-1
1281-2
1282-3
1283-4
1284-5
1285-6
1286-7
1287-8
1288-9
1289-10
1290-11
1291-12
1292-13
1293-14
1294-15
1295-16
1296-17
1297-18
1298-19
1299-20
1300-21
1301-22
1302-23
1303-24
1304-25
1305-Albuquerque in Bernalillo county is extended through fiscal
1306-year 2027.
1307-SECTION 61. ALBUQUERQUE YOUTH EDUCATION PROGRAM
1308-INFORMATION TECHNOLOGY AND VEHICLE PURCHASE--EXTEND TIME--
1309-SEVERANCE TAX BONDS.--The time of expenditure for the local
1310-government division project in Subsection 110 of Section 29
1311-of Chapter 138 of Laws 2021 to purchase and install
1312-information technology and related equipment and vehicles for
1313-a youth education program in Albuquerque in Bernalillo county
1314-is extended through fiscal year 2027.
1315-SECTION 62. ALBUQUERQUE YOUTH TEMPORARY HOUSING
1316-FACILITY RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The
1317-time of expenditure for the local government division project
1318-in Subsection 111 of Section 29 of Chapter 138 of Laws 2021
1319-to plan, design, construct, replace, renovate, purchase and
1320-equip a facility to provide temporary housing for youth in
1321-Albuquerque in Bernalillo county is extended through fiscal
1322-year 2027.
1323-SECTION 63. ALBUQUERQUE-BERNALILLO COUNTY WATER UTILITY
1324-AUTHORITY WINROCK WASTEWATER RECLAMATION SYSTEM
1325-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS
1326-.--The time of
1327-expenditure for the department of environment project
1328-originally authorized in Subsection 4 of Section 26 of
1329-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
1330-Chapter 203, Section 51 to plan, design, construct, SFC/SB 425
1331-Page 27
1332-1
1333-2
1334-3
1335-4
1336-5
1337-6
1338-7
1339-8
1340-9
1341-10
1342-11
1343-12
1344-13
1345-14
1346-15
1347-16
1348-17
1349-18
1350-19
1351-20
1352-21
1353-22
1354-23
1355-24
1356-25
1357-permit and equip a wastewater reuse system for the
1358-Albuquerque-Bernalillo county water utility authority to
1359-provide reclaimed water to the Winrock site and to public
1360-parks in Albuquerque is extended through fiscal year 2027.
1361-SECTION 64. ALBUQUERQUE-BERNALILLO COUNTY WATER UTILITY
1362-AUTHORITY WINROCK WASTEWATER REUSE SYSTEM CONSTRUCTION--
1363-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
1364-for the department of environment project originally
1365-authorized in Subsection 3 of Section 26 of Chapter 81 of
1366-Laws 2020 and reauthorized in Laws 2023, Chapter 203,
1367-Section 50 to plan, design, construct, permit and equip a
1368-wastewater reuse system for the Albuquerque-Bernalillo county
1369-water utility authority to provide reclaimed water to the
1370-Winrock site and to public parks in Albuquerque is extended
1371-through fiscal year 2027.
1372-SECTION 65. BARCELONA ROAD SOUTHWEST IMPROVEMENT--
1373-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
1374-for the department of transportation project in Subsection 19
1375-of Section 33 of Chapter 138 of Laws 2021 to plan, design,
1376-construct and improve Barcelona road SW from west of
1377-Sylvia road to the Isleta drain, including drainage, in
1378-Albuquerque in Bernalillo county is extended through fiscal
1379-year 2027.
1380-SECTION 66. ALBUQUERQUE WORKFORCE DEVELOPMENT CENTER
1381-MODULAR BUILDING CONSTRUCTION--CHANGE TO BERNALILLO COUNTY SFC/SB 425
1382-Page 28
1383-1
1384-2
1385-3
1386-4
1387-5
1388-6
1389-7
1390-8
1391-9
1392-10
1393-11
1394-12
1395-13
1396-14
1397-15
1398-16
1399-17
1400-18
1401-19
1402-20
1403-21
1404-22
1405-23
1406-24
1407-25
1408-WORKFORCE DEVELOPMENT CENTER RENOVATION--CHANGE AGENCY--
1409-EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of
1410-the appropriation to the local government division originally
1411-authorized in Subsection 43 of Section 29 of Chapter 138 of
1412-Laws 2021 and reauthorized in Laws 2023, Chapter 203,
1413-Section 7 to plan, design, construct, purchase, deliver,
1414-renovate, furnish, equip and install a modular building for
1415-an education and workforce development center in
1416-Bernalillo county shall not be expended for the original or
1417-reauthorized purpose but is appropriated to the economic
1418-development department to plan, design, construct, renovate,
1419-equip and furnish an education and workforce development
1420-center for low-income Spanish speakers in Bernalillo county.
1421-The time of expenditure is extended through fiscal year 2027.
1422-SECTION 67. ALBUQUERQUE WORKFORCE DEVELOPMENT CENTER
1423-MODULAR BUILDING PURCHASE--CHANGE TO BERNALILLO COUNTY
1424-WORKFORCE DEVELOPMENT CENTER RENOVATION--CHANGE AGENCY--
1425-EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of
1426-the appropriation to the local government division originally
1427-authorized in Subsection 60 of Section 30 of Chapter 53 of
1428-Laws 2022 and reauthorized in Laws 2023, Chapter 203,
1429-Section 8 to plan, design, construct, purchase, deliver,
1430-renovate, furnish, equip and install a modular building for
1431-an education and workforce development center in
1432-Bernalillo county shall not be expended for the original or SFC/SB 425
1433-Page 29
1434-1
1435-2
1436-3
1437-4
1438-5
1439-6
1440-7
1441-8
1442-9
1443-10
1444-11
1445-12
1446-13
1447-14
1448-15
1449-16
1450-17
1451-18
1452-19
1453-20
1454-21
1455-22
1456-23
1457-24
1458-25
1459-reauthorized purpose but is appropriated to the economic
1460-development department to plan, design, construct, renovate,
1461-equip and furnish an education and workforce development
1462-center for low-income Spanish speakers in Bernalillo county.
1463-The time of expenditure is extended through fiscal year 2027.
1464-SECTION 68. BERNALILLO COUNTY EDUCATION AND WORKFORCE
1465-DEVELOPMENT CENTER MODULAR BUILDING CONSTRUCTION--CHANGE TO
1466-WORKFORCE DEVELOPMENT CENTER RENOVATION--CHANGE AGENCY--
1467-EXTEND TIME.--The unexpended balance of the appropriation to
1468-the local government division in Subsection 7 of Section 28
1469-of Chapter 199 of Laws 2023 to plan, design, construct,
1470-renovate, purchase, deliver, install, furnish and equip a
1471-modular building for an education and workforce development
1472-center in Bernalillo county shall not be expended for the
1473-original purpose but is appropriated to the economic
1474-development department to plan, design, construct, renovate,
1475-equip and furnish an education and workforce development
1476-center for low-income Spanish speakers in Albuquerque in
1477-Bernalillo county. The time of expenditure is extended
1478-through fiscal year 2027.
1479-SECTION 69. BERNALILLO COUNTY MOUNTAINVIEW SIDEWALK
1480-CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of
1481-expenditure for the department of transportation project
1482-originally authorized in Subsection 7 of Section 40 of
1483-Chapter 277 of Laws 2019 and reauthorized in Laws 2023, SFC/SB 425
1484-Page 30
1485-1
1486-2
1487-3
1488-4
1489-5
1490-6
1491-7
1492-8
1493-9
1494-10
1495-11
1496-12
1497-13
1498-14
1499-15
1500-16
1501-17
1502-18
1503-19
1504-20
1505-21
1506-22
1507-23
1508-24
1509-25
1510-Chapter 203, Section 14 to acquire rights of way and to plan,
1511-design and construct sidewalks and drainage infrastructure in
1512-the Mountainview area, including Prince street and
1513-Prosperity avenue, in Bernalillo county is extended through
1514-fiscal year 2027.
1515-SECTION 70. BERNALILLO COUNTY NORTHEAST AREA SHERIFF
1516-SUBSTATION CONSTRUCTION--EXTEND TIME--SEVERANCE TAX
1517-BONDS.--The time of expenditure for the local government
1518-division project in Subsection 9 of Section 29 of Chapter 138
1519-of Laws 2021 to acquire land and to plan, design and
1520-construct a sheriff substation in county commission
1521-district 4 in Bernalillo county is extended through fiscal
1522-year 2027.
1523-SECTION 71. BERNALILLO COUNTY PARADISE HILLS COMMUNITY
1524-CENTER IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of
1525-expenditure for the local government division project
1526-originally authorized in Subsection 7 of Section 34 of
1527-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
1528-Chapter 203, Section 54 to plan, design, construct, equip and
1529-furnish phase 2 improvements in the Paradise Hills community
1530-center in Bernalillo county is extended through fiscal year
1531-2027.
1532-SECTION 72. BRIDGE BOULEVARD PHASE TWO BUS SHELTERS AND
1533-MEDIAN ART CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time
1534-of expenditure for the department of transportation project SFC/SB 425
1535-Page 31
1536-1
1537-2
1538-3
1539-4
1540-5
1541-6
1542-7
1543-8
1544-9
1545-10
1546-11
1547-12
1548-13
1549-14
1550-15
1551-16
1552-17
1553-18
1554-19
1555-20
1556-21
1557-22
1558-23
1559-24
1560-25
1561-originally authorized in Subsection 9 of Section 40 of
1562-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
1563-Chapter 203, Section 19 to plan, design and construct phase 2
1564-improvements, including bus shelters and median art, along
1565-Bridge boulevard between Young avenue and the Riverside drain
1566-in the South Valley in Bernalillo county is extended through
1567-fiscal year 2027.
1568-SECTION 73. EAGLE RANCH ROAD AND PASEO DEL NORTE
1569-INTERSECTION IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The
1570-time of expenditure for the department of transportation
1571-project originally authorized in Subsection 30 of Section 40
1572-of Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
1573-Chapter 203, Section 60 to plan, design, construct and
1574-install improvements at the intersection of Eagle Ranch road
1575-and paseo del Norte in Albuquerque in Bernalillo county is
1576-extended through fiscal year 2027.
1577-SECTION 74. GIBSON BOULEVARD SOUTHEAST IMPROVEMENT--
1578-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
1579-for the department of transportation project in Subsection 21
1580-of Section 33 of Chapter 138 of Laws 2021 to plan, design,
1581-construct and improve Gibson boulevard SE in Albuquerque in
1582-Bernalillo county is extended through fiscal year 2027.
1583-SECTION 75. MCMAHON BOULEVARD NORTHWEST EXPANSION--
1584-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
1585-for the department of transportation project in Subsection 24 SFC/SB 425
1586-Page 32
1587-1
1588-2
1589-3
1590-4
1591-5
1592-6
1593-7
1594-8
1595-9
1596-10
1597-11
1598-12
1599-13
1600-14
1601-15
1602-16
1603-17
1604-18
1605-19
1606-20
1607-21
1608-22
1609-23
1610-24
1611-25
1612-of Section 33 of Chapter 138 of Laws 2021 to acquire rights
1613-of way and to plan, design, construct and expand
1614-McMahon boulevard NW from Rockcliff drive to Anasazi Ridge
1615-avenue, including the purchase and installation of signal and
1616-safety improvements, in Albuquerque in Bernalillo county is
1617-extended through fiscal year 2027.
1618-SECTION 76. NEAT LANE SOUTHWEST IMPROVEMENT--EXTEND
1619-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
1620-department of transportation project in Subsection 10 of
1621-Section 33 of Chapter 138 of Laws 2021 to acquire rights of
1622-way and to plan, design, construct and improve Neat lane SW
1623-in the Atrisco community, including storm drainage, and for
1624-other road projects in house district 14
1625- in Bernalillo county
1626-is extended through fiscal year 2027.
1627-SECTION 77. PASEO DEL NORTE BOULEVARD NORTHWEST
1628-EXPANSION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
1629-expenditure for the department of transportation project in
1630-Subsection 25 of Section 33 of Chapter 138 of Laws 2021 to
1631-acquire rights of way and to plan, design, construct, improve
1632-and expand paseo del Norte boulevard NW, including two lanes
1633-in each direction, a multi-use trail and bicycle lanes,
1634-between Rainbow boulevard and calle Nortena in Albuquerque in
1635-Bernalillo county is extended through fiscal year 2027.
1636-SECTION 78. QUIET LANE SOUTHWEST IMPROVEMENT--EXTEND
1637-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the SFC/SB 425
1638-Page 33
1639-1
1640-2
1641-3
1642-4
1643-5
1644-6
1645-7
1646-8
1647-9
1648-10
1649-11
1650-12
1651-13
1652-14
1653-15
1654-16
1655-17
1656-18
1657-19
1658-20
1659-21
1660-22
1661-23
1662-24
1663-25
1664-department of transportation project in Subsection 11 of
1665-Section 33 of Chapter 138 of Laws 2021 to acquire rights of
1666-way and to plan, design, construct and improve Quiet lane SW
1667-in the Atrisco community, including storm drainage, and for
1668-other road projects in house district 14 in Bernalillo county
1669-is extended through fiscal year 2027.
1670-SECTION 79. SHIPMAN ROAD SOUTHWEST AND CANAL STREET
1671-SOUTHWEST IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The
1672-time of expenditure for the department of transportation
1673-project in Subsection 13 of Section 33 of Chapter 138 of
1674-Laws 2021 to acquire rights of way and to plan, design,
1675-construct and improve Shipman road SW and Canal street SW in
1676-the Atrisco community, including storm drainage, and for
1677-other road projects in house district 14
1678- in Bernalillo county
1679-is extended through fiscal year 2027.
1680-SECTION 80. SUNSET ROAD DRAINAGE IMPROVEMENT--EXTEND
1681-TIME--GENERAL FUND.--The time of expenditure for the
1682-department of transportation project originally authorized in
1683-Subsection 2 of Section 40 of Chapter 277 of Laws 2019 and
1684-reauthorized in Laws 2023, Chapter 203, Section 70 to plan,
1685-design and construct drainage improvements to Sunset road SW
1686-between Neetsie drive and Gonzales road in the South Valley
1687-area of Bernalillo county is extended through fiscal year
1688-2027.
1689-SECTION 81. UNIVERSITY OF NEW MEXICO INDOOR FOOTBALL SFC/SB 425
1690-Page 34
1691-1
1692-2
1693-3
1694-4
1695-5
1696-6
1697-7
1698-8
1699-9
1700-10
1701-11
1702-12
1703-13
1704-14
1705-15
1706-16
1707-17
1708-18
1709-19
1710-20
1711-21
1712-22
1713-23
1714-24
1715-25
1716-FIELD RENOVATION--EXPAND PURPOSE--GENERAL FUND.--The
1717-university of New Mexico project in Subsection 11 of
1718-Section 40 of Chapter 66 of Laws 2024 to plan, design,
1719-construct, repair, equip, furnish and renovate the indoor
1720-football practice field at the university of New Mexico in
1721-Albuquerque in Bernalillo county may include planning,
1722-designing, constructing, repairing, equipping, furnishing and
1723-renovating the softball practice field at the university of
1724-New Mexico.
1725-SECTION 82. UNIVERSITY OF NEW MEXICO MAXWELL MUSEUM
1726-RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
1727-expenditure for the university of New Mexico project in
1728-Subsection 13 of Section 41 of Chapter 138 of Laws 2021 to
1729-plan, design, purchase, equip, renovate and improve the
1730-Maxwell museum at the university of New Mexico in Albuquerque
1731-in Bernalillo county is extended through fiscal year 2027.
1732-SECTION 83. UNIVERSITY OF NEW MEXICO NORTH GOLF COURSE
1733-CLUB HOUSE ROOF REPAIR--CHANGE TO NORTH GOLF COURSE CLUB
1734-HOUSE IMPROVEMENT--GENERAL FUND.--The unexpended balance of
1735-the appropriation to the board of regents of the university
1736-of New Mexico in Subsection 19 of Section 40 of Chapter 66 of
1737-Laws 2024 to plan, design, construct, repair and replace the
1738-roof of the north golf course club house at the university of
1739-New Mexico in Albuquerque in Bernalillo county shall not be
1740-expended for the original purpose but is changed to plan, SFC/SB 425
1741-Page 35
1742-1
1743-2
1744-3
1745-4
1746-5
1747-6
1748-7
1749-8
1750-9
1751-10
1752-11
1753-12
1754-13
1755-14
1756-15
1757-16
1758-17
1759-18
1760-19
1761-20
1762-21
1763-22
1764-23
1765-24
1766-25
1767-design, construct, repair, furnish, equip and improve the
1768-north golf course club house at the university of New Mexico
1769-in Albuquerque in Bernalillo county.
1770-SECTION 84. UNIVERSITY OF NEW MEXICO ZIMMERMAN LIBRARY
1771-SLEEP POD CONSTRUCTION--CHANGE TO UNIVERSITY OF NEW MEXICO
1772-SLEEP POD INSTALLATION--GENERAL FUND.--The unexpended balance
1773-of the appropriation to the board of regents of the
1774-university of New Mexico in Subsection 23 of Section 40 of
1775-Chapter 66 of Laws 2024 to plan, design, construct, equip and
1776-install sleep pods at Zimmerman library at the university of
1777-New Mexico in Albuquerque in Bernalillo county shall not be
1778-expended for the original purpose but is changed to plan,
1779-design, construct, equip and install sleep pods at the
1780-university of New Mexico.
1781-SECTION 85. YOUTH TRANSITIONAL LIVING FACILITY
1782-PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure
1783-for the local government division project originally
1784-authorized in Subsection 126 of Section 34 of Chapter 277 of
1785-Laws 2019 and reauthorized in Laws 2023, Chapter 203,
1786-Section 72 to purchase a facility and to plan, design,
1787-construct, renovate, furnish and equip buildings and grounds,
1788-fencing and security infrastructure and to purchase and
1789-install information technology and related equipment at a
1790-youth transitional living facility in Albuquerque in
1791-Bernalillo county is extended through fiscal year 2027. SFC/SB 425
1792-Page 36
1793-1
1794-2
1795-3
1796-4
1797-5
1798-6
1799-7
1800-8
1801-9
1802-10
1803-11
1804-12
1805-13
1806-14
1807-15
1808-16
1809-17
1810-18
1811-19
1812-20
1813-21
1814-22
1815-23
1816-24
1817-25
1818-SECTION 86. LA MESA ELEMENTARY SCHOOL INFORMATION
1819-TECHNOLOGY IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time
1820-of expenditure for the public education department project in
1821-Subsection 77 of Section 16 of Chapter 199 of Laws 2023 to
1822-purchase and install information technology, including
1823-related equipment, furniture and infrastructure, digital
1824-touch screens and classroom presentation boards, at La Mesa
1825-elementary school in the Albuquerque public school district
1826-in Bernalillo county is extended through fiscal year 2027.
1827-SECTION 87. MARIE M. HUGHES ELEMENTARY SCHOOL WELLNESS
1828-ROOM IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of
1829-expenditure for the public education department project in
1830-Subsection 87 of Section 16 of Chapter 199 of Laws 2023 to
1831-plan, design, build, purchase, equip, furnish and install
1832-fixtures, furniture, flooring, carpet, window coverings and
1833-related equipment for student wellness rooms at
1834-Marie M. Hughes elementary school in the Albuquerque public
1835-school district in Bernalillo county is extended through
1836-fiscal year 2027.
1837-SECTION 88. PAJARITO ELEMENTARY SCHOOL OUTDOOR
1838-CLASSROOM CONSTRUCTION--EXTEND TIME--SEVERANCE TAX
1839-BONDS.--The time of expenditure for the public education
1840-department project in Subsection 113 of Section 17 of
1841-Chapter 138 of Laws 2021 to plan, design, construct,
1842-purchase, equip and furnish infrastructure, buildings and SFC/SB 425
1843-Page 37
1844-1
1845-2
1846-3
1847-4
1848-5
1849-6
1850-7
1851-8
1852-9
1853-10
1854-11
1855-12
1856-13
1857-14
1858-15
1859-16
1860-17
1861-18
1862-19
1863-20
1864-21
1865-22
1866-23
1867-24
1868-25
1869-landscaping for an outdoor classroom and equipment for
1870-community gardens at Pajarito elementary school in the
1871-Albuquerque public school district in Bernalillo county is
1872-extended through fiscal year 2027.
1873-SECTION 89. VAN BUREN MIDDLE SCHOOL INFORMATION
1874-TECHNOLOGY IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time
1875-of expenditure for the public education department project in
1876-Subsection 123 of Section 16 of Chapter 199 of Laws 2023 to
1877-purchase and install information technology, including
1878-related equipment, furniture and infrastructure, digital
1879-touch screens and classroom presentation boards, at Van Buren
1880-middle school in the Albuquerque public school district in
1881-Bernalillo county is extended through fiscal year 2027.
1882-SECTION 90. FOURTH STREET NW IMPROVEMENT--EXTEND TIME--
1883-SEVERANCE TAX BONDS.--The time of expenditure for the
1884-department of transportation project in Subsection 29 of
1885-Section 33 of Chapter 138 of Laws 2021 to plan, design and
1886-construct road improvements to Fourth street NW from
1887-Pueblo Solano road NW to Ortega road NW in Los Ranchos de
1888-Albuquerque in Bernalillo county is extended through fiscal
1889-year 2027.
1890-SECTION 91. QUEMADO COMMUNITY CENTERS CONSTRUCTION--
1891-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
1892-for the local government division project in Subsection 122
1893-of Section 29 of Chapter 138 of Laws 2021 to plan, design, SFC/SB 425
1894-Page 38
1895-1
1896-2
1897-3
1898-4
1899-5
1900-6
1901-7
1902-8
1903-9
1904-10
1905-11
1906-12
1907-13
1908-14
1909-15
1910-16
1911-17
1912-18
1913-19
1914-20
1915-21
1916-22
1917-23
1918-24
1919-25
1920-construct, improve, equip and furnish community centers in
1921-Quemado in Catron county is extended through fiscal year
1922-2027.
1923-SECTION 92. CATRON COUNTY AMBULANCE PURCHASE--EXTEND
1924-TIME--GENERAL FUND.--The time of expenditure for the local
1925-government division project in Subsection 164 of Section 28
1926-of Chapter 199 of Laws 2023 to purchase and equip ambulances
1927-for Reserve in Catron county is extended through fiscal year
1928-2027.
1929-SECTION 93. HAGERMAN MUNICIPAL SCHOOL DISTRICT
1930-ADMINISTRATIVE BUILDING ROOF REPLACEMENT--EXPAND PURPOSE--
1931-GENERAL FUND.--The public education department project in
1932-Subsection 157 of Section 16 of Chapter 66 of Laws 2024 to
1933-plan, design, construct and replace roofs and gutters at the
1934-administrative building in the Hagerman municipal school
1935-district in Chaves county may include replacing heating,
1936-ventilation and air conditioning systems and repairing the
1937-roof of the high school administration building in the
1938-Hagerman municipal school district.
1939-SECTION 94. ROSWELL SOUTHEAST REGION SCHOOL SHOOTING
1940-RANGE IMPROVEMENT--CHANGE TO SHOOTING RANGE EQUIPMENT
1941-UPGRADE--CHANGE AGENCY--GENERAL FUND.--The unexpended balance
1942-of the appropriation to the public education department in
1943-Subsection 156 of Section 16 of Chapter 66 of Laws 2024 to
1944-plan, design, construct, upgrade and equip shooting ranges SFC/SB 425
1945-Page 39
1946-1
1947-2
1948-3
1949-4
1950-5
1951-6
1952-7
1953-8
1954-9
1955-10
1956-11
1957-12
1958-13
1959-14
1960-15
1961-16
1962-17
1963-18
1964-19
1965-20
1966-21
1967-22
1968-23
1969-24
1970-25
1971-for high schools in communities in the southeast region of
1972-Roswell in Chaves county shall not be expended for the
1973-original purpose but is appropriated to the local government
1974-division to purchase equipment and to plan, design, construct
1975-and upgrade facilities, technology and equipment at the
1976-Roswell Chaparral skeet club shooting range in Roswell in
1977-Chaves county.
1978-SECTION 95. ROSWELL MUSEUM AND ART CENTER IMPROVEMENT--
1979-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
1980-for the local government division project in Subsection 133
1981-of Section 29 of Chapter 138 of Laws 2021 to plan, design,
1982-construct, renovate, furnish and equip the Roswell museum and
1983-art center, including building system upgrades, in Roswell in
1984-Chaves county is extended through fiscal year 2027.
1985-SECTION 96. CIBOLA COUNTY ABOVE-GROUND STORAGE TANKS
1986-INSTALLATION--EXTEND TIME--GENERAL FUND.--The time of
1987-expenditure for the local government division project in
1988-Subsection 178 of Section 28 of Chapter 199 of Laws 2023 to
1989-plan, design, purchase, equip and install above-ground
1990-storage tanks for public service operations in Cibola county
1991-is extended through fiscal year 2027.
1992-SECTION 97. COMMUNITY DITCH OF SAN JOSE DE LA CIENEGA
1993-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
1994-expenditure for the interstate stream commission project in
1995-Subsection 3 of Section 28 of Chapter 138 of Laws 2021 to SFC/SB 425
1996-Page 40
1997-1
1998-2
1999-3
2000-4
2001-5
2002-6
2003-7
2004-8
2005-9
2006-10
2007-11
2008-12
2009-13
2010-14
2011-15
2012-16
2013-17
2014-18
2015-19
2016-20
2017-21
2018-22
2019-23
2020-24
2021-25
2022-plan, design and construct improvements to the community
2023-ditch of San Jose de la Cienega in Cibola county is extended
2024-through fiscal year 2027.
2025-SECTION 98. CUBERO ACEQUIA ASSOCIATION ACEQUIA
2026-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
2027-expenditure for the interstate stream commission project in
2028-Subsection 4 of Section 28 of Chapter 138 of Laws 2021 to
2029-plan, design and construct improvements for the Cubero
2030-acequia association in Cibola county is extended through
2031-fiscal year 2027.
2032-SECTION 99. RAMAH CHAPTER CEMETERY CONSTRUCTION--EXTEND
2033-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
2034-Indian affairs department project in Subsection 9 of
2035-Section 25 of Chapter 138 of Laws 2021 to acquire land, to
2036-conduct archaeological and environmental studies and to plan,
2037-design and construct a community and veterans' cemetery in
2038-the Ramah chapter of the Navajo Nation in Cibola county is
2039-extended through fiscal year 2027.
2040-SECTION 100. SAN MATEO ACEQUIA ASSOCIATION
2041-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
2042-expenditure for the interstate stream commission project in
2043-Subsection 5 of Section 28 of Chapter 138 of Laws 2021 to
2044-plan, design, construct, furnish and equip improvements for
2045-the San Mateo acequia association in San Mateo in
2046-Cibola county is extended through fiscal year 2027. SFC/SB 425
2047-Page 41
2048-1
2049-2
2050-3
2051-4
2052-5
2053-6
2054-7
2055-8
2056-9
2057-10
2058-11
2059-12
2060-13
2061-14
2062-15
2063-16
2064-17
2065-18
2066-19
2067-20
2068-21
2069-22
2070-23
2071-24
2072-25
2073-SECTION 101. GRANTS DOMESTIC VIOLENCE SHELTER
2074-RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
2075-expenditure for the local government division project in
2076-Subsection 138 of Section 29 of Chapter 138 of Laws 2021 to
2077-plan, design, construct, repair, renovate and equip a
2078-domestic violence shelter in Grants in Cibola county is
2079-extended through fiscal year 2027.
2080-SECTION 102. RAMAH CHAPTER ROAD GRADER PURCHASE--CHANGE
2081-TO DUMP TRUCK PURCHASE--EXTEND TIME--GENERAL FUND.--The
2082-unexpended balance of the appropriation to the Indian affairs
2083-department in Subsection 14 of Section 25 of Chapter 199 of
2084-Laws 2023 to purchase and equip a road grader for the Ramah
2085-chapter of the Navajo Nation in Cibola county shall not be
2086-expended for the original purpose but is changed to purchase
2087-and equip a dump truck for the Ramah chapter of the
2088-Navajo Nation in Cibola county. The time of expenditure is
2089-extended through fiscal year 2027.
2090-SECTION 103. COLFAX COUNTY ROAD DEPARTMENT MAINTENANCE
2091-TRUCK PURCHASE--EXTEND TIME--GENERAL FUND.--The time of
2092-expenditure for the local government division project in
2093-Subsection 183 of Section 28 of Chapter 199 of Laws 2023 to
2094-purchase and equip a maintenance truck for the road
2095-department in Colfax county is extended through fiscal year
2096-2027.
2097-SECTION 104. EAGLE NEST LAGOON DECOMMISSIONING--EXTEND SFC/SB 425
2098-Page 42
2099-1
2100-2
2101-3
2102-4
2103-5
2104-6
2105-7
2106-8
2107-9
2108-10
2109-11
2110-12
2111-13
2112-14
2113-15
2114-16
2115-17
2116-18
2117-19
2118-20
2119-21
2120-22
2121-23
2122-24
2123-25
2124-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
2125-state parks division of the energy, minerals and natural
2126-resources department project in Subsection 4 of Section 19 of
2127-Chapter 138 of Laws 2021 to plan, design and construct the
2128-decommissioning of sewer lagoons, including dewatering,
2129-sludge and lining removal, materials disposal and land
2130-restoration, in Eagle Nest in Colfax county is extended
2131-through fiscal year 2027.
2132-SECTION 105. EAGLE NEST MOTOR GRADER PURCHASE--EXTEND
2133-TIME--GENERAL FUND.--The time of expenditure for the local
2134-government division project in Subsection 185 of Section 28
2135-of Chapter 199 of Laws 2023 to purchase and equip a motor
2136-grader in Eagle Nest in Colfax county is extended through
2137-fiscal year 2027.
2138-SECTION 106. SECOND STREET IMPROVEMENT--CHANGE TO EAGLE
2139-NEST STREET IMPROVEMENT--GENERAL FUND.--The unexpended
2140-balance of the appropriation to the department of
2141-transportation in Subsection 45 of Section 33 of Chapter 199
2142-of Laws 2023 to plan, design, construct and improve
2143-Second street in Eagle Nest in Colfax county shall not be
2144-expended for the original purpose but is changed to plan,
2145-design, construct and improve Second street, Neal avenue and
2146-Lake avenue in Eagle Nest in Colfax county.
