Us Congress 2025-2026 Regular Session

Us Congress House Bill HB2897 Compare Versions

Only one version of the bill is available at this time.
OldNewDifferences
11 I
22 119THCONGRESS
33 1
44 STSESSION H. R. 2897
55 To amend the Small Business Act to make disaster loans available for
66 damages caused by prolonged power outages, and for other purposes.
77 IN THE HOUSE OF REPRESENTATIVES
88 APRIL10, 2025
99 Ms. S
1010 TEVENSintroduced the following bill; which was referred to the
1111 Committee on Small Business
1212 A BILL
1313 To amend the Small Business Act to make disaster loans
1414 available for damages caused by prolonged power out-
1515 ages, and for other purposes.
1616 Be it enacted by the Senate and House of Representa-1
1717 tives of the United States of America in Congress assembled, 2
1818 SECTION 1. SMALL BUSINESS DISASTER LOANS FOR PRO-3
1919 LONGED POWER OUTAGES. 4
2020 Section 7(b) of the Small Business Act (15 U.S.C. 5
2121 636(b)) is amended— 6
2222 (1) by redesignating the second paragraph (16) 7
2323 (relating to statute of limitations) as paragraph 8
2424 (17); and 9
2525 VerDate Sep 11 2014 16:31 Apr 28, 2025 Jkt 059200 PO 00000 Frm 00001 Fmt 6652 Sfmt 6201 E:\BILLS\H2897.IH H2897
2626 ssavage on LAPJG3WLY3PROD with BILLS 2
2727 •HR 2897 IH
2828 (2) by inserting after paragraph (17), as so re-1
2929 designated, the following new paragraph: 2
3030 ‘‘(18) P
3131 ROLONGED POWER OUTAGE .— 3
3232 ‘‘(A) I
3333 N GENERAL.—For the purposes of 4
3434 paragraphs (1)(A) and (2), the term ‘disaster’ 5
3535 includes prolonged power outages. 6
3636 ‘‘(B) U
3737 SE OF LOAN AMOUNTS .—In addi-7
3838 tion to any other allowable uses of a loan made 8
3939 under paragraph (1)(A) or (2), if a borrower 9
4040 receives such a loan pursuant to a disaster that 10
4141 is prolonged power outage, the borrower may 11
4242 use the proceeds of such loan to— 12
4343 ‘‘(i) purchase energy resilience sys-13
4444 tems that enable the borrower to cope with 14
4545 and recover from disruptions to the com-15
4646 mercial availability of electrical power, in-16
4747 cluding generators, solar panels, wind tur-17
4848 bines, microgrids, fuel cells, batteries, and 18
4949 other technologies that provide electrical 19
5050 generation and storage capabilities, as de-20
5151 termined appropriate by the Administrator; 21
5252 and 22
5353 ‘‘(ii) pay for the cost of replacing any 23
5454 food and drink of the borrower that was 24
5555 lost, destroyed, or rendered unfit for 25
5656 VerDate Sep 11 2014 16:31 Apr 28, 2025 Jkt 059200 PO 00000 Frm 00002 Fmt 6652 Sfmt 6201 E:\BILLS\H2897.IH H2897
5757 ssavage on LAPJG3WLY3PROD with BILLS 3
5858 •HR 2897 IH
5959 human consumption as a result of such 1
6060 disaster. 2
6161 ‘‘(C) P
6262 ROLONGED POWER OUTAGE DE -3
6363 FINED.—In this subsection, the term ‘prolonged 4
6464 power outage’ means— 5
6565 ‘‘(i) for the purposes of paragraph 6
6666 (1)(A), a loss of electrical power that 7
6767 causes not fewer than 25 homes or 25 8
6868 business concerns, or any combination of 9
6969 not fewer than 25 homes, business con-10
7070 cerns, or other eligible recipients of a loan 11
7171 under such paragraph, located in any 12
7272 county or smaller political subdivision of a 13
7373 State or territory or possession of the 14
7474 United States to each sustain uninsured 15
7575 losses of not less than 40 percent of the es-16
7676 timated fair replacement value or pre-dis-17
7777 aster fair market value of the damaged 18
7878 property, whichever is lower; and 19
7979 ‘‘(ii) for the purposes of paragraph 20
8080 (2), not fewer than 25 homes or 25 busi-21
8181 ness concerns, or any combination of not 22
8282 fewer than 25 homes, business concerns, or 23
8383 other eligible recipients of a loan under 24
8484 such paragraph, located in any county or 25
8585 VerDate Sep 11 2014 16:31 Apr 28, 2025 Jkt 059200 PO 00000 Frm 00003 Fmt 6652 Sfmt 6201 E:\BILLS\H2897.IH H2897
8686 ssavage on LAPJG3WLY3PROD with BILLS 4
8787 •HR 2897 IH
8888 smaller political subdivision of a State or 1
8989 territory or possession of the United States 2
9090 concurrently losing electrical power for not 3
9191 fewer than 48 hours.’’. 4
9292 Æ
9393 VerDate Sep 11 2014 16:31 Apr 28, 2025 Jkt 059200 PO 00000 Frm 00004 Fmt 6652 Sfmt 6301 E:\BILLS\H2897.IH H2897
9494 ssavage on LAPJG3WLY3PROD with BILLS