Texas 2025 - 89th Regular

Texas House Bill HB3563 Latest Draft

Bill / Introduced Version Filed 02/28/2025

Download
.pdf .doc .html
                            89R5624 SRA-F
 By: Paul H.B. No. 3563




 A BILL TO BE ENTITLED
 AN ACT
 relating to the method used to select engineers and general
 contractors for certain transportation-related construction
 projects.
 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
 SECTION 1.  Chapter 223, Transportation Code, is amended by
 adding Subchapter G to read as follows:
 SUBCHAPTER G. CONSTRUCTION MANAGER-GENERAL CONTRACTOR METHOD
 Sec. 223.301.  DEFINITION. In this subchapter,
 "construction manager-general contractor method" means a delivery
 method by which the department contracts with an engineer for
 design and construction phase services and contracts separately
 with a construction manager to serve as the general contractor and
 to provide consultation during the design and construction of a
 state highway.
 Sec. 223.302.  USE OF CONSTRUCTION MANAGER-GENERAL
 CONTRACTOR METHOD.  Notwithstanding any other law requiring a
 particular procurement procedure, including Subchapter A of this
 chapter, the department may use the construction manager-general
 contractor method to select a general contractor for a state
 highway project as provided by this subchapter.
 Sec. 223.303.  CONSTRUCTION MANAGER. (a)  For purposes of
 this subchapter, a construction manager may be a sole
 proprietorship, partnership, corporation, or other legal entity.
 (b)  A construction manager serves as the general contractor
 for a state highway project and assumes the risk for the
 construction of the state highway at the contracted price.
 (c)  A construction manager shall provide consultation to
 the department regarding construction of a state highway project
 during and after the design of the project, including consultation
 regarding preconstruction services such as scheduling, pricing,
 phasing, technical innovations, site investigation, and risk
 mitigation.
 (d)  The contracted price may be a guaranteed maximum price
 or converted to a lump sum.
 Sec. 223.304.  USE OF ENGINEER. (a)  On or before the
 selection of a construction manager, the department shall select an
 engineer to prepare the construction documents for the state
 highway project.
 (b)  The engineer selected for a state highway project under
 Section 223.041 may not serve, alone or in combination with another
 person, as the construction manager for that project.
 (c)  Subsection (b) does not prohibit the engineer from
 providing customary construction phase services under the
 engineer's contract with the department in accordance with
 applicable licensing laws.
 Sec. 223.305.  ADOPTION OF CRITERIA AND RULES. (a)  The
 department shall adopt weighted selection criteria and rules for
 the selection process and award of contracts under this subchapter,
 which may include interviews with top-ranked offerors.
 (b)  The rules adopted under Subsection (a) must address the
 selection process applicable to the award of a contract for
 preconstruction services and for construction management and
 construction services, including the process for contract
 negotiations with the construction manager for construction of the
 project or work packages associated with the project in accordance
 with contract documents.
 Sec. 223.306.  EVALUATION TEAM. (a)  Before preparing a
 request under Section 223.307 for a state highway project, the
 director shall appoint a team of at least three members to assist
 the department in evaluating proposals and qualifications received
 by the department.  The members may be department employees or
 outside consultants.
 (b)  At least one-half, or as near one-half as possible, of
 the team members must be engineers registered in this state. An
 engineer who serves on the team and is not a department employee may
 not otherwise be involved in the project for which the request is
 prepared under Section 223.307.
 (c)  The team must include at least one person who is a senior
 management employee of a general contractor that:
 (1)  is registered as a prequalified general contractor
 under department rules;
 (2)  is not involved in the project for which the
 request is prepared under Section 223.307; and
 (3)  has no other conflict of interest as determined by
 the department.
 Sec. 223.307.  SELECTION PROCESS. (a)  The department may
 select the construction manager in a one-step or two-step process.
 (b)  The department shall prepare a single request for
 proposals, in the case of a one-step process, and an initial request
 for qualifications followed by a request for proposals and any
 required interviews, in the case of a two-step process. A request
 prepared under this subsection must include:
 (1)  a statement as to whether the selection process is
 a one-step or two-step process;
 (2)  information regarding the project's location,
 scope, and limits;
 (3)  publicly available cost estimates and a budget for
 the project;
 (4)  information regarding funding that may be
 available for the project;
 (5)  the selection criteria adopted under Section
 223.305 and the relative weighted value for each criterion;
 (6)  the time and place for receipt of qualifications
 or proposals, as applicable; and
 (7)  any other information that may assist the
 department in the selection of a construction manager.
 (c)  If a one-step process is used, the department may
 request, as part of the offeror's proposal, the offeror's:
 (1)  proposed billable rates for preconstruction
 services personnel;
 (2)  proposed fee for home office overhead; and
 (3)  profit fee on the negotiated construction price
 for performing construction services.
