414 | 333 | | |
---|
415 | 334 | | 2. A Phase II Utility shall meet one percent of the RPS Program requirements in any given compliance year with solar, wind, or anaerobic digestion resources of one megawatt or less located in the Commonwealth, with not more than 3,000 kilowatts at any single location or at contiguous locations owned by the same entity or affiliated entities and, to the extent that low-income qualifying projects are available, then no less than 25 percent of such one percent shall be composed of low-income qualifying projects. |
---|
416 | 335 | | |
---|
417 | 336 | | 3. Beginning with the 2025 compliance year and thereafter, at least 75 percent of all RECs used by a Phase II Utility in a compliance period shall come from RPS eligible resources located in the Commonwealth. |
---|
418 | 337 | | |
---|
419 | 338 | | 4. Any Phase I or Phase II Utility may apply renewable energy sales achieved or RECs acquired in excess of the sales requirement for that RPS Program to the sales requirements for RPS Program requirements in the year in which it was generated and the five calendar years after the renewable energy was generated or the RECs were created. To the extent that a Phase I or Phase II Utility procures RECs for RPS Program compliance from resources the utility does not own, the utility shall be entitled to recover the costs of such certificates at its election pursuant to 56-249.6 or subdivision A 5 d of 56-585.1. |
---|
420 | 339 | | |
---|
421 | 340 | | 5. Energy from a geothermal heating and cooling system is eligible for inclusion in meeting the requirements of the RPS Program. RECs from a geothermal heating and cooling system are created based on the amount of energy, converted from BTUs to kilowatt-hours, that is generated by a geothermal heating and cooling system for space heating and cooling or water heating. The Commission shall determine the form and manner in which such RECs are verified. |
---|
422 | 341 | | |
---|
423 | 342 | | D. Each Phase I or Phase II Utility shall petition the Commission for necessary approvals to procure zero-carbon electricity generating capacity as set forth in this subsection and energy storage resources as set forth in subsection E. To the extent that a Phase I or Phase II Utility constructs or acquires new zero-carbon generating facilities or energy storage resources, the utility shall petition the Commission for the recovery of the costs of such facilities, at the utility's election, either through its rates for generation and distribution services or through a rate adjustment clause pursuant to subdivision A 6 of 56-585.1. All costs not sought for recovery through a rate adjustment clause pursuant to subdivision A 6 of 56-585.1 associated with generating facilities provided by sunlight or onshore or offshore wind are also eligible to be applied by the utility as a customer credit reinvestment offset as provided in subdivision A 8 of 56-585.1. Costs associated with the purchase of energy, capacity, or environmental attributes from facilities owned by the persons other than the utility required by this subsection shall be recovered by the utility either through its rates for generation and distribution services or pursuant to 56-249.6. |
---|
424 | 343 | | |
---|
425 | 344 | | 1. Each Phase I Utility shall petition the Commission for necessary approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of 600 megawatts of generating capacity using energy derived from sunlight or onshore wind. |
---|
426 | 345 | | |
---|
427 | 346 | | a. By December 31, 2023, each Phase I Utility shall petition the Commission for necessary approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of at least 200 megawatts of generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind, and 35 percent of such generating capacity procured shall be from the purchase of energy, capacity, and environmental attributes from solar or onshore wind facilities owned by persons other than the utility, with the remainder, in the aggregate, being from construction or acquisition by such Phase I Utility. |
---|
428 | 347 | | |
---|
429 | 348 | | b. By December 31, 2027, each Phase I Utility shall petition the Commission for necessary approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of at least 200 megawatts of additional generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind, and 35 percent of such generating capacity procured shall be from the purchase of energy, capacity, and environmental attributes from solar or onshore wind facilities owned by persons other than the utility, with the remainder, in the aggregate, being from construction or acquisition by such Phase I Utility. |
---|
430 | 349 | | |
---|
431 | 350 | | c. By December 31, 2030, each Phase I Utility shall petition the Commission for necessary approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of at least 200 megawatts of additional generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind, and 35 percent of such generating capacity procured shall be from the purchase of energy, capacity, and environmental attributes from solar or onshore wind facilities owned by persons other than the utility, with the remainder, in the aggregate, being from construction or acquisition by such Phase I Utility. |
---|
432 | 351 | | |
---|
