Texas 2023 - 88th Regular

Texas Senate Bill SB851 Latest Draft

Bill / Introduced Version Filed 02/13/2023

Download
.pdf .doc .html
                            88R4205 SCL-D
 By: Blanco S.B. No. 851


 A BILL TO BE ENTITLED
 AN ACT
 relating to subdivision plat requirements for certain counties
 located near the international border.
 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
 SECTION 1.  Section 232.023(b), Local Government Code, is
 amended to read as follows:
 (b)  A plat required under this section must:
 (1)  be certified by a surveyor or engineer registered
 to practice in this state;
 (2)  define the subdivision by metes and bounds;
 (3)  locate the subdivision with respect to an original
 corner of the original survey of which it is a part;
 (4)  describe each lot, number each lot in progression,
 [and] give the dimensions of each lot, and provide an address for
 each lot sufficient for the provision of 9-1-1 services;
 (5)  state the dimensions of and accurately describe
 each lot, street, alley, square, park, or other part of the tract
 intended to be dedicated to public use or for the use of purchasers
 or owners of lots fronting on or adjacent to the street, alley,
 square, park, or other part;
 (6)  include or have attached a document containing a
 description in English and Spanish of the water and sewer
 facilities and roadways and easements dedicated for the provision
 of water and sewer facilities that will be constructed or installed
 to service the subdivision and a statement specifying the date by
 which the facilities will be fully operable;
 (7)  have attached a document prepared by an engineer
 registered to practice in this state certifying that the water and
 sewer service facilities proposed under Subdivision (6) are in
 compliance with the model rules adopted under Section 16.343, Water
 Code, and a certified estimate of the cost to install water and
 sewer service facilities;
 (8)  provide for drainage in the subdivision to:
 (A)  avoid concentration of storm drainage water
 from each lot to adjacent lots;
 (B)  provide positive drainage away from all
 buildings; and
 (C)  coordinate individual lot drainage with the
 general storm drainage pattern for the area;
 (9)  include a description of the drainage requirements
 as provided in Subdivision (8);
 (10)  identify the topography of the area;
 (11)  include a certification by a surveyor or engineer
 registered to practice in this state describing any area of the
 subdivision that is in a floodplain or stating that no area is in a
 floodplain; and
 (12)  include certification that the subdivider has
 complied with the requirements of Section 232.032 and that:
 (A)  the water quality and connections to the lots
 meet, or will meet, the minimum state standards;
 (B)  sewer connections to the lots or septic tanks
 meet, or will meet, the minimum requirements of state standards;
 (C)  electrical connections provided to the lot
 meet, or will meet, the minimum state standards; and
 (D)  gas connections, if available, provided to
 the lot meet, or will meet, the minimum state standards.
 SECTION 2.  The change in law made by this Act applies only
 to a plat application filed on or after the effective date of this
 Act.
 SECTION 3.  This Act takes effect September 1, 2023.