1-01-28 09:40 1st Sub. (Green) S.B. 58
2-Calvin R. Musselman proposes the following substitute bill:
1+01-02 17:14 S.B. 58
32 1
43 Mobile Crane Amendments
54 2025 GENERAL SESSION
65 STATE OF UTAH
76 Chief Sponsor: Calvin R. Musselman
8-House Sponsor:
97 2
108
119 3
1210 LONG TITLE
1311 4
1412 General Description:
1513 5
1614 This bill addresses the use of mobile cranes.
1715 6
1816 Highlighted Provisions:
1917 7
2018 This bill:
2119 8
2220 ▸ defines terms;
2321 9
2422 ▸ requires that an owner of real property on which a mobile crane will be used to:
2523 10
2624 ● obtain a geotechnical report; and
2725 11
2826 ● take certain precautions if the geotechnical report states that the conditions of the real
2927 12
3028 property cannot support the maximum crane load;
3129 13
3230 ▸ prohibits an owner from using a mobile crane on the owner's property under certain
3331 14
3432 conditions;
3533 15
3634 ▸ creates a presumption of negligence in a civil action resulting from an owner failing to
3735 16
3836 take certain precautions when using a mobile crane; and
3937 17
4038 ▸ makes technical and conforming changes.
4139 18
4240 Money Appropriated in this Bill:
4341 19
4442 None
4543 20
4644 Other Special Clauses:
4745 21
4846 None
4947 22
5048 Utah Code Sections Affected:
5149 23
5250 AMENDS:
5351 24
5452 15A-6-301, as enacted by Laws of Utah 2024, Chapter 329
5553 25
5654 ENACTS:
5755 26
5856 15A-6-302, Utah Code Annotated 1953
5957 27
6058 15A-6-303, Utah Code Annotated 1953
6159 28
6260
63-1st Sub. S.B. 58 1st Sub. (Green) S.B. 58 01-28 09:40
6461 29
6562 Be it enacted by the Legislature of the state of Utah:
6663 30
6764 Section 1. Section 15A-6-301 is amended to read:
6865 31
69-
70-Part 3. Cranes
66+Part 3. Cranes S.B. 58 01-02 17:14
7167 32
7268 15A-6-301 . Definitions.
7369 33
7470 (1) As used in this [section] part:
7571 34
7672 (a) "Affected land" means the same as that term is defined in Section 10-9a-539.
7773 35
7874 (b) "Airspace approval" means the same as that term is defined in Section 10-9a-539.
7975 36
80-(c) "Concrete tilt-up construction" means a method of construction involving casting a
76+(c) "Construction project" means the same as that term is defined in Section 38-1a-102.
8177 37
82-concrete wall on a construction project site and lifting the concrete wall into place
78+(d) "Improvement" means the same as that term is defined in Section 38-1a-102.
8379 38
84-using a crane.
80+[(c)] (e) "Jib" means the part of a tower crane that:
8581 39
86-(d) "Improvement" means the same as that term is defined in Section 38-1a-102.
82+(i) extends horizontally or almost horizontally from the main vertical component of
8783 40
88-[(c)] (e) "Jib" means the part of a tower crane that:
84+the tower crane; and
8985 41
90-(i) extends horizontally or almost horizontally from the main vertical component of
86+(ii) carries the live load.
9187 42
92-the tower crane; and
88+[(d)] (f) "Live load" means the same as that term is defined in Section 10-9a-539.
9389 43
94-(ii) carries the live load.
90+(g) "Maximum crane load" means the total maximum load of a mobile crane plus the
9591 44
96-[(d)] (f) "Live load" means the same as that term is defined in Section 10-9a-539.
92+maximum point load that the crane may lift during a construction project.
9793 45
98-(g) "Maximum crane load" means the total maximum load of a mobile crane plus the
94+[(e)] (h) "Minimum hook height" means the distance that, measured from the lowest
9995 46
100-maximum point load that the crane may lift during a construction project.
96+point of a hook suspended from a jib, is:
10197 47
102-[(e)] (h) "Minimum hook height" means the distance that, measured from the lowest
98+(i) 50 feet above the ground level of affected land; or
10399 48
104-point of a hook suspended from a jib, is:
100+(ii) 20 feet above a building on affected land.
105101 49
106-(i) 50 feet above the ground level of affected land; or
102+(i) "Mobile crane" means a lifting device:
107103 50
108-(ii) 20 feet above a building on affected land.
104+(i) with a lifting capacity of more than 45 tons that uses a cable-suspended latticed
109105 51
110-(i) "Mobile crane" means a lifting device:
106+boom or hydraulic telescopic boom; and
111107 52
112-(i) with a lifting capacity of more than 45 tons that uses a cable-suspended latticed
108+(ii) that is designed to be moved between operating locations by road transport.
113109 53
114-boom or hydraulic telescopic boom; and
110+[(f)] (j) "Tower crane" means the same as that term is defined in Section 10-9a-539.
115111 54
116-(ii) that is designed to be moved between operating locations by road transport.
112+[(2) An operator of a tower crane shall operate the tower crane in accordance with the
117113 55
118-(j) "Private project" means the same as that term is defined in Section 38-1a-102.