433 | 352 | | d. Nothing in this subdivision 1 shall prohibit such Phase I Utility from constructing, acquiring, or entering into agreements to purchase the energy, capacity, and environmental attributes of more than 600 megawatts of generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind, provided the utility receives approval from the Commission pursuant to 56-580 and 56-585.1. |
---|
434 | 353 | | |
---|
435 | 354 | | 2. By December 31, 2035, each Phase II Utility shall petition the Commission for necessary approvals to (i) construct, acquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of 16,100 megawatts of generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind, which shall include 1,100 megawatts of solar generation of a nameplate capacity not to exceed three megawatts per individual project and 35 percent of such generating capacity procured shall be from the purchase of energy, capacity, and environmental attributes from solar facilities owned by persons other than a utility, including utility affiliates and deregulated affiliates and (ii) pursuant to 56-585.1:11, construct or purchase one or more offshore wind generation facilities located off the Commonwealth's Atlantic shoreline or in federal waters and interconnected directly into the Commonwealth with an aggregate capacity of up to 5,200 megawatts. At least 200 megawatts of the 16,100 megawatts shall be placed on previously developed project sites. |
---|
436 | 355 | | |
---|
437 | 356 | | a. By December 31, 2024, each Phase II Utility shall petition the Commission for necessary approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of at least 3,000 megawatts of generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind, and 35 percent of such generating capacity procured shall be from the purchase of energy, capacity, and environmental attributes from solar or onshore wind facilities owned by persons other than the utility, with the remainder, in the aggregate, being from construction or acquisition by such Phase II Utility. |
---|
438 | 357 | | |
---|
439 | 358 | | b. By December 31, 2027, each Phase II Utility shall petition the Commission for necessary approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of at least 3,000 megawatts of additional generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind, and 35 percent of such generating capacity procured shall be from the purchase of energy, capacity, and environmental attributes from solar or onshore wind facilities owned by persons other than the utility, with the remainder, in the aggregate, being from construction or acquisition by such Phase II Utility. |
---|
440 | 359 | | |
---|
441 | 360 | | c. By December 31, 2030, each Phase II Utility shall petition the Commission for necessary approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of at least 4,000 megawatts of additional generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind, and 35 percent of such generating capacity procured shall be from the purchase of energy, capacity, and environmental attributes from solar or onshore wind facilities owned by persons other than the utility, with the remainder, in the aggregate, being from construction or acquisition by such Phase II Utility. |
---|
442 | 361 | | |
---|
443 | 362 | | d. By December 31, 2035, each Phase II Utility shall petition the Commission for necessary approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of at least 6,100 megawatts of additional generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind, and 35 percent of such generating capacity procured shall be from the purchase of energy, capacity, and environmental attributes from solar or onshore wind facilities owned by persons other than the utility, with the remainder, in the aggregate, being from construction or acquisition by such Phase II Utility. |
---|
444 | 363 | | |
---|
445 | 364 | | e. Nothing in this subdivision 2 shall prohibit such Phase II Utility from constructing, acquiring, or entering into agreements to purchase the energy, capacity, and environmental attributes of more than 16,100 megawatts of generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind, provided the utility receives approval from the Commission pursuant to 56-580 and 56-585.1. |
---|
446 | 365 | | |
---|
447 | 366 | | 3. Nothing in this section shall prohibit a utility from petitioning the Commission to construct or acquire zero-carbon electricity or from entering into contracts to procure the energy, capacity, and environmental attributes of zero-carbon electricity generating resources in excess of the requirements in subsection B. The Commission shall determine whether to approve such petitions on a stand-alone basis pursuant to 56-580 and 56-585.1, provided that the Commission's review shall also consider whether the proposed generating capacity (i) is necessary to meet the utility's native load, (ii) is likely to lower customer fuel costs, (iii) will provide economic development opportunities in the Commonwealth, and (iv) serves a need that cannot be more affordably met with demand-side or energy storage resources. |
---|
448 | 367 | | |
---|
