1 2 3 4 5 6 7 8 9 83rd OREGON LEGISLATIVE ASSEMBLY--2025 Regular Session House Bill 3864 Sponsored by Representative SMITH G SUMMARY The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject to consideration by the Legislative Assembly. It is an editor’s brief statement of the essential features of the measure as introduced.The statement includes a measure digest written in compliance with applicable readability standards. Digest: Makes the PUC do a study on electrical infrastructure. Makes the PUC give a report on its findings.(Flesch Readability Score: 70.8). Requires the Public Utility Commission to study electrical infrastructure. Directs the commis- sion to submit findings to the interim committees of the Legislative Assembly related to energy not later than September 15, 2026. Sunsets on January 2, 2027. A BILL FOR AN ACT Relating to electrical infrastructure. Be It Enacted by the People of the State of Oregon: SECTION 1. The Public Utility Commission shall study electrical infrastructure. The commission shall submit a report in the manner provided by ORS 192.245, and may include recommendations for legislation, to the interim committees of the Legislative Assembly re- lated to energy no later than September 15, 2026. SECTION 2.Section 1 of this 2025 Act is repealed on January 2, 2027. NOTE:Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted. New sections are in boldfaced type. LC 3620