 (d)  If a two-step process is used, the department may not
 request proposed billable rates, fees, or prices in step one. In
 step two, the department may request that five or fewer offerors,
 selected on the basis of qualifications, experience, technical
 competence, and ability to develop the project, provide additional
 information, including the offeror's:
 (1)  proposed billable rates for preconstruction
 services and general conditions personnel;
 (2)  proposed fee for home office overhead; and
 (3)  profit fee on the negotiated construction price
 for performing construction services.
 (e)  If a one-step process is used, proposed billable rates
 for general conditions personnel must be negotiated on selection of
 the construction manager.
 Sec. 223.308.  SELECTION OF CONSTRUCTION MANAGER. (a)  The
 department shall:
 (1)  rank the offerors in accordance with the selection
 criteria provided in the request for proposals under Section
 223.307(b)(5); and
 (2)  select the offeror that submits the proposal with
 the highest ranking.
 (b)  The award of a preconstruction services contract under
 Subsection (a) authorizes the construction manager to:
 (1)  provide consultation to the department and project
 engineer; and
 (2)  enter into open and transparent negotiations with
 the department during the design phase of the project to refine the
 project's cost and schedule for the construction management and
 construction services contract.
 (c)  The department shall use the services of an independent
 cost estimator for each work package associated with the project to
 validate the negotiated costs for the construction management and
 construction services contract.  The independent cost estimator
 shall follow procedures outlined in the Federal Highway
 Administration Major Project Program Cost Estimating Guidance, as
 it existed on September 1, 2025, and as adapted by the department.
 (d)  On successful negotiations under Subsection (b)(2), the
 department shall execute a construction management and
 construction services contract with the construction manager for
 either construction of the project or selected work packages
 associated with the project.
 (e)  Negotiations under Subsection (b)(2) shall be
 terminated if the department is unable to reach a price agreement
 with the construction manager.  If negotiations are terminated, the
 department may competitively bid the construction of the project in
 accordance with the department's procedures under Subchapter A.
 (f)  Not later than the seventh day after the date a
 preconstruction services contract is awarded under this section,
 the department shall make public the selection rankings determined
 under Subsection (a).
 Sec. 223.309.  PERFORMANCE OF WORK. (a) A construction
 manager shall perform a minimum percentage of construction work,
 excluding general conditions work, as required by the department's
 rules regarding standard specifications for highway and bridge
 construction.
 (b)  A construction manager shall publicly advertise for
 bids or proposals and receive bids or proposals from subcontractors
 for the performance of the remaining construction work.
 Sec. 223.310.  PERFORMANCE OR PAYMENT BOND. The
 construction manager shall deliver any performance and payment
 bonds not later than the 10th day after the date the construction
 manager is awarded a preconstruction services contract under
 Section 223.308 unless the construction manager furnishes a bid
 bond or other financial security acceptable to the department to
 ensure that the construction manager will furnish the required
 performance and payment bonds when a guaranteed maximum price is
 established.
 SECTION 2.  Chapter 370, Transportation Code, is amended by
 adding Subchapter L to read as follows:
 SUBCHAPTER L. CONSTRUCTION MANAGER-GENERAL CONTRACTOR METHOD
 Sec. 370.451.  DEFINITION. In this subchapter,
 "construction manager-general contractor method" means a delivery
 method by which an authority contracts with an engineer for design
 and construction phase services and contracts separately with a
 construction manager to serve as the general contractor and to
 provide consultation during the design and construction of a
 transportation project.
 Sec. 370.452.  USE OF CONSTRUCTION MANAGER-GENERAL
 CONTRACTOR METHOD. Notwithstanding any other law requiring a
 particular procurement procedure, including Subchapter E of this
 chapter, an authority may use the construction manager-general
 contractor method to select a general contractor for a
 transportation project as provided by this subchapter.
 Sec. 370.453.  CONSTRUCTION MANAGER. (a) For purposes of
 this subchapter, a construction manager may be a sole
 proprietorship, partnership, corporation, or other legal entity.
 (b)  A construction manager serves as the general contractor
 for a transportation project and assumes the risk for the
 construction of the project at the contracted price.
 (c)  A construction manager shall provide consultation to an
 authority regarding construction of a transportation project
 during and after the design of the project, including consultation
 regarding preconstruction services such as scheduling, pricing,
 phasing, technical innovations, site investigation, and risk
 mitigation.
 (d)  The contracted price may be a guaranteed maximum price
 or converted to a lump sum.
 Sec. 370.454.  USE OF ENGINEER. On or before the selection
 of a construction manager, an authority shall select an engineer to
 prepare the construction documents for the transportation project.
 Sec. 370.455.  ADOPTION OF CRITERIA AND RULES. (a) An
 authority shall adopt weighted selection criteria and rules for the
 selection process and award of contracts under this subchapter,
 which may include interviews with top-ranked offerors.
 (b)  The rules adopted under Subsection (a) must address the
 selection process applicable to the award of a contract for
 preconstruction services and for construction management and
 construction services, including the process for contract
 negotiations with the construction manager for construction of the
 project or work packages associated with the project in accordance
 with contract documents.