449 | 368 | | Each Phase I and Phase II Utility shall, at least once every year, conduct a request for proposals for new solar and wind resources. Such requests shall quantify and describe the utility's need for energy, capacity, or renewable energy certificates. The requests for proposals shall be publicly announced and made available for public review on the utility's website at least 45 days prior to the closing of such request for proposals. The requests for proposals shall provide, at a minimum, the following information: (a) the size, type, and timing of resources for which the utility anticipates contracting; (b) any minimum thresholds that must be met by respondents; (c) major assumptions to be used by the utility in the bid evaluation process, including environmental emission standards; (d) detailed instructions for preparing bids so that bids can be evaluated on a consistent basis; (e) the preferred general location of additional capacity; and (f) specific information concerning the factors involved in determining the price and non-price criteria used for selecting winning bids. A utility may evaluate responses to requests for proposals based on any criteria that it deems reasonable but shall at a minimum consider the following in its selection process: (1) the status of a particular project's development; (2) the age of existing generation facilities; (3) the demonstrated financial viability of a project and the developer; (4) a developer's prior experience in the field; (5) the location and effect on the transmission grid of a generation facility; (6) benefits to the Commonwealth that are associated with particular projects, including regional economic development and the use of goods and services from Virginia businesses; and (7) the environmental impacts of particular resources, including impacts on air quality within the Commonwealth and the carbon intensity of the utility's generation portfolio. |
---|
450 | 369 | | |
---|
451 | 370 | | 4. In connection with the requirements of this subsection, each Phase I and Phase II Utility shall, commencing in 2020 and concluding in 2035, submit annually a plan and petition for approval for the development of new solar and onshore wind generation capacity. Such plan shall reflect, in the aggregate and over its duration, the requirements of subsection D concerning the allocation percentages for construction or purchase of such capacity. Such petition shall contain any request for approval to construct such facilities pursuant to subsection D of 56-580 and a request for approval or update of a rate adjustment clause pursuant to subdivision A 6 of 56-585.1 to recover the costs of such facilities. Such plan shall also include the utility's plan to meet the energy storage project targets of subsection E, including the goal of installing at least 10 percent of such energy storage projects behind the meter. In determining whether to approve the utility's plan and any associated petition requests, the Commission shall determine whether they are reasonable and prudent and shall give due consideration to (i) the RPS and carbon dioxide reduction requirements in this section; (ii) the promotion of new renewable generation and energy storage resources within the Commonwealth, and associated economic development; and (iii) fuel savings projected to be achieved by the plan. Notwithstanding any other provision of this title, the Commission's final order regarding any such petition and associated requests shall be entered by the Commission not more than six months after the date of the filing of such petition. |
---|
452 | 371 | | |
---|
453 | 372 | | 5. If, in any year, a Phase I or Phase II Utility is unable to meet the compliance obligation of the RPS Program requirements or if the cost of RECs necessary to comply with RPS Program requirements exceeds $45 per megawatt hour, such supplier shall be obligated to make a deficiency payment equal to $45 for each megawatt-hour shortfall for the year of noncompliance, except that the deficiency payment for any shortfall in procuring RECs for solar, wind, or anaerobic digesters located in the Commonwealth shall be $75 per megawatts hour for resources one megawatt and lower. The amount of any deficiency payment shall increase by one percent annually after 2021. A Phase I or Phase II Utility shall be entitled to recover the costs of such payments as a cost of compliance with the requirements of this subsection pursuant to subdivision A 5 d of 56-585.1. All proceeds from the deficiency payments shall be deposited into an interest-bearing account administered by the Department of Energy. In administering this account, the Department of Energy shall manage the account as follows: (i) 50 percent of total revenue shall be directed to job training programs in historically economically disadvantaged communities; (ii) 16 percent of total revenue shall be directed to energy efficiency measures for public facilities; (iii) 30 percent of total revenue shall be directed to renewable energy programs located in historically economically disadvantaged communities; and (iv) four percent of total revenue shall be directed to administrative costs. |
---|
454 | 373 | | |
---|
455 | 374 | | For any project constructed pursuant to this subsection or subsection E, a utility shall, subject to a competitive procurement process, procure equipment from a Virginia-based or United States-based manufacturer using materials or product components made in Virginia or the United States, if reasonably available and competitively priced. |
---|
456 | 375 | | |
---|
457 | 376 | | E. To enhance reliability and performance of the utility's generation and distribution system, each Phase I and Phase II Utility shall petition the Commission for necessary approvals to construct or acquire new, utility-owned energy storage resources. |