114+requirements of the manufacturer of the tower crane.]
119115 56
120-[(f)] (k) "Tower crane" means the same as that term is defined in Section 10-9a-539.
116+[(3)(a) A live load may travel over affected land at the minimum hook height with
121117 57
122-[(2) An operator of a tower crane shall operate the tower crane in accordance with the
118+airspace approval.]
123119 58
124-requirements of the manufacturer of the tower crane.]
120+[(b) A jib, but not a live load, may travel over the affected land at the minimum hook
125121 59
126-[(3)(a) A live load may travel over affected land at the minimum hook height with
122+height without airspace approval.]
127123 60
128-airspace approval.]
124+[(4) The functioning of a tower crane in accordance with Subsection (3) does not constitute
129125 61
130-[(b) A jib, but not a live load, may travel over the affected land at the minimum hook
126+a trespass on affected land.]
131127 62
132-height without airspace approval.]
133-- 2 - 01-28 09:40 1st Sub. (Green) S.B. 58
128+Section 2. Section 15A-6-302 is enacted to read:
134129 63
135-[(4) The functioning of a tower crane in accordance with Subsection (3) does not constitute
130+15A-6-302 . Tower crane operation.
136131 64
137-a trespass on affected land.]
132+(1) An operator of a tower crane shall operate the tower crane in accordance with the
138133 65
139-Section 2. Section 15A-6-302 is enacted to read:
134+requirements of the manufacturer of the tower crane.
135+- 2 - 01-02 17:14 S.B. 58
140136 66
141-15A-6-302 . Tower crane operation.
137+(2)(a) A live load may travel over affected land at the minimum hook height with
142138 67
143-(1) An operator of a tower crane shall operate the tower crane in accordance with the
139+airspace approval.
144140 68
145-requirements of the manufacturer of the tower crane.
141+(b) A jib, but not a live load, may travel over the affected land at the minimum hook
146142 69
147-(2)(a) A live load may travel over affected land at the minimum hook height with
143+height without airspace approval.
148144 70
149-airspace approval.
145+(3) The functioning of a tower crane in accordance with Subsection (2) does not constitute a
150146 71
151-(b) A jib, but not a live load, may travel over the affected land at the minimum hook
147+trespass on affected land.
152148 72
153-height without airspace approval.
149+Section 3. Section 15A-6-303 is enacted to read:
154150 73
155-(3) The functioning of a tower crane in accordance with Subsection (2) does not constitute a
151+15A-6-303 . Mobile crane requirements.
156152 74
157-trespass on affected land.
153+(1) Before using a mobile crane on a construction project where the bearing pressure
158154 75
159-Section 3. Section 15A-6-303 is enacted to read:
155+imposed by the maximum crane load will exceed 3,500 pounds per square foot, the
160156 76
161-15A-6-303 . Mobile crane requirements.
157+owner of the real property on which the improvement will be built shall:
162158 77
163-(1) Before using a mobile crane to facilitate concrete tilt-up construction on a private
159+(a) obtain, from a professional geotechnical engineer, a geotechnical report that states
164160 78
165-project where the bearing pressure imposed by the maximum crane load will exceed
161+whether the existing soil and subgrade conditions of the real property have sufficient
166162 79
167-3,500 pounds per square foot, the owner of the real property on which the improvement
163+structural strength to support the maximum crane load; and
168164 80
169-will be built shall:
165+(b) if the geotechnical report described in Subsection (1)(a) states that the soil and
170166 81
171-(a) obtain, from a professional geotechnical engineer, a geotechnical report that states
167+subgrade conditions of the real property on which the improvement will be made
172168 82
173-whether the existing soil and subgrade conditions of the real property have sufficient
169+cannot support the maximum crane load, the owner shall design, develop, install, and
174170 83
175-structural strength to support the maximum crane load; and
171+use a structural pad to ensure that the mobile crane has sufficient support for the
176172 84
177-(b) if the geotechnical report described in Subsection (1)(a) states that the soil and
173+duration of the project to safely operate while carrying the maximum crane load.
178174 85
179-subgrade conditions of the real property on which the improvement will be made
175+(2) If an owner fails to comply with Subsection (1), an owner may not operate or allow a
180176 86
181-cannot support the maximum crane load, the owner shall design, develop, install, and
177+mobile crane to be operated on a project on the owner's property.
182178 87
183-use a structural pad to ensure that the mobile crane has sufficient support for the
179+(3) In any civil action brought for damages caused during the operation of a mobile crane,
184180 88
185-duration of the project to safely operate while carrying the maximum crane load.
181+there is a presumption that the owner was negligent if, in violation of Subsection (2), an
186182 89
187-(2) If an owner fails to comply with Subsection (1), an owner may not operate or allow a
183+owner operates or allows a mobile crane to be operated on a project on the owner's
188184 90
189-mobile crane to be operated on a private project on the owner's property.
185+property.
190186 91
191-(3) In any civil action brought for damages caused during the operation of a mobile crane in
187+Section 4. Effective Date.
192188 92
193-violation of Subsection (1) or (2), there is a presumption that the owner was negligent.
194-93
195-Section 4. Effective Date.
196-94
197189 This bill takes effect on May 7, 2025.
198190 - 3 -