83rd OREGON LEGISLATIVE ASSEMBLY--2025 Regular Session
House Bill 3336
Sponsored by Representative GAMBA; Representatives HELM, WALTERS, WRIGHT, Senators GOLDEN,
SOLLMAN
SUMMARY
The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
to consideration by the Legislative Assembly. It is an editor’s brief statement of the essential features of the
measure as introduced.The statement includes a measure digest written in compliance with applicable readability
standards.
Digest: Makes a power company file with the PUC a plan for using grid enhancing technologies
where doing so is cost-effective. Requires the plan to be updated every two years.(Flesch Read-
ability Score: 61.8).
Declares a state policy regarding the electric transmission system.
Requires an electric company to file with the Public Utility Commission a strategic plan for
using grid enhancing technologies where doing so is cost-effective. Requires the plan to be updated
every two years. Requires an electric company to carry out the electric company’s first filed stra-
tegic plan not later than January 1, 2030.
Requires an electric company to conduct a cost-effectiveness and timetable analysis of multiple
strategies when proposing additions, improvements or modifications to a transmission system.
Takes effect on the 91st day following adjournment sine die.
A BILL FOR AN ACT
Relating to electric transmission systems; and prescribing an effective date.
Be It Enacted by the People of the State of Oregon:
SECTION 1.	(1) As used in this section:
(a) “Electric company” means an  electric company as defined in ORS 757.600, that owns
and operates a transmission system and sells  more than two million megawatt hours of
electricity in a calendar year.
(b) “Grid enhancing technology” includes any hardware or  software technology that en-
hances the performance or improves  performance efficiency of a transmission system in-
cluding, but not limited to, dynamic line rating, advanced power flow control technology,
topology optimization, advanced reconductoring, flexible alternating  current transmission
systems or energy storage when used as a transmission resource.
(2) The Legislative Assembly declares that  it is the policy of this state that electric
companies:
(a) Meet the required clean energy targets set forth in ORS 469A.410;
(b) Develop sufficient resources to meet load growth;
(c) Create efficiencies and resilience in the transmission system; and
(d) Maintain energy affordability.
(3) When an electric company files a resource or grid  investment plan with the Public
Utility Commission proposing additions, improvements or modifications to a transmission
system, the commission shall require the electric company to conduct an analysis to  deter-
mine the cost-effectiveness and timetable of multiple strategies, including strategies that use
grid enhancing technologies, to:
(a) Increase transmission capacity;
(b) Increase transmission reliability;
NOTE:Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
New sections are in boldfaced type.
LC 1902 HB3336
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
(c) Reduce transmission system congestion;
(d) Reduce curtailment of renewable and nonemitting energy resources;
(e) Increase capacity to connect new renewable and nonemitting energy resources; and
(f) Reduce risk of wildfires, consistent with the electric company’s wildfire protection
plan required under ORS 757.963.
(4) An electric company shall file and include as part of the electric company’s clean
energy plan required under ORS 469A.415, and the electric company’s integrated resource
plan filed with the commission, a separate section  that provides a strategic plan for using
grid enhancing technologies where doing so  is cost-effective. The electric company shall up-
date the strategic plan every two years and make the strategic  plan publicly available. At a
minimum, the strategic plan must:
(a) Include a timeline for deploying grid enhancing technologies where doing so is cost-
effective;
(b) Report on the electric company’s continual progress towards  implementing the stra-
tegic plan; and
(c) Be designed to:
(A) Increase transmission capacity;
(B) Increase transmission reliability;
(C) Reduce transmission system congestion;
(D) Reduce curtailment of renewable and nonemitting energy resources;
(E) Increase capacity to connect new renewable and nonemitting energy resources; and
(F) Reduce risk of wildfires, consistent with the electric company’s wildfire protection
plan required under ORS 757.963.
(5) For purposes of this section, the commission  shall define “cost-effective” and estab-
lish criteria for determining where using grid enhancing technologies is cost-effective.
SECTION 2.	An electric company’s strategic plan that is first filed, and as updated, under
section 1 of this 2025 Act, shall be carried out no later than January 1, 2030.
SECTION 3. The requirements under section 1 of  this 2025 Act apply to an electric
company’s clean energy plan or integrated resource plan that is filed with  the Public Utility
Commission on or after the effective date of this 2025 Act.
SECTION 4.This 2025 Act takes effect on the 91st day after the date on  which the 2025