---|
458 | 377 | | |
---|
459 | 378 | | 1. By December 31, 2035, each Phase I Utility shall petition the Commission for necessary approvals to construct or acquire 400 megawatts of energy storage capacity. Nothing in this subdivision shall prohibit a Phase I Utility from constructing or acquiring more than 400 megawatts of energy storage, provided that the utility receives approval from the Commission pursuant to 56-580 and 56-585.1. |
---|
460 | 379 | | |
---|
461 | 380 | | 2. By December 31, 2035, each Phase II Utility shall petition the Commission for necessary approvals to construct or acquire 2,700 megawatts of energy storage capacity. Nothing in this subdivision shall prohibit a Phase II Utility from constructing or acquiring more than 2,700 megawatts of energy storage, provided that the utility receives approval from the Commission pursuant to 56-580 and 56-585.1. |
---|
462 | 381 | | |
---|
463 | 382 | | 3. No single energy storage project shall exceed 500 megawatts in size, except that a Phase II Utility may procure a single energy storage project up to 800 megawatts. |
---|
464 | 383 | | |
---|
465 | 384 | | 4. All energy storage projects procured pursuant to this subsection shall meet the competitive procurement protocols established in subdivision D 3. |
---|
466 | 385 | | |
---|
467 | 386 | | 5. After July 1, 2020, at least 35 percent of the energy storage facilities placed into service shall be (i) purchased by the public utility from a party other than the public utility or (ii) owned by a party other than a public utility, with the capacity from such facilities sold to the public utility. By January 1, 2021, the Commission shall adopt regulations to achieve the deployment of energy storage for the Commonwealth required in subdivisions 1 and 2, including regulations that set interim targets and update existing utility planning and procurement rules. The regulations shall include programs and mechanisms to deploy energy storage, including competitive solicitations, behind-the-meter incentives, non-wires alternatives programs, and peak demand reduction programs. |
---|
468 | 387 | | |
---|
469 | 388 | | F. All costs incurred by a Phase I or Phase II Utility related to compliance with the requirements of this section or pursuant to 56-585.1:11, including (i) costs of generation facilities powered by sunlight or onshore or offshore wind, or energy storage facilities, that are constructed or acquired by a Phase I or Phase II Utility after July 1, 2020, (ii) costs of capacity, energy, or environmental attributes from generation facilities powered by sunlight or onshore or offshore wind, or falling water, or energy storage facilities purchased by the utility from persons other than the utility through agreements after July 1, 2020, and (iii) all other costs of compliance, including costs associated with the purchase of RECs associated with RPS Program requirements pursuant to this section shall be recovered from all retail customers in the service territory of a Phase I or Phase II Utility as a non-bypassable charge, irrespective of the generation supplier of such customer, except (a) as provided in subsection G for an accelerated renewable energy buyer or (b) as provided in subdivision C 3 of 56-585.1:11, with respect to the costs of an offshore wind generation facility, for a PIPP eligible utility customer or an advanced clean energy buyer or qualifying large general service customer, as those terms are defined in 56-585.1:11. If a Phase I or Phase II Utility serves customers in more than one jurisdiction, such utility shall recover all of the costs of compliance with the RPS Program requirements from its Virginia customers through the applicable cost recovery mechanism, and all associated energy, capacity, and environmental attributes shall be assigned to Virginia to the extent that such costs are requested but not recovered from any system customers outside the Commonwealth. |
---|
470 | 389 | | |
---|
471 | 390 | | By September 1, 2020, the Commission shall direct the initiation of a proceeding for each Phase I and Phase II Utility to review and determine the amount of such costs, net of benefits, that should be allocated to retail customers within the utility's service territory which have elected to receive electric supply service from a supplier of electric energy other than the utility, and shall direct that tariff provisions be implemented to recover those costs from such customers beginning no later than January 1, 2021. Thereafter, such charges and tariff provisions shall be updated and trued up by the utility on an annual basis, subject to continuing review and approval by the Commission. |
---|
472 | 391 | | |
---|
