Texas 2023 - 88th Regular

Texas House Bill HB1984 Compare Versions

OldNewDifferences
11 88R6480 ANG-F
22 By: Vasut H.B. No. 1984
33
44
55 A BILL TO BE ENTITLED
66 AN ACT
77 relating to cost recovery for costs arising from the
88 interconnection of certain electric generation facilities with the
99 ERCOT transmission system.
1010 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
1111 SECTION 1. Section 35.004, Utilities Code, is amended by
1212 amending Subsection (d) and adding Subsection (d-1) to read as
1313 follows:
1414 (d) The commission shall price wholesale transmission
1515 services within ERCOT based on the postage stamp method of pricing
1616 under which a transmission-owning utility's rate is based on the
1717 ERCOT utilities' combined annual costs of transmission, other than
1818 costs that exceed the allowance described in Subsection (d-1),
1919 divided by the total demand placed on the combined transmission
2020 systems of all such transmission-owning utilities within a power
2121 region. An electric utility subject to the freeze period imposed by
2222 Section 39.052 may treat transmission costs in excess of
2323 transmission revenues during the freeze period as an expense for
2424 purposes of determining annual costs in the annual report filed
2525 under Section 39.257. Notwithstanding Section 36.201, the
2626 commission may approve wholesale rates that may be periodically
2727 adjusted to ensure timely recovery of transmission investment.
2828 Notwithstanding Section 36.054(a), if the commission determines
2929 that conditions warrant the action, the commission may authorize
3030 the inclusion of construction work in progress in the rate base for
3131 transmission investment required by the commission under Section
3232 39.203(e).
3333 (d-1) The commission by rule shall establish a reasonable
3434 allowance for capital costs incurred to interconnect generation
3535 resources and electric energy storage resources described by
3636 Section 35.152(a) with the ERCOT transmission system, which must
3737 include the costs of the direct interconnection of the generator to
3838 the system and upgrades directly caused by the interconnection.
3939 Any costs that exceed the allowance must be borne directly by the
4040 generation resource or electric energy storage resource receiving
4141 interconnection service through the facilities.