2147-SECTION 107. EAGLE NEST WATER SYSTEM PHASE 4
2148-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of SFC/SB 425
2149-Page 43
2150-1
2151-2
2152-3
2153-4
2154-5
2155-6
2156-7
2157-8
2158-9
2159-10
2160-11
2161-12
2162-13
2163-14
2164-15
2165-16
2166-17
2167-18
2168-19
2169-20
2170-21
2171-22
2172-23
2173-24
2174-25
2175-expenditure for the department of environment project in
2176-Subsection 14 of Section 21 of Chapter 138 of Laws 2021 to
2177-plan, design, construct and equip phase 4 of water system
2178-improvements, including environmental studies, in Eagle Nest
2179-in Colfax county is extended through fiscal year 2027.
2180-SECTION 108. EAGLE NEST WELL HOUSE GENERATOR PURCHASE--
2181-CHANGE TO EAGLE NEST WASTEWATER SYSTEM AND WELL HOUSE
2182-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The
2183-unexpended balance of the appropriation to the department of
2184-environment in Subsection 15 of Section 21 of Chapter 138 of
2185-Laws 2021 to plan, design, construct, furnish, equip and
2186-install emergency generators for the Eagle Nest well house in
2187-Eagle Nest in Colfax county shall not be expended for the
2188-original purpose but is changed to plan, design, construct,
2189-furnish, equip and install improvements to a well house and
2190-wastewater lift stations, including the purchase of
2191-generators, pumps, motors and control panels, in Eagle Nest
2192-in Colfax county. The time of expenditure is extended
2193-through fiscal year 2027.
2194-SECTION 109. COLFAX COUNTY ROAD DEPARTMENT VEHICLE
2195-PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure
2196-for the local government division project in Subsection 186
2197-of Section 28 of Chapter 199 of Laws 2023 to purchase and
2198-equip a tractor trailer for the road department in
2199-Colfax county is extended through fiscal year 2027. SFC/SB 425
2200-Page 44
2201-1
2202-2
2203-3
2204-4
2205-5
2206-6
2207-7
2208-8
2209-9
2210-10
2211-11
2212-12
2213-13
2214-14
2215-15
2216-16
2217-17
2218-18
2219-19
2220-20
2221-21
2222-22
2223-23
2224-24
2225-25
2226-SECTION 110. CURRY COUNTY FIRE STATION CONSTRUCTION--
2227-CHANGE TO ADULT DETENTION CENTER IMPROVEMENT--EXTEND TIME--
2228-SEVERANCE TAX BONDS.--The unexpended balance of the
2229-appropriation to the local government division in
2230-Subsection 189 of Section 30 of Chapter 53 of Laws 2022 to
2231-plan, design, construct, furnish and equip a fire station for
2232-the Countyline volunteer fire department in Curry county
2233-shall not be expended for the original purpose but is changed
2234-to plan, design and construct improvements to the adult
2235-detention center in Clovis in Curry county. The time of
2236-expenditure is extended through fiscal year 2027.
2237-SECTION 111. DE BACA COUNTY TRASH TRUCK PURCHASE--
2238-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
2239-department of environment project in Subsection 22 of
2240-Section 19 of Chapter 199 of Laws 2023 to purchase and equip
2241-a front loading trash collection truck for the county solid
2242-waste facility in De Baca county is extended through fiscal
2243-year 2027.
2244-SECTION 112. ALTO DE LAS FLORES MUTUAL DOMESTIC WATER
2245-CONSUMERS ASSOCIATION ADMINISTRATION BUILDING CONSTRUCTION--
2246-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
2247-for the local government division project in Subsection 154
2248-of Section 29 of Chapter 138 of Laws 2021 to acquire land, to
2249-conduct environmental and archaeological studies and to plan,
2250-design, construct, purchase, furnish and equip a building, SFC/SB 425
2251-Page 45
2252-1
2253-2
2254-3
2255-4
2256-5
2257-6
2258-7
2259-8
2260-9
2261-10
2262-11
2263-12
2264-13
2265-14
2266-15
2267-16
2268-17
2269-18
2270-19
2271-20
2272-21
2273-22
2274-23
2275-24
2276-25
2277-including building relocation, for the Alto de las Flores
2278-mutual domestic water consumers association in
2279-Dona Ana county is extended through fiscal year 2027.
2280-SECTION 113. BORDER AUTHORITY SANTA TERESA TO SUNLAND
2281-PARK ROAD EXTENSION--EXTEND TIME--GENERAL FUND.--The time of
2282-expenditure for the border authority project originally
2283-authorized in Subsection 1 of Section 6 of Chapter 277 of
2284-Laws 2019 and reauthorized in Laws 2023, Chapter 203,
2285-Section 88 to plan, design and construct a road between
2286-Santa Teresa and Sunland Park in Dona Ana county is extended
2287-through fiscal year 2027.
2288-SECTION 114. CARVER ROAD IMPROVEMENT--EXPAND PURPOSE--
2289-EXTEND TIME--SEVERANCE TAX BONDS.--The department of
2290-transportation project in Subsection 34 of Section 33 of
2291-Chapter 138 of Laws 2021 to plan, design, construct and
2292-improve Carver road in Dona Ana county may include drainage
2293-improvements and the acquisition of rights of way. The time
2294-of expenditure is extended through fiscal year 2027.
2295-SECTION 115. DONA ANA COUNTY LA MESA COMMUNITY PARK
2296-IMPROVEMENT--CHANGE TO LA MESA COMMUNITY CENTER IMPROVEMENT--
2297-GENERAL FUND.--The unexpended balance of the appropriation to
2298-the local government division in Subsection 275 of Section 28
2299-of Chapter 66 of Laws 2024 to plan, design, construct, equip,
2300-purchase and install improvements at La Mesa community park
2301-in Dona Ana county shall not be expended for the original SFC/SB 425
2302-Page 46
2303-1
2304-2
2305-3
2306-4
2307-5
2308-6
2309-7
2310-8
2311-9
2312-10
2313-11
2314-12
2315-13
2316-14
2317-15
2318-16
2319-17
2320-18
2321-19
2322-20
2323-21
2324-22
2325-23
2326-24
2327-25
2328-purpose but is changed to plan, design, construct, equip,
2329-purchase and install improvements at La Mesa community center
2330-in Dona Ana county.
2331-SECTION 116. DONA ANA COUNTY SANTA TERESA ARROYO
2332-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
2333-expenditure for the interstate stream commission project in
2334-Subsection 6 of Section 28 of Chapter 138 of Laws 2021 to
2335-acquire permits and rights of way and to plan, design and
2336-construct improvements to the Santa Teresa arroyo in
2337-Dona Ana county is extended through fiscal year 2027.
2338-SECTION 117. DONA ANA MUTUAL DOMESTIC WATER CONSUMERS
2339-ASSOCIATION DRAINAGE IMPROVEMENT--SEVERANCE TAX BONDS--EXTEND
2340-TIME.--The time of expenditure for the department of
2341-environment project in Subsection 22 of Section 21 of
2342-Chapter 138 of Laws 2021 to plan, design, construct, repair,
2343-improve and protect wastewater infrastructure, including
2344-manholes, sewer lines and flood control structures, for the
2345-Dona Ana mutual domestic water consumers association in the
2346-Picacho Hills area of Dona Ana county is extended through
2347-fiscal year 2027.
2348-SECTION 118. TALAVERA MUTUAL DOMESTIC WATER CONSUMERS
2349-ASSOCIATION RADIO READ METER PURCHASE--EXTEND TIME--GENERAL
2350-FUND.--The time of expenditure for the department of
2351-environment project in Subsection 32 of Section 19 of
2352-Chapter 199 of Laws 2023 to purchase and install radio read SFC/SB 425
2353-Page 47
2354-1
2355-2
2356-3
2357-4
2358-5
2359-6
2360-7
2361-8
2362-9
2363-10
2364-11
2365-12
2366-13
2367-14
2368-15
2369-16
2370-17
2371-18
2372-19
2373-20
2374-21
2375-22
2376-23
2377-24
2378-25
2379-meters and related equipment for the Talavera mutual domestic
2380-water consumers association in Dona Ana county is extended
2381-through fiscal year 2027.
2382-SECTION 119. WESTMORELAND AVENUE ROAD DRAINAGE
2383-IMPROVEMENT--CHANGE TO WESTMORELAND AVENUE AREA ROAD DRAINAGE
2384-IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The unexpended
2385-balance of the appropriation to the department of
2386-transportation in Subsection 50 of Section 33 of Chapter 199
2387-of Laws 2023 to acquire rights of way and to plan, design and
2388-construct road, drainage and utility improvements along
2389-Westmoreland avenue in Dona Ana county shall not be expended
2390-for the original purpose but is changed to acquire rights of
2391-way and to plan, design and construct road, drainage and
2392-utility improvements in the area of Westmoreland avenue in
2393-Dona Ana county. The time of expenditure is extended through
2394-fiscal year 2027.
2395-SECTION 120. WESTMORELAND AVENUE ROAD DRAIN AND UTILITY
2396-IMPROVEMENT--CHANGE TO WESTMORELAND AVENUE AREA ROAD
2397-IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The unexpended
2398-balance of the appropriation to the department of
2399-transportation in Subsection 48 of Section 33 of Chapter 66
2400-of Laws 2024 to acquire rights of way for and to plan,
2401-design, construct and install road, drainage and utility
2402-improvements along Westmoreland avenue in Dona Ana county
2403-shall not be expended for the original purpose but is changed SFC/SB 425
2404-Page 48
2405-1
2406-2
2407-3
2408-4
2409-5
2410-6
2411-7
2412-8
2413-9
2414-10
2415-11
2416-12
2417-13
2418-14
2419-15
2420-16
2421-17
2422-18
2423-19
2424-20
2425-21
2426-22
2427-23
2428-24
2429-25
2430-to acquire rights of way for and to plan, design, construct
2431-and install road, drainage and utility improvements in the
2432-area of Westmoreland avenue in Dona Ana county. The time of
2433-expenditure is extended through fiscal year 2027.
2434-SECTION 121. ANTHONY MULTIGENERATIONAL BUILDING
2435-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
2436-expenditure for the local government division project in
2437-Subsection 168 of Section 29 of Chapter 138 of Laws 2021 to
2438-acquire land, easements and rights of way and to plan,
2439-design, demolish and construct phase 2 of a multigenerational
2440-building in Anthony in Dona Ana county is extended through
2441-fiscal year 2027.
2442-SECTION 122. CHAMBERINO MUTUAL DOMESTIC WATER
2443-CONSUMERS' AND SEWAGE ASSOCIATION ADMINISTRATION FACILITY
2444-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
2445-expenditure for the local government division project in
2446-Subsection 172 of Section 29 of Chapter 138 of Laws 2021 to
2447-plan, design and construct an administrative and central
2448-operations facility for the Chamberino mutual domestic water
2449-consumers' and sewage association in Chamberino in
2450-Dona Ana county is extended through fiscal year 2027.
2451-SECTION 123. DONA ANA COUNTY CHAPARRAL FIRE STATION 10
2452-RENOVATION--CHANGE TO CHAPARRAL FIRE STATION 44 RENOVATION--
2453-GENERAL FUND.--The unexpended balance of the appropriation to
2454-the local government division in Subsection 218 of Section 28 SFC/SB 425
2455-Page 49
2456-1
2457-2
2458-3
2459-4
2460-5
2461-6
2462-7
2463-8
2464-9
2465-10
2466-11
2467-12
2468-13
2469-14
2470-15
2471-16
2472-17
2473-18
2474-19
2475-20
2476-21
2477-22
2478-23
2479-24
2480-25
2481-of Chapter 199 of Laws 2023 to plan, design, construct,
2482-renovate, furnish and equip fire station 10 in Chaparral in
2483-Dona Ana county shall not be expended for the original
2484-purpose but is changed to plan, design, construct, renovate,
2485-furnish and equip fire station 44 in Chaparral in
2486-Dona Ana county.
2487-SECTION 124. DONA ANA COUNTY DRAINAGE CONSTRUCTION--
2488-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
2489-for the department of transportation project in Subsection 35
2490-of Section 33 of Chapter 138 of Laws 2021 to acquire property
2491-and to plan, design, construct and equip drainage channels to
2492-the Brahman diversion channel in Dona Ana county is extended
2493-through fiscal year 2027.
2494-SECTION 125. EAST MADRID AVENUE IMPROVEMENT--EXTEND
2495-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
2496-department of transportation project in Subsection 44 of
2497-Section 33 of Chapter 138 of Laws 2021 to acquire rights of
2498-way and to plan, design and construct extensions, including
2499-utility and flood control infrastructure, on east Madrid
2500-avenue in Las Cruces in Dona Ana county is extended through
2501-fiscal year 2027.
2502-SECTION 126. LAS CRUCES EAST MESA AREA ROAD
2503-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
2504-expenditure for the department of transportation project in
2505-Subsection 45 of Section 33 of Chapter 138 of Laws 2021 to SFC/SB 425
2506-Page 50
2507-1
2508-2
2509-3
2510-4
2511-5
2512-6
2513-7
2514-8
2515-9
2516-10
2517-11
2518-12
2519-13
2520-14
2521-15
2522-16
2523-17
2524-18
2525-19
2526-20
2527-21
2528-22
2529-23
2530-24
2531-25
2532-acquire rights of way and to plan, design, construct and
2533-improve roads, including utilities and flood control, for the
2534-East Mesa area and for other road projects in Las Cruces in
2535-Dona Ana county is extended through fiscal year 2027.
2536-SECTION 127. LAS CRUCES INTERNATIONAL AIRPORT
2537-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
2538-expenditure for the local government division project in
2539-Subsection 153 of Section 29 of Chapter 138 of Laws 2021 to
2540-plan, design, construct, renovate, equip, furnish and install
2541-improvements for a terminal building, including
2542-infrastructure, landscaping and parking, at the Las Cruces
2543-international airport in Las Cruces in Dona Ana county is
2544-extended through fiscal year 2027.
2545-SECTION 128. LAS CRUCES SEPTIC SYSTEM REPLACEMENT--
2546-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
2547-for the department of environment project in Subsection 25 of
2548-Section 21 of Chapter 138 of Laws 2021 to plan, design,
2549-construct, replace and equip improvements to septic systems
2550-in Las Cruces in Dona Ana county is extended through fiscal
2551-year 2027.
2552-SECTION 129. NEW MEXICO STATE UNIVERSITY FABIAN GARCIA
2553-SCIENCE CENTER EQUIPMENT PURCHASE--EXTEND TIME--GENERAL
2554-FUND.--The time of expenditure for the New Mexico state
2555-university project in Subsection 11 of Section 38 of Chapter
2556-199 of Laws 2023 to purchase equipment for the Fabian Garcia SFC/SB 425
2557-Page 51
2558-1
2559-2
2560-3
2561-4
2562-5
2563-6
2564-7
2565-8
2566-9
2567-10
2568-11
2569-12
2570-13
2571-14
2572-15
2573-16
2574-17
2575-18
2576-19
2577-20
2578-21
2579-22
2580-23
2581-24
2582-25
2583-science center at New Mexico state university in Las Cruces
2584-in Dona Ana county is extended through fiscal year 2027.
2585-SECTION 130. CALLE DE PICACHO DRAINAGE IMPROVEMENT--
2586-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
2587-for the department of transportation project in Subsection 46
2588-of Section 33 of Chapter 138 of Laws 2021 to acquire
2589-easements and rights of way and to plan, design, construct
2590-and improve drainage along calle de Picacho in Mesilla in
2591-Dona Ana county is extended through fiscal year 2027.
2592-SECTION 131. SANTA TERESA PORT OF ENTRY PARKING
2593-FACILITY CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The
2594-time of expenditure for the border authority project in
2595-Subsection 1 of Section 8 of Chapter 138 of Laws 2021 to
2596-plan, design and construct a parking facility on property
2597-adjacent to the New Mexico border authority in Santa Teresa
2598-in Dona Ana county is extended through fiscal year 2027.
2599-SECTION 132. SUNLAND PARK PUBLIC SAFETY COMPLEX
2600-DESIGN--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
2601-expenditure for the local government division project in
2602-Subsection 187 of Section 29 of Chapter 138 of Laws 2021 to
2603-plan, design and construct a public safety complex in
2604-Sunland Park in Dona Ana county is extended through fiscal
2605-year 2027.
2606-SECTION 133. EDDY COUNTY SPLASH PAD CONSTRUCTION--
2607-CHANGE TO PLAYGROUND AND PARK EQUIPMENT INSTALLATION--GENERAL SFC/SB 425
2608-Page 52
2609-1
2610-2
2611-3
2612-4
2613-5
2614-6
2615-7
2616-8
2617-9
2618-10
2619-11
2620-12
2621-13
2622-14
2623-15
2624-16
2625-17
2626-18
2627-19
2628-20
2629-21
2630-22
2631-23
2632-24
2633-25
2634-FUND.--The unexpended balance of the appropriation to the
2635-local government division in Subsection 310 of Section 28 of
2636-Chapter 66 of Laws 2024 to plan, design, construct, install
2637-and equip a splash pad for Eddy county shall not be expended
2638-for the original purpose but is changed to plan, design,
2639-construct and install playground and park equipment in
2640-Eddy county.
2641-SECTION 134. WEST HERMOSA DRIVE IMPROVEMENT--EXTEND
2642-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
2643-department of transportation project in Subsection 53 of
2644-Section 33 of Chapter 138 of Laws 2021 to plan, design and
2645-construct improvements to west Hermosa drive between
2646-south First street and south Thirteenth street in Artesia in
2647-Eddy county is extended through fiscal year 2027.
2648-SECTION 135. CARLSBAD AUTOMATED METER READING SYSTEM
2649-PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure
2650-for the department of environment project in Subsection 42 of
2651-Section 19 of Chapter 199 of Laws 2023 to purchase, equip and
2652-install an automated water meter reading system in Carlsbad
2653-in Eddy county is extended through fiscal year 2027.
2654-SECTION 136. CARLSBAD CANAL STREET STORM DRAIN
2655-EXTENSION--EXTEND TIME--GENERAL FUND.--The time of
2656-expenditure for the department of transportation project
2657-originally authorized in Subsection 79 of Section 40 of
2658-Chapter 277 of Laws 2019 and reauthorized in Laws 2023, SFC/SB 425
2659-Page 53
2660-1
2661-2
2662-3
2663-4
2664-5
2665-6
2666-7
2667-8
2668-9
2669-10
2670-11
2671-12
2672-13
2673-14
2674-15
2675-16
2676-17
2677-18
2678-19
2679-20
2680-21
2681-22
2682-23
2683-24
2684-25
2685-Chapter 203, Section 105 to plan, design, construct and
2686-extend a storm drain from Canal street to west Fox street
2687-along west Greene and south Halagueno streets in Carlsbad in
2688-Eddy county is extended through fiscal year 2027.
2689-SECTION 137. CARLSBAD NORTH MESA SENIOR RECREATION
2690-CENTER RENOVATION--CHANGE TO CASCADES RECREATION AND WELLNESS
2691-CENTER IMPROVEMENT--GENERAL FUND.--The unexpended balance of
2692-the appropriation to the aging and long-term services
2693-department in Subsection 19 of Section 4 of Chapter 199 of
2694-Laws 2023 for renovations to the North Mesa senior recreation
2695-center in Carlsbad in Eddy county shall not be expended for
2696-the original purpose but is changed to purchase, equip and
2697-install recreation, safety and accessibility compliant
2698-equipment and furnishings and to plan, design, construct and
2699-equip outdoor improvements at the Cascades recreation and
2700-wellness center in Carlsbad in Eddy county.
2701-SECTION 138. SOUTHEAST NEW MEXICO COLLEGE HEATING,
2702-VENTILATION AND AIR CONDITIONING SYSTEM REPLACEMENT--EXTEND
2703-TIME--GENERAL FUND.--The time of expenditure for the higher
2704-education department project in Subsection 8 of Section 15 of
2705-Chapter 199 of Laws 2023 to replace the heating, ventilation
2706-and air conditioning systems campuswide at southeast
2707-New Mexico college in Carlsbad in Eddy county is extended
2708-through fiscal year 2027.
2709-SECTION 139. BAYARD PUBLIC SAFETY BUILDING SFC/SB 425
2710-Page 54
2711-1
2712-2
2713-3
2714-4
2715-5
2716-6
2717-7
2718-8
2719-9
2720-10
2721-11
2722-12
2723-13
2724-14
2725-15
2726-16
2727-17
2728-18
2729-19
2730-20
2731-21
2732-22
2733-23
2734-24
2735-25
2736-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
2737-expenditure for the local government division project in
2738-Subsection 195 of Section 29 of Chapter 138 of Laws 2021 to
2739-plan, design and construct building improvements, including
2740-roofing, to the public safety building in Bayard in
2741-Grant county is extended through fiscal year 2027.
2742-SECTION 140. BAYARD RECREATION FACILITY IMPROVEMENT--
2743-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
2744-for the local government division project in Subsection 196
2745-of Section 29 of Chapter 138 of Laws 2021 to plan, design,
2746-construct, equip and furnish recreational facility and
2747-concession stand improvements, including site work and the
2748-purchase of equipment, for Bayard in Grant county is extended
2749-through fiscal year 2027.
2750-SECTION 141. BAYARD RECREATIONAL FACILITY IMPROVEMENT--
2751-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
2752-local government division project originally authorized in
2753-Subsection 227 of Section 34 of Chapter 277 of Laws 2019 and
2754-reauthorized in Laws 2023, Chapter 203, Section 302 to plan,
2755-design, construct, purchase, equip and furnish recreational
2756-facility improvements, including site preparation, in Bayard
2757-in Grant county is extended through fiscal year 2027.
2758-SECTION 142. BAYARD SEWER VACUUM TRUCK PURCHASE--EXTEND
2759-TIME--GENERAL FUND.--The time of expenditure for the
2760-department of environment project in Subsection 265 of SFC/SB 425
2761-Page 55
2762-1
2763-2
2764-3
2765-4
2766-5
2767-6
2768-7
2769-8
2770-9
2771-10
2772-11
2773-12
2774-13
2775-14
2776-15
2777-16
2778-17
2779-18
2780-19
2781-20
2782-21
2783-22
2784-23
2785-24
2786-25
2787-Section 28 of Chapter 199 of Laws 2023 to purchase and equip
2788-a sewer vacuum truck for Bayard in Grant county is extended
2789-through fiscal year 2027.
2790-SECTION 143. BAYARD SLUDGE DEWATERING EQUIPMENT
2791-PURCHASE--CHANGE TO WASTEWATER SYSTEM IMPROVEMENT--EXTEND
2792-TIME--GENERAL FUND.--The unexpended balance of the
2793-appropriation to the department of environment in
2794-Subsection 39 of Section 26 of Chapter 277 of Laws 2019 and
2795-reauthorized in Laws 2023, Chapter 203, Section 303 to plan,
2796-design and construct wastewater system improvements,
2797-including the purchase of sludge dewatering equipment, in
2798-Bayard in Grant county shall not be expended for the original
2799-purpose but is changed to plan, design and construct
2800-wastewater system improvements in Bayard in Grant county.
2801-The time of expenditure is extended through fiscal year 2027.
2802-SECTION 144. HURLEY WATER SYSTEM CONSTRUCTION--EXTEND
2803-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
2804-department of environment project in Subsection 32 of
2805-Section 21 of Chapter 138 of Laws 2021 to plan, design,
2806-construct and equip a water system in Hurley in Grant county
2807-is extended through fiscal year 2027.
2808-SECTION 145. ALDO LEOPOLD CHARTER SCHOOL ACTIVITY
2809-VEHICLE PURCHASE--EXTEND TIME--GENERAL FUND.--The time of
2810-expenditure for the public education department project in
2811-Subsection 144 of Section 16 of Chapter 199 of Laws 2023 to SFC/SB 425
2812-Page 56
2813-1
2814-2
2815-3
2816-4
2817-5
2818-6
2819-7
2820-8
2821-9
2822-10
2823-11
2824-12
2825-13
2826-14
2827-15
2828-16
2829-17
2830-18
2831-19
2832-20
2833-21
2834-22
2835-23
2836-24
2837-25
2838-purchase and equip activity vehicles for Aldo Leopold charter
2839-school in Silver City in Grant county is extended through
2840-fiscal year 2027.
2841-SECTION 146. GUADALUPE COUNTY MAGISTRATE COURT
2842-RELOCATION--CHANGE TO GUADALUPE COUNTY MAGISTRATE COURT
2843-PROPERTY ACQUISITION, CONSTRUCTION AND RENOVATION--EXTEND
2844-TIME--SEVERANCE TAX BONDS.--The unexpended balance of the
2845-appropriation to the administrative office of the courts in
2846-Subsection 3 of Section 4 of Chapter 138 of Laws 2021 to
2847-plan, design, construct, renovate, furnish and equip a new
2848-location for the magistrate court in Guadalupe county shall
2849-not be expended for the original purpose but is changed to
2850-acquire land and property for and to plan, design, construct,
2851-renovate, furnish and equip a magistrate court in
2852-Guadalupe county. The time of expenditure is extended
2853-through fiscal year 2027.
2854-SECTION 147. GUADALUPE COUNTY MAGISTRATE COURT LAND
2855-ACQUISITION--CHANGE TO LAND AND PROPERTY ACQUISITION--GENERAL
2856-FUND.--The unexpended balance of the appropriation to the
2857-administrative office of the courts in Subsection 2 of
2858-Section 3 of Chapter 66 of Laws 2024 to acquire land for the
2859-Guadalupe county magistrate court in Guadalupe county shall
2860-not be expended for the original purpose but is changed to
2861-acquire land and property for and to plan, design, construct,
2862-renovate, furnish and equip a magistrate court in SFC/SB 425
2863-Page 57
2864-1
2865-2
2866-3
2867-4
2868-5
2869-6
2870-7
2871-8
2872-9
2873-10
2874-11
2875-12
2876-13
2877-14
2878-15
2879-16
2880-17
2881-18
2882-19
2883-20
2884-21
2885-22
2886-23
2887-24
2888-25
2889-Guadalupe county.
2890-SECTION 148. SANTA ROSA MAGISTRATE COURT CONSTRUCTION--
2891-CHANGE TO GUADALUPE COUNTY MAGISTRATE COURT COMPLEX
2892-ACQUISITION--EXTEND TIME--SEVERANCE TAX BONDS.--The
2893-unexpended balance of the appropriation to the administrative
2894-office of the courts in Subsection 1 of Section 4 of
2895-Chapter 53 of Laws 2022 to plan, design, construct, renovate,
2896-furnish and equip a magistrate court in Santa Rosa in
2897-Guadalupe county shall not be expended for the original
2898-purpose but is changed to acquire land and property for and
2899-to plan, design, construct, renovate, furnish and equip a
2900-magistrate court complex in Guadalupe county. The time of
2901-expenditure is extended through fiscal year 2027.
2902-SECTION 149. SANTA ROSA VACUUM TRUCK PURCHASE--EXTEND
2903-TIME--GENERAL FUND.--The time of expenditure for the
2904-department of environment project in Subsection 53 of
2905-Section 19 of Chapter 199 of Laws 2023 to purchase and equip
2906-vacuum trucks for the water department in Santa Rosa in
2907-Guadalupe county is extended through fiscal year 2027.
2908-SECTION 150. SANTA ROSA CONSOLIDATED SCHOOL DISTRICT
2909-BUS PURCHASE--EXTEND TIME--GENERAL FUND.--The time of
2910-expenditure for the public education department project in
2911-Subsection 148 of Section 16 of Chapter 199 of Laws 2023 to
2912-purchase and equip an activity bus for the Santa Rosa
2913-consolidated school district in Guadalupe county is extended SFC/SB 425
2914-Page 58
2915-1
2916-2
2917-3
2918-4
2919-5
2920-6
2921-7
2922-8
2923-9
2924-10
2925-11
2926-12
2927-13
2928-14
2929-15
2930-16
2931-17
2932-18
2933-19
2934-20
2935-21
2936-22
2937-23
2938-24
2939-25
2940-through fiscal year 2027.
2941-SECTION 151. VAUGHN WATER SYSTEM IMPROVEMENT--EXTEND
2942-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
2943-department of environment project in Subsection 35 of
2944-Section 21 of Chapter 138 of Laws 2021 to plan, design,
2945-construct, purchase, equip and install water system
2946-improvements, including water meters, in Vaughn in
2947-Guadalupe county is extended through fiscal year 2027.
2948-SECTION 152. HARDING COUNTY ROAD DEPARTMENT HOUSING
2949-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
2950-expenditure for the local government division project in
2951-Subsection 211 of Section 29 of Chapter 138 of Laws 2021 to
2952-plan, design, construct, furnish and equip employee housing
2953-quarters for the road department in Harding county is
2954-extended through fiscal year 2027.
2955-SECTION 153. ALBUQUERQUE INTERNATIONAL DISTRICT FAMILY
2956-RESOURCE CENTER PURCHASE--CHANGE TO HOBBS FAMILY RESOURCE
2957-CENTER CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The
2958-unexpended balance of the appropriation to the local
2959-government division in Subsection 57 of Section 29 of
2960-Chapter 138 of Laws 2021 to plan, design, construct,
2961-purchase, renovate, equip and furnish a family resource
2962-center in the international district in Albuquerque in
2963-Bernalillo county shall not be expended for the original
2964-purpose but is changed to plan, design, construct, purchase, SFC/SB 425
2965-Page 59
2966-1
2967-2
2968-3
2969-4
2970-5
2971-6
2972-7
2973-8
2974-9
2975-10
2976-11
2977-12
2978-13
2979-14
2980-15
2981-16
2982-17
2983-18
2984-19
2985-20
2986-21
2987-22
2988-23
2989-24
2990-25
2991-renovate, equip and furnish a family resource center in Hobbs
2992-in Lea county. The time of expenditure is extended through
2993-fiscal year 2027.