473 | 392 | | G. 1. An accelerated renewable energy buyer may contract with a Phase I or Phase II Utility, or a person other than a Phase I or Phase II Utility, to obtain (i) RECs from RPS eligible resources or (ii) bundled capacity, energy, and RECs from solar or wind generation resources located within the PJM region and initially placed in commercial operation after January 1, 2015, including any contract with a utility for such generation resources that does not allocate to or recover from any other customer of the utility the cost of such resources. Such an accelerated renewable energy buyer may offset all or a portion of its electric load for purposes of RPS compliance through such arrangements. An accelerated renewable energy buyer shall be exempt from the assignment of non-bypassable RPS compliance costs pursuant to subsection F, with the exception of the costs of an offshore wind generating facility pursuant to 56-585.1:11, based on the amount of RECs obtained pursuant to this subsection in proportion to the customer's total electric energy consumption, on an annual basis. An accelerated renewable energy buyer obtaining RECs only shall not be exempt from costs related to procurement of new solar or onshore wind generation capacity, energy, or environmental attributes, or energy storage facilities, by the utility pursuant to subsections D and E, however, an accelerated renewable energy buyer that is a customer of a Phase II Utility and was subscribed, as of March 1, 2020, to a voluntary companion experimental tariff offering of the utility for the purchase of renewable attributes from renewable energy facilities that requires a renewable facilities agreement and the purchase of a minimum of 2,000 renewable attributes annually, shall be exempt from allocation of the net costs related to procurement of new solar or onshore wind generation capacity, energy, or environmental attributes, or energy storage facilities, by the utility pursuant to subsections D and E, based on the amount of RECs associated with the customer's renewable facilities agreements associated with such tariff offering as of that date in proportion to the customer's total electric energy consumption, on an annual basis. To the extent that an accelerated renewable energy buyer contracts for the capacity of new solar or wind generation resources pursuant to this subsection, the aggregate amount of such nameplate capacity shall be offset from the utility's procurement requirements pursuant to subsection D. All RECs associated with contracts entered into by an accelerated renewable energy buyer with the utility, or a person other than the utility, for an RPS Program shall not be credited to the utility's compliance with its RPS requirements, and the calculation of the utility's RPS Program requirements shall not include the electric load covered by customers certified as accelerated renewable energy buyers. |
---|
474 | 393 | | |
---|
475 | 394 | | 2. Each Phase I or Phase II Utility shall certify, and verify as necessary, to the Commission that the accelerated renewable energy buyer has satisfied the exemption requirements of this subsection for each year, or an accelerated renewable energy buyer may choose to certify satisfaction of this exemption by reporting to the Commission individually. The Commission may promulgate such rules and regulations as may be necessary to implement the provisions of this subsection. |
---|
476 | 395 | | |
---|
477 | 396 | | 3. Provided that no incremental costs associated with any contract between a Phase I or Phase II Utility and an accelerated renewable energy buyer is allocated to or recovered from any other customer of the utility, any such contract with an accelerated renewable energy buyer that is a jurisdictional customer of the utility shall not be deemed a special rate or contract requiring Commission approval pursuant to 56-235.2. |
---|
478 | 397 | | |
---|
479 | 398 | | H. No customer of a Phase II Utility with a peak demand in excess of 100 megawatts in 2019 that elected pursuant to subdivision A 3 of 56-577 to purchase electric energy from a competitive service provider prior to April 1, 2019, shall be allocated any non-bypassable charges pursuant to subsection F for such period that the customer is not purchasing electric energy from the utility, and such customer's electric load shall not be included in the utility's RPS Program requirements. No customer of a Phase I Utility that elected pursuant to subdivision A 3 of 56-577 to purchase electric energy from a competitive service provider prior to February 1, 2019, shall be allocated any non-bypassable charges pursuant to subsection F for such period that the customer is not purchasing electric energy from the utility, and such customer's electric load shall not be included in the utility's RPS Program requirements. |
---|
480 | 399 | | |
---|
481 | 400 | | I. In any petition by a Phase I or Phase II Utility for a certificate of public convenience and necessity to construct and operate an electrical generating facility that generates electric energy derived from sunlight submitted pursuant to 56-580, such utility shall demonstrate that the proposed facility was subject to competitive procurement or solicitation as set forth in subdivision D 3. |
---|
482 | 401 | | |
---|
483 | 402 | | J. Notwithstanding any contrary provision of law, for the purposes of this section, any falling water generation facility located in the Commonwealth and commencing commercial operations prior to July 1, 2024, shall be considered a renewable energy portfolio standard (RPS) eligible source. |
---|
484 | 403 | | |
---|
485 | 404 | | K. Nothing in this section shall apply to any entity organized under Chapter 9.1 ( 56-231.15 et seq.). |
---|
486 | 405 | | |
---|
487 | 406 | | L. The Commission shall adopt such rules and regulations as may be necessary to implement the provisions of this section, including a requirement that participants verify whether the RPS Program requirements are met in accordance with this section. |
---|