 Sec. 370.456.  EVALUATION TEAM. (a) Before preparing a
 request under Section 370.457 for a transportation project, an
 authority shall appoint a team of at least three members to assist
 the authority in evaluating proposals and qualifications received
 by the authority. The members may be authority employees or outside
 consultants.
 (b)  At least one-half, or as near one-half as possible, of
 the team members must be engineers registered in this state. An
 engineer who serves on the team and is not an authority employee may
 not otherwise be involved in the project for which the request is
 prepared under Section 370.457.
 (c)  The team must include at least one person who is a senior
 management employee of a general contractor that:
 (1)  is registered as a prequalified general contractor
 under department rules;
 (2)  is not involved in the project for which the
 request is prepared under Section 370.457; and
 (3)  has no other conflict of interest as determined by
 the authority.
 Sec. 370.457.  SELECTION PROCESS. (a) An authority may
 select the construction manager in a one-step or two-step process.
 (b)  An authority shall prepare a single request for
 proposals, in the case of a one-step process, and an initial request
 for qualifications followed by a request for proposals and any
 required interviews, in the case of a two-step process. A request
 prepared under this subsection must include:
 (1)  a statement as to whether the selection process is
 a one-step or two-step process;
 (2)  information regarding the project's location,
 scope, and limits;
 (3)  publicly available cost estimates and a budget for
 the project;
 (4)  information regarding funding that may be
 available for the project;
 (5)  the selection criteria adopted under Section
 370.455 and the relative weighted value for each criterion;
 (6)  the time and place for receipt of qualifications
 or proposals, as applicable; and
 (7)  any other information that may assist the
 authority in the selection of a construction manager.
 (c)  If a one-step process is used, an authority may request,
 as part of the offeror's proposal, the offeror's:
 (1)  proposed billable rates for preconstruction
 services personnel;
 (2)  proposed fee for home office overhead; and
 (3)  profit fee on the negotiated construction price
 for performing construction services.
 (d)  If a two-step process is used, an authority may not
 request proposed billable rates, fees, or prices in step one. In
 step two, an authority may request that five or fewer offerors,
 selected on the basis of qualifications, experience, technical
 competence, and ability to develop the project, provide additional
 information, including the offeror's:
 (1)  proposed billable rates for preconstruction
 services and general conditions personnel;
 (2)  proposed fee for home office overhead; and
 (3)  profit fee on the negotiated construction price
 for performing construction services.
 (e)  If a one-step process is used, proposed billable rates
 for general conditions personnel must be negotiated on selection of
 the construction manager.
 Sec. 370.458.  SELECTION OF CONSTRUCTION MANAGER. (a) An
 authority shall:
 (1)  rank the offerors in accordance with the selection
 criteria provided in the request for proposals under Section
 370.457(b)(5); and
 (2)  select the offeror that submits the proposal with
 the highest ranking.
 (b)  The award of a preconstruction services contract under
 Subsection (a) authorizes the construction manager to:
 (1)  provide consultation to the authority and project
 engineer; and
 (2)  enter into open and transparent negotiations with
 the authority during the design phase of the project to refine the
 project's cost and schedule for the construction management and
 construction services contract.
 (c)  An authority shall use the services of an independent
 cost estimator for each work package associated with the project to
 validate the negotiated costs for the construction management and
 construction services contract. The independent cost estimator
 shall follow procedures outlined in the Federal Highway
 Administration Major Project Program Cost Estimating Guidance, as
 it existed on September 1, 2025, and as adapted by the department.
 (d)  On successful negotiations under Subsection (b)(2), the
 authority shall execute a construction management and construction
 services contract with the construction manager for either
 construction of the project or selected work packages associated
 with the project.
 (e)  Negotiations under Subsection (b)(2) shall be
 terminated if the authority is unable to reach a price agreement
 with the construction manager. If negotiations are terminated, the
 authority may competitively bid the construction of the project in
 accordance with the authority's procedures under Subchapter E.
 (f)  Not later than the seventh day after the date a
 preconstruction services contract is awarded under this section,
 the authority shall make public the selection rankings determined
 under Subsection (a).
 Sec. 370.459.  PERFORMANCE OR PAYMENT BOND. The
 construction manager shall deliver any performance and payment
 bonds not later than the 10th day after the date the construction
 manager is awarded a preconstruction services contract under
 Section 370.458 unless the construction manager furnishes a bid
 bond or other financial security acceptable to the authority to
 ensure that the construction manager will furnish the required
 performance and payment bonds when a guaranteed maximum price is
 established.
 SECTION 3.  This Act takes effect immediately if it receives
 a vote of two-thirds of all the members elected to each house, as
 provided by Section 39, Article III, Texas Constitution.  If this
 Act does not receive the vote necessary for immediate effect, this
 Act takes effect September 1, 2025.