Texas 2025 - 89th Regular

Texas Senate Bill SB2919 Latest Draft

Bill / Introduced Version Filed 03/14/2025

Download
.pdf .doc .html
                            89R7856 LRM-D
 By: Miles, Hancock S.B. No. 2919




 A BILL TO BE ENTITLED
 AN ACT
 relating to power duration requirements in emergency contingency
 plans adopted by end stage renal disease facilities.
 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
 SECTION 1.  Section 251.017(b), Health and Safety Code, is
 amended to read as follows:
 (b)  Unless the facility adopts a plan described by
 Subsection (d) or (e), an end stage renal disease facility must
 adopt an emergency contingency plan as required by Subsection (a)
 under which the facility is required:
 (1)  to have an on-site emergency generator that:
 (A)  has a type 2 essential electrical
 distribution system in accordance with the National Fire Protection
 Association 99, Section 4.5, and the National Fire Protection
 Association 110;
 (B)  is installed, tested, and maintained in
 accordance with the National Fire Protection Association 99,
 Section 4.5.4, and the National Fire Protection Association 110;
 and
 (C)  is kept at all times not less than 10 feet
 from the electrical transformer;
 (2)  except as provided by Subsection (c), to maintain:
 (A)  an on-site fuel source with sufficient [that
 contains enough] fuel capacity to power the on-site generator for
 not less than 72 [24] hours, as determined by the electrical load
 demand on the emergency generator for that period; or
 (B)  an on-site battery-powered generator with
 sufficient electrical capacity to power the facility for not less
 than 72 hours;
 (3)  to maintain a sufficient quantity of potable water
 on-site to operate the facility's water treatment system for not
 less than 24 hours; and
 (4)  to maintain a water valve connection that allows
 an outside vendor to provide potable water to operate the
 facility's water treatment system.
 SECTION 2.  Not later than December 1, 2025, each end stage
 renal disease facility shall modify the facility's emergency
 contingency plan as necessary to comply with Section 251.017(b),
 Health and Safety Code, as amended by this Act.
 SECTION 3.  This Act takes effect September 1, 2025.