2994-SECTION 154. HOBBS FIBER AND WIRELESS NETWORK
2995-INFRASTRUCTURE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX
2996-BONDS.--The time of expenditure for the department of
2997-transportation project in Subsection 57 of Section 33 of
2998-Chapter 138 of Laws 2021 to plan, design, construct, furnish
2999-and equip a citywide fiber and wireless network, including
3000-infrastructure, in Hobbs in Lea county is extended through
3001-fiscal year 2027.
3002-SECTION 155. LEA COUNTY COURTHOUSE RENOVATION--EXTEND
3003-TIME--GENERAL FUND.--The time of expenditure for the local
3004-government division project originally authorized in
3005-Subsection 251 of Section 34 of Chapter 277 of Laws 2019 and
3006-reauthorized in Laws 2023, Chapter 203, Section 115 to plan,
3007-design, construct, renovate, furnish and equip the historic
3008-Lea county courthouse in Lovington in Lea county is extended
3009-through fiscal year 2027.
3010-SECTION 156. LEA COUNTY COURTHOUSE RENOVATION--EXTEND
3011-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
3012-local government division project in Subsection 223 of
3013-Section 29 of Chapter 138 of Laws 2021 to plan, design,
3014-construct, purchase, renovate, equip and furnish the historic
3015-county courthouse in Lovington in Lea county is extended SFC/SB 425
3016-Page 60
3017-1
3018-2
3019-3
3020-4
3021-5
3022-6
3023-7
3024-8
3025-9
3026-10
3027-11
3028-12
3029-13
3030-14
3031-15
3032-16
3033-17
3034-18
3035-19
3036-20
3037-21
3038-22
3039-23
3040-24
3041-25
3042-through fiscal year 2027.
3043-SECTION 157. LEA COUNTY DETENTION CENTER CONSTRUCTION--
3044-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
3045-for the local government division project in Subsection 224
3046-of Section 29 of Chapter 138 of Laws 2021 to plan, design,
3047-construct, equip and furnish an addition for the county
3048-detention center in Lovington in Lea county is extended
3049-through fiscal year 2027.
3050-SECTION 158. LOVINGTON ANIMAL SHELTER CONSTRUCTION--
3051-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
3052-for the local government division project originally
3053-authorized in Subsection 225 of Section 29 of Chapter 138 of
3054-Laws 2021 and reauthorized in Laws 2023, Chapter 203,
3055-Section 117 to plan, design, construct, renovate, refurbish
3056-and equip an animal services facility and shelter in
3057-Lovington in Lea county is extended through fiscal year 2027.
3058-SECTION 159. LOVINGTON BRUSH TRUCK PURCHASE--EXTEND
3059-TIME--GENERAL FUND.--The time of expenditure for the local
3060-government division project in Subsection 296 of Section 28
3061-of Chapter 199 of Laws 2023 to purchase and equip a brush
3062-truck for Lovington in Lea county is extended through fiscal
3063-year 2027.
3064-SECTION 160. LOVINGTON MUNICIPAL FACILITIES INFORMATION
3065-TECHNOLOGY PURCHASE--EXTEND TIME--GENERAL FUND.--The time of
3066-expenditure for the local government division project in SFC/SB 425
3067-Page 61
3068-1
3069-2
3070-3
3071-4
3072-5
3073-6
3074-7
3075-8
3076-9
3077-10
3078-11
3079-12
3080-13
3081-14
3082-15
3083-16
3084-17
3085-18
3086-19
3087-20
3088-21
3089-22
3090-23
3091-24
3092-25
3093-Subsection 297 of Section 28 of Chapter 199 of Laws 2023 to
3094-purchase and install information technology and security
3095-networks, including related equipment, infrastructure and
3096-furniture, for municipal buildings in Lovington in Lea county
3097-is extended through fiscal year 2027.
3098-SECTION 161. LOVINGTON MUNICIPAL WATER TOWER DESIGN--
3099-CHANGE TO WATER INFRASTRUCTURE IMPROVEMENT--EXTEND TIME--
3100-SEVERANCE TAX BONDS.--The unexpended balance of the
3101-appropriation to the department of environment in
3102-Subsection 41 of Section 21 of Chapter 138 of Laws 2021 to
3103-plan, design, construct, purchase and equip a water tower in
3104-northwest Lovington in Lea county shall not be expended for
3105-the original purpose but is changed to plan, design,
3106-construct, equip and install improvements to water
3107-infrastructure in Lovington in Lea county. The time of
3108-expenditure is extended through fiscal year 2027.
3109-SECTION 162. LINCOLN COUNTY GREENTREE SOLID WASTE
3110-AUTHORITY GRAPPLE TRUCK SYSTEM PURCHASE--EXTEND TIME--GENERAL
3111-FUND.--The time of expenditure for the department of
3112-environment project in Subsection 58 of Section 19 of
3113-Chapter 199 of Laws 2023 to purchase and equip a grapple
3114-truck and green waste collection system for the Greentree
3115-solid waste authority in Lincoln county is extended through
3116-fiscal year 2027.
3117-SECTION 163. LOS ALAMOS COUNTY AFFORDABLE HOUSING SFC/SB 425
3118-Page 62
3119-1
3120-2
3121-3
3122-4
3123-5
3124-6
3125-7
3126-8
3127-9
3128-10
3129-11
3130-12
3131-13
3132-14
3133-15
3134-16
3135-17
3136-18
3137-19
3138-20
3139-21
3140-22
3141-23
3142-24
3143-25
3144-INFRASTRUCTURE CONSTRUCT--EXTEND TIME--GENERAL FUND.--The
3145-time of expenditure for the local government division project
3146-originally authorized in Subsection 273 of Section 34 of
3147-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
3148-Chapter 203, Section 122 to plan, design and construct
3149-affordable housing infrastructure in Los Alamos county is
3150-extended through fiscal year 2027.
3151-SECTION 164. UNIVERSITY OF NEW MEXICO-LOS ALAMOS
3152-BUILDING 2 ROOF REPAIR--CHANGE TO BUILDING 2 AND BUILDING 3
3153-ROOF REPLACEMENT--GENERAL FUND.--The unexpended balance of
3154-the appropriation to the board of regents of the university
3155-of New Mexico in Subsection 27 of Section 40 of Chapter 66 of
3156-Laws 2024 to plan, design, construct, repair, renovate and
3157-replace the roof on building 2 at the Los Alamos branch
3158-campus of the university of New Mexico in Los Alamos county
3159-shall not be expended for the original purpose but is changed
3160-to plan, design, construct, repair, renovate and replace the
3161-roofs on building 2 and building 3 at the Los Alamos branch
3162-campus of the university of New Mexico in Los Alamos county.
3163-SECTION 165. COLUMBUS PORT OF ENTRY WASTEWATER SYSTEM
3164-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
3165-expenditure for the border authority project in Subsection 2
3166-of Section 8 of Chapter 138 of Laws 2021 to plan, design and
3167-construct wastewater system improvements, including a new
3168-pond, at the port of entry in Columbus in Luna county is SFC/SB 425
3169-Page 63
3170-1
3171-2
3172-3
3173-4
3174-5
3175-6
3176-7
3177-8
3178-9
3179-10
3180-11
3181-12
3182-13
3183-14
3184-15
3185-16
3186-17
3187-18
3188-19
3189-20
3190-21
3191-22
3192-23
3193-24
3194-25
3195-extended through fiscal year 2027.
3196-SECTION 166. BAHAST'LAH CHAPTER WATER LINE EXTENSION--
3197-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
3198-Indian affairs department project originally authorized in
3199-Subsection 13 of Section 31 of Chapter 277 of Laws 2019 and
3200-reauthorized in Laws 2023, Chapter 203, Section 156 to plan,
3201-design, construct, purchase, equip and install water line
3202-extensions for the Bahast'lah chapter of the Navajo Nation in
3203-McKinley county is extended through fiscal year 2027.
3204-SECTION 167. CASAMERO LAKE CHAPTER SENIOR CENTER
3205-CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of
3206-expenditure for the aging and long-term services department
3207-project originally authorized in Subsection 30 of Section 4
3208-of Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
3209-Chapter 203, Section 147 to plan, design, construct, furnish
3210-and equip a senior center in the Casamero Lake chapter of the
3211-Navajo Nation in McKinley county is extended through fiscal
3212-year 2027.
3213-SECTION 168. CHICHILTAH CHAPTER FENCE CONSTRUCTION--
3214-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
3215-for the Indian affairs department project in Subsection 15 of
3216-Section 25 of Chapter 138 of Laws 2021 to plan, design and
3217-construct fencing for the chapter compound in the Chichiltah
3218-chapter of the Navajo Nation in McKinley county is extended
3219-through fiscal year 2027. SFC/SB 425
3220-Page 64
3221-1
3222-2
3223-3
3224-4
3225-5
3226-6
3227-7
3228-8
3229-9
3230-10
3231-11
3232-12
3233-13
3234-14
3235-15
3236-16
3237-17
3238-18
3239-19
3240-20
3241-21
3242-22
3243-23
3244-24
3245-25
3246-SECTION 169. DINE COLLEGE NAVAJO NATION LIVESTOCK
3247-RESEARCH CENTER CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The
3248-time of expenditure for the Indian affairs department project
3249-originally authorized in Subsection 28 of Section 31 of
3250-Chapter 277 of Laws 2019 and appropriated to the higher
3251-education department in Laws 2023, Chapter 203, Section 138
3252-to plan, design and construct the Navajo Nation livestock,
3253-research and extension center on the Crownpoint campus of
3254-Dine college in McKinley county is extended through fiscal
3255-year 2027.
3256-SECTION 170. IYANBITO CHAPTER HOUSE FENCE
3257-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
3258-expenditure for the Indian affairs department project in
3259-Subsection 23 of Section 25 of Chapter 138 of Laws 2021 to
3260-make site improvements and to plan, design, construct and
3261-equip perimeter fencing for the chapter house in the Iyanbito
3262-chapter of the Navajo Nation in McKinley county is extended
3263-through fiscal year 2027.
3264-SECTION 171. SMITH LAKE CHAPTER HEAVY EQUIPMENT REPAIR
3265-SHOP CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The
3266-time of expenditure for the Indian affairs department project
3267-in Subsection 36 of Section 25 of Chapter 138 of Laws 2021 to
3268-plan, design and construct a heavy equipment repair shop,
3269-including canopies, in the Smith Lake chapter of the
3270-Navajo Nation in McKinley county is extended through fiscal SFC/SB 425
3271-Page 65
3272-1
3273-2
3274-3
3275-4
3276-5
3277-6
3278-7
3279-8
3280-9
3281-10
3282-11
3283-12
3284-13
3285-14
3286-15
3287-16
3288-17
3289-18
3290-19
3291-20
3292-21
3293-22
3294-23
3295-24
3296-25
3297-year 2027.
3298-SECTION 172. THOREAU CHAPTER VETERANS' SERVICE CENTER
3299-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
3300-expenditure for the Indian affairs department project in
3301-Subsection 37 of Section 25 of Chapter 138 of Laws 2021 to
3302-plan, design, construct, furnish and equip a veterans'
3303-service center in the Thoreau chapter of the Navajo Nation in
3304-McKinley county is extended through fiscal year 2027.
3305-SECTION 173. TO'HAJIILEE CHAPTER WATER LINE
3306-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
3307-expenditure for the Indian affairs department project in
3308-Subsection 1 of Section 25 of Chapter 138 of Laws 2021 to
3309-plan, design and construct water system improvements,
3310-including a water line to connect the Albuquerque system to
3311-the To'hajiilee chapter system, for the To'hajiilee chapter
3312-of the Navajo Nation in Bernalillo county is extended through
3313-fiscal year 2027.
3314-SECTION 174. TSAYATOH CHAPTER SCATTERED POWER LINE
3315-RIGHTS OF WAY ACQUISITION AND CONSTRUCTION--EXTEND TIME--
3316-SEVERANCE TAX BONDS.--The time of expenditure for the Indian
3317-affairs department project in Subsection 40 of Section 25 of
3318-Chapter 138 of Laws 2021 to acquire easements and rights of
3319-way and to plan, design and construct wiring and power lines
3320-to homes in the Tsayatoh chapter of the Navajo Nation in
3321-McKinley county is extended through fiscal year 2027. SFC/SB 425
3322-Page 66
3323-1
3324-2
3325-3
3326-4
3327-5
3328-6
3329-7
3330-8
3331-9
3332-10
3333-11
3334-12
3335-13
3336-14
3337-15
3338-16
3339-17
3340-18
3341-19
3342-20
3343-21
3344-22
3345-23
3346-24
3347-25
3348-SECTION 175. TSAYATOH CHAPTER SCATTERED POWER LINE
3349-EXTENSION--EXTEND TIME--GENERAL FUND.--The time of
3350-expenditure for the Indian affairs department project in
3351-Subsection 13 of Section 48 of Chapter 138 of Laws 2021 to
3352-acquire easements and rights of way and to plan, design and
3353-construct wiring and power lines to homes in the Tsayatoh
3354-chapter of the Navajo Nation in McKinley county is extended
3355-through fiscal year 2027.
3356-SECTION 176. BACA CHAPTER BATHROOM ADDITION
3357-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
3358-expenditure for the Indian affairs department project in
3359-Subsection 13 of Section 25 of Chapter 138 of Laws 2021 to
3360-plan, design, construct, furnish and equip residential
3361-bathroom additions in the Baca chapter of the Navajo Nation
3362-in McKinley county is extended through fiscal year 2027.
3363-SECTION 177. BACA CHAPTER BATHROOM ADDITION
3364-CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of
3365-expenditure for the Indian affairs department project in
3366-Subsection 7 of Section 48 of Chapter 138 of Laws 2021 to
3367-plan, design, construct, furnish and equip residential
3368-bathroom additions in the Baca chapter of the Navajo Nation
3369-in McKinley county is extended through fiscal year 2027.
3370-SECTION 178. CASAMERO LAKE CHAPTER SENIOR CENTER
3371-IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of
3372-expenditure for the Indian affairs department project SFC/SB 425
3373-Page 67
3374-1
3375-2
3376-3
3377-4
3378-5
3379-6
3380-7
3381-8
3382-9
3383-10
3384-11
3385-12
3386-13
3387-14
3388-15
3389-16
3390-17
3391-18
3392-19
3393-20
3394-21
3395-22
3396-23
3397-24
3398-25
3399-originally authorized in Subsection 24 of Section 31 of
3400-Chapter 277 of Laws 2019 and appropriated to the aging and
3401-long-term services department in Laws 2020, Chapter 82,
3402-Section 49 and reauthorized in Laws 2023, Chapter 203,
3403-Section 136 to plan, design, construct, furnish and equip
3404-improvements to the senior center in the Casamero Lake
3405-chapter of the Navajo Nation in McKinley county is extended
3406-through fiscal year 2027.
3407-SECTION 179. GALLUP CHILDREN AND FAMILIES FACILITY
3408-RENOVATION--EXPAND PURPOSE--GENERAL FUND.--The local
3409-government division project in Subsection 370 of Section 28
3410-of Chapter 66 of Laws 2024 to plan, design, construct and
3411-renovate transitional housing and facilities for children,
3412-youth and families in Gallup in McKinley county may include
3413-the purchasing of land and buildings.
3414-SECTION 180. NORTHWEST NEW MEXICO COUNCIL OF
3415-GOVERNMENTS BUILDING RENOVATION--EXTEND TIME--SEVERANCE TAX
3416-BONDS.--The time of expenditure for the local government
3417-division project in Subsection 250 of Section 29 of
3418-Chapter 138 of Laws 2021 to plan, design, construct, repair
3419-and renovate the northwest New Mexico council of governments
3420-building, including the interior and exterior, in Gallup in
3421-McKinley county is extended through fiscal year 2027.
3422-SECTION 181. UNIVERSITY OF NEW MEXICO-GALLUP CAREER
3423-TECHNOLOGY AND EDUCATION CENTER RENOVATION--CHANGE TO CAREER SFC/SB 425
3424-Page 68
3425-1
3426-2
3427-3
3428-4
3429-5
3430-6
3431-7
3432-8
3433-9
3434-10
3435-11
3436-12
3437-13
3438-14
3439-15
3440-16
3441-17
3442-18
3443-19
3444-20
3445-21
3446-22
3447-23
3448-24
3449-25
3450-TECHNOLOGY AND EDUCATION CENTER AND CONSTRUCTION TECHNOLOGY
3451-BUILDING RENOVATION--GENERAL FUND.--The unexpended balance of
3452-the appropriation to the board of regents of the university
3453-of New Mexico in Subsection 32 of Section 40 of Chapter 199
3454-of Laws 2023 to plan, design, construct and equip renovations
3455-to the center for career technology and education at the
3456-Gallup branch campus of the university of New Mexico in
3457-McKinley county shall not be expended for the original
3458-purpose but is changed to plan, design, construct, renovate,
3459-furnish and equip a center for career technology and
3460-education and a construction technology building at the
3461-Gallup branch campus of the university of New Mexico in
3462-McKinley county.
3463-SECTION 182. UNIVERSITY OF NEW MEXICO-GALLUP
3464-INFRASTRUCTURE REPAIR AND IMPROVEMENT--EXTEND TIME--SEVERANCE
3465-TAX BONDS.--The time of expenditure for the university of
3466-New Mexico project in Subsection 22 of Section 41 of
3467-Chapter 138 of Laws 2021 to plan, design, construct, improve,
3468-repair and equip infrastructure campuswide, including fire
3469-suppression and elevator upgrades, at the Gallup campus of
3470-the university of New Mexico in McKinley county is extended
3471-through fiscal year 2027.
3472-SECTION 183. IYANBITO CHAPTER HOUSE FENCE
3473-CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of
3474-expenditure for the Indian affairs department project SFC/SB 425
3475-Page 69
3476-1
3477-2
3478-3
3479-4
3480-5
3481-6
3482-7
3483-8
3484-9
3485-10
3486-11
3487-12
3488-13
3489-14
3490-15
3491-16
3492-17
3493-18
3494-19
3495-20
3496-21
3497-22
3498-23
3499-24
3500-25
3501-originally authorized in Subsection 31 of Section 31 of
3502-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
3503-Chapter 203, Section 142 to plan, design, construct, purchase
3504-and install perimeter fencing for the chapter house tract in
3505-the Iyanbito chapter of the Navajo Nation in McKinley county
3506-is extended through fiscal year 2027.
3507-SECTION 184. LAKE VALLEY CHAPTER POWER LINE EXTENSION--
3508-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
3509-Indian affairs department project originally authorized in
3510-Subsection 83 of Section 31 of Chapter 277 of Laws 2019 and
3511-reauthorized in Laws 2023, Chapter 203, Section 201 to plan,
3512-design and construct power lines in the Lake Valley chapter
3513-of the Navajo Nation in San Juan county is extended through
3514-fiscal year 2027.
3515-SECTION 185. MANUELITO CHAPTER HEAVY DUTY TRUCK
3516-PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure
3517-for the Indian affairs department project in Subsection 41 of
3518-Section 25 of Chapter 199 of Laws 2023 to purchase and equip
3519-a heavy duty truck for the Manuelito chapter in the
3520-Navajo Nation in McKinley county is extended through fiscal
3521-year 2027.
3522-SECTION 186. MEXICAN SPRINGS CHAPTER ADMINISTRATION
3523-BUILDING IMPROVEMENT--CHANGE TO UTILITY INFRASTRUCTURE
3524-CONSTRUCTION--GENERAL FUND.--The unexpended balance of the
3525-appropriation to the Indian affairs department in SFC/SB 425
3526-Page 70
3527-1
3528-2
3529-3
3530-4
3531-5
3532-6
3533-7
3534-8
3535-9
3536-10
3537-11
3538-12
3539-13
3540-14
3541-15
3542-16
3543-17
3544-18
3545-19
3546-20
3547-21
3548-22
3549-23
3550-24
3551-25
3552-Subsection 43 of Section 25 of Chapter 199 of Laws 2023 to
3553-plan, design, construct, equip and improve the
3554-intergovernmental administration building in the
3555-Mexican Springs chapter of the Navajo Nation in
3556-McKinley county shall not be expended for the original
3557-purpose but is changed to acquire easements and rights of way
3558-and to plan, design, develop and construct utility
3559-infrastructure for an intergovernmental administrative
3560-building in the Mexican Springs chapter of the Navajo Nation
3561-in McKinley county.
3562-SECTION 187. MEXICAN SPRINGS CHAPTER MULTIPURPOSE
3563-BUILDING CONSTRUCTION--CHANGE TO ADMINISTRATIVE BUILDING
3564-UTILITY INFRASTRUCTURE DEVELOPMENT--GENERAL FUND.--The
3565-unexpended balance of the appropriation to the Indian affairs
3566-department in Subsection 30 of Section 25 of Chapter 66 of
3567-Laws 2024 to plan, design, construct and equip an
3568-intergovernmental administrative building in the
3569-Mexican Springs chapter of the Navajo Nation in
3570-McKinley county shall not be expended for the original
3571-purpose but is changed to acquire easements and rights of way
3572-and to plan, design and construct utility infrastructure for
3573-an administrative building in the Mexican Springs chapter of
3574-the Navajo Nation in McKinley county.
3575-SECTION 188. MEXICAN SPRINGS ADMINISTRATIVE BUILDING
3576-CONSTRUCTION--CHANGE TO UTILITY INFRASTRUCTURE CONSTRUCTION-- SFC/SB 425
3577-Page 71
3578-1
3579-2
3580-3
3581-4
3582-5
3583-6
3584-7
3585-8
3586-9
3587-10
3588-11
3589-12
3590-13
3591-14
3592-15
3593-16
3594-17
3595-18
3596-19
3597-20
3598-21
3599-22
3600-23
3601-24
3602-25
3603-EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of
3604-the appropriation to the Indian affairs department in
3605-Subsection 27 of Section 25 of Chapter 138 of Laws 2021 to
3606-plan, design, construct and equip an intergovernmental
3607-administrative building in the Mexican Springs chapter of the
3608-Navajo Nation in McKinley county shall not be expended for
3609-the original purpose but is changed to acquire easements and
3610-rights of way and to plan, design and construct utility
3611-infrastructure for an administrative building in the
3612-Mexican Springs chapter of the Navajo Nation in
3613-McKinley county. The time of expenditure is extended through
3614-fiscal year in 2027.
3615-SECTION 189. PREWITT SEEWALD ESTATES POWER LINE
3616-EXTENSION--EXTEND TIME--GENERAL FUND.--The time of
3617-expenditure for the Indian affairs department project
3618-originally authorized in Subsection 38 of Section 31 of
3619-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
3620-Chapter 203, Section 148 to plan, design and construct a
3621-power line extension to the Seewald estates area in Prewitt
3622-in the Navajo Nation in McKinley county is extended through
3623-fiscal year 2027.
3624-SECTION 190. PUEBLO PINTADO CHAPTER BUZZARD CANYON
3625-POWER LINE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX
3626-BONDS.--The time of expenditure for the Indian affairs
3627-department project in Subsection 32 of Section 25 of SFC/SB 425
3628-Page 72
3629-1
3630-2
3631-3
3632-4
3633-5
3634-6
3635-7
3636-8
3637-9
3638-10
3639-11
3640-12
3641-13
3642-14
3643-15
3644-16
3645-17
3646-18
3647-19
3648-20
3649-21
3650-22
3651-23
3652-24
3653-25
3654-Chapter 138 of Laws 2021 to acquire easements and rights of
3655-way and to plan, design and construct power line extensions
3656-for the Pueblo Pintado chapter of the Navajo Nation in
3657-McKinley county is extended through fiscal year 2027.
3658-SECTION 191. MCKINLEY COUNTY RAMAH SENIOR CENTER
3659-VEHICLE PURCHASE--EXTEND TIME--GENERAL FUND.--The time of
3660-expenditure for the aging and long-term services department
3661-project in Subsection 29 of Section 4 of Chapter 199 of
3662-Laws 2023 to purchase and equip vehicles for the Ramah senior
3663-center in McKinley county is extended through fiscal year
3664-2027.
3665-SECTION 192. ROCK SPRINGS CHAPTER MULTIPURPOSE BUILDING
3666-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
3667-expenditure for the Indian affairs department project in
3668-Subsection 35 of Section 25 of Chapter 138 of Laws 2021 to
3669-acquire land for and to plan, design, construct, furnish and
3670-equip a multipurpose building in the Rock Springs chapter of
3671-the Navajo Nation in McKinley county is extended through
3672-fiscal year 2027.
3673-SECTION 193. UNITED STATES HIGHWAY 491 AND CHEE DODGE
3674-ELEMENTARY SCHOOL ACCESS ROAD IMPROVEMENT--EXTEND TIME--
3675-GENERAL FUND.--The time of expenditure for the department of
3676-transportation project originally authorized in
3677-Subsection 104 of Section 40 of Chapter 277 of Laws 2019 and
3678-reauthorized in Laws 2023, Chapter 203, Section 150 to plan, SFC/SB 425
3679-Page 73
3680-1
3681-2
3682-3
3683-4
3684-5
3685-6
3686-7
3687-8
3688-9
3689-10
3690-11
3691-12
3692-13
3693-14
3694-15
3695-16
3696-17
3697-18
3698-19
3699-20
3700-21
3701-22
3702-23
3703-24
3704-25
3705-design and construct improvements, including a turnout, to
3706-the access road from United States highway 491 to Chee Dodge
3707-elementary school in the Rock Springs chapter of the
3708-Navajo Nation in McKinley county is extended through fiscal
3709-year 2027.
3710-SECTION 194. SHIPROCK CHAPTER SENIOR CENTER PARKING LOT
3711-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
3712-expenditure for the aging and long-term services department
3713-project in Subsection 40 of Section 5 of Chapter 138 of
3714-Laws 2021 to plan, design, construct, repair, equip and
3715-install improvements to the Shiprock senior center parking
3716-lot in the Shiprock chapter of the Navajo Nation in San Juan
3717-county is extended through fiscal year 2027.
3718-SECTION 195. SMITH LAKE CHAPTER COMMUNITY POWER LINE
3719-EXTENSION--EXTEND TIME--GENERAL FUND.--The time of
3720-expenditure for the Indian affairs department project in
3721-Subsection 3 of Section 48 of Chapter 138 of Laws 2021 to
3722-acquire easements and rights of way and to plan, design and
3723-construct a power line extension in the Smith Lake chapter of
3724-the Navajo Nation in McKinley county is extended through
3725-fiscal year 2027.
3726-SECTION 196. SMITH LAKE CHAPTER VETERANS CENTER
3727-IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of
3728-expenditure for the Indian affairs department project
3729-originally authorized in Subsection 44 of Section 31 of SFC/SB 425
3730-Page 74
3731-1
3732-2
3733-3
3734-4
3735-5
3736-6
3737-7
3738-8
3739-9
3740-10
3741-11
3742-12
3743-13
3744-14
3745-15
3746-16
3747-17
3748-18
3749-19
3750-20
3751-21
3752-22
3753-23
3754-24
3755-25
3756-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
3757-Chapter 203, Section 153 to plan, design, construct, renovate
3758-and improve the Smith Lake veterans center for the Smith Lake
3759-chapter of the Navajo Nation in McKinley county is extended
3760-through fiscal year 2027.
3761-SECTION 197. THOREAU SENIOR CENTER VEHICLE PURCHASE--
3762-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
3763-aging and long-term services department project in
3764-Subsection 31 of Section 4 of Chapter 199 of Laws 2023 to
3765-purchase and equip vehicles for the Thoreau senior center in
3766-McKinley county is extended through fiscal year 2027.
3767-SECTION 198. COUNTY ROAD 51 IMPROVEMENT--EXTEND TIME--
3768-SEVERANCE TAX BONDS.--The time of expenditure for the
3769-department of transportation project in Subsection 66 of
3770-Section 33 of Chapter 138 of Laws 2021 to plan, design,
3771-construct and improve county road 51 in the Thoreau chapter
3772-of the Navajo Nation in McKinley county is extended through
3773-fiscal year 2027.
3774-SECTION 199. TOHATCHI CHAPTER LEACH FIELD REPLACEMENT--
3775-CHANGE TO CONSTRUCT A WAREHOUSE--EXTEND TIME--SEVERANCE TAX
3776-BONDS.--The unexpended balance of the appropriation to the
3777-Indian affairs department in Subsection 38 of Section 25 of
3778-Chapter 138 of Laws 2021 to acquire rights of way and
3779-easements and to plan, design and construct a leach field
3780-replacement in the Tohatchi chapter of the Navajo Nation in SFC/SB 425
3781-Page 75
3782-1
3783-2
3784-3
3785-4
3786-5
3787-6
3788-7
3789-8
3790-9
3791-10
3792-11
3793-12
3794-13
3795-14
3796-15
3797-16
3798-17
3799-18
3800-19
3801-20
3802-21
3803-22
3804-23
3805-24
3806-25
3807-McKinley county shall not be expended for the original
3808-purpose but is changed to plan, design and construct a
3809-warehouse for the Tohatchi chapter of the Navajo Nation in
3810-McKinley county. The time of expenditure is extended through
3811-fiscal year 2027.
3812-SECTION 200. TOHATCHI CHAPTER NAKAI COMMUNITY PARK
3813-RENOVATION--CHANGE TO WAREHOUSE CONSTRUCTION--GENERAL
3814-FUND.--The unexpended balance of the appropriation to the
3815-Indian affairs department in Subsection 38 of Section 25 of
3816-Chapter 66 of Laws 2024 to plan, design, construct, renovate,
3817-furnish and equip Nakai park in the Tohatchi chapter of the
3818-Navajo Nation in McKinley county shall not be expended for
3819-the original purpose but is changed to plan, design and
3820-construct a warehouse for the Tohatchi chapter of the
3821-Navajo Nation in McKinley county.
3822-SECTION 201. TOHATCHI CHAPTER PUBLIC SAFETY COMPLEX
3823-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
3824-expenditure for the Indian affairs department project in
3825-Subsection 39 of Section 25 of Chapter 138 of Laws 2021 to
3826-acquire easements and rights of way and to plan, design,
3827-construct and equip a public safety complex, including
3828-hazardous materials abatement and demolition, in the Tohatchi
3829-chapter of the Navajo Nation in McKinley county is extended
3830-through fiscal year 2027.
