1212 Introduced by: Senator Nelson
1313
1414 Underscores indicate new language.
1515 Overstrikes indicate deleted language.
1616 An Act to reduce the megawattage requirement for energy conversion facilities 1
1717 governed by chapter 49-41B. 2
1818 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF SOUTH DAKOTA: 3
1919 Section 1. That § 49-41B-2 be AMENDED: 4
2020 49-41B-2. Terms as used in this chapter mean: 5
2121 (1) "AC/DC conversion facility," an asynchronous AC to DC to AC tie that is directly 6
2222 connected to a transmission facility or a facility that connects an AC transmission 7
2323 facility with a DC transmission facility or vice versa; 8
2424 (2) "Associated facilities," facilities which that include aqueducts, diversion dams, 9
2525 transmission substations, storage ponds, reservoirs, or cooling ponds; 10
2626 (3) "Carbon dioxide," a fluid that consists of more than ninety percent carbon dioxide 11
2727 molecules compressed in a supercritical state; 12
2828 (4) "Commission," the Public Utilities Commission; 13
2929 (5) "Construction," any clearing of land, excavation, or other action that would affect 14
3030 the environment of the site for each land or rights of way upon or over which a 15
3131 facility may be constructed or modified, but not including activities incident to 16
3232 preliminary engineering or environmental studies. This term includes modifications 17
3333 to facilities as defined in § 49-41B-2.2; 18
3434 (6) "Energy conversion facility," any new facility, or facility expansion, designed for or 19
3535 capable of generation of one hundred fifty megawatts or more of electricity, but 20
3636 does not include any wind or solar energy facilities; 21
3737 (7) "Facility," any energy conversion facility, AC/DC conversion facility, transmission 22
3838 facility, solar energy facility, or wind energy facility, and associated facilities; 23
3939 (8) "Permit," the permit issued by the commission under this chapter required for the 24
4040 construction and operation of a facility; 25 25.440.22 2 108
4141 Underscores indicate new language.
4242 Overstrikes indicate deleted language.
4343 (9) "Person," an individual, partnership, limited liability company, joint venture, 1
4444 private or public corporation, association, firm, public service company, 2
4545 cooperative, political subdivision, municipal corporation, government agency, 3
4646 public utility district, or any other public or private entity, however organized; 4
4747 (10) "Siting area," that an area within ten miles in any direction of a proposed energy 5
4848 conversion facility, AC/DC conversion facility, or which an area that is determined 6
4949 by the commission to be affected by a proposed energy conversion facility; 7
5050 (11) "Trans-state transmission facility," an electric transmission line and its associated 8
5151 facilities which that originates outside the State of South Dakota, crosses this 9
5252 stateand, terminates outside the State of South Dakota;, and which transmission 10
5353 line and associated facilities delivers electric power and energy of twenty-five 11
5454 percent or less of the design capacity of such the line and facilities for use in the 12
5555 State of South Dakota; 13
5656 (12) "Utility," any person engaged in and controlling the generation or transmission of 14
5757 electric energy and gas or liquid transmission facilities as defined by § 49-41B-2.1; 15
5858 (13) "Wind energy facility," a new facility, or facility expansion, consisting of a 16
5959 commonly managed integrated system of towers, wind turbine generators with 17
6060 blades, power collection systems, and electric interconnection systems , that 18
6161 converts wind movement into electricity and that is designed for or capable of 19
6262 generation of one hundred fifty megawatts or more of electricity. A wind energy 20
6363 facility expansion includes the addition of new wind turbines, designed for or 21
6464 capable of generating twenty-five megawatts or more of electricity, which that are 22
6565 to be managed in common and integrated with existing turbines and the combined 23
6666 megawatt capability of the existing and new turbines is one hundred fifty 24
6767 megawatts or more of electricity. The number of megawatts generated by a wind 25
6868 energy facility is determined by adding the nameplate power generation capability 26
6969 of each wind turbine; and 27
7070 (14) "Solar energy facility," a new facility, or facility expansion, consisting of a 28
7171 commonly managed integrated system of solar panels, power collection systems, 29
7272 electric interconnection systems, and associated facilities, that converts solar 30
7373 energy into electricity and is designed for or capable of generating one hundred 31
7474 fifty megawatts AC or more of electricity. A facility expansion includes the addition 32
7575 of new solar panels, designed for or capable of generating twenty-five megawatts 33
7676 AC or more of electricity, that are to be managed in common and integrated with 34 25.440.22 3 108
7777 Underscores indicate new language.
7878 Overstrikes indicate deleted language.
7979 existing solar panels, and the combined megawatt capability of the existing and 1
8080 new solar panels is one hundred fifty megawatts AC or more of electricity. 2
8181 Section 2. That § 49-41B-2.2 be AMENDED: 3
8282 49-41B-2.2. For the purposes of this chapter, a facility is considered to be 4
8383 modified if: 5
8484 (1) A gas or liquid transmission line that did not meet the definition of a transmission 6
8585 facility prior to building the line is to be modified in such a way that the line will 7
8686 meet the definition of a transmission facility after the modification is complete. No 8
8787 permit is required for steel pipe and associated facilities, as described in subsection 9
8888 49-41B-2.1(2)(b), operating on July 1, 2010, that have been historically calculated 10
8989 at an ongoing constant pressure of less than twenty percent of specified minimum 11
9090 yield strength unless the pipeline operator intends to increase the ongoing constant 12
9191 pressure to twenty percent or more. No permit is required for plastic pipe and 13
9292 associated facilities, as described in subsection 49-41B-2.1(2)(b), operating on 14
9393 July 1, 2010, that have been historically calculated at an ongoing constant pressure 15
9494 of less than fifty percent of the design pressure unless the pipeline operator intends 16
9595 to increase the ongoing constant pressure to fifty percent or more; 17
9696 (2) An electric transmission line that does not meet the definition of a transmission 18
9797 facility prior to building the line is to be modified in such a way that the line will 19
9898 meet the definition of a transmission facility after the modification is complete or 20
9999 the nameplate carrying capacity of an electric transmission facility is to be 21
100100 increased by an additional twenty kilovolts or greater; or 22
101101 (3) The nameplate generating capacity of an energy conversion facility is to be 23
102102 increased by a net additional one hundred fifty megawatts or greater. 24