                            H.B. No. 4150


 AN ACT
 relating to safety and inspection requirements for certain
 utilities that provide electricity.
 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
 SECTION 1.  This Act may be cited as the William Thomas Heath
 Power Line Safety Act.
 SECTION 2.  Subchapter A, Chapter 35, Utilities Code, is
 amended by adding Section 35.010 to read as follows:
 Sec. 35.010.  COSTS RELATED TO REPORTING ON SAFETY PROCESSES
 AND INSPECTIONS FOR CERTAIN UTILITIES. (a)  This section applies
 only to a municipally owned utility or electric cooperative that
 has wholesale transmission rates established by the commission.
 (b)  Costs incurred by a municipally owned utility or
 electric cooperative to comply with Section 38.102 shall be
 recorded as a regulatory asset for timely recovery in wholesale
 transmission rates established by the commission.
 (c)  The commission may adopt rules relating to the recording
 of regulatory assets under this section.
 SECTION 3.  Subchapter B, Chapter 36, Utilities Code, is
 amended by adding Section 36.066 to read as follows:
 Sec. 36.066.  COSTS RELATED TO REPORTING ON SAFETY PROCESSES
 AND INSPECTIONS FOR CERTAIN UTILITIES. (a) Costs incurred by an
 electric utility to comply with Section 38.102 shall be recorded as
 a regulatory asset for timely recovery in rates established by the
 commission.
 (b)  The commission may adopt rules relating to the recording
 of regulatory assets under this section.
 SECTION 4.  Section 38.004, Utilities Code, is amended to
 read as follows:
 Sec. 38.004.  MINIMUM CLEARANCE STANDARD. (a)
 Notwithstanding any other law, a transmission or distribution line
 owned by an electric utility or an electric cooperative must be
 constructed, operated, and maintained, as to clearances, in the
 manner described by the National Electrical Safety Code Standard
 ANSI (c)(2), as adopted by the American National Safety Institute
 and in effect at the time of construction.
 (b)  An electric utility, municipally owned utility, or
 electric cooperative shall meet the minimum clearance requirements
 specified in Rule 232 of the National Electrical Safety Code
 Standard ANSI (c)(2) in the construction of any transmission or
 distribution line over the following lakes:
 (1)  Abilene;
 (2)  Alan Henry;
 (3)  Alvarado Park;
 (4)  Amistad;
 (5)  Amon G. Carter;
 (6)  Aquilla;
 (7)  Arlington;
 (8)  Arrowhead;
 (9)  Athens;
 (10)  Austin;
 (11)  Averhoff;
 (12)  B. A. Steinhagen;
 (13)  Bachman;
 (14)  Balmorhea;
 (15)  Bardwell;
 (16)  Bastrop;
 (17)  Baylor Creek;
 (18)  Belton;
 (19)  Benbrook;
 (20)  Big Creek;
 (21)  Bob Sandlin;
 (22)  Bonham;
 (23)  Bonham State Park;
 (24)  Brady Creek;
 (25)  Brandy Branch;
 (26)  Braunig;
 (27)  Brazos;
 (28)  Bridgeport;
 (29)  Brownwood;
 (30)  Bryan;
 (31)  Bryson;
 (32)  Buchanan;
 (33)  Buffalo Creek;
 (34)  Buffalo Springs;
 (35)  Caddo;
 (36)  Calaveras;
 (37)  Canyon;
 (38)  Casa Blanca;
 (39)  Cedar Creek;
 (40)  Champion Creek;
 (41)  Choke Canyon;
 (42)  Cisco;
 (43)  Cleburne State Park;
 (44)  Clyde;
 (45)  Coffee Mill;
 (46)  Coleman;
 (47)  Coleto Creek;
 (48)  Colorado City;
 (49)  Conroe;
 (50)  Cooper;
 (51)  Corpus Christi;
 (52)  Crook;
 (53)  Cypress Springs;
 (54)  Daniel;
 (55)  Davy Crockett;
 (56)  Diversion;
 (57)  Dunlap;
 (58)  Eagle Mountain;