3831-SECTION 202. TOHATCHI CHAPTER LEACH FIELD SFC/SB 425
3832-Page 76
3833-1
3834-2
3835-3
3836-4
3837-5
3838-6
3839-7
3840-8
3841-9
3842-10
3843-11
3844-12
3845-13
3846-14
3847-15
3848-16
3849-17
3850-18
3851-19
3852-20
3853-21
3854-22
3855-23
3856-24
3857-25
3858-CONSTRUCTION--CHANGE TO PUBLIC SAFETY COMPLEX CONSTRUCTION--
3859-EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of
3860-the appropriation to the Indian affairs department in
3861-Subsection 19 of Section 26 of Chapter 53 of Laws 2022 to
3862-plan, design, construct, improve, replace, install and equip
3863-septic tanks and leach fields for the Tohatchi chapter of the
3864-Navajo Nation in McKinley county shall not be expended for
3865-the original purpose but is changed to plan, design,
3866-construct, furnish and equip a public safety complex in the
3867-Tohatchi chapter of the Navajo Nation in McKinley county.
3868-The time of expenditure is extended through fiscal year 2027.
3869-SECTION 203. TSAYATOH CHAPTER SCATTERED POWER LINE
3870-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
3871-expenditure for the Indian affairs department project in
3872-Subsection 41 of Section 25 of Chapter 138 of Laws 2021 to
3873-acquire easements and rights of way and to plan, design,
3874-construct and improve the electrical infrastructure,
3875-including house wiring and power line extension, in the
3876-Tsayatoh chapter of the Navajo Nation in McKinley county is
3877-extended through fiscal year 2027.
3878-SECTION 204. TWIN LAKES CHAPTER HOUSE DEMOLITION--
3879-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
3880-for the Indian affairs department project in Subsection 43 of
3881-Section 25 of Chapter 138 of Laws 2021 to plan, demolish and
3882-remove a former chapter house in the Twin Lakes chapter of SFC/SB 425
3883-Page 77
3884-1
3885-2
3886-3
3887-4
3888-5
3889-6
3890-7
3891-8
3892-9
3893-10
3894-11
3895-12
3896-13
3897-14
3898-15
3899-16
3900-17
3901-18
3902-19
3903-20
3904-21
3905-22
3906-23
3907-24
3908-25
3909-the Navajo Nation in McKinley county is extended through
3910-fiscal year 2027.
3911-SECTION 205. WHITEHORSE LAKE CHAPTER BATHROOM ADDITION
3912-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
3913-expenditure for the Indian affairs department project in
3914-Subsection 45 of Section 25 of Chapter 138 of Laws 2021 to
3915-plan, design, construct and equip bathroom additions in the
3916-Whitehorse Lake chapter of the Navajo Nation in McKinley
3917-county is extended through fiscal year 2027.
3918-SECTION 206. WHITEHORSE LAKE CHAPTER BATHROOM ADDITION
3919-CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of
3920-expenditure for the Indian affairs department project in
3921-Subsection 16 of Section 48 of Chapter 138 of Laws 2021 to
3922-plan, design, construct and equip bathroom additions in the
3923-Whitehorse Lake chapter of the Navajo Nation in McKinley
3924-county is extended through fiscal year 2027.
3925-SECTION 207. ZUNI PUEBLO WASTEWATER INFRASTRUCTURE
3926-CONSTRUCTION--CHANGE TO FIRE AND EMERGENCY MEDICAL SERVICES
3927-FACILITY--EXTEND TIME--GENERAL FUND.--The unexpended balance
3928-of the Indian affairs department project originally
3929-authorized in Subsection 54 of Section 31 of Chapter 277 of
3930-Laws 2019 and reauthorized in Laws 2023, Chapter 203,
3931-Section 158 to plan, design and construct wastewater
3932-infrastructure for a commercial development area at the
3933-Pueblo of Zuni in McKinley county shall not be expended for SFC/SB 425
3934-Page 78
3935-1
3936-2
3937-3
3938-4
3939-5
3940-6
3941-7
3942-8
3943-9
3944-10
3945-11
3946-12
3947-13
3948-14
3949-15
3950-16
3951-17
3952-18
3953-19
3954-20
3955-21
3956-22
3957-23
3958-24
3959-25
3960-the original or reauthorized purpose but is changed to plan,
3961-design, construct, furnish and equip a fire and emergency
3962-medical services facility for the Pueblo of Zuni in McKinley
3963-county. The time of expenditure is extended through fiscal
3964-year 2027.
3965-SECTION 208. ACEQUIA DE LA ISLA DAM IMPROVEMENT--EXTEND
3966-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
3967-interstate stream commission project in Subsection 8 of
3968-Section 28 of Chapter 138 of Laws 2021 to plan, design,
3969-construct and install improvements to the Morphy lake dam and
3970-the acequia de la Isla, including the acquisition of
3971-high-hazard dam monitoring equipment, for the acequia de la
3972-Isla in Mora county is extended through fiscal year 2027.
3973-SECTION 209. AGUA PURA MUTUAL DOMESTIC WATER CONSUMERS
3974-AND MUTUAL SEWAGE WORKS ASSOCIATION WATER SYSTEM
3975-IMPROVEMENT--CHANGE TO FILTRATION SYSTEM AND WELL
3976-CONSTRUCTION AND WATER LINE REPLACEMENT--EXTEND TIME--
3977-SEVERANCE TAX BONDS.--The unexpended balance of the
3978-appropriation to the department of environment in
3979-Subsection 46 of Section 21 of Chapter 138 of Laws 2021 to
3980-plan, design and construct infrastructure improvements,
3981-including water supply lines and well construction, for the
3982-Agua Pura mutual domestic water consumers association in Mora
3983-county shall not be expended for the original purpose but is
3984-changed to plan, design, construct and replace a well, a SFC/SB 425
3985-Page 79
3986-1
3987-2
3988-3
3989-4
3990-5
3991-6
3992-7
3993-8
3994-9
3995-10
3996-11
3997-12
3998-13
3999-14
4000-15
4001-16
4002-17
4003-18
4004-19
4005-20
4006-21
4007-22
4008-23
4009-24
4010-25
4011-filtration and chlorination system and water lines for the
4012-Agua Pura mutual domestic water consumers and mutual sewage
4013-works association in Mora county. The time of expenditure is
4014-extended through fiscal year 2027.
4015-SECTION 210. CRYSTAL CHAPTER GREEN KNOLL SPLIT MESA
4016-WATER SYSTEM CONSTRUCTION--CHANGE TO CRYSTAL CHAPTER CISTERN
4017-AND SEPTIC SYSTEM CONSTRUCTION--EXTEND TIME--GENERAL
4018-FUND.--The unexpended balance of the appropriation to the
4019-Indian affairs department in Subsection 10 of Section 48 of
4020-Chapter 138 of Laws 2021 to plan, design and construct a
4021-water system, including water lines and water storage, for
4022-the Green Knoll and Split Mesa areas in the Crystal chapter
4023-of the Navajo Nation in McKinley county shall not be expended
4024-for the original purpose but is changed to plan, design and
4025-construct cistern and septic systems in the Crystal chapter
4026-of the Navajo Nation in McKinley and San Juan counties. The
4027-time of expenditure is extended through fiscal year 2027.
4028-SECTION 211. NORTH CENTRAL REGIONAL TRANSIT DISTRICT
4029-BUS PURCHASE--EXTEND TIME--GENERAL FUND.--The time of
4030-expenditure for the local government division project in
4031-Subsection 332 of Section 28 of Chapter 199 of Laws 2023 to
4032-purchase and equip transit buses for the north central
4033-regional transit district in Rio Arriba, Santa Fe, Los Alamos
4034-and Taos counties is extended through fiscal year 2027.
4035-SECTION 212. NAVAJO NATION CODE TALKERS MUSEUM SFC/SB 425
4036-Page 80
4037-1
4038-2
4039-3
4040-4
4041-5
4042-6
4043-7
4044-8
4045-9
4046-10
4047-11
4048-12
4049-13
4050-14
4051-15
4052-16
4053-17
4054-18
4055-19
4056-20
4057-21
4058-22
4059-23
4060-24
4061-25
4062-CONSTRUCTION AND DESIGN--CHANGE TO ACQUISITION AND
4063-CONSTRUCTION--GENERAL FUND.--The unexpended balance of the
4064-appropriation to the Indian affairs department in
4065-Subsection 1 of Section 25 of Chapter 66 of Laws 2024 to
4066-plan, design, construct, furnish and equip a Navajo code
4067-talkers museum in the Tse Bonito area of the Navajo Nation in
4068-McKinley county shall not be expended for the original
4069-purpose but is changed to acquire property and to plan,
4070-design, construct, furnish and equip a Navajo code talkers
4071-museum for the Navajo Nation.
4072-SECTION 213. TSE BONITO NAVAJO CODE TALKERS MUSEUM
4073-CONSTRUCTION--CHANGE TO PROPERTY ACQUISITION AND
4074-CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The unexpended
4075-balance of the appropriation to the Indian affairs department
4076-in Subsection 18 of Section 25 of Chapter 199 of Laws 2023 to
4077-plan, design, construct, furnish and equip a Navajo code
4078-talkers museum in the Tse Bonito area of the Navajo Nation in
4079-McKinley county shall not be expended for the original
4080-purpose but is changed to acquire property and to plan,
4081-design, construct, furnish and equip a Navajo code talkers
4082-museum for the Navajo Nation. The time of expenditure is
4083-extended through fiscal year 2027.
4084-SECTION 214. NAVAJO NATION CODE TALKERS MUSEUM AND
4085-VETERANS' CENTER CONSTRUCTION--CHANGE TO PROPERTY
4086-ACQUISITION--EXTEND TIME--GENERAL FUND.--The unexpended SFC/SB 425
4087-Page 81
4088-1
4089-2
4090-3
4091-4
4092-5
4093-6
4094-7
4095-8
4096-9
4097-10
4098-11
4099-12
4100-13
4101-14
4102-15
4103-16
4104-17
4105-18
4106-19
4107-20
4108-21
4109-22
4110-23
4111-24
4112-25
4113-balance of the appropriation to the Indian affairs department
4114-originally authorized in Subsection 16 of Section 31 of
4115-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
4116-Chapter 203, Section 132 to plan, design, construct, furnish
4117-and equip a Navajo code talkers museum in the Tse Bonito area
4118-shall not be expended for the original or reauthorized
4119-purpose but is changed to acquire property and to plan,
4120-design, construct, furnish and equip a Navajo code talkers
4121-museum for the Navajo Nation. The time of expenditure is
4122-extended through fiscal year 2027.
4123-SECTION 215. NORTH CENTRAL REGIONAL TRANSIT DISTRICT
4124-ELECTRIC BUS PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The
4125-time of expenditure for the local government division project
4126-in Subsection 304 of Section 30 of Chapter 53 of Laws 2022 to
4127-purchase, replace and equip electric buses for the north
4128-central regional transit district for public transit service
4129-in Rio Arriba, Los Alamos, Santa Fe and Taos counties is
4130-extended through fiscal year 2027.
4131-SECTION 216. SANTA FE-POJOAQUE SOIL AND WATER
4132-CONSERVATION DISTRICT SANTA CRUZ FLOOD CONTROL DAM BARRIER
4133-CONSTRUCTION--CHANGE TO SANTA CRUZ HIGH-HAZARD DAM SITE
4134-EROSION CONTROL--GENERAL FUND.--The unexpended balance of the
4135-appropriation to the board of regents of New Mexico state
4136-university in Subsection 23 of Section 38 of Chapter 199 of
4137-Laws 2023 to purchase, construct and install dam barriers at SFC/SB 425
4138-Page 82
4139-1
4140-2
4141-3
4142-4
4143-5
4144-6
4145-7
4146-8
4147-9
4148-10
4149-11
4150-12
4151-13
4152-14
4153-15
4154-16
4155-17
4156-18
4157-19
4158-20
4159-21
4160-22
4161-23
4162-24
4163-25
4164-Santa Cruz high-hazard flood control dams in the
4165-Santa Fe-Pojoaque soil and water conservation district in
4166-Rio Arriba and Santa Fe counties shall not be expended for
4167-the original purpose but is changed to purchase, construct
4168-and install erosion control site improvements at Santa Cruz
4169-high-hazard flood control dams in the Santa Fe-Pojoaque soil
4170-and water conservation district.
4171-SECTION 217. UNIVERSITY OF NEW MEXICO HEALTH CARE
4172-SIMULATIONS LABORATORY IMPROVEMENT--EXTEND TIME--SEVERANCE
4173-TAX BONDS.--The time of expenditure for the university of
4174-New Mexico project in Subsection 23 of Section 41 of
4175-Chapter 138 of Laws 2021 to plan, design, construct,
4176-renovate, improve, purchase and install information
4177-technology and equipment for simulations laboratories at the
4178-university of New Mexico in Albuquerque in Bernalillo county
4179-and in Rio Rancho in Sandoval county is extended through
4180-fiscal year 2027.
4181-SECTION 218. TIMBERON WATER AND SANITATION DISTRICT
4182-RESERVOIR CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time
4183-of expenditure for the department of environment project
4184-originally authorized in Subsection 66 of Section 26 of
4185-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
4186-Chapter 203, Section 162 to plan, design and construct a
4187-water storage containment reservoir, including fittings,
4188-valves, gauges, fencing and access road, for the Timberon SFC/SB 425
4189-Page 83
4190-1
4191-2
4192-3
4193-4
4194-5
4195-6
4196-7
4197-8
4198-9
4199-10
4200-11
4201-12
4202-13
4203-14
4204-15
4205-16
4206-17
4207-18
4208-19
4209-20
4210-21
4211-22
4212-23
4213-24
4214-25
4215-water and sanitation district in Otero county is extended
4216-through fiscal year 2027.
4217-SECTION 219. TULAROSA COMMUNITY DITCH PIPELINE
4218-IMPROVEMENT--CHANGE TO ACEQUIA AND RESERVOIR IMPROVEMENT--
4219-EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of
4220-the appropriation to the interstate stream commission in
4221-Subsection 10 of Section 28 of Chapter 138 of Laws 2021 to
4222-plan, design, construct and upgrade a pipeline and water
4223-conveyance system for the Tularosa community ditch
4224-association in Otero county shall not be expended for the
4225-original purpose but is changed to plan, design, construct
4226-and improve the acequia system and reservoir, including
4227-pipelines, gates and reservoir restoration, for the Tularosa
4228-community ditch in Otero county. The time of expenditure is
4229-extended through fiscal year 2027.
4230-SECTION 220. TULAROSA COMMUNITY DITCH GATES
4231-IMPROVEMENT--CHANGE TO GATES AND RESERVOIR IMPROVEMENT--
4232-EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of
4233-the appropriation to the interstate stream commission in
4234-Subsection 9 of Section 28 of Chapter 138 of Laws 2021 to
4235-plan, design, construct and improve the acequia system,
4236-including replacement of switch gates, for the Tularosa
4237-community ditch in Otero county shall not be expended for the
4238-original purpose but is changed to plan, design, construct
4239-and improve the acequia system and reservoir, including SFC/SB 425
4240-Page 84
4241-1
4242-2
4243-3
4244-4
4245-5
4246-6
4247-7
4248-8
4249-9
4250-10
4251-11
4252-12
4253-13
4254-14
4255-15
4256-16
4257-17
4258-18
4259-19
4260-20
4261-21
4262-22
4263-23
4264-24
4265-25
4266-pipelines, gates and reservoir restoration, for the Tularosa
4267-community ditch in Otero county. The time of expenditure is
4268-extended through fiscal year 2027.
4269-SECTION 221. ALAMOGORDO FIRE DEPARTMENT ADMINISTRATIVE
4270-OFFICE AND EMERGENCY OPERATIONS CENTER RENOVATION--EXTEND
4271-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
4272-local government division project originally authorized in
4273-Subsection 259 of Section 29 of Chapter 138 of Laws 2021 and
4274-reauthorized in Laws 2023, Chapter 203, Section 164 to plan,
4275-design, renovate, purchase, furnish and equip a facility to
4276-house fire department administrative offices and an emergency
4277-operations center, including a gymnasium, in Alamogordo in
4278-Otero county is extended through fiscal year 2027.
4279-SECTION 222. ALAMOGORDO POLICE DEPARTMENT STAIRLIFT
4280-INSTALLATION--EXPAND PURPOSE--EXTEND TIME--GENERAL FUND.--The
4281-local government division project in Subsection 339 of
4282-Section 28 of Chapter 199 of Laws 2023 to purchase and
4283-install an accessibility-compliant stairlift elevator at the
4284-police department facility in Alamogordo in Otero county may
4285-include the purchase and equipping of vehicles for the police
4286-department. The time of expenditure is extended through
4287-fiscal year 2027.
4288-SECTION 223. OTERO COUNTY ROOF REPLACEMENT--EXPAND
4289-PURPOSE--GENERAL FUND.--The local government division project
4290-in Subsection 392 of Section 28 of Chapter 66 of Laws 2024 to SFC/SB 425
4291-Page 85
4292-1
4293-2
4294-3
4295-4
4296-5
4297-6
4298-7
4299-8
4300-9
4301-10
4302-11
4303-12
4304-13
4305-14
4306-15
4307-16
4308-17
4309-18
4310-19
4311-20
4312-21
4313-22
4314-23
4315-24
4316-25
4317-plan, design, construct and replace the roof on the old ACES
4318-school building, including gutters and soffits, in Alamogordo
4319-in Otero county may include exterior insulation finishing
4320-systems and other improvements to that building.
4321-SECTION 224. CLOUDCROFT WATER AND WASTEWATER SYSTEM
4322-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
4323-expenditure for the department of environment project
4324-originally authorized in Subsection 56 of Section 26 of
4325-Chapter 81 of Laws 2020 and reauthorized in Laws 2022,
4326-Chapter 52, Section 83 and again reauthorized in Laws 2023,
4327-Chapter 203, Section 167 to plan, design and construct
4328-improvements to contaminated water systems, including the
4329-PURe water project and improvements to the wastewater
4330-treatment plant, in Cloudcroft in Otero county is extended
4331-through fiscal year 2027.
4332-SECTION 225. CLOUDCROFT WASTEWATER TREATMENT PLANT
4333-ACQUISITION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
4334-expenditure for the department of environment project in
4335-Subsection 50 of Section 21 of Chapter 138 of Laws 2021 to
4336-purchase property for a wastewater treatment plant for
4337-Cloudcroft in Otero county is extended through fiscal year
4338-2027.
4339-SECTION 226. CLOUDCROFT WASTEWATER TREATMENT FACILITY
4340-IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of
4341-expenditure for the department of environment project SFC/SB 425
4342-Page 86
4343-1
4344-2
4345-3
4346-4
4347-5
4348-6
4349-7
4350-8
4351-9
4352-10
4353-11
4354-12
4355-13
4356-14
4357-15
4358-16
4359-17
4360-18
4361-19
4362-20
4363-21
4364-22
4365-23
4366-24
4367-25
4368-originally authorized in Subsection 69 of Section 26 of
4369-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
4370-Chapter 203, Section 168 to plan, design, construct,
4371-purchase, equip and install improvements, including an
4372-emergency generator and fan press, to a wastewater treatment
4373-facility in Cloudcroft in Otero county is extended through
4374-fiscal year 2027.
4375-SECTION 227. CLOUDCROFT WASTEWATER TREATMENT FACILITY
4376-AND GENERATOR IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The
4377-time of expenditure for the department of environment project
4378-originally authorized in Subsection 68 of Section 26 of
4379-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
4380-Chapter 203, Section 169 to plan, design, construct,
4381-purchase, equip and install improvements, including an
4382-emergency generator and fan press, to a wastewater treatment
4383-facility in Cloudcroft in Otero county is extended through
4384-fiscal year 2027.
4385-SECTION 228. TULAROSA WASTEWATER SYSTEM IMPROVEMENT--
4386-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
4387-department of environment project originally authorized in
4388-Subsection 71 of Section 26 of Chapter 277 of Laws 2019 and
4389-reauthorized in Laws 2023, Chapter 203, Section 170 to plan,
4390-design, purchase, equip and construct improvements to the
4391-wastewater treatment plant and system, including
4392-rehabilitation of an aeration basin and purchase of a SFC/SB 425
4393-Page 87
4394-1
4395-2
4396-3
4397-4
4398-5
4399-6
4400-7
4401-8
4402-9
4403-10
4404-11
4405-12
4406-13
4407-14
4408-15
4409-16
4410-17
4411-18
4412-19
4413-20
4414-21
4415-22
4416-23
4417-24
4418-25
4419-monitoring system, in Tularosa in Otero county is extended
4420-through fiscal year 2027.
4421-SECTION 229. QUAY COUNTY EMERGENCY MEDICAL SERVICES
4422-RADIO EQUIPMENT IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The
4423-time of expenditure for the local government division project
4424-in Subsection 343 of Section 28 of Chapter 199 of Laws 2023
4425-to purchase, equip and replace fire and emergency medical
4426-services radio equipment and information technology for the
4427-dispatch center and emergency departments in Quay county is
4428-extended through fiscal year 2027.
4429-SECTION 230. TUCUMCARI PRINCESS THEATER RENOVATION--
4430-CHANGE TO HISTORIC BUILDING RENOVATION--GENERAL FUND.--The
4431-unexpended balance of the appropriation to the local
4432-government division in Subsection 399 of Section 28 of
4433-Chapter 66 of Laws 2024 to renovate, reconstruct and repair
4434-the historical Princess theater in Tucumcari in Quay county
4435-shall not be expended for the original purpose but is changed
4436-to plan, design, construct, repair, renovate and equip the
4437-historic Princess theater in Tucumcari in Quay county.
4438-SECTION 231. TUCUMCARI SANITATION TRUCK PURCHASE--
4439-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
4440-local government division project in Subsection 349 of
4441-Section 28 of Chapter 199 of Laws 2023 to purchase and equip
4442-a sanitation truck for Tucumcari in Quay county is extended
4443-through fiscal year 2027. SFC/SB 425
4444-Page 88
4445-1
4446-2
4447-3
4448-4
4449-5
4450-6
4451-7
4452-8
4453-9
4454-10
4455-11
4456-12
4457-13
4458-14
4459-15
4460-16
4461-17
4462-18
4463-19
4464-20
4465-21
4466-22
4467-23
4468-24
4469-25
4470-SECTION 232. ACEQUIA DE LA OTRA VANDA IMPROVEMENT--
4471-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
4472-interstate stream commission project originally authorized in
4473-Subsection 29 of Section 33 of Chapter 277 of Laws 2019 and
4474-reauthorized in Laws 2023, Chapter 203, Section 173 to plan,
4475-design and construct improvements to the acequia
4476-de la Otro Vanda in Rio Arriba county is extended through
4477-fiscal year 2027.
4478-SECTION 233. ACEQUIA MESA DEL MEDIO IMPROVEMENT--EXTEND
4479-TIME--GENERAL FUND.--The time of expenditure for the
4480-interstate stream commission project originally authorized in
4481-Subsection 20 of Section 33 of Chapter 277 of Laws 2019 and
4482-reauthorized in Laws 2023, Chapter 203, Section 175 to plan,
4483-design and construct improvements for the acequia
4484-Mesa del Medio in Rio Arriba county is extended through
4485-fiscal year 2027.
4486-SECTION 234. CHAMA WASTEWATER SYSTEM AND SEWER LINE
4487-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
4488-expenditure for the department of environment project
4489-originally authorized in Subsection 71 of Section 26 of
4490-Chapter 81 of Laws 2020 and reauthorized in Laws 2023,
4491-Chapter 203, Section 179 to plan, design and construct a
4492-wastewater system and sewer line improvements for Chama in
4493-Rio Arriba county is extended through fiscal year 2027.
4494-SECTION 235. JICARILLA APACHE NATION ACCESSIBLE VEHICLE SFC/SB 425
4495-Page 89
4496-1
4497-2
4498-3
4499-4
4500-5
4501-6
4502-7
4503-8
4504-9
4505-10
4506-11
4507-12
4508-13
4509-14
4510-15
4511-16
4512-17
4513-18
4514-19
4515-20
4516-21
4517-22
4518-23
4519-24
4520-25
4521-PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure
4522-for the Indian affairs department project in Subsection 77 of
4523-Section 25 of Chapter 199 of Laws 2023 to purchase an
4524-accessible vehicle and equipment for a community health and
4525-fitness center in the Jicarilla Apache Nation in Rio Arriba
4526-county is extended through fiscal year 2027.
4527-SECTION 236. JICARILLA APACHE NATION EMERGENCY MEDICAL
4528-EQUIPMENT PURCHASE--EXTEND TIME--GENERAL FUND.--The time of
4529-expenditure for the Indian affairs department project in
4530-Subsection 75 of Section 25 of Chapter 199 of Laws 2023 to
4531-purchase and equip chest compression systems for ambulances
4532-and emergency medical services in the Jicarilla Apache Nation
4533-in Rio Arriba county is extended through fiscal year 2027.
4534-SECTION 237. JICARILLA APACHE NATION SUPERMARKET
4535-EQUIPMENT PURCHASE--EXTEND TIME--GENERAL FUND.--The time of
4536-expenditure for the Indian affairs department project in
4537-Subsection 78 of Section 25 of Chapter 199 of Laws 2023 to
4538-purchase and equip a baler, compactor and other equipment for
4539-the Jicarilla supermarket in the Jicarilla Apache Nation in
4540-Rio Arriba county is extended through fiscal year 2027.
4541-SECTION 238. JICARILLA APACHE NATION UTILITY LINES
4542-CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of
4543-expenditure for the Indian affairs department project in
4544-Subsection 16 of Section 47 of Chapter 53 of Laws 2022 to
4545-plan, design, construct and equip utility lines for the SFC/SB 425
4546-Page 90
4547-1
4548-2
4549-3
4550-4
4551-5
4552-6
4553-7
4554-8
4555-9
4556-10
4557-11
4558-12
4559-13
4560-14
4561-15
4562-16
4563-17
4564-18
4565-19
4566-20
4567-21
4568-22
4569-23
4570-24
4571-25
4572-Jicarilla Apache Nation in Rio Arriba county is extended
4573-through fiscal year 2027.
4574-SECTION 239. JICARILLA APACHE NATION WORKFORCE
4575-INNOVATION AND OPPORTUNITY ACT STUDENT VEHICLE PURCHASE--
4576-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
4577-Indian affairs department project in Subsection 81 of
4578-Section 25 of Chapter 199 of Laws 2023 to purchase and equip
4579-vehicles and equipment for workforce innovation opportunity
4580-students in the Jicarilla Apache Nation in Rio Arriba county
4581-is extended through fiscal year 2027.
4582-SECTION 240. NORTHERN NEW MEXICO STATE SCHOOL HEATING,
4583-VENTILATION AND AIR CONDITIONING SYSTEM AND CONTROL
4584-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
4585-expenditure for the northern New Mexico state school project
4586-in Subsection 1 of Section 40 of Chapter 138 of Laws 2021 to
4587-plan, design, construct, equip and install infrastructure
4588-improvements to heating, ventilation and air conditioning
4589-systems and controls at northern New Mexico state school in
4590-Rio Arriba county is extended through fiscal year 2027.
4591-SECTION 241. PIEDRA LUMBRE VISITORS CENTER RENOVATE--
4592-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
4593-department of finance and administration project originally
4594-authorized in Subsection 2 of Section 28 of Chapter 277 of
4595-Laws 2019 and reauthorized in Laws 2020, Chapter 82,
4596-Section 66 and again reauthorized in Laws 2023, Chapter 203, SFC/SB 425
4597-Page 91
4598-1
4599-2
4600-3
4601-4
4602-5
4603-6
4604-7
4605-8
4606-9
4607-10
4608-11
4609-12
4610-13
4611-14
4612-15
4613-16
4614-17
4615-18
4616-19
4617-20
4618-21
4619-22
4620-23
4621-24
4622-25
4623-Section 183 to plan, design, renovate, repair, construct,
4624-furnish, equip, abate and remove asbestos, lead-based paint
4625-and other hazardous materials and to demolish and dispose of
4626-existing structures at the Piedra Lumbre visitors center for
4627-the San Joaquin del Rio de Chama, Juan Bautista Baldez and
4628-Tierra Amarilla land grants-mercedes in Rio Arriba county is
4629-extended through fiscal year 2027.
4630-SECTION 242. RIO ARRIBA COUNTY EMBUDO FIBER OPTIC
4631-EXPANSION--CHANGE TO RIO ARRIBA COUNTY FACILITIES FIBER OPTIC
4632-INSTALLATION--EXTEND TIME--SEVERANCE TAX BONDS.--The
4633-unexpended balance of the appropriation to the local
4634-government division in Subsection 278 of Section 29 of
4635-Chapter 138 of Laws 2021 to plan, design and construct
4636-REDINet repeater fiber optic expansions, including 911
4637-security improvements, for governmental business operations
4638-in Embudo in Rio Arriba county shall not be expended for the
4639-original purpose but is changed to plan, design, construct
4640-and equip fiber optic installations for county facilities in
4641-Rio Arriba county. The time of expenditure is extended
4642-through fiscal year 2027.
4643-SECTION 243. RIO ARRIBA COUNTY EMPOWERMENT CENTER
4644-REDINET COMMUNICATION INFRASTRUCTURE INSTALLATION--CHANGE TO
4645-RIO ARRIBA COUNTY FACILITIES FIBER OPTIC INSTALLATION--EXTEND
4646-TIME--SEVERANCE TAX BONDS.--The unexpended balance of the
4647-appropriation to the local government division in SFC/SB 425
4648-Page 92
4649-1
4650-2
4651-3
4652-4
4653-5
4654-6
4655-7
4656-8
4657-9
4658-10
4659-11
4660-12
4661-13
4662-14
4663-15
4664-16
4665-17
4666-18
4667-19
4668-20
4669-21
4670-22
4671-23
4672-24
4673-25
4674-Subsection 393 of Section 29 of Chapter 138 of Laws 2021 to
4675-plan, design, construct and install communications equipment
4676-and infrastructure, including four-strand fiber terminations
4677-on existing lateral service off of the REDINet backbone, at
4678-the Rio Arriba empowerment center in Espanola in Rio Arriba
4679-county shall not be expended for the original purpose but is
4680-changed to plan, design, construct and equip fiber optic
4681-installations for county facilities in Rio Arriba county.
