Texas 2025 - 89th Regular

Texas Senate Bill SB2042 Latest Draft

Bill / Introduced Version Filed 03/07/2025

Download
.pdf .doc .html
                            89R12289 CS-F
 By: Hancock S.B. No. 2042




 A BILL TO BE ENTITLED
 AN ACT
 relating to the time frame required for excavation notification.
 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
 SECTION 1.  Section 251.002, Utilities Code, is amended by
 amending Subdivision (1) and adding Subdivision (1-a) to read as
 follows:
 (1)  "Business day" means a day other than:
 (A)  a Saturday or Sunday; or
 (B)  a legal holiday.
 (1-a) "Class A underground facility" means an
 underground facility that is used to produce, store, convey,
 transmit, or distribute:
 (A)  electrical energy;
 (B)  natural or synthetic gas;
 (C)  petroleum or petroleum products;
 (D)  steam;
 (E)  any form of telecommunications service,
 including voice, data, video, or optical transmission, or cable
 television service; or
 (F)  any other liquid, material, or product not
 defined as a Class B underground facility.
 SECTION 2.  Section 251.151(a), Utilities Code, is amended
 to read as follows:
 (a)  Except as provided by Sections 251.155 and 251.156, a
 person who intends to excavate shall notify a notification center
 not earlier than the 14th business day or later than the 3rd
 business day before the date the excavation is to begin [or later
 than the 48th hour before the time the excavation is to begin,
 excluding Saturdays, Sundays, and legal holidays].
 SECTION 3.  Sections 251.157(a) and (d), Utilities Code, are
 amended to read as follows:
 (a)  Each Class A underground facility operator contacted by
 the notification system shall mark the approximate location of its
 underground facilities at or near the site of the proposed
 excavation if the operator believes that marking the location is
 necessary. The operator shall mark the location not later than:
 (1)  11:59 p.m. on the second business day [48th hour]
 after the date [time] the excavator gives to the notification
 system notice of intent to excavate[, excluding Saturdays, Sundays,
 and legal holidays]; or
 (2)  [11:59 a.m. on the Tuesday following a Saturday
 notification unless the intervening Monday is a holiday;
 [(3)  11:59 a.m. on the Wednesday following a Saturday
 notification if the intervening Monday is a holiday; or
 [(4)]  a time agreed to by the operator and the
 excavator.
 (d)  Not later than 11:59 p.m. on the second business day
 [48th hour] after the date [time] the excavator gives to the
 notification center notice of intent to excavate, an operator
 contacted by the notification center shall notify the excavator of
 the operator's plans to not mark the proximate location of an
 underground facility at or near the site of the proposed
 excavation.  The operator must provide the notification by e-mail
 or facsimile or by another verifiable electronic method approved by
 the board.
 SECTION 4.  The following provisions of the Utilities Code
 are repealed:
 (1)  Section 251.002(14); and
 (2)  Section 251.151(b).
 SECTION 5.  This Act takes effect September 1, 2025.