 (59)  E. V. Spence;
 (60)  Fairfield;
 (61)  Falcon;
 (62)  Fayette County;
 (63)  Findley;
 (64)  Fork;
 (65)  Fort Parker State Park;
 (66)  Fort Phantom Hill;
 (67)  Fryer;
 (68)  Georgetown;
 (69)  Gibbons Creek;
 (70)  Gilmer;
 (71)  Gladewater;
 (72)  Gonzales;
 (73)  Graham;
 (74)  Granbury;
 (75)  Granger;
 (76)  Grapevine;
 (77)  Greenbelt;
 (78)  Halbert;
 (79)  Hawkins;
 (80)  Holbrook;
 (81)  Hords Creek;
 (82)  Houston;
 (83)  Houston County;
 (84)  Hubbard Creek;
 (85)  Inks;
 (86)  Jacksboro;
 (87)  Jacksonville;
 (88)  J. B. Thomas;
 (89)  Joe Pool;
 (90)  Kemp;
 (91)  Kickapoo;
 (92)  Kirby;
 (93)  Kurth;
 (94)  Lady Bird;
 (95)  Lake O' The Pines;
 (96)  Lavon;
 (97)  Leon;
 (98)  Lewisville;
 (99)  Limestone;
 (100) Livingston;
 (101) Lone Star;
 (102) Lost Creek;
 (103) Lyndon B. Johnson;
 (104) Mackenzie;
 (105) Marble Falls;
 (106) Marine Creek;
 (107) Martin Creek;
 (108) McClellan;
 (109) Medina;
 (110) Meredith;
 (111) Meridian State Park;
 (112) Mexia;
 (113) Mill Creek;
 (114) Millers Creek;
 (115) Mineral Wells;
 (116) Monticello;
 (117) Moss;
 (118) Mountain Creek;
 (119) Muenster;
 (120) Murvaul;
 (121) Nacogdoches;
 (122) Naconiche;
 (123) Nasworthy;
 (124) Navarro Mills;
 (125) New Ballinger;
 (126) Nocona;
 (127) Oak Creek;
 (128) O. C. Fisher;
 (129) O. H. Ivie;
 (130) Palestine;
 (131) Palo Duro;
 (132) Palo Pinto;
 (133) Pat Cleburne;
 (134) Pat Mayse;
 (135) Pinkston;
 (136) Placid;
 (137) Possum Kingdom;
 (138) Proctor;
 (139) Purtis Creek;
 (140) Quitman;
 (141) Raven;
 (142) Ray Hubbard;
 (143) Ray Roberts;
 (144) Red Bluff;
 (145) Richland-Chambers;
 (146) Sam Rayburn;
 (147) Sheldon;
 (148) Somerville;
 (149) Squaw Creek;
 (150) Stamford;
 (151) Stillhouse Hollow;
 (152) Striker;
 (153) Sulphur Springs;
 (154) Sweetwater;
 (155) Tawakoni;
 (156) Texana;
 (157) Texoma;
 (158) Timpson;
 (159) Toledo Bend;
 (160) Tradinghouse Creek;
 (161) Travis;
 (162) Twin Buttes;
 (163) Tyler;
 (164) Waco;
 (165) Walter E. Long;
 (166) Waxahachie;
 (167) Weatherford;
 (168) Welsh;
 (169) Wheeler Branch;
 (170) White River;
 (171) White Rock;
 (172) Whitney;
 (173) Wichita;
 (174) Winnsboro;
 (175) Winters-Elm Creek;
 (176) Wood;
 (177) Worth; and
 (178) Wright Patman.
 SECTION 5.  Subchapter E, Chapter 38, Utilities Code, is
 amended by adding Section 38.102 to read as follows:
 Sec. 38.102.  REPORTS ON SAFETY PROCESSES AND INSPECTIONS.
 (a)  Each electric utility, municipally owned utility, and electric
 cooperative that owns or operates overhead transmission or
 distribution assets shall submit to the commission a report that
 includes:
 (1)  a summary description of hazard recognition
 training documents provided by the utility or electric cooperative
 to its employees related to overhead transmission and distribution
 facilities; and
 (2)  a summary description of training programs
 provided to employees by the utility or electric cooperative
 related to the National Electrical Safety Code for the construction
 of electric transmission and distribution lines.
 (b)  An electric utility, municipally owned utility, or
 electric cooperative shall submit an updated report not later than
 the 30th day after the date the utility or electric cooperative
 finalizes a material change to a document or program included in a
 report submitted under Subsection (a).