4682-The time of expenditure is extended through fiscal year 2027.
4683-SECTION 244. RIO ARRIBA COUNTY VELARDE RESIDENTIAL
4684-RECOVERY CENTER REDINET CONSTRUCTION--CHANGE TO RIO ARRIBA
4685-COUNTY FACILITIES FIBER OPTIC INSTALLATION--EXTEND TIME--
4686-SEVERANCE TAX BONDS.--The unexpended balance of the
4687-appropriation to the local government division in
4688-Subsection 394 of Section 29 of Chapter 138 of Laws 2021 to
4689-plan, design and construct a micro fiber installation for
4690-five sites on the campus of a residential recovery facility
4691-in Velarde in Rio Arriba county shall not be expended for the
4692-original purpose but is changed to plan, design, construct
4693-and equip fiber optic installations for county facilities in
4694-Rio Arriba county. The time of expenditure is extended
4695-through fiscal year 2027.
4696-SECTION 245. RIO ARRIBA COUNTY HOUSING AND RESIDENTIAL
4697-CARE FACILITIES LAND ACQUISITION--EXTEND TIME--SEVERANCE TAX
4698-BONDS.--The time of expenditure for the local government SFC/SB 425
4699-Page 93
4700-1
4701-2
4702-3
4703-4
4704-5
4705-6
4706-7
4707-8
4708-9
4709-10
4710-11
4711-12
4712-13
4713-14
4714-15
4715-16
4716-17
4717-18
4718-19
4719-20
4720-21
4721-22
4722-23
4723-24
4724-25
4725-division project in Subsection 270 of Section 29 of
4726-Chapter 138 of Laws 2021 to acquire land for and to plan,
4727-design, develop and construct workforce housing and
4728-residential care facilities in Rio Arriba county is extended
4729-through fiscal year 2027.
4730-SECTION 246. RIO ARRIBA COUNTY OJO CALIENTE COMMUNITY
4731-CENTER CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The
4732-time of expenditure for the local government division project
4733-in Subsection 273 of Section 29 of Chapter 138 of Laws 2021
4734-to plan, design and construct a community center in the
4735-vicinity of Ojo Caliente in Rio Arriba county is extended
4736-through fiscal year 2027.
4737-SECTION 247. TIERRA AMARILLA LAND GRANT LAND AND WATER
4738-RIGHTS ACQUISITION--CHANGE TO LAND ACQUISITION AND LOAN
4739-REPAYMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended
4740-balance of the appropriation to the local government division
4741-originally authorized in Subsection 276 of Section 29 of
4742-Chapter 138 of Laws 2021 and reauthorized in Laws 2023,
4743-Chapter 203, Section 178 to acquire vacant land and water
4744-rights within the exterior boundaries of the land
4745-grant-merced de los Pueblos de Tierra Amarilla in Rio Arriba
4746-county shall not be expended for the original or reauthorized
4747-purpose but is changed to acquire land, including the
4748-repayment of a loan for the purpose of purchasing property,
4749-for the land grant-merced de los Pueblos de Tierra Amarilla. SFC/SB 425
4750-Page 94
4751-1
4752-2
4753-3
4754-4
4755-5
4756-6
4757-7
4758-8
4759-9
4760-10
4761-11
4762-12
4763-13
4764-14
4765-15
4766-16
4767-17
4768-18
4769-19
4770-20
4771-21
4772-22
4773-23
4774-24
4775-25
4776-The time of expenditure is extended through fiscal year 2027.
4777-SECTION 248. TRUCHAS MUTUAL DOMESTIC WATER CONSUMERS'
4778-ASSOCIATION AND MUTUAL SEWAGE WORKS ASSOCIATION AUTOMATED
4779-METER READING SYSTEM PURCHASE--EXTEND TIME--GENERAL
4780-FUND.--The time of expenditure for the department of
4781-environment project in Subsection 82 of Section 19 of
4782-Chapter 199 of Laws 2023 to purchase, equip and install
4783-automated meter reading systems, including information
4784-technology and infrastructure and replacement of meters, for
4785-the Truchas mutual domestic water consumers' association and
4786-mutual sewage works association in Rio Arriba county is
4787-extended through fiscal year 2027.
4788-SECTION 249. TRUCHAS MUTUAL DOMESTIC WATER CONSUMERS'
4789-ASSOCIATION AND MUTUAL SEWAGE WORKS ASSOCIATION WATER METER
4790-PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
4791-expenditure for the department of environment project in
4792-Subsection 55 of Section 21 of Chapter 138 of Laws 2021 to
4793-plan, design, construct, purchase and install smart water
4794-meters and related information technology for the Truchas
4795-mutual domestic water consumers' association and mutual
4796-sewage works association in Rio Arriba county is extended
4797-through fiscal year 2027.
4798-SECTION 250. ACEQUIA DEL RINCON RIO ARRIBA
4799-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
4800-expenditure for the interstate stream commission project in SFC/SB 425
4801-Page 95
4802-1
4803-2
4804-3
4805-4
4806-5
4807-6
4808-7
4809-8
4810-9
4811-10
4812-11
4813-12
4814-13
4815-14
4816-15
4817-16
4818-17
4819-18
4820-19
4821-20
4822-21
4823-22
4824-23
4825-24
4826-25
4827-Subsection 15 of Section 28 of Chapter 138 of Laws 2021 to
4828-plan, design and construct improvements to the acequia
4829-del Rincon in Rio Arriba county is extended through fiscal
4830-year 2027.
4831-SECTION 251. ALCALDE LA LOMA VISTA CEMETERY
4832-RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
4833-expenditure for the local government division project in
4834-Subsection 277 of Section 29 of Chapter 138 of Laws 2021 to
4835-plan, design, construct, equip and renovate a cemetery in
4836-Alcalde in Rio Arriba county is extended through fiscal year
4837-2027.
4838-SECTION 252. CHAMA WATER METER PURCHASE--EXTEND TIME--
4839-GENERAL FUND.--The time of expenditure for the department of
4840-environment project in Subsection 84 of Section 19 of
4841-Chapter 199 of Laws 2023 to purchase, equip and install water
4842-meters and implementation systems in Chama in Rio Arriba
4843-county is extended through fiscal year 2027.
4844-SECTION 253. CHAMA WASTEWATER SYSTEM AND SEWER LINE
4845-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
4846-expenditure for the department of environment project in
4847-Subsection 57 of Section 21 of Chapter 138 of Laws 2021 to
4848-plan, design and construct wastewater system improvements,
4849-including sewer line extensions, for Chama in Rio Arriba
4850-county is extended through fiscal year 2027.
4851-SECTION 254. ESPANOLA LA JOYA FIRE STATION SFC/SB 425
4852-Page 96
4853-1
4854-2
4855-3
4856-4
4857-5
4858-6
4859-7
4860-8
4861-9
4862-10
4863-11
4864-12
4865-13
4866-14
4867-15
4868-16
4869-17
4870-18
4871-19
4872-20
4873-21
4874-22
4875-23
4876-24
4877-25
4878-CONSTRUCTION--CHANGE TO FIRE STATION AND REGIONAL TRAINING
4879-FACILITY ACQUISITION--SEVERANCE TAX BONDS.--The unexpended
4880-balance of the appropriation to the local government division
4881-in Subsection 329 of Section 30 of Chapter 53 of Laws 2022 to
4882-plan, design, construct and replace a fire station to meet
4883-international organization for standardization ratings for
4884-Espanola in Rio Arriba and Santa Fe counties shall not be
4885-expended for the original purpose but is changed to acquire
4886-property and to plan, design, construct, equip and make
4887-infrastructure improvements to a fire station and regional
4888-training facility in Espanola in Rio Arriba county.
4889-SECTION 255. ESPANOLA MISION Y CONVENTO VISITOR CENTER
4890-ROOF REPLACEMENT--CHANGE TO MUNICIPAL BUILDING IMPROVEMENT--
4891-EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of
4892-the appropriation to the local government division in
4893-Subsection 330 of Section 30 of Chapter 53 of Laws 2022 to
4894-replace and install roofing at the Mision y Convento visitor
4895-center in Espanola in Rio Arriba county shall not be expended
4896-for the original purpose but is changed to plan, design,
4897-construct and make improvements to municipal buildings in
4898-Espanola. The time of expenditure is extended through fiscal
4899-year 2027.
4900-SECTION 256. ESPANOLA SENIOR CENTER RENOVATION--EXTEND
4901-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
4902-aging and long-term services department project in SFC/SB 425
4903-Page 97
4904-1
4905-2
4906-3
4907-4
4908-5
4909-6
4910-7
4911-8
4912-9
4913-10
4914-11
4915-12
4916-13
4917-14
4918-15
4919-16
4920-17
4921-18
4922-19
4923-20
4924-21
4925-22
4926-23
4927-24
4928-25
4929-Subsection 33 of Section 5 of Chapter 138 of Laws 2021 to
4930-plan, design, construct and improve the interior and exterior
4931-of the Espanola senior center, including the purchase and
4932-installation of equipment, in Espanola in Rio Arriba county
4933-is extended through fiscal year 2027.
4934-SECTION 257. ESPANOLA VALDEZ PARK EXPANSION--EXTEND
4935-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
4936-local government division project in Subsection 280 of
4937-Section 29 of Chapter 138 of Laws 2021 to acquire property
4938-for and to plan, design, construct, equip, renovate and
4939-expand Valdez park, including replacement of existing
4940-playground equipment, in Espanola in Rio Arriba county is
4941-extended through fiscal year 2027.
4942-SECTION 258. ESPANOLA VALDEZ PARK SKATEBOARD PARK
4943-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
4944-expenditure for the local government division project in
4945-Subsection 281 of Section 29 of Chapter 138 of Laws 2021 to
4946-plan, design and construct basketball courts and a skate park
4947-at Valdez park in Espanola in Rio Arriba county is extended
4948-through fiscal year 2027.
4949-SECTION 259. RIO ARRIBA COUNTY COMMUNITY SERVICES
4950-CENTER RENOVATION--EXTEND TIME--GENERAL FUND.--The time of
4951-expenditure for the local government division project
4952-originally authorized in Subsection 326 of Section 34 of
4953-Chapter 277 of Laws 2019 and reauthorized in Laws 2023, SFC/SB 425
4954-Page 98
4955-1
4956-2
4957-3
4958-4
4959-5
4960-6
4961-7
4962-8
4963-9
4964-10
4965-11
4966-12
4967-13
4968-14
4969-15
4970-16
4971-17
4972-18
4973-19
4974-20
4975-21
4976-22
4977-23
4978-24
4979-25
4980-Chapter 203, Section 181 to plan, design, equip, renovate and
4981-repair a facility to serve as a community services delivery
4982-center and business development hub in Espanola in Rio Arriba
4983-county is extended through fiscal year 2027.
4984-SECTION 260. RIO ARRIBA COUNTY EMPOWERMENT CENTER
4985-RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
4986-expenditure for the local government division project in
4987-Subsection 282 of Section 29 of Chapter 138 of Laws 2021 to
4988-plan, design, construct, equip and renovate the Rio Arriba
4989-empowerment center in Espanola in Rio Arriba county is
4990-extended through fiscal year 2027.
4991-SECTION 261. RIO ARRIBA COUNTY LOW RIDER MUSEUM
4992-CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of
4993-expenditure for the local government division project
4994-originally authorized in Subsection 328 of Section 34 of
4995-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
4996-Chapter 203, Section 182 to plan, design, prepare the site,
4997-construct, renovate and equip a low rider museum in Espanola
4998-in Rio Arriba county is extended through fiscal year 2027.
4999-SECTION 262. SILKEY WAY EXPANSION--EXTEND TIME--
5000-SEVERANCE TAX BONDS.--The time of expenditure for the
5001-department of transportation project in Subsection 75 of
5002-Section 33 of Chapter 138 of Laws 2021 to acquire property
5003-for and to plan, design, construct and expand Silkey way in
5004-Espanola in Rio Arriba county is extended through fiscal year SFC/SB 425
5005-Page 99
5006-1
5007-2
5008-3
5009-4
5010-5
5011-6
5012-7
5013-8
5014-9
5015-10
5016-11
5017-12
5018-13
5019-14
5020-15
5021-16
5022-17
5023-18
5024-19
5025-20
5026-21
5027-22
5028-23
5029-24
5030-25
5031-2027.
5032-SECTION 263. ACEQUIA DE OJO SARCO PHASE 5 DITCH LINING
5033-CONSTRUCTION--EXPAND PURPOSE--GENERAL FUND.--The interstate
5034-stream commission project in Subsection 16 of Section 27 of
5035-Chapter 66 of Laws 2024 to plan, design and construct phase 5
5036-improvements, including the installation of ditch linings,
5037-for the acequia de Ojo Sarco in Rio Arriba county may include
5038-the purchase of new track for a trackhoe and repair and
5039-upgrading of heavy equipment.
5040-SECTION 264. ELIDA WASTEWATER SYSTEM CONSTRUCTION--
5041-CHANGE TO WATER SYSTEM IMPROVEMENT--EXTEND TIME--SEVERANCE
5042-TAX BONDS.--The unexpended balance of the appropriation to
5043-the department of environment originally authorized in
5044-Subsection 77 of Section 26 of Chapter 81 of Laws 2020 and
5045-reauthorized in Laws 2024, Chapter 65, Section 165 to plan,
5046-design, construct, furnish and equip a wastewater system in
5047-Elida in Roosevelt county shall not be expended for the
5048-original or reauthorized purpose but is changed to plan,
5049-design, construct and equip water system improvements,
5050-including the replacement of water lines from a well site to
5051-water storage tanks, the rehabilitation of wells and the
5052-purchase of supervisory control and data acquisition
5053-components, in Elida in Roosevelt county. The time of
5054-expenditure is extended through fiscal year 2027.
5055-SECTION 265. ELIDA MUNICIPAL SCHOOL DISTRICT SCHOOL BUS SFC/SB 425
5056-Page 100
5057-1
5058-2
5059-3
5060-4
5061-5
5062-6
5063-7
5064-8
5065-9
5066-10
5067-11
5068-12
5069-13
5070-14
5071-15
5072-16
5073-17
5074-18
5075-19
5076-20
5077-21
5078-22
5079-23
5080-24
5081-25
5082-PURCHASE--CHANGE TO ACTIVITY VEHICLE PURCHASE--EXTEND TIME--
5083-GENERAL FUND.--The unexpended balance of the appropriation to
5084-the public education department in Subsection 172 of
5085-Section 16 of Chapter 199 of Laws 2023 to purchase and equip
5086-an activity bus, including addition of the school logo and
5087-colors, for the Elida municipal school district in Roosevelt
5088-county shall not be expended for the original purpose but is
5089-changed to purchase and equip activity vehicles for the Elida
5090-municipal school district. The time of expenditure is
5091-extended through fiscal year 2027.
5092-SECTION 266. PORTALES CHIP SPREADER PURCHASE--CHANGE TO
5093-GARBAGE TRUCK PURCHASE--EXTEND TIME--GENERAL FUND.--The
5094-unexpended balance of the appropriation to the local
5095-government division in Subsection 362 of Section 28 of
5096-Chapter 199 of Laws 2023 to purchase and equip a chip
5097-spreader for the street works department in Portales in
5098-Roosevelt county shall not be expended for the original
5099-purpose but is changed to purchase and equip a garbage truck
5100-for the solid waste department in Portales. The time of
5101-expenditure is extended through fiscal year 2027.
5102-SECTION 267. PORTALES EMULSION TANK PURCHASE--CHANGE TO
5103-GARBAGE TRUCK PURCHASE--EXTEND TIME--GENERAL FUND.--The
5104-unexpended balance of the appropriation to the local
5105-government division in Subsection 363 of Section 28 of
5106-Chapter 199 of Laws 2023 to purchase, install and equip SFC/SB 425
5107-Page 101
5108-1
5109-2
5110-3
5111-4
5112-5
5113-6
5114-7
5115-8
5116-9
5117-10
5118-11
5119-12
5120-13
5121-14
5122-15
5123-16
5124-17
5125-18
5126-19
5127-20
5128-21
5129-22
5130-23
5131-24
5132-25
5133-emulsion tanks for the street works department in Portales in
5134-Roosevelt county shall not be expended for the original
5135-purpose but is changed to purchase and equip a garbage truck
5136-for the solid waste department in Portales. The time of
5137-expenditure is extended through fiscal year 2027.
5138-SECTION 268. BLOOMFIELD IRRIGATION DISTRICT FLUME
5139-IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of
5140-expenditure for the office of the state engineer project
5141-originally authorized in Subsection 5 of Section 23 of
5142-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
5143-Chapter 203, Section 185 to plan, design and construct
5144-improvements to the district irrigation ditch, including the
5145-Blanco flume, for the Bloomfield irrigation district in
5146-San Juan county is extended through fiscal year 2027.
5147-SECTION 269. GADII'AHI/TO'KOI CHAPTER ADMINISTRATIVE
5148-COMPLEX CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The
5149-time of expenditure for the Indian affairs department project
5150-in Subsection 62 of Section 25 of Chapter 138 of Laws 2021 to
5151-plan, design, construct, equip and furnish an administrative
5152-complex for the Gadii'ahi/To'koi chapter of the Navajo Nation
5153-in San Juan county is extended through fiscal year 2027.
5154-SECTION 270. GADII'AHI/TO'KOI CHAPTER SENIOR CENTER
5155-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
5156-expenditure for the aging and long-term services department
5157-project in Subsection 39 of Section 5 of Chapter 138 of SFC/SB 425
5158-Page 102
5159-1
5160-2
5161-3
5162-4
5163-5
5164-6
5165-7
5166-8
5167-9
5168-10
5169-11
5170-12
5171-13
5172-14
5173-15
5174-16
5175-17
5176-18
5177-19
5178-20
5179-21
5180-22
5181-23
5182-24
5183-25
5184-Laws 2021 to plan, design, construct, equip and furnish a
5185-senior center, including infrastructure, for the
5186-Gadii'ahi/To'koi chapter of the Navajo Nation in San Juan
5187-county is extended through fiscal year 2027.
5188-SECTION 271. HILLSIDE IRRIGATION DITCH ACEQUIA HEADGATE
5189-SPILLWAY SYSTEM CONSTRUCTION--EXTEND TIME--SEVERANCE TAX
5190-BONDS.--The time of expenditure for the interstate stream
5191-commission project in Subsection 16 of Section 28 of
5192-Chapter 138 of Laws 2021 to plan, design and construct a
5193-headgate spillway system for the Hillside irrigation ditch in
5194-San Juan county is extended through fiscal year 2027.
5195-SECTION 272. LAKE VALLEY CHAPTER ROAD GRADER PURCHASE--
5196-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
5197-Indian affairs department project in Subsection 95 of
5198-Section 25 of Chapter 199 of Laws 2023 to purchase and equip
5199-heavy equipment, including a road grader, for the Lake Valley
5200-chapter of the Navajo Nation in San Juan county is extended
5201-through fiscal year 2027.
5202-SECTION 273. NAVAJO ROUTE 571 GADII'AHI/TO'KOI CHAPTER
5203-IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of
5204-expenditure for the department of transportation project in
5205-Subsection 2 of Section 48 of Chapter 53 of Laws 2023 to
5206-plan, design and construct road improvements to Navajo route
5207-571 in the Gadii'ahi/To'koi chapter of the Navajo Nation in
5208-San Juan county is extended through fiscal year 2027. SFC/SB 425
5209-Page 103
5210-1
5211-2
5212-3
5213-4
5214-5
5215-6
5216-7
5217-8
5218-9
5219-10
5220-11
5221-12
5222-13
5223-14
5224-15
5225-16
5226-17
5227-18
5228-19
5229-20
5230-21
5231-22
5232-23
5233-24
5234-25
5235-SECTION 274. NAVAJO DAM DOMESTIC WATER CONSUMERS AND
5236-MUTUAL SEWAGE WORKS COOPERATIVE WATER STORAGE TANK
5237-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
5238-expenditure for the department of environment project in
5239-Subsection 62 of Section 21 of Chapter 138 of Laws 2021 to
5240-purchase land for and to plan, design, construct, purchase
5241-and install water storage tanks and related equipment,
5242-including concrete slabs and fencing, for the Navajo Dam
5243-domestic water consumers and mutual sewage works cooperative
5244-in San Juan county is extended through fiscal year 2027.
5245-SECTION 275. NEW MEXICO HIGHWAY 371 AND NAVAJO ROUTE 36
5246-TRAFFIC SIGNAL CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The
5247-time of expenditure for the department of transportation
5248-project originally authorized in Subsection 116 of Section 40
5249-of Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
5250-Chapter 203, Section 187 to plan, design, construct, purchase
5251-and install a traffic signal and related road work, including
5252-widening, at the intersection of New Mexico highway 371 and
5253-Navajo route 36 in San Juan county is extended through fiscal
5254-year 2027.
5255-SECTION 276. NAVAJO NATION SCATTERED POWER LINE
5256-CONSTRUCTION--CHANGE TO RED VALLEY CHAPTER MITTEN ROCK
5257-TRANSFER STATION CONSTRUCTION--GENERAL FUND.--The unexpended
5258-balance of the appropriation to the Indian affairs department
5259-in Subsection 99 of Section 25 of Chapter 199 of Laws 2023 to SFC/SB 425
5260-Page 104
5261-1
5262-2
5263-3
5264-4
5265-5
5266-6
5267-7
5268-8
5269-9
5270-10
5271-11
5272-12
5273-13
5274-14
5275-15
5276-16
5277-17
5278-18
5279-19
5280-20
5281-21
5282-22
5283-23
5284-24
5285-25
5286-plan, design and construct scattered power lines in the
5287-Mitten Rock area of the Red Valley chapter of the
5288-Navajo Nation in San Juan county shall not be expended for
5289-the original purpose but is changed to plan, design,
5290-construct and equip the Mitten Rock transfer station in the
5291-Red Valley chapter of the Navajo Nation in San Juan county.
5292-SECTION 277. TSE ALNAOZTI'I' CHAPTER WATER LINE AND
5293-BATHROOM CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The
5294-time of expenditure for the Indian affairs department project
5295-in Subsection 67 of Section 25 of Chapter 138 of Laws 2021 to
5296-acquire rights of way and easements and to plan, design and
5297-construct water line extensions and bathroom additions in the
5298-Tse Alnaozti'i' chapter of the Navajo Nation in San Juan
5299-county is extended through fiscal year 2027.
5300-SECTION 278. TSE'DAA'KAAN CHAPTER SERVICE CENTER
5301-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
5302-expenditure for the Indian affairs department project in
5303-Subsection 73 of Section 25 of Chapter 138 of Laws 2021 to
5304-plan, design and construct a community service center in the
5305-Tse'Daa'Kaan chapter of the Navajo Nation in San Juan county
5306-is extended through fiscal year 2027.
5307-SECTION 279. AZTEC WATER SYSTEM CONSTRUCTION--EXTEND
5308-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
5309-department of environment project in Subsection 61 of
5310-Section 21 of Chapter 138 of Laws 2021 to acquire easements SFC/SB 425
5311-Page 105
5312-1
5313-2
5314-3
5315-4
5316-5
5317-6
5318-7
5319-8
5320-9
5321-10
5322-11
5323-12
5324-13
5325-14
5326-15
5327-16
5328-17
5329-18
5330-19
5331-20
5332-21
5333-22
5334-23
5335-24
5336-25
5337-and to plan, design and construct a water system and a
5338-transmission line for Aztec in San Juan county is extended
5339-through fiscal year 2027.
5340-SECTION 280. BECLABITO CHAPTER HELIPAD ACCESS ROAD
5341-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
5342-expenditure for the department of transportation project in
5343-Subsection 82 of Section 33 of Chapter 138 of Laws 2021 to
5344-plan, design, construct and improve a helipad access road for
5345-the Beclabito chapter of the Navajo Nation in San Juan county
5346-is extended through fiscal year 2027.
5347-SECTION 281. BECLABITO CHAPTER TRANSFER STATION
5348-CONSTRUCTION--CHANGE TO HELIPAD CONSTRUCTION--GENERAL
5349-FUND.--The unexpended balance of the appropriation to the
5350-Indian affairs department in Subsection 89 of Section 25 of
5351-Chapter 199 of Laws 2023 to acquire easements and rights of
5352-way and to plan, design, construct and equip a solid waste
5353-transfer station in the Beclabito chapter of the
5354-Navajo Nation in San Juan county shall not be expended for
5355-the original purpose but is changed to plan, design and
5356-construct a helipad in the Beclabito chapter of the
5357-Navajo Nation in San Juan county.
5358-SECTION 282. BECLABITO CHAPTER HELIPAD CONSTRUCTION--
5359-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
5360-Indian affairs department project originally authorized in
5361-Subsection 79 of Section 31 of Chapter 277 of Laws 2019 and SFC/SB 425
5362-Page 106
5363-1
5364-2
5365-3
5366-4
5367-5
5368-6
5369-7
5370-8
5371-9
5372-10
5373-11
5374-12
5375-13
5376-14
5377-15
5378-16
5379-17
5380-18
5381-19
5382-20
5383-21
5384-22
5385-23
5386-24
5387-25
5388-reauthorized in Laws 2023, Chapter 203, Section 193 to plan,
5389-design and construct a helipad in the Beclabito chapter of
5390-the Navajo Nation in San Juan county is extended through
5391-fiscal year 2027.
5392-SECTION 283. BECLABITO CHAPTER HELIPAD CONSTRUCTION--
5393-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
5394-for the department of transportation project in Subsection 83
5395-of Section 33 of Chapter 138 of Laws 2021 to plan, design and
5396-construct a helipad in the Beclabito chapter of the
5397-Navajo Nation in San Juan county is extended through fiscal
5398-year 2027.
5399-SECTION 284. EAST BLANCO BOULEVARD IMPROVEMENT--EXTEND
5400-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
5401-department of transportation project in Subsection 79 of
5402-Section 33 of Chapter 138 of Laws 2021 to plan, design and
5403-construct improvements to east Blanco boulevard, including
5404-bridge replacement and drainage, in Bloomfield in San Juan
5405-county is extended through fiscal year 2027.
5406-SECTION 285. NORTH FARMINGTON DITCH IMPROVEMENT--EXTEND
5407-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
5408-interstate stream commission project in Subsection 17 of
5409-Section 28 of Chapter 138 of Laws 2021 to plan, design and
5410-construct improvements to the north Farmington ditch in
5411-Farmington in San Juan county is extended through fiscal year
5412-2027. SFC/SB 425
5413-Page 107
5414-1
5415-2
5416-3
5417-4
5418-5
5419-6
5420-7
5421-8
5422-9
5423-10
5424-11
5425-12
5426-13
5427-14
5428-15
5429-16
5430-17
5431-18
5432-19
5433-20
5434-21
5435-22
5436-23
5437-24
5438-25
5439-SECTION 286. NAVAJO PREPARATORY SCHOOL SECURITY SYSTEM
5440-INSTALLATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
5441-expenditure for the Indian affairs department project in
5442-Subsection 61 of Section 25 of Chapter 138 of Laws 2021 to
5443-purchase and install improvements, including cameras, keyless
5444-entry systems, computers and servers, at Navajo preparatory
5445-school in Farmington in San Juan county is extended through
5446-fiscal year 2027.
5447-SECTION 287. SAN JUAN COLLEGE SCHOOL BUS PURCHASE--
5448-CHANGE TO PASSENGER BUS PURCHASE--GENERAL FUND.--The
5449-unexpended balance of the appropriation to the higher
5450-education department in Subsection 12 of Section 15 of
5451-Chapter 66 of Laws 2024 to purchase and equip a school bus
5452-for a school bus driver training program at San Juan college
5453-in Farmington in San Juan county shall not be expended for
5454-the original purpose but is changed to purchase and equip a
5455-passenger bus that carries more than sixteen passengers,
5456-including the driver, for the purpose of training school bus
5457-drivers at San Juan college in Farmington in San Juan county.
5458-SECTION 288. HUERFANO CHAPTER POWER LINE CONSTRUCTION--
5459-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
5460-for the Indian affairs department project in Subsection 63 of
5461-Section 25 of Chapter 138 of Laws 2021 to acquire easements
5462-and rights of way for and to plan, design and construct
5463-scattered power lines in the Huerfano chapter of the SFC/SB 425
5464-Page 108
5465-1
5466-2
5467-3
5468-4
5469-5
5470-6
5471-7
5472-8
5473-9
5474-10
5475-11
5476-12
5477-13
5478-14
5479-15
5480-16
5481-17
5482-18
5483-19
5484-20
5485-21
5486-22
5487-23
5488-24
5489-25
5490-Navajo Nation in San Juan county is extended through fiscal
5491-year 2027.
5492-SECTION 289. NASCHITTI CHAPTER POWER LINE EXTENSION--
5493-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
5494-Indian affairs department project originally authorized in
5495-Subsection 85 of Section 31 of Chapter 277 of Laws 2019 and
5496-reauthorized in Laws 2023, Chapter 203, Section 204 to
5497-acquire rights of way and easements, to plan and design
5498-archaeological and environmental studies and to plan, design
5499-and construct power line extensions in the Naschitti chapter
5500-of the Navajo Nation in San Juan county is extended through
5501-fiscal year 2027.
5502-SECTION 290. NAVAJO ROUTE 5001 AND UNITED STATES
5503-HIGHWAY 491 INTERSECTION STREETLIGHT CONSTRUCTION--EXTEND
5504-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
5505-department of transportation project in Subsection 85 of
5506-Section 33 of Chapter 138 of Laws 2021 to plan, design,
5507-construct, purchase and install solar streetlights at the
5508-main intersection of United States highway 491 and
5509-Navajo route 5001 in the Newcomb chapter of the Navajo Nation
5510-in San Juan county is extended through fiscal year 2027.
5511-SECTION 291. RED VALLEY CHAPTER MITTEN ROCK POWER LINE
5512-CONSTRUCTION--CHANGE TO RED VALLEY CHAPTER MITTEN ROCK
5513-TRANSFER STATION CONSTRUCTION--EXTEND TIME--GENERAL FUND.--
5514-The unexpended balance of the appropriation to the Indian SFC/SB 425
5515-Page 109
5516-1
5517-2
5518-3
5519-4
5520-5
5521-6
5522-7
5523-8
5524-9
5525-10
5526-11
5527-12
5528-13
5529-14
5530-15
5531-16
5532-17
5533-18
5534-19
5535-20
5536-21
5537-22
5538-23
5539-24
5540-25
5541-affairs department originally authorized in Subsection 87 of
5542-Section 31 of Chapter 277 of Laws 2019 and reauthorized in
5543-Laws 2023, Chapter 203, Section 202 to acquire easements and
5544-rights of way for and to plan, design and construct power
5545-lines to homes on the New Mexico side of the state line in
5546-the Mitten Rock area of the Red Valley chapter of the
5547-Navajo Nation in San Juan county shall not be expended for
5548-the original purpose but is changed to plan, design,
5549-construct and equip the Mitten Rock transfer station in the
5550-Red Valley chapter of the Navajo Nation in San Juan county.
5551-The time of expenditure is extended through fiscal year 2027.
5552-SECTION 292. DINE COLLEGE NORTH SHIPROCK CAMPUS
5553-GYMNASIUM HEATING, VENTILATION AND AIR CONDITIONING SYSTEM
5554-REPLACEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
5555-expenditure for the higher education department project in
5556-Subsection 15 of Section 34 of Chapter 138 of Laws 2021 to
5557-plan, design, construct, replace, purchase and install a
5558-heating, ventilation and air conditioning system in the
5559-gymnasium at the north Shiprock campus of Dine college in
5560-San Juan county is extended through fiscal year 2027.
5561-SECTION 293. NAVAJO NATION RENEWABLE ENERGY SYSTEM
5562-CONSTRUCTION--CHANGE TO SHIPROCK INCIDENT COMMAND CENTER
5563-CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The unexpended
5564-balance of the appropriation to the Indian affairs department
5565-originally authorized in Subsection 56 of Section 31 of SFC/SB 425
5566-Page 110
5567-1
5568-2
5569-3
5570-4
5571-5
5572-6
5573-7
5574-8
5575-9
5576-10
5577-11
5578-12
5579-13
5580-14
5581-15
5582-16
5583-17
5584-18
5585-19
5586-20
5587-21
5588-22
5589-23
5590-24
5591-25
5592-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
5593-Chapter 203, Section 161 to plan, design, construct,
5594-purchase, equip and install renewable energy systems for the
5595-Navajo Nation in McKinley, San Juan and Sandoval counties
5596-shall not be expended for the original purpose but is changed
5597-to plan, design, construct and equip the Shiprock incident
5598-command center in the Shiprock chapter of the Navajo Nation
5599-in San Juan county. The time of expenditure is extended
5600-through fiscal year 2027.
5601-SECTION 294. SHIPROCK CHAPTER SENIOR CENTER PARKING LOT
5602-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
5603-expenditure for the aging and long-term services department
5604-project in Subsection 10 of Section 5 of Chapter 53 of
5605-Laws 2022 to plan, design, construct and repair the Shiprock
5606-senior center parking lot in the Shiprock chapter of the
5607-Navajo Nation in San Juan county is extended through fiscal
5608-year 2027.
5609-SECTION 295. SHIPROCK CHAPTER SENIOR CENTER PARKING LOT
5610-CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of
5611-expenditure for the aging and long-term services department
5612-project in Laws 2022, Chapter 53, Section 46 to plan, design,
5613-construct and repair the Shiprock senior center parking lot
5614-in the Shiprock chapter of the Navajo Nation in San Juan
5615-county is extended through fiscal year 2027.
5616-SECTION 296. NEW MEXICO HIGHWAY 134 AND UNITED STATES SFC/SB 425
5617-Page 111
5618-1
5619-2
5620-3
5621-4
5622-5
5623-6
5624-7
5625-8
5626-9
5627-10
5628-11
5629-12
5630-13
5631-14
5632-15
5633-16
5634-17
5635-18
5636-19
5637-20
5638-21
5639-22
5640-23
5641-24
5642-25
5643-HIGHWAY 491 INTERSECTION SAFETY IMPROVEMENT--EXTEND TIME--
5644-SEVERANCE TAX BONDS.--The time of expenditure for the
5645-department of transportation project in Subsection 86 of
5646-Section 33 of Chapter 138 of Laws 2021 to plan, design and
5647-construct road safety improvements, including traffic lights
5648-and signage, for the intersection of New Mexico highway 134
5649-and United States highway 491 in the Tooh Haltsooi chapter of
5650-the Navajo Nation in San Juan county is extended through
5651-fiscal year 2027.
5652-SECTION 297. TOOH HALTSOOI CHAPTER POWER LINE
5653-EXTENSION--EXTEND TIME--GENERAL FUND.--The time of
5654-expenditure for the Indian affairs department project
5655-originally authorized in Subsection 78 of Section 31 of
5656-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
5657-Chapter 203, Section 210 to acquire rights of way for and to
5658-plan, design and construct power line extensions, including
5659-archaeological and environmental studies, for the
5660-Tooh Haltsooi chapter of the Navajo Nation in McKinley county
5661-is extended through fiscal year 2027.
5662-SECTION 298. TSE'DAA'KAAN CHAPTER HOGBACK SENIOR CENTER
5663-IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of
5664-expenditure for the aging and long-term services department
5665-project originally authorized in Subsection 46 of Section 4
5666-of Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
5667-Chapter 203, Section 211 to plan, design and construct SFC/SB 425
5668-Page 112
5669-1
5670-2
5671-3
5672-4
5673-5
5674-6
5675-7
5676-8
5677-9
5678-10
5679-11
5680-12
5681-13
5682-14
5683-15
5684-16
5685-17
5686-18
5687-19
5688-20
5689-21
5690-22
5691-23
5692-24
5693-25
5694-improvements to the Hogback senior center in the Tse'Daa'Kaan
5695-chapter of the Navajo Nation in San Juan county is extended
5696-through fiscal year 2027.
5697-SECTION 299. TSE'DAA'KAAN CHAPTER POWER LINE
5698-EXTENSION--EXTEND TIME--GENERAL FUND.--The time of
5699-expenditure for the Indian affairs department project
5700-originally authorized in Subsection 93 of Section 31 of
5701-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
5702-Chapter 203, Section 189 to plan, design and construct power
5703-line extensions in the Tse'Daa'Kaan chapter of the
5704-Navajo Nation in San Juan county is extended through fiscal
5705-year 2027.
5706-SECTION 300. UPPER FRUITLAND CHAPTER SENIOR CENTER
5707-IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of
5708-expenditure for the aging and long-term services department
5709-project originally authorized in Subsection 48 of Section 4
5710-of Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
5711-Chapter 203, Section 190 to plan, design, construct, furnish
5712-and equip phase 2 of a senior center, including an addition,
5713-for the Upper Fruitland chapter of the Navajo Nation in
5714-San Juan county is extended through fiscal year 2027.
5715-SECTION 301. WHITE ROCK CHAPTER POWER LINE EXTENSION--
5716-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
5717-Indian affairs department project in Subsection 23 of
5718-Section 48 of Chapter 138 of Laws 2021 to plan, design and SFC/SB 425
5719-Page 113
5720-1
5721-2
5722-3
5723-4
5724-5
5725-6
5726-7
5727-8
5728-9
5729-10
5730-11
5731-12
5732-13
5733-14
5734-15
5735-16
5736-17
5737-18
5738-19
5739-20
5740-21
5741-22
5742-23
5743-24
5744-25
5745-construct scattered power line extensions in the White Rock
5746-chapter of the Navajo Nation in San Juan county is extended
5747-through fiscal year 2027.
5748-SECTION 302. SHIPROCK INDUSTRIAL PARK SOLAR STREET
5749-LIGHT IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The
5750-time of expenditure for the Indian affairs department project
5751-in Subsection 68 of Section 25 of Chapter 138 of Laws 2021 to
5752-plan, design, construct, purchase and equip solar street
5753-lights at the Shiprock industrial park in Shiprock in the
5754-Navajo Nation in San Juan county is extended through fiscal
5755-year 2027.
5756-SECTION 303. ACEQUIA DE LOS VECINOS DE LOS VALLECITOS
5757-WEST CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The
5758-time of expenditure for the interstate stream commission
5759-project in Subsection 18 of Section 28 of Chapter 138 of
5760-Laws 2021 to plan, design, construct, equip and install
5761-improvements for the acequia de los Vecinos de los Vallecitos
5762-west in San Miguel county is extended through fiscal year
5763-2027.
5764-SECTION 304. ACEQUIA MADRE DE EL CERRITO IMPROVEMENT--
5765-CHANGE TO PIPELINE PURCHASE AND ACEQUIA IMPROVEMENT--EXTEND
5766-TIME--GENERAL FUND.--The unexpended balance of the
5767-appropriation to the interstate stream commission originally
5768-authorized in Subsection 39 of Section 27 of Chapter 199 of
5769-Laws 2023 and reauthorized in Laws 2024, Chapter 65, SFC/SB 425
5770-Page 114
5771-1
5772-2
5773-3
5774-4
5775-5
5776-6
5777-7
5778-8
5779-9
5780-10
5781-11
5782-12
5783-13
5784-14
5785-15
5786-16
5787-17
5788-18
5789-19
5790-20
5791-21
5792-22
5793-23
5794-24
5795-25
5796-Section 189 to plan, design, construct, improve and equip the
5797-acequia Madre de el Cerrito in San Miguel county shall not be
5798-expended for the original or reauthorized purpose but is
5799-changed to purchase and install pipeline and to plan, design,
5800-construct, improve and equip the acequia Madre de el Cerrito.
5801-The time of expenditure is extended through fiscal year 2027.
5802-SECTION 305. ACEQUIA MADRE DE LOS ROMEROS IMPROVEMENT--
5803-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
5804-for the interstate stream commission project in Subsection 22
5805-of Section 28 of Chapter 138 of Laws 2021 to plan, design and
5806-construct improvements for the acequia Madre de los Romeros
5807-in San Miguel county is extended through fiscal year 2027.
5808-SECTION 306. PENDARIES VILLAGE MUTUAL DOMESTIC WATER
5809-CONSUMERS ASSOCIATION WATER SYSTEM IMPROVEMENT--EXTEND TIME--
5810-SEVERANCE TAX BONDS.--The time of expenditure for the
5811-department of environment project in Subsection 67 of
5812-Section 21 of Chapter 138 of Laws 2021 to plan, design and
5813-construct water supply lines and well construction projects
5814-for the Pendaries village mutual domestic water consumers
5815-association in San Miguel county is extended through fiscal
5816-year 2027.
5817-SECTION 307. SAN MIGUEL COUNTY DRUG TREATMENT FACILITY
5818-FURNITURE AND EQUIPMENT INSTALLATION--EXTEND TIME--GENERAL
5819-FUND.--The time of expenditure for the local government
5820-division project in Subsection 376 of Section 28 of SFC/SB 425
5821-Page 115
5822-1
5823-2
5824-3
5825-4
5826-5
5827-6
5828-7
5829-8
5830-9
5831-10
5832-11
5833-12
5834-13
5835-14
5836-15
5837-16
5838-17
5839-18
5840-19
5841-20
5842-21
5843-22
5844-23
5845-24
5846-25
5847-Chapter 199 of Laws 2023 to purchase and install fixtures,
5848-furniture and equipment at a drug treatment facility in
5849-San Miguel county is extended through fiscal year 2027.
5850-SECTION 308. SAN MIGUEL COUNTY EMERGENCY OPERATIONS
5851-CENTER LAPTOPS PURCHASE--EXTEND TIME--GENERAL FUND.--The time
5852-of expenditure for the local government division project in
5853-Subsection 387 of Section 28 of Chapter 199 of Laws 2023 to
5854-purchase and equip laptops for the emergency operations
5855-center in the office of emergency management in San Miguel
5856-county is extended through fiscal year 2027.
5857-SECTION 309. SAN MIGUEL COUNTY RADIO SYSTEM PURCHASE--
5858-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
5859-local government division project in Subsection 378 of
5860-Section 28 of Chapter 199 of Laws 2023 to purchase and equip
5861-radio systems for the sheriff's office in San Miguel county
5862-is extended through fiscal year 2027.
5863-SECTION 310. SAN MIGUEL COUNTY VEHICLE PURCHASE--EXTEND
5864-TIME--GENERAL FUND.--The time of expenditure for the local
5865-government division project in Subsection 380 of Section 28
5866-of Chapter 199 of Laws 2023 to purchase and equip vehicles
5867-for San Miguel county is extended through fiscal year 2027.
5868-SECTION 311. TECOLOTE ACEQUIA ASSOCIATION ACEQUIA
5869-IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of
5870-expenditure for the interstate stream commission project
5871-originally authorized in Subsection 41 of Section 33 of SFC/SB 425
5872-Page 116
5873-1
5874-2
5875-3
5876-4
5877-5
5878-6
5879-7
5880-8
5881-9
5882-10
5883-11
5884-12
5885-13
5886-14
5887-15
5888-16
5889-17
5890-18
5891-19
5892-20
5893-21
5894-22
5895-23
5896-24
5897-25
5898-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
5899-Chapter 203, Section 218 to plan, design and construct
5900-improvements for the Tecolote acequia association in
5901-San Miguel county is extended through fiscal year 2027.
5902-SECTION 312. LAS VEGAS EIGHTH STREET WATER LINE
5903-EXTENSION--CHANGE TO PURCHASE VEHICLES AND EQUIPMENT--CHANGE
5904-AGENCY--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended
5905-balance of the appropriation to the department of environment
5906-in Subsection 91 of Section 22 of Chapter 53 of Laws 2022 to
5907-plan, design and construct a water line along Eighth street
5908-north of Mills avenue in Las Vegas in San Miguel county shall
5909-not be expended for the original purpose but is appropriated
5910-to the local government division to purchase and equip
5911-vehicles and equipment for the utilities department in
5912-Las Vegas in San Miguel county. The time of expenditure is
5913-extended through fiscal year 2027.
5914-SECTION 313. LAS VEGAS VETERANS OF FOREIGN WARS
5915-BUILDING RENOVATION--CHANGE TO IMPROVE VETERANS PARK--GENERAL
5916-FUND.--The unexpended balance of the appropriation to the
5917-local government division in Subsection 450 of Section 28 of
5918-Chapter 66 of Laws 2024 to plan, design, construct and
5919-renovate the Las Vegas veterans of foreign wars building,
5920-including heating, ventilation and air conditioning systems,
5921-and to purchase and install equipment, including
5922-commemorative bricks, in Las Vegas in San Miguel county shall SFC/SB 425
5923-Page 117
5924-1
5925-2
5926-3
5927-4
5928-5
5929-6
5930-7
5931-8
5932-9
5933-10
5934-11
5935-12
5936-13
5937-14
5938-15
5939-16
5940-17
5941-18
5942-19
5943-20
5944-21
5945-22
5946-23
5947-24
5948-25
5949-not be expended for the original purpose but is changed to
5950-plan, design, construct, renovate, furnish and equip
5951-improvements to Veterans park in Las Vegas in San Miguel
5952-county.
5953-SECTION 314. LUNA COMMUNITY COLLEGE MOBILE MEDICAL
5954-CLASSROOM EQUIPMENT PURCHASE--CHANGE TO ALLIED HEALTH
5955-BUILDING RENOVATION--EXTEND TIME--GENERAL FUND.--The
5956-unexpended balance of the appropriation to the higher
5957-education department in Subsection 21 of Section 15 of
5958-Chapter 199 of Laws 2023 to purchase and equip a mobile
5959-medical classroom for the department of allied health and
5960-public service at Luna community college in Las Vegas in
5961-San Miguel county shall not be expended for the original
5962-purpose but is changed to plan, design, construct, renovate,
5963-furnish and equip the allied health building, including
5964-accessibility and heating, ventilation and air conditioning
5965-system improvements, at Luna community college in Las Vegas
5966-in San Miguel county. The time of expenditure is extended
5967-through fiscal year 2027.
5968-SECTION 315. NEW MEXICO HIGHLANDS UNIVERSITY SININGER
5969-HALL RENOVATION--CHANGE TO FACILITY SERVICES BUILDING
5970-RENOVATION--GENERAL FUND.--The unexpended balance of the
5971-appropriation to the board of regents of New Mexico highlands
5972-university in Subsection 4 of Section 35 of Chapter 199 of
5973-Laws 2023 to plan, design, construct, renovate and equip SFC/SB 425
5974-Page 118
5975-1
5976-2
5977-3
5978-4
5979-5
5980-6
5981-7
5982-8
5983-9
5984-10
5985-11
5986-12
5987-13
5988-14
5989-15
5990-16
5991-17
5992-18
5993-19
5994-20
5995-21
5996-22
5997-23
5998-24
5999-25
6000-Sininger hall at New Mexico highlands university in Las Vegas
6001-in San Miguel county shall not be expended for the original
6002-purpose but is changed to plan, design, construct, renovate,
6003-furnish and equip a facility services building at New Mexico
6004-highlands university in Las Vegas in San Miguel county.
6005-SECTION 316. SAN MIGUEL COUNTY PASSENGER VAN PURCHASE--
6006-EXPAND PURPOSE--EXTEND TIME--GENERAL FUND.--The local
6007-government division project in Subsection 388 of Section 28
6008-of Chapter 199 of Laws 2023 to purchase and equip passenger
6009-vans for after-school and summer programs in Las Vegas in
6010-San Miguel county may include purchasing and equipping buses.
6011-The time of expenditure is extended through fiscal year 2027.
6012-SECTION 317. PECOS WATER TANK CONSTRUCTION--CHANGE TO
6013-PECOS WATER AND WASTEWATER SYSTEM IMPROVEMENT--EXTEND TIME--
6014-GENERAL FUND.--The unexpended balance of the appropriation to
6015-the department of environment in Subsection 77 of Section 20
6016-of Chapter 66 of Laws 2024 to plan, design, construct and
6017-equip a water storage tank for the Benedictine monastery in
6018-Pecos in San Miguel county shall not be expended for the
6019-original purpose but is changed to plan, design, construct
6020-and improve water and wastewater systems, including water
6021-tanks, in Pecos in San Miguel county. The time of
6022-expenditure is extended through fiscal year 2027.
6023-SECTION 318. VALLEY ELEMENTARY AND MIDDLE SCHOOL HEALTH
6024-CENTER RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The SFC/SB 425
6025-Page 119
6026-1
6027-2
6028-3
6029-4
6030-5
6031-6
6032-7
6033-8
6034-9
6035-10
6036-11
6037-12
6038-13
6039-14
6040-15
6041-16
6042-17
6043-18
6044-19
6045-20
6046-21
6047-22
6048-23
6049-24
6050-25
6051-time of expenditure for the public education department
6052-project in Subsection 165 of Section 17 of Chapter 138 of
6053-Laws 2021 to plan, design, construct and renovate existing
6054-space for a health center at Valley elementary and middle
6055-schools in the West Las Vegas public school district in
6056-San Miguel county is extended through fiscal year 2027.
6057-SECTION 319. GARCIA LUCERO ACEQUIA ASSOCIATION
6058-IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of
6059-expenditure for the interstate stream commission project
6060-originally authorized in Subsection 46 of Section 33 of
6061-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
6062-Chapter 203, Section 225 to plan, design, construct and equip
6063-improvements to the Garcia Lucero acequia association in
6064-Sandoval county is extended through fiscal year 2027.
6065-SECTION 320. LA JARA WATER USERS' ASSOCIATION WATER
6066-SYSTEM IMPROVEMENT--CHANGE TO LA JARA MUTUAL DOMESTIC WATER
6067-CONSUMERS' AND MUTUAL SEWAGE WORKS ASSOCIATION WATER SYSTEM
6068-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The
6069-unexpended balance of the appropriation to the department of
6070-environment in Subsection 70 of Section 21 of Chapter 138 of
6071-Laws 2021 to plan, design and construct water system
6072-improvements for La Jara water users' association in Sandoval
6073-county shall not be expended for the original purpose but is
6074-changed to plan, design and construct water system
6075-improvements for La Jara mutual domestic water consumers' and SFC/SB 425
6076-Page 120
6077-1
6078-2
6079-3
6080-4
6081-5
6082-6
6083-7
6084-8
6085-9
6086-10
6087-11
6088-12
6089-13
6090-14
6091-15
6092-16
6093-17
6094-18
6095-19
6096-20
6097-21
6098-22
6099-23
6100-24
6101-25
6102-mutual sewage works association in Sandoval county. The time
6103-of expenditure is extended through fiscal year 2027.
6104-SECTION 321. PENA BLANCA WATER AND SANITATION DISTRICT
6105-WATER SYSTEM IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--
6106-The time of expenditure for the department of environment
6107-project in Subsection 71 of Section 21 of Chapter 138 of
6108-Laws 2021 to plan, design and construct water system
6109-improvements, including water lines, pressure-reducing valve
6110-stations and fire hydrants, for the Pena Blanca water and
6111-sanitation district in Sandoval county is extended through
6112-fiscal year 2027.
6113-SECTION 322. PLACITAS SENIOR CENTER PLAN AND DESIGN--
6114-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
6115-for the aging and long-term services department project in
6116-Subsection 46 of Section 5 of Chapter 138 of Laws 2021 to
6117-plan and design the Placitas senior center in Sandoval county
6118-is extended through fiscal year 2027.
6119-SECTION 323. SAN ANTONIO DE LAS HUERTAS LAND
6120-GRANT-MERCED COMMUNITY BUILDING CONSTRUCTION--EXTEND TIME--
6121-GENERAL FUND.--The time of expenditure for the local
6122-government division project originally authorized in
6123-Subsection 380 of Section 34 of Chapter 277 of Laws 2019 and
6124-reauthorized in Laws 2021, Chapter 139, Section 67 and
6125-reauthorized again in Laws 2023, Chapter 203, Section 228 to
6126-plan, design, construct, purchase, renovate, furnish and SFC/SB 425
6127-Page 121
6128-1
6129-2
6130-3
6131-4
6132-5
6133-6
6134-7
6135-8
6136-9
6137-10
6138-11
6139-12
6140-13
6141-14
6142-15
6143-16
6144-17
6145-18
6146-19
6147-20
6148-21
6149-22
6150-23
6151-24
6152-25
6153-equip a community building for the San Antonio de las Huertas
6154-land grant-merced in Sandoval county is extended through
6155-fiscal year 2027.
6156-SECTION 324. SANDOVAL COUNTY THIRTEENTH JUDICIAL
6157-DISTRICT COURTHOUSE CONSTRUCTION--CHANGE AGENCY--GENERAL
6158-FUND.--The agency for the office of the district attorney of
6159-the thirteenth judicial district project in Laws 2024,
6160-Chapter 66, Section 12 to plan, design, construct, furnish
6161-and expand the thirteenth judicial district courthouse in
6162-Sandoval county is changed to the thirteenth judicial
6163-district court.
6164-SECTION 325. EDGEWOOD WASTEWATER TREATMENT PLANT
6165-CONSTRUCTION--CHANGE TO SANDOVAL COUNTY ANIMAL SHELTER
6166-CONSTRUCTION--CHANGE AGENCY--EXTEND TIME--SEVERANCE TAX
6167-BONDS.--Twenty-one percent of the unexpended balance of
6168- the
6169-department of environment project in Subsection 85 of
6170-Section 21 of Chapter 138 of Laws 2021 to plan, design,
6171-construct and equip a wastewater treatment plant for Edgewood
6172-in Santa Fe county shall not be expended for the original
6173-purpose but is appropriated to the local government division
6174-to acquire land for and to plan, design, construct and equip
6175-an animal shelter in Sandoval county. The time of
6176-expenditure is extended through fiscal year 2027.
6177-SECTION 326. COCHITI PUEBLO PLAZA HOUSING RENOVATION--
6178-EXTEND TIME--GENERAL FUND.--The time of expenditure for the SFC/SB 425
6179-Page 122
6180-1
6181-2
6182-3
6183-4
6184-5
6185-6
6186-7
6187-8
6188-9
6189-10
6190-11
6191-12
6192-13
6193-14
6194-15
6195-16
6196-17
6197-18
6198-19
6199-20
6200-21
6201-22
6202-23
6203-24
6204-25
6205-Indian affairs department project in Subsection 23 of
6206-Section 47 of Chapter 53 of Laws 2022 to plan, design,
6207-construct and renovate housing in the council-designated
6208-historic area of the plaza in the Pueblo of Cochiti in
6209-Sandoval county is extended through fiscal year 2027.
6210-SECTION 327. COCHITI PUEBLO SENIOR CENTER IMPROVEMENT
6211-AND VEHICLE PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The
6212-time of expenditure for the aging and long-term services
6213-department project in Subsection 43 of Section 5 of
6214-Chapter 138 of Laws 2021 to plan, design and construct
6215-improvements, including lighting, parking, entry, garage,
6216-patio, bathrooms, kitchen and roof repair and replacement,
6217-and to purchase and equip vehicles for the senior center in
6218-the Pueblo of Cochiti in Sandoval county is extended through
6219-fiscal year 2027.
6220-SECTION 328. COCHITI PUEBLO SENIOR CENTER ROOF
6221-IMPROVEMENT AND VEHICLE PURCHASE--EXTEND TIME--GENERAL
6222-FUND.--The time of expenditure for the aging and long-term
6223-services department project in Subsection 1 of Section 45 of
6224-Chapter 138 of Laws 2021 to plan, design and construct
6225-improvements, including lighting, parking, entry, garage,
6226-patio, bathrooms, kitchen and roof repair and replacement,
6227-and to purchase and equip vehicles for the senior center in
6228-the Pueblo of Cochiti in Sandoval county is extended through
6229-fiscal year 2027. SFC/SB 425
6230-Page 123
6231-1
6232-2
6233-3
6234-4
6235-5
6236-6
6237-7
6238-8
6239-9
6240-10
6241-11
6242-12
6243-13
6244-14
6245-15
6246-16
6247-17
6248-18
6249-19
6250-20
6251-21
6252-22
6253-23
6254-24
6255-25
6256-SECTION 329. CORRALES WEST MEADOWLARK LANE TRAIL
6257-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
6258-expenditure for the local government division project in
6259-Subsection 322 of Section 29 of Chapter 138 of Laws 2021 to
6260-plan, design and construct the west Meadowlark lane trail in
6261-Corrales in Sandoval county is extended through fiscal year
6262-2027.
6263-SECTION 330. SANDOVAL COUNTY RIDING CENTER VEHICLE
6264-PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure
6265-for the local government division project originally
6266-authorized in Subsection 409 of Section 28 of Chapter 199 of
6267-Laws 2023 and reauthorized in Laws 2024, Chapter 65,
6268-Section 195 to purchase vehicles and equipment for a
6269-therapeutic riding facility in Corrales in Sandoval county is
6270-extended through fiscal year 2027.
6271-SECTION 331. JEMEZ PUEBLO GLOBAL POSITIONING SYSTEM
6272-UNIT EQUIPMENT PURCHASE--EXTEND TIME--GENERAL FUND.--The time
6273-of expenditure for the Indian affairs department project in
6274-Subsection 127 of Section 25 of Chapter 199 of Laws 2023 to
6275-purchase, equip and install a global positioning system unit
6276-for the Pueblo of Jemez in Sandoval county is extended
6277-through fiscal year 2027.
6278-SECTION 332. JEMEZ PUEBLO SEWER JETTER EQUIPMENT
6279-PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure
6280-for the department of environment project in Subsection 104 SFC/SB 425
6281-Page 124
6282-1
6283-2
6284-3
6285-4
6286-5
6287-6
6288-7
6289-8
6290-9
6291-10
6292-11
6293-12
6294-13
6295-14
6296-15
6297-16
6298-17
6299-18
6300-19
6301-20
6302-21
6303-22
6304-23
6305-24
6306-25
6307-of Section 19 of Chapter 199 of Laws 2023 to purchase and
6308-equip a sewer jetter for the Pueblo of Jemez in Sandoval
6309-county is extended through fiscal year 2027.
6310-SECTION 333. IDALIA ROAD AND LOMA COLORADO BOULEVARD
6311-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
6312-expenditure for the department of transportation project in
6313-Subsection 92 of Section 33 of Chapter 138 of Laws 2021 to
6314-plan, design and construct intersection improvements at
6315-Idalia road and Loma Colorado boulevard in Rio Rancho in
6316-Sandoval county is extended through fiscal year 2027.
6317-SECTION 334. SOUTHERN SANDOVAL COUNTY ARROYO FLOOD
6318-CONTROL AUTHORITY INDUSTRIAL PARK WATER FACILITY
6319-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
6320-expenditure for the department of environment project in
6321-Subsection 74 of Section 21 of Chapter 138 of Laws 2021 to
6322-plan, design and construct a water quality facility for an
6323-industrial park for the southern Sandoval county arroyo flood
6324-control authority in Sandoval county is extended through
6325-fiscal year 2027.
6326-SECTION 335. ENCHANTED HILLS ELEMENTARY SCHOOL FIRE
6327-PROTECTION SYSTEM IMPROVEMENT--EXTEND TIME--GENERAL
6328-FUND.--The time of expenditure for the public education
6329-department project in Subsection 193 of Section 16 of
6330-Chapter 199 of Laws 2023 to plan, design, purchase and
6331-install a fire protection system for Enchanted Hills SFC/SB 425
6332-Page 125
6333-1
6334-2
6335-3
6336-4
6337-5
6338-6
6339-7
6340-8
6341-9
6342-10
6343-11
6344-12
6345-13
6346-14
6347-15
6348-16
6349-17
6350-18
6351-19
6352-20
6353-21
6354-22
6355-23
6356-24
6357-25
6358-elementary school in the Rio Rancho public school district in
6359-Sandoval county is extended through fiscal year 2027.