 (c)  Not later than May 1 every five years, each electric
 utility, municipally owned utility, and electric cooperative that
 owns or operates overhead transmission facilities greater than 60
 kilovolts shall submit to the commission a report for the preceding
 five-year period ending on December 31 of the preceding calendar
 year that includes:
 (1)  the percentage of overhead transmission
 facilities greater than 60 kilovolts inspected for compliance with
 the National Electrical Safety Code relating to vertical clearance
 in the reporting period; and
 (2)  the percentage of the overhead transmission
 facilities greater than 60 kilovolts anticipated to be inspected
 for compliance with the National Electrical Safety Code relating to
 vertical clearance during the five-year period beginning on January
 1 of the year in which the report is submitted.
 (d)  Subject to Subsection (f), not later than May 1 of each
 year, each electric utility, municipally owned utility, or electric
 cooperative that owns or operates overhead transmission facilities
 greater than 60 kilovolts shall submit to the commission a report on
 the overhead transmission facilities for the preceding calendar
 year that includes information regarding:
 (1)  the number of identified occurrences of
 noncompliance with Section 38.004 regarding the vertical clearance
 requirements of the National Electrical Safety Code for overhead
 transmission facilities;
 (2)  whether the utility or electric cooperative has
 actual knowledge that any portion of the utility's or electric
 cooperative's transmission system is not in compliance with Section
 38.004 regarding the vertical clearance requirements of the
 National Electrical Safety Code; and
 (3)  whether the utility or electric cooperative has
 actual knowledge of any violations of easement agreements with the
 United States Army Corps of Engineers relating to Section 38.004
 regarding the vertical clearance requirements of the National
 Electrical Safety Code for overhead transmission facilities.
 (e)  Subject to Subsection (f), not later than May 1 of each
 year, each electric utility, municipally owned utility, or electric
 cooperative that owns or operates overhead transmission facilities
 greater than 60 kilovolts or distribution facilities greater than 1
 kilovolt shall submit to the commission a report for the preceding
 calendar year that includes:
 (1)  the number of fatalities or injuries of
 individuals other than employees, contractors, or other persons
 qualified to work in proximity to overhead high voltage lines
 involving transmission or distribution assets related to
 noncompliance with the requirements of Section 38.004; and
 (2)  a description of corrective actions taken or
 planned to prevent the reoccurrence of fatalities or injuries
 described by Subdivision (1).
 (f)  Violations resulting from, and incidents, fatalities,
 or injuries attributable to a violation resulting from, a natural
 disaster, weather event, or man-made act or force outside of a
 utility's or electric cooperative's control are not required to be
 included in the portions of the reports required under Subsections
 (d) and (e).
 (g)  Not later than September 1, each year the commission
 shall make the reports publicly available on the commission's
 Internet website.
 (h)  A report, and any required information contained in a
 report, made on an incident or violation under this section is not
 admissible in a civil or criminal proceeding against the electric
 utility, municipally owned utility, or electric cooperative, or the
 utility's or electric cooperative's employees, directors, or
 officers. The commission may otherwise take enforcement actions
 under the commission's authority.
 SECTION 6.  Any electric utility, municipally owned utility,
 or electric cooperative that owns a transmission or distribution
 line over a lake listed in Section 38.004(b), Utilities Code, as
 added by this Act, that is not in compliance on the effective date
 of this Act with the clearance standards of Rule 232 of the National
 Electrical Safety Code Standard ANSI (c)(2) in effect at the time
 the line was constructed shall bring the line into compliance not
 later than December 31, 2021.  Any line over a lake listed in
 Section 38.004(b), Utilities Code, as added by this Act, that must
 be rebuilt to comply with this section must be constructed in
 accordance with the clearance standards of Rule 232 of the National
 Electrical Safety Code Standard ANSI (c)(2) in effect on the
 effective date of this Act.
 SECTION 7.  An electric utility, a municipally owned
 utility, or an electric cooperative required to submit a report
 under Section 38.102, Utilities Code, as added by this Act, is not
 required to submit the report until May 1, 2020.
 SECTION 8.  This Act takes effect September 1, 2019.
 ______________________________ ______________________________
 President of the Senate Speaker of the House
 I certify that H.B. No. 4150 was passed by the House on May 3,
 2019, by the following vote:  Yeas 143, Nays 0, 1 present, not
 voting; and that the House concurred in Senate amendments to H.B.
 No. 4150 on May 24, 2019, by the following vote:  Yeas 139, Nays 0,
 2 present, not voting.
 ______________________________
 Chief Clerk of the House
 I certify that H.B. No. 4150 was passed by the Senate, with
 amendments, on May 22, 2019, by the following vote:  Yeas 31, Nays
 0.
 ______________________________
 Secretary of the Senate
 APPROVED: __________________
 Date
 __________________
 Governor