6360-SECTION 336. ZIA PUEBLO HEALTH AND WELLNESS CENTER
6361-CONSTRUCTION--CHANGE TO GAS STATION CONSTRUCTION--GENERAL
6362-FUND.--The unexpended balance of the appropriation to the
6363-Indian affairs department in Subsection 142 of Section 25 of
6364-Chapter 199 of Laws 2023 to plan, design, construct and equip
6365-a health and wellness center for the Pueblo of Zia in
6366-Sandoval county shall not be expended for the original
6367-purpose but is changed to plan, design, construct and equip a
6368-gas station for the Pueblo of Zia in Sandoval county.
6369-SECTION 337. ACEQUIA DE LA OTRA BANDA IMPROVEMENT--
6370-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
6371-interstate stream commission project originally authorized in
6372-Subsection 54 of Section 33 of Chapter 277 of Laws 2019 and
6373-reauthorized in Laws 2023, Chapter 203, Section 234 to
6374-plan, design and construct improvements to the acequia
6375-de la Otra Banda in Santa Fe county is extended through
6376-fiscal year 2027.
6377-SECTION 338. ACEQUIA DEL BARRANCO ALTO IMPROVEMENT--
6378-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
6379-interstate stream commission project originally authorized in
6380-Subsection 56 of Section 33 of Chapter 277 of Laws 2019 and
6381-reauthorized in Laws 2023, Chapter 203, Section 236 to
6382-plan, design and construct improvements to the acequia SFC/SB 425
6383-Page 126
6384-1
6385-2
6386-3
6387-4
6388-5
6389-6
6390-7
6391-8
6392-9
6393-10
6394-11
6395-12
6396-13
6397-14
6398-15
6399-16
6400-17
6401-18
6402-19
6403-20
6404-21
6405-22
6406-23
6407-24
6408-25
6409-del Barranco Alto in Santa Fe county is extended through
6410-fiscal year 2027.
6411-SECTION 339. ACEQUIA DEL CANO IMPROVEMENT--EXTEND
6412-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
6413-interstate stream commission project in Subsection 27 of
6414-Section 28 of Chapter 138 of Laws 2021 to plan, design and
6415-construct improvements to the acequia del Cano in Santa Fe
6416-county is extended through fiscal year 2027.
6417-SECTION 340. ELDORADO AREA WATER AND SANITATION
6418-DISTRICT HEAVY EQUIPMENT PURCHASE--EXPAND PURPOSE--GENERAL
6419-FUND.--The local government division project in Subsection
6420-583 of Section 28 of Chapter 66 of Laws 2024 to purchase and
6421-equip heavy equipment, including a backhoe, dump truck and
6422-fleet maintenance truck, for the Eldorado area water and
6423-sanitation district in Santa Fe county may include the
6424-purchase of a generator.
6425-SECTION 341. LA BAJADA COMMUNITY DITCH AND MUTUAL
6426-DOMESTIC WATER ASSOCIATION WATER LINE CONSTRUCT--EXTEND
6427-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
6428-department of environment project in Subsection 81 of
6429-Section 21 of Chapter 138 of Laws 2021 to plan, design and
6430-construct water lines, including tank connections, for
6431-La Bajada community ditch and mutual domestic water
6432-association in Santa Fe county is extended through fiscal
6433-year 2027. SFC/SB 425
6434-Page 127
6435-1
6436-2
6437-3
6438-4
6439-5
6440-6
6441-7
6442-8
6443-9
6444-10
6445-11
6446-12
6447-13
6448-14
6449-15
6450-16
6451-17
6452-18
6453-19
6454-20
6455-21
6456-22
6457-23
6458-24
6459-25
6460-SECTION 342. LA BAJADA COMMUNITY DITCH AND MUTUAL
6461-DOMESTIC WATER ASSOCIATION HYDRANT AND METER INSTALLATION--
6462-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
6463-for the department of environment project in Subsection 80 of
6464-Section 21 of Chapter 138 of Laws 2021 to plan, design,
6465-construct, purchase, equip and install fire hydrants and
6466-meters related to a well for La Bajada community ditch and
6467-mutual domestic water association in Santa Fe county is
6468-extended through fiscal year 2027.
6469-SECTION 343. LA BAJADA MUTUAL DOMESTIC WATER CONSUMERS
6470-ASSOCIATION WATER SYSTEM IMPROVEMENT--CHANGE TO LA BAJADA
6471-COMMUNITY DITCH AND MUTUAL DOMESTIC WATER ASSOCIATION WATER
6472-SYSTEM IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The
6473-unexpended balance of the appropriation to the department of
6474-environment originally authorized in Subsection 120 of
6475-Section 26 of Chapter 277 of Laws 2019 and reauthorized in
6476-Laws 2023, Chapter 203, Section 240 to plan, design and
6477-construct water system improvements for La Bajada mutual
6478-domestic water consumers association in Santa Fe county shall
6479-not be expended for the original or reauthorized purpose but
6480-is changed to plan, design and construct water system
6481-improvements for La Bajada community ditch and mutual
6482-domestic water association in Santa Fe county. The time of
6483-expenditure is extended through fiscal year 2027.
6484-SECTION 344. SANTA FE COUNTY EDGEWOOD FIRE STATION SFC/SB 425
6485-Page 128
6486-1
6487-2
6488-3
6489-4
6490-5
6491-6
6492-7
6493-8
6494-9
6495-10
6496-11
6497-12
6498-13
6499-14
6500-15
6501-16
6502-17
6503-18
6504-19
6505-20
6506-21
6507-22
6508-23
6509-24
6510-25
6511-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
6512-expenditure for the local government division project
6513-originally authorized in Subsection 337 of Section 29 of
6514-Chapter 138 of Laws 2021 and reauthorized in Laws 2023,
6515-Chapter 203, Section 247 to plan, design, construct, furnish,
6516-equip and improve fire stations in the Edgewood fire district
6517-in Santa Fe county is extended through fiscal year 2027.
6518-SECTION 345. SANTA FE COUNTY ESPERANZA SHELTER SOLAR
6519-PANEL INSTALLATION--CHANGE TO SANTA FE COUNTY FACILITIES
6520-SOLAR PANEL INSTALLATION--EXTEND TIME--SEVERANCE TAX
6521-BONDS.--The unexpended balance of the appropriation to the
6522-local government division in Subsection 402 of Section 30 of
6523-Chapter 53 of Laws 2022 to plan, design and construct a roof
6524-replacement and to purchase and install solar panels at the
6525-Esperanza shelter in Santa Fe in Santa Fe county shall not be
6526-expended for the original purpose but is changed to plan,
6527-design, construct, purchase and install solar panels at
6528-county facilities in Santa Fe county. The time of
6529-expenditure is extended through fiscal year 2027.
6530-SECTION 346. SANTA FE COUNTY LA CIENEGA WATER MASTER
6531-PLAN--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
6532-expenditure for the department of environment project in
6533-Subsection 83 of Section 21 of Chapter 138 of Laws 2021 for a
6534-master plan and a preliminary engineering report to evaluate
6535-existing water infrastructure, to examine uses and impacts SFC/SB 425
6536-Page 129
6537-1
6538-2
6539-3
6540-4
6541-5
6542-6
6543-7
6544-8
6545-9
6546-10
6547-11
6548-12
6549-13
6550-14
6551-15
6552-16
6553-17
6554-18
6555-19
6556-20
6557-21
6558-22
6559-23
6560-24
6561-25
6562-and to identify the best methods for increasing flows in
6563-La Cienega springs and traditional water sources for
6564-La Cienega in Santa Fe county is extended through fiscal year
6565-2027.
6566-SECTION 347. SANTA FE COUNTY POJOAQUE DISTRICT FIRE
6567-STATION CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of
6568-expenditure for the local government division project
6569-originally authorized in Subsection 393 of Section 34 of
6570-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
6571-Chapter 203, Section 306 to plan, design, construct, improve,
6572-furnish and equip fire stations in the Pojoaque fire district
6573-in Santa Fe county is extended through fiscal year 2027.
6574-SECTION 348. TEODORO Y TEODORA DITCH IMPROVEMENT--
6575-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
6576-interstate stream commission project originally authorized in
6577-Subsection 53 of Section 33 of Chapter 277 of Laws 2019 and
6578-reauthorized in Laws 2023, Chapter 203, Section 243 to plan,
6579-design and construct improvements to the Teodoro y Teodora
6580-ditch in Santa Fe county is extended through fiscal year
6581-2027.
6582-SECTION 349. TESUQUE PUEBLO WATER DISTRIBUTION SYSTEM
6583-CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of
6584-expenditure for the Indian affairs department project in
6585-Subsection 29 of Section 48 of Chapter 138 of Laws 2021 to
6586-plan, design and construct a drinking water delivery and fire SFC/SB 425
6587-Page 130
6588-1
6589-2
6590-3
6591-4
6592-5
6593-6
6594-7
6595-8
6596-9
6597-10
6598-11
6599-12
6600-13
6601-14
6602-15
6603-16
6604-17
6605-18
6606-19
6607-20
6608-21
6609-22
6610-23
6611-24
6612-25
6613-protection system for the Pueblo of Tesuque in Santa Fe
6614-county is extended through fiscal year 2027.
6615-SECTION 350. UNITED STATES HIGHWAY 84/285 NOISE
6616-MITIGATION CONSTRUCTION--EXTEND TIME--SEVERANCE TAX
6617-BONDS.--The time of expenditure for the department of
6618-transportation project in Subsection 96 of Section 33 of
6619-Chapter 138 of Laws 2021 to plan, design and construct a road
6620-noise mitigation project for United States highway 84/285
6621-north of Santa Fe in Santa Fe county is extended through
6622-fiscal year 2027.
6623-SECTION 351. AGUA FRIA COMMUNITY WATER SYSTEM
6624-ASSOCIATION TRANSFERS AND WATER SYSTEM IMPROVEMENT--EXTEND
6625-TIME--GENERAL FUND.--The time of expenditure for the
6626-department of transportation project originally authorized in
6627-Subsection 135 of Section 40 of Chapter 277 of Laws 2019 and
6628-reauthorized to the department of environment in Laws 2023,
6629-Chapter 203, Section 238 to acquire water rights, including
6630-applications and transfers, and to plan, design and construct
6631-improvements to water distribution systems, including well
6632-and water line extensions, for the Agua Fria community water
6633-system association in Santa Fe county is extended through
6634-fiscal year 2027.
6635-SECTION 352. AGUA FRIA COMMUNITY WATER SYSTEM
6636-ASSOCIATION WATER RIGHTS ACQUISITION AND WATER SYSTEM
6637-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of SFC/SB 425
6638-Page 131
6639-1
6640-2
6641-3
6642-4
6643-5
6644-6
6645-7
6646-8
6647-9
6648-10
6649-11
6650-12
6651-13
6652-14
6653-15
6654-16
6655-17
6656-18
6657-19
6658-20
6659-21
6660-22
6661-23
6662-24
6663-25
6664-expenditure for the department of transportation project
6665-originally authorized in Subsection 97 of Section 33 of
6666-Chapter 138 of Laws 2021 and appropriated to the department
6667-of environment in Laws 2023, Chapter 203, Section 237 to
6668-acquire water rights, including applications and transfers,
6669-and to plan, design and construct improvements to water
6670-distribution systems, including well and water line
6671-extensions, for the Agua Fria community water system
6672-association in Santa Fe county is extended through fiscal
6673-year 2027.
6674-SECTION 353. AGUA FRIA COMMUNITY WATER SYSTEM
6675-ASSOCIATION WATER DISTRIBUTION SYSTEM CONSTRUCTION--EXTEND
6676-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
6677-department of environment project in Subsection 77 of
6678-Section 21 of Chapter 138 of Laws 2021 to acquire water
6679-rights, including applications and transfers, and to plan,
6680-design and construct improvements to water distribution
6681-systems, including wells and water line extensions, for the
6682-Agua Fria community water system association in Santa Fe
6683-county is extended through fiscal year 2027.
6684-SECTION 354. MADRID WATER MUTUAL DOMESTIC WATER
6685-CONSUMERS ASSOCIATION FIRE SUPPRESSION TANK CONSTRUCTION--
6686-CHANGE TO SANTA FE COUNTY MADRID COMMUNITY WATER SYSTEM TEST
6687-WELL CONSTRUCTION--CHANGE AGENCY--EXTEND TIME--GENERAL
6688-FUND.--The unexpended balance of the appropriation to the SFC/SB 425
6689-Page 132
6690-1
6691-2
6692-3
6693-4
6694-5
6695-6
6696-7
6697-8
6698-9
6699-10
6700-11
6701-12
6702-13
6703-14
6704-15
6705-16
6706-17
6707-18
6708-19
6709-20
6710-21
6711-22
6712-23
6713-24
6714-25
6715-local government division in Subsection 384 of Section 34 of
6716-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
6717-Chapter 203, Section 241 to plan, design, construct,
6718-purchase, equip and install a non-pressurized underground
6719-fire suppression tank for the Madrid water mutual domestic
6720-water consumers association in Santa Fe county shall not be
6721-expended for the original or reauthorized purpose but is
6722-appropriated to the department of environment to plan,
6723-design, construct, improve and equip test water wells for the
6724-community water system in Madrid in Santa Fe county. The
6725-time of expenditure is extended through fiscal year 2027.
6726-SECTION 355. SANTA FE COUNTY MADRID FIRE SUPPRESSION
6727-SYSTEM CONSTRUCTION--CHANGE TO SANTA FE COUNTY MADRID
6728-COMMUNITY WATER SYSTEM TEST WELL CONSTRUCTION--CHANGE
6729-AGENCY--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended
6730-balance of the appropriation to the local government division
6731-in Subsection 339 of Section 29 of Chapter 138 of Laws 2021
6732-to plan, design, construct, improve and equip the fire
6733-suppression system in the Madrid area in Santa Fe county
6734-shall not be expended for the original purpose but is
6735-appropriated to the department of environment to plan,
6736-design, construct, improve and equip test water wells for the
6737-community water system in Madrid in Santa Fe county. The
6738-time of expenditure is extended through fiscal year 2027.
6739-SECTION 356. NAMBE PUEBLO SENIOR CENTER IMPROVEMENT-- SFC/SB 425
6740-Page 133
6741-1
6742-2
6743-3
6744-4
6745-5
6746-6
6747-7
6748-8
6749-9
6750-10
6751-11
6752-12
6753-13
6754-14
6755-15
6756-16
6757-17
6758-18
6759-19
6760-20
6761-21
6762-22
6763-23
6764-24
6765-25
6766-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
6767-aging and long-term services department project in
6768-Subsection 2 of Section 45 of Chapter 138 of Laws 2021 to
6769-plan, design, construct, improve, furnish and equip a senior
6770-center in the Pueblo of Nambe in Santa Fe county is extended
6771-through fiscal year 2027.
6772-SECTION 357. SANTA FE COUNTY ABEDON LOPEZ SENIOR CENTER
6773-UPGRADE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
6774-expenditure for the aging and long-term services department
6775-project in Subsection 50 of Section 5 of Chapter 138 of
6776-Laws 2021 to plan, design, construct, upgrade and equip the
6777-Abedon Lopez senior center in Santa Cruz in Santa Fe county
6778-is extended through fiscal year 2027.
6779-SECTION 358. CHILDREN, YOUTH AND FAMILIES DEPARTMENT
6780-PUBLIC EMPLOYEES RETIREMENT ASSOCIATION BUILDING RENOVATION--
6781-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
6782-for the capital program fund project in Subsection 4 of
6783-Section 9 of Chapter 138 of Laws 2021 to plan, design,
6784-construct, renovate, furnish and equip facilities for the
6785-children, youth and families department at the public
6786-employees retirement association building in Santa Fe in
6787-Santa Fe county is extended through fiscal year 2027.
6788-SECTION 359. DEPARTMENT OF HEALTH FORT BAYARD WATER
6789-INFRASTRUCTURE IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The
6790-time of expenditure for the capital program fund project SFC/SB 425
6791-Page 134
6792-1
6793-2
6794-3
6795-4
6796-5
6797-6
6798-7
6799-8
6800-9
6801-10
6802-11
6803-12
6804-13
6805-14
6806-15
6807-16
6808-17
6809-18
6810-19
6811-20
6812-21
6813-22
6814-23
6815-24
6816-25
6817-originally authorized in Subsection 4 of Section 7 of
6818-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
6819-Chapter 203, Section 110 to plan, design, construct, improve,
6820-renovate, repair, remediate, furnish and equip infrastructure
6821-extending from springs located in the Gila national forest to
6822-the old Fort Bayard water tanks and to certify code
6823-compliance to provide water to the current Fort Bayard
6824-medical facility in Grant county is extended through fiscal
6825-year 2027.
6826-SECTION 360. GOVERNOR MILES ROAD IMPROVEMENT--EXTEND
6827-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
6828-department of transportation project in Subsection 98 of
6829-Section 33 of Chapter 138 of Laws 2021 to acquire rights of
6830-way and to plan, design, construct and improve pedestrian,
6831-bicycle and drainage infrastructure on Governor Miles road in
6832-Santa Fe in Santa Fe county is extended through fiscal year
6833-2027.
6834-SECTION 361. JOHN F. SIMMS BUILDING RENOVATION--EXTEND
6835-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
6836-capital program fund project in Subsection 8 of Section 9 of
6837-Chapter 138 of Laws 2021 to plan, design, construct, renovate
6838-and improve the John F. Simms building in Santa Fe in
6839-Santa Fe county is extended through fiscal year 2027.
6840-SECTION 362. LA BAJADA COMMUNITY DITCH IMPROVEMENT--
6841-CHANGE TO LA BAJADA COMMUNITY DITCH AND MUTUAL DOMESTIC WATER SFC/SB 425
6842-Page 135
6843-1
6844-2
6845-3
6846-4
6847-5
6848-6
6849-7
6850-8
6851-9
6852-10
6853-11
6854-12
6855-13
6856-14
6857-15
6858-16
6859-17
6860-18
6861-19
6862-20
6863-21
6864-22
6865-23
6866-24
6867-25
6868-ASSOCIATION ACEQUIA IMPROVEMENT--EXTEND TIME--GENERAL
6869-FUND.--The unexpended balance of the appropriation to the
6870-interstate stream commission originally authorized in
6871-Subsection 59 of Section 33 of Chapter 277 of Laws 2019 and
6872-reauthorized in Laws 2023, Chapter 203, Section 239 to plan,
6873-design, construct, repair, rehabilitate and improve La Bajada
6874-community ditch in the La Bajada area of Santa Fe county
6875-shall not be expended for the original or reauthorized
6876-purpose but is changed to plan, design, construct, repair,
6877-rehabilitate and improve La Bajada community ditch for
6878-La Bajada community ditch and mutual domestic water
6879-association in the La Bajada area of Santa Fe county. The
6880-time of expenditure is extended through fiscal year 2027.
6881-SECTION 363. LA BAJADA COMMUNITY DITCH AND MUTUAL
6882-DOMESTIC WATER ASSOCIATION BROADBAND CONSTRUCTION--CHANGE TO
6883-FIRE HYDRANT AND METER INSTALLATION--CHANGE AGENCY--EXTEND
6884-TIME--SEVERANCE TAX BONDS.--The unexpended balance of the
6885-appropriation to the local government division in
6886-Subsection 395 of Section 29 of Chapter 138 of Laws 2021 to
6887-plan, design and construct broadband connections for
6888-La Bajada community ditch and mutual domestic water
6889-association in Santa Fe county shall not be expended for the
6890-original purpose but is appropriated to the department of
6891-environment to plan, design, construct, purchase, equip and
6892-install fire hydrants and meters for La Bajada community SFC/SB 425
6893-Page 136
6894-1
6895-2
6896-3
6897-4
6898-5
6899-6
6900-7
6901-8
6902-9
6903-10
6904-11
6905-12
6906-13
6907-14
6908-15
6909-16
6910-17
6911-18
6912-19
6913-20
6914-21
6915-22
6916-23
6917-24
6918-25
6919-ditch and mutual domestic water association in Santa Fe
6920-county. The time of expenditure is extended through fiscal
6921-year 2027.
6922-SECTION 364. NAMBE PUEBLO SENIOR CENTER IMPROVEMENT--
6923-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
6924-for the aging and long-term services department project in
6925-Subsection 49 of Section 5 of Chapter 138 of Laws 2021 to
6926-plan, design, construct, furnish and equip facility
6927-improvements to the Nambe Pueblo senior center in the Pueblo
6928-of Nambe in Santa Fe county is extended through fiscal year
6929-2027.
6930-SECTION 365. NEW MEXICO HIGHWAY 118 IMPROVEMENT--EXTEND
6931-TIME--GENERAL FUND.--The time of expenditure for the
6932-department of transportation project originally authorized in
6933-Subsection 96 of Section 40 of Chapter 277 of Laws 2019 and
6934-reauthorized in Laws 2023, Chapter 203, Section 137 to plan,
6935-design and construct road improvements along New Mexico
6936-highway 118 for the Church Rock chapter of the Navajo Nation
6937-in McKinley county is extended through fiscal year 2027.
6938-SECTION 366. NEW MEXICO SCHOOL FOR THE DEAF CENTRAL
6939-PLANT AND JAMES A. LITTLE THEATER IMPROVEMENT--EXTEND TIME--
6940-SEVERANCE TAX BONDS.--The time of expenditure for the New
6941-Mexico school for the deaf project in Laws 2021, Chapter 138,
6942-Section 12 to plan, design, construct, renovate, furnish and
6943-equip facilities, including abatement, at the James A. Little SFC/SB 425
6944-Page 137
6945-1
6946-2
6947-3
6948-4
6949-5
6950-6
6951-7
6952-8
6953-9
6954-10
6955-11
6956-12
6957-13
6958-14
6959-15
6960-16
6961-17
6962-18
6963-19
6964-20
6965-21
6966-22
6967-23
6968-24
6969-25
6970-theater building, central plant and associated site areas at
6971-the New Mexico school for the deaf in Santa Fe in Santa Fe
6972-county is extended through fiscal year 2027.
6973-SECTION 367. SANTA FE COUNTY SHERIFF LICENSE PLATE
6974-READER PURCHASE--EXTEND TIME--GENERAL FUND.--The time of
6975-expenditure for the local government division project in
6976-Subsection 431 of Section 28 of Chapter 199 of Laws 2023 to
6977-purchase and equip police mobile camera license plate
6978-readers, including fixed and mobile systems and related
6979-technology, for the county sheriff in Santa Fe county is
6980-extended through fiscal year 2027.
6981-SECTION 368. SANTA FE FIRE STATION 2 CONSTRUCTION--
6982-CHANGE TO SANTA FE FIRE STATION IMPROVEMENT--GENERAL
6983-FUND.--The unexpended balance of the appropriation to the
6984-local government division in Subsection 492 of Section 28 of
6985-Chapter 66 of Laws 2024 to plan, design, construct, furnish
6986-and equip fire station 2, including related infrastructure,
6987-in Santa Fe in Santa Fe county shall not be expended for the
6988-original purpose but is changed to plan, design, construct,
6989-renovate, furnish and equip fire station facilities in
6990-Santa Fe in Santa Fe county.
6991-SECTION 369. SANTA FE FIRE STATION 2 CONSTRUCTION--
6992-CHANGE TO FIRE STATION RENOVATION--EXTEND TIME--GENERAL
6993-FUND.--The unexpended balance of the appropriation to the
6994-local government division in Subsection 447 of Section 28 of SFC/SB 425
6995-Page 138
6996-1
6997-2
6998-3
6999-4
7000-5
7001-6
7002-7
7003-8
7004-9
7005-10
7006-11
7007-12
7008-13
7009-14
7010-15
7011-16
7012-17
7013-18
7014-19
7015-20
7016-21
7017-22
7018-23
7019-24
7020-25
7021-Chapter 199 of Laws 2023 to plan, design, construct, furnish
7022-and equip fire station 2, including infrastructure, for
7023-Santa Fe in Santa Fe county shall not be expended for the
7024-original purpose but is changed to plan, design, construct,
7025-renovate, furnish and equip fire station facilities in
7026-Santa Fe in Santa Fe county. The time of expenditure is
7027-extended through fiscal year 2027.
7028-SECTION 370. SANTA FE HOMEBOUND MEALS PROGRAM
7029-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
7030-expenditure for the local government division project in
7031-Subsection 340 of Section 29 of Chapter 138 of Laws 2021 to
7032-plan, design, renovate, construct, improve and equip a
7033-facility for a meals program serving homebound and special
7034-needs individuals in Santa Fe in Santa Fe county is extended
7035-through fiscal year 2027.
7036-SECTION 371. SANTA FE MIDTOWN INFRASTRUCTURE
7037-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
7038-expenditure for the local government division project in
7039-Subsection 344 of Section 29 of Chapter 138 of Laws 2021 to
7040-plan, design, construct and improve infrastructure for the
7041-midtown Santa Fe property in Santa Fe in Santa Fe county is
7042-extended through fiscal year 2027.
7043-SECTION 372. SANTA FE PARKS IMPROVEMENT--EXTEND TIME--
7044-SEVERANCE TAX BONDS.--The time of expenditure for the local
7045-government division project in Subsection 341 of Section 29 SFC/SB 425
7046-Page 139
7047-1
7048-2
7049-3
7050-4
7051-5
7052-6
7053-7
7054-8
7055-9
7056-10
7057-11
7058-12
7059-13
7060-14
7061-15
7062-16
7063-17
7064-18
7065-19
7066-20
7067-21
7068-22
7069-23
7070-24
7071-25
7072-of Chapter 138 of Laws 2021 to plan, design, construct,
7073-repair, improve and equip parks in Santa Fe in Santa Fe
7074-county is extended through fiscal year 2027.
7075-SECTION 373. SANTA FE SOUTHSIDE TEEN CENTER
7076-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
7077-expenditure for the local government division project in
7078-Subsection 342 of Section 29 of Chapter 138 of Laws 2021 to
7079-plan, design, construct, furnish and equip a teen and
7080-resource center on the south side of Santa Fe in Santa Fe
7081-county is extended through fiscal year 2027.
7082-SECTION 374. SANTA FE CAPITOL CAMPUS MASTER PLAN
7083-IMPLEMENTATION--CHANGE TO SANTA FE STATE BUILDING
7084-RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended
7085-balance of the appropriation to the capital program fund in
7086-Subsection 7 of Section 9 of Chapter 138 of Laws 2021 to
7087-plan, design, construct, renovate, remediate, furnish and
7088-equip state buildings located on the capitol campus to
7089-implement the Santa Fe master plan in Santa Fe county shall
7090-not be expended for the original purpose but is changed to
7091-plan, design, construct, renovate, remediate, furnish and
7092-equip state buildings in Santa Fe in Santa Fe county. The
7093-time of expenditure is extended through fiscal year 2027.
7094-SECTION 375. SANTA FE SOUTHWEST ACTIVITY NODE PARK
7095-PHASE 2 IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of
7096-expenditure for the local government division project SFC/SB 425
7097-Page 140
7098-1
7099-2
7100-3
7101-4
7102-5
7103-6
7104-7
7105-8
7106-9
7107-10
7108-11
7109-12
7110-13
7111-14
7112-15
7113-16
7114-17
7115-18
7116-19
7117-20
7118-21
7119-22
7120-23
7121-24
7122-25
7123-originally authorized in Subsection 407 of Section 34 of
7124-Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
7125-Chapter 203, Section 261 to plan, design, construct, furnish
7126-and equip phase 2 improvements at Southwest Activity Node
7127-park in Santa Fe in Santa Fe county is extended through
7128-fiscal year 2027.
7129-SECTION 376. SUPREME COURT BUILDING RENOVATION--CHANGE
7130-AGENCY--GENERAL FUND.--The agency for the capital program
7131-fund project in Subsection 8 of Section 6 of Chapter 66 of
7132-Laws 2024 to plan, design, construct, renovate, repair,
7133-furnish and equip improvements to the supreme court,
7134-including elevator, electrical, heating, cooling and
7135-ventilation systems, in Santa Fe in Santa Fe county is
7136-changed to the supreme court building commission.
7137-SECTION 377. SANTA FE INDIAN SCHOOL WIDE AREA NETWORK
7138-CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of
7139-expenditure for the Indian affairs department project in
7140-Subsection 36 of Section 48 of Chapter 138 of Laws 2021 to
7141-continue the construction of a regional middle-mile education
7142-network employing fiber-optic construction, point-to-point
7143-wireless and leased dark fiber, where appropriate, for an
7144-internet exchange, network, security and data operation
7145-center that connects tribes and educational entities through
7146-a wide area network at the Santa Fe Indian school in Santa Fe
7147-in Santa Fe county is extended through fiscal year 2027. SFC/SB 425
7148-Page 141
7149-1
7150-2
7151-3
7152-4
7153-5
7154-6
7155-7
7156-8
7157-9
7158-10
7159-11
7160-12
7161-13
7162-14
7163-15
7164-16
7165-17
7166-18
7167-19
7168-20
7169-21
7170-22
7171-23
7172-24
7173-25
7174-SECTION 378. TESUQUE PUEBLO STORM DRAINAGE SYSTEM
7175-CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of
7176-expenditure for the department of transportation project
7177-originally authorized in Subsection 140 of Section 40 of
7178-Chapter 277 of Laws 2019 to plan, design and construct a
7179-storm drainage system in the Pueblo of Tesuque in Santa Fe
7180-county and appropriated to the Indian affairs department in
7181-Laws 2023, Chapter 203, Section 264 for that purpose is
7182-extended through fiscal year 2027.
7183-SECTION 379. TESUQUE PUEBLO WATER SYSTEM IMPROVEMENT--
7184-EXTEND TIME--GENERAL FUND.--The time of expenditure for the
7185-Indian affairs department project in Subsection 26 of
7186-Section 48 of Chapter 138 of Laws 2021 to plan, design and
7187-construct water system improvements, including a
7188-source-to-storage water line, for the Pueblo of Tesuque in
7189-Santa Fe county is extended through fiscal year 2027.
7190-SECTION 380. SPACEPORT AMERICA MASTER PLANNING AND
7191-PAYLOAD FACILITY CONSTRUCTION--EXTEND TIME--GENERAL
7192-FUND.--The time of expenditure for the spaceport authority
7193-project originally authorized in Subsection 54 of Section 5
7194-of Chapter 73 of Laws 2018 and reauthorized in Item (64) of
7195-Section 5 of Chapter 271 of Laws 2019 and reauthorized again
7196-in Laws 2020, Chapter 82, Section 95 and reauthorized again
7197-in Laws 2023, Chapter 203, Section 268 for master planning
7198-and to plan, design, construct and equip a payload processing SFC/SB 425
7199-Page 142
7200-1
7201-2
7202-3
7203-4
7204-5
7205-6
7206-7
7207-8
7208-9
7209-10
7210-11
7211-12
7212-13
7213-14
7214-15
7215-16
7216-17
7217-18
7218-19
7219-20
7220-21
7221-22
7222-23
7223-24
7224-25
7225-center, an information technology building and a visitor
7226-access control facility at spaceport America in Sierra county
7227-is extended through fiscal year 2027.
7228-SECTION 381. SPACEPORT AMERICA IMPROVEMENT--EXTEND
7229-TIME--GENERAL FUND.--The time of expenditure for the
7230-spaceport authority project originally appropriated in
7231-Laws 2019, Chapter 277, Section 38 and reauthorized in
7232-Laws 2021, Chapter 139, Section 79 and reauthorized again in
7233-Laws 2023, Chapter 203, Section 266 to plan, design,
7234-construct and make improvements at spaceport America in
7235-Sierra county, to include funding for operating expenses of
7236-up to one million seven hundred fifty thousand dollars
7237-($1,750,000), notwithstanding any restrictions otherwise
7238-limiting the use of those funds for indirect costs, is
7239-extended through fiscal year 2026.
7240-SECTION 382. TRUTH OR CONSEQUENCES KEN JAMES SENIOR
7241-CENTER VEHICLE PURCHASE--EXTEND TIME--GENERAL FUND.--The time
7242-of expenditure for the aging and long-term services
7243-department project in Subsection 59 of Section 4 of
7244-Chapter 199 of Laws 2023 to purchase and equip vehicles for
7245-the Ken James senior center in Truth or Consequences in
7246-Sierra county is extended through fiscal year 2027.
7247-SECTION 383. KEN JAMES SENIOR CENTER RENOVATION--EXTEND
7248-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
7249-aging and long-term services department project in SFC/SB 425
7250-Page 143
7251-1
7252-2
7253-3
7254-4
7255-5
7256-6
7257-7
7258-8
7259-9
7260-10
7261-11
7262-12
7263-13
7264-14
7265-15
7266-16
7267-17
7268-18
7269-19
7270-20
7271-21
7272-22
7273-23
7274-24
7275-25
7276-Subsection 52 of Section 5 of Chapter 138 of Laws 2021 for
7277-renovations to the Ken James senior center in Truth or
7278-Consequences in Sierra county is extended through fiscal year
7279-2027.
7280-SECTION 384. ALAMO CHAPTER STORAGE BUILDING
7281-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
7282-expenditure for the Indian affairs department project in
7283-Subsection 117 of Section 25 of Chapter 138 of Laws 2021 to
7284-plan, design, purchase and construct a food and water storage
7285-and distribution building, including a loading dock and
7286-security fencing, in the Alamo chapter of the Navajo Nation
7287-in Socorro county is extended through fiscal year 2027.
7288-SECTION 385. ALAMO CHAPTER DUMP TRUCK PURCHASE--EXTEND
7289-TIME--GENERAL FUND.--The time of expenditure for the Indian
7290-affairs department project in Subsection 164 of Section 25 of
7291-Chapter 199 of Laws 2023 to purchase and equip a dump truck
7292-for the Alamo chapter of the Navajo Nation in Socorro county
7293-is extended through fiscal year 2027.
7294-SECTION 386. MAGDALENA BENJAMIN WELL IMPROVEMENT--
7295-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
7296-for the department of environment project in Subsection 89 of
7297-Section 21 of Chapter 138 of Laws 2021 to plan, design,
7298-construct and improve Benjamin well, including a booster pump
7299-and water storage tank, in Magdalena in Socorro county is
7300-extended through fiscal year 2027. SFC/SB 425
7301-Page 144
7302-1
7303-2
7304-3
7305-4
7306-5
7307-6
7308-7
7309-8
7310-9
7311-10
7312-11
7313-12
7314-13
7315-14
7316-15
7317-16
7318-17
7319-18
7320-19
7321-20
7322-21
7323-22
7324-23
7325-24
7326-25
7327-SECTION 387. MAGDALENA SENIOR CENTER IMPROVEMENT--
7328-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
7329-for the aging and long-term services department project in
7330-Subsection 55 of Section 5 of Chapter 138 of Laws 2021 for
7331-improvements to the facility to address code compliance
7332-issues and for the purchase and installation of equipment and
7333-building systems at the Magdalena senior center in Socorro
7334-county is extended through fiscal year 2027.
7335-SECTION 388. SOCORRO EAGLE PICHER SUPERFUND SITE
7336-MULTIPURPOSE BUILDING CONSTRUCTION--CHANGE TO INDUSTRIAL PARK
7337-SITE MULTIPURPOSE BUILDING CONSTRUCTION--GENERAL FUND.--The
7338-unexpended balance of the appropriation to the local
7339-government division in Subsection 515 of Section 28 of
7340-Chapter 66 of Laws 2024 to plan, design, construct, purchase
7341-and equip a multipurpose building for commercial and
7342-industrial development on a remediated United States
7343-environmental protection agency superfund site near Socorro
7344-in Socorro county shall not be expended for the original
7345-purpose but is changed to plan, design, construct, purchase
7346-and equip a multipurpose building in an industrial park in
7347-Socorro in Socorro county.
7348-SECTION 389. CHILDREN, YOUTH AND FAMILIES DEPARTMENT
7349-FACILITY IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The
7350-time of expenditure for the capital program fund project in
7351-Subsection 10 of Section 9 of Chapter 138 of Laws 2021 to SFC/SB 425
7352-Page 145
7353-1
7354-2
7355-3
7356-4
7357-5
7358-6
7359-7
7360-8
7361-9
7362-10
7363-11
7364-12
7365-13
7366-14
7367-15
7368-16
7369-17
7370-18
7371-19
7372-20
7373-21
7374-22
7375-23
7376-24
7377-25
7378-plan, design, construct, improve, renovate, furnish and equip
7379-facilities for the children, youth and families department
7380-statewide is extended through fiscal year 2027.
7381-SECTION 390. DEPARTMENT OF INFORMATION TECHNOLOGY
7382-BROADBAND IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The
7383-time of expenditure for the department of information
7384-technology project in Subsection 1 of Section 26 of
7385-Chapter 138 of Laws 2021 to plan, design, engineer,
7386-construct, purchase and equip broadband infrastructure
7387-statewide, provided that no more than five hundred thousand
7388-dollars ($500,000) shall be expended until the department of
7389-information technology submits an expenditure plan to the
7390-legislative finance committee, is extended through fiscal
7391-year 2027.
7392-SECTION 391. DEPARTMENT OF INFORMATION TECHNOLOGY RURAL
7393-BROADBAND INFRASTRUCTURE DEVELOPMENT--EXTEND TIME--GENERAL
7394-FUND.--The time of expenditure for the department of
7395-information technology project originally authorized in
7396-Subsection 4 of Section 32 of Chapter 277 of Laws 2019 and
7397-reauthorized in Laws 2023, Chapter 203, Section 280 for
7398-broadband expansion, including assessments and contracts, in
7399-rural areas statewide is extended through fiscal year 2027.
7400-SECTION 392. DEPARTMENT OF INFORMATION TECHNOLOGY
7401-STATEWIDE LIBRARY BROADBAND EXPANSION--EXTEND TIME--GENERAL
7402-FUND.--The time of expenditure for the department of SFC/SB 425
7403-Page 146
7404-1
7405-2
7406-3
7407-4
7408-5
7409-6
7410-7
7411-8
7412-9
7413-10
7414-11
7415-12
7416-13
7417-14
7418-15
7419-16
7420-17
7421-18
7422-19
7423-20
7424-21
7425-22
7426-23
7427-24
7428-25
7429-information technology project originally authorized in
7430-Subsection 6 of Section 32 of Chapter 277 of Laws 2019 and
7431-reauthorized in Laws 2023, Chapter 203, Section 286 for
7432-statewide library broadband expansion and improvement,
7433-contingent upon the execution of a memorandum of
7434-understanding for use of the funds with the cultural affairs
7435-department, is extended through fiscal year 2027.
7436-SECTION 393. EARLY CHILDHOOD EDUCATION AND CARE
7437-DEPARTMENT PUBLIC EMPLOYEES RETIREMENT ASSOCIATION BUILDING
7438-RENOVATION--CHANGE TO INFRASTRUCTURE IMPROVEMENTS STATEWIDE--
7439-EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of
7440-the appropriation to the capital program fund in Subsection 6
7441-of Section 9 of Chapter 138 of Laws 2021 to plan, design,
7442-construct, renovate, furnish and equip facilities for the
7443-early childhood education and care department at the public
7444-employees retirement association building in Santa Fe in
7445-Santa Fe county shall not be expended for the original
7446-purpose but is changed to plan, design, construct, renovate,
7447-furnish and equip infrastructure improvements at early
7448-childhood education and care department facilities statewide.
7449-The time of expenditure is extended through fiscal year 2027.
7450-SECTION 394. GENERAL SERVICES DEPARTMENT STATE
7451-FACILITIES DEMOLITION AND DECOMMISSION--EXTEND TIME--GENERAL
7452-FUND.--The time of expenditure for the capital program fund
7453-project originally authorized in Subsection 21 of Section 7 SFC/SB 425
7454-Page 147
7455-1
7456-2
7457-3
7458-4
7459-5
7460-6
7461-7
7462-8
7463-9
7464-10
7465-11
7466-12
7467-13
7468-14
7469-15
7470-16
7471-17
7472-18
7473-19
7474-20
7475-21
7476-22
7477-23
7478-24
7479-25
7480-of Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
7481-Chapter 203, Section 287 to decommission and demolish
7482-buildings, including abatement of hazardous materials, at
7483-state-owned facilities statewide, including facilities at the
7484-Los Lunas campus in Los Lunas in Valencia county and at the
7485-New Mexico behavioral health institute at Las Vegas in
7486-San Miguel county, is extended through fiscal year 2027.
7487-SECTION 395. EXECUTIVE OFFICE BUILDING CONSTRUCTION--
7488-CHANGE TO STATEWIDE PROPERTY ACQUISITION--CHANGE AGENCY--
7489-EXTEND TIME--GENERAL FUND.--The unexpended balance of the
7490-appropriation to the general services department in Item (18)
7491-of Section 10 of Chapter 54 of Laws 2022 to plan, design,
7492-construct, furnish and equip, including demolition of
7493-existing structures, an executive office building in Santa Fe
7494-in Santa Fe county shall not be expended for the original
7495-purpose but is appropriated to the capital program fund to
7496-acquire property and to plan, design, construct, improve,
7497-furnish and equip buildings and property statewide. The time
7498-of expenditure is extended through fiscal year 2027.
7499-SECTION 396. HARRIET SAMMONS BUILDING INFRASTRUCTURE
7500-IMPROVEMENT--CHANGE TO HEALTH CARE AUTHORITY FACILITY
7501-INFRASTRUCTURE IMPROVEMENT STATEWIDE--EXTEND TIME--GENERAL
7502-FUND.--The unexpended balance of the appropriation to the
7503-capital program fund in Section 46 of Chapter 138 of
7504-Laws 2021 to plan, design, construct, renovate, equip, SFC/SB 425
7505-Page 148
7506-1
7507-2
7508-3
7509-4
7510-5
7511-6
7512-7
7513-8
7514-9
7515-10
7516-11
7517-12
7518-13
7519-14
7520-15
7521-16
7522-17
7523-18
7524-19
7525-20
7526-21
7527-22
7528-23
7529-24
7530-25
7531-purchase and install infrastructure improvements, including
7532-roofing replacement, at the Harriet Sammons building in
7533-Farmington in San Juan county shall not be expended for the
7534-original purpose but is changed to plan, design, construct,
7535-renovate, furnish and equip infrastructure improvements at
7536-health care authority facilities statewide. The time of
7537-expenditure is extended through fiscal year 2027.
7538-SECTION 397. MAINSTREET AND ARTS AND CULTURAL DISTRICT
7539-INFRASTRUCTURE IMPROVEMENT--EXTEND TIME--SEVERANCE TAX
7540-BONDS.--The time of expenditure for the economic development
7541-department project in Subsection 2 of Section 16 of
7542-Chapter 138 of Laws 2021 to plan, design, construct and
7543-improve infrastructure in downtown mainstreet districts and
7544-in local arts and cultural districts statewide is extended
7545-through fiscal year 2027.
7546-SECTION 398. PUBLIC EDUCATION DEPARTMENT SCHOOL BUS
7547-CAMERAS PURCHASE--EXTEND TIME--PUBLIC SCHOOL CAPITAL OUTLAY
7548-FUND.--The time of expenditure for the public education
7549-department project in Subsection 1 of Section 44 of
7550-Chapter 199 of Laws 2023 to purchase cameras for newly
7551-purchased to-and-from school buses is extended through fiscal
7552-year 2027.
7553-SECTION 399. PUBLIC EDUCATION DEPARTMENT SCHOOL BUS
7554-REPLACEMENT--EXTEND TIME--PUBLIC SCHOOL CAPITAL OUTLAY
7555-FUND.--The time of expenditure for the public education SFC/SB 425
7556-Page 149
7557-1
7558-2
7559-3
7560-4
7561-5
7562-6
7563-7
7564-8
7565-9
7566-10
7567-11
7568-12
7569-13
7570-14
7571-15
7572-16
7573-17
7574-18
7575-19
7576-20
7577-21
7578-22
7579-23
7580-24
7581-25
7582-department project in Subsection 2 of Section 44 of
7583-Chapter 199 of Laws 2023 to purchase district-owned,
7584-to-and-from school buses statewide is extended through fiscal
7585-year 2027.
7586-SECTION 400. OFFICE OF THE STATE ENGINEER DAM
7587-REHABILITATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time
7588-of expenditure for the office of the state engineer project
7589-in Subsection 5 of Section 20 of Chapter 138 of Laws 2021 to
7590-plan, design, construct, rehabilitate and make improvements
7591-to publicly owned dams statewide is extended through fiscal
7592-year 2027.
7593-SECTION 401. VETERAN CEMETERIES AND MONUMENTS
7594-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
7595-expenditure for the capital program fund project originally
7596-authorized in Section 43 of Chapter 138 of Laws 2021 and
7597-reauthorized in Laws 2022, Chapter 52, Section 127 to plan,
7598-design, construct, improve, repair, furnish and equip and
7599-make improvements, including safety and security
7600-infrastructure, at veteran cemeteries and monuments statewide
7601-is extended through fiscal year 2027.
7602-SECTION 402. LAND GRANT COUNCIL LAND ACQUISITION--
7603-CHANGE TO CRISTOBAL DE LA SERNA LAND GRANT-MERCED LAND
7604-ACQUISITION--EXTEND TIME--GENERAL FUND.--The unexpended
7605-balance of the appropriation to the local government division
7606-in Subsection 427 of Section 34 of Chapter 277 of Laws 2019 SFC/SB 425
7607-Page 150
7608-1
7609-2
7610-3
7611-4
7612-5
7613-6
7614-7
7615-8
7616-9
7617-10
7618-11
7619-12
7620-13
7621-14
7622-15
7623-16
7624-17
7625-18
7626-19
7627-20
7628-21
7629-22
7630-23
7631-24
7632-25
7633-for the land grant council to acquire land within and for the
7634-Cristobal de la Serna land grant-merced in Taos county shall
7635-not be expended for the original purpose but is changed to
7636-acquire land for the Cristobal de la Serna land grant-merced
7637-in Taos county. The time of expenditure for the project is
7638-extended through fiscal year 2027.
7639-SECTION 403. UNIVERSITY OF NEW MEXICO TAOS BRANCH
7640-CAMPUS HARWOOD MUSEUM INFRASTRUCTURE RENOVATION--CHANGE TO
7641-HARWOOD MUSEUM FACILITY INFRASTRUCTURE CONSTRUCTION--GENERAL
7642-FUND.--The unexpended balance of the appropriation to the
7643-board of regents of the university of New Mexico in
7644-Subsection 31 of Section 40 of Chapter 66 of Laws 2024 to
7645-plan, design, construct, renovate, purchase, install and
7646-equip infrastructure, including accessibility improvements,
7647-at the Harwood museum at the Taos branch campus of the
7648-university of New Mexico in Taos county shall not be expended
7649-for the original purpose but is changed to plan, design,
7650-construct, renovate, purchase, install and equip
7651-infrastructure, including accessibility improvements, at
7652-multiple Harwood museum facilities at the Taos branch campus
7653-of the university of New Mexico in Taos county.
7654-SECTION 404. CABRESTO ROAD PAVEMENT CONSTRUCTION--
7655-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
7656-for the department of transportation project in
7657-Subsection 106 of Section 33 of Chapter 138 of Laws 2021 to SFC/SB 425
7658-Page 151
7659-1
7660-2
7661-3
7662-4
7663-5
7664-6
7665-7
7666-8
7667-9
7668-10
7669-11
7670-12
7671-13
7672-14
7673-15
7674-16
7675-17
7676-18
7677-19
7678-20
7679-21
7680-22
7681-23
7682-24
7683-25
7684-plan, design and construct improvements to Cabresto road in
7685-Questa in Taos county is extended through fiscal year 2027.
7686-SECTION 405. QUESTA INDEPENDENT SCHOOL DISTRICT SPORT
7687-UTILITY VEHICLE PURCHASE--CHANGE TO VEHICLE AND EQUIPMENT
7688-PURCHASE--GENERAL FUND.--The unexpended balance of the
7689-appropriation to the public education department in
7690-Subsection 225 of Section 16 of Chapter 66 of Laws 2024 to
7691-purchase and equip a student activities sport utility vehicle
7692-for the Questa independent school district in Taos county
7693-shall not be expended for the original purpose but is changed
7694-to purchase and equip heavy equipment and vehicles for the
7695-Questa independent school district in Taos county.
7696-SECTION 406. TAOS REGIONAL AIRPORT ENTRANCE ROAD AND
7697-PARKING LOT CONSTRUCTION--EXTEND TIME--SEVERANCE TAX
7698-BONDS.--The time of expenditure for the local government
7699-division project originally authorized in Subsection 357 of
7700-Section 29 of Chapter 138 of Laws 2021 and reauthorized in
7701-Laws 2022, Chapter 52, Section 146 to plan, design, construct
7702-and improve the entrance road and the parking lot at the Taos
7703-regional airport in Taos county is extended through fiscal
7704-year 2027.
7705-SECTION 407. TAOS SKI VALLEY KACHINA WATER BOOSTER
7706-STATION CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of
7707-expenditure for the department of environment project
7708-originally authorized in Subsection 128 of Section 26 of SFC/SB 425
7709-Page 152
7710-1
7711-2
7712-3
7713-4
7714-5
7715-6
7716-7
7717-8
7718-9
7719-10
7720-11
7721-12
7722-13
7723-14
7724-15
7725-16
7726-17
7727-18
7728-19
7729-20
7730-21
7731-22
7732-23
7733-24
7734-25
7735-Chapter 277 of Laws 2019 and reauthorized in Laws 2021,
7736-Chapter 139, Section 87 and again in Laws 2023, Chapter 203,
7737-Section 299 to plan, design, construct and equip a water
7738-booster station to provide water to the Kachina water tank
7739-and to install corresponding distribution network
7740-infrastructure to serve Taos Ski Valley in Taos county is
7741-extended through fiscal year 2027.
7742-SECTION 408. TAOS PUEBLO SENIOR DAYCARE FACILITY
7743-CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of
7744-expenditure for the aging and long-term services department
7745-project originally authorized in Subsection 69 of Section 4
7746-of Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
7747-Chapter 203, Section 298 to acquire easements and rights of
7748-way for and to plan, design, construct and equip a senior
7749-daycare facility in the Pueblo of Taos in Taos county is
7750-extended through fiscal year 2027.
7751-SECTION 409. TAOS SKI VALLEY WATER BOOSTER
7752-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
7753-expenditure for the department of environment project in
7754-Subsection 97 of Section 21 of Chapter 138 of Laws 2021 to
7755-plan, design, construct, equip and install a water booster
7756-station for a water tank for Taos Ski Valley in Taos county
7757-is extended through fiscal year 2027.
7758-SECTION 410. CLAUNCH-PINTO SOIL AND WATER CONSERVATION
7759-DISTRICT HEAVY EQUIPMENT PURCHASE--CHANGE TO TRUCK PURCHASE-- SFC/SB 425
7760-Page 153
7761-1
7762-2
7763-3
7764-4
7765-5
7766-6
7767-7
7768-8
7769-9
7770-10
7771-11
7772-12
7773-13
7774-14
7775-15
7776-16
7777-17
7778-18
7779-19
7780-20
7781-21
7782-22
7783-23
7784-24
7785-25
7786-EXTEND TIME--GENERAL FUND.--The unexpended balance of the
7787-appropriation to the board of regents of New Mexico state
7788-university in Subsection 29 of Section 38 of Chapter 199 of
7789-Laws 2023 to purchase and equip heavy equipment, including a
7790-skid steer with attachments and a trailer, for the
7791-Claunch-Pinto soil and water conservation district in
7792-Torrance county shall not be expended for the original
7793-purpose but is changed to purchase and equip trucks for the
7794-Claunch-Pinto soil and water conservation district in
7795-Torrance county. The time of expenditure is extended through
7796-fiscal year 2027.
7797-SECTION 411. TORRANCE COUNTY ADMINISTRATIVE BUILDING
7798-CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
7799-expenditure for the local government division project in
7800-Subsection 360 of Section 29 of Chapter 138 of Laws 2021 to
7801-plan, design, construct, equip and furnish a county
7802-administrative building in Torrance county is extended
7803-through fiscal year 2027.
7804-SECTION 412. TORRANCE COUNTY FAIRGROUNDS IMPROVEMENT--
7805-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
7806-for the local government division project in Subsection 361
7807-of Section 29 of Chapter 138 of Laws 2021 to plan, design,
7808-construct, improve, furnish and equip the county fairgrounds
7809-in Torrance county is extended through fiscal year 2027.
7810-SECTION 413. MOUNTAINAIR PUBLIC SCHOOL DISTRICT SFC/SB 425
7811-Page 154
7812-1
7813-2
7814-3
7815-4
7816-5
7817-6
7818-7
7819-8
7820-9
7821-10
7822-11
7823-12
7824-13
7825-14
7826-15
7827-16
7828-17
7829-18
7830-19
7831-20
7832-21
7833-22
7834-23
7835-24
7836-25
7837-ACCESSIBLE ACTIVITY BUS PURCHASE--CHANGE TO PURCHASE AN
7838-ACTIVITY BUS--EXTEND TIME--GENERAL FUND.--The public
7839-education department project in Subsection 211 of Section 16
7840-of Chapter 199 of Laws 2023 to purchase and equip an activity
7841-bus with wheelchair lift capabilities for the Mountainair
7842-public school district in Torrance county shall not be
7843-expended for the original purpose but is changed to purchase
7844-and equip an activity bus for the Mountainair public school
7845-district. The time of expenditure is extended through fiscal
7846-year 2027.
7847-SECTION 414. MORIARTY AMBULANCE PURCHASE--EXTEND TIME--
7848-GENERAL FUND.--The time of expenditure for the local
7849-government division project in Subsection 485 of Section 28
7850-of Chapter 199 of Laws 2023 to purchase and equip an
7851-ambulance for the Moriarty police and fire departments in
7852-Moriarty in Torrance county is extended through fiscal year
7853-2027.
7854-SECTION 415. MORIARTY POLICE VEHICLE PURCHASE--EXTEND
7855-TIME--GENERAL FUND.--The time of expenditure for the local
7856-government division project in Subsection 486 of Section 28
7857-of Chapter 199 of Laws 2023 to purchase and equip police
7858-vehicles in Moriarty in Torrance county is extended through
7859-fiscal year 2027.
7860-SECTION 416. MORIARTY SENIOR CENTER RENOVATION--EXTEND
7861-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the SFC/SB 425
7862-Page 155
7863-1
7864-2
7865-3
7866-4
7867-5
7868-6
7869-7
7870-8
7871-9
7872-10
7873-11
7874-12
7875-13
7876-14
7877-15
7878-16
7879-17
7880-18
7881-19
7882-20
7883-21
7884-22
7885-23
7886-24
7887-25
7888-aging and long-term services department project in
7889-Subsection 57 of Section 5 of Chapter 138 of Laws 2021 for
7890-renovations to the Moriarty senior center in Torrance county
7891-is extended through fiscal year 2027.
7892-SECTION 417. BELEN SEWER LINES WEST ARAGON ROAD
7893-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
7894-expenditure for the department of environment project in
7895-Subsection 104 of Section 21 of Chapter 138 of Laws 2021 to
7896-plan, design, construct, replace and improve sewer lines
7897-along west Aragon road in Belen in Valencia county is
7898-extended through fiscal year 2027.
7899-SECTION 418. DON LUIS TRUJILLO BOULEVARD CONSTRUCTION--
7900-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
7901-for the department of transportation project in
7902-Subsection 111 of Section 33 of Chapter 138 of Laws 2021 to
7903-plan, design, construct and improve Don Luis Trujillo
7904-boulevard in Belen in Valencia county is extended through
7905-fiscal year 2027.
7906-SECTION 419. BOSQUE FARMS FIRE AND POLICE DEPARTMENTS
7907-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
7908-expenditure for the local government division project in
7909-Subsection 375 of Section 29 of Chapter 138 of Laws 2021 to
7910-plan, design, construct, equip and install improvements to
7911-the fire and police departments in Bosque Farms in Valencia
7912-county is extended through fiscal year 2027. SFC/SB 425
7913-Page 156
7914-1
7915-2
7916-3
7917-4
7918-5
7919-6
7920-7
7921-8
7922-9
7923-10
7924-11
7925-12
7926-13
7927-14
7928-15
7929-16
7930-17
7931-18
7932-19
7933-20
7934-21
7935-22
7936-23
7937-24
7938-25
7939-SECTION 420. BOSQUE FARMS WASTEWATER TREATMENT SYSTEM
7940-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
7941-expenditure for the department of environment project in
7942-Subsection 105 of Section 21 of Chapter 138 of Laws 2021 to
7943-plan, design, construct, equip and install improvements to
7944-the wastewater treatment system, including clarifier and
7945-sludge processing, for Bosque Farms in Valencia county is
7946-extended through fiscal year 2027.
7947-SECTION 421. VALENCIA COUNTY ADMINISTRATION BUILDING
7948-IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of
7949-expenditure for the local government division project in
7950-Subsection 380 of Section 29 of Chapter 138 of Laws 2021 to
7951-plan, design, construct, renovate, equip and install
7952-improvements, including a fire alarm and sprinkler system,
7953-upgrades to electrical, plumbing, heating, ventilation and
7954-air conditioning systems, furnishings and accessibility
7955-improvements, to the county administration building in
7956-Los Lunas in Valencia county is extended through fiscal year
7957-2027.
7958-SECTION 422. PERALTA FIRE STATION CONSTRUCTION--EXTEND
7959-TIME--SEVERANCE TAX BONDS.--The time of expenditure for the
7960-local government division project in Subsection 384 of
7961-Section 29 of Chapter 138 of Laws 2021 to plan, design and
7962-construct a fire station in Peralta in Valencia county is
7963-extended through fiscal year 2027. SFC/SB 425
7964-Page 157
7965-1
7966-2
7967-3
7968-4
7969-5
7970-6
7971-7
7972-8
7973-9
7974-10
7975-11
7976-12
7977-13
7978-14
7979-15
7980-16
7981-17
7982-18
7983-19
7984-20
7985-21
7986-22
7987-23
7988-24
7989-25
7990-SECTION 423. COLUMBUS HEALTH COMPLEX IMPROVEMENT--
7991-EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure
7992-for the local government division project in Subsection 237
7993-of Section 29 of Chapter 138 of Laws 2021 to plan, design,
7994-construct, improve, equip and furnish a health and wellness
7995-community complex for Columbus in Luna county is extended
7996-through fiscal year 2027.
7997-SECTION 424. MALAGA MUTUAL DOMESTIC WATER CONSUMERS AND
7998-SEWAGE WORKS ASSOCIATION BACKHOE PURCHASE--CHANGE TO VACUUM
7999-TRAILER PURCHASE--EXTEND TIME--GENERAL FUND.--The unexpended
8000-balance of the appropriation to the local government division
8001-in Subsection 252 of Section 28 of Chapter 199 of Laws 2023
8002-to purchase and equip a backhoe for the Malaga mutual
8003-domestic water consumers and sewage works association in Eddy
8004-county shall not be expended for the original purpose but is
8005-changed to purchase and equip a vacuum trailer for the Malaga
8006-mutual domestic water consumers and sewage works association
8007-in Eddy county. The time of expenditure is extended through
8008-fiscal year 2027.
8009-SECTION 425. TOADLENA/TWO GREY HILLS CHAPTER SENIOR
8010-CENTER IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of
8011-expenditure for the aging and long-term services department
8012-project originally authorized in Subsection 47 of Section 4
8013-of Chapter 277 of Laws 2019 and reauthorized in Laws 2023,
8014-Chapter 203, Section 213 to plan, design, construct, SFC/SB 425
8015-Page 158
8016-1
8017-2
8018-3
8019-4
8020-5
8021-6
8022-7
8023-8
8024-9
8025-10
8026-11
8027-12
8028-13
8029-14
8030-15
8031-16
8032-17
8033-18
8034-19
8035-20
8036-21
8037-22
8038-23
8039-24
8040-25
8041-purchase, furnish, equip and install improvements, including
8042-heating, ventilation and air conditioning systems, electrical
8043-systems and accessibility, to the senior center in the
8044-Toadlena/Two Grey Hills chapter of the Navajo Nation in
8045-San Juan county is extended through fiscal year 2027.
8046-SECTION 426. EMERGENCY.--It is necessary for the public
8047-peace, health and safety that this act take effect
8048-immediately.
265+SECTION 7. EMERGENCY.--It is necessary for the public
266+peace, health and safety that this act take effect immediately.
267+- 5 -
268+.230191.1